SCHEDULE OF WORK / ITEM(S) Sl.No Description of Work / Item(s) No.of Qty Units Estimated Satish Aggarwal and Rate Company(GSTN- 03AADFS1107M1ZI) Rate Amount 1.00 “Construction of Two laning with Hard shoulder road of 1.00 Lumpsum 0.00 1550000000 1550000000 Ukhrul – Toloi - Tadubi section of NH-102A from Design .00 .00
Total in Figures 1550000000
.00
Lowest Amount Quoted BY: Satish Aggarwal and Company(1550000000.00)
BoQ1 1 Satish Aggarwal and Company 1550000000.00 L1 2 LEKCON INFRASTRUCTURE PRIVATE LIMITED 1668973599.00 L2 3 MS M AND S Co 1674099999.00 L3 4 M/s J.K. Associates 1696900000.00 L4 5 Bhavya Construction 1808452000.00 L5 6 B R GOYAL INFRASTRUCTURE LIMITED 1812600000.00 L6 7 Comt Constructions Private Limited 1888100000.00 L7 8 HES INFRA PRIVATE LIMITED 1935000000.00 L8 9 VIJETA - SHYAM INFRA JV 1966174460.00 L9