N
CL 11 12 13 14 15 16 17 18 19
A
MATCH LINE FOR CONTINUATION REFER DRAWING NO.KRP-CD-ELE-1404-002
4330
B 350
1730
PLC-1
800 800
AC DB
1730
2700 3252
2395 1500 UPS ATS DB-200 4485 1200 800
250 PLC-2 HT PANEL DC DB
600
200 600 1317
7250
800
UDB-3-UC
1700
1300
1000
ESCALATOR-3 250 1020
600 1200
4000 250 2200
1000
600
800
2844
600 DB-210 DB-220 700
800
LDB-3-PL BATTERY CHARGER
600
ESCALATOR-4 600 800 800 600 DB-210
DB-280
3470
2200
UDB-4-PL 2132 2400
1358
3200 245 1212
600
2000
ISO/TXR
LDB-4-PL BATTERY BANK
600
C
1000
DB-251 3037 3500
DB-255
DB-250
Battery Bank 3
UDB-281
2000
Battery Bank 2
1010
SPDB-4-UC
1630
Battery Bank 4
1000 1260
Battery Bank-1
8400 1000 RELOCATE THE CUTOUT TO
SCVS 1531
5100
SPDB-5-PL
RTU LOCATION
2500
4860
UPS RTU
6060
SPDB-6-PL
1200
1010
3446
SPDB-TUNNEL UPS TRANSFORMER-2 2000 KVA
DB-200
800
1550
1500
COM. DB MARSHALLNG BOX
ADDB-2-PL
2140
350
1000
575
D Battery Bank 4
4330
SCADA DB-2-PL
KEY PLAN
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19
B FD FD
FD
FD
C FD FD FD FD FD
FD
D
E
CONTRACT DC-06: “DESIGN AND CONSTRUCTION OF TWIN TUNNEL BY SHIELD TBM, CUT & COVER TUNNEL BOX, UNDERGROUND RAMP AND ONE
UNDERGROUND STATION NAMELY KRISHNA PARK EXTN. WITH ENTRY/EXITS & CONNECTING SUBWAY BY BOX PUSHING METHOD INCLUDING ARCHITECTURAL
Architecture Structure
METRO RAIL CORPORATION LTD.
CSTE/P-II JGM/E/UG GM/E/UG ASST.INT. Sr. DGM/S&T CSTE/P-I AM/AFC FINISHING, WATER SUPPLY, SANITARY INSTALLATION & DRAINAGE WORKS FROM CHAINAGE 805.110MT. TO 2830.863MT. (UP LINE) & FROM CHAINAGE 788.198
MGR/S&T Team Leader Team Leader E&M Team Leader MT. TO 2814.745 MT. (DN LINE) OF JANAKPURI WEST TO R.K. ASHRAM CORRIDOR (EXTN. OF LINE-8) OF PHASE-IV OF DELHI MRTS.”
OFFICE OF ORIGIN:-
KRISHNA PARK EXTENSION
AM/MGR/L&E Sr. DGM/L&E GM/E/L&E AM/MGR/E&M JGM/E&M/RC-1 CGM/E/RC-1 Sr. DGM/AFC AYESA Ingenieria Y Arquitectura, S.A.U DRAWN BY: STATION :
D 99, 4th Floor, Sector 2, Noida -201301,Gautam Budh Nagar, Uttar Pradesh
Tel.: +(91) 120 490 8800, Email: dcdd01@ayesa.com V.S
DRAWING TITLE: PLATFORM LEVEL PLAN EQUIPMENT LAYOUT
GM/IT AM/CIVIL CEE / PLANING DY CSTE/Sig. PM CPM
CHECKED BY:
L.R.S/V.K DATE : 07.04.2021 REV : R0 GRAPHICAL SCALE: 1 : 200 STATUS : FOR CRD
AM/MGR/DESIGN DY CE/DESIGN ED/TECH
E&M
07-04-2021 R0 ISSUED FOR FIRST SUBMISSION V.S L.R.S/V.K MARIANO AYESA Ingenieria Y Arquitectura, S.A.U SHEET NO: SHEET SIZE:
D 99, 4th Floor, Sector 2, Noida -201301,Gautam Budh Nagar, Uttar Pradesh APPROVED BY: DRAWING NUMBER: KRP-CD-ELE-1404-003 3 OF 3 A1
( * Definition OF TERMS NOC/APPROVAL to be read as per terms outlined in respective Contracts, Notice of no objection Tel.: +(91) 120 490 8800, Email: dcdd01@ayesa.com
DATE REV. DESCRIPTION DRAWN CHECKED APPROVED
MARIANO This drawing must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of DMRC.
from employer is being accorded for design principal only.)