DETAIL
A Absolutely new compenent NO experience of priduction so far
B That the part happen to be similar to actual had been produced so far but there happen to be large scale difference in
A component similar to the component produced so far but there may be change in production site
C That the part happen to be similar to actual had been produced so far even manufacturing methodology is same but t
D Minor deviation in the component produced so far (May bi in size , Tolerance etc).
E New parts in special cases like for only one time, parts in which APQP issue not resolved but needs to develop for tria
B C D E RESP
√ √ ENGG QA PROD PUR MKT/MD HR
√ √
√ √
√ √
√ √
√ X
√ X
√ X
√ X
√ √
√ √
√ x
√ √
√ √
√ √
√ √
√
√
√
Blank or X No Requirement
√ Requiremnet to be full filled.