You are on page 1of 1

36" x 48" Arch E -SHEET SIZE

PROJECT

GENERAL NOTES:

1. NETW ORK ARCHITECTURE DIAGRAM IS PURELY DIAGRAMMATIC TO INDICATE FLOW OF CONNECTIVITY BETW EEN
DEVICES AND SYSTEMS. REFER TO OTHER DISCIPLINES CONTRACT DOCUMENTS AND DRAW INGS FOR COMPLETE
DETAILS OF SYSTEM CONNECTIVITY.
2. REFER TO OTHER DISCIPLINES CONTRACT DOCUMENTS AND DRAW INGS FOR SYSTEMS W HERE W IRELESS
CONNECTIVITY IS REQUIRED. NETW ORK CONTRACTOR SHALL COORDINATE W ITH TRADES TO PROVIDE A
COMPLETE AND FUNCTIONAL SYSTEM.

688 W 41st Avenue, Vancouver, BC V5Z 2M9


5931 Cambie Street, Vancouver, BC V5Z 4H2
REFERENCE NOTES 650 W 41st Avenue, Vancouver, BC V5Z 2M9
CLIENT
N-1 IN EVENT OF FAILURE OF OLT A, SECONDARY OLT B IS ON COLD STAND-BY AND MUST BE INITIATED BY MANUAL
STARTUP TO REROUTE ALL NETW ORK TRAFFIC. COVERGED BUILDING NETW ORK SHALL BE CONFIGURED BY
NETW ORK CONTRACTOR.

KEY PLAN

LEGEND

System -
Precise ParkLink Wohr
Owner Gottspeed
System
FOR EACH SYSTEM Contractor ED
- System Responsibility
- Contractor
- Responsibility BHERTECH
via ANDORDIX
WPE
ED
ARUBA
WPE Wavelinx System - DDC
ED Cairns / WPE Control Solutions
KodeLabs (MSI) EllisDon EllisDon
Owner
N-1
Simplex
Telus Cairns / WPE
Owner EllisDon

Triacta
Cairns / WPE
ED

System
N-1 Contractor
Owner
0 ISSUED FOR 100% CONSTRUCTION 21 OCT 2021
DOCUMENTS - PH1S PODIUM - BASE
BUILDING / ISSUED FOR CONSTRUCTION -
PH1S PODIUM - BASE BUILDING
ISSUED FOR TENDER 08 JUL 2021
KONE ISSUED FOR CONSTRUCTION - PH1N 30 APR 2021
Building Network TKE PARKADE - BASE BUILDING
Richmond ISSUED FOR 100% CD FINAL 12 FEB 2021
Backbone: Andorix / Belden EllisDon
ISSUED FOR 100% CONSTRUCTION 30 NOV 2020
Entry: ICT DOCUMENTS - PH1N BASE BUILDING
WPE Panic: Aiphone ISSUED FOR PROCUREMENT 28 AUG 2020
No. DESCRIPTION: DATE:
EllisDon Avigilon Paladin
REVISIONS
Paladin ED
DRAW ING STATUS
ACC Avigilon EllisDon
Including: Paladin
Definitions: - Bathroom EllisDon
FOR CONSTRUCTION
- Occupancy
IBMP - Integrated Building Management System: The layer of technology that integrates - Lockers Discrepancies must be reported immediately to the
Architect before proceeding. Only figured dimensions
to all site sub-systems and cloud connections, providing integration, workflow and Leak are to be used. Contractors must check all dimensions
functionality between systems and to other application Detection
on site. This drawing is protected by copyright.

MSI - Master Systems Integrator - The MSI contractor shall project manage, install and System System
commission the IBMP Contractor System SMT ALL DIMENSIONS ARE SHOW N IN METRIC.

GPON - Gigabit Passive Optical Network - optical fiber serves multiple endpoints by using Responsibility Contractor EllisDon
unpowered (passive) fiber optic splitters to divide the fiber bandwidth among the Responsibility
endpoints. System
ICT - Information and Communications Technology - all devices, networking components, Contractor
applications and systems that combined allow people and organizations to interact in the Responsibility
digital world 300 - 6400 Roberts Street, Burnaby BC, V5G 4C9
t 604 294 8414 smithandandersen.com

SEAL NORTH ARROW

N
FOR CONSTRUCTION
Oakridge Redevelopment PP1S
Document: IFC & 100% CD
PH1S Podium - Base Building
FILE NAME: D:\Users\james.wong\Documents\13202.005_Oakridge_ICT_R18_james.wongDCAGF.rvt

Received: October 21, 2021


Executed: October 22, 2021

PROJECT NORTH TRUE NORTH

DRAW ING TITLE

ICT NETWORK
ARCHITECTURE DIAGRAM

DRAW N CHECKED
JW VW

Parkade and Podium SCALE AT ARCH E


NTS.
DATE
30 APR 2021

GRAPHIC
SCALE 0 25 50 100mm
PLOT DATE: 10/18/2021 1:33:05 PM

DRAFT ONLY - DETAILS TBC


SCALE IN MILLIMETERS

PROJECT NO. REV NO.


13202.005 0
DRAW ING NO.

1 NETW ORK ARCHITECTURE DIAGRAM


IX00-IS00-060
IX00-IS00-060

You might also like