CHECK DAM
SCOUR DEPTH
D = 0.47 (Q / f)1/3 (Scour depth of a river during flood from Lacey's equation)
Chek Dam No. Constant Discharge (Q) Cfs Silt Fator (f) Scour Depth (D)
1 0.47 0 1.1 0
2 0.47 0 1.1 0
3 0.47 0 1.1 0
4 0.47 0 1.1 0
5 0.47 2071 1.1 5.80
6 0.47 2805 1.1 6.42
7 0.47 0 1.1 0
8 0.47 0 1.1 0
DESIGN CALCULATION CHECK DAM 10' HEIGHT
A = X-sectional Area = 988.0 Sft
Pw = Wetted perimeter = 190 Ft
R = A / Pw
R= 5.2 Ft
V = (1.486 /n) R 2/3 S 1/2
S= 1 / 60
n= 0.04 (For torrential rivers)
V= 14.40 Ft /Sec
Q=AV
Q= 14222 Cfs
Q = C B Hd3/2
C= 3.70 for ogee fall
B= 100 Ft (Assumed)
Hd = (Q / C . B)2/3
Hd = 11.39 Ft
2nd Trial B= 150 Ft
Hd = 8.69 Ft
DESIGN OF BUCKET
Q= 403.05 cumecs
H = (10 + Hd) 5.70 Meter
Hd = 2.65 Meter
R = 0.305 x 10p
P = (v+6.4Hd+4.88)/(3.6Hd+19.50)
Va / Vt = 0.9
Vt = ((2g(H - 0.5 Hd))1/2
Vt = 9.26 M/Sec
Va = 8.33 M/Sec
P= 1.04 Meter
R= 3.34 Meter
= 10.94 = 11 Ft
DESIGN CALCULATION CHECK DAM 12' HEIGHT
A = X-sectional Area = 988.0 Sft
Pw = Wetted perimeter = 190 Ft
R = A / Pw
R= 5.2 Ft
V = (1.486 /n) R 2/3 S 1/2
S= 1 / 60
n= 0.04 (For torrential rivers)
V= 14.40 Ft /Sec
Q=AV
Q= 14222 Cfs
Q = C B Hd3/2
C= 3.70 for ogee fall
B= 100 Ft (Assumed)
Hd = (Q / C . B)2/3
Hd = 11.39 Ft
2nd Trial B= 150 Ft
Hd = 8.69 Ft
DESIGN OF BUCKET
Q= 403.05 cumecs
H = (10 + Hd) 5.70 Meter
Hd = 2.65 Meter
R = 0.305 x 10p
P = (v+6.4Hd+4.88)/(3.6Hd+19.50)
Va / Vt = 0.9
Vt = ((2g(H - 0.5 Hd))1/2
Vt = 9.26 M/Sec
Va = 8.33 M/Sec
P= 1.04 Meter
R= 3.34 Meter
= 10.94 = 11 Ft
Scour Depth 5.74
DESIGN CALCULATION CHECK DAM 14' HEIGHT
A = X-sectional Area = 988.0 Sft
Pw = Wetted perimeter = 190 Ft
R = A / Pw
R= 5.2 Ft
V = (1.486 /n) R 2/3 S 1/2
S= 1 / 60
n= 0.04 (For torrential rivers)
V= 14.40 Ft /Sec
Q=AV
Q= 14222 Cfs
Q = C B Hd3/2
C= 3.70 for ogee fall
B= 100 Ft (Assumed)
Hd = (Q / C . B)2/3
Hd = 11.39 Ft
2nd Trial B= 150 Ft
Hd = 8.69 Ft
DESIGN OF BUCKET
Q= 403.05 cumecs
H = (10 + Hd) 5.70 Meter
Hd = 2.65 Meter
R = 0.305 x 10p
P = (v+6.4Hd+4.88)/(3.6Hd+19.50)
Va / Vt = 0.9
Vt = ((2g(H - 0.5 Hd))1/2
Vt = 9.26 M/Sec
Va = 8.33 M/Sec
P= 1.04 Meter
R= 3.34 Meter
= 10.94 = 11 Ft
DESIGN CALCULATION CHECK DAM 10' HEIGHT
CHECK DAM NO. 5
A = X-sectional Area = 235.0 Sft
Pw = Wetted perimeter = 45.2 Ft
R = A / Pw
R= 5.19912 Ft
V = (1.486 /n) R 2/3 S 1/2
S= 1 / 160
n= 0.04 (For torrential rivers)
V= 8.81 Ft /Sec
Q=AV
Q= 2071 Cfs
Q = C B Hd3/2
C= 3.70 for ogee fall
B= 30 Ft (Assumed)
Hd = (Q / C . B)2/3
Hd = 7.04 Ft
DESIGN OF BUCKET
Q= 58.70 cumecs
H = (10 + Hd) 5.19 Meter
Hd = 2.14 Meter
R = 0.305 x 10p
P = (v+6.4Hd+4.88)/(3.6Hd+19.50)
Va / Vt = 0.9
Vt = ((2g(H - 0.5 Hd))1/2
Vt = 8.99 M/Sec
Va = 8.09 M/Sec
P= 0.98 Meter
R= 2.92 Meter
= 9.57 = 10 Ft
DESIGN CALCULATION CHECK DAM 10' HEIGHT
CHECK DAM NO. 6
A = X-sectional Area = 306.5 Sft
Pw = Wetted perimeter = 58.5 Ft
R = A / Pw
R= 5.24 Ft
V = (1.486 /n) R 2/3 S 1/2
S= 1 / 150
n= 0.04 (For torrential rivers)
V= 9.15 Ft /Sec
Q=AV
Q= 2805 Cfs
Q = C B Hd3/2
C= 3.70 for ogee fall
B= 40 Ft (Assumed)
Hd = (Q / C . B)2/3
Hd = 7.11 Ft
DESIGN OF BUCKET
Q= 79.48 cumecs
H = (10 + Hd) 5.22 Meter
Hd = 2.17 Meter
R = 0.305 x 10p
P = (v+6.4Hd+4.88)/(3.6Hd+19.50)
Va / Vt = 0.9
Vt = ((2g(H - 0.5 Hd))1/2
Vt = 9.00 M/Sec
Va = 8.10 M/Sec
P= 0.98 Meter
R= 2.94 Meter
= 9.63 = 10 Ft
DESIGN CALCULATION CHECK DAM 10' HEIGHT
A = X-sectional Area = 264.3 Sft
Pw = Wetted perimeter = 48 Ft
R = A / Pw
R= 5.51 Ft
V = (1.486 /n) R 2/3 S 1/2
S= 1 / 150
n= 0.04 (For torrential rivers)
V= 9.46 Ft /Sec
Q=AV
Q= 2499 Cfs
Q = C B Hd3/2
C= 3.70 for ogee fall
B= 30 Ft (Assumed)
Hd = (Q / C . B)2/3
Hd = 7.97 Ft
DESIGN OF BUCKET
Q= 70.82 cumecs
H = (10 + Hd) 5.48 Meter
Hd = 2.43 Meter
R = 0.305 x 10p
P = (v+6.4Hd+4.88)/(3.6Hd+19.50)
Va / Vt = 0.9
Vt = ((2g(H - 0.5 Hd))1/2
Vt = 9.14 M/Sec
Va = 8.23 M/Sec
P= 1.01 Meter
R= 3.15 Meter
= 10.35 = 11 Ft
Sub Divisional Officer
Small Dams Sub Division No. II
Jhelum
DESIGN CALCULATION CHECK DAM 10' HEIGHT
A = X-sectional Area = 300.0 Sft
Pw = Wetted perimeter = 53.5 Ft
R = A / Pw
R= 5.61 Ft
V = (1.486 /n) R 2/3 S 1/2
S= 1 / 150
n= 0.04 (For torrential rivers)
V= 9.57 Ft /Sec
Q=AV
Q= 2872 Cfs
Q = C B Hd3/2
C= 3.70 for ogee fall
B= 50 Ft (Assumed)
Hd = (Q / C . B)2/3
Hd = 6.22 Ft
DESIGN OF BUCKET
Q= 81.39 cumecs
H = (10 + Hd) 4.95 Meter
Hd = 1.90 Meter
R = 0.305 x 10p
P = (v+6.4Hd+4.88)/(3.6Hd+19.50)
Va / Vt = 0.9
Vt = ((2g(H - 0.5 Hd))1/2
Vt = 8.85 M/Sec
Va = 7.97 M/Sec
P= 0.95 Meter
R= 2.71 Meter
= 8.90 = 9 Ft
Sub Divisional Officer
Small Dams Sub Division No. II
Jhelum
DESIGN CALCULATION CHECK DAM 10' HEIGHT
A = X-sectional Area = 536.3 Sft
Pw = Wetted perimeter = 86 Ft
R = A / Pw
R= 6.24 Ft
V = (1.486 /n) R 2/3 S 1/2
S= 1 / 150
n= 0.04 (For torrential rivers)
V= 10.28 Ft /Sec
Q=AV
Q= 5511 Cfs
Q = C B Hd3/2
C= 3.70 for ogee fall
B= 80 Ft (Assumed)
Hd = (Q / C . B)2/3
Hd = 7.02 Ft
DESIGN OF BUCKET
Q= 156.16 cumecs
H = (10 + Hd) 5.19 Meter
Hd = 2.14 Meter
R = 0.305 x 10p
P = (v+6.4Hd+4.88)/(3.6Hd+19.50)
Va / Vt = 0.9
Vt = ((2g(H - 0.5 Hd))1/2
Vt = 8.99 M/Sec
Va = 8.09 M/Sec
P= 0.98 Meter
R= 2.91 Meter
= 9.56 = 10 Ft
Sub Divisional Officer
Small Dams Sub Division No. II
Jhelum
DESIGN CALCULATION CHECK DAM 10' HEIGHT
A = X-sectional Area = 474.0 Sft
Pw = Wetted perimeter = 92 Ft
R = A / Pw
R= 5.15 Ft
V = (1.486 /n) R 2/3 S 1/2
S= 1 / 150
n= 0.04 (For torrential rivers)
V= 9.05 Ft /Sec
Q=AV
Q= 4289 Cfs
Q = C B Hd3/2
C= 3.70 for ogee fall
B= 85 Ft (Assumed)
Hd = (Q / C . B)2/3
Hd = 5.71 Ft
DESIGN OF BUCKET
Q= 121.54 cumecs
H = (10 + Hd) 4.79 Meter
Hd = 1.74 Meter
R = 0.305 x 10p
P = (v+6.4Hd+4.88)/(3.6Hd+19.50)
Va / Vt = 0.9
Vt = ((2g(H - 0.5 Hd))1/2
Vt = 8.76 M/Sec
Va = 7.89 M/Sec
P= 0.93 Meter
R= 2.58 Meter
= 8.47 = 9 Ft
Sub Divisional Officer
Small Dams Sub Division No. II
Jhelum
DESIGN CALCULATION CHECK DAM 10' HEIGHT
A = X-sectional Area = 732.8 Sft
Pw = Wetted perimeter = 123 Ft
R = A / Pw
R= 5.96 Ft
V = (1.486 /n) R 2/3 S 1/2
S= 1 / 150
n= 0.04 (For torrential rivers)
V= 9.97 Ft /Sec
Q=AV
Q= 7304 Cfs
Q = C B Hd3/2
C= 3.70 for ogee fall
B= 120 Ft (Assumed)
Hd = (Q / C . B)2/3
Hd = 6.47 Ft
DESIGN OF BUCKET
Q= 206.99 cumecs
H = (10 + Hd) 5.02 Meter
Hd = 1.97 Meter
R = 0.305 x 10p
P = (v+6.4Hd+4.88)/(3.6Hd+19.50)
Va / Vt = 0.9
Vt = ((2g(H - 0.5 Hd))1/2
Vt = 8.89 M/Sec
Va = 8.00 M/Sec
P= 0.96 Meter
R= 2.77 Meter
= 9.10 = 9 Ft
Sub Divisional Officer
Small Dams Sub Division No. II
Jhelum
DESIGN CALCULATION CHECK DAM 10' HEIGHT
A = X-sectional Area = 796.0 Sft
Pw = Wetted perimeter = 148 Ft
R = A / Pw
R= 5.38 Ft
V = (1.486 /n) R 2/3 S 1/2
S= 1 / 150
n= 0.04 (For torrential rivers)
V= 9.31 Ft /Sec
Q=AV
Q= 7412 Cfs
Q = C B Hd3/2
C= 3.70 for ogee fall
B= 145 Ft (Assumed)
Hd = (Q / C . B)2/3
Hd = 5.76 Ft
DESIGN OF BUCKET
Q= 210.04 cumecs
H = (10 + Hd) 4.80 Meter
Hd = 1.76 Meter
R = 0.305 x 10p
P = (v+6.4Hd+4.88)/(3.6Hd+19.50)
Va / Vt = 0.9
Vt = ((2g(H - 0.5 Hd))1/2
Vt = 8.77 M/Sec
Va = 7.90 M/Sec
P= 0.93 Meter
R= 2.60 Meter
= 8.51 = 9 Ft
Sub Divisional Officer
Small Dams Sub Division No. II
Jhelum