RESUME PENGENDALIAN MUTU (SUMMARY TEST)

Project : Peningkatan Jalan Hauling PT Borneo Indobara


Sumber : Ex Quary (…...)

KEGIATAN FREKUENSI PERSYARATAN Asal VOLUME


NO. MATERIAL VOLUME
Material
Jumlah Sudah
KONTROL KUALITAS TEST MINIMAL MUTU Bulan lalu Bulan ini Total s/d skrng M3
Test di Test
Ton
1 Agregat TEST MATERIAL DI LAB : m³ Density per 100 m AMR/Batu Ladung 9.385,66 - 9.385,66 6.704,04 1,00
Kelas B Job Mix Formula (JMF) per 5000 m³= 1 JMF Awang Bangkal 51.050,27 - 51.050,27 36.464,48 7,00
Katunun 25,89 - 25,89 18,49 1,00
Merak - - - 3.907,73 1,00

Gradasi (T-27, T-11) 5 per 1000 m³


Plasticity Index (T-90) 5 per 1000 m³ Maks. 6%
Liquid Limits (T-89) 5 per 1000 m³ Maks. 25 %
Max. Dry Density (T-180) 1 per 1000 m³
Abrasi (T-96) Min.3 per sumber Maks. 40 %
CBR Lab. (T-193) Min.3 per sumber Min. 60 %
TEST LAPANGAN :
Filed Dry Density (T-191) 1 per 200 m' Min. 100 %

1 Agregat TEST MATERIAL DI LAB : m³ Density per 100 m Awang Bangkal 25.702,53 - 25.702,53 18.358,95 3,00
Kelas A Job Mix Formula (JMF) per 5000 m³= 1 JMF Katunun 167,22 - 167,22 119,44 1,00
AMR/Batu Ladung 1.612,03 - 1.612,03 1.151,45 1,00
Merak 4.309,20 - 4.309,20 3.078,00 1,00

Gradasi (T-27, T-11) 5 per 1000 m³


Plasticity Index (T-90) 5 per 1000 m³ Maks. 6%
Liquid Limits (T-89) 5 per 1000 m³ Maks. 25 %
Max. Dry Density (T-180) 1 per 1000 m³
Abrasi (T-96) Min.3 per sumber Maks. 40 %
CBR Lab. (T-193) Min.3 per sumber Min. 90 %
TEST LAPANGAN :
Filed Dry Density (T-191) 1 per 200 m' Min. 100 %