You are on page 1of 1

SUSPENDED SLAB CONSTRUCTION

JOINT DETAIL

PIPE SLEEVE THRU WALL

SLAB ON GRADE BEAM CONSTRUCTION JOINT DETAIL


EXPANSION JOINT DETAIL

WALL SUPPORT @
BOTTOM OF SLAB/BEAM
SECTION 1 - 1

REINFORCEMENT LAP SPLICE DET. 8 SLAB ON GRADE


CONSTRUCTION JOINT DETAIL

COLUMN LAP SPLICE AND EXTERIOR


GIRDER TO COLUMN CONNECTION DETAIL

DOOR OPENING ELEVATION

WINDOW OPENING ELEVATION


WINDOW OPENING DETAIL

NOTES :

DOOR OPENING DETAIL


PIPE SLEEVE THRU R.C. BEAM DETAIL

SLAB OPENING DETAIL

BAR BENDING DETAIL 9 TYPICAL R.C. DETAILS AND CONSTRUCTION NOTES

G
SCALE
E N E R A L N O T E S A N D M I S C E L L A N E O U S D E T A I L NTS
S
ARCHITECT: ENGINEER: PROJECT TITLE CLIENT NAME: MARK DATE REVISION:
PROJECT NO: SHEET NO.
CAD DWG FILE:
DESIGNED BY:

MHEREEN P. LERUM JOHN ERIC D. WONG


TWO STOREY CHARLIE M. BALUCA DRAWN BY:
CHECKED BY:
S- 02
SHEET CONTENTS:

ADDRESS: BLK 30 LT 19 MONTALBAN HEIGHTS SAN JOSE RODRIGUEZ RIZAL TEL. NO.:(02) 844-28-155 / REG. NO. 0048643
ARCHITECT
PTR. NO. 8247219 REG. NO. 0175597
ENGINEER
PTR. NO. 17738097
RESIDENCE GENERAL NOTES & PRELIMINARY CONSTRUCTION
DATE ISSUED: 02/18/20 PLACE ISSUED: ANTIPOLO CITY DATE ISSUED: 12/02/19 PLACE ISSUED: SAN MATEO, RIZAL LOCATION: MISCELLANEOUS DETAILS BUILDING PERMIT AS-BUILT
MOBILE NO.: 09091740242 / 09631637022 / EMAIL ADDRESS: LeRoomArch@gmail.com T.I.N. 346-379-519-000 DATE: 01/08/22 T.I.N. 743-183-992 DATE: 4/18/22 TREVI MARIKINA CITY DATE OF ISSUE: