From : To
Dr. N. Satyanarayana I.A.S., 1. All the District Collectors in the State
Director of Municipal Administration, 2. All the Additional Collectors for Local
640, A.C.Guards, Bodies in the State
HYDERABAD - 5OO OO4. 3. All the Municipal Commissioners in th
State
3) rnstant building approval for plot area up to 500 sq.mts and height up
to 10mts based on self-certification by the applicant.
4) Single window approvat for all buildings having height above 10 mts.
and all non-residential building permissionl will be!anct-ioned in 21 days.
Post verification:
The post verification of all building application instanUy granted for
certificate of Registration in plot areas up to 75 sq. yds., (63 sq. Mts.) under
section 174 (1) of Telangana Municipalities Act 2019 and permissions issued
basing on Self-certification for plots having extent upto 500 Sq. Mts. (59g sq.
Yds.,) with (G+2) Residen2tial Individual Buildings, the following post
verification team members are required to conduct post verification within 21
days from the date of issue of instant approval, with reference to the provisions
of Telangana Building Rules 2012 issued vide G,O.Ms,No.16g MA dt:Ot-04-2Ot2
and the provisions of approved Master Plan of concerned ULB and submit report
through online,
a. superintending Engineer of panchayat Raj Department or his
representative (TiUe verification).
5, Hence, I request all the District collectors, additional collectors for local
bodies and all Municipal commissioners in the state to ensure to upload the
maximum layout & building applications in such developed software application
vide (http://tsbpass.telangana.gov.in) with immediate effect.
Yours faithfullY,
l - Dr.N.Satyanarayana, I.A.S.,
Sd
Director of Municipal Administration
llt.c.t.b.ol /
J S,'*l
SUPERINTENDENT
ffi1,,*
నూతన మ���ి�ా�ట� చట్ట ం – 2019 ప్ర�ారం�ా తకష్ణ�� TS-bPASS
��్వ�ా భవన ��ా్మణ మ��య� ల�అవ�ట్ అనుమత�ల�
I. భవన ��ా్మణ అనుమత�ల�: (http://tsbpass.telangana.gov.in/html/en/index.html)
Occupancy Certificate:
• The applicant (owner/ Builder) shall submit Self-Certification
attested by Licensed Technical Personnel (LTP).
• Shall be issued through online for buildings in plots above 200 Sq.
mtrs. and above 7 Mts height.
• District Level Committee will verify and approve or reject within 15
days.