You are on page 1of 4

QUOTATION

Ref No: BKR/QUO/22/026


Date: 08 Oct 2022
Rev: 01
Attention To En Jid
Address No. 20 Jalan 3/9, Taman Tiara Residence, Bandar Baru Selayang,
68100 Batu Caves, Selangor
Phone 013-4804088
CUSTOMER INFORMATION

Dear Sir/Madam,
We are pleased to present you the following quotation for the services/ goods/ supplies as below;-

No Descriptions Price
1 Base Kitchen cabinet grand floor w-14ft x h-850 x d-600
Top Quartz Stone (Supplied by owner) (ground floor 1-8)
RM 10,800.00
Material: Formica

2 Hanging Cabinet Hood Cabinet Only & Oven/Fridge


Material: Formica RM 4,500.00

3 Area Kitchen Storage Cabinet w-80 in x h-3020 x d-500 full height


Material: Formica RM 4,550.00

4 Kitchen Cabinet Base Unit and Hanging cabinet with exhaust fan
w-78 x h-full height x d-350 (top) & d-500 (base unit)
Top Quartz Stone (Supplied by owner) RM 3,950.00
Material: Formica

5 Book Rack Level 1 w-2400 2 drawer left and right with open in between
h-30 x d-350 x 3 shelves with dimension w-2400 x h-40mm x d-200
Material: Melamine RM 4,400.00
Formica Price for reference: RM 5,200.00

6 Bar Island w-2800 x h-850 x d-900 body only, top quartz stone supplied by
owner
RM 3,950.00
Material: Formica

7 Storage Cabinet w-2350 x h-3010 x d-400


Material: Formica RM 3,600.00

8 Wardrobe w-3850 x h-2810 x d-550 (level 1 9-16)


Material: Melamine
RM 6,240.00

BMS KITCHEN AND RENOVATION ENTERPRISE | QUOTATION


9 Partition w-3850 x h-full height x d-100
Material: Melamine RM 3,640.00

10 Hidden Door
Material: Formica RM 700.00

11 Bed Backside Panel w-3300 x h-1000 x d100 top lamp LED left and right
4 unit of socket included – Unit 1
RM 2,100.00
Material: Melamine

12 Wardrobe w-1950 x h-full 3000 x d-600


Material: Melamine RM 3,360.00

13 Bed Backside Panel w-2820 x h-1000 x d-100 top lamp LED left and right
4 unit of socket included – Unit 2
RM 1,900.00
Material: Melamine

14 Bed Backside Panel w-2820 x h-1000 x d-100 top lamp LED left and right
4 unit of socket included – Unit 3
RM 1,900.00
Material: Melamine

15 Wardrobe w-1790 x h-full x d-600


Material: Melamine RM 2,880.00

16 Wardrobe w-2000 x h-full x d-600 basement (1 17-19)


Material: Melamine RM 3,200.00

17 TV Cabinet Hanging w-3200 x h-300 x d-350 left and right complete with
drawer and open box with sliding door in between
RM 1,800.00
Material: Formica

TOTAL RM 63,470.00

BMS KITCHEN AND RENOVATION ENTERPRISE | QUOTATION


Unit rates for wiring (based on customer request at site)

No Descriptions Price
1 Single point Downlight (Installation) – 95 Unit RM 1,900.00
2 Fan Installation – 10 Unit RM 500.00
3 New point wiring (Looping with less than 8 feet cable length) – 59 Unit
hacking and plaster. (new paint not included)
 Car parking - 2 unit
 Entrance lobby - 5 unit
 Dry kitchen - 2 unit
 Living area - 6 unit
 Balcony - 2 unit
 Master bedroom - 3 unit
 Bedroom 2 - 4 unit
 Bedroom 3 – 4 unit
 Wardrobe master bedroom area – 2 unit RM 3,245.00
 Game room - 2 unit
 Roof terrace - 2 unit
 Family area - 4 unit
 Pantry - 4 unit
 Bedroom 4 – 4 unit
 Laundry - 2 unit
 Yard – 2 unit
 Pantry 2 – 2 unit
 Bedroom 5 – 3 unit
 Leisure deck – 4 unit
4 13A Flush Switched socket outlet- 51 unit
Hacking,plaster, New paiping. (new paint not included). Plug supply by
owner
 Ground floor – 20 unit
RM 4,335.00
 First floor – 13 unit
 Second floor – 1 unit
 Basement 1 – 9 unit
 Basement 2 – 8 unit
5 Usb outlet point- 8 unit
Plug supply by owner
RM 1,040.00
 First floor – 6 unit
 Basement 1 – 2 unit
6 Tv outlet point- 3 unit
Plug supply by owner
 First floor – 1 unit RM 300.00
 Second floor – 1 unit
 Basement 1 - unit

7 Lan outlet and telephone point- 3 unit (Hacking only) 1ft – RM15

BMS KITCHEN AND RENOVATION ENTERPRISE | QUOTATION


 First floor – 1 unit
 Second floor – 1unit
 Basement 1 – 1 unit
New wiring from Distribution board panel to kitchen RM 300.00
Blue canvas FOC
RM 11,620.00

TERMS & CONDITIONS

1. Payment Schedule:
Down payment is 30% of the quotation price, followed with progress payment of
30% when material arrival at site.
The subsequent payment will be 30% during work in progress stage and upon
finishing the last 10%
2. Please arrange pass for workers if required.
3. Any additional work will be advised accordingly.
4. Validation Date of the quotation: 30 days from submission.

Company Bank Account: CIMB 860-232-3030 (BMS Kitchen & Renovation Enterprise)
Please do provide us bank in statement for records purposes
Please do not hesitate if you need any further clarification.

Authorized Signature Received by

…………………………………………………………. ……………………………………………….
BMS Kitchen & Renovation Enterprise Name:

BMS KITCHEN AND RENOVATION ENTERPRISE | QUOTATION

You might also like