MOH-BARMM, HEALTH FACILITY DEVELOPMENT DIVISION (GAAB 2021)

Project Contract ID:


Project Name: Repair and Refurbishment of the Public Health Bureau/Minister Office
Project Location: Bangsamoro Government Center, RHVII, Cotabato City

BILL OF QUANTITIES
ITEM
DESCRIPTION QTY UNIT UNIT. COST AMOUNT(Php)
NO.
PART I FACILITIES FOR THE ENGINEER
In Figures: In Figures:

A.1.1(8) Provision of Field Office for the Engineer (Rental Basis) 4.00 mo
In Words:Pesos: In Words:Pesos:

PART II OTHER GENERAL REQUIREMENTS


In Figures: In Figures:

B.3 Permits and Clearances 1.00 l.s.


In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

B.5 Project Billboard/ Sign Board 2.00 ea


In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

B.7 Occupational Safety and Health Program 1.00 l.s


In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

B.9 Mobilization and Demobilization 1.00 l.s.


In Words:Pesos: In Words:Pesos:

PART III CIVIL, ELECTRICAL AND SANITARY/PLUMBING WORKS


PART A FINISHING AND OTHER CIVIL WORKS
In Figures: In Figures:

801(1) Clearing/Removal of Structures and Obstacles/Demolition 840.00 l.s.


In Words:Pesos: In Words:Pesos:

PART B PLAIN AND REINFORCED CONCRETE WORKS


In Figures: In Figures:

2
903(2) Formworks and Falseworks 23.00 m
In Words:Pesos: In Words:Pesos:

PART C FINISHING WORKS


C.1. Termite Control works
In Figures: In Figures:

1000(1) Soil Poisoning 10.00 L


In Words:Pesos: In Words:Pesos:

C.2 Masonry Works


In Figures: In Figures:
100mm CHB Non Load Bearing Wall (Including Reinforcing
1046(2)a1 36.00 L
Steel) In Words:Pesos: In Words:Pesos:

C.3 Fabricated Materials


In Figures: In Figures:
W-1 Glass Window with Steel Frame Casement Type-
1005 1.00 l.s.
Replacement of damage Glass In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1006 Fire rated Fire Exitr Steel Door, (Panic Door) 2.00 l.s.
In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

2
1007 Aluminum Glass Door (Sliding type/Swing type) 51.00 m
In Words:Pesos: In Words:Pesos:

Page 1
ITEM
DESCRIPTION QTY UNIT UNIT. COST AMOUNT(Php)
NO.
PART I FACILITIES FOR THE ENGINEER In Figures: In Figures:
Aluminum Glass Window (Sliding) with Analok Frame and
1008 13.00 m2
Awning In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

2
1010(2)b Wooden Panel Door 6.00 m
In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

2
1012(5) Tempered Glass Walls/Barriers, etc. 72.00 m
In Words:Pesos: In Words:Pesos:

In Figures: In Figures:
Tempered Glass Walls/Barriers, etc. (Repair of Fixed 2
1012(5) 11.00 m
Aluminum Glass Wall) In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

2
1043(1) PVC Panel Door with Frames 12.00 m
In Words:Pesos: In Words:Pesos:

C.4 Finishing Works


In Figures: In Figures:
Ceiling (4.5mm, Metal Frame, Fiber Cement 2
1003(1)c1 560.00 m
Board)Replacement of Ceiling and removal In Words:Pesos: In Words:Pesos:

In Figures: In Figures:
4.5/6.0 mm, Metal Frame, Fiber Cement Board Metal frame
1003(02) 96.00 m3
Double Wall Partition In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

3
1003(17) Carpentry and Joinery Works 1.00 m
In Words:Pesos: In Words:Pesos:

In Figures: In Figures:
Glazed Tiles/Ceramic Tiles (new Tiles, Replacement of
1018(1) 250.00 m2
damage Tiles) In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

3
1018 Unglazed Tiles / Ceramic Tiles 26.00 m
In Words:Pesos: In Words:Pesos:

C.5 Painting Works


In Figures: In Figures:

2
1032(1)a Painting Works (Masonry/Concrete ) 1103.00 m
In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1032(1)b Painting Works (Wood ) 760.00 m2


In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

2
1032(1)c Painting Works (Metal Roof, Window Grills) 412.00 m
In Words:Pesos: In Words:Pesos:

PART D PLUMBING/SANITARY WORKS


In Figures: In Figures:

1001(8) Sewer Line Works (Replacement of Damage Pipe) 1.00 l.s.


In Words:Pesos: In Words:Pesos:

In Figures: In Figures:
Storm Drainage and Downspout (Replacement of Damage
1001(9) 1.00 l.s.
Pipe) In Words:Pesos: In Words:Pesos:

Page 2
ITEM
DESCRIPTION QTY UNIT UNIT. COST AMOUNT(Php)
NO.
PART I FACILITIES FOR THE ENGINEER In Figures: In Figures:

1002(4) Plumbing Fixtures (Replacement of Plumbing Fixture) 1.00 l.s.


In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1002(24) Cold Water Line Works (Replacement of Damage Pipe) 1.00 l.s.
In Words:Pesos: In Words:Pesos:

PART E ELECTRICAL WORKS


In Figures: In Figures:
Conduits, Boxes, and Fittings (Conduit Works/ Conduit
1100(10) 1.00 l.s.
Rough-in) In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1101(33) Wires and Wiring Devices 1.00 l.s.


In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1103(1) Lighting Fixtures and Lamps 1.00 l.s.


In Words:Pesos: In Words:Pesos:

PART F MECHANICAL WORKS


In Figures: In Figures:

1200(12) Airconditioning (1.5 HP Kopel Super Inverter Split type AC) 1.00 l.s.
In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1208(1) Fire Alarm System 1.00 l.s.


In Words:Pesos: In Words:Pesos:

GRAND TOTAL

Amount in Words:
_________________________________________________________________________
_________________________________________________________________________

Submitted by:

_________________________________________
Name & Signature of Bidder's Representatives

____________________________________
Position

____________________________________
Name of Firm

____________________________________
Address

Page 3