Professional Documents
Culture Documents
:
Site/Office :
Sub-Contractor Details (If any) :
Date :
Inspection Date:
Last Inspection Done on:
Site:
SP Code:
Make of Crane:
Model of Crane:
Mast Size:
Jib length in Use:
Height Under Hook In Use:
Position of Tie
st !Mtr"
#nd !Mtr"
$rd !Mtr"
%th !Mtr"
&th ! Mtr"
'eneral (rrange)ent of Tie:
!Co))ents"
Condition of Joints and Pins
Condition of Po*er pack +
H,dra-lic Jack
Condition of the ./01
2hether site Tea) is
Con3ersant of Thoro-gh
telescoping operation
Press-re ga-ge of po*er pack
*orking or not
TOWER CRANE INSPECTION CHECKLIST
'eneral Condition of Str-ct-re
of Crane
Painting on the crane
Condition of the 1lectrical
Panel
Condition of the 4ope
Condition of the 'ear 5o6es
Condition of Trolle, 4ollers
Condition of the P-lle,s
(n, abnor)al so-nd in Motors
7'ear 5o6es
(lign)ent of the
Crane!4eading of the Pl-)b"
(ne)o)eter *orking or
5,passed
Li)its s*itches
a"Hoisting
b"Trolle,
c"De8ection
d"S*ing
2hether tea) kno* the
setting of Li)it S*itches
Does crane operator kno*s
ho* to read load chart
Does the operator kno*s the
operation of the crane
Hoist Motor Details
Hoist Motor C-rrent and
9oltage 4eadings at
T14MI:(LS /; M/T/4S /4 (T
Strip Connectors
Trolle, Motor Details
*hether Lightening (rrestor
(3ailable and Connected to
the tripping )echanis)
2orking Lights on 5oo)
(3ailable or not
Is the *arning Horn 2orking
Is the 9alid Test Certi<cate
fro) 16ternal 'o3t (ppro3ed
1ngineer (3l *ith Crane
Is the Ladder cage a3ailable
and ;i6ed on the Ladder
(n, inter)ediate access to
crane fo-nd -ng-arded!*ith
action initiated"
2hether Hook Latch a3ailable
*ith the loacking spring
Is the load chart of crane
a3ailable in operator=s cabin
(n, po*er line in 3icinit,
noticed *hich is hazardo-s
Site 1ngineer HS1 o>cer
Pro?ect In@ Charge