You are on page 1of 8

PROTECH

PEB
OVER 1000 BUILDING
ACROSS 100 CITIES IN 20 STATES
M/S. LP ASSOCIATES
NAR-NARAYAN Road
West Durgasarobar
Kamakhya Gate, Guwahati
781009, Assam
Mob - 9864062866
sushil.lpa@gmail.com

GUWAHATI
INTEGRATED
PRE-ENGINEERING
BUILDING
SOLUTIONS

)
S)-3
TCM
’3’’(
KOLKATA


PAN
M/S. BUILDCON

S
137 E, Picnic Garden Road,

LTI
Ground Floor, Kolkata ,

MU
GHAZIABAD West Bengal- 700039
Mob - 8240284302

N
M/S. ARKO99 GWALIOR
UM
wbsales.arko@gmail.com
PLASTIC AND STEELS
COL
Bindal Plywood,
Cm-31c, 1st Floor
Behind Old Police Chowky,
RED

Gagan Enclave
Daulatganj Lashkar, Gwalior
Gt Road ,Ghaziabad
M.P.- 474001
E
TAP

U.P. 201001
Mob -9762725249
0120-2866969
EA
VE

PRI
C

TYP
UR

MA
PROTECH NEW DELHI
VED

AN ISO

RY

LIC
PEB 9001:2015 816, Laxmi Deep,

AL
ME
WIT

CERTIFIED Laxmi Nagar, New Delhi

RA
MB
H

ARKO BUILDING PRODUCTS PVT. LTD. Mob: +91- 9762725249

FT
PR

ER

ER
www.arkobuildingproducts.com
Email: enquiry.arko@gmail.com
OJE


Z”S
CT

HAP
ION

E
PROTECH
PEB

ABOUT US ADVANTAGES
PROTECH specializes in providing complete To realize our vision and mission we shall Super Fast construction: Quality control:
solutions including design, fabrication and exert every effort to achieve the following in We can delivered Buildings are typically in just 3 stage quality check we have in our plant,
erection of high-quality pre-engineered steel all our activities: a few weeks after approval of drawings. which gives you superior quality products.
building and steel structure products. Since its Gaining the condence and trust of our Foundation and anchor bolts are cast parallel
establishment in 2014, ARKO has implemented supervising bodies, employees, stakeholders, with nished, ready for the site bolting. Low maintenance:
more than 100 steel buildings across PAN customers, and the public through strict arkoTech building systems reduces total Buildings are delivered with high quality
INDIA. We provide customers with full steel adherence to all applicable laws, regulations, construction time of the project by at least chemical treatment and paint systems for
structures such as factory, warehouse, high- best practices, Quality Standard (ISO 50%. This also allows faster occupancy and cladding and steel to match your actual
rise building, heavy industry, shopping mall, 9001:2015) Adopting a proactive approach earlier realization of revenue. requirements, which results in long durability
exhibition centers, infrastructure (railway and setting an excellent example for other and low maintenance in cost.
stations, airports.) governmental and private sectors by Cost Saving:
implementing our Quality and Environment Pre engineering metal building systems is Energy efcient roong and wall systems:
TURNKEY CONSTRUCTION SOLUTIONS Management System and through applying super fast construction technology which Buildings can be delivered with PUF Sandwich
The scope of work include the design, scientic knowledge, use of resources in a reduce cost in wastage material, time Panels (polyurethane insulated ) or Bubble
fabrication and supply of steel buildings; sustainable manner and utilizing best available consuming delivery project. As it is by nature insulation to achieve required “U” values.
related civil and concrete works; erection of the clean technologies in all our activities. approach, there is a signicant saving in
steel buildings; re ghting and re alarm Conducting all our business operations in such design, manufacturing and on site erection Architectural versatility:
systems; architectural materials; and a way as to protect and conserve the cost. The secondary members and cladding Building can be delivered with various types of
mechanical, electrical and plumbing works on environment, to prevent pollution and to nest together reducing transportation cost. fascias, canopies, and curved eaves and are
the basis of turnkey contracts through full site minimize all risks to the environment. designed to receive pre cast concrete wall
management teams. Systematically monitoring, measuring, Flexibility of expansion: panels, curtain walls, block walls and other
reviewing and taking effective actions to ArkoTech Buildings can be easily expanded in wall systems.
OUR POLICY STATEMENT mitigate adverse risks & enhancing positive length by adding additional bays. Also
We, Arko Building Products Pvt Ltd, are impacts on the Quality & Environment of all our expansion in width and height is possible by Trunkey Project Benets:
committed to the success of our business, the activities Communicating our Policy and only pre designing for future expansion. As the complete building package is supplied
design, production and supply of pre- Objectives to all our employees, stakeholders, by a single vendor, compatibility of all the
engineered/structural steel buildings and partners, customers, interested parties and the Large clear spans: building components and accessories is
cladding. public. Continually improving the effectiveness ArkoTech Buildings can be delivered to around assured by arkoTech. This is one of the major
of our Quality and Environment Management 80M clear spans. benets of the arkoTech pre engineered
System through periodic monitoring and review building systems.
of its performance and suitability.
PROTECH
PEB

BASIC BUILDING PARAMETERS


Building Length Building Width Interior Bay Length Design Wind Speed: 130 km/hr, 3 Sec gust
Building length is the distance between No matter what primary framing system is This is the distance between the centre lines of Design parameters of snow loads, earthquake
the outside anges of end wall columns in used, the building width is dened as the two adjacent interior main frame columns. The loads, collateral loads, crane loads or any
opposite end walls. It is a combination of distance from outside of eave strut of one most common bay lengths are 6, 7.5, and 9 other loading condition must be specied
several bay lengths. sidewall to outside of eave strut of the opposite meters. Any bay length is possible up to 10 when requesting a quotation.
sidewall. meters.
Building Height Loads are applied in accordance with
Building height is the eave height, Which Roof Slope Design Loads American codes and standards applicable to
is usually the distance from the bottom of This is the angle of the roof with respect to the Unless otherwise specied, Arko Pre- pre-engineered buildings unless otherwise
the main frame column base plate to the top horizontal. The most common roof slopes engineered building are designed for the requested at the time of quotation.
outer point of the eave strut. When should not be less than 0.50/10. Any practical following minimum loads.
Columns are recessed or elevated from the roof slope is possible. For more detailed information, please refer to
nished oor, eave height is the distance from the Zamil Steel Technical Manual for Pre-
the nished oor level to the top of the eave End Bay Length Roof Live Load: 0.57 kN/m2 Engineered Building.
strut. This is the distance from the outside of the
outer ange of endwall columns to the centre
line of the rst interior frame column. 10
RIDGE
X
LINE
ROOF
PURLIN SPACING SHEETING
Pre-engineering POST & BEAM RIGID FRAME EAVE
END WALL
(TYPICAL)
ENDWALL STRUT
building are PURLIN
dened by EAVE STRUT
the following basic
END WALL
COLUMN
BUILDING WIDTH

parameters,

EAVE HEIGHT
Building
Width, Length, RAFTER FINIDHED
Height, Roof FLOOR
LEVEL
200MM

Slope, End COLUMN


Bay Length, 300
Interior Bay Length
and Design 200MM 285MM 200MM 200MM
Loads. CORNER
COLUMN END BAY INERIOR BAY END BAY

BUILDING LENGTH BUILDING WIDTH


PROTECH
PEB

PRIMARY FRAMING SYSTEMS


PROTECH Pre-engineered building are Asymmetrical and non-equal Multi-Span Ridge Line

constructed using a variety of framing framing systems are also available. Please
systems. The diagrams on this page illustrate consult with your Arko Tech representative
those most commonly employed.They are nearest to you about your specic project
symmetrical at the ridge line. requirements. By Others

Building Wdth Building Wdth


Max Practical Width = 30m Max Practical Width = 50m
Crane Bracket & | Crane Beam Bulitup Curved Frame
Ridge Line Ridge Line

Width Module Width Module


Building Wdth
Building Wdth
Max . Practical Width = 60m
Max . Practical Width = 60m

TRPERED COLUMN TAPERED COLUMN


CLEAR SPAN (TCCS) MULTI SPAN’’1’’(TCMS)-1)
Building Wdth

Ridge Line Ridge Line Building Wdth

Lean- to Mono Slope

Building Wdth Building Wdth Building Wdth Width Module Width Module Width Module Width Module
Building Wdth Building Wdth
Max . Practical Width Module = 120m Max.Practical Width Module =120m

TRPERED COLUMN TAPERED COLUMN


MULTI SPAN’’2’’(TCMS-2) MULTI SPAN’’3’’(TCMS)-3)
R F Column Curved Roof Rafter

Building Wdth
Width Module Width Module
Ridge Line Ridge Line Ridge Line

Building Wdth

Mezzanine Arched Multi Span Roof System


Floor

By Others
Width Module Width Module
Width Module

Building Wdth Building Wdth


Max Practical Width Module = 80m

Multi Gable (MG) Crane Bracket & | Crane Bean


/ Mezzanine Floor Provision
PROTECH
PEB

PRIMARY & SECONDARY BUILT-UP MEMBER


MEMBERS
Secondary framing systems is mainly purlin and girth of Z or C Material :
shapes of Various size. In Pre-engineered building normally cold
form Z section are used for secondary framing to achieve high H - Beams are fabricated from high grade steel plates conforming
strength and lower weight. Typically cold form members used to IS : 2062, ASTM A572 50, ASTM A570 50, ASTM A572M Grade
for roof are called purlin and for wall it is called as girth however 345 Type 1 or Equivalent with a minimum yield strength of
prole for the both in general is same. Sometime C section is 34.5Kn/Sq.cm and are factory painted with a minimum of 25
also used in place of Z. Purlin/Girth are the members which microns DFT of Red Oxide Primer.
transfer forces and moments from one frame to another frame
for overall stability o f the building structure and it all acts
framing systems for weather covering sheeting purpose. For all
practical purpose these members are spaced at an interval of
about 1.5mm; which can vary and placed perpendicular to the
direction of the rafter.

‘C’ SECTION

sta ble
Adju
Adjustable

‘Z’ SECTION
Thikness Range : 1 to 3mm
Customized size of purline also available

stable
Adju
Typlical Rafter Typical Volumn
Adjustable

Thikness Range : 1 to 3mm


Customized size of purline also available
PROTECH
PEB

STRUCTURAL SUBSYSTEMS STRUCTURAL SUBSYSTEMS


PROTECH PEB Construction:- Pre engineered Ÿ Canopy CANOPY
steel buildings can be tted with different Ÿ Curve Eave with projection GIRT
GUTTER
structural accessories including mezzanine Ÿ Curved Eave without projection CANOPY ROOF PANEL

oors, canopies, fascia, interior partitions etc. Ÿ Parapet Fascia


Fascia is used to conceal the gable roof slop of Ÿ Vertical Fascia with back up Panel
building. Arkotech Pre-engineered steel buildings Ÿ Top & Bottom Curved Fascia
can be tted with different structural accessories. Ÿ Mezzanine Beam Connection
The Buildings made up of Steel where different Ÿ Mezzanine Joist Connection
components of the building are designed, SOFFIT TRIM
CANOPY
detailed and fabricated in the Manufacturing unit, RAFTER
shipped to and erected at the site. These are SOFFIT PANEL WALL PANEL
provided at the eave level of the roof. This action (OPTIONAL

safeguards the roof and imparts a show-room VERTICAL FASCIA WITH MAIN FRAME COLUMN
EAVE CURVED WITH PROJECTION
like appearance to the construction. Following are BACK UP PANEL BEAD MASTIC ROOF PANRL
Different Types of Fascia Used In PEB CURVED EAVE +600
CAP
PANEL
Construction. FLASHING
ZEE CLIP
PURLIN
BACK UP PANEL

R=
50
FASCIA

0
PANEL
VALLEY GUTTER

INSIDE FOAM
CLOSURE RAFTER
DRIP TRIM SHEETING ANGLE
W/SELF DRILLING
CLOSURE TRIM
FAST TENERS
PARAPET FASCIA
RIFGID FRAME COLUMN
WALL PANEL
185 200 OUTSIDE FOAM CLOSURE
CAP FLASHING SOFFIT PANEL SIDEWALL GIET
(OPTIONAL) RIGID
FRAME
BACK UP PANEL EAVE CURVED WITHOUT PROJECTION

VALLY GUTTER +600

PURLIN
CURVED EAVE
FASCIA PANEL
R=
WALL 50
0
PANEL
TRIM W/
RIGID
DELF DRILLING
FRAME
FASTENERS
RIGID FRAME
DOWNSPOUT RAFTER
GIRT RIGID FRAME COLUMN
WALL PANEL

SIDEWALL GIRT
200
PROTECH
PEB

ENDWALL ROOF EXTENSION


ROOF PANEL GABLE TRIM
CRANE AND MEZZANINES
Crane - PROTECH pre-engineered buildings Mezzanine -Intermediate mezzanine
can be designed to accept most types of oors are possible in metal buildings.
crane systems such as EOT, Monorail, Mezzanine oors can be provided in
Under-hung cranes and other load complete or partial area in Pre-
PURLIN SOFFIT PANEL
(OPTINOAL) carrying devices like conveyors etc., in engineered buildings to suit loading
both clear span and multi-span buildings. requirements for ofce and storage.
ENDWALL
RAFTER When a crane system is to be conform, Mezzanine oors consists of steel
Arko's scope is limited to brackets and decks, supported by joists framed to the
ENDWALL PANEL crane runway beams which support the mezzanine beams. Main mezzanine
crane system. Complete information on beams normally run across the width of
the crane system is required in order to the building and are located under the
SIDEWALL ROOF EXTENSION design and estimate buildings with main rafters while joists run parallel to
cranes. the length of the building. The top ange
ROOF EXTENSION BUILDING WIDTH of the joists t immediately below the
ROOF PANEL EAVE TRIM INSIDE FOAM CLOSURE
top ange of the mezzanine beam. The
economy of the mezzanine oor is
EAVE GUTTER
EAVE STRUT affected by the applied load and support
(EAVE TRIM OPTIONAL RIGID FRAME column spacing. Multi-level equipment
1

CANOPY TRIM platforms, catwalks, staircases etc. can


ROOF EXTENSION
PURLINES OUT SIDE FOAM
3
TOP RUNING CRANE be accommodated, if complete data is
CLOUSER ROOF EXTENSION
BRACKET available.pre-engineered buildings can
ROOF EXTENSION
RIGID FRAME
RAFTER
WALL PANEL RAFTER be designed to accept most types of
crane systems such as EOT, Monorail,
Under-hung cranes and other load
TOP & BOTTOM CURVED FASCIA carrying devices like conveyors etc., in
COLUMN
CRAE BRIDGE
CRANE BEAN both clear span and multi-span
buildings. When a crane system is to be
FINISHED FLOOR LEVEL
TOP CURVED
FASCIA PANEL
conform, Arko's scope is limited to
TRIM
brackets and crane runway beams
BACK-UP PANEL
which support the crane system.
(STANDARD WITH VALLY GUTTER)
Complete information on the crane
VALLEY GUTTER
OR EAVE GUTTER system is required in order to design
FACIAL and estimate buildings with cranes.
WALL
PANEL

UNDER-HUNG CRANE MONORAIL CRANE


RAFTER RIGID FRAME RAFTER RIGID FRAME

DOWNSPOUT
R
WALL F
PANEL

BOTTOM CURVED COLUMN CRAE BRIDGE CRANE BEAN


FASCIAL PANEL
MONORAIL BEAM
FINISHED FLOOR LEVEL
FINISHED FLOOR LEVEL
PROTECH
PEB

MEZZANINES
Mezzanine -Intermediate mezzanine oors are possible in metal MEEZ BEAM CONNECTION
buildings. Mezzanine oors can be provided in complete or partial REINFORCED
TO MAINFRAME COLUMN
area in Pre-engineered buildings to suit loading requirements for CONCRETE SLAB
ofce and storage. Mezzanine oors consists of steel decks,
supported by joists framed to the mezzanine beams. Main
mezzanine beams normally run across the width of the building
and are located under the main rafters while joists run parallel to
the length of the building. The top ange of the joists t
immediately below the top ange of the mezzanine beam. The
economy of the mezzanine oor is affected by the applied load
and support column spacing. Multi-level equipment platforms,
catwalks, staircases etc. can be accommodated, if complete data
is available. MEZZANINES MEZZ
MEZZ JOIST
TRACDEK ROOFING SHEETS JOIST

MEZZ BEAM

TRACDEK CLADDING
MEEZ BEAM CONNECTION
MEZZ SECK PANEL
SHEETS TO MEZZ. BEAM
MEZZ JOIST MEZZ BEAM
GROUND FLOOR REINFORCED
CONCRETE SLAB
INTERMEDIATE MEZZ COLUMNS END WALL PANEL

REINFORCRED
MEZZANINE CONCERETE SLAB
EDGE TRIM

MEZZANINE
EDHGE TRIM
SIDE WALL
PANEL
MEZZ

JOIST

END WALL
MEZZANINES PANEL
MEZZANINE

SIDE WALL GRIT A SIDE WALL STELL LINE


MEZZ JOIST

MEZZANINES MEZZ JOIST

MEZZ BEAM
MEZZ DECK PANEL

MEZZ BEAM

INTERMEDIATE
END WALL MEZZ COLUMNS
STEEL LINE

END WALL GIRT

You might also like