NEW DELHI
Coram
1. Dr. Pramod Deo, Chairperson
2. Shri S.Jayaraman, Member
3. Shri V.S.Verma, Member
IN THE MATTER OF
Determination of generic levellised generation tariff under Regulation 8 of the
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination
from Renewable Energy Sources) Regulations, 2009 and Central Electricity Regulatory
Commission (Terms and Conditions for Tariff determination from Renewable Energy
Sources) (First Amendment) Regulations, 2010.
ORDER
1.
In exercise of the powers vested under Section 61 read with Section 178 of the Act
and after previous publication, the Commission has notified the Central Electricity
Regulatory Commission (Terms and Conditions for Tariff determination from
Renewable Energy Sources) Regulations, 2009, (hereinafter referred to as the
RE Regulations). The RE Regulations provide for terms and conditions and the
procedure for determination of tariff of the following categories of renewable
energy generating stations:
(a) Wind Power Project;
(b) Small Hydro Projects;
Page1
2.
3.
Page2
generic tariff of the RE projects for the second year of control period (i.e. FY 201011).
4.
The Commission has made the following provision in regulation 8 through the
CERC (Terms and Conditions for Tariff determination from Renewable Energy
Sources) (First Amendment) Regulations, 2010, as under:
5.
Page3
shall be signed before March 31, 2011 and entire capacity shall be commissioned
on or before March 31, 2012 in case of solar PV projects and on or before March
31, 2013 in case of thermal projects.
6.
The proposed generic levellised generation tariff for various renewable energy
technologies other than solar, for 2010-11 and for solar PV projects for 2010-11
and 2011 12 and for solar thermal projects for 2010-11, 2011-12 and 2012-13
(subject to the conditions stipulated in the first amendment to RE Regulations as
highlighted in the preceding para) are discussed below:
USEFUL LIFE
7.
Years
25
35
20
20
25
25
CONTROL PERIOD
8.
Page4
Regulations till 31.3.2010 and the second year of the control period shall by FY
2010-11.The Proviso to the said regulation stipulates that the tariff determined for
the RE projects commissioned during the control period shall continue to be
applicable for the entire duration of the tariff period as specified in Regulation 6 of
the RE Regulations. However, the benchmark cost for Solar PV and Solar thermal
may be reviewed by the Commission annually. Further, as per First Amendment to
RE Regulations, generic tariff determined for solar photovoltaic power projects for
year 2010-11 shall also apply for projects commissioned during 2011-12 also the
generic tariff determined for solar thermal power projects for year 2010-11 shall also
apply for projects commissioned during 2011-12 and 2012-13, subject to the
conditions stipulated in the amendment.
TARIFF PERIOD
9.
Years
13
35
13
13
13
25
Page5
In terms of clauses (4) and (5) of the said regulation, the tariff period specified
above shall be reckoned from the date of commercial operation of the RE projects
and the tariff determined under the regulations shall be applicable for the duration
of the tariff period.
TARIFF STRUCTURE
10.
Clause (1) of Regulation 9 of the RE Regulations stipulates that the tariff for RE
projects shall be single part tariff consisting of the following fixed cost
components:
(a) Return on equity;
(b) Interest on loan capital;
(c) Depreciation;
(d) Interest on working capital;
(e) Operation and maintenance expenses;
For renewable energy technologies having fuel cost component, like biomass
power projects and non-fossil fuel based cogeneration, single part tariff with two
components, fixed cost component and fuel cost component, is to be determined.
TARIFF DESIGN
11.
The generic tariff shall be determined on levellised basis for the Tariff Period.
Provided that for renewable energy technologies having single part tariff with two
components, tariff shall be determined on levellised basis considering the year of
Page6
commissioning of the project for fixed cost component while the fuel cost
component shall be specified on year of operation basis.
(2)
For the purpose of levellised tariff computation, the discount factor equivalent to
weighted average cost of capital shall be considered.
(3)
Levellisation shall be carried out for the useful life of the Renewable Energy while
tariff shall be specified for the period equivalent to Tariff Period.
LEVELLISED TARIFF
12.
Levellised Tariff is calculated by carrying out levellisation for useful life of each
technology considering the discount factor for time value of money.
Discount Factor
The discount factor considered for this purpose is equal to the weighted average
cost of the capital on the basis of normative debt: equity ratio (70:30) specified in
the Regulations. Considering the normative debt equity ratio and weighted
average of the rates for interest and equity component, the discount factor is
calculated.
Interest Rate considered for the loan component (i.e. 70%) of Capital Cost is
13.39% (as explained later). For equity component (i.e. 30%) rate of Return on
Equity (ROE) for the first ten (10) years is 19% and for 11th year onward till useful
life of the RE project the rate is 24%. Based on these rates, the weighted average
of rate of ROE has been calculated which is around 22% (ranging from 21.5% to
22.5% depending on useful life of RE technologies).
The discount factor derived by this method for each technology is as shown in the
following table:
Page7
Details
Wind
Energy
Small Hydro
Less than
5 MW
(Himachal
Pradesh,
Uttarakha
nd and
North
Eastern
States)
Discount
Rate
(%)
15.97
16.14
Between 5
MW to 25
MW
(Himachal
Pradesh,
Uttarakha
nd and
North
Eastern
States
16.14
Other
States
(below
5 MW
16.14
Biomass
Nonfossil
fuel cogenerati
on
Solar
PV
Solar
Thermal
15.82
15.97
15.97
Other
states
(5 MW
to 25
MW)
16.14
15.82
CAPITAL COST
13.
Regulation 12 of the RE Regulations stipulates that the norms for the capital cost
as specified in the technology specific chapter shall be inclusive of all capital
works like plant and machinery, civil works, erection and commissioning, financing
and interest during construction, and evacuation infrastructure up to interconnection point. The Commission has specified the normative capital cost,
applicable for the first year of control period i.e. FY 2009-10, for various RE
technologies viz Wind Energy, Small Hydro Power, Biomass Power, Non-Fossil
Fuel based Cogeneration Solar PV and Solar Thermal Projects.
In order to determine the normative capital cost for the remaining years of the
control period, the regulations stipulate the indexation mechanism, for Wind
Energy, Small Hydro Power, Biomass Power and Non-Fossil Fuel based
Cogeneration. However, the Capital Cost norms for Solar PV and Solar Thermal
Power Projects shall be reviewed on annual basis. The indexation mechanism
Page8
shall take into account adjustments in capital cost with the changes in Wholesale
Price Index of Steel and Wholesale Price Index of Electrical Machinery as per
formulation stipulated under the RE Tariff Regulations, which is reproduced below.
SI (n-1) = Average WPI Steel Index prevalent for calendar year (n-1) of the Control
Period
SI (0)
= Average WPI Steel Index prevalent for calendar year (0) at the beginning
= Average WPI Electrical and Machinery Index prevalent for calendar year
(0) at the beginning of the Control Period i.e. January 2008 to December 2008
Page9
F1
F2
F3
The default values of the factors for various RE technologies as stipulated under the said
RE Regulations, is summarized in the table below,
Parameters
Wind Energy
Small Hydro
Projects
Biomass
Power
a
b
F1
F2
F3
0.6
0.4
0.08
0.07
0.10
0.6
0.4
0.16
0.10
0.14
0.7
0.3
0.10
0.09
0.14
Non-Fossil
Fuel Based
Cogeneration
0.7
0.3
0.10
0.09
0.14
The Commission has relied on the following sources for relevant information on various
indices:
Source for WPI (electrical & machinery and iron and steel), WPI ( all commodities),
WPI (Price of HSD): Office of Economic Advisor, Ministry of Commerce & Industry
(www.eaindustry.nic.in)
Source for IRC (Average Annual Inflation rate for indexed energy charge
component in case of captive coal mine source): CERC (www.cercind.gov.in)
Page10
Wind Power projects located at the wind sites having minimum annual Wind
Power Density(WPD) of 200 Watt/m2 measured at hub height of 50 meters and
using new wind turbine generators are eligible for tariff determination under the
RE Regulations. Regulation 24 provides that the capital cost for wind energy
project shall include wind turbine generator including its auxiliaries, land cost, site
development charges and other civil works, transportation charges, evacuation
cost up to inter-connection point, financing charges and IDC.
The Commission under Regulation 24 (2) has specified the normative capital cost
for wind energy projects as Rs. 515Lakh/MW for FY 2009-10 which shall be linked
to the indexation mechanism specified under Regulation 25 of the RE Tariff
Regulations. In line with the indexation mechanism specified in Regulation 25 of
the RE Regulations, the normative capital cost of the Wind Energy Projects shall
be Rs.467Lakh/MW for FY 2010-11. The detailed computations of the indexation
mechanism and determination of the capital cost for FY 2010-11 thereof, has been
enclosed as Appendix-1 of this Order.
Small Hydro Projects for the purpose of the RE Regulations cover those projects
which are located at the sites approved by the State Nodal Agencies/State
Governments using new plant and machinery and with installed power plant
capacity lower than or equal to 25 MW.
Page11
16.
The Commission under Regulation 28 (1) has specified the normative capital cost
for small hydro projects for FY 2009-10 which shall be linked to the indexation
mechanism specified under Regulation 29 of the RE Regulations.
17.
Region
Project Size
Capital Cost
(FY 2009-10)
(RsLakh/ MW)
Below 5 MW
5 MW to 25 MW
700
630
Other States
Below 5 MW
5 MW to 25 MW
550
500
Region
Project Size
Capital Cost
(FY 2010-11)
(RsLakh/ MW)
Below 5 MW
5 MW to 25 MW
635
571
Other States
Below 5 MW
5 MW to 25 MW
499
454
The detailed computations of the indexation mechanism and the determination of the
capital cost for FY 2010-11 thereof, has been enclosed as Appendix-2 of this Order.
18.
Biomass power project for the purpose of these regulations covers the projects
using new plant and machinery based on Rankine cycle technology application
using water cooled condenser and biomass fuel sources where use of fossil fuel is
limited to 15% of total fuel consumption on annual basis.
Page12
19.
The Commission under Regulation 34 has specified the normative capital cost for
the biomass power projects based on Rankine cycle technology application using
water cooled condenser as Rs.450 Lakh/MW for FY 2009-10 which shall be linked
to the indexation mechanism specified under Regulation 35 of the RE Tariff
Regulations. In line with the indexation mechanism specified in Regulation 35 of
the RE Regulations, the normative capital cost of the biomass power projects
based on Rankine cycle technology application using water cooled condenser
shall be Rs.403Lakh/MW for FY 2010-11. The detailed calculations of the
indexation mechanism and determination of the capital cost for FY 2010-11
thereof, has been enclosed as Appendix -3 of this Order.
(D) Capital Cost of Non-fossil fuel based Cogeneration Projects for FY 2010-11
20.
Non-fossil based cogeneration has been defined as the process in which more
than one form of energy is produced in a sequential manner by using biomass. As
per Regulation 4(4) of the RE Regulations, a project to qualify as the non-fossil
based co-generation project must be using new plant and machinery with topping
cycle mode of operation which uses the non-fossil fuel input for power generation
and utilizes the thermal energy generated for useful heat applications in other
industrial activities simultaneously, and where the sum of useful power output and
half of useful thermal output is greater than 45% of the plants energy
consumption during the season.
21.
The Commission under Regulation 47 has specified the normative capital cost for
the Non-Fossil Fuel Based Cogeneration Projects as Rs.445 Lakh/MW for FY
Page13
Solar Photo Voltaic (PV) power projects which directly convert solar energy into
electricity using the crystalline silicon or thin film technology or any other
technology as approved by the Ministry of New and Renewable Energy and are
connected to the grid qualify for the purpose of tariff determination under the RE
Regulations.
23.
25.02.2010 in Petition no. 13/2010 benchmark capital cost for Solar PV power
projects and it shall be Rs.1690 Lakh/MW for the FY 2010-11. Further as per the
first amendment to RE Regulations, the generic tariff determined for solar PV
projects based on the benchmark capital cost and other norms applicable for
2010-11 shall also be applicable for such projects commissioned during 2011-12
subject to the condition that the power purchase agreement (PPA) is signed on or
before 31.03.2011 and entire capacity covered under the PPA is signed on or
before 31.03.2012.
Page14
In order to qualify for tariff determination under the RE Regulations, Solar Thermal
Power Project shall be based on concentrated solar power technologies with line
focusing or point focusing as may be approved by the Ministry of New and
Renewable Energy and which uses direct sunlight to generate sufficient heat to
operate a conventional power cycle to generate electricity.
25.
As per Regulation 5, the Commission has reviewed by the Order dated 25.02.2010
in Petition no. 13/2010 benchmark capital cost for Solar Thermal Power projects
and it shall be Rs.1530 Lakh/MW for the FY 2010-11. Further as per the first
amendment to RE Regulations, the generic tariff determined for solar thermal
projects based on the benchmark capital cost and other norms applicable for
2010-11 shall also be applicable for such projects commissioned during 2011-12
2012-13 subject to the condition that the power purchase agreement (PPA) is
signed on or before 31.03.2011 and entire capacity covered under the PPA is
signed on or before 31.03.2013.
26.
The capital cost for the second year (FY 2010-11) of the control period in respect
of the renewable energy power generating stations is summarized as under:
Page15
(3)
(4)
(5)
(6)
454
403
398
1690
1530
DEBT-EQUITY RATIO
27.
28.
Based on the debt equity ratio of 70:30, the debt and equity components of the
normative capital cost for determination of tariff for the RE projects have been
worked out as under:
Debt
(Rs Lakh)
Equity
(Rs Lakh)
326.99
140.14
444.46
190.48
400.01
171.43
349.21
149.66
317.47
136.06
(3) Biomass
281.78
120.76
278.65
119.42
(5) Solar PV
(6) Solar Thermal
1183.00
1071.00
507.00
459.00
Page16
RETURN ON EQUITY
29.
Clause (1) of Regulation 16 of the RE Regulations provides that the value base for
the equity shall be 30% of the capital cost for generic tariff determination. Clause
(2) of the said regulation stipulates the normative return on equity as under:
(a) Pre-tax 19% per annum for the first 10 years, and
(b) Pre-tax 24% per annum from the 11th year onwards.
30.
In accordance with the above regulations, return on equity has been worked out in
respect of the RE generating technologies taking the value base of equity as 30%
of the capital cost as under:
Small Hydro
Wind
Energy
Less than
5 MW
(Himachal
Pradesh,
Uttarakha
nd and
North
Eastern
States)
Equity
opening (Rs
in lakh)
140.14
190.48
171.43
149.66
136.06
120.76
119.42
507
459
Return on
Equity for
the first 10
years (%)
19
19
19
19
19
19
19
19
19
24
24
24
24
24
24
24
24
24
22
22.57
22.57
22.57
21.50
21.50
22
22
Details
Return on
Equity after
first
10
years (%)
Weighted
average
rate
on
ROE (%)
Between
5 MW to
25 MW
(Himachal
Pradesh,
Uttarakha
nd and
North
Eastern
States
Other
States
(below 5
MW
Other
states (5
MW to 25
MW)
22.57
Biomass
Nonfossil
fuel cogenerati
on
Solar
PV
Solar
Therm
al
Page17
INTEREST ON LOAN
31.
Clause (1) of Regulation 14 of the RE Regulations provides that the loan tenure of
10 years is to be considered for the purpose of determination of tariff for RE
projects. Clause (2) of the said regulation provides for computation of the rate of
interest on loan as under:
(a) The loans arrived at in the manner indicated above shall be considered as gross
normative loan for calculation for interest on loan. The normative loan outstanding as on
April 1st of every year shall be worked out by deducting the cumulative repayment up to
March 31st of previous year from the gross normative loan.
(b) For the purpose of computation of tariff, the normative interest rate shall be considered
as average long term prime lending rate (LTPLR) of State Bank of India (SBI) prevalent
during the previous year plus 150 basis points.
(c) Notwithstanding any moratorium period availed by the generating company, the
repayment of loan shall be considered from the first year of commercial operation of the
project and shall be equal to the annual depreciation allowed.
32.
Period
1-Apr- 2009 to 28-June 2009
29-Jun-2009 to 15-Feb-2010
Avg. SBI PLR
SBI PLR
12.25%
11.75%
11.89%
Page18
Small Hydro
Details
Wind
Energy
Less than
5 MW (HP
,
Uttarakha
nd &
North
Eastern
States)
Between 5
MW to
25MW (HP,
Uttarakhand
& North
Eastern
States
Other
States
(below 5
MW
Other
states (5
MW to 25
MW)
Biomass
Nonfossil fuel
cogeneratio
n
Solar
PV
Solar
Thermal
Gross loan
opening
(Rs in lakh)
326.99
444.46
400.01
349.21
317.47
281.78
278.65
1183
1071
Period of
repayment
10
10
10
10
10
10
10
10
10
Rate
of
interest
(%)
13.39
13.39
13.39
13.39
13.39
13.39
13.39
13.39
13.39
DEPRECIATION
33.
34.
In accordance with the above, the rate of depreciation for the first 10 years has
been considered as 7% and the rate of depreciation from the 11th year onwards
has been spread over the balance useful life of the RE project as under:
Page19
Details
Wind
Energy
Small
Hydro
Biomass
Non-fossil
fuel cogeneration
Solar
PV
Solar
Thermal
25
35
20
20
25
25
7.00
7.00
7.00
7.00
7.00
7.00
Rate of depreciation
after first 10 years (%)
1.33
0.80
2.00
2.00
1.33
1.33
(2) The Working Capital requirement in respect of biomass power projects and non-fossil
fuel based co-generation projects shall be computed in accordance with the following
clause:
Biomass Power and Non-fossil fuel Co-generation
(a) Fuel costs for four months equivalent to normative PLF;
(b) Operation & Maintenance expense for one month;
(c) Receivables equivalent to 2 (Two) months of fixed and variable charges for sale of
electricity calculated on the target PLF;
(d) Maintenance spare @ 15% of operation and maintenance expenses
(3) Interest on Working Capital shall be at interest rate equivalent to average State Bank
of India short term PLR during the previous year plus 100 basis points
Page20
36.
Receivables equivalent to two months of actual fixed cost and variable cost, (as
applicable for biomass power and non-fossil fuel based co-generation) have been
considered. The interest on working capital has been worked out as specified
below for determination of tariff of the RE projects:
Details
Wind
Energy
Small
Hydro
Biomass
Non-fossil
fuel cogeneration
Solar
PV
Solar
Thermal
15
15
15
15
15
15
12.89
Page21
38.
The normative O&M expenses for various RE technologies specified under the
relevant provisions of the RE Regulations are as under:
Region
Project Size
Below 5 MW
5 MW to 25 MW
O&M expenses
(Rs Lakh/MW)
22.20
15.86
Other States
Below 5 MW
5 MW to 25 MW
17.97
12.69
Page22
The normative O&M expenses have been worked out as specified above for
determination of tariff for the renewable energy generating stations.
Page23
Regulations 26, 30, 58 and 62 of the RE Regulations specify the norms for
Capacity Utilization Factor (CUF) in respect of the renewable energy generating
stations except biomass and non- fossil fuel based cogeneration as per the details
given in the table below which has been considered for determination of tariff.
41.
CUF
20%
23%
27%
30%
45%
30%
19%
23%
Regulation 36 of the RE Regulations specifies the plant load factor for biomass
based renewable energy generating stations as given in the table below which
has been considered for determination of fixed charges component of tariff.
Page24
PLF (%)
Biomass
(a) During stabilization (6 months)
(b) During first year after stabilization
(c) Second year onwards
43.
60%
70%
80%
Regulation 49 of the RE Regulations stipulates the plant load factor for non-fossil
fuel based co-generation projects as under, computed on the basis of plant
availability for number of operating days considering the operations during
crushing season and off-season and load factor of 92%. The number of operating
days for different States as specified in the regulations is as under:
States
Operating days
PLF (%)
Uttar Pradesh
and Andhra Pradesh
45%
60%
Other States
53%
Small Hydro
1.0%
Biomass
10.0%
8.5%
Solar Thermal
10.0%
Page25
The Station Heat Rates (SHR) specified under Regulations 38 and 51 of the RE
Regulations for biomass and non-fossil fuel based co-generation projects are as
under:
Renewable Energy Projects
SHR
(kCal / kWh)
Biomass
3800
3600
FUEL
(a) Fuel Mix
46.
Page26
of Regulation 42 of the said regulations the mechanism for monitoring the use of
fossil fuel is as under:
(1) The Project developer shall furnish a monthly fuel usage statement and
monthly fuel procurement statement duly certified by Chartered Accountant to
the beneficiary (with a copy to appropriate agency appointed by the Commission
for the purpose of monitoring the fossil and non-fossil fuel consumption) for each
month, along with the monthly energy bill. The statement shall cover details such
as;
(a) Quantity of fuel (in tonnes) for each fuel type (biomass fuels and fossil fuels)
consumed and procured during the month for power generation purposes;
(b) Cumulative quantity (in tonnes) of each fuel type consumed and procured till
the end of that month during the year;
(c) Actual (gross and net) energy generation (denominated in units) during the
month;
(d) Cumulative actual (gross and net) energy generation (denominated in units)
until the end of that month during the year;
(e) Opening fuel stock quantity (in tonnes);
(f) Receipt of fuel quantity (in tonnes) at the power plant site; and
(g) Closing fuel stock quantity (in tonnes) for each fuel type (biomass fuels and
fossil fuels) available at the power plant site.
(2) Non-compliance with the condition of fossil fuel usage by the project developer,
during any financial year, shall result in withdrawal of applicability of tariff as per
these Regulations for such biomass based power project.
(c) Calorific value
48.
Calorific Value(kCal/kg)
3275
3458
3611
3612
3368
Page27
State
Rajasthan
Tamilnadu
Uttar Pradesh
Other States
49.
Calorific Value(kCal/kg)
3689
3300
3371
3467
In terms of Regulation 52 of the said regulations, the gross calorific value for
bagasse to be considered in case of non-fossil fuel co-generation projects is 2250
kCal/kg and for the use of biomass fuels other than bagasse, the calorific value as
specified above shall be applicable.
Andhra Pradesh
Biomass price
(Rs/MT)
1343
Haryana
2238
Maharashtra
1859
Madhya Pradesh
1341
Punjab
2159
Rajasthan
Tamil Nadu
1881
1882
Uttar Pradesh
1567
Other States
1855
State
Page28
51.
Bagasse Price
(Rs/MT)
Andhra Pradesh
928
Haryana
1456
Maharashtra
1159
Madhya Pradesh
835
Punjab
1443
Tamilnadu
1283
Uttar Pradesh
1046
Other States
1200
The Commission shall take into consideration any incentive or subsidy offered by
the Central or State Government, including accelerated depreciation benefit if
availed by the generating company, for the renewable energy power plants while
determining the tariff under these Regulations.
Provided that the following principles shall be considered for ascertaining income
tax benefit on account of accelerated depreciation, if availed, for the purpose of
tariff determination:
Page29
53.
In terms of the above regulation, for the projects availing the benefit of Section 80
IA of the Income Tax Act, 1961, the Minimum Alternate Tax (MAT) @ 16.995%
(15% MAT+10% surcharge+3% education cess) for the first ten years and
thereafter the normal tax rate @ 33.99% (30% IT rate+ 10% surcharge +3%
Education cess) has been considered. For the purpose of determining net
depreciation benefits, depreciation @ 5.28% as per straight line method (Book
depreciation as per Companies Act, 1956) has been compared with depreciation
as per Income Tax rate i.e. 80% of the written down value method and
depreciation for the first year has been calculated at the rate of 50% of 80% i.e
40%, as project is capitalized during the second half of the financial year as per
proviso (ii) to Regulation 22. Tax benefit has been worked out as per normal tax
rate on the net depreciation benefit. Per unit levellised accelerated depreciation
benefit has been computed considering the weighted average cost of capital as
discount factor.
54.
In the light of the discussion made in the preceding paragraphs, the generic tariffs
of the following RE projects for the financial year 2010-11 have been determined
as under:
Page30
RE Technologies as per CERC RE Tariff Regulations Norms for FY 2010-11
Particular
Levellised
Total Tariff
(FY2010-11)
Benefit of
Accelerated
Depreciation
(if availed)
(Rs / kWh)
(Rs/kWh)
(Rs/kWh)
Wind Energy
Wind Zone -1 (CUF
20%)
Wind Zone -2 (CUF
23%)
Wind Zone -3 (CUF
27%)
Wind Zone -4 (CUF
30%)
5.07
0.78
4.29
4.41
0.68
3.73
3.75
0.58
3.18
3.38
0.52
2.86
3.59
0.48
3.11
3.06
0.43
2.63
4.26
0.57
3.70
Other States (5 MW to
25 MW)
3.65
0.51
3.14
17.91
2.96
14.95
Solar Thermal
15.31
2.46
12.85
State
Levellised
Fixed
Cost
Variable
Cost (FY
2010-11)
Applicable
Tariff Rate
(FY 2010-11)
Benefit of
Accelerated
Depreciation
(if availed)
(Rs/kWh)
(Rs/kWh)
(Rs/kWh)
(Rs/kWh)
Net Levellised
Tariff
(upon adjusting
for Accelerated
Depreciation
benefit) (if availed)
(Rs/kWh)
Andhra
Pradesh
1.80
1.73
3.53
0.19
3.34
Haryana
1.89
2.73
4.62
0.19
4.43
Madhya
Pradesh
1.78
1.57
3.35
0.19
3.16
Maharashtra
1.84
2.17
4.01
0.19
3.82
Punjab
1.88
2.71
4.59
0.19
4.40
Page31
Levellised
Fixed
Cost
Variable
Cost (FY
2010-11)
Applicable
Tariff Rate
(FY 2010-11)
Benefit of
Accelerated
Depreciation
(if availed)
(Rs/kWh)
(Rs/kWh)
(Rs/kWh)
(Rs/kWh)
Net Levellised
Tariff
(upon adjusting
for Accelerated
Depreciation
benefit) (if availed)
(Rs/kWh)
Rajasthan
1.83
2.15
3.99
0.19
3.80
Tamil Nadu
1.86
2.41
4.26
0.19
4.07
Uttar Pradesh
1.82
1.96
3.78
0.19
3.59
Others
1.84
2.26
4.10
0.19
3.91
State
2.61
1.62
4.23
0.32
3.91
Haryana
2.32
2.55
4.86
0.27
4.59
Maharashtra
Madhya
Pradesh
2.03
2.03
4.05
0.24
3.81
2.22
1.46
3.68
0.27
3.41
Punjab
2.31
2.52
4.84
0.27
4.57
Tamil Nadu
2.05
2.24
4.29
0.24
4.05
Uttar Pradesh
2.62
1.83
4.45
0.32
4.13
Others
2.28
2.10
4.38
0.27
4.11
55.
S No
Appendix
Appendix 1
Appendix 2
Appendix 3
Appendix 4
Page32
56.
The detailed computations for the generic tariff for various RE technologies have
been enclosed to this Order as per the details given hereunder:
S No
Annexure
Wind Zone-I
Annexure 1A
Wind Zone-II
Annexure 1B
Annexure 1C
Wind Zone IV
Annexure 1D
Annexure 2B
Annexure 2C
Annexure 2D
States
C
Annexure 3A
Haryana
Annexure 3B
Maharashtra
Annexure 3C
Punjab
Annexure 3D
Madhya Pradesh
Annexure 3E
Rajasthan
Annexure 3F
Uttar Pradesh
Annexure 3G
Tamil Nadu
Annexure 3H
Other
Annexure 3I
Annexure 4A
Haryana
Annexure 4B
Page33
S No
57.
Annexure
Maharashtra
Annexure 4C
Madhya Pradesh
Annexure 4D
Punjab
Annexure 4E
Uttar Pradesh
Annexure 4F
Tamil Nadu
Annexure 4G
Other
Annexure 4H
Solar Projects
Solar PV Projects
Annexure 5A
Annexure 5B
Above generic tariff is proposed for the RE power projects (other than solar
projects) commissioned during the FY 2010-11 and for solar PV projects for the
FY 2010-11 and FY 2011- 12 and for solar thermal power projects for the FY
2010-11, FY 2011- 12
Sd/-
Sd/-
Sd/-
[V.S.VERMA]
MEMBER
[S. JAYARAMAN]
MEMBER
Page34
Appendix 1
Capital Cost Indexation for Wind Power Projects (FY2010-11)
Indexation Formulation
CC(n)=P&M(n)*[1+F1+F2+F3]
dn = (a*(SIn-1/SI0)-1)+b*(EIn-1/EI0)-1))/(a+b)
P&M(n)=P&M(0)*(1+dn)
Variable
a
b
F1
Description
Weightage for Steel Index
Weightage for Electrical Machinery Index
Factor for Land and Civil Work
Value
0.6
0.4
0.08
F2
F3
0.07
0.10
Month/Year
January
Febuary
March
April
May
June
July
August
September
October
November
December
Average
Parameter
CC(0)(RsL/MW)
Description
Value
515.00
P&M(0) (RsL/MW)
412.00
dn
P&M(n) (RsL/MW)
CC(n) (RsL/MW)
-9.29%
373.71
467.13
SourceofWPI(Iron&SteelandElectricalandMachinery):OfficeofEconomicAdvisor,Ministryof
CommerceandIndustry(www.eaindustry.nic.in)
Page35
Appendix-2
Capital Cost Indexation for Small Hydro Power Projects (FY2010-11)
Indexation Formulation
CC(n)=P&M(n)*[1+F1+F2+F3]
dn = (a*(SIn-1/SI0)-1)+b*(EIn-1/EI0)-1))/(a+b)
P&M(n)=P&M(0)*(1+dn)
Variable
a
b
F1
F2
F3
Description
Weightage for Steel Index
Weightage for Electrical Machinery Index
Factor for Land and Civil Work
Factor for Erection and Commissioning
0.10
0.14
Month/Year
January
Febuary
March
April
May
June
July
August
September
October
November
December
Average
Parameter
Value
0.6
0.4
0.16
E&M
2009
2008
146.70 145.20
146.70 145.20
147.30 145.70
146.40 147.30
146.70 149.50
146.20 152.80
146.10 153.20
147.00 153.20
149.00 152.90
148.40 152.90
149.20 153.40
148.20 149.10
147.33 150.00
Description
HP/Uttrakhand/NE
CC(0)(RsL/MW)
< 5MW
700.00
P&M(0) (RsL/MW)
500.00
-9.29%
453.53
634.94
dn
P&M(n) (RsL/MW)
CC(n) (RsL/MW)
Other States
392.86
-9.29%
356.34
498.88
357.14
-9.29%
323.95
453.53
SourceofWPI(Iron&SteelandElectricalandMachinery):OfficeofEconomicAdvisor,Ministryof
CommerceandIndustry(www.eaindustry.nic.in)Appendix 3
Page36
Capital Cost Indexation for Biomass Power Projects (FY2010-11)
Indexation Formulation
CC(n)=P&M(n)*[1+F1+F2+F3]
dn = (a*(SIn-1/SI0)-1)+b*(EIn-1/EI0)-1))/(a+b)
P&M(n)=P&M(0)*(1+dn)
Variable
a
b
F1
Description
Weightage for Steel Index
Weightage for Electrical Machinery Index
Factor for Land and Civil Work
Value
0.7
0.3
0.10
F2
F3
0.09
0.14
Month/Year
January
Febuary
March
April
May
June
July
August
September
October
November
December
Average
Parameter
CC(0)(RsL/MW)
Description
Value
450.00
P&M(0) (RsL/MW)
dn
P&M(n) (RsL/MW)
CC(n) (RsL/MW)
338.35
-10.55%
302.66
402.54
SourceofWPI(Iron&SteelandElectricalandMachinery):OfficeofEconomicAdvisor,Ministryof
CommerceandIndustry(www.eaindustry.nic.in)
Page37
Appendix 4
Capital Cost Indexation for Non-Fossil Fuel Based Cogeneration Power Projects (FY2010-11)
Indexation Formulation
CC(n)=P&M(n)*[1+F1+F2+F3]
dn = (a*(SIn-1/SI0)-1)+b*(EIn-1/EI0)-1))/(a+b)
P&M(n)=P&M(0)*(1+dn)
Variable
a
b
F1
Description
Weightage for Steel Index
Weightage for Electeical Machinery Index
Factor for Land and Civil Work
Value
0.7
0.3
0.10
F2
F3
0.09
0.14
Month/Year
January
Febuary
March
April
May
June
July
August
September
October
November
December
Average
Parameter
CC(0)(RsL/MW)
Description
Value
445.00
P&M(0) (RsL/MW)
dn
P&M(n) (RsL/MW)
CC(n) (RsL/MW)
334.59
-10.55%
299.30
398.07
SourceofWPI(Iron&SteelandElectricalandMachinery):OfficeofEconomicAdvisor,Ministryof
CommerceandIndustry(www.eaindustry.nic.in)
Page38
Appendix 5
Biomass Fuel Price across States for FY 2010-11
(as per Fuel Price Index Mechanism outlined under Regulation 45)
Fuel Price Indexation for Biomass Power Projects (FY2010-11)
Indexation Formulation
Pn = Pn-1*{a*(WPIn/WPIn-1)+b*(1+IRCn-1)+c*(Pdn/Pdn-1)}
Parameter
WPI(n-1)
Values
229.7
WPI(n)
246.5
IRC(n-1)
2.98%
Pd(n-1)
482.3
Pd(n)
a
b
c
481.4
0.2
0.6
0.2
State
Biomass Price
Rs/MT
(2009-10)
Biomass Price
Rs/MT
(2010-11)
Andhra Pradesh
1301
1,343
Haryana
2168
2,238
Maharashtra
1801
1,859
Madhya Pradesh
1299
1,341
Punjab
2092
2,159
Rajasthan
1822
1,881
Tamil Nadu
1823
1,882
Uttar Pradesh
1518
1,567
Other States
1797
1,855
SourceofWPIandWPI(PriceofHSD):OfficeofEconomicAdvisor,MinistryofCommerceandIndustry
(www.eaindustry.nic.in)
SourceofIRC:CERC(www.cercind.gov.in)
Page39
Appendix 6
Bagasse Price across States for FY 2010-11
(as per Fuel Price Index Mechanism outlined under Regulation 54)
Fuel Price Indexation for Non-Fossil Fuel Based Cogeneration Power Projects (FY2010-11)
Indexation Formulation
Pn = Pn-1*{a*(WPIn/WPIn-1)+b*(1+IRCn-1)+c*(Pdn/Pdn-1)}
Parameter
WPI(n-1)
Values
229.7
WPI(n)
246.5
IRC(n-1)
2.98%
Pd(n-1)
482.3
Pd(n)
a
b
c
481.4
0.2
0.6
0.2
State
Baggase Price
Rs/MT
(2009-10)
Bagasse Price
Rs/MT
(2010-11)
Andhra Pradesh
899
928
Haryana
1411
1,456
Maharashtra
1123
1,159
Madhya Pradesh
809
835
Punjab
1398
1,443
Tamil Nadu
1243
1,283
Uttar Pradesh
1013
1,046
Other States
1163
1,200
SourceofWPIandWPI(PriceofHSD):OfficeofEconomicAdvisor,MinistryofCommerceandIndustry
(www.eaindustry.nic.in)
SourceofIRC:CERC(www.cercind.gov.in)
Page40
Annexure 1A
(Wind Zone-1)
Form 1.1 Assumptions Parameters
Assumption
Head
S. No.
Sub-Head
Sub-Head (2)
Unit
Power Generation
Capacity
Installed Power Generation Capacity
Capacity Utilization Factor
Deration Factor
Useful Life
MW
%
%
Years
1
20%
0.00%
25
Rs Lacs/MW
Tariff Period
Years
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
327
140
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
327
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity 11th year onwards
Weighted average of ROE
Discount Rate
Rs Lacs
% p.a
Year
% p.a
140
19.00%
10
24.00%
22.00%
15.97%
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
2 Project Cost
Capital Cost/MW
467
3 Sources of Fund
13
Debt: Equity
Debt Component
Equity Component
4 Financial Assumptions
Fiscal Assumptions
Depreciation
33.99%
16.995%
Yes
0.0%
7.00%
1.33%
10
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Interest On Working Capital
Months
Months
1
15%
2
12.89%
6.87
5.72%
Page41
Form 1.2 Form Template for (Wind Power Projects) : Determination of Tariff Component
1
Units Generation
Installed Capacity
Gross/Net Generation
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
0.744
0.641
0.553
0.477
0.411
0.354
0.306
0.264
0.227
0.196
0.169
0.146
0.126
0.108
0.093
0.081
0.069
0.060
0.052
0.045
0.038
0.033
0.029
Year--->
1
1
1.75
2
1
1.75
3
1
1.75
4
1
1.75
5
1
1.75
6
1
1.75
7
1
1.75
8
1
1.75
9
1
1.75
10
1
1.75
11
1
1.75
12
1
1.75
13
1
1.75
14
1
1.75
15
1
1.75
16
1
1.75
17
1
1.75
18
1
1.75
19
1
1.75
20
1
1.75
21
1
1.75
22
1
1.75
23
1
1.75
24
1
1.75
25
1
1.75
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Year--->
1
6.87
32.70
41.59
2.58
26.63
110.37
2
7.26
32.70
37.21
2.50
26.63
106.31
3
7.68
32.70
32.84
2.43
26.63
102.27
4
8.12
32.70
28.46
2.35
26.63
98.26
5
8.58
32.70
24.08
2.28
26.63
94.27
6
9.08
32.70
19.70
2.21
26.63
90.32
7
9.59
32.70
15.32
2.14
26.63
86.39
8
10.14
32.70
10.95
2.08
26.63
82.49
9
10.72
32.70
6.57
2.01
26.63
78.63
10
11.34
32.70
2.19
1.95
26.63
74.80
11
11.99
6.23
0.00
1.51
33.63
53.35
12
12.67
6.23
0.00
1.54
33.63
54.08
13
13.40
6.23
0.00
1.58
33.63
54.84
14
14.16
6.23
0.00
1.62
33.63
55.64
15
14.97
6.23
0.00
1.66
33.63
56.50
16
15.83
6.23
0.00
1.71
33.63
57.40
17
16.73
6.23
0.00
1.76
33.63
58.35
18
17.69
6.23
0.00
1.81
33.63
59.36
19
18.70
6.23
0.00
1.86
33.63
60.42
20
19.77
6.23
0.00
1.92
33.63
61.55
21
20.90
6.23
0.00
1.98
33.63
62.74
22
22.10
6.23
0.00
2.04
33.63
64.00
23
23.36
6.23
0.00
2.11
33.63
65.33
24
24.70
6.23
0.00
2.18
33.63
66.74
25
26.11
6.23
0.00
2.25
33.63
68.22
1
0.39
1.87
2.37
0.15
1.52
6.30
2
0.41
1.87
2.12
0.14
1.52
6.07
3
0.44
1.87
1.87
0.14
1.52
5.84
4
0.46
1.87
1.62
0.13
1.52
5.61
5
0.49
1.87
1.37
0.13
1.52
5.38
6
0.52
1.87
1.12
0.13
1.52
5.15
7
0.55
1.87
0.87
0.12
1.52
4.93
8
0.58
1.87
0.62
0.12
1.52
4.71
9
0.61
1.87
0.37
0.11
1.52
4.49
10
0.65
1.87
0.12
0.11
1.52
4.27
11
0.68
0.36
0.00
0.09
1.92
3.05
12
0.72
0.36
0.00
0.09
1.92
3.09
13
0.76
0.36
0.00
0.09
1.92
3.13
14
0.81
0.36
0.00
0.09
1.92
3.18
15
0.85
0.36
0.00
0.09
1.92
3.22
16
0.90
0.36
0.00
0.10
1.92
3.28
17
0.96
0.36
0.00
0.10
1.92
3.33
18
1.01
0.36
0.00
0.10
1.92
3.39
19
1.07
0.36
0.00
0.11
1.92
3.45
20
1.13
0.36
0.00
0.11
1.92
3.51
21
1.19
0.36
0.00
0.11
1.92
3.58
22
1.26
0.36
0.00
0.12
1.92
3.65
23
1.33
0.36
0.00
0.12
1.92
3.73
24
1.41
0.36
0.00
0.12
1.92
3.81
25
1.49
0.36
0.00
0.13
1.92
3.89
0.862
Unit
MW
MU
0.862
0.744
0.641
0.553
0.477
0.411
0.354
0.306
0.264
0.227
0.196
0.169
0.146
0.126
0.108
0.093
Page42
0.081
0.069
0.060
0.052
0.045
0.038
0.033
0.029
90%
5.28%
80%
16.995%
33.99%
467.1
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
12.33
2
5.28%
24.66
3
5.28%
24.66
4
5.28%
24.66
5
5.28%
24.66
6
5.28%
24.66
7
5.28%
24.66
8
5.28%
24.66
9
5.28%
24.66
10
5.28%
24.66
11
5.28%
24.66
12
5.28%
24.66
13
5.28%
24.66
14
5.28%
24.66
15
5.28%
24.66
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
186.85
60%
48.00%
12%
224.22
12%
9.60%
2.40%
44.84
2%
1.92%
0.48%
8.97
0%
0.38%
0.10%
1.79
0%
0.08%
0.02%
0.36
0%
0.02%
0.00%
0.07
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
174.52
59.32
0.88
1.00
199.56
67.83
1.75
0.93
0.93
20.18
6.86
1.75
0.80
0.80
-15.70
-5.33
1.75
0.69
0.69
-22.87
-7.77
1.75
0.60
0.60
-24.31
-8.26
1.75
0.51
0.51
-24.59
-8.36
1.75
0.44
0.44
-24.65
-8.38
1.75
0.38
0.38
-24.66
-8.38
1.75
0.33
0.33
-24.66
-8.38
1.75
0.28
0.28
-24.66
-8.38
1.75
0.24
0.24
-24.66
-8.38
1.75
0.21
0.21
-24.66
-8.38
1.75
0.18
0.18
-24.66
-8.38
1.75
0.16
0.16
-24.66
-8.38
1.75
0.14
0.14
0.78
Rs/Unit
Page43
Annexure 2A
(Wind Zone-2)
Form 1.1 Assumptions Parameters
Assumption
Head
S. No.
Sub-Head
Sub-Head (2)
Unit
Power Generation
Capacity
Installed Power Generation Capacity
Capacity Utilization Factor
Deration Factor
Useful Life
MW
%
%
Years
1
23%
0.00%
25
Rs Lacs/MW
Tariff Period
Years
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
327
140
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
327
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity 11th year onwards
Weighted average of ROE
Discount Rate
Rs Lacs
% p.a
Year
% p.a
140
19.00%
10
24.00%
22.00%
15.97%
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
2 Project Cost
Capital Cost/MW
467
3 Sources of Fund
13
Debt: Equity
Debt Component
Equity Component
4 Financial Assumptions
Fiscal Assumptions
Depreciation
33.99%
16.995%
Yes
0.0%
7.00%
1.33%
10
5 Working Capital
For Fixed Charges
O&M C harges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Interest On Working Capital
Months
Months
1
15%
2
12.89%
6.87
5.72%
Page44
Form 1.2 Form Template for (Wind Power Projects) : Determination of Tariff Component
1
Units Generation
Installed Capacity
Gross/Net Generation
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
0.744
0.641
0.553
0.477
0.411
0.354
0.306
0.264
0.227
0.196
0.169
0.146
0.126
0.108
0.093
0.081
0.069
0.060
0.052
0.045
0.038
0.033
0.029
Year--->
1
1
2.01
2
1
2.01
3
1
2.01
4
1
2.01
5
1
2.01
6
1
2.01
7
1
2.01
8
1
2.01
9
1
2.01
10
1
2.01
11
1
2.01
12
1
2.01
13
1
2.01
14
1
2.01
15
1
2.01
16
1
2.01
17
1
2.01
18
1
2.01
19
1
2.01
20
1
2.01
21
1
2.01
22
1
2.01
23
1
2.01
24
1
2.01
25
1
2.01
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Year--->
1
6.87
32.70
41.59
2.58
26.63
110.37
2
7.26
32.70
37.21
2.50
26.63
106.31
3
7.68
32.70
32.84
2.43
26.63
102.27
4
8.12
32.70
28.46
2.35
26.63
98.26
5
8.58
32.70
24.08
2.28
26.63
94.27
6
9.08
32.70
19.70
2.21
26.63
90.32
7
9.59
32.70
15.32
2.14
26.63
86.39
8
10.14
32.70
10.95
2.08
26.63
82.49
9
10.72
32.70
6.57
2.01
26.63
78.63
10
11.34
32.70
2.19
1.95
26.63
74.80
11
11.99
6.23
0.00
1.51
33.63
53.35
12
12.67
6.23
0.00
1.54
33.63
54.08
13
13.40
6.23
0.00
1.58
33.63
54.84
14
14.16
6.23
0.00
1.62
33.63
55.64
15
14.97
6.23
0.00
1.66
33.63
56.50
16
15.83
6.23
0.00
1.71
33.63
57.40
17
16.73
6.23
0.00
1.76
33.63
58.35
18
17.69
6.23
0.00
1.81
33.63
59.36
19
18.70
6.23
0.00
1.86
33.63
60.42
20
19.77
6.23
0.00
1.92
33.63
61.55
21
20.90
6.23
0.00
1.98
33.63
62.74
22
22.10
6.23
0.00
2.04
33.63
64.00
23
23.36
6.23
0.00
2.11
33.63
65.33
24
24.70
6.23
0.00
2.18
33.63
66.74
25
26.11
6.23
0.00
2.25
33.63
68.22
1
0.34
1.62
2.06
0.13
1.32
5.48
2
0.36
1.62
1.85
0.12
1.32
5.28
3
0.38
1.62
1.63
0.12
1.32
5.08
4
0.40
1.62
1.41
0.12
1.32
4.88
5
0.43
1.62
1.20
0.11
1.32
4.68
6
0.45
1.62
0.98
0.11
1.32
4.48
7
0.48
1.62
0.76
0.11
1.32
4.29
8
0.50
1.62
0.54
0.10
1.32
4.09
9
0.53
1.62
0.33
0.10
1.32
3.90
10
0.56
1.62
0.11
0.10
1.32
3.71
11
0.59
0.31
0.00
0.07
1.67
2.65
12
0.63
0.31
0.00
0.08
1.67
2.68
13
0.66
0.31
0.00
0.08
1.67
2.72
14
0.70
0.31
0.00
0.08
1.67
2.76
15
0.74
0.31
0.00
0.08
1.67
2.80
16
0.79
0.31
0.00
0.08
1.67
2.85
17
0.83
0.31
0.00
0.09
1.67
2.90
18
0.88
0.31
0.00
0.09
1.67
2.95
19
0.93
0.31
0.00
0.09
1.67
3.00
20
0.98
0.31
0.00
0.10
1.67
3.05
21
1.04
0.31
0.00
0.10
1.67
3.11
22
1.10
0.31
0.00
0.10
1.67
3.18
23
1.16
0.31
0.00
0.10
1.67
3.24
24
1.23
0.31
0.00
0.11
1.67
3.31
25
1.30
0.31
0.00
0.11
1.67
3.39
0.862
Unit
MW
MU
0.862
0.744
0.641
0.553
0.477
0.411
0.354
0.306
0.264
0.227
0.196
0.169
0.146
0.126
0.108
0.093
Page45
0.081
0.069
0.060
0.052
0.045
0.038
0.033
0.029
90%
5.28%
80%
16.995%
33.99%
467.1
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
12.33
2
5.28%
24.66
3
5.28%
24.66
4
5.28%
24.66
5
5.28%
24.66
6
5.28%
24.66
7
5.28%
24.66
8
5.28%
24.66
9
5.28%
24.66
10
5.28%
24.66
11
5.28%
24.66
12
5.28%
24.66
13
5.28%
24.66
14
5.28%
24.66
15
5.28%
24.66
16
5.28%
24.66
17
5.28%
24.66
18
2.88%
13.45
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
186.85
60%
48.00%
12%
224.22
12%
9.60%
2.40%
44.84
2%
1.92%
0.48%
8.97
0%
0.38%
0.10%
1.79
0%
0.08%
0.02%
0.36
0%
0.02%
0.00%
0.07
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
174.52
59.32
1.01
1.00
199.56
67.83
2.01
0.93
0.93
20.18
6.86
2.01
0.80
0.80
-15.70
-5.33
2.01
0.69
0.69
-22.87
-7.77
2.01
0.60
0.60
-24.31
-8.26
2.01
0.51
0.51
-24.59
-8.36
2.01
0.44
0.44
-24.65
-8.38
2.01
0.38
0.38
-24.66
-8.38
2.01
0.33
0.33
-24.66
-8.38
2.01
0.28
0.28
-24.66
-8.38
2.01
0.24
0.24
-24.66
-8.38
2.01
0.21
0.21
-24.66
-8.38
2.01
0.18
0.18
-24.66
-8.38
2.01
0.16
0.16
-24.66
-8.38
2.01
0.14
0.14
-24.66
-8.38
2.01
0.12
0.12
-24.66
-8.38
2.01
0.10
0.10
-13.45
-4.57
2.01
0.09
0.09
0.00
0.00
2.01
0.07
0.07
0.00
0.00
2.01
0.06
0.06
0.68
Rs/Unit
Page46
Annexure 3A
(Wind Zone-3)
Form 1.1 Assumptions Parameters
Assumption
Head
S. No.
Sub-Head
Sub-Head (2)
Unit
Power Generation
Capacity
Installed Power Generation Capacity
Capacity Utilization Factor
Deration Factor
Useful Life
MW
%
%
Years
1
27%
0.00%
25
Rs Lacs/MW
Tariff Period
Years
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
327
140
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
327
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity 11th year onwards
Weighted average of ROE
Discount Rate
Rs Lacs
% p.a
Year
% p.a
140
19.00%
10
24.00%
22.00%
15.97%
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
2 Project Cost
Capital Cost/MW
467
3 Sources of Fund
13
Debt: Equity
Debt Component
Equity Component
4 Financial Assumptions
Fiscal Assumptions
Depreciation
33.99%
16.995%
Yes
0.0%
7.00%
1.33%
10
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Interest On Working Capital
Months
Months
1
15%
2
12.89%
6.87
5.72%
Page47
Form 1.2 Form Template for (Wind Power Projects) : Determination of Tariff Component
1
Units Generation
Installed Capacity
Gross/Net Generation
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
0.744
0.641
0.553
0.477
0.411
0.354
0.306
0.264
0.227
0.196
0.169
0.146
0.126
0.108
0.093
0.081
0.069
0.060
0.052
0.045
0.038
0.033
0.029
Year--->
1
1
2.37
2
1
2.37
3
1
2.37
4
1
2.37
5
1
2.37
6
1
2.37
7
1
2.37
8
1
2.37
9
1
2.37
10
1
2.37
11
1
2.37
12
1
2.37
13
1
2.37
14
1
2.37
15
1
2.37
16
1
2.37
17
1
2.37
18
1
2.37
19
1
2.37
20
1
2.37
21
1
2.37
22
1
2.37
23
1
2.37
24
1
2.37
25
1
2.37
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Year--->
1
6.87
32.70
41.59
2.58
26.63
110.37
2
7.26
32.70
37.21
2.50
26.63
106.31
3
7.68
32.70
32.84
2.43
26.63
102.27
4
8.12
32.70
28.46
2.35
26.63
98.26
5
8.58
32.70
24.08
2.28
26.63
94.27
6
9.08
32.70
19.70
2.21
26.63
90.32
7
9.59
32.70
15.32
2.14
26.63
86.39
8
10.14
32.70
10.95
2.08
26.63
82.49
9
10.72
32.70
6.57
2.01
26.63
78.63
10
11.34
32.70
2.19
1.95
26.63
74.80
11
11.99
6.23
0.00
1.51
33.63
53.35
12
12.67
6.23
0.00
1.54
33.63
54.08
13
13.40
6.23
0.00
1.58
33.63
54.84
14
14.16
6.23
0.00
1.62
33.63
55.64
15
14.97
6.23
0.00
1.66
33.63
56.50
16
15.83
6.23
0.00
1.71
33.63
57.40
17
16.73
6.23
0.00
1.76
33.63
58.35
18
17.69
6.23
0.00
1.81
33.63
59.36
19
18.70
6.23
0.00
1.86
33.63
60.42
20
19.77
6.23
0.00
1.92
33.63
61.55
21
20.90
6.23
0.00
1.98
33.63
62.74
22
22.10
6.23
0.00
2.04
33.63
64.00
23
23.36
6.23
0.00
2.11
33.63
65.33
24
24.70
6.23
0.00
2.18
33.63
66.74
25
26.11
6.23
0.00
2.25
33.63
68.22
1
0.29
1.38
1.76
0.11
1.13
4.67
2
0.31
1.38
1.57
0.11
1.13
4.49
3
0.32
1.38
1.39
0.10
1.13
4.32
4
0.34
1.38
1.20
0.10
1.13
4.15
5
0.36
1.38
1.02
0.10
1.13
3.99
6
0.38
1.38
0.83
0.09
1.13
3.82
7
0.41
1.38
0.65
0.09
1.13
3.65
8
0.43
1.38
0.46
0.09
1.13
3.49
9
0.45
1.38
0.28
0.09
1.13
3.32
10
0.48
1.38
0.09
0.08
1.13
3.16
11
0.51
0.26
0.00
0.06
1.42
2.26
12
0.54
0.26
0.00
0.07
1.42
2.29
13
0.57
0.26
0.00
0.07
1.42
2.32
14
0.60
0.26
0.00
0.07
1.42
2.35
15
0.63
0.26
0.00
0.07
1.42
2.39
16
0.67
0.26
0.00
0.07
1.42
2.43
17
0.71
0.26
0.00
0.07
1.42
2.47
18
0.75
0.26
0.00
0.08
1.42
2.51
19
0.79
0.26
0.00
0.08
1.42
2.55
20
0.84
0.26
0.00
0.08
1.42
2.60
21
0.88
0.26
0.00
0.08
1.42
2.65
22
0.93
0.26
0.00
0.09
1.42
2.71
23
0.99
0.26
0.00
0.09
1.42
2.76
24
1.04
0.26
0.00
0.09
1.42
2.82
25
1.10
0.26
0.00
0.10
1.42
2.88
0.862
Unit
MW
MU
0.862
0.744
0.641
0.553
0.477
0.411
0.354
0.306
0.264
0.227
0.196
0.169
0.146
0.126
0.108
0.093
Page48
0.081
0.069
0.060
0.052
0.045
0.038
0.033
0.029
90%
5.28%
80%
16.995%
33.99%
467.1
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
12.33
2
5.28%
24.66
3
5.28%
24.66
4
5.28%
24.66
5
5.28%
24.66
6
5.28%
24.66
7
5.28%
24.66
8
5.28%
24.66
9
5.28%
24.66
10
5.28%
24.66
11
5.28%
24.66
12
5.28%
24.66
13
5.28%
24.66
14
5.28%
24.66
15
5.28%
24.66
16
5.28%
24.66
17
5.28%
24.66
18
2.88%
13.45
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
186.85
60%
48.00%
12%
224.22
12%
9.60%
2.40%
44.84
2%
1.92%
0.48%
8.97
0%
0.38%
0.10%
1.79
0%
0.08%
0.02%
0.36
0%
0.02%
0.00%
0.07
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
174.52
59.32
1.18
1.00
199.56
67.83
2.37
0.93
0.93
20.18
6.86
2.37
0.80
0.80
-15.70
-5.33
2.37
0.69
0.69
-22.87
-7.77
2.37
0.60
0.60
-24.31
-8.26
2.37
0.51
0.51
-24.59
-8.36
2.37
0.44
0.44
-24.65
-8.38
2.37
0.38
0.38
-24.66
-8.38
2.37
0.33
0.33
-24.66
-8.38
2.37
0.28
0.28
-24.66
-8.38
2.37
0.24
0.24
-24.66
-8.38
2.37
0.21
0.21
-24.66
-8.38
2.37
0.18
0.18
-24.66
-8.38
2.37
0.16
0.16
-24.66
-8.38
2.37
0.14
0.14
-24.66
-8.38
2.37
0.12
0.12
-24.66
-8.38
2.37
0.10
0.10
-13.45
-4.57
2.37
0.09
0.09
0.00
0.00
2.37
0.07
0.07
0.00
0.00
2.37
0.06
0.06
0.58
Rs/Unit
Page49
Annexure 4A
(Wind Zone-4)
Form 1.1 Assumptions Parameters
Assumption
Head
S. No.
Sub-Head
Sub-Head (2)
Unit
Power Generation
Capacity
Installed Power Generation Capacity
Capacity Utilization Factor
Deration Factor
Useful Life
MW
%
%
Years
1
30%
0.00%
25
Rs Lacs/MW
Tariff Period
Years
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
327
140
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
327
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity 11th year onwards
Weighted average of ROE
Discount Rate
Rs Lacs
% p.a
Year
% p.a
140
19.00%
10
24.00%
22.00%
15.97%
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
2 Project Cost
Capital Cost/MW
467
3 Sources of Fund
13
Debt: Equity
Debt Component
Equity Component
4 Financial Assumptions
Fiscal Assumptions
Depreciation
33.99%
16.995%
Yes
0.0%
7.00%
1.33%
10
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Interest On Working Capital
Months
Months
1
15%
2
12.89%
6.87
5.72%
Page50
Form 1.2 Form Template for (Wind Power Projects) : Determination of Tariff Component
1
Units Generation
Installed Capacity
Gross/Net Generation
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
0.744
0.641
0.553
0.477
0.411
0.354
0.306
0.264
0.227
0.196
0.169
0.146
0.126
0.108
0.093
0.081
0.069
0.060
0.052
0.045
0.038
0.033
0.029
Year--->
1
1
2.63
2
1
2.63
3
1
2.63
4
1
2.63
5
1
2.63
6
1
2.63
7
1
2.63
8
1
2.63
9
1
2.63
10
1
2.63
11
1
2.63
12
1
2.63
13
1
2.63
14
1
2.63
15
1
2.63
16
1
2.63
17
1
2.63
18
1
2.63
19
1
2.63
20
1
2.63
21
1
2.63
22
1
2.63
23
1
2.63
24
1
2.63
25
1
2.63
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Year--->
1
6.87
32.70
41.59
2.58
26.63
110.37
2
7.26
32.70
37.21
2.50
26.63
106.31
3
7.68
32.70
32.84
2.43
26.63
102.27
4
8.12
32.70
28.46
2.35
26.63
98.26
5
8.58
32.70
24.08
2.28
26.63
94.27
6
9.08
32.70
19.70
2.21
26.63
90.32
7
9.59
32.70
15.32
2.14
26.63
86.39
8
10.14
32.70
10.95
2.08
26.63
82.49
9
10.72
32.70
6.57
2.01
26.63
78.63
10
11.34
32.70
2.19
1.95
26.63
74.80
11
11.99
6.23
0.00
1.51
33.63
53.35
12
12.67
6.23
0.00
1.54
33.63
54.08
13
13.40
6.23
0.00
1.58
33.63
54.84
14
14.16
6.23
0.00
1.62
33.63
55.64
15
14.97
6.23
0.00
1.66
33.63
56.50
16
15.83
6.23
0.00
1.71
33.63
57.40
17
16.73
6.23
0.00
1.76
33.63
58.35
18
17.69
6.23
0.00
1.81
33.63
59.36
19
18.70
6.23
0.00
1.86
33.63
60.42
20
19.77
6.23
0.00
1.92
33.63
61.55
21
20.90
6.23
0.00
1.98
33.63
62.74
22
22.10
6.23
0.00
2.04
33.63
64.00
23
23.36
6.23
0.00
2.11
33.63
65.33
24
24.70
6.23
0.00
2.18
33.63
66.74
25
26.11
6.23
0.00
2.25
33.63
68.22
1
0.26
1.24
1.58
0.10
1.01
4.20
2
0.28
1.24
1.42
0.10
1.01
4.05
3
0.29
1.24
1.25
0.09
1.01
3.89
4
0.31
1.24
1.08
0.09
1.01
3.74
5
0.33
1.24
0.92
0.09
1.01
3.59
6
0.35
1.24
0.75
0.08
1.01
3.44
7
0.37
1.24
0.58
0.08
1.01
3.29
8
0.39
1.24
0.42
0.08
1.01
3.14
9
0.41
1.24
0.25
0.08
1.01
2.99
10
0.43
1.24
0.08
0.07
1.01
2.85
11
0.46
0.24
0.00
0.06
1.28
2.03
12
0.48
0.24
0.00
0.06
1.28
2.06
13
0.51
0.24
0.00
0.06
1.28
2.09
14
0.54
0.24
0.00
0.06
1.28
2.12
15
0.57
0.24
0.00
0.06
1.28
2.15
16
0.60
0.24
0.00
0.07
1.28
2.18
17
0.64
0.24
0.00
0.07
1.28
2.22
18
0.67
0.24
0.00
0.07
1.28
2.26
19
0.71
0.24
0.00
0.07
1.28
2.30
20
0.75
0.24
0.00
0.07
1.28
2.34
21
0.80
0.24
0.00
0.08
1.28
2.39
22
0.84
0.24
0.00
0.08
1.28
2.44
23
0.89
0.24
0.00
0.08
1.28
2.49
24
0.94
0.24
0.00
0.08
1.28
2.54
25
0.99
0.24
0.00
0.09
1.28
2.60
0.862
Unit
MW
MU
0.862
0.744
0.641
0.553
0.477
0.411
0.354
0.306
0.264
0.227
0.196
0.169
0.146
0.126
0.108
0.093
Page51
0.081
0.069
0.060
0.052
0.045
0.038
0.033
0.029
90%
5.28%
80%
16.995%
33.99%
467.1
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
12.33
2
5.28%
24.66
3
5.28%
24.66
4
5.28%
24.66
5
5.28%
24.66
6
5.28%
24.66
7
5.28%
24.66
8
5.28%
24.66
9
5.28%
24.66
10
5.28%
24.66
11
5.28%
24.66
12
5.28%
24.66
13
5.28%
24.66
14
5.28%
24.66
15
5.28%
24.66
16
5.28%
24.66
17
5.28%
24.66
18
2.88%
13.45
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
186.85
60%
48.00%
12%
224.22
12%
9.60%
2.40%
44.84
2%
1.92%
0.48%
8.97
0%
0.38%
0.10%
1.79
0%
0.08%
0.02%
0.36
0%
0.02%
0.00%
0.07
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
174.52
59.32
1.31
1.00
199.56
67.83
2.63
0.93
0.93
20.18
6.86
2.63
0.80
0.80
-15.70
-5.33
2.63
0.69
0.69
-22.87
-7.77
2.63
0.60
0.60
-24.31
-8.26
2.63
0.51
0.51
-24.59
-8.36
2.63
0.44
0.44
-24.65
-8.38
2.63
0.38
0.38
-24.66
-8.38
2.63
0.33
0.33
-24.66
-8.38
2.63
0.28
0.28
-24.66
-8.38
2.63
0.24
0.24
-24.66
-8.38
2.63
0.21
0.21
-24.66
-8.38
2.63
0.18
0.18
-24.66
-8.38
2.63
0.16
0.16
-24.66
-8.38
2.63
0.14
0.14
-24.66
-8.38
2.63
0.12
0.12
-24.66
-8.38
2.63
0.10
0.10
-13.45
-4.57
2.63
0.09
0.09
0.00
0.00
2.63
0.07
0.07
0.00
0.00
2.63
0.06
0.06
0.52
Rs/Unit
Page52
Annexure 2A
(Less then 5 MW HP/Uttarakhand/NE)
1.1 Form Template for (HP, Uttarakhand, NE States <5MW) Assumptions Parameters
S. No.
Assumption Head
Sub-Head
Sub-Head (2)
Unit
HP, Uttarakhand, NE
States
Less than 5 MW
1
Power Generation
Capacity
Installed Power Generation Capacity
Capacity Utilization Factor
Auxiliary Consumption
Deration Factor
Useful Life
MW
%
1
45%
1%
0.00%
35
Rs Lacs/MW
Tariff Period
Years
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
444
190
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Intrest Rate
Rs Lacs
years
years
%
444
0
10
13.39%
%
Years
2 Project Cost
Capital Cost/MW
635
3 Financial Assumption
35
Debt: Equity
Debt Component
Equity Component
Equity amount
Rs Lacs
Normative ROE (Post-tax)
Return on Equity for first 10 years
% p.a
RoE Period
Year
Return on Equity 11th year onwards
% p.a
Weighted average of ROE
Discount Rate (equiv. to WACC) 11th year onwards
190
16%
19%
10
24.00%
22.57%
16.14%
4 Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
0
0%
0%
16%
0%
Fiscal Assumptions
Depreciation
33.99%
16.995%
Yes
0.0%
7.00%
0.80%
10
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Intrest On Working Capital
Months
Months
1
15%
2
12.89%
0%
22.20
5.72%
Page53
Form 1.2 Form Template for (HP, Uttarakhand, NE States < 5MW) : Determination of Tariff Component
Units Generation
Installed Capacity
Net Generation
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Unit
MW
MU
Year--->
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Year--->
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
12.69
31.75
40.38
2.82
25.85
113.48
13.41
31.75
36.13
2.76
25.85
109.90
14.18
31.75
31.88
2.71
25.85
106.37
14.99
31.75
27.63
2.66
25.85
102.88
15.85
31.75
23.38
2.61
25.85
99.44
16.75
31.75
19.13
2.57
25.85
96.05
17.71
31.75
14.88
2.52
25.85
92.71
18.73
31.75
10.63
2.48
25.85
89.43
19.80
31.75
6.38
2.45
25.85
86.22
20.93
31.75
2.13
2.41
25.85
83.07
22.13
3.63
0.00
1.96
32.65
60.37
23.39
3.63
0.00
2.03
32.65
61.70
24.73
3.63
0.00
2.10
32.65
63.11
26.14
3.63
0.00
2.17
32.65
64.60
27.64
3.63
0.00
2.25
32.65
66.17
29.22
3.63
0.00
2.34
32.65
67.84
30.89
3.63
0.00
2.42
32.65
69.60
32.66
3.63
0.00
2.52
32.65
71.46
34.53
3.63
0.00
2.62
32.65
73.43
36.50
3.63
0.00
2.72
32.65
75.50
38.59
3.63
0.00
2.83
32.65
77.70
40.80
3.63
0.00
2.95
32.65
80.03
43.13
3.63
0.00
3.07
32.65
82.48
45.60
3.63
0.00
3.20
32.65
85.08
48.21
3.63
0.00
3.34
32.65
87.83
50.96
3.63
0.00
3.48
32.65
90.73
53.88
3.63
0.00
3.64
32.65
93.80
56.96
3.63
0.00
3.80
32.65
97.04
60.22
3.63
0.00
3.97
32.65
100.47
63.66
3.63
0.00
4.15
32.65
104.10
67.31
3.63
0.00
4.34
32.65
107.93
71.16
3.63
0.00
4.55
32.65
111.98
75.23
3.63
0.00
4.76
32.65
116.27
79.53
3.63
0.00
4.99
32.65
120.80
84.08
3.63
0.00
5.23
32.65
125.59
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
0.49
1.22
1.55
0.11
0.99
4.36
0.52
1.22
1.39
0.11
0.99
4.22
0.54
1.22
1.23
0.10
0.99
4.09
0.58
1.22
1.06
0.10
0.99
3.95
0.61
1.22
0.90
0.10
0.99
3.82
0.64
1.22
0.74
0.10
0.99
3.69
0.68
1.22
0.57
0.10
0.99
3.56
0.72
1.22
0.41
0.10
0.99
3.44
0.76
1.22
0.25
0.09
0.99
3.31
0.80
1.22
0.08
0.09
0.99
3.19
0.85
0.14
0.00
0.08
1.26
2.32
0.90
0.14
0.00
0.08
1.26
2.37
0.95
0.14
0.00
0.08
1.26
2.43
1.00
0.14
0.00
0.08
1.26
2.48
1.06
0.14
0.00
0.09
1.26
2.54
1.12
0.14
0.00
0.09
1.26
2.61
1.19
0.14
0.00
0.09
1.26
2.68
1.26
0.14
0.00
0.10
1.26
2.75
1.33
0.14
0.00
0.10
1.26
2.82
1.40
0.14
0.00
0.10
1.26
2.90
1.48
0.14
0.00
0.11
1.26
2.99
1.57
0.14
0.00
0.11
1.26
3.08
1.66
0.14
0.00
0.12
1.26
3.17
1.75
0.14
0.00
0.12
1.26
3.27
1.85
0.14
0.00
0.13
1.26
3.38
1.96
0.14
0.00
0.13
1.26
3.49
2.07
0.14
0.00
0.14
1.26
3.61
2.19
0.14
0.00
0.15
1.26
3.73
2.31
0.14
0.00
0.15
1.26
3.86
2.45
0.14
0.00
0.16
1.26
4.00
2.59
0.14
0.00
0.17
1.26
4.15
2.73
0.14
0.00
0.17
1.26
4.30
2.89
0.14
0.00
0.18
1.26
4.47
3.06
0.14
0.00
0.19
1.26
4.64
3.23
0.14
0.00
0.20
1.26
4.83
0.861
0.741
0.638
0.550
0.473
0.407
0.351
0.302
0.260
0.224
0.193
0.166
0.143
0.123
0.106
0.091
0.079
0.068
0.058
0.050
0.043
0.037
0.032
0.028
Page54
0.024
0.020
0.018
0.015
0.013
0.011
0.010
0.008
0.007
0.006
90%
5.28%
80%
17%
33.99%
634.9
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
16.76
2
5.28%
33.52
3
5.28%
33.52
4
5.28%
33.52
5
5.28%
33.52
6
5.28%
33.52
7
5.28%
33.52
8
5.28%
33.52
9
5.28%
33.52
10
5.28%
33.52
11
5.28%
33.52
12
5.28%
33.52
13
5.28%
33.52
14
5.28%
33.52
15
5.28%
33.52
16
5.28%
33.52
17
5.28%
33.52
18
2.88%
18.29
19
0.00%
0.00
20
0.00%
0.00
21
0.00%
0.00
22
0.00%
0.00
23
0.00%
0.00
24
0.00%
0.00
25
0.00%
0.00
26
0.00%
0.00
27
0.00%
0.00
28
0.00%
0.00
29
0.00%
0.00
30
0.00%
0.00
31
0.00%
0.00
32
0.00%
0.00
33
0.00%
0.00
34
0.00%
0.00
35
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
253.97
60%
48.00%
12%
304.77
12%
9.60%
2.40%
60.95
2%
1.92%
0.48%
12.19
0%
0.38%
0.10%
2.44
0%
0.08%
0.02%
0.49
0%
0.02%
0.00%
0.10
0%
0.00%
0.00%
0.02
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
237.21
80.63
1.95
1.00
271.24
92.20
3.90
0.93
27.43
9.32
3.90
0.80
-21.33
-7.25
3.90
0.69
-31.09
-10.57
3.90
0.59
-33.04
-11.23
3.90
0.51
-33.43
-11.36
3.90
0.44
-33.51
-11.39
3.90
0.38
-33.52
-11.39
3.90
0.33
-33.52
-11.39
3.90
0.28
-33.52
-11.39
3.90
0.24
-33.52
-11.40
3.90
0.21
-33.52
-11.40
3.90
0.18
-33.52
-11.40
3.90
0.15
-33.52
-11.40
3.90
0.13
-33.52
-11.40
3.90
0.11
-33.52
-11.40
3.90
0.10
-18.29
-6.22
3.90
0.08
0.00
0.00
3.90
0.07
0.00
0.00
3.90
0.06
0.00
0.00
3.90
0.05
0.00
0.00
3.90
0.05
0.00
0.00
3.90
0.04
0.00
0.00
3.90
0.03
0.00
0.00
3.90
0.03
0.00
0.00
3.90
0.03
0.00
0.00
3.90
0.02
0.00
0.00
3.90
0.02
0.00
0.00
3.90
0.02
0.00
0.00
3.90
0.01
0.00
0.00
3.90
0.01
0.00
0.00
3.90
0.01
0.00
0.00
3.90
0.01
0.00
0.00
3.90
0.01
0.00
0.00
3.90
0.01
0.48
Rs/Unit
Page55
Annexure 2B
(5 MW to 25 MWHP/Uttarakhand/NE)
1.1 Form Template for (HP, Uttarakhand, NE States 5MW to 25MW) Assumptions Parameters
S. No.
Assumption Head
Sub-Head
Sub-Head (2)
Unit
HP, Uttarakhand, NE
States
5 MW to 25 MW
1
Power Generation
Capacity
Installed Power Generation Capacity
Capacity Utilization Factor
Auxiliary Consumption
Deration Factor
Useful Life
MW
%
1
45%
1%
0.00%
35
%
Years
Rs Lacs/MW
Tariff Period
Years
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
400
171
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Intrest Rate
Rs Lacs
years
years
%
400
0
10
13.39%
2 Project Cost
Capital Cost/MW
571
3 Financial Assumption
13
Debt: Equity
Debt Component
Equity Component
Equity amount
Rs Lacs
Normative ROE (Post-tax)
Return on Equity for first 10 years
% p.a
RoE Period
Year
Return on Equity 11th year onwards
% p.a
Weighted average of ROE
Discount Rate (equiv. to WACC) 11th year onwards
171
16%
19%
10
24.00%
22.57%
16.14%
4 Financial Assumptions
0
0%
0%
16%
0%
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
Fiscal Assumptions
Depreciation
33.99%
16.995%
Yes
0.0%
7.00%
0.80%
10
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Intrest On Working Capital
Months
Months
1
15%
2
12.89%
0%
15.86
5.72%
Page56
Form 1.2 Form Template for (HP, Uttarakhand, NE States 5MW to 25MW) : Determination of Tariff Component
Units Generation
Installed Capacity
Net Generation
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Unit
MW
MU
Year--->
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Year--->
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
12.69
31.75
40.38
2.82
25.85
113.48
13.41
31.75
36.13
2.76
25.85
109.90
14.18
31.75
31.88
2.71
25.85
106.37
14.99
31.75
27.63
2.66
25.85
102.88
15.85
31.75
23.38
2.61
25.85
99.44
16.75
31.75
19.13
2.57
25.85
96.05
17.71
31.75
14.88
2.52
25.85
92.71
18.73
31.75
10.63
2.48
25.85
89.43
19.80
31.75
6.38
2.45
25.85
86.22
20.93
31.75
2.13
2.41
25.85
83.07
22.13
3.63
0.00
1.96
32.65
60.37
23.39
3.63
0.00
2.03
32.65
61.70
24.73
3.63
0.00
2.10
32.65
63.11
26.14
3.63
0.00
2.17
32.65
64.60
27.64
3.63
0.00
2.25
32.65
66.17
29.22
3.63
0.00
2.34
32.65
67.84
30.89
3.63
0.00
2.42
32.65
69.60
32.66
3.63
0.00
2.52
32.65
71.46
34.53
3.63
0.00
2.62
32.65
73.43
36.50
3.63
0.00
2.72
32.65
75.50
38.59
3.63
0.00
2.83
32.65
77.70
40.80
3.63
0.00
2.95
32.65
80.03
43.13
3.63
0.00
3.07
32.65
82.48
45.60
3.63
0.00
3.20
32.65
85.08
48.21
3.63
0.00
3.34
32.65
87.83
50.96
3.63
0.00
3.48
32.65
90.73
53.88
3.63
0.00
3.64
32.65
93.80
56.96
3.63
0.00
3.80
32.65
97.04
60.22
3.63
0.00
3.97
32.65
100.47
63.66
3.63
0.00
4.15
32.65
104.10
67.31
3.63
0.00
4.34
32.65
107.93
71.16
3.63
0.00
4.55
32.65
111.98
75.23
3.63
0.00
4.76
32.65
116.27
79.53
3.63
0.00
4.99
32.65
120.80
84.08
3.63
0.00
5.23
32.65
125.59
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
0.49
1.22
1.55
0.11
0.99
4.36
0.52
1.22
1.39
0.11
0.99
4.22
0.54
1.22
1.23
0.10
0.99
4.09
0.58
1.22
1.06
0.10
0.99
3.95
0.61
1.22
0.90
0.10
0.99
3.82
0.64
1.22
0.74
0.10
0.99
3.69
0.68
1.22
0.57
0.10
0.99
3.56
0.72
1.22
0.41
0.10
0.99
3.44
0.76
1.22
0.25
0.09
0.99
3.31
0.80
1.22
0.08
0.09
0.99
3.19
0.85
0.14
0.00
0.08
1.26
2.32
0.90
0.14
0.00
0.08
1.26
2.37
0.95
0.14
0.00
0.08
1.26
2.43
1.00
0.14
0.00
0.08
1.26
2.48
1.06
0.14
0.00
0.09
1.26
2.54
1.12
0.14
0.00
0.09
1.26
2.61
1.19
0.14
0.00
0.09
1.26
2.68
1.26
0.14
0.00
0.10
1.26
2.75
1.33
0.14
0.00
0.10
1.26
2.82
1.40
0.14
0.00
0.10
1.26
2.90
1.48
0.14
0.00
0.11
1.26
2.99
1.57
0.14
0.00
0.11
1.26
3.08
1.66
0.14
0.00
0.12
1.26
3.17
1.75
0.14
0.00
0.12
1.26
3.27
1.85
0.14
0.00
0.13
1.26
3.38
1.96
0.14
0.00
0.13
1.26
3.49
2.07
0.14
0.00
0.14
1.26
3.61
2.19
0.14
0.00
0.15
1.26
3.73
2.31
0.14
0.00
0.15
1.26
3.86
2.45
0.14
0.00
0.16
1.26
4.00
2.59
0.14
0.00
0.17
1.26
4.15
2.73
0.14
0.00
0.17
1.26
4.30
2.89
0.14
0.00
0.18
1.26
4.47
3.06
0.14
0.00
0.19
1.26
4.64
3.23
0.14
0.00
0.20
1.26
4.83
0.861
0.741
0.638
0.550
0.473
0.407
0.351
0.302
0.260
0.224
0.193
0.166
0.143
0.123
0.106
0.091
0.079
0.068
0.058
0.050
0.043
0.037
0.032
0.028
Page57
0.024
0.020
0.018
0.015
0.013
0.011
0.010
0.008
0.007
0.006
90%
5.28%
80%
17%
33.99%
571.4
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
15.09
2
5.28%
30.17
3
5.28%
30.17
4
5.28%
30.17
5
5.28%
30.17
6
5.28%
30.17
7
5.28%
30.17
8
5.28%
30.17
9
5.28%
30.17
10
5.28%
30.17
11
5.28%
30.17
12
5.28%
30.17
13
5.28%
30.17
14
5.28%
30.17
15
5.28%
30.17
16
5.28%
30.17
17
5.28%
30.17
18
2.88%
16.46
19
0.00%
0.00
20
0.00%
0.00
21
0.00%
0.00
22
0.00%
0.00
23
0.00%
0.00
24
0.00%
0.00
25
0.00%
0.00
26
0.00%
0.00
27
0.00%
0.00
28
0.00%
0.00
29
0.00%
0.00
30
0.00%
0.00
31
0.00%
0.00
32
0.00%
0.00
33
0.00%
0.00
34
0.00%
0.00
35
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
228.58
60%
48.00%
12%
274.29
12%
9.60%
2.40%
54.86
2%
1.92%
0.48%
10.97
0%
0.38%
0.10%
2.19
0%
0.08%
0.02%
0.44
0%
0.02%
0.00%
0.09
0%
0.00%
0.00%
0.02
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
213.49
72.57
1.95
1.00
244.12
82.98
3.90
0.93
24.69
8.39
3.90
0.80
-19.20
-6.53
3.90
0.69
-27.98
-9.51
3.90
0.59
-29.73
-10.11
3.90
0.51
-30.08
-10.23
3.90
0.44
-30.15
-10.25
3.90
0.38
-30.17
-10.25
3.90
0.33
-30.17
-10.26
3.90
0.28
-30.17
-10.26
3.90
0.24
-30.17
-10.26
3.90
0.21
-30.17
-10.26
3.90
0.18
-30.17
-10.26
3.90
0.15
-30.17
-10.26
3.90
0.13
-30.17
-10.26
3.90
0.11
-30.17
-10.26
3.90
0.10
-16.46
-5.59
3.90
0.08
0.00
0.00
3.90
0.07
0.00
0.00
3.90
0.06
0.00
0.00
3.90
0.05
0.00
0.00
3.90
0.05
0.00
0.00
3.90
0.04
0.00
0.00
3.90
0.03
0.00
0.00
3.90
0.03
0.00
0.00
3.90
0.03
0.00
0.00
3.90
0.02
0.00
0.00
3.90
0.02
0.00
0.00
3.90
0.02
0.00
0.00
3.90
0.01
0.00
0.00
3.90
0.01
0.00
0.00
3.90
0.01
0.00
0.00
3.90
0.01
0.00
0.00
3.90
0.01
0.00
0.00
3.90
0.01
0.43
Rs/Unit
Page58
Annexure 2C
(Less Than 5 MW Other States)
1.1 Form Template for (Other States <5MW) Assumptions Parameters
S. No.
Assumption Head
Sub-Head
Sub-Head (2)
Unit
Other States
Less than 5 MW
1
Power Generation
Capacity
Installed Power Generation Capacity
Capacity Utilization Factor
Auxiliary Consumption
Deration Factor
Useful Life
MW
%
1
30%
1%
0.00%
35
Rs Lacs/MW
Tariff Period
Years
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
349
150
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Intrest Rate
Rs Lacs
years
years
%
349
0
10
13.39%
%
Years
2 Project Cost
Capital Cost/MW
499
3 Financial Assumption
35
Debt: Equity
Debt Component
Equity Component
Equity amount
Rs Lacs
Normative ROE (Post-tax)
Return on Equity for first 10 years
% p.a
RoE Period
Year
Return on Equity 11th year onwards
% p.a
Weighted average of ROE
Discount Rate (equiv. to WACC) 11th year onwards
150
16%
19%
10
24.00%
22.57%
16.14%
4 Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
0
0%
0%
16%
0%
Fiscal Assumptions
Depreciation
33.99%
16.995%
Yes
0.0%
7.00%
0.80%
10
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Intrest On Working Capital
Months
Months
1
15%
2
12.89%
0%
17.97
5.72%
Page59
Form 1.2 Form Template for Other States < 5MW) : Determination of Tariff Component
Units Generation
Installed Capacity
Net Generation
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Unit
MW
MU
Year--->
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Year--->
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
12.69
31.75
40.38
2.82
25.85
113.48
13.41
31.75
36.13
2.76
25.85
109.90
14.18
31.75
31.88
2.71
25.85
106.37
14.99
31.75
27.63
2.66
25.85
102.88
15.85
31.75
23.38
2.61
25.85
99.44
16.75
31.75
19.13
2.57
25.85
96.05
17.71
31.75
14.88
2.52
25.85
92.71
18.73
31.75
10.63
2.48
25.85
89.43
19.80
31.75
6.38
2.45
25.85
86.22
20.93
31.75
2.13
2.41
25.85
83.07
22.13
3.63
0.00
1.96
32.65
60.37
23.39
3.63
0.00
2.03
32.65
61.70
24.73
3.63
0.00
2.10
32.65
63.11
26.14
3.63
0.00
2.17
32.65
64.60
27.64
3.63
0.00
2.25
32.65
66.17
29.22
3.63
0.00
2.34
32.65
67.84
30.89
3.63
0.00
2.42
32.65
69.60
32.66
3.63
0.00
2.52
32.65
71.46
34.53
3.63
0.00
2.62
32.65
73.43
36.50
3.63
0.00
2.72
32.65
75.50
38.59
3.63
0.00
2.83
32.65
77.70
40.80
3.63
0.00
2.95
32.65
80.03
43.13
3.63
0.00
3.07
32.65
82.48
45.60
3.63
0.00
3.20
32.65
85.08
48.21
3.63
0.00
3.34
32.65
87.83
50.96
3.63
0.00
3.48
32.65
90.73
53.88
3.63
0.00
3.64
32.65
93.80
56.96
3.63
0.00
3.80
32.65
97.04
60.22
3.63
0.00
3.97
32.65
100.47
63.66
3.63
0.00
4.15
32.65
104.10
67.31
3.63
0.00
4.34
32.65
107.93
71.16
3.63
0.00
4.55
32.65
111.98
75.23
3.63
0.00
4.76
32.65
116.27
79.53
3.63
0.00
4.99
32.65
120.80
84.08
3.63
0.00
5.23
32.65
125.59
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
0.49
1.22
1.55
0.11
0.99
4.36
0.52
1.22
1.39
0.11
0.99
4.22
0.54
1.22
1.23
0.10
0.99
4.09
0.58
1.22
1.06
0.10
0.99
3.95
0.61
1.22
0.90
0.10
0.99
3.82
0.64
1.22
0.74
0.10
0.99
3.69
0.68
1.22
0.57
0.10
0.99
3.56
0.72
1.22
0.41
0.10
0.99
3.44
0.76
1.22
0.25
0.09
0.99
3.31
0.80
1.22
0.08
0.09
0.99
3.19
0.85
0.14
0.00
0.08
1.26
2.32
0.90
0.14
0.00
0.08
1.26
2.37
0.95
0.14
0.00
0.08
1.26
2.43
1.00
0.14
0.00
0.08
1.26
2.48
1.06
0.14
0.00
0.09
1.26
2.54
1.12
0.14
0.00
0.09
1.26
2.61
1.19
0.14
0.00
0.09
1.26
2.68
1.26
0.14
0.00
0.10
1.26
2.75
1.33
0.14
0.00
0.10
1.26
2.82
1.40
0.14
0.00
0.10
1.26
2.90
1.48
0.14
0.00
0.11
1.26
2.99
1.57
0.14
0.00
0.11
1.26
3.08
1.66
0.14
0.00
0.12
1.26
3.17
1.75
0.14
0.00
0.12
1.26
3.27
1.85
0.14
0.00
0.13
1.26
3.38
1.96
0.14
0.00
0.13
1.26
3.49
2.07
0.14
0.00
0.14
1.26
3.61
2.19
0.14
0.00
0.15
1.26
3.73
2.31
0.14
0.00
0.15
1.26
3.86
2.45
0.14
0.00
0.16
1.26
4.00
2.59
0.14
0.00
0.17
1.26
4.15
2.73
0.14
0.00
0.17
1.26
4.30
2.89
0.14
0.00
0.18
1.26
4.47
3.06
0.14
0.00
0.19
1.26
4.64
3.23
0.14
0.00
0.20
1.26
4.83
0.861
0.741
0.638
0.550
0.473
0.407
0.351
0.302
0.260
0.224
0.193
0.166
0.143
0.123
0.106
0.091
0.079
0.068
0.058
0.050
0.043
0.037
0.032
0.028
Page60
0.024
0.020
0.018
0.015
0.013
0.011
0.010
0.008
0.007
0.006
90%
5.28%
80%
17%
33.99%
498.9
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
13.17
2
5.28%
26.34
3
5.28%
26.34
4
5.28%
26.34
5
5.28%
26.34
6
5.28%
26.34
7
5.28%
26.34
8
5.28%
26.34
9
5.28%
26.34
10
5.28%
26.34
11
5.28%
26.34
12
5.28%
26.34
13
5.28%
26.34
14
5.28%
26.34
15
5.28%
26.34
16
5.28%
26.34
17
5.28%
26.34
18
2.88%
14.37
19
0.00%
0.00
20
0.00%
0.00
21
0.00%
0.00
22
0.00%
0.00
23
0.00%
0.00
24
0.00%
0.00
25
0.00%
0.00
26
0.00%
0.00
27
0.00%
0.00
28
0.00%
0.00
29
0.00%
0.00
30
0.00%
0.00
31
0.00%
0.00
32
0.00%
0.00
33
0.00%
0.00
34
0.00%
0.00
35
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
199.55
60%
48.00%
12%
239.46
12%
9.60%
2.40%
47.89
2%
1.92%
0.48%
9.58
0%
0.38%
0.10%
1.92
0%
0.08%
0.02%
0.38
0%
0.02%
0.00%
0.08
0%
0.00%
0.00%
0.02
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
186.38
63.35
1.30
1.00
213.12
72.44
2.60
0.93
21.55
7.33
2.60
0.80
-16.76
-5.70
2.60
0.69
-24.43
-8.30
2.60
0.59
-25.96
-8.82
2.60
0.51
-26.26
-8.93
2.60
0.44
-26.33
-8.95
2.60
0.38
-26.34
-8.95
2.60
0.33
-26.34
-8.95
2.60
0.28
-26.34
-8.95
2.60
0.24
-26.34
-8.95
2.60
0.21
-26.34
-8.95
2.60
0.18
-26.34
-8.95
2.60
0.15
-26.34
-8.95
2.60
0.13
-26.34
-8.95
2.60
0.11
-26.34
-8.95
2.60
0.10
-14.37
-4.88
2.60
0.08
0.00
0.00
2.60
0.07
0.00
0.00
2.60
0.06
0.00
0.00
2.60
0.05
0.00
0.00
2.60
0.05
0.00
0.00
2.60
0.04
0.00
0.00
2.60
0.03
0.00
0.00
2.60
0.03
0.00
0.00
2.60
0.03
0.00
0.00
2.60
0.02
0.00
0.00
2.60
0.02
0.00
0.00
2.60
0.02
0.00
0.00
2.60
0.01
0.00
0.00
2.60
0.01
0.00
0.00
2.60
0.01
0.00
0.00
2.60
0.01
0.00
0.00
2.60
0.01
0.00
0.00
2.60
0.01
0.57
Rs/Unit
Page61
Annexure 2D
(5 MW to 25 MW Other States)
1.1 Form Template for (Other States 5MW to 25MW) Assumptions Parameters
S. No.
Assumption Head
Sub-Head
Sub-Head (2)
Unit
Other States
5 MW to 25 MW
1
Power Generation
Capacity
Installed Power Generation Capacity
Capacity Utilization Factor
Auxiliary Consumption
Deration Factor
Useful Life
MW
%
1
30%
1%
0.00%
35
Rs Lacs/MW
Tariff Period
Years
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
317
136
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Intrest Rate
Rs Lacs
years
years
%
317
0
10
13.39%
%
Years
2 Project Cost
Capital Cost/MW
454
3 Financial Assumption
13
Debt: Equity
Debt Component
Equity Component
Equity amount
Rs Lacs
Normative ROE (Post-tax)
Return on Equity for first 10 years
% p.a
RoE Period
Year
Return on Equity 11th year onwards
% p.a
Weighted average of ROE
Discount Rate (equiv. to WACC) 11th year onwards
136
16%
19%
10
24.00%
22.57%
16.14%
4 Financial Assumptions
0
0%
0%
16%
0%
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
Fiscal Assumptions
Depreciation
33.99%
16.995%
Yes
0.0%
7.00%
0.80%
10
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Intrest On Working Capital
Months
Months
1
15%
2
12.89%
0%
12.69
5.72%
Page62
Form 1.2 Form Template for (OtherStates 5MW to 25 MW) : Determination of Tariff Component
Units Generation
Installed Capacity
Net Generation
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Unit
MW
MU
Year--->
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Year--->
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
1
2.60
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
12.69
31.75
40.38
2.82
25.85
113.48
13.41
31.75
36.13
2.76
25.85
109.90
14.18
31.75
31.88
2.71
25.85
106.37
14.99
31.75
27.63
2.66
25.85
102.88
15.85
31.75
23.38
2.61
25.85
99.44
16.75
31.75
19.13
2.57
25.85
96.05
17.71
31.75
14.88
2.52
25.85
92.71
18.73
31.75
10.63
2.48
25.85
89.43
19.80
31.75
6.38
2.45
25.85
86.22
20.93
31.75
2.13
2.41
25.85
83.07
22.13
3.63
0.00
1.96
32.65
60.37
23.39
3.63
0.00
2.03
32.65
61.70
24.73
3.63
0.00
2.10
32.65
63.11
26.14
3.63
0.00
2.17
32.65
64.60
27.64
3.63
0.00
2.25
32.65
66.17
29.22
3.63
0.00
2.34
32.65
67.84
30.89
3.63
0.00
2.42
32.65
69.60
32.66
3.63
0.00
2.52
32.65
71.46
34.53
3.63
0.00
2.62
32.65
73.43
36.50
3.63
0.00
2.72
32.65
75.50
38.59
3.63
0.00
2.83
32.65
77.70
40.80
3.63
0.00
2.95
32.65
80.03
43.13
3.63
0.00
3.07
32.65
82.48
45.60
3.63
0.00
3.20
32.65
85.08
48.21
3.63
0.00
3.34
32.65
87.83
50.96
3.63
0.00
3.48
32.65
90.73
53.88
3.63
0.00
3.64
32.65
93.80
56.96
3.63
0.00
3.80
32.65
97.04
60.22
3.63
0.00
3.97
32.65
100.47
63.66
3.63
0.00
4.15
32.65
104.10
67.31
3.63
0.00
4.34
32.65
107.93
71.16
3.63
0.00
4.55
32.65
111.98
75.23
3.63
0.00
4.76
32.65
116.27
79.53
3.63
0.00
4.99
32.65
120.80
84.08
3.63
0.00
5.23
32.65
125.59
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
0.49
1.22
1.55
0.11
0.99
4.36
0.52
1.22
1.39
0.11
0.99
4.22
0.54
1.22
1.23
0.10
0.99
4.09
0.58
1.22
1.06
0.10
0.99
3.95
0.61
1.22
0.90
0.10
0.99
3.82
0.64
1.22
0.74
0.10
0.99
3.69
0.68
1.22
0.57
0.10
0.99
3.56
0.72
1.22
0.41
0.10
0.99
3.44
0.76
1.22
0.25
0.09
0.99
3.31
0.80
1.22
0.08
0.09
0.99
3.19
0.85
0.14
0.00
0.08
1.26
2.32
0.90
0.14
0.00
0.08
1.26
2.37
0.95
0.14
0.00
0.08
1.26
2.43
1.00
0.14
0.00
0.08
1.26
2.48
1.06
0.14
0.00
0.09
1.26
2.54
1.12
0.14
0.00
0.09
1.26
2.61
1.19
0.14
0.00
0.09
1.26
2.68
1.26
0.14
0.00
0.10
1.26
2.75
1.33
0.14
0.00
0.10
1.26
2.82
1.40
0.14
0.00
0.10
1.26
2.90
1.48
0.14
0.00
0.11
1.26
2.99
1.57
0.14
0.00
0.11
1.26
3.08
1.66
0.14
0.00
0.12
1.26
3.17
1.75
0.14
0.00
0.12
1.26
3.27
1.85
0.14
0.00
0.13
1.26
3.38
1.96
0.14
0.00
0.13
1.26
3.49
2.07
0.14
0.00
0.14
1.26
3.61
2.19
0.14
0.00
0.15
1.26
3.73
2.31
0.14
0.00
0.15
1.26
3.86
2.45
0.14
0.00
0.16
1.26
4.00
2.59
0.14
0.00
0.17
1.26
4.15
2.73
0.14
0.00
0.17
1.26
4.30
2.89
0.14
0.00
0.18
1.26
4.47
3.06
0.14
0.00
0.19
1.26
4.64
3.23
0.14
0.00
0.20
1.26
4.83
0.861
0.741
0.638
0.550
0.473
0.407
0.351
0.302
0.260
0.224
0.193
0.166
0.143
0.123
0.106
0.091
0.079
0.068
0.058
0.050
0.043
0.037
0.032
0.028
Page63
0.024
0.020
0.018
0.015
0.013
0.011
0.010
0.008
0.007
0.006
90%
5.28%
80%
17%
33.99%
453.5
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
11.97
2
5.28%
23.95
3
5.28%
23.95
4
5.28%
23.95
5
5.28%
23.95
6
5.28%
23.95
7
5.28%
23.95
8
5.28%
23.95
9
5.28%
23.95
10
5.28%
23.95
11
5.28%
23.95
12
5.28%
23.95
13
5.28%
23.95
14
5.28%
23.95
15
5.28%
23.95
16
5.28%
23.95
17
5.28%
23.95
18
2.88%
13.06
19
0.00%
0.00
20
0.00%
0.00
21
0.00%
0.00
22
0.00%
0.00
23
0.00%
0.00
24
0.00%
0.00
25
0.00%
0.00
26
0.00%
0.00
27
0.00%
0.00
28
0.00%
0.00
29
0.00%
0.00
30
0.00%
0.00
31
0.00%
0.00
32
0.00%
0.00
33
0.00%
0.00
34
0.00%
0.00
35
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
181.41
60%
48.00%
12%
217.69
12%
9.60%
2.40%
43.54
2%
1.92%
0.48%
8.71
0%
0.38%
0.10%
1.74
0%
0.08%
0.02%
0.35
0%
0.02%
0.00%
0.07
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
169.44
57.59
1.30
1.00
193.75
65.85
2.60
0.93
19.59
6.66
2.60
0.80
-15.24
-5.18
2.60
0.69
-22.20
-7.55
2.60
0.59
-23.60
-8.02
2.60
0.51
-23.88
-8.12
2.60
0.44
-23.93
-8.13
2.60
0.38
-23.94
-8.14
2.60
0.33
-23.95
-8.14
2.60
0.28
-23.95
-8.14
2.60
0.24
-23.95
-8.14
2.60
0.21
-23.95
-8.14
2.60
0.18
-23.95
-8.14
2.60
0.15
-23.95
-8.14
2.60
0.13
-23.95
-8.14
2.60
0.11
-23.95
-8.14
2.60
0.10
-13.06
-4.44
2.60
0.08
0.00
0.00
2.60
0.07
0.00
0.00
2.60
0.06
0.00
0.00
2.60
0.05
0.00
0.00
2.60
0.05
0.00
0.00
2.60
0.04
0.00
0.00
2.60
0.03
0.00
0.00
2.60
0.03
0.00
0.00
2.60
0.03
0.00
0.00
2.60
0.02
0.00
0.00
2.60
0.02
0.00
0.00
2.60
0.02
0.00
0.00
2.60
0.01
0.00
0.00
2.60
0.01
0.00
0.00
2.60
0.01
0.00
0.00
2.60
0.01
0.00
0.00
2.60
0.01
0.00
0.00
2.60
0.01
0.51
Rs/Unit
Page64
Annexure 3A
2.1 Form Template for Biomass Power Projects- Andhra Pradesh
S. No.
Assumption Head
1 Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity MW
Auxillary Consumption during stablisatio%
Auxillary Consumption after stabilisation%
PLF(Stablization for 6 months)
%
PLF(during first year after Stablization) %
PLF(second year onwards)
%
Useful Life
Years
2
Project Cost
Capital Cost/MW
1
10%
10%
60%
70%
80%
20
Rs Lacs/MW
402.54
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
281.78
120.76
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
281.78
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
120.76
19.00%
10.00
24.00%
Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
0%
0%
16%
Fiscal Assumptions
33.99%
16.995%
Yes
Depreciation
Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Biomass Stock
Interest On Working Capital
7.00%
2.00%
10.00
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3800
3800
Base Price(FY10-11)
GCV - Biomass
Biomass Price Escalation Factor
Rs/T
Kcal/kg
1343
3275
5%
Biomass
Hrs
Days
Hrs
21.41
5.72%
24
365
8760
Page65
2.2 Form Template for (Biomass Power Projects) : Determination of Tariff Component
1
0.863
0.745
0.644
0.556
0.480
0.414
0.358
0.309
0.267
0.230
0.199
0.172
0.148
0.128
0.110
0.095
0.082
0.071
0.061
Unit
MW
MU
MU
MU
Year--->
1
1
5.69
0.57
5.12
2
1
7.01
0.70
6.31
3
1
7.01
0.70
6.31
4
1
7.01
0.70
6.31
5
1
7.01
0.70
6.31
6
1
7.01
0.70
6.31
7
1
7.01
0.70
6.31
8
1
7.01
0.70
6.31
9
1
7.01
0.70
6.31
10
1
7.01
0.70
6.31
11
1
7.01
0.70
6.31
12
1
7.01
0.70
6.31
13
1
7.01
0.70
6.31
14
1
7.01
0.70
6.31
15
1
7.01
0.70
6.31
16
1
7.01
0.70
6.31
17
1
7.01
0.70
6.31
18
1
7.01
0.70
6.31
19
1
7.01
0.70
6.31
20
1
7.01
0.70
6.31
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
1
88.72
1.73
2
114.65
1.82
3
120.38
1.91
4
126.40
2.00
5
132.72
2.10
6
139.36
2.21
7
146.32
2.32
8
153.64
2.44
9
161.32
2.56
10
169.39
2.69
11
177.86
2.82
12
186.75
2.96
13
196.09
3.11
14
205.89
3.26
15
216.19
3.43
16
227.00
3.60
17
238.35
3.78
18
250.26
3.97
19
262.78
4.17
20
275.92
4.37
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
1
21.41
28.18
35.84
8.88
22.94
117.25
2.29
2
22.63
28.18
32.07
10.57
22.94
116.39
1.85
3
23.93
28.18
28.29
10.93
22.94
114.28
1.81
4
25.30
28.18
24.52
11.32
22.94
112.26
1.78
5
26.74
28.18
20.75
11.73
22.94
110.34
1.75
6
28.27
28.18
16.98
12.16
22.94
108.53
1.72
7
29.89
28.18
13.20
12.62
22.94
106.84
1.69
8
31.60
28.18
9.43
13.11
22.94
105.27
1.67
9
33.41
28.18
5.66
13.63
22.94
103.82
1.65
10
35.32
28.18
1.89
14.18
22.94
102.51
1.63
11
37.34
8.05
0.00
14.49
28.98
88.87
1.41
12
39.47
8.05
0.00
15.19
28.98
91.70
1.45
13
41.73
8.05
0.00
15.93
28.98
94.69
1.50
14
44.12
8.05
0.00
16.70
28.98
97.85
1.55
15
46.64
8.05
0.00
17.51
28.98
101.18
1.60
16
49.31
8.05
0.00
18.36
28.98
104.70
1.66
17
52.13
8.05
0.00
19.26
28.98
108.42
1.72
18
55.11
8.05
0.00
20.20
28.98
112.35
1.78
19
58.27
8.05
0.00
21.19
28.98
116.49
1.85
20
61.60
8.05
0.00
22.23
28.98
120.86
1.92
Levellised
2.30
0.48
0.40
0.32
0.20
0.39
4.09
1
1.73
0.42
0.55
0.70
0.17
0.45
4.02
2
1.82
0.36
0.45
0.51
0.17
0.36
3.66
3
1.91
0.38
0.45
0.45
0.17
0.36
3.72
4
2.00
0.40
0.45
0.39
0.18
0.36
3.78
5
2.10
0.42
0.45
0.33
0.19
0.36
3.85
6
2.21
0.45
0.45
0.27
0.19
0.36
3.93
7
2.32
0.47
0.45
0.21
0.20
0.36
4.01
8
2.44
0.50
0.45
0.15
0.21
0.36
4.10
9
2.56
0.53
0.45
0.09
0.22
0.36
4.20
10
2.69
0.56
0.45
0.03
0.22
0.36
4.31
11
2.82
0.59
0.13
0.00
0.23
0.46
4.23
12
2.96
0.63
0.13
0.00
0.24
0.46
4.41
13
3.11
0.66
0.13
0.00
0.25
0.46
4.61
14
3.26
0.70
0.13
0.00
0.26
0.46
4.82
15
3.43
0.74
0.13
0.00
0.28
0.46
5.03
16
3.60
0.78
0.13
0.00
0.29
0.46
5.26
17
3.78
0.83
0.13
0.00
0.31
0.46
5.50
18
3.97
0.87
0.13
0.00
0.32
0.46
5.75
19
4.17
0.92
0.13
0.00
0.34
0.46
6.01
20
4.37
0.98
0.13
0.00
0.35
0.46
6.29
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Unit
Year -->
1
1
117.7
92.1
2
0.863
144.9
113.4
3
0.745
144.9
113.4
4
0.644
144.9
113.4
5
0.556
144.9
113.4
6
0.480
144.9
113.4
7
0.414
144.9
113.4
8
0.358
144.9
113.4
9
0.309
144.9
113.4
10
0.267
144.9
113.4
11
0.230
144.9
113.4
12
0.199
144.9
113.4
13
0.172
144.9
113.4
14
0.148
144.9
113.4
2.30
1.73
1.80
3.53
Page66
15
0.128
144.9
113.4
16
0.110
144.9
113.4
17
0.095
144.9
113.4
18
0.082
144.9
113.4
19
0.071
144.9
113.4
20
0.061
144.9
113.4
90%
5.28%
80%
16.995%
33.99%
402.5
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.63
2
5.28%
21.25
3
5.28%
21.25
4
5.28%
21.25
5
5.28%
21.25
6
5.28%
21.25
7
5.28%
21.25
8
5.28%
21.25
9
5.28%
21.25
10
5.28%
21.25
11
5.28%
21.25
12
5.28%
21.25
13
5.28%
21.25
14
5.28%
21.25
15
5.28%
21.25
16
5.28%
21.25
17
5.28%
21.25
18
2.88%
11.59
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
161.02
60%
48.00%
12%
193.22
12%
9.60%
2.40%
38.64
2%
1.92%
0.48%
7.73
0%
0.38%
0.10%
1.55
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
150.39
51.12
2.56
1.00
171.96
58.45
6.31
0.93
17.39
5.91
6.31
0.80
-13.53
-4.60
6.31
0.69
-19.71
-6.70
6.31
0.60
-20.94
-7.12
6.31
0.52
-21.19
-7.20
6.31
0.45
-21.24
-7.22
6.31
0.38
-21.25
-7.22
6.31
0.33
-21.25
-7.22
6.31
0.29
-21.25
-7.22
6.31
0.25
-21.25
-7.22
6.31
0.21
-21.25
-7.22
6.31
0.18
-21.25
-7.22
6.31
0.16
-21.25
-7.22
6.31
0.14
-21.25
-7.22
6.31
0.12
-21.25
-7.22
6.31
0.10
-11.59
-3.94
6.31
0.09
0.00
0.00
6.31
0.08
0.00
0.00
6.31
0.07
0.19
(Rs/kWh)
Page67
Annexure 3B
2.1 Form Template for Biomass Power Projects- Haryana
S. No.
Assumption Head
1 Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity MW
Auxillary Consumption during stablisatio%
Auxillary Consumption after stabilisation%
PLF(Stablization for 6 months)
%
PLF(during first year after Stablization) %
PLF(second year onwards)
%
Useful Life
Years
1
10%
10%
60%
70%
80%
20
2 Project Cost
Capital Cost/MW
Rs Lacs/MW
402.54
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
281.78
120.76
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
281.78
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
120.76
19.00%
10.00
24.00%
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
0%
0%
16%
Fiscal Assumptions
33.99%
16.995%
Yes
Depreciation
7.00%
2.00%
10.00
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Biomass Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3800
3800
Base Price(FY10-11)
GCV - Biomass
Biomass Price Escalation Factor
Rs/T
Kcal/kg
2238
3458
5%
Biomass
Hrs
Days
Hrs
21.41
5.72%
24
365
8760
Page68
2.2 Form Template for (Biomass Power Projects - Haryana) : Determination of Tariff Component
1
0.745
0.644
0.556
0.480
0.414
0.358
0.309
0.267
0.230
0.199
0.172
0.148
0.128
0.110
0.095
0.082
0.071
0.061
Year--->
1
1
5.69
0.57
5.12
2
1
7.01
0.70
6.31
3
1
7.01
0.70
6.31
4
1
7.01
0.70
6.31
5
1
7.01
0.70
6.31
6
1
7.01
0.70
6.31
7
1
7.01
0.70
6.31
8
1
7.01
0.70
6.31
9
1
7.01
0.70
6.31
10
1
7.01
0.70
6.31
11
1
7.01
0.70
6.31
12
1
7.01
0.70
6.31
13
1
7.01
0.70
6.31
14
1
7.01
0.70
6.31
15
1
7.01
0.70
6.31
16
1
7.01
0.70
6.31
17
1
7.01
0.70
6.31
18
1
7.01
0.70
6.31
19
1
7.01
0.70
6.31
20
1
7.01
0.70
6.31
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
1
140.01
2.73
2
180.94
2.87
3
189.99
3.01
4
199.49
3.16
5
209.46
3.32
6
219.94
3.49
7
230.93
3.66
8
242.48
3.84
9
254.60
4.04
10
267.33
4.24
11
280.70
4.45
12
294.73
4.67
13
309.47
4.91
14
324.94
5.15
15
341.19
5.41
16
358.25
5.68
17
376.16
5.96
18
394.97
6.26
19
414.72
6.58
20
435.46
6.90
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
1
21.41
28.18
35.84
12.26
22.94
120.63
2.35
2
22.63
28.18
32.07
14.94
22.94
120.76
1.91
3
23.93
28.18
28.29
15.52
22.94
118.86
1.88
4
25.30
28.18
24.52
16.13
22.94
117.07
1.86
5
26.74
28.18
20.75
16.78
22.94
115.40
1.83
6
28.27
28.18
16.98
17.47
22.94
113.84
1.80
7
29.89
28.18
13.20
18.20
22.94
112.41
1.78
8
31.60
28.18
9.43
18.96
22.94
111.12
1.76
9
33.41
28.18
5.66
19.77
22.94
109.96
1.74
10
35.32
28.18
1.89
20.63
22.94
108.96
1.73
11
37.34
8.05
0.00
21.27
28.98
95.64
1.52
12
39.47
8.05
0.00
22.30
28.98
98.81
1.57
13
41.73
8.05
0.00
23.39
28.98
102.16
1.62
14
44.12
8.05
0.00
24.54
28.98
105.69
1.68
15
46.64
8.05
0.00
25.74
28.98
109.42
1.73
16
49.31
8.05
0.00
27.00
28.98
113.35
1.80
17
52.13
8.05
0.00
28.33
28.98
117.50
1.86
18
55.11
8.05
0.00
29.73
28.98
121.88
1.93
19
58.27
8.05
0.00
31.20
28.98
126.49
2.01
20
61.60
8.05
0.00
32.74
28.98
131.37
2.08
Levellised
3.63
0.48
0.40
0.32
0.29
0.39
5.51
1
2.73
0.42
0.55
0.70
0.24
0.45
5.09
2
2.87
0.36
0.45
0.51
0.24
0.36
4.78
3
3.01
0.38
0.45
0.45
0.25
0.36
4.90
4
3.16
0.40
0.45
0.39
0.26
0.36
5.02
5
3.32
0.42
0.45
0.33
0.27
0.36
5.15
6
3.49
0.45
0.45
0.27
0.28
0.36
5.29
7
3.66
0.47
0.45
0.21
0.29
0.36
5.44
8
3.84
0.50
0.45
0.15
0.30
0.36
5.61
9
4.04
0.53
0.45
0.09
0.31
0.36
5.78
10
4.24
0.56
0.45
0.03
0.33
0.36
5.97
11
4.45
0.59
0.13
0.00
0.34
0.46
5.97
12
4.67
0.63
0.13
0.00
0.35
0.46
6.24
13
4.91
0.66
0.13
0.00
0.37
0.46
6.53
14
5.15
0.70
0.13
0.00
0.39
0.46
6.83
15
5.41
0.74
0.13
0.00
0.41
0.46
7.14
16
5.68
0.78
0.13
0.00
0.43
0.46
7.48
17
5.96
0.83
0.13
0.00
0.45
0.46
7.83
18
6.26
0.87
0.13
0.00
0.47
0.46
8.19
19
6.58
0.92
0.13
0.00
0.49
0.46
8.58
20
6.90
0.98
0.13
0.00
0.52
0.46
8.99
0.863
Unit
MW
MU
MU
MU
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Unit
Year -->
1
1
185.8
96.6
2
0.863
228.6
118.9
3
0.745
228.6
118.9
4
0.644
228.6
118.9
5
0.556
228.6
118.9
6
0.480
228.6
118.9
7
0.414
228.6
118.9
8
0.358
228.6
118.9
9
0.309
228.6
118.9
10
0.267
228.6
118.9
11
0.230
228.6
118.9
12
0.199
228.6
118.9
13
0.172
228.6
118.9
14
0.148
228.6
118.9
3.63
2.73
1.89
4.62
Page69
15
0.128
228.6
118.9
16
0.110
228.6
118.9
17
0.095
228.6
118.9
18
0.082
228.6
118.9
19
0.071
228.6
118.9
20
0.061
228.6
118.9
90%
5.28%
80%
16.995%
33.99%
402.5
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.63
2
5.28%
21.25
3
5.28%
21.25
4
5.28%
21.25
5
5.28%
21.25
6
5.28%
21.25
7
5.28%
21.25
8
5.28%
21.25
9
5.28%
21.25
10
5.28%
21.25
11
5.28%
21.25
12
5.28%
21.25
13
5.28%
21.25
14
5.28%
21.25
15
5.28%
21.25
16
5.28%
21.25
17
5.28%
21.25
18
2.88%
11.59
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
161.02
60%
48.00%
12%
193.22
12%
9.60%
2.40%
38.64
2%
1.92%
0.48%
7.73
0%
0.38%
0.10%
1.55
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
150.39
51.12
2.56
1.00
171.96
58.45
6.31
0.93
17.39
5.91
6.31
0.80
-13.53
-4.60
6.31
0.69
-19.71
-6.70
6.31
0.60
-20.94
-7.12
6.31
0.52
-21.19
-7.20
6.31
0.45
-21.24
-7.22
6.31
0.38
-21.25
-7.22
6.31
0.33
-21.25
-7.22
6.31
0.29
-21.25
-7.22
6.31
0.25
-21.25
-7.22
6.31
0.21
-21.25
-7.22
6.31
0.18
-21.25
-7.22
6.31
0.16
-21.25
-7.22
6.31
0.14
-21.25
-7.22
6.31
0.12
-21.25
-7.22
6.31
0.10
-11.59
-3.94
6.31
0.09
0.00
0.00
6.31
0.08
0.00
0.00
6.31
0.07
0.19
(Rs/kWh)
Page70
Annexure 3C
2.1 Form Template for Biomass Power Projects- Maharashtra
S. No.
Assumption Head
1 Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity MW
Auxillary Consumption during stablisatio%
Auxillary Consumption after stabilisation%
PLF(Stablization for 6 months)
%
PLF(during first year after Stablization) %
PLF(second year onwards)
%
Useful Life
Years
1
10%
10%
60%
70%
80%
20
2 Project Cost
Capital Cost/MW
Rs Lacs/MW
402.54
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
281.78
120.76
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
281.78
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
120.76
19.00%
10.00
24.00%
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
0%
0%
16%
Fiscal Assumptions
33.99%
16.995%
Yes
Depreciation
7.00%
2.00%
10.00
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Biomass Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3800
3800
Base Price(FY10-11)
GCV - Biomass
Biomass Price Escalation Factor
Rs/T
Kcal/kg
1859
3611
5%
Biomass
Hrs
Days
Hrs
21.41
5.72%
24
365
8760
Page71
2.2 Form Template for (Biomass Power Projects) : Determination of Tariff Component
1
0.745
0.644
0.556
0.480
0.414
0.358
0.309
0.267
0.230
0.199
0.172
0.148
0.128
0.110
0.095
0.082
0.071
0.061
Year--->
1
1
5.69
0.57
5.12
2
1
7.01
0.70
6.31
3
1
7.01
0.70
6.31
4
1
7.01
0.70
6.31
5
1
7.01
0.70
6.31
6
1
7.01
0.70
6.31
7
1
7.01
0.70
6.31
8
1
7.01
0.70
6.31
9
1
7.01
0.70
6.31
10
1
7.01
0.70
6.31
11
1
7.01
0.70
6.31
12
1
7.01
0.70
6.31
13
1
7.01
0.70
6.31
14
1
7.01
0.70
6.31
15
1
7.01
0.70
6.31
16
1
7.01
0.70
6.31
17
1
7.01
0.70
6.31
18
1
7.01
0.70
6.31
19
1
7.01
0.70
6.31
20
1
7.01
0.70
6.31
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
1
111.38
2.17
2
143.94
2.28
3
151.14
2.40
4
158.70
2.52
5
166.63
2.64
6
174.96
2.77
7
183.71
2.91
8
192.90
3.06
9
202.54
3.21
10
212.67
3.37
11
223.30
3.54
12
234.47
3.72
13
246.19
3.90
14
258.50
4.10
15
271.43
4.30
16
285.00
4.52
17
299.25
4.74
18
314.21
4.98
19
329.92
5.23
20
346.42
5.49
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
1
21.41
28.18
35.84
10.37
22.94
118.74
2.32
2
22.63
28.18
32.07
12.50
22.94
118.32
1.88
3
23.93
28.18
28.29
12.96
22.94
116.30
1.84
4
25.30
28.18
24.52
13.44
22.94
114.39
1.81
5
26.74
28.18
20.75
13.96
22.94
112.58
1.78
6
28.27
28.18
16.98
14.51
22.94
110.88
1.76
7
29.89
28.18
13.20
15.09
22.94
109.30
1.73
8
31.60
28.18
9.43
15.70
22.94
107.85
1.71
9
33.41
28.18
5.66
16.35
22.94
106.53
1.69
10
35.32
28.18
1.89
17.03
22.94
105.36
1.67
11
37.34
8.05
0.00
17.49
28.98
91.86
1.46
12
39.47
8.05
0.00
18.33
28.98
94.84
1.50
13
41.73
8.05
0.00
19.23
28.98
97.99
1.55
14
44.12
8.05
0.00
20.16
28.98
101.31
1.61
15
46.64
8.05
0.00
21.15
28.98
104.82
1.66
16
49.31
8.05
0.00
22.18
28.98
108.52
1.72
17
52.13
8.05
0.00
23.27
28.98
112.43
1.78
18
55.11
8.05
0.00
24.41
28.98
116.56
1.85
19
58.27
8.05
0.00
25.61
28.98
120.91
1.92
20
61.60
8.05
0.00
26.87
28.98
125.50
1.99
1
2.17
0.42
0.55
0.70
0.20
0.45
4.49
2
2.28
0.36
0.45
0.51
0.20
0.36
4.16
3
2.40
0.38
0.45
0.45
0.21
0.36
4.24
4
2.52
0.40
0.45
0.39
0.21
0.36
4.33
5
2.64
0.42
0.45
0.33
0.22
0.36
4.43
6
2.77
0.45
0.45
0.27
0.23
0.36
4.53
7
2.91
0.47
0.45
0.21
0.24
0.36
4.65
8
3.06
0.50
0.45
0.15
0.25
0.36
4.77
9
3.21
0.53
0.45
0.09
0.26
0.36
4.90
10
3.37
0.56
0.45
0.03
0.27
0.36
5.04
11
3.54
0.59
0.13
0.00
0.28
0.46
5.00
12
3.72
0.63
0.13
0.00
0.29
0.46
5.22
13
3.90
0.66
0.13
0.00
0.30
0.46
5.46
14
4.10
0.70
0.13
0.00
0.32
0.46
5.70
15
4.30
0.74
0.13
0.00
0.34
0.46
5.97
16
4.52
0.78
0.13
0.00
0.35
0.46
6.24
17
4.74
0.83
0.13
0.00
0.37
0.46
6.53
18
4.98
0.87
0.13
0.00
0.39
0.46
6.83
19
5.23
0.92
0.13
0.00
0.41
0.46
7.15
20
5.49
0.98
0.13
0.00
0.43
0.46
7.48
0.863
Unit
MW
MU
MU
MU
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Unit
Year -->
1
1
111.4
94.1
2
0.863
137.1
115.8
3
0.745
137.1
115.8
4
0.644
137.1
115.8
5
0.556
137.1
115.8
6
0.480
137.1
115.8
7
0.414
137.1
115.8
8
0.358
137.1
115.8
9
0.309
137.1
115.8
10
0.267
137.1
115.8
11
0.230
137.1
115.8
12
0.199
137.1
115.8
13
0.172
137.1
115.8
14
0.148
137.1
115.8
2.17
1.84
4.01
Page72
15
0.128
137.1
115.8
16
0.110
137.1
115.8
17
0.095
137.1
115.8
18
0.082
137.1
115.8
19
0.071
137.1
115.8
20
0.061
137.1
115.8
90%
5.28%
80%
16.995%
33.99%
402.5
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.63
2
5.28%
21.25
3
5.28%
21.25
4
5.28%
21.25
5
5.28%
21.25
6
5.28%
21.25
7
5.28%
21.25
8
5.28%
21.25
9
5.28%
21.25
10
5.28%
21.25
11
5.28%
21.25
12
5.28%
21.25
13
5.28%
21.25
14
5.28%
21.25
15
5.28%
21.25
16
5.28%
21.25
17
5.28%
21.25
18
2.88%
11.59
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
161.02
60%
48.00%
12%
193.22
12%
9.60%
2.40%
38.64
2%
1.92%
0.48%
7.73
0%
0.38%
0.10%
1.55
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
150.39
51.12
2.56
1.00
171.96
58.45
6.31
0.93
17.39
5.91
6.31
0.80
-13.53
-4.60
6.31
0.69
-19.71
-6.70
6.31
0.60
-20.94
-7.12
6.31
0.52
-21.19
-7.20
6.31
0.45
-21.24
-7.22
6.31
0.38
-21.25
-7.22
6.31
0.33
-21.25
-7.22
6.31
0.29
-21.25
-7.22
6.31
0.25
-21.25
-7.22
6.31
0.21
-21.25
-7.22
6.31
0.18
-21.25
-7.22
6.31
0.16
-21.25
-7.22
6.31
0.14
-21.25
-7.22
6.31
0.12
-21.25
-7.22
6.31
0.10
-11.59
-3.94
6.31
0.09
0.00
0.00
6.31
0.08
0.00
0.00
6.31
0.07
0.19
(Rs/kWh)
Page73
Annexure 3D
2.1 Form Template for Biomass Power Projects-Punjab
S. No.
Assumption Head
1 Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity MW
Auxillary Consumption during stablisatio%
Auxillary Consumption after stabilisation%
PLF(Stablization for 6 months)
%
PLF(during first year after Stablization) %
PLF(second year onwards)
%
Useful Life
Years
1
10%
10%
60%
70%
80%
20
2 Project Cost
Capital Cost/MW
Rs Lacs/MW
402.54
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
281.78
120.76
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
281.78
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
120.76
19.00%
10.00
24.00%
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
0%
0%
16%
Fiscal Assumptions
33.99%
16.995%
Yes
Depreciation
7.00%
2.00%
10.00
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Biomass Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3800
3800
Base Price(FY10-11)
GCV - Biomass
Biomass Price Escalation Factor
Rs/T
Kcal/kg
2159
3368
5%
Biomass
Hrs
Days
Hrs
21.41
5.72%
24
365
8760
Page74
2.2 Form Template for (Biomass Power Projects - Punjab) : Determination of Tariff Component
1
0.863
0.745
0.644
0.556
0.480
0.414
0.358
0.309
0.267
0.230
0.199
0.172
0.148
0.128
0.110
0.095
0.082
0.071
0.061
Unit
MW
MU
MU
MU
Year--->
1
1
5.69
0.57
5.12
2
1
7.01
0.70
6.31
3
1
7.01
0.70
6.31
4
1
7.01
0.70
6.31
5
1
7.01
0.70
6.31
6
1
7.01
0.70
6.31
7
1
7.01
0.70
6.31
8
1
7.01
0.70
6.31
9
1
7.01
0.70
6.31
10
1
7.01
0.70
6.31
11
1
7.01
0.70
6.31
12
1
7.01
0.70
6.31
13
1
7.01
0.70
6.31
14
1
7.01
0.70
6.31
15
1
7.01
0.70
6.31
16
1
7.01
0.70
6.31
17
1
7.01
0.70
6.31
18
1
7.01
0.70
6.31
19
1
7.01
0.70
6.31
20
1
7.01
0.70
6.31
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
1
138.72
2.71
2
179.26
2.84
3
188.23
2.98
4
197.64
3.13
5
207.52
3.29
6
217.90
3.45
7
228.79
3.63
8
240.23
3.81
9
252.24
4.00
10
264.85
4.20
11
278.10
4.41
12
292.00
4.63
13
306.60
4.86
14
321.93
5.10
15
338.03
5.36
16
354.93
5.63
17
372.68
5.91
18
391.31
6.20
19
410.88
6.51
20
431.42
6.84
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
1
21.41
28.18
35.84
12.17
22.94
120.54
2.35
2
22.63
28.18
32.07
14.82
22.94
120.65
1.91
3
23.93
28.18
28.29
15.40
22.94
118.75
1.88
4
25.30
28.18
24.52
16.01
22.94
116.95
1.85
5
26.74
28.18
20.75
16.65
22.94
115.27
1.83
6
28.27
28.18
16.98
17.33
22.94
113.71
1.80
7
29.89
28.18
13.20
18.05
22.94
112.27
1.78
8
31.60
28.18
9.43
18.82
22.94
110.97
1.76
9
33.41
28.18
5.66
19.62
22.94
109.81
1.74
10
35.32
28.18
1.89
20.47
22.94
108.79
1.72
11
37.34
8.05
0.00
21.10
28.98
95.47
1.51
12
39.47
8.05
0.00
22.12
28.98
98.63
1.56
13
41.73
8.05
0.00
23.20
28.98
101.97
1.62
14
44.12
8.05
0.00
24.34
28.98
105.49
1.67
15
46.64
8.05
0.00
25.53
28.98
109.21
1.73
16
49.31
8.05
0.00
26.79
28.98
113.13
1.79
17
52.13
8.05
0.00
28.10
28.98
117.27
1.86
18
55.11
8.05
0.00
29.49
28.98
121.63
1.93
19
58.27
8.05
0.00
30.94
28.98
126.24
2.00
20
61.60
8.05
0.00
32.47
28.98
131.10
2.08
Unit
Rs/kWh
Rs/kWh
Rs/kWh
Rs/kWh
Rs/kWh
Rs/kWh
Rs/kWh
Levellised
3.59
0.48
0.40
0.32
0.29
0.39
5.47
1
2.71
0.42
0.55
0.70
0.24
0.45
5.06
2
2.84
0.36
0.45
0.51
0.24
0.36
4.76
3
2.98
0.38
0.45
0.45
0.24
0.36
4.87
4
3.13
0.40
0.45
0.39
0.25
0.36
4.99
5
3.29
0.42
0.45
0.33
0.26
0.36
5.12
6
3.45
0.45
0.45
0.27
0.27
0.36
5.26
7
3.63
0.47
0.45
0.21
0.29
0.36
5.41
8
3.81
0.50
0.45
0.15
0.30
0.36
5.57
9
4.00
0.53
0.45
0.09
0.31
0.36
5.74
10
4.20
0.56
0.45
0.03
0.32
0.36
5.92
11
4.41
0.59
0.13
0.00
0.33
0.46
5.92
12
4.63
0.63
0.13
0.00
0.35
0.46
6.19
13
4.86
0.66
0.13
0.00
0.37
0.46
6.48
14
5.10
0.70
0.13
0.00
0.39
0.46
6.78
15
5.36
0.74
0.13
0.00
0.40
0.46
7.09
16
5.63
0.78
0.13
0.00
0.42
0.46
7.42
17
5.91
0.83
0.13
0.00
0.45
0.46
7.77
18
6.20
0.87
0.13
0.00
0.47
0.46
8.13
19
6.51
0.92
0.13
0.00
0.49
0.46
8.52
20
6.84
0.98
0.13
0.00
0.51
0.46
8.92
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Levellised Tariff
Discount Factor
Variable Cost
Fixed Cost
Variable Cost (FY10-11)
Levellised Tariff (Fixed)
Applicable Tariff FY10-11 (Rs/Unit)
Unit
Year -->
1
1
138.7
96.5
2
0.863
170.7
118.8
3
0.745
170.7
118.8
4
0.644
170.7
118.8
5
0.556
170.7
118.8
6
0.480
170.7
118.8
7
0.414
170.7
118.8
8
0.358
170.7
118.8
9
0.309
170.7
118.8
10
0.267
170.7
118.8
11
0.230
170.7
118.8
12
0.199
170.7
118.8
13
0.172
170.7
118.8
2.71
1.88
4.59
Page75
14
0.148
170.7
118.8
15
0.128
170.7
118.8
16
0.110
170.7
118.8
17
0.095
170.7
118.8
18
0.082
170.7
118.8
19
0.071
170.7
118.8
20
0.061
170.7
118.8
90%
5.28%
80%
16.995%
33.99%
402.5
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.63
2
5.28%
21.25
3
5.28%
21.25
4
5.28%
21.25
5
5.28%
21.25
6
5.28%
21.25
7
5.28%
21.25
8
5.28%
21.25
9
5.28%
21.25
10
5.28%
21.25
11
5.28%
21.25
12
5.28%
21.25
13
5.28%
21.25
14
5.28%
21.25
15
5.28%
21.25
16
5.28%
21.25
17
5.28%
21.25
18
2.88%
11.59
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
161.02
60%
48.00%
12%
193.22
12%
9.60%
2.40%
38.64
2%
1.92%
0.48%
7.73
0%
0.38%
0.10%
1.55
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
150.39
51.12
2.56
1.00
171.96
58.45
6.31
0.93
17.39
5.91
6.31
0.80
-13.53
-4.60
6.31
0.69
-19.71
-6.70
6.31
0.60
-20.94
-7.12
6.31
0.52
-21.19
-7.20
6.31
0.45
-21.24
-7.22
6.31
0.38
-21.25
-7.22
6.31
0.33
-21.25
-7.22
6.31
0.29
-21.25
-7.22
6.31
0.25
-21.25
-7.22
6.31
0.21
-21.25
-7.22
6.31
0.18
-21.25
-7.22
6.31
0.16
-21.25
-7.22
6.31
0.14
-21.25
-7.22
6.31
0.12
-21.25
-7.22
6.31
0.10
-11.59
-3.94
6.31
0.09
0.00
0.00
6.31
0.08
0.00
0.00
6.31
0.07
0.19
(Rs/kWh)
Page76
Annexure 3E
2.1 Form Template for Biomass Power Projects- Madhya Pradesh
S. No.
Assumption Head
1 Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity MW
Auxillary Consumption during stablisatio%
Auxillary Consumption after stabilisation%
PLF(Stablization for 6 months)
%
PLF(during first year after Stablization) %
PLF(second year onwards)
%
Useful Life
Years
1
10%
10%
60%
70%
80%
20
2 Project Cost
Capital Cost/MW
Rs Lacs/MW
402.54
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
281.78
120.76
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
281.78
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
120.76
19.00%
10.00
24.00%
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
0%
0%
16%
Fiscal Assumptions
33.99%
16.995%
Yes
Depreciation
7.00%
2.00%
10.00
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Biomass Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3800
3800
Base Price(FY10-11)
GCV - Biomass
Biomass Price Escalation Factor
Rs/T
Kcal/kg
1341
3612
5%
Biomass
Hrs
Days
Hrs
21.41
5.72%
24
365
8760
Page77
2.2 Form Template for (Biomass Power Projects) : Determination of Tariff Component
1
0.863
0.745
0.644
0.556
0.480
0.414
0.358
0.309
0.267
0.230
0.199
0.172
0.148
0.128
0.110
0.095
0.082
0.071
0.061
Unit
MW
MU
MU
MU
Year--->
1
1
5.69
0.57
5.12
2
1
7.01
0.70
6.31
3
1
7.01
0.70
6.31
4
1
7.01
0.70
6.31
5
1
7.01
0.70
6.31
6
1
7.01
0.70
6.31
7
1
7.01
0.70
6.31
8
1
7.01
0.70
6.31
9
1
7.01
0.70
6.31
10
1
7.01
0.70
6.31
11
1
7.01
0.70
6.31
12
1
7.01
0.70
6.31
13
1
7.01
0.70
6.31
14
1
7.01
0.70
6.31
15
1
7.01
0.70
6.31
16
1
7.01
0.70
6.31
17
1
7.01
0.70
6.31
18
1
7.01
0.70
6.31
19
1
7.01
0.70
6.31
20
1
7.01
0.70
6.31
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
1
80.32
1.57
2
103.79
1.65
3
108.98
1.73
4
114.43
1.81
5
120.15
1.91
6
126.16
2.00
7
132.47
2.10
8
139.09
2.21
9
146.05
2.32
10
153.35
2.43
11
161.02
2.55
12
169.07
2.68
13
177.52
2.81
14
186.40
2.96
15
195.72
3.10
16
205.50
3.26
17
215.78
3.42
18
226.57
3.59
19
237.89
3.77
20
249.79
3.96
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
1
21.41
28.18
35.84
8.33
22.94
116.70
2.28
2
22.63
28.18
32.07
9.85
22.94
115.68
1.83
3
23.93
28.18
28.29
10.18
22.94
113.53
1.80
4
25.30
28.18
24.52
10.53
22.94
111.47
1.77
5
26.74
28.18
20.75
10.90
22.94
109.52
1.74
6
28.27
28.18
16.98
11.29
22.94
107.67
1.71
7
29.89
28.18
13.20
11.71
22.94
105.93
1.68
8
31.60
28.18
9.43
12.15
22.94
104.31
1.65
9
33.41
28.18
5.66
12.63
22.94
102.81
1.63
10
35.32
28.18
1.89
13.12
22.94
101.45
1.61
11
37.34
8.05
0.00
13.38
28.98
87.76
1.39
12
39.47
8.05
0.00
14.03
28.98
90.53
1.44
13
41.73
8.05
0.00
14.70
28.98
93.47
1.48
14
44.12
8.05
0.00
15.41
28.98
96.57
1.53
15
46.64
8.05
0.00
16.16
28.98
99.84
1.58
16
49.31
8.05
0.00
16.95
28.98
103.29
1.64
17
52.13
8.05
0.00
17.77
28.98
106.94
1.70
18
55.11
8.05
0.00
18.64
28.98
110.78
1.76
19
58.27
8.05
0.00
19.55
28.98
114.85
1.82
20
61.60
8.05
0.00
20.51
28.98
119.14
1.89
Levellised
2.08
0.48
0.40
0.32
0.19
0.39
3.86
1
1.57
0.42
0.55
0.70
0.16
0.45
3.84
2
1.65
0.36
0.45
0.51
0.16
0.36
3.48
3
1.73
0.38
0.45
0.45
0.16
0.36
3.53
4
1.81
0.40
0.45
0.39
0.17
0.36
3.58
5
1.91
0.42
0.45
0.33
0.17
0.36
3.64
6
2.00
0.45
0.45
0.27
0.18
0.36
3.71
7
2.10
0.47
0.45
0.21
0.19
0.36
3.78
8
2.21
0.50
0.45
0.15
0.19
0.36
3.86
9
2.32
0.53
0.45
0.09
0.20
0.36
3.95
10
2.43
0.56
0.45
0.03
0.21
0.36
4.04
11
2.55
0.59
0.13
0.00
0.21
0.46
3.94
12
2.68
0.63
0.13
0.00
0.22
0.46
4.12
13
2.81
0.66
0.13
0.00
0.23
0.46
4.30
14
2.96
0.70
0.13
0.00
0.24
0.46
4.49
15
3.10
0.74
0.13
0.00
0.26
0.46
4.69
16
3.26
0.78
0.13
0.00
0.27
0.46
4.90
17
3.42
0.83
0.13
0.00
0.28
0.46
5.12
18
3.59
0.87
0.13
0.00
0.30
0.46
5.35
19
3.77
0.92
0.13
0.00
0.31
0.46
5.59
20
3.96
0.98
0.13
0.00
0.33
0.46
5.85
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Unit
Year -->
1
1
80.3
91.4
2
0.863
98.8
112.5
3
0.745
98.8
112.5
4
0.644
98.8
112.5
5
0.556
98.8
112.5
6
0.480
98.8
112.5
7
0.414
98.8
112.5
8
0.358
98.8
112.5
9
0.309
98.8
112.5
10
0.267
98.8
112.5
11
0.230
98.8
112.5
12
0.199
98.8
112.5
13
0.172
98.8
112.5
14
0.148
98.8
112.5
1.57
1.78
3.35
Page78
15
0.128
98.8
112.5
16
0.110
98.8
112.5
17
0.095
98.8
112.5
18
0.082
98.8
112.5
19
0.071
98.8
112.5
20
0.061
98.8
112.5
90%
5.28%
80%
16.995%
33.99%
402.5
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.63
2
5.28%
21.25
3
5.28%
21.25
4
5.28%
21.25
5
5.28%
21.25
6
5.28%
21.25
7
5.28%
21.25
8
5.28%
21.25
9
5.28%
21.25
10
5.28%
21.25
11
5.28%
21.25
12
5.28%
21.25
13
5.28%
21.25
14
5.28%
21.25
15
5.28%
21.25
16
5.28%
21.25
17
5.28%
21.25
18
2.88%
11.59
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
161.02
60%
48.00%
12%
193.22
12%
9.60%
2.40%
38.64
2%
1.92%
0.48%
7.73
0%
0.38%
0.10%
1.55
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
150.39
51.12
2.56
1.00
171.96
58.45
6.31
0.93
17.39
5.91
6.31
0.80
-13.53
-4.60
6.31
0.69
-19.71
-6.70
6.31
0.60
-20.94
-7.12
6.31
0.52
-21.19
-7.20
6.31
0.45
-21.24
-7.22
6.31
0.38
-21.25
-7.22
6.31
0.33
-21.25
-7.22
6.31
0.29
-21.25
-7.22
6.31
0.25
-21.25
-7.22
6.31
0.21
-21.25
-7.22
6.31
0.18
-21.25
-7.22
6.31
0.16
-21.25
-7.22
6.31
0.14
-21.25
-7.22
6.31
0.12
-21.25
-7.22
6.31
0.10
-11.59
-3.94
6.31
0.09
0.00
0.00
6.31
0.08
0.00
0.00
6.31
0.07
0.19
(Rs/kWh)
Page79
Annexure 3F
2.1 Form Template for Biomass Power Projects- Rajasthan
S. No.
Assumption Head
1 Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity MW
Auxillary Consumption during stablisatio%
Auxillary Consumption after stabilisation%
PLF(Stablization for 6 months)
%
PLF(during first year after Stablization) %
PLF(second year onwards)
%
Useful Life
Years
1
10%
10%
60%
70%
80%
20
2 Project Cost
Capital Cost/MW
Rs Lacs/MW
402.54
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
281.78
120.76
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
281.78
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
120.76
19.00%
10.00
24.00%
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
0%
0%
16%
Fiscal Assumptions
33.99%
16.995%
Yes
Depreciation
7.00%
2.00%
10.00
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Biomass Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3800
3800
Base Price(FY10-11)
GCV - Biomass
Biomass Price Escalation Factor
Rs/T
Kcal/kg
1881
3689
5%
Biomass
Hrs
Days
Hrs
21.41
5.72%
24
365
8760
Page80
2.2 Form Template for (Biomass Power Projects) : Determination of Tariff Component
1
0.863
0.745
0.644
0.556
0.480
0.414
0.358
0.309
0.267
0.230
0.199
0.172
0.148
0.128
0.110
0.095
0.082
0.071
0.061
Unit
MW
MU
MU
MU
Year--->
1
1
5.69
0.57
5.12
2
1
7.01
0.70
6.31
3
1
7.01
0.70
6.31
4
1
7.01
0.70
6.31
5
1
7.01
0.70
6.31
6
1
7.01
0.70
6.31
7
1
7.01
0.70
6.31
8
1
7.01
0.70
6.31
9
1
7.01
0.70
6.31
10
1
7.01
0.70
6.31
11
1
7.01
0.70
6.31
12
1
7.01
0.70
6.31
13
1
7.01
0.70
6.31
14
1
7.01
0.70
6.31
15
1
7.01
0.70
6.31
16
1
7.01
0.70
6.31
17
1
7.01
0.70
6.31
18
1
7.01
0.70
6.31
19
1
7.01
0.70
6.31
20
1
7.01
0.70
6.31
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
1
110.30
2.15
2
142.54
2.26
3
149.67
2.37
4
157.15
2.49
5
165.01
2.62
6
173.26
2.75
7
181.92
2.88
8
191.02
3.03
9
200.57
3.18
10
210.60
3.34
11
221.13
3.51
12
232.19
3.68
13
243.80
3.87
14
255.99
4.06
15
268.78
4.26
16
282.22
4.47
17
296.33
4.70
18
311.15
4.93
19
326.71
5.18
20
343.04
5.44
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
1
21.41
28.18
35.84
10.30
22.94
118.67
2.32
2
22.63
28.18
32.07
12.41
22.94
118.23
1.87
3
23.93
28.18
28.29
12.86
22.94
116.21
1.84
4
25.30
28.18
24.52
13.34
22.94
114.28
1.81
5
26.74
28.18
20.75
13.85
22.94
112.47
1.78
6
28.27
28.18
16.98
14.40
22.94
110.77
1.76
7
29.89
28.18
13.20
14.97
22.94
109.19
1.73
8
31.60
28.18
9.43
15.57
22.94
107.73
1.71
9
33.41
28.18
5.66
16.22
22.94
106.40
1.69
10
35.32
28.18
1.89
16.89
22.94
105.22
1.67
11
37.34
8.05
0.00
17.34
28.98
91.72
1.45
12
39.47
8.05
0.00
18.18
28.98
94.69
1.50
13
41.73
8.05
0.00
19.07
28.98
97.83
1.55
14
44.12
8.05
0.00
20.00
28.98
101.15
1.60
15
46.64
8.05
0.00
20.97
28.98
104.65
1.66
16
49.31
8.05
0.00
22.00
28.98
108.34
1.72
17
52.13
8.05
0.00
23.08
28.98
112.24
1.78
18
55.11
8.05
0.00
24.21
28.98
116.36
1.84
19
58.27
8.05
0.00
25.40
28.98
120.70
1.91
20
61.60
8.05
0.00
26.65
28.98
125.28
1.99
Levellised
2.86
0.48
0.40
0.32
0.24
0.39
4.69
1
2.15
0.42
0.55
0.70
0.20
0.45
4.47
2
2.26
0.36
0.45
0.51
0.20
0.36
4.13
3
2.37
0.38
0.45
0.45
0.20
0.36
4.22
4
2.49
0.40
0.45
0.39
0.21
0.36
4.30
5
2.62
0.42
0.45
0.33
0.22
0.36
4.40
6
2.75
0.45
0.45
0.27
0.23
0.36
4.50
7
2.88
0.47
0.45
0.21
0.24
0.36
4.62
8
3.03
0.50
0.45
0.15
0.25
0.36
4.74
9
3.18
0.53
0.45
0.09
0.26
0.36
4.87
10
3.34
0.56
0.45
0.03
0.27
0.36
5.01
11
3.51
0.59
0.13
0.00
0.27
0.46
4.96
12
3.68
0.63
0.13
0.00
0.29
0.46
5.18
13
3.87
0.66
0.13
0.00
0.30
0.46
5.42
14
4.06
0.70
0.13
0.00
0.32
0.46
5.66
15
4.26
0.74
0.13
0.00
0.33
0.46
5.92
16
4.47
0.78
0.13
0.00
0.35
0.46
6.19
17
4.70
0.83
0.13
0.00
0.37
0.46
6.48
18
4.93
0.87
0.13
0.00
0.38
0.46
6.78
19
5.18
0.92
0.13
0.00
0.40
0.46
7.09
20
5.44
0.98
0.13
0.00
0.42
0.46
7.43
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Unit
Year -->
1
1
110.3
94.0
2
0.863
135.8
115.7
3
0.745
135.8
115.7
4
0.644
135.8
115.7
5
0.556
135.8
115.7
6
0.480
135.8
115.7
7
0.414
135.8
115.7
8
0.358
135.8
115.7
9
0.309
135.8
115.7
10
0.267
135.8
115.7
11
0.230
135.8
115.7
12
0.199
135.8
115.7
13
0.172
135.8
115.7
14
0.148
135.8
115.7
2.15
1.83
3.99
Page81
15
0.128
135.8
115.7
16
0.110
135.8
115.7
17
0.095
135.8
115.7
18
0.082
135.8
115.7
19
0.071
135.8
115.7
20
0.061
135.8
115.7
90%
5.28%
80%
16.995%
33.99%
402.5
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.63
2
5.28%
21.25
3
5.28%
21.25
4
5.28%
21.25
5
5.28%
21.25
6
5.28%
21.25
7
5.28%
21.25
8
5.28%
21.25
9
5.28%
21.25
10
5.28%
21.25
11
5.28%
21.25
12
5.28%
21.25
13
5.28%
21.25
14
5.28%
21.25
15
5.28%
21.25
16
5.28%
21.25
17
5.28%
21.25
18
2.88%
11.59
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
161.02
60%
48.00%
12%
193.22
12%
9.60%
2.40%
38.64
2%
1.92%
0.48%
7.73
0%
0.38%
0.10%
1.55
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
150.39
51.12
2.56
1.00
171.96
58.45
6.31
0.93
17.39
5.91
6.31
0.80
-13.53
-4.60
6.31
0.69
-19.71
-6.70
6.31
0.60
-20.94
-7.12
6.31
0.52
-21.19
-7.20
6.31
0.45
-21.24
-7.22
6.31
0.38
-21.25
-7.22
6.31
0.33
-21.25
-7.22
6.31
0.29
-21.25
-7.22
6.31
0.25
-21.25
-7.22
6.31
0.21
-21.25
-7.22
6.31
0.18
-21.25
-7.22
6.31
0.16
-21.25
-7.22
6.31
0.14
-21.25
-7.22
6.31
0.12
-21.25
-7.22
6.31
0.10
-11.59
-3.94
6.31
0.09
0.00
0.00
6.31
0.08
0.00
0.00
6.31
0.07
0.19
(Rs/kWh)
Page82
Annexure 3G
2.1 Form Template for Biomass Power Projects- Uttar Pradesh
S. No.
Assumption Head
1 Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity MW
Auxillary Consumption during stablisatio%
Auxillary Consumption after stabilisation%
PLF(Stablization for 6 months)
%
PLF(during first year after Stablization) %
PLF(second year onwards)
%
Useful Life
Years
1
10%
10%
60%
70%
80%
20
2 Project Cost
Capital Cost/MW
Rs Lacs/MW
402.54
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
281.78
120.76
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
281.78
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
120.76
19.00%
10.00
24.00%
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
0%
0%
16%
Fiscal Assumptions
33.99%
16.995%
Yes
Depreciation
7.00%
2.00%
10.00
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Biomass Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3800
3800
Base Price(FY10-11)
GCV - Biomass
Biomass Price Escalation Factor
Rs/T
Kcal/kg
1567
3371
5%
Biomass
Hrs
Days
Hrs
21.41
5.72%
24
365
8760
Page83
2.2 Form Template for (Biomass Power Projects) : Determination of Tariff Component
1
0.863
0.745
0.644
0.556
0.480
0.414
0.358
0.309
0.267
0.230
0.199
0.172
0.148
0.128
0.110
0.095
0.082
0.071
0.061
Unit
MW
MU
MU
MU
Year--->
1
1
5.69
0.57
5.12
2
1
7.01
0.70
6.31
3
1
7.01
0.70
6.31
4
1
7.01
0.70
6.31
5
1
7.01
0.70
6.31
6
1
7.01
0.70
6.31
7
1
7.01
0.70
6.31
8
1
7.01
0.70
6.31
9
1
7.01
0.70
6.31
10
1
7.01
0.70
6.31
11
1
7.01
0.70
6.31
12
1
7.01
0.70
6.31
13
1
7.01
0.70
6.31
14
1
7.01
0.70
6.31
15
1
7.01
0.70
6.31
16
1
7.01
0.70
6.31
17
1
7.01
0.70
6.31
18
1
7.01
0.70
6.31
19
1
7.01
0.70
6.31
20
1
7.01
0.70
6.31
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
1
100.57
1.96
2
129.96
2.06
3
136.46
2.16
4
143.28
2.27
5
150.45
2.39
6
157.97
2.50
7
165.87
2.63
8
174.16
2.76
9
182.87
2.90
10
192.01
3.04
11
201.61
3.20
12
211.69
3.36
13
222.28
3.52
14
233.39
3.70
15
245.06
3.89
16
257.32
4.08
17
270.18
4.28
18
283.69
4.50
19
297.88
4.72
20
312.77
4.96
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
1
21.41
28.18
35.84
9.66
22.94
118.03
2.30
2
22.63
28.18
32.07
11.58
22.94
117.40
1.86
3
23.93
28.18
28.29
11.99
22.94
115.34
1.83
4
25.30
28.18
24.52
12.43
22.94
113.37
1.80
5
26.74
28.18
20.75
12.90
22.94
111.51
1.77
6
28.27
28.18
16.98
13.39
22.94
109.76
1.74
7
29.89
28.18
13.20
13.91
22.94
108.13
1.71
8
31.60
28.18
9.43
14.46
22.94
106.62
1.69
9
33.41
28.18
5.66
15.05
22.94
105.24
1.67
10
35.32
28.18
1.89
15.67
22.94
104.00
1.65
11
37.34
8.05
0.00
16.06
28.98
90.43
1.43
12
39.47
8.05
0.00
16.83
28.98
93.34
1.48
13
41.73
8.05
0.00
17.65
28.98
96.42
1.53
14
44.12
8.05
0.00
18.51
28.98
99.66
1.58
15
46.64
8.05
0.00
19.41
28.98
103.09
1.63
16
49.31
8.05
0.00
20.36
28.98
106.70
1.69
17
52.13
8.05
0.00
21.35
28.98
110.52
1.75
18
55.11
8.05
0.00
22.40
28.98
114.55
1.82
19
58.27
8.05
0.00
23.50
28.98
118.80
1.88
20
61.60
8.05
0.00
24.66
28.98
123.29
1.95
1
1.96
0.42
0.55
0.70
0.19
0.45
4.27
2
2.06
0.36
0.45
0.51
0.18
0.36
3.92
3
2.16
0.38
0.45
0.45
0.19
0.36
3.99
4
2.27
0.40
0.45
0.39
0.20
0.36
4.07
5
2.39
0.42
0.45
0.33
0.20
0.36
4.15
6
2.50
0.45
0.45
0.27
0.21
0.36
4.24
7
2.63
0.47
0.45
0.21
0.22
0.36
4.34
8
2.76
0.50
0.45
0.15
0.23
0.36
4.45
9
2.90
0.53
0.45
0.09
0.24
0.36
4.57
10
3.04
0.56
0.45
0.03
0.25
0.36
4.69
11
3.20
0.59
0.13
0.00
0.25
0.46
4.63
12
3.36
0.63
0.13
0.00
0.27
0.46
4.84
13
3.52
0.66
0.13
0.00
0.28
0.46
5.05
14
3.70
0.70
0.13
0.00
0.29
0.46
5.28
15
3.89
0.74
0.13
0.00
0.31
0.46
5.52
16
4.08
0.78
0.13
0.00
0.32
0.46
5.77
17
4.28
0.83
0.13
0.00
0.34
0.46
6.04
18
4.50
0.87
0.13
0.00
0.36
0.46
6.31
19
4.72
0.92
0.13
0.00
0.37
0.46
6.61
20
4.96
0.98
0.13
0.00
0.39
0.46
6.91
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Unit
Year -->
1
1
100.6
93.2
2
0.863
123.8
114.7
3
0.745
123.8
114.7
4
0.644
123.8
114.7
5
0.556
123.8
114.7
6
0.480
123.8
114.7
7
0.414
123.8
114.7
8
0.358
123.8
114.7
9
0.309
123.8
114.7
10
0.267
123.8
114.7
11
0.230
123.8
114.7
12
0.199
123.8
114.7
13
0.172
123.8
114.7
14
0.148
123.8
114.7
1.96
1.82
3.78
Page84
15
0.128
123.8
114.7
16
0.110
123.8
114.7
17
0.095
123.8
114.7
18
0.082
123.8
114.7
19
0.071
123.8
114.7
20
0.061
123.8
114.7
90%
5.28%
80%
16.995%
33.99%
402.5
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.63
2
5.28%
21.25
3
5.28%
21.25
4
5.28%
21.25
5
5.28%
21.25
6
5.28%
21.25
7
5.28%
21.25
8
5.28%
21.25
9
5.28%
21.25
10
5.28%
21.25
11
5.28%
21.25
12
5.28%
21.25
13
5.28%
21.25
14
5.28%
21.25
15
5.28%
21.25
16
5.28%
21.25
17
5.28%
21.25
18
2.88%
11.59
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
161.02
60%
48.00%
12%
193.22
12%
9.60%
2.40%
38.64
2%
1.92%
0.48%
7.73
0%
0.38%
0.10%
1.55
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
150.39
51.12
2.56
1.00
171.96
58.45
6.31
0.93
17.39
5.91
6.31
0.80
-13.53
-4.60
6.31
0.69
-19.71
-6.70
6.31
0.60
-20.94
-7.12
6.31
0.52
-21.19
-7.20
6.31
0.45
-21.24
-7.22
6.31
0.38
-21.25
-7.22
6.31
0.33
-21.25
-7.22
6.31
0.29
-21.25
-7.22
6.31
0.25
-21.25
-7.22
6.31
0.21
-21.25
-7.22
6.31
0.18
-21.25
-7.22
6.31
0.16
-21.25
-7.22
6.31
0.14
-21.25
-7.22
6.31
0.12
-21.25
-7.22
6.31
0.10
-11.59
-3.94
6.31
0.09
0.00
0.00
6.31
0.08
0.00
0.00
6.31
0.07
0.19
(Rs/kWh)
Page85
Annexure 3H
2.1 Form Template for Biomass Power Projects- Tamil Nadu
S. No.
Assumption Head
1 Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity MW
Auxillary Consumption during stablisatio%
Auxillary Consumption after stabilisation%
PLF(Stablization for 6 months)
%
PLF(during first year after Stablization) %
PLF(second year onwards)
%
Useful Life
Years
1
10%
10%
60%
70%
80%
20
2 Project Cost
Capital Cost/MW
Rs Lacs/MW
402.54
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
281.78
120.76
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
281.78
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
120.76
19.00%
10.00
24.00%
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
0%
0%
16%
Fiscal Assumptions
33.99%
16.995%
Yes
Depreciation
7.00%
2.00%
10.00
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Biomass Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3800
3800
Base Price(FY10-11)
GCV - Biomass
Biomass Price Escalation Factor
Rs/T
Kcal/kg
1882
3300
5%
Biomass
Hrs
Days
Hrs
21.41
5.72%
24
365
8760
Page86
2.2 Form Template for (Biomass Power Projects) : Determination of Tariff Component
1
0.745
0.644
0.556
0.480
0.414
0.358
0.309
0.267
0.230
0.199
0.172
0.148
0.128
0.110
0.095
0.082
0.071
0.061
Year--->
1
1
5.69
0.57
5.12
2
1
7.01
0.70
6.31
3
1
7.01
0.70
6.31
4
1
7.01
0.70
6.31
5
1
7.01
0.70
6.31
6
1
7.01
0.70
6.31
7
1
7.01
0.70
6.31
8
1
7.01
0.70
6.31
9
1
7.01
0.70
6.31
10
1
7.01
0.70
6.31
11
1
7.01
0.70
6.31
12
1
7.01
0.70
6.31
13
1
7.01
0.70
6.31
14
1
7.01
0.70
6.31
15
1
7.01
0.70
6.31
16
1
7.01
0.70
6.31
17
1
7.01
0.70
6.31
18
1
7.01
0.70
6.31
19
1
7.01
0.70
6.31
20
1
7.01
0.70
6.31
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
1
123.37
2.41
2
159.43
2.53
3
167.40
2.65
4
175.77
2.79
5
184.56
2.93
6
193.79
3.07
7
203.48
3.23
8
213.65
3.39
9
224.34
3.56
10
235.55
3.73
11
247.33
3.92
12
259.70
4.12
13
272.68
4.32
14
286.32
4.54
15
300.63
4.77
16
315.66
5.00
17
331.45
5.26
18
348.02
5.52
19
365.42
5.79
20
383.69
6.08
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
1
21.41
28.18
35.84
11.16
22.94
119.53
2.33
2
22.63
28.18
32.07
13.52
22.94
119.34
1.89
3
23.93
28.18
28.29
14.03
22.94
117.37
1.86
4
25.30
28.18
24.52
14.57
22.94
115.51
1.83
5
26.74
28.18
20.75
15.14
22.94
113.76
1.80
6
28.27
28.18
16.98
15.75
22.94
112.12
1.78
7
29.89
28.18
13.20
16.39
22.94
110.60
1.75
8
31.60
28.18
9.43
17.07
22.94
109.22
1.73
9
33.41
28.18
5.66
17.78
22.94
107.97
1.71
10
35.32
28.18
1.89
18.54
22.94
106.86
1.69
11
37.34
8.05
0.00
19.07
28.98
93.44
1.48
12
39.47
8.05
0.00
20.00
28.98
96.50
1.53
13
41.73
8.05
0.00
20.97
28.98
99.74
1.58
14
44.12
8.05
0.00
21.99
28.98
103.15
1.64
15
46.64
8.05
0.00
23.07
28.98
106.75
1.69
16
49.31
8.05
0.00
24.20
28.98
110.54
1.75
17
52.13
8.05
0.00
25.39
28.98
114.55
1.82
18
55.11
8.05
0.00
26.64
28.98
118.78
1.88
19
58.27
8.05
0.00
27.95
28.98
123.25
1.95
20
61.60
8.05
0.00
29.33
28.98
127.96
2.03
Levellised
3.19
0.48
0.40
0.32
0.26
0.39
5.05
1
2.41
0.42
0.55
0.70
0.22
0.45
4.74
2
2.53
0.36
0.45
0.51
0.21
0.36
4.42
3
2.65
0.38
0.45
0.45
0.22
0.36
4.52
4
2.79
0.40
0.45
0.39
0.23
0.36
4.62
5
2.93
0.42
0.45
0.33
0.24
0.36
4.73
6
3.07
0.45
0.45
0.27
0.25
0.36
4.85
7
3.23
0.47
0.45
0.21
0.26
0.36
4.98
8
3.39
0.50
0.45
0.15
0.27
0.36
5.12
9
3.56
0.53
0.45
0.09
0.28
0.36
5.27
10
3.73
0.56
0.45
0.03
0.29
0.36
5.43
11
3.92
0.59
0.13
0.00
0.30
0.46
5.40
12
4.12
0.63
0.13
0.00
0.32
0.46
5.65
13
4.32
0.66
0.13
0.00
0.33
0.46
5.90
14
4.54
0.70
0.13
0.00
0.35
0.46
6.17
15
4.77
0.74
0.13
0.00
0.37
0.46
6.46
16
5.00
0.78
0.13
0.00
0.38
0.46
6.76
17
5.26
0.83
0.13
0.00
0.40
0.46
7.07
18
5.52
0.87
0.13
0.00
0.42
0.46
7.40
19
5.79
0.92
0.13
0.00
0.44
0.46
7.75
20
6.08
0.98
0.13
0.00
0.46
0.46
8.11
0.863
Unit
MW
MU
MU
MU
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Unit
Year -->
1
1
123.4
95.2
2
0.863
151.8
117.1
3
0.745
151.8
117.1
4
0.644
151.8
117.1
5
0.556
151.8
117.1
6
0.480
151.8
117.1
7
0.414
151.8
117.1
8
0.358
151.8
117.1
9
0.309
151.8
117.1
10
0.267
151.8
117.1
11
0.230
151.8
117.1
12
0.199
151.8
117.1
13
0.172
151.8
117.1
14
0.148
151.8
117.1
2.41
1.86
4.26
Page87
15
0.128
151.8
117.1
16
0.110
151.8
117.1
17
0.095
151.8
117.1
18
0.082
151.8
117.1
19
0.071
151.8
117.1
20
0.061
151.8
117.1
90%
5.28%
80%
16.995%
33.99%
402.5
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.63
2
5.28%
21.25
3
5.28%
21.25
4
5.28%
21.25
5
5.28%
21.25
6
5.28%
21.25
7
5.28%
21.25
8
5.28%
21.25
9
5.28%
21.25
10
5.28%
21.25
11
5.28%
21.25
12
5.28%
21.25
13
5.28%
21.25
14
5.28%
21.25
15
5.28%
21.25
16
5.28%
21.25
17
5.28%
21.25
18
2.88%
11.59
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
161.02
60%
48.00%
12%
193.22
12%
9.60%
2.40%
38.64
2%
1.92%
0.48%
7.73
0%
0.38%
0.10%
1.55
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
150.39
51.12
2.56
1.00
171.96
58.45
6.31
0.93
17.39
5.91
6.31
0.80
-13.53
-4.60
6.31
0.69
-19.71
-6.70
6.31
0.60
-20.94
-7.12
6.31
0.52
-21.19
-7.20
6.31
0.45
-21.24
-7.22
6.31
0.38
-21.25
-7.22
6.31
0.33
-21.25
-7.22
6.31
0.29
-21.25
-7.22
6.31
0.25
-21.25
-7.22
6.31
0.21
-21.25
-7.22
6.31
0.18
-21.25
-7.22
6.31
0.16
-21.25
-7.22
6.31
0.14
-21.25
-7.22
6.31
0.12
-21.25
-7.22
6.31
0.10
-11.59
-3.94
6.31
0.09
0.00
0.00
6.31
0.08
0.00
0.00
6.31
0.07
0.19
(Rs/kWh)
Page88
Annexure 3I
2.1 Form Template for Biomass Power Projects- Other
S. No.
Assumption Head
1 Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity MW
Auxillary Consumption during stablisatio%
Auxillary Consumption after stabilisation%
PLF(Stablization for 6 months)
%
PLF(during first year after Stablization) %
PLF(second year onwards)
%
Useful Life
Years
1
10%
10%
60%
70%
80%
20
2 Project Cost
Capital Cost/MW
Rs Lacs/MW
402.54
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
281.78
120.76
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
281.78
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
120.76
19.00%
10.00
24.00%
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
0%
0%
16%
Fiscal Assumptions
33.99%
16.995%
Yes
Depreciation
7.00%
2.00%
10.00
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Biomass Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3800
3800
Base Price(FY10-11)
GCV - Biomass
Biomass Price Escalation Factor
Rs/T
Kcal/kg
1855
3467
5%
Biomass
Hrs
Days
Hrs
21.41
5.72%
24
365
8760
Page89
2.2 Form Template for (Biomass Power Projects) : Determination of Tariff Component
1
0.863
0.745
0.644
0.556
0.480
0.414
0.358
0.309
0.267
0.230
0.199
0.172
0.148
0.128
0.110
0.095
0.082
0.071
0.061
Unit
MW
MU
MU
MU
Year--->
1
1
5.69
0.57
5.12
2
1
7.01
0.70
6.31
3
1
7.01
0.70
6.31
4
1
7.01
0.70
6.31
5
1
7.01
0.70
6.31
6
1
7.01
0.70
6.31
7
1
7.01
0.70
6.31
8
1
7.01
0.70
6.31
9
1
7.01
0.70
6.31
10
1
7.01
0.70
6.31
11
1
7.01
0.70
6.31
12
1
7.01
0.70
6.31
13
1
7.01
0.70
6.31
14
1
7.01
0.70
6.31
15
1
7.01
0.70
6.31
16
1
7.01
0.70
6.31
17
1
7.01
0.70
6.31
18
1
7.01
0.70
6.31
19
1
7.01
0.70
6.31
20
1
7.01
0.70
6.31
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
1
115.75
2.26
2
149.59
2.37
3
157.07
2.49
4
164.92
2.61
5
173.17
2.75
6
181.83
2.88
7
190.92
3.03
8
200.46
3.18
9
210.49
3.34
10
221.01
3.50
11
232.06
3.68
12
243.66
3.86
13
255.85
4.06
14
268.64
4.26
15
282.07
4.47
16
296.17
4.70
17
310.98
4.93
18
326.53
5.18
19
342.86
5.44
20
360.00
5.71
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
1
21.41
28.18
35.84
10.66
22.94
119.03
2.32
2
22.63
28.18
32.07
12.87
22.94
118.69
1.88
3
23.93
28.18
28.29
13.35
22.94
116.69
1.85
4
25.30
28.18
24.52
13.85
22.94
114.80
1.82
5
26.74
28.18
20.75
14.39
22.94
113.01
1.79
6
28.27
28.18
16.98
14.96
22.94
111.33
1.77
7
29.89
28.18
13.20
15.56
22.94
109.78
1.74
8
31.60
28.18
9.43
16.20
22.94
108.35
1.72
9
33.41
28.18
5.66
16.87
22.94
107.06
1.70
10
35.32
28.18
1.89
17.58
22.94
105.91
1.68
11
37.34
8.05
0.00
18.06
28.98
92.44
1.47
12
39.47
8.05
0.00
18.94
28.98
95.45
1.51
13
41.73
8.05
0.00
19.86
28.98
98.63
1.56
14
44.12
8.05
0.00
20.83
28.98
101.98
1.62
15
46.64
8.05
0.00
21.85
28.98
105.52
1.67
16
49.31
8.05
0.00
22.92
28.98
109.26
1.73
17
52.13
8.05
0.00
24.04
28.98
113.21
1.79
18
55.11
8.05
0.00
25.22
28.98
117.37
1.86
19
58.27
8.05
0.00
26.46
28.98
121.76
1.93
20
61.60
8.05
0.00
27.77
28.98
126.40
2.00
Levellised
3.00
0.48
0.40
0.32
0.25
0.39
4.84
1
2.26
0.42
0.55
0.70
0.21
0.45
4.58
2
2.37
0.36
0.45
0.51
0.20
0.36
4.25
3
2.49
0.38
0.45
0.45
0.21
0.36
4.34
4
2.61
0.40
0.45
0.39
0.22
0.36
4.43
5
2.75
0.42
0.45
0.33
0.23
0.36
4.54
6
2.88
0.45
0.45
0.27
0.24
0.36
4.65
7
3.03
0.47
0.45
0.21
0.25
0.36
4.77
8
3.18
0.50
0.45
0.15
0.26
0.36
4.90
9
3.34
0.53
0.45
0.09
0.27
0.36
5.03
10
3.50
0.56
0.45
0.03
0.28
0.36
5.18
11
3.68
0.59
0.13
0.00
0.29
0.46
5.14
12
3.86
0.63
0.13
0.00
0.30
0.46
5.38
13
4.06
0.66
0.13
0.00
0.31
0.46
5.62
14
4.26
0.70
0.13
0.00
0.33
0.46
5.88
15
4.47
0.74
0.13
0.00
0.35
0.46
6.15
16
4.70
0.78
0.13
0.00
0.36
0.46
6.43
17
4.93
0.83
0.13
0.00
0.38
0.46
6.73
18
5.18
0.87
0.13
0.00
0.40
0.46
7.04
19
5.44
0.92
0.13
0.00
0.42
0.46
7.37
20
5.71
0.98
0.13
0.00
0.44
0.46
7.71
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Unit
Year -->
1
1
115.8
94.5
2
0.863
142.5
116.3
3
0.745
142.5
116.3
4
0.644
142.5
116.3
5
0.556
142.5
116.3
6
0.480
142.5
116.3
7
0.414
142.5
116.3
8
0.358
142.5
116.3
9
0.309
142.5
116.3
10
0.267
142.5
116.3
11
0.230
142.5
116.3
12
0.199
142.5
116.3
13
0.172
142.5
116.3
14
0.148
142.5
116.3
2.26
1.84
4.10
Page90
15
0.128
142.5
116.3
16
0.110
142.5
116.3
17
0.095
142.5
116.3
18
0.082
142.5
116.3
19
0.071
142.5
116.3
20
0.061
142.5
116.3
90%
5.28%
80%
16.995%
33.99%
402.5
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.63
2
5.28%
21.25
3
5.28%
21.25
4
5.28%
21.25
5
5.28%
21.25
6
5.28%
21.25
7
5.28%
21.25
8
5.28%
21.25
9
5.28%
21.25
10
5.28%
21.25
11
5.28%
21.25
12
5.28%
21.25
13
5.28%
21.25
14
5.28%
21.25
15
5.28%
21.25
16
5.28%
21.25
17
5.28%
21.25
18
2.88%
11.59
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
161.02
60%
48.00%
12%
193.22
12%
9.60%
2.40%
38.64
2%
1.92%
0.48%
7.73
0%
0.38%
0.10%
1.55
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
150.39
51.12
2.56
1.00
171.96
58.45
6.31
0.93
17.39
5.91
6.31
0.80
-13.53
-4.60
6.31
0.69
-19.71
-6.70
6.31
0.60
-20.94
-7.12
6.31
0.52
-21.19
-7.20
6.31
0.45
-21.24
-7.22
6.31
0.38
-21.25
-7.22
6.31
0.33
-21.25
-7.22
6.31
0.29
-21.25
-7.22
6.31
0.25
-21.25
-7.22
6.31
0.21
-21.25
-7.22
6.31
0.18
-21.25
-7.22
6.31
0.16
-21.25
-7.22
6.31
0.14
-21.25
-7.22
6.31
0.12
-21.25
-7.22
6.31
0.10
-11.59
-3.94
6.31
0.09
0.00
0.00
6.31
0.08
0.00
0.00
6.31
0.07
0.19
(Rs/kWh)
Page91
Annexure 4A
2.1 Form Template for Non-Fossil Fueled Based Cogeneration Power Projects- Andhra Pradesh
S. No.
1
Assumption Head
Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity
Auxillary Consumption
Plant Load Factor
Life of Power Plant
MW
%
%
Years
1
8.5%
45%
20
Rs Lacs/MW
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
278.65
119.42
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
278.65
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
119.42
19.00%
10.00
24.00%
2 Project Cost
Capital Cost/MW
398.07
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
%
%
0%
0%
16%
Depreciation
%
%
7.00%
2.00%
10.00
16.995%
33.99%
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Bagasse Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3600
3600
Base Price(FY10-11)
GCV - Bagasse
Bagasse Price Escalation Factor
Rs/T
Kcal/kg
928
2250
5%
Bagasse
100%
0%
14.11
5.72%
As a % of fuel cost
As a % of fuel cost
Days
Hrs
365
8760
Page92
2.2 Form Template for (Non fossil Fueled Based Cogeneration Power Projects) : Determination of Tariff Component
1
Unit
MW
MU
MU
MU
Year--->
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Levellised Tariff
Discount Factor
Variable Cost
Fixed Cost
Variable Cost (FY10-11)
Levellised Tariff Fixed
Applicable Tariff (FY10-11)
Year--->
Unit
0.863
0.745
0.644
0.556
0.480
0.414
0.358
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
10
11
12
13
14
15
16
17
18
19
20
58.52
1.62
61.45
1.70
64.52
1.79
67.75
1.88
71.14
1.97
74.69
2.07
78.43
2.17
82.35
2.28
86.47
2.40
90.79
2.52
95.33
2.64
100.10
2.78
105.10
2.91
110.36
3.06
115.87
3.21
121.67
3.37
127.75
3.54
134.14
3.72
140.84
3.90
147.89
4.10
10
11
12
13
14
15
16
17
18
19
20
14.11
27.86
35.44
6.49
22.69
106.60
2.96
14.92
27.86
31.71
6.64
22.69
103.83
2.88
15.77
27.86
27.98
6.80
22.69
101.11
2.80
16.68
27.86
24.25
6.98
22.69
98.46
2.73
17.63
27.86
20.52
7.17
22.69
95.88
2.66
18.64
27.86
16.79
7.38
22.69
93.36
2.59
19.71
27.86
13.06
7.60
22.69
90.92
2.52
20.83
27.86
9.33
7.84
22.69
88.55
2.45
22.02
27.86
5.60
8.09
22.69
86.26
2.39
23.28
27.86
1.87
8.36
22.69
84.06
2.33
24.62
7.96
0.00
8.38
28.66
69.62
1.93
26.02
7.96
0.00
8.77
28.66
71.41
1.98
27.51
7.96
0.00
9.18
28.66
73.31
2.03
29.09
7.96
0.00
9.60
28.66
75.31
2.09
30.75
7.96
0.00
10.06
28.66
77.43
2.15
32.51
7.96
0.00
10.53
28.66
79.66
2.21
34.37
7.96
0.00
11.03
28.66
82.02
2.27
36.33
7.96
0.00
11.55
28.66
84.51
2.34
38.41
7.96
0.00
12.10
28.66
87.14
2.42
40.61
7.96
0.00
12.68
28.66
89.91
2.49
10
11
12
13
14
15
16
17
18
19
20
1.62
0.39
0.77
0.98
0.18
0.63
4.58
1.70
0.41
0.77
0.88
0.18
0.63
4.58
1.79
0.44
0.77
0.78
0.19
0.63
4.59
1.88
0.46
0.77
0.67
0.19
0.63
4.61
1.97
0.49
0.77
0.57
0.20
0.63
4.63
2.07
0.52
0.77
0.47
0.20
0.63
4.66
2.17
0.55
0.77
0.36
0.21
0.63
4.69
2.28
0.58
0.77
0.26
0.22
0.63
4.74
2.40
0.61
0.77
0.16
0.22
0.63
4.79
2.52
0.65
0.77
0.05
0.23
0.63
4.85
2.64
0.68
0.22
0.00
0.23
0.79
4.57
2.78
0.72
0.22
0.00
0.24
0.79
4.75
2.91
0.76
0.22
0.00
0.25
0.79
4.95
3.06
0.81
0.22
0.00
0.27
0.79
5.15
3.21
0.85
0.22
0.00
0.28
0.79
5.36
3.37
0.90
0.22
0.00
0.29
0.79
5.58
3.54
0.95
0.22
0.00
0.31
0.79
5.82
3.72
1.01
0.22
0.00
0.32
0.79
6.06
3.90
1.06
0.22
0.00
0.34
0.79
6.32
4.10
1.13
0.22
0.00
0.35
0.79
6.59
1
1
58.5
94.0
2
0.863
3
0.745
4
0.644
5
0.556
6
0.480
7
0.414
8
0.358
58.5
94.0
58.5
94.0
58.5
94.0
58.5
94.0
58.5
94.0
58.5
94.0
58.5
94.0
9
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
58.5
94.0
58.5
94.0
58.5
94.0
58.5
94.0
58.5
94.0
58.5
94.0
58.5
94.0
58.5
94.0
58.5
94.0
58.5
94.0
58.5
94.0
58.5
94.0
1.62
2.61
4.23
Page93
Determination of Accelerated Depreciation for Non fossil Fueled Based Cogeneration Power Projects
Depreciation amount
Book Depreciation rate
Tax Depreciation rate
Income Tax (MAT)
Income Tax (Normal Rates)
Capital Cost
90%
5.28%
80%
16.995%
33.99%
398.1
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.51
2
5.28%
21.02
3
5.28%
21.02
4
5.28%
21.02
5
5.28%
21.02
6
5.28%
21.02
7
5.28%
21.02
8
5.28%
21.02
9
5.28%
21.02
10
5.28%
21.02
11
5.28%
21.02
12
5.28%
21.02
13
5.28%
21.02
14
5.28%
21.02
15
5.28%
21.02
16
5.28%
21.02
17
5.28%
21.02
18
2.88%
11.46
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
159.23
60%
48.00%
12%
191.07
12%
9.60%
2.40%
38.21
2%
1.92%
0.48%
7.64
0%
0.38%
0.10%
1.53
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
148.72
50.55
1.80
1.00
170.05
57.80
3.61
0.93
17.20
5.85
3.61
0.80
-13.38
-4.55
3.61
0.69
-19.49
-6.62
3.61
0.60
-20.71
-7.04
3.61
0.52
-20.96
-7.12
3.61
0.45
-21.01
-7.14
3.61
0.38
-21.02
-7.14
3.61
0.33
-21.02
-7.14
3.61
0.29
-21.02
-7.14
3.61
0.25
-21.02
-7.14
3.61
0.21
-21.02
-7.14
3.61
0.18
-21.02
-7.14
3.61
0.16
-21.02
-7.14
3.61
0.14
-21.02
-7.14
3.61
0.12
-21.02
-7.14
3.61
0.10
-11.46
-3.90
3.61
0.09
0.00
0.00
3.61
0.08
0.00
0.00
3.61
0.07
0.32
Rs/Unit
Page94
Annexure 4B
2.1 Form Template for Non-Fossil Fueled Based Cogeneration Power Projects- Haryana
S. No.
1
Assumption Head
Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity
Auxillary Consumption
Plant Load Factor
Life of Power Plant
MW
%
%
Years
1
8.5%
53%
20
Rs Lacs/MW
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
278.65
119.42
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
278.65
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
119.42
19.00%
10.00
24.00%
2 Project Cost
Capital Cost/MW
398.07
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
%
%
0%
0%
16%
Depreciation
%
%
7.00%
2.00%
10.00
16.995%
33.99%
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Bagasse Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3600
3600
Base Price(FY10-11)
GCV - Bagasse
Bagasse Price Escalation Factor
Rs/T
Kcal/kg
1456
2250
5%
Bagasse
100%
0%
14.11
5.72%
As a % of fuel cost
As a % of fuel cost
Days
Hrs
365
8760
Page95
2.2 Form Template for (Non fossil Fueled Based Cogeneration Power Projects) : Determination of Tariff Component
1
Unit
MW
MU
MU
MU
Year--->
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Levellised Tariff
Discount Factor
Variable Cost
Fixed Cost
Variable Cost (FY10-11)
Levellised Tariff Fixed
Applicable Tariff (FY10-11)
Year--->
Unit
0.863
0.745
0.644
0.556
0.480
0.414
0.358
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
10
11
12
13
14
15
16
17
18
19
20
108.18
2.55
113.59
2.67
119.27
2.81
125.24
2.95
131.50
3.10
138.07
3.25
144.98
3.41
152.23
3.58
159.84
3.76
167.83
3.95
176.22
4.15
185.03
4.36
194.28
4.57
204.00
4.80
214.20
5.04
224.91
5.29
236.15
5.56
247.96
5.84
260.36
6.13
273.38
6.44
10
11
12
13
14
15
16
17
18
19
20
14.11
27.86
35.44
9.76
22.69
109.87
2.59
14.92
27.86
31.71
10.07
22.69
107.26
2.52
15.77
27.86
27.98
10.41
22.69
104.72
2.47
16.68
27.86
24.25
10.77
22.69
102.25
2.41
17.63
27.86
20.52
11.15
22.69
99.85
2.35
18.64
27.86
16.79
11.55
22.69
97.54
2.30
19.71
27.86
13.06
11.98
22.69
95.30
2.24
20.83
27.86
9.33
12.44
22.69
93.15
2.19
22.02
27.86
5.60
12.92
22.69
91.09
2.14
23.28
27.86
1.87
13.43
22.69
89.13
2.10
24.62
7.96
0.00
13.71
28.66
74.94
1.76
26.02
7.96
0.00
14.36
28.66
77.01
1.81
27.51
7.96
0.00
15.05
28.66
79.18
1.86
29.09
7.96
0.00
15.77
28.66
81.48
1.92
30.75
7.96
0.00
16.53
28.66
83.90
1.98
32.51
7.96
0.00
17.33
28.66
86.46
2.04
34.37
7.96
0.00
18.17
28.66
89.16
2.10
36.33
7.96
0.00
19.05
28.66
92.00
2.17
38.41
7.96
0.00
19.97
28.66
95.01
2.24
40.61
7.96
0.00
20.95
28.66
98.18
2.31
10
11
12
13
14
15
16
17
18
19
20
2.55
0.33
0.66
0.83
0.23
0.53
5.13
2.67
0.35
0.66
0.75
0.24
0.53
5.20
2.81
0.37
0.66
0.66
0.25
0.53
5.27
2.95
0.39
0.66
0.57
0.25
0.53
5.35
3.10
0.42
0.66
0.48
0.26
0.53
5.45
3.25
0.44
0.66
0.40
0.27
0.53
5.55
3.41
0.46
0.66
0.31
0.28
0.53
5.66
3.58
0.49
0.66
0.22
0.29
0.53
5.78
3.76
0.52
0.66
0.13
0.30
0.53
5.91
3.95
0.55
0.66
0.04
0.32
0.53
6.05
4.15
0.58
0.19
0.00
0.32
0.67
5.91
4.36
0.61
0.19
0.00
0.34
0.67
6.17
4.57
0.65
0.19
0.00
0.35
0.67
6.44
4.80
0.68
0.19
0.00
0.37
0.67
6.72
5.04
0.72
0.19
0.00
0.39
0.67
7.02
5.29
0.77
0.19
0.00
0.41
0.67
7.33
5.56
0.81
0.19
0.00
0.43
0.67
7.66
5.84
0.86
0.19
0.00
0.45
0.67
8.00
6.13
0.90
0.19
0.00
0.47
0.67
8.37
6.44
0.96
0.19
0.00
0.49
0.67
8.75
1
1
2
0.863
3
0.745
4
0.644
5
0.556
6
0.480
7
0.414
8
0.358
108.2
98.4
108.2
98.4
108.2
98.4
108.2
98.4
108.2
98.4
108.2
98.4
108.2
98.4
108.2
98.4
9
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
108.2
98.4
108.2
98.4
108.2
98.4
108.2
98.4
108.2
98.4
108.2
98.4
108.2
98.4
108.2
98.4
108.2
98.4
108.2
98.4
108.2
98.4
108.2
98.4
2.55
2.32
4.86
Page96
Determination of Accelerated Depreciation for Non fossil Fueled Based Cogeneration Power Projects
Depreciation amount
Book Depreciation rate
Tax Depreciation rate
Income Tax (MAT)
Income Tax (Normal Rates)
Capital Cost
90%
5.28%
80%
16.995%
33.99%
398.1
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.51
2
5.28%
21.02
3
5.28%
21.02
4
5.28%
21.02
5
5.28%
21.02
6
5.28%
21.02
7
5.28%
21.02
8
5.28%
21.02
9
5.28%
21.02
10
5.28%
21.02
11
5.28%
21.02
12
5.28%
21.02
13
5.28%
21.02
14
5.28%
21.02
15
5.28%
21.02
16
5.28%
21.02
17
5.28%
21.02
18
2.88%
11.46
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
159.23
60%
48.00%
12%
191.07
12%
9.60%
2.40%
38.21
2%
1.92%
0.48%
7.64
0%
0.38%
0.10%
1.53
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
148.72
50.55
2.40
1.00
170.05
57.80
4.81
0.93
17.20
5.85
4.81
0.80
-13.38
-4.55
4.81
0.69
-19.49
-6.62
4.81
0.60
-20.71
-7.04
4.81
0.52
-20.96
-7.12
4.81
0.45
-21.01
-7.14
4.81
0.38
-21.02
-7.14
4.81
0.33
-21.02
-7.14
4.81
0.29
-21.02
-7.14
4.81
0.25
-21.02
-7.14
4.81
0.21
-21.02
-7.14
4.81
0.18
-21.02
-7.14
4.81
0.16
-21.02
-7.14
4.81
0.14
-21.02
-7.14
4.81
0.12
-21.02
-7.14
4.81
0.10
-11.46
-3.90
4.81
0.09
0.00
0.00
4.81
0.08
0.00
0.00
4.81
0.07
0.24
Rs/Unit
Page97
Annexure 4C
2.1 Form Template for Non-Fossil Fueled Based Cogeneration Power Projects- Maharashtra
S. No.
1
Assumption Head
Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity
Auxillary Consumption
Plant Load Factor
Life of Power Plant
MW
%
%
Years
1
8.5%
60%
20
Rs Lacs/MW
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
278.65
119.42
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
278.65
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
119.42
19.00%
10.00
24.00%
2 Project Cost
Capital Cost/MW
398.07
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
%
%
0%
0%
16%
Depreciation
%
%
7.00%
2.00%
10.00
16.995%
33.99%
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Bagasse Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3600
3600
Base Price(FY10-11)
GCV - Bagasse
Bagasse Price Escalation Factor
Rs/T
Kcal/kg
1159
2250
5%
Bagasse
100%
0%
14.11
5.72%
As a % of fuel cost
As a % of fuel cost
Days
Hrs
365
8760
Page98
2.2 Form Template for (Non fossil Fueled Based Cogeneration Power Projects) : Determination of Tariff Component
1
Unit
MW
MU
MU
MU
Year--->
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Levellised Tariff
Discount Factor
Variable Cost
Fixed Cost
Variable Cost (FY10-11)
Levellised Tariff Fixed
Applicable Tariff (FY10-11)
Year--->
Unit
0.863
0.745
0.644
0.556
0.480
0.414
0.358
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
10
11
12
13
14
15
16
17
18
19
20
97.47
2.03
102.35
2.13
107.47
2.23
112.84
2.35
118.48
2.46
124.41
2.59
130.63
2.72
137.16
2.85
144.01
2.99
151.22
3.14
158.78
3.30
166.71
3.47
175.05
3.64
183.80
3.82
192.99
4.01
202.64
4.21
212.77
4.42
223.41
4.65
234.58
4.88
246.31
5.12
10
11
12
13
14
15
16
17
18
19
20
14.11
27.86
35.44
9.05
22.69
109.16
2.27
14.92
27.86
31.71
9.33
22.69
106.52
2.21
15.77
27.86
27.98
9.63
22.69
103.94
2.16
16.68
27.86
24.25
9.95
22.69
101.43
2.11
17.63
27.86
20.52
10.29
22.69
99.00
2.06
18.64
27.86
16.79
10.65
22.69
96.64
2.01
19.71
27.86
13.06
11.04
22.69
94.35
1.96
20.83
27.86
9.33
11.45
22.69
92.16
1.92
22.02
27.86
5.60
11.88
22.69
90.05
1.87
23.28
27.86
1.87
12.34
22.69
88.04
1.83
24.62
7.96
0.00
12.56
28.66
73.80
1.53
26.02
7.96
0.00
13.15
28.66
75.80
1.58
27.51
7.96
0.00
13.78
28.66
77.92
1.62
29.09
7.96
0.00
14.44
28.66
80.15
1.67
30.75
7.96
0.00
15.13
28.66
82.51
1.72
32.51
7.96
0.00
15.86
28.66
84.99
1.77
34.37
7.96
0.00
16.63
28.66
87.62
1.82
36.33
7.96
0.00
17.43
28.66
90.39
1.88
38.41
7.96
0.00
18.28
28.66
93.31
1.94
40.61
7.96
0.00
19.17
28.66
96.40
2.00
10
11
12
13
14
15
16
17
18
19
20
2.03
0.29
0.58
0.74
0.19
0.47
4.30
2.13
0.31
0.58
0.66
0.19
0.47
4.34
2.23
0.33
0.58
0.58
0.20
0.47
4.40
2.35
0.35
0.58
0.50
0.21
0.47
4.46
2.46
0.37
0.58
0.43
0.21
0.47
4.52
2.59
0.39
0.58
0.35
0.22
0.47
4.60
2.72
0.41
0.58
0.27
0.23
0.47
4.68
2.85
0.43
0.58
0.19
0.24
0.47
4.77
2.99
0.46
0.58
0.12
0.25
0.47
4.87
3.14
0.48
0.58
0.04
0.26
0.47
4.97
3.30
0.51
0.17
0.00
0.26
0.60
4.84
3.47
0.54
0.17
0.00
0.27
0.60
5.04
3.64
0.57
0.17
0.00
0.29
0.60
5.26
3.82
0.60
0.17
0.00
0.30
0.60
5.49
4.01
0.64
0.17
0.00
0.31
0.60
5.73
4.21
0.68
0.17
0.00
0.33
0.60
5.98
4.42
0.71
0.17
0.00
0.35
0.60
6.25
4.65
0.76
0.17
0.00
0.36
0.60
6.52
4.88
0.80
0.17
0.00
0.38
0.60
6.82
5.12
0.84
0.17
0.00
0.40
0.60
7.13
1
1
97.5
97.5
2
0.863
3
0.745
4
0.644
5
0.556
6
0.480
7
0.414
8
0.358
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
9
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
2.03
2.03
4.05
Page99
Determination of Accelerated Depreciation for Non fossil Fueled Based Cogeneration Power Projects
Depreciation amount
Book Depreciation rate
Tax Depreciation rate
Income Tax (MAT)
Income Tax (Normal Rates)
Capital Cost
90%
5.28%
80%
16.995%
33.99%
398.1
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.51
2
5.28%
21.02
3
5.28%
21.02
4
5.28%
21.02
5
5.28%
21.02
6
5.28%
21.02
7
5.28%
21.02
8
5.28%
21.02
9
5.28%
21.02
10
5.28%
21.02
11
5.28%
21.02
12
5.28%
21.02
13
5.28%
21.02
14
5.28%
21.02
15
5.28%
21.02
16
5.28%
21.02
17
5.28%
21.02
18
2.88%
11.46
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
159.23
60%
48.00%
12%
191.07
12%
9.60%
2.40%
38.21
2%
1.92%
0.48%
7.64
0%
0.38%
0.10%
1.53
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
148.72
50.55
2.40
1.00
170.05
57.80
4.81
0.93
17.20
5.85
4.81
0.80
-13.38
-4.55
4.81
0.69
-19.49
-6.62
4.81
0.60
-20.71
-7.04
4.81
0.52
-20.96
-7.12
4.81
0.45
-21.01
-7.14
4.81
0.38
-21.02
-7.14
4.81
0.33
-21.02
-7.14
4.81
0.29
-21.02
-7.14
4.81
0.25
-21.02
-7.14
4.81
0.21
-21.02
-7.14
4.81
0.18
-21.02
-7.14
4.81
0.16
-21.02
-7.14
4.81
0.14
-21.02
-7.14
4.81
0.12
-21.02
-7.14
4.81
0.10
-11.46
-3.90
4.81
0.09
0.00
0.00
4.81
0.08
0.00
0.00
4.81
0.07
0.24
Rs/Unit
Page100
Annexure 4D
2.1 Form Template for Non-Fossil Fueled Based Cogeneration Power Projects- Madhya Pradesh
S. No.
1
Assumption Head
Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity
Auxillary Consumption
Plant Load Factor
Life of Power Plant
MW
%
%
Years
1
8.5%
53%
20
Rs Lacs/MW
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
278.65
119.42
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
278.65
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
119.42
19.00%
10.00
24.00%
2 Project Cost
Capital Cost/MW
398.07
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
%
%
0%
0%
16%
Depreciation
%
%
7.00%
2.00%
10.00
16.995%
33.99%
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Bagasse Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3600
3600
Base Price(FY10-11)
GCV - Bagasse
Bagasse Price Escalation Factor
Rs/T
Kcal/kg
835
2250
5%
Bagasse
100%
0%
14.11
5.72%
As a % of fuel cost
As a % of fuel cost
Days
Hrs
365
8760
Page101
2.2 Form Template for (Non fossil Fueled Based Cogeneration Power Projects) : Determination of Tariff Component
1
Unit
MW
MU
MU
MU
Year--->
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Levellised Tariff
Discount Factor
Variable Cost
Fixed Cost
Variable Cost (FY10-11)
Levellised Tariff Fixed
Applicable Tariff (FY10-11)
Year--->
Unit
0.863
0.745
0.644
0.556
0.480
0.414
0.358
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
10
11
12
13
14
15
16
17
18
19
20
62.03
1.46
65.13
1.53
68.39
1.61
71.80
1.69
75.39
1.77
79.16
1.86
83.12
1.96
87.28
2.05
91.64
2.16
96.23
2.27
101.04
2.38
106.09
2.50
111.39
2.62
116.96
2.75
122.81
2.89
128.95
3.04
135.40
3.19
142.17
3.35
149.28
3.51
156.74
3.69
10
11
12
13
14
15
16
17
18
19
20
14.11
27.86
35.44
6.72
22.69
106.83
2.51
14.92
27.86
31.71
6.88
22.69
104.07
2.45
15.77
27.86
27.98
7.06
22.69
101.37
2.39
16.68
27.86
24.25
7.25
22.69
98.73
2.32
17.63
27.86
20.52
7.45
22.69
96.16
2.26
18.64
27.86
16.79
7.67
22.69
93.66
2.20
19.71
27.86
13.06
7.91
22.69
91.23
2.15
20.83
27.86
9.33
8.16
22.69
88.87
2.09
22.02
27.86
5.60
8.43
22.69
86.60
2.04
23.28
27.86
1.87
8.71
22.69
84.42
1.99
24.62
7.96
0.00
8.76
28.66
69.99
1.65
26.02
7.96
0.00
9.16
28.66
71.81
1.69
27.51
7.96
0.00
9.59
28.66
73.72
1.74
29.09
7.96
0.00
10.04
28.66
75.75
1.78
30.75
7.96
0.00
10.51
28.66
77.88
1.83
32.51
7.96
0.00
11.01
28.66
80.14
1.89
34.37
7.96
0.00
11.53
28.66
82.52
1.94
36.33
7.96
0.00
12.08
28.66
85.04
2.00
38.41
7.96
0.00
12.66
28.66
87.69
2.06
40.61
7.96
0.00
13.27
28.66
90.50
2.13
10
11
12
13
14
15
16
17
18
19
20
1.46
0.33
0.66
0.83
0.16
0.53
3.97
1.53
0.35
0.66
0.75
0.16
0.53
3.98
1.61
0.37
0.66
0.66
0.17
0.53
4.00
1.69
0.39
0.66
0.57
0.17
0.53
4.01
1.77
0.42
0.66
0.48
0.18
0.53
4.04
1.86
0.44
0.66
0.40
0.18
0.53
4.07
1.96
0.46
0.66
0.31
0.19
0.53
4.10
2.05
0.49
0.66
0.22
0.19
0.53
4.15
2.16
0.52
0.66
0.13
0.20
0.53
4.20
2.27
0.55
0.66
0.04
0.21
0.53
4.25
2.38
0.58
0.19
0.00
0.21
0.67
4.03
2.50
0.61
0.19
0.00
0.22
0.67
4.19
2.62
0.65
0.19
0.00
0.23
0.67
4.36
2.75
0.68
0.19
0.00
0.24
0.67
4.54
2.89
0.72
0.19
0.00
0.25
0.67
4.72
3.04
0.77
0.19
0.00
0.26
0.67
4.92
3.19
0.81
0.19
0.00
0.27
0.67
5.13
3.35
0.86
0.19
0.00
0.28
0.67
5.35
3.51
0.90
0.19
0.00
0.30
0.67
5.58
3.69
0.96
0.19
0.00
0.31
0.67
5.82
1
1
62.0
94.4
2
0.863
3
0.745
4
0.644
5
0.556
6
0.480
7
0.414
8
0.358
62.0
94.4
62.0
94.4
62.0
94.4
62.0
94.4
62.0
94.4
62.0
94.4
62.0
94.4
9
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
62.0
94.4
62.0
94.4
62.0
94.4
62.0
94.4
62.0
94.4
62.0
94.4
62.0
94.4
62.0
94.4
62.0
94.4
62.0
94.4
62.0
94.4
62.0
94.4
1.46
2.22
3.68
Page102
Determination of Accelerated Depreciation for Non fossil Fueled Based Cogeneration Power Projects
Depreciation amount
Book Depreciation rate
Tax Depreciation rate
Income Tax (MAT)
Income Tax (Normal Rates)
Capital Cost
90%
5.28%
80%
16.995%
33.99%
398.1
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.51
2
5.28%
21.02
3
5.28%
21.02
4
5.28%
21.02
5
5.28%
21.02
6
5.28%
21.02
7
5.28%
21.02
8
5.28%
21.02
9
5.28%
21.02
10
5.28%
21.02
11
5.28%
21.02
12
5.28%
21.02
13
5.28%
21.02
14
5.28%
21.02
15
5.28%
21.02
16
5.28%
21.02
17
5.28%
21.02
18
2.88%
11.46
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
159.23
60%
48.00%
12%
191.07
12%
9.60%
2.40%
38.21
2%
1.92%
0.48%
7.64
0%
0.38%
0.10%
1.53
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
148.72
50.55
2.12
1.00
170.05
57.80
4.25
0.93
17.20
5.85
4.25
0.80
-13.38
-4.55
4.25
0.69
-19.49
-6.62
4.25
0.60
-20.71
-7.04
4.25
0.52
-20.96
-7.12
4.25
0.45
-21.01
-7.14
4.25
0.38
-21.02
-7.14
4.25
0.33
-21.02
-7.14
4.25
0.29
-21.02
-7.14
4.25
0.25
-21.02
-7.14
4.25
0.21
-21.02
-7.14
4.25
0.18
-21.02
-7.14
4.25
0.16
-21.02
-7.14
4.25
0.14
-21.02
-7.14
4.25
0.12
-21.02
-7.14
4.25
0.10
-11.46
-3.90
4.25
0.09
0.00
0.00
4.25
0.08
0.00
0.00
4.25
0.07
0.27
Rs/Unit
Page103
Annexure 4E
2.1 Form Template for Non-Fossil Fueled Based Cogeneration Power Projects- Punjab
S. No.
1
Assumption Head
Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity
Auxillary Consumption
Plant Load Factor
Life of Power Plant
MW
%
%
Years
1
8.5%
53%
20
Rs Lacs/MW
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
278.65
119.42
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
278.65
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
119.42
19.00%
10.00
24.00%
2 Project Cost
Capital Cost/MW
398.07
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
%
%
0%
0%
16%
Depreciation
%
%
7.00%
2.00%
10.00
16.995%
33.99%
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Bagasse Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3600
3600
Base Price(FY10-11)
GCV - Bagasse
Bagasse Price Escalation Factor
Rs/T
Kcal/kg
1443
2250
5%
Bagasse
100%
0%
14.11
5.72%
As a % of fuel cost
As a % of fuel cost
Days
Hrs
365
8760
Page104
2.2 Form Template for (Non fossil Fueled Based Cogeneration Power Projects) : Determination of Tariff Component
1
Unit
MW
MU
MU
MU
Year--->
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Levellised Tariff
Discount Factor
Variable Cost
Fixed Cost
Variable Cost (FY10-11)
Levellised Tariff Fixed
Applicable Tariff (FY10-11)
Year--->
Unit
0.863
0.745
0.644
0.556
0.480
0.414
0.358
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
10
11
12
13
14
15
16
17
18
19
20
107.19
2.52
112.55
2.65
118.17
2.78
124.08
2.92
130.29
3.07
136.80
3.22
143.64
3.38
150.82
3.55
158.36
3.73
166.28
3.91
174.60
4.11
183.33
4.32
192.49
4.53
202.12
4.76
212.22
5.00
222.83
5.25
233.98
5.51
245.68
5.78
257.96
6.07
270.86
6.38
10
11
12
13
14
15
16
17
18
19
20
14.11
27.86
35.44
9.69
22.69
109.80
2.58
14.92
27.86
31.71
10.00
22.69
107.19
2.52
15.77
27.86
27.98
10.34
22.69
104.65
2.46
16.68
27.86
24.25
10.69
22.69
102.17
2.41
17.63
27.86
20.52
11.07
22.69
99.77
2.35
18.64
27.86
16.79
11.47
22.69
97.45
2.29
19.71
27.86
13.06
11.89
22.69
95.21
2.24
20.83
27.86
9.33
12.35
22.69
93.06
2.19
22.02
27.86
5.60
12.82
22.69
91.00
2.14
23.28
27.86
1.87
13.33
22.69
89.03
2.10
24.62
7.96
0.00
13.60
28.66
74.84
1.76
26.02
7.96
0.00
14.25
28.66
76.89
1.81
27.51
7.96
0.00
14.93
28.66
79.07
1.86
29.09
7.96
0.00
15.65
28.66
81.36
1.92
30.75
7.96
0.00
16.40
28.66
83.77
1.97
32.51
7.96
0.00
17.19
28.66
86.32
2.03
34.37
7.96
0.00
18.02
28.66
89.01
2.10
36.33
7.96
0.00
18.90
28.66
91.85
2.16
38.41
7.96
0.00
19.82
28.66
94.85
2.23
40.61
7.96
0.00
20.78
28.66
98.01
2.31
10
11
12
13
14
15
16
17
18
19
20
2.52
0.33
0.66
0.83
0.23
0.53
5.11
2.65
0.35
0.66
0.75
0.24
0.53
5.17
2.78
0.37
0.66
0.66
0.24
0.53
5.25
2.92
0.39
0.66
0.57
0.25
0.53
5.33
3.07
0.42
0.66
0.48
0.26
0.53
5.42
3.22
0.44
0.66
0.40
0.27
0.53
5.51
3.38
0.46
0.66
0.31
0.28
0.53
5.62
3.55
0.49
0.66
0.22
0.29
0.53
5.74
3.73
0.52
0.66
0.13
0.30
0.53
5.87
3.91
0.55
0.66
0.04
0.31
0.53
6.01
4.11
0.58
0.19
0.00
0.32
0.67
5.87
4.32
0.61
0.19
0.00
0.34
0.67
6.13
4.53
0.65
0.19
0.00
0.35
0.67
6.39
4.76
0.68
0.19
0.00
0.37
0.67
6.67
5.00
0.72
0.19
0.00
0.39
0.67
6.97
5.25
0.77
0.19
0.00
0.40
0.67
7.28
5.51
0.81
0.19
0.00
0.42
0.67
7.60
5.78
0.86
0.19
0.00
0.44
0.67
7.95
6.07
0.90
0.19
0.00
0.47
0.67
8.31
6.38
0.96
0.19
0.00
0.49
0.67
8.68
1
1
2
0.863
3
0.745
4
0.644
5
0.556
6
0.480
7
0.414
8
0.358
107.2
98.3
107.2
98.3
107.2
98.3
107.2
98.3
107.2
98.3
107.2
98.3
107.2
98.3
107.2
98.3
9
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
107.2
98.3
107.2
98.3
107.2
98.3
107.2
98.3
107.2
98.3
107.2
98.3
107.2
98.3
107.2
98.3
107.2
98.3
107.2
98.3
107.2
98.3
107.2
98.3
2.52
2.31
4.84
Page105
Determination of Accelerated Depreciation for Non fossil Fueled Based Cogeneration Power Projects
Depreciation amount
Book Depreciation rate
Tax Depreciation rate
Income Tax (MAT)
Income Tax (Normal Rates)
Capital Cost
90%
5.28%
80%
16.995%
33.99%
398.1
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.51
2
5.28%
21.02
3
5.28%
21.02
4
5.28%
21.02
5
5.28%
21.02
6
5.28%
21.02
7
5.28%
21.02
8
5.28%
21.02
9
5.28%
21.02
10
5.28%
21.02
11
5.28%
21.02
12
5.28%
21.02
13
5.28%
21.02
14
5.28%
21.02
15
5.28%
21.02
16
5.28%
21.02
17
5.28%
21.02
18
2.88%
11.46
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
159.23
60%
48.00%
12%
191.07
12%
9.60%
2.40%
38.21
2%
1.92%
0.48%
7.64
0%
0.38%
0.10%
1.53
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
148.72
50.55
2.12
1.00
170.05
57.80
4.25
0.93
17.20
5.85
4.25
0.80
-13.38
-4.55
4.25
0.69
-19.49
-6.62
4.25
0.60
-20.71
-7.04
4.25
0.52
-20.96
-7.12
4.25
0.45
-21.01
-7.14
4.25
0.38
-21.02
-7.14
4.25
0.33
-21.02
-7.14
4.25
0.29
-21.02
-7.14
4.25
0.25
-21.02
-7.14
4.25
0.21
-21.02
-7.14
4.25
0.18
-21.02
-7.14
4.25
0.16
-21.02
-7.14
4.25
0.14
-21.02
-7.14
4.25
0.12
-21.02
-7.14
4.25
0.10
-11.46
-3.90
4.25
0.09
0.00
0.00
4.25
0.08
0.00
0.00
4.25
0.07
0.27
Rs/Unit
Page106
Annexure 4F
2.1 Form Template for Non-Fossil Fueled Based Cogeneration Power Projects- Uttar Pradesh
S. No.
1
Assumption Head
Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity
Auxillary Consumption
Plant Load Factor
Life of Power Plant
MW
%
%
Years
1
8.5%
45%
20
Rs Lacs/MW
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
278.65
119.42
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
278.65
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
119.42
19.00%
10.00
24.00%
2 Project Cost
Capital Cost/MW
398.07
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
%
%
0%
0%
16%
Depreciation
%
%
7.00%
2.00%
10.00
16.995%
33.99%
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Bagasse Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3600
3600
Base Price(FY10-11)
GCV - Bagasse
Bagasse Price Escalation Factor
Rs/T
Kcal/kg
1046
2250
5%
Bagasse
100%
0%
14.11
5.72%
As a % of fuel cost
As a % of fuel cost
Days
Hrs
365
8760
Page107
2.2 Form Template for (Non fossil Fueled Based Cogeneration Power Projects) : Determination of Tariff Component
1
Unit
MW
MU
MU
MU
Year--->
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Levellised Tariff
Discount Factor
Variable Cost
Fixed Cost
Variable Cost (FY10-11)
Levellised Tariff Fixed
Applicable Tariff (FY10-11)
Year--->
Unit
0.863
0.745
0.644
0.556
0.480
0.414
0.358
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
1
3.94
0.34
3.61
10
11
12
13
14
15
16
17
18
19
20
65.95
1.83
69.24
1.92
72.70
2.02
76.34
2.12
80.16
2.22
84.16
2.33
88.37
2.45
92.79
2.57
97.43
2.70
102.30
2.84
107.42
2.98
112.79
3.13
118.43
3.28
124.35
3.45
130.57
3.62
137.10
3.80
143.95
3.99
151.15
4.19
158.70
4.40
166.64
4.62
10
11
12
13
14
15
16
17
18
19
20
14.11
27.86
35.44
6.97
22.69
107.08
2.97
14.92
27.86
31.71
7.15
22.69
104.34
2.89
15.77
27.86
27.98
7.34
22.69
101.65
2.82
16.68
27.86
24.25
7.55
22.69
99.03
2.75
17.63
27.86
20.52
7.77
22.69
96.47
2.67
18.64
27.86
16.79
8.00
22.69
93.99
2.61
19.71
27.86
13.06
8.25
22.69
91.57
2.54
20.83
27.86
9.33
8.52
22.69
89.24
2.47
22.02
27.86
5.60
8.81
22.69
86.98
2.41
23.28
27.86
1.87
9.12
22.69
84.82
2.35
24.62
7.96
0.00
9.18
28.66
70.41
1.95
26.02
7.96
0.00
9.60
28.66
72.25
2.00
27.51
7.96
0.00
10.05
28.66
74.19
2.06
29.09
7.96
0.00
10.53
28.66
76.23
2.11
30.75
7.96
0.00
11.02
28.66
78.39
2.17
32.51
7.96
0.00
11.55
28.66
80.68
2.24
34.37
7.96
0.00
12.10
28.66
83.09
2.30
36.33
7.96
0.00
12.67
28.66
85.63
2.37
38.41
7.96
0.00
13.28
28.66
88.31
2.45
40.61
7.96
0.00
13.92
28.66
91.15
2.53
10
11
12
13
14
15
16
17
18
19
20
1.83
0.39
0.77
0.98
0.19
0.63
4.80
1.92
0.41
0.77
0.88
0.20
0.63
4.81
2.02
0.44
0.77
0.78
0.20
0.63
4.83
2.12
0.46
0.77
0.67
0.21
0.63
4.86
2.22
0.49
0.77
0.57
0.22
0.63
4.90
2.33
0.52
0.77
0.47
0.22
0.63
4.94
2.45
0.55
0.77
0.36
0.23
0.63
4.99
2.57
0.58
0.77
0.26
0.24
0.63
5.05
2.70
0.61
0.77
0.16
0.24
0.63
5.11
2.84
0.65
0.77
0.05
0.25
0.63
5.19
2.98
0.68
0.22
0.00
0.25
0.79
4.93
3.13
0.72
0.22
0.00
0.27
0.79
5.13
3.28
0.76
0.22
0.00
0.28
0.79
5.34
3.45
0.81
0.22
0.00
0.29
0.79
5.56
3.62
0.85
0.22
0.00
0.31
0.79
5.79
3.80
0.90
0.22
0.00
0.32
0.79
6.04
3.99
0.95
0.22
0.00
0.34
0.79
6.29
4.19
1.01
0.22
0.00
0.35
0.79
6.56
4.40
1.06
0.22
0.00
0.37
0.79
6.85
4.62
1.13
0.22
0.00
0.39
0.79
7.15
1
1
65.9
94.7
2
0.863
3
0.745
4
0.644
5
0.556
6
0.480
7
0.414
8
0.358
65.9
94.7
65.9
94.7
65.9
94.7
65.9
94.7
65.9
94.7
65.9
94.7
65.9
94.7
9
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
65.9
94.7
65.9
94.7
65.9
94.7
65.9
94.7
65.9
94.7
65.9
94.7
65.9
94.7
65.9
94.7
65.9
94.7
65.9
94.7
65.9
94.7
65.9
94.7
1.83
2.62
4.45
Page108
Determination of Accelerated Depreciation for Non fossil Fueled Based Cogeneration Power Projects
Depreciation amount
Book Depreciation rate
Tax Depreciation rate
Income Tax (MAT)
Income Tax (Normal Rates)
Capital Cost
90%
5.28%
80%
16.995%
33.99%
398.1
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.51
2
5.28%
21.02
3
5.28%
21.02
4
5.28%
21.02
5
5.28%
21.02
6
5.28%
21.02
7
5.28%
21.02
8
5.28%
21.02
9
5.28%
21.02
10
5.28%
21.02
11
5.28%
21.02
12
5.28%
21.02
13
5.28%
21.02
14
5.28%
21.02
15
5.28%
21.02
16
5.28%
21.02
17
5.28%
21.02
18
2.88%
11.46
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
159.23
60%
48.00%
12%
191.07
12%
9.60%
2.40%
38.21
2%
1.92%
0.48%
7.64
0%
0.38%
0.10%
1.53
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
148.72
50.55
1.80
1.00
170.05
57.80
3.61
0.93
17.20
5.85
3.61
0.80
-13.38
-4.55
3.61
0.69
-19.49
-6.62
3.61
0.60
-20.71
-7.04
3.61
0.52
-20.96
-7.12
3.61
0.45
-21.01
-7.14
3.61
0.38
-21.02
-7.14
3.61
0.33
-21.02
-7.14
3.61
0.29
-21.02
-7.14
3.61
0.25
-21.02
-7.14
3.61
0.21
-21.02
-7.14
3.61
0.18
-21.02
-7.14
3.61
0.16
-21.02
-7.14
3.61
0.14
-21.02
-7.14
3.61
0.12
-21.02
-7.14
3.61
0.10
-11.46
-3.90
3.61
0.09
0.00
0.00
3.61
0.08
0.00
0.00
3.61
0.07
0.32
Rs/Unit
Page109
Annexure 4G
2.1 Form Template for Non-Fossil Fueled Based Cogeneration Power Projects- Tamil Nadu
S. No.
1
Assumption Head
Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity
Auxillary Consumption
Plant Load Factor
Life of Power Plant
MW
%
%
Years
1
8.5%
60%
20
Rs Lacs/MW
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
278.65
119.42
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
278.65
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
119.42
19.00%
10.00
24.00%
2 Project Cost
Capital Cost/MW
398.07
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
%
%
0%
0%
16%
Depreciation
%
%
7.00%
2.00%
10.00
16.995%
33.99%
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Bagasse Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3600
3600
Base Price(FY10-11)
GCV - Bagasse
Bagasse Price Escalation Factor
Rs/T
Kcal/kg
1283
2250
5%
Bagasse
100%
0%
14.11
5.72%
As a % of fuel cost
As a % of fuel cost
Days
Hrs
365
8760
Page110
2.2 Form Template for (Non fossil Fueled Based Cogeneration Power Projects) : Determination of Tariff Component
1
Unit
MW
MU
MU
MU
Year--->
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Levellised Tariff
Discount Factor
Variable Cost
Fixed Cost
Variable Tariff (FY10-11)
Levellised Tariff Fixed
Applicable Tariff (FY10-11)
Year--->
Unit
0.863
0.745
0.644
0.556
0.480
0.414
0.358
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
1
5.26
0.45
4.81
10
11
12
13
14
15
16
17
18
19
20
107.89
2.24
113.28
2.36
118.95
2.47
124.90
2.60
131.14
2.73
137.70
2.86
144.58
3.01
151.81
3.16
159.40
3.31
167.37
3.48
175.74
3.65
184.53
3.84
193.76
4.03
203.44
4.23
213.62
4.44
224.30
4.66
235.51
4.90
247.29
5.14
259.65
5.40
272.63
5.67
10
11
12
13
14
15
16
17
18
19
20
14.11
27.86
35.44
9.74
22.69
109.85
2.28
14.92
27.86
31.71
10.05
22.69
107.24
2.23
15.77
27.86
27.98
10.39
22.69
104.70
2.18
16.68
27.86
24.25
10.75
22.69
102.23
2.13
17.63
27.86
20.52
11.13
22.69
99.83
2.08
18.64
27.86
16.79
11.53
22.69
97.51
2.03
19.71
27.86
13.06
11.96
22.69
95.27
1.98
20.83
27.86
9.33
12.41
22.69
93.12
1.94
22.02
27.86
5.60
12.89
22.69
91.07
1.89
23.28
27.86
1.87
13.40
22.69
89.10
1.85
24.62
7.96
0.00
13.68
28.66
74.91
1.56
26.02
7.96
0.00
14.33
28.66
76.97
1.60
27.51
7.96
0.00
15.01
28.66
79.15
1.65
29.09
7.96
0.00
15.73
28.66
81.44
1.69
30.75
7.96
0.00
16.49
28.66
83.86
1.74
32.51
7.96
0.00
17.29
28.66
86.42
1.80
34.37
7.96
0.00
18.13
28.66
89.12
1.85
36.33
7.96
0.00
19.00
28.66
91.96
1.91
38.41
7.96
0.00
19.93
28.66
94.96
1.97
40.61
7.96
0.00
20.90
28.66
98.13
2.04
10
11
12
13
14
15
16
17
18
19
20
2.24
0.29
0.58
0.74
0.20
0.47
4.53
2.36
0.31
0.58
0.66
0.21
0.47
4.59
2.47
0.33
0.58
0.58
0.22
0.47
4.65
2.60
0.35
0.58
0.50
0.22
0.47
4.72
2.73
0.37
0.58
0.43
0.23
0.47
4.80
2.86
0.39
0.58
0.35
0.24
0.47
4.89
3.01
0.41
0.58
0.27
0.25
0.47
4.99
3.16
0.43
0.58
0.19
0.26
0.47
5.09
3.31
0.46
0.58
0.12
0.27
0.47
5.21
3.48
0.48
0.58
0.04
0.28
0.47
5.33
3.65
0.51
0.17
0.00
0.28
0.60
5.21
3.84
0.54
0.17
0.00
0.30
0.60
5.44
4.03
0.57
0.17
0.00
0.31
0.60
5.67
4.23
0.60
0.17
0.00
0.33
0.60
5.92
4.44
0.64
0.17
0.00
0.34
0.60
6.19
4.66
0.68
0.17
0.00
0.36
0.60
6.46
4.90
0.71
0.17
0.00
0.38
0.60
6.75
5.14
0.76
0.17
0.00
0.40
0.60
7.05
5.40
0.80
0.17
0.00
0.41
0.60
7.37
5.67
0.84
0.17
0.00
0.43
0.60
7.71
1
1
2
0.863
3
0.745
4
0.644
5
0.556
6
0.480
7
0.414
8
0.358
107.9
98.4
107.9
98.4
107.9
98.4
107.9
98.4
107.9
98.4
107.9
98.4
107.9
98.4
107.9
98.4
9
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
107.9
98.4
107.9
98.4
107.9
98.4
107.9
98.4
107.9
98.4
107.9
98.4
107.9
98.4
107.9
98.4
107.9
98.4
107.9
98.4
107.9
98.4
107.9
98.4
2.24
2.05
4.29
Page111
Determination of Accelerated Depreciation for Non fossil Fueled Based Cogeneration Power Projects
Depreciation amount
Book Depreciation rate
Tax Depreciation rate
Income Tax (MAT)
Income Tax (Normal Rates)
Capital Cost
90%
5.28%
80%
16.995%
33.99%
398.1
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.51
2
5.28%
21.02
3
5.28%
21.02
4
5.28%
21.02
5
5.28%
21.02
6
5.28%
21.02
7
5.28%
21.02
8
5.28%
21.02
9
5.28%
21.02
10
5.28%
21.02
11
5.28%
21.02
12
5.28%
21.02
13
5.28%
21.02
14
5.28%
21.02
15
5.28%
21.02
16
5.28%
21.02
17
5.28%
21.02
18
2.88%
11.46
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
159.23
60%
48.00%
12%
191.07
12%
9.60%
2.40%
38.21
2%
1.92%
0.48%
7.64
0%
0.38%
0.10%
1.53
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
148.72
50.55
2.40
1.00
170.05
57.80
4.81
0.93
17.20
5.85
4.81
0.80
-13.38
-4.55
4.81
0.69
-19.49
-6.62
4.81
0.60
-20.71
-7.04
4.81
0.52
-20.96
-7.12
4.81
0.45
-21.01
-7.14
4.81
0.38
-21.02
-7.14
4.81
0.33
-21.02
-7.14
4.81
0.29
-21.02
-7.14
4.81
0.25
-21.02
-7.14
4.81
0.21
-21.02
-7.14
4.81
0.18
-21.02
-7.14
4.81
0.16
-21.02
-7.14
4.81
0.14
-21.02
-7.14
4.81
0.12
-21.02
-7.14
4.81
0.10
-11.46
-3.90
4.81
0.09
0.00
0.00
4.81
0.08
0.00
0.00
4.81
0.07
0.24
Rs/Unit
Page112
Annexure 4H
2.1 Form Template for Non-Fossil Fueled Based Cogeneration Power Projects- Other States
S. No.
1
Assumption Head
Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity
Auxillary Consumption
Plant Load Factor
Life of Power Plant
MW
%
%
Years
1
8.5%
53%
20
Rs Lacs/MW
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
278.65
119.42
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
278.65
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity after 10 years
Rs Lacs
% p.a
Year
119.42
19.00%
10.00
24.00%
2 Project Cost
Capital Cost/MW
398.07
3 Financial Assumptions
Debt: Equity
Debt Component
Equity Component
21.50%
15.82%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
%
%
0%
0%
16%
Depreciation
%
%
7.00%
2.00%
10.00
16.995%
33.99%
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Bagasse Stock
Interest On Working Capital
Months
Months
1
15%
2
Months
%
4
12.89%
Kcal/kwh
Kcal/kwh
3600
3600
Base Price(FY10-11)
GCV - Bagasse
Bagasse Price Escalation Factor
Rs/T
Kcal/kg
1200
2250
5%
Bagasse
100%
0%
14.11
5.72%
As a % of fuel cost
As a % of fuel cost
Days
Hrs
365
8760
Page113
2.2 Form Template for (Non fossil Fueled Based Cogeneration Power Projects) : Determination of Tariff Component
1
Unit
MW
MU
MU
MU
Year--->
Vaiable Cost
Biomass Cost
Per unit Var Cost
Unit
Rs Lakh
Rs/kWh
Year--->
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Per unit Fixed Cost
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs/kWh
Year--->
Units Generation
Installed Capacity
Gross Generation
Auxiliary Consumption
Net Generation
Levellised Tariff
Discount Factor
Variable Cost
Fixed Cost
Variable Cost (FY10-11)
Levellised Tariff Fixed
Applicable Tariff (FY10-11)
Year--->
Unit
0.863
0.745
0.644
0.556
0.480
0.414
0.358
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
1
4.64
0.39
4.25
10
11
12
13
14
15
16
17
18
19
20
89.17
2.10
93.63
2.20
98.31
2.31
103.22
2.43
108.39
2.55
113.81
2.68
119.50
2.81
125.47
2.95
131.74
3.10
138.33
3.26
145.25
3.42
152.51
3.59
160.14
3.77
168.14
3.96
176.55
4.16
185.38
4.36
194.65
4.58
204.38
4.81
214.60
5.05
225.33
5.30
10
11
12
13
14
15
16
17
18
19
20
14.11
27.86
35.44
8.50
22.69
108.61
2.56
14.92
27.86
31.71
8.76
22.69
105.95
2.49
15.77
27.86
27.98
9.03
22.69
103.34
2.43
16.68
27.86
24.25
9.32
22.69
100.80
2.37
17.63
27.86
20.52
9.63
22.69
98.33
2.31
18.64
27.86
16.79
9.96
22.69
95.94
2.26
19.71
27.86
13.06
10.30
22.69
93.62
2.20
20.83
27.86
9.33
10.68
22.69
91.39
2.15
22.02
27.86
5.60
11.07
22.69
89.24
2.10
23.28
27.86
1.87
11.49
22.69
87.19
2.05
24.62
7.96
0.00
11.67
28.66
72.90
1.72
26.02
7.96
0.00
12.22
28.66
74.86
1.76
27.51
7.96
0.00
12.80
28.66
76.93
1.81
29.09
7.96
0.00
13.41
28.66
79.12
1.86
30.75
7.96
0.00
14.05
28.66
81.42
1.92
32.51
7.96
0.00
14.73
28.66
83.86
1.97
34.37
7.96
0.00
15.43
28.66
86.42
2.03
36.33
7.96
0.00
16.18
28.66
89.13
2.10
38.41
7.96
0.00
16.96
28.66
92.00
2.17
40.61
7.96
0.00
17.78
28.66
95.01
2.24
10
11
12
13
14
15
16
17
18
19
20
2.10
0.33
0.66
0.83
0.20
0.53
4.66
2.20
0.35
0.66
0.75
0.21
0.53
4.70
2.31
0.37
0.66
0.66
0.21
0.53
4.75
2.43
0.39
0.66
0.57
0.22
0.53
4.80
2.55
0.42
0.66
0.48
0.23
0.53
4.87
2.68
0.44
0.66
0.40
0.23
0.53
4.94
2.81
0.46
0.66
0.31
0.24
0.53
5.02
2.95
0.49
0.66
0.22
0.25
0.53
5.10
3.10
0.52
0.66
0.13
0.26
0.53
5.20
3.26
0.55
0.66
0.04
0.27
0.53
5.31
3.42
0.58
0.19
0.00
0.27
0.67
5.14
3.59
0.61
0.19
0.00
0.29
0.67
5.35
3.77
0.65
0.19
0.00
0.30
0.67
5.58
3.96
0.68
0.19
0.00
0.32
0.67
5.82
4.16
0.72
0.19
0.00
0.33
0.67
6.07
4.36
0.77
0.19
0.00
0.35
0.67
6.34
4.58
0.81
0.19
0.00
0.36
0.67
6.62
4.81
0.86
0.19
0.00
0.38
0.67
6.91
5.05
0.90
0.19
0.00
0.40
0.67
7.22
5.30
0.96
0.19
0.00
0.42
0.67
7.54
1
1
89.2
96.7
2
0.863
3
0.745
4
0.644
5
0.556
6
0.480
7
0.414
8
0.358
89.2
96.7
89.2
96.7
89.2
96.7
89.2
96.7
89.2
96.7
89.2
96.7
89.2
96.7
9
0.309
10
0.267
11
0.230
12
0.199
13
0.172
14
0.148
15
0.128
16
0.110
17
0.095
18
0.082
19
0.071
20
0.061
89.2
96.7
89.2
96.7
89.2
96.7
89.2
96.7
89.2
96.7
89.2
96.7
89.2
96.7
89.2
96.7
89.2
96.7
89.2
96.7
89.2
96.7
89.2
96.7
2.10
2.28
4.38
Page114
Determination of Accelerated Depreciation for Non fossil Fueled Based Cogeneration Power Projects
Depreciation amount
Book Depreciation rate
Tax Depreciation rate
Income Tax (MAT)
Income Tax (Normal Rates)
Capital Cost
90%
5.28%
80%
16.995%
33.99%
398.1
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
10.51
2
5.28%
21.02
3
5.28%
21.02
4
5.28%
21.02
5
5.28%
21.02
6
5.28%
21.02
7
5.28%
21.02
8
5.28%
21.02
9
5.28%
21.02
10
5.28%
21.02
11
5.28%
21.02
12
5.28%
21.02
13
5.28%
21.02
14
5.28%
21.02
15
5.28%
21.02
16
5.28%
21.02
17
5.28%
21.02
18
2.88%
11.46
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
159.23
60%
48.00%
12%
191.07
12%
9.60%
2.40%
38.21
2%
1.92%
0.48%
7.64
0%
0.38%
0.10%
1.53
0%
0.08%
0.02%
0.31
0%
0.02%
0.00%
0.06
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
148.72
50.55
2.12
1.00
170.05
57.80
4.25
0.93
17.20
5.85
4.25
0.80
-13.38
-4.55
4.25
0.69
-19.49
-6.62
4.25
0.60
-20.71
-7.04
4.25
0.52
-20.96
-7.12
4.25
0.45
-21.01
-7.14
4.25
0.38
-21.02
-7.14
4.25
0.33
-21.02
-7.14
4.25
0.29
-21.02
-7.14
4.25
0.25
-21.02
-7.14
4.25
0.21
-21.02
-7.14
4.25
0.18
-21.02
-7.14
4.25
0.16
-21.02
-7.14
4.25
0.14
-21.02
-7.14
4.25
0.12
-21.02
-7.14
4.25
0.10
-11.46
-3.90
4.25
0.09
0.00
0.00
4.25
0.08
0.00
0.00
4.25
0.07
0.27
Rs/Unit
Page115
Annexure 5A
Form 1.1 Form Template for (Solar PV Power Projects) Parameters Assumptions
Assumption
Sub-Head
Head
1 Power Generation
Capacity
Sub-Head (2)
S. No.
Unit
Asumptions
MW
%
%
Years
1
19.0%
0.0%
25
Rs Lacs/MW
Tariff Period
Years
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
1183
507
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
1183.00
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity 11th year onwards
Weighted average of ROE
Rs Lacs
% p.a
Year
% p.a
507.00
19.00%
10
24.00%
22.00%
2 Project Cost
Capital Cost/MW
1690
3 Financial Assumptions
25
Debt: Equity
Debt Component
Equity Component
Discount Rate
4
15.97%
Financial Assumptions
Economic Assumptions
Coal Price Escalation
HSD Price Escalation
Discount Rate
% p.a
% p.a
% p.a
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
0%
0%
16%
Fiscal Assumptions
33.99%
16.995%
Yes
Depreciation
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Interest On Working Capital
Months
Months
7.00%
1.33%
10
1
15%
2
12.89%
9.5148
5.72%
Page116
Form 1.2 Form Template for (Solar PV) - Determination of Tariff Component
Units Generation
Installed Capacity
Gross Generation
Year--->
1
1
1.66
2
1
1.66
3
1
1.66
4
1
1.66
5
1
1.66
6
1
1.66
7
1
1.66
8
1
1.66
9
1
1.66
10
1
1.66
11
1
1.66
12
1
1.66
13
1
1.66
14
1
1.66
15
1
1.66
16
1
1.66
17
1
1.66
18
1
1.66
19
1
1.66
20
1
1.66
21
1
1.66
22
1
1.66
23
1
1.66
24
1
1.66
25
1
1.66
Year--->
1
9.51
118.30
150.47
8.52
96.33
383.13
23.02
2
10.06
118.30
134.63
8.20
96.33
367.52
22.08
3
10.63
118.30
118.79
7.88
96.33
351.94
21.14
4
11.24
118.30
102.95
7.56
96.33
336.39
20.21
5
11.89
118.30
87.11
7.25
96.33
320.88
19.28
6
12.57
118.30
71.28
6.94
96.33
305.41
18.35
7
13.28
118.30
55.44
6.63
96.33
289.98
17.42
8
14.04
118.30
39.60
6.32
96.33
274.59
16.50
9
14.85
118.30
23.76
6.02
96.33
259.25
15.58
10
15.70
118.30
7.92
5.71
96.33
243.96
14.66
11
16.59
22.53
0.00
4.04
121.68
164.85
9.90
12
17.54
22.53
0.00
4.09
121.68
165.85
9.96
13
18.55
22.53
0.00
4.14
121.68
166.90
10.03
14
19.61
22.53
0.00
4.20
121.68
168.02
10.09
15
20.73
22.53
0.00
4.26
121.68
169.20
10.17
16
21.92
22.53
0.00
4.32
121.68
170.45
10.24
17
23.17
22.53
0.00
4.39
121.68
171.77
10.32
18
24.49
22.53
0.00
4.46
121.68
173.16
10.40
19
25.90
22.53
0.00
4.53
121.68
174.64
10.49
20
27.38
22.53
0.00
4.61
121.68
176.20
10.59
21
28.94
22.53
0.00
4.69
121.68
177.85
10.69
22
30.60
22.53
0.00
4.78
121.68
179.59
10.79
23
32.35
22.53
0.00
4.87
121.68
181.43
10.90
24
34.20
22.53
0.00
4.97
121.68
183.38
11.02
25
36.16
22.53
0.00
5.07
121.68
185.44
11.14
Unit
Levellised
1
Rs/kWh
0.57
0.82
Rs/kWh
7.11
5.91
Rs/kWh
9.04
4.66
Rs/kWh
0.51
0.41
Rs/kWh
5.79
6.10
Rs/kWh
17.91
23.02
Levellised
2
0.60
7.11
8.09
0.49
5.79
22.08
3
0.64
7.11
7.14
0.47
5.79
21.14
4
0.68
7.11
6.19
0.45
5.79
20.21
5
0.71
7.11
5.23
0.44
5.79
19.28
6
0.75
7.11
4.28
0.42
5.79
18.35
7
0.80
7.11
3.33
0.40
5.79
17.42
8
0.84
7.11
2.38
0.38
5.79
16.50
9
0.89
7.11
1.43
0.36
5.79
15.58
10
0.94
7.11
0.48
0.34
5.79
14.66
11
1.00
1.35
0.00
0.24
7.31
9.90
12
1.05
1.35
0.00
0.25
7.31
9.96
13
1.11
1.35
0.00
0.25
7.31
10.03
14
1.18
1.35
0.00
0.25
7.31
10.09
15
1.25
1.35
0.00
0.26
7.31
10.17
16
1.32
1.35
0.00
0.26
7.31
10.24
17
1.39
1.35
0.00
0.26
7.31
10.32
18
1.47
1.35
0.00
0.27
7.31
10.40
19
1.56
1.35
0.00
0.27
7.31
10.49
20
1.64
1.35
0.00
0.28
7.31
10.59
21
1.74
1.35
0.00
0.28
7.31
10.69
22
1.84
1.35
0.00
0.29
7.31
10.79
23
1.94
1.35
0.00
0.29
7.31
10.90
24
2.05
1.35
0.00
0.30
7.31
11.02
25
2.17
1.35
0.00
0.30
7.31
11.14
0.862
298.06
0.744
298.06
0.641
298.06
0.553
298.06
0.477
298.06
0.411
298.06
0.354
298.06
0.306
298.06
0.264
298.06
0.227
298.06
0.196
298.06
0.169
298.06
0.146
298.06
0.126
298.06
0.108
298.06
0.093
298.06
0.081
298.06
0.069
298.06
0.060
298.06
0.052
298.06
0.045
298.06
0.038
298.06
0.033
298.06
0.029
298.06
Unit
MW
MU
Fixed Cost
Unit
O&M Expenses
Rs Lakh
Depreciation
Rs Lakh
Interest on term loan
Rs Lakh
Interest on working Capita Rs Lakh
Return on Equity
Rs Lakh
Total Fixed Cost
Rs Lakh
Per unit Fixed Cost
Rs/kWh
Levellised COG
Per Unit Cost of Generat
O&M expn
Depreciation
Int. on term loan
Int. on working capital
RoE
Total COG
Discount Factor
Fixed Cost
Levellised Tariff
17.91
17.91
1
298.06
Rs/Unit
Page117
90%
5.28%
80%
16.995%
33.99%
1690.0
Years
----------------->
Book Depreciation
Book Depreciation
Rs Lakh
1
2.64%
44.62
2
5.28%
89.23
3
5.28%
89.23
4
5.28%
89.23
5
5.28%
89.23
6
5.28%
89.23
7
5.28%
89.23
8
5.28%
89.23
9
5.28%
89.23
10
5.28%
89.23
11
5.28%
89.23
12
5.28%
89.23
13
5.28%
89.23
14
5.28%
89.23
15
5.28%
89.23
16
5.28%
89.23
17
5.28%
89.23
18
2.88%
48.67
19
0.00%
0.00
20
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
676.00
60%
48.00%
12%
811.20
12%
9.60%
2.40%
162.24
2%
1.92%
0.48%
32.45
0%
0.38%
0.10%
6.49
0%
0.08%
0.02%
1.30
0%
0.02%
0.00%
0.26
0%
0.00%
0.00%
0.05
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
631.38
214.61
0.83
1.00
721.97
245.40
1.66
0.93
0.93
73.01
24.82
1.66
0.80
0.80
-56.78
-19.30
1.66
0.69
0.69
-82.74
-28.12
1.66
0.60
0.60
-87.93
-29.89
1.66
0.51
0.51
-88.97
-30.24
1.66
0.44
0.44
-89.18
-30.31
1.66
0.38
0.38
-89.22
-30.33
1.66
0.33
0.33
-89.23
-30.33
1.66
0.28
0.28
-89.23
-30.33
1.66
0.24
0.24
-89.23
-30.33
1.66
0.21
0.21
-89.23
-30.33
1.66
0.18
0.18
-89.23
-30.33
1.66
0.16
0.16
-89.23
-30.33
1.66
0.14
0.14
-89.23
-30.33
1.66
0.12
0.12
-89.23
-30.33
1.66
0.10
0.10
-48.67
-16.54
1.66
0.09
0.09
0.00
0.00
1.66
0.07
0.07
0.00
0.00
1.66
0.06
0.06
Levellised benefit
Unit
2.96
Rs/Unit
Page118
Annexure 6A
Form 1.1 Form Template for (Solar Thermal Power Projects) Parameters Assumptions
S. No.
1
Assumption Head
Power Generation
Sub-Head
Sub-Head (2)
Unit
Assumptions
Capacity
Installed Power Generation Capacity
Capacity Utilization Factor
Auxiliary Consumption Factor
Useful Life
MW
%
%
Years
1
23.0%
10.0%
25
Rs Lacs/MW
Tariff Period
Years
Debt
Equity
Total Debt Amount
Total Equity Amout
%
%
Rs Lacs
Rs Lacs
70%
30%
1071
459
Loan Amount
Moratorium Period
Repayment Period(incld Moratorium)
Interest Rate
Rs Lacs
years
years
%
1071
0
10
13.39%
Equity amount
Return on Equity for first 10 years
RoE Period
Return on Equity 11th year onwards
Weighted average of ROE
Discount Rate
Rs Lacs
% p.a
Year
% p.a
459.00
19.00%
10
24.00%
22.00%
15.97%
% p.a
% p.a
% p.a
Income Tax
MAT Rate (for first 10 years)
80 IA benefits
%
%
Yes/No
%
%
2 Project Cost
Capital Cost/MW
1530
3 Sources of Fund
25
Debt: Equity
Debt Component
Equity Component
Financial Assumptions
Economic Assumptions
0%
0%
16%
Fiscal Assumptions
33.99%
16.995%
Yes
Depreciation
7.00%
1.33%
10
5 Working Capital
For Fixed Charges
O&M Charges
Maintenance Spare
(% of O&M exepenses)
Receivables for Debtors
For Variable Charges
Interest On Working Capital
Months
Months
1
15%
2
12.89%
13.74
5.72%
Page119
Form 1.2 Form Template for (Solar Thermal) - Determination of Tariff Component
Discount Factor
Units Generation
Installed Capacity
Net Generation
Fixed Cost
O&M Expenses
Depreciation
Interest on term loan
Interest on working Capital
Return on Equity
Total Fixed Cost
Levellised COG
Per Unit Cost of Generation
O&M expn
Depreciation
Int. on term loan
Int. on working capital
RoE
Total COG
Levellised Tariff
0.862
0.744
0.641
0.553
0.477
0.411
0.354
0.306
10
0.264
11
0.227
12
0.196
13
0.169
14
0.146
15
0.126
16
0.108
17
0.093
18
0.081
19
0.069
20
0.060
21
0.052
22
0.045
23
0.038
24
0.033
25
0.029
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
1
1.81
Unit
MW
MU
Year--->
Unit
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Rs Lakh
Year--->
Unit
Levellised
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Rs/kWh
Rs/kWh
Rs/kWh
Rs/kWh
Rs/kWh
Rs/kWh
Levellised
1.09
4.91
3.87
0.36
5.07
15.31
0.76
5.91
7.51
0.44
4.81
19.43
0.80
5.91
6.72
0.43
4.81
18.66
0.85
5.91
5.93
0.41
4.81
17.90
0.90
5.91
5.14
0.40
4.81
17.15
0.95
5.91
4.35
0.38
4.81
16.39
1.00
5.91
3.56
0.37
4.81
15.64
1.06
5.91
2.77
0.35
4.81
14.89
1.12
5.91
1.98
0.34
4.81
14.15
1.18
5.91
1.19
0.32
4.81
13.41
1.25
5.91
0.40
0.31
4.81
12.67
1.32
1.13
0.00
0.23
6.08
8.75
1.40
1.13
0.00
0.23
6.08
8.83
1.48
1.13
0.00
0.24
6.08
8.91
1.56
1.13
0.00
0.24
6.08
9.00
1.65
1.13
0.00
0.25
6.08
9.10
1.75
1.13
0.00
0.25
6.08
9.20
1.85
1.13
0.00
0.26
6.08
9.30
1.95
1.13
0.00
0.26
6.08
9.41
2.06
1.13
0.00
0.27
6.08
9.53
2.18
1.13
0.00
0.27
6.08
9.65
2.31
1.13
0.00
0.28
6.08
9.79
2.44
1.13
0.00
0.29
6.08
9.92
2.58
1.13
0.00
0.29
6.08
10.07
2.72
1.13
0.00
0.30
6.08
10.23
2.88
1.13
0.00
0.31
6.08
10.39
15.31
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
13.74
107.10
136.22
7.98
87.21
352.26
14.53
107.10
121.88
7.71
87.21
338.43
15.36
107.10
107.55
7.44
87.21
324.65
16.24
107.10
93.21
7.17
87.21
310.92
17.17
107.10
78.87
6.90
87.21
297.25
18.15
107.10
64.53
6.64
87.21
283.63
19.19
107.10
50.19
6.38
87.21
270.06
20.29
107.10
35.85
6.12
87.21
256.57
21.45
107.10
21.51
5.87
87.21
243.13
22.67
107.10
7.17
5.62
87.21
229.77
23.97
20.40
0.00
4.13
110.16
158.66
25.34
20.40
0.00
4.20
110.16
160.10
26.79
20.40
0.00
4.28
110.16
161.63
28.32
20.40
0.00
4.36
110.16
163.24
29.94
20.40
0.00
4.44
110.16
164.95
31.66
20.40
0.00
4.53
110.16
166.75
33.47
20.40
0.00
4.63
110.16
168.66
35.38
20.40
0.00
4.73
110.16
170.67
37.40
20.40
0.00
4.84
110.16
172.80
39.54
20.40
0.00
4.95
110.16
175.05
41.81
20.40
0.00
5.07
110.16
177.44
44.20
20.40
0.00
5.19
110.16
179.95
46.73
20.40
0.00
5.33
110.16
182.61
49.40
20.40
0.00
5.47
110.16
185.43
52.22
20.40
0.00
5.62
110.16
188.40
Rs/Unit
Page120
90%
5.28%
80%
16.995%
33.99%
1530.0
Years
----------------->
Book Depreciation
Book Depreciation
Unit
%
Rs Lakh
1
2.64%
40.39
2
5.28%
80.78
3
5.28%
80.78
4
5.28%
80.78
5
5.28%
80.78
6
5.28%
80.78
7
5.28%
80.78
8
5.28%
80.78
9
5.28%
80.78
10
5.28%
80.78
11
5.28%
80.78
12
5.28%
80.78
13
5.28%
80.78
14
5.28%
80.78
15
5.28%
80.78
16
5.28%
80.78
17
5.28%
80.78
18
2.88%
44.06
19
0.00%
0.00
20
0.00%
0.00
21
0.00%
0.00
22
0.00%
0.00
23
0.00%
0.00
24
0.00%
0.00
25
0.00%
0.00
Accelerated Depreciation
Opening
Allowed during the year
Closing
Accelrated Deprn.
%
%
%
Rs Lakh
100%
40%
60%
612.00
60%
48.00%
12%
734.40
12%
9.60%
2.40%
146.88
2%
1.92%
0.48%
29.38
0%
0.38%
0.10%
5.88
0%
0.08%
0.02%
1.18
0%
0.02%
0.00%
0.24
0%
0.00%
0.00%
0.05
0%
0.00%
0.00%
0.01
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
0%
0.00%
0.00%
0.00
Rs Lakh
Rs Lakh
MU
571.61
194.29
0.91
1.00
653.62
222.16
1.81
0.93
66.10
22.47
1.81
0.80
-51.41
-17.47
1.81
0.69
-74.91
-25.46
1.81
0.60
-79.61
-27.06
1.81
0.51
-80.55
-27.38
1.81
0.44
-80.74
-27.44
1.81
0.38
-80.77
-27.46
1.81
0.33
-80.78
-27.46
1.81
0.28
-80.78
-27.46
1.81
0.24
-80.78
-27.46
1.81
0.21
-80.78
-27.46
1.81
0.18
-80.78
-27.46
1.81
0.16
-80.78
-27.46
1.81
0.14
-80.78
-27.46
1.81
0.12
-80.78
-27.46
1.81
0.10
-44.06
-14.98
1.81
0.09
0.00
0.00
1.81
0.07
0.00
0.00
1.81
0.06
0.00
0.00
1.81
0.06
0.00
0.00
1.81
0.05
0.00
0.00
1.81
0.04
0.00
0.00
1.81
0.04
0.00
0.00
1.81
0.03
2.46
Rs/Unit
Page121