6600041347
applicable, aQ,d all drawings, specifications and standards app licable to the
WORK. Construction process ITPs must comply With Parag raphs 9.1 .1 and
9.1.2.
4 MANAGEMENT RESPONSIBILITY -
required above, prior to Substantial Completion Confirmation (SCC).
Q-3
MP-CV-LSTK, MP-CV-IK-LSPB 12/15