Company Introduction
>>>COMPANY PROFILE
Established by 2005, LEFIN is the flagship leading company of Tianjin based Steel Group of Industries, a
prestigious business house, well recognized for its consistency and dependability as one of the most
successful conglomerates in China and aboard.
The office-cum-factory premises at Tianjin, cover an area 60,000 sq/mt, charged by highly motivated and
efficient team of 300 employees and is equipped with most advanced and integrated technology and
machines to manufacture wide range of Scaffold System, Steel Pipes, Couplers and other Accessories prod-
ucts strictly conforming to customers’ designs requirements.
Carefully designed, high precision products of LEFIN are being exported for the last 17 years to more than
70 countries mainly Asia,Middle East, America, Africa,Europe, and Australia.
The professional and experienced sales force of LEFIN, besides supplying the world class products, also
support the global customers with their valuable services and technical guidance which in turn assures the
contractors to deliver the projects in utmost secure and economical manner, maximizing their value addition.
LEFIN always believes in testing its limits to the maximum by exploring, experimenting and establishing
innovative products carrying lateral and horizontal expansions to meet diverse and challenging demands.
We warmly welcome you to visit our factory and establish the long-term business relationship from now on!
01 02
Tube and Coupler Scaffold
Thickness Steel
Standard Size (mm) Marking
(mm) Grade
EN39,
48.3mm 3.2mm
BS1139,
S235GT Paint Marking,
MS1462,
48.3mm 4.0mm Embossing Marking
ST4SG / ST6SG / ST8SG / ST10SG / ST13SG EN10219
Interlocking Steel Tubes (eg:EN 39 LEFIN)
JISG3444 48.6mm 2.4mm STK500
Swivel Coupler Double Coupler Sleeve Coupler
Standard:BS1139/EN74 Standard:BS1139/EN74 Standard:BS1139/EN74
CRA19 Rigid Clamp
We use an independent lab to verify that all steel arriving in Weight:1.12kg/pcs Weight:0.98kg/pcs Weight:1.00kg/pcs
our factories meets or exceeds the appropriate
BS1139,EN39, MS1462 EN10219 and EN10215,JIS
•Joins scaffold tube having outside diameter •Joins two scaffold tubes having outside •Joins 48 O.D. scaffold tubes end to end
G3444,ANSI1163 specifications. of 48.3mm at any angle. diameter of 48.3mm at right angles. externally.
•Each half of the Coupler is interconnected •Used for end to end joining of scaffold tube
Our Commitment to Safety We provide extensive classroom with a swivel pin. •Tightening nuts suit standard Scaffold standards.
Spanner (23mm A/F). •Locates on outside diameter of scaffold tube
and on the job training for all members of our factory team. •Typically used for connecting bracing
members. Also used for tension splicing of •Replaceable 'T' bolts, nuts and washers.
members.
•Tightening bolt suits standard Scaffold
Our welding procedures were written by an independent scaffold tubes. • Tightening nuts suit standard
Scaffold Spanner (23mm A/F).
•Robust design made from drop forged steel Spanner.
•Made from high quality pressed steel.
for durability and reliability.
professional engineer, and were qualified by testing at •Replaceable 'T' bolts, nuts and washers. •Under compression loading this Coupler is
capable of taking the full capacity of the
•Robust design made from drop forged steel •Hot dip galvanised finish for corrosion
scaffold tube.
1 Standard(tubes) 8 Join Pin/Sleev e Coupler independent labs. for durability and reliability. resistance. •Not to be used for tension loads. Under
•Hot dip galvanised finish for corrosion tension loading, it is necessary to splice the
2 Sole-board 9 Guardrail •Complies with the requirements of
resistance. joint with another scaffold tube and Swivel
•Complies with the requirements of EN74/AS1576.2. Couplers (tension load check required).
3 Metal Base Plate 10 Boarded Platform Scaffolding Tube Specification EN74/AS1576.2. •Typical working load limit of 6.25kN against •Can be used for end to end joining of tube
•WLL = 6.25 kN against slip at tightening ledgers.
4 Ledgers(tubes) 11 Toe-board Scaffold Tube are 48.3 mm Outer Diameter in 4.0 mm and 3.2 slip at tightening torque of 54 Nm. •Typical scaffold tube sizes are: – 48.3mm
torque of 54 Nm. O.D. x 40.3mm I.D. (4.00mm wall thickness
5 Transoms/Putlogs 12 Diagonal Bracing •Can be used to resist tension or •Can be used to resist tension or compression
mm wall thickness in various lengths.The Scaffold Tubes are compression loads in bracing. loads.
tube) or – 48.3mm O.D. x 38.5mm I.D.
(4.88mm wall thickness tube).
6 Right Angle Coupler 13 Cross Bracing
available in Black and Galvanized steel finish.
7 Putlog Coupler 14 Rev eal Pin
Ask any building contractor, and they will say what critical role
Tube and Coupler Scaffold is easy to erect and disman- scaffolds play. Scaffold tubes/pipes play a Central Role in
tle.With only three basic components,Tube and Coupler providing the temporary support a building needs during
Scaffold is adaptable to any scaffold situation-high or construction, repairing, or maintenance.
low,inside or outside, round or stright, standard or irregular
shapes. And we supply just that.
Quality Steel Means Quality Scaffolding. At LEFIN Steel we LEFIN Industrial Group is the leading scaffold tube suppliers
are committed to quality in every step of the scaffold in Tianjin,China.We supply galvanized steel pipes to
manufacturing process. All the steel we use comes with Grider Coupler Putlog Coupler BRC Coupler
businesses in the construction and oil gas industry.Our
mill certifications, but we don’t stop there. Weight:1.45kg/pcs Weight:0.63kg/pcs Weight:0.63kg/pcs
scaffold tubes are of top-most quality, meaning:
03 04
Frame Scaffold
Width 1219 Height 1700 Width 1219 Height 1930 Width 1219 Height 1524 Thickness 2.5mm/3.2mm/4.0mm
1 Walking Frame 6 Walking Board 11 Hand Rail Vertical Frame Ladder Type Frame Ladder Type Frame Joint Pin
Width 762 Height 1700 Width 762 Height 1700 Width 1219 Height 1700 Dia 36 Length 220
1. Lay wooden planks in horizontal position and install jack base.
2. Insert vertical frames into jack base as per drawing.
Cross Brace Base Plate Jack Base Shoring Head
3. Insert arm lock to ensure Stability and Safety.
4. Fix the cross braces to the frames.
1829 1219
5. Fix the lock into walking frame. It is recommended that walking frame be 1829 914
1829 610
installed in alternate 3-5 stories. 1829 280
6. Insert joint pins into each ends of the frame and repeat the above process for 1219 1219
1219 610
05 06
Ringlock Scaffold
Brace (Diagonal)
Standard (vertical) The brace is used to connect the standard in a horizontal direction. It is made from scaffold tube fixing at each fits in the
Steel tubes with rosettes at every 500mm distance and with Spigot. For small holes in the rosette determine right angled rosette holes the standard.
connections for larger holes permit connections at any angles.
HDGP 48.3*2.5mm
HDGP 48.3*3.2mm with Spigot
Part No Length(mm) WT/KG Length WT/LBS Part No Length(mm) WT/KG Length WT/LBS
RLS-S-500 500 3.19 1' 8" 7.01 RLS-B-500 650 7.34 2' 2" 16.16
RLS-S-1000 1,000 5.66 3' 3" 12.45 RLS-S-880 880 7.99 2' 10" 17.58
RLS-S-1500 1,500 8.07 4' 11" 17.75 RLS-S-920 920 8.31 3' 18.27
RLS-S-2000 2,000 10.45 6' 7" 23.00 RLS-S-1070 1,070 8.40 3' 6" 18.49
RLS-S-2500 2,500 12.87 8' 2" 28.32 RLS-S-1150 1,150 8.53 3' 10" 18.77
RLS-S-3000 3,000 15.29 9' 10" 33.64 RLS-S-1570 1,570 9.23 5' 2" 20.31
RLS-S-4000 4,000 20.11 13' 1" 42.24 RLS-S-1830 1,830 9.72 6' 21.38
RLS-S-2130 2,130 10.31 7' 22.69
RLS-S-2440 2,440 11.02 8" 24.24
RLS-S-3050 3,050 12.15 10" 26.73
Ledger(Horizontal)
The ledgers is used to connect the standard in a diagonal direction. It is made from scaffold tube fixing at each and which
fits in the rosette holes on the standard.
HDGP 48.3*3.0mm
Intermediate Transom
Part No Length(mm) WT/KG Length WT/LBS HDGP 48.3*3.0mm
RLS-L-650 650 3.14 2' 2" 6.91
RLS-L-880 880 3.93 2' 10" 8.65
Part No Length(mm) WT/KG Length WT/LBS
RLS-L-920 920 4.09 3' 9.01
RLS-I T-1150 1,150 5.36 3' 10" 11.78
RLS-L-1070 1,070 4.68 3' 6" 10.29
RLS-I T-1570 1,570 6.85 5' 2" 15.06
RLS-L-1150 1,150 4.95 3' 10" 10.88
RLS-I T-2130 2,130 8.91 7' 19.60
RLS-L-1570 1,570 6.47 5' 2" 14.23
RLS-I T-3050 3,050 12.20 10' 26.85
RLS-L-1830 1,830 7.40 6' 16.28
RLS-L-2130 2,130 8.49 7' 18.68
RLS-L-2440 2,440 9.61 8' 21.15
RLS-L-3050 3,050 11.83 10' 26.02
07 08
Scaffold Pipe
Note: The results comply with the requirement of MS 1462-2-1:2010 Type (S235GT)
(a)≤0.05 % (range 1) (≤0.04 % if option 2 is specified) or≥0.15 % ≤0.25 % (range 2).
Tubular Strip
Black tube 429 360 33.5 Pass
specimen
Element C Si Mn P S Con.
Note: The result of test elements specified by client comply with the requirement of BS 1139-1.1:1990.
≥340
Req. ---------- ≥235 ≥24 ----------
<340
Tubular Strip
3-1 specimen 449 386 28.0 Pass
Symbol of class C Si Mn P S
STK500 0.24 max 0.35 max 0.30 to 1.30 0.040 max 0.040 max
Seamless, butt-welding,
Method of Seamless, butt-welding, electric resistance welding and Seamless, butt-welding, electric
electric resistance welding Arc welding process
manufacture arc welding process resistance welding process
process
JIS G3444 Scaffold Tube
Outside
diameter
Full range Full range Over 40 mm 50 mm or under Full range Over 350 mm
Size:48.6X2.5mm
Grade:STK400 and STK500
STK500 500 min 355 min 15 min 10 min 90° 8D 7/8D 500 min
09 10
Adjustable Steel Prop
11 12
Metal Deck and Catwalk
Metal Deck
13 14
Pine LVL Board
III.Other Recommendations
3.1 Scaffold planks should not be exposed to oxidizing chemicals
3.2 Avoid placing heavy objects on planks. Do not jump on planks
3.3 Use the planks exclusively as scaffold planks and for no other application or purpose
3.4 Do not drive vehicles over or on Scaffold planks Decay & Chemical Effect
3.5 Under normal service conditions, planks subject to wetting and drying cycles will not decay. Decay can
affect the structural performance of the plank and any planks found with decay should be removed from service
pending evaluation before reuse.
3.6 The pine veneers used in the construction of the Scaffold planks will be relatively unaffected by exposure
to moderate strength acids or alkalis(Ph range 3 to 9). Stronger concentrations than this can effect the binding of
the wood fibres. Planks used in these conditions should be evaluated before reuse.
15 16
Ladder and Accessories
Scaffolding Steel Ladder Beams are a very flexible and light-duty beam solution. They have a reduced
depth of 360mm and vertical chords set at 300mm centres, making them
a very versatile beam for use in various applications such as bridging, cantilevers, loading bays and also as Screw Jacks locate in the bottom of the scaffold standards,
a means of support. they provide adjustment to cope with variations in ground
Steel ladder beams can be supplied in either a self-colour or a hot-dip galvanised finish in an arrange of levels,they have a safe working load of approx 4 tons each.
sizes as shown.
Staircase/Step Ladder
Size(mm) Hook(mm)
450*1829*1725*2515 44/50
450*1829*1955*2677 44/50
Item U Head Jack Base Swivel Jack Base Base Plate
450*1829*1549*2397 44/50
450*1800*2000*2691 44/50
450*1800*1955*2657 44/50
450*1800*1725*2493 44/50
860*1829*1955*2677 44/50 Sample Photo
860*1829*1725*2515 44/50
860*1800*1800*2545 44/50
800*1800*1800*2545 44/50
730*2000*2000*2828 44/50 Weight (kg/pcs) 1.00-5.00kg 1.00-5.00kg 1.00-5.00kg 1.00-3.00kg
900*2130*2000*2922 44/50
Material S235 or S355
17 18
Exhibitions and Valuce Clients
Every year we attend numerous Constructions Exhibitions and visit clients at their countries,
Welcome to contact with me for long-term cooperation,and have face to face talk at our factory and
also available in your country!
Düsseldorf Tube and Wire, Shanghai Tube and Wire/Canton Fair Spring and Autumn
Established in 2005, with a solid 17 years of experience rendering the
Thailand, Myanmar, Malaysia, Indonesia, Philippines, Vietnam, Singapore, Japan, Korea, Interna-
highest calibre of service to the industry.
tional Building Materials Exhibitions
LEFIN Scaffolding has become a leading manufacturer and supplier of
Brazil, Chile, Mexico, Peru, Colombia, Panama Construction Exhibitions
scaffolding system and Tube products from Tianjin,China Region.
Qatar, Kuwait, Bahrain, Kenya, South Africa , Nigeria, Ghana, Mozambique, Building Materials
Relying on top quality and best turnaround delivery time, it’s wide
range of products and services command high praise and acclaim Exhibitions,Dubai Big 5,Jeddh, Riyadh,Dammam and so on.
from the reputed customers around the world.
19 20
Market
Your
Your
One-Stop
One-Stop
Construction
Construction and Projects Solution Partner
OUR MARKET
Our products are exported to more than 70
countries and regions in the world.
21 22