You are on page 1of 1

SCS ROOM DRAWINGS STATUS - 16.11.

2020
S.No Description Civil Dwg Panel location DWG Remarks
Mech Location GA dwg not received for
1 RAW MILL HYDRAULIC PANEL ROOM Received Done Lubrication & grease spray system
2 COOLER HYDRAULIC PANEL ROOM Not released
Mech Location GA dwg not received for
3 CEMENT MILL HYDRAULIC PANEL ROOM Received Done Lubrication & grease spray system
4 GAS ANALYSIER (SOx+NOx) - CEM ANALYSER - 97.6 mtr level Not released
5 GAS ANALYSERS (CO+O2) AT PH-1 OUTLET - 97.6 mtr level Not released
6 GAS ANALYSERS (CO+O2+NOx) AT PC-1 OUTLET - 59.8 mtr level Received Done
7 GAS ANALYSERS (CO+O2+NOx) AT KILN INLET 461 KL1 - 13 mtr level Received Done
8 CABINET FOR CO+O2 GAS ANALYSIS BAG FILTER L41 BF3 Not released
9 COAL MILL CO2 SYSTEM ROOM Not released
Tower dwg not
10 CABINET FOR KILN SHELL SCANNER
released
We sent mail to FLS for tower design

11 WEIGH BRIDGE ROOM Not released


12 KILN THRUST AND GREASE SPRAY SYSTEM ROOM Not released
13 PACKING PLANT OPERATION ROOM / PP CCR Not released
14 AAQMS Not released Later

You might also like