Statement showing Unit wise structure to be designed of Dudhai sub Branch Canal from 23346 to 68522 m As on date 25-11-2022

Unit wise
Unit No. Name of Structure Nos. Chainage in m
Structures
Long Barrel 2 23346-23926 48872-49352 63062
CR/CSY/VRB 2 35497 61838
CR/CSY 2 31756 38521
UNIT-I 08 nos
CR/Long CSY 0 29716 -30406 44111 - 47311 53822-54362 57782-58622
CR/FALL 1 25457-25517
Long CSY 1 35831 43091 - 43961 54572 - 54842 55112 - 55772
CSY 5 24869 (new 24774) 40001 59843 63422 64788
24202 25249 25442 26416 27168 28289 28546 33696 35151
DSY 26 35343 36914 37281 37918 39561 47771 49891 50432 53162
56520 56792 60242 61652 62468 62612 64052 64322
25951 26716 27324 27515 27916 28926 29063 29510 30690
Drainage Culvert 20 32392 32968 33265 33988 34298 34671 41686 42041 51512
UNIT-II 51897 60780 73 nos

25706 31186 32531 34456 35386 41456 49544 50606 52862


HR 13
53786 59236 63632 65536
SP 3 65462 66062 66602
Escape 3 38256 51722 68522
CR 2 40485 50072
CR/FALL 1 24046
25109 27826 28246 30772 31566 32187 33766 36477 37233
UNIT-IV VRB 24 37804 38044 38827 40315 47977 49448 49882 52314 56192 24 nos

60430 63002 64562 65432 66811 67606


Total Stracture in 23.346 to
105 105 nos
68.522 km

Structures are on hold and not to be considered in total number as of now


GAD, Detailed Drawings, Construction Stage Drawings 61
Barrel Size Prepared 20
Design Under Preparation 5
Data Under Compliance 19
Total 105