You are on page 1of 4
Saudi Aramco 2616-ENG (03/99) SAUDI ARABIAN OIL COMPANY 5 1.1.1.10 Protection layer: Non-woven geotextile protection layer 300 gms./sq.m. = over the thermal insulation board. 1.1.1.11Finishing layer: Concrete Tiles (3-lanes 40cm x 40cm x 4cm) from the stairway, on walkway, to all area around AC units, first step & 1-lane all over roof perimeter walls including the upper roof. Separated with non-woven protection layer. 1.1.1.12 Remove & clean old-visible back rod, sealants for all vertical expansion al. joints (parapet & retaining walls) and apply INSUWRAP bonding agents with 5/8 compressive strength of 6500 psi or approved equal. iil2 ae 1.4.4.13 Wrapping of HVAC ducts, dressing around the drains, HVAC base, vents, 8 exhaust fan, Scuppers, pipe penetration with flushings & others as identified 5 during the actual inspection. g 1.1.1.14 Seal to make watertight underneath AC Air Handling units, around the 2 parapets, skylights and any other roof penetrations of the entire roof. é 1.1.1.15 Maintain the proper drain slope @ least 5%, drainage scupper, downspouts and assure no blockages of any foreign materials. a J 4.1.1.16 Fabrication and installation of pre-cast roof drain scupper ~ 4 pcs each for a3] & each school as required & necessary. (Quantity not used will be tumed over ENGREE to SABGSD respective warehouses) be 4.1.1.17 Repair and application of liquid membrane waterproofing to all concrete re cracks on the parapet walls, joints, & other concrete structures on the roof. Er ae | 4.1.1.18 All materials needed has to be readied by Contractor and inspected by CERTFED Saudi Project Engineer prior to actual work implementation. FSi one ava0z2 CORTREON 1.4.1.19 Roof flood test shall be conducted after the completion of the waterproofing ne system and water supply to be provided by the contractor of at least 4 trucks ee of sweet water (8000 Liters/truck) Per school as completed & inspected by ‘OPERATIONS SABGSD Eng’. 1.1.1.20Contractor has to provision corrugated metal deck of maximum 2% of the S— total roof area, to be used for the replacement of any damaged metal deck Lg within the roof. (Type P-3606 or approved equal) with nominal thickness of ne Simm (Quantity not_used wil be tumed over to SABGSD respective Ia El warehouses) ERE ; z é 1.1.2. The contractor shall visit the sites in order to know the schools locations, be able to 2 ze conduct field investigations, verify the accuracy of SOW and actual site conditions, a |8 ; é gathered data to come up with accurate cost estimates. Eres Brgee zii £6 |[Repcaccment or pve ROor system s'sscHooLs | ovore[prvo] wane] —ovamero [vrvo evn S556) [ivsourieRn akea wo #703%2073 a greeeg or EFS EE [now SAUDI ARABIA | ore 8. ‘Saudi Aramco: Company General Use ALMOAJIL CEMENT PRODUCTS PLANT G.R. 2050013464 mon fetes FeO TEE cage TECHNICAL DATA Paving Tiles 400 x 400 x 40 mm Concrete Masonry Units Shall be produced in Accordance with ASTM C90 with the following references: CEMENT COARSE AGGREGATE FINE AGGREGATE WATER PRODUCTION CURING : Shall be ordinary Portland Cement conforming to ASTM C150 type 1 or type 5 specified. : Shall be of natural Dense Stone Crushed and Graded to Size conforming to ASTM C33 + Shall be of Natural Dune Sand free from deleterious Materials, Claylumps and Frayable Particles. + Shall be from the municipal water supply free from Oils, Acids, Organic matter or other Deleterious Substances Excessive Chloride Sulfates and Dissolved Solids Etc. : Produced in Automatic Stationary Machine : Cured in Curing Chambers by Heat and Moisture Treatment Duration - 24 Hours. For ALMOAJIL ‘GE! ENG .NASSER A. AL QADER PLANT MANAGER NT RRODUCTS PLANT SVT AE YYTs GaSb AEV PMT = ALY VAT oT ALY WAL: Ogduld — Qyagauadl dug pall ASLALI — TVEEY pla! WEA Aue P.O. Box 1758-Dammam 31441 - Kingdom of Saudi Arabia Tel: 013 647-1794 / 847-2086 / 847-3903 Fax: 013 847-2260 mepp@eimosiiholding com / www almeaiiholding com AL HOTY-STANGER TEST REPORT 1@ —— tes Sample No, :3628-7 Soi Report No, 20/2038-7 ‘TEST METHOD: BS 4131-73 Pageit 1 of 1 Client Name ‘AL MOAJIL CEMENT PRODUCT PLANT ‘Sample Doseripton Cement Ties Nominal Size 400%400%40mm Date of Received : 28.03.2021 Sampled by : Client TEST RESULTS Compressive Strength Cutout specimen Compressive Stenght Dimension Lx Wx Hmm) | Load (a) we) 40x40340 155 97 4040340 130 84 Tiorane HASSAN. 2 c : Acting Department Manager Lab Supervisor For Al HOTY.STANGER | TD CO ‘ro no to engi a a ope ha wl ave ef AKSL Wr bosry "AL HOTY-STANGER LTD, CO. INDEPENDENT LABORATORIES & MATERIALS TESTING 0. 00x:072AbHoebar 3052 To (01) 88 000/808 7808 7517 8 75/88 S27 Fe (08) 408.1468 Abst PO.467 Tt 0a) eb 870 Fo: (01)34-02- Hed PO, Bx 22 Te (13) 563210 Fo (19) 587-120 -Foyadn PO Bon TST 47-202 Fae (ATONE “osha 825-01) 6024 Fax (012) 05 4742- York PO, Bon 9912 a (08) 22 5408 an (1) 21-747 = saz Wh (17518

You might also like