You are on page 1of 2

P3738D AC 700 85.

4t P3738D
PLANTA
Max. Wind Speed according to Load Chart 12.5 m/s General 1 2
Hacia Venta de
Load Case
Max. Wind Sail Area according to Load Chart 47 m² Configuration Ha
Carpio
Wind Resistance Coefficient Cw 1.2 Outrigger Base 12.36 x 12.19 m Crane Parameters
Projected Surface of the Load 57 m²
Boom System Radius m 22 25.2
Actual Surface of the Load 68 m²
Max. Wind Speed according to Calculations 10.4 m/s Main Boom Length 45.5 m Slew Range ° 0 0
Telescoping 90/90/45/45 Load Chart Capacity t 54.7 47.3

10+620
Ductos de PEMEX Max. Wind Speed for Lifting 10.4 m/s
Counterweight Load Parameters
R1 Superstructure CW 140 t Load t 36.64 36.64
32 Tackle t 0.6 0.6
00 Hook Block
Hook Block t 1.8 1.8
HB Weight 1.8 t
Total Load t 39.04 39.04
# Reeving 5
Reeving Capacity 72 t Utilisation
Tr
ab
eV Load Chart Utilisation % 71.4 82.5
Demag AC 500 De 3 P
re 37 90° Reeving Utilisation % 54.2 54.2
ch -P
a 38
C A Static Ground Bearing Pressure
A: 9 m² (Area) kN/m² 97 105
10+600
B: 9 m² (Area) kN/m² 97 105
R 7500 180° 0° C: 9 m² (Area) kN/m² 62 53
D: 9 m² (Area) kN/m² 62 53
55
00 D B
8100

R22000
Est.=10+586.456

24
00
V3 - P38

70 P3738D AC 500 85.4t P3738D


00
Max. Wind Speed according to Load Chart 12 m/s General 1 2
Load Case
10+580

R20

8600 Max. Wind Sail Area according to Load Chart 61 m² Configuration Ha


000

Wind Resistance Coefficient Cw 1.2 Outrigger Base 12.0 x 12.0 m

0
Crane Parameters

00
Projected Surface of the Load 57 m²
Boom System

12
Actual Surface of the Load 68 m² Radius m 13.2 20
C:\Users\lramirez\Documents\01 SRNS Latinoamerica\Projects 2018\Estado de México\S-18-08953 TNG Siervo de la Nacion\engineering\valid\S-18-08953_DR3738D_D.dwg, 24/07/2020 21:33:29

Max. Wind Speed according to Calculations 11.4 m/s Main Boom Length 40.2 m Slew Range ° 0 0
Telescoping 86/43/43 Load Chart Capacity t 86.4 59
Max. Wind Speed for Lifting 11.4 m/s
00
AC
7
Counterweight Load Parameters
8
Trabe V3 P37-P3

Superstructure CW 98 t Load t 48.76 48.76


Izquierda

R7

Tackle t 0.6 0.6


50

Hook Block
0

Hook Block t 1.8 1.8


HB Weight 1.8 t
Total Load t 51.16 51.16
10+560

# Reeving 6
Terex Demag AC 700 Reeving Capacity 72 t Utilisation
Load Chart Utilisation % 59.2 86.7
90° Reeving Utilisation % 71.1 71.1
R25200

C A Static Ground Bearing Pressure


A: 6.4 m² (Area) kN/m² 118 153
B: 6.4 m² (Area) kN/m² 118 153
180° 0° C: 6.4 m² (Area) kN/m² 98 63
D: 6.4 m² (Area) kN/m² 98 63
D B
Ducto de PEMEX
10+540

D 24-07-2020 Cambio de grúa principal 2 L.R.R. A.M.G .J.M.A.


C 16-07-2020 Cambio de posición de las grúas L.R.R. A.M.G. J.M.A.
B 01-07-2020 Confirmación de posición de fabricación L.R.R. A.M.G. J.M.A.
le)
val

A 04-03-2020 Posición de carga punta norte A.M.G. A.M.G J.M.A.


rro

- 04-03-2020 Preliminar, para aprobación del cliente A.M.G. A.M.G J.M.A.


Fe

rev. date description designed verified approved


a(

client:
Preparación del Suelo
rre
Fe

El área deberá ser compactada y nivelada por el cliente


37

Vía
s

Presión mínima requerida: 153 kN/m2


a

3 P36-P
ME mb

Requerimientos del Nivel del Suelo: 0° ±0.3° (±0.5%)


Trabe V cha
PE e Bo

Material Compactado: 95 %.
Dere
10+520
X

37

Copyright Sarens group. All rights reserved. This document is the sole property of Sarens.
No license under any patent, or copyright, nor any other intellectual property, proprietary or
3 P36-P
ad

other right shall be granted to other parties, except for Sarens.


Trabe V rda

equipment:
set

Izquie

Terex Demag AC 700 (Ha) & Demag AC 500 (Ha)


N
Ca

description:
107.5t

Pz-123
2234.48
Montaje de Trabe de Acero Derecha - V3 P37 - P38 (W= 85.40t)
108.8t

2232.67
Posición de Fabricación - Instalación - Planta
O E site: proj.:
A.U. "Siervo de la Nación", Ecatepec de Morelos, México, México
owner: drawing type: size:
SMX General Arrangement A3
Hacia Río de los
S
appr. state: project: scale:
Remedios Concept S-18-08953 1:500
doc No.: sheet:
S-18-08953_DR3738D_D 1-2
Terex Demag AC 700 ELEVACIÓN Demag AC 500
Posición de Instalación Posición de Instalación

R4
550
0

R40
200
10856

8572
312t
7758

8503
1
2
1
2

203
2
2
1

2
4012

2
1

3525
1000

1000
21
2

3551
5400

+2245.515
+2246.647

13957
12453

Ductos de PEMEX
AC 700 DEMAG

+2233.300 +2233.300
C:\Users\lramirez\Documents\01 SRNS Latinoamerica\Projects 2018\Estado de México\S-18-08953 TNG Siervo de la Nacion\engineering\valid\S-18-08953_DR3738D_D.dwg, 24/07/2020 21:33:02

20000 7500

25200 7500 Ductos de PEMEX

Terex Demag AC 700


500

Posición de Fabricación Demag AC 500


R45

Posición de Fabricación

0
R4015
Preparación del Suelo
El área deberá ser compactada y nivelada por el cliente
Presión mínima requerida: 153 kN/m2
27310

Requerimientos del Nivel del Suelo: 0° ±0.3° (±0.5%)

26422
Material Compactado: 95 %.

D 24-07-2020 Cambio de grúa principal 2 L.R.R. A.M.G. J.M.A.


C 16-07-2020 Cambio de poaición de las grúas L.R.R. A.M.G. J.M.A.
B 01-07-2020 Confirmación de posición de fabricación L.R.R. A.M.G. J.M.A.
A 04-03-2020 Posición de carga punta norte A.M.G. A.M.G J.M.A.
- 04-03-2020 Preliminar, para aprobación del cliente A.M.G. A.M.G J.M.A.
rev. date description designed verified approved
312t
client:

7473
7764

Copyright Sarens group. All rights reserved. This document is the sole property of Sarens.
No license under any patent, or copyright, nor any other intellectual property, proprietary or
2
2
1
other right shall be granted to other parties, except for Sarens.

4250
2
2
1
4250

equipment:
Terex Demag AC 700 (Ha) & Demag AC 500 (Ha)
1000
1000

description:
Montaje de Trabe de Acero Derecha - V3 P37 - P38 (W= 85.40t)
3300
3300

DEMAG AC700 +2233.300 +2233.300 Posición de Fabricación - Instalación - Elevación


site: proj.:
A.U. "Siervo de la Nación", Ecatepec de Morelos, México, México
owner: drawing type: size:
SMX General Arrangement A3
7500 22000 7500 13200 appr. state: project: scale:
Concept S-18-08953 1:333
doc No.: sheet:
S-18-08953_DR3738D_D 2-2