1 MEP TUNNELS DIRIYAH SQUARE

IFC Package 2

Plant and equipment incorporating cooling coils will be designed 1. Electrical Substations: A total of 4 substations distributed in system, BMS control system is not part of the scope of this
with condensate drainage pipes running to fall and terminating at the four corners of the gyratory road tunnel at level B03. package.
appropriate drain risers. Condensate drain lines will be designed 2. Fan rooms: A total of 3 VSD rooms associated with the fan
with sealed traps to prevent loss of air flow via such pipe work. It is rooms located in the west and southwest zone of the 1.7.3.3 MANUAL CONTROL
very important to consider the routing of the condensate drainage gyratory road tunnel.
It is considered that equipment can be operated directly from its
path to avoid passing over or through rooms with electrical 3. IDF and MDF rooms: located throughout the gyratory road
electrical panel for maintenance or operational purpose. Control
equipment inside. Condensate piping must be insulated according tunnel, both in level B02 and B03.
panels should present three different option in its front panel:
to regulations and as indicated in the specifications related to pipe
insulation.  Automatic
1.7.3 Operation Sequence  Off
DUCTWORK
1.7.3.1 AUTOMATIC CONTROL  Manual.
The sizing of air ducts meets the criterion of the Basis of Design on
this project, with a maximum speed value between 8-12 m/s. All air conditioning equipment, as well as motorized control
dampers, will be associated with a thermostat to measure the room
Friction loss through low pressure (LP) air ducts should not exceed temperature and, depending on that value, regulate the flow of air
1,2 Pa/m equivalent air duct length. treated to air condition the room, thus maintaining the desired set
point. The VRF system allows to have a speed regulation system in
Final connections to terminal units shall be made in thermally the fans, allowing flexibility in terms of the regulation of the treated
insulated flexible ductwork limited to 250mm in length and air to adapt the needs of the room to the air conditioning
stretched without bends and kinks to reduce ductwork borne noise considered, regulating around the set point established.
regeneration and excessive fan resistance. Ductwork will be made
of stainless steel. The fans in the electrical substation rooms should run continuously
to ensure proper ventilation of the rooms.
1.7.2.2 The air ducts will be metal with a thickness as recommended by
ASHRAE.Equipment and rooms location & Distributions Due to the high thermal dissipation of the equipment in use, it will be
considered the activation of the air conditioning equipment in a
The rooms and equipment arranged for the air conditioning and
constant way if the electrical equipment is working and before its
ventilation solution can be located by consulting the attached
start-up to ensure the correct temperature and humidity conditions
drawings.
during its operation. For this purpose, the set point temperatures
By way of description, the main equipment for the air conditioning considered are the following:
of the electrical substations is in two rooms, one specifically for the
 VSD Room = 28 ºC
VRF outdoor units and another mechanical room where the fans are
 IDF & MDF Rooms = 22 ºC
located to provide forced ventilation to the rooms and the ducted
 LV E & NE Rooms = 28 ºC
indoor units (FCU).
 UPS Room = 22 ºC
Distribution will be by running refrigerant lines from the outdoor  MV Room = 28 Cº
units to the appropriate indoor units and through a network of ducts  Trafo A/B room = 28 ºC
for ventilation of the rooms. On the other hand, air for the generator  Others, WIFI & FD Rooms = 28 ºC
group as well as for the VRF units must also be distributed from the
1.7.3.2 REMOTE CONTROL
outside, at the ground level, for the supply and extraction of
ventilation air to allow the correct operation of the equipment. In accordance with these operating sequences, the HVAC
equipment control systems will be automated using a BMS control
The location of the rooms is as follows:

1.0 MEP TUNNELS