Seat No.: ________ Enrolment No.

___________

GUJARAT TECHNOLOGICAL UNIVERSITY


BE - SEMESTER– VI (NEW) EXAMINATION – WINTER 2021
Subject Code:3161713 Date:24/11/2021
Subject Name:Instrumentation Project Management
Time:10:30 AM TO 01:00 PM Total Marks: 70
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
4. Simple and non-programmable scientific calculators are allowed.

MARKS

Q.1 (a) List out advantages of electrical transducer. 03

(b) Write the full name of four International Codes and Standards used in 04
Instrumentation design engineering

(c) Brief about Mechanical flow sheet. How it is different then Process flow 07
sheet?

Q.2 (a) Give your suggestions about future and spare capacity needed in control 03
centers and transmission facilities for following situations:
a. If process is new…
b. If process is proven…
(b) Draw single loop wiring diagram considering electronic loop instruments 04
( consider: final control element is pneumatic).

(c) State the various steps of CPM network technique for project 07
planning. Differentiate CPM & PERT technique.

OR
(c) State disadvantages of conventional planning methods . Brief about 07
PERT planning technique & explain it’s various steps .

Q.3 (a) State the features and limitations of Electromagnetic flow meters. 03

(b) Brief about Intrinsic Safety and purging. 04


(c) Give comparison between Pneumatic and electronic Instrumentation 07
system.
OR
Q.3 (a) Define term ‘ Project procedure ‘. What type of information it should 03
provide ?

(b) Brief about important consideration for following: 04


Location of Taps, Sealing instruments from process
(c) Brief about the important planning consideration/guideline that should 07
be considered for instrument job execution.

1
Q.4 (a) Write the equation for capacitance type transducer. How it can be used 03
to measure level of tank.
(b) Evaluate following temperature measurement methods. 04
i ) Filled systems, ii) RTD , iii) Thermocouple

(c) Why loop checking is carried out ? Explain typical check out 07
procedure for a pneumatic differential pressure cell used as a flow
transmitter .
OR
Q.4 (a) What is calibration? How traceability to international standard is 03
achieved for any measuring instrument ?
(b) Brief about important points need to be considered for control room 04
layout.
(c) Give the format for Instrument progress report. How it helps to 07
control the project cost ?

Q.5 (a) Brief about types of control valves and its application. 03
(b) Discuss about key role and responsibility of Instrumentation and Control 04
Design Engineer in typical EPC companies.

(c) Discuss the major functions carried out by project manager during 07
execution of project. List out the other personal with whom instrument
engineer should coordinate during project face.
OR
Q.5 (a) What is Zero elevation & Zero suppression ? 03
(b) State the difference between single port and double port globe body 04
design. In slurry fluid, which kind of control valve should be used?
Justify your answer.
(c) State the problems faced during the ‘start up ‘ of plant . 07

*************