You are on page 1of 18
(AFCONS) gm AFCONS INFRASTRUCTURE LIMITED | ShapoorPalion Ref: GMRCL/AMD-C1/AFCONS/01 10°-Dec-2020 To, Gujarat Metro Rail Corporation Limited Block No.1, 1* Floor, Karmayogl Bhavan, Behind Nirman Bhavar Sector — 10A, Gandhinagar Gujarat, India. 382010, Kind Attn.: ir. §.S, Rathore, Managing Director, GMRC. Project: “Construction of ) 8.124 km elevated viaducts and 8 stations from Ch. 17343,443m to 26467.443m, ii) 5.420 km elevated viaducts and 3 stations from GNLU to GIFT City and ii) 0.815 km elevated viaducts and additional platform at Koteshwar Road station for Ahmedabad Metro Rail Project, Phase-tI from Motera to Mahatma Mandir and GNLU to GIFT City (excl, E&M, Architectural, finishing and roofing) - Package — C1” Tender No. GMRC/CONS/VDCT+STNSIPKG-C1/PH- 212020, dated 10-01-2020 ‘Subject: Unconditional acceptance of LOA. Ref: LOA Letter No. GMRC/CONSTIVDCT*STNSIPKG-C1/PH-2/2020 cated 07.12.2020 Dear Sir, We are thankful to you for considering our bid forthe subject project and issuing "Letter of Acceptance’. ‘Attached please find Letter of Acceptance in original, duly signed and stamped as per the requirement of Clause 9 of the sald LOA. We further affirm that all the parts of this Letter of Acceptance including all appendices attached therewith have been read, fully understood and unconditionally accepted herewith, ‘We also like to inform that Mr. Arunkumar U. Mishra, Vice President is the designated Project Director for this project and can be contacted on Mob.no.+91 8291325302, email id: arunkumar.mishra@afcon: Thanking you and assuring our best services at all times, ew er GMRC LTD. i) (om) KARMYOGI BHAVAN, 6'HAGAR; 302610 fumar A Mice President a

You might also like