You are on page 1of 1

JKT02 SS1/1

MARCH 2022 ISSUED FOR CONSTRUCTION SECTION 1 - CONTENTS

SPECIFICATION

MARCH 2022

SS01 Section 1 Contents


SS02 Section 2 Suspended Ceiling System
SS03 Section 3 Supply and Installation of Drywall Partitions
SS04 Section 4 Steel and Metal Works
SS05 Section 5 Waterproofing
SS06 Section 6 External and Internal Aluminium Works
SS07 Section 7 Glass and Glazing
SS08 Section 8 Epoxy Flooring
SS09 Section 9 Mock-ups and Tests
SS10 Section 10 Roofing
SS11 Section 11 Floor Screed and Hardeners
SS12 Section 12 Bricklayer, Blockwork and Plastering
SS13 Section 13 Supply and Installation of Concrete Wall Panels
SS14 Section 14 Handrails Guarding and Railing
SS15 Section 15 Cement Paving
SS16 Section 16 Tiling and Tiling Adhesives
SS17 Section 17 Stonework
SS18 Section 18 Painting and Texture Coating
SS19 Section 19 Siphonic Roof Drainage System
SS20 Section 20 Signage
SS21 Section 21 Termite Control Treatment
SS22 Section 22 Ironmongery
SS23 Section 23 Acoustic Design and Noise & Vibration Control
Consideration
SS24 Section 24 External Works
SS25 Section 25 Carpet Finishes
SS26 Section 26 Acoustic Wall Lining System
SS27 Section 27 Sealant
SS28 Section 28 Door
SS29 Section 29 General Repairs
SS30 Section 30 Sanitary Fittings and Accessories
SS31 Section 31 Carpentry and Joinery
SS32 Section 32 Others and Miscellaneous Items

COPYRIGHT BY M/S AWP PTE LTD. THIS SPECIFICATION IS THE PROPERTY OF M/S AWP PTE LTD AND CANNOT BE COPIED, REPRODUCED PARTLY OR
WHOLLY WITHOUT THE WRITTEN PERMISSION OF M/S AWP PTE LTD.

You might also like