You are on page 1of 13

目录

CONTENTS
1.Company Introduction...........................................................01-02

2.Scaffold System
2.1 Tube and Coupler Scaffold............................................03-04

2.2 Frame Scaffold..............................................................05-06

2.3 Ringlock Scaffold ..........................................................07-08

3.Scaffold and Formwork Accessories

3.1 Scaffold Pipe.................................................................09-10

3.1 Adjustable Steel Prop ...................................................11-12

3.2 Metal Deck and Catwalk ...............................................13-14

3.3 Pine LVL Board .............................................................15-16

3.4 Ladder and Accessories................................................17-18

4.Exhibitions and Valuce Clients..............................................19-20

5. Market..................................................................................21-22
Company Introduction

>>>COMPANY PROFILE
Established by 2005, LEFIN is the flagship leading company of Tianjin based Steel Group of Industries, a
prestigious business house, well recognized for its consistency and dependability as one of the most
successful conglomerates in China and aboard.

The office-cum-factory premises at Tianjin, cover an area 60,000 sq/mt, charged by highly motivated and
efficient team of 300 employees and is equipped with most advanced and integrated technology and
machines to manufacture wide range of Scaffold System, Steel Pipes, Couplers and other Accessories prod-
ucts strictly conforming to customers’ designs requirements.

Carefully designed, high precision products of LEFIN are being exported for the last 17 years to more than
70 countries mainly Asia,Middle East, America, Africa,Europe, and Australia.
The professional and experienced sales force of LEFIN, besides supplying the world class products, also
support the global customers with their valuable services and technical guidance which in turn assures the
contractors to deliver the projects in utmost secure and economical manner, maximizing their value addition.

LEFIN always believes in testing its limits to the maximum by exploring, experimenting and establishing
innovative products carrying lateral and horizontal expansions to meet diverse and challenging demands.

We warmly welcome you to visit our factory and establish the long-term business relationship from now on!

LEFIN Scaffold will be your Best Partner!

01 02
Tube and Coupler Scaffold

Thickness Steel
Standard Size (mm) Marking
(mm) Grade
EN39,
48.3mm 3.2mm
BS1139,
S235GT Paint Marking,
MS1462,
48.3mm 4.0mm Embossing Marking
ST4SG / ST6SG / ST8SG / ST10SG / ST13SG EN10219
Interlocking Steel Tubes (eg:EN 39 LEFIN)
JISG3444 48.6mm 2.4mm STK500
Swivel Coupler Double Coupler Sleeve Coupler
Standard:BS1139/EN74 Standard:BS1139/EN74 Standard:BS1139/EN74
CRA19 Rigid Clamp
We use an independent lab to verify that all steel arriving in Weight:1.12kg/pcs Weight:0.98kg/pcs Weight:1.00kg/pcs
our factories meets or exceeds the appropriate
BS1139,EN39, MS1462 EN10219 and EN10215,JIS
•Joins scaffold tube having outside diameter •Joins two scaffold tubes having outside •Joins 48 O.D. scaffold tubes end to end
G3444,ANSI1163 specifications. of 48.3mm at any angle. diameter of 48.3mm at right angles. externally.
•Each half of the Coupler is interconnected •Used for end to end joining of scaffold tube
Our Commitment to Safety We provide extensive classroom with a swivel pin. •Tightening nuts suit standard Scaffold standards.
Spanner (23mm A/F). •Locates on outside diameter of scaffold tube
and on the job training for all members of our factory team. •Typically used for connecting bracing
members. Also used for tension splicing of •Replaceable 'T' bolts, nuts and washers.
members.
•Tightening bolt suits standard Scaffold
Our welding procedures were written by an independent scaffold tubes. • Tightening nuts suit standard
Scaffold Spanner (23mm A/F).
•Robust design made from drop forged steel Spanner.
•Made from high quality pressed steel.
for durability and reliability.
professional engineer, and were qualified by testing at •Replaceable 'T' bolts, nuts and washers. •Under compression loading this Coupler is
capable of taking the full capacity of the
•Robust design made from drop forged steel •Hot dip galvanised finish for corrosion
scaffold tube.
1 Standard(tubes) 8 Join Pin/Sleev e Coupler independent labs. for durability and reliability. resistance. •Not to be used for tension loads. Under
•Hot dip galvanised finish for corrosion tension loading, it is necessary to splice the
2 Sole-board 9 Guardrail •Complies with the requirements of
resistance. joint with another scaffold tube and Swivel
•Complies with the requirements of EN74/AS1576.2. Couplers (tension load check required).
3 Metal Base Plate 10 Boarded Platform Scaffolding Tube Specification EN74/AS1576.2. •Typical working load limit of 6.25kN against •Can be used for end to end joining of tube
•WLL = 6.25 kN against slip at tightening ledgers.
4 Ledgers(tubes) 11 Toe-board Scaffold Tube are 48.3 mm Outer Diameter in 4.0 mm and 3.2 slip at tightening torque of 54 Nm. •Typical scaffold tube sizes are: – 48.3mm
torque of 54 Nm. O.D. x 40.3mm I.D. (4.00mm wall thickness
5 Transoms/Putlogs 12 Diagonal Bracing •Can be used to resist tension or •Can be used to resist tension or compression
mm wall thickness in various lengths.The Scaffold Tubes are compression loads in bracing. loads.
tube) or – 48.3mm O.D. x 38.5mm I.D.
(4.88mm wall thickness tube).
6 Right Angle Coupler 13 Cross Bracing
available in Black and Galvanized steel finish.
7 Putlog Coupler 14 Rev eal Pin

Ask any building contractor, and they will say what critical role
Tube and Coupler Scaffold is easy to erect and disman- scaffolds play. Scaffold tubes/pipes play a Central Role in
tle.With only three basic components,Tube and Coupler providing the temporary support a building needs during
Scaffold is adaptable to any scaffold situation-high or construction, repairing, or maintenance.
low,inside or outside, round or stright, standard or irregular
shapes. And we supply just that.
Quality Steel Means Quality Scaffolding. At LEFIN Steel we LEFIN Industrial Group is the leading scaffold tube suppliers
are committed to quality in every step of the scaffold in Tianjin,China.We supply galvanized steel pipes to
manufacturing process. All the steel we use comes with Grider Coupler Putlog Coupler BRC Coupler
businesses in the construction and oil gas industry.Our
mill certifications, but we don’t stop there. Weight:1.45kg/pcs Weight:0.63kg/pcs Weight:0.63kg/pcs
scaffold tubes are of top-most quality, meaning:

1) They possess a higher carrying capacity.


2) They are steady and durable.
3) These tubes are easy to assemble and disassemble.
4) They are guaranteed to sustain all weathers.
5) Embossing marking 1 line or 2 lines are both OK for us.

The scaffold tubes we supply are 48.3 mm in outer diameter


and are available in different lengths depending on the Inner Joint Pin Ladder Clamp Limpet Coupler
requirement. Each of these pipes is graded for stress, strain, Weight:0.85kg/pcs Weight:0.63kg/pcs Weight:0.40kg/pcs
and every other strength factor to ensure a quality finish.

Tube and Coupler Scaffold adapts quickly to complex scaffold


projects. Interchangeable components in various lengths with
rigid or swivel couplers and scaffold clamps enable contrac-
tors to construct to almost exact specifications, saving time
and labor costs. Tube and Coupler Scaffold also integrates
into our system scaffolding and is frequently used in power
plants, refineries,civil & residential,industrial & offshore and
petrochemical plant environments. JIS Swivel Coupler JIS Double Coupler JIS Sleeve Coupler
Weight:0.63kg/pcs Weight:0.63kg/pcs Weight:1.00kg/pcs

03 04
Frame Scaffold

Vertical Frame Vertical Frame Vertical Frame Galvanized Pipe

Width 1219 Height 1700 Width 1219 Height 1930 Width 1219 Height 1524 Thickness 2.5mm/3.2mm/4.0mm

Vertical Frame Vertical Frame Walking Board

Code width height


A B
104 762 1700
104A 762 1524
104B 762 1219
104C 762 914
104D 762 490
104H 762 2000
Width 914 Height 1700 Width 500 Width1829

1 Walking Frame 6 Walking Board 11 Hand Rail Vertical Frame Ladder Type Frame Ladder Type Frame Joint Pin

2 Vertical Frame 7 Jack Base 12 Toe Board

3 Cross Brace 8 Stair

4 Arm Lock 9 Walking Frame

5 Joint Pin 10 Hand Rail Pole

Width 762 Height 1700 Width 762 Height 1700 Width 1219 Height 1700 Dia 36 Length 220
1. Lay wooden planks in horizontal position and install jack base.
2. Insert vertical frames into jack base as per drawing.
Cross Brace Base Plate Jack Base Shoring Head
3. Insert arm lock to ensure Stability and Safety.
4. Fix the cross braces to the frames.
1829 1219
5. Fix the lock into walking frame. It is recommended that walking frame be 1829 914
1829 610
installed in alternate 3-5 stories. 1829 280

6. Insert joint pins into each ends of the frame and repeat the above process for 1219 1219
1219 610

greater heights. 1219 280


1524 1219 Dia 36 Height 80 Dia 32 Height 600 Dia 32 Height 600

05 06
Ringlock Scaffold

Ringplock scaffolding is a multi-purpose modular


scaffolding system with ring lock joints.
It is easy to install and operate with only one or two
Base Collar(Starter)
workers required. Workers can install, use and disas- Ringlock Base collar are always place an initial section on the base plate and then the vertical standard on the initial
semble this temporary working platform quickly, there- section. placed over the base jack and enables an easy base out of the scaffold.
by saving time and labor costs.
Part No Length(mm) WT/KG
RLS-BC-240 240 1.60
A: Ledger G: Jack Base RLS-BC-280 280 1.75
B: Standard H: Steel Toe Plate RLS-BC-300 300 2.00
C: Base Collar I: U-head Jack RLS-BC-310 310 2.43
D: Steel Plank J: Side Bracket RLS-BC-320 320 2.20
RLS-BC-430 430 2.70
E: Diagonal Brace K: Lattice Girder
F: Stair Stringer L: Truss Ledger

Brace (Diagonal)
Standard (vertical) The brace is used to connect the standard in a horizontal direction. It is made from scaffold tube fixing at each fits in the
Steel tubes with rosettes at every 500mm distance and with Spigot. For small holes in the rosette determine right angled rosette holes the standard.
connections for larger holes permit connections at any angles.
HDGP 48.3*2.5mm
HDGP 48.3*3.2mm with Spigot

Part No Length(mm) WT/KG Length WT/LBS Part No Length(mm) WT/KG Length WT/LBS
RLS-S-500 500 3.19 1' 8" 7.01 RLS-B-500 650 7.34 2' 2" 16.16
RLS-S-1000 1,000 5.66 3' 3" 12.45 RLS-S-880 880 7.99 2' 10" 17.58
RLS-S-1500 1,500 8.07 4' 11" 17.75 RLS-S-920 920 8.31 3' 18.27
RLS-S-2000 2,000 10.45 6' 7" 23.00 RLS-S-1070 1,070 8.40 3' 6" 18.49
RLS-S-2500 2,500 12.87 8' 2" 28.32 RLS-S-1150 1,150 8.53 3' 10" 18.77
RLS-S-3000 3,000 15.29 9' 10" 33.64 RLS-S-1570 1,570 9.23 5' 2" 20.31
RLS-S-4000 4,000 20.11 13' 1" 42.24 RLS-S-1830 1,830 9.72 6' 21.38
RLS-S-2130 2,130 10.31 7' 22.69
RLS-S-2440 2,440 11.02 8" 24.24
RLS-S-3050 3,050 12.15 10" 26.73
Ledger(Horizontal)
The ledgers is used to connect the standard in a diagonal direction. It is made from scaffold tube fixing at each and which
fits in the rosette holes on the standard.
HDGP 48.3*3.0mm
Intermediate Transom
Part No Length(mm) WT/KG Length WT/LBS HDGP 48.3*3.0mm
RLS-L-650 650 3.14 2' 2" 6.91
RLS-L-880 880 3.93 2' 10" 8.65
Part No Length(mm) WT/KG Length WT/LBS
RLS-L-920 920 4.09 3' 9.01
RLS-I T-1150 1,150 5.36 3' 10" 11.78
RLS-L-1070 1,070 4.68 3' 6" 10.29
RLS-I T-1570 1,570 6.85 5' 2" 15.06
RLS-L-1150 1,150 4.95 3' 10" 10.88
RLS-I T-2130 2,130 8.91 7' 19.60
RLS-L-1570 1,570 6.47 5' 2" 14.23
RLS-I T-3050 3,050 12.20 10' 26.85
RLS-L-1830 1,830 7.40 6' 16.28
RLS-L-2130 2,130 8.49 7' 18.68
RLS-L-2440 2,440 9.61 8' 21.15
RLS-L-3050 3,050 11.83 10' 26.02

07 08
Scaffold Pipe

Standard:EN 39,BS1139,MS 1462,EN10219


Outside Diameter Wall Thickness Zinc Coating
Conv ert to
Type
Nominal Tolerance Nominal Tolerance outside surface
coating thickness

Type 3 48.3mm +/ -0.5mm 3.2mm (µm) (g/m2)


+/ -10%
Type 4 48.3mm +/ -0.5mm 4.0mm ≥ 40 288

* other size 38mm,42.2mm,42.7mm,50mm,60.3mm,63.5mm with different thickness can be customized

1.Test Item: Chemical Composition| Analysis


Test Method: OES
Element C Si Mn P S Alt Conclusion
Reg.,% ≤0.20 (a) ≤1.40 ≤0.040 ≤0.045 ≥0.020 ---
1-Black Tube-Result,% 0.19 0.02 0.45 0.018 0.011 0.026 Pass

Note: The results comply with the requirement of MS 1462-2-1:2010 Type (S235GT)
(a)≤0.05 % (range 1) (≤0.04 % if option 2 is specified) or≥0.15 % ≤0.25 % (range 2).

2. Test item: Tensile Test


Test Method: BS EN ISO 6892-1:2016

Tensile strength Yield strength Elongation after


Specimen
Test item (Rm) (ReH) fracture(A) Conclusion
type
(MPa) (MPa) L。=5.65 So (%)

Req. -------- 340~520 ≥235 ≥24 --------

Tubular Strip
Black tube 429 360 33.5 Pass
specimen

1. Test Item: Chemical Composition Analysis


Test Method: OES

Element C Si Mn P S Con.

Req.,% ≤0.20 ≤0.05 --- ≤0.05 ≤0.05 ----

2-Result,% 0.06 0.02 0.16 0.02 0.01 Pass

Note: The result of test elements specified by client comply with the requirement of BS 1139-1.1:1990.

2. Test item: Tensile Test


Test Method: BS EN ISO 6892-1:2019

Tensile strength Yield strength Elongation after


Specimen
Test item (Rm) (Rp0.2) fracture(A) Conclusion
type (N/mm 2 ) (N/mm2 ) L。=5.65 So (%)

≥340
Req. ---------- ≥235 ≥24 ----------
<340

Tubular Strip
3-1 specimen 449 386 28.0 Pass

JIS G3444 STK500 steel pipes/tubes Chemical Compositiont

Symbol of class C Si Mn P S

STK500 0.24 max 0.35 max 0.30 to 1.30 0.040 max 0.040 max

JIS G3444_STK500 steel pipes/tubes Mechanical Properties


Elongation % Bendability Flattening
No.11 and
Tensile Yield point or No.5 test Tensile strength in
Mechanical No.12 test Inside radius (D: Distance between flattening
strength proof stress piece Bend welded zone
Properties pieces outside diameter of plates (H) (D: outside diameter of
N/mm2 N/mm2 angle N/mm2
Longitudinal Transverse tube) tube)
direction direction

Seamless, butt-welding,
Method of Seamless, butt-welding, electric resistance welding and Seamless, butt-welding, electric
electric resistance welding Arc welding process
manufacture arc welding process resistance welding process
process
JIS G3444 Scaffold Tube
Outside
diameter
Full range Full range Over 40 mm 50 mm or under Full range Over 350 mm
Size:48.6X2.5mm
Grade:STK400 and STK500
STK500 500 min 355 min 15 min 10 min 90° 8D 7/8D 500 min

09 10
Adjustable Steel Prop

Adjustable Steel Prop (Light Duty Prop -Spanish Prop) Surface


Prop with Fixed Cross
Min Height Max Height 1.Pow der Coating,
I nner tube Outer tube Tube Thk
(closed) (open) 2.Painted, Outter Tube:56mm Inner Tube:48.3mm
0.6m 1.1m 40mm 48mm 1.5-2.5mm 3.Hot dipped Galv anized, Steel tubes S235JRH
0.8m 1.4m 40mm 48mm 1.5-2.5mm 4.Pre-Galv anized Sleeve L 135 mm, mm pitch thread, with welded handles
5.Electro -galv anized Safety pin Ø 14 mm, to fix the outer and inner tubes
1.6m 2.9m 40mm 48mm 1.5-2.5mm
Sliding washer and sleeve protection
1.8m 3.2m 40mm 48mm 1.5-2.5mm
Flat bottom plate 120x120x4.5 cm, to distribute the load to the floor
2.0m 3.6m 40mm 48mm 1.5-2.5mm Manufactured according to UNI EN 729-2: 1996
2.2m 4.0m 40mm 48mm 1.5-2.5mm
Adjustable Steel Prop (Light Duty Prop -Italian prop)
Min Height Max Height
Inner tube Outer tube Tube Thk
(closed) (open)
1.6m 2.9m 48mm 56mm 1.5-2.75mm
1.8m 3.2m 48mm 56mm 1.5-2.75mm Prop with U Head
2.0m 3.5m 48mm 56mm 1.5-2.75mm Outter Tube:56mm Inner Tube:48.3mm
2.0m 3.6m 48mm 56mm 1.5-2.75mm Steel tubes S235JRH
2.2m 4.0m 48mm 56mm 1.5-2.75mm Sleeve L 135 mm, with 8 mm pitch thread and welded handles
Safety pin Ø 14 mm, to fix the outer and inner tubes
Adjustable Steel Prop (Heavy duty prop -Middle East Prop)
Sliding washer and sleeve protection
Min Height Max Height
Inner tube Outer tube Tube Thk Bottom flat plate 120x120x4.5 cm, to distribute the load to the floor
(closed) (open)
Fork 100x100x50 mm
1.6m 2.9m 48mm 60mm 1.5-4.0mm
1.8m 3.2m 48mm 60mm 1.5-4.0mm
2.0m 3.5m 48mm 60mm 1.5-4.0mm
2.0m 3.6m 48mm 60mm 1.5-4.0mm
2.2m 4.0m 48mm 60mm 1.5-4.0mm
3.0m 5.0m 48mm 60mm 1.5-4.0mm
3.5m 6.0m 48mm 60mm 1.5-4.0mm
Double Plates Standard Telescopic Prop

TRIANGLEPROPS(Push-pull Prop) Outter Tube:57/60mm Inner Tube:48.3mm


Steel tubes S235JRH
Adjustable Top and Base Weight Per
Main Tube I nner Tube Male thread welded on the outer tube; it is made through rolling
Height(mm) Plates Pcs(+/ -3%)
process, which grant a fine adjustment of the prop, and ensure
700-1000 48.3*3.25 OD:32 170*70*8.0 8.64kg
stability and a greater loading capacity.
900-1200 48.3*3.25 OD:32 170*70*8.0 9.35kg Internal tube with punched holes every 100 mm for height adjustment
1700-2000 48.3*3.25 OD:32 170*70*8.0 12.22kg Sleeve L 135 mm, with 8 mm pitch thread and welded handles
Safety pin Ø 14 mm, to fix the outer and inner tubes
2000-2300 48.3*3.25 OD:32 170*70*8.0 13.30kg
Sliding washer and sleeve protection
2200-2500 48.3*3.25 OD:32 170*70*8.0 14.02kg Flat plates 120x120x6cm, to distribute the load to the floor
2500-2800 48.3*3.25 OD:32 170*70*8.0 15.40kg Anti-shearing system for maximum safety.

3000-3300 48.3*3.25 OD:32 170*70*8.0 17.30kg

11 12
Metal Deck and Catwalk

Metal Deck

Width Height Length


Support Thickness(mm)
(mm) (mm) (mm)
45 1000
45 2000
210 Plate Rib or Square Rib 1.0/1.1/1.2/1.5/1.8/2.0
45 3000
45 4000
45 1000
45 2000
240 Plate Rib or Square Rib 1.0/1.1/1.2/1.5/1.8/2.0
45 3000
45 4000
50 1000
50 2000 Catwalk
250 Plate Rib or Square Rib 1.0/1.1/1.2/1.5/1.8/2.0
50 3000
50 4000 Height Thickness Length
Width (mm) Hook (mm)
38 1000 (mm) (mm) (mm)
38 2000 1.0/1.1/1.2 1219
225 Plate Rib or Square Rib 1.0/1.1/1.2/1.5/1.8/2.0 330 50 45/50
38 3000 /1.5/1.8/2.0 1829
1200
38 4000
1219
63 1000
1.0/1.1/1.2 1500
63 2000 420 45 45/50
230 Plate Rib or Square Rib 1.0/1.1/1.2/1.5/1.8/2.0 /1.5/1.8/2.0 1800
63 3000
1829
63 4000
2000
1200
1219
1.0/1.1/1.2 1500
1.Scaffolding Steel Plank/Metal Deck is the main parts of 480 45 45/50
/1.5/1.8/2.0 1800
scaffolding system which is convenient for workers to walk
1829
on high building. 2000
2.Stamping holes are on the scaffolding plank to resist skid- 1200
ding for workers. 1219
3. The galvanized surface makes scaffolding plank more 1.0/1.1/1.2 1500
500 50 45/50
stronger in moist environment. /1.5/1.8/2.0 1800
1829
4. Various size of scaffolding plank could be customized.
2000
5.Scaffolding Steel Plank/Metal Deck & Catwalk are Easy to
assemble & dismantle. LEFIN Scaffold Walking Boards are sold all over the world. Thus, each and every product must comply
6.They are Corrode-resistant, Slip Prevention, Anti-fire, with safety and reliability standards always exceeding the standards required in the country of use.
Anti-sand, Less weight. Setting up a safe construction site requires compliance with strict standards, right from the choice of
materials used for setting up the worksite. Our products guarantee safety and reliability for our custom-
ers.

13 14
Pine LVL Board

Thickness Width Length


Standards Testing
(mm) (mm) (mm)
38 225 3900 1.Stiffness Test
OSHA, 38 230 3900 2.Strength Test
ANSI A10.8(US) 3.Walking Load Limit
BS24829(UK) 40 235 3900/6000mm 4.Visual Examination: Appearance
AS1577(AUS) 5.Thickness Test
42 230 3900/6000mm
6.Density Test

Density : Moisture Marking Glue Adv antages I.Recommendations for Storage


1.1 Keep Scaffold Planks dry where ever possible.
1.High quality stability and high strength
2.Free Dimensions and cost saving
Dry planks can be stored on top of one another, well clear of the ground and covered to keep dry.
3.Insect prevention,anticorrosion,fire prevention Wet planks should be stacked in a dry, well ventilated area clear of the ground, with
Custom Melamine glue, and waterproof before loading spacers between each layer to allow adequate air flow to
580-640kg/m3 ≤15% 4.Strong seismic and shock absorption
Embossing WBP glue dry out the planks.
performance
5.The board can be spraying waterproof paint in 1.2 Protect planks from excessive exposure to water and temperatures exceeding 150 degrees Fahrenheit
four sides so that can be used for many times.
(65o Celsius)
Stacked bundles should be kept off the ground. They should be supported by stickers approximately 6 feet
Laminations provide superior strength and consistency (1.82m) apart.
1.3 Do not store heavy objects on the planks.

II.Recommended Handling Methods


2.1 Do not overload scaffold planks. If planks are overloaded they must be removed from service and tested
before reuse.
2.2 Do not throw planks or drop from heights
2.3 Do not hit planks with the fork blades

III.Other Recommendations
3.1 Scaffold planks should not be exposed to oxidizing chemicals
3.2 Avoid placing heavy objects on planks. Do not jump on planks
3.3 Use the planks exclusively as scaffold planks and for no other application or purpose
3.4 Do not drive vehicles over or on Scaffold planks Decay & Chemical Effect
3.5 Under normal service conditions, planks subject to wetting and drying cycles will not decay. Decay can
affect the structural performance of the plank and any planks found with decay should be removed from service
pending evaluation before reuse.
3.6 The pine veneers used in the construction of the Scaffold planks will be relatively unaffected by exposure
to moderate strength acids or alkalis(Ph range 3 to 9). Stronger concentrations than this can effect the binding of
the wood fibres. Planks used in these conditions should be evaluated before reuse.

IIV.Cautions & Inspection


4.1 Notching or shallow cuts in the plank reduces the strength of the product as do drilled holes, end splits,
edge splits and cracks in the face of the planks.
4.2 Any plank showing excessive signs of deformation in any direction (bow, spring, twist or cupping) should
be removed from service and evaluated before reuse.
4.3 Regular inspection is strongly recommended. Any plank that shows signs of misuse or is suspect of any
form of damage should be withdrawn from use pending evaluation of performance.

15 16
Ladder and Accessories

Scaffolding Steel Ladder Beams are a very flexible and light-duty beam solution. They have a reduced
depth of 360mm and vertical chords set at 300mm centres, making them
a very versatile beam for use in various applications such as bridging, cantilevers, loading bays and also as Screw Jacks locate in the bottom of the scaffold standards,
a means of support. they provide adjustment to cope with variations in ground
Steel ladder beams can be supplied in either a self-colour or a hot-dip galvanised finish in an arrange of levels,they have a safe working load of approx 4 tons each.
sizes as shown.

Type: Solid / Hollow.


Pipe size:30mm/32mm/34mm/38mm/48mm or as your
request Length: 600,914,1524mm mm
Surface Treatment: Zinc-Plated and HDG
AS Per Standard EN74-1:2005 Class B, AS1576.2,BS1139

Staircase/Step Ladder
Size(mm) Hook(mm)
450*1829*1725*2515 44/50
450*1829*1955*2677 44/50
Item U Head Jack Base Swivel Jack Base Base Plate
450*1829*1549*2397 44/50
450*1800*2000*2691 44/50
450*1800*1955*2657 44/50
450*1800*1725*2493 44/50
860*1829*1955*2677 44/50 Sample Photo
860*1829*1725*2515 44/50
860*1800*1800*2545 44/50
800*1800*1800*2545 44/50
730*2000*2000*2828 44/50 Weight (kg/pcs) 1.00-5.00kg 1.00-5.00kg 1.00-5.00kg 1.00-3.00kg
900*2130*2000*2922 44/50
Material S235 or S355

Diameter 28/30/32/34/35/38/48.3MM or according to your requirements.


Type Monkey Ladder
Outer Pipe: 25*1.5mm
100MM,150MM
Inner Pipe: 21.3*1.5mm
Length 200/280/600/760MM or customized
Monkey Ladder Hook: 12mm
or customized
(Round Pipe) Width: 300mm
Distance between Steps: 300mm
Length: 1-5m 120*120*50*4MM 120*120*5MM 20*120*5MM 20*120*5MM
Floor Size
Outer Pipe: 25*25*1.5mm 120*120*50*5MM 150*150*5MM etc 150*150*5MM etc 150*150*5MM etc

Inner Pipe: 20*20*1.5mm

Monkey Ladder Hook: 12mm


Surface Treatment Natural ,painted, Electro galv anized,HDG
(Square Pipe) Width: 300mm
Distance between Steps: 300mm Color Black,Silv er,or Galv anized
Length: 1-5m

17 18
Exhibitions and Valuce Clients

Every year we attend numerous Constructions Exhibitions and visit clients at their countries,
Welcome to contact with me for long-term cooperation,and have face to face talk at our factory and
also available in your country!

Düsseldorf Tube and Wire, Shanghai Tube and Wire/Canton Fair Spring and Autumn
Established in 2005, with a solid 17 years of experience rendering the
Thailand, Myanmar, Malaysia, Indonesia, Philippines, Vietnam, Singapore, Japan, Korea, Interna-
highest calibre of service to the industry.
tional Building Materials Exhibitions
LEFIN Scaffolding has become a leading manufacturer and supplier of
Brazil, Chile, Mexico, Peru, Colombia, Panama Construction Exhibitions
scaffolding system and Tube products from Tianjin,China Region.
Qatar, Kuwait, Bahrain, Kenya, South Africa , Nigeria, Ghana, Mozambique, Building Materials
Relying on top quality and best turnaround delivery time, it’s wide
range of products and services command high praise and acclaim Exhibitions,Dubai Big 5,Jeddh, Riyadh,Dammam and so on.
from the reputed customers around the world.

19 20
Market

Your
Your
One-Stop
One-Stop
Construction
Construction and Projects Solution Partner

OUR MARKET
Our products are exported to more than 70
countries and regions in the world.

21 22

You might also like