533
200 1300
a
200 1000
a a
200 1000
b b b b a a
b b b b a c c
A B C D E a
b b b b b b
b
b
b
b b b b b b b b
b
b
b
b b
b b b b
a b
a b
b b
b
b b b b
b
b b
b a
b
c
c c a ALL DIMENSIONS MUST
b b b b
950 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 950 173 1000 1000 1000 1000 1000 1000 1000 1000 173
TRUSS-3 1000
4 SETS
1000 1000 BE VERIFY IN ACTUAL
TRUSS-2 8345 3000
TRUSS-1 17900
2 SETS (VERIFY ON ACTUAL SITE) (VERIFY ON ACTUAL SITE)
7 SETS (VERIFY ON ACTUAL SITE)
RB-1
RB-1
4700
RB-1
RB-1
RB-1
TRUSS-1
SCHEDULE OF ROOF BEAMS
4200
BEAM SIZE REINFORCEMENT
LEFT SUPPORT MID-SPAN RIGHT SUPPORT STIFFENER
MARK WIDTH DEPTH
C-2 RB-1 RB-1 RB-1 RB-1 TOP MID BOT TOP MID BOT TOP MID BOTTOM
2 C-2
TRUSS-1
RB-1
RB-1
TRUSS-1
RB-1
14100
4700
RB-1
RB-1
RB-1
REINFORCEMENT
3000
BEAM SIZE
LEFT SUPPORT MID-SPAN RIGHT SUPPORT STIFFENER STIRRUPS
MARK WIDTH DEPTH
C-2 RB-1 RB-1 TRUSS-1 RB-1 RB-1 TOP MID BOT TOP MID BOT TOP MID BOTTOM
3 C-2
TB-1
TB-2
3000
TRUSS-1
G-1
RB-1
4700
RB-1
G-2
RB-1
RB-1
RB-1
TRUSS-1
C-2
RB-1 RB-1 RB-1 RB-1 SCHEDULE OF BEAMS AND GIRDERS - FIFTH TO SEVENTH FLOOR
4 C-2 REINFORCEMENT
3000
BEAM SIZE
LEFT SUPPORT MID-SPAN RIGHT SUPPORT STIFFENER STIRRUPS
MARK WIDTH DEPTH
TOP MID BOT TOP MID BOT TOP MID BOTTOM
G-1
3000
VERTICAL BARS 22mm DIA DEFORMED BAR
SCALE: 1:100 MTS CEILING HANGER ROD (TYP. FROM 2ND TO 7TH FLOOR)
R.C. CANOPY (SEE DETAIL)
S-3 REINFORCED CONCRETE BEAM (SEE SCHED. OF BEAM)
3000
D E
120MM THICK SUSPENDED SLAB (TYP. FROM 2ND TO 7TH FLOOR)
CEILING HANGER ROD
4500
3000
TRUSS-3
C-1 RB-1
3000
5 C-2
800
120MM THICK SLAB ON FILL
TRUSS-3 TRUSS-3
REINFORCE CONCRETE COLUMN (SEE COLUMN SCHEDULE)
10 000
4700
RB-1
RB-1
-2
TR
TRUSS-3
SS
U
SS
U
TR
650
PILE CAP (SEE DETAIL)
C-2 C-2
BORED PILE (SEE SCALED/DETAILS)
6
RB-1
IN THE OFFICE OF: SUBJECT: STUDENT: PROJECT OWNER: PROJECT TITLE: REMARKS: S H E E T C O N T E N T S : S H E E T N O. :