IRRIGATION & POWER DEPARTMENT

WORKS UNDER ANNUAL DEVELOPMENT PROGRAM (ADP)

CHECK LIST FOR CONCRETE SIDE PROTECTION


Project:

Contractor:

Contract Package:

From RD: To RD: Side: Left Right

Date
S.No. Item of Works Contractor Client Consultant Remarks
Checked
1 Survey
i Marking of Centre Line
ii Marking of Centre Line
iii Setting Out
1 Toe Wall
a) Excavation for Toe Wall
i Preparation of Sub-Grade
ii Type of Equipment Used for Compaction
iii Compaction Test or Field Density Test
iv Bed Levels, Width and Alignment
b) Lean Concrete (1:4:8)
i Quality of Stone Ballast and Sand
ii Mixing, Laying and Compaction
iii Levels, Width & Alignment
c) Brick Work for Toe Wall
i Quality of Approved Bricks
ii Soaking and Laying of Bricks
iii Mortar Ratio and Joint Filling
iv Alignment and Level
2 Linning
a) Earth Work for Slope of Embankments
i Quality of Earth Being Used
ii Type of Equipment Used for Compaction
iii Compaction Test or Field Density Test

iv Dressing & Formation of Slopes With


Reference to Center Line
b) PCC Profiles (1:2:4)
i C/C Distance of Concrete Profiles
ii Width and Thickness of Profiles
iii Bitument Coating of Profiles
c) C/S Plaster (1:6) on slope & Bed
i Mixing and Ratio of Mortar
ii Thickness of Plaster
d) Concrete Lining PCC 1:2:4
i Quality of Coarse Aggregates by Employing
Gradation Test
ii Quality of Fine Aggregates (Chenab Sand)
iii Mixing, Laying and Compaction of Concrete
iv Casting & Testing of Cubes and Slump Test

v Alignment, Thickness and Surface Finishing


of Concrete
vi Provision of Expansion Joints
vii Joint Filling
viii Curing of Concrete

NESPAK REPRESENTATIVE:

Signature: ________________________ Name: ________________________ Designation: __________________________

file:///conversion/tmp/activity_task_scratch/630503181.xlsx\Check List For Concrete Side Pr