Professional Documents
Culture Documents
NOTES:
TRUE
1. ALL DIMENSIONS ARE IN MILLIMETERS AND COORDINATES &
PLANT NORTH ELEVATIONS ARE IN METERS UNLESS OTHERWISE NOTED.
NORTH
2. PLANT DATUM COORDINATES E.100000.000 N.100000.000
ELEVATION OF HPP 100.000 ARE EQUAL TO
UTM-ZONE 39N AIN AL ABD 1970 DATUM
22.
5° E. 368699.433 N. 2963437.797 ELEVATION +13.3M ABOVE MSL
OF
.6
CONSENT
100
N 2972500.000
5. EPC CONTRACTOR CAMP TO BE DEVELOPED DURING EPC PHASE
H
A
TTEN
K
K
A
M
LI
PREVAI NG
WRI
ND
WI
THE
THOUT
EXISTING OVERHEAD
WI
TRANSMISSION CORRIDOR EXISTING WATER
PIPELINE
NG
DRAWI
NEW INCOMING OVERHEAD
TRANSMISSION CORRIDOR
FROM BERRI N 2970000.000
S
THI
QBGG PIPELINE
HIGHWAY TO JUBAIL CORRIDOR DHAHRAN JUBAIL
FROM
EXPRESSWAY 613
EPC
PRIMARY
CONTRACTOR
PLANT ACCESS HAUL ROAD
TCF
NED
ROAD
NOTE 5
OBTAI
SECONDARY HOLDS:
PLANT ACCESS
1. DELETED
ROAD
BE
2. DELETED.
SAPMT
3. DELETED.
STP
PART,SHALL
LUP - DRILLING 4. DELETED.
WELL (FUTURE) (TYP.) 5. DELETED.
NOTE 4
LUP BOUNDARY 6. DELETED.
N 2967500.000
POINTS 7. DELETED.
HAUL ROAD 3b-2 3b-1, 2, 3, 4, 5 8. DELETED.
NOTE 3 9. DELETED.
10. DELETED.
N
I
FULL,OR
INDUSTRIAL
AREA
SAPMT
EPC
STP
N
I
LEGEND:
ON
REPRODUCTI
3b-1
LUP BOUNDARY COORDINATE POINTS.
N 2965000.000
SAUDIARAMCO.NO
3b-5
3b-3
ABU HADRIAH
(HIGHWAY 95)
OF
REFERENCE DRAWINGS
PIPELINES AND INCOMING
OVERALL PLOT PLAN-NGL FRACTIONATION JN-014102.001
WATER LINE
PROPERTY
GENERAL LAYOUT PLAN NGL FRACTIONATION - JN-034101.001
SOLE
NOTE 2 mark.banfield dean.butler
D1 12/15/22 dean.butler paul.edwards james.rosewarn jayantakumar.de barry.woo2 jack.mcminigal philip.kaveney david.scull robin.peatey colin.beedle
A1 10/26/22 VJ MB DEB PM DP JD BW JM PK HB RM JB
THE
O3 08/10/22 VJ MB DEB PM DP JD BW JM PK HB RM JB
O2 07/11/22 VJ MB DEB PM DP JD BW JM GM FR RM JB
ARE
ROAD 6374 SALT PLANT AFW DATE BY CH'D APP PLG PRJ PRO HSE PLN CIV C&I ELE COM CON
N
HEREI
0 500 1000 1500 2000 2500
METERS
NED
SCALE: 25000
CONTAI
LUP - RESIDENTIAL REVISION VALIDATION
BLOCK
THIS REVISION NO. E IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
N 2960000.000 REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
ON
10-17537-0001-000
E
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
TBA TBA
REVISION MARKERS NOT SHOWN
DUE TO EXTENSIVE MODIFICATIONS REV.NO. DATE REVISION DESCRIPTION
I
E 12/15/22 ISSUED FOR PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-17537-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
000
000
000
000
000
000
000
000
SAUDI ARABIAN OIL COMPANY
AND
362500.
365000.
367500.
370000.
372500.
375000.
377500.
380000.
DRAWING TYPE
NG
NGL FRACTIONATION
DRAWI
RNGLF COMMON FACILITIES
E
E
RIYAS SAUDI ARABIA
N 2957500.000
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
886 A JN-014101 001 E
502385-8230-01-0001 CLASS: 2
AFW DOC NO: REV: D1 DSN:1179 Saudi Aramco 2615 ENG. (05/05)
VECTOR CADD-05