National Builtech Trading & Contracting Co.

SURFACE PREPARATION AND PAINTING INSPECTION REPORT NBTC-FO/QC-03/Rev.00


PROJECT : JOB NO : 2648 REPORT NO : NBTC-PIR- 2648 001
CONTRACTOR : TBK PAINTING SYSTEM : Project specification DATE : 31/08/2021
SUB CONTRACTOR : SUBSYSTEM : NA LOCATION : NBTC Workshop
Wheather conditions SURFACE PREPARATION AND PRIMER COAT INTERMEDIATE COAT TOP COAT SURFACE PREPARATION

Date and Time AM PM AM 5.00PM 2:00 PM 2:00 AM Inspection time & Date : 27/08/2021
Substrate Temperature inoC 27 24 25 Surface Preparation Required : BLASTING
Ambient Temperature inoC 26 27 26 Abrasive Used & Batch No : Garnet 30/60
Relative Humidity in % 60% 55% 55% Surface profile Roughness : SA 2.5
Dew Point inoC 20 19 20 Attach Press 'O' Film
Paint Details P.C. Batch No. I.C. Batch No. T.C. Batch No.

Base 820080070 820080070 45889570200015

C.A. : 820061389 820061389 820010064 Signature


Thinner 820021766 820021766 820030126 DATE 27/08/2021
PROCEDURE NO: Project specification SPECIFICATION NO : NA REF DRAWING NO: NA NBTC Contractor Client
PRIMER COAT START DATE & TIME : 27/08/2021 INTERMEDIATE COAT START DATE & TIME : 28/08/2021 FINAL COAT START DATE & TIME : 29/08/2021

S. NO LINE NO/DRAWING NO/ISOMETRIC NO VISUAL REQ. DFT IN µ PRIMER COAT DFT IN µ INTERMEDIATE COAT DFT IN µ TOP COAT DFT IN µ REMARKS

1 14F -02 OK 180 85 90 93 153 158 165 225 245 258

2 15F -01 OK 180 92 97 100 160 165 172 232 252 265

3 15F -02 OK 180 81 86 89 149 154 161 221 241 254

4 17F -01 OK 180 82 87 90 150 155 162 222 242 255

5 18F -01 OK 180 84 89 92 152 157 164 224 244 257

6 18F -02 OK 180 87 92 95 155 160 167 227 247 260

7 19F -01 OK 180 81 86 89 149 154 161 221 241 254

8 19F -02 OK 180 79 134 134 194 199 206 266 286 299

9 20F -01 OK 180 86 91 94 154 200 207 267 287 297

10 21F -02 OK 180 88 93 96 156 201 208 268 288 298

11 22F -01 OK 180 99 104 107 167 202 209 269 289 299

12 22F -02 OK 180 78 83 86 146 203 210 270 290 300

Final Coat Colour Code / RAL No: RAL 7030 NBTC CONTRACTOR / TPI CLIENT

DFT Gauge Serial No : SC05897 Signature

Calibration Due Date : 23/Dec/2021 Date 31/08/2021

REMARKS : Adhesion Test: NA Dust level : NA


Holiday Test: NA Holiday Voltage: NA
Chloride
Chloride Test: NA : NA
Level
NBTC CONTRACTOR CLIENT
Signature

Name AMAL

Date: 31/08/2021