You are on page 1of 18

Loknete Hon.

Hanmantrao Patil Charitable Trust’s


ADARSH INSTITUTE OF TECHNOLOGY AND
RESEARCH CENTRE ,VITA
MSBTE- 0991

THIRD SEMESTER
(Year: 2022-23)
Micro Project
DATABASE MANAGEMENT SYSTEM (22319)
Title of the Project: “HOSTEL MANAGEMENT SYSTEM”
Branch: Computer Technology (CM4I)

Members of the Group:

1. Gade Janhavi Satish Roll No. 2156

2. Javir Divyani Sanjay Roll No. 2157

3. Phase Shreedhar Vilas Roll No. 2158

4. Kurkute Parth Hemant Roll No. 2159

5. Metkari Rohit Manohar Roll No. 2160

1|Pag e
MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION, MUMBAI

MICRO PROJECT
Progress Report / Weekly Report

Title of the Project: “HOSTEL MANAGEMENT SYSTEM”

Course: DBMS (22319) (CM4I) Program: Computer Technology

Sign of
Week Duration
Date Work / Activity Performed the
No in Hrs.
Faculty
1

2|Pag e
Teacher Evaluation Sheet for Micro Project
Course Title and Code: : DATABASE MANAGEMENT SYSTEM (22319)

Title of the Project: - “HOSTEL MANAGEMENT SYSTEM”

Group No: 12

COs addressed by the Micro Project:

CO a:

CO b:

CO c: -

CO d: -

CO e: -

CO f: -

Marks:-
Marks obtained
Marks for by the Total
Roll No. Name Of Student Group Work individual Marks
(06) based on viva (10)
(04)
2156 Gade Janhavi Satish
2157 Javir Divyani Sanjay
2158 Phase Shreedhar Vilas
2159 Kurkute Parth Hemant
2160 Metkari Rohit Manohar

Name and designation of Faculty Member: Ms. P.S. Pawar


Lecturer (Computer Technology Department)

Signature: ___ __ _ _ _ _ __

3|Pag e
Adarsh Institute of Technology & Research Centre Vita,

CERTIFICATE
This is to certify that he micro project report entitled
“HOSTEL MANAGEMENT SYSTEM”
Submitted by

Sr. No. Name of Student Roll No.


01 Gade Janhavi Satish 2156
02 Javir Divyani Sanjay 2157
03 Phase Shreedhar Vilas 2158
04 Kurkute Parth Hemant 2159
05 Metkari Rohit Manohar 2160

For Third Semester of Diploma in Computer Technology of course DATABASE MANAGEMENT SYSTEM
(22319) for academic year 2022-23 as per MSBTE, Mumbai curriculum of ‘I’ scheme.

DIPLOMA OFENGINEERING
(Computer Technology)

SUBMITTED TO
MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION MUMBAI
ACADEMIC YEAR 2022-23

Project Guide H.O.D. Principal


Ms. P.S. Pawar Mr.A.A.Vankudre P.R.Baddapure

4|Pag e
ACKNOWLEDGEMENT

I express my sincere gratitude to Ms. P.S. Pawar, Department of Computer


Technology, for his/her stimulating guidance, continuous encouragement and
supervision throughout the course of present work.

I would like to place on record my deep sense of gratitude to Prof.A.A.Vankudre


HOD-Department of Computer Technology, for his generous guidance, help and useful
suggestions.

I am extremely thankful to Principal Dr. P.R.Baddapure for this motivation and


providing me infrastructural facilities to work in, without which this work would not
have been possible.

I would like to express my gratitude to all my colleagues for their support, co-
operation and fruitful discussions on diverse seminar topics and technical help.

Name of Student Sign

1. Gade Janhavi Satish

2. Javir Divyani Sanjay

3. Phase Shreedhar Vilas

4. Kurkute Parth Hemant

5. Metkari Rohit Manohar

5|Pag e
Index
Sr. No. Content Page No.

1 Rationale

2 Course of the Outcomes

3 Literature Review

4 Actual Proposed Methodology

5 Actual Methodology Followed

6 Actual Resource Used

7 Proposed Methodology

8 Action Plan

9 Output Of Microproject

10 Skill Developed

11 Application Of Microproject

12 Area of Future Improvement

6|Pag e
MICRO PROJECT REPORT

TITLE OF MICRO PROJECT: HOSTEL


MANAGEMENT SYSTEM

1. Rationale:
Hostel management system is a customize and user friendly software for hostel which
provides hostel information and hostel room information and hostel account information. It is
a system for managing the various activities in the hostel. It can manage the hostel
information. Student information, room allocation details, fees details, mess fees details,
employee fees details, Availability of the room. The main purpose of this project hostel
management system is to manage the details of beds, hostel, room, allocates and rent.

In hostel, there are many things which are Many thing which are managed by the files, so
the errors, redundancy of will be increase so I have developed this system to reduce the errors
and the redundancy of the data.

2. Course of the Outcomes:


1. Use fundamental concepts of database in a database system.

2. Choose relevant data model to solve a problems.

3. Develop relational database using entity relationship modelling approach.

7|Pag e
3.Literature Review :
This project can be used in hostels to store records of hosteller in
database, to display the saved records with printing facilities. The old system of keeping
records in hostel was paper file system. On which records are kept in a paper file by
hand . There were many problems such as security, slowness, calculation error, storage
place, backup of records
,redundancy, etc.

1. The existing system is highly manual involving a lot of paper work and calculation and therefore
may be erroneous. This has lead to inconsistency and inaccuracy in the maintenance of data.

2. The data, which is stored on the paper only, may be lost, stolen or destroyed due to natural
calamity like fire and water.

3. The existing system is sluggish and consumes a lot of time causing inconvenience to student and
the employees.

4. Due to Manuel nature, it is difficult to update, delete, add or view the data.

5. Since the number of students have drastically increased therefore maintaining and retrieving
detailed record of every student is extremely difficult.

There are some drawbacks of existing system -


 Lack of security of the data
 Time consuming.
 Consumer longer volume of paper work.
 Manual work.
 Redundancy of data.

To avoid all these limitations and make the system working more accurately it needs to be
computerized.

8|Pag e
4.Actual Proposed Methodology :
It is a small database which is helpful in the areas of hostel. This database
includes all the activities in which the hostel is managed. The activities like
hosteller admission, fee payment, inventory purchasing report generating, etc. will
be included.

User can simply add record , delete them, update them, create backups of the
database and many more using this software.

This project consists of different tables that includes tables like student master,
admission details, parents details, room details, attendance details, staff details, warden
details, complaint details and feedback details. In the tables, the all information of
students like roll no , name, address, mobile number, etc. Contains.

This project developed our abilities in many ways. First of all, in our group we select
topic "Hostel management system" for project then we discuss about our topic like
which points will done in project report. After that we all team members in team collect
the information related to our project.

We create a database for hostel management system. After that we all team members
created a report and show the softcopy to our guide. After getting permission, we submit
it.

After all these activities, finally we submit the hardcopy of report and part B to our
project guide.

9|Pag e
5.0 Actual Methodology Followed:
Member 1): Name: All Members.
Work: Finalize the group & project

Member 2): Name: Gade Janhavi Satish


Work: Search information regarding project subject.

Member 3): Name: Javir Divyani Sanjay


Work: Collect information and discuss with group members

about proposal. Prepare proposal and submit tothe guide.

Member 4): Name: Phase Shreedhar Vilas


Work: Analyze and finalize the information of the project report.

Member 5): Name: Kurkute Parth Hemant


Work: Write project report

Member 6): Metkari Rohit Manohar


Work: Prepare rough sketch and final chart

10 | P a g e
6.ACTUAL RESOURCES USED:

Name of
Sr. No. Specification Qty
resources

i5 11th gen, 8 GB RAM, 512


1. Laptop: HP 15s 1
GB SSD, Windows 11

2. Software Microsoft Access 1

OPPOA53, 6GB RAM, 128


3. Smart phone 1
GB Storage, Android 11

Browsers: Google and


4. Internet -
Chrome

11 | P a g e
7. Proposed Methodology :

Knowing the basics of the topic.

Decide aim of the project and collect the data.

Prepare project proposal.

Search Literature reviews.

Analysis of data.

Discussion over preparing and correction in booklet and report.

Converting the content of project in report writing.

Checking and correction in report writing.

Rechecking and finalizing report writing.

Final submission and oral presentation of micro project.

12 | P a g e
8.0 Action Plan :

Planned Name of
Sr. Planned
Details of activity Finish Responsible Team
No. start date
date Members

1 Project Proposal All Members

2 Data Collection & Analysis All Members

3 Preparation of Prototype/ Model All Members

4 Preparation of Report All Members


5 Presentation & Submission All Members

13 | P a g e
9.0 Output of Microproject:

14 | P a g e
15 | P a g e
16 | P a g e
10. Skill Developed :

In this project developed our abilities in many ways. We firstly started


developing our intellectual skill needed for the report. Really the job was too
much difficult which taught us time management and our own decision
making views and also thoughts. We also came to hoe to enhance our skills
and improve our logic.
We had a greate experience with our seniors while the project making lot of
was gained from them. Most of things which where unknown was came to be
known. We developed the capacity of thinking and focusing on a particular
thing. We evaluated the facts or the result of our report. Good writing skills
was developed to communicate with darity. We tried to form our own point
opinions. This was the task that requires a lot of patience which is why
patience is a skill you cannot succeed without.

11.Applications of the Micro-Project:

The software of the hostel management system is used in hostels for


easy accommodation
It is also useful for parents information.
It is useful for teachers/warden for information about hostel student and
their parents.
It is also important for details of attendance for teachers.

12.Area in future improvement :

The software product "Hostel Management System" will be an application


that will be used for maintaining the records in an organized manner and to
replace old paper work system. This project Aims at automating the hostel
management for smooth working of the hostel by automating almost all the
activities. Updations and modification will be easily achievable and all the
calculations and accounting work would be accurate

17 | P a g e
18 | P a g e