Weighing the cement (7 kg), sand (17 kg), and gravel (28 kg) to be used.
Mixing the cement, sand, and gravel and adding an approximately 2 kg of water.
After 14 days of curing, the concrete cylinder underwent a compressive strength test.
After 28 days of curing, the second concrete cylinder underwent a compressive strength test.