This document outlines the schedule and areas for asphalt restoration projects taking place from November 12th to December 9th 2022. It lists the date, designation, area in square meters, and linear meters for each project, with a total area of 398 square meters and 393.4 linear meters restored over the period.
This document outlines the schedule and areas for asphalt restoration projects taking place from November 12th to December 9th 2022. It lists the date, designation, area in square meters, and linear meters for each project, with a total area of 398 square meters and 393.4 linear meters restored over the period.
This document outlines the schedule and areas for asphalt restoration projects taking place from November 12th to December 9th 2022. It lists the date, designation, area in square meters, and linear meters for each project, with a total area of 398 square meters and 393.4 linear meters restored over the period.
November 12, 2022 AREA 41&42 27.02 28.60 November 15, 2022 7TH AVE REPAIR 18.20 42.40 November 16, 2022 AREA 29 23.36 21.00 November 18, 2022 AREA 39 27.50 21.00 November 22, 2022 AREA 38 (A1) 25.80 20.60 November 23, 2022 AREA 38 (A2&A3) 45.01 37.60 November 24, 2022 AREA 38 (A4) 31.76 38.60 November 25, 2022 AREA 38 (A5) 33.00 28.00 November 29, 2022 AREA 38 (A6) 34.20 29.80 December 05, 2022 AREA 04 (A7) 37.80 30.30 December 06, 2022 AREA 04 (A8) 23.24 35.50 December 07, 2022 AREA 04 (A9) 47.36 36.00 December 09, 2022 AREA 12 (A10) 23.75 24.00