Estimate cost as per

Sr No. Type of Structure Chainage (m) Package No. Estimate cost for AA Weightage (%) Design

1 2 3 4 5 6 7
1 Long Barrel 23346 - 23926 DIR-III 69,85,28,900 5.48 50,99,25,000
2 CR_Fall (4.0m) 24046 DIR-III 4,73,23,500 0.37 1,32,87,100
3 DSY 24202 DIR-III 3,16,89,699 0.25
CSY (Combine for Drain @
4 24869 DIR-III 32,56,47,845 2.56
24739m & 24869m)
5 VRB 25109 DIR-III 1,96,00,000 0.15 87,90,000
6 DSY 25249 DIR-III 3,16,89,699 0.25
7 DSY 25442 DIR-III 3,80,54,525 0.30 1,08,40,000
8 CR_Fall (2.80m) 25516 DIR-III 4,73,23,500 0.37 2,03,40,100
9 HR_11/Fall 25706 DIR-III ,42,93,300 0.03 15,40,600
10 Drainage Culvert 25951 DIR-III 2,61,20,283 0.21
11 DSY 26416 DIR-III 3,16,89,699 0.25
12 Drainage Culvert 26716 DIR-III 2,61,20,283 0.21
13 DSY 27168 DIR-III 3,16,89,699 0.25
14 Drainage Culvert 27324 DIR-III 3,13,66,500 0.25 2,41,69,645
15 Drainage Culvert 27515 DIR-III 2,61,20,283 0.21
16 VRB 27826 DIR-III 1,96,00,000 0.15 95,90,000
17 Drainage Culvert 27916 DIR-III 2,61,20,283 0.21
18 VRB 28246 DIR-III 1,96,00,000 0.15 1,36,10,000
19 DSY 28289 DIR-III 3,16,89,699 0.25
20 DSY 28546 DIR-III 3,16,89,699 0.25
21 Drainage Culvert 28926 DIR-III 2,61,20,283 0.21
22 Drainage Culvert 29063 DIR-III 2,61,20,283 0.21
23 Drainage Culvert 29510 DIR-III 2,61,20,283 0.21
24 CR_Long Syphon 29716 - 30406 DIR-IV 64,11,31,877 5.03
25 Drainage Culvert 30690 DIR-IV 2,61,20,283 0.21
26 VRB 30772 DIR-IV 1,63,21,794 0.13
27 HR_12/Fall 31186 DIR-IV ,35,75,222 0.03
28 VRB 31566 DIR-IV 1,63,21,794 0.13
29 CR_CSY 31756 DIR-IV 4,45,45,173 0.35
30 DSY/Drainage Culvert 32171 DIR-IV 3,16,89,699 0.25
31 VRB 32187 DIR-IV 1,63,21,794 0.13
32 Drainage Culvert 32392 DIR-IV 2,61,20,283 0.21
33 HR_13/Fall 32531 DIR-IV ,35,75,222 0.03
34 Drainage Culvert 32968 DIR-IV 2,61,20,283 0.21
35 CSY 33265 DIR-IV 32,56,47,845 2.56
36 DSY 33696 DIR-IV 3,16,89,699 0.25
37 VRB 33766 DIR-IV 1,63,21,794 0.13
38 Drainage Culvert 33988 DIR-IV 2,61,20,283 0.21
Drainage Culvert (Drain @
39 34298 DIR-IV 2,61,20,283 0.21
34267m to be diverted)
40 HR_14/Fall 34456 DIR-IV ,35,75,222 0.03
41 CSY 34671 DIR-IV 32,56,47,845 2.56
42 DSY 35151 DIR-IV 3,16,89,699 0.25
43 DSY 35343 DIR-IV 3,16,89,699 0.25
44 HR_15/Fall 35386 DIR-IV ,35,75,222 0.03
45 CR_VRB_CSY 35497 DIR-IV 1,62,81,072 0.13
46 Long_CSY 35831 DIR-IV 51,41,95,456 4.04
47 VRB 36477 DIR-IV 1,63,21,794 0.13
48 DSY 36914 DIR-IV 3,16,89,699 0.25
49 VRB 37233 DIR-IV 1,63,21,794 0.13
50 DSY 37281 DIR-IV 3,16,89,699 0.25
51 VRB 37804 DIR-IV 1,63,21,794 0.13
52 DSY 37918 DIR-IV 3,16,89,699 0.25
53 VRB 38044 DIR-IV 1,96,00,000 0.15 74,00,000
54 Escape 38256 DIR-IV ,28,32,497 0.02
55 Nihwara Nala_CR_CSY 38521 DIR-IV 5,34,92,000 0.42 20,87,30,000
56 VRB 38827 DIR-V 1,96,00,000 0.15 1,32,70,000
57 DSY 39561 DIR-V 3,16,89,699 0.25
58 Lotia_River_CSY 40001 DIR-V 32,56,47,845 2.56
59 VRB 40315 DIR-V 1,63,21,794 0.13
60 CR_CSY_Existing Canal 40485 DIR-V 4,45,45,173 0.35
61 HR_16/Fall 41456 DIR-V ,35,75,222 0.03
62 Drainage Culvert 41686 DIR-V 2,61,20,283 0.21
63 Drainage Culvert 42041 DIR-V 2,61,20,283 0.21
64 Long CSY 43091 - 43961 DIR-V 85,01,69,750 6.67
65 CR_Long CSY 44111 - 47311 DIR-VI 314,63,51,732 24.70
66 DSY 47771 DIR-VII 3,16,89,699 0.25
67 VRB 47977 DIR-VII 1,63,21,794 0.13
68 Kaswali_River_SP 49137 DIR-VII 1,54,05,858 0.12
69 VRB 49448 DIR-VII 1,63,21,794 0.13
70 HR_17 49544 DIR-VII ,28,22,838 0.02
71 VRB 49882 DIR-VII 1,63,21,794 0.13
72 DSY 49891 DIR-VII 3,16,89,699 0.25
CR_Existing Canal_CSY
(Combine structure for Existing
73 50072 DIR-VII 1,43,24,206 0.11
Canal @ 50032m & Drain @
50072m)
74 DSY 50432 DIR-VII 3,16,89,699 0.25
75 HR_18 50606 DIR-VII ,28,22,838 0.02
76 SP_Existing Canal 50720 DIR-VII 1,54,05,858 0.12
77 Drainage Culvert 51512 DIR-VII 2,61,20,283 0.21
78 Escape 51722 DIR-VII ,28,32,497 0.02
79 CSY_Center of Pool 51897 DIR-VII 32,56,47,845 2.56
80 VRB 52314 DIR-VII 1,63,21,794 0.13
81 HR_19 52862 DIR-VII ,28,22,838 0.02
82 DSY 53162 DIR-VII 3,16,89,699 0.25
83 HR-20/Fall 53786 DIR-VII ,35,75,222 0.03
84 CR_Long Syphon 53822-54362 DIR-VII 46,79,86,460 3.67
85 Long Syphon 54572 - 54842 DIR-VII 25,13,58,869 1.97
86 Long Syphon 55112 - 55772 DIR-VII 56,63,69,235 4.45
87 DSY 56042 DIR-VII 3,16,89,699 0.25
88 VRB 56192 DIR-VII 1,63,21,794 0.13
89 DSY 56520 DIR-VII 3,16,89,699 0.25
90 DSY/Drainage Culvert 56792 DIR-VII 3,16,89,699 0.25
91 CR_Long Syphon 57782 - 58622 DIR-VIII 74,60,94,916 5.86
92 CSY_Existing Canal 59063 DIR-VIII 32,56,47,845 2.56
93 HR_21/Fall 59236 DIR-VIII ,35,75,222 0.03
94 CSY_Center of Pool 59843 DIR-VIII 32,56,47,845 2.56
95 DSY 60242 DIR-VIII 3,16,89,699 0.25
96 VRB 60430 DIR-VIII 1,63,21,794 0.13
97 Drainage Culvert 60780 DIR-VIII 2,61,20,283 0.21
DSY (Drain @ 61546m to be
98 61652 DIR-VIII 3,16,89,699 0.25
diverted to this drain)
CR_VRB_CSY (Combine
99 structure for CTC @ 61838m & 61838 DIR-VIII 1,62,81,072 0.13
drain @ 61890m)
100 DSY 62468 DIR-VIII 3,16,89,699 0.25
101 DSY 62612 DIR-VIII 3,16,89,699 0.25
102 VRB 63002 DIR-VIII 1,63,21,794 0.13
103 SP 63062 DIR-VIII 1,54,05,858 0.12
104 CSY 63422 DIR-VIII 32,56,47,845 2.56
105 HR_22/Fall 63632 DIR-VIII ,35,75,222 0.03
106 DSY 64052 DIR-VIII 3,16,89,699 0.25
107 DSY 64322 DIR-VIII 3,16,89,699 0.25
108 VRB 64562 DIR-VIII 1,63,21,794 0.13
109 DSY 64788 DIR-VIII 3,16,89,699 0.25
110 VRB 65432 DIR-VIII 1,63,21,794 0.13
111 SP 65462 DIR-VIII 1,54,05,858 0.12
112 HR_23 65536 DIR-VIII ,28,22,838 0.02
113 SP 66062 DIR-VIII 1,54,05,858 0.12
114 SP 66602 DIR-VIII 1,54,05,858 0.12
115 VRB 66811 DIR-VIII 1,63,21,794 0.13
116 VRB 67606 DIR-VIII 1,63,21,794 0.13
117 CR_Tail_Escape_Pur_River 68522 DIR-VIII 4,17,06,180 0.33
Total 1273,82,49,600 100.00
Estimate cost as per
Sr Str Weightage
Type of Structure Chainage (m) Package No. Estimate cost for AA Design
No. No. (%)

1 1 2 3 4 5 6 7
1 65 CR_Long CSY 44111 - 47311 DIR-VI 379,50,40,200 29.79 316,94,90,000
2 64 Long CSY 43091 - 43961 DIR-V 85,01,69,750 6.67
3 91 CR_Long Syphon 57782 - 58622 DIR-VIII 89,59,46,900 7.03
4 1 Long Barrel 23346 - 23926 DIR-III 69,85,28,900 5.48 50,99,25,000
5 24 CR_Long Syphon 29716 - 30406 DIR-IV 64,11,31,877 5.03
6 86 Long Syphon 55112 - 55772 DIR-VII 69,23,40,449 5.44
7 46 Long_CSY 35831 DIR-IV 51,41,95,456 4.04
8 84 CR_Long Syphon 53822-54362 DIR-VII 56,64,60,367 4.45
CSY (Combine for Drain @
9 4 24869 DIR-III 10,56,47,845 0.83
24739m & 24869m)
10 35 CSY 33265 DIR-IV 20,56,47,845 1.61
11 41 CSY 34671 DIR-IV 20,56,47,845 1.61
12 58 Lotia_River_CSY 40001 DIR-V 20,56,47,845 1.61
13 79 CSY_Center of Pool 51897 DIR-VII 20,56,47,845 1.61
14 92 **CSY_Existing Canal 59063 DIR-VIII 20,56,47,845 1.61 ,,,0
15 94 CSY_Center of Pool 59843 DIR-VIII 20,56,47,845 1.61
16 104 CSY 63422 DIR-VIII 20,56,47,845 1.61
17 85 Long Syphon 54572 - 54842 DIR-VII 28,32,30,183 2.22
18 55 Nihwara Nala_CR_CSY 38521 DIR-IV 5,34,92,000 0.42 20,87,30,000
19 2 CR_Fall (4.0m) 24046 DIR-III 4,73,23,500 0.37 1,32,87,100
20 8 CR_Fall (2.80m) 25516 DIR-III 4,73,23,500 0.37 2,03,40,100
21 29 CR_CSY 31756 DIR-IV 4,45,45,173 0.35 24,81,60,000
22 60 CR_CSY_Existing Canal 40485 DIR-V 4,45,45,173 0.35
23 117 CR_Tail_Escape_Pur_River 68522 DIR-VIII 4,17,06,180 0.33
24 7 DSY 25442 DIR-III 3,80,54,525 0.30 1,08,40,000
25 3 DSY 24202 DIR-III 3,16,89,699 0.25 77,90,000
26 6 DSY 25249 DIR-III 3,16,89,699 0.25
27 11 DSY 26416 DIR-III 3,16,89,699 0.25 85,88,000
28 13 DSY 27168 DIR-III 3,16,89,699 0.25
29 19 DSY 28289 DIR-III 3,16,89,699 0.25
30 20 DSY 28546 DIR-III 3,16,89,699 0.25
31 30 **DSY/Drainage Culvert 32171 DIR-IV 3,16,89,699 0.25 ,,,0
32 36 DSY 33696 DIR-IV 3,16,89,699 0.25
33 42 DSY 35151 DIR-IV 3,16,89,699 0.25
34 43 DSY 35343 DIR-IV 3,16,89,699 0.25
35 48 DSY 36914 DIR-IV 3,16,89,699 0.25
36 50 DSY 37281 DIR-IV 3,16,89,699 0.25
37 52 DSY 37918 DIR-IV 3,16,89,699 0.25
38 57 DSY 39561 DIR-V 3,16,89,699 0.25
39 66 DSY 47771 DIR-VII 3,16,89,699 0.25
40 72 DSY 49891 DIR-VII 3,16,89,699 0.25
41 74 DSY 50432 DIR-VII 3,16,89,699 0.25
42 82 DSY 53162 DIR-VII 3,16,89,699 0.25
43 87 **DSY 56042 DIR-VII 3,16,89,699 0.25 ,,,0
44 89 DSY 56520 DIR-VII 3,16,89,699 0.25
45 90 DSY/Drainage Culvert 56792 DIR-VII 3,16,89,699 0.25
46 95 DSY 60242 DIR-VIII 3,16,89,699 0.25
DSY (Drain @ 61546m to be
47 98 61652 DIR-VIII 3,16,89,699 0.25
diverted to this drain)
48 100 DSY 62468 DIR-VIII 3,16,89,699 0.25
49 101 DSY 62612 DIR-VIII 3,16,89,699 0.25
50 106 DSY 64052 DIR-VIII 3,16,89,699 0.25
51 107 DSY 64322 DIR-VIII 3,16,89,699 0.25
52 109 DSY 64788 DIR-VIII 3,16,89,699 0.25
Estimate cost as per
Sr Str Weightage
Type of Structure Chainage (m) Package No. Estimate cost for AA Design
No. No. (%)

1 1 2 3 4 5 6 7
53 14 Drainage Culvert 27324 DIR-III 3,13,66,500 0.25 2,41,69,645
54 10 Drainage Culvert 25951 DIR-III 2,61,20,283 0.21
55 12 Drainage Culvert 26716 DIR-III 2,61,20,283 0.21
56 15 Drainage Culvert 27515 DIR-III 2,61,20,283 0.21
57 17 Drainage Culvert 27916 DIR-III 2,61,20,283 0.21
58 21 Drainage Culvert 28926 DIR-III 2,61,20,283 0.21
59 22 Drainage Culvert 29063 DIR-III 2,61,20,283 0.21
60 23 Drainage Culvert 29510 DIR-III 2,61,20,283 0.21
61 25 Drainage Culvert 30690 DIR-IV 2,61,20,283 0.21
62 32 Drainage Culvert 32392 DIR-IV 2,61,20,283 0.21
63 34 Drainage Culvert 32968 DIR-IV 2,61,20,283 0.21
64 38 Drainage Culvert 33988 DIR-IV 2,61,20,283 0.21 1,58,00,000
Drainage Culvert (Drain @
65 39 34298 DIR-IV 2,61,20,283 0.21
34267m to be diverted)
66 62 Drainage Culvert 41686 DIR-V 2,61,20,283 0.21
67 63 Drainage Culvert 42041 DIR-V 2,61,20,283 0.21
68 77 Drainage Culvert 51512 DIR-VII 2,61,20,283 0.21
69 97 Drainage Culvert 60780 DIR-VIII 2,61,20,283 0.21 2,44,30,000
70 5 VRB 25109 DIR-III 1,96,00,000 0.15 87,90,000
71 16 VRB 27826 DIR-III 1,96,00,000 0.15 95,90,000
72 18 VRB 28246 DIR-III 1,96,00,000 0.15 1,36,10,000
73 53 VRB 38044 DIR-IV 1,96,00,000 0.15 74,00,000
74 56 VRB 38827 DIR-V 1,96,00,000 0.15 1,32,70,000
75 26 VRB 30772 DIR-IV 1,63,21,794 0.13
76 28 VRB 31566 DIR-IV 1,63,21,794 0.13 1,04,10,000
77 31 VRB 32187 DIR-IV 1,63,21,794 0.13 1,02,60,000
78 37 VRB 33766 DIR-IV 1,63,21,794 0.13
79 47 VRB 36477 DIR-IV 1,63,21,794 0.13
80 49 VRB 37233 DIR-IV 1,63,21,794 0.13 1,17,70,000
81 51 VRB 37804 DIR-IV 1,63,21,794 0.13
82 59 VRB 40315 DIR-V 1,63,21,794 0.13
83 67 VRB 47977 DIR-VII 1,63,21,794 0.13 1,58,80,000
84 69 VRB 49448 DIR-VII 1,63,21,794 0.13
85 71 VRB 49882 DIR-VII 1,63,21,794 0.13
86 80 VRB 52314 DIR-VII 1,63,21,794 0.13
87 88 VRB 56192 DIR-VII 1,63,21,794 0.13 1,34,60,000
88 96 VRB 60430 DIR-VIII 1,63,21,794 0.13
89 102 VRB 63002 DIR-VIII 1,63,21,794 0.13
90 108 VRB 64562 DIR-VIII 1,63,21,794 0.13
91 110 VRB 65432 DIR-VIII 1,63,21,794 0.13
92 115 VRB 66811 DIR-VIII 1,63,21,794 0.13
93 116 VRB 67606 DIR-VIII 1,63,21,794 0.13 97,50,000
94 45 CR_VRB_CSY 35497 DIR-IV 1,62,81,072 0.13

CR_VRB_CSY (Combine
95 99 structure for CTC @ 61838m 61838 DIR-VIII 2,14,24,168 0.17
& drain @ 61890m)

96 68 Kaswali_River_SP 49137 DIR-VII 1,54,05,858 0.12


97 76 **SP_Existing Canal 50720 DIR-VII 1,54,05,858 0.12 ,,,0
98 103 SP 63062 DIR-VIII 1,54,05,858 0.12
99 111 SP 65462 DIR-VIII 1,54,05,858 0.12
100 113 SP 66062 DIR-VIII 1,54,05,858 0.12
101 114 SP 66602 DIR-VIII 1,54,05,858 0.12
Estimate cost as per
Sr Str Weightage
Type of Structure Chainage (m) Package No. Estimate cost for AA Design
No. No. (%)

1 1 2 3 4 5 6 7
CR_Existing Canal_CSY
(Combine structure for
102 73 50072 DIR-VII 1,43,24,206 0.11
Existing Canal @ 50032m &
Drain @ 50072m)
9 HR_11/Fall 25706 DIR-III 42,93,300 0.03 15,40,600
104 27 HR_12/Fall 31186 DIR-IV 35,75,222 0.03 12,83,000
105 33 HR_13/Fall 32531 DIR-IV 35,75,222 0.03
106 40 HR_14/Fall 34456 DIR-IV 35,75,222 0.03
107 44 HR_15/Fall 35386 DIR-IV 35,75,222 0.03
108 61 HR_16/Fall 41456 DIR-V 35,75,222 0.03
109 83 HR-20/Fall 53786 DIR-VII 35,75,222 0.03
110 93 HR_21/Fall 59236 DIR-VIII 35,75,222 0.03
111 105 HR_22/Fall 63632 DIR-VIII 35,75,222 0.03
112 54 Escape 38256 DIR-IV 28,32,497 0.02
113 78 Escape 51722 DIR-VII 28,32,497 0.02
114 70 HR_17 49544 DIR-VII 28,22,838 0.02
115 75 HR_18 50606 DIR-VII 28,22,838 0.02
116 81 HR_19 52862 DIR-VII 28,22,838 0.02
117 112 HR_23 65536 DIR-VIII 28,22,838 0.02
Total 1273,82,49,600 100.00

Note:- ** structures are omitted as per decided with design circle


All Pkg in Descending order
Estimate cost as per
Sr Str Weightage
Type of Structure Chainage (m) Package No. Estimate cost for AA Design
No. No. (%)

1 1 2 3 4 5 6 7
1 65 CR_Long CSY 44111 - 47311 DIR-VI 379,50,40,200 29.79 316,94,90,000
2 64 Long CSY 43091 - 43961 DIR-V 85,01,69,750 6.67
3 91 CR_Long Syphon 57782 - 58622 DIR-VIII 89,59,46,900 7.03
4 1 Long Barrel 23346 - 23926 DIR-III 69,85,28,900 5.48 50,99,25,000
5 24 CR_Long Syphon 29716 - 30406 DIR-IV 64,11,31,877 5.03
6 86 Long Syphon 55112 - 55772 DIR-VII 69,23,40,449 5.44
7 46 Long_CSY 35831 DIR-IV 51,41,95,456 4.04
8 84 CR_Long Syphon 53822-54362 DIR-VII 56,64,60,367 4.45
CSY (Combine for Drain @
9 4 24869 DIR-III 10,56,47,845 0.83
24739m & 24869m)
10 35 CSY 33265 DIR-IV 20,56,47,845 1.61
11 41 CSY 34671 DIR-IV 20,56,47,845 1.61
12 58 Lotia_River_CSY 40001 DIR-V 20,56,47,845 1.61
13 79 CSY_Center of Pool 51897 DIR-VII 20,56,47,845 1.61
14 92 **CSY_Existing Canal 59063 DIR-VIII 20,56,47,845 1.61 ,,,0
15 94 CSY_Center of Pool 59843 DIR-VIII 20,56,47,845 1.61
16 104 CSY 63422 DIR-VIII 20,56,47,845 1.61
17 85 Long Syphon 54572 - 54842 DIR-VII 28,32,30,183 2.22
18 55 Nihwara Nala_CR_CSY 38521 DIR-IV 5,34,92,000 0.42 20,87,30,000
19 2 CR_Fall (4.0m) 24046 DIR-III 4,73,23,500 0.37 1,32,87,100
20 8 CR_Fall (2.80m) 25516 DIR-III 4,73,23,500 0.37 2,03,40,100
21 29 CR_CSY 31756 DIR-IV 4,45,45,173 0.35 24,81,60,000
22 60 CR_CSY_Existing Canal 40485 DIR-V 4,45,45,173 0.35
23 117 CR_Tail_Escape_Pur_River 68522 DIR-VIII 4,17,06,180 0.33
24 7 DSY 25442 DIR-III 3,80,54,525 0.30 1,08,40,000
25 3 DSY 24202 DIR-III 3,16,89,699 0.25 77,90,000
26 6 DSY 25249 DIR-III 3,16,89,699 0.25
27 11 DSY 26416 DIR-III 3,16,89,699 0.25 85,88,000
28 13 DSY 27168 DIR-III 3,16,89,699 0.25
29 19 DSY 28289 DIR-III 3,16,89,699 0.25
30 20 DSY 28546 DIR-III 3,16,89,699 0.25
31 30 **DSY/Drainage Culvert 32171 DIR-IV 3,16,89,699 0.25 ,,,0
32 36 DSY 33696 DIR-IV 3,16,89,699 0.25
33 42 DSY 35151 DIR-IV 3,16,89,699 0.25
34 43 DSY 35343 DIR-IV 3,16,89,699 0.25
35 48 DSY 36914 DIR-IV 3,16,89,699 0.25
36 50 DSY 37281 DIR-IV 3,16,89,699 0.25
37 52 DSY 37918 DIR-IV 3,16,89,699 0.25
38 57 DSY 39561 DIR-V 3,16,89,699 0.25
39 66 DSY 47771 DIR-VII 3,16,89,699 0.25
40 72 DSY 49891 DIR-VII 3,16,89,699 0.25
41 74 DSY 50432 DIR-VII 3,16,89,699 0.25
42 82 DSY 53162 DIR-VII 3,16,89,699 0.25
43 87 **DSY 56042 DIR-VII 3,16,89,699 0.25 ,,,0
44 89 DSY 56520 DIR-VII 3,16,89,699 0.25
45 90 DSY/Drainage Culvert 56792 DIR-VII 3,16,89,699 0.25
46 95 DSY 60242 DIR-VIII 3,16,89,699 0.25
DSY (Drain @ 61546m to be
47 98 61652 DIR-VIII 3,16,89,699 0.25
diverted to this drain)
48 100 DSY 62468 DIR-VIII 3,16,89,699 0.25
49 101 DSY 62612 DIR-VIII 3,16,89,699 0.25
50 106 DSY 64052 DIR-VIII 3,16,89,699 0.25
51 107 DSY 64322 DIR-VIII 3,16,89,699 0.25
Estimate cost as per
Sr Str Weightage
Type of Structure Chainage (m) Package No. Estimate cost for AA Design
No. No. (%)

1 1 2 3 4 5 6 7
52 109 DSY 64788 DIR-VIII 3,16,89,699 0.25
53 14 Drainage Culvert 27324 DIR-III 3,13,66,500 0.25 2,41,69,645
54 10 Drainage Culvert 25951 DIR-III 2,61,20,283 0.21
55 12 Drainage Culvert 26716 DIR-III 2,61,20,283 0.21
56 15 Drainage Culvert 27515 DIR-III 2,61,20,283 0.21
57 17 Drainage Culvert 27916 DIR-III 2,61,20,283 0.21
58 21 Drainage Culvert 28926 DIR-III 2,61,20,283 0.21
59 22 Drainage Culvert 29063 DIR-III 2,61,20,283 0.21
60 23 Drainage Culvert 29510 DIR-III 2,61,20,283 0.21
61 25 Drainage Culvert 30690 DIR-IV 2,61,20,283 0.21
62 32 Drainage Culvert 32392 DIR-IV 2,61,20,283 0.21
63 34 Drainage Culvert 32968 DIR-IV 2,61,20,283 0.21
64 38 Drainage Culvert 33988 DIR-IV 2,61,20,283 0.21 1,58,00,000
Drainage Culvert (Drain @
65 39 34298 DIR-IV 2,61,20,283 0.21
34267m to be diverted)
66 62 Drainage Culvert 41686 DIR-V 2,61,20,283 0.21
67 63 Drainage Culvert 42041 DIR-V 2,61,20,283 0.21
68 77 Drainage Culvert 51512 DIR-VII 2,61,20,283 0.21
69 97 Drainage Culvert 60780 DIR-VIII 2,61,20,283 0.21 2,44,30,000
70 5 VRB 25109 DIR-III 1,96,00,000 0.15 87,90,000
71 16 VRB 27826 DIR-III 1,96,00,000 0.15 95,90,000
72 18 VRB 28246 DIR-III 1,96,00,000 0.15 1,36,10,000
73 53 VRB 38044 DIR-IV 1,96,00,000 0.15 74,00,000
74 56 VRB 38827 DIR-V 1,96,00,000 0.15 1,32,70,000
75 26 VRB 30772 DIR-IV 1,63,21,794 0.13
76 28 VRB 31566 DIR-IV 1,63,21,794 0.13
77 31 VRB 32187 DIR-IV 1,63,21,794 0.13 1,02,60,000
78 37 VRB 33766 DIR-IV 1,63,21,794 0.13
79 47 VRB 36477 DIR-IV 1,63,21,794 0.13
80 49 VRB 37233 DIR-IV 1,63,21,794 0.13 1,17,70,000
81 51 VRB 37804 DIR-IV 1,63,21,794 0.13
82 59 VRB 40315 DIR-V 1,63,21,794 0.13
83 67 VRB 47977 DIR-VII 1,63,21,794 0.13 1,58,80,000
84 69 VRB 49448 DIR-VII 1,63,21,794 0.13
85 71 VRB 49882 DIR-VII 1,63,21,794 0.13
86 80 VRB 52314 DIR-VII 1,63,21,794 0.13
87 88 VRB 56192 DIR-VII 1,63,21,794 0.13 1,34,60,000
88 96 VRB 60430 DIR-VIII 1,63,21,794 0.13
89 102 VRB 63002 DIR-VIII 1,63,21,794 0.13
90 108 VRB 64562 DIR-VIII 1,63,21,794 0.13
91 110 VRB 65432 DIR-VIII 1,63,21,794 0.13
92 115 VRB 66811 DIR-VIII 1,63,21,794 0.13
93 116 VRB 67606 DIR-VIII 1,63,21,794 0.13 97,50,000
94 45 CR_VRB_CSY 35497 DIR-IV 1,62,81,072 0.13

CR_VRB_CSY (Combine
95 99 structure for CTC @ 61838m 61838 DIR-VIII 2,14,24,168 0.17
& drain @ 61890m)

96 68 Kaswali_River_SP 49137 DIR-VII 1,54,05,858 0.12


97 76 **SP_Existing Canal 50720 DIR-VII 1,54,05,858 0.12 ,,,0
98 103 SP 63062 DIR-VIII 1,54,05,858 0.12
99 111 SP 65462 DIR-VIII 1,54,05,858 0.12
100 113 SP 66062 DIR-VIII 1,54,05,858 0.12
101 114 SP 66602 DIR-VIII 1,54,05,858 0.12
Estimate cost as per
Sr Str Weightage
Type of Structure Chainage (m) Package No. Estimate cost for AA Design
No. No. (%)

1 1 2 3 4 5 6 7
CR_Existing Canal_CSY
(Combine structure for
102 73 50072 DIR-VII 1,43,24,206 0.11
Existing Canal @ 50032m &
Drain @ 50072m)
9 HR_11/Fall 25706 DIR-III 42,93,300 0.03 15,40,600
104 27 HR_12/Fall 31186 DIR-IV 35,75,222 0.03 12,83,000
105 33 HR_13/Fall 32531 DIR-IV 35,75,222 0.03
106 40 HR_14/Fall 34456 DIR-IV 35,75,222 0.03
107 44 HR_15/Fall 35386 DIR-IV 35,75,222 0.03
108 61 HR_16/Fall 41456 DIR-V 35,75,222 0.03
109 83 HR-20/Fall 53786 DIR-VII 35,75,222 0.03
110 93 HR_21/Fall 59236 DIR-VIII 35,75,222 0.03
111 105 HR_22/Fall 63632 DIR-VIII 35,75,222 0.03
112 54 Escape 38256 DIR-IV 28,32,497 0.02
113 78 Escape 51722 DIR-VII 28,32,497 0.02
114 70 HR_17 49544 DIR-VII 28,22,838 0.02
115 75 HR_18 50606 DIR-VII 28,22,838 0.02
116 81 HR_19 52862 DIR-VII 28,22,838 0.02
117 112 HR_23 65536 DIR-VIII 28,22,838 0.02
Total 1273,82,49,600 100.00

Note:- ** structures are omitted as per decided with design circle


Comparison pkg wise desending order
Package Estimate cost for
Sr No. Str No. Type of Structure Chainage (m)
No. AA

1 65 CR_Long CSY 44111 - 47311 DIR-VI 379,50,40,200


3 91 CR_Long Syphon 57782 - 58622 DIR-VIII 89,59,46,900
2 64 Long CSY 43091 - 43961 DIR-V 85,01,69,750
4 1 Long Barrel 23346 - 23926 DIR-III 69,85,28,900
6 86 Long Syphon 55112 - 55772 DIR-VII 69,23,40,449
5 24 CR_Long Syphon 29716 - 30406 DIR-IV 64,11,31,877
8 84 CR_Long Syphon 53822-54362 DIR-VII 56,64,60,367
7 46 Long_CSY 35831 DIR-IV 51,41,95,456
17 85 Long Syphon 54572 - 54842 DIR-VII 28,32,30,183
10 35 CSY 33265 DIR-IV 20,56,47,845
11 41 CSY 34671 DIR-IV 20,56,47,845
12 58 Lotia_River_CSY 40001 DIR-V 20,56,47,845
13 79 CSY_Center of Pool 51897 DIR-VII 20,56,47,845
14 92 **CSY_Existing Canal 59063 DIR-VIII 20,56,47,845
15 94 CSY_Center of Pool 59843 DIR-VIII 20,56,47,845
16 104 CSY 63422 DIR-VIII 20,56,47,845
CSY (Combine for Drain @
9 4 24869 DIR-III 10,56,47,845
24739m & 24869m)
18 55 Nihwara Nala_CR_CSY 38521 DIR-IV 5,34,92,000
19 2 CR_Fall (4.0m) 24046 DIR-III 4,73,23,500
20 8 CR_Fall (2.80m) 25516 DIR-III 4,73,23,500
21 29 CR_CSY 31756 DIR-IV 4,45,45,173
22 60 CR_CSY_Existing Canal 40485 DIR-V 4,45,45,173
23 117 CR_Tail_Escape_Pur_River 68522 DIR-VIII 4,17,06,180
24 7 DSY 25442 DIR-III 3,80,54,525
25 3 DSY 24202 DIR-III 3,16,89,699
26 6 DSY 25249 DIR-III 3,16,89,699
27 11 DSY 26416 DIR-III 3,16,89,699
28 13 DSY 27168 DIR-III 3,16,89,699
29 19 DSY 28289 DIR-III 3,16,89,699
30 20 DSY 28546 DIR-III 3,16,89,699
31 30 **DSY/Drainage Culvert 32171 DIR-IV 3,16,89,699
32 36 DSY 33696 DIR-IV 3,16,89,699
33 42 DSY 35151 DIR-IV 3,16,89,699
34 43 DSY 35343 DIR-IV 3,16,89,699
35 48 DSY 36914 DIR-IV 3,16,89,699
36 50 DSY 37281 DIR-IV 3,16,89,699
37 52 DSY 37918 DIR-IV 3,16,89,699
38 57 DSY 39561 DIR-V 3,16,89,699
39 66 DSY 47771 DIR-VII 3,16,89,699
40 72 DSY 49891 DIR-VII 3,16,89,699
41 74 DSY 50432 DIR-VII 3,16,89,699
42 82 DSY 53162 DIR-VII 3,16,89,699
43 87 **DSY 56042 DIR-VII 3,16,89,699
44 89 DSY 56520 DIR-VII 3,16,89,699
45 90 DSY/Drainage Culvert 56792 DIR-VII 3,16,89,699
46 95 DSY 60242 DIR-VIII 3,16,89,699
DSY (Drain @ 61546m to be
47 98 61652 DIR-VIII 3,16,89,699
diverted to this drain)
48 100 DSY 62468 DIR-VIII 3,16,89,699
49 101 DSY 62612 DIR-VIII 3,16,89,699
50 106 DSY 64052 DIR-VIII 3,16,89,699
51 107 DSY 64322 DIR-VIII 3,16,89,699
52 109 DSY 64788 DIR-VIII 3,16,89,699
53 14 Drainage Culvert 27324 DIR-III 3,13,66,500
54 10 Drainage Culvert 25951 DIR-III 2,61,20,283
55 12 Drainage Culvert 26716 DIR-III 2,61,20,283
56 15 Drainage Culvert 27515 DIR-III 2,61,20,283
57 17 Drainage Culvert 27916 DIR-III 2,61,20,283
58 21 Drainage Culvert 28926 DIR-III 2,61,20,283
59 22 Drainage Culvert 29063 DIR-III 2,61,20,283
60 23 Drainage Culvert 29510 DIR-III 2,61,20,283
61 25 Drainage Culvert 30690 DIR-IV 2,61,20,283
62 32 Drainage Culvert 32392 DIR-IV 2,61,20,283
63 34 Drainage Culvert 32968 DIR-IV 2,61,20,283
64 38 Drainage Culvert 33988 DIR-IV 2,61,20,283
Drainage Culvert (Drain @
65 39 34298 DIR-IV 2,61,20,283
34267m to be diverted)
66 62 Drainage Culvert 41686 DIR-V 2,61,20,283
67 63 Drainage Culvert 42041 DIR-V 2,61,20,283
68 77 Drainage Culvert 51512 DIR-VII 2,61,20,283
69 97 Drainage Culvert 60780 DIR-VIII 2,61,20,283

CR_VRB_CSY (Combine
95 99 structure for CTC @ 61838m 61838 DIR-VIII 2,14,24,168
& drain @ 61890m)

70 5 VRB 25109 DIR-III 1,96,00,000


71 16 VRB 27826 DIR-III 1,96,00,000
72 18 VRB 28246 DIR-III 1,96,00,000
73 53 VRB 38044 DIR-IV 1,96,00,000
74 56 VRB 38827 DIR-V 1,96,00,000
75 26 VRB 30772 DIR-IV 1,63,21,794
76 28 VRB 31566 DIR-IV 1,63,21,794
77 31 VRB 32187 DIR-IV 1,63,21,794
78 37 VRB 33766 DIR-IV 1,63,21,794
79 47 VRB 36477 DIR-IV 1,63,21,794
80 49 VRB 37233 DIR-IV 1,63,21,794
81 51 VRB 37804 DIR-IV 1,63,21,794
82 59 VRB 40315 DIR-V 1,63,21,794
83 67 VRB 47977 DIR-VII 1,63,21,794
84 69 VRB 49448 DIR-VII 1,63,21,794
85 71 VRB 49882 DIR-VII 1,63,21,794
86 80 VRB 52314 DIR-VII 1,63,21,794
87 88 VRB 56192 DIR-VII 1,63,21,794
88 96 VRB 60430 DIR-VIII 1,63,21,794
89 102 VRB 63002 DIR-VIII 1,63,21,794
90 108 VRB 64562 DIR-VIII 1,63,21,794
91 110 VRB 65432 DIR-VIII 1,63,21,794
92 115 VRB 66811 DIR-VIII 1,63,21,794
93 116 VRB 67606 DIR-VIII 1,63,21,794
94 45 CR_VRB_CSY 35497 DIR-IV 1,62,81,072
96 68 Kaswali_River_SP 49137 DIR-VII 1,54,05,858
97 76 **SP_Existing Canal 50720 DIR-VII 1,54,05,858
98 103 SP 63062 DIR-VIII 1,54,05,858
99 111 SP 65462 DIR-VIII 1,54,05,858
100 113 SP 66062 DIR-VIII 1,54,05,858
101 114 SP 66602 DIR-VIII 1,54,05,858
CR_Existing Canal_CSY
(Combine structure for
102 73 50072 DIR-VII 1,43,24,206
Existing Canal @ 50032m &
Drain @ 50072m)
9 HR_11/Fall 25706 DIR-III 42,93,300
104 27 HR_12/Fall 31186 DIR-IV 35,75,222
105 33 HR_13/Fall 32531 DIR-IV 35,75,222
106 40 HR_14/Fall 34456 DIR-IV 35,75,222
107 44 HR_15/Fall 35386 DIR-IV 35,75,222
108 61 HR_16/Fall 41456 DIR-V 35,75,222
109 83 HR-20/Fall 53786 DIR-VII 35,75,222
110 93 HR_21/Fall 59236 DIR-VIII 35,75,222
111 105 HR_22/Fall 63632 DIR-VIII 35,75,222
112 54 Escape 38256 DIR-IV 28,32,497
113 78 Escape 51722 DIR-VII 28,32,497
114 70 HR_17 49544 DIR-VII 28,22,838
115 75 HR_18 50606 DIR-VII 28,22,838
116 81 HR_19 52862 DIR-VII 28,22,838
117 112 HR_23 65536 DIR-VIII 28,22,838
1273,82,49,595
ng order
Estimate cost as per
Weightag Weightage
Design
e (%) (%)

29.79 316,94,90,000 24.88


7.03 0.00
6.67 0.00
5.48 50,99,25,000 4.00
5.44 0.00
5.03 0.00
4.45 0.00
4.04 0.00
2.22 0.00
1.61 0.00
1.61 0.00
1.61 0.00
1.61 0.00
1.61 ,,,0 0.00
1.61 0.00
1.61 0.00
0.83
0.00
0.42 20,87,30,000 1.64
0.37 1,32,87,100 0.10
0.37 2,03,40,100 0.16
0.35 24,81,60,000 1.95
0.35 0.00
0.33 0.00
0.30 1,08,40,000 0.09
0.25 77,90,000 0.06
0.25 0.00
0.25 85,88,000 0.07
0.25 0.00
0.25 0.00
0.25 0.00
0.25 ,,,0 0.00
0.25 0.00
0.25 0.00
0.25 0.00
0.25 0.00
0.25 0.00
0.25 0.00
0.25 0.00
0.25 0.00
0.25 0.00
0.25 0.00
0.25 0.00
0.25 ,,,0 0.00
0.25 0.00
0.25 0.00
0.25 0.00
0.25
0.00
0.25 0.00
0.25 0.00
0.25 0.00
0.25 0.00
0.25 0.00
0.25 2,41,69,645 0.19
0.21 0.00
0.21 0.00
0.21 0.00
0.21 0.00
0.21 0.00
0.21 0.00
0.21 0.00
0.21 0.00
0.21 0.00
0.21 0.00
0.21 1,58,00,000 0.12
0.21
0.00
0.21 0.00
0.21 0.00
0.21 0.00
0.21 2,44,30,000 0.19

0.17

0.00
0.15 87,90,000 0.07
0.15 95,90,000 0.08
0.15 1,36,10,000 0.11
0.15 74,00,000 0.06
0.15 1,32,70,000 0.10
0.13 0.00
0.13 1,04,10,000 0.08
0.13 1,02,60,000 0.08
0.13 0.00
0.13 0.00
0.13 1,17,70,000 0.09
0.13 0.00
0.13 0.00
0.13 1,58,80,000 0.12
0.13 0.00
0.13 0.00
0.13 0.00
0.13 1,34,60,000 0.11
0.13 0.00
0.13 0.00
0.13 0.00
0.13 0.00
0.13 0.00
0.13 97,50,000 0.08
0.13 0.00
0.12 0.00
0.12 ,,,0 0.00
0.12 0.00
0.12 0.00
0.12 0.00
0.12 0.00

0.11

0.00
0.03 15,40,600 0.01
0.03 12,83,000 0.01
0.03 0.00
0.03 0.00
0.03 0.00
0.03 0.00
0.03 0.00
0.03 0.00
0.03 0.00
0.02 0.00
0.02 0.00
0.02 0.00
0.02 0.00
0.02 0.00
0.02 0.00
438,85,63,445
Package Estimate cost for Weightag
Sr No. Str No. Type of Structure Chainage (m)
No. AA e (%)

4 1 Long Barrel 23346 - 23926 DIR-III 69,85,28,900 5.48

CSY (Combine for


9 4 Drain @ 24739m & 24869 DIR-III 10,56,47,845 0.83
24869m)

19 2 CR_Fall (4.0m) 24046 DIR-III 4,73,23,500 0.37


20 8 CR_Fall (2.80m) 25516 DIR-III 4,73,23,500 0.37
24 7 DSY 25442 DIR-III 3,80,54,525 0.30
25 3 DSY 24202 DIR-III 3,16,89,699 0.25
26 6 DSY 25249 DIR-III 3,16,89,699 0.25
27 11 DSY 26416 DIR-III 3,16,89,699 0.25
28 13 DSY 27168 DIR-III 3,16,89,699 0.25
29 19 DSY 28289 DIR-III 3,16,89,699 0.25
30 20 DSY 28546 DIR-III 3,16,89,699 0.25
53 14 Drainage Culvert 27324 DIR-III 3,13,66,500 0.25
54 10 Drainage Culvert 25951 DIR-III 2,61,20,283 0.21
55 12 Drainage Culvert 26716 DIR-III 2,61,20,283 0.21
56 15 Drainage Culvert 27515 DIR-III 2,61,20,283 0.21
57 17 Drainage Culvert 27916 DIR-III 2,61,20,283 0.21
58 21 Drainage Culvert 28926 DIR-III 2,61,20,283 0.21
59 22 Drainage Culvert 29063 DIR-III 2,61,20,283 0.21
60 23 Drainage Culvert 29510 DIR-III 2,61,20,283 0.21
70 5 VRB 25109 DIR-III 1,96,00,000 0.15
71 16 VRB 27826 DIR-III 1,96,00,000 0.15
72 18 VRB 28246 DIR-III 1,96,00,000 0.15
9 HR_11/Fall 25706 DIR-III 42,93,300 0.03
Total 140,43,18,245
Estimate cost as
per Design

50,99,25,000

1,32,87,100
2,03,40,100
1,08,40,000
77,90,000

85,88,000

2,41,69,645

87,90,000
95,90,000
1,36,10,000
15,40,600
62,84,70,445
Package Estimate cost Weightag
Sr No. Str No. Type of Structure Chainage (m)
No. for AA e (%)

5 24 CR_Long Syphon 29716 - 30406 DIR-IV 64,11,31,877 5.03


7 46 Long_CSY 35831 DIR-IV 51,41,95,456 4.04
10 35 CSY 33265 DIR-IV 20,56,47,845 1.61
11 41 CSY 34671 DIR-IV 20,56,47,845 1.61
18 55 Nihwara Nala_CR_CSY 38521 DIR-IV 5,34,92,000 0.42
21 29 CR_CSY 31756 DIR-IV 4,45,45,173 0.35
31 30 **DSY/Drainage Culvert 32171 DIR-IV 3,16,89,699 0.25
32 36 DSY 33696 DIR-IV 3,16,89,699 0.25
33 42 DSY 35151 DIR-IV 3,16,89,699 0.25
34 43 DSY 35343 DIR-IV 3,16,89,699 0.25
35 48 DSY 36914 DIR-IV 3,16,89,699 0.25
36 50 DSY 37281 DIR-IV 3,16,89,699 0.25
37 52 DSY 37918 DIR-IV 3,16,89,699 0.25
61 25 Drainage Culvert 30690 DIR-IV 2,61,20,283 0.21
62 32 Drainage Culvert 32392 DIR-IV 2,61,20,283 0.21
63 34 Drainage Culvert 32968 DIR-IV 2,61,20,283 0.21
64 38 Drainage Culvert 33988 DIR-IV 2,61,20,283 0.21

Drainage Culvert (Drain @


65 39 34298 DIR-IV 2,61,20,283 0.21
34267m to be diverted)

73 53 VRB 38044 DIR-IV 1,96,00,000 0.15


75 26 VRB 30772 DIR-IV 1,63,21,794 0.13
76 28 VRB 31566 DIR-IV 1,63,21,794 0.13
77 31 VRB 32187 DIR-IV 1,63,21,794 0.13
78 37 VRB 33766 DIR-IV 1,63,21,794 0.13
79 47 VRB 36477 DIR-IV 1,63,21,794 0.13
80 49 VRB 37233 DIR-IV 1,63,21,794 0.13
81 51 VRB 37804 DIR-IV 1,63,21,794 0.13
94 45 CR_VRB_CSY 35497 DIR-IV 1,62,81,072 0.13
104 27 HR_12/Fall 31186 DIR-IV 35,75,222 0.03
105 33 HR_13/Fall 32531 DIR-IV 35,75,222 0.03
106 40 HR_14/Fall 34456 DIR-IV 35,75,222 0.03
107 44 HR_15/Fall 35386 DIR-IV 35,75,222 0.03
112 54 Escape 38256 DIR-IV 28,32,497 0.02
Total 218,43,56,519
Estimate cost
as per Design

20,87,30,000
24,81,60,000
,,,0

1,58,00,000

74,00,000

1,04,10,000
1,02,60,000

1,17,70,000

12,83,000

26,56,53,000
Package Estimate cost Weightag
Sr No. Str No. Type of Structure Chainage (m)
No. for AA e (%)

2 64 Long CSY 43091 - 43961 DIR-V 85,01,69,750 6.67


12 58 Lotia_River_CSY 40001 DIR-V 20,56,47,845 1.61
22 60 CR_CSY_Existing Canal 40485 DIR-V 4,45,45,173 0.35
38 57 DSY 39561 DIR-V 3,16,89,699 0.25
66 62 Drainage Culvert 41686 DIR-V 2,61,20,283 0.21
67 63 Drainage Culvert 42041 DIR-V 2,61,20,283 0.21
74 56 VRB 38827 DIR-V 1,96,00,000 0.15
82 59 VRB 40315 DIR-V 1,63,21,794 0.13
108 61 HR_16/Fall 41456 DIR-V 35,75,222 0.03
Total 122,37,90,049
Estimate cost
as per Design

1,32,70,000

1,32,70,000
Type of Package Estimate cost for Weightage
Sr No. Str No. Chainage (m)
Structure No. AA (%)

1 65 CR_Long CSY 44111 - 47311 DIR-VI 379,50,40,200 29.79


Estimate cost as
per Design

316,94,90,000
Package Estimate cost Weightag
Sr No. Str No. Type of Structure Chainage (m)
No. for AA e (%)

6 86 Long Syphon 55112 - 55772 DIR-VII 69,23,40,449 5.44


8 84 CR_Long Syphon 53822-54362 DIR-VII 56,64,60,367 4.45
13 79 CSY_Center of Pool 51897 DIR-VII 20,56,47,845 1.61
17 85 Long Syphon 54572 - 54842 DIR-VII 28,32,30,183 2.22
39 66 DSY 47771 DIR-VII 3,16,89,699 0.25
40 72 DSY 49891 DIR-VII 3,16,89,699 0.25
41 74 DSY 50432 DIR-VII 3,16,89,699 0.25
42 82 DSY 53162 DIR-VII 3,16,89,699 0.25
43 87 **DSY 56042 DIR-VII 3,16,89,699 0.25
44 89 DSY 56520 DIR-VII 3,16,89,699 0.25
45 90 DSY/Drainage Culvert 56792 DIR-VII 3,16,89,699 0.25
68 77 Drainage Culvert 51512 DIR-VII 2,61,20,283 0.21
83 67 VRB 47977 DIR-VII 1,63,21,794 0.13
84 69 VRB 49448 DIR-VII 1,63,21,794 0.13
85 71 VRB 49882 DIR-VII 1,63,21,794 0.13
86 80 VRB 52314 DIR-VII 1,63,21,794 0.13
87 88 VRB 56192 DIR-VII 1,63,21,794 0.13
96 68 Kaswali_River_SP 49137 DIR-VII 1,54,05,858 0.12
97 76 **SP_Existing Canal 50720 DIR-VII 1,54,05,858 0.12

CR_Existing Canal_CSY
(Combine structure for
102 73 Existing Canal @ 50072 DIR-VII 1,43,24,206 0.11
50032m & Drain @
50072m)

109 83 HR-20/Fall 53786 DIR-VII 35,75,222 0.03


113 78 Escape 51722 DIR-VII 28,32,497 0.02
114 70 HR_17 49544 DIR-VII 28,22,838 0.02
115 75 HR_18 50606 DIR-VII 28,22,838 0.02
116 81 HR_19 52862 DIR-VII 28,22,838 0.02
Total 213,72,48,145
Estimate cost
as per Design

,,,0

1,58,80,000

1,34,60,000

,,,0

2,93,40,000
Chainage Package Estimate cost for Weightag
Sr No. Str No. Type of Structure
(m) No. AA e (%)

57782 -
3 91 CR_Long Syphon DIR-VIII 89,59,46,900 7.03
58622
14 92 **CSY_Existing Canal 59063 DIR-VIII 20,56,47,845 1.61
15 94 CSY_Center of Pool 59843 DIR-VIII 20,56,47,845 1.61
16 104 CSY 63422 DIR-VIII 20,56,47,845 1.61
23 117 CR_Tail_Escape_Pur_River 68522 DIR-VIII 4,17,06,180 0.33
46 95 DSY 60242 DIR-VIII 3,16,89,699 0.25
DSY (Drain @ 61546m to be
47 98 61652 DIR-VIII 3,16,89,699 0.25
diverted to this drain)
48 100 DSY 62468 DIR-VIII 3,16,89,699 0.25
49 101 DSY 62612 DIR-VIII 3,16,89,699 0.25
50 106 DSY 64052 DIR-VIII 3,16,89,699 0.25
51 107 DSY 64322 DIR-VIII 3,16,89,699 0.25
52 109 DSY 64788 DIR-VIII 3,16,89,699 0.25
69 97 Drainage Culvert 60780 DIR-VIII 2,61,20,283 0.21
88 96 VRB 60430 DIR-VIII 1,63,21,794 0.13
89 102 VRB 63002 DIR-VIII 1,63,21,794 0.13
90 108 VRB 64562 DIR-VIII 1,63,21,794 0.13
91 110 VRB 65432 DIR-VIII 1,63,21,794 0.13
92 115 VRB 66811 DIR-VIII 1,63,21,794 0.13
93 116 VRB 67606 DIR-VIII 1,63,21,794 0.13

CR_VRB_CSY (Combine
95 99 structure for CTC @ 61838m 61838 DIR-VIII 2,14,24,168 0.17
& drain @ 61890m)

98 103 SP 63062 DIR-VIII 1,54,05,858 0.12


99 111 SP 65462 DIR-VIII 1,54,05,858 0.12
100 113 SP 66062 DIR-VIII 1,54,05,858 0.12
101 114 SP 66602 DIR-VIII 1,54,05,858 0.12
110 93 HR_21/Fall 59236 DIR-VIII 35,75,222 0.03
111 105 HR_22/Fall 63632 DIR-VIII 35,75,222 0.03
117 112 HR_23 65536 DIR-VIII 28,22,838 0.02
Total 199,34,96,437
Estimate cost
as per
Design

,,,0

2,44,30,000

97,50,000

3,41,80,000