You are on page 1of 15

National Power System Information

Southern Africa National Committee


Contents
1. Background Information
2. SAPP Members
3. Southern Africa Power Pool (SAPP)
4. SAPP Peak demand and Interconnector transfer limits
5. South Africa
A. Electricity Supply Industry Structure
B. South African Electricity Supply Chain
C. Eskom
D. Independent Power Producers
E. High Voltage Transmission Grid
F. Grid information and characteristics
6. References
Background Information (SAPP)
• Southern African Power Pool (SAPP) was created in 1995
with the aim to provide reliable and economical electricity
to supply to the consumers of each of the SAPP
members, consistent with efficient utilisation of natural
resources and the effect on the environment.
• SAPP has twelve member countries represented by their
respective electric power utilities organised through
Southern African Development Community (SADC).
SAPP Members
Utility Name Abbreviation Country
Botswana Power Corporation BPC Botswana
Electricidade de Mozambique EDM Mozambique
Electricity Supply Corporation of Malawi ESCOM Malawi
Rede Nacional de Transporte de Electricidade RNT Angola
Eskom Eskom South Africa
Hidroelectrica de Cahora Bassa HCB Mozambique
Lesotho Electricity Corporation LEC Lesotho
Mozambique Transmission Company MOTRACO Mozambique
Nam Power Nam Power Namibia
Societe Nationale d'Electricite SNEL DRC
Eswatini Electricity Company EEC Swaziland
Tanzania Electricity Supply Company Ltd TANESCO Tanzania
ZESCO Limited ZESCO Zambia
Copperbelt Energy Cooperation CEC Zambia
Lunsemfwa Hydro Power Company LHPC Zambia
Zimbabwe Electricity Supply Authority ZESA Zimbabwe
Ndola Energy Corporation Ndola Zambia
Southern African Power Pool (SAPP)
SAPP Peak demand and
Interconnector Transfer limits
SOUTH AFRICA
Electricity Supply Industry Structure
Electricity Supply Chain

Eskom
Single Transmission TSO Single Eskom DSO (Several regions)

Eskom Generation Eskom Transmission Eskom Distribution

Import Generation
Large Power Users
Independent Power
Producers (IPPs)
DSO (Several Munics)
Municipality
Municipalities
Generation

National Control (TSO) Regional Control (DSO) Reticulation (Regional Control) Load Customers
• 765 kV – 132 kV • 132 kV – 66 kV • 66 kV – 11 kV
• Frequency control • Voltage control • Customer connection / supply
• Voltage control • System security
• System security
Eskom
Independent Power Producers (IPP)
IPP projects totalling 4981 MW were commissioned and in Commercial
operation by 31 March 2019
High Voltage Transmission Grid
Grid Information & Characteristics
Power lines and Transformers in Service by 31/03/2019 (Eskom)
References
• Eskom Integrated Report 2019
• Eskom Transmission TDP 2019
• SAPP Annual Report 2019