Introduction
• A major activity in most countries.
• Treated as the ‘poor relation’ of the construction industry (industry and building owners).
• Lack of understanding of both its scope & significance by all parties to the building procurement,
construction and management processes.
• A process by which a building is kept usable and benefit of its occupants or users.
• Design, materials, workmanship, functions and uses will determine the amount the maintenance
required during the lifetime of a building.
Therefore ;
• Incorrect identification of the true cause of a defect.
• Inappropriate remedial work, will not only do nothing to rectify the original defect but may substantially
worsen the condition of the building.
• Lack of care in carrying out repairs and inspections.
2
Definition
3
The Objectives Of Building Maintenance
4
Continue...
7
9 punca kebocoran bumbung Parlimen
KUALA LUMPUR: Jabatan Kerja Raya (JKR) akan menubuhkan unit
penyelenggaraan khas bagi mengatasi masalah kebocoran di bumbung
Parlimen dan tempoh seminggu diperlukan menyiapkan laporan berkaitan
masalah itu untuk diserahkan kepada Jemaah Menteri.
Mula‐mula saya minta RM45 juta, kemudian menjadi RM60 juta,
meningkat RM75 juta dan akhirnya RM90 juta untuk kerja rekabentuk
dalaman dilakukan tapi tidak menyentuh penukaran bumbung yang tidak
rosak ketika itu," katanya.
UTUSAN MALAYSIA 24/5/2007
Kejadian kebocoran paip pagi ini pula merupakan kejadian ketiga yang dilaporkan melibatkan premis-premis
kerajaan dalam tempoh dua bulan. Kejadian serupa pernah dilaporkan di Ibu Pejabat Imigresen dan Dewan
Serbaguna Kementerian Pembangunan dan Koperasi, masing-masing pada 11 April dan 28 April di
Putrajaya.
Semalam, Perdana Menteri, Datuk Seri Abdullah Ahmad Badawi menegur Menteri Kerja Raya, Datuk Seri S.
Samy Vellu kerana menuduh pengurusan Parlimen bertanggungjawab apabila bumbung bangunan Parlimen
bocor baru-baru ini. Beliau telah memberitahu Samy bahawa JKR bertanggungjawab terhadap kerja-kerja
penyenggaraan bangunan kerajaan.
Hospital
UTUSAN MALAYSIA : 15/10/2010 (Page: 12)
Sekolah
20
THE STAR
Date : 08/10/2010
Page: N12
BERITA HARIAN :
14/10/2010
(Page: 11)
HARIAN METRO BERITA HARIAN Date :
Date : 15/10/2010 15/10/2010
(Page: 23) Page: 16
THE STAR
Date : 15/10/2010
Page: N4
BERITA HARIAN : 08/11/2010 (Page: 31)
HARIAN METRO
Date : 20/09/2011
Page : 13
13/04/2008 - Harian Metro
Bumbung dewan runtuh
Antara kerosakan itu ialah pada siling yang berpunca daripada sistem
hawa dingin, tandas orang kenamaan, jalan masuk ke kompleks serta
beberapa kemudahan di bahagian dalaman, tetapi tiada yang
membabitkan peralatan penyiaran Radio Televisyen Malaysia (RTM).
DENGKIL:
Hampir seluruh bangunan baru dua tingkat bernilai RM30 juta
yang menempatkan pejabat Lembaga Pelesenan Tenaga Atom
di Dengkil, dekat sini kelmarin mengalami kebocoran tidak
sampai dua bulan diduduki.
Menteri Kerja Raya, Datuk Seri S. Samy Vellu berkata kerosakan longkang itu
menyebabkan air meresap ke dalam tanah apabila hujan lebat sehingga
mengakibatkan berlaku runtuhan.
Berikutan itu, beliau mendakwa syarikat Bekalan Air Selangor (Syabas) yang
menduduki kuarters lama di kawasan berkenaan, gagal melakukan
penyelenggaraan ke atas longkang yang rosak.
"Oleh itu, kami mahu penjelasan lanjut daripada Syabas kenapa tidak
menyelenggara kawasan berkenaan diduduki syarikat itu," katanya.
komuniti
Utusan online 4 oktober 2009
Bumbung masjid Kg.Batu Puteh Kerteh Kemaman (RM 2.1 juta) masjid runtuh, 3 cedera