MOLD & Co. « It is our responsibility to mould a better world. »
New factory description CEO, MOLD & Co.
A NEW CHALLENGE TO TAKE UP Key Objectives:
The implementation of the project is a challenge in itself, as the project will be located in the heart of an eco-residential district of the green city of Tianjin in China.
- Reduced energy consumption, Reduced
One of the keys for a successful production plant environmental footprint (objective: zero impact). installation is to ensure that the installation is as
eco-friendly as possible. - A limited disturbance on the adjacent urban
structure.
- An optimization of the working conditions for
the employees in terms of thermal comfort,
visual comfort, air quality and supply and
proximity to the work place.
IMPLEMENTATION FACTORY’S DESCRIPTION
The new MOLD & Co plant will have: The product lines and the machines used in the
new factory will be similar to 3 actual client
- 15,000 m2 of workshops and assembly lines; factories in China. Here are some visual - 5,000 m2 of offices (administration, R&D); examples.