<<Name>>
<<Designation>>
<<Department>>
Approval:
<<Name>>
<<Designation>>
<<Department>>
Page: 2 / 7
Table of contents
1 BACKGROUND....................................................................................................................................4
1.1 PURPOSE.........................................................................................................................................4
1.3 REFERENCES...................................................................................................................................4
2 ASSUMPTIONS.....................................................................................................................................5
3 TEST PROCESS....................................................................................................................................5
4 DEVIATIONS........................................................................................................................................7
5 RECOMMENDATION............................................................................................................................7
Page: 3 / 7
1 BACKGROUND
<Describe a brief background of the <<<project name>>> project and the particular phase for which
the completion report is prepared for>
1.1 PURPOSE
This document is the test completion report for the <<<project name>>> project. The purpose of this
document is to:
Serve as the final release document, confirming the end of all test levels for the <<<project
name>>> project in scope of the test plan (Ref: Conducting Tests section)
Summarize outstanding defects at the end of testing (based on triage outcome), providing
details of responsibility and planned timescales for resolution
<List all terms and abbreviations used in this document in this section. It is also permissible to
reference a glossary document, if one is being maintained and approved, and omit this section.>
1.3 REFERENCES
[This subsection should provide a complete list of all documents referenced elsewhere in the Test
Summary Report]
Page: 4 / 7
2 ASSUMPTIONS
Detail the assumptions made from relevant test plan of <<project name>>. Include additional
assumptions made during test activities (if any)
3 TEST PROCESS
Provide a summary of the quality of the test process as implemented. Provide an overall assessment
of the scope coverage, build or release tested, with a summary of the test results, including the
number of defects summarized by impact/severity level.
Page: 5 / 7
3.3 RELEASE SUMMARY RESULTS
The following is a summary of the release/iteration info obtained for the reported test effort.
<Severity> <# total <# total <# total <# total <# total <comments>
reported> resolved> outstanding> rejected> deferred>
Total
Page: 6 / 7
4 DEVIATIONS
Provide a brief description of the unexpected results, problems, or defects that occurred during the
testing.
5 RECOMMENDATION
Outcome of the triage and final release plan for deployment – Go/No Go to be expanded
Provide any recommended improvements in the design, operation, or future testing of the project
that resulted from the testing being reported. A discussion of each recommendation and its impact on
the business aspect of project may be provided. If there are no recommendations to report, then
simply state as such.