FUNDAMENTALS: Electricity -
Definition, Units, & Symbols, Basics &
  Importance of Electricity, Electrical codes
D1   & standards, Generation, Transmission &      
distribution system Introduction to electric
motor, drives, starters etc.

WIRING AND CABLE MANAGEMENT


SYSTEMS-Rules & regulations, Types &
selection Of wiring systems, Applications and
D2
Selection of switches & sockets, Applications
and Selection of wires and cables.

Lighting, power circuit wiring diagrams, Conduit


D3
Layout Design.
  Load schedule & Load balancing, Selection of MCB
D4   Distribution Boards, Standard heights of mounting      
accessories.
LIGHTING MANAGEMENT SYSTEM-
  Lighting Schemes, Lighting load estimation and
D5   designing of lighting panel, Types and      
application of luminaries.

Lighting designing of Auditoriums and Theaters,


Lighting designing for interior decoration and
D6      
landscape, Emergency lighting system.

D7 POWER DISTRIBUTION SYSTEM-Types


& selection of Circuit Breakers, Importance &
application of VCB, ACB, MCCB & MCB,
and Residual Current Devices.

Isolators and SDF (S/w Disconnecting Fuse)


Capacitors, Resistor and Reactors, Selection of
D8 AMF (Automatic Main Failure) & APFC
(Automatic Power factor Correction) Panel.

Under Ground cable type & selection, LT


Panel Board Design, Coordination with
HVAC, Plumbing, Firefighting,
D9
Mechanical systems like Chillers, AHU,
FCU, water and Drainage pumps,
Firefighting Pumps etc, Switchgears-types
and selection, UPS & Inverters.

EARTHING & LIGTINING


PROTECTION SYSTEM- Earthling
D10 Systems (Types Method and Installation),
Lightning Protection Systems.

TRANSFORMERS & GENERATORS (HT) -


Types and Selections, Installation - Rules and
D11
Regulations, Parallel operation of transformers
and generators, Internal Connections & Testing.
ELECTRICAL DESIGN CALCULATIONS -
Calculating the Total power requirements,
D12 Circuit Breaker selection & Design calculations,
RCBO/ELCB selection & Design calculations.

Branch & Main feeder cable sizing, selection &


calculation, Determining cable trays and
D13 trenches, Busbar selection and Design, Earthling
cable selection and Design.

Total connected load & Maximum demand


calculation based on Diversity factor, Load
distribution schedule & load balancing
D14 calculations, Transformer selection & Design
calculations, Generator selection & Design
Calculations, Capacitor bank selection.

UPS selection & Design calculations, Battery


selection & Design calculation, Voltage Drop
D15
calculations, Fault level calculations.

D16 Preparation of Schematic diagram (One Line


Diagram) - Residential, High rise, Commercial
and Industrial buildings, Introduction to
structural, Introduction to HVAC & sewage
treatment plant.

Basics of Electrical CAD, Preparation of


Lighting, Power, Communication and Earthling
D17
layout, Preparation of Schematic Diagrams.

Physical layout of transformers, Generators &


Panel Boards, Preparation of general installations
D18
and sections, Schematic Drawings.

D19 MAIN PROJECT


DOUBT CLARIFICATION AND
D20
EXAMINATION

A: Theory Test Mark: - B: Practical Test Mark:- 50


Total Test Mark (A 100 + B):-
Note: 1. Class Note (Notes & Daily Syllabus Details), 2. Test Paper (T & P), 3. Feed Back Form.

STUDENT SIGN FACULTY SIGN CENTERHEADSIGN

You might also like