BILL OF QUANTITIES
ITEM
DESCRIPTION QTY UNIT UNIT. COST AMOUNT(Php)
NO.
PART I FACILITIES FOR THE ENGINEER
In Figures: In Figures:
A.1.1(8) Provision of Field Office for the Engineer (Rental Basis) 4.00 mo
In Words:Pesos: In Words:Pesos:
In Figures: In Figures:
In Figures: In Figures:
In Figures: In Figures:
2
903(2) Formworks and Falseworks 23.00 m
In Words:Pesos: In Words:Pesos:
In Figures: In Figures:
1006 Fire rated Fire Exitr Steel Door, (Panic Door) 2.00 l.s.
In Words:Pesos: In Words:Pesos:
In Figures: In Figures:
2
1007 Aluminum Glass Door (Sliding type/Swing type) 51.00 m
In Words:Pesos: In Words:Pesos:
Page 1
ITEM
DESCRIPTION QTY UNIT UNIT. COST AMOUNT(Php)
NO.
PART I FACILITIES FOR THE ENGINEER In Figures: In Figures:
Aluminum Glass Window (Sliding) with Analok Frame and
1008 13.00 m2
Awning In Words:Pesos: In Words:Pesos:
In Figures: In Figures:
2
1010(2)b Wooden Panel Door 6.00 m
In Words:Pesos: In Words:Pesos:
In Figures: In Figures:
2
1012(5) Tempered Glass Walls/Barriers, etc. 72.00 m
In Words:Pesos: In Words:Pesos:
In Figures: In Figures:
Tempered Glass Walls/Barriers, etc. (Repair of Fixed 2
1012(5) 11.00 m
Aluminum Glass Wall) In Words:Pesos: In Words:Pesos:
In Figures: In Figures:
2
1043(1) PVC Panel Door with Frames 12.00 m
In Words:Pesos: In Words:Pesos:
In Figures: In Figures:
4.5/6.0 mm, Metal Frame, Fiber Cement Board Metal frame
1003(02) 96.00 m3
Double Wall Partition In Words:Pesos: In Words:Pesos:
In Figures: In Figures:
3
1003(17) Carpentry and Joinery Works 1.00 m
In Words:Pesos: In Words:Pesos:
In Figures: In Figures:
Glazed Tiles/Ceramic Tiles (new Tiles, Replacement of
1018(1) 250.00 m2
damage Tiles) In Words:Pesos: In Words:Pesos:
In Figures: In Figures:
3
1018 Unglazed Tiles / Ceramic Tiles 26.00 m
In Words:Pesos: In Words:Pesos:
2
1032(1)a Painting Works (Masonry/Concrete ) 1103.00 m
In Words:Pesos: In Words:Pesos:
In Figures: In Figures:
In Figures: In Figures:
2
1032(1)c Painting Works (Metal Roof, Window Grills) 412.00 m
In Words:Pesos: In Words:Pesos:
In Figures: In Figures:
Storm Drainage and Downspout (Replacement of Damage
1001(9) 1.00 l.s.
Pipe) In Words:Pesos: In Words:Pesos:
Page 2
ITEM
DESCRIPTION QTY UNIT UNIT. COST AMOUNT(Php)
NO.
PART I FACILITIES FOR THE ENGINEER In Figures: In Figures:
In Figures: In Figures:
1002(24) Cold Water Line Works (Replacement of Damage Pipe) 1.00 l.s.
In Words:Pesos: In Words:Pesos:
In Figures: In Figures:
In Figures: In Figures:
1200(12) Airconditioning (1.5 HP Kopel Super Inverter Split type AC) 1.00 l.s.
In Words:Pesos: In Words:Pesos:
In Figures: In Figures:
GRAND TOTAL
Amount in Words:
_________________________________________________________________________
_________________________________________________________________________
Submitted by:
_________________________________________
Name & Signature of Bidder's Representatives
____________________________________
Position
____________________________________
Name of Firm
____________________________________
Address
Page 3