Professional Documents
Culture Documents
Crusher Calibration Log Sheet
Crusher Calibration Log Sheet
_+ 2%
_+ 2%
10/6/2015
_+ 2%
_+2%
_+ 2%
_+ 2%
9/11/2015
_+ 2%
_+2%
_+2%
_+2%
10/24/2015
_+2%
_+2%
_+2%
0.2
_+2%
11/3/2015
_+2%
_+2%
Mass Span
correction
performed Remarks
(Y/N or
value)
10-CV-10 SCALE LOG SHEET
FULL SCALE SPEED (m/min) =
CALIBRATION LENGTH (m) =
_+ 2%
_+ 2%
10/6/2015
_+ 2%
_+2%
_+ 2%
_+ 2%
9/11/2015
_+ 2%
_+2%
_+2%
_+2%
10/24/2015
_+2%
_+2%
_+2%
_+2%
11/3/2015
_+2%
_+2%
Mass Span
correction
performed Remarks
(Y/N or
value)
10-CV-001 SCALE LOG SHEET
FULL SCALE SPEED (m/min) = 89.5
CALIBRATION LENGTH (m) = 117.8
_+ 2% 0.12
10/6/2015
_+ 2% 0 NO
_+2%
_+ 2% 0.04
9/11/2015
_+ 2% 0 NO
_+2%
_+2%
_+2%
0.2 0.2
_+2%
0.12 0.03
11/3/2015
_+2% 0 NO
_+2%
Mass Span
correction
performed Remarks
(Y/N or
value)
Y
Calibration within allowable limit.
N
Calibration within allowable limit.
0.01