You are on page 1of 1

a a

NOTE:

533
200 1300
a

200 1000
a a

200 1000
b b b b a a
b b b b a c c
A B C D E a
b b b b b b
b
b
b
b b b b b b b b
b
b
b
b b
b b b b
a b
a b
b b
b
b b b b
b
b b
b a
b
c
c c a ALL DIMENSIONS MUST
b b b b
950 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 950 173 1000 1000 1000 1000 1000 1000 1000 1000 173
TRUSS-3 1000
4 SETS
1000 1000 BE VERIFY IN ACTUAL
TRUSS-2 8345 3000
TRUSS-1 17900
2 SETS (VERIFY ON ACTUAL SITE) (VERIFY ON ACTUAL SITE)
7 SETS (VERIFY ON ACTUAL SITE)

LEGENDS AND SYMBOLS:


18000
3 TRUSS DETAIL a - 2" x 2" mm THK. ANGLE BAR
4500 4500 4500 4500 SCALE: NTS
S-3 b - 2" x 2" x 4.5" mm THK. ANGLE BAR
C-2 RB-1 C-2 RB-1 C-2 RB-1 C-2 RB-1 C-2

1 c - 1 12" x 1 12" x 4.5" mm THK. ANGLE BAR


TRUSS-1 2" x 4" x 1.2" mm C-PURLINS @ 600 mm
PARAPET WALL (SEE DETAILS)
12 mm DIA. SAG ROD

RB-1

RB-1
4700

RB-1

RB-1

RB-1
TRUSS-1
SCHEDULE OF ROOF BEAMS

4200
BEAM SIZE REINFORCEMENT
LEFT SUPPORT MID-SPAN RIGHT SUPPORT STIFFENER
MARK WIDTH DEPTH
C-2 RB-1 RB-1 RB-1 RB-1 TOP MID BOT TOP MID BOT TOP MID BOTTOM
2 C-2

TRUSS-1
RB-1
RB-1

TRUSS-1
RB-1
14100

4700

SCHEDULE OF BEAMS AND GIRDERS - FOUNDATION TO FOURTH FLOOR

RB-1

RB-1
RB-1
REINFORCEMENT

3000
BEAM SIZE
LEFT SUPPORT MID-SPAN RIGHT SUPPORT STIFFENER STIRRUPS
MARK WIDTH DEPTH
C-2 RB-1 RB-1 TRUSS-1 RB-1 RB-1 TOP MID BOT TOP MID BOT TOP MID BOTTOM
3 C-2

TB-1
TB-2

3000
TRUSS-1
G-1

RB-1
4700

RB-1

G-2
RB-1

RB-1

RB-1
TRUSS-1

C-2
RB-1 RB-1 RB-1 RB-1 SCHEDULE OF BEAMS AND GIRDERS - FIFTH TO SEVENTH FLOOR
4 C-2 REINFORCEMENT

3000
BEAM SIZE
LEFT SUPPORT MID-SPAN RIGHT SUPPORT STIFFENER STIRRUPS
MARK WIDTH DEPTH
TOP MID BOT TOP MID BOT TOP MID BOTTOM

G-1

1 ROOF 'A' FRAMING PLAN G-2

3000
VERTICAL BARS 22mm DIA DEFORMED BAR
SCALE: 1:100 MTS CEILING HANGER ROD (TYP. FROM 2ND TO 7TH FLOOR)
R.C. CANOPY (SEE DETAIL)
S-3 REINFORCED CONCRETE BEAM (SEE SCHED. OF BEAM)

3000
D E
120MM THICK SUSPENDED SLAB (TYP. FROM 2ND TO 7TH FLOOR)
CEILING HANGER ROD

4500

3000
TRUSS-3

C-1 RB-1

3000
5 C-2

800
120MM THICK SLAB ON FILL

TRUSS-3 TRUSS-3
REINFORCE CONCRETE COLUMN (SEE COLUMN SCHEDULE)

10 000
4700

RB-1

RB-1
-2

TR
TRUSS-3
SS

U
SS
U
TR

-2 WELL COMPACTED SOIL

650
PILE CAP (SEE DETAIL)
C-2 C-2
BORED PILE (SEE SCALED/DETAILS)
6
RB-1

2 ROOF 'B' FRAMING PLAN 4 STRUCTURAL BAY SECTION


SCALE: 1:50 MTS
SCALE: 1:100 MTS
S-3 S-3

IN THE OFFICE OF: SUBJECT: STUDENT: PROJECT OWNER: PROJECT TITLE: REMARKS: S H E E T C O N T E N T S : S H E E T N O. :

DRAWN BY: CHECKED BY: APPROVED:


VIKTORIA ALLONA M. YUMANG
BUILDING TECHNOLOGY 3
(C-PCBT3)
DEPARTMENT: YEAR AND SECTION:
MIXED USED BUILDING ROOF FRAMING PLAN
TRUSS DETAILS
STRUCTURAL BAY SECTION
VIKTORIA
ALLONA M.
YUMANG
AR. EDRIAN T.
SITCHON
S
SCHEDULE OF BEAMS
INSTRUCTOR: ARCHITECTURE DEPARTMENT - CEA AR-3A
3 4
AR. EDRIAN T. SITCHON SCHOOL: UNIVERSITY OF THE ASSUMPTION LOCATION: DATE SUBMITTED: