You are on page 1of 1

2.

5 g
o= 61.4
1

EXIS. ROAD AND CUTTING AREA


ROCK BARRIER TO SEPARATE
4 C Ac=
22
7.3 6
r=2 31.3
40

6 F =2
5.5 0 Sv
31

T= 240.0
12
R=
32
800.0

33
ABUTME
NT A
825.0 Km 0+81
2.75
34

L PIER 1
850.0 Km 0+842.75
35
km 0+859.21
Km 0+872.75
875.0 L PIER 2 36

900.0 L PIER 3 37

L=115.23
Km 0+902.75

L=115.23
AFOOL BRIDGE
925.0 38
L PIER 4
Km 0+932.75

300m
950.0 39

L PIER 5
Km 0+962.75
975.0 km 0+974.44450.00km 0+974.44
40
450.00
L PIER 6
Km 0+992.75
41
1000.0

L PIER 7 5
Km 1+022.742
1025.0

43
8
1050.0 L PIER 2.75
Km 1+05
44

R9
1075.0 L PIE1+082.75
Km
45
B
MENT
ABUT 12.75
204.2851 1100 Km 1+1
.0 46

WA LL N.2
INING
1125 RETA
.0 47

CONNECTION TO WADI
PEDESTRIAN RAMP OF
48
1150 6
4.7
20
.0
1+
km

300

600.0311 600.0311

50.0000 50.0000

Hanzie

Qayum
Sh a

.
C

.
L

.
nf

L
ar

i& Since 1960 o


AL -MANARAH Par t ne r s C
Engineering Consultancy

You might also like