PAINTING INSPECTION REPORT FOR

DFT MEASUREMENT
Report No.
Project : LINE Project WP2 Inspection Date : Page No.
05 September 2023 PIR-WP2-SPT-STL-CN-00314 1 of 2
Procedure No.
VD-LINE-550-MP-4-0001-AWH-01-011 Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat

Surface Preparation KC#30224069-XC#330512015 KC#30410220-KC#30410234 KC#30216008-MC#30201007


Sa 2½ / SSPC SP 10
SPEC : 1st Coat DFT (µ m) SPEC : 2nd Coat DFT (µ m) SPEC : Top Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot S110
75 µm 120 µm 50 µm

Environmental Condition Date : 03-Sep-2023 Date : 04-Sep-2023 Date : 05-Sep-2023


Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC ) 33 34 34 34 34 33 34 34 28
Air Temperature - Wer Blub ( OC ) 26 27 27 27 26 25 27 26 25
Relative Humidity ( % ) 77 70 77 73 74 72 78 70 77
Dew Point ( OC ) 25 24 24 24 23 24 23 24 26
Substrate Temperature ( OC ) 35 33 35 34 33 30 34 34 33

SKETCH

Measurement Tool : ESF 150 - 24 THD AUTONICS | ELCO METER 224 (YF23506) | Dial Test Gauge | SSPC / SSPC VIS-1| | ELCOMETER 234(XG06679)
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
03-Sep-23 1st Coat 89 78 85 81 86 76 76 85 86 79 79 84
1 BH-GT307 1/1 04-Sep-23 2nd Coat 218 218 207 220 196 198 217 207 195 212 208 220 ACC
05-Sep-23 Top Coat 266 275 280 263 282 257 285 250 261 269 265 273
03-Sep-23 1st Coat 84 81 79 75 85 79 76 79 90 84 88 82
2 BH-GT308 1/1 04-Sep-23 2nd Coat 200 208 207 195 212 217 195 196 219 203 205 218 ACC
05-Sep-23 Top Coat 264 265 269 269 250 249 257 246 263 257 257 281
03-Sep-23 1st Coat 84 78 79 90 85 79 76 90 77 90 88 86
3 BH-GT309 1/1 04-Sep-23 2nd Coat 201 208 195 195 219 217 213 196 216 199 213 207 ACC
05-Sep-23 Top Coat 249 295 269 265 250 261 257 247 263 245 278 248

Note

Inspected by : Inspected by : Inspected by

SPT LEC LCI

1 of 36
PAINTING INSPECTION REPORT

Project : LINE Project WP2 Report No. : PIR-WP2-SPT-STL-CN-00314


Work Pkg. : WP2-AWH Date : 05 September 2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

PRIMER COAT - DFT


DFT Requirement: 75 µm (Total : 75µm)

Intermediate COAT - DFT


DFT Requirement: 120 µm (Total : 195µm)

TOP COAT - DFT


DFT Requirement: 50 µm (Total : 245µm)

2 of 36
PAINTING INSPECTION REPORT FOR
DFT MEASUREMENT
Inspection Date : Report No.
Project : LINE Project WP2 Page No.
2/16/2023 PIR-WPS-SPT-STL-00002 1 of 1
Procedure No.
Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat
VD-LINE-550-MP-4-0001-AWH-01-011

Surface Preparation KC#20811146-XC#20915012 KC#20905262-KC20905281 KC#20817197-MC#20811009


Sa 2½ / SSPC SP 10
SPEC : 1st Coat DFT (µ m) SPEC : 2nd Coat DFT (µ m) SPEC : Top Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot
75 µm 120 µm 50 µm

Environmental Condition Date : 12-02-2023 Date : 13- 02-2023 Date : 15-02-2023


Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC ) 30 27 29 29 32 30 30 30 28
Air Temperature - Wer Blub ( OC ) 27 24 25 26 27 25 27 26 24
Relative Humidity ( % ) 79 78 72 79 68 67 79 73 77
Dew Point ( OC ) 26 23 23 25 25 23 26 25 22
Substrate Temperature ( OC ) 30 31 32 29 31 32 29 31 33

SKETCH

Measurement Tool : Sling Hygrometer ( ) | Infrared Temperature ( ) | Dial Test Gauge ( ) | SSPC / SSPC VIS-1 ( )| DFT Elcometer ( )
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
12-Feb-23 1st Coat 75 77 76 82 79 84 89 76 92 77 78 88 81
1 BH-B039-1/1 13-Feb-23 2nd Coat 125 120 129 122 130 126 125 121 121 125 134 132 126
15-Feb-23 Top Coat 55 50 51 58 52 51 55 54 66 71 54 72 57
12-Feb-23 1st Coat 76 75 79 75 88 89 76 75 95 74 77 76 80
2 BH-B174-3/4 13-Feb-23 2nd Coat 121 120 119 128 123 133 132 124 135 142 120 122 127
15-Feb-23 Top Coat 51 55 50 52 62 56 50 52 58 72 50 51 55
12-Feb-23 1st Coat 77 75 74 80 78 75 77 76 81 75 77 79 77
3 BH-B165 - 1/1 13-Feb-23 2nd Coat 131 121 120 125 132 133 141 120 123 127 122 120 126
15-Feb-23 Top Coat 54 50 50 51 68 51 52 66 57 50 50 53 54
12-Feb-23 1st Coat 80 76 77 77 75 81 79 76 82 80 76 77 78
4 BH-G025- 1/3 13-Feb-23 2nd Coat 121 120 132 125 122 121 131 122 124 123 125 120 124
15-Feb-23 Top Coat 51 54 50 50 52 66 56 53 52 50 51 50 53
12-Feb-23 1st Coat 76 76 81 75 73 74 77 76 77 77 79 70 76
5 BH-G025 - 2/3 13-Feb-23 2nd Coat 132 150 124 137 120 125 132 121 132 126 125 121 129
15-Feb-23 Top Coat 50 57 50 50 53 51 52 57 52 60 71 55 55
12-Feb-23 1st Coat 76 75 75 82 74 76 75 75 80 74 77 76 76
6 BH-G025 -3/3 13-Feb-23 2nd Coat 120 119 123 122 134 125 122 130 126 125 121 121 124
15-Feb-23 Top Coat 66 71 53 55 55 51 51 55 51 50 52 62 56
12-Feb-23 1st Coat 78 76 77 77 79 70 77 84 75 75 82 74 77
7 BH-B181-1/1 13-Feb-23 2nd Coat 121 121 132 126 125 121 120 132 122 122 120 123 124
15-Feb-23 Top Coat 55 57 52 60 71 55 61 54 50 52 50 51 56
Note

Inspected by : Inspected by : Inspected by

SPT LEC LCI

PAINTING INSPECTION REPORT

3 of 36
Project : LINE Project WP2 Report No. : PIR-WPS-SPT-STL-00002
Work Pkg. : WP2-AWH Date : 2/24/2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

4 of 36
PAINTING INSPECTION REPORT FOR
DFT MEASUREMENT
Inspection Date : Report No.
Project : LINE Project WP2 Page No.
2/17/2023 PIR-WPS-SPT-STL-00003 1 of 1
Procedure No.
Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat
VD-LINE-550-MP-4-0001-AWH-01-011

Surface Preparation KC#20811146-XC#20915012 KC#20905262-KC20905281 KC#20817197-MC#20811009


Sa 2½ / SSPC SP 10
SPEC : 1st Coat DFT (µ m) SPEC : 2nd Coat DFT (µ m) SPEC : Top Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot
75 µm 120 µm 50 µm

Environmental Condition Date : 14-02-2023 Date : 15- 02-2023 Date : 16-02-2023


Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC ) 29 28 27 30 30 31 28 31 30
Air Temperature - Wer Blub ( OC ) 26 25 24 27 26 26 25 27 25
Relative Humidity ( % ) 79 79 78 79 73 67 79 73 67
Dew Point ( OC ) 25 24 23 26 25 24 24 26 23
Substrate Temperature ( OC ) 28 30 31 29 31 33 28 32 33

SKETCH

Measurement Tool : Sling Hygrometer ( ) | Infrared Temperature ( ) | Dial Test Gauge ( ) | SSPC / SSPC VIS-1 ( )| DFT Elcometer ( )
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
14-Feb-23 1st Coat 78 75 75 82 74 76 81 80 75 77 79 75 77
1 BH-B174 - 4/4 15-Feb-23 2nd Coat 122 131 124 125 122 120 127 133 130 123 122 121 125
17-Feb-23 Top Coat 51 50 56 61 51 52 53 60 66 52 50 55 55
14-Feb-23 1st Coat 75 74 80 76 75 73 81 77 77 81 76 75 77
2 BH-G055-1/1 15-Feb-23 2nd Coat 131 120 121 125 121 120 119 123 122 134 120 120 123
17-Feb-23 Top Coat 56 50 50 52 61 54 52 50 57 52 50 53 53
14-Feb-23 1st Coat 77 76 74 75 75 82 74 76 75 75 82 77 77
3 BH-B033 - 5/13 15-Feb-23 2nd Coat 121 121 125 119 123 122 134 125 122 122 120 133 124
17-Feb-23 Top Coat 50 62 56 71 53 55 51 51 55 50 52 62 56
14-Feb-23 1st Coat 81 75 77 79 76 77 77 79 81 74 80 78 78
4 BH-B033 - 6/13 15-Feb-23 2nd Coat 123 127 122 120 127 120 124 133 131 125 125 120 125
17-Feb-23 Top Coat 57 50 50 53 52 52 71 65 57 55 57 52 56
14-Feb-23 1st Coat 76 74 75 75 82 74 76 75 74 80 78 77 76
5 BH-B181-2/2 15-Feb-23 2nd Coat 125 122 121 131 122 124 125 122 125 125 121 121 124
17-Feb-23 Top Coat 55 51 51 55 57 55 51 51 55 57 52 51 53

Note

Inspected by : Inspected by : Inspected by

SPT LEC LCI

5 of 36
PAINTING INSPECTION REPORT

Project : LINE Project WP2 Report No. : PIR-WPS-SPT-STL-00003


Work Pkg. : WP2-AWH Date : 2/24/2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

6 of 36
PAINTING INSPECTION REPORT FOR
DFT MEASUREMENT
Inspection Date : Report No.
Project : LINE Project WP2 Page No.
2/18/2023 PIR-WPS-SPT-STL-00004 1 of 1
Procedure No.
Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat
VD-LINE-550-MP-4-0001-AWH-01-011

Surface Preparation KC#20811146-XC#20915012 KC#20905262-KC20905281 KC#20817197-MC#20811009


Sa 2½ / SSPC SP 10
SPEC : 1st Coat DFT (µ m) SPEC : 2nd Coat DFT (µ m) SPEC : Top Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot
75 µm 120 µm 50 µm

Environmental Condition Date : 14-02-2023 Date : 15- 02-2023 Date : 17-02-2023


Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC ) 29 28 27 30 30 31 28 31 30
Air Temperature - Wer Blub ( OC ) 26 25 24 27 26 26 25 27 25
Relative Humidity ( % ) 79 79 78 79 73 67 79 73 67
Dew Point ( OC ) 25 24 23 26 25 24 24 26 23
Substrate Temperature ( OC ) 28 30 31 29 31 33 28 32 33

SKETCH

Measurement Tool : Sling Hygrometer ( ) | Infrared Temperature ( ) | Dial Test Gauge ( ) | SSPC / SSPC VIS-1 ( )| DFT Elcometer ( )
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
14-Feb-23 1st Coat 76 77 77 79 81 80 75 74 77 76 80 76 77
1 BH-B222 - 1/3 15- Feb-23 2nd Coat 121 120 132 133 121 126 125 121 121 125 134 132 126
17-Feb-23 Top Coat 52 60 71 53 55 51 51 55 57 52 50 52 55
14-Feb-23 1st Coat 76 124 125 122 120 127 133 130 123 122 76 75 113
2 BH-B222 - 2/3 15- Feb-23 2nd Coat 121 56 61 51 52 53 60 66 52 50 120 120 72
17-Feb-23 Top Coat 51 56 50 52 66 57 50 50 57 52 50 53 54
14-Feb-23 1st Coat 75 78 77 74 79 81 74 74 76 75 75 70 76
3 BH-B222 - 3/3 15- Feb-23 2nd Coat 121 123 120 132 125 131 125 129 125 122 130 122 125
17-Feb-23 Top Coat 53 55 51 50 65 57 55 55 51 51 55 50 54
14-Feb-23 1st Coat 78 76 77 77 79 70 77 84 75 75 82 74 77
4 BH-B162 - 1/1 15- Feb-23 2nd Coat 121 121 132 126 125 121 120 132 122 122 120 123 124
17-Feb-23 Top Coat 55 57 52 60 71 55 61 54 50 52 50 51 56
14-Feb-23 1st Coat 76 75 80 74 77 76 74 80 78 77 81 74 77
5 BH-B163 - 1/1 15- Feb-23 2nd Coat 122 130 126 125 121 121 125 125 121 120 132 133 125
17-Feb-23 Top Coat 53 55 51 50 52 62 56 50 52 58 52 50 53

Note

Inspected by : Inspected by : Inspected by

SPT LEC LCI

7 of 36
PAINTING INSPECTION REPORT

Project : LINE Project WP2 Report No. : PIR-WPS-SPT-STL-00004


Work Pkg. : WP2-AWH Date : 2/24/2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

8 of 36
PAINTING INSPECTION REPORT FOR
DFT MEASUREMENT
Inspection Date : Report No.
Project : LINE Project WP2 Page No.
2/22/2023 PIR-WPS-SPT-STL-00005 1 of 1
Procedure No.
Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat
VD-LINE-550-MP-4-0001-AWH-01-011

Surface Preparation KC#20811146-XC#20915012 KC#20905262-KC20905281 KC#20817197-MC#20811009


Sa 2½ / SSPC SP 10
SPEC : 1st Coat DFT (µ m) SPEC : 2nd Coat DFT (µ m) SPEC : Top Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot
75 µm 120 µm 50 µm

Environmental Condition Date : 16-02-2023 Date : 19- 02-2023 Date : 21-02-2023


Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC ) 30 32 30 29 31 33 28 30 29
Air Temperature - Wer Blub ( OC ) 27 27 26 26 27 27 25 26 25
Relative Humidity ( % ) 79 68 73 79 73 63 79 73 72
Dew Point ( OC ) 26 25 25 25 26 25 24 25 23
Substrate Temperature ( OC ) 29 33 31 28 32 33 29 32 31

SKETCH

Measurement Tool : Sling Hygrometer ( ) | Infrared Temperature ( ) | Dial Test Gauge ( ) | SSPC / SSPC VIS-1 ( )| DFT Elcometer ( )
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
16-Feb-23 1st Coat 75 77 76 81 75 73 74 77 77 81 76 80 77
1 BH-B177-3/4 19-Feb-23 2nd Coat 126 137 150 124 137 120 125 132 133 141 120 123 131
21-Feb-23 Top Coat 52 66 57 50 50 52 51 52 53 60 66 50 55
16-Feb-23 1st Coat 76 74 75 75 82 74 76 75 74 80 78 77 76
2 BH-B033 - 7/13 19-Feb-23 2nd Coat 122 125 119 123 122 134 125 122 125 125 121 121 124
21-Feb-23 Top Coat 62 56 64 53 55 55 51 51 55 57 52 51 55

Note

Inspected by : Inspected by : Inspected by

SPT LEC LCI


9 of 36
PAINTING INSPECTION REPORT

Project : LINE Project WP2 Report No. : PIR-WPS-SPT-STL-00005


Work Pkg. : WP2-AWH Date : 2/24/2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

10 of 36
PAINTING INSPECTION REPORT FOR
DFT MEASUREMENT
Inspection Date : Report No.
Project : LINE Project WP2 Page No.
2/19/2023 PIR-WPS-SPT-STL-00006 1 of 1
Procedure No.
Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat
VD-LINE-550-MP-4-0001-AWH-01-011

Surface Preparation KC#20811146-XC#20915012 KC#20905262-KC20905281 KC#20817197-MC#20811009


Sa 2½ / SSPC SP 10
SPEC : 1st Coat DFT (µ m) SPEC : 2nd Coat DFT (µ m) SPEC : Top Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot
75 µm 120 µm 50 µm

Environmental Condition Date : 15-02-2023 Date : 17- 02-2023 Date : 18-02-2023


Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC ) 30 30 33 28 30 31 28 28 27
Air Temperature - Wer Blub ( OC ) 27 26 28 25 26 26 25 25 24
Relative Humidity ( % ) 79 73 69 79 73 67 79 79 78
Dew Point ( OC ) 26 25 26 24 25 24 24 24 23
Substrate Temperature ( OC ) 29 31 32 29 30 32 29 30 32

SKETCH

Measurement Tool : Sling Hygrometer ( ) | Infrared Temperature ( ) | Dial Test Gauge ( ) | SSPC / SSPC VIS-1 ( )| DFT Elcometer ( )
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
15-Feb-23 1st Coat 75 74 80 78 75 82 74 77 77 81 76 75 77
1 BH-B128 - 1/2 17-Feb-23 2nd Coat 123 125 125 121 123 122 134 123 122 134 120 120 124
18-Feb-23 Top Coat 62 56 50 52 66 57 50 50 57 52 50 53 55

Note

Inspected by : Inspected by : Inspected by

SPT LEC LCI

11 of 36
PAINTING INSPECTION REPORT

Project : LINE Project WP2 Report No. : PIR-WPS-SPT-STL-00006


Work Pkg. : WP2-AWH Date : 2/24/2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

12 of 36
PAINTING INSPECTION REPORT FOR
DFT MEASUREMENT
Inspection Date : Report No.
Project : LINE Project WP2 Page No.
2/24/2023 PIR-WPS-SPT-STL-00007 1 of 1
Procedure No.
Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat
VD-LINE-550-MP-4-0001-AWH-01-011

Surface Preparation KC#20811146-XC#20915012 KC#20905262-KC20905281 KC#20817197-MC#20811009


Sa 2½ / SSPC SP 10
SPEC : 1st Coat DFT (µ m) SPEC : 2nd Coat DFT (µ m) SPEC : Top Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot
75 µm 120 µm 50 µm

Environmental Condition Date : 20-02-2023 Date : 22- 02-2023 Date : 23-02-2023


Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC ) 29 27 27 30 31 31 28 28 30
Air Temperature - Wer Blub ( OC ) 26 24 24 27 27 26 25 25 25
Relative Humidity ( % ) 79 78 78 79 73 67 79 79 67
Dew Point ( OC ) 25 23 23 26 26 24 24 24 23
Substrate Temperature ( OC ) 29 31 31 29 32 32 28 30 33

SKETCH

Measurement Tool : Sling Hygrometer ( ) | Infrared Temperature ( ) | Dial Test Gauge ( ) | SSPC / SSPC VIS-1 ( )| DFT Elcometer ( )
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
20-Feb-23 1st Coat 75 74 80 76 75 76 74 75 75 82 74 75 76
1 BH-G059 22-Feb-23 2nd Coat 123 120 125 121 123 122 134 123 122 134 132 120 125
23-Feb-23 Top Coat 60 56 54 52 62 57 55 50 57 52 50 63 56
20-Feb-23 1st Coat 80 76 77 77 75 81 75 76 74 75 80 78 77
2 BH-G058 22-Feb-23 2nd Coat 121 120 132 133 121 126 132 121 132 126 125 121 126
23-Feb-23 Top Coat 53 55 51 50 51 55 54 66 57 52 50 63 55
20-Feb-23 1st Coat 76 75 75 82 74 76 79 76 77 77 79 74 77
3 BH-B174 22-Feb-23 2nd Coat 137 120 125 132 133 121 121 132 126 125 121 132 127
23-Feb-23 Top Coat 57 52 50 63 55 57 57 52 51 60 56 53 55
20-Feb-23 1st Coat 77 74 75 76 80 76 77 75 78 74 74 76 76
4 BH-G031 22-Feb-23 2nd Coat 123 120 125 121 126 132 121 132 126 125 121 132 125
23-Feb-23 Top Coat 50 56 61 51 52 50 57 52 50 60 56 54 54
20-Feb-23 1st Coat 75 77 76 79 74 76 74 75 75 76 75 75 76
5 BH-B161 22-Feb-23 2nd Coat 126 137 120 125 125 121 123 122 134 123 120 125 125
23-Feb-23 Top Coat 57 57 52 51 52 58 64 57 52 50 63 50 55
20-Feb-23 1st Coat 74 75 76 74 75 76 74 75 75 75 77 70 75
6 BH-B161 22-Feb-23 2nd Coat 122 134 132 125 121 120 132 133 123 120 125 121 126
23-Feb-23 Top Coat 54 66 57 52 60 56 54 52 62 57 60 56 57
20-Feb-23 1st Coat 76 74 76 74 75 75 75 77 74 75 76 75 75
7 BH-B161 22-Feb-23 2nd Coat 120 132 133 123 120 125 121 123 122 134 132 120 125
23-Feb-23 Top Coat 60 56 54 52 62 57 60 56 54 52 62 57 57
21-Feb-23 1st Coat 74 76 74 75 75 76 75 74 76 74 75 75 75
8 BH-B040 22-Feb-23 2nd Coat 126 137 120 125 125 121 123 122 126 125 121 132 125
23-Feb-23 Top Coat 57 60 63 55 57 57 50 57 52 50 63 50 56
Note

Inspected by : Inspected by : Inspected by

13 of 36
SPT LEC LCI

PAINTING INSPECTION REPORT

Project : LINE Project WP2 Report No. : PIR-WPS-SPT-STL-00007


Work Pkg. : WP2-AWH Date : 2/24/2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

FOTOGRAPH DFT PRIMER COAT

14 of 36
15 of 36
PAINTING INSPECTION REPORT FOR
DFT MEASUREMENT
Inspection Date : Report No.
Project : LINE Project WP2 Page No.
2/27/2023 PIR-WPS-SPT-STL-00008 1 of 1
Procedure No.
Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat
VD-LINE-550-MP-4-0001-AWH-01-011

Surface Preparation KC#20811146-XC#20915012 KC#20905262-KC20905281 KC#20817197-MC#20811009


Sa 2½ / SSPC SP 10
SPEC : 1st Coat DFT (µ m) SPEC : 2nd Coat DFT (µ m) SPEC : Top Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot
75 µm 120 µm 50 µm

Environmental Condition Date : 21-02-2023 Date : 24- 02-2023 Date : 25-02-2023


Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC ) 30 27 27 30 30 30 28 30 30
Air Temperature - Wer Blub ( OC ) 27 24 24 27 26 25 25 26 25
Relative Humidity ( % ) 79 78 78 79 73 67 79 73 67
Dew Point ( OC ) 26 23 23 26 25 23 24 25 23
Substrate Temperature ( OC ) 30 31 31 29 30 32 28 32 33

SKETCH

Measurement Tool : Sling Hygrometer ( ) | Infrared Temperature ( ) | Dial Test Gauge ( ) | SSPC / SSPC VIS-1 ( )| DFT Elcometer ( )
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
21-Feb-23 1st Coat 76 77 77 79 81 80 75 75 74 80 78 79 78
1 BH-B052 24-Feb-23 2nd Coat 123 122 134 123 134 123 121 123 123 120 125 121 124
25-Feb-23 Top Coat 51 51 55 57 55 51 51 55 57 55 61 57 55
21-Feb-23 1st Coat 74 80 78 76 77 77 79 81 80 75 80 75 78
2 BH-B048 24-Feb-23 2nd Coat 134 123 121 123 122 134 123 136 132 128 131 129 128
25-Feb-23 Top Coat 65 51 50 59 64 53 55 51 51 55 57 55 56
21-Feb-23 1st Coat 80 75 75 76 77 77 79 81 80 75 74 76 77
3 BH-B054 24-Feb-23 2nd Coat 121 120 132 138 121 123 125 129 125 122 134 123 126
25-Feb-23 Top Coat 53 56 64 53 55 59 55 57 52 50 52 51 55
21-Feb-23 1st Coat 79 81 80 75 74 76 77 77 79 81 80 75 78
4 BH-B050 24-Feb-23 2nd Coat 121 123 123 122 134 123 120 121 120 132 120 134 124
25-Feb-23 Top Coat 57 50 50 57 52 50 53 53 56 64 53 55 54
21-Feb-23 1st Coat 75 74 80 78 74 75 75 76 74 75 75 79 76
5 BH-B083 24-Feb-23 2nd Coat 133 123 120 125 121 123 123 122 134 123 121 123 124
25-Feb-23 Top Coat 55 51 51 55 57 55 65 51 50 59 55 51 55
21-Feb-23 1st Coat 79 81 80 75 80 78 74 76 74 75 75 77 77
6 BH-B174 24-Feb-23 2nd Coat 133 123 120 125 121 123 123 123 125 125 129 125 125
25-Feb-23 Top Coat 55 62 50 53 56 64 53 55 65 51 50 59 56
21-Feb-23 1st Coat 74 77 76 80 76 76 74 75 75 74 75 75 76
7 BH-C111 24-Feb-23 2nd Coat 132 133 141 120 133 123 120 125 121 123 123 123 126
25-Feb-23 Top Coat 52 62 64 51 50 56 61 51 52 54 51 60 55
21-Feb-23 1st Coat 77 79 75 74 74 75 75 76 76 74 75 75 75
8 BH-B006 24-Feb-23 2nd Coat 141 120 133 123 125 121 123 123 132 133 141 120 128
25-Feb-23 Top Coat 56 64 53 55 62 56 50 52 66 62 56 50 57
21-Feb-23 1st Coat 76 74 75 75 80 75 77 79 75 74 75 75 76
9 BH-G008 24-Feb-23 2nd Coat 125 129 125 132 133 123 132 133 141 120 123 123 128
25-Feb-23 Top Coat 62 56 50 52 66 55 51 51 55 57 55 63 56
Note

16 of 36
Inspected by : Inspected by : Inspected by

SPT LEC LCI

PAINTING INSPECTION REPORT

Project : LINE Project WP2 Report No. : PIR-WPS-SPT-STL-00008


Work Pkg. : WP2-AWH Date : 2/24/2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

17 of 36
18 of 36
PAINTING INSPECTION REPORT FOR
DFT MEASUREMENT
Inspection Date : Report No.
Project : LINE Project WP2 Page No.
2/27/2023 PIR-WPS-SPT-STL-00009 1 of 1
Procedure No.
Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat
VD-LINE-550-MP-4-0001-AWH-01-011
KC#20818117
Surface Preparation LC#20811001
Sa 2½ / SSPC SP 10 Thinner : 024 # MC21122003 N/A N/A
SPEC : 1st Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot
100 µm
FIRE PROOFING
Environmental Condition Date : Date : Date : 27-02-2023
Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC ) 30 30 27 29 30 30 28 30 30
Air Temperature - Wer Blub ( OC ) 27 26 24 26 26 25 25 26 25
Relative Humidity ( % ) 79 73 78 79 73 67 79 73 67
Dew Point ( OC ) 26 25 23 25 25 23 24 25 23
Substrate Temperature ( OC ) 29 31 31 29 30 31 28 32 33

SKETCH

Measurement Tool : Sling Hygrometer ( ) | Infrared Temperature ( ) | Dial Test Gauge ( ) | SSPC / SSPC VIS-1 ( )| DFT Elcometer ( )
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
10-Feb-23 1st Coat 112 120 101 105 104 117 120 105 101 103 106 114 109
1 BH-C042 0
0
10-Feb-23 1st Coat 103 106 114 111 100 118 120 107 105 112 120 106 110
2 BH-C042 0
0
20-Feb-23 1st Coat 116 102 108 120 117 109 114 120 118 120 113 102 113
3 BH-C042 0
0
23-Feb-23 1st Coat 114 120 118 120 116 102 108 120 101 103 106 114 112
4 BH-G037 0
0
23-Feb-23 1st Coat 112 120 101 105 104 118 120 105 101 103 106 114 109
5 BH-G004 0
0
24-Feb-23 1st Coat 105 101 103 106 114 105 104 120 118 120 112 120 111
6 BH-B170 0
0
24-Feb-23 1st Coat 118 120 101 103 111 112 120 101 105 104 105 101 108
7 BH-B112 0
0
24-Feb-23 1st Coat 113 102 112 120 101 105 104 113 102 100 118 120 109
8 BH-B021 0
0
24-Feb-23 1st Coat 103 106 114 107 105 104 105 101 117 109 114 100 107
9 BH-C035 0
0
24-Feb-23 1st Coat 105 104 105 101 103 111 112 112 120 101 105 104 107
10 BH-G024 0
0
24-Feb-23 1st Coat 117 109 114 101 112 120 101 105 104 103 111 112 109
11 19 of 36
11 BH-B025 0
0
Note

Inspected by : Inspected by : Inspected by

SPT LEC LCI

PAINTING INSPECTION REPORT

Project : LINE Project WP2 Report No. : PIR-WPS-SPT-STL-00009


Work Pkg. : WP2-AWH Date : 2/24/2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

20 of 36
21 of 36
PAINTING INSPECTION REPORT FOR
DFT MEASUREMENT
Inspection Date : Report No.
Project : LINE Project WP2 Page No.
3/2/2023 PIR-WPS-SPT-STL-00010 1 of 1
Procedure No.
Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat
VD-LINE-550-MP-4-0001-AWH-01-011

Surface Preparation KC#20811146-XC#20915012 KC#20905262-KC20905281 KC#20817197-MC#20811009


Sa 2½ / SSPC SP 10
SPEC : 1st Coat DFT (µ m) SPEC : 2nd Coat DFT (µ m) SPEC : Top Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot
75 µm 120 µm 50 µm

Environmental Condition Date : 15-02-2023 Date : 28- 02-2023 Date : 01-03-2023


Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC ) 29 30 27 29 32 31 28 31 29
Air Temperature - Wer Blub ( OC ) 26 26 24 26 27 26 25 27 25
Relative Humidity ( % ) 79 73 78 79 68 67 79 73 72
Dew Point ( OC ) 25 25 23 25 25 24 24 26 23
Substrate Temperature ( OC ) 28 31 31 29 31 33 28 32 31

SKETCH

Measurement Tool : Sling Hygrometer ( ) | Infrared Temperature ( ) | Dial Test Gauge ( ) | SSPC / SSPC VIS-1 ( )| DFT Elcometer ( )
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
15-Feb-23 1st Coat 75 74 80 76 75 75 80 75 80 76 76 74 76
1 BH-VB017(3/4) 28-Feb-23 2nd Coat 121 123 123 123 125 123 125 129 125 122 134 123 125
1-Mar-23 Top Coat 62 56 64 53 55 50 50 57 52 50 50 63 55
15-Feb-23 1st Coat 76 74 75 80 76 78 75 82 74 77 87 74 77
2 BH-VB017(4/4) 28-Feb-23 2nd Coat 123 125 129 125 122 134 123 120 125 121 123 125 125
1-Mar-23 Top Coat 55 57 57 52 51 60 62 50 50 64 58 60 56
15-Feb-23 1st Coat 76 74 75 80 78 90 89 76 74 75 80 77 79
3 BH-VB010 28-Feb-23 2nd Coat 123 125 125 121 132 133 140 121 123 123 123 125 126
1-Mar-23 Top Coat 54 66 57 52 50 63 63 54 56 51 62 64 58
15-Feb-23 1st Coat 76 74 75 75 80 76 75 75 82 74 83 76 77
4 BH-VB031(1/2) 28-Feb-23 2nd Coat 123 125 129 125 122 134 123 132 120 125 121 123 125
1-Mar-23 Top Coat 58 66 57 52 50 63 55 57 57 52 51 60 57
15-Feb-23 1st Coat 76 74 75 75 80 82 85 83 76 79 77 75 78
5 BH-VB031(2/2) 28-Feb-23 2nd Coat 120 125 121 123 125 129 125 122 134 123 125 129 125
1-Mar-23 Top Coat 56 51 62 64 57 53 55 65 51 50 59 51 56
15-Feb-23 1st Coat 83 81 75 78 90 89 76 74 75 75 80 77 79
6 BH-VB011 28-Feb-23 2nd Coat 125 125 121 132 120 125 121 123 123 129 125 122 124
1-Mar-23 Top Coat 52 50 63 63 57 54 66 57 52 50 63 51 57
Note

Inspected by : Inspected by : Inspected by

SPT LEC LCI


22 of 36
PAINTING INSPECTION REPORT

Project : LINE Project WP2 Report No. : PIR-WPS-SPT-STL-00010


Work Pkg. : WP2-AWH Date : 2/24/2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

FOTOGRAPH DFT PRIMER COAT

FOTOGRAPH DFT intermediate COAT

FOTOGRAPH DFT FINISH COAT

23 of 36
PAINTING INSPECTION REPORT FOR
DFT MEASUREMENT
Inspection Date : Report No.
Project : LINE Project WP2 Page No.
2/2/2023 PIR-WPS-SPT-STL-00010 1 of 1
Procedure No.
Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat
VD-LINE-550-MP-4-0001-AWH-01-011

Surface Preparation KC#20811146-XC#20915012 KC#20905262-KC20905281 KC#20817197-MC#20811009


Sa 2½ / SSPC SP 10
SPEC : 1st Coat DFT (µ m) SPEC : 2nd Coat DFT (µ m) SPEC : Top Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot
75 µm 120 µm 50 µm

Environmental Condition Date : 13-02-2023 Date : 15- 02-2023 Date 01-03-2023


Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC )
Air Temperature - Wer Blub ( OC )
Relative Humidity ( % )
Dew Point ( OC )
Substrate Temperature ( OC )

SKETCH

Measurement Tool : Sling Hygrometer ( ) | Infrared Temperature ( ) | Dial Test Gauge ( ) | SSPC / SSPC VIS-1 ( )| DFT Elcometer ( )
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
13-Feb-23 1st Coat 75 74 80 76 75 73 81 80 75 77 79 75 77
1 BH-B033 15-Feb-23 2nd Coat 122 131 124 125 123 122 134 125 122 122 120 133 125
1-Mar-23 Top Coat 51 50 56 61 62 56 71 60 66 52 50 55 58
13-Feb-23 1st Coat 82 74 76 75 75 82 77 77 77 81 76 75 77
2 BH-B033 15-Feb-23 2nd Coat 123 122 134 125 122 122 120 133 122 134 120 120 125
1-Mar-23 Top Coat 56 50 51 52 61 56 61 62 56 52 50 53 55
13-Feb-23 1st Coat 77 76 81 75 77 79 76 77 75 75 82 77 77
3 BH-B033 15-Feb-23 2nd Coat 121 121 125 119 123 122 127 122 120 127 120 124 123
1-Mar-23 Top Coat 50 62 56 71 53 57 50 50 53 50 52 62 56
13-Feb-23 1st Coat 81 75 77 79 76 77 77 79 81 74 80 78 78
4 BH-B033 15-Feb-23 2nd Coat 131 124 125 123 122 120 124 133 131 125 125 120 125
1-Mar-23 Top Coat 57 50 50 53 52 52 71 62 56 71 57 52 57
Note

Inspected by : Inspected by : Inspected by

SPT LEC LCI

PAINTING INSPECTION REPORT

Project : LINE Project WP2 Report No. : PIR-WPS-SPT-STL-00010


Work Pkg. : WP2-AWH Date : 2/24/2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

24 of 36
25 of 36
PAINTING INSPECTION REPORT FOR
DFT MEASUREMENT
Inspection Date : Report No.
Project : LINE Project WP2 Page No.
3/2/2023 PIR-WPS-SPT-STL-00012 1 of 3
Procedure No.
Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat
VD-LINE-550-MP-4-0001-AWH-01-011

Surface Preparation KC#20811146-XC#20915012 KC#20905262-KC20905281 KC#20817197-MC#20811009


Sa 2½ / SSPC SP 10
SPEC : 1st Coat DFT (µ m) SPEC : 2nd Coat DFT (µ m) SPEC : Top Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot
75 µm 120 µm 50 µm

Environmental Condition Date : 22-02-2023 Date : 28- 02-2023 Date : 01-03-2023


Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC )
Air Temperature - Wer Blub ( OC )
Relative Humidity ( % )
Dew Point ( OC )
Substrate Temperature ( OC )

SKETCH

Measurement Tool : Sling Hygrometer ( ) | Infrared Temperature ( ) | Dial Test Gauge ( ) | SSPC / SSPC VIS-1 ( )| DFT Elcometer ( )
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
22-Feb-23 1st Coat 75 75 80 76 75 75 76 74 75 80 78 74 76
1 BH-B043 28-Feb-23 2nd Coat 125 125 121 123 125 125 121 134 123 121 123 132 125
1-Mar-23 Top Coat 50 50 57 52 50 57 52 50 63 51 56 64 54
22-Feb-23 1st Coat 74 75 75 80 73 90 76 74 75 75 80 89
2 BH-B043 28-Feb-23 2nd Coat 120 131 124 135 121 132 133 140 121 138 134 122
1-Mar-23 Top Coat 55 51 51 55 57 55 64 53 55 59 55 50
22-Feb-23 1st Coat 74 75 76 74 75 78 90 89 76 74 75 75 78
3 BH-G008 28-Feb-23 2nd Coat 123 125 125 121 119 131 126 122 128 137 125 120 125
1-Mar-23 Top Coat 57 52 50 63 51 57 52 50 53 56 64 50 55

Note

Inspected by : Inspected by : Inspected by

SPT LEC LCI

26 of 36
PAINTING INSPECTION REPORT
Project : LINE Project WP2 Report No. : PIR-WPS-SPT-STL-00012
Work Pkg. : WP2-AWH Date : 2/24/2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

27 of 36
28 of 36
PAINTING INSPECTION REPORT FOR
DFT MEASUREMENT
Inspection Date : Report No.
Project : LINE Project WP2 Page No.
3/2/2023 PIR-WPS-SPT-STL-00013 1 of 4
Procedure No.
Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat
VD-LINE-550-MP-4-0001-AWH-01-011

Surface Preparation KC#20811146-XC#20915012 KC#20905262-KC20905281 KC#20817197-MC#20811009


Sa 2½ / SSPC SP 10
SPEC : 1st Coat DFT (µ m) SPEC : 2nd Coat DFT (µ m) SPEC : Top Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot
75 µm 120 µm 50 µm

Environmental Condition Date : 23-02-2023 Date : 28- 02-2023 Date : 01-03-2023


Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC )
Air Temperature - Wer Blub ( OC )
Relative Humidity ( % )
Dew Point ( OC )
Substrate Temperature ( OC )

SKETCH

Measurement Tool : Sling Hygrometer ( ) | Infrared Temperature ( ) | Dial Test Gauge ( ) | SSPC / SSPC VIS-1 ( )| DFT Elcometer ( )
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
23-Feb-23 1st Coat 75 74 80 76 75 76 74 75 74 75 75 80 76
1 BH-B056 28-Feb-23 2nd Coat 128 132 124 131 138 122 120 128 136 130 121 124 128
1-Mar-23 Top Coat 62 60 51 58 53 56 64 60 50 53 62 51 57
23-Feb-23 1st Coat 83 81 75 78 90 75 82 74 77 87 76 84 80
2 BH-B043 28-Feb-23 2nd Coat 131 138 122 122 134 123 132 120 123 123 125 123 126
1-Mar-23 Top Coat 56 64 60 62 56 64 53 54 56 51 62 64 59
Note

Inspected by : Inspected by : Inspected by

SPT LEC LCI

PAINTING INSPECTION REPORT


Project : LINE Project WP2 Report No. : PIR-WPS-SPT-STL-00013
Work Pkg. : WP2-AWH Date : 2/24/2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

29 of 36
30 of 36
PAINTING INSPECTION REPORT FOR
DFT MEASUREMENT
Inspection Date : Report No.
Project : LINE Project WP2 Page No.
3/2/2023 PIR-WPS-SPT-STL-00014 1 of 5
Procedure No.
Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat
VD-LINE-550-MP-4-0001-AWH-01-011

Surface Preparation KC#20811146-XC#20915012 KC#20905262-KC20905281 KC#20817197-MC#20811009


Sa 2½ / SSPC SP 10
SPEC : 1st Coat DFT (µ m) SPEC : 2nd Coat DFT (µ m) SPEC : Top Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot
75 µm 120 µm 50 µm

Environmental Condition Date : 24-02-2023 Date : 28- 02-2023 Date : 01-03-2023


Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC )
Air Temperature - Wer Blub ( OC )
Relative Humidity ( % )
Dew Point ( OC )
Substrate Temperature ( OC )

SKETCH

Measurement Tool : Sling Hygrometer ( ) | Infrared Temperature ( ) | Dial Test Gauge ( ) | SSPC / SSPC VIS-1 ( )| DFT Elcometer ( )
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
24-Feb-23 1st Coat 74 75 76 76 74 75 75 76 74 75 75 80 75
1 BH-C119 28-Feb-23 2nd Coat 123 125 125 121 123 123 134 123 121 123 120 139 125
1-Mar-23 Top Coat 51 57 50 63 60 52 64 51 58 51 64 53 56
1st Coat 0
2 2nd Coat 0
Top Coat 0
1st Coat 0
3 2nd Coat 0
Top Coat 0
Note

Inspected by : Inspected by : Inspected by

SPT LEC LCI

PAINTING INSPECTION REPORT


Project : LINE Project WP2 Report No. : PIR-WPS-SPT-STL-00014
Work Pkg. : WP2-AWH Date : 2/24/2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

31 of 36
32 of 36
PAINTING INSPECTION REPORT FOR
DFT MEASUREMENT
Inspection Date : Report No.
Project : LINE Project WP2 Page No.
3/2/2023 PIR-WPS-SPT-STL-00015 1 of 6
Procedure No.
Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat
VD-LINE-550-MP-4-0001-AWH-01-011

Surface Preparation KC#20811146-XC#20915012 KC#20905262-KC20905281 KC#20817197-MC#20811009


Sa 2½ / SSPC SP 10
SPEC : 1st Coat DFT (µ m) SPEC : 2nd Coat DFT (µ m) SPEC : Top Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot
75 µm 120 µm 50 µm

Environmental Condition Date : 25-02-2023 Date : 28- 02-2023 Date : 01-03-2023


Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC )
Air Temperature - Wer Blub ( OC )
Relative Humidity ( % )
Dew Point ( OC )
Substrate Temperature ( OC )

SKETCH

Measurement Tool : Sling Hygrometer ( ) | Infrared Temperature ( ) | Dial Test Gauge ( ) | SSPC / SSPC VIS-1 ( )| DFT Elcometer ( )
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
25-Feb-23 1st Coat 76 74 75 75 80 77 81 80 75 74 76 81 77
1 BH-B213 28-Feb-23 2nd Coat 125 125 129 123 125 125 121 137 120 125 132 120 126
1-Mar-23 Top Coat 57 50 50 53 55 65 51 50 53 56 51 64 55
1st Coat 0
2 BH-B213 2nd Coat 0
Top Coat 0
1st Coat 0
3 BH-B213 2nd Coat 0
Top Coat 0
Note

Inspected by : Inspected by : Inspected by

SPT LEC LCI

PAINTING INSPECTION REPORT


Project : LINE Project WP2 Report No. : PIR-WPS-SPT-STL-00015
Work Pkg. : WP2-AWH Date : 2/24/2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

33 of 36
34 of 36
PAINTING INSPECTION REPORT FOR
DFT MEASUREMENT
Inspection Date : Report No.
Project : LINE Project WP2 Page No.
3/2/2023 PIR-WPS-SPT-STL-00016 1 of 7
Procedure No.
Batch No. 1st Coat Batch No. 2nd Coat Batch No. Top Coat
VD-LINE-550-MP-4-0001-AWH-01-011

Surface Preparation KC#20811146-XC#20915012 KC#20905262-KC20905281 KC#20817197-MC#20811009


Sa 2½ / SSPC SP 10
SPEC : 1st Coat DFT (µ m) SPEC : 2nd Coat DFT (µ m) SPEC : Top Coat DFT (µ m)
Abrasive : Steel Grit G40 + Steel Shoot
75 µm 120 µm 50 µm

Environmental Condition Date : 25-02-2023 Date : 28- 02-2023 Date : 01-03-2023


Primer Coat Aplication Second Coat Aplication Finish Coat Aplication
Time 8:00 10:00 14:00 8:00 10:00 14:00 8:00 10:00 14:00
Air Temperature - Dry Blub ( OC )
Air Temperature - Wer Blub ( OC )
Relative Humidity ( % )
Dew Point ( OC )
Substrate Temperature ( OC )

SKETCH

Measurement Tool : Sling Hygrometer ( ) | Infrared Temperature ( ) | Dial Test Gauge ( ) | SSPC / SSPC VIS-1 ( )| DFT Elcometer ( )
I II III
No. ITEM / MARK No. DATE COATING RESULT REMARK
A B C D A B C D A B C D
1st Coat
1 BH-B033 2nd Coat
Top Coat
1st Coat 0
2 BH-B033 2nd Coat 0
Top Coat 0
Note

Inspected by : Inspected by : Inspected by

SPT LEC LCI

PAINTING INSPECTION REPORT


Project : LINE Project WP2 Report No. : PIR-WPS-SPT-STL-00016
Work Pkg. : WP2-AWH Date : 2/24/2023
Location : Cikarang, Bekasi Subcont. : PT. SPACE TECHNOLOGY

35 of 36
36 of 36