You are on page 1of 35

M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.

IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Banchawali Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Sikandrabad RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Qty C/F For
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous
Invoice No Document as per as per Nashik as per jal Final Rate Next Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme
Date. Invoice BOQ depot on Nigam (16+17) (Khanauda)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Nagla Karan)
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 24.11.2021 D-U3-2122-1823 18.11.2021 63 mm 0.0032 370.23 370.23 84.15 41.65 125.80 0.57 84.153 116.963 102.85 41.65 144.50 18.7000 6,923.30 370.23 -

2 20.12.2021 DD2122006450 16.12.2021 63 mm 0.0032 1500 1500 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 22,920.00 -

3 20.12.2021 DD2122006451 16.12.2021 63 mm 0.0032 1500 1500 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 22,920.00 -
7392.00
4 20.12.2021 DD2122006452 16.12.2021 63 mm 0.0032 1500 1500 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 22,920.00 -

5 20.12.2021 DD2122006453 16.12.2021 63 mm 0.0032 1500 1500 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 22,920.00 -

6 20.12.2021 DD2122006459 16.12.2021 63 mm 0.0032 1500 1021.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 15,612.65 478.23

7 17.11.2021 D-U3-2122-1712 04.11.2021 75 mm 0.0039 159.50 159.50 120.73 48.47 169.20 0.82 84.153 116.963 147.63 48.47 196.10 26.9000 4,290.55 159.50 -
354.00
8 19.12.2021 DD2122006432 16.12.2021 75 mm 0.0039 2400 194.50 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 4,275.11 2,205.50

9 16.11.2021 D-U3-2122-1699 04.11.2021 90 mm 0.0046 160.97 160.97 175.07 54.43 229.50 1.16 84.153 116.963 213.13 54.43 267.56 38.0600 6,126.52 160.97 -
314.00
10 18.12.2021 DD2122006404 16.12.2021 90 mm 0.0046 2000 153.03 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 4,757.70 1,846.97

11 23.11.2021 D-U3-2122-1802 18.11.2021 110 mm 0.0063 1.00 1.00 270.62 69.29 339.91 1.93 84.153 116.963 333.94 69.29 403.23 63.3200 63.32 1.00 -
181.00
12 20.12.2021 DD2122006450 16.12.2021 110 mm 0.0063 500.00 180.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 9,311.40 320.00

13 21.11.2021 D-U3-2122-1775 18.11.2021 125mm 0.0064 202.00 202.00 344.98 76.87 421.85 2.25 84.153 116.963 418.80 69.29 488.09 66.2400 13,380.48 202.00 -
211.00
14 16.12.2021 125mm 0.0064 110.955 -

15 23.11.2021 D-U3-2122-1802 18.11.2021 140 mm 0.0071 10.00 10.00 402.33 93.82 496.15 2.81 84.153 116.963 494.53 93.82 588.35 92.2000 922.00 10.00 -
475.00
16 19.12.2021 DD2122006439 16.12.2021 140 mm 0.0071 1,800.00 465.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 35,019.15 1,335.00

17 22.11.2021 D-U3-2122-1779 18.11.2021 160mm 0.0082 116.963 23.00 23.00

18 21.11.2021 D-U3-2122-1775 18.11.2021 180mm 0.0091 116.963 3.00 3.00

19 19.11.2021 D-U3-2122-1749 18.11.2021 200mm 0.0102 116.963 2.00 2.00

Total Amount (A) 0.0000 1,92,362.18


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Khanauda Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Lakhaothi RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Qty C/F For
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous
Invoice No Document as per as per Nashik as per jal Final Rate Next Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme
Date. Invoice BOQ depot on Nigam (16+17) (Basendua)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Banchawali)
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 20.12.2021 DD2122006459 16.12.2021 63 mm 0.0032 478.23 478.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 7,307.35 478.23 -

2 20.12.2021 DD2122006465 16.12.2021 63 mm 0.0032 1,200.00 2943.00 1200 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 18,336.00 -

3 20.12.2021 DD2122006467 16.12.2021 63 mm 0.0032 1,500.00 1264.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 19,325.69 235.23

4 19.12.2021 DD2122006432 16.12.2021 75 mm 0.0039 2,205.50 515.00 515.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 11,319.70 2,205.50 1,690.50

5 18.12.2021 DD2122006404 16.12.2021 90 mm 0.0046 1,846.97 130.00 130.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 4,041.70 1,846.97 1,716.97

6 20.12.2021 DD2122006450 16.12.2021 110 mm 0.0063 320.00 87.00 87.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 4,500.51 320.00 233.00

7 19.12.2021 DD2122006439 16.12.2021 140 mm 0.0071 1,335.00 265.00 265.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 19,957.15 1,335.00 1,070.00

8 22.11.2021 D-U3-2122-1779 160mm 0.0000 23.00 23.00

9 21.11.2021 D-U3-2122-1775 180mm 0.0000 3.00 3.00

10 19.11.2021 D-U3-2122-1749 200mm 0.0000 2.00 2.00

Total Amount (A) 0.0000 84,788.10


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Basendua Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Bulandshahr RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Qty C/F For
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous
Invoice No Document as per as per Nashik as per jal Final Rate Next Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme
Date. Invoice BOQ depot on Nigam (16+17) (Chirchita)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Khanauda)
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 20.12.2021 DD2122006467 16.12.2021 63 mm 0.0032 235.23 235.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 3,594.31 235.23 -

2 20.12.2021 DD2122006466 16.12.2021 63 mm 0.0032 1,500.00 2101.00 1500 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 22,920.00 -

3 20.12.2021 DD2122006478 16.12.2021 63 mm 0.0032 7,800.00 365.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 5,588.97 7,434.23

7 19.12.2021 DD2122006432 16.12.2021 75 mm 0.0039 1,690.50 252.00 252.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 5,538.96 1,690.50 1,438.50

9 18.12.2021 DD2122006404 16.12.2021 90 mm 0.0046 1,716.97 481.00 481.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 1,716.97 1,716.97 1,235.97

11 20.12.2021 DD2122006450 16.12.2021 110 mm 0.0063 233.00 206.00 206.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 10,656.38 233.00 27.00

13 19.12.2021 DD2122006439 16.12.2021 140 mm 0.0071 1,070.00 291.00 291.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 21,915.21 1,070.00 779.00

14 22.11.2021 D-U3-2122-1779 160mm 0.0000 23.00 23.00

16 21.11.2021 D-U3-2122-1775 180mm 0.0000 3.00 3.00

17 19.11.2021 D-U3-2122-1749 200mm 0.0000 2.00 2.00

Total Amount (A) 0.0000 71,930.80


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Chirchita Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Bulandshahr RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme (Guthaolitikr
Date. Invoice BOQ depot on Nigam (16+17)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Basendua) e)
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 20.12.2021 DD2122006478 16.12.2021 63 mm 0.0032 7,434.23 7,434.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 1,13,595.03 7,434.23 -
8462.00
2 20.12.2021 DD2122006480 16.12.2021 63 mm 0.0032 7,800.00 1027.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 15,704.33 6,772.23

3 19.12.2021 DD2122006432 16.12.2021 75 mm 0.0039 1,438.50 1,438.50 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 31,618.23 1,438.50 -
1737.00
4 19.12.2021 DD2122006429 16.12.2021 75 mm 0.0039 2,400.00 298.50 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 6,561.03 2,101.50

5 18.12.2021 DD2122006404 16.12.2021 90 mm 0.0046 1,235.97 344.00 344.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 10,694.96 1,235.97 891.97

6 20.12.2021 DD2122006450 16.12.2021 110 mm 0.0063 27.00 27.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 1,396.71 27.00 -

7 20.12.2021 DD2122006451 16.12.2021 110 mm 0.0063 500.00 500.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 25,865.00 -
1393.00
8 20.12.2021 DD2122006452 16.12.2021 110 mm 0.0063 500.00 500.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 25,865.00 -

9 20.12.2021 DD2122006453 16.12.2021 110 mm 0.0063 600.00 366.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 18,933.18 234.00

10 19.12.2021 DD2122006439 16.12.2021 140 mm 0.0071 779.00 197.00 197.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 14,836.07 779.00 582.00

11 23.12.2021 DD2122006576 16.12.2021 180mm 0.0091 600.00 170.00 167.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 20,768.12 433.00

12 19.12.2021 DD2122006439 16.12.2021 200mm 0.0102 1,200.00 1,200.00 805.72 110.21 915.93 5.75 84.153 110.955 959.83 110.21 1070.04 154.1100 1,84,932.00 -
1354.28
13 20.12.2021 DD2122006448 16.12.2021 200mm 0.0102 1,200.00 152.28 805.72 110.21 915.93 5.75 84.153 110.955 959.83 110.21 1070.04 154.1100 23,467.87 1,047.72

0.0000 4,94,237.53
M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Guthaolitikre Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Agota RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme (Mahepa
Date. Invoice BOQ depot on Nigam (16+17)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Chirchita) jagir)
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 20.12.2021 DD2122006480 16.12.2021 63 mm 0.0032 6,772.23 4626.00 4,626.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 70,685.28 6,772.23 2,146.23

2 19.12.2021 DD2122006429 16.12.2021 75 mm 0.0039 2,101.50 507.08 507.08 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 11,145.62 2,101.50 1,594.42

3 18.12.2021 DD2122006404 16.12.2021 90 mm 0.0046 891.97 213.00 213.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 1,716.97 891.97 678.97

4 20.12.2021 DD2122006453 16.12.2021 110 mm 0.0063 234.00 167.00 167.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 8,638.91 234.00 67.00

5 19.12.2021 DD2122006439 16.12.2021 140 mm 0.0071 582.00 19.00 19.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 1,430.89 582.00 563.00

6 22.11.2021 D-U3-2122-1779 18.11.2021 160mm 0.0082 23.00 23.00 545.21 105.5 650.71 3.69 84.153 116.963 666.28 105.5 771.78 121.0700 2,784.61 23.00 -

7 19.12.2021 DD2122006439 16.12.2021 160mm 0.0082 600.00 760.00 600.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 59,340.00 -

8 20.12.2021 DD2122006448 16.12.2021 160mm 0.0082 600.00 137.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 13,549.30 463.00

9 23.12.2021 DD2122006576 16.12.2021 180mm 0.0091 433.00 433.00

10 20.12.2021 DD2122006448 16.12.2021 200mm 0.0102 1,047.72 1,047.72

Total Amount (A) 0.0000 1,69,291.58


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Mahepa Jagir Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Sikandrabad RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous Qty C/F For
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay
Invoice No Document as per as per Nashik as per jal Final Rate Scheme Next Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8)
Date. Invoice BOQ depot on Nigam (16+17) (Guthaolitikre (Poth)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin
01.09.202 (SWSM) )
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 20.12.2021 DD2122006480 16.12.2021 63 mm 0.0032 2,146.23 2,146.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 32,794.39 2,146.23 -
6409.00
2 20.12.2021 DD2122006481 16.12.2021 63 mm 0.0000 8,100.00 4,262.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 3,837.23

3 19.12.2021 DD2122006429 16.12.2021 75 mm 0.0039 1,594.42 1177.00 1,177.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 25,870.46 1,594.42 417.42

4 18.12.2021 DD2122006404 16.12.2021 90 mm 0.0046 678.97 604.00 604.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 1,716.97 678.97 74.97

5 20.12.2021 DD2122006453 16.12.2021 110 mm 0.0063 67.00 67.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 3,465.91 67.00 -
127.00
6 20.12.2021 DD2122006459 16.12.2021 110 mm 0.0063 500.00 60.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 3,103.80 440.00

7 19.12.2021 DD2122006439 16.12.2021 140 mm 0.0071 110.955 - 563.00 563.00

8 20.12.2021 DD2122006448 16.12.2021 160mm 0.0082 463.00 141.00 141.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 13,944.90 463.00 322.00

9 23.12.2021 DD2122006576 180mm 0.0000 433.00 433.00

10 20.12.2021 DD2122006448 200mm 0.0000 1,047.72 1,047.72

Total Amount (A) 0.0000 80,896.43


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Poth Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Lakhaothi RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous Qty C/F For
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay
Invoice No Document as per as per Nashik as per jal Final Rate Scheme Next Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8)
Date. Invoice BOQ depot on Nigam (16+17) (Mahepa (Lahagra)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin
01.09.202 (SWSM) Jagir)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 20.12.2021 DD2122006481 16.12.2021 63 mm 0.0032 3,837.23 3687.00 3,687.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 56,337.36 3,837.23 150.23

2 19.12.2021 DD2122006429 16.12.2021 75 mm 0.0039 417.42 336.00 336.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 7,385.28 417.42 81.42

3 18.12.2021 DD2122006404 16.12.2021 90 mm 0.0046 74.97 74.97 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 2,330.82 74.97 -
205.00
4 18.12.2021 DD2122006409 16.12.2021 90 mm 0.0046 2,000.00 130.03 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 4,042.63 1,869.97

5 20.12.2021 DD2122006459 16.12.2021 110 mm 0.0063 440.00 440.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 22,761.20 440.00 -
911.00
6 20.12.2021 DD2122006465 16.12.2021 110 mm 0.0063 500.00 471.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 24,364.83 29.00

7 19.12.2021 DD2122006439 16.12.2021 140 mm 0.0071 563.00 252.00 252.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 18,978.12 563.00 311.00

8 20.12.2021 DD2122006448 16.12.2021 160mm 0.0082 322.00 16.00 16.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 1,582.40 322.00 306.00

9 23.12.2021 DD2122006576 180mm 0.0000 433.00 433.00

10 20.12.2021 DD2122006448 200mm 0.0000 1,047.72 1,047.72

Total Amount (A) 0.0000 1,37,782.64


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Lahagra Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Agota RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty C/F For
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Next Scheme
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous
Invoice No Document as per as per Nashik as per jal Final Rate (Nijampur& Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme
Date. Invoice BOQ depot on Nigam (16+17) Mehtabnagar
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Poth)
01.09.202 (SWSM) )
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 20.12.2021 DD2122006481 16.12.2021 63 mm 0.0032 150.23 150.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 2,295.51 150.23 -
6185.00
2 20.12.2021 DD2122006482 16.12.2021 63 mm 0.0032 7,800.00 6,034.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 92,211.29 1,765.23

3 19.12.2021 DD2122006429 16.12.2021 75 mm 0.0039 81.42 81.42 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 1,789.61 81.42 -
817.00
4 19.12.2021 DD2122006430 16.12.2021 75 mm 0.0039 2,400.00 735.58 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 16,168.05 1,664.42

5 18.12.2021 DD2122006409 16.12.2021 90 mm 0.0046 1,869.97 609.00 609.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 18,933.81 1,869.97 1,260.97

6 20.12.2021 DD2122006465 16.12.2021 110 mm 0.0063 29.00 29.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 1,500.17 29.00 -
308.00
7 20.12.2021 DD2122006467 16.12.2021 110 mm 0.0063 500.00 279.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 14,432.67 221.00

8 19.12.2021 DD2122006439 16.12.2021 140 mm 0.0071 311.00 311.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 23,421.41 311.00 -
413.00
9 20.12.2021 DD2122006448 16.12.2021 140 mm 0.0071 1,800.00 102.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 7,681.62 1,698.00

10 20.12.2021 DD2122006448 16.12.2021 160mm 0.0082 306.00 306.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 30,263.40 306.00 -
528.00
11 21.12.2021 DD2122006502 16.12.2021 160mm 0.0082 600.00 222.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 21,955.80 378.00

12 23.12.2021 DD2122006576 16.12.2021 180mm 0.0091 433.00 433.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 53,847.88 433.00 -
1364.00
13 22.12.2021 DD2122006559 16.12.2021 180mm 0.0091 1,400.00 931.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 1,15,779.16 469.00

14 20.12.2021 DD2122006448 16.12.2021 200mm 0.0000 1,047.72 1,047.72

Total Amount (A) 0.0000 4,00,280.38


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Nijampur&Mehtabnagar Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Sikandrabad RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme (Kazipur&Ba
Date. Invoice BOQ depot on Nigam (16+17)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Lahagra) dnaura)
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 20.12.2021 DD2122006482 16.12.2021 63 mm 0.0032 1,765.23 1,765.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 26,972.71 1,765.23 -
6901.00
2 20.12.2021 DD2122006475 16.12.2021 63 mm 0.0032 6,900.00 5,135.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 78,474.57 1,764.23

3 19.12.2021 DD2122006430 16.12.2021 75 mm 0.0039 1,664.42 496.00 496.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 10,902.08 1,664.42 1,168.42

4 18.12.2021 DD2122006409 16.12.2021 90 mm 0.0046 1,260.97 957.00 957.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 29,753.13 1,260.97 303.97

5 20.12.2021 DD2122006467 16.12.2021 110 mm 0.0063 221.00 221.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 11,432.33 221.00 -

6 20.12.2021 DD2122006466 16.12.2021 110 mm 0.0063 500.00 1194.00 500.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 25,865.00 -

7 21.12.2021 DD2122006490 16.12.2021 110 mm 0.0063 500.00 473.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 24,468.29 27.00

8 20.12.2021 DD2122006448 16.12.2021 140 mm 0.0071 1,698.00 349.00 349.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 26,283.19 1,698.00 1,349.00

9 21.12.2021 DD2122006502 16.12.2021 160mm 0.0082 378.00 378.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 37,384.20 378.00 -

10 21.12.2021 DD2122006487 16.12.2021 160mm 0.0082 600.00 1502.00 600.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 59,340.00 -

11 23.12.2021 DD2122006576 16.12.2021 160mm 0.0082 2,640.00 524.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 51,823.60 2,116.00

12 22.12.2021 DD2122006559 16.12.2021 180mm 0.0091 469.00 17.00 17.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 2,114.12 469.00 452.00

13 20.12.2021 DD2122006448 16.12.2021 200mm 0.0000 1,047.72 1,047.72

Total Amount (A) 0.0000 3,84,813.22


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Kazipur&Badnaura Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Agota RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous Qty C/F For
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay
Invoice No Document as per as per Nashik as per jal Final Rate Scheme Next Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8)
Date. Invoice BOQ depot on Nigam (16+17) (Nijampur&M (Chola)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin
01.09.202 (SWSM) ehtabnagar)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 20.12.2021 DD2122006475 16.12.2021 63 mm 0.0032 1,764.23 1,764.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 26,957.43 1,764.23 -
6707.00
2 20.12.2021 DD2122006476 16.12.2021 63 mm 0.0032 7,800.00 4,942.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 75,525.53 2,857.23

3 19.12.2021 DD2122006430 16.12.2021 75 mm 0.0039 1,168.42 321.00 321.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 7,055.58 1,168.42 847.42

4 18.12.2021 DD2122006409 16.12.2021 90 mm 0.0046 303.97 233.00 233.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 7,243.97 303.97 70.97

5 21.12.2021 DD2122006490 16.12.2021 110 mm 0.0063 27.00 27.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 1,396.71 27.00 -
422.00
6 21.12.2021 DD2122006486 16.12.2021 110 mm 0.0063 600.00 395.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 20,433.35 205.00

7 20.12.2021 DD2122006448 16.12.2021 140 mm 0.0071 1,349.00 15.00 15.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 1,129.65 1,349.00 1,334.00

8 23.12.2021 DD2122006576 16.12.2021 160mm 0.0082 2,116.00 2,116.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 2,09,272.40 2,116.00 -
2257.00
9 22.12.2021 DD2122006559 16.12.2021 160mm 0.0082 1,200.00 141.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 13,944.90 1,059.00

10 22.12.2021 DD2122006559 16.12.2021 180mm 0.0091 452.00 181.00 181.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 22,509.16 452.00 271.00

11 20.12.2021 DD2122006448 16.12.2021 200mm 0.0091 1,047.72 1,047.72 805.72 110.21 915.93 5.75 84.153 110.955 959.83 110.21 1070.04 154.1100 1,61,464.13 1,047.72 -
1075.98
12 21.12.2021 DD2122006502 16.12.2021 200mm 0.0102 1,128.00 28.26 805.72 110.21 915.93 5.75 84.153 110.955 959.83 110.21 1070.04 154.1100 4,355.15 1,099.74

Total Amount (A) 0.0000 5,51,287.96


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Chola Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Sikandrabad RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) (Alamgirpur
Date. Invoice BOQ depot on Nigam (16+17) (Kazipur&Bad
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin Dhanaura)
01.09.202 (SWSM) naura)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 20.12.2021 DD2122006476 16.12.2021 63 mm 0.0032 2,857.23 2,857.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 43,658.47 2,857.23 -
3745.00
2 20.12.2021 DD2122006474 16.12.2021 63 mm 0.0032 8,100.00 887.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 13,565.13 7,212.23

3 19.12.2021 DD2122006430 16.12.2021 75 mm 0.0039 847.42 440.00 440.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 9,671.20 847.42 407.42

4 18.12.2021 DD2122006409 16.12.2021 90 mm 0.0046 70.97 70.97 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 2,206.46 70.97 -
273.00
5 18.12.2021 DD2122006410 16.12.2021 90 mm 0.0046 2,000.00 202.03 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 6,281.11 1,797.97

6 21.12.2021 DD2122006486 16.12.2021 110 mm 0.0063 110.955 - 205.00 205.00

7 20.12.2021 DD2122006448 16.12.2021 140 mm 0.0071 1,334.00 175.00 175.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 13,179.25 1,334.00 1,159.00

8 22.12.2021 DD2122006559 16.12.2021 160mm 0.0082 1,059.00 441.00 441.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 43,614.90 1,059.00 618.00

9 22.12.2021 DD2122006559 180mm 0.0000 271.00 271.00

10 21.12.2021 DD2122006502 200mm 0.0000 1,099.74 1,099.74

Total Amount (A) 0.0000 1,32,176.52


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Alamgirpur Dhanaura Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Lakhaothi RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Qty C/F For
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous
Invoice No Document as per as per Nashik as per jal Final Rate Next Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme
Date. Invoice BOQ depot on Nigam (16+17) (Ghayaspur)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Chola)
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 20.12.2021 DD2122006474 16.12.2021 63 mm 0.0032 7,212.23 3382.00 3,382.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 51,676.96 7,212.23 3,830.23

2 19.12.2021 DD2122006430 16.12.2021 75 mm 0.0039 407.42 407.42 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 8,955.09 407.42 -
570.00
3 19.12.2021 DD2122006426 16.12.2021 75 mm 0.0039 3,000.00 162.58 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 3,573.51 2,837.42

4 18.12.2021 DD2122006410 16.12.2021 90 mm 0.0046 1,797.97 281.00 281.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 8,736.29 1,797.97 1,516.97

5 21.12.2021 DD2122006486 16.12.2021 110 mm 0.0063 205.00 144.00 144.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 7,449.12 205.00 61.00

6 20.12.2021 DD2122006448 16.12.2021 140 mm 0.0071 1,159.00 107.00 107.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 8,058.17 1,159.00 1,052.00

7 22.12.2021 DD2122006559 16.12.2021 160mm 0.0082 618.00 218.00 218.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 21,560.20 618.00 400.00

8 22.12.2021 DD2122006559 16.12.2021 180mm 0.0091 271.00 158.00 158.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 19,648.88 271.00 113.00

9 21.12.2021 DD2122006502 200mm 0.0000 1,099.74 1,099.74

Total Amount (A) 0.0000 1,29,658.22


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Ghayaspur Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Bulandshahr RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous Qty C/F For
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay
Invoice No Document as per as per Nashik as per jal Final Rate Scheme Next Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8)
Date. Invoice BOQ depot on Nigam (16+17) (Alamgirpur (Gangarua)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin
01.09.202 (SWSM) Dhanaura)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 20.12.2021 DD2122006474 16.12.2021 63 mm 0.0032 3,830.23 3,830.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 58,525.91 3,830.23 -
4276.00
2 21.12.2021 DD2122006503 16.12.2021 63 mm 0.0032 7,500.00 445.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 6,811.37 7,054.23

3 19.12.2021 DD2122006426 16.12.2021 75 mm 0.0039 2,837.42 339.00 339.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 7,451.22 2,837.42 2,498.42

4 18.12.2021 DD2122006410 16.12.2021 90 mm 0.0046 1,516.97 146.00 146.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 4,539.14 1,516.97 1,370.97

5 21.12.2021 DD2122006486 16.12.2021 110 mm 0.0063 61.00 61.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 3,155.53 61.00 -
236.00
6 21.12.2021 DD2122006494 16.12.2021 110 mm 0.0063 500.00 175.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 9,052.75 325.00

7 20.12.2021 DD2122006448 16.12.2021 140 mm 0.0071 1,052.00 456.00 456.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 34,341.36 1,052.00 596.00

8 22.12.2021 DD2122006559 16.12.2021 160mm 0.0082 400.00 153.00 153.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 15,131.70 400.00 247.00

9 22.12.2021 DD2122006559 16.12.2021 180mm 0.0000 113.00 113.00

10 21.12.2021 DD2122006502 16.12.2021 200mm 0.0000 1,099.74 1,099.74

Total Amount (A) 0.0000 1,39,008.98


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Gangarua Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Bulandshahr RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme (Akbarpur
Date. Invoice BOQ depot on Nigam (16+17)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Ghayaspur) Raina)
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 21.12.2021 DD2122006503 16.12.2021 63 mm 0.0032 7,054.23 5480.00 5,480.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 83,734.40 7,054.23 1,574.23

2 19.12.2021 DD2122006426 16.12.2021 75 mm 0.0039 2,498.42 251.00 251.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 5,516.98 2,498.42 2,247.42

3 18.12.2021 DD2122006410 16.12.2021 90 mm 0.0046 1,370.97 509.00 509.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 15,824.81 1,370.97 861.97

4 21.12.2021 DD2122006494 16.12.2021 110 mm 0.0063 325.00 242.00 242.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 12,518.66 325.00 83.00

5 20.12.2021 DD2122006448 16.12.2021 140 mm 0.0071 596.00 596.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 44,884.76 596.00 -
789.00
6 21.12.2021 DD2122006502 16.12.2021 140 mm 0.0071 2,040.00 193.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 14,534.83 1,847.00

7 22.12.2021 DD2122006559 16.12.2021 160mm 0.0082 247.00 247.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 24,428.30 247.00 -
892.00
8 23.12.2021 DD2122006587 16.12.2021 160mm 0.0082 1,800.00 645.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 63,790.50 1,155.00

9 22.12.2021 DD2122006559 16.12.2021 180mm 0.0091 113.00 113.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 14,052.68 113.00 -
637.00
10 23.12.2021 DD2122006587 16.12.2021 180mm 0.0091 600.00 524.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 65,164.64 76.00

11 21.12.2021 DD2122006502 16.12.2021 200mm 0.0102 1,099.74 982.00 982.00 805.72 110.21 915.93 5.75 84.153 110.955 959.83 110.21 1070.04 154.1100 1,51,336.02 1,099.74 117.74

Total Amount (A) 0.0000 4,95,786.58


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Akbarpur Raina Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Agota RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme (Kurval
Date. Invoice BOQ depot on Nigam (16+17)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Gangarua) Banaras)
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 21.12.2021 DD2122006503 16.12.2021 63 mm 0.0032 1,574.23 1,574.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 24,054.23 1,574.23 -
3965.00
2 21.12.2021 DD2122006509 16.12.2021 63 mm 0.0032 7,800.00 2,390.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 36,530.97 5,409.23

3 19.12.2021 DD2122006426 16.12.2021 75 mm 0.0039 2,247.42 220.00 220.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 4,835.60 2,247.42 2,027.42

4 18.12.2021 DD2122006410 16.12.2021 90 mm 0.0046 861.97 146.00 146.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 4,539.14 861.97 715.97

5 21.12.2021 DD2122006494 16.12.2021 110 mm 0.0063 83.00 26.00 26.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 1,344.98 83.00 57.00

6 21.12.2021 DD2122006502 16.12.2021 140 mm 0.0071 1,847.00 526.00 526.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 39,613.06 1,847.00 1,321.00

7 23.12.2021 DD2122006587 160mm 0.0000 1,155.00 1,155.00

8 23.12.2021 DD2122006587 180mm 0.0000 76.00 76.00

9 21.12.2021 DD2122006502 200mm 0.0000 117.74 117.74

Total Amount (A) 0.0000 1,10,917.98


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Kurval Banaras Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Bulandshahr RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) (Alipur
Date. Invoice BOQ depot on Nigam (16+17) (Akbarpur
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin Gijhauri)
01.09.202 (SWSM) Raina)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 21.12.2021 DD2122006509 16.12.2021 63 mm 0.0032 5,409.23 5,409.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 82,653.03 5,409.23 -
5862.00
2 21.12.2021 DD2122006490 16.12.2021 63 mm 0.0032 1,200.00 452.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 6,918.33 747.23

3 19.12.2021 DD2122006426 16.12.2021 75 mm 0.0039 2,027.42 253.00 253.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 5,560.94 2,027.42 1,774.42

4 18.12.2021 DD2122006410 16.12.2021 90 mm 0.0046 110.955 - 715.97 715.97

5 21.12.2021 DD2122006494 16.12.2021 110 mm 0.0063 57.00 40.00 40.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 2,069.20 57.00 17.00

6 21.12.2021 DD2122006502 16.12.2021 140 mm 0.0071 1,321.00 472.00 472.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 35,546.32 1,321.00 849.00

7 23.12.2021 DD2122006587 16.12.2021 160mm 0.0082 1,155.00 268.00 268.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 26,505.20 1,155.00 887.00

8 23.12.2021 DD2122006587 16.12.2021 180mm 0.0091 76.00 76.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 9,451.36 76.00 -
298.00
9 24.12.2021 DD2122006640 16.12.2021 180mm 0.0091 600.00 222.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 27,607.92 378.00

10 21.12.2021 DD2122006502 200mm 0.0102 117.74 117.74

Total Amount (A) 0.0000 1,96,312.30


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Alipur Gijhauri Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Bulandshahr RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) (Khangawali
Date. Invoice BOQ depot on Nigam (16+17) (Kurval
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin )
01.09.202 (SWSM) Banaras)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 21.12.2021 DD2122006490 16.12.2021 63 mm 0.0032 747.23 747.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 11,417.67 747.23 -

2 21.12.2021 DD2122006486 16.12.2021 63 mm 0.0032 1,500.00 2452.00 1,500.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 22,920.00 -

3 21.12.2021 DD2122006494 16.12.2021 63 mm 0.0032 1,200.00 204.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 3,128.89 995.23

4 19.12.2021 DD2122006426 16.12.2021 75 mm 0.0039 1,774.42 165.00 165.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 3,626.70 1,774.42 1,609.42

5 18.12.2021 DD2122006410 16.12.2021 90 mm 0.0046 715.97 290.00 290.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 9,016.10 715.97 425.97

6 21.12.2021 DD2122006494 16.12.2021 110 mm 0.0063 17.00 17.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 879.41 17.00 -
111.00
7 21.12.2021 DD2122006491 16.12.2021 110 mm 0.0063 500.00 94.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 4,862.62 406.00

8 21.12.2021 DD2122006502 16.12.2021 140 mm 0.0071 849.00 379.00 379.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 28,542.49 849.00 470.00

9 23.12.2021 DD2122006587 160mm 0.0000 887.00 887.00

10 24.12.2021 DD2122006640 180mm 0.0000 378.00 378.00

11 21.12.2021 DD2122006502 200mm 0.0000 117.74 117.74

Total Amount (A) 0.0000 84,393.88


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Khangawali Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Agota RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form Qty C/F For
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous Next Scheme
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay
Invoice No Document as per as per Nashik as per jal Final Rate Scheme (Dalapatpur Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8)
Date. Invoice BOQ depot on Nigam (16+17) (Alipur Mukteshvera
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin
01.09.202 (SWSM) Gijhauri) )
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 21.12.2021 DD2122006494 16.12.2021 63 mm 0.0032 995.23 995.23 84.15 41.65 125.80 0.57 84.153 116.963 102.85 41.65 144.50 18.7000 18,610.80 995.23 -
3143.00
2 21.12.2021 DD2122006508 16.12.2021 63 mm 0.0032 6,900.00 2,147.77 84.15 41.65 125.80 0.57 84.153 116.963 102.85 41.65 144.50 18.7000 40,163.30 4,752.23

3 19.12.2021 DD2122006426 16.12.2021 75 mm 0.0039 1,609.42 502.00 502.00 120.73 48.47 169.20 0.82 84.153 116.963 147.63 48.47 196.10 26.9000 13,503.80 1,609.42 1,107.42

4 18.12.2021 DD2122006410 16.12.2021 90 mm 0.0046 - 425.97 425.97

5 21.12.2021 DD2122006491 16.12.2021 110 mm 0.0063 406.00 158.00 158.00 270.62 69.29 339.91 1.93 84.153 116.963 333.94 69.29 403.23 63.3200 10,004.56 406.00 248.00

6 21.12.2021 DD2122006502 16.12.2021 140 mm 0.0071 470.00 470.00 402.33 93.82 496.15 2.81 84.153 116.963 494.53 93.82 588.35 92.2000 43,334.00 470.00 -
904.00
7 21.12.2021 DD2122006487 16.12.2021 140 mm 0.0071 1,800.00 434.00 402.33 93.82 496.15 2.81 84.153 116.963 494.53 93.82 588.35 92.2000 40,014.80 1,366.00

8 23.12.2021 DD2122006587 160mm 0.0000 887.00 887.00

9 24.12.2021 DD2122006640 180mm 0.0000 378.00 378.00

10 21.12.2021 DD2122006502 200mm 0.0000 117.74 117.74

Total Amount (A) 0.0000 1,65,631.26


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Dalapatpur Mukteshvera Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Agota RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme (Murtzabad
Date. Invoice BOQ depot on Nigam (16+17)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Khangawali) Bhatwara)
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 21.12.2021 DD2122006508 16.12.2021 63 mm 0.0032 4,752.23 4,752.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 72,614.07 4,752.23 -
5689.00
2 21.12.2021 DD2122006491 16.12.2021 63 mm 0.0032 1,200.00 936.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 14,313.85 263.23

3 19.12.2021 DD2122006426 16.12.2021 75 mm 0.0039 1,107.42 118.00 118.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 2,593.64 1,107.42 989.42

4 18.12.2021 DD2122006410 16.12.2021 90 mm 0.0046 425.97 253.00 253.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 7,865.77 425.97 172.97

5 21.12.2021 DD2122006491 16.12.2021 110 mm 0.0063 248.00 248.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 12,829.04 248.00 -
477.00
6 21.12.2021 DD2122006493 16.12.2021 110 mm 0.0063 600.00 229.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 11,846.17 371.00

7 21.12.2021 DD2122006487 16.12.2021 140 mm 0.0071 1,366.00 28.00 28.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 2,108.68 1,366.00 1,338.00

8 23.12.2021 DD2122006587 160mm 0.0000 887.00 887.00

9 24.12.2021 DD2122006640 180mm 0.0000 378.00 378.00

10 21.12.2021 DD2122006502 200mm 0.0000 117.74 117.74

Total Amount (A) 0.0000 1,24,171.22


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Murtzabad Bhatwara Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Bulandshahr RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) (Khawazapu
Date. Invoice BOQ depot on Nigam (16+17) (Dalpatpur
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin r Mirpur)
01.09.202 (SWSM) Mukteshvera)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 21.12.2021 DD2122006491 16.12.2021 63 mm 0.0032 263.23 263.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 4,022.15 263.23 -

2 21.12.2021 DD2122006493 16.12.2021 63 mm 0.0032 1,500.00 6208.00 1,500.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 22,920.00 -

3 21.12.2021 DD2122006517 16.12.2021 63 mm 0.0032 6,900.00 4,444.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 67,916.09 2,455.23

4 19.12.2021 DD2122006426 16.12.2021 75 mm 0.0039 989.42 989.42 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 21,747.45 989.42 -
1285.00
5 19.12.2021 DD2122006427 16.12.2021 75 mm 0.0039 3,000.00 295.58 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 6,496.85 2,704.42

6 18.12.2021 DD2122006410 16.12.2021 90 mm 0.0046 172.97 172.97 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 5,377.64 172.97 -
727.00
7 19.12.2021 DD2122006422 16.12.2021 90 mm 0.0046 2,000.00 554.03 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 17,224.79 1,445.97

8 21.12.2021 DD2122006493 16.12.2021 110 mm 0.0063 371.00 371.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 19,191.83 371.00 -
883.00
9 21.12.2021 DD2122006488 16.12.2021 110 mm 0.0063 600.00 512.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 26,485.76 88.00

10 21.12.2021 DD2122006487 16.12.2021 140 mm 0.0071 1,338.00 663.00 663.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 49,930.53 1,338.00 675.00

11 23.12.2021 DD2122006587 16.12.2021 160mm 0.0082 887.00 887.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 87,724.30 887.00 -
1382.00
12 24.12.2021 DD2122006640 16.12.2021 160mm 0.0082 576.00 495.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 48,955.50 81.00

13 24.12.2021 DD2122006640 16.12.2021 180mm 0.0091 378.00 15.00 15.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 1,865.40 378.00 363.00

14 21.12.2021 DD2122006502 200mm 0.0000 117.74 117.74

Total Amount (A) 0.0000 3,79,858.29


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Khawazapur Mirpur Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Bulandshahr RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous Qty C/F For
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay
Invoice No Document as per as per Nashik as per jal Final Rate Scheme Next Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8)
Date. Invoice BOQ depot on Nigam (16+17) (Murtzabad (Machkauli)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin
01.09.202 (SWSM) Bhatwara)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 21.12.2021 DD2122006517 16.12.2021 63 mm 0.0032 2,455.23 2,455.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 37,515.91 2,455.23 -
8563.00
2 21.12.2021 DD2122006501 16.12.2021 63 mm 0.0032 8,100.00 6,107.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 93,326.73 1,992.23

3 19.12.2021 DD2122006427 16.12.2021 75 mm 0.0039 2,704.42 669.00 669.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 14,704.62 2,704.42 2,035.42

4 19.12.2021 DD2122006422 16.12.2021 90 mm 0.0046 1,445.97 193.00 193.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 6,000.37 1,445.97 1,252.97

5 21.12.2021 DD2122006488 16.12.2021 110 mm 0.0063 88.00 88.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 4,552.24 88.00 -
161.00
6 22.12.2021 DD2122006530 16.12.2021 110 mm 0.0063 600.00 73.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 3,776.29 527.00

7 21.12.2021 DD2122006487 16.12.2021 140 mm 0.0071 675.00 478.00 478.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 35,998.18 675.00 197.00

8 24.12.2021 DD2122006640 16.12.2021 160mm 0.0082 81.00 81.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 8,010.90 81.00 -
965.00
9 24.12.2021 DD2122006639 16.12.2021 160mm 0.0082 1,800.00 884.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 87,427.60 916.00

10 24.12.2021 DD2122006640 16.12.2021 180mm 0.0091 363.00 354.00 354.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 44,023.44 363.00 9.00

11 21.12.2021 DD2122006502 200mm 0.0000 117.74 117.74

Total Amount (A) 0.0000 3,35,336.28


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Machkauli Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Bulandshahr RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form Qty C/F For
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous Next Scheme
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay
Invoice No Document as per as per Nashik as per jal Final Rate Scheme (Hazratpur Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8)
Date. Invoice BOQ depot on Nigam (16+17) (Khawazapur Urf
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin
01.09.202 (SWSM) Mirpur) Samaspur)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 21.12.2021 DD2122006501 16.12.2021 63 mm 0.0032 1,992.23 1,992.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 30,441.27 1,992.23 -
2575.00
2 21.12.2021 DD2122006488 16.12.2021 63 mm 0.0032 1,500.00 582.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 8,904.73 917.23

3 19.12.2021 DD2122006427 16.12.2021 75 mm 0.0039 2,035.42 121.00 121.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 2,659.58 2,035.42 1,914.42

4 19.12.2021 DD2122006422 16.12.2021 90 mm 0.0046 1,252.97 300.00 300.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 9,327.00 1,252.97 952.97

5 22.12.2021 DD2122006530 16.12.2021 110 mm 0.0063 527.00 123.00 123.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 6,362.79 527.00 404.00

6 21.12.2021 DD2122006487 16.12.2021 140 mm 0.0071 197.00 197.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 14,836.07 197.00 -
308.00
7 23.12.2021 DD2122006576 16.12.2021 140 mm 0.0071 600.00 111.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 8,359.41 489.00

8 24.12.2021 DD2122006639 160mm 0.0000 916.00 916.00

9 24.12.2021 DD2122006640 180mm 0.0000 9.00 9.00

10 21.12.2021 DD2122006502 200mm 0.0000 117.74 117.74

Total Amount (A) 0.0000 80,890.85


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Hazratpur Urf Samaspur Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Bulandshahr RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price, Qty C/F For
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form Next Scheme
IOCL Quantity Quantity IOCL Jointing Rate Total Rate
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous (Rasulpur
Invoice No Document as per as per Nashik as per jal Final Rate Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme Sarafuddinp
Date. Invoice BOQ depot on Nigam (16+17)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Machkauli) ur Urf Acheja
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price Ghat)
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 21.12.2021 DD2122006488 16.12.2021 63 mm 0.0032 917.23 917.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 14,015.27 917.23 -
4636.00
2 22.12.2021 DD2122006529 16.12.2021 63 mm 0.0032 7,800.00 3,718.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 56,822.81 4,081.23

3 19.12.2021 DD2122006427 16.12.2021 75 mm 0.0039 1,914.42 331.00 331.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 7,275.38 1,914.42 1,583.42

4 19.12.2021 DD2122006422 16.12.2021 90 mm 0.0046 952.97 55.00 55.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 1,709.95 952.97 897.97

5 22.12.2021 DD2122006530 16.12.2021 110 mm 0.0063 404.00 105.00 105.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 5,431.65 404.00 299.00

6 23.12.2021 DD2122006576 16.12.2021 140 mm 0.0071 489.00 114.00 114.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 8,585.34 489.00 375.00

7 24.12.2021 DD2122006639 160mm 0.0000 916.00 916.00

8 24.12.2021 DD2122006640 180mm 0.0000 9.00 9.00

9 21.12.2021 DD2122006502 200mm 0.0000 117.74 117.74

Total Amount (A) 0.0000 93,840.40


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Rasulpur Sarafuddinpur Urf Acheja Ghat Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Bulandshahr RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price, Qty B/F Form
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Previous Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Scheme Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) (Hazratpur (Ginorashek
Date. Invoice BOQ depot on Nigam (16+17)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin Urf h)
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price Samaspur)
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 22.12.2021 DD2122006529 16.12.2021 63 mm 0.0032 4,081.23 4,081.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 62,361.19 4,081.23 -

2 22.12.2021 DD2122006530 16.12.2021 63 mm 0.0032 1,200.00 5946.00 1,200.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 18,336.00 -

3 22.12.2021 DD2122006534 16.12.2021 63 mm 0.0032 7,800.00 664.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 10,157.69 7,135.23

4 19.12.2021 DD2122006427 16.12.2021 75 mm 0.0039 1,583.42 653.00 653.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 14,352.94 1,583.42 930.42

5 19.12.2021 DD2122006422 16.12.2021 90 mm 0.0046 897.97 409.00 409.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 12,715.81 897.97 488.97

6 22.12.2021 DD2122006530 16.12.2021 110 mm 0.0063 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 - 299.00 299.00

7 23.12.2021 DD2122006576 16.12.2021 140 mm 0.0071 375.00 375.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 28,241.25 375.00 -

8 22.12.2021 DD2122006559 16.12.2021 140 mm 0.0071 1,200.00 2393.00 1,200.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 90,372.00 -

9 23.12.2021 DD2122006587 16.12.2021 140 mm 0.0071 1,440.00 818.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 61,603.58 622.00

10 24.12.2021 DD2122006639 16.12.2021 160mm 0.0082 916.00 24.00 24.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 2,373.60 916.00 892.00

11 24.12.2021 DD2122006640 180mm 0.0000 9.00 9.00

12 21.12.2021 DD2122006502 200mm 0.0000 117.74 117.74

Total Amount (A) 0.0000 3,00,514.06


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Ginorashekh Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Gulaothi RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old Qty B/F Form
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Previous
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Scheme Qty C/F For
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay
Invoice No Document as per as per Nashik as per jal Final Rate (Rasulpur Next Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8)
Date. Invoice BOQ depot on Nigam (16+17) Sarafuddinpu (Anchana)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin
01.09.202 (SWSM) r Urf Acheja
17/02/2022) (P1) 17/02/2022) depot Price
0 Ghat)
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 22.12.2021 DD2122006534 16.12.2021 63 mm 0.0032 7,135.23 4857.00 4,857.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 74,214.96 7,135.23 2,278.23

2 19.12.2021 DD2122006427 16.12.2021 75 mm 0.0039 930.42 843.00 843.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 18,529.14 930.42 87.42

3 19.12.2021 DD2122006422 16.12.2021 90 mm 0.0046 488.97 488.97 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 1,716.97 488.97 -
542.00
4 19.12.2021 DD2122006424 16.12.2021 90 mm 0.0046 2,000.00 53.03 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 1,716.97 1,946.97

5 22.12.2021 DD2122006530 16.12.2021 110 mm 0.0063 299.00 184.00 184.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 9,518.32 299.00 115.00

6 23.12.2021 DD2122006587 16.12.2021 140 mm 0.0071 622.00 66.00 66.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 4,970.46 622.00 556.00

7 24.12.2021 DD2122006639 16.12.2021 160mm 0.0082 892.00 322.00 322.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 31,845.80 892.00 570.00

8 24.12.2021 DD2122006640 16.12.2021 180mm 0.0091 9.00 9.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 1,119.24 9.00 -
201.00
9 24.12.2021 DD2122006639 16.12.2021 180mm 0.0091 600.00 192.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 23,877.12 408.00

10 21.12.2021 DD2122006502 16.12.2021 200mm 0.0102 117.74 100.00 100.00 805.72 110.21 915.93 5.75 84.153 110.955 959.83 102.96 1062.79 146.8600 14,686.00 117.74 17.74

Total Amount (A) 0.0000 1,82,194.98


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Anchana Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Gulaothi RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous Qty C/F For
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay
Invoice No Document as per as per Nashik as per jal Final Rate Scheme Next Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8)
Date. Invoice BOQ depot on Nigam (16+17) (Ginorashekh (Utsara)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin
01.09.202 (SWSM) )
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 22.12.2021 DD2122006534 16.12.2021 63 mm 0.0032 2,278.23 2,278.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 34,811.35 2,278.23 -
2936.00
2 22.12.2021 DD2122006547 16.12.2021 63 mm 0.0032 1,500.00 657.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 10,050.73 842.23

3 19.12.2021 DD2122006427 16.12.2021 75 mm 0.0039 87.42 87.42 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 1,921.49 87.42 -
395.00
4 22.12.2021 DD2122006567 16.12.2021 75 mm 0.0039 1,800.00 307.58 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 6,760.61 1,492.42

5 19.12.2021 DD2122006424 16.12.2021 90 mm 0.0046 1,946.97 432.00 432.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 1,716.97 1,946.97 1,514.97

6 22.12.2021 DD2122006530 16.12.2021 110 mm 0.0063 115.00 115.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 5,948.95 115.00 -
153.00
7 22.12.2021 DD2122006547 16.12.2021 110 mm 0.0063 500.00 38.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 1,965.74 462.00

8 23.12.2021 DD2122006587 16.12.2021 140 mm 0.0071 556.00 415.00 415.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 31,253.65 556.00 141.00

9 24.12.2021 DD2122006639 16.12.2021 160mm 0.0082 570.00 89.00 89.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 8,802.10 570.00 481.00

10 24.12.2021 DD2122006639 180mm 0.0000 408.00 408.00

11 21.12.2021 DD2122006502 200mm 0.0000 17.74 17.74

Total Amount (A) 0.0000 1,03,231.59


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Utsara Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Gulaothi RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme (Akbarpur
Date. Invoice BOQ depot on Nigam (16+17)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Anchana) Jhojha)
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 22.12.2021 DD2122006547 16.12.2021 63 mm 0.0032 842.23 842.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 12,869.27 842.23 -
2113.00
2 22.12.2021 DD2122006548 16.12.2021 63 mm 0.0000 7,800.00 1,270.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 19,417.37 6,529.23

3 22.12.2021 DD2122006567 16.12.2021 75 mm 0.0039 1,492.42 246.00 246.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 5,407.08 1,492.42 1,246.42

4 19.12.2021 DD2122006424 16.12.2021 90 mm 0.0046 1,514.97 214.00 214.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 6,653.26 1,514.97 1,300.97

5 22.12.2021 DD2122006547 16.12.2021 110 mm 0.0063 462.00 76.00 76.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 3,931.48 462.00 386.00

6 23.12.2021 DD2122006587 16.12.2021 140 mm 0.0071 141.00 141.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 10,618.71 141.00 -
327.00
7 24.12.2021 DD2122006640 16.12.2021 140 mm 0.0071 2,592.00 186.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 14,007.66 2,406.00

8 24.12.2021 DD2122006639 160mm 0.0000 481.00 481.00

9 24.12.2021 DD2122006639 180mm 0.0000 408.00 408.00

10 21.12.2021 DD2122006502 200mm 0.0000 17.74 17.74

Total Amount (A) 0.0000 72,904.83


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Akbarpur Jhojha Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Gulaothi RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme (Shekhpur
Date. Invoice BOQ depot on Nigam (16+17)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Utsara) Garhwa)
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 22.12.2021 DD2122006548 16.12.2021 63 mm 0.0032 6,529.23 5987.00 5,987.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 91,481.36 6,529.23 542.23

2 22.12.2021 DD2122006567 16.12.2021 75 mm 0.0039 1,246.42 883.00 883.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 19,408.34 1,246.42 363.42

3 19.12.2021 DD2122006424 16.12.2021 90 mm 0.0046 1,300.97 32.00 32.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 994.88 1,300.97 1,268.97

4 22.12.2021 DD2122006547 16.12.2021 110 mm 0.0063 386.00 386.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 19,967.78 386.00 -

5 22.12.2021 DD2122006556 16.12.2021 110 mm 0.0063 500.00 928.00 500.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 25,865.00 -

6 22.12.2021 DD2122006560 16.12.2021 110 mm 0.0063 500.00 42.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 2,172.66 458.00

7 24.12.2021 DD2122006640 16.12.2021 140 mm 0.0071 2,406.00 1299.00 1,299.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 97,827.69 2,406.00 1,107.00

8 24.12.2021 DD2122006639 16.12.2021 160mm 0.0082 481.00 481.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 47,570.90 481.00 -
903.00
9 25.12.2021 DD2122006644 16.12.2021 160mm 0.0082 2,052.00 422.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 41,735.80 1,630.00

10 24.12.2021 DD2122006639 16.12.2021 180mm 0.0091 408.00 91.00 91.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 11,316.76 408.00 317.00

11 21.12.2021 DD2122006502 200mm 0.0000 17.74 17.74

Total Amount (A) 0.0000 3,58,341.17


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Shekhpur Garhwa Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Lakhaothi RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) (Rahimpur
Date. Invoice BOQ depot on Nigam (16+17) (Akbarpur
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin Alawa)
01.09.202 (SWSM) Jhoja)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 22.12.2021 DD2122006548 16.12.2021 63 mm 0.0032 542.23 542.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 8,285.27 542.23 -

2 22.12.2021 DD2122006556 16.12.2021 63 mm 0.0032 1,500.00 1,500.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 22,920.00 -

3 22.12.2021 DD2122006560 16.12.2021 63 mm 0.0032 1,500.00 1,500.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 22,920.00 -

4 22.12.2021 DD2122006563 16.12.2021 63 mm 0.0032 1,200.00 1,200.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 18,336.00 -
9757.00
5 21.12.2021 DD2122006492 16.12.2021 63 mm 0.0032 1,200.00 1,200.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 18,336.00 -

6 22.12.2021 DD2122006549 16.12.2021 63 mm 0.0032 1,500.00 1,500.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 22,920.00 -

7 22.12.2021 DD2122006555 16.12.2021 63 mm 0.0032 1,500.00 1,500.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 22,920.00 -

8 22.12.2021 DD2122006546 16.12.2021 63 mm 0.0032 1,200.00 814.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 12,449.69 385.23

9 22.12.2021 DD2122006567 16.12.2021 75 mm 0.0039 363.42 363.42 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 7,987.97 363.42 -
401.00
10 22.12.2021 DD2122006554 16.12.2021 75 mm 0.0039 1,500.00 37.58 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 826.01 1,462.42

11 19.12.2021 DD2122006424 16.12.2021 90 mm 0.0046 1,268.97 646.00 646.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 20,084.14 1,268.97 622.97

12 22.12.2021 DD2122006560 16.12.2021 110 mm 0.0063 458.00 454.00 454.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 23,485.42 458.00 4.00

13 24.12.2021 DD2122006640 16.12.2021 140 mm 0.0071 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 - 1,107.00 1,107.00

14 25.12.2021 DD2122006644 16.12.2021 160mm 0.0000 110.955 1,630.00 1,630.00

15 24.12.2021 DD2122006639 16.12.2021 180mm 0.0000 110.955 317.00 317.00

16 21.12.2021 DD2122006502 16.12.2021 200mm 0.0102 17.74 17.74 805.72 110.21 915.93 5.75 84.153 110.955 959.83 102.96 1062.79 146.8600 2,605.30 17.74 -
477.99
17 21.12.2021 DD2122006487 16.12.2021 200mm 0.0102 1,200.00 460.25 805.72 110.21 915.93 5.75 84.153 110.955 959.83 102.96 1062.79 146.8600 67,592.32 739.75

Total Amount (A) 0.0000 2,71,668.11


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Rahimpur Alawa Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Lakhaothi RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) (Nagala Jeet
Date. Invoice BOQ depot on Nigam (16+17) (Shekhpur
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin Urf Jitava)
01.09.202 (SWSM) Garhwa)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 22.12.2021 DD2122006546 16.12.2021 63 mm 0.0032 385.23 385.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 5,886.31 385.23 -

2 22.12.2021 DD2122006568 16.12.2021 63 mm 0.0032 600.00 2130.00 600.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 9,168.00 -

3 23.12.2021 DD2122006589 16.12.2021 63 mm 0.0032 1,500.00 1,144.77 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 17,492.09 355.23

4 22.12.2021 DD2122006554 16.12.2021 75 mm 0.0039 1,462.42 291.00 291.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 6,396.18 1,462.42 1,171.42

5 19.12.2021 DD2122006424 16.12.2021 90 mm 0.0046 622.97 201.00 201.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 6,249.09 622.97 421.97

6 22.12.2021 DD2122006560 16.12.2021 110 mm 0.0063 4.00 4.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 206.92 4.00 -
158.00
7 22.12.2021 DD2122006563 16.12.2021 110 mm 0.0063 500.00 154.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 7,966.42 346.00

8 24.12.2021 DD2122006640 16.12.2021 140 mm 0.0071 1,107.00 314.00 314.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 23,647.34 1,107.00 793.00

9 25.12.2021 DD2122006644 16.12.2021 160mm 0.0000 1,630.00 1,630.00

10 24.12.2021 DD2122006639 16.12.2021 180mm 0.0000 317.00 317.00

11 21.12.2021 DD2122006487 16.12.2021 200mm 0.0000 739.75 739.75

Total Amount (A) 0.0000 77,012.35


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Nagala Jeet Urf Jitava Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Lakhaothi RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous Qty C/F For
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay
Invoice No Document as per as per Nashik as per jal Final Rate Scheme Next Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8)
Date. Invoice BOQ depot on Nigam (16+17) (Rahimpur (Kanwara)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin
01.09.202 (SWSM) Alawa)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 23.12.2021 DD2122006589 16.12.2021 63 mm 0.0032 355.23 355.23 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 5,427.91 355.23 -
6749.60
2 23.12.2021 DD2122006575 16.12.2021 63 mm 0.0032 7,800.00 6,394.37 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 97,705.97 1,405.63

3 22.12.2021 DD2122006554 16.12.2021 75 mm 0.0039 1,171.42 522.90 522.90 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 11,493.34 1,171.42 648.52

4 19.12.2021 DD2122006424 16.12.2021 90 mm 0.0046 421.97 139.20 139.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 4,321.51 421.97 282.97

5 22.12.2021 DD2122006563 16.12.2021 110 mm 0.0063 346.00 123.50 123.50 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 6,388.66 346.00 222.50

6 24.12.2021 DD2122006640 16.12.2021 140 mm 0.0071 793.00 780.60 780.60 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 58,786.99 793.00 12.40

7 25.12.2021 DD2122006644 16.12.2021 160mm 0.0082 1,630.00 225.00 225.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 22,252.50 1,630.00 1,405.00

8 24.12.2021 DD2122006639 16.12.2021 180mm 0.0091 317.00 317.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 39,422.12 317.00 -
372.10
9 25.12.2021 DD2122006644 16.12.2021 180mm 0.0091 816.00 55.10 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 6,852.24 760.90

10 21.12.2021 DD2122006487 16.12.2021 200mm 0.0000 739.75 739.75

Total Amount (A) 0.0000 2,52,651.24


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Kanwara Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Sikandrabad RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous Qty C/F For
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay
Invoice No Document as per as per Nashik as per jal Final Rate Scheme Next Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8)
Date. Invoice BOQ depot on Nigam (16+17) (Nagala Jeet (Dhanaura)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin
01.09.202 (SWSM) Urf Jitava)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 23.12.2021 DD2122006575 16.12.2021 63 mm 0.0032 1,405.63 1,405.63 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 21,478.03 1,405.63 -
10039.00
2 24.12.2021 DD2122006628 16.12.2021 63 mm 0.0032 2,400.00 2,400.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 36,672.00 -

3 25.12.2021 DD2122006651 16.12.2021 63 mm 0.0032 1,500.00 1,500.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 22,920.00 -

4 25.12.2021 DD2122006652 16.12.2021 63 mm 0.0032 7,200.00 4,733.37 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 72,325.89 2,466.63

5 22.12.2021 DD2122006554 16.12.2021 75 mm 0.0039 648.52 236.00 236.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 5,187.28 648.52 412.52

6 19.12.2021 DD2122006424 16.12.2021 90 mm 0.0046 282.97 258.00 258.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 8,021.22 282.97 24.97

7 22.12.2021 DD2122006563 16.12.2021 110 mm 0.0063 222.50 222.50 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 11,509.93 222.50 -

8 21.12.2021 DD2122006492 16.12.2021 110 mm 0.0063 500.00 500.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 25,865.00 -
1691.00
9 22.12.2021 DD2122006549 16.12.2021 110 mm 0.0063 600.00 600.00 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 31,038.00 -

10 22.12.2021 DD2122006555 16.12.2021 110 mm 0.0063 500.00 368.50 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 19,062.51 131.50

11 24.12.2021 DD2122006640 16.12.2021 140 mm 0.0071 12.40 12.40 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 933.84 12.40 -
554.00
12 24.12.2021 DD2122006639 16.12.2021 140 mm 0.0071 1,536.00 541.60 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 40,787.90 994.40

13 25.12.2021 DD2122006644 16.12.2021 160mm 0.0082 1,405.00 1,405.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 1,38,954.50 1,405.00 -
1533.00
14 26.12.2021 DD2122006694 16.12.2021 160mm 0.0082 360.00 128.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 12,659.20 232.00

15 25.12.2021 DD2122006644 16.12.2021 180mm 0.0091 760.90 309.00 309.00 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 38,427.24 760.90 451.90

16 21.12.2021 DD2122006487 16.12.2021 200mm 0.0102 739.75 225.00 225.00 805.72 110.21 915.93 5.75 84.153 110.955 959.83 102.96 1062.79 146.8600 33,043.50 739.75 514.75

Total Amount (A) 0.0000 5,18,886.03


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Dhanaura Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Sikandrabad RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form Qty C/F For
IOCL Quantity Quantity IOCL Jointing Rate Total Rate
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous Next Scheme
Invoice No Document as per as per Nashik as per jal Final Rate Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme (Ashadei Urf
Date. Invoice BOQ depot on Nigam (16+17)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Kanwara) Prangarh)
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 25.12.2021 DD2122006652 16.12.2021 63 mm 0.0032 2,466.63 2,466.63 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 37,690.11 2,466.63 -

2 26.12.2021 DD2122006691 16.12.2021 63 mm 0.0032 7,800.00 12506.00 7,800.00 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 1,19,184.00 -

3 26.12.2021 DD2122006694 16.12.2021 63 mm 0.0032 5,700.00 2,239.37 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 34,217.57 3,460.63

4 22.12.2021 DD2122006554 16.12.2021 75 mm 0.0039 412.52 225.00 225.00 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 4,945.50 412.52 187.52

5 19.12.2021 DD2122006424 16.12.2021 90 mm 0.0046 24.97 24.97 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 1,716.97 24.97 -
1087.00
6 19.12.2021 DD2122006423 16.12.2021 90 mm 0.0046 2,000.00 1,062.03 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 1,716.97 937.97

7 22.12.2021 DD2122006555 16.12.2021 110 mm 0.0063 131.50 131.50 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 6,802.50 131.50 -
590.00
8 22.12.2021 DD2122006555 16.12.2021 110 mm 0.0063 500.00 458.50 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 23,718.21 41.50

9 24.12.2021 DD2122006639 16.12.2021 140 mm 0.0071 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 - 994.40 994.40

10 26.12.2021 DD2122006694 16.12.2021 160mm 0.0082 232.00 232.00 232.00 545.21 105.5 650.71 3.69 84.153 110.955 644.11 105.5 749.61 98.9000 22,944.80 232.00 -

11 25.12.2021 DD2122006644 16.12.2021 180mm 0.0082 451.90 451.90 672.25 102.96 775.21 4.64 84.153 110.955 796.61 102.96 899.57 124.3600 56,198.28 451.90 -
493.00
12 16.12.2021 180mm 0.0000 110.955

13 21.12.2021 DD2122006487 16.12.2021 200mm 0.0102 514.75 514.75 805.72 110.21 915.93 5.75 84.153 110.955 959.83 102.96 1062.79 146.8600 75,596.19 514.75 -
574.00
14 16.12.2021 200mm 0.0000 110.955

Total Amount (A) 0.0000 3,84,731.09


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Ashadei Urf Prangarh Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Sikandrabad RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price Qty B/F Form
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Qty C/F For
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay Previous
Invoice No Document as per as per Nashik as per jal Final Rate Next Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8) Scheme
Date. Invoice BOQ depot on Nigam (16+17) (Masauta)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin (Dhanaura)
01.09.202 (SWSM)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 26.12.2021 DD2122006694 16.12.2021 63 mm 0.0032 3,460.63 3,460.63 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 52,878.43 3,460.63 -
5804.00
2 25.12.2021 DD2122006662 16.12.2021 63 mm 0.0032 3,000.00 2,343.37 84.15 41.65 125.80 0.57 84.153 110.955 99.43 41.65 141.08 15.2800 35,806.69 656.63

3 22.12.2021 DD2122006554 16.12.2021 75 mm 0.0039 187.52 187.52 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 4,121.69 187.52 -
548.00
4 25.12.2021 DD2122006650 16.12.2021 75 mm 0.0039 1,200.00 360.48 120.73 48.47 169.20 0.82 84.153 110.955 142.71 48.47 191.18 21.9800 7,923.35 839.52

5 19.12.2021 DD2122006423 16.12.2021 90 mm 0.0046 937.97 456.00 456.00 175.07 54.43 229.50 1.16 84.153 110.955 206.16 54.43 260.59 31.0900 1,716.97 937.97 481.97

6 22.12.2021 DD2122006555 16.12.2021 110 mm 0.0063 41.50 41.50 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 2,146.80 41.50 -
213.00
7 22.12.2021 DD2122006546 16.12.2021 110 mm 0.0063 500.00 171.50 270.62 69.29 339.91 1.93 84.153 110.955 322.35 69.29 391.64 51.7300 8,871.70 328.50

8 24.12.2021 DD2122006639 16.12.2021 140 mm 0.0071 994.40 448.00 448.00 402.33 93.82 496.15 2.81 84.153 110.955 477.64 93.82 571.46 75.3100 33,738.88 994.40 546.40

9 26.12.2021 DD2122006694 16.12.2021 160mm 0.0000 110.955 -

10 25.12.2021 DD2122006644 16.12.2021 180mm 0.0000 110.955 -

11 21.12.2021 DD2122006487 16.12.2021 200mm 0.0000 110.955 -

Total Amount (A) 0.0000 1,47,204.50


M/s. POWERMECH PROJECTS LTD.-BHOORATHNOM CONSTRUCTION CO. PVT. LTD.
IMPLEMENTATION OF MEERUT WATER SUPPLY PROJCT IN THE STATE OF UTTAR PRADESH INCLUDING 10 YEARS OPERATION & MAINTENANCE Village- Masauta Date:- 05.11.2022
PRICE VARIATION BILL No. 1 AGAINST SUPPLY OF HDPE PIPE
Cover Agreement No. 111/ED/2021-22, Dated 17.08.2021 Block- Sikandrabad RA Bill – Price Escalation Bill
P2=P1+(W*(R2-
R1))
R1 = Old
COST OF HDPE PIPE COST OF LAYING R2= New Resin P2= New Price,
Resin rate Laying Qty B/F Form
Wall Quantity RATE PER MTR (As RATE PER MTR (As Total Rate WEIGHT rate as per P1= Old Price
IOCL Quantity Quantity IOCL Jointing Rate Total Rate Previous Qty C/F For
Sr. Date Of Size of Thickness Certified as per SWSM LETTER per SWSM LETTER Final Rate OF PIPE Invoice date W= Weight of Pipe Difference in Now to Pay
Invoice No Document as per as per Nashik as per jal Final Rate Scheme Next Scheme Remarks
No. Invoice Pipe (m) per the RA- NO 4086/W- NO 4086/W- (10+11) as (KG/MTR) From in Kg Rate (18-12) (19x8)
Date. Invoice BOQ depot on Nigam (16+17) (Ashadei Urf (Khaguawas)
In Avg. Bill PER MTR 17/2021-22 dt:- 17/2021-22 dt:- per SWSM AS PER IS IOCL Nashik R2= New Resin
01.09.202 (SWSM) Prangarh)
17/02/2022) (P1) 17/02/2022) depot Price
0
R1= Old Resin
Price

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 25.12.2021 DD2122006662 16.12.2021 63 mm 0.0032 656.63 656.63 84.15 41.65 125.80 0.57 84.153 116.963 102.85 41.65 144.50 18.7000 12,278.98 656.63 -

2 28.12.2021 DD2122006758 16.12.2021 63 mm 0.0032 3,000.00 4395.00 3,000.00 84.15 41.65 125.80 0.57 84.153 116.963 102.85 41.65 144.50 18.7000 56,100.00 -

3 28.12.2021 DD2122006760 16.12.2021 63 mm 0.0032 3,000.00 738.37 84.15 41.65 125.80 0.57 84.153 116.963 102.85 41.65 144.50 18.7000 13,807.52 2,261.63

4 25.12.2021 DD2122006650 16.12.2021 75 mm 0.0039 839.52 260.00 260.00 120.73 48.47 169.20 0.82 84.153 114.953 145.99 48.47 194.46 25.2600 6,567.60 839.52 579.52

5 19.12.2021 DD2122006423 16.12.2021 90 mm 0.0046 481.97 481.97 175.07 54.43 229.50 1.16 84.153 114.953 210.80 54.43 265.23 35.7300 17,220.79 481.97 -
569.00
6 22.12.2021 DD2122006554 16.12.2021 90 mm 0.0046 1,000.00 87.03 175.07 54.43 229.50 1.16 84.153 114.953 210.80 54.43 265.23 35.7300 3,109.58 912.97

7 22.12.2021 DD2122006546 16.12.2021 110 mm 0.0063 328.50 164.00 164.00 270.62 69.29 339.91 1.93 84.153 116.963 333.94 69.29 403.23 63.3200 10,384.48 328.50 164.50

8 24.12.2021 DD2122006639 16.12.2021 140 mm 0.0071 546.40 135.00 135.00 402.33 93.82 496.15 2.81 84.153 116.963 494.53 93.82 588.35 92.2000 12,447.00 546.40 411.40

9 26.12.2021 DD2122006694 16.12.2021 160mm 0.0000 -

10 25.12.2021 DD2122006644 16.12.2021 180mm 0.0000 -

11 21.12.2021 DD2122006487 16.12.2021 200mm 0.0000 -

Total Amount (A) 0.0000 1,31,915.95