PT Berkat Manunggal Energi

ii
company profile

Table of Contents

Introductions 3
Experiences 5

Overview Warehouse Millennium 29


Overview Techno Panel 30
Overview BMGS Series 31
Overview MGS Series 32
Overview KU Series 33
After Sales Suport Service 34
The Organization Chart 35
Reference List 36
The Official Supporting Document 51

The Reference Letter 52

1
PT Berkat Manunggal Energi

PT Berkat Manunggal Energi

2
company profile

Introduction

PT Berkat Manunggal Energi


(PT BME) was estabilished in
the beginning of year 2000 with
the line of business is in the power
generation supplies plus full
project planning, instalation work,
testing commisioning and
operation maintenance services.

We are focusing to enhance the


generating set market with our
own Mitsubishi Diesel Generator
Set for all sectors such as: Building
Services, Industries, Petroleum,
Mining, Agriculture, Fishery, Power
Plant and
Telecomunication sectors.

3
PT Berkat Manunggal Energi

Building Services Industries

Petroleum Mining

Agriculture Fisher y

Power Plant Telecommunication


4
company profile

Experiences

We have significant experiences of


managing the Electrical Power Project
especially for supplying and installing
the Diesel Generating Set in Indonesia.
This Experience is made available to you
to through our project management
teams. Our Project engineers and
manager will work alongside with your
team to specify and select the most
suitable and reliable capacity of power
generator set you needs. At every each
phase of the project, we will work closely
with you to ensure the succesfulland
timely completion of the project.

5
PT Berkat Manunggal Energi

Experiences

Bakrie Tower Rasuna Epicentrum Central Park Mall & Soho - Podomoro City
9 X 1920 KVA 2 X 1800 KVA, 2 X 1125 KVA,
7 X 2000 KVA

6
company profile

Experiences

Menara Prima - Mega Kuningan Menara Palma - Rasuna Said


3 X 1300 KVA 2 X 2000 KVA

7
PT Berkat Manunggal Energi

Experiences

Grand Indonesia The Energy Building


6 X 2000 KVA 4 X 2000 KVA

8
company profile

Experiences

Ciputra World Gudang Garam Tower


14 X 2030 KVA, 2 X 1362 KVA 2 x 2030 KVA, 1 x 1800 KVA

9
PT Berkat Manunggal Energi

Experiences

Kuningan city - 6 x 1800 KVA, 6 x 2030 KVA, 1 x 680 KVA

Green Bay Pluit Tahap II Mall, Hotel & Condominium


5 X 2000 KVA, 1 X 1125 KVA, 3 X 1600 KVA

10
company profile

Experiences

Allianz Tower - Kuningan Bursa Efek Indonesia - Sudirman


3 X 1125 KVA 2 X 2020 KVA

11
PT Berkat Manunggal Energi

Experiences

Tempo Scan Tower Residence 8 @ Senopati


3 X 2030 KVA 3 X 2030 KVA

12
company profile

Experiences

Hotel JS Luwansa - 2 X 1250 KVA

13
PT Berkat Manunggal Energi

Experiences

Dipo Business Center


2 X 1362.5 KVA

14
company profile

Experiences

The Pakubuwono Signature - 3 X 1362.5 KVA


The Pakubuwono House - 2 X 1450 KVA

15
PT Berkat Manunggal Energi

Experiences

Bintaro Lifestyle Center


4 x 2030 KVA

Sepinggan International Airport - Balikpapan


5 X 2030 KVA

16
company profile

Experiences

Sultan Hasanuddin International Airport - Makassar


2 X 2000 KVa, 1 X 680 KVA

Juanda International Airport - Surabaya


5 x 1740 KVA, 4 x 2030 KVA

17
PT Berkat Manunggal Energi

Experiences

PLTD Pare-Pare
Sulawesi Selatan
10 X 1740 KVA

18
company profile

Experiences

South Quarter
1 x MGS 1000 B, 2 x MGS 1400 B, 3 x MGS 2000 B

19
PT Berkat Manunggal Energi

Experiences

Sudirman Office 7.8, Jakarta Podomoro City Deli, Medan


3 x 2015 KVA 2 x 885 KVA, 7 x 1450 KVA, 12 x 2015 KVA

The Elements Apartment Lot 16 - Kuningan, Jakarta


2 x 2015 KVA
20
company profile

Experiences

Sopo Del Office Tower + Lifestyle & Hotel, Jakarta


3 x 1450 KVA, 4 x 2015 KVA

Pantai Indah Kapuk Mall & Hotel, Jakarta


3 x 1125 KVA, 4 x 1600 KVA
Pantai Indah Kapuk Office, Jakarta 21
4 x 2015 KVA
PT Berkat Manunggal Energi

Experiences

Marvell City Surabaya


2 x 1362,5 KVA, 2 x 1450 KVA, 3 x 1800 KVA

Sampoerna Strategic Square, Jakarta


4 x 2000 KVA

22
company profile

Experiences

SOHO @ Podomoro City, Jakarta Gama Tower, Jakarta


3 x 1800 KVA, 7 x 2030 KVA 6 x 2015 KVA

Nipah Mall, Makassar


23
5 x 2015 KVA
PT Berkat Manunggal Energi

Experiences

BAKRIE TOWER - 5 x 1920 KVA

EMPORIUM PLUIT MALL - 2 x 2030 KVA

GRAND INDONESIA (I) - 1 x 1920 KVA + 3 x 2020 KVA

24
company profile

Experiences

LIFESTYLE - 3 x 1920 KVA

TANGerang CITY - 1 x 375 KVA + 4 x 2030 KVA

TEMPO SCAN TOWER - 3 x 2030 KVA

25
PT Berkat Manunggal Energi

Experiences

BTPN TOWER - 5 x 2015 KVA

PALMA TOWER - 2 x 2015 KVA

GAMA TOWER - 6 x 2015 KVA

26
company profile

Experiences

Distric-8 @ SCBD Senopati, Jakarta


9 x 2015 KVA, 5 x 2250 KVA

27
PT Berkat Manunggal Energi

Experiences

Kimia Farma, Bandung


2 x 2000 KVA

Jumeirah Resort, Bali


3 x 1362,5 KVA

Menteng Park - Cikini, Jakarta


2 x 2015 KVA
28
company profile

Overview Warehouse Millennium

29
PT Berkat Manunggal Energi

Overview Techno Panel


Proses Produksi
Workshop

Simulasi
Test System and
Setting Module
Control

Torsi
Busbar Line

Panel AM/ATS Kapasitas 1000 KVA

Koneksi
Busbar
Line

Panel Synchron Base Load PLN Generator Control Panel Synchron with
Kapasitas 1 X 1740 KVA PLN
Kapasitas 3 X 2000 KVA
30
company profile

Overview BMGS Series

BMGS-55 Open Type (S4K-T) BMGS- 30 Silent Type (S4K)


Cap: 55kVA Prime (50Hz-1500 rpm) Cap: 30 KVA Prime (50Hz-1500rpm)

Diesel Pump Mobile Genset - Small Capacity

BMGS-770 Open Type (S6R2-PTAA) BMGS-1740 Open Type (S16R2-PTA)


Cap: 770 KVA Prime (50Hz-1500rpm) Cap: 1740 KVA Prime/1560 KVA
Continous (50Hz-1500rpm)

BMGS-6U2 Open Type (S6U2-PTK) BMGS-16U Open Type (S16U-PTK)


Cap: 1500 kVA Continous (50Hz- Cap: 4100 kVA Prime (50Hz-1000rpm)
31
1000rpm)
PT Berkat Manunggal Energi

Overview MGS Series

MGS-1000-B (S12H-PTA-S) MGS-1200 B (S12R-PTA-S)


Cap: 1250 KVA Standby (50Hz-1500rpm) Cap: 1500 KVA Standby (50Hz-1500rpm)

MGS-1500-B (S16R-PTA-S) MGS-2000 B/C (S16R-PTA2-S)


Cap: 2000 KVA Standby (50Hz-1500rpm) Cap: 2030 KVA Prime (50Hz-1500rpm)

MGS-2500-B/C (S16R-PTAA2-S) MOG-Series


Cap: 2035 KVA Prime (50Hz-1500rpm) For Oil & Gas Aplication

32
company profile

Overview KU Series

18 MACH II- SI - Gas Engine


5750 kW. 50Hz, 750 rpm

33
PT Berkat Manunggal Energi

After Sales Support Services

Our centralized qualified

engineers and technicians

provide the comprehensive

technical advice and

assistance to our field

mechanics for operation


and maintenance works.

34
company profile

The Organization Chart

PT Berkat Manunggal Energi

Board of Director

Secretary

Finance & Accounting Engineering


Manager Sales Manager technical manager

Project & technical


Sales EngineErs
Engineering

Accounting Finance Administration

35
PT Berkat Manunggal Energi

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS


1 PT. Pupuk Sriwijaya - Palembang 1 x 2000 KVA Finished 1999
2 PCI - Batam 1 x 500 KVA Finished 1999
3 Jomblang Mall - Semarang 4 x 1000 KVA Finished 2000
4 PT. Jarum Kudus - Kudus 2 x 1500 KVA Finished 2000
5 PT. Indomiwon Citra Inti Lampung 2 x 2000 KVA Finished 2000
1 x 600 KVA Finished 2000
6  Mustika Agro Sari - Jakarta 
1 x 400 KVA Finished 2000
7 Trans TV - Jakarta 2 x 1000 KVA Finished 2000
8 PT. Sinar Sosro - Bekasi 2 x 600 KVA Finished 2000
9 Puri Agung - Jakarta 2 x 500 KVA Finished 2001
PT. (PERSERO) Angkasa Pura I
10 1 x 1000 KVA Finished 2001
(Lombok Airport) - Lombok
11 Arcadia Tower - Jakarta 1 x 500 KVA Finished 2001
12 PT. Siemens Indonesia - Bandung 1 x 500 KVA Finished 2001
13 PLN Wilayah Bali - Kupang Area 9 x 1000 KVA Finished 2001
14 PLN Wilayah Bali - Sumbawa Area 6 x 2000 KVA Finished 2001
15 PLN Wilayah Bali - Lombok Area 5 x 1500 KVA Finished 2001
16 Kantor Walikota Batam 1 x 500 KVA Finished 2001
17 PLN Wilayah Kalbar 2 x 1000 KVA Finished 2001
18 PT. Bella Prima - Jakarta 2 x 1000 KVA Finished 2001
19 Davinci Tower 2 x 1500 KVA Finished 2002
20 PT. Starmas - Jakarta 9 x 1000 KVA Finished 2002
21 PT. Lautan Luas - Tangerang 1 x 1000 KVA Finished 2002
22 Pemda Balikpapan - Batakan 8 x 2000 KVA Finished 2002
23 Club Store Medan 1 x 800 KVA Finished 2002
24 Pemda Kutai 9 x 2000 KVA Finished 2002
2 x 2000 KVA Finished 2003
25 Kelapa Gading Trade Center 2 x 1000 KVA Finished 2003
2 x 300 KVA Finished 2003
26 Pemda Kutai Kertanegara 9 x 2000 KVA Finished 2003
27 Conrad Bali Resort - Bali 3 x 1000 KVA Finished 2003
28 PT. Pupuk Sriwijaya - Palembang 1 x 1000 KVA Finished 2003
29 Cihampelas Walk - Bandung 2 x 1000 KVA Finished 2004
30 Metro Tanah Abang - Jakarta 3 x 1735 KVA Finished 2004
31 Graha Auto Centre - Jakarta 1 x 1500 KVA Finished 2004
32 Medan Fair - Medan 5 x 2000 KVA Finished 2004
33 PT. Growth Asia - Medan 2 x 1735 KVA Finished 2004
34 Hon Lin Co - Taiwan 2 x 1920 KVA Finished 2004

36
company profile

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS


35 Hop Sing Pty. Ltd - Hongkong 1 x 2000 KVA Finished 2004
2 x 2000 KVA Finished 2004
36 Aska International - China
4 x 1735 KVA Finished 2004
37 RS. Gading Pluit 2 x 1000 KVA Finished 2004
38 Hop Sing Pty. Ltd - Hongkong 2 x 2000 KVA Finished 2004
39 PT. Timah Tbk (Pulau Kundur) 1 x 1735 KVA Finished 2004
40 Puri Karnos 1 x 375 KVA Finished 2004
41 Telkom - Bandung 1 x 1500 KVA Finished 2004
42 PLN Papua 7 x 1735 KVA Finished 2004
43 Batam Expo 2 x 1300 KVA Finished 2005
44 Darmo Trade Centre - Surabaya 2 x 1735 KVA Finished 2005
45 Belagio Apartment 2 x 2000 KVA Finished 2005
2 x 1280 KVA Finished 2005
46 Solo Grand Mall - Solo
1 x 1000 KVA Finished 2005
47 Dhanarmas Textile - Bandung 2 x 1735 KVA Finished 2005
48 Pamanukan Mall - Cirebon 1 x 1250 KVA Finished 2005
49 Gedung MPR/DPR 1 x 2000 KVA Finished 2005
50 Batam City Square 3 x 1735 KVA Finished 2005
51 Pasar Tanah Abang Blok A 6 x 2000 KVA Finished 2005
52 RS. Cahya Kawaluyan - Bandung 2 x 1000 KVA Finished 2005
53 Senayan Residence 2 x 2000 KVA Finished 2005
54 Poins Square 3 x 1735 KVA Finished 2005
2 x 1280 KVA Finished 2005
55 Panakkukang Square - Makassar
2 x 1735 KVA Finished 2005
56 Mega Glodok Kemayoran 4 x 2000 KVA Finished 2005
57 Ambarukmo Mall 4 x 2000 KVA Finished 2005
58 ITC Depok 2 x 2000 KVA Finished 2005
59 PT. Timah Tbk (Pulau Bangka) 2 x 1500 KVA Finished 2005
60 PT. Indonesia Nippon Seiki 2 x 770 KVA Finished 2005
61 Restaurant Angke 2 x 500 KVA Finished 2005
62 Senayan Annex 1 x 1000 KVA Finished 2005
63 Bvlgary Resort 2 x 770 KVA Finished 2005
64 Plaza Cibubur 2 x 770 KVA Finished 2005
65 Boulevard Square - Manado 2 x 2000 KVA Finished 2006
66 Telehouse Engineering 40 x 10 KVA Finished 2006
67 Palembang Indah Mall 3 x 1250 KVA Finished 2006
2 x 1735 KVA Finished 2006
68 Sentra Grosir Cikarang
1 x 1000 KVA Finished 2006
69 DIKTI - Sudirman 1 x 2100 KVA Finished 2006

37
PT Berkat Manunggal Energi

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS


70 Lemigas Cileduk 1 x 500 KVA Finished 2006
71 Lemigas Cileduk 1 x 770 KVA Finished 2007
72 Permata Kuningan 2 x 1500 KVA Finished 2007
73 Menara Prima 3 x 1300 KVA Finished 2007
74 Matahari Cito Waru 2 x 770 KVA Finished 2007
75 Rekayasa Industri 1 x 1250 KVA Finished 2007
1 x 500 KVA Finished 2007
76 Excedy Pulo Gadung
1 x 420 KVA Finished 2007
77 PT. Mitra Hutama Mandiri 1 x 260 KVA Finished 2007
78 RS. Omni Alam Sutera - Serpong 3 x 1050 KVA Finished 2007
79 Angkasapura I - Makassar 2 x 2000 KVA Finished 2008
80 Matahari Binjai - Medan 2 x 770 KVA Finished 2008
2 x 750 KVA Finished 2008
81 Hampton’s Park Apartment
1 x 420 KVA Finished 2008
82 Bakrie Tower Rasuna Epicentrum 5 x 1920 KVA Finished 2008
83 Bakrie Lifestyle Rasuna Epicetrum 3 x 1920 KVA Finished 2008
84 Excel Metal Industry 1 x 2000 KVA Finished 2008
85 Arcadia Office Park 2 x 1450 KVA Finished 2008
86 Graha Energi 4 x 2000 KVA Finished 2008
87 RS. Dr. Soetomo 1 x 1500 KVA Finished 2008
88 Bandar Udara Hang Nadim 2 x 770 KVA Finished 2008
89 New Kuta Condotel 1 x 1125 KVA Finished 2008
90 RS. Yadika 4 x 600 KVA Finished 2008
91 Hotel Formule - 1 Cikini 1 x 1125 KVA Finished 2008
92 Giant Taman Yasmin Bogor 2 x 770 KVA Finished 2008
93 PT. Margonda Jaya Raya 1 x 500 KVA Finished 2008
94 Menara Palma 2 x 2000 KVA Finished 2009
2 x 1300 KVA Finished 2009
95 Plaza Balikpapan
2 x 1000 KVA Finished 2009
96 Hypermart Mall Bali Galeria 2 x 600 KVA Finished 2009
97 Bvlgary Residences 2 x 500 KVA Finished 2009
98 Bidakara 3 x 1500 KVA Finished 2009
99 PT. Ratu Sayang International 3 x 1050 KVA Finished 2009
100 Singa Gas Project - IKPT 1 x 1250 KVA Finished 2009
101 PT. Toyota Motor Manufacturing Indonesia 1 x 1362,5 KVA Finished 2009
102 Bursa Efek Jakarta 2 x 2020 KVA Finished 2009
103 Shell Project - Gresik 1 x 680 KVA Finished 2009
104 Union Sampoerna 1 x 460 KVA Finished 2009
105 Carrefour Serang 1 x 770 KVA Finished 2009
106 Carrefour Medan 1 x 770 KVA Finished 2009

38
company profile

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS


107 Carrefour Karawang 1 x 460 KVA Finished 2009
108 Meiji Indonesia 1 x 1055 KVA Finished 2009
109 RS. Siloam Jakarta 2 x 2000 KVA Finished 2009
110 TVRI - Jakarta 1 x 680 KVA Finished 2009
111 Gem’s Center - Jakarta 1 x 1055 KVA Finished 2009
1 x 1920 KVA Finished 2009
112 Grand Indonesia
3 x 2020 KVA Finished 2009
113 Paris Van Java 2 x 2000 KVA Finished 2009
114 PT. Nipsea Paint & Chemicals 2 x 1050 KVA Finished 2010
3 x 2000 KVA Finished 2010
115 The Groove - Bakrie 1 x 1920 KVA Finished 2010
1 x 1740KVA Finished 2010
116 RS. Tropis Unair 2 x 1450 KVA Finished 2010
117 Banyan Tree Resort 2 x 1250 KVA Finished 2010
Cibaliung Sumber Daya - PT. Cemara
118 3 x 1390 KVA Finished 2010
Siko Engineering
119 Fakultas Kedokteran UIN - Ciputat 1 x 500 KVA Finished 2010
1 x 1000 KVA Finished 2010
120 Bandar Udara Int’l Lombok
2 x 2000 KVA Finished 2010
121 Juanda Airport - Surabaya 1 x 1740KVA Finished 2010
122 Gedung Satu Atap Mahkamah Agung RI 2 x 1300 KVA Finished 2010
123 PT. Antar Mitra Sembada 1 x 600 KVA Finished 2010
124 PLTD Selat Panjang 4 x 1740 KVA Finished 2010
1 x 1740 KVA Finished 2010
125 PLTD Tembilahan
3 x 1735 KVA Finished 2010
2 x 1740 KVA Finished 2010
126 PLTD Rengat
4 x 1735 KVA Finished 2010
1 x 1050 KVA Finished 2010
127 Museum Bank Indonesia
1 x 500 KVA Finished 2010
128 Industri Perikanan Sukadana 3 x 300 KVA Finished 2011
129 Harco Mangga Dua 1 x 1740 KVA Finished 2011
130 Prudential Tower 1 x 680 KVA Finished 2011
131 PT. Adhimix Precast Indonesia 9 x 250 KVA Finished 2011
132 PT. Prakarsa Alam Segar - Wings Group 1 x 1740 KVA Finished 2011
133 Budha Tzu Chi 3 x 1450 KVA Finished 2011
134 Cigading Int’l Bulk Terminal 2 x 1300 KVA Finished 2011
135 Dharmawangsa Residence 1 x 2030 KVA Finished 2011
136 Cibaliung SumberDaya - PT. Mesindo Tekninesia 1 x 1740 KVA Finished 2011
137 Politeknik Ilmu Pelayaran Semarang 1 x 680 KVA Finished 2011
138 PT. Citra Sarana Sejahtera 2 x 680 KVA Finished 2011

39
PT Berkat Manunggal Energi

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS


139 Sports Center Bekasi 1 x 195 KVA Finished 2011
140 RS. Udayana Bali 1 x 680 KVA Finished 2011
141 PD Pasar Djaya Koja 1 x 195 KVA Finished 2011
142 Inoac Project - Shimizu Corp. 2 x 1050 KVA Finished 2011
143 Sari Ater Hot Spring Resorts 1 x 260 KVA Finished 2011
144 PT. Excel Metal Industry 1 x 2020 KVA Finished 2011
145 PT. Yamatogawa Indonesia 1 x 680 KVA Finished 2011
146 PT. Tempo Nagadi 1 x 500 KVA Finished 2011
147 Muara Tawar - Jakarta 1 x 680 KVA Finished 2011
148 Meratus Jaya Iron & Steel 1 x 1500 KVA Finished 2011
149 PT. Imora Honda Motor 1 x 1050 KVA Finished 2011
150 Carrefour Pasuruan 1 x 500 KVA Finished 2011
151 PLTD Pare - Pare 10 x 1740 KVA Finished 2011
152 PLTD Loepana 22 x 1740 KVA Finished 2011
153 PT. Adhimix Precast Indonesia 3 x 250 KVA Finished 2011
154 Atrium Senen Jakarta 1 x 1920 KVA Finished 2011
155 Multi Jaya Supermarket - Jayapura 1 x 1550 KVA Finished 2011
156 PLTD Kahayan 22 x 1740 KVA Finished 2011
157 PLTD Ampenan 11 x 1740 KVA Finished 2011
158 Allianz Tower 3 x 1125 KVA Finished 2011
159 Coal Boiler Plant - IKPT 1 x 1500 KVA Finished 2011
4 x 2030 KVA Finished 2011
160 Tangerang City Mall
1 x 375 KVA Finished 2011
161 Tempo Scan Tower 3 x 2030 KVA Finished 2012
162 Hotel Harris Batam 2 x 500 KVA Finished 2012
163 Kampus UMN Serpong 1 x 1450 KVA Finished 2012
164 Central Park 1 x 1800 KVA Finished 2012
6 x 1800 KVA Finished 2012
165 Kuningan City 6 x 2030 KVA Finished 2012
1 x 680 KVA Finished 2012
166 Hotel Mercure - TB. Simatupang, Jakarta 1 x 1450 KVA Finished 2012
167 MMC Tower - Jakarta 3 x 1500 KVA Finished 2012
2 x 1450 KVA Finished 2012
168 Solo Paragon Mall
1 x 1125 KVA Finished 2012
169 Central Park Apartement 1 x 1800 KVA Finished 2012
170 Central Park Hotel 2 x 1125 KVA Finished 2012
171 Emporium Pluit Mall 2 x 2030 KVA Finished 2012
1 x 600 KVA Finished 2012
172 Kejaksaan Republik Indonesia
3 x 1362,5 KVA Finished 2012
173 PT. Indocement Tunggal Prakarsa, Tbk 1 x 1250 KVA Finished 2012

40
company profile

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS


174 Apartement Nagoya Mansion Batam 2 x 680 KVA Finished 2012
175 Residence 8 @ Senopati 3 x 2030 KVA Finished 2012
176 Montigo Resorts Batam 2 x 1300 KVA Finished 2012
177 Cipinang Indah Mall 2 x 1450 KVA Finished 2012
178 BAKORSUTANAL - PT. Focustama Sentralindo 1 x 500 KVA Finished 2012

Cibaliung Sumber Daya - PT. Smara 1 x 1735 KVA Finished 2012


179
Reditan Indonesia   Finished 2012
180 Hotel Emersia Lampung 1 x 770 KVA Finished 2012
Cibaliung Sumber Daya - PT. Cibaliung
181  1 x 1735 KVA Finished 2012
Sumber Daya
182 Bvlgari Residence - Bali 2 x 500 KVA Finished 2012
183 Plaza Cibubur 3 1 x 1300 KVA Finished 2012
184 Matahari MDS Cimanggis 1 x 680 KVA Finished 2012
185 PT. Lestari Alam Segar (Wings Group) 1 x 1050 KVA Finished 2012
186 Matahari MDS Kendari 1 x 1050 KVA Finished 2012
187 Matahari MDS Gresik 1 x 680 KVA Finished 2012
188 PT. Pakoakuina 3 x 1750 KVA Finished 2012
189 PT. Tirta Alam Segar (Wings Group) 1 x 1050 KVA Finished 2012
190 PLTD Tanjung Batu - Mahakam 10 x 1735 KVA Finished 2012
191 Bandar Udara Adi Sucipto - Jogja 1 x 2030 KVA Finished 2012
192 PT. Excel Metal Industry 2 x 2020 KVA Finished 2013
193 Bandar Udara Sam Ratulangi - Manado 1 x 2030 KVA Finished 2013
194 Bandar Udara Syamsudin Noor - Banjarmasin 1 x 2030 KVA Finished 2013
195 Bandar Udara Sepinggan Balikpapan 5 x 2030 KVA Finished 2013
2 x 2030 KVA
196 Gudang Garam Tower Finished 2013
1 x 1800 KVA
197 Hotel J.S. Luwansa 2 x 1250 KVA Finished 2013
198  Kelapa Gading Mixed Square - MOI 3 x 2020 KVA Finished 2013
1 x 1050 KVA
199 Menara Prima 2 Finished 2013
2 x 1300 KVA

200 PT. Karunia Alam Segar (Wings Group) 3 x 1050 KVA Finished 2013
Hartomo Mall Solo - PT. Delta Merlin Dunia
201 3 x 2030 KVA Finished 2013
Propertindo
202 PT. Prima Plastic Internusa 1 x 770 KVA Finished 2013
203 PT. Yamasoji Indonesia 1 x 500 KVA Finished 2013
204 PT. Cometacan 1 x 680 KVA Finished 2013
205 Grand Indonesia 2 x 2020 KVA Finished 2013
206 Apartment Tower IA & IB - Green Bay Pluit 4 x 1000 KVA Finished 2013
207 Ciputra Dipo Business Center 2 x 1362,5 KVA Finished 2013
208 Ritz Carlton Sawangan Resorts Bali 4 x 1740 KVA Finished 2013

41
PT Berkat Manunggal Energi

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS


2 x 500 KVA
209 PT. Wisma Nusantara International Finished 2013
1 x 2030 KVA
210 Pasar Metro Atom - Jakarta 2 x 770 KVA Finished 2013
211 Kawasaki Factory Cibitung 1 x 375 KVA Finished 2013
212 The Pakubuwono Signature 3 x 1362,5 KVA Finished 2013
213 The Pakubuwono House 2 x 1450 KVA Finished 2013
214 Antam Office Park 2 x 1450 KVA Finished 2013
215 Bintaro Lifestyle Center 4 x 2030 KVA Finished 2013
1 x 1125 KVA
216 Green Bay Pluit Tahap II - Mall Finished 2013
5 x 2030 KVA
217 Bandar Udara Mahmud Badarudin II - Palembang 1 x 1000 KVA Finished 2013
218 The Mansion@Dukuh Golf Kemayoran 3 x 1800 KVA Finished 2013
219 Kantor Pusat Angkasa Pura I 1 x 1000 KVA Finished 2013
220 PT. Hamson Indonesia 1 x 1400 KVA Finished 2013
221 HPPM CVT BELT Factory - JO. Shimizu -BCK 1 x 1800 KVA Finished 2013
222 Bandar Udara Internasional Juanda Tahap II 4 x 2030 KVA Finished 2014
223 PT. Denki Engineering (Morimo Apartement) 1 x 800 KVA Finished 2014
224 Pelindo Banjarmasin - PT. Borneo Maju Jaya 2 x 2020 KVA Finished 2014
225 Bandar Udara Samarinda Baru 2 x 2015 KVA Finished 2014
14 x 2030 KVA
226 Ciputra World - Jakarta Finished 2014
2 x 1362,5 KVA
227 Gedung TBS Ferrari 1 x 2015 KVA Finished 2014
228 Green Bay Pluit Tahap II - Hotel 1 x 1600 KVA Finished 2014
229 Green Bay Pluit Tahap II - Condominium 2 x 1600 KVA Finished 2014
230 Office Mabua Harley Davidson 2 x 450 KVA Finished 2014
231 Rumah Susun Cengkareng 2 x 885 KVA Finished 2014
232 The Convergence Indonesia 3 x 1740 KVA Finished 2014
Pompa Banjir Pluit - PT. Torishima Guna
233 1 x 1740 KVA Finished 2014
Engineering
234 Palma Tower 2 x 2015 KVA Finished 2014
235 The Providence Park Apartment 2 x 1362,5 KVA Finished 2014
236 PT. Mitsuba Indonesia 1 x 2500 KVA Finished 2014
237 Cipinang Indah Mall Extension 1 x 1500 KVA Finished 2014
238 Pertamina Makassar 1 x 800 KVA Finished 2014
239 Kempinski Hotel Nusa Dua Bali 3 x 2000 KVA Finished 2014
240 Cinere Bellevue Suites 3 x 1800 KVA Finished 2014
241 PT. Tirta Alam Segar (Wings Group) 2 x 1050 KVA Finished 2014
242 PT. Karya Indah Alam Sejahtera (Wings Group) 1 x 1800 KVA Finished 2014
243 Plaza Balikpapan 1 x 1130 KVA Finished 2014
244 PLTG Tanjung Uncang Batam 1 x 1125 KVA Finished 2014
245 PT. Cibaliung Sumberdaya 1 x 1550 KVA Finished 2014

42
company profile

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS


246 PT. Envitech Perkasa 1 x 1500 KVA Finished 2014
247 Dewi Air Restaurant 1 x 885 KVA Finished 2014
248 PT. Asama Indonesia 1 x 770 KVA Finished 2014
249 HPPM CVT BELT Factory Phase 2 1 x 1450 KVA Finished 2014
250 PT. Kingsland International 1 x 680 KVA Finished 2014
251 Menara Selaras Semanggi 4 x 2030 KVA Finished 2014
252 Telkom Landmark Tower 5 x 2030 KVA Finished 2014
253 Setiabudi Sky Garden Apartment 3 x 1125 KVA Finished 2014
254 Jakarta Box Tower 3 x 1450 KVA Finished 2014
1 x 800 KVA
255 Paragon Square Tangerang Finished 2014
2 x 1450 KVA
256 Indika Energy Headquarters - Jakarta 3 x 1800 KVA Finished 2014
257 Ballroom Hotel Tentrem - Yogyakarta 1 x 1000 KVA Finished 2014
258 PT. Asahi Indofood Beverage Makmur - Pepsi 1 x 1735 KVA Finished 2014
259 PT. Adyabuana Persada 2 x 1050 KVA Finished 2014
260 PT. Polari Limunusa Inti 1 x 1450 KVA Finished 2014
261 PT. Evonik Sumi Asih 1 x 680 KVA Finished 2014
262 Panakkukang Mall - Makassar 1 x 2020 KVA Finished 2014
263 Menara Danamon Jakarta 2 x 1500 KVA Finished 2014
264 PT. Wahana Idea Cipta 2 x 1740 KVA Finished 2014
265 Sami Jepara New Factory 2 x 800 KVA Finished 2014
266 RS. Sanbe Prakasa Husada 2 x 2030 KVA Finished 2014
267 New Greenfield Brewery Ungaran - Orang Tua 2 x 2015 KVA Finished 2014
268 PT. QL Agro Food 1 x 1450 KVA Finished 2014
1 x 680 KVA
269 PT. Taikisha Indonesia Engineering Finished 2015
1 x 1450 KVA
1 x 1125 KVA
270 South Quarter 2 x 1450 KVA Finished 2015
3 x 2015 KVA
271 Gama Tower Jakarta (Rasuna Tower) 6 x 2015 KVA Finished 2015
272 International Financial Centre Tower II 4 x 2015 KVA Finished 2015
273 Puncak Bukit Golf Surabaya 1 x 1050 KVA Finished 2015
1 x 800 KVA
274 Mayora Head Office Jakarta Finished 2015
2 x 1800 KVA
3 x 1050 KVA
275 Ciputra World 2 Jakarta - Phase 1 Finished 2015
3 x 1300 KVA
276 Pusri II B - PT. Rekayasa Industri 1 x 2000 KVA Finished 2015
277 Lumina Jaya Lestari Factory 1 x 1500 KVA Finished 2015
278 CV. Riotech Mandiri 3 x 1300 KVA Finished 2015

43
PT Berkat Manunggal Energi

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS


279 PT. Delta Pasific Indotuna 1 x 1050 KVA Finished 2015
280 PT. Cocotama Makmur Abadi - Pontianak 1 x 1050 KVA Finished 2015
3 x 1800 KVA
281 SOHO @ Podomoro City Finished 2015
7 x 2030 KVA
282 Izzara - GTU Simatupang Mixed Use 3 x 1450 KVA Finished 2015
1 x 600 KVA
283 MNC News Centre Kebon Sirih Finished 2015
3 x 1810 KVA
1 x 1362,5 KVA
284 G3TV Kebon Jeruk Finished 2015
5 x 2250 KVA
285 Pancoran Riverside Apartment 1 x 1450 KVA Finished 2015
286 Ciputra World 2 Jakarta - Phase 2 Office 3 x 2015 KVA Finished 2015
1 x 30 KVA
287 University Hospital UI Finished 2015
3 x 2000 KVA
288 Mangga Dua Square 2 x 2030 KVA Finished 2015
289 Gedung Arsip Data Elektronik Mandiri Rempoa 3 x 1500 KVA Finished 2015
290 STG & Boiler Batubara - PT. Rekayasa Industri 1 x 2000 KVA Finished 2015
291 Non Crucible ESF IV Antam Pomalaa - Sulteng 1 x 1875 KVA Finished 2015
292 Pertamina Donggi Gas Production Facilities 1 x 1287,5 KVA Finished 2015
293 Mercure Hotel Mega Glodok Kemayoran 2 x 2015 KVA Finished 2015
2 x 1287,5 KVA
294 Gedung Diklat BCA Sentul Finished 2015
2 x 1362,5 KVA
295 RS. Telogorejo Semarang 1 x 1500 KVA Finished 2015
1 x 260 KVA
296 PT. Banua Pandiang Andiko Finished 2015
1 x 600 KVA
297 Panakukkang Mall - Makassar 1 x 2020 KVA Finished 2015
2 x 680 KVA
298 Intermark Serpong Finished 2015
2 x 1125 KVA
1 x 600 KVA
299 Tempo Pavilion Finished 2015
1 x 1125 KVA

300 Menara Dang Merdu Bank Riau 2 x 1130 KVA Finished 2015
Gedung Serbaguna Universitas Maranatha -
301 2 x 770 KVA Finished 2015
Bandung
302 PT. AIA Financial 1 x 260 KVA Finished 2015
303 CV. Budi Mulyo Tehnik 3 x 260 KVA Finished 2015
304 CV. Adem Ayem 1 x 260 KVA Finished 2015
305 PT. Karya Indah Alam Sejahtera (Wings Group) 1 x 1735 KVA Finished 2016
306 Panarub Industry Factory 1 x 1450 KVA Finished 2016
307 Harris Hotel & Yello Hotel @ Hayam Wuruk 2 x 1810 KVA Finished 2016
308 Pantai Indah Kapuk Mall & Hotel 3 x 1125 KVA Finished 2016

44
company profile

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS


4 x 1600 KVA
309 Sampoerna Strategic Square Jakarta Finished 2016
4 x 2000 KVA
310 PT. Lapi Laboratories 2 x 2015 KVA Finished 2016
311 1 Park Avenue Jakarta 3 x 1300 KVA Finished 2016
1 x 375 KVA
312 Borneo Mall Kapuas Finished 2016
2 x 680 KVA
313 PT. CitraKarya ReksaGuna - Bekasi 1 x 1450 KVA Finished 2016
314  RSUD Margono Soekarjo - Purwokerto 1 x 1125 KVA Finished 2016
315 Bahana Office Tower / BTPN Tower 5 x 2015 KVA Finished 2016
2 x 1362,5 KVA
316 Marvell City Surabaya 2 x 1450 KVA Finished 2016
3 x 1800 KVA
317 Puri Matahari Tower 3 x 1800 KVA Finished 2016
The Mansion@Dukuh Golf Kemayoran - Block
318 3 x 2015 KVA Finished 2016
Bougenville
319 Menara Palma II 3 x 2015 KVA Finished 2016
320 Wika Tower Jakarta 2 x 1500 KVA Finished 2016
321 Dinas Teknis Kuningan - Jakarta 1 x 1050 KVA Finished 2016
322 Bvlgari Hotels & Resorts - Bali 1 x 1050 KVA Finished 2016
323 RS. Universitas Andalas - Padang 2 x 770 KVA Finished 2016
1 x 680 KVA
324 PT. Karsa Utama Lestari Finished 2016
1 x 1125 KVA
325 Unissula Semarang 1 x 1740 KVA Finished 2016
326 Kementerian Komunikasi & Informatika RI 1 x 1000 KVA Finished 2016
327 Bekasi Square Mall 1 x 1735 KVA Finished 2016
328 Oleos Plaza - Jakarta 1 x 480 KVA Finished 2016
329 Lahendong Unit 5&6 Geothermal Power - Manado 1 x 770 KVA Finished 2016
330 Pertamina Sangatta Field 1 x 1875 KVA Finished 2016
331 Graha BNPB Pramuka 1 x 1300 KVA Finished 2016
332 PT. Tirta Alam Segar (Wings Group) 2 x 1050 KVA Finished 2016
2 x 680 KVA
333 Gren Horison Degreen Pasteur Finished 2016
4 x 1300 KVA
334 Bandung International Convention Centre 3 x 2030 KVA Finished 2016
1 x 30 KVA
Pertamina Ulubelu & Geothermal Power -
335 1 x 130 KVA Finished 2016
Lampung
1 x 680 KVA
336 Kantor Pusat KPK - Jakarta 2 x 2015 KVA Finished 2016
337 Gallery West Jakarta 7 x 1810 KVA Finished 2016
338 Menteng Park Cikini 2 x 2015 KVA Finished 2016

45
PT Berkat Manunggal Energi

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS


1 x 1125 KVA
339 Aeropolis Utility Residences Finished 2016
1 x 1810 KVA
340 Menara Pertiwi - Jakarta 2 x 2015 KVA Finished 2016
1 x 130 KVA
341 Alfa HQ Office Tower, Alam Sutera 1 x 1050 KVA Finished 2016
2 x 2015 KVA
9 x 2015 KVA
342 Distric-8 @ SCBD Senopati Jakarta Finished 2016
5 x 2250 KVA
343 RS. Dr. Oen Surakarta 2 x 1362,5 KVA Finished 2016
344 RSPI Bintaro Jaya 2 x 1450 KVA Finished 2016
345 Gedung Prima Sejahtera Alam Sutera 3 x 2015 KVA Finished 2016
346 Meira Factory Karawang 1 x 885 KVA Finished 2016
347 PLBN (Pos Lintas Batas Negara) Wini - Kupang 1 x 260 KVA Finished 2016
348 PT. Wiratadaya Bangun Persada 1 x 680 KVA Finished 2016
349 PT. Bayer Indonesia 1 x 2015 KVA Finished 2016
350 Pertamina RU V Balikpapan 1 x 1810 KVA Finished 2016
351 PT. Mega Dharma Properti Warehouse 1 x 480 KVA Finished 2016
352 PDAM Moya Bekasi 1 x 1735 KVA Finished 2016
1 x 1030 KVA
353 Gedung Pusdiklat Kementerian ATR/BPN Finished 2016
1 x 1500 KVA
354 Harco Glodok Jakarta 3 x 2030 KVA Finished 2017
355 GCNM - Casa Domaine Apartment, Jakarta 3 x 1810 KVA Finished 2017
356 World Capital Tower Jakarta 4 x 2015 KVA Finished 2017
2 x 680 KVA
357 Signature Park Grande Tahap 1A & 1B Finished 2017
2 x 1125 KVA
358 PT. Cargill Indonesia 2 x 1290 KVA Finished 2017
Sub Station 07 Dermaga International PT. Terminal
359 2 x 1500 KVA Finished 2017
Petikemas Surabaya
Sopo Del Office Tower + Lifestyle & Hotel - 3 x 1450 KVA
360 Finished 2017
Jakarta 4 x 2015 KVA
361 PT. Karet Batin Delapan - Jambi 2 x 1362,5 KVA Finished 2017
362 Sahid Eminence Ciloto 2 x 1125 KVA Finished 2017
363 PT. Penata Karya Keluarga Utama 1 x 375 KVA Finished 2017
364 PT. Tech Pack Asia - Demak 1 x 260 KVA Finished 2017
365 PT. Zebra Asaba Industries - Jakarta 1 x 1810 KVA Finished 2017
366 Kampus UMN Tower 3 Serpong 1 x 1450 KVA Finished 2017
2 x 1810 KVA
367 Puri Mansion Apartment Jakarta Finished 2017
1 x 2015 KVA
368 Kimia Farma Bandung 2 x 2000 KVA Finished 2017

46
company profile

Reference List
NO PROJECT NAME / END USER CAPACITY PROJECT STATUS
2 x 1810 KVA
369 Gold Coast Mixed Use Development Jakarta Finished 2017
2 x 2015 KVA
370 Pantai Indah Kapuk Office 4 x 2015 KVA Finished 2017
371 The Elements Apartment Lot 16 - Kuningan 2 x 2015 KVA Finished 2017
372 The Pakubuwono Spring - Jakarta 3 x 1362,5 KVA Finished 2017
4 x 1050 KVA
373 Ciputra International Phase-1 Puri - Jakarta Finished 2017
3 x 1362,5 KVA
1 x 300 KVA Finished 2017
374 Jakarta Mass Rapid Transport (JMRT)
6 x 1000 KVA Finished 2017
375 Mangkuluhur City Jakarta 4 x 1450 KVA Finished 2017
376 Midtown Point & Ibis Style Hotel Jakarta 2 x 1362,5 KVA Finished 2017
1 x 1735 KVA Finished 2017
377 UTC Aerospace Systems - Bandung
1 x 2125 KVA Finished 2017
5 x 2015 KVA Finished 2017
378 Nipah Mall Makassar

1 x 800 KVA
379 The Branz - BSD City Finished 2017
2 x 1125 KVA
380 Sun Plaza Medan 2 x 2000 KVA Finished 2017
Tokyuland Apartment - The Branz Simatupang
381 2 x 1810 KVA Finished 2017
Jakarta
382 Roseville Apartment Soho & Suite BSD 2 x 1450 KVA Finished 2017
383 Grand Madison Apartment Jakarta 2 x 800 KVA Finished 2017
384 Lazada Warehouse - PT. Mega Dharma Properti 1 x 1362,5 KVA Finished 2017

385 Galleria Mall Vivo Sentul 4 x 1810 KVA Finished 2017

1 x 600 KVA
386 Mall Ambon Finished 2017
1 x 750 KVA
387 Australia International School Bali (AIS - Bali) 1 x 1030 KVA Finished 2017
388 Lapi Laboratories - PT. Taikisha Indonesia 1 x 1000 KVA Finished 2017
389 TCLZ Sentul 2 x 2500 KVA Finished 2017
390 Sima - Izzar Office Tower - Jakarta 2 x 2015 KVA Finished 2018
391 Depo BBM Pertamina Makassar 2 x 680 KVA Finished 2018
392 Hotel Aloft Seminyak Bali 2 x 375 KVA Finished 2018
393 Grand Indonesia 3 x 2015 KVA Finished 2018
394 Hotel Artama Jakarta - PT. Karsa Utama Lestari 1 x 800 KVA Finished 2018
395 The Sima Office Tower - Jakarta 1 x 2015 KVA Finished 2018
396 Millennium Centennial Center - Jakarta 5 x 1925 KVA Finished 2018
397 Jumeirah Resort Bali 3 x 1362,5 KVA Finished 2018
1 x 260 KVA
398 Wisma 81 - TOTO Office Building Jakarta Finished 2018
1 x 2015 KVA
399 Kino Office Tower Alam Sutera 2 x 1362,5 KVA Finished 2018

47
PT Berkat Manunggal Energi

Reference List
NO PROJECT NAME / END USER CAPACITY PROJECT STATUS
400 Sudirman Office 7.8 3 x 2015 KVA Finished 2018
401 The Entrance - Arcadia Office Tower Blok A 1 x 1000 KVA Finished 2018
402 The Regatta Phase II - Jakarta 2 x 1000 KVA Finished 2018
403 Hotel & Apartment Tentrem - Semarang 3 x 1500 KVA Finished 2018
404 Arcade Office Pantai Indah Kapuk 2 x 1030 KVA Finished 2018
405 Arcadia Office Tower Blok G 3 x 1810 KVA Finished 2018
1 x 530 KVA
406 PT. Cakra Inti Artha Finished 2018
1 x 800 KVA
407 Pluit Village - Jakarta 1 x 1450 KVA Finished 2018
408 PT. Pelayaran Tahta Bahtera 1 x 680 KVA Finished 2018
409 Galaxy Mall - Surabaya 5 x 2015 KVA Finished 2018
410 Cilegon Center Mall 2 x 2015 KVA Finished 2018
411 EPPC PG Assembagoes Situbondo 2 x 1500 KVA Finished 2018
412 South Hills Apartment Kuningan - Jakarta 3 x 1500 KVA Finished 2018
1 x 1450 KVA
413 PT. Asahimas Chemical - Cilegon Finished 2018
1 x 1810 KVA
414 PT. Bara Alam Utama (Baucoal) 2 x 750 KVA Finished 2018
415 T Tower - Jakarta 1 x 2015 KVA Finished 2018
416 Verde II Condominiums - Jakarta 3 x 1000 KVA Finished 2018
417 Permata Hijau Suites - Jakarta 2 x 800 KVA Finished 2018
418 RAPP Riau - PT. Indokarya Bangun Bersama 1 x 2500 KVA Finished 2018
1 x 375 KVA
419 Pabrik Feronikel Halmahera Timur (P3FH) - Antam Finished 2018
1 x 2500 KVA
1 x 1500 KVA
420 Terminal LPG Tanjung Sekong - Merak, Banten Finished 2018
2 x 2500 KVA
Pembangunan Tangki Timbun Depot LPG Pulau
421 1 x 250 KVA Finished 2018
Layang - Palembang
422 Yakult Factory - Surabaya 1 x 1920 KVA Finished 2018
423 Fujita Kanko Apartment - Cikarang 1 x 1000 KVA Finished 2018
424 Palembang Trade Center Extension 1 x 2015 KVA Finished 2018
425 Cibis Tower Nine - Jakarta 1 x 2015 KVA Finished 2018
426 Green Sedayu Taman Palem Apartment - Jakarta 2 x 2015 KVA Finished 2018
427 Departemen Perhubungan Head Office - Jakarta 1 x 1450 KVA Finished 2018
Water Treatment Kawasan Industri Suryacipta -
428 1 x 260 KVA Finished 2018
Karawang
429 Pertamina RU V Balikpapan - Phase II 1 x 1810 KVA Finished 2018
430 Depo Pertamina BBM Balongan - Cirebon   1 x 1000 KVA Finished 2018
NEX Logistics Indonesia (Nippon Express) -
431 1 x 900 KVA Finished 2018
Cikarang
432 PLTD Kundur - PT. Timah, Tbk 1 x 1740 KVA Finished 2018
433 CV. Hasya Pratama - Samarinda 1 x 1250 KVA Finished 2018

48
company profile

Reference List
NO PROJECT NAME / END USER CAPACITY PROJECT STATUS

Makassar New Port & Kendari New Port - Pelindo 2 x 600 KVA
434 Finished 2018
IV 4 x 2500 KVA
435 Terminal Petikemas Semarang - Pelindo III 2 x 2500 KVA Finished 2019
436 Grand Indonesia 2 x 2015 KVA Finished 2019
437 Hotel Grand Mercure - Lampung 4 x 2015 KVA Finished 2019
438 PT. Softex Indonesia 2 x 1362,5 KVA Finished 2019
439 Sedayu City @ Kelapa Gading Apartment 2 x 1450 KVA Finished 2019
440 Saka Farma Factory - Cikarang 2 x 2015 KVA Finished 2019
441 Bintang Toedjoe Factory - Cikarang 1 x 2015 KVA Finished 2019
442 DPPU Bandara Kertajati - Majalengka 2 x 800 KVA Finished 2019
443 Dawuan Factory Cikampek - PT. Alexindo 1 x 2015 KVA Finished 2019
PT. Indofood CBP Sukses Makmur Tbk - Factory
444 1 x 2015 KVA Finished 2019
Palembang
Pocari Kejayaan Factory Malang - PT. Amerta
445 2 x 2015 KVA Finished 2019
Indah Otsuka
446 LPG Pertamina Cilacap 1 x 450 KVA Finished 2019
447 Hotel Ibis & Mercure Samarinda 2 x 1000 KVA Finished 2019
1 x 625 KVA
2 x 1000 KVA
448 Southgate Phase 1, Tanjung Barat - Jakarta Finished 2019
1 x 1362,5 KVA
4 x 2015 KVA
2 x 1450 KVA
449 Borneo Bay Balikpapan Finished 2019
5 x 2015 KVA
450 Ciputra World 2 Phase 3, Jakarta - The Newton 2 x 1450 KVA Finished 2019
451 Bandar Udara Sam Ratulangi Manado - Phase II 1 x 2030 KVA Finished 2019
452 Renaissance Nusa Dua - Bali 2 x 2015 KVA Finished 2019
453 Suzuki Indomobil Plant Bekasi 1 x 1500 KVA Finished 2019
Anugrah Pharmindo Lestari, Cikarang - PT.
454 1 x 1250 KVA Finished 2019
Taikisha Indonesia Engineering
455 Arandra Residence - Jakarta 1 x 2250 KVA Finished 2019
Menara Aria Office Building @ Harbour Bay -
456 1 x 1030 KVA Finished 2019
Batam
457 PT. Excel Metal Industry 1 x 2020 KVA Finished 2019
458 Function Hall @ Mall Alam Sutera 1 x 1250 KVA Finished 2019
2 x 885 KVA
459 Podomoro City Deli Medan 7 x 1450 KVA Finished 2020
12 x 2015 KVA
460 Daswin Office Tower - Jakarta 3 x 2250 KVA Finished 2020
461 AKR - Grand Kawanua City Walk Manado 1 x 1740 KVA Finished 2020
5 x 1030 KVA
462 Chadstone Cikarang Finished 2020
3 x 2000 KVA
Southgate Phase 2 - Apartment 1 & 2, Tanjung
463 2 x 1362,5 KVA Finished 2020
Barat - Jakarta

49
PT Berkat Manunggal Energi

Reference List
NO PROJECT NAME / END USER CAPACITY PROJECT STATUS
2 x 700 KVA
464 Rajawali Place ST. Regis - Jakarta 2 x 1450 KVA Finished 2020
2 x 2015 KVA
1 x 1550 KVA
465 Wisma Barito Pasific II - Jakarta Finished 2020
2 x 2015 KVA
Ciputra International Phase-1 Puri - Tower 2,
466 2 x 1362,5 KVA Finished 2020
Jakarta
467 Taman Permata Buana Apartment 3 x 1500 KVA Finished 2020
468 Grand Indonesia 2 x 2015 KVA Finished 2020
469 PT. Emerald Seaweed Indonesia - Pasuruan 1 x 800 KVA Finished 2020
470 Mall Ciputra Citra Raya - Tangerang 3 x 1250 KVA Finished 2020
471 Meisterstadt Mall & Apartment - Batam 4 x 1810 KVA Finished 2020
472 Logos Warehousing - Bekasi 2 x 1125 KVA Finished 2020
473 RCTI Kebon Jeruk - Jakarta 1 x 2250 KVA Finished 2020
474 The Park Mall Sawangan 4 x 1500 KVA Finished 2020
475 The Smith Alam Sutera 2 x 1500 KVA Finished 2020
476 Mayapada Hospital Kuningan 2 x 1030 KVA Finished 2020
2 x 1125 KVA
2 x 1362,5 KVA
477 The Stature Kebon Sirih Mix Use - Jakarta Finished 2020
2 x 1450 KVA
2 x 2015 KVA
478 Discovery Shopping Mall - Bali 1 x 2015 KVA Finished 2020
479 BCA KCU Matraman - Jakarta 1 x 1250 KVA Finished 2020
480 Pondok Indah Mall 3 & Office Towers - Jakarta 7 x 2500 KVA Finished 2020
481 Buddha Tzu Chi Hospital - Jakarta 4 x 2000 KVA Finished 2020
LRT Gateway Park Jaticempaka Apartment -
482 1 x 1000 KVA Finished 2020
Bekasi
483 Galaxy Mall Surabaya - Condominium Area 6 x 2015 KVA Finished 2020
484 PT. PemukaSakti ManisIndah - Lampung 1 x 2015 KVA Finished 2020
485 Gold Coast Office Tower 8 - Jakarta 1 x 2015 KVA Finished 2020
Universitas Islam Internasional Indonesia (UIII) -
486 1 x 2000 KVA Finished 2020
Depok
487 The Pakubuwono Menteng - Jakarta 2 x 1450 KVA Finished 2020
Gedung Syariah Tower Universitas Airlangga -
488 1 x 2500 KVA Finished 2020
Surabaya
489 BRI Tower @ Gatot Subroto - Jakarta 3 x 2015 KVA Finished 2020
490 Citimall Cianjur 2 x 600 KVA Finished 2020
491 Control Building @ SCBD - Jakarta 2 x 1000 KVA Finished 2020
492 Central Park Mall - Jakarta 2 x 2030 KVA Finished 2020
493 Stadion GOR Jatidiri Semarang 1 x 1740 KVA Finished 2020

50
PT Berkat Manunggal Energi

The Official Suporting Document

51
company profile

The Reference Letter

52
PT Berkat Manunggal Energi

The Reference Letter

53
company profile

The Reference Letter

54
PT Berkat Manunggal Energi

Warehouse Millennium

Warehouse BME Millennium, Tigaraksa - Banten

55
company profile

Workshop

Workshop Jakarta Area, Taman Techno Office Park, Serpong

56
PT Berkat Manunggal Energi

www.bmepower.com

Office :
BME Building 5th & 6th Floor, Jl. Warung Jati Barat No. 22 B
Ragunan – Pasar Minggu, Jakarta Selatan 12550
Ph. (62-21) 78848930 (Hunting), 79198360, Fax (62-21) 78848928

Warehouse BME Millennium : Workshop :


Kawasan Industri Millennium Blok Q No. 1B, Tigaraksa - Banten Taman Tekno BSD Blok A-1 No. 47, Sektor XI - Tangerang
58 Email : bmepower@indo.net.id