You are on page 1of 84

PT.

MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo


General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Tranfer/Cash project : 28 Desember 2020 Rp 1,000,000
Tranfer/Cash project : 7 Januari 2021 Rp 500,000
Tranfer/Cash project : 11 Januari 2021 Rp 500,000
Tranfer/Cash project : 18 Januari 2021 Rp 500,000
Minus 24 Desember 2020 Rp 2,413,156
Pembayaran Minus 30 Januari 2021 Rp 1,413,156

28-Dec-20 BBM testcom QNN Kalianda Rp 150,000

28-Dec-20 top up e-toll Rp 100,000

28-Dec-20 BBM testcom QNN kotabumi Rp 250,000

28-Dec-20 top up e-toll Rp 150,000

29-Dec-20 BBM testcom Diskominfo Kalianda Rp 150,000

29-Dec-20 top up e-toll Rp 100,000

Lampu LED philips 11 watt basecamp 1


29-Dec-20 Rp 40,000
pcs
Tescom PT Catur Hasil Sentosa + ambil
11-Jan-21 Rp 150,000
data GGP way lunik
16-Jan-21 BBM Survey BPPRD Tubaba Rp 250,000

16-Jan-21 top up e-toll BPPRD Rp 200,000

18-Jan-21 BBM Testcom BPPRD Tubaba Rp 250,000

18-Jan-21 top up e -toll BPPRD Rp 150,000


conduit 10m, klem kabel,klem paralon,
18-Jan-21 Rp 125,000
siku perangkat, terminal
18-Jan-21 bayar listrik bsecamp Rp 197,344

18-Jan-21 Sitaq satpam gi menggala Rp 20,000

8-Jan-21 bbm ambil data 2019 Rp 50,000

30-Jan-21 bbm testcom GMP Rp 200,000

30-Jan-21 top up e toll Rp 150,000

30-Jan-21 rapid test 2 orang Rp 300,000


2-Feb-21 top up e toll Rp 100,000

2-Feb-21 bbm testcom samsat sukadana Rp 150,000

Rp 5,645,500 Rp 3,913,156
(-) (1,732,344)
Lampung 2710/2020

Reported by Checked by Knowledged Finance Balance received


Admin Project Project Manager

Hendri Dwi Cahyo


........................................ ……………………………………..
……………………………………………………………………….. .............................
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Tranfer/Cash project : 8 Februari 2021 Rp 1,000,000
Tranfer/Cash project : 19 Februari 2021 Rp 1,000,000

8-Feb-21 BBM Survey Kominfo Tubaba Rp 250,000

8-Feb-21 top up e toll Tubaba Rp 175,000

8-Feb-21 Galon Aqua Rp 19,000

Iuran Keamanan Komplek Januari,


11-Feb-21 Rp 80,000
Februari

12-Feb-21 BBM Progress Kominfo Tubaba Rp 250,000

12-Feb-21 top up e toll Tubaba Rp 101,500

12-Feb-21 Mata Bor Kecil Rp 35,000

12-Feb-21 Siku Penahan @6 Pcs Rp 90,000

12-Feb-21 baut skrup Rp 10,000

12-Feb-21 Kabel lisrik eterna 2x1.5 (50 Meter) Rp 269,000

12-Feb-21 Terminal Lubang 3 @6 Pcs Rp 72,000

12-Feb-21 Klem 10 mm @3 pcs Rp 21,000

12-Feb-21 klem 3/4 inch @3 pcs Rp 30,000

12-Feb-21 odf 24 Core Fullset Rp 750,000

14-Feb-21 BBM Tracing Menggala Tubaba Rp 150,000

14-Feb-21 Tambang Rp 30,000


BBM Ambl SFP dan ODF ke Bandar
19-Feb-21 Rp 250,000
Lampung
19-Feb-21 Top Up e-toll Rp 176,500

20-Feb-21 Bayar Listrik Basecamp Rp 167,354

22-Feb-21 BBM Testcom Diskominfo Tubaba Rp 150,000

24-Feb-21 BBM Pulang Ke Bandar Lampung Rp 150,000

24-Feb-21 Top Up e-toll Rp 101,500


Rp 3,327,854 Rp 2,000,000
(-) (1,327,854)
Lampung 2710/2020

Reported by Checked by Knowledged Finance Balance received


Admin Project Project Manager

Hendri Dwi Cahyo


........................................ ……………………………………..
……………………………………………………………………….. .............................
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Tranfer/Cash project : 1 Maret 2021 Rp 500,000
Tranfer/Cash project : 3 Maret 2021 Rp 1,000,000

1-Mar-21 BBM Tescom BPPRD Tubaba Rp 250,000

1-Mar-21 top up e toll Tubaba Rp 175,000

2-Mar-21 BBM Tescom BPPRD Tubaba Rp 250,000

2-Mar-21 top up e toll Tubaba Rp 175,000

4-Mar-21 Ganti Oli, Ganti filter Udara Rp 670,000

5-Mar-21 tambal Ban Rp 25,000

5-Mar-21 galon Rp 19,000

5-Mar-21 BBM Tescom QNN Ulu Belu Rp 250,000

5-Mar-21 Rapid test + Surat Kesehatan Rp 300,000

BBM Testcom Alfamart Hos Cokro &


9-Mar-21 Rp 100,000
Alfamart Imam Bonjol 5

BBM Testcom Alfamart Raden Imba,


10-Mar-21 Rp 150,000
Alfamart Muh yamin & alfamart Natar

11-Mar-21 BBM Survey BSI Sribawono Rp 150,000

12-Mar-21 BBM Testcom Alfamart Sribhawono Rp 150,000

12-Mar-21 Survey BSI Metro Rp 100,000

13-Mar-21 hot Gun/ head torch pembakar Rp 45,000

13-Mar-21 Battery AAA isi 6 pcs Rp 33,000

13-Mar-21 Galon Aqua Rp 19,000


Rp 2,861,000 Rp 1,500,000
(-) (1,361,000)
Lampung 2710/2020

Reported by Checked by Knowledged Finance Balance received


Admin Project Project Manager

Hendri Dwi Cahyo


........................................ ……………………………………..
……………………………………………………………………….. .............................
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Tranfer/Cash project : 9 Maret 2021 Rp 1,000,000
Tranfer/Cash project : 15 Maret 2021 Rp 1,000,000

Tranfer/Cash project : 20 Maret 2021 Rp 1,000,000

Tranfer/Cash project : 27 Maret 2021 Rp 1,000,000

15-Mar-21 BBM Testcom BPN Tubaba Rp 250,000

15-Mar-21 E-toll BPN Tubaba Rp 175,000

BBM Survey & Tarcing Core BSI


16-Mar-21 Rp 150,000
Pringsewu

16-Mar-21 Galon Rp 19,000

17-Mar-21 BBM Tracing Core BSI Metro Rp 150,000

BBM Indoor Dan Testcom BSI


18-Mar-21 Rp 150,000
Sribawono

19-Mar-21 BBM indoor dan Testcom BSI Pringsewu Rp 150,000

Klem kabel 10 mm @3pcs, klem pipa


19-Mar-21 Rp 87,000
3/4 @3pcs, cutter, isi cutter

BBM Lanjut Tesstcom BSI Pringsewu


20-Mar-21 Rp 150,000
day 2

22-Mar-21 BBM testcom BSI Metro Rp 150,000

BBM Tescom Alfamart Muh yamin, Hos


23-Mar-21 Rp 100,000
cokro aminoto

25-Mar-21 Survey PTPN 7 Desa Karang Sari Rp 250,000

25-Mar-21 top up e-toll Rp 100,000

Tescom Alfa Natar & Sidomulyo


26-Mar-20 Rp 150,000
Kalianda

26-Mar-20 top up e-toll Rp 150,000

27-Mar-20 Tetscom Alfa Baturaja Rp 400,000

27-Mar-20 top up e-toll Rp 100,000


BBM Tetscom Alfa R.imba, Imam
24-Mar-21 Rp 100,000
bonjol 3, Imam Bonjol 5
20-Mar-21 Bayar Listrik Basecamp Rp 178,340

Rp 2,959,340 Rp 4,000,000
(-) 1,040,660
Lampung 2710/2020

Reported by Checked by Knowledged Finance Balance received


Admin Project Project Manager

Hendri Dwi Cahyo


........................................ ……………………………………..
……………………………………………………………………….. .............................
BBM
Tetscom
Alfa
R.imba,
Imam
bonjol 3,
Imam
Bonjol 5
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Transfer/Cash project : 12 April 2021 Rp 1,000,000
Transfer/Cash project : 27 April 2021 Rp 500,000

1-Apr-21 BBM Survey Indomarco P bacan Rp 50,000

BBM Survey & Tracing core Indomarco


3-Apr-21 Rp 150,000
Punggur

5-Apr-21 BBM Tracing Core Indomarco P.Bacan Rp 50,000

6-Apr-21 BBM Indoor Indomarco Punggur Rp 150,000

8-Apr-21 BBM Indoor Indomarco P.Bacan Rp 50,000

BBM Survey Ulang PTPN 7 Jalur


13-Apr-21 Rp 250,000
Kotabumi

13-Apr-21 top up e-toll Rp 100,000

15-Apr-21 BBM Tracing Core Indomarco Soehatt Rp 50,000

17-Apr-21 BBM Indoor Indomarco Soehatt Rp 50,000

17-Apr-21 Klem Pipa PVC, pipa pvc Rp 45,000

19-Apr-21 Galon, sunlight, Tehcelup, susu kaleng Rp 51,500

20-Apr-21 Bayar Listrik Basecamp Rp 197,534

BBM tracing core PT union Way Muli


22-Apr-21 Rp 250,000
Lamsel Day 1

22-Apr-21 top up e-toll Rp 100,000

BBM tracing core PT union Way Muli


23-Apr-21 Rp 150,000
Lamsel Day 2
23-Apr-21 top up e-toll Rp 100,000

27-Apr-21 BBM Indoor PT union Way Muli Lamsel Rp 250,000


27-Apr-21 top up e-toll Rp 100,000

28-Apr-21 BBM Survey + tracing core PT APJII Rp 50,000

Rp 2,194,034 Rp 1,500,000
(-) (694,034)
Lampung 2710/2020

Reported by Checked by Knowledged Finance Balance received


Admin Project Project Manager

Hendri Dwi Cahyo


........................................ ……………………………………..
……………………………………………………………………….. .............................
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Transfer/Cash project : 5/05/2021 Rp 500,000
Transfer/Cash project : 9/05/2021 Rp 600,000
Transfer/Cash project : 18/05/2021 Rp 500,000

Transfer/Cash project : 20/05/2021 Rp 600,000


Transfer/Cash project : 28/05/2021 Rp 500,000

5-May-21 BBM Indoor dan Penarikan APJII Rp 75,000

BBM Label Kabel Indomarco P bacan


6-May-21 Rp 50,000
dan Suhatt

7-May-21 BBM testcom PT.Union Kalianda Rp 250,000

7-May-21 top up e-toll Kalianda Rp 100,000

BBM Survey +Penarikan Stroomnet


8-May-21 Rp 150,000
Pringsewu H 1
BBM Survey +Penarikan Stroomnet
9-May-21 Rp 150,000
Pringsewu H 2

9-May-21 Kirim Nota Rp 21,000

BBM Ke POP Kota Bumi pasang SFP


18-May-21 Rp 250,000
dan Joint New JB

18-May-21 top up e-toll Rp 150,000

19-May-21 BBM indoor PT Anagata (PTPN &) Rp 200,000

19-May-21 top up e-toll Rp 100,000

Klem Pipa PVC, pipa pvc, klem kabel,


19-May-21 Rp 82,000
isi cutter

BBM Tracing core dan Survey Rumah


20-May-21 Rp 250,000
kadis H1

20-May-21 top up e-toll Rp 175,000

20-May-21 Galon, tissue, pengharum mobil Rp 52,500

21-May-21 BBM Tracing core Rumah kadis H2 Rp 250,000

21-May-21 top up e-toll Rp 150,000


22-May-21 BBM Indoor dan testcom Rumah Kadis Rp 250,000

22-May-21 top up e-toll Rp 175,000

21-May-21 Bayar Listrik Basecamp Rp 165,375

Makan Siang Bersama setelah QC


24-May-21 Rp 100,000
indomarco Soekarno hatta dan P. Bacan

28-May-21 BBM Survey BSI Antasari Rp 50,000

Rp 2,700,000
(495,875)
Rp 3,195,875
(-)
Lampung 2710/2020 Balance received

Reported by Checked by Knowledged Finance


Admin Project Project Manager

.............................
Hendri Dwi Cahyo
........................................ ……………………………………..
………………………………………………………………………..
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Transfer/Cash project : 31/05/2021 Rp 600,000
Transfer/Cash project : 3/06/2021 Rp 1,000,000
Transfer/Cash project : 11/06/2021 Rp 500,000

Transfer/Cash project : 18/06/2021 Rp 1,000,000


Transfer/Cash project : 24/06/2021 Rp 500,000

Transfer/Cash project : 28/06/2021 Rp 500,000

Transfer/Cash project : 30/06/2021 Rp 500,000

BBM Progress penarikan UTP kantor


31-May-21 Rp 200,000
BPPRD Lam-teng

31-May-21 top up e-toll Rp 100,000

1-Jun-21 galon aqua,tissue Rp 32,500

2-Jun-21 BBM indoor dan Testcom BSI antasari Rp 100,000

2-Jun-21 Klaim kabel kecil dan besar Rp 25,000

Beli Peralatan dapur, kompor+magcom,


2-Jun-21 Rp 928,000
dll

2-Jun-21 Gas 5,5 kg + isi Rp 340,000

2-Jun-21 BBM Lanjut testcom BSI Rp 50,000

7-Jun-21 BBM Survey Bukit Asam Rp 150,000

BBM Indoor dan testcom Bukit Asam +


11-Jun-21 Rp 100,000
ambil kunci ODC ke serpo Kalianda

11-Jun-21 Galon aqua Rp 19,000

BBM Progres IKR Pringsewu user


14-Jun-21 Rp 150,000
Cahya dan Rama Thoriq

BBM progress IKR Pringsewu Widodo


15-Jun-21 Rp 150,000
dan Doel
BBM progress IKR Pringsewu Doel dan
16-Jun-21 Rp 150,000
ambil kekurangan Data IKR
BBM progress IKR Pringsewu User
17-Jun-21 Rp 150,000
M.Habib & Sri Eka Yuti

17-Jun-21 Beli klaim kabel kecil dan besar Rp 25,000

20-Jun-21 BBM Progress IKR Nanda Aulia Rp 50,000

20-Jun-21 Galon Aqua Rp 19,000

20-Jun-21 Bayar Listrik Basecamp Bulan Juni Rp 182,325

22-Jun-21 BBM Progress IKR Ni Kadek Dewi Rp 100,000

Transfer tim serpo perbaikan Gangguan


23-Jun-21 Rp 150,000
IKR Cahya
BBM Survey Dan Tracing core SMB
23-Jun-21 Rp 250,000
LAMBU Kibang
23-Jun-21 top up e-toll Rp 250,000
28-Jun-21 BBM Testcom SMB Lambu Kibang Rp 250,000
28-Jun-21 top up e-toll Rp 200,000
28-Jun-21 Pipa PVC 1 Rp 25,000
29-Jun-21 Galon Aqua Rp 19,000
BBM Survey dan Testcom Diskominfo
30-Jun-21 Rp 300,000
Waykanan
30-Jun-21 top up e-toll Rp 150,000

Rp 4,600,000
(14,825)
Rp 4,614,825
(-)
Lampung 2710/2020 Balance received

Reported by Checked by Knowledged Finance


Admin Project Project Manager

.............................
Hendri Dwi Cahyo
........................................ ……………………………………..
………………………………………………………………………..
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Transfer/Cash project : 13/07/2021 Rp 2,000,000
Transfer/Cash project : 22/07/2021 Rp 700,000
Transfer/Cash project : 29/07/2021 Rp 1,000,000

Transfer/Cash project :
Transfer/Cash project :

Transfer Tim serpo penanganan


1-Jul-21 Rp 300,000
gangguan Diskominfo Tubaba

2-Jul-21 BBM Testcom PT SMB lambu kibang Rp 250,000

2-Jul-21 top up e-toll Rp 200,000

5-Jul-21 BBM progress IKR Yusef Rudhy Rp 150,000

6-Jul-21 BBM Progress IKR Rajabasa Rp 50,000

7-Jul-21 BBM Progress IKR Pringsewu M.arif Rp 150,000

BBM Progress IKR Pringsewu Buyung


8-Jul-21 Rp 150,000
Arifin\

Transfer Tim serpo penanganan


9-Jul-21 Rp 150,000
gangguan IKR Buyung Arifin

BBM Progress IKR Pringsewu Ardi


11-Jul-21 Rp 150,000
Fairuz

12-Jul-21 BBM progress IKR Yusef Rudhy Rp 100,000

BBM Progress IKR Pringsewu Rafli,M


13-Jul-21 Rp 150,000
syarifudin

14-Jul-21 BBM Progress IKR Tommy Lassalata Rp 100,000

BBM Progress IKR Yefando Aljaya


15-Jul-21 Rp 150,000
Pringsewu

15-Jul-21 Klem kabel kecil, solasi hitam Rp 25,000

15-Jul-21 Galon Aqua Rp 19,000


BBM progress IKR Khavid Ridho
16-Jul-21 Rp 150,000
Pringsewu

17-Jul-21 BBM Progress IKR Suryawati Pringsewu Rp 100,000

18-Jul-21 BBM Progress IKR Rifanno Rp 100,000

21-Jul-21 Pembayaran PLN Basecamp Rp 197,540

21-Jul-21 BBM Progress Penarikan Anjas Moro Rp 100,000

BBM Progress Penarikan Elida Ferli


22-Jul-21 Rp 150,000
Metro

BBM Progress Penarikan Anisa vitara


23-Jul-21 Rp 100,000
Mirzha
24-Jul-21 BBM Progress IKR Inge Yuniarti Rp 50,000

26-Jul-21 BBM Progress IKR Agus Fitrianto Rp 50,000


BBM Progress IKR Ryan Rifki
27-Jul-21 Rp 150,000
Pringsewu

28-Jul-21 BBM Progress IKR Rusli Darwis Metro Rp 150,000

BBM Survey PT Global Citra Teknologi


29-Jul-21 Rp 350,000
Liwa - Lampung Barat
29-Jul-21 top up e-toll Rp 100,000

29-Jul-21 BBM Progress IKR Agus Fitrianto Rp 50,000


31-Jul-21 BBM Progress IKR Metro Rp 150,000
31-Jul-21 Klaim Kabel kecil 3 Besar 3 Rp 65,000

Rp 3,700,000
(406,540)
Rp 4,106,540
(-)
Lampung 2710/2020 Balance received

Reported by Checked by Knowledged Finance


Admin Project Project Manager

.............................
Hendri Dwi Cahyo
........................................ ……………………………………..
………………………………………………………………………..
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Transfer/Cash project : 05/08/2020 Rp 700,000
Transfer/Cash project : 15/08/2021 Rp 1,500,000
Transfer/Cash project : 27/08/2021 Rp 1,000,000

Transfer/Cash project : 28/08/2021 Rp 500,000


Transfer/Cash project :

BBM Progress IKR Sri Apriani


1-Aug-21 Rp 150,000
Pringsewu

2-Aug-21 Galon Aqua Rp 19,000

BBM Progress PT Global Citra


3-Aug-21 Rp 250,000
Teknologi

3-Aug-21 Top up e-toll Rp 100,000

Biaya Penginapan Progress PT Global


4-Aug-21 Rp 320,000
Citra 2 Malam

5-Aug-21 BBM Pulang ke Bandar Lampung Rp 250,000

BBM Progress integrasi dan pelurusan


6-Aug-21 Rp 50,000
core BSI

7-Aug-21 BBM Progress IKR Sepriwan Sukarame Rp 100,000

BBM Progress testcom Kades Hanura


9-Aug-21 Rp 150,000
dan progress gangguan iconnet

10-Aug-21 BBM Progress IKR Metro Budi Sumarno Rp 150,000

10-Aug-21 Klaim Kabel kecil 3 Kotak Rp 30,000

BBM Progress IKR Fitri Nurjanah


11-Aug-21 Rp 100,000
Sukarame

BBM Progress Testcom SMAN 2


12-Aug-21 Rp 100,000
Gedong Tataan

16-Aug-21 BBM Progress IKR Metro Saferi Rp 150,000

18-Aug-21 BBM Progress IKR Pringsewu Rp 150,000

19-Aug-21 BBM Progress IKR Metro Rp 150,000

19-Aug-21 Klaim Kabel kecil 3 Kotak Rp 30,000

20-Aug-21 Galon Aqua Rp 20,000

20-Aug-21 Bayar Listrik Basecamp Rp 210,980

BBM Progress IKR sukarame dan


26-Aug-21 Rp 100,000
Kemiling

Ganti AKI mobil tukar tambah dgn Aki


27-Aug-21 Rp 664,000
lama

28-Aug-21 Galon Aqua Rp 20,000

28-Aug-21 BBM IKR Rajabasa Rp 100,000

29-Aug-21 BBM IKR Rajabasa Rp 50,000

31-Aug-21 BBM Survey Feeder Metro Rp 150,000


Rp 3,700,000
136,020
Rp 3,563,980
(-)
Lampung 2710/2020 Balance received

Reported by Checked by Knowledged Finance


Admin Project Project Manager

.............................
Hendri Dwi Cahyo
........................................ ……………………………………..
………………………………………………………………………..
;
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Transfer/Cash project : 02/09/2021 Rp 1,000,000
Transfer/Cash project :07/09/2021 Rp 500,000
Transfer/Cash project :11/09/2021 Rp 500,000
Transfer/Cash project :16/09/2021 Rp 1,000,000
Transfer/Cash project :22/09/2021 Rp 1,500,000
Transfer/Cash project : 30/09/2021 Rp 1,000,000

Transfer/Cash project :

2-Sep-21 Beli FAT 1:16 Fullset Rp 550,000

2-Sep-21 BBM Survey Ulang Jalur feeder Metro Rp 150,000

3-Sep-21 BBM Progress IKR Sukarame Rp 100,000

Bayar Iuran Sampah dan keamanan


komplek Bulan
4-Sep-21 Rp 225,000
Mei,Juni,Juli,Agustus,september
@45.000/bulan

5-Sep-21 BBM Anter acc penarikan Kabel metro Rp 150,000

6-Sep-21 Mata cutter, solasi besar Rp 17,000

BBM Relokasi FAT existing dan


8-Sep-21 Rp 150,000
pemasnagan NEW FAT Metro
BBM Lanjut Relokasi FAT existing
9-Sep-21 Rp 150,000
Metro

10-Sep-21 BBM Survey Feeder Jati Agung Rp 100,000

10-Sep-21 Galon Aqua 2 Rp 38,000

14-Sep-21 BBM Survey RSU Metro Rp 150,000

16-Sep-21 BBM Survey SMB Lampung Utara Rp 250,000

16-Sep-21 top up e-toll Rp 200,000

17-Sep-21 BBM Instalasi FAT relokasi Jati agung Rp 100,000

BBM Insert Kabel Dan instal JB RSU


19-Sep-21 Rp 150,000
Metro

20-Sep-21 BBM Indoor dan Testcom Rsu Metro Rp 150,000

20-Sep-21 Klaim Kabel 3 Rp 30,000

BBM cut over dan join JB SMB


21-Sep-21 Rp 250,000
Lampung Utara

21-Sep-21 top up e-toll Rp 200,000

21-Sep-21 Beli JB new Fullset 2 pcs Rp 800,000

21-Sep-21 Sewa prnginapan 3 malam Rp 390,000

22-Sep-21 BBM lanjut Tracing core SMB Rp 100,000


testcom dan BBM pulang ke
23-Sep-21 Rp 200,000
bandarlampung

24-Sep-21 BBM Spa Sukarame Rp 100,000

27-Sep-21 BBM Spa Metro Rp 150,000

BBM relokasi FAT Pringsewu dan SPA


28-Sep-21 Rp 150,000
rajabasa

28-Sep-21 Mata Cutter Rp 5,000

28-Sep-21 Galon Aqua 2 Rp 38,000

29-Sep-21 Bayar Listrik bulan September Rp 293,000


29-Sep-21 BBM Survey Feeder Permata Asri Rp 100,000

Rp 5,500,000
64,000
Rp 5,436,000
(-)
Lampung Balance received

Reported by Checked by Knowledged Finance


Admin Project Project Manager

.............................
Hendri Dwi Cahyo
........................................ ……………………………………..
………………………………………………………………………..
;
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Transfer/Cash project : 10/10/2021 Rp 1,000,000
Transfer/Cash project : 14/10/2021 Rp 1,000,000
Transfer/Cash project : 21/10/2021 Rp 1,500,000
Transfer/Cash project :
Transfer/Cash project :
Transfer/Cash project :

Transfer/Cash project :

5-Oct-21 BBM Progress install FAT Permata Asri Rp 100,000

6-Oct-21 BBM Pemasangan BOX NEW FDT Rp 50,000

7-Oct-21 BBM Pemasangan Box pelindung Rp 50,000

8-Oct-21 Penginapan 3 Hari @200k/night Rp 600,000

8-Oct-21 BBM Progress Diskominfo Waykanan Rp 250,000

8-Oct-21 Top up E-toll Rp 150,000

9-Oct-21 BBM Testcom Kominfo Rp 100,000

10-Oct-21 BBM Testcom CV Degan Perkasa Rp 100,000

11-Oct-21 BBM pulang Bandar Lampung Rp 200,000

12-Oct-21 BBM Testcom PLN Bukit Kemuning Rp 250,000

12-Oct-21 Top up E-toll Rp 150,000

12-Oct-21 Penginapan Liwa 1 Malam Rp 175,000

BBM Lanjut testcom PLN Liwa dan


13-Oct-21 Rp 200,000
pulang ke bandar lampung

15-Oct-21 BBM Motor Progress IKR Permata Asri Rp 50,000

BBM Mobil Testcom Natar PT Sukanda


15-Oct-21 Rp 100,000
Djaya

Beli Kasur Tidur @2 Bantal @2 utk tim


16-Oct-21 Rp 400,000
IKR

18-Oct-21 BBM Survey PT Pusri Sriwidjaja Rp 50,000

18-Oct-21 Bayar listrik Bulan Okt Rp 263,260

22-Oct-21 Beli tool Box peralatan kunci lengkap Rp 250,000

23-Oct-21

24-Oct-21

25-Oct-21

26-Oct-21

27-Oct-21
28-Oct-21

29-Oct-21

30-Oct-21

31-Oct-21

1-Nov-21
2-Nov-21

Rp 3,500,000
11,740
Rp 3,488,260
(-)
Lampung Balance received

Reported by Checked by Knowledged Finance


Admin Project Project Manager

.............................
Hendri Dwi Cahyo
........................................ ……………………………………..
………………………………………………………………………..
;
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Transfer/Cash project : 28/10/2021 Rp 700,000
Transfer/Cash project :01/11/2021 Rp 1,000,000
Transfer/Cash project :
Transfer/Cash project :
Transfer/Cash project :
Transfer/Cash project :

Transfer/Cash project :

23-Oct-21 BBM Tracing core PT Pusri Rp 100,000

23-Oct-21 Sitaq Satpam GI Sutami Rp 25,000

26-Oct-21 BBM Mobil SPA Denny Busrian Rp 100,000

BBM Mobil SPA Riyanto dan I wayan


27-Oct-21 Rp 100,000
Rajabasa & Permata Asri

BBM Motor Progress Gangguan SPA


28-Oct-21 Rp 30,000
Riyanto

28-Oct-21 BBM Mobil Indoor dan testcom Pusri Rp 100,000

Siku perangkat, paralon pvc, klem besar,


28-Oct-21 Rp 80,000
klem kecil, solasi hitam

28-Oct-21 Beli JB Fullset Rp 400,000

29-Oct-21 BBM Mobil SPA Jati Baru Rp 100,000

29-Oct-21 mata cutter Rp 7,000

30-Oct-21 BBM Motor SPA Permata Asri Rp 30,000

30-Oct-21 BBM Mobil SPA Jati Baru Rp 100,000

31-Oct-21 BBM Mobil SPA Jati Baru Supendi Rp 50,000


Rp 1,700,000
478,000
Rp 1,222,000
(-)
Lampung Balance received

Reported by Checked by Knowledged Finance


Admin Project Project Manager

.............................
Hendri Dwi Cahyo
........................................ ……………………………………..
………………………………………………………………………..
PT. MARNO-I TEK INDONESIA Name :
General Supply and IT Solution Division :
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kre
Transfer/Cash project : 05/11/2021
Transfer/Cash project : 11/11/2021
Transfer/Cash project : 19/11/2021
Transfer/Cash project : 26/11/2021
Transfer/Cash project :
Transfer/Cash project :

Transfer/Cash project :

1-Nov-21 BBM Motor SPA Jati Baru Rp 30,000

2-Nov-21 BBM Survey Feeder Gedong tataan Rp 100,000

2-Nov-21 BBM IKR Kemiling dan Permata Asri 2 Rp 50,000

3-Nov-21 Galon Aqua 2 Rp 39,000

3-Nov-21 BBM IKR Metro Rp 50,000

3-Nov-21 BBM Survey Jalur Feeder Kemiling Rp 100,000

4-Nov-21 BBM Progress H3i Pringsewu Rp 150,000

4-Nov-21 BBM Progress IKR Permata Asri Rp 35,000

5-Nov-21 BBM Progress IKR Permata Asri Rp 30,000

6-Nov-21 Perum Griya Indah Permata Rp 30,000

7-Nov-21 Perum Alfa Residence dan Permata Asri Rp 30,000

8-Nov-21 Perum Rajabasa dan Permata Asri Rp 35,000

9-Nov-21 Perum Rajabasa dan Permata Asri Rp 35,000

10-Nov-21 BBM Progress Pemasangan FDT Jl Pramuka Rp 100,000

10-Nov-21 Beli JB 2 Sett Rp 800,000

10-Nov-21 Perum Griya Indah Permata Rp 35,000

11-Nov-21 Perum Permata Asri Rp 30,000

12-Nov-21 BBM Motor Perum Margorejo Rp 35,000

12-Nov-21 Claim Kabel kecil 2 pcs Rp 20,000

12-Nov-21 cutter set mata cutter Rp 30,000

12-Nov-21 BBM Mobil Progress Join FAT Rp 75,000

13-Nov-21 BBM Motor SPA jati baru dan permata Asri Rp 50,000

13-Nov-21 BBM Mobil SPA Kemiling Rp 100,000

13-Nov-21 BBM Motor SPA Jati Baru danSukarame Rp 40,000


14-Nov-21 Beli Battery AA 2 pcs (isi 6) Rp 76,000

14-Nov-21 BBM Mobil Join FAT dan JB Feeder Rp 150,000

14-Nov-21 BBM Motor SPA Sukarame dan Kemiling Rp 50,000

15-Nov-21 BBM Mobil SPA Pesawaran Rp 100,000

15-Nov-21 BBM Motor SPA Sukarame dan Kemiling Rp 50,000

16-Nov-21 BBM Mobil Join Fat Rp 150,000

16-Nov-21 BBM Motor SPA jati agung dan sukarame Rp 40,000

17-Nov-21 BBM Mobil SPA Kemiling Rp 100,000

17-Nov-21 BBM motor SPA tj seneng dan kemiling Rp 50,000

18-Nov-21 beli klem kabel kecil 10 pcs Rp 100,000

18-Nov-21 BBM Mobil SPA Kemiling Rp 100,000

18-Nov-21 BBM Motor SPA Sukarame Rp 35,000

18-Nov-21 Bayar Listrik Bulan November Rp 289,460

19-Nov-21 Servis Mobil Rp 695,000

19-Nov-21 BBM Progress SPA Junia Rp 100,000

19-Nov-21 BBM motor SPA Permata asri dan kemiling Rp 35,000

20-Nov-21 BBM motor SPA Kemiling Rp 35,000

20-Nov-21 BBM Progress SPA Gedung Dalam Rp 100,000

21-Nov-21 BBM SPA kemiling Rp 100,000

21-Nov-21 BBM Motor SPA Pesawaran Rp 30,000

22-Nov-21 BBM SPA Mulyojati Rp 100,000

22-Nov-21 BBM Survey Feeder MargaPunduh Rp 250,000

23-Nov-21 BBM Motor IKR Sukarame dan Permata asri


Rp 35,000
23-Nov-21
Galon Aqua 2 Rp 39,000
24-Nov-21
BBM Motor IKR Sukarame Rp 35,000

25-Nov-21
BBM motor IKR jati Agung dan Margorejo Rp 35,000

26-Nov-21
BBM Mobil Progress join fdt Ulang Rp 100,000

26-Nov-21
BBM Motor IKR Pesawaran Dan Kemiling Rp 35,000

27-Nov-21
BBM Anter Acc ke margapunduh penarikan Feeder Rp 250,000

27-Nov-21 BBM Motor Gangguan User Rp 35,000

29-Nov-21 BBM Motor Margorejo Dan Kemiling Rp 35,000

30-Nov-21 BBM Mobil Progress Pasang FAT Margapunduh Rp 200,000

Rp
(63,460)

Rp 5,563,460
(-) Balance
Lampung
Reported by Checked by Knowledged Finance
Admin Project Project Manager
...............

Hendri Dwi Cahyo


........................................ …………………………………….. ………………………………………… ……………………………..
;
Hendri Dwi Cahyo
Aktivasi Lampung

Total
Kredit
Rp 1,000,000
Rp 1,000,000
Rp 2,500,000
Rp 1,000,000
Rp 5,500,000
(63,460)

Balance received
.............................

………………..
;
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Transfer/Cash project : 08/12/2021 Rp 1,500,000
Transfer/Cash project : 16/12/2021 Rp 2,500,000
Transfer/Cash project : 19/12/2021 Rp 2,000,000
Transfer/Cash project : 25/12/2021 Rp 1,500,000
Transfer/Cash project :
Transfer/Cash project :

Transfer/Cash project :

1-Dec-21 BBM Motor IKR Kemiling Rp 35,000

2-Dec-21 BBM Mobil Rp 50,000

3-Dec-21

BBM Progress IKR Sukarame dan


4-Dec-21 Rp 35,000
waykandis

5-Dec-21 BBM motor IKR Margapunduh Rp 35,000

6-Dec-21 progrees Join jb dan opm margapunduh Rp 250,000

6-Dec-21 Bayar Sewa Motor IKR Margapunduh Rp 500,000

6-Dec-21 BBM Ikr Margapunduh Rp 20,000

6-Dec-21 Iuran keamanan Feeder Margapunduh Rp 500,000

7-Dec-21 BBM Ikr Margapunduh Rp 25,000

7-Dec-21 BBM Progress Gangguan Iconnet Rp 100,000

8-Dec-21 BBM Ikr Margapunduh Rp 35,000

Klem kabel 6 pcs untk IKR


9-Dec-21 Rp 60,000
margapunduh

9-Dec-21 BBM Ikr Margapunduh Rp 30,000

10-Dec-21 BBM Ikr Margapunduh Rp 30,000

11-Dec-21 Ganti Ban dalam Motor Rp 40,000

11-Dec-21 BBM Ikr Margapunduh Rp 25,000

BBM Gangguan Iconnet Perum Griya


11-Dec-21 Rp 50,000
Saka

12-Dec-21 BBM Ikr Margapunduh Rp 25,000

13-Dec-21 BBM Progress IKR Bandarlampung Rp 100,000

13-Dec-21 BBM Ikr Margapunduh Rp 35,000

Klem kabel 10 pcs untk IKR


14-Dec-21 Rp 100,000
margapunduh

14-Dec-21 BBM Ikr Margapunduh Rp 35,000


14-Dec-21 BBM Survey Ulang Pusri Rp 100,000

15-Dec-21 BBM Progress pemasangan cctv Pusri Rp 100,000

15-Dec-21 Braket siku 5 pcs Rp 50,000

15-Dec-21 Steker 5 pcs Rp 35,000

15-Dec-21 stop kontak 5 pcs lubang 2 Rp 50,000

15-Dec-21 klaim Powel 8mm 5 pcs Rp 50,000

15-Dec-21 Beli RJ45 10 pcs Rp 30,000

BBM Progress gangguan IKR dan


16-Dec-21 Rp 100,000
pemasangan CCTV Pusri

16-Dec-21 BBM Progress IKR Marga Punduh Rp 25,000

16-Dec-21 Kabel Power NYYHY 2 x1.5 1 roll 50 m Rp 297,000

16-Dec-21 Beli UTP Belden Cat6 1 Roll 305 M Rp 2,200,000

17-Dec-21 BBM Progress IKR Marga Punduh Rp 30,000

17-Dec-21 Bayar Listrik Basecamp Bulan desember Rp 315,344

18-Dec-21 BBM Progress IKR Marga Punduh Rp 30,000

20-Dec-21 BBM Progress IKR Marga Punduh Rp 20,000

20-Dec-21 BBM Lanjut Progress cctv Pusri Rp 100,000

20-Dec-21 Beli UTP Belden Cat6 1 00 M Rp 760,000

20-Dec-21 Paralon tray 2 pcs Rp 64,000

20-Dec-21 RJ45 10 pcs Rp 30,000

21-Dec-21 Steam Mobil kantor Rp 50,000

21-Dec-21 Galon Aqua 2 Rp 38,000

21-Dec-21 Lanjut Aktivassi cctv Pusri Rp 50,000

22-Dec-21 BBM IKR Sukarame Rp 100,000

22-Dec-21 BBM motor IKR Permata Asri Rp 30,000

BBM Motor Ikr sukarame dan permata


23-Dec-21 Rp 30,000
Asri

23-Dec-21 BBM Mobil IKR jatimulyo Rp 50,000

24-Dec-21 Survey Feeder Talang Padang Rp 250,000

24-Dec-21 BBM Motor IKR Permata Asri Rp 30,000

25-Dec-21 BBM SPA Sukarame dan Permata Asri Rp 50,000

BBM Motor SPA Sukarame dan Permata


25-Dec-21 Rp 35,000
Asri
BBM Motor SPA Sukarame dan Permata
26-Dec-21 Rp 35,000
Asri

26-Dec-21 Klem kabel powell 10 pcs Rp 100,000

27-Dec-21 BBM Motor SPA Sukarame Rp 30,000

28-Dec-21 BBM Motor SPA permata Asri Rp 30,000

29-Dec-21 BBM Motor SPA permata Asri Rp 35,000

BBM Motor SPA Jati Baru dan


30-Dec-21 Rp 35,000
Sukarame

BBM Motor SPA Jati Baru dan


31-Dec-21 Rp 35,000
Sukarame

Rp 7,500,000
(14,344)
Rp 7,514,344
(-)
Lampung Balance received

Reported by Checked by Knowledged Finance


Admin Project Project Manager

.............................
Hendri Dwi Cahyo
........................................ ……………………………………..
………………………………………………………………………..
;
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Transfer/Cash project : 05/01/2022 Rp 1,000,000
Transfer/Cash project : Rp 1,000,000
Transfer/Cash project : Rp 1,500,000
Transfer/Cash project : 21/01/2022 Rp 1,000,000
Transfer/Cash project :
Transfer/Cash project :

Transfer/Cash project :

2-Jan-22 BBM Mobil SPA Margapunduh Rp 250,000

BBM Motor SPA Sukarame dan Sabah


2-Jan-22 Rp 35,000
Balau
BBM Mobil Lanjut progress Marga
3-Jan-22 Rp 100,000
punduh
BBM Motor SPA Sukarame dan Sabah
3-Jan-22 Rp 25,000
Balau

4-Jan-22 BBM SPA Kemiling dan UID Rp 35,000

5-Jan-22 BBM SPA Jati baru dan Sukarame Rp 25,000

7-Jan-22 BBM Motor SPA UID Lampung Rp 30,000

8-Jan-22 BBM Motor SPA UID Lampung Rp 30,000

7-Jan-22 BBM Survey Feeder Jati baru Rp 50,000

8-Jan-22 BBM Progress Relokasi FAT jati Baru Rp 100,000

9-Jan-22 BBM lanjut progress FAT Rp 50,000

10-Jan-22 Bayar Listrik Bulan Januari Rp 302,430

11-Jan-22 BBM Motor SPA Kemiling Rp 30,000

12-Jan-22 BBM Motor SPA Permata Asri Rp 25,000

12-Jan-22 Beli Join box 3 psc Fullset Rp 1,200,000

14-Jan-22 BBM Motor SPA Jati Baru Rp 25,000

14-Jan-22 Top Up etoll Rp 150,000

BBM Mobil Survey Diskominfo


14-Jan-22 Rp 250,000
Waykanan

15-Jan-22 BBM Motor SPA Permata Asri Rp 30,000

16-Jan-22 Galon Aqua 2 Rp 38,000

17-Jan-22

18-Jan-22

18-Jan-22 Steel band 1 roll Rp 180,000

18-Jan-22 Pipa pvc 1 Rp 28,000


18-Jan-22 Claim Pipa dan siku Rp 21,000

19-Jan-22 Penginapan kamar size L Rp 300,000

19-Jan-22 Top up e toll Rp 150,000

BBM Mobil Tracing Core Diskominfo


19-Jan-22 Rp 250,000
Waykanan

Lanjut Progress Diskominfo Waykanan


20-Jan-22 Rp 100,000
dan Pulang ke Bandar lampung

21-Jan-22 Survey Feeder Sabah Balau Rp 100,000

22-Jan-22 BBM SPA Jati Baru Rp 30,000

23-Jan-22 Galon Aqua 2 Rp 38,000

23-Jan-22 Steam Mobil Operasional Rp 50,000

27-Jan-22 BBM Motor SPA Perum Aden 2 Rp 25,000

BBM Motbil SPA Margapunduh dan


27-Jan-22 Rp 200,000
Gangguan Pelanggan Marga Punduh

28-Jan-22 BBM Survey Prodia Rp 100,000

BBM Gangguan Pelanggan Iconnet


29-Jan-22 Rp 25,000
Sukarame

Rp 4,500,000
122,570
Rp 4,377,430
(-)
Lampung Balance received

Reported by Checked by Knowledged Finance


Admin Project Project Manager

.............................
Hendri Dwi Cahyo
........................................ ……………………………………..
………………………………………………………………………..
;
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Transfer/Cash project :30/01/2022 Rp 700,000
Transfer/Cash project :12/02/2022 Rp 1,000,000
Transfer/Cash project : 19/02/2022 Rp 4,300,000
Transfer/Cash project : 28-Feb-22 Rp 1,500,000
Transfer/Cash project :
Transfer/Cash project :

Transfer/Cash project :

2-Feb-22 BBM Tracing core prodia Rp 100,000

2-Feb-22 BBM SPA Sukarame Rp 35,000

3-Feb-22 BBM SPA Sukarame dan Kemiling Rp 35,000

BBM Instalasi FAT Perumahan Abdi


3-Feb-22 Rp 100,000
Negara

4-Feb-22 BBM SPA Kemiling Rp 35,000

4-Feb-22 BBM Instert Kabel FDT Rp 50,000

5-Feb-22 BBM SPA Kemiling Rp 35,000

5-Feb-22 PVC Paralon, Klem besar paralon Rp 42,000

5-Feb-22 BBM Testcom Prodia Rp 100,000

5-Feb-22 Sitaq Satpam GI Teluk Rp 25,000

6-Feb-22 BBM SPA Kemiling Rp 40,000

7-Feb-22 BBM SPA kemiling Rp 35,000

7-Feb-22 BBM Install FAT Sabah Balau Rp 100,000

BBM SPA Kemiling, Sukarame dan


8-Feb-22 Rp 50,000
Permata Asri

8-Feb-22 BBM Instal FAT Sabah Balau Rp 50,000

9-Feb-22 BBM SPA Sabah Balau permata asri Rp 35,000

BBM Survey PA Indomarco Tegineneng


9-Feb-22 Rp 200,000
dan PA Azzahranet Batanghari

10-Feb-22 BBM SPA Kemiling Rp 30,000

10-Feb-22 BBM SPA Permata Asri dan Sukabumi Rp 30,000

11-Feb-22 BBM Motor SPA Kemiling Rp 25,000

12-Feb-22 BBM Motor SPA Permata Asri Rp 25,000

13-Feb-22 BBM Motor SPA Kemiling Rp 30,000

BBM Motor SPA Kemiling, gedung


14-Feb-22 Rp 30,000
Harapan
15-Feb-22 BBM Motor SPA Permata Asri Rp 30,000

18-Feb-22 BBM Motor SPA Permata Asri Rp 25,000

BBM Mobil Tracing Core CV


15-Feb-22 Rp 150,000
Azzahranet Batanghari

16-Feb-22 BBM Motor SPA Kemiling Rp 30,000

16-Feb-22 BBM Testcom CV AzzahraNet Rp 150,000

16-Feb-22 Sitaq Satpam Metro Rp 25,000

Pipa PVC,Klem pipa 1/4, klaim kabel


16-Feb-22 Rp 55,000
8mm, mata cutter

Survey Ulang Link Indomarco


17-Feb-22 Rp 150,000
Tegineneng

18-Feb-22 uang keamanan penarikan Indomarco Rp 500,000

18-Feb-22 beli JB 7 pcs fullset @400/pcs Rp 2,800,000

18-Feb-22 Bayar Listrik Basecamp Rp 254,709

BBM Mobil indoor indomarco dan


18-Feb-22 Rp 150,000
tracing core

18-Feb-22 Beli duct indoor indomaret 3@pcs Rp 45,000

19-Feb-22 BBM Motor SPA JatiBAru Rp 25,000

BBM Lanjut Testcom Indomarco Rejo


19-Feb-22 Rp 150,000
Agung

19-Feb-22 Sitaq Satpam Tegineneng Rp 25,000

20-Feb-22 BBM Motor SPA Sukarame Rp 25,000

21-Feb-22 BBM Mobil Progress IKR gisting Rp 200,000

22-Feb-22 BBM Motor SPA Sabah Balau Rp 25,000

23-Feb-22 BBM Motor SPA Sabah Balau Rp 30,000

23-Feb-22 BBM Mobil Survey PWI tulang Bawang Rp 250,000

23-Feb-22 Top up e-toll Rp 200,000

24-Feb-22 BBM Survey Punduh pidada feeder


Rp 250,000
24-Feb-22 BBM Motor SPA Sabah Balau Rp 25,000

25-Feb-22 BBM Motor SPA Jati Baru Rp 25,000

BBM Survey Link Feeder Backbone


28-Feb-21 Rp 200,000
Padang Ceremin
Rp 7,500,000
468,291
Rp 7,031,709
(-)
Lampung Balance received

Reported by Checked by Knowledged Finance


Admin Project Project Manager

.............................
Hendri Dwi Cahyo
........................................ ……………………………………..
………………………………………………………………………..
PT. MARNO-I TEK INDONESIA Name :
General Supply and IT Solution Division :
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kre
Transfer/Cash project :02/03/2022
Transfer/Cash project : 05/03/2022
Transfer/Cash project : 11/03/2022
Transfer/Cash project : 15-Mar-22
Transfer/Cash project :
Transfer/Cash project :

Transfer/Cash project :

1-Mar-22 BBM Progress Gedung PWI Rp 250,000

1-Mar-22 Top E-toll Rp 100,000

1-Mar-22 Beli subduct PVC HDPE 50 meter Rp 550,000

1-Mar-22 Beli Pipa PVC paralon 15 pcs Rp 450,000

1-Mar-22 Beli utp CAT-5 100 m Rp 500,000

1-Mar-22 penginapan Tulang bawang 2 malam (L) Rp 400,000

2-Mar-22 meteran bangunan Rp 150,000

2-Mar-22 claim pipa paralon 1/4 30 pcs Rp 30,000

3-Mar-22 Top E-toll Rp 100,000

3-Mar-22 BBM Pulang ke bandarlampung Rp 200,000

2-Mar-22 Bayar tukang Gali 50 meter Rp 1,500,000

3-Mar-22 Beli Galon 3 Rp 57,000

7-Mar-22 BBM Mobil Pemasangan FAT Punduh Pidada Rp 250,000

11-Mar-22 Ganti ban mobil operasioanl belakang Rp 1,100,000

14-Mar-22 BBM mobil test opm dan install FAT Punduh Pidada Rp 250,000

14-Mar-22 Bayar Listrik Basecamp Rp 243,650

15-Mar-22 Galon 2, tissue Rp 52,000

16-Mar-22 BBM Survey Feeder Kota Agung Rp 250,000

21-Mar-22 BBM Progress Gangguan FAT Punduh Pidada Rp 200,000

24-Mar-22 Mata cutter 2 Rp 16,000

24-Mar-22 BBM Progress Install FAT dan FDT Kota Agung Rp 250,000

24-Mar-22 Penginapan size Triple Bed Rp 300,000


25-Mar-22 Tambahan BBM Mobil Rp 100,000

29-Mar-22 BBM Progress Kota Agung install OLT dan dokumentasi OPM Rp 200,000

29-Mar-22 Penginapan Rp 250,000

Rp 30,000
01/03/22 Jati Baru, Kemiling dan Permata Asri

Rp 30,000
02/03/22 Kemiling dan Pesawaran

Rp 110,000
02/03/22 Klaim Kabel kecil 10 pcs

Rp 25,000
03/03/22 UID lampung dan Jati Baru
Rp 30,000
04/03/22 Kemiling dan Jati Baru

Rp 35,000
05/03/22 Jati baru, kemiling, sabah balau dan Permata Asri

Rp 25,000
06/03/22 Permata Asri, Kemiling dan Sabah Balau

Rp 25,000
08/03/22 UID Lampung, JatiBaru dan Kemiling

Rp 25,000
09/03/22 Kemiling

Rp 25,000
10/03/22 Jati Baru

Rp 25,000
11/03/22 Jati Baru

Rp 30,000
12/03/22 Permata Asri dan Jati Baru

Rp 25,000
13/03/22 Maintenance Gangguan Pelanggan
Rp 25,000
14/03/22 Kemiling

Rp 30,000
18/03/22 Permata Asri

Rp 30,000
20/03/22 Permata Asri, Jati Baru

Rp 30,000
21/03/22 Sabah Balau

Rp 35,000
22/03/22 Permata Asri dan Sukarame

Margodadi,kemiling, tataan Rp 30,000


23/03/22

Pesawaran, Jati agung,Kemiling Rp 25,000


24/03/22

Permata Asri, Waykandis, Jatibaru Rp 25,000


25/03/22

Klaim Kabel kecil 10 pcs Rp 110,000


25/03/22

Jati Baru, Kemiling Rp 30,000


26/03/22

27/03/22 Jati Baru, sabah balau Rp 30,000

Sabah Balau Rp 30,000


28/03/22

Sukarame, UID lampung, Kemiling Rp 25,000


30/03/22
Permata Asri, Kemiling Rp 30,000
31/03/22
Rp
(1,473,650)

Balance
Rp 8,673,650
(-)
Lampung

Reported by Checked by Knowledged Finance ...............


Admin Project Project Manager

Hendri Dwi Cahyo


........................................ …………………………………….. ………………………………………… ……………………………..
;
Hendri Dwi Cahyo
Aktivasi Lampung

Total
Kredit
Rp 2,500,000
Rp 2,500,000
Rp 1,200,000
Rp 1,000,000
Rp 7,200,000
(1,473,650)

Balance received

.............................

………………..
PT. MARNO-I TEK INDONESIA Name :
General Supply and IT Solution Division :
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kre
Transfer/Cash project : 1/04/2022
Transfer/Cash project : 15/04/2022
Transfer/Cash project : 22/04/2022
Transfer/Cash project : 27/04/2022
Transfer/Cash project :
Transfer/Cash project :

Transfer/Cash project :

1-Apr-22 BBM Survey PT.Sulotco Rp 100,000

6-Apr-22 BBM Tracing Core PT.Sulotco Rp 100,000

7-Apr-22 BBM lanjut Indoor PT.Sulotco Rp 50,000

8-Apr-22 BBM testcom Sulotco Rp 100,000

8-Apr-22 Beli ducting indoor (5meter) Rp 110,000

13-Apr-22 BBM Progres ke Punduh Pidada Rp 200,000

14-Apr-22 BBM Survey PLN GI Dipasena Rawajitu Rp 250,000

14-Apr-22 Top Up e-toll In Kotabaru Rp 100,000

14-Apr-22 Penginapan Dipasena Rp 150,000

15-Apr-22 Bayar Listrik Basecamp bulan Maret Rp 189,202

15-Apr-22 top upe-toll Rp 100,000

15-Apr-22 BBM Survey PLN Pulung Kencana Rp 200,000

17-Apr-22 BBM Jemput Tim IKR punduh pidada Rp 200,000

18-Apr-22 BBM Survey Indomarco Campang Raya Rp 50,000

BBM Antar tim ke BandarJaya dan progress Gangguan Fat


20-Apr-22 Rp 250,000
Kota Agung

20-Apr-22 Top Up e-toll In Kotabaru Rp 100,000

21-Apr-22 Beli battery OFI Alkaline Kotak Rp 42,300

21-Apr-22 BBM Tracing core Indomarco Rp 100,000

22-Apr-22 BBM Testcom Bapas dan Lapas Metro Rp 150,000

23-Apr-22 BBM Tracing Core Indomarco Rp 100,000

23-Apr-22 Battery Alkaline untuk label print Baru Rp 47,500

26-Apr-22 BBM Jemput tim IKR bandar Jaya dan testcom Indomarco Rp 150,000
26-Apr-22 Top Up e-toll In Kotabaru Rp 100,000

Rp
60,998

Balance

Rp 2,939,002

(-)

Lampung

Knowledged
Reported by Checked by Finance ...............

Admin Project
Project Manager

Hendri Dwi Cahyo

…………………………………….. …………………………………………
........................................ ……………………………..
;
Hendri Dwi Cahyo
Aktivasi Lampung

Total
Kredit
Rp 1,000,000
Rp 500,000
Rp 500,000
Rp 1,000,000
Rp 3,000,000
60,998

Balance received

.............................

………………..
PT. MARNO-I TEK INDONESIA Name :
General Supply and IT Solution Division :
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kre
Transfer/Cash project : 26/05/2022
Transfer/Cash project : 31/05/2022
Transfer/Cash project :
Transfer/Cash project :
Transfer/Cash project :
Transfer/Cash project :

Transfer/Cash project :

17-May-22 BBM Progress Dipasena Rp 300,000

17-May-22 top up e-toll Kota Baru- exit Sp pematang Rp 150,000

17-May-22 Penginapan Dipasena Day 1 Rp 200,000

18-May-22 Beli Pipa 30 pcs @20.000/pcs Rp 600,000

18-May-22 Klem paralon 2 pcs Rp 50,000

18-May-22 klem kabel 2 pcs Rp 30,000

18-May-22 paku beton 30 pcs Rp 45,000

18-May-22 Penginapan Dipasena Day 2 Rp 200,000

19-May-22 BBM progress Pulung kencana Rp 250,000

19-May-22 top up e-toll in Sp Pematang-ex Gunung Batin Rp 100,000

19-May-22 Penginapan pulung Kencana Day 3 Rp 175,000

20-May-22 BBM Tracing Core Pulung - kotabumi Rp 100,000

20-May-22 Penginapan Kotabumi Day 4 Rp 150,000

21-May-22 BBM Tracing Core Pulung - kotabumi Rp 100,000

21-May-22 Penginapan Kotabumi Day 5 Rp 150,000

22-May-22 BBM Tracing Core Pulung - kotabumi Rp 100,000

22-May-22 Penginapan Kotabumi Day 6 Rp 150,000

23-May-22 BBM Tracing core dan Pulang Ke bandar lampung Rp 200,000

23-May-22 top up etoll in gunung sugih- ex kotabaru Rp 100,000

28-May-22 BBM Lanjut tracing core Pulung Rp 250,000

28-May-22 Top up e-toll Rp 150,000

31-May-22 BBM Progress Tracing Kotabumi Rp 250,000


31-May-22 Top up e-toll Rp 100,000

31-May-22 Penginapan Pulung Kencana Rp 150,000

Rp
(1,050,000)

Balance

Rp 4,050,000

(-)

Lampung

Knowledged
Reported by Checked by Finance ...............

Admin Project
Project Manager

Hendri Dwi Cahyo

…………………………………….. …………………………………………
........................................ ……………………………..
;
Hendri Dwi Cahyo
Aktivasi Lampung

Total
Kredit
Rp 1,500,000
Rp 1,500,000
Rp 3,000,000
(1,050,000)

Balance received

.............................

………………..
PT. MARNO-I TEK INDONESIA Name :
General Supply and IT Solution Division :
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kre
Transfer/Cash project : 03/06/2022
Transfer/Cash project : 14/06/2022
Transfer/Cash project : 22-Jun-22
Transfer/Cash project :
Transfer/Cash project :
Transfer/Cash project :

Transfer/Cash project :

1-Jun-22 BBM Lanjut tracing core Pulung Rp 100,000

1-Jun-22 Penginapan Pulung Rp 200,000

BBM Lanjut tracing core Pulung dan pulang Ke


2-Jun-22 Rp 200,000
bandarlampung

2-Jun-22 top up e toll Rp 150,000

8-Jun-22 BBM lanjut Tracing core kotabumi Rp 200,000

8-Jun-22 top up e toll Rp 150,000

8-Jun-22 Penginapan Pulung Rp 200,000

8-Jun-22 Token Listrik Basecamp Rp 100,000

9-Jun-22 BBM Lanjt Tracing Rp 150,000

9-Jun-22 Sitaq Satpam Menggala Rp 30,000

9-Jun-22 Makan Bersama Tim icon Rp 150,000

13-Jun-22 BBM Survey User LintasArta Pringsewu Rp 150,000

14-Jun-22 Servis Mobiil Operasional Rp 1,100,000

15-Jun-22 BBM Tracing Adira Rp 150,000

16-Jun-22 BBM Penarikan Dan Testcom Adira Prngsewu Rp 150,000

21-Jun-22 BBM Survey Feeder Talang Padang Rp 200,000

24-Jun-22 BBM Survey PT ARAZ Inti Line Rp 100,000

25-Jun-22 Token Listrik Basecamp Rp 50,000


Rp

(30,000)

Balance

Rp 3,530,000
(-)

Lampung

Knowledged
Reported by Checked by Finance ...............

Admin Project
Project Manager

Hendri Dwi Cahyo

…………………………………….. …………………………………………
........................................ ……………………………..
;
Hendri Dwi Cahyo
Aktivasi Lampung

Total
Kredit
Rp 1,000,000
Rp 1,500,000
Rp 1,000,000
Rp 3,500,000

(30,000)

Balance received

.............................

………………..
PT. MARNO-I TEK INDONESIA Name :
General Supply and IT Solution Division :
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kre
Transfer/Cash project : 28/06/22
Transfer/Cash project :
Transfer/Cash project :
Transfer/Cash project :
Transfer/Cash project :
Transfer/Cash project :

Transfer/Cash project :

1-Jul-22 BBM Progress User Araz Intiline Rp 100,000

5-Jul-22 BBM Progress Feeder Talang Padang Rp 250,000

5-Jul-22 Mata Cutter 2 pcs Rp 15,000

5-Jul-22 BBM Survey Feeder Fajar Bulan Lampung Barat Rp 300,000

7-Jul-22 BBM Survey Feeder Kuala Penat Lampung Timur Rp 250,000

7-Jul-22 Galon Aqua 2 Rp 40,000

Rp

45,000

Balance

Rp 955,000
(-)

Lampung

Knowledged
Reported by Checked by Finance ...............

Admin Project
Project Manager

Hendri Dwi Cahyo

…………………………………….. …………………………………………
........................................ ……………………………..
;
Hendri Dwi Cahyo
Aktivasi Lampung

Total
Kredit
Rp 1,000,000

Rp 1,000,000

45,000

Balance received

.............................

………………..
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Tranfer/Cash project : 11 juli 2022 Rp 1,000,000
Tranfer/Cash project : 14 Juli 2022 Rp 1,000,000

12-Jul-22 BBM Survey PT Teknologi Abyakta Rp 150,000


BBM Indoor User PT Teknologi
13-Jul-22 Rp 150,000
Abyakta
13-Jul-22 Beli klaim Kabel 2 pcs @10 mm Rp 20,000

13-Jul-22 Rj 45 10 biji Rp 30,000

13-Jul-22 paralon 5 pcs @meter Rp 55,000

13-Jul-22 Beli Utp 70 Meter cat 6 @8k/meter Rp 560,000

14-Jul-22 Token Listrik Basecamp Rp 100,000

BBM Survey RSUD Pringsewu,PT. Data


15-Jul-22 Rp 150,000
Bisnis Solusi

15-Jul-22 BBM Survey Diskominfo Tulang bawang Rp 250,000

15-Jul-22 op up E-toll tulang bawang Rp 200,000

Rp 1,665,000 Rp 2,000,000
(-) 335,000
Lampung 14 Juli 2022

Reported by Checked by Knowledged Finance Balance received


Admin Project Project Manager

Hendri Dwi Cahyo


........................................ ……………………………………..
……………………………………………………………………….. .............................
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Tranfer/Cash project : 11 juli 2022 Rp 1,000,000
Tranfer/Cash project : 15 juli 2022 Rp 800,000

Tranfer/Cash project : 14 Juli 2022 Rp 1,000,000

Tranfer/Cash project : 23 Juli 2022 Rp 3,000,000

12-Jul-22 BBM Survey PT Teknologi Abyakta Rp 150,000


BBM Indoor User PT Teknologi
13-Jul-22 Rp 150,000
Abyakta
13-Jul-22 Beli klaim Kabel 2 pcs @10 mm Rp 20,000

13-Jul-22 Rj 45 10 biji Rp 30,000

13-Jul-22 paralon 5 pcs @meter Rp 55,000

13-Jul-22 Beli Utp 70 Meter cat 6 @8k/meter Rp 560,000

14-Jul-22 Token Listrik Basecamp Rp 100,000

15-Jul-22 PT. Data Bisnis Solusi Rp 150,000

15-Jul-22 BBM Survey Diskominfo Tulang bawang Rp 250,000

15-Jul-22 op up E-toll tulang bawang Rp 200,000

18-Jul-22 BBM Survey RSUD Pringsewu, Rp 150,000


BBM Progress Pemasangan FAT di
20-Jul-22 Rp 200,000
Kuala penet
20-Jul-22 Penginapan Di Lampung timur Rp 150,000

21-Jul-22 BBM Lanjut pemasangan FAT Rp 100,000

BBM Maintenance PT. Abyakta


22-Jul-22 Rp 150,000
Teknologi

23-Jul-22 Pembelian UTP CAT 6e 1 roll 300 m Rp 1,245,000

23-Jul-22 BBM Pemasngan CCTV Di gudang icon Rp 100,000

23-Jul-22 rj 45 10 biji Rp 30,000

27-Jul-22 BBM Pemasangan FAT Kuala Penet Rp 200,000

30-Jul-22 BBM Pemasangan FAT Talang Padang Rp 200,000


1-Aug-22 BBM OPM FAT di Talang Padang Rp 200,000

2-Aug-22 Token Listrik Basecamp Rp 150,000

BBM Instalasi FDT dan FAT Feeder


3-Aug-22 Rp 200,000
Kuala Penet

6-Aug-22 BBM OPM FAT Feeder Kuala Penet Rp 200,000

6-Aug-22 Penginapan Kuala Penet Rp 250,000

BBM Repair FAT Loss Feeder Talang


6-Aug-22 Rp 200,000
Padang
BBM Progress Tracing Core Gedung
8-Aug-22 Rp 250,000
Inspektorat Tulang Bawang
top up e-toll Kotabaru exit Lambu
8-Aug-22 Rp 200,000
Kibang PP

Rp 5,840,000 Rp 5,800,000
(-) (40,000)
Lampung 09 Agustus 2022

Reported by Checked by Knowledged Finance Balance received


Admin Project Project Manager

Hendri Dwi Cahyo


........................................ ……………………………………..
……………………………………………………………………….. .............................
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Tranfer/Cash project : Rp 1,000,000
Tranfer/Cash project : 12/08/2022 Rp 2,000,000

Tranfer/Cash project : 16/08/2022 Rp 1,000,000

Tranfer/Cash project : Rp 1,000,000

Tranfer/Cash project : 27/08/2022 Rp 1,000,000


BBM Lanjut Progress Indoor Inspektorat
9-Aug-22 dan Testcom AP Existing Tulang Rp 250,000
Bawang
top up e-toll Kotabaru exit Lambu
9-Aug-22 Rp 200,000
Kibang PP
BBM Repair FAT Loss Feeder Kuala
9-Aug-22 Rp 200,000
Penet
10-Aug-22 Token Listrik Basecamp Rp 100,000

10-Aug-22 BBM Testcom Inspektorat TBB Rp 250,000


top up e-toll Kotabaru exit Lambu
10-Aug-22 Rp 200,000
Kibang PP
10-Aug-22 Beli Klaim, Siku, Paralon Rp 89,000
Transfer tim serpo Repair FAT Talang
11-Aug-22 Rp 200,000
Padang
BBM Progress Feeder Fajar Bulan
12-Aug-22 Rp 250,000
Lampung Barat
top up e-toll Kotabaru exit Terbanggi
12-Aug-22 Rp 100,000
Besar
12-Aug-22 Penginapan Fajar Bulan Rp 300,000
BBM Lanjut Progress tracing Link trunk
13-Aug-22 Rp 100,000
Fajar Bulan

13-Aug-22 Penginapan Fajar Bulan Rp 300,000

14-Aug-22 BBM Pulang Ke bandar Lampung Rp 150,000

BBM Progress Cut Over Diskominfo


16-Aug-22 Rp 250,000
Tubaba

16-Aug-22 Top up Toll in Kotabaru Exit Menggala Rp 200,000

19-Aug-22 Mata Cutter 2 pcs Rp 20,000


BBM Progress Cut Over Diskominfo
19-Aug-22 Rp 250,000
Tubaba
19-Aug-22 Top up Toll in Kotabaru Exit Menggala Rp 200,000

19-Aug-22 Penginapan Tulang bawang Barat Rp 200,000


20-Aug-22 BBM Pulang Ke bandar Lampung Rp 150,000
21-Aug-22 Token Listrik Basecamp Rp 50,000
23-Aug-22 Beli gergaji besi Rp 45,000
BBM Testcom dan tracing core BPKAD
23-Aug-22 Rp 250,000
Tubaba
23-Aug-22 Top up e-toll Rp 100,000
23-Aug-22 Prnginapan Pulung Rp 200,000
24-Aug-22 BBM lanjut Progress Kominfo Rp 200,000

24-Aug-22 top up e-toll pulang ke bandarlampung Rp 100,000

26-Aug-22 BBM Testcom PLN Metro Rp 150,000


27-Aug-22 Survey Feeder Gunung Batu Rp 250,000
6-Sep-22 Survey BNI dan Indomarco Metro Rp 150,000
7-Sep-22 Token listrik Basecamp Rp 50,000
8-Sep-22 mata bor, mata cutter, paralon pvc Rp 90,000
8-Sep-22 BBM Indoor RSUD Pringsewu Rp 200,000
9-Sep-22 BBM Testcom RSUD Pringsewu Rp 150,000

Rp 5,944,000 Rp 6,000,000
(-) 56,000
Lampung 14 Juli 2022

Reported by Checked by Knowledged Finance Balance received


Admin Project Project Manager

Hendri Dwi Cahyo


........................................ ……………………………………..
……………………………………………………………………….. .............................
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Tranfer/Cash project : 12/09/2022 Rp 1,000,000

Tranfer/Cash project : 21/09/2022 Rp 1,500,000

Tranfer/Cash project :

Tranfer/Cash project :

Tranfer/Cash project :

Pembayaran sewa motor bulan agustus


10-Sep-22 Rp 500,000
tim IKR 2 minggu

13-Sep-22 BBM Survey Lintas Artha Rp 100,000

13-Sep-22 Antigen Rp 65,000

15-Sep-22 Bayar Paket COD Paket FAT Rp 130,000

16-Sep-22 BBM Progress Tracing Core BNI Metro Rp 150,000

20-Sep-22 BBM Progress FAT Gunung Batu Rp 250,000


20-Sep-22 Penginapan Triple Bed Rp 250,000
23-Sep-22 BBM Tracing AKR tembesu Rp 100,000
24-Sep-22 Lanjut Tracing AKR Rp 50,000
26-Sep-22 BBM Survey Indomarco sidomulyo Rp 200,000
26-Sep-22 Top up E-toll Rp 100,000
27-Sep-22 token listrik basecamp Rp 150,000
28-Sep-22 BBM Testcom BNI Metro Rp 150,000
3-Oct-22 Antigen 2 orang Rp 130,000
3-Oct-22 BBM Tracing core indomarco Rp 100,000
3-Oct-22 Galon Aqua 2 Rp 39,500

Rp 2,464,500 Rp 2,500,000
(-) 35,500
Lampung 07 Oktober 2022

Reported by Checked by Knowledged Finance Balance received


Admin Project Project Manager

Hendri Dwi Cahyo


........................................ ……………………………………..
……………………………………………………………………….. .............................
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Tranfer/Cash project : 12/09/2022 Rp 1,000,000

Tranfer/Cash project :

Tranfer/Cash project :

Tranfer/Cash project :

Tranfer/Cash project :

Pembayaran sewa motor bulan agustus


10-Sep-22 Rp 500,000
tim IKR 2 minggu

13-Sep-22 BBM Survey Lintas Artha Rp 100,000

13-Sep-22 Antigen Rp 65,000

15-Sep-22 Bayar Paket COD Paket FAT Rp 130,000

16-Sep-22 BBM Progress Tracing Core BNI Metro Rp 150,000

20-Sep-22 BBM Progress FAT Gunung Batu Rp 250,000


20-Sep-22 Penginapan Triple Bed Rp 250,000

Rp 1,445,000 Rp 1,000,000
(-) (445,000)
Lampung 14 Juli 2022

Reported by Checked by Knowledged Finance Balance received


Admin Project Project Manager

Hendri Dwi Cahyo


........................................ ……………………………………..
……………………………………………………………………….. .............................
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Tranfer/Cash project : 21/09/2022 Rp 1,500,000

Tranfer/Cash project :

Tranfer/Cash project :

Tranfer/Cash project :

Tranfer/Cash project :

23-Sep-22 BBM Tracing AKR tembesu Rp 100,000

24-Sep-22 Lanjut Tracing AKR Rp 50,000

26-Sep-22 BBM Survey Indomarco sidomulyo Rp 200,000

26-Sep-22 Top up E-toll Rp 100,000

27-Sep-22 token listrik basecamp Rp 150,000

28-Sep-22 BBM Testcom BNI Metro Rp 150,000


3-Oct-22 Antigen 2 orang Rp 130,000
3-Oct-22 BBM Tracing core indomarco Rp 100,000
3-Oct-22 Galon Aqua 2 Rp 39,500

Rp 1,019,500 Rp 1,500,000
480,500
Lampung 07 Oktober 2022

Reported by Checked by Knowledged Finance Balance received


Admin Project Project Manager

Hendri Dwi Cahyo


........................................ ……………………………………..
……………………………………………………………………….. .............................
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Tranfer/Cash project : 07/10/2022 Rp 1,000,000

Tranfer/Cash project : 24/10/2022 Rp 1,500,000

Tranfer/Cash project :

Tranfer/Cash project :

Tranfer/Cash project :

5-Oct-22 BBM Tracing Core Indomarco P.sebesi Rp 100,000

7-Oct-22 Beli tang Potong Baja Rp 125,000

11-Oct-22 BBM Progress putus kabel sabah balau Rp 100,000

12-Oct-22 BBM Progress Indomarco Sidomulyo Rp 200,000

12-Oct-22 Top Up etoll sidomulyo Rp 100,000

BBM Testcom Lapas Wanita dan Rutan


13-Oct-22 Rp 100,000
rajabasa

Testcom Bapas dan survey BSI


14-Oct-22 Rp 150,000
Pringsewu

BBM Insert kabel improvement


17-Oct-22 Rp 50,000
indomarco

18-Oct-22 BBM testcom Indomarco P sebesi Rp 100,000


19-Oct-22 Token listrik bc Rp 100,000
19-Oct-22 BBM Testcom Lintasarta AKR Rp 100,000
22-Oct-22 BBM Testcom Budi Utomo Metro Rp 150,000
23-Oct-22 BBM pasang JB Sabah Balau Rp 100,000
24-Oct-22 BBM testcom Bapas Mtero Rp 150,000
25-Oct-22 BBM Tetscom Lapas Masgar Rp 200,000
25-Oct-22 top Up etoll Tegineneng Rp 75,000
BBM Tracing dan indoor Indomarco
26-Oct-22 Rp 150,000
Sidomulyo
26-Oct-22 topup etoll sidomulyo Rp 100,000
27-Oct-22 BBM Testcom Indomarco Sidomulyo Rp 200,000
27-Oct-22 top up e toll sidomulyo Rp 100,000

Rp 2,450,000 Rp 2,500,000
50,000
Lampung 07 Oktober 2022

Reported by Checked by Knowledged Finance Balance received


Admin Project Project Manager

Hendri Dwi Cahyo


........................................ ……………………………………..
……………………………………………………………………….. .............................
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit
Tranfer/Cash project : 29/10/2022 Rp 1,000,000

Tranfer/Cash project :

Tranfer/Cash project :

Tranfer/Cash project :

BBM Survey PT Baim Mahes Corp


31-Oct-22 Rp 300,000
Tubaba

Top up e toll in Kota Baru-Out Lambu


31-Oct-22 Rp 230,000
Kibang
31-Oct-22 Token listik basecamp Rp 100,000

3-Nov-22 BBM Progress install FDT Gunung Batu Rp 250,000

3-Nov-22 Penginapan Gisting Rp 200,000

Rp 1,080,000 Rp 1,000,000
(80,000)
Lampung 07 Oktober 2022
Reported by Checked by Knowledged Finance Balance received
Admin Project Project Manager

Hendri Dwi Cahyo


........................................ ……………………………………..
……………………………………………………………………….. .............................
PT. MARNO-I TEK INDONESIA Name : Hendri Dwi Cahyo
General Supply and IT Solution Division : Aktivasi Lampung
PV No :
EXPENSES CLAIM
Transfer Date :

Project Total
Date Supplier Name/Received Description
Number Debit Kredit

Tranfer/Cash project : TRF MII 05/11/2022 Rp 1,000,000

Tranfer/Cash project : TRF MII 15/11/2023 Rp 1,000,000

Tranfer/Cash project : TRF MII 25 november 2022 Rp 2,000,000

Tranfer/Cash project :
BBM pemasangan Iwin RSUD
7-Nov-22 Rp 200,000
Pringsewu
11-Nov-22 BBM Survey 3PA Diskomifo Tubaba Rp 300,000
Top up e toll in Kota Baru-Out Lambu
11-Nov-22 Rp 215,000
Kibang
BBM testcom Lapas dan Rutan Kota
15-Nov-22 Rp 250,000
Agung dan perbaikan FAT gunung Batu
BBM Perbaikan Splitter FDT feeder
17-Nov-22 Rp 250,000
Gunung Batu
19-Nov-22 BBM Tracing core PT Baim Mahes Corp Rp 300,000
Top up e toll in Kota Baru-Out Lambu
19-Nov-22 Rp 220,000
Kibang
21-Nov-22 BBM Tetscom PT Baim Mahes Corp Rp 300,000
Top up e toll in Kota Baru-Out Lambu
21-Nov-22 Rp 110,000
Kibang
21-Nov-22 Penginapan Tubaba Rp 200,000

22-Nov-22 BBM Tescom Lapas kelas II Kotabumi Rp 250,000


Top up e toll in Kota Baru-Out Lambu
22-Nov-22 Rp 110,000
Kibang
BBM Pengambilan Kekurangan data
24-Nov-22 Rp 150,000
DOKTEK lampung
BBM Progress tracing Core Diskominfo
28-Nov-22 Rp 300,000
tulang Bawang
Top up e toll in Kota Baru-Out Lambu
28-Nov-22 Rp 220,000
Kibang
28-Nov-22 Penginapan Tubaba Rp 250,000

29-Nov-22 pulsa listrik Basecamp Rp 100,000


Rp 3,725,000 Rp 4,000,000
275,000
Lampung 24 November 2022

Reported by Checked by Knowledged Finance Balance received


Admin Project Project Manager

Hendri Dwi Cahyo


........................................ ……………………………………..
……………………………………………………………………….. .............................