You are on page 1of 1

SAUDIARAMCO.

NOTES:
TRUE
1. ALL DIMENSIONS ARE IN MILLIMETERS AND COORDINATES &
PLANT NORTH ELEVATIONS ARE IN METERS UNLESS OTHERWISE NOTED.
NORTH
2. PLANT DATUM COORDINATES E.100000.000 N.100000.000
ELEVATION OF HPP 100.000 ARE EQUAL TO
UTM-ZONE 39N AIN AL ABD 1970 DATUM
22.
5° E. 368699.433 N. 2963437.797 ELEVATION +13.3M ABOVE MSL

OF
.6

3. POINT 3b-1, 2, 3, 4, 5 DENOTES RNGLF PLANT BOUNDARY.

CONSENT
100

4. LUPs FOR FUTURE DRILLING WELLS ARE NOT TO BE


UTILISED UNTIL AFTER REMOVAL OF THE SAPMT.

N 2972500.000
5. EPC CONTRACTOR CAMP TO BE DEVELOPED DURING EPC PHASE

H
A

TTEN
K
K
A
M
LI
PREVAI NG

WRI
ND
WI

THE
THOUT
EXISTING OVERHEAD

WI
TRANSMISSION CORRIDOR EXISTING WATER
PIPELINE

NG
DRAWI
NEW INCOMING OVERHEAD
TRANSMISSION CORRIDOR
FROM BERRI N 2970000.000

S
THI
QBGG PIPELINE
HIGHWAY TO JUBAIL CORRIDOR DHAHRAN JUBAIL

FROM
EXPRESSWAY 613
EPC
PRIMARY
CONTRACTOR
PLANT ACCESS HAUL ROAD
TCF

NED
ROAD
NOTE 5

OBTAI
SECONDARY HOLDS:

PLANT ACCESS
1. DELETED
ROAD

BE
2. DELETED.
SAPMT
3. DELETED.
STP

PART,SHALL
LUP - DRILLING 4. DELETED.
WELL (FUTURE) (TYP.) 5. DELETED.
NOTE 4
LUP BOUNDARY 6. DELETED.
N 2967500.000
POINTS 7. DELETED.
HAUL ROAD 3b-2 3b-1, 2, 3, 4, 5 8. DELETED.
NOTE 3 9. DELETED.

10. DELETED.

N
I
FULL,OR
INDUSTRIAL
AREA

SAPMT
EPC
STP

N
I
LEGEND:

ON
REPRODUCTI
3b-1
LUP BOUNDARY COORDINATE POINTS.

N 2965000.000

SAUDIARAMCO.NO
3b-5
3b-3
ABU HADRIAH
(HIGHWAY 95)

PIPELINE CORRIDOR FOR


NEW FEED / PRODUCT

OF
REFERENCE DRAWINGS
PIPELINES AND INCOMING
OVERALL PLOT PLAN-NGL FRACTIONATION JN-014102.001
WATER LINE

PROPERTY
GENERAL LAYOUT PLAN NGL FRACTIONATION - JN-034101.001

ROAD 6335 RNGLF PERMANENT LUP

SADAF SALT GENERAL LAYOUT PLAN NGL FRACTIONATION - JN-034102.001

RNGLF DATUM PLANT ROAD RNGLF TEMPORARY LUP


3b-4
E. 100000.000
N 2962500.000
N. 100000.000

SOLE
NOTE 2 mark.banfield dean.butler
D1 12/15/22 dean.butler paul.edwards james.rosewarn jayantakumar.de barry.woo2 jack.mcminigal philip.kaveney david.scull robin.peatey colin.beedle

A1 10/26/22 VJ MB DEB PM DP JD BW JM PK HB RM JB

THE
O3 08/10/22 VJ MB DEB PM DP JD BW JM PK HB RM JB

O2 07/11/22 VJ MB DEB PM DP JD BW JM GM FR RM JB

SADAF- O1 06/16/22 VJ MB DEB PE JR DB BW JM MR FR RM JB

ARE
ROAD 6374 SALT PLANT AFW DATE BY CH'D APP PLG PRJ PRO HSE PLN CIV C&I ELE COM CON

N
HEREI
0 500 1000 1500 2000 2500

METERS

NED
SCALE: 25000

CONTAI
LUP - RESIDENTIAL REVISION VALIDATION

BLOCK
THIS REVISION NO. E IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
N 2960000.000 REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

ON
10-17537-0001-000
E

NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

TBA TBA
REVISION MARKERS NOT SHOWN
DUE TO EXTENSIVE MODIFICATIONS REV.NO. DATE REVISION DESCRIPTION

I
E 12/15/22 ISSUED FOR PROPOSAL

THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-17537-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
000

000

000

000

000

000

000

000
SAUDI ARABIAN OIL COMPANY

AND
362500.

365000.

367500.

370000.

372500.

375000.

377500.

380000.
DRAWING TYPE

SITE PLAN FPP

NG
NGL FRACTIONATION

DRAWI
RNGLF COMMON FACILITIES
E

E
RIYAS SAUDI ARABIA
N 2957500.000

S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
886 A JN-014101 001 E
502385-8230-01-0001 CLASS: 2
AFW DOC NO: REV: D1 DSN:1179 Saudi Aramco 2615 ENG. (05/05)