General Specification:
1. Foundation and plinth: Brickwork in foundation and plinth shall be of first class brick
in cement mortar (1:4) over cement concrete (1:3:6)
2. Filling: Foundation trenches shall be filled up with excavated earth and the plinth
shall be filled up with local sand.
3. Damp-Proof-Course: DPC shall be of cement concrete (1:2:4) with water proofing
compound.
4. Superstructure: Shall be of first class brickwork in cement mortar (1:6).Wall thickness
are 10inch.
5. Roofing: The roof shall be of 5inch R.C.C slab with 3.5in lime terracing over it.
Concrete mix ration is 1:3:6
6. Flooring: The under bed of ground floor shall be of 3inch thick CC laid over a layer
of brick flat soling.
7. Plastering: Inside and outside walls shall 1/2inch thick cement mortar(1:6). Ceiling
and sunshade shall be of 1/4inch cement plastered (1:4).
8. Doors and windows:
9. Painting:
Given:
W2 W3 W2 W2
10"
BED KITCHEN DINNING BED
10'-0"
W1 10'-0" X 9'-0" 5'-0" X 9'-0" 9'-0" WIDE 13'-0" X 10'-0"
W1
D2
D1
D1
10"
24'-0"
W3
D2
D3
D1 D3
11'-6"
BED
15'-3" X 7'-0"
W1
TOILET 13'-0" X 11'-6"
STAIR
10"
W3 W2 W3 W1
41'-2"
10 9' 9
13 10
9
5
5
4
15'-3" 7
13 11
5 7
4 7