Professional Documents
Culture Documents
Issue No: 0
2019.05.3
SYSTEM-
MANUAL
COPYRIGHT PROTECTION
All rights reserved. This manual is a property of CESL and no part of this manual may be reproduced or utilized otherwise in any form or by any
means, electronic or mechanical, including photocopying, or posting on the internet or an intranet, without prior written permission.
2
CONTENT
CONTENT
1. SCOPE 07
2. NORMATIVE REFERENCE 07
3. TERMS & DEFINITIONS 07
4. CONTEXT OF THE ORGANIZATION 08
5. LEADERSHIP 10
6. PLANNING 11
7. SUPPORT 12
8. OPERATIONS 17
9. PERFORMANCE EVALUATION 27
10. IMPROVEMENTS 31
3
FORWARD
Central Engineering Services (Private) Limited (CESL) is a subsidiary company of Central Engineering
Consultancy Bureau (CECB) and registered as a limited liability company under Companies act
xxxxxxxxxxxxxxxxxxx of 2007. CECL mainly undertake construction works in Sri Lanka and in foreign
counters and produce ready-mix concrete and asphalt concrete mainly for its construction projects.
CESL has maintained ISO 9001 quality management certification since 2011 as a construction company and
the management is in strong position to continually improve its quality management system aiming exceeded
customer satisfaction and to take business challenges for a better future of the company.
Contract and System Development section of the company under the patronage of Chairman, Executive
Director and the Chief Executive Officer developed this manual based on the ISO 9001:2015 Quality
Management System -Requirements and requirements of the company.
This document can be used as a guide to implement, maintain and improve the quality management system
of the company. It is not required to merely depend on this document and manages and employees can make
their own judgment when taking decision with respect to quality management system as far as such
judgments are based on the ISO 9001:2015 requirements and the company's requirements.
4
INTRODUCTION
This manual is prepared and circulated on the Management decision to implement, maintained and upgrade
Quality Management System (QMS) in CESL complying with ISO9001:2015 Standard requirements.
Objectives of CESL quality management system is to improve overall performance of the organization and to
to provide basis for sustainable development initiative.
The potential benefits of QMS are:
a) Ensure consistently providing products/services that meet of customer, standard and regulatory
requirements;
b) Facilitating opportunities to enhance customer satisfaction;
c) Address risk and opportunities associated with context and objectives of the organization;
d) Ability to demonstrate conformity of ISO9001:2015 quality management system requirements.
Quality management Principals
1 Leadership
2 Customer Focus
3 Engagement of People
4 Process Approach
5 Improvements
7 Relationship Management
Process Approach
It is required by QMS of CESL to adopt Process Approach for Planning, implementing, monitoring and
changing the management systems within the organization.
The Quality Management System of the CESL consisted of interrelated processes that are managed
separately and as a whole in achieving organization's goals effectively and efficiently. The interrelationships
and interdependencies are understood and controlled for enhanced performance of the organization.
PDCA cycle will be used for the management of processes and system as a whole while risk based thinking
allows to take advantage of opportunities while preventing undesirable results.
5
Figure 1 shows the benefits of process approach.
Process Aproach
Processes and their interrelationships of CESL at organization level is presented in Annexure I. PDCA cycle
has been applied here to the whole QMS of the organization.
Risk-based thinking
CESL is address risk and opportunities at various level following requirements of the ISO 9001:2015
Standard. Risk and opportunities are addressed at following levels
-Organizational level
-Base office level
-Projects and operational unit level
6
CESL QUALITY MANAGEMENT SYSTEM-MANUAL FOR PLANING, IMPLIMENTING,
MONITORING AND CONTINUAL IMPROVEMENT
1. SCOPE
The scope of this document is to establish a frame work for effective and efficient implementation,
monitoring, evaluation and up grading of the QMS of CESL in all business areas.
2. NORMATIVE REFERENCE
ISO 9001: 2015, Quality Management system Requirements
7
4. CONTEXT OF THE ORGANIZATION
4.1. Vision, Mission, Values, corporate plan, action plan and all the policies of the organization together
define the context of the organization. Analysis of Internal and external issues that are relevant to
CESL are identified and reviewed annually by the senior management. Analyzing of internal and
external issues includes;
Identify relevant internal and external issues,
Determining risk and opportunities related to above issues,
Establishing objectives to eliminate risks and make use of opportunities.
(Doc No: CESL/QMS/4.1-1)
4.2. Organization interested parties and their relevant requirements are identified and given in Analysis of
Interested parties. This list shall be reviewed and up dated if required at the Senior Management
meeting or at Management Review Meeting as appropriate.
(Doc No: CESL/QMS/4.2-1)
Board of
Competitors
Directors
Employees
Suppliers &
Service providers
Trade Unions
Certification
Societies Bodies
Tech. Education
Neighbors Jurisdiction Bankers
Ins
JV Partners
All bases sections, unit &projects shall determine their interested parties and their relevant
requirements as per above format and establish an action plan to meet these requirements and
review regularly the extent to which above have been met by the section / Project.
4.3. Scope of Quality Management System (QMS)
The quality Management system of Central Engineering Services (Pvt) Ltd shall include following
areas of the business.
Construction including all bases and projects
E&M Works
8
ICT works
Production
Human Resource Management & Administration
Accounts & Finance Management
Business promotion and quantity Surveying
Maintenance of Plant & machinery
Procurement & stores Management
Research & Development
Training
1.
2.
3.
4.
4.1.
4.2.
4.3.
4.4. Integrated Management System and Processes
CESL has identified process required for the effective implementation, maintain and continually
improve its Integrated Management System and their interrelations in Process Diagram (Doc No:
CESL/QMS/4.4-1), processes, input required and expected outputs are given in Process Plans (Doc
No: CESL/QMS/4.4-2 (a) to (d)).
Each section /unit/project shall determine respective processes their interrelationships, inputs,
outputs, controls, resources and assign responsibilities and Authorities for these processes.
For each process A process plan shall be defined as per given format (Doc No CSD/QMS/PPL/F1).
However bases and projects may use their own formats according to the requirement of respective
processes.
9
5. LEADERSHIP
5.1. Leadership and Commitment
5.1.1. Top management of CESL shall:
i. Accountable for effectiveness of QMS
ii. Establishing qualities policy & quality objectives in line with corporate objectives of the organization
iii. Integrate QMS requirements into business process
iv. Promoting process based approach and risk based thinking
v. Providing necessary resources for QMS when and where necessary
vi. Communicating the importance of effective QMS & of its requirements
vii. Ensuring QMS achieves its intended result,
viii. Taking the support of employees for the effectiveness of QMS
ix. Ensuring improvements
x. Supporting all other functional heads to demonstrate their leadership in respective areas
5.2. Policy
5.2.1. Quality Policy
Quality Policy of CESL is attached as Annexure 1 of this manual.
5.2.2. The quality policy shall be distributed and displayed at all CESL office & sites as appropriately.
It shall be available in CESL website for interested parties. It shall be communication to suppliers,
subcontractors & other services providers whenever necessary
5.3. Organizational Roles, responsibilities and Authorities
The CESL organization structure is given in Annexure-2 and it shall be reviewed annually at
management review meeting. Organization structure could be revised according to the business
requirements and approval should be obtained from the Board of Directors for such changes before
adopting. The responsibility of review and revision of Organization structure is vested with Chief
Executive Officer (CEO) of the CESL.
Roles and responsibilities of all employees are in general defined in job description documents.
All sections/units project sites shall determine and document the roles & responsibilities of respective
employees as per requirements.
10
6 PLANNING
6.1 Actions to address risks and opportunities
6.1.2 All sections/units/projects sites shall define risk and opportunities need to address.
Risk and opportunities of CESL are identified by evaluation of Internal and external issues of the
organization in the corporate plan. Objectives are identified and prioritized to enhance desirable
effects, prevent or reduce undesirable effects, achieve improvements. Action plan is prepared for
five year period.
Corporate goals, objectives and action plan are reviewed annually to identify progress and to
make changes appropriately. An annual plan and actions are prepared and circulated before the
end of March of each year.
For Operational Process/Projects, risk and opportunities shall be analyzed and prioritized using
"Risk Register and Response Plan" (Format: CESL/QMS/6.1/F1) Planning shall be done to
address risk deciding how can we eliminate the risk and how can we mitigate the risk. Once
decide above and actions shall be taken to implement, monitor and modify or improve the plan.
6.1.3 Action to address risk and opportunities shall be determined in the "Response Plan". Use above
same format.
Once risk and opportunities are identified response plan shall include but not limited to;
Mitigation Measure/Action to be taken
Contingency plan/action
Responsible person
Progress Monitoring
Effectiveness evaluation.
6.2 Quality objectives & planning to achieve them
6.2.2 The organizational level quality objectives are defined in corporate plan and all bases shall
defined their quality objectives in line with corporate objectives. Bases & project can define their
own quality objectives as given requirements of the standard. (SMART objectives: format No-
CESL/QMS/6.2/F1).
6.2.3 All bases / units/ sites shall establish an action plans to achieve defined quality objective and shall
monitor such plans in planned intervals.
6.3 Planning changes
When deciding changes to QMS, CESL shall consider following requirements
a) The purpose of the changes and their potential consequences
b) The integrity of QMS
c) Availability of resources
d) Allocation &reallocation of responsibilities and authorities
Decisions regarding changing of QMS shall be taken by the Senior Management of the CESL
and such changes shall be immediately communicated to all the relevant parties as soon as
possible.
11
7 SUPPORT
7.1 Resources CESL and its bases/units shall determine & provide the resources needed for QMS for
effective & efficient establishment, maintenance & continual improvement
7.1.2 Implementation of quality management system shall be done in centrally and base wise.
The responsibility of monitoring of QMS & training of staff shall lie with contract & system
Development unit while respective Department/section shall implement QMS in their respective
bases.
For this purpose each bases shall have section coordinator QHSE & he is responsible
implementation, monitoring &continuous improvement of QMS in respective base.
For sites- project coordinator QHSE shall be appointed and he/she will take the responsibilities
together with project in charge.
In each base /project, functional heads shall be appointed and they are responsible for
Infrastructure respective function/ process of the base /project.
7.1.3 The management and respective section/unit heads shall determine infrastructure required for
process of the organization and shall provide necessary infrastructure Organization, bases. Sites
and respective process heads periodically review and update resources requirements for them.
7.1.4 CESL is in position to provide suitable environment for its operations of process. It is the
responsibilities of the management all section and process/ function head to ensure socially,
psychologically and physically fit environment for all employees
7.1.5 Monitoring & measurement
12
7.1.6 Process / function heads shall determine monitoring & measurements required of respective
process and resources required, to verify the conformity of products to services. These monitoring
requirements resources required shall be mentioned in respective quality plans.
The measuring / monitoring functions that can be performed by availability measuring /
monitoring equipment’s and controlling measures shall be displayed at respective stores/
functions area using measuring / monitoring equipment control plan (Format No.
CESL/QMS/7.1.5/F1)
7.1.7 Necessary calibration or verification of fitness shall be done at planned internals evidence shall
be kept with such equipment’s
All measurements and data collected shall be secured & safeguard adequate for future use.
Traceability of results shall be ensured by recording respective identification number with the
record taken.
14
- Results of the review and new requirements for the products and services
(clause 8.2.3). [Record on review of requirements/identification of new
requirements of the product] Format No: CESL/QMS/8.2.3./F1
- Records of the evaluation, selection, monitoring of performance and re‐
evaluation of external providers and any and actions arising from these activities
(clause 8.4.1) [1-Supplier/Service Providers selection criteria. Format
CESL/QMS/8.4.1/D1: Material Specification and Acceptance Criteria,2-Supplier
Evaluation Report, Format CESL/QMS/8.4.1/F1 and F2., 3-Outsourced Services
Evaluation, Format CESL/QMS/8.4.1/F3].
- Evidence of the unique identification of the outputs when traceability is a
requirement (clause 8.5.2).
- Records of property of the customer or external provider that is lost, damaged or
otherwise found to be unsuitable for use and of its communication to the owner
(clause 8.5.3).[Records/Letters etc. regarding communication]
- Results of the review of changes for production or service provision, the persons
authorizing the change, and necessary actions taken (clause 8.5.6). [Variation
orders, Log Notes, variation letters, authorizing of variations etc.]
- Records of the authorized release of products and services for delivery to the
customer including acceptance criteria and traceability to the authorizing
person(s) (clause 8.6). [ ex:- signed handing over document]
- Records of nonconformities, the actions taken, concessions obtained and the
identification of the authority deciding the action in respect of the nonconformity
(clause 8.7). [Nonconformity register, Format No: CESL/QMS/8.7/F1]
- Results of the evaluation of the performance and the effectiveness of the QMS
(clause 9.1.1) [Status Report/Management System Review Report]
- Evidence of the implementation of the audit programme and the audit results
(clause 9.2.2). [Audit reports and action taken]
- Evidence of the results of management reviews (clause 9.3.3). [Management
review minutes]
- Evidence of the nature of the nonconformities and any subsequent actions taken
(clause 10.2.2). [Nonconformity Register, Format No:
CESL/QMS/8.7/F1/Corrective Action, Format No: CESL/QMS/10.2/F1/Corrective
Action Log, Format No: CESL/QMS/10.2/F2]
- Results of any corrective action (clause 10.2.2). [Corrective Actions and
Corrective Action Log]
7.5.2 Documented information included all the formats, filled formats, reports, certificates, books,
standard other standard documents etc.
Documented information may be internal or external. External documented information are which
are generated externally to the company and the company does not have authority to change or
revised.
Format or report certificate etc generated by internal section/ units of the organization shall
contained
- Title
- Date of Issue
15
- Reference number
7.5.3.2 Following activities shall be followed for proper controlling of all documented information
Record of all documented information shall be kept by respective office/site.
- List of Formats/Documents, Format No: CESL/QMS/7.5.3.2 /F1
- List of Files/Folders, Format No: CESL/QMS/7.5.3.2/F2
- File/Folder Index, Format: CESL/QMS/7.5.3.2/F3
Distribution of such documented information shall be done at various level of these company
and distribution record shall be retained.
All documented information adequately protected from rain, dust, insects and other damages
& theft.
Whenever new version of the documented information is created the previous version shall
be removed and store / filled in folder / file called “Obsolete documented information” with
red ink stamp “obsolete”
All documented information in record form shall have retention tome decided by respective
process head.
Documented information (if any) to be deposition it shall be done considering legal and other
requirement of the country & the company
If any documented information to be revised or alter that could be done only by the section/
unit/ project where it is originated.
16
8. OPERATIONS
1.
2.
3.
4.
5.
6.
7.
8.
8.1. Operational Planning & control
Operational processes of the organization could be identified as below. However depending on the
situation and business requirements those could be changed time to time.
- Construction
- Designs & Consultancy
- Hire of Machinery & equipment’s
- Selling ready mix/ Asphalt
- Electrical and Mechanical Services
- IT works
For above operational process quality plan shall be prepared by respective sections / unit/ project &
shall include minimum of following requirements for each & every activity
- Reference or related documents
- Applicable verifications/ Monitoring
- Monitoring frequency / time
- Requirements / standard to be met
- Responsibility monitoring
- Acceptance criteria
- Records
For this purpose following model quality plans may be used;
Model Quality Plan for Building Construction, CESL/QMS/8.1/D1
Model Quality Plan for Road Construction, CESL/QMS/8.1/D2
Model Quality Plan for Bridge Construction, CESL/QMS/8.1/D3
Model Quality Plan for Building Service, Under Preparation
Model Quality Plan for IT and Networking, Under Preparation
Materials, plant & machine and Labour requirements of activities shall be determined for operational
activities in planning stage (Format No: CESL/QMS/8.1/F1 to F4). Procurement schedule shall also
be prepared to acquire above resources (Format No CESL/QMS/8.4/P/F1
17
Where necessary work schedule shall be prepared prior to commencement of activities using suitable
project management software or XL software as appropriately.
For operational activities method statements are advised to be prepared and prior approval shall be
taken either from project Engineer or respective authorized personal.
The method statement for any operational activity shall contain.
- Activity name
- Resources requirement
- Method of carrying out & sequence
- Safety concerns
- Environmental Concerns
- Reference documents /drawings etc.
- Applicable control measures/ Test & measurements
To determine that operations are carried out on planned & output meet the requirements
necessary checklist shall be retained.
- Customer feedback shall be taken, reviewed and necessary actions shall be taken once
a project work / service is completed (Format No: CESL/QMS/8.2/F2)
- Adequate control & measures shall be taken to protect customer properly that are in the
custody of CESL (land, trus partly or totally completed works, materials, intellectual
properties etc)
- Prior approval shall be taken from the client if any customer belonged property to be used
other than intended use of such property
Structural design & Architectural Designs are basically outsourced to CECB or any other
suitable consultant.
Construction materials& methods and project Management development are promoted by the
company. Following procedures shall be followed when planning design & development
activities by respective individual / unit/ section.
Design & Developments shall be planned by respective individual /unit /section considering
following
(i) Identification of need of design & development considering project needs, technical or
managerial issue or interest of the employee
19
(ii) All such proposed shall be properly identified by 9 design & development proposed (Format :
under development )
(iii) Such proposed shall contain description of design, issue or problem identified
(iv) Duration& time schedule of design & development activities, budget and other resources
required.
(v) Required testing, validation criteria
(vi) Design & Development plan shall include monitoring frequency of the work
(vii) Such Design &Development work may be carried out by individual or group of employees
with a expert supervisor selected with the organization or form out side
(viii) List of objectives , requirements to be met
(ix) Documents information to be furnished shall be in the form of
- Drawings
- Presentation
- Report
- Procedure
- Specification etc
Any design & Development work shall be started with following essential requirements
- Functional & performance requirements of the product / service
- Details from similar type design &developments (previous such works)
- Statuary and regulations requirements
- Standard , code of practice relevant to the work
- Potential consequences of failure
All above details shall be documented and keep an evidence of the design & development inputs
c) Monitoring of performance
Performance of external providers shall be monitored monthly basis and record their performance
level.
Material/Goods shall be randomly monitor at the receiving documented information using format No:
CESL/QMS/8.4.1/F2.
Those information collected regarding suppliers shall be evaluated using following parameters to
decide the eligibility of such suppliers to continue the supply of goods/materials.
- Punctuality of delivery
- Quality of goods/materials
- Quantity
- Operational documents
- Response to quality issues
- Corporate with site staff
Documented information with respect to such evaluation shall be retained using format No:
CESL/QMS/8.4.1/F1 in soft format.
Service providers shall be evaluated at least once during the service, if service period is less than one
year and otherwise twice a year. Undermentioned criteria shall be considered for the evaluation of
service providers (Use format No: CESL/QMS/8.4.1/F3)
- Quality of the work performed
- Allocation of skilled workers as in Skill Matrix
- Meeting the completion dates
- Daily attendance during contract period
- Reaction to quality problems
- Following of company rules [safety, cleanliness, protecting customer property]
- Cooperation with the Supervisors
CESL shall make sure that externally provided processes, products or service shall not adversely
affect the organizations ability to consistently deliver confirming products and services to the
customers.
22
a) To control externally provided process, products and services following steps shall be taken.
The procurement department/ purchasing department of the company shall communicate to external
providers its requirements for
A) The process, products and services to be provided
B) The approval of
1) Products and services
2) Method, processes and equipment
3) The release of product & services
e) Verification or validation activities that the organization or its customer, intends to perform at the
external providers’ premises.
CESL shall care about properties belonging to customers or external providers while it is under the
company’s’ control or being used by the organization.
24
CESL shall identify properties belonging to customers or external providers and notice shall be
displayed on such properties if available in physical form
For intellectual or similar properties belongs to customer or external providers. Shall be kept is
protected environment avoiding unauthorized use of such properties.
Any damage, loss or become unusable any property belong to the customer or service provider shall
be informed within 24 hrs time to owner of such property. All documented information shall be retain
with respect to such incident.
8.5.4 Preservation
Outputs of operational process shall be preserved (identify, handle, protect, package, store, transport
or transmit) to the extended necessary to ensure conformity to the requirements
Preservation shall include:
- Numbering, tagging, labeling of completed works if required
- Keeping records such as quantity, description, as-build drawings, test certificates,
measurements, methods, material data sheets, specifications, list of references,
relevant memos, letters etc.
- Protection of competed works as appropriately.
Regarding construction projects/works CESL shall agree with the client a defects liability period as per
contract document.
The defects liability period starts soon after the handover of the project or part of the project to the
client's use. At the handing over of the project, CESL shall agree with the client existing defects and
such defects shall be rectified within one month period from the date of handing over of the project. If
the defects rectification need additional time, CESL shall agree with the client regarding adequate
time period to rectify defects identified at the time of handing over.
During the defects liability period, CESL shall attend defects indented by CESL or defects informed by
the client. All defects informed by the client shall be taken in writing. All such defects shall be rectified
before the expiration of the defects liability period. However CESL may extend the defects liability
period with mutual agreement of the client.
Warranty and guarantees regarding all items installed or supplied to the client trough sub-contractors
shall be obtained for the name of the client and respective agreements to be signed by the client and
the sub-contractor after the free maintenance period shall be signed before expiration of such period.
All bases shall take customer feedback with respect to completed project within the defects liability
period using format No: CESL/MR/9.3/01 or any other suitable meaning.
The Completion certificate for the completed projects shall be obtained at the end of defects liability
period for each and every project.
25
8.5.6 Control of changes
CESL shall review and control changes for product (Contract) or service provisions, to the extent
necessary to ensure continuing conformity with requirements.
Changes to the product here means variations to the contract (Change of scope).
- Quantity variation
- Change of specification
- Change of location, level etc.
All such changes shall be revived and necessary approvals shall be taken from the client and the
respective head of the section before proceeding.
Project sites, plant & production process and any other operational site shall implement planned
arrangement at appropriate stages, to verify that the product and services requirements have been
met.
The release of product and service to the client/ customer shall be done only after verifying that the
planned arrangements have been satisfactory completed, unless approved by a relevant authority
and, as applicable, by the client/ customer
The respective project / operational yard shall retain documented information called "Handing over
document” in case of a construction site and in other operations a document called “Product/ service
delivering note” which has minimum of
a) Evidence of conformity with acceptance criteria
b) Traceability to the person(s) authorizing the release.
8.7.1 All outputs that do not conform to their requirements shall be identified and prevent their intended use
delivery by respective projects, site or yard etc.
Non confirming products or service including already delivered defective products within defects
liability period shall be dealt in one or more of the following ways.
- Do correct to the requirements
- Segregate, containment, return or suspension of provision of products & services;
- Inform the customer
- Obtain authorization for acceptance under concession
26
Conformity to the requirements shall be verified when non confirming outputs are corrected.
27
PERFORMANCE EVALUATION
9.1 Monitoring measurement, analysis and evaluation
9.1.1 General
Undermentioned sections shall monitor respective parameters as required.
Unit/Section What to be monitored Frequency How
Measurement of operation process and activities shall be decided according to requirements and
recorded in respective quality plans, method statement, check lists etc.
The results obtained through measurements and monitoring of process/activities shall be evaluated
and analyzed at weekly progress meetings of respective site/project/ yard. A decision regarding such
evaluation/analysis shall be taken at respective SOE/SOE/project levels. However any decision that
have to be taken by the management (Board of Director/ Chairman/ CEO) shall be referred to
respective persons with adequate information. The performance of QMS of the organization shall be
evaluated annually at the management review meeting.
28
9.I.2 customer satisfaction
All COE bases, SOE units and project site jointly & separately monitor customers’ perceptions of the
degree to which their need and expectations have been fulfilled. The required data shall be collected
by
1 Customer complaint Register
2 Feedback forms
Customer complaint Register
Use format No CESL/QMS/8.2/F1 for this purpose and all sites/projects/SOE units/ COE bases as
required to maintain a customer complained register. All complaints received in writing, mails, letters,
telephone calls, memos, orally shall be recorded in their document & evaluated by a most senior
person of the respective location. If required corrective actions are taken and recorded.
Feedback forms
It is required to handover and take back a filled feedback form the client and consultant of the project.
After the completion and handling over of a project. Such feedback form shall be evaluated and result
are conveyed to the management.
Use format no No CESL/QMS/8.2/F2 for this purpose.
9.2.1 CESL shall conduct internal audits at planned intervals to provide information on whether the QMS
a) Conforms to;
1) The organizations requirements for its QMS
2) The requirements of International standard
9.2.2 CESL shall plan, establish, implement maintain an audit program on annual basis
29
An audit programme according to the requirements shall be prepared at the beginning of each year
and distributed.
A audit plan shall be prepared at last one week perform the audit and the audit plan shall contain,
audit …………..scope of audit.
An Audit Team has been nominated for the organization and members of particular audit shall be
selected among such members.
Results of audit conducted shall be reported to the management within 2 months from the internal
audit.
Appropriate actions shall be taken by respective SOE/COE to correct the non-conformities found form
internal audits.
Audit findings shall be distributed among other COEs/SOEs enabling them to correct similar non-
conformity in advance.
Results of internal audits & evidence of audit plans are kept in document form as evidence.
Reference documents
b) Changes in external & internal issue that are external to management systems (QMS, EMS, &
OHSMS)
30
- customerr satisfaction & feedback from
- Status Of QMS, EMS & OH&SMS objectives
- Quality , EMS & OHSMS issue
- Non conformities & corrective actions
- Monitoring & measurements results
- Audit result
- Performance of external providers
Notes
1) Only organizational level, issues, status and progress of each item shall be discussed at
main management review
2) Base level issues, progress shall be discussed at base management review
a) Opportunities to improvement
b) Resources need
c) New strategies & investments proposals
d) Changes required for the management, organization structure , QMS, EMS & OH&SMS etc
e) Follow up actions for corporate goals actions plan, System objectives
Results of management review shall be in document form (Minutes, reports, etc)
31
10 IMPROVEMENTS
1.1 Opportunities for improvements shall be identified as an output of the management review. These
opportunities shall be made use to meet customer requirements and enhance customer satisfaction
by
1.2.1 All nonconformities including those arising from complaints shall be recorded a document call
nonconformity register or customer complaint register as applicable
a) All such non conformities shall controlled and corrected as applicable. Consequences of such
nonconformity shall also be controlled.
b) For any non-conformity first step is to take action to correct the situation & then effectiveness of such
action shall be evaluated.
c) Depending on the weight and or frequency of the non-conformity further review and analyze to
identify root cause of the non-conformity and to verify similar situation.
f) Necessary alternation shall be made to QMS, EMS or OHSMS at the management review if
necessary
10.2.2 Non conformities and respective action taken shall be recorded in nonconformity register (Format
No:CESL/QMS/10.2/F3)
Corrective actions, if any shall be recorded and evaluated using corrective action form (Doc No:
CESL/QMS/10.2/F2)
Handling of non-conformities are described in Procedure No CESL/QMS/10.2/P
1.3 CESL shall take necessary action at the management review meeting or whenever necessary to
continually improve the suitability , adequacy and effectiveness of the QMS,EMS & OHSMS
32