You are on page 1of 3

Fluor Project No.

: A9LR
Document No. : CSA MTO Job: A9LR

Reinforced conctere: Lean concrete: 15


30 MPa, min 28 day MPa, min 28 day
compressive compressive
Sr. No. strength (m3) strength (m3) Excavation Backfill Desposal
(m3) (m3) (m3)

1 2-E-3004 3.44 0.32 13.84 11.11 2.73


2 2-E-3005 2.90 0.28 12.61 10.26 2.35
3 2-R-3001 6.11 0.28 14.97 9.96 5.01
4 2-V-3001 5.47 0.20 11.91 7.54 4.37
5 2-V-3002 4.86 0.24 8.92 4.91 4.01
6 New Pipe Rack (F-1) 7.72 0.88 30.15 22.76 7.39
7 New Pipe Rack (F-2) 6.14 0.67 23.97 18.16 5.81
8 New Pipe Rack (F-3)) 7.54 0.83 32.41 25.29 7.12
9 New Pipe Rack (F-4) 4.46 0.40 20.28 16.32 3.96
10 150 mm thick paving 23.77
150 mm and 150 mm high curb wall
11 around the new paving 1.31

12 U/G ELECTRICAL (NEW) 56.36 52.34 4.03

13 MPS (GOAL POST) 58.84 5.58 174.42 118.01 56.41


14 Fence
15 Metering Skid 2.51
16 U/G pipe from metering skid to 5.25 25.00 25.00 0.00
RC corridore
17 U/G pipe installation 45.00 45.00 0.00

1 Sleeper Foundation (Type-1) 3.48 0.44 9.82 6.42 3.41


2 Sleeper Foundation (Type-2) 7.95 1.00 23.34 15.63 7.71
3 Sleeper Foundation (Type-3) 17.50 2.18 53.54 36.75 16.79
4 Structural Steel for the loop
extension, MPS

1 Concrete foundation for Flow 0.49 0.03 1.18 0.84 0.34


meter
2 Misc steel on existing Pipe rack

3 U/G pipe road crossing 5.25 25.00 25.00 0.00


3 U/G pipe installation 250.00 250.00 0.00

Total 174.97 13.35 832.73 701.28 131.45


300 micron Polythene 2 coats of U/G surface 3 coats of A/G surface Red Color potection tile Structural Steel (JIS New Demolition of
sheet (m2) protection Bitumen protection coating (m2) for electrical Cables G3101 SS400 or Fence (m) existing Fence (m)
coating (m2) (m2) Equivalent) (kg)

APC AREA
6.74 10.65 9.50
5.99 9.42 7.92
7.14 18.66 6.56
5.25 17.49 6.56
5.08 9.86 3.17
18.21 17.95 3.96
13.95 16.37 3.96
8040.09
17.26 17.93 3.96
8.73 22.44 5.94

104.50

115.87 119.46 20.79 24412.00


24.00 16.50

RC AREA
9.18 6.86 1.09
20.93 18.74 3.27
45.76 49.90 9.80
33289.90

UNITED AREA
1.00 1.96 0.84

5835.00

281.11 337.68 87.32 104.50 71576.99 24.00 16.50


Client: APC REV. B
DATE: 13-OCT-22

Demolition and
reinstate of the
existing road (m2)
16" pvc pipe for duct
bank (m) Remarks

The new electrical cables are directly burried.


Therefore, only excavation, red color projection tiles
and backfill is considered.

6.00 6.00 Concrete duct bank

total 45m of UG pipe installation is considered

New sleeper
New sleeper
New sleeper

6.00 6.00 Concrete duct bank


total 250m of UG pipe installation is
considered

12.00 12.00