You are on page 1of 1

2.

5 g
o= 61.4
1

EXIS. ROAD AND CUTTING AREA


ROCK BARRIER TO SEPARATE
4 C Ac=
22
7.3 6
r=2 31.3
40

6 F =2
5.5 0 Sv
31

T= 240.0
12
R=
32
800.0

33
ABUTME
NT A
825.0 Km 0+8
12.75
34

L PIER 1
850.0 Km 0+842.75
35
km 0+859.21
Km 0+872.75
875.0 L PIER 2 36

900.0 L PIER 3 37

L=115.23
Km 0+902.75

L=115.23
AFOOL BRIDGE
925.0 38
L PIER 4
Km 0+932.75

300m
950.0 39

L PIER 5
Km 0+962.75
975.0 km 0+974.44450.00km 0+974.44
40
160.0000

450.00
L PIER 6
Km 0+992.75
41
1000.0

L PIER 7
Km 1+022.75
42
1025.0

43
8
1050.0 L PIER 2.75
Km 1+05

44

R9
1075.0 L PIE 82.75
Km 1+0
45
B
MENT
ABUT 112.75
1100 Km 1+
.0 46

LL N.2
INI NG WA
1125 RETA
.0 47

CONNECTION TO WADI
PEDESTRIAN RAMP OF
48
6
4.7
20
1+
km

2153.5000 2153.2019

130.2953

1181.1591

Hanzie

Qayum
Sh a

.
L C

.
.
nf

L
ar

&
Since 1960 o
Par t n e r s C
i

AL -MANARAH
Engineering Consultancy

You might also like