You are on page 1of 12

A

MICRO PROJECT REPORT


ON
Calculate Area Of Any Type Of Shape Using Abstract
Class.

Program&Program code: Cco-4-1


Course:JAVA Programming
Course code 22412

Submitted by,
Name of student Enrollment No Program
1DEOKAR SUMITRA NANDKISHOR
2014640024 CO-H

Under the Guidance of

Prof. Mahajan Jagruti


In part ial fulfillment of requirement for the award of

Diploma in Comput er Engin eering

MSBTE, Mumbai.

Academic Year: 2021-22

MEDR
o

DEPARTMENT OF COMPUTER ENGINEERING


SSM. ADSUL POLYTECHNIc cOLLBGE
CHAS, AHMEDNAGAR-414 005(M.S)

AMIN VIKAS

EOR

CERTIFICATE
This is to certiy that the micro proect report entitled

"Calculate Area Of Any Type Of Shape Using Abstract


Class."

Submitted by
Name of studentEnrolment No
Program
1DEOKAR SUMITRA NANDKISHOR 204640024 CO-

of semester4 institute, Sau Sundarabai Manik Adsul


Polyte Chas,
chnic in course
Ahmednagar(code: 1464) has completed the micro project satístactorily
(22412) for the Academic year 2021-22 as prescribed in the MSBTE curriculum.

Place: Ahmednagar
Date: /2021
ACKNOWLEDGEMENT

I take this opport unity to acknowledge the constant encouragement and

continuous help given to me by my guide Prof. Mahajan Jagruti l convey my sincere

thanks to his valuable timely sugge stion.

I would also like to thanks principal Prof. Gadakh R.S. and Head of Computer

Department Prof. Bhise A.K. I would also like to thank teaching staff of Computer

Department for helping us to achieve this goal.

I am also thankful to those who directly or indire ctly helped me for completing this
micro project. I would like to thank my parents without whose supports; the

completion of the micro project would not have been possible.\

DEOKAR SUMITRA NANDKISHOR


INDEX

SR NO CONTENT PAGE
S
NO
Aim of the Micro-Project
2 Rationale

3 Course Outcomes Achieved


Literature Review

Actual Methodology Followed


Actual Resources Used

Skills Developed
8
Applications of MicroProject

A Micro-Project

Proposal

1.0Aim of the Micro-Project:

Program To Calculate Area Of Any Type Of Shape Using Abstract Class.

2.0 Intended Course Outcomes:


a)Develop programs us ing Object-Oriented methodology in Java.

3.0 Proposed methodology:


I.Study the concept of JAVA programming
L. Study various syntax and functions of JAVA.
II. Study to create small programs using JAVA.

V. Make program for given crit eria.

VPrepare the final report.

4.0Action Plan:

Planned N a m e o
Sr Planne
Details of Activity responsible
d Start Finish
N
Team
Date Date
members
dentity the requirements of
1
he project.
Design the structure of the
project.
Develop the program
using in JAVA.
DeDUg cOde and eliminate

eTors occuTed.
5 Test the project.

Prepare the final report.

5.0Resources Required:

S.NNo. Resources required Spe cificati


ons
1 Computer systemn Intel(R) Pentium CPU, RAM 4 GB
2
Operat ing System Windows 10, 64 Bit Operating System
3 Software 's Java JDK 15.02, Notepad+*
BUS BOOKING MANAGEMENT SYSTEM:
is aimed
atreducing paper work for the bas industry and
hence improving its efficiency and
speeding up of
all processes.
T. database can be accessed
by the passengers
from any computer tenninal connected
through
LAN to a server where the system has been
install. Hence, all the related information about a
passenger is available to Admin and Employees.
Thus this software say. the entire
passenger's long
queue and hassle.

1.1 Background
Horizon coach is a trans, company
Located in CBD Nairobi Kenya along Accra road. It
was started in 1958. The company is most well
knonm passenger, courier, parcel delivery and
tran.ort company operator in East Africa

which provide the safest, most comfortable lux,


bus. on Kenyan roads today.
Problem Statement
In Horizon Coach, most of the drtver information is
kept in a file. Thereto, it is quite hard for them to
search the driver information when needed.
Moreover, it uses a lot of papers and data is lost
because no bacicup provided for the ta Some of
the dza is quite hard to read because the fonn was
frilled up by hand miting.
Ot.r problems that occur in Bus Information is
its maintenance record. Most of the bus
tracking
will be maintained at list four times in year. By
using a manual tom, each bus must have its own
maintenance record file. Problems that occur to
this manual system are to store the maintenance
C.ord file and
to find it back. It takes quite a time in order to find
the correct maintenance record needed.
Proposed solution:
Horizon Coach have decided to take charge in
designing a system that is friendly and will try to
work out solution in a way that favors the interests
of every customer and workers, solve
problems
faster, manage data, so that al the transactions
become fast and there should not be any error in
transaction like calculation mistake and bill
generation.

1.3 Objectives
The objective of "Bus booking management
system is to easily track the information of all
Customers, drivers and bus destination. The main
goal of the software is to build a good management
tool for all customers. The main purpose of this
software is to reduce the time taken through
manual system in order to maintain all the records.
Justifications:
The purposes of this system is to help easily
capture the information of all patients and to
reduce the time taken through manual system in
order to maintain all the records.

1.5 Scope
This system is helpful to reduce the time and
complexity of maintaining the records. It also helps
in accurate maintenance of passengers and
drivers.-lt can be used in any transport company
for maintaining Passenger details
Data Collection mathodogies
Horizon coach uses a manual system but is not
efficient on passenger's detail. So l thought there
was a need to improve on
passenger registration
system to overcome some problems.
Data collection tools

They include the following


1. Observation-I observed that their system is not
efficient on keeping a passenger registration
details this give the passenger a hard time if one
loses receipt issued.

2. Documentation review- all the documents used


to record transactions and capturing of information
were available. These gave me views of what kind
of data is involved in the current system to enable
me borrow from it.
Problems identified in the collected data:

1. Security: -data stored in database can be


access by unauthorized person because of using
access database which is weak and it cannot
prevent unauthorized people from access it. This
lead to information stored in their database being
interfered and damaged.
2. The system is slow - because its users keeping
information manually in books which can easily be
Overwrite.
1.7 Development Method

The methodology that I used through out the


development process was a variation on the
waterfall life cycle. As the requirements for the
project was unlikely to change dramatically. If the
project looked like the requirements would be
changing often a more agile methodology would
have been chosen. The waterfall ifecycle works by
following a strict path through the development
process not moving on to the next stage until the
previous stage has been completed.

You might also like