Professional Documents
Culture Documents
Estimasi Utang
Estimasi Utang
22-Mar-19
519
17.3 IDR 481,500,000.00 IDR 474,145,581.00 IDR 7,354,419.00 IDR 425,110.92
IDR 42,372,000.00 IDR 41,724,811.13
IDR 3,531,000.00 IDR 3,477,067.59
IDR 3,956,110.92 IDR 3,902,178.52
potong pokok 100juta potong pokok 125juta
estimasi pokok now BTN (22 tahun) 2023 BTN (22 tahun)
IDR 5,101,331.10 IDR 469,044,249.90 IDR 369,044,249.90 IDR 344,044,249.90
IDR 35,059,203.74 IDR 32,684,203.74
IDR 2,921,600.31 IDR 2,723,683.65
IDR 1,397,894.89 IDR 1,303,197.92
IDR 4,319,495.20 IDR 4,026,881.56