You are on page 1of 3

Key Plan:

JA
LU
R P
IP AG
A S

SUN
GAI
PRY:0+

KAL
IMA
000

LAN
G
PRY:0+0

50

Salur
an
Tarum
PRY:0+100

Barat

ABT
PRY:0+150

PRY:0+200

1
CCTV PRY:0+214
ctv

ctv

Saluran
Tarum
Barat

P1

POS
P2

SC
05
P3
P4
CCTV

P5
P6
P7
P8
B
B

P9
P10
P11
tngg

P12

ABT
2
SHARED BUILDING OF
BRIMOB POST&DORMITORY
AND
BI INTERNAL SECURITY
POST&DORMITORY

jln

LOKASI
CCTV

A
CCTV

0+000
0+050
0+100
0+150
EXTEND

SICPA

0+200
0+250
EXPANSI
PERURI

0+300
0+000
+27.5ex
+32
+31

0+350
+25ex +32 +31
0+050

+35ex
+36+37+34 bottom of swale

+36 (?) 0+400


0+100

+42.5ex
3F +41.5 bottom of swale
+44.5
+43.5

0+138
+42.5

CP-04

0+450
+27ex +32 +31 +39 (?)

3K

0+480
+35ex

0+000
+34 bottom of swale
+39 (?) +37 TOW
+36 Patrol
+37 Internal Lvl
+27ex +39.0
+32
+31
+31
+40.0

2C
+31 +31 0+050
+27ex +32 +32 +29

0+100

3G

0+137
+28.5
Permanent water body

Permanent water body


top level at 28
area of 10,540 m2 +28.5

+27.5ex
+32
+31
+32

+33 Internal Lvl +31 bottom of swale


+34 TOW

SCP-3A
+33 Patrol

+31 +27.5ex
+32 +32 +32
+27.5ex +32 +29.3 +31 +32 (new entrance level)
Alfresco (alt)

+31

3C
Permanent water body
top level at 28.5

+29.3

+27.5ex+32 +29.3 Permanent water body


+31 top level at 29.0water body
Permanent +36

+32

+38

+34.5 Internal Lvl


+33.5 Patrol
+34.5 TOW
+29.3 +31.5 bottom of swale
+32.5ex
Permanent water body
top level at 29.5
+31

+27.5ex +32 +31

+35

2B
+38

+40.0
+32
+31
+27.5ex

3H

3L
+38
0+000

3I
0+050
3

3J
0+100
+32

0+150
+31
+27.5 ex

+40

+36.5 bottom of swale

3D
+39 +37.5ex
+39.5 TOW
+38.5 Patrol
+32 Internal Lvl +39 +39 Internal Lvl
+32 Patrol
+33 TOW
+30 swale 3B+32.0

0+200
+31ex
+49

+41 +48
3B

+43.0
+44 +40
+45.5

+44.0
+40

0+250
+46
+45.5

3E +33 Permanent water body


top level at 32
+37 Internal Lvl area of 730 m2
+38.5 Patrol +34
+39.5 TOW Permanent water body
+36.5 swale
+37.5ex
+44
+33

0+300
Permanent water body
top level at 32.5
area of 550 m2
+35 Internal Lvl +34 Patrol
+35 TOW
+35 +35 +31ex
+35 Permanent water body
top level at 33
+46 area of 850 m2
S

0+350
+35

+32
+35

0+400 +35 Permanent water body


top level at 34
area of 750 m2

+36
+35 Internal Lvl
+35 TOW
0+450
0+454 +34 Patrol
+32.5ex

+52 Internal Lvl


+31 Patrol
+52 TOW
+49 swale
+50ex

Legend :

PEMBERI TUGAS
Developer/ Owner:

BANK INDONESIA
Address:

c.q. Unit Khusus Pembangunan SPU, DC


dan BRS (UKPS)
Jl. M.H. Thamrin No.2 Jakarta 10350

KONSULTAN PMCM
Consultant PMCM :

KSO EGIS-YODYA

Wisma PMI, Lantai 4 T: (+62 21) 7252577


Jl. Wijaya 1 No.63 E: egis-indonesia@egis.fr
Kebayoran Baru, Jakarta
Selatan, 12170

TEAM LEADER ENGINEERING PMCM

(Nanang Zain, S.T, M.T.)

KONSULTAN PERANCANG
TEAM LEADER PERANCANG IKI KSO TIM AHLI PERANCANG IKI KSO

(Sri Winarti, S.T.) (Devlin Tedy S.T, M.T.)

Lead Design Consultant :

PT. INDOKOEI INTERNATIONAL

Jl. Sultan Hasanudin T: (+62 21) 7237620


No.45, Jakarta 12160 E: info@indokoei.co.id
www.indokoei.co.id

Design Consultant :

AURECON INDONESIA

Revenue Tower, 25th Floor T: (+62 21) 29654000


Distrcit 8 Jenderal Sudirman E: jakarta@aurecongroup.com
SCBD Lot 13, Jakarta 12190 www.aurecongroup.com

Design Consultant :

PT. ANGGARA ARCHITEAM

Jl. Tebet Barat II No.12B T: (+62 21) 83706091


Jakarta 12810 E: adm@anggara.co.id
www.anggara.co.id

Design Consultant :

PT. AIRMAS ASRI

Jl. Cikini IV No.6 T: (+62 21) 31906688


Jakarta 10330 E: info@airmasasri.com
www.airmasasri.com

PERANCANGAN TERINTEGRASI
BANK INDONESIA DI KAWASAN
KARAWANG DAN KAWASAN GRESIK

DENAH RUANG POMPA


GWT 2

SBI-IKIKSO-K-E01-DN-DR-0001

DETAIL ENGINEERING DESIGN 30 SEPTEMBER 2022


Key Plan:

JA
LU
R P
IP AG
A S

SUN
GAI
PRY:0+

KAL
IMA
000

LAN
G
PRY:0+0

50

Salur
an
Tarum
PRY:0+100

Barat

ABT
PRY:0+150

PRY:0+200

1
CCTV PRY:0+214
ctv

ctv

Saluran
Tarum
Barat

P1

POS
P2

SC
05
P3
P4
CCTV

P5
P6
P7
P8
B
B

P9
P10
P11
tngg

P12

ABT
2
SHARED BUILDING OF
BRIMOB POST&DORMITORY
AND
BI INTERNAL SECURITY
POST&DORMITORY

LOKASI
jln

CCTV

CCTV

0+000
0+050
0+100
0+150
EXTEND

SICPA

3D16

0+200
0+250
EXPANSI
PERURI

0+300
0+000
+27.5ex
+32
+31

0+350
+25ex +32 +31
0+050

+35ex
+36+37+34 bottom of swale

+36 (?) 0+400


0+100

+42.5ex
3F +41.5 bottom of swale
+44.5
+43.5

0+138
+42.5

CP-04

0+450
+27ex +32 +31 +39 (?)

3K

0+480
+35ex

0+000
+34 bottom of swale
+39 (?) +37 TOW
+36 Patrol
+37 Internal Lvl
+27ex +39.0
+32
+31
+31
+40.0

2C
+31 +31 0+050
+27ex +32 +32 +29

0+100

3G

0+137
+28.5
Permanent water body

Permanent water body


top level at 28
area of 10,540 m2 +28.5

+27.5ex
+32
+31
+32

12D-16
+33 Internal Lvl +31 bottom of swale
+34 TOW

SCP-3A
+33 Patrol

+31 +27.5ex
+32 +32 +32
+27.5ex +32 +29.3 +31 +32 (new entrance level)
Alfresco (alt)

+31

3C
Permanent water body
top level at 28.5

+29.3

+27.5ex+32 +29.3 Permanent water body


+31 top level at 29.0water body
Permanent +36

+32

+38

3800 3000 3000 3000 3300


+34.5 Internal Lvl
+33.5 Patrol
+34.5 TOW
+29.3 +31.5 bottom of swale
+32.5ex
Permanent water body
top level at 29.5
+31

+27.5ex +32 +31

+35

2B

40
+38

+40.0
+32
+31
+27.5ex

3H

3L
+38
0+000

3I
0+050
3
200

3J
0+100
D13
+32

0+150
+31
+27.5 ex

+40

+36.5 bottom of swale

3D
+39 +37.5ex
+39.5 TOW
+38.5 Patrol
+32 Internal Lvl +39 +39 Internal Lvl
+32 Patrol
+33 TOW
+30 swale 3B+32.0

0+200
+31ex
+49

+41 +48
3B

+43.0
+44 +40
+45.5

+44.0
+40

0+250
+46
+45.5

3E +33 Permanent water body


top level at 32
+37 Internal Lvl area of 730 m2
+38.5 Patrol +34
+39.5 TOW Permanent water body
+36.5 swale
+37.5ex
+44
+33

0+300
Permanent water body
top level at 32.5
area of 550 m2
+35 Internal Lvl +34 Patrol
+35 TOW
+35 +35 +31ex
+35 Permanent water body
top level at 33
+46 area of 850 m2
S

0+350
+35

+32
+35

0+400 +35 Permanent water body


top level at 34
area of 750 m2

+36
+35 Internal Lvl
+35 TOW
0+450
0+454 +34 Patrol
+32.5ex

+52 Internal Lvl


+31 Patrol

400

400
+52 TOW
+49 swale
+50ex

2D16 75
Legend :

D10-200 TUMPUAN D13-100 TUMPUAN


3100

3300
200 DAN LAPANGAN
DAN LAPANGAN
KOLOM
400
400x400
KOLOM 400x400
200

BALOK 200x400

DETAIL PENULANGAN BALOK ATAS DETAIL PENULANGAN KOLOM


3100

3300
DAFTAR BALOK PEMBERI TUGAS
Developer/ Owner:

NOTASI BALOK ATAS DAFTAR PENULANGAN KOLOM BANK INDONESIA


Address:

Tumpuan Dan Lapangan c.q. Unit Khusus Pembangunan SPU, DC


NOTASI KOLOM dan BRS (UKPS)
Jl. M.H. Thamrin No.2 Jakarta 10350
Tumpuan Dan Lapangan
200

KONSULTAN PMCM
200 3600 200 2800 200 2800 200 2800 200 3100 200 Consultant PMCM :

KSO EGIS-YODYA
40 75
DENAH BALOK ATAP Wisma PMI, Lantai 4
Jl. Wijaya 1 No.63
Kebayoran Baru, Jakarta
T: (+62 21) 7252577
E: egis-indonesia@egis.fr

Selatan, 12170

TEAM LEADER ENGINEERING PMCM

3800 3000 3000 3000 3300


(Nanang Zain, S.T, M.T.)

H
300

H
POTONGAN POTONGAN
KONSULTAN PERANCANG
TEAM LEADER PERANCANG IKI KSO TIM AHLI PERANCANG IKI KSO

(Sri Winarti, S.T.) (Devlin Tedy S.T, M.T.)

Lead Design Consultant :

PT. INDOKOEI INTERNATIONAL


B
3300

3000
DINDING TEBAL300
B Jl. Sultan Hasanudin T: (+62 21) 7237620
No.45, Jakarta 12160 E: info@indokoei.co.id
www.indokoei.co.id
KOLOM
400x400
BxH 400 x 400 Design Consultant :

BxH 200 x 400 AURECON INDONESIA


TUL. LONGITUDINAL 12D-16
300

TUL. ATAS 3-D16


TUL. SENGKANG 4D13-100
Revenue Tower, 25th Floor T: (+62 21) 29654000
Distrcit 8 Jenderal Sudirman E: jakarta@aurecongroup.com
TUL. BAWAH 3-D16 SCBD Lot 13, Jakarta 12190 www.aurecongroup.com

TUL. SENGKANG
TUL. CONFINEMENT D13 Design Consultant :

10-200 PT. ANGGARA ARCHITEAM


3300

3000

-
TUL. TENGAH 2-D16 Jl. Tebet Barat II No.12B T: (+62 21) 83706091
Jakarta 12810 E: adm@anggara.co.id
KETERANGAN - www.anggara.co.id

Design Consultant :

PT. AIRMAS ASRI

Jl. Cikini IV No.6 T: (+62 21) 31906688


300

Jakarta 10330 E: info@airmasasri.com


300 3500 300 12000 300 www.airmasasri.com
TUL. HORIZONTAL

TUL. VERTIKAL
DENAH KOLOM PERANCANGAN TERINTEGRASI
BANK INDONESIA DI KAWASAN
KARAWANG DAN KAWASAN GRESIK

DETAIL KOLOM, BALOK,


DINDING, PLAT LANTAI,
PLAT ATAP RUANG POMPA
GWT 2

SBI-IKIKSO-K-E01-DN-DR-0002

DETAIL ENGINEERING DESIGN 30 SEPTEMBER 2022


Key Plan:

JA
LU
R P
IP AG
A S

SUN
GAI
PRY:0+

KAL
IMA
000

LAN
G
PRY:0+0

50

Salur
an
Tarum
PRY:0+100

Barat

ABT
PRY:0+150

PRY:0+200

1
CCTV PRY:0+214
ctv

ctv

Saluran
Tarum
Barat

P1

POS
P2

SC
05
P3
P4
CCTV

P5
P6
P7
P8
B
B

P9
P10
P11
tngg

P12

ABT
2
SHARED BUILDING OF
BRIMOB POST&DORMITORY
AND
BI INTERNAL SECURITY
POST&DORMITORY

D10-150 LOKASI
jln

KOLOM 400x400
CCTV

CCTV

0+000
0+050
D19-125

40

0+100
0+150
EXTEND

SICPA

0+200
0+250
EXPANSI
PERURI

0+300
DETAIL TULANGAN BW1, T=300mm 0+000
+27.5ex
+32
+31

0+350
+25ex +32 +31
0+050

+35ex
+36+37+34 bottom of swale

+36 (?) 0+400


0+100

+42.5ex
3F +41.5 bottom of swale

75
+44.5
+43.5

0+138
+42.5

CP-04

0+450
+27ex +32 +31 +39 (?)

3K

0+480
+35ex

0+000
+34 bottom of swale
+39 (?) +37 TOW
+36 Patrol
+37 Internal Lvl
+27ex +39.0
+32
+31
+31
+40.0

2C
+31 +31 0+050
+27ex +32 +32 +29

3800 3000 3000 3000 3300

250
0+100

3G

0+137
+28.5
Permanent water body

Permanent water body


top level at 28
area of 10,540 m2 +28.5

+27.5ex
+32
+31
+32

+33 Internal Lvl +31 bottom of swale


+34 TOW

SCP-3A
+33 Patrol

+31 +27.5ex
+32 +32 +32
+27.5ex +32 +29.3 +31 +32 (new entrance level)
Alfresco (alt)

+31

3C
Permanent water body
top level at 28.5

+29.3

+27.5ex+32 +29.3 Permanent water body


+31 top level at 29.0water body
Permanent +36

+32

+38

+34.5 Internal Lvl


+33.5 Patrol
+34.5 TOW
+29.3 +31.5 bottom of swale
+32.5ex
Permanent water body
top level at 29.5
+31
300

+27.5ex +32 +31

+35

2B
+38

+40.0
+32
+31
+27.5ex

3H

3L
+38
0+000

3I
0+050
3

3J
0+100
D19
+32

0+150
+31
+27.5 ex

+40

+36.5 bottom of swale

3D
+39 +37.5ex
+39.5 TOW
+38.5 Patrol
+32 Internal Lvl +39 +39 Internal Lvl
+32 Patrol
+33 TOW
+30 swale 3B+32.0

0+200
+31ex
+49

+41 +48
3B

+43.0
+44 +40
+45.5

+44.0
+40

0+250
+46
+45.5

3E +33 Permanent water body


top level at 32
+37 Internal Lvl area of 730 m2
+38.5 Patrol +34
+39.5 TOW Permanent water body
+36.5 swale

800
+37.5ex
+44
+33

0+300
Permanent water body
top level at 32.5
area of 550 m2
+35 Internal Lvl +34 Patrol
+35 TOW
+35 +35 +31ex
+35 Permanent water body
top level at 33
+46 area of 850 m2
S

0+350
+35

+32
+35

0+400 +35 Permanent water body


top level at 34
area of 750 m2

+36
+35 Internal Lvl
+35 TOW
0+450
0+454 +34 Patrol
+32.5ex

+52 Internal Lvl


+31 Patrol
+52 TOW
+49 swale
+50ex

Legend :

3300
3000

KOLOM 400x400
A A D19-125 TUMPUAN
KOLOM
400x400 DAN LAPANGAN
DETAIL PENULANGAN DAK ATAS
DETAIL PENULANGAN LANTAI

300
3000

3300
D19-125 PEMBERI TUGAS
Developer/ Owner:

TIES BANK INDONESIA


Address:

D10-100 c.q. Unit Khusus Pembangunan SPU, DC


300

100
dan BRS (UKPS)
550 3000 3000 3000 3000 3000 550 Jl. M.H. Thamrin No.2 Jakarta 10350

PANJANG DINDING
KONSULTAN PMCM

75
TUL. HORIZONTAL

800
Consultant PMCM :

D16-100
DENAH BORE PILE KSO EGIS-YODYA

Wisma PMI, Lantai 4 T: (+62 21) 7252577


Jl. Wijaya 1 No.63 E: egis-indonesia@egis.fr
Kebayoran Baru, Jakarta
Selatan, 12170

TEAM LEADER ENGINEERING PMCM


250

(Nanang Zain, S.T, M.T.)


DAK ATAS TUL. VERTIKAL
LANTAI BAWAH D16-200
TEAM LEADER PERANCANG IKI KSO
KONSULTAN PERANCANG
TIM AHLI PERANCANG IKI KSO

SPIRAL D10-75
(Sri Winarti, S.T.) (Devlin Tedy S.T, M.T.)

KOLOM Lead Design Consultant :

400x400
SLAB S1 PT. INDOKOEI INTERNATIONAL
4000

Jl. Sultan Hasanudin T: (+62 21) 7237620


No.45, Jakarta 12160 E: info@indokoei.co.id
www.indokoei.co.id

800
Design Consultant :

12D25 AURECON INDONESIA

LANTAI
Revenue Tower, 25th Floor T: (+62 21) 29654000
800

Distrcit 8 Jenderal Sudirman E: jakarta@aurecongroup.com


SCBD Lot 13, Jakarta 12190 www.aurecongroup.com

Design Consultant :

DETAIL TULANGAN BW1, T=300mm PT. ANGGARA ARCHITEAM

Jl. Tebet Barat II No.12B T: (+62 21) 83706091


Jakarta 12810 E: adm@anggara.co.id
www.anggara.co.id

Design Consultant :

PT. AIRMAS ASRI


BORED PILE Ø600 L=8000
Jl. Cikini IV No.6 T: (+62 21) 31906688
Jakarta 10330 E: info@airmasasri.com
www.airmasasri.com

PERANCANGAN TERINTEGRASI
12D25 BANK INDONESIA DI KAWASAN
KARAWANG DAN KAWASAN GRESIK
POTONGAN A-A SPIRAL D10-75
DETAIL KOLOM, BALOK,
DINDING, PLAT LANTAI,
PLAT ATAP RUANG POMPA
DETAIL TULANGAN BORE PILE GWT 2

SBI-IKIKSO-K-E01-DN-DR-0003

DETAIL ENGINEERING DESIGN 30 SEPTEMBER 2022

You might also like