<th scope="col">ID</th><th scope="col">Location</th><th
scope="col">PlanTitle</th><th scope="col">Status</th><th
scope="col">AssignedTo</th><th scope="col">Category</th><th
scope="col">Type</th><th scope="col">Item</th><th scope="col">Description</th><th
scope="col">Priority</th><th scope="col">DueBy</th><th
scope="col">CreatedBy</th><th scope="col">CreatedDate</th><th
scope="col">IR</th><th scope="col">LastUpdated</th><th
scope="col">UpdatedDescription</th><th scope="col">LocationReference</th><th
scope="col">Classification</th>
</tr><tr>
<td>34072</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipe penetrations shall be sealed.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:22:01 PM</td><td> </td><td>12/1/2022 3:52:54
PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34074</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct penetration shall be sealed.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:22:04 PM</td><td> </td><td>12/1/2022 3:52:34
PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34310</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct penetration need to be sealed.
</td><td>High</td><td>10/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/18/2022 4:05:53 PM</td><td> </td><td>12/1/2022 3:51:46
PM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34847</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain pipe penetration throw wall shall be sealed.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:42 PM</td><td> </td><td>12/1/2022 3:51:22
PM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34848</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Fire pipe penetration throw slap need to be sealed.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:43 PM</td><td> </td><td>12/1/2022 3:51:09
PM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34851</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct penetration throw wall.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:48 PM</td><td> </td><td>12/1/2022 3:50:56
PM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>29999</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing name tag for
EWH. </td><td>High</td><td>6/2/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:34 PM</td><td> </td><td>12/1/2022 3:50:16
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>31216</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Valves name tags is missing. </td><td>High</td><td>6/8/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:56:27 PM</td><td>
</td><td>12/1/2022 3:49:46
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28947</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Valves name tags are
missing. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:49 PM</td><td> </td><td>12/1/2022 3:48:00
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29971</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Valves name tags is missing.
</td><td>High</td><td>6/2/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:38 PM</td><td> </td><td>12/1/2022 3:47:47
PM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29723</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Valve name tag is missing.
</td><td>High</td><td>6/1/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:21:04 PM</td><td> </td><td>12/1/2022 3:45:41
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28330</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing valves name tag. </td><td>High</td><td>5/3/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>4/26/2022 11:43:36 AM</td><td>
</td><td>12/1/2022 3:45:07
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28956</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Valves name tags are
missing. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:14 PM</td><td> </td><td>12/1/2022 3:43:05
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28959</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Valves name tag
missing. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:20 PM</td><td> </td><td>12/1/2022 3:42:26
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28977</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Valves name tags are missing. </td><td>High</td><td>5/24/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:33:00 PM</td><td>
</td><td>12/1/2022 3:42:11
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28985</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Valves name tags are missing. </td><td>High</td><td>5/24/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:33:18 PM</td><td>
</td><td>12/1/2022 3:41:46
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29017</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Valves name tags are
missing. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:34 PM</td><td> </td><td>12/1/2022 3:41:32
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29037</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing name tags for valves. </td><td>High</td><td>5/24/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:11:32 PM</td><td>
</td><td>12/1/2022 3:41:12
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29082</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing valves name tags.
</td><td>High</td><td>5/26/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:35 AM</td><td> </td><td>12/1/2022 3:40:50
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29144</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing name tags for valves.
</td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:02 AM</td><td> </td><td>12/1/2022 3:40:29
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29158</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing valves name tags.
</td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:31 AM</td><td> </td><td>12/1/2022 3:40:08
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>28345</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Valves name tag is missing.
</td><td>High</td><td>5/3/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:24 AM</td><td> </td><td>12/1/2022 3:38:39
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28422</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing valves tag names in all hydronic works in this area.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:42 PM</td><td> </td><td>12/1/2022 3:38:28
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28487</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing name tags for the valves.
</td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:03 PM</td><td> </td><td>12/1/2022 3:36:16
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29242</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing valves name tags.
</td><td>High</td><td>5/30/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:46 PM</td><td> </td><td>12/1/2022 3:36:00
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29249</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing name tags for hydronic valves.
</td><td>High</td><td>5/30/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:05 PM</td><td> </td><td>12/1/2022 3:35:36
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>34249</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Termination box cover need to be fixed.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:14:23 PM</td><td> </td><td>12/1/2022 3:34:53
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34226</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Differential pressure sensor need to be
installed properly. </td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:45 PM</td><td> </td><td>12/1/2022 3:34:12
PM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34219</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Indicator for dampers actuators are
missing. </td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:34 PM</td><td> </td><td>12/1/2022 3:33:14
PM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34125</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Termination box for valve actuator.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:23:25 PM</td><td> </td><td>12/1/2022 3:32:24
PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34120</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Termination box cover
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:23:18 PM</td><td> </td><td>12/1/2022 3:31:54
PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>33992</td><td>AHU</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Dampers actuators have missing parts.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:15:02 PM</td><td> </td><td>12/1/2022 3:31:22
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33990</td><td>AHU</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Damper electrical terminations not
complete. </td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:14:54 PM</td><td> </td><td>12/1/2022 3:30:09
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33976</td><td>AHU</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;DPS connection.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:14:25 PM</td><td> </td><td>12/1/2022 3:29:29
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33996</td><td>AHU</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;DPS need be fixed properly.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:15:10 PM</td><td> </td><td>12/1/2022 3:27:41
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>23765</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Brush is missing and should be
extended </td><td>Low</td><td>11/4/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/14/2021 3:46:42 PM</td><td> </td><td>12/1/2022 9:20:34
AM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>34980</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Damaged sealant and water proofing should be
repaired and adjusted </td><td>Low</td><td>11/20/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/30/2022 10:05:03 AM</td><td> </td><td>12/1/2022
9:19:47 AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34770</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door accessories </td><td>Low</td><td>11/14/2022 12:00:00
PM</td><td>Mohamed.Halim</td><td>10/24/2022 10:37:33 AM</td><td> </td><td>12/1/2022
9:19:07 AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34756</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damage hardware accessories </td><td>Low</td><td>11/14/2022
12:00:00 AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:34:50 AM</td><td>
</td><td>12/1/2022 9:18:36
AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34738</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing hardware accessories.</td><td>Low</td><td>11/14/2022
12:00:00 PM</td><td>Mohamed.Halim</td><td>10/24/2022 10:34:08 AM</td><td>
</td><td>12/1/2022 9:17:54
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34195</td><td>SHAFT</td><td>MU L35</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door accessories </td><td>Low</td><td>11/6/2022 12:00:00
PM</td><td>Mohamed.Halim</td><td>10/16/2022 11:13:49 AM</td><td> </td><td>12/1/2022
9:17:27 AM</td><td>&nbsp;</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34191</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door accessories </td><td>Low</td><td>10/23/2022 12:00:00
PM</td><td>Mohamed.Halim</td><td>10/16/2022 11:13:42 AM</td><td> </td><td>12/1/2022
9:16:46 AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34168</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged rubber should be repaired </td><td>Low</td><td>11/6/2022
12:00:00 PM</td><td>Mohamed.Halim</td><td>10/16/2022 11:10:13 AM</td><td>
</td><td>12/1/2022 9:16:06
AM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32824</td><td>The Palm Garden - Exhibition - Band
A</td><td>Exhibition - Children&#39;s Museum</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Exhibition works </td><td>General
Snag</td><td>&#39;Missing walls graphics </td><td>Low</td><td>9/22/2022 12:00:00
AM</td><td>mohamed.sami</td><td>9/1/2022 10:46:59 AM</td><td> </td><td>11/30/2022
5:02:47 PM</td><td>As per previous agreement for graphics background
changement</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32806</td><td>Classroom 1 - Exhibition - Band
A</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Lockers are missing
</td><td>Low</td><td>9/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/31/2022
11:32:45 AM</td><td> </td><td>11/30/2022 1:50:25 PM</td><td>Based on assigned
sketch by Eng. Ayman for material &amp; dimensions changes &amp; CIR is not
submitted</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32750</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Archeology table/Missing artifacts
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:52:27 PM</td><td> </td><td>11/30/2022 1:48:20 PM</td><td>CIR is not
submitted</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32766</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Frame 4/Missing table should be installed
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:52:54 PM</td><td> </td><td>11/30/2022 1:47:13 PM</td><td>CIR is not
submitted</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32773</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;The Throne/Missing
fan</td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:53:04 PM</td><td> </td><td>11/30/2022
1:46:05 PM</td><td>CIR is not submitted</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>19496</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Remove storage material
</td><td>Low</td><td>7/20/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/29/2021
10:18:06 AM</td><td> </td><td>11/30/2022 1:38:38 PM</td><td>&nbsp;</td><td>Museum
Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>32446</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Support </td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:42 PM</td><td>
</td><td>11/30/2022 1:26:54
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34812</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Toilet service shaft access is closed.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:11:46 PM</td><td> </td><td>11/30/2022 9:01:43
AM</td><td>&nbsp;</td><td>MP.14.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>34800</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Shaft access door is closed. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:11:29 PM</td><td>
</td><td>11/30/2022 9:01:37
AM</td><td>&nbsp;</td><td>MW.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>28470</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Filters are not installed and machine need general cleaning and
coil fins need to be adjusted. </td><td>High</td><td>5/12/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:06:33 PM</td><td>
</td><td>11/30/2022 8:58:46
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34292</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct penetration need to be sealed.
</td><td>High</td><td>10/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/18/2022 4:05:16 PM</td><td> </td><td>11/30/2022 8:58:07
AM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34296</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipe penetration. </td><td>High</td><td>10/25/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:05:25 PM</td><td>
</td><td>11/30/2022 8:41:39
AM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34289</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain pipes penetrations shall be sealed.
</td><td>High</td><td>10/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/18/2022 4:05:12 PM</td><td> </td><td>11/30/2022 8:41:19
AM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34291</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipe penetrations. </td><td>High</td><td>10/25/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:05:15 PM</td><td>
</td><td>11/30/2022 8:40:42
AM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34855</td><td>FIRE LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drainage pipes penetrations throw slap shall be sealed.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:56 PM</td><td> </td><td>11/30/2022 8:28:09
AM</td><td>&nbsp;</td><td>MQ.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34856</td><td>FIRE LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipes penetrations need to be sealed.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:57 PM</td><td> </td><td>11/30/2022 8:25:47
AM</td><td>&nbsp;</td><td>MQ.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>13004</td><td>TUT- TUTANKAMEN GALLERY(+46.50)</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Refer to comment in relevant
NCR-981000-Q648</td><td>High</td><td>11/9/2020 12:00:00 AM</td><td>Sherif
Elabd</td><td>11/2/2020 1:11:30 PM</td><td> </td><td>11/29/2022 12:08:40
PM</td><td>based on PMC comments on
CIR-238000-.</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>34623</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipe penetration need to be sealed.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:09:10 PM</td><td> </td><td>11/29/2022 10:48:02
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>31730</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air filters. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:05 AM</td><td>
</td><td>11/29/2022 10:47:25
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>32568</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:34:02 AM</td><td> </td><td>11/29/2022 7:42:20
AM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>18006</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Electrical</td><td>General
Snag</td><td>General</td><td>&#39;BMS including Microclimate gateway and sensors
interface with BMS systems</td><td>High</td><td>6/1/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>5/25/2021 8:00:58 AM</td><td>
</td><td>11/28/2022 4:46:07 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21731</td><td>Food Court</td><td>Food
Court</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Cat6a cable Termination,Labeling,face
plate fixing and testing also not done</td><td>High</td><td>8/26/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>8/19/2021 11:28:18 AM</td><td>
</td><td>11/28/2022 4:43:45 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>34039</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover trunk</td><td>High</td><td>10/17/2022
12:00:00 AM</td><td>mina.moussa</td><td>10/10/2022 4:17:10 PM</td><td>
</td><td>11/28/2022 4:43:19
PM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32447</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:44 PM</td><td>
</td><td>11/28/2022 4:07:08
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>18004</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General</td><td>&#39;Durlum Lighting control black box installation
and sensors installation on TUT Gallery ceiling</td><td>High</td><td>6/1/2021
12:00:00 AM</td><td>andrewjohn.rose</td><td>5/25/2021 7:58:22 AM</td><td>
</td><td>11/28/2022 3:46:00 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>34438</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tray cover</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:01 AM</td><td>
</td><td>11/28/2022 3:45:58
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34449</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tray cover</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:21 AM</td><td>
</td><td>11/28/2022 3:45:58
PM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34473</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover tray</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:54 AM</td><td>
</td><td>11/28/2022 3:45:56
PM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34474</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Screw for
tray</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:56 AM</td><td>
</td><td>11/28/2022 3:45:55
PM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34692</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover tray</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:22:41 PM</td><td>
</td><td>11/28/2022 3:45:54
PM</td><td>&nbsp;</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34699</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover tray</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:22:53 PM</td><td>
</td><td>11/28/2022 3:45:53
PM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34972</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Explain extra cables
reason</td><td>High</td><td>11/3/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/27/2022 11:35:00 AM</td><td>
</td><td>11/28/2022 3:45:52
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34977</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>General Snag</td><td>General Snag</td><td>&#39;Incomplete works
</td><td>High</td><td>11/3/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/27/2022 11:35:10 AM</td><td>
</td><td>11/28/2022 3:45:51
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32448</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete works
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:30:45 PM</td><td> </td><td>11/28/2022 3:19:26
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32569</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Poor workmanship
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:34:04 AM</td><td> </td><td>11/28/2022 3:17:49
PM</td><td>&nbsp;</td><td>MS.14.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>25437</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged rockwool should be repaired
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/7/2021
12:20:22 PM</td><td> </td><td>11/27/2022 4:26:33
PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25614</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Missing rock wool </td><td>Low</td><td>1/4/2022
12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021 10:52:02 AM</td><td>
</td><td>11/27/2022 4:26:33 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25621</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Damaged rock wool to be repaired
</td><td>Low</td><td>1/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:52:12 AM</td><td> </td><td>11/27/2022 4:26:32
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25623</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Damaged rock wool should be repaired
</td><td>Low</td><td>1/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:52:14 AM</td><td> </td><td>11/27/2022 4:26:31
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25636</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Rock wool is missing
</td><td>Low</td><td>1/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:52:25 AM</td><td> </td><td>11/27/2022 4:26:30
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>9534</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 4B- ews19- joints between enter faces
need adjustment/ joints not aligned/ panels need cleaning/ toothing between panels
</td><td>Low</td><td>8/5/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/15/2020
10:14:24 AM</td><td> </td><td>11/27/2022 3:51:44 PM</td><td>&nbsp;</td><td>Stiletto
- wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9260</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 11 A inside- discoloring between
tiles/ broken edges/ joints not aligned / stone need cleaning
</td><td>Low</td><td>7/28/2020 12:00:00 AM</td><td>Sherif Elabd</td><td>7/7/2020
12:03:13 PM</td><td> </td><td>11/27/2022 2:39:45 PM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9509</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 4 B - joints not aligned/ joints
between enter faces irregular/ bad repair/ chipped edges/ joint between wall &amp;
floor need adjustment/ loose tiles/ toothing between
tiles</td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>7/14/2020 12:34:08 PM</td><td> </td><td>11/27/2022 2:39:44
PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9510</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 4 A- discoloring between tiles/ stains
at tiles/ black stains </td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>7/14/2020 12:34:10 PM</td><td> </td><td>11/27/2022 2:39:43
PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9517</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Discoloring between tiles/ stains at tiles/
joint between enter face irregular </td><td>Low</td><td>8/4/2020 12:00:00
PM</td><td>Sherif Elabd</td><td>7/14/2020 12:34:58 PM</td><td> </td><td>11/27/2022
2:39:42 PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9533</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 4 B - discoloring between tiles/
joints not aligned/ joints between enter faces need adjustment/ damaged tiles/
chipped edges/ need cleaning </td><td>Low</td><td>8/5/2020 12:00:00
PM</td><td>Sherif Elabd</td><td>7/15/2020 10:14:20 AM</td><td> </td><td>11/27/2022
2:39:41 PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9536</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 3 B- discoloring between tiles/ joints
not aligned/ joints between enter faces need adjustment/ damaged tiles/ chipped
edges/ need cleaning </td><td>Low</td><td>8/5/2020 12:00:00 AM</td><td>Sherif
Elabd</td><td>7/15/2020 10:14:33 AM</td><td> </td><td>11/27/2022 2:39:40
PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9538</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 2B- discoloring between tiles/ joints
not aligned/ joints between enter faces need adjustment/ crystal vines / chipped
edges/ broken tiles/ cracks</td><td>Low</td><td>8/5/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>7/15/2020 10:14:48 AM</td><td> </td><td>11/27/2022 2:39:38
PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9541</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 1 A - discoloring between tiles/
joints not aligned/ joints between enter faces need adjustment/ dark spots/ black
vines / toothing between tiles/ damaged edges/ crack at tiles
</td><td>Low</td><td>8/5/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/15/2020
10:15:55 AM</td><td> </td><td>11/27/2022 2:39:36 PM</td><td>&nbsp;</td><td>Stiletto
- wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9543</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 3A- black vines/ dark spots/
discoloring between tiles </td><td>Low</td><td>8/5/2020 12:00:00 AM</td><td>Sherif
Elabd</td><td>7/15/2020 10:16:19 AM</td><td> </td><td>11/27/2022 2:39:35
PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>31081</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Connection work be completed
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:23:43 PM</td><td> </td><td>11/27/2022 1:39:32
PM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>34389</td><td>SECURITY ROOM</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:42 PM</td><td>
</td><td>11/27/2022 1:39:31
PM</td><td>&nbsp;</td><td>MB.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34414</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Deformation of cover of cable trunk must
rectified </td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:14:30 PM</td><td>
</td><td>11/27/2022 1:39:29
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34424</td><td>CORE E2</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:48:34 AM</td><td>
</td><td>11/27/2022 1:39:27
PM</td><td>&nbsp;</td><td>MC.13.03.E21</td><td>&nbsp;</td>
</tr><tr>
<td>34425</td><td>CORE E2</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:48:36 AM</td><td>
</td><td>11/27/2022 1:39:26
PM</td><td>&nbsp;</td><td>MC.13.03.E21</td><td>&nbsp;</td>
</tr><tr>
<td>34426</td><td>BREAK OUT SPACE</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:48:37 AM</td><td>
</td><td>11/27/2022 1:39:24
PM</td><td>&nbsp;</td><td>MP.13.03.007</td><td>&nbsp;</td>
</tr><tr>
<td>34448</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:20 AM</td><td>
</td><td>11/27/2022 1:39:22
PM</td><td>&nbsp;</td><td>MS.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34459</td><td>MECH</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label </td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:35 AM</td><td>
</td><td>11/27/2022 1:39:20
PM</td><td>&nbsp;</td><td>MS.19.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>34462</td><td>MECH</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:39 AM</td><td>
</td><td>11/27/2022 1:39:19
PM</td><td>&nbsp;</td><td>MS.19.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>34463</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:41 AM</td><td>
</td><td>11/27/2022 1:39:17 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>34465</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tray should be
covered</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:44 AM</td><td>
</td><td>11/27/2022 1:39:15
PM</td><td>&nbsp;</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34658</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:21:37 PM</td><td>
</td><td>11/27/2022 1:39:13
PM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34661</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable systemization and cover
trunk</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:21:43 PM</td><td>
</td><td>11/27/2022 1:39:11 PM</td><td>&nbsp;</td><td>Level
+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>34664</td><td>Level +45.00</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:21:48 PM</td><td>
</td><td>11/27/2022 1:39:09 PM</td><td>&nbsp;</td><td>Level
+45.00</td><td>&nbsp;</td>
</tr><tr>
<td>34666</td><td>Level +45.00</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:21:51 PM</td><td>
</td><td>11/27/2022 1:39:07 PM</td><td>&nbsp;</td><td>Level
+45.00</td><td>&nbsp;</td>
</tr><tr>
<td>34683</td><td>Level +45.00</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:22:24 PM</td><td>
</td><td>11/27/2022 1:39:04 PM</td><td>&nbsp;</td><td>Level
+45.00</td><td>&nbsp;</td>
</tr><tr>
<td>34693</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:22:42 PM</td><td>
</td><td>11/27/2022 1:39:03
PM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34715</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tray cover</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:23:23 PM</td><td>
</td><td>11/27/2022 1:39:01
PM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34716</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:23:25 PM</td><td>
</td><td>11/27/2022 1:39:00
PM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34719</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:23:29 PM</td><td>
</td><td>11/27/2022 1:38:58 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>34862</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Manufacturers shop drawing to be attached
for LCP</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:20 PM</td><td>
</td><td>11/27/2022 1:38:56
PM</td><td>&nbsp;</td><td>MS.19.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34875</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth bond</td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:48 PM</td><td>
</td><td>11/27/2022 1:38:54
PM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>34893</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/24/2022 4:19:37 PM</td><td>
</td><td>11/27/2022 1:38:52
PM</td><td>&nbsp;</td><td>MW.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34898</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag</td><td>High</td><td>11/1/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/25/2022 11:34:24 AM</td><td> </td><td>11/27/2022
1:38:50 PM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34910</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Covers</td><td>High</td><td>11/1/2022
12:00:00 AM</td><td>mina.moussa</td><td>10/25/2022 11:34:43 AM</td><td>
</td><td>11/27/2022 1:38:48
PM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>9535</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 3B - ews19 - joints between enter
faces need adjustment/ joints not aligned/ panels need cleaning/ toothing between
panels </td><td>Low</td><td>8/5/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>7/15/2020 10:14:28 AM</td><td> </td><td>11/27/2022 1:26:57
PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9542</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 2A- discoloring between tiles/ joints
not aligned/ joints between enter faces need adjustment/ dark spots/ black vines
</td><td>Low</td><td>8/5/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/15/2020
10:16:13 AM</td><td> </td><td>11/27/2022 1:26:56 PM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9544</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 3A- damaged tiles/ joints not aligned/
rust at tiles/ toothing between tiles/ joints irregular/ joint between enter faces
need adjustment </td><td>Low</td><td>8/5/2020 12:00:00 AM</td><td>Sherif
Elabd</td><td>7/15/2020 10:16:30 AM</td><td> </td><td>11/27/2022 1:26:55
PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9545</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 3A- joints not aligned/ loose tiles/
damaged edges/ bad repair/ need cleaning/ joints between enter faces need
adjustment/ joint between wall &amp; floor need adjustment
</td><td>Low</td><td>8/5/2020 12:00:00 AM</td><td>Sherif Elabd</td><td>7/15/2020
10:16:53 AM</td><td> </td><td>11/27/2022 1:26:54 PM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>25598</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Joints and edges between include stone
reveal and stone cladding /module 1 should be aligned and adjusted
</td><td>Low</td><td>12/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:51:39 AM</td><td> </td><td>11/27/2022 1:26:54
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25648</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Joints between false ceiling and
stainless should be regular </td><td>Low</td><td>1/4/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/14/2021 10:52:42 AM</td><td> </td><td>11/27/2022
1:26:53 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25652</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Vertical joint between stone cladding
should be regular </td><td>Low</td><td>1/4/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/14/2021 10:52:48 AM</td><td> </td><td>11/27/2022
1:26:52 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25703</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Not aligned</td><td>&#39;Different width between two parts of up
stand should be unified </td><td>Low</td><td>1/5/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/15/2021 1:49:48 PM</td><td> </td><td>11/27/2022
1:26:51 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>9258</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 11B - joints not aligned/ panels need
cleaning </td><td>Low</td><td>7/28/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>7/7/2020 12:02:59 PM</td><td> </td><td>11/27/2022 12:05:32
PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9259</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 10 A - broken edges/ joints not
aligned/ reveals to be adjusted/ pitted tiles </td><td>Low</td><td>7/28/2020
12:00:00 PM</td><td>Sherif Elabd</td><td>7/7/2020 12:03:13 PM</td><td>
</td><td>11/27/2022 12:05:32 PM</td><td>&nbsp;</td><td>Stiletto - wall
A</td><td>&nbsp;</td>
</tr><tr>
<td>9262</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 11 A - stone need cleaning/ broken
edges/ joints not aligned </td><td>Low</td><td>7/28/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>7/7/2020 12:03:17 PM</td><td> </td><td>11/27/2022 12:05:31
PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9264</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 12 B Discoloring between tiles /
broken edges / joints not aligned </td><td>Low</td><td>7/28/2020 12:00:00
PM</td><td>Sherif Elabd</td><td>7/7/2020 12:04:22 PM</td><td> </td><td>11/27/2022
12:05:30 PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9266</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 12B - EWS-19: irregular joints with
stone cladding and ceiling, irregular joints of alu panels, cleaning / cleaning
inside module </td><td>Low</td><td>7/28/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>7/7/2020 12:04:27 PM</td><td> </td><td>11/27/2022 12:05:29
PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9501</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Damages to be rectified or replaced</td><td>&#39;Module 9 A -
discoloring between tiles/ toothing between tiles/ loose panels/ irregular joints/
enter face joint irregular / pitted tiles/ white stains / joint between wall &amp;
floor need adjustment / damaged edges/ need cleaning</td><td>Low</td><td>8/2/2020
12:00:00 PM</td><td>Sherif Elabd</td><td>7/12/2020 12:13:58 PM</td><td>
</td><td>11/27/2022 12:05:28 PM</td><td>&nbsp;</td><td>Stiletto - wall
A</td><td>&nbsp;</td>
</tr><tr>
<td>9502</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Damages to be rectified or replaced</td><td>&#39;Module 8 A -
discoloring between tiles/ irregular joints between tiles/ need cleaning/ damaged
edges/ joint between wall &amp; floor need adjustment / toothing between tiles/
loose panels / poor repair </td><td>Low</td><td>8/2/2020 12:00:00 AM</td><td>Sherif
Elabd</td><td>7/12/2020 12:14:55 PM</td><td> </td><td>11/27/2022 12:05:27
PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9503</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>Colour is inconsistent</td><td>&#39;Module 8 B - irregular joints
between panels/ enter face joint irregular/ need cleaning
</td><td>Low</td><td>8/2/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/12/2020
12:15:14 PM</td><td> </td><td>11/27/2022 12:05:26
PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9505</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 9 B - irregular joints between tiles /
damaged edges/ poor repair for stone tiles / need cleaning/ discoloring between
tiles </td><td>Low</td><td>8/2/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>7/12/2020 12:15:26 PM</td><td> </td><td>11/27/2022 12:05:25
PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9506</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 9 B - irregular joints between panels/
enter face joint irregular/ need cleaning/ </td><td>Low</td><td>8/2/2020 12:00:00
PM</td><td>Sherif Elabd</td><td>7/12/2020 12:15:34 PM</td><td> </td><td>11/27/2022
12:05:24 PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9507</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 10 B - toothing between panels/ enter
face joint irregular/ joints not aligned between panels/ need cleaning
</td><td>Low</td><td>8/2/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/12/2020
12:15:40 PM</td><td> </td><td>11/27/2022 12:05:24
PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9508</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 10 B - Irregular joints/ damaged
edges/ need cleaning/ discoloring between tiles / stains / enter face joints
irregular </td><td>Low</td><td>8/2/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>7/12/2020 12:15:48 PM</td><td> </td><td>11/27/2022 12:05:23
PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9511</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 5 B - ews 19 - joints not aligned/
joints between enter face not adjusted/ panels need cleaning/ loose panels
</td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/14/2020
12:34:20 PM</td><td> </td><td>11/27/2022 12:05:22
PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9512</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 5 B - discoloring between tiles/
joints not aligned/ joints between enter faces not adjusted/ stone need cleaning /
damaged edges </td><td>Low</td><td>8/4/2020 12:00:00 AM</td><td>Sherif
Elabd</td><td>7/14/2020 12:34:25 PM</td><td> </td><td>11/27/2022 12:05:21
PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9513</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 6 B - joints not aligned/ joint
between enter face not adjusted/ scratches at tiles / tiles need
cleaning</td><td>Low</td><td>8/4/2020 12:00:00 AM</td><td>Sherif
Elabd</td><td>7/14/2020 12:34:30 PM</td><td> </td><td>11/27/2022 12:05:20
PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9514</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 6 B - ews 19 - joints between panels
not aligned/ panels need cleaning/ joint between enter face not adjusted/
</td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/14/2020
12:34:37 PM</td><td> </td><td>11/27/2022 12:05:19
PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9515</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 7 B- ews19 - joints between panels not
aligned/ loose panels/ need cleaning/ joint between enter faces not adjusted
</td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/14/2020
12:34:49 PM</td><td> </td><td>11/27/2022 12:05:18
PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9516</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 7 B - discoloring between tiles/ joint
between enter faces irregular/ damaged edges/ joint connection between faces not
adjusted </td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>7/14/2020 12:34:56 PM</td><td> </td><td>11/27/2022 12:05:17
PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9525</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 6 A- Damaged edges/ joints between
enter face not aligned/ joint between wall &amp; floor need adjustment / toothing
between tiles / stone need cleaning </td><td>Low</td><td>8/4/2020 12:00:00
PM</td><td>Sherif Elabd</td><td>7/14/2020 12:35:20 PM</td><td> </td><td>11/27/2022
12:05:16 PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9528</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Toothing between tiles/ joints between wall
&amp; floor not aligned/ damaged edges &amp; pitted </td><td>Low</td><td>8/4/2020
12:00:00 AM</td><td>Sherif Elabd</td><td>7/14/2020 12:35:28 PM</td><td>
</td><td>11/27/2022 12:05:15 PM</td><td>&nbsp;</td><td>Stiletto - wall
A</td><td>&nbsp;</td>
</tr><tr>
<td>25436</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Water test not done for
EWS-05</td><td>Low</td><td>12/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/7/2021 12:20:20 PM</td><td> </td><td>11/27/2022
12:05:14 PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25468</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Damages</td><td>&#39;Damaged tile should be replaced
</td><td>Low</td><td>12/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>12/7/2021
12:24:49 PM</td><td> </td><td>11/27/2022 12:05:12
PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25469</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>level</td><td>&#39;Stainless steel plate should be
aligned with others</td><td>Low</td><td>12/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/7/2021 12:24:51 PM</td><td> </td><td>11/27/2022
12:05:11 PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25479</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Ceiling tiles level/flush</td><td>&#39;Toothing between false
ceiling tiles ( 5th folded )</td><td>Low</td><td>12/15/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/8/2021 1:40:41 PM</td><td> </td><td>11/27/2022
12:05:11 PM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25490</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Ceiling tiles level/flush</td><td>&#39;Toothing between false
ceiling tiles ( 4th folded )</td><td>Low</td><td>12/29/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/8/2021 1:41:07 PM</td><td> </td><td>11/27/2022
12:05:10 PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25509</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Chamfer edge should be sharp </td><td>Low</td><td>12/29/2021
12:00:00 AM</td><td>mohamed.sami</td><td>12/8/2021 1:41:54 PM</td><td>
</td><td>11/27/2022 12:05:09
PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25536</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>Sealant</td><td>&#39;Substandard interface between glazing
panels and stone cladding should be addressed - @Bridge- at St. no.
5</td><td>Low</td><td>12/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>12/9/2021
12:57:11 PM</td><td> </td><td>11/27/2022 12:05:08
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25550</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked two louvre should be leveled
</td><td>Low</td><td>12/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>12/9/2021
12:57:43 PM</td><td> </td><td>11/27/2022 12:05:07 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25554</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Toothing between false
ceiling tiles (7th folded from level three )</td><td>Low</td><td>12/16/2021
12:00:00 AM</td><td>mohamed.sami</td><td>12/9/2021 12:57:51 PM</td><td>
</td><td>11/27/2022 12:05:06 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25556</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Toothing between false
ceiling tiles (6th folded from level three )</td><td>Low</td><td>12/30/2021
12:00:00 AM</td><td>mohamed.sami</td><td>12/9/2021 12:57:55 PM</td><td>
</td><td>11/27/2022 12:05:05 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25573</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Different tone of sealer coat
</td><td>Low</td><td>12/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>12/9/2021
12:58:32 PM</td><td> </td><td>11/27/2022 12:05:04 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25627</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Marked tiles should e leveled
</td><td>Low</td><td>1/4/2022 12:00:00 AM</td><td>mohamed.sami</td><td>12/14/2021
10:52:18 AM</td><td> </td><td>11/27/2022 12:05:03
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25694</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Rock</td><td>Architectural</td><td>Glass partion and
door</td><td>General Snag</td><td>&#39;Missing cap should be installed
</td><td>Low</td><td>1/5/2022 12:00:00 AM</td><td>mohamed.sami</td><td>12/15/2021
12:55:45 PM</td><td> </td><td>11/27/2022 12:05:02
PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25718</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloration between stone flooring tiles
</td><td>Low</td><td>1/5/2022 12:00:00 AM</td><td>mohamed.sami</td><td>12/15/2021
1:50:22 PM</td><td> </td><td>11/27/2022 12:05:01 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25726</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloration between stone flooring tiles
</td><td>Low</td><td>1/5/2022 12:00:00 AM</td><td>mohamed.sami</td><td>12/15/2021
1:50:40 PM</td><td> </td><td>11/27/2022 12:05:00
PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25747</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Inside and outside of spandrel should be
removed. - @ Bridge</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:39:53 PM</td><td> </td><td>11/27/2022
12:04:59 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25762</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lose panels should be
fixed.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:40:26 PM</td><td> </td><td>11/27/2022
12:04:58 PM</td><td>&nbsp;</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>26171</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Sharp edges should be chamfered as per shop
drawings (for 3 benches)</td><td>Low</td><td>3/10/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/17/2022 10:39:05 AM</td><td> </td><td>11/27/2022
12:04:57 PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>26174</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Fixation Plates appears from gaps should be
hidden </td><td>Low</td><td>3/10/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/17/2022 10:39:10 AM</td><td> </td><td>11/27/2022
12:04:56 PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>16493</td><td>Motor Room</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Opening should be closed </td><td>Low</td><td>3/8/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>2/15/2021 11:34:59 AM</td><td> </td><td>11/27/2022
10:43:44 AM</td><td>&nbsp;</td><td>MS.19.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>34988</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>11/20/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/30/2022 10:07:56 AM</td><td>
</td><td>11/27/2022 10:43:18
AM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34345</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around MEP fixtures
</td><td>Low</td><td>11/9/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/19/2022
10:24:27 AM</td><td> </td><td>11/27/2022 10:42:50
AM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34181</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;epoxy painting floor need to clean
and touch up </td><td>Low</td><td>11/6/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:13:25 AM</td><td>
</td><td>11/27/2022 10:42:10
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>19925</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing media converter, missing ICT labels,
missing access control labels </td><td>High</td><td>8/5/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>7/29/2021 11:43:49 AM</td><td> </td><td>11/27/2022
9:30:52 AM</td><td>&nbsp;</td><td>MS.18.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>34031</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Trunk should be covered</td><td>High</td><td>10/17/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/10/2022 4:16:47 PM</td><td> </td><td>11/27/2022
9:27:45 AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34042</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover and earth and damage flexible
</td><td>High</td><td>10/17/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/10/2022
4:17:16 PM</td><td> </td><td>11/27/2022 9:27:29
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34047</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damaged flexible </td><td>High</td><td>10/17/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/10/2022 4:17:24 PM</td><td> </td><td>11/27/2022
9:26:58 AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28160</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Camera label and cable should be
protected</td><td>High</td><td>3/23/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/16/2022 3:54:48 PM</td><td> </td><td>11/27/2022 9:22:48
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>34361</td><td>ELECTRICAL ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damper should be installed properly
</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:11:30 PM</td><td>
</td><td>11/27/2022 9:22:18
AM</td><td>&nbsp;</td><td>MS.13.3A.014</td><td>&nbsp;</td>
</tr><tr>
<td>32416</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete works
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:55 PM</td><td> </td><td>11/27/2022 7:27:36
AM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32604</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Acoustic
Walling</td><td>General Snag</td><td>&#39;Closing around
duct</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/19/2022 10:58:47 AM</td><td> </td><td>11/26/2022 4:51:35
PM</td><td>DONE</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>10817</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Damaged edges/ joints not aligned/ bad repair
for stone tiles / </td><td>Low</td><td>10/5/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/14/2020 12:16:05 PM</td><td>
</td><td>11/24/2022 12:20:02
PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>25438</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Misalignment between stone cladding and
glazing panels should be adjusted </td><td>Low</td><td>12/28/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/7/2021 12:20:24 PM</td><td> </td><td>11/24/2022
12:19:50 PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>34290</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipe penetration need to be sealed.
</td><td>High</td><td>10/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/18/2022 4:05:13 PM</td><td> </td><td>11/24/2022 10:08:18
AM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34083</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct penetration shall be sealed.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:22:19 PM</td><td> </td><td>11/24/2022 10:07:16
AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34637</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct penetration need to be sealed.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:09:48 PM</td><td> </td><td>11/24/2022 10:06:11
AM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>34318</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage sealant around duct penetration.
</td><td>High</td><td>10/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/18/2022 4:06:06 PM</td><td> </td><td>11/24/2022 10:04:57
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34336</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage fire stop. </td><td>High</td><td>10/25/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:06:39 PM</td><td>
</td><td>11/24/2022 10:04:33
AM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34320</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipe penetration need to be sealed.
</td><td>High</td><td>10/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/18/2022 4:06:09 PM</td><td> </td><td>11/24/2022 10:02:41
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34789</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around
duct</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:38:18 AM</td><td>
</td><td>11/24/2022 9:00:14
AM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>31866</td><td>CORE E2</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Elevator works not complete.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:24 PM</td><td> </td><td>11/23/2022 3:29:08
PM</td><td>&nbsp;</td><td>MC.13.02.E21</td><td>&nbsp;</td>
</tr><tr>
<td>20296</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Bag filters &amp; pre filters for most of
AHU need to changes </td><td>High</td><td>8/11/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/4/2021 12:57:56 PM</td><td> </td><td>11/23/2022
3:28:44 PM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13702</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Missing AHU filters for AHU
222</td><td>High</td><td>12/7/2020 12:00:00
PM</td><td>ahmedsalem</td><td>11/30/2020 12:00:32 PM</td><td> </td><td>11/23/2022
3:28:04 PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>13705</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Filters are defective
</td><td>High</td><td>12/7/2020 12:00:00 AM</td><td>ahmedsalem</td><td>11/30/2020
12:00:39 PM</td><td> </td><td>11/23/2022 3:27:36
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28709</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Filters not installed. </td><td>High</td><td>5/18/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/11/2022 11:45:35 AM</td><td>
</td><td>11/23/2022 3:25:13
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28861</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air filters shall be changed. </td><td>High</td><td>5/23/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/16/2022 4:06:53 PM</td><td>
</td><td>11/23/2022 3:23:21
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>14610</td><td>TUT-CORE B3</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Installation not to
specification/drawing</td><td>&#39;Pipe penetrations and duct penetrations
</td><td>High</td><td>1/7/2021 12:00:00 AM</td><td>ahmedsalem</td><td>1/4/2021
9:59:49 AM</td><td> </td><td>11/23/2022 3:17:31
PM</td><td>&nbsp;</td><td>MC.12.3A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>31345</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air filters. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:54:10 AM</td><td>
</td><td>11/23/2022 3:11:53
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31161</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air filters. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:54:02 PM</td><td>
</td><td>11/23/2022 3:11:23
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31612</td><td>PLANT</td><td>MU L20</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air filters shall be changed. </td><td>High</td><td>6/12/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/5/2022 11:53:43 AM</td><td>
</td><td>11/23/2022 3:10:52
PM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>29045</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Air filters shall be installed
correctly and changed.</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:47 PM</td><td> </td><td>11/23/2022 3:10:31
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29009</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Filters shall be changed and
installed correctly. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:07 PM</td><td> </td><td>11/23/2022 3:09:40
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>28984</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air filters are missing. </td><td>High</td><td>5/24/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:33:16 PM</td><td>
</td><td>11/23/2022 3:08:19
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28872</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Filters are missing.
</td><td>High</td><td>5/23/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:07:11 PM</td><td> </td><td>11/23/2022 3:07:29
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28461</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Filters to be installed and coil fins shall be fixed.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:15 PM</td><td> </td><td>11/23/2022 3:06:52
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28299</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Filters shall be installed and coil fins need repair.
</td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:15 AM</td><td> </td><td>11/23/2022 3:05:59
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29021</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Filters shall be changed and
installed correctly. </td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:45 PM</td><td> </td><td>11/23/2022 3:04:56
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29029</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to specification/drawing</td><td>&#39;Air
filters shall be changed and installed. </td><td>High</td><td>5/24/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:11:09 PM</td><td>
</td><td>11/23/2022 3:04:10
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>28389</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Bag filters</td><td>&#39;Air
filters not installed, coil fins damaged and inside the machine need general
cleaning. </td><td>High</td><td>5/4/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/27/2022 11:44:51 AM</td><td> </td><td>11/23/2022 3:02:45
PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>34626</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain pipe penetration. </td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:09:19 PM</td><td>
</td><td>11/23/2022 3:02:23
PM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>34627</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct penetration throw roof slap.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:09:21 PM</td><td> </td><td>11/23/2022 3:01:44
PM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>34628</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Penetration of PPR pipes. </td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:09:24 PM</td><td>
</td><td>11/23/2022 3:01:13
PM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>34630</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipe penetration need to be sealed.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:09:29 PM</td><td> </td><td>11/23/2022 2:58:15
PM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>34610</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct penetration. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:08:26 PM</td><td>
</td><td>11/23/2022 2:57:56
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34826</td><td>LIFT SHAFT</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Shaft cleaning. </td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:12:05 PM</td><td>
</td><td>11/23/2022 2:56:44
PM</td><td>&nbsp;</td><td>MQ.14.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34084</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct penetration shall be sealed.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:22:20 PM</td><td> </td><td>11/23/2022 2:55:53
PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34071</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct penetration throw slap shall be sealed.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:22:00 PM</td><td> </td><td>11/23/2022 2:55:13
PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34597</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Machine base need cleaning and paintings.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:07:59 PM</td><td> </td><td>11/23/2022 2:01:01
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27796</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All the fiber and cat6a cables should be installed inside the
cable trunks and cable trunk top cover should be installed properly
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:03 PM</td><td> </td><td>11/23/2022 1:18:27
PM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27976</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV labeling and patching </td><td>High</td><td>3/20/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:23:06 PM</td><td>
</td><td>11/23/2022 1:18:14
PM</td><td>&nbsp;</td><td>MS.18.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27996</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Label </td><td>High</td><td>3/20/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:23:38 PM</td><td>
</td><td>11/23/2022 1:17:58
PM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>34390</td><td>SECURITY ROOM</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:44 PM</td><td>
</td><td>11/23/2022 1:16:33
PM</td><td>&nbsp;</td><td>MB.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>27891</td><td>IT 7</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing camera label, </td><td>High</td><td>3/19/2022 12:00:00
AM</td><td>Mohamed Samir</td><td>3/12/2022 11:52:36 AM</td><td> </td><td>11/23/2022
1:16:13 PM</td><td>&nbsp;</td><td>MS.14.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34049</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover should be installed properly
</td><td>High</td><td>10/17/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/10/2022
4:17:27 PM</td><td> </td><td>11/23/2022 1:14:27
PM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29323</td><td>CORE B2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged in door leaf should be repaired and touch up
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:15:12 PM</td><td> </td><td>11/23/2022 12:07:32
PM</td><td>&nbsp;</td><td>MC.18.2A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>29327</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door painting need to touch up </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 1:15:17 PM</td><td>
</td><td>11/23/2022 12:07:31
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29367</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door should be close
well.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:34 PM</td><td> </td><td>11/23/2022 12:07:30
PM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29372</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Defective painting should be
adjusted.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:42 PM</td><td> </td><td>11/23/2022 12:07:29
PM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29593</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Doors need cleaning and touch up painting
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
11:37:57 AM</td><td> </td><td>11/23/2022 12:07:28
PM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>29608</td><td>STORAGE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be repaired and
adjusted</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:34 AM</td><td> </td><td>11/23/2022 12:07:27
PM</td><td>&nbsp;</td><td>MW.12.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>34740</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:34:14 AM</td><td>
</td><td>11/23/2022 9:18:40
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34166</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor needs cleaning ,repair and touch up
painting </td><td>Low</td><td>11/6/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:10:10 AM</td><td>
</td><td>11/23/2022 9:18:02
AM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34979</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor should be repaired and
repainted</td><td>Low</td><td>11/20/2022 12:00:00
PM</td><td>Mohamed.Halim</td><td>10/30/2022 10:05:00 AM</td><td>
</td><td>11/23/2022 9:17:02
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34786</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing accessories </td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:38:12 AM</td><td>
</td><td>11/23/2022 9:16:12
AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34780</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need to closed properly </td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:38:00 AM</td><td>
</td><td>11/23/2022 9:15:45
AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34766</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing sealant around MEP fixtures
</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:37:05 AM</td><td>
</td><td>11/23/2022 9:15:16
AM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32211</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete works </td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:54 AM</td><td>
</td><td>11/22/2022 4:13:36
PM</td><td>&nbsp;</td><td>MS.13.3A.011</td><td>&nbsp;</td>
</tr><tr>
<td>24316</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof
Tiles</td><td>Chipped/damaged</td><td>&#39;Missing mesh panels
</td><td>Low</td><td>11/17/2021 12:00:00 AM</td><td>mohamed.sami</td><td>10/27/2021
11:25:28 AM</td><td> </td><td>11/22/2022 1:18:37 PM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>24330</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steel works at roof</td><td>Overall
finishes</td><td>&#39;Repair for cementious of steel structure columns
</td><td>Low</td><td>11/17/2021 12:00:00 AM</td><td>mohamed.sami</td><td>10/27/2021
11:25:54 AM</td><td> </td><td>11/22/2022 1:17:55 PM</td><td>Protection is entirely
BOJV fully responsibility</td><td>Museum Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>25534</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Joint should be aligned
</td><td>Low</td><td>12/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:52:58 PM</td><td> </td><td>11/22/2022 11:43:36 AM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25558</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Curtain
Wall</td><td>Joints improper</td><td>&#39;Interface between glazing panels and
stone cladding should be regular and leveled </td><td>Low</td><td>12/30/2021
12:00:00 AM</td><td>mohamed.sami</td><td>12/9/2021 12:58:01 PM</td><td>
</td><td>11/22/2022 11:43:35 AM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25569</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing sealant around access door
</td><td>Low</td><td>12/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:58:22 PM</td><td> </td><td>11/22/2022 11:43:34 AM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25733</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Irregular joints between plates should be
adjusted and unified.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:39:19 PM</td><td> </td><td>11/22/2022
11:43:33 AM</td><td>&nbsp;</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25750</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Levels between funiculars cabinet and
landing should be checked.</td><td>Low</td><td>12/29/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:39:58 PM</td><td> </td><td>11/22/2022
11:43:33 AM</td><td>&nbsp;</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25751</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Toothing for plate cover should be
leveled.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:40:00 PM</td><td> </td><td>11/22/2022
11:43:31 AM</td><td>&nbsp;</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25769</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Levels between funiculars cabinet and
landing should be checked.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:40:49 PM</td><td> </td><td>11/22/2022
11:43:31 AM</td><td>&nbsp;</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25793</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface joints between travelator and
plates/ stone floor should be adjusted properly.</td><td>Low</td><td>1/12/2022
12:00:00 AM</td><td>mohamed.sami</td><td>12/22/2021 3:27:09 PM</td><td>
</td><td>11/22/2022 11:43:27
AM</td><td>&nbsp;</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>23741</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked edges should be aligned
</td><td>Low</td><td>11/3/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:32 PM</td><td> </td><td>11/22/2022 11:14:07
AM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23761</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Marked stone edges should be aligned
</td><td>Low</td><td>11/3/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:17:04 PM</td><td> </td><td>11/22/2022 11:14:04
AM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>32701</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Based on PMC visit on 14-8-22 ,the
welding joints should be smooth and finished properly at bands
D&amp;E</td><td>Low</td><td>9/4/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/14/2022 1:06:40 PM</td><td> </td><td>11/22/2022 11:14:03
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32666</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;General cleaning is needed for both
sides of shed</td><td>Low</td><td>8/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>7/26/2022 11:57:46 AM</td><td> </td><td>11/22/2022 10:49:43
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>34399</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Rod</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:13:14 PM</td><td>
</td><td>11/22/2022 10:08:19
AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34415</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Clips</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:15:10 PM</td><td>
</td><td>11/22/2022 10:07:55
AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34952</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Label</td><td>High</td><td>11/2/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/26/2022 3:46:49 PM</td><td> </td><td>11/22/2022
10:07:26 AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>28161</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices installation not installed
</td><td>High</td><td>3/23/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/16/2022 3:54:50 PM</td><td> </td><td>11/22/2022 10:07:09
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28163</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices installation not installed
</td><td>High</td><td>3/23/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/16/2022 3:54:53 PM</td><td> </td><td>11/22/2022 10:07:04
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>27806</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV camera label </td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:34:16 PM</td><td>
</td><td>11/22/2022 10:06:38 AM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>27904</td><td>STAFF W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>3/12/2022 11:52:59 AM</td><td> </td><td>11/22/2022 10:03:06
AM</td><td>&nbsp;</td><td>MW.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27600</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Cctv labeling </td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:52:48 PM</td><td>
</td><td>11/22/2022 9:59:42
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34065</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices </td><td>High</td><td>10/17/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/10/2022 4:17:54 PM</td><td> </td><td>11/22/2022
9:57:02 AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34064</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices </td><td>High</td><td>10/17/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/10/2022 4:17:52 PM</td><td> </td><td>11/22/2022
9:56:52 AM</td><td>&nbsp;</td><td>MS.13.3A.011</td><td>&nbsp;</td>
</tr><tr>
<td>34062</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Not fixed properly </td><td>High</td><td>10/17/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/10/2022 4:17:48 PM</td><td> </td><td>11/22/2022
9:56:39 AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34401</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete works </td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:13:47 PM</td><td>
</td><td>11/22/2022 9:56:23
AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34055</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices </td><td>High</td><td>10/17/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/10/2022 4:17:37 PM</td><td> </td><td>11/22/2022
9:56:17 AM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34046</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices </td><td>High</td><td>10/17/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/10/2022 4:17:22 PM</td><td> </td><td>11/22/2022
9:56:07 AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34040</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices </td><td>High</td><td>10/17/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/10/2022 4:17:12 PM</td><td> </td><td>11/22/2022
9:55:50 AM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>34037</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices </td><td>High</td><td>10/17/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/10/2022 4:17:07 PM</td><td> </td><td>11/22/2022
9:55:34 AM</td><td>&nbsp;</td><td>MS.14.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34038</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices </td><td>High</td><td>10/17/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/10/2022 4:17:09 PM</td><td> </td><td>11/22/2022
9:55:23 AM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>34032</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work for access control devices
</td><td>High</td><td>10/17/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/10/2022
4:16:53 PM</td><td> </td><td>11/22/2022 9:55:06
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32980</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing access control devices - missing lots for
mc</td><td>High</td><td>10/12/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/5/2022 4:07:23 PM</td><td> </td><td>11/22/2022
9:54:53 AM</td><td>&nbsp;</td><td>MS.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>32427</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:11 PM</td><td>
</td><td>11/22/2022 8:54:14
AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32561</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos
Motoshaleh Farag</td><td>7/18/2022 11:33:41 AM</td><td> </td><td>11/21/2022 1:46:40
PM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32440</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete works </td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:32 PM</td><td>
</td><td>11/21/2022 1:46:02
PM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32188</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control not completed </td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:25 AM</td><td>
</td><td>11/21/2022 1:45:19
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34154</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;
Missing accessories should be installed </td><td>Low</td><td>11/6/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:09:51 AM</td><td>
</td><td>11/21/2022 8:40:54
AM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>34153</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door should be closed properly </td><td>Low</td><td>11/6/2022
12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:09:49 AM</td><td>
</td><td>11/21/2022 8:40:28
AM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>34347</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around MEP fixtures
</td><td>Low</td><td>11/9/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/19/2022
10:24:32 AM</td><td> </td><td>11/21/2022 8:39:56
AM</td><td>&nbsp;</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34196</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Missing sealant around MEP fixtures
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:13:51 AM</td><td> </td><td>11/21/2022 8:39:31
AM</td><td>&nbsp;</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>24448</td><td>Bay-03 (from level +37.5 to +43.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Cleaning for the
inclined lift </td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:16 AM</td><td> </td><td>11/20/2022 2:39:46
PM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>24455</td><td>Bay-02 (from level +31.5 to +37.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Cleaning for the
inclined lift </td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:31 AM</td><td> </td><td>11/20/2022 2:39:45
PM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>24472</td><td>Bay-01 (from level +25.5 to +31.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Cleaning inclined
lift </td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:41:07 AM</td><td> </td><td>11/20/2022 2:39:44
PM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>33970</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct penetration need to be sealed.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:13:55 PM</td><td> </td><td>11/20/2022 2:39:43
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33975</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Canvases need to be adjusted. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:14:07 PM</td><td>
</td><td>11/20/2022 2:39:42
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33977</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air filters. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:14:28 PM</td><td>
</td><td>11/20/2022 2:39:41
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33986</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Coil fins need adjustment and cleaning.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:14:47 PM</td><td> </td><td>11/20/2022 2:39:40
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34002</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Canvases need to be adjusted. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:15:22 PM</td><td>
</td><td>11/20/2022 2:39:39
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34004</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Door handles. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:15:25 PM</td><td>
</td><td>11/20/2022 2:39:38
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34008</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Coils and fins need to be cleaned and adjusted.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:15:35 PM</td><td> </td><td>11/20/2022 2:39:37
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34010</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing handles for the door. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:15:42 PM</td><td>
</td><td>11/20/2022 2:39:36
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34109</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct penetration shall be sealed.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:23:00 PM</td><td> </td><td>11/20/2022 2:39:35
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34114</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipes penetration throw slap need to be sealed.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:23:08 PM</td><td> </td><td>11/20/2022 2:39:33
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34118</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Wall opening around duct penetration shall be sealed.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:23:14 PM</td><td> </td><td>11/20/2022 2:39:33
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34209</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipe penetration need to be sealed.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:19 PM</td><td> </td><td>11/20/2022 2:39:31
PM</td><td>&nbsp;</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34235</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Ducts penetrations need to be sealed.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:59 PM</td><td> </td><td>11/20/2022 2:39:30
PM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34237</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Ducts penetrations shall be sealed.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:14:03 PM</td><td> </td><td>11/20/2022 2:39:29
PM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>25846</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Provide the installed application servers specification,operating
systems,Firewalls details between micro soft servers and GEM Network
switches,security policy admin login credentials and windows configuration
</td><td>High</td><td>1/18/2022 12:00:00 AM</td><td>Mohamed Samir</td><td>1/11/2022
3:46:09 PM</td><td> </td><td>11/20/2022 9:49:56
AM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28044</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All the cables needs to be dressed and terminated within the
racks and patching also done from switch to patch panels
</td><td>High</td><td>3/21/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/14/2022 1:36:00 PM</td><td> </td><td>11/20/2022 9:48:14
AM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34112</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct penetration throw slap need to be sealed.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:23:05 PM</td><td> </td><td>11/20/2022 9:20:05
AM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34128</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing rock wool around air duct penetration.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:23:30 PM</td><td> </td><td>11/20/2022 9:18:07
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34137</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing fire sealant around chilled water pipes.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:23:45 PM</td><td> </td><td>11/20/2022 9:17:43
AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34138</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing fire seal. </td><td>High</td><td>10/18/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:23:47 PM</td><td>
</td><td>11/20/2022 9:17:11
AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>6765</td><td>LOBBY</td><td>AT CONNEC
L37</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Need cleaning / repair concrete wall
</td><td>Low</td><td>1/14/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>12/24/2019 11:17:05 AM</td><td> </td><td>11/17/2022 3:06:43
PM</td><td>&nbsp;</td><td>SN.00.0B.03</td><td>&nbsp;</td>
</tr><tr>
<td>7965</td><td>LIFT LOBBY</td><td>CCB
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Toothing between tiles/ joints not
aligned/ </td><td>Low</td><td>1/29/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>1/8/2020 12:12:58 PM</td><td> </td><td>11/17/2022 2:54:32
PM</td><td>&nbsp;</td><td>CC.02.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>11393</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Suspended Ceiling Tile</td><td>General
Snag</td><td>&#39;False ceiling should be cleaned or replaced and adjust alignment
of joints </td><td>Low</td><td>10/14/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>9/23/2020 12:13:51 PM</td><td> </td><td>11/17/2022 2:54:20
PM</td><td>&nbsp;</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>12475</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Metal ceiling need to be aligned ,
cleaned and adjusted . </td><td>Low</td><td>11/12/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/22/2020 12:02:27 PM</td><td> </td><td>11/17/2022 2:54:01
PM</td><td>&nbsp;</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16098</td><td>Core B5</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Joints should be fixed properly
</td><td>Low</td><td>3/2/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>2/9/2021
4:50:01 PM</td><td> </td><td>11/17/2022 2:53:41
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17347</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Ceiling leveling should be adjusted
</td><td>Low</td><td>5/3/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>4/12/2021
3:08:18 PM</td><td> </td><td>11/17/2022 2:53:26
PM</td><td>&nbsp;</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>19337</td><td>ROOF AREA</td><td>CCB
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>False Ceiling
Tiles</td><td>Alignment of tiles</td><td>&#39;Metal mesh edge should be aligned
with white concrete </td><td>Low</td><td>7/12/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>6/21/2021 4:17:24 PM</td><td> </td><td>11/17/2022 2:53:12
PM</td><td>&nbsp;</td><td>CX.08.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>8049</td><td>STAFF ROOF GARDEN</td><td>CCB
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Metal flashing should continue
</td><td>Low</td><td>1/30/2020 12:00:00 PM</td><td>Marios Ioannou,</td><td>1/9/2020
12:06:02 PM</td><td> </td><td>11/17/2022 2:28:57
PM</td><td>&nbsp;</td><td>CX.07.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>11136</td><td>Lett-able retail space</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Fiber cables are hanging and fiber cables were pulled without any
protection and incomplete Rack installation and cables Termination
</td><td>High</td><td>9/29/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/22/2020 11:46:34 AM</td><td> </td><td>11/17/2022 2:28:44
PM</td><td>&nbsp;</td><td>CR.03.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>11144</td><td>Retail space</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>WIRING
ACCESSORIES</td><td>General Snag</td><td>&#39;All fiber cables are not terminated
within the rack and rack has not installed.Cable has pulled inappropriately without
any protection </td><td>High</td><td>9/29/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>9/22/2020 11:46:58 AM</td><td> </td><td>11/17/2022 2:28:31
PM</td><td>&nbsp;</td><td>CR.08.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>11217</td><td>W.C. LOBBY</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Clean Stone flooring
</td><td>Low</td><td>10/13/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>9/22/2020 12:13:27 PM</td><td> </td><td>11/17/2022 2:28:16
PM</td><td>&nbsp;</td><td>CW.08.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>11272</td><td>Retail space</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Incomplete Installation</td><td>&#39;Fiber cable has not been
terminated within the rack and tanent connection rack also missing.Also no
permanent labeling for fiber cables</td><td>High</td><td>9/29/2020 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>9/23/2020 7:22:30 AM</td><td>
</td><td>11/17/2022 2:28:00
PM</td><td>&nbsp;</td><td>CR.02.0G.xxx</td><td>&nbsp;</td>
</tr><tr>
<td>11559</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Discoloring of tiles
</td><td>Low</td><td>10/15/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>9/24/2020 12:08:10 PM</td><td> </td><td>11/17/2022 2:27:46
PM</td><td>&nbsp;</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>11580</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Discoloring between tiles- alignment of
joints </td><td>Low</td><td>10/15/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>9/24/2020 12:08:40 PM</td><td> </td><td>11/17/2022 2:27:32
PM</td><td>&nbsp;</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>12845</td><td>W.C. LOBBY</td><td>CCB
GF</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Scratches at stone cladding tiles
</td><td>Low</td><td>11/17/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/27/2020 4:25:21 PM</td><td> </td><td>11/17/2022 2:27:14
PM</td><td>&nbsp;</td><td>CW.07.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>12908</td><td>DIRECTORS ROOF GARDEN</td><td>CCB
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;The ceiling need cleaning and adjustment
</td><td>High</td><td>11/8/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/1/2020 12:22:53 PM</td><td> </td><td>11/17/2022 2:26:50
PM</td><td>&nbsp;</td><td>CX.07.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>13064</td><td>DIRECTORS ROOF GARDEN</td><td>CCB
L30</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Joints is not aligned/cleaning for the ceiling
</td><td>High</td><td>11/9/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/2/2020 4:34:28 PM</td><td> </td><td>11/17/2022 2:26:30
PM</td><td>&nbsp;</td><td>CX.02.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>14087</td><td>MEN DRESSING ROOMS</td><td>CCB
L10</td><td>Closed</td><td>Trade
Link</td><td>Architectural</td><td>Floors</td><td>Rough
surface</td><td>&#39;Damaged Linoleum floor need repair
</td><td>Low</td><td>1/6/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>12/16/2020 12:29:34 PM</td><td> </td><td>11/17/2022 2:26:01
PM</td><td>&nbsp;</td><td>CA.02.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>15139</td><td>CLASSROOM</td><td>CCB
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Raised
Floor</td><td>Chipped/dent</td><td>&#39;Leveling needs adjustment /joints is not
aligned </td><td>High</td><td>1/26/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>1/19/2021 4:54:58 PM</td><td> </td><td>11/17/2022 2:25:11
PM</td><td>&nbsp;</td><td>CE.07.01.012</td><td>&nbsp;</td>
</tr><tr>
<td>15448</td><td>CONFERENCE BRIDGE</td><td>CCB
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;The content of false ceiling should have not been seen from
outside</td><td>High</td><td>2/2/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>1/26/2021 4:26:24 PM</td><td> </td><td>11/17/2022 2:24:55
PM</td><td>&nbsp;</td><td>CA.08.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>15691</td><td>3D THEATER FOYER</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Stains</td><td>&#39;Discoloring between ceiling tiles
</td><td>Low</td><td>2/23/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>2/2/2021
4:09:53 PM</td><td> </td><td>11/17/2022 2:24:38
PM</td><td>&nbsp;</td><td>CT.03.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>15802</td><td>CONFERENCE FOYER</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;cleaning is needed for the ceiling
</td><td>High</td><td>2/10/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>2/3/2021 4:04:40 PM</td><td> </td><td>11/17/2022 2:24:14
PM</td><td>&nbsp;</td><td>CX.03.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>15804</td><td>CONFERENCE FOYER</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Leveling needs adjustment/color discoloration /joints is not
aligned </td><td>High</td><td>2/10/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/3/2021 4:04:47 PM</td><td> </td><td>11/17/2022 2:24:02
PM</td><td>&nbsp;</td><td>CX.03.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>17161</td><td>CC RO Band F</td><td>CCB
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Panels</
td><td>General Snag</td><td>&#39;Missing horizontal supports and
baffle</td><td>Low</td><td>4/19/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/29/2021 12:52:42 PM</td><td> </td><td>11/17/2022 2:23:40
PM</td><td>Re-measurable item - QS </td><td>Conference Roof Band
F</td><td>&nbsp;</td>
</tr><tr>
<td>17335</td><td>IT</td><td>CCB GF</td><td>Closed</td><td>Trade
Link</td><td>Architectural</td><td>Raised Floor</td><td>General
Snag</td><td>&#39;The gaps and leveling should be adjusted
</td><td>Low</td><td>5/3/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>4/12/2021
3:08:00 PM</td><td> </td><td>11/17/2022 2:22:34
PM</td><td>&nbsp;</td><td>CS.08.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>17579</td><td>CR.08.0G.001,.002 - CR.07.0G.003</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Incomplete Installation</td><td>&#39;Incomplete rack installation
and fiber Termination with permanent labeling.RJ45 and fiber patching also missing
</td><td>High</td><td>5/11/2021 12:00:00 AM</td><td>Ahmed.Galal</td><td>5/4/2021
1:39:05 PM</td><td> </td><td>11/17/2022 2:22:17
PM</td><td>&nbsp;</td><td>CR.08.0G.001,.002 - CR.07.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>18980</td><td>EDUCATION CIRCULATION</td><td>CCB
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Flooring -
Rubber flooring</td><td>Damages to be rectified or replaced</td><td>&#39;Toothing
between rubber floor</td><td>Low</td><td>6/22/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>6/15/2021 12:19:51 PM</td><td> </td><td>11/17/2022 2:21:58
PM</td><td>&nbsp;</td><td>CE.07.01.020</td><td>&nbsp;</td>
</tr><tr>
<td>19225</td><td>IT HUB ROOM</td><td>CCB
L30</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Flooring -
Rubber flooring</td><td>General</td><td>&#39;Rubber flooring tiles need adjustment
</td><td>Low</td><td>7/8/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>6/17/2021
3:53:34 PM</td><td> </td><td>11/17/2022 2:21:42
PM</td><td>&nbsp;</td><td>CS.07.03.009</td><td>&nbsp;</td>
</tr><tr>
<td>19363</td><td>CC RO Band B</td><td>CCB
RO</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Steel works
at roof</td><td>Overall finishes</td><td>&#39;Check Safety opening
</td><td>Low</td><td>6/29/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>6/22/2021 10:53:46 AM</td><td> </td><td>11/17/2022 2:21:25
PM</td><td>&nbsp;</td><td>Conference Roof Band B</td><td>&nbsp;</td>
</tr><tr>
<td>19373</td><td>CC RO Band A</td><td>CCB
RO</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Steel works
at roof</td><td>Overall finishes</td><td>&#39;Check Safety opening
</td><td>Low</td><td>7/13/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>6/22/2021 10:54:00 AM</td><td> </td><td>11/17/2022 2:21:04
PM</td><td>&nbsp;</td><td>Conference Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>19498</td><td>AUDITORIUM FOYER</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs general cleaning </td><td>Low</td><td>7/20/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>6/29/2021 12:33:47 PM</td><td>
</td><td>11/17/2022 2:20:49
PM</td><td>&nbsp;</td><td>CA.08.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>21827</td><td>WEST Facade - CCB</td><td>CCB West
Facade</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Damaged</td><td>&#39;Gap around mesh panels should be leveled and
same width</td><td>Low</td><td>9/12/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/22/2021 12:13:29 PM</td><td> </td><td>11/17/2022 2:20:11
PM</td><td>&nbsp;</td><td>WEST Facade-CCB</td><td>&nbsp;</td>
</tr><tr>
<td>21893</td><td>WEST Facade - CCB</td><td>CCB West
Facade</td><td>Closed</td><td>El
Banaon</td><td>Architectural</td><td>Panels</td><td>General Snag</td><td>&#39;Gap
around mesh panels should be the same width</td><td>Low</td><td>9/12/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>8/22/2021 3:36:10 PM</td><td>
</td><td>11/17/2022 2:19:51 PM</td><td>&nbsp;</td><td>WEST
Facade-CCB</td><td>&nbsp;</td>
</tr><tr>
<td>12500</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Rounded edges instead of right angle
</td><td>High</td><td>10/29/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/22/2020 12:13:12 PM</td><td> </td><td>11/17/2022 2:18:17
PM</td><td>Already deducted</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>12462</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>11/12/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/22/2020 12:01:45 PM</td><td> </td><td>11/17/2022 2:17:30
PM</td><td>Already deducted</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21985</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;The ceiling from inside should be covered
</td><td>Low</td><td>9/13/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/23/2021 1:53:17 PM</td><td> </td><td>11/17/2022 2:12:00
PM</td><td>&nbsp;</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>17237</td><td>SERVERY</td><td>PR
GF</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
architrave needs repair and touchup paint </td><td>Low</td><td>4/21/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/31/2021 11:58:28 AM</td><td>
</td><td>11/17/2022 1:55:41 PM</td><td>Subject to
deduction</td><td>SP.00.0G.65</td><td>&nbsp;</td>
</tr><tr>
<td>7971</td><td>VIP GARDEN</td><td>CCB
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Repair stone cladding
</td><td>Low</td><td>1/29/2020 12:00:00 AM</td><td>Marios Ioannou,</td><td>1/8/2020
12:13:10 PM</td><td> </td><td>11/17/2022 1:53:22 PM</td><td>Subject to
deduction</td><td>CX.02.03.007</td><td>&nbsp;</td>
</tr><tr>
<td>11378</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Suspended Ceiling
Tile</td><td>General Snag</td><td>&#39;Adjust gab between ceiling and glazing
</td><td>Low</td><td>10/14/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>9/23/2020 12:12:57 PM</td><td> </td><td>11/17/2022 1:53:12
PM</td><td>Subject to deduction</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>11388</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Suspended Ceiling
Tile</td><td>General Snag</td><td>&#39;Gab between ceiling and glazing not aligned
</td><td>Low</td><td>10/14/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>9/23/2020 12:13:36 PM</td><td> </td><td>11/17/2022 1:52:56
PM</td><td>Subject to deduction</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>11555</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Damaged panel
</td><td>Low</td><td>10/15/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>9/24/2020 12:08:05 PM</td><td> </td><td>11/17/2022 1:52:46
PM</td><td>Subject to deduction</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>11557</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Alignment of gap between ceiling and
glazing panels </td><td>Low</td><td>10/15/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>9/24/2020 12:08:07 PM</td><td> </td><td>11/17/2022 1:52:37
PM</td><td>Subject to deduction</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>12811</td><td>STAFF LIFT LOBBY</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>Damages to be rectified or replaced</td><td>&#39;Bad cutting
around signage</td><td>Low</td><td>11/17/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/27/2020 4:22:51 PM</td><td> </td><td>11/17/2022 1:52:27
PM</td><td>Subject to deduction</td><td>CB.02.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>13038</td><td>DIRECTORS ROOF GARDEN</td><td>CCB
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Ceiling</
td><td>General Snag</td><td>&#39;Gap is irregular /general cleaning for ceiling
/adjustment</td><td>Low</td><td>11/23/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/2/2020 4:28:01 PM</td><td> </td><td>11/17/2022 1:52:16
PM</td><td>Subject to deduction</td><td>CX.07.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15572</td><td>W.C</td><td>CCB L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Gypsum Ceiling</td><td>Electrical outlets
alignment/loosely fixed</td><td>&#39;It should end in proper
way</td><td>Low</td><td>2/21/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>1/31/2021 4:24:16 PM</td><td> </td><td>11/17/2022 1:52:05
PM</td><td>Subject to deduction</td><td>CW.07.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>15799</td><td>CONFERENCE FOYER</td><td>CCB
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Doors</
td><td>General Snag</td><td>&#39;Scratches on the door leaf should be repaired
</td><td>High</td><td>2/10/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>2/3/2021 4:04:32 PM</td><td> </td><td>11/17/2022 1:51:53
PM</td><td>Subject to deduction</td><td>CX.03.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16245</td><td>Food Court</td><td>Food
Court</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Tiles are not leveled/damaged tile
needs repair </td><td>Low</td><td>3/4/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>2/11/2021 11:15:17 AM</td><td> </td><td>11/17/2022 1:51:42
PM</td><td>Subject to deduction</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17827</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Marked part should be adjusted
</td><td>Low</td><td>5/31/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>5/10/2021 11:50:27 AM</td><td> </td><td>11/17/2022 1:51:32
PM</td><td>Subject to deduction</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>19134</td><td>ATRIUM</td><td>CCB
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Columns painting need to touch up
</td><td>Low</td><td>7/7/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>6/16/2021
4:31:52 PM</td><td> </td><td>11/17/2022 1:51:19 PM</td><td>Subject to
deduction</td><td>CX.07.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19688</td><td>CLASSROOM 9</td><td>CCB
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Raised
Floor</td><td>General Snag</td><td>&#39;Marked tiles need adjustment for the joints
and leveling </td><td>Low</td><td>7/28/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>7/7/2021 12:14:25 PM</td><td> </td><td>11/17/2022 1:51:08
PM</td><td>Subject to deduction</td><td>CE.07.01.014</td><td>&nbsp;</td>
</tr><tr>
<td>21447</td><td>CCB-North Facade</td><td>CCB North
Facade</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>Scratches in frame</td><td>&#39;Scratched frame should be repaired
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/18/2021
11:43:38 AM</td><td> </td><td>11/17/2022 1:50:58 PM</td><td>Subject to
deduction</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21920</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Cut excess horizontal metal trim
</td><td>Low</td><td>9/13/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/23/2021 12:08:53 PM</td><td> </td><td>11/17/2022 1:50:47
PM</td><td>Subject to deduction</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21923</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Un equal joints surrounded glazing window
</td><td>Low</td><td>9/13/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>8/23/2021 12:08:57 PM</td><td> </td><td>11/17/2022 1:50:36
PM</td><td>Subject to deduction</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21996</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Unequal projection between
glazing panel and stone cladding and not equal gap surround glazing
panels</td><td>Low</td><td>9/13/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/23/2021 1:53:35 PM</td><td> </td><td>11/17/2022 1:50:26
PM</td><td>Subject to deduction</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21997</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Glazing facades should be flushed
with stone cladding </td><td>Low</td><td>9/13/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/23/2021 1:53:37 PM</td><td> </td><td>11/17/2022 1:50:04
PM</td><td>Subject to deduction</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21998</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Glazing facades should be flush
with stone cladding </td><td>Low</td><td>9/13/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/23/2021 1:53:39 PM</td><td> </td><td>11/17/2022 1:49:55
PM</td><td>Subject to deduction</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22311</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Stone cladding is not aligned to
glazing panel at the top</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>8/24/2021 2:34:01 PM</td><td> </td><td>11/17/2022 1:49:44
PM</td><td>Subject to deduction</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22312</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Stone cladding is not aligned to
the roof slab/beam</td><td>Low</td><td>9/14/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/24/2021 2:34:02 PM</td><td> </td><td>11/17/2022 1:49:32
PM</td><td>Subject to deduction</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>8036</td><td>W.C. LOBBY</td><td>CCB
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>General Snag</td><td>&#39;Ceramic tiles not aligned / corner bead
need adjustment / need cleaning </td><td>Low</td><td>1/30/2020 12:00:00
PM</td><td>Marios Ioannou,</td><td>1/9/2020 12:05:21 PM</td><td>
</td><td>11/17/2022 1:49:21 PM</td><td>Subject to
deduction</td><td>CW.07.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>8041</td><td>W.C. LOBBY</td><td>CCB
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>General Snag</td><td>&#39;Ceramic tiles not aligned / corner bead
need adjustment </td><td>Low</td><td>1/30/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>1/9/2020 12:05:40 PM</td><td> </td><td>11/17/2022 1:49:04
PM</td><td>Subject to deduction</td><td>CW.07.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>8255</td><td>FINANCE</td><td>CCB
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>Cleaning</td><td>&#39;Cleaning for tiles - toothing between tiles
</td><td>Low</td><td>2/3/2020 12:00:00 PM</td><td>Marios Ioannou,</td><td>1/13/2020
12:32:46 PM</td><td> </td><td>11/17/2022 1:48:53 PM</td><td>Subject to
deduction</td><td>CO.02.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>8263</td><td>FINANCE</td><td>CCB
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>Cleaning</td><td>&#39;Cleaning for tiles - toothing between tiles
</td><td>Low</td><td>2/3/2020 12:00:00 PM</td><td>Marios Ioannou,</td><td>1/13/2020
12:33:13 PM</td><td> </td><td>11/17/2022 1:48:42 PM</td><td>Subject to
deduction</td><td>CO.02.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>8287</td><td>W.C. LOBBY</td><td>CCB
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>Grout</td><td>&#39;Grout is missing - toothing between tiles -
cleaning - scratches </td><td>Low</td><td>2/3/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>1/13/2020 12:35:27 PM</td><td> </td><td>11/17/2022 1:48:32
PM</td><td>Subject to deduction</td><td>CW.07.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>11202</td><td>W.C. LOBBY</td><td>CCB
GF</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Metal frame Not grouting properly </td><td>Low</td><td>10/13/2020
12:00:00 PM</td><td>Marios Ioannou,</td><td>9/22/2020 12:12:34 PM</td><td>
</td><td>11/17/2022 1:48:19 PM</td><td>Subject to
deduction</td><td>CW.08.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>12190</td><td>W.C. LOBBY</td><td>CCB
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>General Snag</td><td>&#39;Toothing in wall
tiles</td><td>High</td><td>10/14/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/7/2020 3:44:17 PM</td><td> </td><td>11/17/2022 1:48:09
PM</td><td>Subject to deduction</td><td>CW.07.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>12193</td><td>W.C. LOBBY</td><td>CCB
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>General Snag</td><td>&#39;Toothing in wall
tiles</td><td>High</td><td>10/14/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/7/2020 3:44:29 PM</td><td> </td><td>11/17/2022 1:47:59
PM</td><td>Subject to deduction</td><td>CW.07.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>12838</td><td>W.C. LOBBY</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Toothing between stone
tiles</td><td>Low</td><td>11/17/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/27/2020 4:24:50 PM</td><td> </td><td>11/17/2022 1:47:48
PM</td><td>Subject to deduction</td><td>CW.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>12846</td><td>W.C. LOBBY</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>11/17/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/27/2020 4:25:28 PM</td><td> </td><td>11/17/2022 1:47:35
PM</td><td>Subject to deduction</td><td>CW.07.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>15382</td><td>FEMALE W.C</td><td>CCB
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Sprinkler
System</td><td>Sprinkler plate</td><td>&#39;Sprinkler location to be adjusted
</td><td>High</td><td>2/2/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>1/26/2021 3:56:48 PM</td><td> </td><td>11/17/2022 1:47:24
PM</td><td>Subject to deduction</td><td>CW.08.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>15795</td><td>CONFERENCE FOYER</td><td>CCB
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Ceiling</
td><td>General Snag</td><td>&#39;Metal mesh needs cleaning
</td><td>High</td><td>2/10/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/3/2021 4:04:25 PM</td><td> </td><td>11/17/2022 1:47:09
PM</td><td>Subject to deduction</td><td>CX.03.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>15800</td><td>CONFERENCE FOYER</td><td>CCB
L10</td><td>Closed</td><td>De-Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Vertical joints are not aligned /repair for
corner of tile</td><td>High</td><td>2/10/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>2/3/2021 4:04:35 PM</td><td> </td><td>11/17/2022 1:46:54
PM</td><td>Subject to deduction</td><td>CX.03.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>17498</td><td>LOBBY</td><td>CCB
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Joints between ceiling and metal cladding
need to adjustment </td><td>Low</td><td>5/17/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>4/26/2021 12:54:29 PM</td><td> </td><td>11/17/2022 1:46:39
PM</td><td>Subject to deduction</td><td>CT.08.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>18926</td><td>LOBBY</td><td>CCB L10</td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked joint should be aligned </td><td>Low</td><td>7/5/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>6/14/2021 12:06:40 PM</td><td>
</td><td>11/17/2022 1:46:23 PM</td><td>Subject to
deduction</td><td>CE.08.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>19008</td><td>EDUCATION CIRCULATION</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Metal trim should be the same width </td><td>Low</td><td>7/6/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>6/15/2021 12:21:20 PM</td><td>
</td><td>11/17/2022 1:46:09 PM</td><td>Subject to
deduction</td><td>CE.07.01.020</td><td>&nbsp;</td>
</tr><tr>
<td>19515</td><td>VIP LOUNGE</td><td>CCB
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Rusty tiles should be replaced
</td><td>Low</td><td>7/20/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>6/29/2021 4:13:40 PM</td><td> </td><td>11/17/2022 1:45:29
PM</td><td>Subject to deduction</td><td>CV.02.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>19752</td><td>AUDITORIUM LOBBY</td><td>CCB
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;The gap should be the same around the
false ceiling </td><td>Low</td><td>7/28/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>7/7/2021 4:44:44 PM</td><td> </td><td>11/17/2022 1:45:18
PM</td><td>Subject to deduction</td><td>CA.07.01.015</td><td>&nbsp;</td>
</tr><tr>
<td>21415</td><td>North Facade - CCB</td><td>CCB North
Facade</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls should be repainted
</td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>8/18/2021
11:43:11 AM</td><td> </td><td>11/17/2022 1:45:05 PM</td><td>Subject to
deduction</td><td>North Facade - CCB</td><td>&nbsp;</td>
</tr><tr>
<td>21421</td><td>North Facade - CCB</td><td>CCB North
Facade</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Gap should be
closed</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/18/2021 11:43:18 AM</td><td> </td><td>11/17/2022 1:44:54
PM</td><td>Subject to deduction</td><td>North Facade - CCB</td><td>&nbsp;</td>
</tr><tr>
<td>21425</td><td>CCB-North Facade</td><td>CCB North
Facade</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Wall - Metal cladding</td><td>Not
aligned</td><td>&#39;Gap between concrete wall and louvre should be same width
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/18/2021
11:43:21 AM</td><td> </td><td>11/17/2022 1:44:42 PM</td><td>Subject to
deduction</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21435</td><td>North Facade - CCB</td><td>CCB North
Facade</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Gaps should be closed as per technical
office advise</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/18/2021 11:43:29 AM</td><td> </td><td>11/17/2022 1:44:31
PM</td><td>Subject to deduction</td><td>North Facade - CCB</td><td>&nbsp;</td>
</tr><tr>
<td>21442</td><td>CCB-North Facade</td><td>CCB North
Facade</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Wall - stone cladding</td><td>Not
aligned</td><td>&#39;Gap between concrete wall and louvre should be same width
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/18/2021
11:43:34 AM</td><td> </td><td>11/17/2022 1:44:20 PM</td><td>Subject to
deduction</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21446</td><td>North Facade - CCB</td><td>CCB North
Facade</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;Gaps
should be closed-as per technical office advise</td><td>Low</td><td>9/8/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>8/18/2021 11:43:38 AM</td><td>
</td><td>11/17/2022 1:44:09 PM</td><td>Subject to deduction</td><td>North Facade -
CCB</td><td>&nbsp;</td>
</tr><tr>
<td>21449</td><td>CCB-North Facade</td><td>CCB North
Facade</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Wall - Metal cladding</td><td>Not
aligned</td><td>&#39;Gap between concrete wall and louvre not same width
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/18/2021
11:43:40 AM</td><td> </td><td>11/17/2022 1:43:57 PM</td><td>Subject to
deduction</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21828</td><td>WEST Facade - CCB</td><td>CCB West
Facade</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Panels</
td><td>General Snag</td><td>&#39;Bottom level of mesh panel with GRC need to be
aligned </td><td>Low</td><td>9/12/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/22/2021 12:13:31 PM</td><td> </td><td>11/17/2022 1:43:42
PM</td><td>Subject to deduction</td><td>WEST Facade-CCB</td><td>&nbsp;</td>
</tr><tr>
<td>21829</td><td>WEST Facade - CCB</td><td>CCB West
Facade</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Panels</
td><td>Gap in panel</td><td>&#39;Gap around mesh panel not the same width ( not
centered )</td><td>Low</td><td>9/12/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/22/2021 12:13:33 PM</td><td> </td><td>11/17/2022 1:43:30
PM</td><td>Subject to deduction</td><td>WEST Facade-CCB</td><td>&nbsp;</td>
</tr><tr>
<td>21922</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Visible touch-up not acceptable</td><td>&#39;Sealer is not done
for marked parts </td><td>Low</td><td>8/30/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/23/2021 12:08:56 PM</td><td> </td><td>11/17/2022 1:43:16
PM</td><td>Subject to deduction</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21925</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Visible touch-up not acceptable</td><td>&#39;Sealer is not done
for marked parts</td><td>Low</td><td>9/13/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/23/2021 12:08:59 PM</td><td> </td><td>11/17/2022 1:42:59
PM</td><td>Subject to deduction</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21926</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Visible touch-up not acceptable</td><td>&#39;Sealer is not done
for marked parts </td><td>Low</td><td>9/13/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/23/2021 12:09:01 PM</td><td> </td><td>11/17/2022 1:42:45
PM</td><td>Subject to deduction</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>15225</td><td>SERVICE RISER</td><td>MU
BA</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cable not installed properly and missing labels
</td><td>High</td><td>1/27/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>1/20/2021
4:07:03 PM</td><td> </td><td>11/17/2022 1:40:45
PM</td><td>&nbsp;</td><td>CQ.07.0B.004</td><td>&nbsp;</td>
</tr><tr>
<td>15236</td><td>SERVICE RISER</td><td>MU
BA</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cables out of trunk, missing back box
label.</td><td>High</td><td>1/27/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>1/20/2021 4:07:44 PM</td><td> </td><td>11/17/2022 1:40:07
PM</td><td>&nbsp;</td><td>CQ.07.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>32982</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing PA speaker</td><td>High</td><td>10/12/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/5/2022 4:07:26 PM</td><td> </td><td>11/17/2022
1:39:23 PM</td><td>&nbsp;</td><td>MS.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>27895</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi device is missing, camera labels not
done</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>3/12/2022 11:52:42 AM</td><td> </td><td>11/17/2022 1:38:31
PM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32883</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing ICT work</td><td>High</td><td>10/11/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/4/2022 4:15:10 PM</td><td> </td><td>11/17/2022
1:37:39 PM</td><td>&nbsp;</td><td>MS.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>32957</td><td>FIRE EXIT</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing cctv camera</td><td>High</td><td>10/12/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/5/2022 4:06:46 PM</td><td> </td><td>11/17/2022
1:37:28 PM</td><td>&nbsp;</td><td>MP.14.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>34053</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>10/17/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/10/2022 4:17:34 PM</td><td> </td><td>11/17/2022
1:37:13 PM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>25333</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steel works at roof</td><td>Overall
finishes</td><td>&#39;Repair for cementious of steel structure columns
</td><td>Low</td><td>11/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>11/22/2021
12:00:53 PM</td><td> </td><td>11/17/2022 12:45:53 PM</td><td>&nbsp;</td><td>Museum
Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>34348</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Marked part need to touch up painting
</td><td>Low</td><td>11/9/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/19/2022
10:24:35 AM</td><td> </td><td>11/17/2022 12:44:56
PM</td><td>&nbsp;</td><td>MS.19.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34198</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete floor need to repair and painting
dust sealer</td><td>Low</td><td>11/6/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:13:55 AM</td><td>
</td><td>11/17/2022 12:44:15
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34984</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Marked Leakage need to
repaired.</td><td>Low</td><td>11/20/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/30/2022 10:07:45 AM</td><td>
</td><td>11/17/2022 12:43:40
PM</td><td>&nbsp;</td><td>MS.19.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34172</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All Missing accessories should be installed
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:10:19 AM</td><td> </td><td>11/17/2022 12:42:43
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34142</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door </td><td>Low</td><td>11/6/2022
12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:09:34 AM</td><td>
</td><td>11/17/2022 12:42:10
PM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>15822</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
stone cladding</td><td>Damages to be rectified or replaced</td><td>&#39;Joint
between stone panels uneven - make good</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 10:09:32 AM</td><td>
</td><td>11/17/2022 12:27:48 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25442</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Defected and irregular sealant
should be adjusted </td><td>Low</td><td>12/28/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/7/2021 12:20:31 PM</td><td> </td><td>11/17/2022
11:32:10 AM</td><td>Done </td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25443</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Missing sealant
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/7/2021
12:20:33 PM</td><td> </td><td>11/17/2022 11:32:09 AM</td><td>Done
</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25462</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Stone edge should be aligned
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/7/2021
12:24:41 PM</td><td> </td><td>11/17/2022 11:32:04 AM</td><td>Done
</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25514</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked bulge should be fixed and seated properly
</td><td>Low</td><td>12/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>12/9/2021
12:52:31 PM</td><td> </td><td>11/17/2022 11:32:02 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25524</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Electrical box should be fixed properly
</td><td>Low</td><td>12/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>12/9/2021
12:52:44 PM</td><td> </td><td>11/17/2022 11:32:01 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25604</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Marked joint should be aligned and
uniform </td><td>Low</td><td>1/4/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/14/2021 10:51:48 AM</td><td> </td><td>11/17/2022
11:32:00 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25704</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Not aligned</td><td>&#39;Marked edge should be aligned
</td><td>Low</td><td>1/5/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/15/2021
1:49:50 PM</td><td> </td><td>11/17/2022 11:31:59 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25709</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone slides between stone floor and travelator
should be regular and unified as same width for both sides together
</td><td>Low</td><td>12/22/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/15/2021
1:50:03 PM</td><td> </td><td>11/17/2022 11:31:57 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25715</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone slides between stone floor and travelator
should be regular and unified as same width for both sides together
</td><td>Low</td><td>12/22/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/15/2021
1:50:16 PM</td><td> </td><td>11/17/2022 11:31:56 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25720</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone slides between stone floor and travelator
should be regular and unified as same width for both sides together
</td><td>Low</td><td>12/22/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/15/2021
1:50:27 PM</td><td> </td><td>11/17/2022 11:31:53 AM</td><td>Done </td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25725</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone slides between stone floor and travelator
should be regular and unified as same width for each separate side and for both
sides together </td><td>Low</td><td>1/5/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/15/2021 1:50:39 PM</td><td> </td><td>11/17/2022
11:31:52 AM</td><td>Done </td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25732</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Uneven size between plates caused to miss
alignment joints.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:39:16 PM</td><td> </td><td>11/17/2022
11:31:50 AM</td><td>Done </td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25735</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing bolts and fixation plates should be
installed.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:39:22 PM</td><td> </td><td>11/17/2022
11:31:49 AM</td><td>Done </td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25761</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Irregular joint should be
unified.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:40:24 PM</td><td> </td><td>11/17/2022
11:31:43 AM</td><td>Done </td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25765</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Uneven size for plates should be
adjusted.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:40:39 PM</td><td> </td><td>11/17/2022
11:31:42 AM</td><td>Done </td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25768</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Irregular joints between
plates.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:40:47 PM</td><td> </td><td>11/17/2022
11:31:41 AM</td><td>Done </td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25771</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rust stain for structural and on fixation
plates and handrail should be removed.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:40:54 PM</td><td> </td><td>11/17/2022
11:31:39 AM</td><td>Done </td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25776</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Uneven size between panels
</td><td>Low</td><td>12/29/2021 12:00:00 AM</td><td>mohamed.sami</td><td>12/22/2021
2:07:27 PM</td><td> </td><td>11/17/2022 11:31:38 AM</td><td>Done
</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25782</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Uneven size between panels
</td><td>Low</td><td>1/12/2022 12:00:00 AM</td><td>mohamed.sami</td><td>12/22/2021
2:07:45 PM</td><td> </td><td>11/17/2022 11:31:36 AM</td><td>Done
</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25783</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Toothing between plate panels should be
leveled </td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 2:07:47 PM</td><td> </td><td>11/17/2022
11:31:32 AM</td><td>Done </td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25784</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Irregular joint between plates
</td><td>Low</td><td>1/12/2022 12:00:00 AM</td><td>mohamed.sami</td><td>12/22/2021
2:07:51 PM</td><td> </td><td>11/17/2022 11:31:31 AM</td><td>Done
</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25792</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joints between plates should be
regular.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 3:27:01 PM</td><td> </td><td>11/17/2022
11:31:29 AM</td><td>Done </td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25795</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing and lose fixation plates should be
installed and fixed properly.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 3:27:13 PM</td><td> </td><td>11/17/2022
11:31:28 AM</td><td>Done </td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25805</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Uneven size for panels caused to miss
alignment joints should be adjusted.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 3:36:55 PM</td><td> </td><td>11/17/2022
11:31:27 AM</td><td>Done </td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25806</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joints between plates should be
regular.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 3:36:58 PM</td><td> </td><td>11/17/2022
11:31:25 AM</td><td>Done </td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>21110</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:49:26 AM</td><td> </td><td>11/17/2022 10:05:47
AM</td><td>&nbsp;</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21017</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on CIR</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/15/2021 11:13:27 AM</td><td> </td><td>11/17/2022 10:04:40
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21544</td><td>TUT-CORE B3</td><td>MU
L30</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 9:51:45 AM</td><td> </td><td>11/17/2022 10:03:38
AM</td><td>&nbsp;</td><td>MC.12.03.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21732</td><td>CORE D3</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on CIR </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 11:28:19 AM</td><td> </td><td>11/17/2022 10:02:40
AM</td><td>&nbsp;</td><td>MC.13.02.D31</td><td>&nbsp;</td>
</tr><tr>
<td>29902</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted for both
sides</td><td>Low</td><td>6/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/26/2022 10:18:39 AM</td><td> </td><td>11/17/2022 10:01:41
AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>29900</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted for both
sides</td><td>Low</td><td>6/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/26/2022 10:18:36 AM</td><td> </td><td>11/17/2022 10:00:38
AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21730</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on CIR </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 11:28:17 AM</td><td> </td><td>11/17/2022 9:59:43
AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21726</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>Level difference</td><td>&#39;Epoxy painting floor not leveled
with elevator frame </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:28:09 AM</td><td> </td><td>11/17/2022 9:58:33
AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>27821</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:34:35 PM</td><td>
</td><td>11/16/2022 8:47:00
PM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>15233</td><td>ELEC. ROOM</td><td>MU
BA</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Labels not done yet</td><td>High</td><td>1/27/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>1/20/2021 4:07:32 PM</td><td> </td><td>11/16/2022
8:43:49 PM</td><td>&nbsp;</td><td>MS.12.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>15234</td><td>PLANT</td><td>MU
BA</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Label</td><td>High</td><td>1/27/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>1/20/2021 4:07:36 PM</td><td> </td><td>11/16/2022 8:42:54
PM</td><td>&nbsp;</td><td>CS.07.0B.004</td><td>&nbsp;</td>
</tr><tr>
<td>34905</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work for access control
</td><td>High</td><td>11/1/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/25/2022
11:34:36 AM</td><td> </td><td>11/16/2022 8:39:07
PM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>32869</td><td>AHU</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control device</td><td>High</td><td>10/11/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/4/2022 4:14:45 PM</td><td> </td><td>11/16/2022
8:38:27 PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>32875</td><td>CORRIDOR</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control device</td><td>High</td><td>10/11/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/4/2022 4:14:55 PM</td><td> </td><td>11/16/2022
8:37:46 PM</td><td>&nbsp;</td><td>MS.18.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>32872</td><td>AHU</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>10/11/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/4/2022 4:14:50 PM</td><td> </td><td>11/16/2022
8:37:23 PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>32965</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing access control devices </td><td>High</td><td>10/12/2022
12:00:00 AM</td><td>mina.moussa</td><td>10/5/2022 4:06:59 PM</td><td>
</td><td>11/16/2022 8:36:09
PM</td><td>&nbsp;</td><td>MW.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>28206</td><td>CORE F1</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices not installed
</td><td>High</td><td>3/24/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/17/2022 1:50:58 PM</td><td> </td><td>11/16/2022 8:35:48
PM</td><td>&nbsp;</td><td>MC.24.03.F11</td><td>&nbsp;</td>
</tr><tr>
<td>26131</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Microsoft to ensure that public portal Security is considered a
critical issue of enterprise development as there is a huge probability of data
breach. Also, Provide your recommendations about how to avoid your data to be
stolen.</td><td>High</td><td>2/15/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/8/2022 2:33:58 PM</td><td> </td><td>11/16/2022 8:35:16
PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27858</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV camera label </td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:25 PM</td><td>
</td><td>11/16/2022 8:31:14
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27627</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;CCTV camera need label</td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:53:33 PM</td><td>
</td><td>11/16/2022 8:30:33 PM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>27622</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;CCTV camera labeling </td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:53:25 PM</td><td>
</td><td>11/16/2022 8:29:37 PM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>32797</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing button, cables termination / final
touch up</td><td>High</td><td>9/6/2022 12:00:00
AM</td><td>mina.moussa</td><td>8/30/2022 1:28:34 PM</td><td> </td><td>11/16/2022
8:29:19 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27885</td><td>GEM CAVE EXP.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV is not installed </td><td>High</td><td>3/19/2022 12:00:00
AM</td><td>Mohamed Samir</td><td>3/12/2022 11:52:24 AM</td><td> </td><td>11/16/2022
8:25:07 PM</td><td>&nbsp;</td><td>MP.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27867</td><td>GEM CAVE EXP.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cctv devices are not installed </td><td>High</td><td>3/19/2022
12:00:00 AM</td><td>Mohamed Samir</td><td>3/12/2022 11:51:56 AM</td><td>
</td><td>11/16/2022 8:24:33
PM</td><td>&nbsp;</td><td>MP.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27876</td><td>GEM CAVE EXP</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cctv devices are missing </td><td>High</td><td>3/19/2022 12:00:00
AM</td><td>Mohamed Samir</td><td>3/12/2022 11:52:10 AM</td><td> </td><td>11/16/2022
8:24:13 PM</td><td>&nbsp;</td><td>MP.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32865</td><td>SECURITY ROOM</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Floor box label</td><td>High</td><td>10/11/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/4/2022 4:14:38 PM</td><td> </td><td>11/16/2022
8:22:13 PM</td><td>&nbsp;</td><td>MB.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34464</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:42 AM</td><td>
</td><td>11/16/2022 2:59:36
PM</td><td>&nbsp;</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34476</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:58 AM</td><td>
</td><td>11/16/2022 2:59:35
PM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34480</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:50:04 AM</td><td>
</td><td>11/16/2022 2:59:34
PM</td><td>&nbsp;</td><td>MS.19.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34694</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable must be laid in
tray</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:22:45 PM</td><td>
</td><td>11/16/2022 2:59:32
PM</td><td>&nbsp;</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34723</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label </td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:29:36 PM</td><td>
</td><td>11/16/2022 2:59:31 PM</td><td>&nbsp;</td><td>Level
+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>34730</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:29:46 PM</td><td>
</td><td>11/16/2022 2:59:29 PM</td><td>&nbsp;</td><td>Level
+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>34891</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:19:32 PM</td><td>
</td><td>11/16/2022 2:59:28
PM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32993</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices </td><td>High</td><td>10/12/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/5/2022 4:07:45 PM</td><td> </td><td>11/16/2022
1:13:43 PM</td><td>&nbsp;</td><td>Level +49.50</td><td>&nbsp;</td>
</tr><tr>
<td>32988</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing access control devices. Missing labeling .missing ICT
device</td><td>High</td><td>10/12/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/5/2022 4:07:37 PM</td><td> </td><td>11/16/2022
1:13:33 PM</td><td>&nbsp;</td><td>MS.19.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>32866</td><td>SECURITY ROOM</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control device </td><td>High</td><td>10/11/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/4/2022 4:14:40 PM</td><td> </td><td>11/16/2022
1:13:22 PM</td><td>&nbsp;</td><td>MB.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>32881</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing access control IT room m6</td><td>High</td><td>10/11/2022
12:00:00 AM</td><td>mina.moussa</td><td>10/4/2022 4:15:06 PM</td><td>
</td><td>11/16/2022 1:13:08
PM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>28154</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices installation not installed
</td><td>High</td><td>3/23/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/16/2022 3:54:39 PM</td><td> </td><td>11/16/2022 1:12:43
PM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28159</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices installation not installed
</td><td>High</td><td>3/23/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/16/2022 3:54:46 PM</td><td> </td><td>11/16/2022 1:10:47
PM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>34902</td><td>CORE E1</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices not installed
</td><td>High</td><td>11/1/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/25/2022
11:34:30 AM</td><td> </td><td>11/16/2022 1:10:15
PM</td><td>&nbsp;</td><td>MC.24.03.E11</td><td>&nbsp;</td>
</tr><tr>
<td>26240</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Microsoft should transfer all the required documents, credentials
and information provided for the delivered website and mobile app to Legacy and GEM
team.</td><td>High</td><td>2/28/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/21/2022 12:59:01 PM</td><td> </td><td>11/16/2022 1:08:30
PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>26208</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;provide the Operator&#160;with operational access (URL,
operational user account) to the GEM Complex website, back-end system, to, fully
operate the website and the mobile application
contents.</td><td>High</td><td>2/28/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/21/2022 10:32:34 AM</td><td> </td><td>11/16/2022 1:07:12
PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>26239</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;GEM team and Legacy should have the right to publish and manage
any relevant content on the GEM Complex website according to the Prudent Industry
Practice.</td><td>High</td><td>2/28/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/21/2022 12:57:43 PM</td><td> </td><td>11/16/2022 1:07:00
PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>12073</td><td>AHU - Band B- B.O.H</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up - missing rubber - CIR not submitted
</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
2:15:26 PM</td><td> </td><td>11/16/2022 11:55:13
AM</td><td>&nbsp;</td><td>MS.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>12077</td><td>IT-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up - CIR not submitted </td><td>Low</td><td>10/22/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020 2:15:38 PM</td><td>
</td><td>11/16/2022 11:55:12
AM</td><td>&nbsp;</td><td>MS.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>16866</td><td>FEMALE SHOWERS/ LOCKERS-BAnd B</td><td>MU
L10</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Damage</td><td>&#39;Damages should be repaired
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:00:44 PM</td><td> </td><td>11/16/2022 11:55:11
AM</td><td>&nbsp;</td><td>MW.13.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>16871</td><td>MALE SHOWER/ LOCKERS-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>General Snag</td><td>&#39;Edge should be adjusted
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:00:54 PM</td><td> </td><td>11/16/2022 11:55:10
AM</td><td>&nbsp;</td><td>MW.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16919</td><td>JEWELLERY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Marked Damaged strip should be replaced
</td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021
1:02:29 PM</td><td> </td><td>11/16/2022 11:55:09
AM</td><td>&nbsp;</td><td>ME.12.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16998</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Vanity
Counter Top</td><td>General Snag</td><td>&#39;The vanity top have a different color
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:32:47 PM</td><td> </td><td>11/16/2022 11:55:07
AM</td><td>&nbsp;</td><td>MW.12.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>16999</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Vanity
Counter Top</td><td>General Snag</td><td>&#39;Discoloration/black spots
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:32:48 PM</td><td> </td><td>11/16/2022 11:55:06
AM</td><td>&nbsp;</td><td>MW.12.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>17002</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:32:54 PM</td><td> </td><td>11/16/2022 11:55:05
AM</td><td>&nbsp;</td><td>MW.12.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>17016</td><td>WC / DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:33:38 PM</td><td> </td><td>11/16/2022 11:55:04
AM</td><td>&nbsp;</td><td>MW.12.01.001E</td><td>&nbsp;</td>
</tr><tr>
<td>17017</td><td>WC / DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Tiles are not leveled
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:33:40 PM</td><td> </td><td>11/16/2022 11:55:03
AM</td><td>&nbsp;</td><td>MW.12.01.001E</td><td>&nbsp;</td>
</tr><tr>
<td>17027</td><td>WC / DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Tiles are not leveled
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:01 PM</td><td> </td><td>11/16/2022 11:55:02
AM</td><td>&nbsp;</td><td>MW.12.01.001E</td><td>&nbsp;</td>
</tr><tr>
<td>17030</td><td>WC CLEANERS STORE-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:08 PM</td><td> </td><td>11/16/2022 11:55:01
AM</td><td>&nbsp;</td><td>MW.12.01.001D</td><td>&nbsp;</td>
</tr><tr>
<td>17033</td><td>WC LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:16 PM</td><td> </td><td>11/16/2022 11:55:00
AM</td><td>&nbsp;</td><td>MW.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>17049</td><td>MEETING-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls painting need touchup
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:49 PM</td><td> </td><td>11/16/2022 11:54:59
AM</td><td>&nbsp;</td><td>ME.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20091</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>Signage</td><td>damaged</td><td>&#39;Scratches
need to touch up </td><td>Low</td><td>8/23/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/2/2021 4:15:24 PM</td><td> </td><td>11/16/2022 11:54:58
AM</td><td>&nbsp;</td><td>ME.12.01.009</td><td>&nbsp;</td>
</tr><tr>
<td>21130</td><td>CORE B2-Band B</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Remove plate and touch up for epoxy
painting </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:50:10 AM</td><td> </td><td>11/16/2022 11:54:57
AM</td><td>&nbsp;</td><td>MC.18.01.B21</td><td>&nbsp;</td>
</tr><tr>
<td>34912</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Wall -
Timber paneling</td><td>General</td><td>&#39;Marked part needs touch up painting
</td><td>Low</td><td>11/2/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>10/26/2022
1:20:21 PM</td><td> </td><td>11/16/2022 11:54:56
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34921</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Wall -
Timber paneling</td><td>General</td><td>&#39;All wooden ending trim to be in
gray</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/26/2022 1:20:35 PM</td><td> </td><td>11/16/2022 11:54:55
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34923</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Wall -
Timber paneling</td><td>General</td><td>&#39;Touch up painting for marked
part</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/26/2022 1:20:38 PM</td><td> </td><td>11/16/2022 11:52:58
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34924</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between stone and carpet to be covered
</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>10/26/2022
1:20:40 PM</td><td> </td><td>11/16/2022 11:52:56
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34926</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Scratches should be repaired for bottom
part</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/26/2022 1:20:44 PM</td><td> </td><td>11/16/2022 11:52:55
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34931</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Floor
box to be leveled </td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/26/2022 1:20:54 PM</td><td> </td><td>11/16/2022 11:52:53
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34932</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Wall -
Timber paneling</td><td>General</td><td>&#39;Touch up painting for marked
part</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/26/2022 1:20:55 PM</td><td> </td><td>11/16/2022 11:52:52
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34936</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Wall -
Timber paneling</td><td>General</td><td>&#39;Marked part should be closed properly
</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>10/26/2022
1:21:02 PM</td><td> </td><td>11/16/2022 11:52:51
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34937</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Wall -
Timber paneling</td><td>General</td><td>&#39; Missing stainless
profile</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/26/2022 1:21:03 PM</td><td> </td><td>11/16/2022 11:52:49
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34939</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Wall -
Timber paneling</td><td>General</td><td>&#39;Missing architrave at both sides
</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>10/26/2022
1:21:07 PM</td><td> </td><td>11/16/2022 11:52:47
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34941</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Missing sealant </td><td>Low</td><td>11/16/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>10/26/2022 1:21:10 PM</td><td>
</td><td>11/16/2022 11:52:45
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34942</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Wall -
Timber paneling</td><td>General</td><td>&#39;Missing stainless profile
</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>10/26/2022
1:21:11 PM</td><td> </td><td>11/16/2022 11:52:44
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>21558</td><td>CORE B3-Band B</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 9:52:03 AM</td><td> </td><td>11/16/2022 11:48:36
AM</td><td>&nbsp;</td><td>MC.12.01.B31</td><td>&nbsp;</td>
</tr><tr>
<td>24332</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain</
td><td>General Snag</td><td>&#39;Toothing between glazing panels
</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>mohamed.sami</td><td>10/27/2021
11:25:58 AM</td><td> </td><td>11/15/2022 9:53:00 AM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>25785</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Toothing between plate panels should be
leveled </td><td>Low</td><td>12/29/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 2:08:36 PM</td><td> </td><td>11/15/2022
9:51:50 AM</td><td>&nbsp;</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25778</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;First panel should be fixed properly
</td><td>Low</td><td>1/12/2022 12:00:00 AM</td><td>mohamed.sami</td><td>12/22/2021
2:07:32 PM</td><td> </td><td>11/15/2022 9:51:42
AM</td><td>&nbsp;</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25777</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Irregular joint between plates
</td><td>Low</td><td>1/12/2022 12:00:00 AM</td><td>mohamed.sami</td><td>12/22/2021
2:07:29 PM</td><td> </td><td>11/15/2022 9:51:35
AM</td><td>&nbsp;</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>34778</td><td>MS.24.3B.002</td><td>MU-L40-Band
B,D</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete floor need to repair and touch up
</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:37:54 AM</td><td>
</td><td>11/15/2022 9:10:05
AM</td><td>&nbsp;</td><td>MS.24.3B.002</td><td>&nbsp;</td>
</tr><tr>
<td>34343</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Steel ladder need to touch up painting
</td><td>Low</td><td>11/9/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/19/2022
10:24:19 AM</td><td> </td><td>11/15/2022 9:09:32
AM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34342</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail painting need to touch up
</td><td>Low</td><td>11/9/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/19/2022
10:24:13 AM</td><td> </td><td>11/15/2022 9:09:04
AM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34140</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor needs cleaning ,repair
and touch up painting </td><td>Low</td><td>11/6/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:09:31 AM</td><td>
</td><td>11/15/2022 9:08:39
AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>21542</td><td>TUT-CORE B3</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Adjust and repair for wall painting
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
9:51:43 AM</td><td> </td><td>11/15/2022 9:07:13
AM</td><td>&nbsp;</td><td>MC.12.03.B31</td><td>&nbsp;</td>
</tr><tr>
<td>10911</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Laser system installation is incomplete and
PTZ camera port labels are missing </td><td>High</td><td>9/21/2020 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>9/14/2020 4:01:12 PM</td><td>
</td><td>11/14/2022 3:07:14
PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>11041</td><td>TUT- EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>WIRING
ACCESSORIES</td><td>General Snag</td><td>&#39;Access control cable Termination not
done and power cables Termination also done.No thermostat naming
</td><td>High</td><td>9/22/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/15/2020 4:13:37 PM</td><td> </td><td>11/14/2022 3:06:07
PM</td><td>&nbsp;</td><td>MS.12.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>11045</td><td>TUT-CORE B2</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>WIRING
ACCESSORIES</td><td>General Snag</td><td>&#39;Face plates Permanent labeling is
missing and access control devices cable Termination and devices installation are
not done</td><td>High</td><td>9/22/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/15/2020 4:13:57 PM</td><td> </td><td>11/14/2022 3:05:12
PM</td><td>&nbsp;</td><td>MC.18.3A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>11051</td><td>TUT- EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>WIRING
ACCESSORIES</td><td>General Snag</td><td>&#39;Access control cable Termination not
done</td><td>High</td><td>9/22/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/15/2020 4:14:21 PM</td><td> </td><td>11/14/2022 3:03:43
PM</td><td>&nbsp;</td><td>MS.18.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>11053</td><td>TUT-CORE B1</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>WIRING
ACCESSORIES</td><td>General Snag</td><td>&#39;Access control cable Termination and
field devices installation not done</td><td>High</td><td>9/22/2020 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>9/15/2020 4:14:34 PM</td><td>
</td><td>11/14/2022 3:02:57
PM</td><td>&nbsp;</td><td>MC.23.3A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>31007</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable arrangements
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:20:53 PM</td><td> </td><td>11/14/2022 2:04:57
PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>34386</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:35 PM</td><td>
</td><td>11/14/2022 1:41:56
PM</td><td>&nbsp;</td><td>MS.19.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>34489</td><td>CORE E1</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:50:18 AM</td><td>
</td><td>11/14/2022 1:41:54
PM</td><td>&nbsp;</td><td>MC.24.03.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34660</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Second layer trunk not systemization
</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:21:40 PM</td><td>
</td><td>11/14/2022 1:41:53 PM</td><td>&nbsp;</td><td>Level
+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>34675</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing screws
</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:22:06 PM</td><td>
</td><td>11/14/2022 1:41:52 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>34708</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:23:11 PM</td><td>
</td><td>11/14/2022 1:41:51 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>34710</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tray cover and cable systemization
</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:23:16 PM</td><td>
</td><td>11/14/2022 1:41:50 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>34711</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:23:18 PM</td><td>
</td><td>11/14/2022 1:41:49 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>34969</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>11/3/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/27/2022 11:34:54 AM</td><td>
</td><td>11/14/2022 1:41:48
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34970</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete works
</td><td>High</td><td>11/3/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/27/2022 11:34:55 AM</td><td>
</td><td>11/14/2022 1:41:47
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34975</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete works
</td><td>High</td><td>11/3/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/27/2022 11:35:06 AM</td><td>
</td><td>11/14/2022 1:41:45
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34892</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes</td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/24/2022 4:19:35 PM</td><td>
</td><td>11/14/2022 1:37:09
PM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>28052</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;The cable should be installed within cable
trunk</td><td>High</td><td>3/21/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/14/2022 1:52:27 PM</td><td> </td><td>11/14/2022 1:33:49
PM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28053</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cable addressing and termination and labeling
</td><td>High</td><td>3/21/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/14/2022 1:52:29 PM</td><td> </td><td>11/14/2022 1:33:17
PM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28040</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All the pulled cat6a and fiber cables needs to be dressed
properly and terminated within the racks and make sure that none of cables are
visible in this hub room</td><td>High</td><td>3/21/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/14/2022 1:33:49 PM</td><td>
</td><td>11/14/2022 1:32:38
PM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>18554</td><td>COMPUTER ROOM</td><td>CCB
L10</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Not inspected
</td><td>High</td><td>6/15/2021 12:00:00 AM</td><td>Ahmed.Galal</td><td>6/8/2021
1:43:20 PM</td><td> </td><td>11/14/2022 11:01:31
AM</td><td>&nbsp;</td><td>CE.07.01.008</td><td>&nbsp;</td>
</tr><tr>
<td>31176</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air filters. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:54:43 PM</td><td>
</td><td>11/14/2022 10:22:35
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31194</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air filters. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:55:26 PM</td><td>
</td><td>11/14/2022 10:21:33
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19963</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Coils need cleaning and fins need
adjustment and filters need cleaning </td><td>High</td><td>8/5/2021 12:00:00
AM</td><td>ahmedsalem</td><td>7/29/2021 1:04:21 PM</td><td> </td><td>11/14/2022
10:13:08 AM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>13833</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;General cleaning and filters
</td><td>High</td><td>12/8/2020 12:00:00 PM</td><td>ahmedsalem</td><td>12/1/2020
12:20:29 PM</td><td> </td><td>11/14/2022 10:11:46
AM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>8961</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 6A face 1 damaged stone wall cladding
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>sally.george</td><td>4/28/2020
11:26:20 AM</td><td> </td><td>11/14/2022 9:51:44 AM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8960</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 6A face 1 joint isn’t aligned/stone
need general cleaning </td><td>Low</td><td>5/19/2020 12:00:00
PM</td><td>sally.george</td><td>4/28/2020 11:26:16 AM</td><td> </td><td>11/14/2022
9:51:37 AM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>32267</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rock wool need adjustment
</td><td>High</td><td>7/24/2022 12:00:00 PM</td><td>hossamreda</td><td>7/17/2022
3:32:03 PM</td><td> </td><td>11/14/2022 9:50:43
AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>28164</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi not installed </td><td>High</td><td>3/23/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/16/2022 3:54:54 PM</td><td>
</td><td>11/14/2022 9:19:07
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>27797</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All the cat6a and fiber cables should be routed inside the rack
through cable trunks and it’s needs to be terminated in the patch panels with
proper patching </td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:05 PM</td><td> </td><td>11/14/2022 9:06:50
AM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27906</td><td>CORE E1</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing access control , cctv , media converter, rfid , WiFi
devices and termination </td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>3/12/2022 11:53:05 AM</td><td> </td><td>11/14/2022 9:01:26
AM</td><td>&nbsp;</td><td>MC.24.2A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>27853</td><td>ELEC ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation and
patching </td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:35:18 PM</td><td> </td><td>11/14/2022 9:00:08
AM</td><td>&nbsp;</td><td>MS.19.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>27644</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;No labeling for cctv</td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:54:02 PM</td><td>
</td><td>11/14/2022 8:55:47
AM</td><td>&nbsp;</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>27654</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;CCTV labeling </td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:54:18 PM</td><td>
</td><td>11/14/2022 8:55:21
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27849</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV label </td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:13 PM</td><td>
</td><td>11/14/2022 8:54:51
AM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27909</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV device and label not done , elevator cctv not
done</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>3/12/2022 11:53:10 AM</td><td> </td><td>11/14/2022 8:54:06
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>32272</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Missing rock wool around
duct</td><td>High</td><td>7/24/2022 12:00:00
PM</td><td>hossamreda</td><td>7/17/2022 3:32:11 PM</td><td> </td><td>11/14/2022
8:50:15 AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32268</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Work around duct not done
</td><td>High</td><td>7/24/2022 12:00:00 PM</td><td>hossamreda</td><td>7/17/2022
3:32:04 PM</td><td> </td><td>11/14/2022 8:50:10
AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>28075</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
properly </td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/15/2022 12:07:43 PM</td><td> </td><td>11/13/2022 11:19:45
AM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>27712</td><td>IT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up </td><td>Low</td><td>3/31/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>3/10/2022 11:07:38 AM</td><td> </td><td>11/13/2022
11:19:42 AM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27722</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up </td><td>Low</td><td>3/31/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>3/10/2022 11:07:54 AM</td><td> </td><td>11/13/2022
11:19:40 AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27725</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up </td><td>Low</td><td>3/31/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>3/10/2022 11:07:59 AM</td><td> </td><td>11/13/2022
11:19:38 AM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27730</td><td>SERVICES</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need to touch up </td><td>Low</td><td>3/31/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/10/2022 11:08:07 AM</td><td> </td><td>11/13/2022 11:19:38
AM</td><td>&nbsp;</td><td>MS.14.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27734</td><td>IT 7</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up </td><td>Low</td><td>3/31/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>3/10/2022 11:08:13 AM</td><td> </td><td>11/13/2022
11:19:37 AM</td><td>&nbsp;</td><td>MS.14.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28070</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail should be aligned and
uniform </td><td>Low</td><td>4/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/15/2022 12:07:36 PM</td><td> </td><td>11/13/2022 11:19:32
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28071</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
properly </td><td>Low</td><td>4/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/15/2022 12:07:37 PM</td><td> </td><td>11/13/2022 11:19:31
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29739</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged door
leaf.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:13:20 PM</td><td> </td><td>11/13/2022 11:19:29
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29741</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door should be repainted </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:13:26 PM</td><td> </td><td>11/13/2022
11:19:28 AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29745</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be
repaired</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:13:34 PM</td><td> </td><td>11/13/2022 11:19:28
AM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>29750</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be
repaired</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:13:47 PM</td><td> </td><td>11/13/2022 11:19:27
AM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>29752</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be
repaired</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:13:49 PM</td><td> </td><td>11/13/2022 11:19:26
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29755</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
door lighting should be repaired </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:14:01 PM</td><td> </td><td>11/13/2022
11:19:25 AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29757</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be
repaired</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:14:06 PM</td><td> </td><td>11/13/2022 11:19:24
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29766</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
door leaf should be repaired </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:14:23 PM</td><td> </td><td>11/13/2022
11:19:23 AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29791</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Defective painting need to repair.</td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022 3:15:36 PM</td><td>
</td><td>11/13/2022 11:19:22
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29911</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Doors
need repair and touch up painting </td><td>Low</td><td>6/16/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/26/2022 10:58:03 AM</td><td> </td><td>11/13/2022
11:19:21 AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>29916</td><td>LIFT ESCAPE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs touch up painting /missing accessories
</td><td>Low</td><td>6/16/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/26/2022
10:58:14 AM</td><td> </td><td>11/13/2022 11:19:19
AM</td><td>&nbsp;</td><td>MQ.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29917</td><td>LIFT ESCAPE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf need touch up painting </td><td>Low</td><td>6/16/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/26/2022 10:58:16 AM</td><td>
</td><td>11/13/2022 11:19:18
AM</td><td>&nbsp;</td><td>MQ.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29933</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to repaint from
both side .</td><td>Low</td><td>6/16/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/26/2022 10:58:48 AM</td><td> </td><td>11/13/2022 11:19:17
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29935</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door should be repainted </td><td>Low</td><td>6/16/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/26/2022 10:58:50 AM</td><td> </td><td>11/13/2022
11:19:16 AM</td><td>&nbsp;</td><td>MS.14.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29937</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to
repaint.</td><td>Low</td><td>6/16/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/26/2022 10:58:53 AM</td><td> </td><td>11/13/2022 11:19:15
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29938</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged door leaf should be repaired
</td><td>Low</td><td>6/16/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/26/2022
10:58:53 AM</td><td> </td><td>11/13/2022 11:19:14
AM</td><td>&nbsp;</td><td>MS.14.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29942</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damaged door leaf.</td><td>Low</td><td>6/16/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/26/2022 10:58:57 AM</td><td> </td><td>11/13/2022
11:19:13 AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29943</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to
repaint.</td><td>Low</td><td>6/16/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/26/2022 10:59:04 AM</td><td> </td><td>11/13/2022 11:19:13
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>26132</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Website Access to data of GEM website organization should be
restricted. It can have two-level secure access – VPN and a particular group of
people. It is important to implement diverse levels of access to information for
different GEM employees.</td><td>High</td><td>2/15/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>2/8/2022 2:39:03 PM</td><td>
</td><td>11/13/2022 10:06:06
AM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>6786</td><td>ELECTRICAL ROOM</td><td>AT CONNEC
L45</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Temporary AC to be removed
</td><td>Low</td><td>1/14/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>12/24/2019 11:17:57 AM</td><td> </td><td>11/13/2022 10:06:01
AM</td><td>&nbsp;</td><td>SN.00.0G.03</td><td>&nbsp;</td>
</tr><tr>
<td>34532</td><td>Temple Garden-Band D</td><td>Temple
Garden</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>False Ceiling
Tiles</td><td>Saggaing</td><td>&#39;Missing two tiles should be installed
</td><td>Low</td><td>11/13/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/23/2022 12:03:11 PM</td><td>
</td><td>11/13/2022 10:04:03 AM</td><td>&nbsp;</td><td>Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25845</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cctv</td><td>High</td><td>1/18/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>1/11/2022 3:46:05 PM</td><td> </td><td>11/13/2022 10:03:25
AM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>26118</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Warranty information’s for Enterprise service contract, Microsoft
cloud infrastructure premium support and BMA Application support for the GEM
Website, etc is missing</td><td>High</td><td>2/15/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>2/8/2022 1:35:24 PM</td><td>
</td><td>11/13/2022 10:00:50
AM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>26121</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Microsoft Website O&amp;M manual-All the Museum Digital platform
solution information needs to be removed from this O&amp;M Manual (Page no:945 to
970). Also, the Acceptance form for the Mobile app needs to be
removed</td><td>High</td><td>2/15/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/8/2022 1:38:37 PM</td><td> </td><td>11/13/2022 9:59:22
AM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>11988</td><td>IT-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete Rack cable Termination and some of the cables are not
pulled up to the Racks location.Voice raiser cables are not terminated and dressing
is not done properly </td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:57:35 AM</td><td> </td><td>11/13/2022 9:56:04
AM</td><td>&nbsp;</td><td>MS.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>21627</td><td>CORE D3</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:24:13 AM</td><td> </td><td>11/13/2022 9:55:27
AM</td><td>&nbsp;</td><td>MC.13.01.D31</td><td>&nbsp;</td>
</tr><tr>
<td>34179</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete floor need to repair and painting
dust sealer</td><td>Low</td><td>11/6/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:13:21 AM</td><td>
</td><td>11/13/2022 9:53:22
AM</td><td>&nbsp;</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34178</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete floor need to repair and painting
dust sealer</td><td>Low</td><td>10/23/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:13:20 AM</td><td>
</td><td>11/13/2022 9:52:49
AM</td><td>&nbsp;</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34354</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail need touch up painting
</td><td>Low</td><td>11/9/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/19/2022
10:25:45 AM</td><td> </td><td>11/13/2022 9:52:16
AM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34188</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>Cracks</td><td>&#39;Concrete floor need to repair and painting dust
sealer</td><td>Low</td><td>11/6/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:13:37 AM</td><td>
</td><td>11/13/2022 9:51:42
AM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>25311</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steel works at roof</td><td>Overall
finishes</td><td>&#39;Repair for cementious of steel structure columns
</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>11/22/2021
11:59:53 AM</td><td> </td><td>11/13/2022 9:50:59 AM</td><td>&nbsp;</td><td>Museum
Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>17997</td><td>TUT- Digital (+49.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Install hard of
hearing</td><td>High</td><td>5/31/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>5/24/2021 5:45:03 PM</td><td>
</td><td>11/13/2022 9:50:39
AM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>11987</td><td>IT-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables are not terminated up to the access control
panel location and fire alarm interface cabling also not
done</td><td>High</td><td>10/8/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:57:25 AM</td><td> </td><td>11/13/2022 9:49:34
AM</td><td>&nbsp;</td><td>MS.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>25850</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Aruba should have fiber uplinks connection,not the cat6a patch
cords connection.There is no labeling for the fiber patch cords and Cat6a Patch
cords</td><td>High</td><td>1/18/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>1/11/2022 3:46:29 PM</td><td> </td><td>11/13/2022 9:38:03
AM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>26169</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Design documents, complete source code, database structure, API
Integrations, original graphics, and fonts source files, and 3rd party
libraries</td><td>High</td><td>2/23/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/16/2022 12:46:04 PM</td><td> </td><td>11/13/2022 9:29:20
AM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>34066</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Back box </td><td>High</td><td>10/17/2022
12:00:00 AM</td><td>mina.moussa</td><td>10/10/2022 4:17:55 PM</td><td>
</td><td>11/13/2022 9:24:08
AM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>34947</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No CIR for installation </td><td>High</td><td>11/2/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/26/2022 3:46:43 PM</td><td> </td><td>11/13/2022
9:22:36 AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34063</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>10/17/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/10/2022
4:17:51 PM</td><td> </td><td>11/13/2022 9:21:30
AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>14623</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;RFID receiver permanent device labeling and port mapping is
incomplete. RFID tag and humidity sensors installation also pending in all
showcases and Artifacts etc.</td><td>High</td><td>1/11/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>1/4/2021 11:43:18 AM</td><td>
</td><td>11/13/2022 9:19:18
AM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>18001</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Fiber patch cord or RJ45 patch corn connection from double slab
floor boxes to showcase and Media to be completed</td><td>High</td><td>6/1/2021
12:00:00 AM</td><td>andrewjohn.rose</td><td>5/25/2021 7:36:28 AM</td><td>
</td><td>11/13/2022 9:18:26 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27878</td><td>GEM CAVE EXP.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices are not installed
</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed Samir</td><td>3/12/2022
11:52:14 AM</td><td> </td><td>11/13/2022 9:17:09
AM</td><td>&nbsp;</td><td>MP.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27869</td><td>GEM CAVE EXP.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Public address system is not installed
</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed Samir</td><td>3/12/2022
11:51:59 AM</td><td> </td><td>11/13/2022 9:15:43
AM</td><td>&nbsp;</td><td>MP.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27883</td><td>GEM CAVE EXP.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control not installed </td><td>High</td><td>3/19/2022
12:00:00 AM</td><td>Mohamed Samir</td><td>3/12/2022 11:52:21 AM</td><td>
</td><td>11/13/2022 9:14:31
AM</td><td>&nbsp;</td><td>MP.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32179</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:13 AM</td><td>
</td><td>11/13/2022 8:46:53
AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32415</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover tray and earth jumper
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:54 PM</td><td> </td><td>11/13/2022 8:46:03
AM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32181</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete works
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:48:16 AM</td><td> </td><td>11/13/2022 8:02:20
AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32562</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:33:43 AM</td><td> </td><td>11/13/2022 8:02:11
AM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32175</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth jumper </td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:08 AM</td><td>
</td><td>11/13/2022 8:00:35
AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>16483</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Inspection after remove the protection tape
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:47 AM</td><td> </td><td>11/10/2022 11:42:01 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21571</td><td>CORE B3</td><td>MU
BA</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Inspection after removing protection
cover </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 9:52:23 AM</td><td> </td><td>11/10/2022 11:41:58
AM</td><td>Done </td><td>MC.12.0B.B31</td><td>&nbsp;</td>
</tr><tr>
<td>29814</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to
repaint.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:22 PM</td><td> </td><td>11/10/2022 11:41:56
AM</td><td>Done </td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29815</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged door
leaf.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:26 PM</td><td> </td><td>11/10/2022 11:41:54
AM</td><td>Done </td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29910</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs repair and touch up painting
</td><td>Low</td><td>6/16/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/26/2022
10:58:01 AM</td><td> </td><td>11/10/2022 11:41:52
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>27682</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 3:35:42 PM</td><td> </td><td>11/10/2022 11:41:16
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>28195</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail Welding connection should be
adjusted.</td><td>Low</td><td>4/7/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/17/2022 11:29:23 AM</td><td> </td><td>11/10/2022 11:41:15
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>29665</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to touch up
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
12:05:30 PM</td><td> </td><td>11/10/2022 11:41:13
AM</td><td>&nbsp;</td><td>MS.19.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29770</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged door leaf and frame should be repaired
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:14:33 PM</td><td> </td><td>11/10/2022 11:41:12
AM</td><td>&nbsp;</td><td>MS.19.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29772</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door should be repainted </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:14:36 PM</td><td> </td><td>11/10/2022
11:41:11 AM</td><td>&nbsp;</td><td>MS.19.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29780</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be
repaired</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:14:47 PM</td><td> </td><td>11/10/2022 11:41:10
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29782</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged door leaf and frame should be repaired
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:15:00 PM</td><td> </td><td>11/10/2022 11:41:08
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29784</td><td>STAFF W.C./F</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged door leaf should be repaired
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:15:16 PM</td><td> </td><td>11/10/2022 11:41:07
AM</td><td>&nbsp;</td><td>MW.19.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>29789</td><td>STAFF W.C./F</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs touch up painting </td><td>Low</td><td>6/15/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022 3:15:33 PM</td><td>
</td><td>11/10/2022 11:41:06
AM</td><td>&nbsp;</td><td>MW.19.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>29794</td><td>STAFF W.C./F</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs repair and touch up painting
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
3:15:38 PM</td><td> </td><td>11/10/2022 11:41:04
AM</td><td>&nbsp;</td><td>MW.19.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>29796</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
needs repair and touch up painting </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:15:43 PM</td><td> </td><td>11/10/2022
11:41:03 AM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>29802</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door should be repainted </td><td>Low</td><td>6/15/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/25/2022 3:15:53 PM</td><td> </td><td>11/10/2022
11:41:02 AM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>29803</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to
repaint.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:15:55 PM</td><td> </td><td>11/10/2022 11:41:00
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29806</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Defective painting need to
repair.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:02 PM</td><td> </td><td>11/10/2022 11:40:59
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29808</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective Painting door and frame should be
repaired</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:07 PM</td><td> </td><td>11/10/2022 11:40:57
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29810</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged door and frame should be repaired and adjusted
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:16:12 PM</td><td> </td><td>11/10/2022 11:40:56
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29816</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting for marked parts should be repaired and
adjusted</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:27 PM</td><td> </td><td>11/10/2022 11:40:55
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29819</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to
repaint.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:32 PM</td><td> </td><td>11/10/2022 11:40:53
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29820</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged door leaf should be repaired and adjusted
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:16:34 PM</td><td> </td><td>11/10/2022 11:40:52
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>29821</td><td>STAFF W.C./F</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to repair and touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:34 PM</td><td> </td><td>11/10/2022 11:40:50
AM</td><td>&nbsp;</td><td>MW.19.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>29822</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;General
cleaning is needed and touch up painting for door </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022 3:16:37 PM</td><td>
</td><td>11/10/2022 11:40:49 AM</td><td>&nbsp;</td><td>MC.25.2A.G11
</td><td>&nbsp;</td>
</tr><tr>
<td>29824</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Frame
door is not leveled with stone and should be adjusted
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:16:41 PM</td><td> </td><td>11/10/2022 11:40:48
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>29827</td><td>STAFF W.C./F</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged door leaf and
frame.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:48 PM</td><td> </td><td>11/10/2022 11:40:47
AM</td><td>&nbsp;</td><td>MW.19.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>29829</td><td>STAFF W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged door
leaf.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:54 PM</td><td> </td><td>11/10/2022 11:40:46
AM</td><td>&nbsp;</td><td>MW.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29830</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damaged door leaf.</td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:16:56 PM</td><td> </td><td>11/10/2022
11:40:45 AM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>29833</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy door
leaf.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:17:01 PM</td><td> </td><td>11/10/2022 11:40:43
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29834</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company, Ltd.</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door frame and leaf should be
leveled.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:17:03 PM</td><td> </td><td>11/10/2022 11:40:42
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29840</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy door
leaf.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:17:12 PM</td><td> </td><td>11/10/2022 11:40:41
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>29841</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Defective painting need to repair.</td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022 3:17:14 PM</td><td>
</td><td>11/10/2022 11:40:39 AM</td><td>&nbsp;</td><td>MC.25.2A.G11
</td><td>&nbsp;</td>
</tr><tr>
<td>29842</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damaged door leaf.</td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:17:16 PM</td><td> </td><td>11/10/2022
11:40:38 AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>29847</td><td>STAFF W.C./F</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs touch up painting </td><td>Low</td><td>6/15/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022 3:17:26 PM</td><td>
</td><td>11/10/2022 11:40:37
AM</td><td>&nbsp;</td><td>MW.19.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>29851</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged door
leaf.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:20:07 PM</td><td> </td><td>11/10/2022 11:40:36
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>29854</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged door
leaf.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:20:15 PM</td><td> </td><td>11/10/2022 11:40:34
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>29867</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defect need to adjusted from both sides
</td><td>Low</td><td>6/1/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
4:22:31 PM</td><td> </td><td>11/10/2022 11:40:33
AM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>29869</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted for both sides
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
4:22:34 PM</td><td> </td><td>11/10/2022 11:40:31
AM</td><td>&nbsp;</td><td>MS.19.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29924</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Door leaf should be close well.</td><td>Low</td><td>6/16/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/26/2022 10:58:41 AM</td><td>
</td><td>11/10/2022 11:40:29
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>29925</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damaged door leaf.</td><td>Low</td><td>6/16/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/26/2022 10:58:42 AM</td><td> </td><td>11/10/2022
11:40:27 AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>34184</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete floor need to repair and painting
dust sealer</td><td>Low</td><td>11/6/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:13:30 AM</td><td>
</td><td>11/10/2022 11:01:42
AM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>34159</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail needs touch up painting
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:09:59 AM</td><td> </td><td>11/10/2022 11:01:17
AM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29945</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing accessories door leaf.</td><td>Low</td><td>6/16/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/26/2022 10:59:07 AM</td><td>
</td><td>11/10/2022 11:00:43
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29932</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/26/2022 10:58:48 AM</td><td> </td><td>11/10/2022 11:00:10
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>34991</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing hardware accessories.</td><td>Low</td><td>11/20/2022
12:00:00 AM</td><td>Mohamed.Halim</td><td>10/30/2022 10:08:09 AM</td><td>
</td><td>11/10/2022 10:58:39
AM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34989</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need repair and touch
up.</td><td>Low</td><td>11/20/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/30/2022 10:08:02 AM</td><td>
</td><td>11/10/2022 10:58:12
AM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34346</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Paint Stains</td><td>&#39;Handrail need to touch up painting
</td><td>Low</td><td>11/9/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/19/2022
10:24:29 AM</td><td> </td><td>11/10/2022 10:57:31
AM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34197</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete floor need to repair and painting
dust sealer</td><td>Low</td><td>10/23/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:13:53 AM</td><td>
</td><td>11/10/2022 10:56:12
AM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34176</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Paint finish</td><td>&#39;Handrail painting need to touch up
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:13:14 AM</td><td> </td><td>11/10/2022 10:55:33
AM</td><td>&nbsp;</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34173</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Scratches</td><td>&#39;Steel ladder should be welded properly
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:13:08 AM</td><td> </td><td>11/10/2022 10:54:57
AM</td><td>&nbsp;</td><td>MS.18.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34167</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair is needed and touch up painting
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:10:11 AM</td><td> </td><td>11/10/2022 10:54:10
AM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34161</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor need cleaning and repair
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:10:02 AM</td><td> </td><td>11/10/2022 10:53:21
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34146</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail needs touch up painting
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:09:40 AM</td><td> </td><td>11/10/2022 10:52:29
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>33964</td><td>CORRIDOR</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Acoustic
Walling</td><td>General Snag</td><td>&#39;Cleaning.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:13:40 PM</td><td> </td><td>11/10/2022 10:51:46
AM</td><td>&nbsp;</td><td>MS.18.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>10870</td><td>TUT- Digital (+49.50)</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Missing panels/ joints not aligned/
</td><td>Low</td><td>10/5/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/14/2020 3:43:57 PM</td><td>
</td><td>11/10/2022 10:29:58 AM</td><td>IWS-01 type was Installed with minor
comments</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>15818</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Feature
Cladding</td><td>Not to spec</td><td>&#39;Metal floor not following the approved
drawing - re do as the drawing. Amount and finish of the sealant not acceptable -
not shown on the approved drawings</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 9:56:46 AM</td><td> </td><td>11/10/2022
10:23:24 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>34958</td><td>SECURITY ROOM</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing fire extinguishers. </td><td>High</td><td>11/3/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/27/2022 11:32:51 AM</td><td>
</td><td>11/10/2022 8:51:03
AM</td><td>&nbsp;</td><td>MB.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>21756</td><td>RECEIVING AREA</td><td>MU
L10</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Travellator</
td><td>General Snag</td><td>&#39;Incomplete work </td><td>High</td><td>8/26/2021
12:00:00 AM</td><td>ahmedsalem</td><td>8/19/2021 11:47:21 AM</td><td>
</td><td>11/10/2022 8:50:24
AM</td><td>&nbsp;</td><td>MS.14.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>30803</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Incomplete works for elevator.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:33 PM</td><td> </td><td>11/10/2022 8:50:15
AM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>34584</td><td>Temple Garden-Band C</td><td>Temple
Garden</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked gap should be closed </td><td>Low</td><td>11/13/2022
12:00:00 AM</td><td>mohamed.sami</td><td>10/23/2022 2:22:41 PM</td><td>
</td><td>11/10/2022 8:39:47 AM</td><td>&nbsp;</td><td>Band C</td><td>&nbsp;</td>
</tr><tr>
<td>32525</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV QC
MEP</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct cleaning </td><td>High</td><td>7/25/2022 12:00:00
PM</td><td>Sherif Boshra Ghaly</td><td>7/18/2022 11:29:35 AM</td><td>
</td><td>11/9/2022 4:12:33
PM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34575</td><td>Temple Garden-Band B</td><td>Temple
Garden</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing metal copping </td><td>Low</td><td>11/13/2022 12:00:00
AM</td><td>mohamed.sami</td><td>10/23/2022 2:22:27 PM</td><td> </td><td>11/9/2022
2:28:46 PM</td><td>&nbsp;</td><td>Band B</td><td>&nbsp;</td>
</tr><tr>
<td>32849</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Track light not installed
</td><td>High</td><td>9/18/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>9/11/2022 1:14:59 PM</td><td> </td><td>11/9/2022 2:25:04
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34556</td><td>Temple Garden-Band A</td><td>Temple
Garden</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked tiles should be seated properly
</td><td>Low</td><td>10/30/2022 12:00:00 AM</td><td>mohamed.sami</td><td>10/23/2022
1:07:57 PM</td><td> </td><td>11/9/2022 2:16:50 PM</td><td>&nbsp;</td><td>Band
A</td><td>&nbsp;</td>
</tr><tr>
<td>21616</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Painting works are not finished </td><td>Low</td><td>9/9/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021 11:23:55 AM</td><td>
</td><td>11/9/2022 11:17:17
AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21615</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail is not aligned and should
be adjusted </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:23:53 AM</td><td> </td><td>11/9/2022 11:16:00
AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>11023</td><td>TUT- CORRIDOR</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>WIRING
ACCESSORIES</td><td>General Snag</td><td>&#39;No faceplate labeling and access
control cables are not terminated </td><td>High</td><td>9/22/2020 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>9/15/2020 4:12:16 PM</td><td>
</td><td>11/9/2022 11:15:55
AM</td><td>&nbsp;</td><td>MS.23.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>11050</td><td>TUT- ELEC.</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>WIRING
ACCESSORIES</td><td>General Snag</td><td>&#39;No permanent labeling for Secure data
outlets </td><td>High</td><td>9/22/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/15/2020 4:14:18 PM</td><td> </td><td>11/9/2022 11:14:51
AM</td><td>&nbsp;</td><td>MS.18.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>21614</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joints should be adjusted and
repaired </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:23:52 AM</td><td> </td><td>11/9/2022 11:14:24
AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>11033</td><td>TUT- ELECTRICAL HUB</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>WIRING
ACCESSORIES</td><td>General Snag</td><td>&#39;Some of the cables are not pulled and
faceplate labeling also not done</td><td>High</td><td>9/22/2020 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>9/15/2020 4:13:07 PM</td><td>
</td><td>11/9/2022 11:13:15
AM</td><td>&nbsp;</td><td>MS.12.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>21613</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:23:51 AM</td><td> </td><td>11/9/2022 11:12:38
AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>11035</td><td>TUT-CORE B3</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>WIRING
ACCESSORIES</td><td>General Snag</td><td>&#39;Face plates labeling ICT are not
finished </td><td>High</td><td>9/22/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/15/2020 4:13:12 PM</td><td> </td><td>11/9/2022 11:11:14
AM</td><td>&nbsp;</td><td>MC.12.3A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>11040</td><td>TUT- ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>WIRING
ACCESSORIES</td><td>General Snag</td><td>&#39;No faceplate labeling and port
mapping </td><td>High</td><td>9/22/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/15/2020 4:13:33 PM</td><td> </td><td>11/9/2022 11:08:24
AM</td><td>&nbsp;</td><td>MS.13.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>13911</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Electrical</td><td>PANELS AND
DISTRIBUTION BOARDS</td><td>General Snag</td><td>&#39;Missing panels not delivered
yet </td><td>High</td><td>12/9/2020 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>12/2/2020 11:35:36 AM</td><td> </td><td>11/9/2022 9:51:34
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27400</td><td>PLANT</td><td>MU L20</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Electrical</td><td>CABLE LADDER</td><td>Alignment and Level
not followed</td><td>&#39;Termination </td><td>High</td><td>3/14/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:08:44 PM</td><td>
</td><td>11/9/2022 9:51:33
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>27535</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work and panel not delivered yet
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:54 AM</td><td> </td><td>11/9/2022 9:51:32
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27749</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Bad workmanship and NCR should be issued for
electro power contractor </td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:16 PM</td><td> </td><td>11/9/2022 9:51:31
AM</td><td>&nbsp;</td><td>MS.14.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>27752</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work and panel not delivered
yet</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:21 PM</td><td> </td><td>11/9/2022 9:51:30
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>27768</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work and panel not delivered
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:51 PM</td><td> </td><td>11/9/2022 9:51:29
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27772</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work and panel not delivered yet
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:57 PM</td><td> </td><td>11/9/2022 9:51:28
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27774</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rearranging the power cables and
tie</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:23:01 PM</td><td> </td><td>11/9/2022 9:51:27
AM</td><td>&nbsp;</td><td>MS.19.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>34398</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Must install 2 screws and provide aligned
rod and base</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:13:11 PM</td><td> </td><td>11/9/2022
9:51:26 AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34406</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Should be
closed</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:14:05 PM</td><td> </td><td>11/9/2022
9:51:25 AM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34450</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:22 AM</td><td>
</td><td>11/9/2022 9:51:24
AM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34455</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:30 AM</td><td>
</td><td>11/9/2022 9:51:23
AM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34470</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:50 AM</td><td>
</td><td>11/9/2022 9:51:22
AM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34477</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:50:00 AM</td><td>
</td><td>11/9/2022 9:51:21
AM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34677</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:22:12 PM</td><td> </td><td>11/9/2022
9:51:20 AM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>34868</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Manufacturers shop drawing to be attached
for LCP</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:29 PM</td><td> </td><td>11/9/2022
9:51:20 AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34869</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Manufacturers shop drawing to be attached
for LCP</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:30 PM</td><td> </td><td>11/9/2022
9:51:19 AM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34971</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>General Snag</td><td>General Snag</td><td>&#39;Touch up
deformation &amp; slight deformations in metal sheets after
(repair)</td><td>High</td><td>11/3/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/27/2022 11:34:57 AM</td><td>
</td><td>11/9/2022 9:51:18
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34973</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>General Snag</td><td>General Snag</td><td>&#39;Touch up
deformation &amp; slight deformations in metal sheets after
(repair)</td><td>High</td><td>11/3/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/27/2022 11:35:02 AM</td><td>
</td><td>11/9/2022 9:51:17
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34976</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>General Snag</td><td>General Snag</td><td>&#39;Touch up
deformation &amp; slight deformations in metal sheets after
(repair)</td><td>High</td><td>11/3/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/27/2022 11:35:08 AM</td><td>
</td><td>11/9/2022 9:51:16
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>31461</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;INERGEN abort switch was painted.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:05:33 PM</td><td> </td><td>11/9/2022 9:29:58
AM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>34021</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:16:02 PM</td><td>
</td><td>11/9/2022 9:29:06
AM</td><td>&nbsp;</td><td>MW.18.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>34656</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:31:36 PM</td><td>
</td><td>11/9/2022 9:28:22
AM</td><td>&nbsp;</td><td>MS.13.03.009</td><td>&nbsp;</td>
</tr><tr>
<td>34796</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:11:23 PM</td><td>
</td><td>11/9/2022 9:28:10
AM</td><td>&nbsp;</td><td>MW.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34817</td><td>MECH.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning of shaft around air duct.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:11:53 PM</td><td> </td><td>11/9/2022 9:27:55
AM</td><td>&nbsp;</td><td>MP.14.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>31530</td><td>PLANT</td><td>MU L20</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Directional valves not connected.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:21 PM</td><td> </td><td>11/9/2022 9:24:53
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31515</td><td>PLANT</td><td>MU L20</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Directional valves not connected.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:31:10 PM</td><td> </td><td>11/9/2022 9:24:23
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31511</td><td>PLANT</td><td>MU L20</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Directional valves not connected.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:56 PM</td><td> </td><td>11/9/2022 9:22:59
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31520</td><td>PLANT</td><td>MU L20</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Directional valves are not connected.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:31:42 PM</td><td> </td><td>11/9/2022 9:22:13
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30105</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Isolation valves name tags is missing.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:07 AM</td><td> </td><td>11/9/2022 9:20:46
AM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30152</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Valve name tag is
missing. </td><td>High</td><td>6/6/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:59 AM</td><td> </td><td>11/9/2022 9:19:09
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30620</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing valve name tag.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:47 AM</td><td> </td><td>11/9/2022 9:11:01
AM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>29912</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs touch up painting /missing accessories
</td><td>Low</td><td>6/2/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/26/2022
10:58:05 AM</td><td> </td><td>11/8/2022 3:53:01
PM</td><td>&nbsp;</td><td>MS.13.2A.013
</td><td>&nbsp;</td>
</tr><tr>
<td>29913</td><td>CORE E2</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
needs touch up painting /missing accessories </td><td>Low</td><td>6/2/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/26/2022 10:58:08 AM</td><td> </td><td>11/8/2022
3:52:56 PM</td><td>&nbsp;</td><td>MC.13.2A.E21</td><td>&nbsp;</td>
</tr><tr>
<td>29914</td><td>LIFT ESCAPE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs touch up painting </td><td>Low</td><td>6/2/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/26/2022 10:58:10 AM</td><td>
</td><td>11/8/2022 3:52:50
PM</td><td>&nbsp;</td><td>MQ.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29915</td><td>LIFT ESCAPE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs touch up painting /missing accessories
</td><td>Low</td><td>6/2/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/26/2022
10:58:12 AM</td><td> </td><td>11/8/2022 3:52:38
PM</td><td>&nbsp;</td><td>MQ.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>21144</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:50:40 AM</td><td> </td><td>11/8/2022 12:27:34
PM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21210</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:58:05 AM</td><td> </td><td>11/8/2022 12:27:33
PM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21211</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked joints should be adjusted and
repaired </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:58:09 AM</td><td> </td><td>11/8/2022 12:27:32
PM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>27308</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches need to repair
.</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/7/2022
12:06:19 PM</td><td> </td><td>11/8/2022 12:27:31
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29390</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly and balanced </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 5:04:21 PM</td><td> </td><td>11/8/2022
12:27:30 PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29392</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs cleaning and touch up painting
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
5:04:23 PM</td><td> </td><td>11/8/2022 12:27:29
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29393</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs cleaning and touch up painting
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
5:04:24 PM</td><td> </td><td>11/8/2022 12:27:28
PM</td><td>&nbsp;</td><td>MS.13.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29396</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs cleaning and touch up painting
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
5:04:28 PM</td><td> </td><td>11/8/2022 12:27:27
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29397</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs cleaning and touch up painting
</td><td>Low</td><td>6/14/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/24/2022
5:04:29 PM</td><td> </td><td>11/8/2022 12:27:26
PM</td><td>&nbsp;</td><td>MS.18.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>29400</td><td>IT 5</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning and touch up painting for door
</td><td>Low</td><td>6/14/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/24/2022
5:04:32 PM</td><td> </td><td>11/8/2022 12:27:25
PM</td><td>&nbsp;</td><td>MS.18.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>29401</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door should be cleaned and touch up painting is needed
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
5:04:33 PM</td><td> </td><td>11/8/2022 12:27:25
PM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29403</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs cleaning and-touch up
painting</td><td>Low</td><td>6/14/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/24/2022 5:04:35 PM</td><td> </td><td>11/8/2022 12:27:24
PM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29405</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning and touch up painting are needed
</td><td>Low</td><td>6/14/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/24/2022
5:04:38 PM</td><td> </td><td>11/8/2022 12:27:23
PM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29407</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning is needed and touch up painting
</td><td>Low</td><td>6/14/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/24/2022
5:04:40 PM</td><td> </td><td>11/8/2022 12:27:22
PM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29409</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Cleaning
is needed and touch up painting </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 5:04:42 PM</td><td> </td><td>11/8/2022
12:27:21 PM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>29410</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Snagging
for balancing after compilation ICT work </td><td>Low</td><td>5/31/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 5:04:43 PM</td><td> </td><td>11/8/2022
12:27:20 PM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>29411</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Snagging
after compilation ICT work </td><td>Low</td><td>5/31/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/24/2022 5:04:44 PM</td><td> </td><td>11/8/2022 12:27:19
PM</td><td>&nbsp;</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>29412</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Snagging
after compilation ICT work </td><td>Low</td><td>5/31/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/24/2022 5:04:46 PM</td><td> </td><td>11/8/2022 12:27:18
PM</td><td>&nbsp;</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>29413</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door should be cleaned and touch up painting
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
5:04:47 PM</td><td> </td><td>11/8/2022 12:27:17
PM</td><td>&nbsp;</td><td>MS.18.2A.020</td><td>&nbsp;</td>
</tr><tr>
<td>29417</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Marked part to be repaired and touch up painting
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
5:04:53 PM</td><td> </td><td>11/8/2022 12:27:15
PM</td><td>&nbsp;</td><td>MS.18.2A.021</td><td>&nbsp;</td>
</tr><tr>
<td>29437</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Wavy door leaf surface should be adjusted
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
5:05:47 PM</td><td> </td><td>11/8/2022 12:27:14
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29438</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning is needed </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 5:05:48 PM</td><td> </td><td>11/8/2022
12:27:13 PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29440</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs touch up painting </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 5:05:53 PM</td><td>
</td><td>11/8/2022 12:27:12
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29442</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged door should be repaired </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 5:05:56 PM</td><td>
</td><td>11/8/2022 12:27:11
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29668</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to touch up from both
sides</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 12:05:36 PM</td><td> </td><td>11/8/2022 12:27:10
PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>29670</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to touch up from both
sides</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 12:05:39 PM</td><td> </td><td>11/8/2022 12:27:09
PM</td><td>&nbsp;</td><td>MS.19.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>29674</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to touch up from both
sides</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 12:05:45 PM</td><td> </td><td>11/8/2022 12:27:08
PM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29676</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to touch up from both sides
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
12:05:49 PM</td><td> </td><td>11/8/2022 12:27:07
PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29679</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to touch up
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
12:05:53 PM</td><td> </td><td>11/8/2022 12:27:06
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29681</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to touch up from both sides
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
12:05:56 PM</td><td> </td><td>11/8/2022 12:27:05
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29683</td><td>CORE E1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;All
Hardware accessories need to clean from exposed mortar
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
12:05:59 PM</td><td> </td><td>11/8/2022 12:27:05
PM</td><td>&nbsp;</td><td>MC.24.2A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>29684</td><td>CORE E1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defect need to repair and touch up
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
12:06:00 PM</td><td> </td><td>11/8/2022 12:27:04
PM</td><td>&nbsp;</td><td>MC.24.2A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>29685</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches in Door leaf and frame need to repair and touch up
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
12:06:02 PM</td><td> </td><td>11/8/2022 12:27:03
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29735</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:13:10 PM</td><td> </td><td>11/8/2022 12:27:02
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29738</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Hardware accessories need to clean </td><td>Low</td><td>6/1/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022 3:13:15 PM</td><td>
</td><td>11/8/2022 12:27:01
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29740</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:13:21 PM</td><td> </td><td>11/8/2022 12:27:00
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29749</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:13:37 PM</td><td> </td><td>11/8/2022 12:26:59
PM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>29754</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/1/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
3:13:58 PM</td><td> </td><td>11/8/2022 12:26:58
PM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29759</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged in door leaf should be repaired
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:14:09 PM</td><td> </td><td>11/8/2022 12:26:57
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29762</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:14:14 PM</td><td> </td><td>11/8/2022 12:26:56
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29771</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defect need to adjusted from both sides
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:14:34 PM</td><td> </td><td>11/8/2022 12:26:55
PM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>29776</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Painting traces on door should be cleaned
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
3:14:40 PM</td><td> </td><td>11/8/2022 12:26:54
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29777</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:14:41 PM</td><td> </td><td>11/8/2022 12:26:54
PM</td><td>&nbsp;</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29778</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged door leaf should be repaired
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:14:42 PM</td><td> </td><td>11/8/2022 12:26:53
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29783</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to touch up from both sides
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:15:10 PM</td><td> </td><td>11/8/2022 12:26:52
PM</td><td>&nbsp;</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29793</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to touch up
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:15:38 PM</td><td> </td><td>11/8/2022 12:26:51
PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>29859</td><td>ELEC ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;painting defects need to touch up from both sides
</td><td>Low</td><td>6/1/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
4:22:18 PM</td><td> </td><td>11/8/2022 12:26:50
PM</td><td>&nbsp;</td><td>MS.19.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>29861</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;painting defects need to touch up from both sides
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
4:22:22 PM</td><td> </td><td>11/8/2022 12:26:49
PM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>29863</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to touch up from both sides
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
4:22:25 PM</td><td> </td><td>11/8/2022 12:26:47
PM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>34943</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No CIR for installation and termination
</td><td>High</td><td>11/2/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/26/2022
3:46:37 PM</td><td> </td><td>11/8/2022 9:34:56
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>17416</td><td>External South Fence</td><td>South
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Metal cladding</td><td>Not aligned</td><td>&#39;Ground line not aligned
</td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>aymanhaddadin</td><td>4/18/2021
10:40:47 AM</td><td> </td><td>11/7/2022 12:37:37 PM</td><td>&nbsp;</td><td>External
South Fence</td><td>&nbsp;</td>
</tr><tr>
<td>27604</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;Cabling
should be protected by flexible conduit </td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:52:54 PM</td><td>
</td><td>11/7/2022 10:23:07
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27645</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;No
patching for panel</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:54:03 PM</td><td> </td><td>11/7/2022 10:22:58
AM</td><td>&nbsp;</td><td>MS.18.2A.020</td><td>&nbsp;</td>
</tr><tr>
<td>31522</td><td>PLANT</td><td>MU L20</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Directional valves not connected.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:31:56 PM</td><td> </td><td>11/7/2022 8:20:45
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>34928</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;All
Missing electrical covers </td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/26/2022 1:20:47 PM</td><td> </td><td>11/7/2022 8:17:58
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34200</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation need repairs.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:06 PM</td><td> </td><td>11/6/2022 4:49:26
PM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>13149</td><td>FIRE EXIT</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Missing cladding
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:35:24 PM</td><td> </td><td>11/6/2022 1:43:14 PM</td><td>Cladding panels
installed</td><td>MP.14.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>34742</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch
up.</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:34:21 AM</td><td> </td><td>11/6/2022
12:42:21 PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>29767</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:14:24 PM</td><td> </td><td>11/6/2022 12:41:30
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34752</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:34:41 AM</td><td> </td><td>11/6/2022
12:40:10 PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34183</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around cable trunk
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:13:29 AM</td><td> </td><td>11/6/2022 12:39:40
PM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>34182</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant MEP fixtures
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:13:27 AM</td><td> </td><td>11/6/2022 12:39:02
PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34174</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around MEP fixtures
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:13:10 AM</td><td> </td><td>11/6/2022 12:38:22
PM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34151</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant </td><td>Low</td><td>11/6/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:09:47 AM</td><td> </td><td>11/6/2022
12:37:44 PM</td><td>&nbsp;</td><td>MS.13.3A.011</td><td>&nbsp;</td>
</tr><tr>
<td>34144</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing sealant </td><td>Low</td><td>11/6/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:09:37 AM</td><td> </td><td>11/6/2022
12:37:06 PM</td><td>&nbsp;</td><td>MS.18.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29763</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:14:17 PM</td><td> </td><td>11/6/2022 12:36:29
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29760</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need to balance and closed properly </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:14:10 PM</td><td> </td><td>11/6/2022
12:36:02 PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34791</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door accessories </td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:38:23 AM</td><td> </td><td>11/6/2022
12:35:08 PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34775</td><td>PLANT</td><td>MU L35</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories should be installed </td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:37:48 AM</td><td> </td><td>11/6/2022
12:34:41 PM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34743</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:34:22 AM</td><td> </td><td>11/6/2022
12:34:11 PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34352</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing accessories should be installed
</td><td>Low</td><td>11/9/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/19/2022
10:25:37 AM</td><td> </td><td>11/6/2022 12:33:37
PM</td><td>&nbsp;</td><td>MS.19.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34169</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing fire sealant </td><td>Low</td><td>11/6/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:10:14 AM</td><td> </td><td>11/6/2022
12:32:55 PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34160</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked part should be fixed properly
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:10:00 AM</td><td> </td><td>11/6/2022 12:32:17
PM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>34150</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing accessories should be installed
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:09:45 AM</td><td> </td><td>11/6/2022 12:31:44
PM</td><td>&nbsp;</td><td>MS.13.3A.011</td><td>&nbsp;</td>
</tr><tr>
<td>34148</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door should be closed properly </td><td>Low</td><td>11/6/2022
12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:09:43 AM</td><td>
</td><td>11/6/2022 12:31:11
PM</td><td>&nbsp;</td><td>MS.13.3A.011</td><td>&nbsp;</td>
</tr><tr>
<td>34751</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Steel ladder need to touch up
painting.</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:34:37 AM</td><td> </td><td>11/6/2022
12:30:36 PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34192</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Scratches</td><td>&#39;Welding lines should be finished
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:13:44 AM</td><td> </td><td>11/6/2022 12:29:55
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34187</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Opening should be closed
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:13:35 AM</td><td> </td><td>11/6/2022 12:29:09
PM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>34186</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:13:34 AM</td><td> </td><td>11/6/2022 12:28:26
PM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>34185</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked area should be repaired </td><td>Low</td><td>11/6/2022
12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:13:32 AM</td><td>
</td><td>11/6/2022 12:27:42
PM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>34745</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceramic tiles flooring and walls need to
clean.</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:34:27 AM</td><td> </td><td>11/6/2022
12:27:00 PM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34987</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail need to touch up
painting.</td><td>Low</td><td>11/20/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/30/2022 10:07:55 AM</td><td> </td><td>11/6/2022
12:26:22 PM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34765</td><td>SHAFT</td><td>MU L35</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:37:00 AM</td><td> </td><td>11/6/2022
12:25:19 PM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>34762</td><td>SHAFT</td><td>MU L35</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:36:47 AM</td><td> </td><td>11/6/2022
12:24:53 PM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>34735</td><td>ELEC.</td><td>MU L35</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company, Ltd.</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing hardware
accessories.</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:34:01 AM</td><td> </td><td>11/6/2022
12:24:26 PM</td><td>&nbsp;</td><td>MS.14.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34162</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked part should be repaired </td><td>Low</td><td>11/6/2022
12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:10:03 AM</td><td>
</td><td>11/6/2022 12:23:38
PM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34158</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs repair and touch up painting
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:09:57 AM</td><td> </td><td>11/6/2022 12:23:06
PM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>34147</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail should be fixed properly
</td><td>Low</td><td>10/23/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/16/2022 11:09:41 AM</td><td> </td><td>11/6/2022
12:22:17 PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34143</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked parts should be repaired and closed
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:09:35 AM</td><td> </td><td>11/6/2022 12:21:38
PM</td><td>&nbsp;</td><td>MS.18.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34165</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Repair is needed around electrical boxes
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:10:08 AM</td><td> </td><td>11/6/2022 12:21:09
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>21933</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Duct penetration must be as per approved
detail </td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/23/2021 1:35:25 PM</td><td> </td><td>11/6/2022
12:20:14 PM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21214</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Floor needs cleaning and touch up
painting </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 11:00:58 AM</td><td> </td><td>11/6/2022 12:18:43
PM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>34920</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Lighting fixtures to be aligned </td><td>Low</td><td>11/16/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>10/26/2022 1:20:33 PM</td><td>
</td><td>11/6/2022 10:53:16
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34945</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No CIR for insulation </td><td>High</td><td>11/2/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/26/2022 3:46:40 PM</td><td> </td><td>11/6/2022
10:52:51 AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32745</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Archeology table/Missing
jars</td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:17 PM</td><td> </td><td>11/6/2022
10:52:45 AM</td><td>Based on Eng. Ayman&#39;s
approval.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>34949</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Reader not installed </td><td>High</td><td>11/2/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/26/2022 3:46:45 PM</td><td> </td><td>11/6/2022
10:52:18 AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34906</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable to be
protected</td><td>High</td><td>11/1/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/25/2022 11:34:38 AM</td><td> </td><td>11/6/2022
10:51:42 AM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>18420</td><td>External South Fence</td><td>South
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Installation not to specification/drawing</td><td>&#39;Relocate Pole
Encroaching the Road (Two Nos)</td><td>High</td><td>6/13/2021 12:00:00
AM</td><td>Amr Nofal</td><td>6/6/2021 4:15:48 PM</td><td> </td><td>11/3/2022
3:11:55 PM</td><td>Subject to deduction</td><td>External South
Fence</td><td>&nbsp;</td>
</tr><tr>
<td>17418</td><td>External South Fence</td><td>South
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Metal cladding</td><td>Not aligned</td><td>&#39;Non uniform skyline ( top of
fence )</td><td>Low</td><td>5/9/2021 12:00:00
AM</td><td>aymanhaddadin</td><td>4/18/2021 10:40:50 AM</td><td> </td><td>11/3/2022
3:11:46 PM</td><td>&nbsp;</td><td>External South Fence</td><td>&nbsp;</td>
</tr><tr>
<td>17860</td><td>Pyramid Garden</td><td>Pyramid
Garden</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Installation not to specification/drawing</td><td>&#39;Some tree
grills levels need to be adjusted</td><td>High</td><td>5/27/2021 12:00:00
AM</td><td>Amr Nofal</td><td>5/20/2021 9:18:52 AM</td><td> </td><td>11/3/2022
3:11:02 PM</td><td>Subject to deduction</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>12325</td><td>Pyramid Ramp</td><td>Pyramid
Ramp</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloring between stone
tiles</td><td>Low</td><td>11/4/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>10/14/2020 10:45:58 AM</td><td> </td><td>11/3/2022 3:10:33
PM</td><td>Subject to deduction</td><td>Pyramid Ramp</td><td>&nbsp;</td>
</tr><tr>
<td>16443</td><td>OUTDOOR TERRACE_02</td><td>PR
GF</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Stone
Floor</td><td>Difference in colour/shade</td><td>&#39;Discoloring between stone
flooring tiles</td><td>Low</td><td>3/7/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/14/2021 3:50:24 PM</td><td> </td><td>11/3/2022 3:10:03
PM</td><td>Subject to deduction</td><td>SP.00.0G.21</td><td>&nbsp;</td>
</tr><tr>
<td>16447</td><td>OUTDOOR TERRACE_02</td><td>PR
GF</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joints between glazing panels and
stone cladding not aligned need to adjustment </td><td>Low</td><td>3/7/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>2/14/2021 3:50:47 PM</td><td>
</td><td>11/3/2022 3:09:47 PM</td><td>Subject to
deduction</td><td>SP.00.0G.21</td><td>&nbsp;</td>
</tr><tr>
<td>22012</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete
work</td><td>High</td><td>8/30/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/23/2021 3:56:55 PM</td><td> </td><td>11/3/2022
1:43:27 PM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>28451</td><td>CORE E1</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Elevator works not done yet and not inspected by
PMC team. </td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:05:57 PM</td><td> </td><td>11/3/2022 1:41:14
PM</td><td>&nbsp;</td><td>MC.24.2A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>30669</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Elevators works not finished yet.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:53:06 AM</td><td> </td><td>11/3/2022 1:35:27
PM</td><td>&nbsp;</td><td>MQ.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>34859</td><td>CORE D1.2</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Elevators works not finished.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:13:02 PM</td><td> </td><td>11/3/2022 1:33:10
PM</td><td>&nbsp;</td><td>MC.24.03.D12</td><td>&nbsp;</td>
</tr><tr>
<td>31460</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;INERGEN control panel painted.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:05:31 PM</td><td> </td><td>11/3/2022 1:26:23
PM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>10725</td><td>TUT-CORE B2</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Fire collars
missing</td><td>High</td><td>9/21/2020 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>9/14/2020 11:24:01 AM</td><td> </td><td>11/3/2022 1:25:29
PM</td><td>&nbsp;</td><td>MC.18.3A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>24459</td><td>Bay-01 (from level +25.5 to +31.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Coil fins need
adjustment </td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:38 AM</td><td> </td><td>11/3/2022 1:24:48
PM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>11052</td><td>TUT- W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>WIRING
ACCESSORIES</td><td>General Snag</td><td>&#39;All the cables should be installed
within the cable trunks and missing permanent labels for cable trunks.Top cover
should be installed on cable trunks</td><td>High</td><td>9/22/2020 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>9/15/2020 4:14:30 PM</td><td>
</td><td>11/3/2022 9:25:25
AM</td><td>&nbsp;</td><td>MW.23.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27887</td><td>SERVICE ZONE 9</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General</td><td>&#39;Missing access control, cables management not
done</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>3/12/2022 11:52:27 AM</td><td> </td><td>11/3/2022 9:24:13
AM</td><td>&nbsp;</td><td>MS.14.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>21903</td><td>IT ROOM</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Left management system rack is not done
yet</td><td>High</td><td>8/30/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>8/23/2021 10:53:10 AM</td><td> </td><td>11/3/2022 9:22:57
AM</td><td>&nbsp;</td><td>MS.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>26567</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>CABLE BASKET
TRAY</td><td>General Snag</td><td>&#39;IP address should not be mentioned on the
camera.on the other hand,camera numbers and feeding outdoor rack details needs to
be mentioned </td><td>High</td><td>3/3/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/24/2022 3:40:05 PM</td><td> </td><td>11/3/2022 9:22:44
AM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>
<td>34944</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No CIR for installation </td><td>High</td><td>11/2/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/26/2022 3:46:39 PM</td><td> </td><td>11/3/2022
9:11:20 AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32991</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing access control devices</td><td>High</td><td>10/12/2022
12:00:00 AM</td><td>mina.moussa</td><td>10/5/2022 4:07:42 PM</td><td>
</td><td>11/3/2022 9:11:12 AM</td><td>&nbsp;</td><td>Level
+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>32405</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth jumper </td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:29:38 PM</td><td>
</td><td>11/3/2022 9:01:41
AM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32406</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Poor workmanship
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:39 PM</td><td> </td><td>11/3/2022 9:01:09
AM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32408</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:42 PM</td><td> </td><td>11/3/2022 9:00:52
AM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32409</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:44 PM</td><td> </td><td>11/3/2022 9:00:39
AM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32410</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover and
label</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:46 PM</td><td> </td><td>11/3/2022 9:00:27
AM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32412</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete works
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:49 PM</td><td> </td><td>11/3/2022 9:00:03
AM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>4363</td><td>CORRIDOR</td><td>MFPC
L40</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Acoustic
Walling</td><td>General Snag</td><td>&#39;Plaster end accessories not installed
</td><td>High</td><td>6/26/2019 12:00:00 PM</td><td>Marios
Ioannou,</td><td>6/19/2019 11:41:37 AM</td><td> </td><td>11/2/2022 5:07:03
PM</td><td>Subject to deduction</td><td>DS.03.04.17</td><td>&nbsp;</td>
</tr><tr>
<td>4804</td><td>CORRIDOR</td><td>MFPC
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Adjust
levels for mep duct and fire pipe clash with door
leaf</td><td>Low</td><td>8/12/2019 12:00:00 PM</td><td>Marios
Ioannou,</td><td>7/22/2019 4:08:08 PM</td><td> </td><td>11/2/2022 5:06:53
PM</td><td>Subject to deduction</td><td>DS.03.03.84</td><td>&nbsp;</td>
</tr><tr>
<td>4837</td><td>TOILET 23 (FEM.) </td><td>MFPC
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Plastering</td><td>General</
td><td>&#39;Missing end beats around door frame </td><td>Low</td><td>8/14/2019
12:00:00 PM</td><td>Marios Ioannou,</td><td>7/24/2019 4:26:44 PM</td><td>
</td><td>11/2/2022 5:06:41 PM</td><td>Subject to
deduction</td><td>DS.04.03.82</td><td>&nbsp;</td>
</tr><tr>
<td>7042</td><td>ELEV.03</td><td>MFPC
GF</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone flooring not inspected yet - Sealant not
done - Stains - discoloring - broken edge - vain from edge to edge- toothing -
wrong joints thickness </td><td>Low</td><td>1/19/2020 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>12/29/2019 11:39:31 AM</td><td>
</td><td>11/2/2022 5:06:34 PM</td><td>Subject to
deduction</td><td>DS.03.0G.58</td><td>&nbsp;</td>
</tr><tr>
<td>7726</td><td>ROOF</td><td>MFPC
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Missing floor tiles / floor need cleaning /
remove damaged tiles </td><td>Low</td><td>1/23/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>1/2/2020 11:58:57 AM</td><td> </td><td>11/2/2022 5:06:08
PM</td><td>Subject to deduction</td><td>DS.01.02.01</td><td>&nbsp;</td>
</tr><tr>
<td>12497</td><td>CYL. ROOM</td><td>MFPC
GF</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing covers for cable trunk, missing
labels for boxes , missing covers for cable tray </td><td>High</td><td>10/29/2020
12:00:00 AM</td><td>Ahmed.Galal</td><td>10/22/2020 12:05:36 PM</td><td>
</td><td>11/2/2022 5:05:58 PM</td><td>Subject to
deduction</td><td>DS.02.0G.22</td><td>&nbsp;</td>
</tr><tr>
<td>13514</td><td>TOILET</td><td>MFPC
GF</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>Damaged</td><td>&#39;Some damages on ceramic wall
tiles</td><td>Low</td><td>12/6/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/15/2020 11:36:54 AM</td><td> </td><td>11/2/2022 5:05:48
PM</td><td>Subject to deduction</td><td>DS.04.0G.83</td><td>&nbsp;</td>
</tr><tr>
<td>13518</td><td>TOILET</td><td>MFPC
GF</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>Damaged</td><td>&#39;Broken edges for some tiles
</td><td>Low</td><td>12/6/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/15/2020 11:37:03 AM</td><td> </td><td>11/2/2022 5:05:39
PM</td><td>Subject to deduction</td><td>DS.04.0G.85</td><td>&nbsp;</td>
</tr><tr>
<td>16631</td><td>TOILET 01 (MALE)</td><td>MFPC
GF</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>Damaged</td><td>&#39;Damaged four ceramic tiles
</td><td>Low</td><td>3/16/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/23/2021 3:23:53 PM</td><td> </td><td>11/2/2022 5:05:32
PM</td><td>Subject to deduction</td><td>DS.01.0G.02</td><td>&nbsp;</td>
</tr><tr>
<td>16661</td><td>STAIR NO. 04</td><td>MFPC
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Floor</td><td>Level difference</td><td>&#39;Check the level between stone floor and
door frame </td><td>Low</td><td>3/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/3/2021 3:04:45 PM</td><td> </td><td>11/2/2022 5:05:24
PM</td><td>Subject to deduction</td><td>DS.03.03.10</td><td>&nbsp;</td>
</tr><tr>
<td>17940</td><td>ROOF</td><td>MFPC
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>Damaged tile</td><td>&#39;Replace all damaged tiles
</td><td>Low</td><td>6/13/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>5/23/2021 3:33:59 PM</td><td> </td><td>11/2/2022 5:05:10
PM</td><td>Subject to deduction</td><td>DS.03.04.01</td><td>&nbsp;</td>
</tr><tr>
<td>7708</td><td>Roof</td><td>MFPC RO</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Missing threshold </td><td>Low</td><td>1/23/2020 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>1/2/2020 11:57:34 AM</td><td>
</td><td>11/2/2022 5:04:15 PM</td><td>Re-measurable -
QS</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18942</td><td>Main Facade - Part 4</td><td>MFPC
Facades</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Stone
Skirting</td><td>General Snag</td><td>&#39;Missing skirting
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>6/14/2021 3:36:17 PM</td><td> </td><td>11/2/2022 5:03:55
PM</td><td>Re-measurable - QS</td><td>Main Facade - Part 4</td><td>&nbsp;</td>
</tr><tr>
<td>18946</td><td>South Side Facade</td><td>MFPC
Facades</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Stone
Skirting</td><td>General Snag</td><td>&#39;Missing skirting
</td><td>Low</td><td>7/5/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>6/14/2021
3:36:23 PM</td><td> </td><td>11/2/2022 5:03:44 PM</td><td>Re-measurable -
QS</td><td>South Side Facade</td><td>&nbsp;</td>
</tr><tr>
<td>4304</td><td>OFFICE</td><td>MFPC
L40</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Acoustic
Walling</td><td>General Snag</td><td>&#39;Flushing of air grill no properly
installed</td><td>High</td><td>6/25/2019 12:00:00 PM</td><td>Marios
Ioannou,</td><td>6/18/2019 12:39:44 PM</td><td> </td><td>11/2/2022 5:02:27
PM</td><td>Subject to deduction</td><td>DS.03.04.05</td><td>&nbsp;</td>
</tr><tr>

<td>26788</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Drainage System</td><td>General
Snag</td><td>&#39;Slot drain needs adjustment </td><td>High</td><td>3/8/2022
12:00:00 AM</td><td>ahmedsalem</td><td>3/1/2022 4:12:48 PM</td><td>
</td><td>11/2/2022 3:19:45 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26800</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Drainage System</td><td>General
Snag</td><td>&#39;Slot drain need cleaning and adjustment and basin is defective
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>ahmedsalem</td><td>3/1/2022
4:13:12 PM</td><td> </td><td>11/2/2022 3:19:44
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>34828</td><td>CORE F5</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Elevators works not finished yet.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:09 PM</td><td> </td><td>11/2/2022 3:19:43
PM</td><td>&nbsp;</td><td>MC.14.03.F51</td><td>&nbsp;</td>
</tr><tr>
<td>34428</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover tray</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:48:41 AM</td><td>
</td><td>11/2/2022 2:09:30
PM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34429</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rod</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:48:43 AM</td><td>
</td><td>11/2/2022 2:09:29
PM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34430</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover box</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:48:45 AM</td><td>
</td><td>11/2/2022 2:09:28
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34431</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:48:47 AM</td><td>
</td><td>11/2/2022 2:09:28
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34863</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Manufacturers shop drawing to be attached
for LCP</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:21 PM</td><td> </td><td>11/2/2022
2:09:27 PM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34889</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/24/2022 4:19:27 PM</td><td>
</td><td>11/2/2022 2:09:24
PM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34930</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>General Snag</td><td>General Snag</td><td>&#39;Missing led
fixtures </td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/26/2022 1:20:52 PM</td><td> </td><td>11/2/2022 2:09:22
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34964</td><td>LOBBY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>11/3/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/27/2022 11:34:45 AM</td><td>
</td><td>11/2/2022 2:09:21 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>34965</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth bond</td><td>High</td><td>11/3/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/27/2022 11:34:47 AM</td><td>
</td><td>11/2/2022 2:09:19
PM</td><td>&nbsp;</td><td>MS.13.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>34966</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable tag</td><td>High</td><td>11/3/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/27/2022 11:34:49 AM</td><td>
</td><td>11/2/2022 2:09:18
PM</td><td>&nbsp;</td><td>MS.13.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>34967</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag</td><td>High</td><td>11/3/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/27/2022 11:34:51 AM</td><td>
</td><td>11/2/2022 2:09:16
PM</td><td>&nbsp;</td><td>MS.13.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>34968</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Drawing should be attached
</td><td>High</td><td>11/3/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/27/2022 11:34:52 AM</td><td>
</td><td>11/2/2022 2:09:14
PM</td><td>&nbsp;</td><td>MS.13.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>34978</td><td>STORAGE-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>11/3/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/27/2022 11:35:11 AM</td><td>
</td><td>11/2/2022 2:09:13
PM</td><td>&nbsp;</td><td>MS.13.01.008</td><td>&nbsp;</td>
</tr><tr>
<td>32665</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Gaps around all cameras should be covered
</td><td>Low</td><td>8/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>7/26/2022 11:57:44 AM</td><td> </td><td>11/2/2022 1:29:02
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>11132</td><td>Lett-able retail space</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>WIRING
ACCESSORIES</td><td>General Snag</td><td>&#39;Missing cover plates for Draka cables
and these cables needs to be replaced with another type
</td><td>High</td><td>9/29/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/22/2020 11:46:22 AM</td><td> </td><td>11/2/2022 1:27:49
PM</td><td>&nbsp;</td><td>CR.03.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>14785</td><td>Land of Egypt - Level +42.00</td><td>Land of
Egypt</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Remove storage material including all other
stuff, generators, containers..etc.</td><td>Low</td><td>1/19/2021 12:00:00
AM</td><td>aymanhaddadin</td><td>1/13/2021 7:52:29 AM</td><td> </td><td>11/2/2022
11:49:26 AM</td><td>Done </td><td>Land of Egypt - Level +42.00</td><td>&nbsp;</td>
</tr><tr>
<td>20986</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>Scratches in frame</td><td>&#39;Stainless steel metal frame joints not
properly finished </td><td>Low</td><td>9/1/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/11/2021 12:01:25 PM</td><td> </td><td>11/2/2022 11:49:25
AM</td><td>Done </td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>23717</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Interface between wall cladding and stone
flooring should e adjusted </td><td>Low</td><td>11/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>10/11/2021 10:29:33 AM</td><td> </td><td>11/2/2022 11:49:24
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24010</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged interlock need to be replaced
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
3:18:40 PM</td><td> </td><td>11/2/2022 11:49:18 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24012</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Replace cast in site concrete by interlock
blocks </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 3:18:44 PM</td><td> </td><td>11/2/2022 11:49:15
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24718</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39;Ceiling should be cleaned </td><td>Low</td><td>11/24/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>11/3/2021 4:03:30 PM</td><td>
</td><td>11/2/2022 11:49:13 AM</td><td>Done </td><td>Mankauras - Phase
2</td><td>&nbsp;</td>
</tr><tr>

<td>27238</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Cut / open movement joint and sealant
application </td><td>Low</td><td>3/27/2022 12:00:00 PM</td><td>Marios
Ioannou,</td><td>3/6/2022 4:51:05 PM</td><td> </td><td>11/2/2022 11:48:52
AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>28272</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Damaged glazing panel should be replaced
</td><td>Low</td><td>4/13/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/23/2022
2:02:34 PM</td><td> </td><td>11/2/2022 11:48:50 AM</td><td>Done </td><td>Mankauras
- Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>32670</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Construction joints should be made along the
concrete surface to avoid cracks </td><td>Low</td><td>8/22/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>8/1/2022 4:28:26 PM</td><td> </td><td>11/2/2022
11:48:49 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32714</td><td>Solar Boat - Main Elevation</td><td>Main
Elevation</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Touch up painting is needed for marked parts
</td><td>Low</td><td>9/6/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/16/2022
3:59:47 PM</td><td> </td><td>11/2/2022 11:48:45 AM</td><td>Done </td><td>Solar Boat
- Main Elevation</td><td>&nbsp;</td>
</tr><tr>
<td>32715</td><td>Solar Boat - Main Elevation</td><td>Main
Elevation</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Metal plate
(S/S cladding)</td><td>General Snag</td><td>&#39;Stainless steel profile should be
completed </td><td>Low</td><td>9/6/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/16/2022 3:59:49 PM</td><td> </td><td>11/2/2022 11:48:44
AM</td><td>Done </td><td>Solar Boat - Main Elevation</td><td>&nbsp;</td>
</tr><tr>
<td>32716</td><td>Solar Boat - North Elevation</td><td>North
Elevation </td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Cleaning is needed for fa&#231;ade
</td><td>Low</td><td>9/6/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/16/2022
3:59:49 PM</td><td> </td><td>11/2/2022 11:48:43 AM</td><td>Done </td><td>Solar Boat
- North Elevation</td><td>&nbsp;</td>
</tr><tr>
<td>26655</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting control pixel box cat6a cables
terminations, testing, and secure data activations at M11 Hub room need to be
done.</td><td>High</td><td>3/7/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/28/2022 3:42:11 PM</td><td> </td><td>11/2/2022 9:38:31
AM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26654</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting control pixel box cat6a cables
terminations, testing, and secure data activations at MFPC Hub room need to be
done.</td><td>High</td><td>3/7/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/28/2022 3:40:42 PM</td><td> </td><td>11/2/2022 9:38:28
AM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26653</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting control pixel box cat6a cables
terminations, testing, and secure data activations at MFPC Hub room need to be
done.</td><td>High</td><td>3/7/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/28/2022 3:40:19 PM</td><td> </td><td>11/2/2022 9:38:21
AM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26652</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting control pixel box cat6a cables
terminations, testing, and secure data activations need to be
done.</td><td>High</td><td>3/7/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/28/2022 3:39:29 PM</td><td> </td><td>11/2/2022 9:38:17
AM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26651</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting control pixel box cat6a cables
terminations, testing, and secure data activations need to be
done.</td><td>High</td><td>3/7/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/28/2022 3:38:52 PM</td><td> </td><td>11/2/2022 9:38:13
AM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26650</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting control pixel box cat6a cables
terminations,testing and secure data activations needs to be
done.</td><td>High</td><td>3/7/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/28/2022 3:38:04 PM</td><td> </td><td>11/2/2022 9:38:09
AM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26649</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting control pixel box cat6a cables
terminations,testing and secure data activations needs to be
done.</td><td>High</td><td>3/7/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/28/2022 3:37:28 PM</td><td> </td><td>11/2/2022 9:38:05
AM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26648</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting control pixel box cat6a cables
terminations,testing and secure data activations needs to be
done.</td><td>High</td><td>3/7/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/28/2022 3:36:46 PM</td><td> </td><td>11/2/2022 9:38:01
AM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>34164</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ladder needs touch up painting
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:10:06 AM</td><td> </td><td>11/2/2022 9:25:57
AM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34163</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked part needs touch up painting
</td><td>Low</td><td>11/6/2022 12:00:00 AM</td><td>Mohamed.Halim</td><td>10/16/2022
11:10:05 AM</td><td> </td><td>11/2/2022 9:25:13
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>22069</td><td>TUT-CORE B3</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing
labels</td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/23/2021 3:57:52 PM</td><td> </td><td>11/2/2022
8:34:47 AM</td><td>&nbsp;</td><td>MC.12.03.B31</td><td>&nbsp;</td>
</tr><tr>
<td>34957</td><td>SECURITY ROOM</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing labels for MEP trades. </td><td>High</td><td>11/3/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/27/2022 11:32:50 AM</td><td>
</td><td>11/2/2022 8:34:25
AM</td><td>&nbsp;</td><td>MB.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34962</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air outlet need to be cleaned and any tape on it shall be
removed. </td><td>High</td><td>11/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/27/2022 11:32:57 AM</td><td> </td><td>11/2/2022 8:33:37
AM</td><td>&nbsp;</td><td>MS.13.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>34963</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning from inside and outside, house keeping.
</td><td>High</td><td>11/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/27/2022 11:32:59 AM</td><td> </td><td>11/2/2022 8:29:54
AM</td><td>&nbsp;</td><td>MS.13.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>34948</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover missing </td><td>High</td><td>11/2/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/26/2022 3:46:44 PM</td><td> </td><td>11/1/2022
2:28:58 PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32845</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Socket not installed </td><td>High</td><td>9/18/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>9/11/2022 1:14:40 PM</td><td>
</td><td>11/1/2022 1:56:05
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32854</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work trun style </td><td>High</td><td>9/18/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>9/11/2022 1:15:12 PM</td><td>
</td><td>11/1/2022 1:55:03
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32848</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>General Snag</td><td>General Snag</td><td>&#39;Floor box
incomplete </td><td>High</td><td>9/18/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>9/11/2022 1:14:55 PM</td><td> </td><td>11/1/2022 1:53:45
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32479</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Civil</td><td>Boundary
Walls</td><td>Alignment/Plumbness</td><td>&#39;Closing around
duct</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:16 AM</td><td> </td><td>11/1/2022 11:30:13
AM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>27868</td><td>GEM CAVE EXP.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices are not installed
</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed Samir</td><td>3/12/2022
11:51:58 AM</td><td> </td><td>11/1/2022 9:49:34
AM</td><td>&nbsp;</td><td>MP.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>20100</td><td>TEXTILE-Band A</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing cctv WiFi labels, door lock cables shouldn’t be
visible , damaged WiFi </td><td>High</td><td>8/10/2021 12:00:00 PM</td><td>Sameh
Ibrahim El-Sawah</td><td>8/3/2021 11:28:55 AM</td><td> </td><td>11/1/2022 9:48:01
AM</td><td>&nbsp;</td><td>ME.12.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20102</td><td>POTTERY-Band A</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing cctv WiFi labels, door lock cables shouldn’t be visible
</td><td>High</td><td>8/10/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/3/2021 11:28:58 AM</td><td> </td><td>11/1/2022 9:47:38
AM</td><td>&nbsp;</td><td>ME.12.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>26962</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lift management system installation and
intercom service are not installed yet </td><td>High</td><td>3/9/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/2/2022 4:00:30 PM</td><td>
</td><td>11/1/2022 9:44:31
AM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>34772</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete floor need to repair and touch up
</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:37:41 AM</td><td> </td><td>11/1/2022
8:14:00 AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34763</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around MEP fixtures
</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:36:56 AM</td><td> </td><td>11/1/2022
8:13:07 AM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>34739</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Sealant need to
repair.</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:34:10 AM</td><td> </td><td>11/1/2022
8:12:12 AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32857</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>General Snag</td><td>General Snag</td><td>&#39;All faceplate
should be installed and incomplete work of cover box
10*10</td><td>High</td><td>9/18/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>9/11/2022 1:15:25 PM</td><td> </td><td>10/31/2022 1:47:08
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32856</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>General Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>9/18/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>9/11/2022 1:15:20 PM</td><td> </td><td>10/31/2022 1:47:01
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32858</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>General Snag</td><td>General Snag</td><td>&#39;Lighting control
screen should be installed </td><td>High</td><td>9/18/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>9/11/2022 1:15:28 PM</td><td>
</td><td>10/31/2022 1:46:48
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32736</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Reception desk/Marked part to be checked and
submitted composite drawing </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:03 PM</td><td> </td><td>10/31/2022
10:56:59 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>34877</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:55 PM</td><td>
</td><td>10/31/2022 9:42:10
AM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>27892</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Camera label not done , access control not
done</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>3/12/2022 11:52:38 AM</td><td> </td><td>10/31/2022 9:40:05
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27602</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All access control devices are not
terminated</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:52:51 PM</td><td> </td><td>10/31/2022 9:39:40
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27852</td><td>ELEC ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:17 PM</td><td>
</td><td>10/31/2022 9:39:31
AM</td><td>&nbsp;</td><td>MS.19.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>27857</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation and no
data outlet and bus cabling and cover box</td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:24 PM</td><td>
</td><td>10/31/2022 9:39:24
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>34951</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Speakers not installed </td><td>High</td><td>11/2/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/26/2022 3:46:48 PM</td><td> </td><td>10/31/2022
9:39:15 AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>27649</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:54:09 PM</td><td> </td><td>10/31/2022 9:39:03
AM</td><td>&nbsp;</td><td>MS.18.2A.025</td><td>&nbsp;</td>
</tr><tr>
<td>34850</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain pipe need to be cleaned. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:12:47 PM</td><td>
</td><td>10/31/2022 9:38:35
AM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34849</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain pipe need cleaning. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:12:45 PM</td><td>
</td><td>10/31/2022 9:38:10
AM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34618</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Fan coil supports need adjustments.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:08:44 PM</td><td> </td><td>10/31/2022 9:37:45
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34391</td><td>FIRE LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:46 PM</td><td>
</td><td>10/31/2022 9:37:36
AM</td><td>&nbsp;</td><td>MQ.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34488</td><td>CORE E1</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover box</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:50:16 AM</td><td>
</td><td>10/31/2022 9:37:35
AM</td><td>&nbsp;</td><td>MC.24.03.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34657</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Labels</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:21:36 PM</td><td>
</td><td>10/31/2022 9:37:34
AM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34667</td><td>Level +45.00</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:21:53 PM</td><td>
</td><td>10/31/2022 9:37:33 AM</td><td>&nbsp;</td><td>Level
+45.00</td><td>&nbsp;</td>
</tr><tr>
<td>34673</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged flexible
</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:22:03 PM</td><td>
</td><td>10/31/2022 9:37:32 AM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>34674</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Clips</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:22:04 PM</td><td>
</td><td>10/31/2022 9:37:31 AM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>34691</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing screws
</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:22:39 PM</td><td>
</td><td>10/31/2022 9:37:29
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34695</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth bond and
rod</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:22:46 PM</td><td>
</td><td>10/31/2022 9:37:28
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34696</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable systemization
</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:22:48 PM</td><td>
</td><td>10/31/2022 9:37:27
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34697</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damage in flexible
</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:22:50 PM</td><td>
</td><td>10/31/2022 9:37:26
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34698</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable systemization and tie
rap</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:22:51 PM</td><td>
</td><td>10/31/2022 9:37:25
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34592</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipes thermal insulation need repairs.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:07:49 PM</td><td> </td><td>10/31/2022 9:37:25
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34701</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing support and earth bond and cover
tray</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:22:56 PM</td><td>
</td><td>10/31/2022 9:37:25
AM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>34724</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:29:37 PM</td><td>
</td><td>10/31/2022 9:37:24 AM</td><td>&nbsp;</td><td>Level
+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>34864</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Manufacturers shop drawing to be attached
for LCP</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:23 PM</td><td>
</td><td>10/31/2022 9:37:22
AM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34870</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Manufacturers shop drawing to be attached
for LCP</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:31 PM</td><td>
</td><td>10/31/2022 9:37:21
AM</td><td>&nbsp;</td><td>MS.19.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>34871</td><td>CORE E1</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Manufacturers shop drawing to be attached
for LCP</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:33 PM</td><td>
</td><td>10/31/2022 9:37:20
AM</td><td>&nbsp;</td><td>MC.24.03.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34872</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth bond</td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:39 PM</td><td>
</td><td>10/31/2022 9:37:19
AM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>27822</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:36 PM</td><td> </td><td>10/31/2022 9:37:19
AM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34873</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth bond </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:42 PM</td><td>
</td><td>10/31/2022 9:37:19
AM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>34874</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes</td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:45 PM</td><td>
</td><td>10/31/2022 9:37:18
AM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>34876</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:51 PM</td><td>
</td><td>10/31/2022 9:37:17
AM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>34879</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rearrangement
</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:19:01 PM</td><td>
</td><td>10/31/2022 9:37:16
AM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34886</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:19:19 PM</td><td>
</td><td>10/31/2022 9:37:15
AM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34887</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fixation </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/24/2022 4:19:21 PM</td><td>
</td><td>10/31/2022 9:37:14
AM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34888</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fixation </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/24/2022 4:19:25 PM</td><td>
</td><td>10/31/2022 9:37:13
AM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34890</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Manufacturing
drawing</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:19:30 PM</td><td>
</td><td>10/31/2022 9:37:12
AM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>27824</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No installed wifi</td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:34:39 PM</td><td>
</td><td>10/31/2022 9:37:09
AM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27861</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation and no
outlet for door controller </td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:30 PM</td><td>
</td><td>10/31/2022 9:36:55
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>34950</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover missing</td><td>High</td><td>11/2/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/26/2022 3:46:46 PM</td><td> </td><td>10/31/2022
9:36:41 AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32964</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing PA speakers and cctv
camera</td><td>High</td><td>10/12/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/5/2022 4:06:57 PM</td><td> </td><td>10/31/2022
9:36:39 AM</td><td>&nbsp;</td><td>MS.19.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>34954</td><td>SECURITY ROOM</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipes thermal insulation need repairs.
</td><td>High</td><td>11/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/27/2022 11:32:46 AM</td><td> </td><td>10/31/2022 9:34:48
AM</td><td>&nbsp;</td><td>MB.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>31998</td><td>CORE F2</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Tape should be removed </td><td>Low</td><td>7/26/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>7/5/2022 12:14:13 PM</td><td> </td><td>10/31/2022
9:30:38 AM</td><td>&nbsp;</td><td>MC.19.03.F21</td><td>&nbsp;</td>
</tr><tr>
<td>31997</td><td>CORE F2</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing around metal door
</td><td>Low</td><td>7/26/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>7/5/2022
12:14:12 PM</td><td> </td><td>10/31/2022 9:30:09
AM</td><td>&nbsp;</td><td>MC.19.03.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29795</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Frame angle need to
close.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:15:40 PM</td><td> </td><td>10/31/2022 9:29:38
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>27924</td><td>STAFF W.C./F</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to
cleaning.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:33 AM</td><td> </td><td>10/31/2022 9:28:51
AM</td><td>&nbsp;</td><td>MW.19.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>21610</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing around metal door
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
11:23:46 AM</td><td> </td><td>10/31/2022 9:28:22
AM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21225</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Floor finishes are not finished
yet</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
11:01:26 AM</td><td> </td><td>10/31/2022 9:27:55
AM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>21223</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy is missing
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
11:01:20 AM</td><td> </td><td>10/31/2022 9:27:17
AM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>30871</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:51 AM</td><td> </td><td>10/31/2022 9:26:36
AM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28090</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/15/2022
12:08:20 PM</td><td> </td><td>10/31/2022 9:26:09
AM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28088</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wavy concrete wall should be aligned
</td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/15/2022
12:08:16 PM</td><td> </td><td>10/31/2022 9:25:29
AM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28200</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to
cleaning.</td><td>Low</td><td>4/7/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/17/2022 11:29:34 AM</td><td> </td><td>10/31/2022 9:24:37
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>27711</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing fire sealant around electrical trunks
</td><td>Low</td><td>3/31/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2022
11:07:37 AM</td><td> </td><td>10/31/2022 9:23:49
AM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>21215</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Marked part is not finished
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
11:00:59 AM</td><td> </td><td>10/31/2022 9:22:31
AM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>34764</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Missing block should be installed </td><td>Low</td><td>11/14/2022
12:00:00 AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:36:58 AM</td><td>
</td><td>10/31/2022 9:21:53
AM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>27714</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Raised
Floor</td><td>Cleaning</td><td>&#39;Flooring tiles need to cleaning
</td><td>Low</td><td>3/31/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2022
11:07:42 AM</td><td> </td><td>10/31/2022 9:21:20
AM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27713</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Raised Floor</td><td>General
Snag</td><td>&#39;Missing raised floor tiles should be installed and adjusted
</td><td>Low</td><td>3/31/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2022
11:07:41 AM</td><td> </td><td>10/31/2022 9:20:54
AM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27708</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Raised Floor</td><td>General
Snag</td><td>&#39;Missing raised floor tiles </td><td>Low</td><td>3/31/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2022 11:07:31 AM</td><td>
</td><td>10/31/2022 9:19:59
AM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>21149</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need adjusted
and finish </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 10:50:49 AM</td><td> </td><td>10/31/2022 9:19:18
AM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>10702</td><td>TUT-CORE B3</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Fire stopping
</td><td>High</td><td>9/21/2020 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>9/14/2020 11:22:48 AM</td><td> </td><td>10/31/2022 9:18:17
AM</td><td>&nbsp;</td><td>MC.12.3A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21929</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Pipes penetration must be as per approved
detail </td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/23/2021 1:35:18 PM</td><td> </td><td>10/31/2022
9:17:37 AM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21152</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting not finished
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
10:50:58 AM</td><td> </td><td>10/31/2022 9:16:31
AM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>34938</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Carpet
Floor</td><td>General Snag</td><td>&#39;Short carpet should be extended
</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>10/26/2022
1:21:05 PM</td><td> </td><td>10/31/2022 9:15:40
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34935</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Wall -
Timber paneling</td><td>General</td><td>&#39;Missing skirting
</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>10/26/2022
1:21:01 PM</td><td> </td><td>10/31/2022 9:14:54
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34934</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;General cleaning is needed
</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>10/26/2022
1:20:59 PM</td><td> </td><td>10/31/2022 9:14:14
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34929</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Missing skirting
</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>10/26/2022
1:20:49 PM</td><td> </td><td>10/31/2022 9:06:25
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34918</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked parts need touch up painting
</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>10/26/2022
1:20:30 PM</td><td> </td><td>10/31/2022 9:05:47
AM</td><td>&nbsp;</td><td>MS.13.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>34915</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Touch up painting for marked part </td><td>Low</td><td>11/16/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>10/26/2022 1:20:26 PM</td><td>
</td><td>10/31/2022 9:05:00
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34788</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to repair
and touch up </td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:38:16 AM</td><td>
</td><td>10/31/2022 9:03:47
AM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34784</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Patches/Touch up</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:38:08 AM</td><td>
</td><td>10/31/2022 9:03:11
AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34783</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete floor need to repair and touch up
</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:38:06 AM</td><td>
</td><td>10/31/2022 9:02:40
AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34773</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Remove storage material
</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:37:43 AM</td><td>
</td><td>10/31/2022 9:02:01
AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34771</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:37:35 AM</td><td>
</td><td>10/31/2022 9:01:28
AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34759</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:34:56 AM</td><td>
</td><td>10/31/2022 9:00:45
AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34754</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceramic flooring and walls need to
clean.</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:34:46 AM</td><td>
</td><td>10/31/2022 8:59:44
AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34748</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceramic tiles flooring and walls need to
clean.</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:34:32 AM</td><td>
</td><td>10/31/2022 8:59:17
AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34744</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire sealant
</td><td>Low</td><td>11/14/2022 12:00:00
AM</td><td>Mohamed.Halim</td><td>10/24/2022 10:34:25 AM</td><td>
</td><td>10/31/2022 8:58:44
AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34919</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling - Ceiling access
panel</td><td>General</td><td>&#39;Access door to be adjusted /seated properly
</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>10/26/2022
1:20:32 PM</td><td> </td><td>10/31/2022 8:57:58
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>34917</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Handle
to be cleaned </td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/26/2022 1:20:28 PM</td><td> </td><td>10/31/2022 8:57:12
AM</td><td>&nbsp;</td><td>MS.13.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>34916</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Handle
to be seated properly </td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/26/2022 1:20:27 PM</td><td> </td><td>10/31/2022 8:56:33
AM</td><td>&nbsp;</td><td>MS.13.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>34922</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling - Ceiling access
panel</td><td>General</td><td>&#39;Access door to be adjusted
</td><td>Low</td><td>11/16/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>10/26/2022
1:20:37 PM</td><td> </td><td>10/31/2022 8:55:23
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32002</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy flooring should be cleaned and
repainted </td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 12:14:20 PM</td><td> </td><td>10/31/2022 8:54:14
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>28089</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to cleaning
and touch up </td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/15/2022 12:08:18 PM</td><td> </td><td>10/31/2022 8:53:31
AM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28072</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked joints should be aligned and
uniform </td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/15/2022 12:07:39 PM</td><td> </td><td>10/31/2022 8:52:17
AM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29901</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;All
hardware accessories need to clean </td><td>Low</td><td>6/16/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/26/2022 10:18:37 AM</td><td> </td><td>10/31/2022
8:51:29 AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>29899</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;All
hardware accessories need to clean </td><td>Low</td><td>6/2/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/26/2022 10:18:35 AM</td><td> </td><td>10/31/2022
8:50:55 AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>33974</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation need repairs.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:14:05 PM</td><td> </td><td>10/30/2022 3:16:50
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34260</td><td>CORE E1</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Lift works not completed yet.
</td><td>High</td><td>10/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/17/2022 4:25:04 PM</td><td> </td><td>10/30/2022 3:16:38
PM</td><td>&nbsp;</td><td>MC.24.03.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34273</td><td>CORE E2</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Elevator works not completed yet.
</td><td>High</td><td>10/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/17/2022 4:25:25 PM</td><td> </td><td>10/30/2022 3:16:37
PM</td><td>&nbsp;</td><td>MC.13.03.E21</td><td>&nbsp;</td>
</tr><tr>
<td>34795</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;PPR pipe need to be aligned. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:11:22 PM</td><td>
</td><td>10/30/2022 3:16:36
PM</td><td>&nbsp;</td><td>MW.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34801</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air outlet color need to be checked.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:11:31 PM</td><td> </td><td>10/30/2022 3:16:35
PM</td><td>&nbsp;</td><td>MW.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34807</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct cladding works not finished yet.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:11:39 PM</td><td> </td><td>10/30/2022 3:16:34
PM</td><td>&nbsp;</td><td>MS.19.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>34833</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Dismantled pipe hanger. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:12:17 PM</td><td>
</td><td>10/30/2022 3:16:33
PM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34959</td><td>SECURITY ROOM</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;INERGEN pipe need paintings touchup.
</td><td>High</td><td>11/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/27/2022 11:32:53 AM</td><td> </td><td>10/30/2022 3:16:32
PM</td><td>&nbsp;</td><td>MB.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34961</td><td>SECURITY ROOM</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air diffusers need cleaning and tape shall be removed.
</td><td>High</td><td>11/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/27/2022 11:32:56 AM</td><td> </td><td>10/30/2022 3:16:30
PM</td><td>&nbsp;</td><td>MB.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>32331</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Ladder needs touch up painting
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:06:24 PM</td><td> </td><td>10/30/2022 10:59:30 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.13.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32326</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Bolts should be removed/ then all holes should be repaired
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:06:16 PM</td><td> </td><td>10/30/2022 10:59:21 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32325</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Floor should be repaired and
repainted </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 4:06:15 PM</td><td> </td><td>10/30/2022
10:59:13 AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32342</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:14:54 PM</td><td> </td><td>10/30/2022 10:59:02
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32345</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:00 PM</td><td> </td><td>10/30/2022 10:58:54
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32301</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Stair should be repaired and repainted
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:05:45 PM</td><td> </td><td>10/30/2022 10:57:59 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32302</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant is missing </td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>sally.george</td><td>7/17/2022 4:05:47 PM</td><td>
</td><td>10/30/2022 10:57:59 AM</td><td>This Snag can be closed on that PMC
snagging was done</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32303</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;All joints should be finished
properly </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 4:05:48 PM</td><td> </td><td>10/30/2022
10:57:59 AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32304</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor should be repaired and repainted
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:05:49 PM</td><td> </td><td>10/30/2022 10:57:59 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.19.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32305</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls should be repaired and repainted
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:05:51 PM</td><td> </td><td>10/30/2022 10:57:59 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.19.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32306</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Opening should be closed
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:05:53 PM</td><td> </td><td>10/30/2022 10:57:59 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.19.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32308</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door should be repaired and repainted from both sides
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:05:55 PM</td><td> </td><td>10/30/2022 10:57:59 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32309</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant is missing </td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>sally.george</td><td>7/17/2022 4:05:56 PM</td><td>
</td><td>10/30/2022 10:57:59 AM</td><td>This Snag can be closed on that PMC
snagging was done</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32310</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant is missing </td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>sally.george</td><td>7/17/2022 4:05:57 PM</td><td>
</td><td>10/30/2022 10:57:59 AM</td><td>This Snag can be closed on that PMC
snagging was done</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32311</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;All
walls should be repaired and repainted </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 4:05:58 PM</td><td> </td><td>10/30/2022
10:57:59 AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32312</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor should be repaired and repainted
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:05:59 PM</td><td> </td><td>10/30/2022 10:57:59 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32313</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked openings should be closed </td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>sally.george</td><td>7/17/2022 4:06:00 PM</td><td>
</td><td>10/30/2022 10:57:59 AM</td><td>This Snag can be closed on that PMC
snagging was done</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32314</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Damaged bases should be repaired and finished
properly </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 4:06:02 PM</td><td> </td><td>10/30/2022
10:57:59 AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32315</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Walls should be repaired and touch up
painting</td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 4:06:03 PM</td><td> </td><td>10/30/2022
10:57:59 AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32316</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Opening should be closed from both sides
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:06:04 PM</td><td> </td><td>10/30/2022 10:57:59 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32317</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Fire sealant is missing
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:06:05 PM</td><td> </td><td>10/30/2022 10:57:58 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32340</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:14:47 PM</td><td> </td><td>10/30/2022 10:57:58
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32341</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:14:52 PM</td><td> </td><td>10/30/2022 10:57:58
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32343</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing hardware accessories.</td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>Moussa Nageh Khella</td><td>7/17/2022 4:14:56 PM</td><td>
</td><td>10/30/2022 10:57:58 AM</td><td>This Snag can be closed on that PMC
snagging was done</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32344</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:14:59 PM</td><td> </td><td>10/30/2022 10:57:58
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32346</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Opening should be
closed.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:01 PM</td><td> </td><td>10/30/2022 10:57:58
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32867</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work for call point
device</td><td>High</td><td>10/11/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/4/2022 4:14:42 PM</td><td> </td><td>10/30/2022
9:27:27 AM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>27596</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;WiFi labeling </td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:52:42 PM</td><td>
</td><td>10/30/2022 9:26:20
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34895</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable to be protected
</td><td>High</td><td>11/1/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/25/2022
11:34:20 AM</td><td> </td><td>10/30/2022 9:25:56
AM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34907</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing access control device</td><td>High</td><td>11/1/2022
12:00:00 AM</td><td>mina.moussa</td><td>10/25/2022 11:34:39 AM</td><td>
</td><td>10/30/2022 9:25:34
AM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>34911</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>11/1/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/25/2022 11:34:46 AM</td><td> </td><td>10/30/2022
9:25:16 AM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>34253</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct access need adjustments. </td><td>High</td><td>10/23/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:14:29 PM</td><td>
</td><td>10/30/2022 9:01:33
AM</td><td>&nbsp;</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34339</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Metal wires fixing the NRD shall be removed.
</td><td>High</td><td>10/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/18/2022 4:06:44 PM</td><td> </td><td>10/30/2022 8:57:35
AM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34643</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Ducts thermal insulation need repairs.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:30:07 PM</td><td> </td><td>10/30/2022 8:50:04
AM</td><td>&nbsp;</td><td>MS.13.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>34956</td><td>SECURITY ROOM</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;INERGEN nozzle need cleaning and adjustments.
</td><td>High</td><td>11/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/27/2022 11:32:49 AM</td><td> </td><td>10/30/2022 8:47:10
AM</td><td>&nbsp;</td><td>MB.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34960</td><td>SECURITY ROOM</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;INERGEN nozzle need cleaning and adjustment.
</td><td>High</td><td>11/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/27/2022 11:32:54 AM</td><td> </td><td>10/30/2022 8:46:53
AM</td><td>&nbsp;</td><td>MB.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34020</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;HDPE pipes cleaning. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:16:01 PM</td><td>
</td><td>10/30/2022 8:33:40
AM</td><td>&nbsp;</td><td>MW.18.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>32853</td><td>LOBBY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cables should be protected
</td><td>High</td><td>9/18/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>9/11/2022 1:15:07 PM</td><td> </td><td>10/30/2022 7:50:04
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32850</td><td>LOBBY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be protected
</td><td>High</td><td>9/18/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>9/11/2022 1:15:01 PM</td><td> </td><td>10/30/2022 7:50:01
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32580</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flexible to be installed properly
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:34:29 AM</td><td> </td><td>10/29/2022 10:49:14
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28328</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Elevators works not complete.
</td><td>High</td><td>4/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:50:10 AM</td><td> </td><td>10/27/2022 2:24:47
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34358</td><td>ELECTRICAL ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:11:22 PM</td><td>
</td><td>10/27/2022 2:21:15
PM</td><td>&nbsp;</td><td>MS.13.3A.014</td><td>&nbsp;</td>
</tr><tr>
<td>34359</td><td>ELECTRICAL ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:11:24 PM</td><td>
</td><td>10/27/2022 2:21:13
PM</td><td>&nbsp;</td><td>MS.13.3A.014</td><td>&nbsp;</td>
</tr><tr>
<td>34364</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover should be installed properly
</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:11:37 PM</td><td>
</td><td>10/27/2022 2:21:12
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34365</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:11:40 PM</td><td>
</td><td>10/27/2022 2:21:11
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34373</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover trunk</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:04 PM</td><td>
</td><td>10/27/2022 2:21:10
PM</td><td>&nbsp;</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34377</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:15 PM</td><td>
</td><td>10/27/2022 2:21:09
PM</td><td>&nbsp;</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34384</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Earth bond and cover tray</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:30 PM</td><td>
</td><td>10/27/2022 2:21:08
PM</td><td>&nbsp;</td><td>MS.19.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>34432</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Conduit should be fixed properly
</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:48:48 AM</td><td>
</td><td>10/27/2022 2:21:07
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34433</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Clips</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:48:50 AM</td><td>
</td><td>10/27/2022 2:21:06
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34434</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Clips</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:48:52 AM</td><td>
</td><td>10/27/2022 2:21:05
PM</td><td>&nbsp;</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34435</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth bond</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:48:55 AM</td><td>
</td><td>10/27/2022 2:21:03
PM</td><td>&nbsp;</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34436</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:48:57 AM</td><td>
</td><td>10/27/2022 2:21:02
PM</td><td>&nbsp;</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34439</td><td>EQUIPMENT ROOM</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth bond</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:02 AM</td><td>
</td><td>10/27/2022 2:21:01
PM</td><td>&nbsp;</td><td>MS.13.03.008</td><td>&nbsp;</td>
</tr><tr>
<td>34440</td><td>EQUIPMENT ROOM</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Opening
holes</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:04 AM</td><td>
</td><td>10/27/2022 2:21:00
PM</td><td>&nbsp;</td><td>MS.13.03.008</td><td>&nbsp;</td>
</tr><tr>
<td>34441</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Opening holes </td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:06 AM</td><td>
</td><td>10/27/2022 2:20:59
PM</td><td>&nbsp;</td><td>MS.13.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>34442</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damage flexible </td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:07 AM</td><td>
</td><td>10/27/2022 2:20:56
PM</td><td>&nbsp;</td><td>MS.13.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>34443</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Tag</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:09 AM</td><td>
</td><td>10/27/2022 2:20:55
PM</td><td>&nbsp;</td><td>MS.13.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>34444</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing screws
</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:11 AM</td><td>
</td><td>10/27/2022 2:20:54
PM</td><td>&nbsp;</td><td>MS.13.03.009</td><td>&nbsp;</td>
</tr><tr>
<td>34451</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rod should be aligned
</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:24 AM</td><td>
</td><td>10/27/2022 2:20:53
PM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34452</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover </td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:25 AM</td><td>
</td><td>10/27/2022 2:20:51
PM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34453</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:27 AM</td><td>
</td><td>10/27/2022 2:20:50
PM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34454</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damage flexible
</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:28 AM</td><td>
</td><td>10/27/2022 2:20:48
PM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34456</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:31 AM</td><td>
</td><td>10/27/2022 2:20:47
PM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34466</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Add supports
</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:45 AM</td><td>
</td><td>10/27/2022 2:20:46
PM</td><td>&nbsp;</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34467</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:46 AM</td><td>
</td><td>10/27/2022 2:20:44
PM</td><td>&nbsp;</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34468</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Not aligned </td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:47 AM</td><td>
</td><td>10/27/2022 2:20:43
PM</td><td>&nbsp;</td><td>MS.19.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34469</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Clips</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:49 AM</td><td>
</td><td>10/27/2022 2:20:42
PM</td><td>&nbsp;</td><td>MS.19.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34471</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:52 AM</td><td>
</td><td>10/27/2022 2:20:41
PM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34478</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damage flexible
</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:50:01 AM</td><td>
</td><td>10/27/2022 2:20:40
PM</td><td>&nbsp;</td><td>MS.19.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34479</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:50:03 AM</td><td>
</td><td>10/27/2022 2:20:39
PM</td><td>&nbsp;</td><td>MS.19.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34481</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rod</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:50:06 AM</td><td>
</td><td>10/27/2022 2:20:38
PM</td><td>&nbsp;</td><td>MS.19.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34482</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Opening
holes</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:50:07 AM</td><td>
</td><td>10/27/2022 2:20:37
PM</td><td>&nbsp;</td><td>MS.19.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34484</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Clips</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:50:10 AM</td><td>
</td><td>10/27/2022 2:20:36
PM</td><td>&nbsp;</td><td>MS.19.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34659</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover box</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:21:38 PM</td><td>
</td><td>10/27/2022 2:20:35
PM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34662</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label box</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:21:45 PM</td><td>
</td><td>10/27/2022 2:20:33 PM</td><td>&nbsp;</td><td>Level
+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>34663</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth bond and cover
tray</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:21:47 PM</td><td>
</td><td>10/27/2022 2:20:32 PM</td><td>&nbsp;</td><td>Level
+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>34713</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;One screw
only</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:23:21 PM</td><td>
</td><td>10/27/2022 2:20:31
PM</td><td>&nbsp;</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>34714</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:23:22 PM</td><td>
</td><td>10/27/2022 2:20:30
PM</td><td>&nbsp;</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>34717</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Clips</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:23:26 PM</td><td>
</td><td>10/27/2022 2:20:29 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>34718</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:23:27 PM</td><td>
</td><td>10/27/2022 2:20:28 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>34720</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Opening hole</td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/23/2022 4:23:31 PM</td><td>
</td><td>10/27/2022 2:20:27 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>34721</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Opening
hole</td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/23/2022 4:23:32 PM</td><td>
</td><td>10/27/2022 2:20:25 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>34860</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Manufacturers shop drawing to be attached
for LCP</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:17 PM</td><td>
</td><td>10/27/2022 2:20:24
PM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34861</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Manufacturers shop drawing to be attached
for LCP</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:19 PM</td><td>
</td><td>10/27/2022 2:20:24
PM</td><td>&nbsp;</td><td>MS.14.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34865</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Manufacturers shop drawing to be attached
for LCP</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:24 PM</td><td>
</td><td>10/27/2022 2:20:23
PM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34866</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Manufacturers shop drawing to be attached
for LCP</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:26 PM</td><td>
</td><td>10/27/2022 2:20:21
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34867</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Manufacturers shop drawing to be attached
for LCP</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:28 PM</td><td>
</td><td>10/27/2022 2:20:20
PM</td><td>&nbsp;</td><td>MS.13.3A.011</td><td>&nbsp;</td>
</tr><tr>
<td>34878</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:18:57 PM</td><td>
</td><td>10/27/2022 2:20:19
PM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34880</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Buttom plate</td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/24/2022 4:19:03 PM</td><td>
</td><td>10/27/2022 2:20:18
PM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34881</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Screws</td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/24/2022 4:19:06 PM</td><td>
</td><td>10/27/2022 2:20:17
PM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34882</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag</td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/24/2022 4:19:08 PM</td><td>
</td><td>10/27/2022 2:20:16
PM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34884</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/24/2022 4:19:13 PM</td><td>
</td><td>10/27/2022 2:20:15
PM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34793</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;PPR pipes have missing labels. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:11:19 PM</td><td>
</td><td>10/27/2022 2:09:13
PM</td><td>&nbsp;</td><td>MW.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34794</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipes cleaning </td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:11:20 PM</td><td>
</td><td>10/27/2022 2:07:37
PM</td><td>&nbsp;</td><td>MW.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>31501</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts - Machine
room</td><td>Gear box (include oil level)</td><td>&#39;Installation of elevator
equipment not complete. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:33 PM</td><td> </td><td>10/27/2022 2:06:40
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34633</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Rock wool need to be covered to avoid damage.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:09:38 PM</td><td> </td><td>10/27/2022 2:06:28
PM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>24193</td><td>Bay-04 (from level +43.5 to +49.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Missing CIR for
inclined lift</td><td>High</td><td>11/2/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/26/2021 1:22:27 PM</td><td> </td><td>10/27/2022 11:33:04
AM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>24447</td><td>Bay-04 (from level +43.5 to +49.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Cleaning for the
inclined lift </td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:13 AM</td><td> </td><td>10/27/2022 11:33:03
AM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>24456</td><td>Bay-02 (from level +31.5 to +37.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Missing guide for
the rail </td><td>High</td><td>11/4/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:33 AM</td><td> </td><td>10/27/2022 11:33:02
AM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>24464</td><td>Bay-01 (from level +25.5 to +31.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Travellator</td><td>General
Snag</td><td>&#39;Missing cover for sum pit</td><td>High</td><td>11/4/2021 12:00:00
AM</td><td>Kriton Katsamenis </td><td>10/28/2021 11:40:49 AM</td><td>
</td><td>10/27/2022 11:33:01 AM</td><td>&nbsp;</td><td>@ Grand
Stair</td><td>&nbsp;</td>
</tr><tr>
<td>24469</td><td>Bay-01 (from level +25.5 to +31.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Incomplete work
for AC</td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:41:00 AM</td><td> </td><td>10/27/2022 11:33:00
AM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>32683</td><td>Mankauras - Phase 1</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Based on PMC visit on 2-8-22,Damaged drain
should be repaired </td><td>Low</td><td>8/23/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/2/2022 4:39:30 PM</td><td> </td><td>10/27/2022 11:32:59
AM</td><td>&nbsp;</td><td>Mankauras - Phase 1</td><td>&nbsp;</td>
</tr><tr>
<td>17100</td><td>ELEVATOR (B3)</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Joints should be adjusted
</td><td>Low</td><td>4/8/2021 12:00:00 AM</td><td>sally.george</td><td>3/18/2021
11:40:49 AM</td><td> </td><td>10/27/2022 9:54:45 AM</td><td>Done </td><td>ELEVATOR
(B3)</td><td>&nbsp;</td>
</tr><tr>
<td>34799</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;FD cover need cleaning. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:11:27 PM</td><td>
</td><td>10/27/2022 9:36:40
AM</td><td>&nbsp;</td><td>MW.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34614</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning of PPR pipes. </td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:08:36 PM</td><td>
</td><td>10/27/2022 9:35:59
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34808</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain pipe need more supports. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:11:41 PM</td><td>
</td><td>10/27/2022 9:35:37
AM</td><td>&nbsp;</td><td>MS.19.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>34827</td><td>LIFT SHAFT</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct thermal insulation need to be repaired.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:07 PM</td><td> </td><td>10/27/2022 9:35:20
AM</td><td>&nbsp;</td><td>MQ.14.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34829</td><td>MECH.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;The Al insulation of air duct need repairs.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:10 PM</td><td> </td><td>10/27/2022 9:34:05
AM</td><td>&nbsp;</td><td>MS.14.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34830</td><td>LIFT SHAFT</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct thermal insulation need to be repaired.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:11 PM</td><td> </td><td>10/27/2022 9:33:36
AM</td><td>&nbsp;</td><td>MQ.14.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34832</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct thermal insulation need repairs.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:16 PM</td><td> </td><td>10/27/2022 9:33:17
AM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34840</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain pipes need cleaning. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:12:31 PM</td><td>
</td><td>10/27/2022 9:32:28
AM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34852</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:51 PM</td><td> </td><td>10/27/2022 9:27:30
AM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34853</td><td>FIRE LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation need repairs.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:53 PM</td><td> </td><td>10/27/2022 9:27:15
AM</td><td>&nbsp;</td><td>MQ.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34854</td><td>FIRE LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct thermal insulation need repairs.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:54 PM</td><td> </td><td>10/27/2022 9:26:53
AM</td><td>&nbsp;</td><td>MQ.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34857</td><td>FIRE LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage air duct thermal insulation.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:59 PM</td><td> </td><td>10/27/2022 9:26:06
AM</td><td>&nbsp;</td><td>MQ.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34631</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning for PPR pipes. </td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:09:31 PM</td><td>
</td><td>10/27/2022 9:25:20
AM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>34835</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Incomplete INERGEN works. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:12:20 PM</td><td>
</td><td>10/27/2022 9:24:41
AM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34608</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipes labels are missing. </td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:08:22 PM</td><td>
</td><td>10/27/2022 9:23:49
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34629</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:09:26 PM</td><td>
</td><td>10/27/2022 9:23:32
AM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>34641</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Open termination box for pressurization fan.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:09:58 PM</td><td> </td><td>10/27/2022 9:23:02
AM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>34803</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;No automatic FF system detected in this area.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:11:34 PM</td><td> </td><td>10/27/2022 9:22:46
AM</td><td>&nbsp;</td><td>MS.19.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>34823</td><td>MECH.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;HDPE pipe need to be cleaned. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:12:01 PM</td><td>
</td><td>10/27/2022 9:22:15
AM</td><td>&nbsp;</td><td>MP.14.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>34813</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Floor drain cover need cleaning.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:11:48 PM</td><td> </td><td>10/27/2022 9:21:12
AM</td><td>&nbsp;</td><td>MP.14.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>34814</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;PPR pipe need label. </td><td>High</td><td>10/31/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:11:49 PM</td><td>
</td><td>10/27/2022 9:20:47
AM</td><td>&nbsp;</td><td>MP.14.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>34818</td><td>MECH.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;No ventilation system detected.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:11:54 PM</td><td> </td><td>10/27/2022 9:20:25
AM</td><td>&nbsp;</td><td>MP.14.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>34819</td><td>MECH.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;FD cover need to be cleaned. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:11:55 PM</td><td>
</td><td>10/27/2022 9:19:13
AM</td><td>&nbsp;</td><td>MP.14.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>34820</td><td>MECH.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;PPR pipe need cleaning. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:11:57 PM</td><td>
</td><td>10/27/2022 9:15:23
AM</td><td>&nbsp;</td><td>MP.14.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>34822</td><td>MECH.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Labels for hot and cold water pipes.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:00 PM</td><td> </td><td>10/27/2022 9:13:13
AM</td><td>&nbsp;</td><td>MP.14.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>34838</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipes thermal insulation need repairs.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:26 PM</td><td> </td><td>10/27/2022 9:12:52
AM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34842</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Chilled water pipes thermal insulation damaged.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:35 PM</td><td> </td><td>10/27/2022 9:12:13
AM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34843</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;INERGEN pipes touchup paintings
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:36 PM</td><td> </td><td>10/27/2022 9:11:37
AM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34834</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Canvases need adjustments. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:12:19 PM</td><td>
</td><td>10/27/2022 9:10:55
AM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34836</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning of INERGEN cylinders and pipes.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:23 PM</td><td> </td><td>10/27/2022 9:10:08
AM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34816</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Fire selfmatic need to be relocated away from air supply grill.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:11:51 PM</td><td> </td><td>10/27/2022 9:09:50
AM</td><td>&nbsp;</td><td>MP.14.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>34841</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air grills need cleaning. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:12:33 PM</td><td>
</td><td>10/27/2022 9:08:51
AM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>10565</td><td>TUT- EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Fire collars not
installed</td><td>High</td><td>9/20/2020 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>9/13/2020 11:35:55 AM</td><td> </td><td>10/27/2022 9:07:26
AM</td><td>&nbsp;</td><td>MS.18.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34804</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Chilled water pipes thermal insulation need repairs.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:11:35 PM</td><td> </td><td>10/27/2022 8:58:33
AM</td><td>&nbsp;</td><td>MS.19.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>34598</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain hose connection. </td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:08:02 PM</td><td>
</td><td>10/27/2022 8:55:55
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>24198</td><td>Bay-02 (from level +31.5 to +37.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Travellator</td><td>General
Snag</td><td>&#39;Cleaning and housekeeping </td><td>High</td><td>11/2/2021
12:00:00 AM</td><td>Kriton Katsamenis </td><td>10/26/2021 1:23:01 PM</td><td>
</td><td>10/27/2022 8:41:46 AM</td><td>&nbsp;</td><td>@ Grand
Stair</td><td>&nbsp;</td>
</tr><tr>
<td>34095</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Hoses not connected. </td><td>High</td><td>10/18/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:22:38 PM</td><td>
</td><td>10/27/2022 8:40:44
AM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34792</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Diffuser color need to be checked.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:11:18 PM</td><td> </td><td>10/27/2022 8:40:19
AM</td><td>&nbsp;</td><td>MW.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34798</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air diffuser color need to be checked.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:11:26 PM</td><td> </td><td>10/27/2022 8:39:28
AM</td><td>&nbsp;</td><td>MW.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>32589</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be laying at
tray</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:34:46 AM</td><td> </td><td>10/27/2022 7:55:50
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32586</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover trunk</td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/18/2022 11:34:38 AM</td><td>
</td><td>10/27/2022 7:50:28
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32507</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;The coil should to be cleaned
&amp; fins should to be cleaned &amp; comb</td><td>High</td><td>7/25/2022 12:00:00
PM</td><td>Sherif Boshra Ghaly</td><td>7/18/2022 11:29:04 AM</td><td>
</td><td>10/27/2022 7:24:54
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32585</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Support of conduits
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:34:37 AM</td><td> </td><td>10/26/2022 4:42:05
PM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>7953</td><td>OPEN PLAN OFFICES</td><td>CCB
L30</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Conduit fixation is not accepted, ICT cables
inside cable trunk is not managed, flexible is damaged, pull box cover is missing,
pull box labels is missing, fire alarm device is missing, cable trunk cover is
missing, ICT cables is not protected, </td><td>High</td><td>1/15/2020 12:00:00
PM</td><td>Mohamed Samir</td><td>1/8/2020 12:02:37 PM</td><td> </td><td>10/26/2022
3:47:14 PM</td><td>&nbsp;</td><td>CO.07.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>18841</td><td>CORE F7</td><td>CCB
L30</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/20/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>6/13/2021 9:49:50 AM</td><td> </td><td>10/26/2022
3:47:13 PM</td><td>&nbsp;</td><td>CC.03.03.F71</td><td>&nbsp;</td>
</tr><tr>
<td>18843</td><td>VISITOR LIFTS</td><td>CCB
L30</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/20/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>6/13/2021 9:49:53 AM</td><td> </td><td>10/26/2022
3:47:12 PM</td><td>&nbsp;</td><td>CC.08.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>18844</td><td>VISITOR LIFTS</td><td>CCB
L30</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/20/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>6/13/2021 9:49:55 AM</td><td> </td><td>10/26/2022
3:47:11 PM</td><td>&nbsp;</td><td>CC.08.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>18846</td><td>DIRECTORS ROOF GARDEN</td><td>CCB
L30</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/20/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>6/13/2021 9:49:58 AM</td><td> </td><td>10/26/2022
3:47:10 PM</td><td>&nbsp;</td><td>CX.08.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>18848</td><td>DIRECTORS ROOF GARDEN</td><td>CCB
L30</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/20/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>6/13/2021 9:50:02 AM</td><td> </td><td>10/26/2022
3:47:09 PM</td><td>&nbsp;</td><td>CX.08.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>19928</td><td>MACHINE ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing WiFi device, missing cctv final label
</td><td>High</td><td>8/5/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>7/29/2021
11:44:10 AM</td><td> </td><td>10/26/2022 3:47:08
PM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>27610</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All access control devices are not terminated
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:05 PM</td><td> </td><td>10/26/2022 3:47:07
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27613</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All access control devices are not
terminated</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:10 PM</td><td> </td><td>10/26/2022 3:47:05
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27623</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All access control devices are not
terminated</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:26 PM</td><td> </td><td>10/26/2022 3:47:04
PM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>27631</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All access control devices are not
terminated</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:39 PM</td><td> </td><td>10/26/2022 3:47:03
PM</td><td>&nbsp;</td><td>MS.19.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>27642</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All access control devices are not
terminated</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:59 PM</td><td> </td><td>10/26/2022 3:47:02
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27648</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:54:08 PM</td><td> </td><td>10/26/2022 3:47:01
PM</td><td>&nbsp;</td><td>MS.18.2A.025</td><td>&nbsp;</td>
</tr><tr>
<td>27650</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All access control devices are not terminated nor patching for
door controller and card reader</td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:54:11 PM</td><td>
</td><td>10/26/2022 3:47:01
PM</td><td>&nbsp;</td><td>MS.18.2A.021</td><td>&nbsp;</td>
</tr><tr>
<td>27655</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All access control devices are not terminated nor patching for
door controller and card reader</td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:54:22 PM</td><td>
</td><td>10/26/2022 3:47:00
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27659</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;No termination for access control device no patching and door
control need outlet and bus cabling</td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:54:31 PM</td><td>
</td><td>10/26/2022 3:46:59
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27812</td><td>SERVICE ZONE 7</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:24 PM</td><td> </td><td>10/26/2022 3:46:58
PM</td><td>&nbsp;</td><td>MS.14.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27843</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi label </td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:05 PM</td><td>
</td><td>10/26/2022 3:46:57
PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27850</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:35:14 PM</td><td> </td><td>10/26/2022 3:46:56
PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27860</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:35:28 PM</td><td> </td><td>10/26/2022 3:46:55
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27865</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:35:35 PM</td><td> </td><td>10/26/2022 3:46:54
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27977</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Patching </td><td>High</td><td>3/20/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:23:08 PM</td><td>
</td><td>10/26/2022 3:46:53
PM</td><td>&nbsp;</td><td>MS.18.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>27999</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices termination
</td><td>High</td><td>3/20/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/13/2022 4:23:42 PM</td><td> </td><td>10/26/2022 3:46:51
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32291</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Missing actuators
</td><td>High</td><td>7/24/2022 12:00:00 PM</td><td>hossamreda</td><td>7/17/2022
3:32:46 PM</td><td> </td><td>10/26/2022 2:49:06
PM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32836</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Damaged tiles should be
adjusted</td><td>Low</td><td>10/2/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>9/11/2022 10:25:35 AM</td><td> </td><td>10/26/2022 1:46:36
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32832</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Wood</
td><td>General Snag</td><td>&#39;Joints between wooden cladding should be uniform
</td><td>Low</td><td>10/2/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>9/11/2022 10:25:25 AM</td><td> </td><td>10/26/2022 1:46:17
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16969</td><td>LOBBY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Steel mullion need touchup
painting </td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/11/2021 12:26:57 PM</td><td> </td><td>10/26/2022 1:21:13
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16974</td><td>LOBBY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:27:15 PM</td><td> </td><td>10/26/2022 1:21:12
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>34811</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air filter need to be cleaned. </td><td>High</td><td>10/31/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/24/2022 4:11:45 PM</td><td>
</td><td>10/25/2022 4:11:51
PM</td><td>&nbsp;</td><td>MS.19.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>34824</td><td>MECH.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Fire cabinet supports need to be painted.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:03 PM</td><td> </td><td>10/25/2022 4:11:33
PM</td><td>&nbsp;</td><td>MP.14.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>34846</td><td>FIRE LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning of pipes and cylinders.
</td><td>High</td><td>10/31/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/24/2022 4:12:40 PM</td><td> </td><td>10/25/2022 4:11:00
PM</td><td>&nbsp;</td><td>MQ.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34594</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation around duct sensors need to be repaired.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:07:53 PM</td><td> </td><td>10/25/2022 4:08:50
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34605</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipes a thermal insulation need some repairs.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:08:16 PM</td><td> </td><td>10/25/2022 4:07:49
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34622</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air filter cleaning. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:09:08 PM</td><td>
</td><td>10/25/2022 4:06:33
PM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34589</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation around actuator.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:07:43 PM</td><td> </td><td>10/25/2022 4:06:25
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34638</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:09:51 PM</td><td> </td><td>10/25/2022 4:06:00
PM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>34639</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:09:53 PM</td><td>
</td><td>10/25/2022 4:05:27
PM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>34599</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning from inside. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:08:04 PM</td><td>
</td><td>10/25/2022 4:04:23
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34615</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:08:37 PM</td><td>
</td><td>10/25/2022 4:03:44
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34621</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air grill cleaning. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:09:05 PM</td><td>
</td><td>10/25/2022 4:03:27
PM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34635</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:09:43 PM</td><td> </td><td>10/25/2022 4:03:13
PM</td><td>&nbsp;</td><td>MS.14.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34596</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Machine cleaning from outside. </td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:07:56 PM</td><td>
</td><td>10/25/2022 4:02:15
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34604</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:08:14 PM</td><td>
</td><td>10/25/2022 4:01:52
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34619</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air filter need cleaning. </td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:08:45 PM</td><td>
</td><td>10/25/2022 4:01:30
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>21738</td><td>MACHINE ACCESS ROOM</td><td>MU
L10</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cleaning &amp;
housekeeping</td><td>High</td><td>8/26/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/19/2021 11:46:35 AM</td><td> </td><td>10/25/2022
4:00:20 PM</td><td>&nbsp;</td><td>MS.18.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>34645</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Rusty duct support. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:30:17 PM</td><td>
</td><td>10/25/2022 3:59:18
PM</td><td>&nbsp;</td><td>MS.13.03.009</td><td>&nbsp;</td>
</tr><tr>
<td>34644</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Grills need cleaning. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:30:14 PM</td><td>
</td><td>10/25/2022 3:59:06
PM</td><td>&nbsp;</td><td>MS.13.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>34654</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Rusty drain pipes. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:31:22 PM</td><td>
</td><td>10/25/2022 3:58:51
PM</td><td>&nbsp;</td><td>MS.13.03.009</td><td>&nbsp;</td>
</tr><tr>
<td>34651</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Rusty drain pipe and thermal insulation around it need to be
repaired. </td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:31:03 PM</td><td> </td><td>10/25/2022 3:58:20
PM</td><td>&nbsp;</td><td>MS.13.03.009</td><td>&nbsp;</td>
</tr><tr>
<td>34648</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Canvases need adjustments. </td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:30:49 PM</td><td>
</td><td>10/25/2022 3:57:22
PM</td><td>&nbsp;</td><td>MS.13.03.009</td><td>&nbsp;</td>
</tr><tr>
<td>34655</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Chilled water pipes insulation.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:31:31 PM</td><td> </td><td>10/25/2022 3:55:51
PM</td><td>&nbsp;</td><td>MS.13.03.009</td><td>&nbsp;</td>
</tr><tr>
<td>34649</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct thermal insulation need repairs.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:30:56 PM</td><td> </td><td>10/25/2022 3:54:51
PM</td><td>&nbsp;</td><td>MS.13.03.009</td><td>&nbsp;</td>
</tr><tr>
<td>34647</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct thermal insulation need repairs.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:30:36 PM</td><td> </td><td>10/25/2022 3:54:29
PM</td><td>&nbsp;</td><td>MS.13.03.009</td><td>&nbsp;</td>
</tr><tr>
<td>34646</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct thermal insulation need repairs.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:30:33 PM</td><td> </td><td>10/25/2022 3:53:20
PM</td><td>&nbsp;</td><td>MS.13.03.009</td><td>&nbsp;</td>
</tr><tr>
<td>34616</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct cleaning. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:08:41 PM</td><td>
</td><td>10/25/2022 3:53:03
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34609</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Support need to be painted. </td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:08:24 PM</td><td>
</td><td>10/25/2022 3:52:49
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34617</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain pipes cleaning. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:08:42 PM</td><td>
</td><td>10/25/2022 3:52:38
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34613</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;PPR pipes labels. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:08:33 PM</td><td>
</td><td>10/25/2022 3:52:22
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34612</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipes alignment. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:08:31 PM</td><td>
</td><td>10/25/2022 3:51:58
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34607</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39; Issuing labels for air ducts. </td><td>High</td><td>10/30/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:08:20 PM</td><td>
</td><td>10/25/2022 3:51:28
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>21170</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Inclined handrail and horizontal
handrail should be flushed</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:56:25 AM</td><td> </td><td>10/25/2022 2:27:54
PM</td><td>Done </td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21171</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail is not aligned
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:56:27 AM</td><td> </td><td>10/25/2022 2:27:54 PM</td><td>Done
</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21172</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:56:29 AM</td><td> </td><td>10/25/2022 2:27:53 PM</td><td>Done
</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21173</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joints should be adjusted and
repaired </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:56:31 AM</td><td> </td><td>10/25/2022 2:27:52
PM</td><td>Done </td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21662</td><td>TUT-CORE B3</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail is not aligned and should
be leveled </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:07 AM</td><td> </td><td>10/25/2022 2:27:51
PM</td><td>Done </td><td>MC.12.03.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21663</td><td>TUT-CORE B3</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
11:25:09 AM</td><td> </td><td>10/25/2022 2:27:50 PM</td><td>Done
</td><td>MC.12.03.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21664</td><td>TUT-CORE B3</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joints should be adjusted and
repaired </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:10 AM</td><td> </td><td>10/25/2022 2:27:49
PM</td><td>Done </td><td>MC.12.03.B31</td><td>&nbsp;</td>
</tr><tr>
<td>34213</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Seismic wires need to be tightened.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:25 PM</td><td> </td><td>10/25/2022 8:50:35
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>24201</td><td>Bay-01 (from level +25.5 to +31.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Travellator</td><td>General
Snag</td><td>&#39;Remove excess materials</td><td>High</td><td>11/2/2021 12:00:00
AM</td><td>Kriton Katsamenis </td><td>10/26/2021 1:23:22 PM</td><td>
</td><td>10/25/2022 8:48:54 AM</td><td>&nbsp;</td><td>@ Grand
Stair</td><td>&nbsp;</td>
</tr><tr>
<td>24461</td><td>Bay-01 (from level +25.5 to +31.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Touch up painting
</td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:43 AM</td><td> </td><td>10/25/2022 8:47:54
AM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>34632</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Labels for PPR pipes are missing.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:09:35 PM</td><td> </td><td>10/25/2022 8:34:47
AM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>34591</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/23/2022 3:07:47 PM</td><td>
</td><td>10/25/2022 8:31:16
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34272</td><td>MECH.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain valve insulation is missing.
</td><td>High</td><td>10/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/17/2022 4:25:22 PM</td><td> </td><td>10/25/2022 8:29:11
AM</td><td>&nbsp;</td><td>MS.13.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>34590</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct thermal insulation need repairs.
</td><td>High</td><td>10/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/23/2022 3:07:45 PM</td><td> </td><td>10/25/2022 8:20:57
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>8954</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 3A face 1 stone need cleaning
</td><td>Low</td><td>5/19/2020 12:00:00 AM</td><td>sally.george</td><td>4/28/2020
11:25:47 AM</td><td> </td><td>10/24/2022 4:55:56 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8953</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 3A face 1 stone joint need adjustment
</td><td>Low</td><td>5/19/2020 12:00:00 AM</td><td>sally.george</td><td>4/28/2020
11:25:42 AM</td><td> </td><td>10/24/2022 4:55:47 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8957</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 4A face 2 stone need repair
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>sally.george</td><td>4/28/2020
11:26:06 AM</td><td> </td><td>10/24/2022 4:54:58 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8934</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 7A face 1 stone not aligned
</td><td>Low</td><td>5/19/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>4/28/2020 11:23:05 AM</td><td> </td><td>10/24/2022 4:54:14
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Stiletto -
wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9180</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 8A - light between joints
</td><td>Low</td><td>7/8/2020 12:00:00 AM</td><td>Michael Mahfouz</td><td>6/17/2020
11:39:20 AM</td><td> </td><td>10/24/2022 4:54:05 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9191</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing CIR Approved for stone for modules 9A
face (1,2,3) , 8A face (1,2,3) , 7A face (1,2,3) , 6A face (1,2,3) , 5A face
(1,2,3) , 4A face (1,2,3) , 3A face (1,2,3) , 2A face (1,2,3) and 1A face (1,2,3)
</td><td>Low</td><td>7/9/2020 12:00:00 AM</td><td>Michael Mahfouz</td><td>6/18/2020
11:28:58 AM</td><td> </td><td>10/24/2022 4:53:55 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9185</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Light at joints between stone tiles
</td><td>Low</td><td>7/8/2020 12:00:00 AM</td><td>Michael Mahfouz</td><td>6/17/2020
11:39:34 AM</td><td> </td><td>10/24/2022 4:53:45 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8933</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 9A face 2 stone installation not as
approved DWG. </td><td>Low</td><td>5/19/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>4/28/2020 11:22:58 AM</td><td> </td><td>10/24/2022 4:53:37
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Stiletto -
wall A</td><td>&nbsp;</td>
</tr><tr>
<td>17097</td><td>ELEVATOR (B3)</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Skirting intersection should be
consistent</td><td>Low</td><td>4/8/2021 12:00:00
AM</td><td>sally.george</td><td>3/18/2021 11:40:40 AM</td><td> </td><td>10/24/2022
4:35:05 PM</td><td>Done </td><td>ELEVATOR (B3)</td><td>&nbsp;</td>
</tr><tr>
<td>17098</td><td>ELEVATOR (B3)</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Panels Joints should be Aligned
</td><td>Low</td><td>4/8/2021 12:00:00 AM</td><td>sally.george</td><td>3/18/2021
11:40:44 AM</td><td> </td><td>10/24/2022 4:35:04 PM</td><td>Done </td><td>ELEVATOR
(B3)</td><td>&nbsp;</td>
</tr><tr>
<td>17099</td><td>ELEVATOR (B3)</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Telephone box should be adjusted /to be
flashed with stainless panels cladding </td><td>Low</td><td>4/8/2021 12:00:00
AM</td><td>sally.george</td><td>3/18/2021 11:40:46 AM</td><td> </td><td>10/24/2022
4:35:03 PM</td><td>Done </td><td>ELEVATOR (B3)</td><td>&nbsp;</td>
</tr><tr>
<td>32318</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 4:06:06 PM</td><td> </td><td>10/24/2022
3:22:56 PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32319</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;All
walls need touch up painting </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 4:06:08 PM</td><td> </td><td>10/24/2022
3:22:56 PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32320</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Wooden plate should be removed
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:06:09 PM</td><td> </td><td>10/24/2022 3:22:56 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32322</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Floor should be repaired and
repainted </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 4:06:11 PM</td><td> </td><td>10/24/2022
3:22:56 PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32323</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Openings should be closed if not needed
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:06:12 PM</td><td> </td><td>10/24/2022 3:22:56 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32324</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked part should be repaired and finished
properly </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 4:06:13 PM</td><td> </td><td>10/24/2022
3:22:56 PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32327</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;All
walls need touch up painting </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 4:06:17 PM</td><td> </td><td>10/24/2022
3:22:56 PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32328</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Opening should be closed
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:06:19 PM</td><td> </td><td>10/24/2022 3:22:56 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32347</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:05 PM</td><td> </td><td>10/24/2022 3:22:56
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32348</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Protection should be
removed.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:07 PM</td><td> </td><td>10/24/2022 3:22:56
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32349</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:09 PM</td><td> </td><td>10/24/2022 3:22:56
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32350</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:10 PM</td><td> </td><td>10/24/2022 3:22:55
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32351</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:12 PM</td><td> </td><td>10/24/2022 3:22:55
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32352</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:14 PM</td><td> </td><td>10/24/2022 3:22:55
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32353</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:15 PM</td><td> </td><td>10/24/2022 3:22:55
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32354</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to touch up
l</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:17 PM</td><td> </td><td>10/24/2022 3:22:55
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32355</td><td>SHAFT</td><td>MU L35</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company, Ltd.</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing hardware
accessories.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:18 PM</td><td> </td><td>10/24/2022 3:22:55
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32356</td><td>ELEC.</td><td>MU L35</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company, Ltd.</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing hardware
accessories.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:21 PM</td><td> </td><td>10/24/2022 3:22:55
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.14.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32357</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:23 PM</td><td> </td><td>10/24/2022 3:22:55
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.14.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32358</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:25 PM</td><td> </td><td>10/24/2022 3:22:55
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.14.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32359</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Protection should be
removed.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:26 PM</td><td> </td><td>10/24/2022 3:22:55
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.14.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32321</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Ladder needs touch up painting
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:06:10 PM</td><td> </td><td>10/24/2022 3:22:55 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.14.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32250</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:51:00 AM</td><td> </td><td>10/24/2022 3:08:06 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32251</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor should be cleaned and repainted
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:51:02 AM</td><td> </td><td>10/24/2022 3:08:06 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32252</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door should be repainted from both sides
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:51:03 AM</td><td> </td><td>10/24/2022 3:08:06 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32253</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around metal doors should be adjusted
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:51:05 AM</td><td> </td><td>10/24/2022 3:08:06 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32254</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Protection cover and tape should be removed
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:51:07 AM</td><td> </td><td>10/24/2022 3:08:06 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13096</td><td>LOBBY</td><td>MU L30</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need touch up from inner and out side/missing cylinder
</td><td>Low</td><td>11/24/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
12:45:31 PM</td><td> </td><td>10/24/2022 3:04:25 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>32154</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:37 AM</td><td> </td><td>10/24/2022 3:03:18
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32155</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:38 AM</td><td> </td><td>10/24/2022 3:03:18
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32156</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:40 AM</td><td> </td><td>10/24/2022 3:03:18
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32162</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:50 AM</td><td> </td><td>10/24/2022 3:03:18
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32163</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need repair and touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:52 AM</td><td> </td><td>10/24/2022 3:03:18
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32164</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing hardware accessories </td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>Moussa Nageh Khella</td><td>7/17/2022 11:47:53 AM</td><td>
</td><td>10/24/2022 3:03:18 PM</td><td>This Snag can be closed on that PMC snagging
was done</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32255</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;General cleaning is needed
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:51:08 AM</td><td> </td><td>10/24/2022 3:03:18 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32256</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs touch up painting </td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>sally.george</td><td>7/17/2022 11:51:09 AM</td><td>
</td><td>10/24/2022 3:03:18 PM</td><td>This Snag can be closed on that PMC snagging
was done</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32257</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Gap should be closed
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:51:11 AM</td><td> </td><td>10/24/2022 3:03:18 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32261</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;General cleaning is needed
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:51:17 AM</td><td> </td><td>10/24/2022 3:03:18 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32262</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Ceiling paint</td><td>To be repainted</td><td>&#39;Ceiling needs touch up painting
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:51:19 AM</td><td> </td><td>10/24/2022 3:03:18 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32243</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Stair should be repainted
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:50:49 AM</td><td> </td><td>10/24/2022 3:02:19 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32245</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor should be repaired and
repainted </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 11:50:52 AM</td><td> </td><td>10/24/2022
3:02:19 PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32247</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Fire Sealant is missing
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:50:55 AM</td><td> </td><td>10/24/2022 3:02:19 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32248</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>sally.george</td><td>7/17/2022 11:50:57 AM</td><td>
</td><td>10/24/2022 3:02:19 PM</td><td>This Snag can be closed on that PMC snagging
was done</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32249</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Holes should be repaired and closed </td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>sally.george</td><td>7/17/2022 11:50:59 AM</td><td>
</td><td>10/24/2022 3:02:19 PM</td><td>This Snag can be closed on that PMC snagging
was done</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32246</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Ladder needs touch up painting
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:50:54 AM</td><td> </td><td>10/24/2022 3:02:19 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32158</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:44 AM</td><td> </td><td>10/24/2022 3:01:39
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32159</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing hardware accessories.</td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>Moussa Nageh Khella</td><td>7/17/2022 11:47:45 AM</td><td>
</td><td>10/24/2022 3:01:39 PM</td><td>This Snag can be closed on that PMC snagging
was done</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32165</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:55 AM</td><td> </td><td>10/24/2022 3:01:39
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32166</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:57 AM</td><td> </td><td>10/24/2022 3:01:39
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32168</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:58 AM</td><td> </td><td>10/24/2022 3:01:39
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32258</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;General cleaning is needed
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:51:12 AM</td><td> </td><td>10/24/2022 3:01:39 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32259</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Fixed accessories</td><td>General</td><td>&#39;Accessories should be fixed properly
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:51:14 AM</td><td> </td><td>10/24/2022 3:01:39 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32260</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs touch up painting </td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>sally.george</td><td>7/17/2022 11:51:16 AM</td><td>
</td><td>10/24/2022 3:01:39 PM</td><td>This Snag can be closed on that PMC snagging
was done</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32157</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:42 AM</td><td> </td><td>10/24/2022 2:59:48
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32160</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:47 AM</td><td> </td><td>10/24/2022 2:59:48
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32161</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:49 AM</td><td> </td><td>10/24/2022 2:59:48
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32242</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant is missing </td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>sally.george</td><td>7/17/2022 11:50:48 AM</td><td>
</td><td>10/24/2022 2:55:56 PM</td><td>This Snag can be closed on that PMC snagging
was done</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32241</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:50:46 AM</td><td> </td><td>10/24/2022 2:55:49 PM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32153</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:35 AM</td><td> </td><td>10/24/2022 2:55:41
PM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>13652</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>DB</td><td>General Snag</td><td>&#39;Panel
EDB-MDB2A not delivered yet and the raceways incomplete and termination also
</td><td>High</td><td>12/7/2020 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>11/30/2020 10:58:57 AM</td><td> </td><td>10/24/2022 2:20:30
PM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>16935</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>Power Sockets</td><td>General Snag</td><td>&#39;Un complete work
</td><td>High</td><td>3/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>3/11/2021 11:40:27 AM</td><td> </td><td>10/24/2022 2:20:29
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16937</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>Power Sockets</td><td>General Snag</td><td>&#39;Un complete
work</td><td>High</td><td>3/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>3/11/2021 11:40:31 AM</td><td> </td><td>10/24/2022 2:20:29
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>19885</td><td>SERVICE ZONE2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;Not
allowed for using the coupling for flexible conduit </td><td>High</td><td>8/4/2021
12:00:00 AM</td><td>Sameh Ibrahim El-Sawah</td><td>7/28/2021 11:38:52 AM</td><td>
</td><td>10/24/2022 2:20:27
PM</td><td>&nbsp;</td><td>MS.12.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>20120</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>Power</td><td>13 A Single Socket Outlets</td><td>&#39;Missing
power sockets </td><td>High</td><td>8/10/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>8/3/2021 11:29:32 AM</td><td> </td><td>10/24/2022 2:20:27
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20121</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>Power</td><td>General Snag</td><td>&#39;Housekeeping and touch
up painting </td><td>High</td><td>8/10/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>8/3/2021 11:29:33 AM</td><td> </td><td>10/24/2022 2:20:26
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20122</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>Power</td><td>General Snag</td><td>&#39;Junction box is
defective and should be replaced </td><td>High</td><td>8/10/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/3/2021 11:29:35 AM</td><td>
</td><td>10/24/2022 2:20:24
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>27541</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work- the raceway not installed
yet -the panel not delivered yet </td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/9/2022 10:58:02 AM</td><td>
</td><td>10/24/2022 2:20:23
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27776</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work and panel not delivered yet
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:23:05 PM</td><td> </td><td>10/24/2022 2:20:22
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34472</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:53 AM</td><td>
</td><td>10/24/2022 2:20:21
PM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34475</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>10/27/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/20/2022 11:49:57 AM</td><td>
</td><td>10/24/2022 2:20:20
PM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34485</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Clips</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:50:11 AM</td><td>
</td><td>10/24/2022 2:20:19
PM</td><td>&nbsp;</td><td>MS.19.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>34486</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover box</td><td>High</td><td>10/27/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/20/2022 11:50:13 AM</td><td>
</td><td>10/24/2022 2:20:18
PM</td><td>&nbsp;</td><td>MS.19.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>10618</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;White concrete need repair/ need cleaning
</td><td>Low</td><td>10/4/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/13/2020 3:56:39 PM</td><td>
</td><td>10/24/2022 12:52:38 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10619</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Tiles not rested on angle / tiles need
cleaning/ toothing between tiles </td><td>Low</td><td>10/4/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/13/2020 3:56:47 PM</td><td>
</td><td>10/24/2022 12:52:38 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10625</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Cover need adjustment/ rubber need
adjustment </td><td>Low</td><td>10/4/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/13/2020 3:58:56 PM</td><td>
</td><td>10/24/2022 12:52:36
PM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>10660</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;Edges
to be adjusted /thickness of edges louvre </td><td>Low</td><td>10/4/2020 12:00:00
AM</td><td>andrewjohn.rose</td><td>9/13/2020 4:50:14 PM</td><td>
</td><td>10/24/2022 12:52:35 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10661</td><td>TUT- Digital (+46.50)</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Rejected Gasket /stainless steel
cladding/screws</td><td>Low</td><td>10/4/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/13/2020 4:50:24 PM</td><td>
</td><td>10/24/2022 12:52:34 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10665</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Cable to remove and add
cover</td><td>Low</td><td>10/4/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/13/2020 4:50:42 PM</td><td>
</td><td>10/24/2022 12:52:34 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10684</td><td>TUT- (+45.00)</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;Edge
need adjustment </td><td>Low</td><td>10/4/2020 12:00:00
AM</td><td>andrewjohn.rose</td><td>9/13/2020 4:52:10 PM</td><td>
</td><td>10/24/2022 12:52:33 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10690</td><td>TUT- (+45.00)</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Ceiling</
td><td>General Snag</td><td>&#39;Joint between ceiling and EWS2to be adjusted
</td><td>Low</td><td>10/4/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/13/2020 4:52:30 PM</td><td>
</td><td>10/24/2022 12:52:32 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10829</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Gasket need adjustment / welding
need adjustment/ stainless steel to be aligned with stone
</td><td>Low</td><td>10/5/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/14/2020 12:21:02 PM</td><td>
</td><td>10/24/2022 12:52:31
PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>10831</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Gab to be filled</td><td>Low</td><td>10/5/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/14/2020 12:21:14 PM</td><td>
</td><td>10/24/2022 12:52:30
PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>10871</td><td>TUT- Digital (+48.00)</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Missing panels/ joints not aligned/
</td><td>Low</td><td>10/5/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/14/2020 3:44:10 PM</td><td>
</td><td>10/24/2022 12:52:29
PM</td><td>&nbsp;</td><td>MP.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>10876</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Joints not aligned / missing panels/
</td><td>Low</td><td>10/5/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/14/2020 3:45:07 PM</td><td>
</td><td>10/24/2022 12:52:28 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10880</td><td>TUT- Digital (+46.50)</td><td>MU
L30</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories/ door leaf and frame need touch up
</td><td>Low</td><td>10/5/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/14/2020 3:45:24 PM</td><td>
</td><td>10/24/2022 12:52:27 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10970</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Metal trim not aligned/ gab to be filled
/ toothing between tiles/ joints not aligned </td><td>Low</td><td>10/6/2020
12:00:00 PM</td><td>andrewjohn.rose</td><td>9/15/2020 12:05:00 PM</td><td>
</td><td>10/24/2022 12:52:26
PM</td><td>&nbsp;</td><td>MW.18.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>13003</td><td>TUT- TUTANKAMEN GALLERY(+46.50)</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Irregular joints to be adjusted </td><td>High</td><td>11/9/2020
12:00:00 PM</td><td>Sherif Elabd</td><td>11/2/2020 1:11:26 PM</td><td>
</td><td>10/24/2022 12:52:25
PM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>13008</td><td>TUT- BREAK OUT SPACE</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Joints to be adjusted </td><td>High</td><td>11/9/2020 12:00:00
PM</td><td>Sherif Elabd</td><td>11/2/2020 1:11:43 PM</td><td> </td><td>10/24/2022
12:52:24 PM</td><td>&nbsp;</td><td>MP.18.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>13009</td><td>TUT- BREAK OUT SPACE</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Replacement the marked tiles</td><td>High</td><td>11/9/2020
12:00:00 PM</td><td>Sherif Elabd</td><td>11/2/2020 1:11:45 PM</td><td>
</td><td>10/24/2022 12:52:24
PM</td><td>&nbsp;</td><td>MP.18.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>13012</td><td>TUT- BREAK OUT SPACE</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Shadow gap to be adjusted/general cleaning needed/missing
part</td><td>High</td><td>11/9/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>11/2/2020 1:11:53 PM</td><td> </td><td>10/24/2022 12:52:23
PM</td><td>&nbsp;</td><td>MP.18.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>13936</td><td>TUT- Digital (+46.50)</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Irregular joints/toothing tiles/ resized for the tiles on site is
not accepted </td><td>High</td><td>12/20/2020 12:00:00
PM</td><td>mohamed.sami</td><td>12/13/2020 2:01:39 PM</td><td> </td><td>10/24/2022
12:52:22 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>13946</td><td>TUT- LOBBY(+45.00)</td><td>MU
L30</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need touch up </td><td>High</td><td>12/20/2020 12:00:00
PM</td><td>mohamed.sami</td><td>12/13/2020 2:02:01 PM</td><td> </td><td>10/24/2022
12:52:21 PM</td><td>&nbsp;</td><td>MP.12.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>14565</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>Joints improper</td><td>&#39;Glass panel not leveled with stone floor
refer to NCR 818-Q487</td><td>Low</td><td>1/18/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/28/2020 1:46:41 PM</td><td> </td><td>10/24/2022
12:52:20 PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>14566</td><td>TUT- Digital (+48.00)</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Improper obvious bracket refer to snag no
10827</td><td>Low</td><td>1/18/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/28/2020 1:46:43 PM</td><td> </td><td>10/24/2022
12:52:19 PM</td><td>&nbsp;</td><td>MP.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14690</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches ,damages and dents on door leaf and architrave
</td><td>High</td><td>1/17/2021 12:00:00 AM</td><td>mohamed.sami</td><td>1/10/2021
2:31:11 PM</td><td> </td><td>10/24/2022 12:52:18
PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14698</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Damaged tiles to be replaced </td><td>High</td><td>1/17/2021
12:00:00 PM</td><td>mohamed.sami</td><td>1/10/2021 2:31:25 PM</td><td>
</td><td>10/24/2022 12:52:17
PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14872</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Toilet</td><td>General</td><td>&#39;Door should be closed properly
</td><td>High</td><td>1/25/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>1/18/2021 1:19:46 PM</td><td>
</td><td>10/24/2022 12:52:16
PM</td><td>&nbsp;</td><td>MW.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15827</td><td>TUT- Digital (+48.00)</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General</
td><td>&#39;Ceiling tiles to be replaced because of the mis match of
colours</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 12:28:19 PM</td><td>
</td><td>10/24/2022 12:52:15
PM</td><td>&nbsp;</td><td>MP.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15834</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fit face plate to socket - check all sockets
in the gallery.</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 1:05:44 PM</td><td> </td><td>10/24/2022
12:52:14 PM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>15841</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Wall</td><td>Difference in colour/shade</td><td>&#39;Mismatched stone panel colour
- replace</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 2:49:14 PM</td><td> </td><td>10/24/2022
12:52:13 PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>16610</td><td>TUT- (+45.00)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;The sub contractor did not finish the work to send
CIR for cladding free standing wall rebirth/wall identity/wall rebirth/this snag is
valid for9 free standing wall</td><td>Low</td><td>3/13/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>2/20/2021 2:47:51 PM</td><td> </td><td>10/24/2022
12:52:12 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17403</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Stains should be removed
</td><td>Low</td><td>5/6/2021 12:00:00 PM</td><td>mohamed.sami</td><td>4/15/2021
10:29:43 AM</td><td> </td><td>10/24/2022 12:52:11
PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17404</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Box should be leveled/joints
be adjusted </td><td>Low</td><td>5/6/2021 12:00:00
PM</td><td>mohamed.sami</td><td>4/15/2021 10:29:45 AM</td><td> </td><td>10/24/2022
12:52:10 PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17411</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Irregular joints between
IWS-07and CLG-03</td><td>Low</td><td>5/6/2021 12:00:00
PM</td><td>mohamed.sami</td><td>4/15/2021 10:29:58 AM</td><td> </td><td>10/24/2022
12:52:09 PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17448</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Discoloration between glazed
panels </td><td>Low</td><td>5/9/2021 12:00:00
PM</td><td>mohamed.sami</td><td>4/18/2021 1:52:50 PM</td><td> </td><td>10/24/2022
12:52:08 PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17449</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39;Damaged rockwool should be repaired
</td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021
1:52:53 PM</td><td> </td><td>10/24/2022 12:52:07
PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17450</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39;Interface between between CLG-03 and EWS-06 ,EWS-06 and IWS-
07</td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021
1:52:56 PM</td><td> </td><td>10/24/2022 12:52:06
PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17451</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39;Damaged tiles should be replaced </td><td>Low</td><td>5/9/2021
12:00:00 PM</td><td>mohamed.sami</td><td>4/18/2021 1:52:58 PM</td><td>
</td><td>10/24/2022 12:52:06
PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17452</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>5/9/2021
12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021 1:53:01 PM</td><td>
</td><td>10/24/2022 12:52:05
PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17455</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Damaged rock wool should be repaired
</td><td>Low</td><td>5/9/2021 12:00:00 PM</td><td>mohamed.sami</td><td>4/18/2021
1:53:08 PM</td><td> </td><td>10/24/2022 12:52:04
PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17458</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Toothing between tiles should be
adjusted </td><td>Low</td><td>5/9/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/18/2021 1:53:15 PM</td><td> </td><td>10/24/2022
12:52:03 PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17460</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Fire Box should be fixed properly
</td><td>Low</td><td>5/9/2021 12:00:00 PM</td><td>mohamed.sami</td><td>4/18/2021
1:53:19 PM</td><td> </td><td>10/24/2022 12:52:02
PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>24204</td><td>MAIN STAIR OUTLOOK</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Mis coordination between the monorail
and lighting fixtures</td><td>High</td><td>11/2/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>10/26/2021 3:34:54 PM</td><td> </td><td>10/24/2022 12:52:01
PM</td><td>&nbsp;</td><td>MP.23.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>25461</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Roschmann</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;One additional cladding should be
checked ( drawing )</td><td>Low</td><td>12/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/7/2021 12:24:39 PM</td><td> </td><td>10/24/2022
12:51:59 PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>27661</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>MEP-ELV</td><td>Security</
td><td>General Snag</td><td>&#39;Lift management system installation is incomplete
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:54:35 PM</td><td> </td><td>10/24/2022 9:49:58
AM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>20962</td><td>ELEC.</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing ict label’s, loose utp cable without terminated
</td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>Mohamed Samir</td><td>8/11/2021
11:59:31 AM</td><td> </td><td>10/24/2022 9:48:57
AM</td><td>&nbsp;</td><td>MS.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20664</td><td>RECEIVING AREA</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing cctv and ICT label, face plate should be rotated , access
control door contact not terminated </td><td>High</td><td>8/17/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/10/2021 11:17:57 AM</td><td>
</td><td>10/24/2022 9:48:23
AM</td><td>&nbsp;</td><td>MS.14.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>34319</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/25/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:06:08 PM</td><td>
</td><td>10/24/2022 8:54:21
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>24465</td><td>Bay-01 (from level +25.5 to +31.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Cleaning and
removing of scaffolding </td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton
Katsamenis </td><td>10/28/2021 11:40:52 AM</td><td> </td><td>10/24/2022 8:48:28
AM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>24453</td><td>Bay-02 (from level +31.5 to +37.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Touch up painting
</td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:28 AM</td><td> </td><td>10/24/2022 8:47:34
AM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>24444</td><td>Bay-03 (from level +37.5 to +43.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Touch up painting
</td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:08 AM</td><td> </td><td>10/24/2022 8:46:29
AM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>31924</td><td>CORE G3</td><td>MU
L10</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Elevators works not complete yet.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:54 PM</td><td> </td><td>10/24/2022 8:18:35
AM</td><td>&nbsp;</td><td>MC.19.01.G31</td><td>&nbsp;</td>
</tr><tr>
<td>31936</td><td>Core G3</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Elevators works not completed yet.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:14 PM</td><td> </td><td>10/24/2022 8:18:30
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32847</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>9/18/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>9/11/2022 1:14:45 PM</td><td>
</td><td>10/23/2022 4:40:59
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32844</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All WiFi port activation </td><td>High</td><td>9/18/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>9/11/2022 1:14:36 PM</td><td>
</td><td>10/23/2022 4:40:53
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32842</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Projector not installed </td><td>High</td><td>9/18/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>9/11/2022 1:14:31 PM</td><td>
</td><td>10/23/2022 4:40:37
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32846</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Screen not installed </td><td>High</td><td>9/18/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>9/11/2022 1:14:42 PM</td><td>
</td><td>10/23/2022 4:40:26
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>21015</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Topping stainless steel handrail
should be alignment </td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/15/2021 11:13:21 AM</td><td> </td><td>10/23/2022 3:20:06
PM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21107</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wavy wall need to be leveled </td><td>Low</td><td>9/7/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021 10:49:17 AM</td><td>
</td><td>10/23/2022 3:19:21
PM</td><td>&nbsp;</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>25207</td><td>Temple Garden-Band F</td><td>Temple
Garden</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Stainless panel not aligned,need to
adjusted.</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/15/2021 11:34:34 AM</td><td> </td><td>10/23/2022 2:51:18
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Band
F</td><td>&nbsp;</td>
</tr><tr>
<td>25204</td><td>Temple Garden-Band F</td><td>Temple
Garden</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Stainless panel need to
aligned</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/15/2021 11:34:22 AM</td><td> </td><td>10/23/2022 2:51:07
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Band
F</td><td>&nbsp;</td>
</tr><tr>
<td>25201</td><td>Temple Garden-Band F</td><td>Temple
Garden</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing steel panels need to
installed.</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/15/2021 11:34:13 AM</td><td> </td><td>10/23/2022 2:50:59
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Band
F</td><td>&nbsp;</td>
</tr><tr>
<td>25231</td><td>Temple Garden-Band E</td><td>Temple
Garden</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged mesh panels need to replaced
.</td><td>Low</td><td>12/7/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/16/2021 2:42:10 PM</td><td> </td><td>10/23/2022 2:50:51
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Band
E</td><td>&nbsp;</td>
</tr><tr>
<td>25233</td><td>Temple Garden-Band E</td><td>Temple
Garden</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Stainless steel panels need to
cleaning.</td><td>Low</td><td>12/7/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/16/2021 2:42:15 PM</td><td> </td><td>10/23/2022 2:50:42
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Band
E</td><td>&nbsp;</td>
</tr><tr>
<td>25238</td><td>Temple Garden-Band D</td><td>Temple
Garden</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Mesh cladding panels need to
cleaning.</td><td>Low</td><td>12/7/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/16/2021 2:42:29 PM</td><td> </td><td>10/23/2022 2:50:34
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Band
D</td><td>&nbsp;</td>
</tr><tr>
<td>25237</td><td>Temple Garden-Band D</td><td>Temple
Garden</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Mesh ceiling panels need to
cleaning.</td><td>Low</td><td>12/7/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/16/2021 2:42:26 PM</td><td> </td><td>10/23/2022 2:50:26
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Band
D</td><td>&nbsp;</td>
</tr><tr>
<td>25236</td><td>Temple Garden-Band D</td><td>Temple
Garden</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Metal door need to repair and
painting.</td><td>Low</td><td>12/7/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/16/2021 2:42:23 PM</td><td> </td><td>10/23/2022 2:50:17
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Band
D</td><td>&nbsp;</td>
</tr><tr>
<td>25244</td><td>Temple Garden-Band C</td><td>Temple
Garden</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Stainless steel cladding panels need to
cleaning.</td><td>Low</td><td>12/7/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/16/2021 2:42:49 PM</td><td> </td><td>10/23/2022 2:49:36
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Band
C</td><td>&nbsp;</td>
</tr><tr>
<td>25243</td><td>Temple Garden-Band C</td><td>Temple
Garden</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gap between mesh cladding panels and
stainless cladding panels not aligned need to
adjustment.</td><td>Low</td><td>12/7/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/16/2021 2:42:44 PM</td><td> </td><td>10/23/2022 2:49:28
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Band
C</td><td>&nbsp;</td>
</tr><tr>
<td>25215</td><td>Temple Garden-Band C</td><td>Temple
Garden</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gap between stainless steel panels and mesh
panels need to adjusted.</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Moussa
Nageh Khella</td><td>11/15/2021 3:14:16 PM</td><td> </td><td>10/23/2022 2:49:20
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Band
C</td><td>&nbsp;</td>
</tr><tr>
<td>25219</td><td>Temple Garden-Band B</td><td>Temple
Garden</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Mesh ceiling panels need to
cleaning.</td><td>Low</td><td>11/22/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/15/2021 3:14:29 PM</td><td> </td><td>10/23/2022 2:49:13
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Band
B</td><td>&nbsp;</td>
</tr><tr>
<td>25221</td><td>Temple Garden-Band A</td><td>Temple
Garden</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Gap between mesh panels and lighting fixtures panels need to
adjustment.</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/15/2021 3:14:34 PM</td><td> </td><td>10/23/2022 2:47:51
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Band
A</td><td>&nbsp;</td>
</tr><tr>
<td>25214</td><td>Temple Garden-Band A</td><td>Temple
Garden</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Stainless steel panels need to
cleaning.</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/15/2021 3:14:13 PM</td><td> </td><td>10/23/2022 2:47:18
PM</td><td>This Snag can be closed on that PMC snagging was done</td><td>Band
A</td><td>&nbsp;</td>
</tr><tr>
<td>22328</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Must remove electrical wires around fire
cabinet </td><td>High</td><td>8/31/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/24/2021 3:05:21 PM</td><td> </td><td>10/23/2022
1:50:44 PM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34097</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;Bell and strobe need
cleaning. </td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:22:42 PM</td><td> </td><td>10/23/2022 1:50:43
PM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34360</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting fixtures not work
</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:11:27 PM</td><td>
</td><td>10/23/2022 1:50:42
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34362</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable systemization
</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:11:33 PM</td><td>
</td><td>10/23/2022 1:50:41
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34363</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth bond</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:11:35 PM</td><td>
</td><td>10/23/2022 1:50:40
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34366</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing tag</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:11:43 PM</td><td>
</td><td>10/23/2022 1:50:39
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34367</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Installed cover properly
</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:11:46 PM</td><td>
</td><td>10/23/2022 1:50:38
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34368</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:11:49 PM</td><td>
</td><td>10/23/2022 1:50:37
PM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>34374</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:07 PM</td><td>
</td><td>10/23/2022 1:50:36
PM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34375</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:09 PM</td><td>
</td><td>10/23/2022 1:50:35
PM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34376</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover to install properly
</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:13 PM</td><td>
</td><td>10/23/2022 1:50:34
PM</td><td>&nbsp;</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34378</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:17 PM</td><td>
</td><td>10/23/2022 1:50:33
PM</td><td>&nbsp;</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34379</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Clips</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:20 PM</td><td>
</td><td>10/23/2022 1:50:32
PM</td><td>&nbsp;</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34380</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable systemization
</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:22 PM</td><td>
</td><td>10/23/2022 1:50:31
PM</td><td>&nbsp;</td><td>MS.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>34381</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover and earth
bond</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:23 PM</td><td>
</td><td>10/23/2022 1:50:30
PM</td><td>&nbsp;</td><td>MS.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>34382</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:26 PM</td><td>
</td><td>10/23/2022 1:50:29
PM</td><td>&nbsp;</td><td>MS.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>34387</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:37 PM</td><td>
</td><td>10/23/2022 1:50:28
PM</td><td>&nbsp;</td><td>MS.19.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>34392</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Screw</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:49 PM</td><td>
</td><td>10/23/2022 1:50:27
PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34393</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rod</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:52 PM</td><td>
</td><td>10/23/2022 1:50:26
PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34394</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Clips</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:12:57 PM</td><td>
</td><td>10/23/2022 1:50:25
PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34395</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Add screw</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:13:01 PM</td><td>
</td><td>10/23/2022 1:50:24
PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34396</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Opening </td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:13:04 PM</td><td>
</td><td>10/23/2022 1:50:23
PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34397</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable tag</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:13:07 PM</td><td>
</td><td>10/23/2022 1:50:22
PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34403</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Clips</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:13:56 PM</td><td>
</td><td>10/23/2022 1:50:21
PM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34404</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cables should be properly installed inside
trunk</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:13:59 PM</td><td>
</td><td>10/23/2022 1:50:20
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34405</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Provide proper cover for
tray</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:14:01 PM</td><td>
</td><td>10/23/2022 1:50:19
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34407</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover box</td><td>High</td><td>10/26/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>10/19/2022 4:14:10 PM</td><td>
</td><td>10/23/2022 1:50:18
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34408</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fixation should be properly
</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:14:12 PM</td><td>
</td><td>10/23/2022 1:50:17
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34409</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unused
opening</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:14:16 PM</td><td>
</td><td>10/23/2022 1:50:17
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34410</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Should be tightened
</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:14:18 PM</td><td>
</td><td>10/23/2022 1:50:16
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34411</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wrong accessories of clips must be
change</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:14:21 PM</td><td>
</td><td>10/23/2022 1:50:15
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34412</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unused opening to be
close</td><td>High</td><td>10/26/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>10/19/2022 4:14:24 PM</td><td>
</td><td>10/23/2022 1:50:14
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>17406</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Toothing between
tiles</td><td>Low</td><td>5/6/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/15/2021 10:29:48 AM</td><td> </td><td>10/23/2022
1:08:26 PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17407</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Defected panels
</td><td>Low</td><td>5/6/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/15/2021
10:29:50 AM</td><td> </td><td>10/23/2022 1:08:25
PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17408</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Defected and shaped
edges</td><td>Low</td><td>5/6/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/15/2021 10:29:53 AM</td><td> </td><td>10/23/2022
1:08:24 PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>19675</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Un completed work </td><td>High</td><td>7/11/2021 12:00:00
AM</td><td>Ayman Ahmed Mostafa</td><td>7/4/2021 2:12:20 PM</td><td>
</td><td>10/23/2022 7:30:45
AM</td><td>&nbsp;</td><td>MS.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>19673</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Un completed work </td><td>High</td><td>7/11/2021 12:00:00
AM</td><td>Ayman Ahmed Mostafa</td><td>7/4/2021 2:12:17 PM</td><td>
</td><td>10/23/2022 7:30:35
AM</td><td>&nbsp;</td><td>MS.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>6868</td><td>SERVICE TUNNEL</td><td>AT CONNEC
L49</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Contractor didn’t finish lifts
work</td><td>Low</td><td>1/14/2020 12:00:00
AM</td><td>ahmedsalem</td><td>12/24/2019 4:02:26 PM</td><td> </td><td>10/22/2022
10:45:44 AM</td><td>&nbsp;</td><td>SN.00.01.03</td><td>&nbsp;</td>
</tr><tr>
<td>31981</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Elevator works not complete.
</td><td>High</td><td>7/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>7/5/2022 11:38:46 AM</td><td> </td><td>10/20/2022 3:36:54
PM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>6867</td><td>LIFT SHAFT 02</td><td>AT CONNEC
L49</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Contractor didn’t finish work in lifts
</td><td>Low</td><td>1/14/2020 12:00:00 AM</td><td>ahmedsalem</td><td>12/24/2019
4:02:23 PM</td><td> </td><td>10/20/2022 3:31:42
PM</td><td>&nbsp;</td><td>SN.00.01.13</td><td>&nbsp;</td>
</tr><tr>
<td>24466</td><td>Bay-01 (from level +25.5 to +31.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Ongoing
termination </td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:54 AM</td><td> </td><td>10/20/2022 3:13:50
PM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>34309</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipe thermal insulation need to be repaired.
</td><td>High</td><td>10/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/18/2022 4:05:51 PM</td><td> </td><td>10/20/2022 3:11:32
PM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>33978</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Labels for hydronic pipes. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:14:32 PM</td><td>
</td><td>10/20/2022 3:10:09
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34106</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage hangers. </td><td>High</td><td>10/18/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:22:55 PM</td><td>
</td><td>10/20/2022 3:09:44
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>21823</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Turnstiles cable termination and turnstiles installation is not
done. and Fire alarm interface cabling also not done</td><td>High</td><td>8/26/2021
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>8/19/2021 3:27:25 PM</td><td>
</td><td>10/20/2022 3:05:19
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>29181</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Stopping</td><td>Fire seal damaged</td><td>&#39;Missing HILTI labels.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:58:54 AM</td><td> </td><td>10/20/2022 3:05:17
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>30015</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Unfinished duct works.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:44:02 PM</td><td> </td><td>10/20/2022 3:04:59
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29227</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing HILTI labels for all wall
penetrations. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:10 PM</td><td> </td><td>10/20/2022 3:04:26
PM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>27974</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Patching </td><td>High</td><td>3/20/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:23:03 PM</td><td>
</td><td>10/20/2022 3:04:11
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27994</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination </td><td>High</td><td>3/20/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:23:36 PM</td><td>
</td><td>10/20/2022 3:03:53
PM</td><td>&nbsp;</td><td>MS.18.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>28993</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing HILTI labels. </td><td>High</td><td>5/24/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:09:27 PM</td><td>
</td><td>10/20/2022 3:03:08
PM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>28997</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing HILTI labels for pipes penetrations.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:09:34 PM</td><td> </td><td>10/20/2022 3:02:40
PM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>28996</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing HILTI labels for fire dampers.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:09:32 PM</td><td> </td><td>10/20/2022 3:02:07
PM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>27647</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All access control devices are not terminated nor patching for
door controller and card reader</td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:54:07 PM</td><td>
</td><td>10/20/2022 3:01:37
PM</td><td>&nbsp;</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>28880</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Chilled
water Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing HILTI
labels. </td><td>High</td><td>5/23/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:07:27 PM</td><td> </td><td>10/20/2022 3:01:11
PM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>34288</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Rusty drain pipe. </td><td>High</td><td>10/24/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/17/2022 4:27:39 PM</td><td>
</td><td>10/20/2022 3:00:53
PM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>27658</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;No termination for access control device nor patching
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:54:29 PM</td><td> </td><td>10/20/2022 3:00:48
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>31768</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Drainage System</td><td>General
Snag</td><td>&#39;Pipes connection need adjustment. </td><td>High</td><td>6/13/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:56:26 AM</td><td>
</td><td>10/20/2022 3:00:15
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27662</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;No termination No access control device and
patching</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:54:37 PM</td><td> </td><td>10/20/2022 2:59:44
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34215</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipes thermal insulation need repairs.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:28 PM</td><td> </td><td>10/20/2022 2:59:11
PM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>27390</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Media converter for wifi</td><td>High</td><td>3/14/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:08:28 PM</td><td>
</td><td>10/20/2022 2:58:49
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34263</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation need to be repaired.
</td><td>High</td><td>10/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/17/2022 4:25:09 PM</td><td> </td><td>10/20/2022 2:58:40
PM</td><td>&nbsp;</td><td>MS.19.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>26966</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cctv and WiFi has not installed yet
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:38 PM</td><td> </td><td>10/20/2022 2:56:50
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>26968</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi,RFID,speakers labeling should be done
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:41 PM</td><td> </td><td>10/20/2022 2:54:59
PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>26961</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;IP address should not be mentioned on the camera and back box gap
needs to be fixed </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:28 PM</td><td> </td><td>10/20/2022 2:54:26
PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>26981</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Faceplate cover has been replaced </td><td>High</td><td>3/9/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/2/2022 4:01:03 PM</td><td>
</td><td>10/20/2022 2:53:45
PM</td><td>&nbsp;</td><td>MA.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>19927</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing WiFi device, missing access control devices, missing ICT
labels </td><td>High</td><td>8/5/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>7/29/2021 11:44:02 AM</td><td> </td><td>10/20/2022 2:51:51
PM</td><td>&nbsp;</td><td>MS.18.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>34265</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Water leakage. </td><td>High</td><td>10/24/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/17/2022 4:25:12 PM</td><td>
</td><td>10/20/2022 2:48:05
PM</td><td>&nbsp;</td><td>MS.19.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>34277</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipe thermal insulation need repairs.
</td><td>High</td><td>10/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/17/2022 4:25:31 PM</td><td> </td><td>10/20/2022 2:47:32
PM</td><td>&nbsp;</td><td>MS.19.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>34287</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air grills need cleaning. </td><td>High</td><td>10/24/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/17/2022 4:27:36 PM</td><td>
</td><td>10/20/2022 2:39:27
PM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34284</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Canvas need to be adjusted. </td><td>High</td><td>10/24/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/17/2022 4:27:03 PM</td><td>
</td><td>10/20/2022 2:34:28
PM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>34275</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Leakage from FCU drain pan. </td><td>High</td><td>10/24/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/17/2022 4:25:27 PM</td><td>
</td><td>10/20/2022 2:33:59
PM</td><td>&nbsp;</td><td>MS.19.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>34270</td><td>CORE E2</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air grills cleaning. </td><td>High</td><td>10/24/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/17/2022 4:25:20 PM</td><td>
</td><td>10/20/2022 2:30:38
PM</td><td>&nbsp;</td><td>MC.13.03.E21</td><td>&nbsp;</td>
</tr><tr>
<td>34274</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Support need painting. </td><td>High</td><td>10/24/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/17/2022 4:25:26 PM</td><td>
</td><td>10/20/2022 2:30:10
PM</td><td>&nbsp;</td><td>MS.19.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>34282</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipe thermal insulation need repairs.
</td><td>High</td><td>10/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/17/2022 4:26:36 PM</td><td> </td><td>10/20/2022 2:29:22
PM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28382</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Missing HILTI label. </td><td>High</td><td>5/4/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>4/27/2022 11:44:36 AM</td><td>
</td><td>10/20/2022 2:28:37
PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>28430</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing HILTI labels for all MEP TRADES.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:58 PM</td><td> </td><td>10/20/2022 2:28:24
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28457</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing HILTI labels. </td><td>High</td><td>5/12/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:06:08 PM</td><td>
</td><td>10/20/2022 2:27:27
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28453</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing HILTI labels for penetrations.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:00 PM</td><td> </td><td>10/20/2022 2:27:08
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34330</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/25/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:06:28 PM</td><td>
</td><td>10/20/2022 2:26:10
PM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>17967</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>Glasbau-Hahn GmbH
Representative</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;Silica Gel to be installed</td><td>High</td><td>6/24/2021
12:00:00 AM</td><td>andrewjohn.rose</td><td>5/24/2021 4:44:43 PM</td><td>
</td><td>10/20/2022 2:25:09 PM</td><td>GEM-CC
scope</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>34331</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/25/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:06:30 PM</td><td>
</td><td>10/20/2022 2:23:32
PM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34334</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Rusty air duct. </td><td>High</td><td>10/25/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:06:36 PM</td><td>
</td><td>10/20/2022 2:22:58
PM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34294</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;No FF detected in this area. </td><td>High</td><td>10/25/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:05:20 PM</td><td>
</td><td>10/20/2022 2:21:57
PM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34299</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct support need adjustments. </td><td>High</td><td>10/25/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:05:32 PM</td><td>
</td><td>10/20/2022 2:18:55
PM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34301</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>10/25/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:05:35 PM</td><td>
</td><td>10/20/2022 2:18:14
PM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34302</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation angle. </td><td>High</td><td>10/25/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:05:37 PM</td><td>
</td><td>10/20/2022 2:16:45
PM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34308</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>10/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/18/2022 4:05:48 PM</td><td> </td><td>10/20/2022 2:16:19
PM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34321</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>10/25/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:06:11 PM</td><td>
</td><td>10/20/2022 2:15:41
PM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34332</td><td>CORE E1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Rusty and dirty drain pipe. </td><td>High</td><td>10/25/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:06:33 PM</td><td>
</td><td>10/20/2022 2:15:29
PM</td><td>&nbsp;</td><td>MC.24.3A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>34295</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct need cleaning. </td><td>High</td><td>10/25/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:05:23 PM</td><td>
</td><td>10/20/2022 2:15:14
PM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34316</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>10/25/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:06:03 PM</td><td>
</td><td>10/20/2022 2:14:53
PM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34325</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Fan hanger need to be adjusted.
</td><td>High</td><td>10/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/18/2022 4:06:18 PM</td><td> </td><td>10/20/2022 2:12:56
PM</td><td>&nbsp;</td><td>MS.19.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>24451</td><td>Bay-02 (from level +31.5 to +37.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:23 AM</td><td> </td><td>10/20/2022 2:11:22
PM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>24460</td><td>Bay-01 (from level +25.5 to +31.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;General cleaning
of the motor </td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:40 AM</td><td> </td><td>10/20/2022 2:10:53
PM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>10869</td><td>TUT- Digital (+49.50)</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Missing tiles / joints not aligned
</td><td>Low</td><td>10/5/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/14/2020 3:43:44 PM</td><td>
</td><td>10/20/2022 1:12:11 PM</td><td>Comments covered by snag
#17986</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>17994</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Floors</td><td>General</td><td>&#39;Final
Cleaning after temp protection dismantled</td><td>High</td><td>5/31/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>5/24/2021 5:38:12 PM</td><td>
</td><td>10/20/2022 1:10:45 PM</td><td>Comment covered by snag #17993 for final
painting/touch up for floor</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>17410</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Irregular joints between
IWS-07and floor stone </td><td>Low</td><td>5/6/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/15/2021 10:29:56 AM</td><td> </td><td>10/20/2022
12:16:30 PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17409</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Defected paint/closed
perforation </td><td>Low</td><td>5/6/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/15/2021 10:29:55 AM</td><td> </td><td>10/20/2022
12:16:24 PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17402</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Interface between IWS-07and
EWS-04</td><td>Low</td><td>5/6/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/15/2021 10:29:40 AM</td><td> </td><td>10/20/2022
12:16:13 PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17401</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Interface between IWS-07and
wall stone </td><td>Low</td><td>5/6/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/15/2021 10:29:32 AM</td><td> </td><td>10/20/2022
12:16:06 PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17400</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Interface between IWS-07and
CLG-03</td><td>Low</td><td>5/6/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/15/2021 10:29:30 AM</td><td> </td><td>10/20/2022
12:15:58 PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17399</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Interface between IWS-07and
floor stone </td><td>Low</td><td>5/6/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/15/2021 10:29:29 AM</td><td> </td><td>10/20/2022
12:15:50 PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17398</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Panels should be leveled
</td><td>Low</td><td>5/6/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/15/2021
10:29:27 AM</td><td> </td><td>10/20/2022 12:15:42
PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17397</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Defected panels
</td><td>Low</td><td>5/6/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/15/2021
10:29:25 AM</td><td> </td><td>10/20/2022 12:15:36
PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17396</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Defected paint/closed
perforation </td><td>Low</td><td>5/6/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/15/2021 10:29:22 AM</td><td> </td><td>10/20/2022
12:15:27 PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17395</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Different texture
</td><td>Low</td><td>5/6/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/15/2021
10:29:20 AM</td><td> </td><td>10/20/2022 12:15:22
PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17472</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Interface between IWS-07 and floor
stone should be regular and adjusted </td><td>Low</td><td>5/9/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/18/2021 1:53:55 PM</td><td> </td><td>10/20/2022
12:15:11 PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17471</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Interface between IWS-07and CLG-03
should be regular </td><td>Low</td><td>5/9/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/18/2021 1:53:51 PM</td><td> </td><td>10/20/2022
12:15:03 PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17470</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Interface between IWS-07and EWS-04
should be regular </td><td>Low</td><td>5/9/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/18/2021 1:53:48 PM</td><td> </td><td>10/20/2022
12:14:55 PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17469</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Different textures should be replaced
</td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021
1:53:43 PM</td><td> </td><td>10/20/2022 12:14:47
PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17468</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Joints between tiles should be the same
width </td><td>Low</td><td>5/9/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/18/2021 1:53:42 PM</td><td> </td><td>10/20/2022
12:14:38 PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17467</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Defected panels should be replaced
</td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021
1:53:39 PM</td><td> </td><td>10/20/2022 12:14:31
PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17466</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Defected paint for marked part/the
photo for marked panels for example </td><td>Low</td><td>5/9/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/18/2021 1:53:36 PM</td><td> </td><td>10/20/2022
12:14:24 PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17465</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Marked tiles should be leveled
</td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021
1:53:31 PM</td><td> </td><td>10/20/2022 12:14:18
PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17464</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Check DWG for marked bracket if needed
or not</td><td>Low</td><td>5/9/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/18/2021 1:53:28 PM</td><td> </td><td>10/20/2022
12:14:10 PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17456</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Damaged tiles should be replaced
</td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021
1:53:11 PM</td><td> </td><td>10/20/2022 12:14:02
PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17463</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Different textures tiles should be
replaced </td><td>Low</td><td>5/9/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/18/2021 1:53:26 PM</td><td> </td><td>10/20/2022
12:13:57 PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17440</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Check Dwg for Ends /cutting of
mullions </td><td>Low</td><td>5/9/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/18/2021 1:52:25 PM</td><td> </td><td>10/20/2022
12:13:48 PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17439</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Gasket should be fixed properly
</td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021
1:52:23 PM</td><td> </td><td>10/20/2022 12:13:41
PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>14697</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Joints to be adjusted /toothing tiles
</td><td>High</td><td>1/17/2021 12:00:00 PM</td><td>mohamed.sami</td><td>1/10/2021
2:31:22 PM</td><td> </td><td>10/20/2022 12:11:15
PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15812</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Door
Hardware</td><td>General</td><td>&#39;Clean paint and make good to the locking
plate</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 9:03:04 AM</td><td> </td><td>10/20/2022
12:11:08 PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15810</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Door
Hardware</td><td>General</td><td>&#39;Remove tape to the hinges (both sides) clean
and make good to the finish</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 9:00:09 AM</td><td> </td><td>10/20/2022
12:11:01 PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14711</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Area to be cleaned (ceiling, walls, glazing and
floor)</td><td>High</td><td>1/18/2021 12:00:00 AM</td><td>Sherif
Elabd</td><td>1/11/2021 10:08:48 AM</td><td> </td><td>10/20/2022 12:10:52
PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>13926</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Toothing tiles between louvre and floor tile/joint to be adjusted
</td><td>High</td><td>12/20/2020 12:00:00
PM</td><td>mohamed.sami</td><td>12/13/2020 2:01:20 PM</td><td> </td><td>10/20/2022
12:10:45 PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>10830</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Speaker should be vertical
</td><td>Low</td><td>10/5/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/14/2020 12:21:09 PM</td><td>
</td><td>10/20/2022 12:10:37
PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>15838</td><td>Grand Stair - LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Remove build up of dust on the
lobby side of the glass and clean</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 1:23:59 PM</td><td> </td><td>10/20/2022
12:10:31 PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>16127</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Bottom of door is damaged -</td><td>High</td><td>2/17/2021
12:00:00 AM</td><td>andrewjohn.rose</td><td>2/10/2021 10:20:56 AM</td><td>
</td><td>10/20/2022 12:10:13 PM</td><td>Duplicated comment, refer to sang
#14876</td><td>MW.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14869</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant need adjustment above door</td><td>High</td><td>1/25/2021
12:00:00 PM</td><td>andrewjohn.rose</td><td>1/18/2021 1:19:36 PM</td><td>
</td><td>10/20/2022 12:09:29
PM</td><td>&nbsp;</td><td>MW.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14866</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant need adjustment around the metal
door</td><td>High</td><td>1/25/2021 12:00:00
PM</td><td>andrewjohn.rose</td><td>1/18/2021 1:19:29 PM</td><td>
</td><td>10/20/2022 12:09:22
PM</td><td>&nbsp;</td><td>MW.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14864</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant need adjustment around door /sealant should be the same
color </td><td>High</td><td>1/25/2021 12:00:00
PM</td><td>andrewjohn.rose</td><td>1/18/2021 1:19:22 PM</td><td>
</td><td>10/20/2022 12:09:15
PM</td><td>&nbsp;</td><td>MW.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>10617</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Overall finishes</td><td>&#39;Damaged tiles/ metal trim not
regular/ missing tiles/ toothing between tiles </td><td>Low</td><td>10/4/2020
12:00:00 PM</td><td>andrewjohn.rose</td><td>9/13/2020 3:56:33 PM</td><td>
</td><td>10/20/2022 12:09:05 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10872</td><td>TUT- Digital (+48.00)</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Metal trim not aligned &amp; irregular /
discoloring between tiles / toothing between tiles </td><td>Low</td><td>10/5/2020
12:00:00 PM</td><td>andrewjohn.rose</td><td>9/14/2020 3:44:17 PM</td><td>
</td><td>10/20/2022 12:08:59
PM</td><td>&nbsp;</td><td>MP.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>13951</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Walls need polishing/gaps to be adjusted
</td><td>High</td><td>12/20/2020 12:00:00
PM</td><td>mohamed.sami</td><td>12/13/2020 2:02:13 PM</td><td> </td><td>10/20/2022
12:08:52 PM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>10646</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>Unilex Sign Systems</td><td>Architectural</td><td>Wall -
Signage</td><td>General Snag</td><td>&#39;Signage fixation need adjustment
</td><td>Low</td><td>10/4/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/13/2020 4:49:29 PM</td><td>
</td><td>10/20/2022 12:08:41
PM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>15866</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Toilet</td><td>Other Snag</td><td>&#39;The toilet must be completely cleaned.
Replace the water floor grill. Make sure that the facilities are not used by the
site workforce.</td><td>High</td><td>2/14/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/7/2021 11:47:58 AM</td><td>
</td><td>10/20/2022 12:08:30
PM</td><td>&nbsp;</td><td>MW.18.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14857</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant need adjustment around the metal doors
</td><td>High</td><td>1/25/2021 12:00:00
PM</td><td>andrewjohn.rose</td><td>1/18/2021 1:18:55 PM</td><td>
</td><td>10/20/2022 12:08:25
PM</td><td>&nbsp;</td><td>MW.18.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14854</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant need adjustment around metal doors
</td><td>High</td><td>1/25/2021 12:00:00
PM</td><td>andrewjohn.rose</td><td>1/18/2021 1:18:49 PM</td><td>
</td><td>10/20/2022 12:08:19
PM</td><td>&nbsp;</td><td>MW.18.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15830</td><td>TUT- FIRE EXIT</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Remove paint to the trim throughout the area. Hide the screw
heads. Redo the poor quality sealant works. This to be completed on all 4
elevations of the area.</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 12:51:54 PM</td><td>
</td><td>10/20/2022 12:08:10
PM</td><td>&nbsp;</td><td>MP.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>13922</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Chipped edges/tile leveling to be adjustment
</td><td>High</td><td>12/20/2020 12:00:00
PM</td><td>mohamed.sami</td><td>12/13/2020 2:01:10 PM</td><td> </td><td>10/20/2022
12:08:02 PM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>13928</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Wall -
Signage</td><td>General Snag</td><td>&#39;Leveling signage needs adjustment
</td><td>High</td><td>12/20/2020 12:00:00
PM</td><td>mohamed.sami</td><td>12/13/2020 2:01:24 PM</td><td> </td><td>10/20/2022
12:07:53 PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>13942</td><td>TUT- (+45.00)</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Shortage of /toothing in The threshold
</td><td>High</td><td>12/20/2020 12:00:00
PM</td><td>mohamed.sami</td><td>12/13/2020 2:01:52 PM</td><td> </td><td>10/20/2022
12:06:00 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10697</td><td>TUT- (+45.00)</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Defected tiles /lighting fixtures not settled on ceiling/removal
the paint stains from ceiling tiles</td><td>Low</td><td>10/4/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/13/2020 4:52:54 PM</td><td>
</td><td>10/20/2022 12:05:53 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10691</td><td>TUT- (+45.00)</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Sealant to be adjusted
inEWS2</td><td>Low</td><td>10/4/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/13/2020 4:52:33 PM</td><td>
</td><td>10/20/2022 12:05:46 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>15833</td><td>TUT- (+45.00)</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Painting</td><td>Clean paint off ceiling
trim</td><td>&#39;Remove paint to the ceiling trim. Remove paint to the adaptation
anchor plates - all of them.</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 1:02:08 PM</td><td> </td><td>10/20/2022
12:05:39 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>34303</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Painting of supports and retaining angle.
</td><td>High</td><td>10/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/18/2022 4:05:38 PM</td><td> </td><td>10/20/2022 11:01:59
AM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34304</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Dirty air grill. </td><td>High</td><td>10/25/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:05:40 PM</td><td>
</td><td>10/20/2022 11:01:32
AM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34306</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct holes. </td><td>High</td><td>10/25/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:05:43 PM</td><td>
</td><td>10/20/2022 11:01:19
AM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34313</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Rusty supports. </td><td>High</td><td>10/25/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:05:57 PM</td><td>
</td><td>10/20/2022 11:01:10
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34327</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>10/25/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:06:23 PM</td><td>
</td><td>10/20/2022 10:43:54
AM</td><td>&nbsp;</td><td>MS.19.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34328</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage air grill. </td><td>High</td><td>10/25/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:06:25 PM</td><td>
</td><td>10/20/2022 10:43:35
AM</td><td>&nbsp;</td><td>MS.19.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28868</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Stopping</td><td>Fire seal damaged</td><td>&#39;Missing HILTI label.
</td><td>High</td><td>5/23/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:07:05 PM</td><td> </td><td>10/20/2022 10:27:38
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28991</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Fire stopping
incomplete</td><td>&#39;Missing HILTI labels for fire dampers duct penetrations.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:09:21 PM</td><td> </td><td>10/20/2022 10:25:09
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>19487</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof -
Cladding</td><td>Needs cleaning</td><td>&#39;Touch up for boxes ends from
rusted</td><td>Low</td><td>7/20/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/29/2021 10:17:52 AM</td><td> </td><td>10/20/2022
9:37:51 AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>31999</td><td>CORE F2</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Missing epoxy paint
</td><td>Low</td><td>7/26/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>7/5/2022
12:14:15 PM</td><td> </td><td>10/20/2022 9:18:03
AM</td><td>&nbsp;</td><td>MC.19.03.F21</td><td>&nbsp;</td>
</tr><tr>
<td>31996</td><td>CORE F2</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Touch up painting is needed for marked part
</td><td>Low</td><td>7/26/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>7/5/2022
12:14:10 PM</td><td> </td><td>10/20/2022 9:17:38
AM</td><td>&nbsp;</td><td>MC.19.03.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29792</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories should be clean from
painting.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:15:38 PM</td><td> </td><td>10/20/2022 9:17:03
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>28190</td><td>CORE F1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to
repair.</td><td>Low</td><td>4/7/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/17/2022 11:29:14 AM</td><td> </td><td>10/20/2022 9:16:20
AM</td><td>&nbsp;</td><td>MC.24.03.F11</td><td>&nbsp;</td>
</tr><tr>
<td>21220</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Horizontal handrail should be flush
with inclined handrail </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 11:01:12 AM</td><td> </td><td>10/20/2022 9:15:34
AM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>28381</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing HILTI labels for all MEP trades penetrating the wall.
</td><td>High</td><td>5/4/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/27/2022 11:44:35 AM</td><td> </td><td>10/20/2022 8:44:38
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>34305</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Rusty drain pipe. </td><td>High</td><td>10/25/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:05:42 PM</td><td>
</td><td>10/20/2022 8:36:28
AM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34314</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>10/25/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/18/2022 4:06:00 PM</td><td>
</td><td>10/20/2022 8:35:32
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34317</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage air duct thermal insulation.
</td><td>High</td><td>10/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/18/2022 4:06:05 PM</td><td> </td><td>10/20/2022 8:33:40
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29236</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Coils fins shall be adjusted and
cleaned. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:31 PM</td><td> </td><td>10/20/2022 8:32:59
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32500</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;Missing actuator
gauge</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:52 AM</td><td> </td><td>10/20/2022 7:56:48
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>17971</td><td>TUT- Digital (+48.00)</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General</
td><td>&#39;Language Wall Ceiling Tiles to be
replaced</td><td>High</td><td>6/6/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>5/24/2021 4:55:01 PM</td><td>
</td><td>10/19/2022 3:53:36 PM</td><td>Duplicated comment, refer to snag
#15827</td><td>MP.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>10643</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Bad welding joints
</td><td>Low</td><td>10/4/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/13/2020 4:49:20 PM</td><td>
</td><td>10/19/2022 3:52:26 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>12995</td><td>TUT- BREAK OUT SPACE</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;The Tiles leveling need adjustment
</td><td>High</td><td>11/9/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>11/2/2020
1:11:04 PM</td><td> </td><td>10/19/2022 3:51:40
PM</td><td>&nbsp;</td><td>MP.18.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>13011</td><td>TUT- BREAK OUT SPACE</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Irregular joints/tiles need touchup
</td><td>High</td><td>11/9/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>11/2/2020
1:11:50 PM</td><td> </td><td>10/19/2022 3:51:07
PM</td><td>&nbsp;</td><td>MP.18.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>15852</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
stone</td><td>Stained</td><td>&#39;Clean the floor as stained and in an
unacceptable condition.</td><td>High</td><td>2/14/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/7/2021 11:05:27 AM</td><td>
</td><td>10/19/2022 3:50:03
PM</td><td>&nbsp;</td><td>MW.18.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15859</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Clean the floor that is in an unacceptable
condition</td><td>High</td><td>2/14/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/7/2021 11:43:20 AM</td><td>
</td><td>10/19/2022 3:49:34
PM</td><td>&nbsp;</td><td>MW.18.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>10874</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Damaged panels/ joints not aligned/ missing
signage panel/ </td><td>Low</td><td>10/5/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/14/2020 3:44:56 PM</td><td>
</td><td>10/19/2022 3:47:08 PM</td><td>Panels were replaced by IWS-01
type</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>13945</td><td>TUT- LOBBY(+45.00)</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Joints are not aligned /tiles needs touch up /joint to be
adjusted </td><td>High</td><td>12/20/2020 12:00:00
PM</td><td>mohamed.sami</td><td>12/13/2020 2:02:00 PM</td><td> </td><td>10/19/2022
3:46:45 PM</td><td>Panels were replaced by IWS-01
type</td><td>MP.12.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17603</td><td>CORRIDOR</td><td>CCB
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Media converter is not installed, no WiFi or ict
labels</td><td>High</td><td>5/12/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>5/5/2021 12:22:55 PM</td><td> </td><td>10/19/2022
1:36:14 PM</td><td>&nbsp;</td><td>CS.02.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20103</td><td>PAPYRUS-Band A</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing cctv labels, door lock cables shouldn’t be visible
</td><td>High</td><td>8/10/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/3/2021 11:29:00 AM</td><td> </td><td>10/19/2022 1:35:26
PM</td><td>&nbsp;</td><td>ME.12.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>32884</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Disable reset bottom not installed correctly
</td><td>High</td><td>10/11/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/4/2022
4:15:12 PM</td><td> </td><td>10/19/2022 1:30:20
PM</td><td>&nbsp;</td><td>MW.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>32879</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cable rack cover missing </td><td>High</td><td>10/11/2022
12:00:00 AM</td><td>mina.moussa</td><td>10/4/2022 4:15:02 PM</td><td>
</td><td>10/19/2022 1:29:00
PM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>32377</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:57 PM</td><td> </td><td>10/19/2022 11:49:26
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32379</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:16:02 PM</td><td> </td><td>10/19/2022 11:49:17
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32378</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:59 PM</td><td> </td><td>10/19/2022 11:49:09
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32376</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:56 PM</td><td> </td><td>10/19/2022 11:49:02
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32375</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:54 PM</td><td> </td><td>10/19/2022 11:48:55
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32374</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:52 PM</td><td> </td><td>10/19/2022 11:48:47
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32373</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to repair and touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:51 PM</td><td> </td><td>10/19/2022 11:48:39
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32338</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 4:06:35 PM</td><td> </td><td>10/19/2022
11:48:31 AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.19.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32339</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;All
walls need touch up painting </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 4:06:38 PM</td><td> </td><td>10/19/2022
11:48:21 AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.19.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32337</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs touch up painting from both sides
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:06:34 PM</td><td> </td><td>10/19/2022 11:48:14 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.19.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32336</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Bolts should be removed then all holes should be repaired
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:06:33 PM</td><td> </td><td>10/19/2022 11:48:08 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.19.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32371</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to repair and touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:47 PM</td><td> </td><td>10/19/2022 11:47:59
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32372</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch up
.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:49 PM</td><td> </td><td>10/19/2022 11:47:53
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32370</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:45 PM</td><td> </td><td>10/19/2022 11:47:46
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32369</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:44 PM</td><td> </td><td>10/19/2022 11:47:38
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32368</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:42 PM</td><td> </td><td>10/19/2022 11:47:29
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32367</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to repair and touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:40 PM</td><td> </td><td>10/19/2022 11:47:23
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32365</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:37 PM</td><td> </td><td>10/19/2022 11:47:16
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32364</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:35 PM</td><td> </td><td>10/19/2022 11:47:09
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32366</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:39 PM</td><td> </td><td>10/19/2022 11:47:03
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32362</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:32 PM</td><td> </td><td>10/19/2022 11:46:56
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32361</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:29 PM</td><td> </td><td>10/19/2022 11:46:49
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32363</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail welding should be finished
well.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:34 PM</td><td> </td><td>10/19/2022 11:46:36
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32329</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;All
walls need touch up painting </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 4:06:21 PM</td><td> </td><td>10/19/2022
11:46:23 AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32335</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Fire sealant is missing
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:06:32 PM</td><td> </td><td>10/19/2022 11:46:09 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32334</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs touch up painting from both sides
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:06:30 PM</td><td> </td><td>10/19/2022 11:46:00 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32333</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked opening should be closed
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:06:28 PM</td><td> </td><td>10/19/2022 11:45:53 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32332</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Floor should be repaired and
repainted </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 4:06:26 PM</td><td> </td><td>10/19/2022
11:45:46 AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32330</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Openings should be closed if not needed
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
4:06:23 PM</td><td> </td><td>10/19/2022 11:45:38 AM</td><td>This Snag can be closed
on that PMC snagging was done</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32237</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 11:50:39 AM</td><td> </td><td>10/19/2022
11:45:22 AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32233</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Stair steps should be repainted
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:50:30 AM</td><td> </td><td>10/19/2022 11:45:14 AM</td><td>This Snag can be
closed on that PMC snagging was done</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32232</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>sally.george</td><td>7/17/2022 11:50:29 AM</td><td>
</td><td>10/19/2022 11:45:06 AM</td><td>This Snag can be closed on that PMC
snagging was done</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32235</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor should be repaired and
repainted </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 11:50:34 AM</td><td> </td><td>10/19/2022
11:44:59 AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32234</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>sally.george</td><td>7/17/2022 11:50:32 AM</td><td>
</td><td>10/19/2022 11:44:53 AM</td><td>This Snag can be closed on that PMC
snagging was done</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32141</td><td>ELECTRICAL ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:13 AM</td><td> </td><td>10/19/2022 11:44:42
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.014</td><td>&nbsp;</td>
</tr><tr>
<td>32140</td><td>ELECTRICAL ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:10 AM</td><td> </td><td>10/19/2022 11:44:35
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.014</td><td>&nbsp;</td>
</tr><tr>
<td>32139</td><td>ELECTRICAL ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling need to
repair.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:09 AM</td><td> </td><td>10/19/2022 11:44:29
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.014</td><td>&nbsp;</td>
</tr><tr>
<td>32143</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:17 AM</td><td> </td><td>10/19/2022 11:44:20
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32142</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:15 AM</td><td> </td><td>10/19/2022 11:44:13
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32144</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:19 AM</td><td> </td><td>10/19/2022 11:44:07
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32148</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing hardware accessories.</td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>Moussa Nageh Khella</td><td>7/17/2022 11:47:26 AM</td><td>
</td><td>10/19/2022 11:43:57 AM</td><td>This Snag can be closed on that PMC
snagging was done</td><td>MS.13.3A.011</td><td>&nbsp;</td>
</tr><tr>
<td>32147</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:24 AM</td><td> </td><td>10/19/2022 11:43:49
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.011</td><td>&nbsp;</td>
</tr><tr>
<td>32146</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:23 AM</td><td> </td><td>10/19/2022 11:43:42
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.011</td><td>&nbsp;</td>
</tr><tr>
<td>32145</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:21 AM</td><td> </td><td>10/19/2022 11:43:35
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.011</td><td>&nbsp;</td>
</tr><tr>
<td>32230</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 11:50:24 AM</td><td> </td><td>10/19/2022
11:43:11 AM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>32226</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs touch up painting </td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>sally.george</td><td>7/17/2022 11:50:14 AM</td><td>
</td><td>10/19/2022 11:43:02 AM</td><td>This Snag can be closed on that PMC
snagging was done</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>32225</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Gap should be closed
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:50:10 AM</td><td> </td><td>10/19/2022 11:42:54 AM</td><td>This Snag can be
closed on that PMC snagging was done</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>32231</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Bolts should be removed and /all holes should be closed
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:50:27 AM</td><td> </td><td>10/19/2022 11:42:47 AM</td><td>This Snag can be
closed on that PMC snagging was done</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>32229</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door should be repaired and repainted
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:50:23 AM</td><td> </td><td>10/19/2022 11:42:39 AM</td><td>This Snag can be
closed on that PMC snagging was done</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>32228</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor should be repaired and repainted
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:50:21 AM</td><td> </td><td>10/19/2022 11:42:29 AM</td><td>This Snag can be
closed on that PMC snagging was done</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>32227</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;All
walls should be repainted </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 11:50:19 AM</td><td> </td><td>10/19/2022
11:42:22 AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>32224</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>8/7/2022
12:00:00 AM</td><td>sally.george</td><td>7/17/2022 11:50:08 AM</td><td>
</td><td>10/19/2022 11:42:04 AM</td><td>This Snag can be closed on that PMC
snagging was done</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32223</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Fire sealant is missing
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:50:06 AM</td><td> </td><td>10/19/2022 11:41:56 AM</td><td>This Snag can be
closed on that PMC snagging was done</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32222</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor should be repaired and
repainted </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 11:50:04 AM</td><td> </td><td>10/19/2022
11:41:47 AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32221</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 11:50:01 AM</td><td> </td><td>10/19/2022
11:41:40 AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32134</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:46:59 AM</td><td> </td><td>10/19/2022 11:41:32
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32133</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:46:56 AM</td><td> </td><td>10/19/2022 11:41:25
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32137</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:05 AM</td><td> </td><td>10/19/2022 11:41:16
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32136</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:04 AM</td><td> </td><td>10/19/2022 11:41:07
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32135</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:01 AM</td><td> </td><td>10/19/2022 11:40:59
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32138</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:07 AM</td><td> </td><td>10/19/2022 11:40:52
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32360</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Steel ladder need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 4:15:27 PM</td><td> </td><td>10/19/2022 11:38:58
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32240</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Fire sealant is missing
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:50:45 AM</td><td> </td><td>10/19/2022 11:37:51 AM</td><td>This Snag can be
closed on that PMC snagging was done</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32239</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Wooden plate should be removed
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:50:43 AM</td><td> </td><td>10/19/2022 11:37:41 AM</td><td>This Snag can be
closed on that PMC snagging was done</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32238</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door should be repaired and repainted from both sides
</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>sally.george</td><td>7/17/2022
11:50:40 AM</td><td> </td><td>10/19/2022 11:37:34 AM</td><td>This Snag can be
closed on that PMC snagging was done</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32236</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 11:50:36 AM</td><td> </td><td>10/19/2022
11:37:27 AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32150</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:30 AM</td><td> </td><td>10/19/2022 11:37:05
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32149</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:28 AM</td><td> </td><td>10/19/2022 11:36:57
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32152</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:33 AM</td><td> </td><td>10/19/2022 11:36:49
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32151</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>8/7/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>7/17/2022 11:47:31 AM</td><td> </td><td>10/19/2022 11:36:41
AM</td><td>This Snag can be closed on that PMC snagging was
done</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27931</td><td>STAFF W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gap between wall and ceiling need to
adjusted.</td><td>Low</td><td>4/3/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:44 AM</td><td> </td><td>10/19/2022 10:52:49
AM</td><td>&nbsp;</td><td>MW.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>9652</td><td>AHU/PLANT</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;No outlet label,no access control device installed,no media
converter box installed, no outlet termination inspected fiber or UTP, cable trunks
cables address is not finished,</td><td>High</td><td>7/27/2020 12:00:00
PM</td><td>Mohamed Samir</td><td>7/20/2020 2:06:14 PM</td><td> </td><td>10/19/2022
10:13:18 AM</td><td>&nbsp;</td><td>MS.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>32861</td><td>FIRE LOBBY</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>10/11/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/4/2022 4:14:31 PM</td><td> </td><td>10/19/2022
10:09:33 AM</td><td>&nbsp;</td><td>MQ.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34050</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work cable not installed
</td><td>High</td><td>10/17/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/10/2022
4:17:29 PM</td><td> </td><td>10/19/2022 10:09:07
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>21822</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All the floor boxes ICT cables terminations have not been done
and most of the pulled cat6a cables were not terminated
</td><td>High</td><td>8/26/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:27:23 PM</td><td> </td><td>10/19/2022 10:02:20
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>12097</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Incomplete Installation</td><td>&#39;Floor box cabling Termination
and permanent labeling has not been done yet </td><td>High</td><td>10/8/2020
12:00:00 PM</td><td>Mohamed Samir</td><td>10/1/2020 3:03:19 PM</td><td>
</td><td>10/19/2022 9:50:31
AM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>28084</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/15/2022
12:08:11 PM</td><td> </td><td>10/19/2022 8:22:58
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>27738</td><td>IT 7</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Raised
Floor</td><td>Cleaning</td><td>&#39;Flooring need cleaning
</td><td>Low</td><td>3/31/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022
11:08:20 AM</td><td> </td><td>10/19/2022 8:20:56
AM</td><td>&nbsp;</td><td>MS.14.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>21619</td><td>CORE D3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Marked part should be adjusted and
repaired </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:24:00 AM</td><td> </td><td>10/19/2022 8:20:30
AM</td><td>&nbsp;</td><td>MC.13.02.D31</td><td>&nbsp;</td>
</tr><tr>
<td>32542</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;Missing gauge for
actuators </td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:30:06 AM</td><td> </td><td>10/18/2022 4:45:57
PM</td><td>&nbsp;</td><td>MS.19.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32524</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;Actuator gauges are
missing </td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:34 AM</td><td> </td><td>10/18/2022 4:45:47
PM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32843</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All CCTV activation </td><td>High</td><td>9/18/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>9/11/2022 1:14:33 PM</td><td>
</td><td>10/18/2022 3:52:20
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32873</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>10/11/2022
12:00:00 AM</td><td>mina.moussa</td><td>10/4/2022 4:14:52 PM</td><td>
</td><td>10/18/2022 2:20:03
PM</td><td>&nbsp;</td><td>MP.18.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>32973</td><td>MECH</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing access control devices and cables management
</td><td>High</td><td>10/12/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/5/2022
4:07:11 PM</td><td> </td><td>10/18/2022 2:18:32
PM</td><td>&nbsp;</td><td>MS.13.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>32983</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing PA speaker</td><td>High</td><td>10/12/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/5/2022 4:07:28 PM</td><td> </td><td>10/18/2022
2:16:38 PM</td><td>&nbsp;</td><td>MS.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>26959</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV and RFID devices labeling and RJ45 patch cords should not be
visible </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:26 PM</td><td> </td><td>10/18/2022 2:16:11
PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27396</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No media converter for rfid</td><td>High</td><td>3/14/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:08:36 PM</td><td>
</td><td>10/18/2022 2:15:27
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>27393</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No media converter </td><td>High</td><td>3/14/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:08:32 PM</td><td>
</td><td>10/18/2022 2:15:25
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>31531</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing actuators.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:23 PM</td><td> </td><td>10/18/2022 1:42:24
PM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>20039</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Need ladder for passing for the other side from
duct</td><td>High</td><td>8/5/2021 12:00:00 PM</td><td>ahmedsalem</td><td>7/29/2021
3:00:28 PM</td><td> </td><td>10/18/2022 1:30:11
PM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>28376</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Glasbau-Hahn GmbH Representative</td><td>MEP-
Mechanical</td><td>Mechanical Pipework</td><td>Air vent/bottle to be
fitted</td><td>&#39;Unfinished works. </td><td>High</td><td>5/3/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>4/26/2022 11:45:42 AM</td><td>
</td><td>10/18/2022 1:29:14
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28771</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>Technica
Co.</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Incomplete works. </td><td>High</td><td>5/19/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/12/2022 11:47:58 AM</td><td>
</td><td>10/18/2022 1:28:29
PM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>28687</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>Technica
Co.</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Incomplete pipe works. </td><td>High</td><td>5/17/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:47:33 PM</td><td>
</td><td>10/18/2022 1:28:07
PM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>29073</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Incomplete works.
</td><td>High</td><td>5/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/18/2022 11:56:32 AM</td><td> </td><td>10/18/2022 1:27:08
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29222</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Incomplete pipe works.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:59 AM</td><td> </td><td>10/18/2022 1:25:45
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>31804</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing labels for hydronic valves.
</td><td>High</td><td>6/13/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:29 PM</td><td> </td><td>10/18/2022 1:22:51
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>34006</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning from inside. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:15:30 PM</td><td>
</td><td>10/18/2022 1:20:20
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33994</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;LTHW pipes need more supports. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:15:05 PM</td><td>
</td><td>10/18/2022 1:19:21
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>29774</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories and hardware </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:14:39 PM</td><td> </td><td>10/18/2022 1:14:23
PM</td><td>&nbsp;</td><td>MS.19.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>27685</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Temporary wood should be
removed.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 3:35:48 PM</td><td> </td><td>10/18/2022 1:13:50
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>34220</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning of machine base. </td><td>High</td><td>10/23/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:13:35 PM</td><td>
</td><td>10/18/2022 11:58:21
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34222</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning from inside. </td><td>High</td><td>10/23/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:13:38 PM</td><td>
</td><td>10/18/2022 11:57:50
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34223</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning from outside. </td><td>High</td><td>10/23/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:13:40 PM</td><td>
</td><td>10/18/2022 11:57:32
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34228</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air filter need cleaning. </td><td>High</td><td>10/23/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:13:48 PM</td><td>
</td><td>10/18/2022 11:57:01
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34234</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/23/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:13:57 PM</td><td>
</td><td>10/18/2022 11:56:37
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34254</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Support need painting. </td><td>High</td><td>10/23/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:14:30 PM</td><td>
</td><td>10/18/2022 11:55:58
AM</td><td>&nbsp;</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34230</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;MEP trades conflict shall be solved.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:52 PM</td><td> </td><td>10/18/2022 11:55:39
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34211</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/23/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:13:22 PM</td><td>
</td><td>10/18/2022 11:54:13
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34229</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation for chilled water pipes need to be
completed. </td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:50 PM</td><td> </td><td>10/18/2022 11:52:49
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34233</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation need repairs and cleanning.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:56 PM</td><td> </td><td>10/18/2022 11:52:19
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34255</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Hydronic pipes labels are missing.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:14:31 PM</td><td> </td><td>10/18/2022 11:51:53
AM</td><td>&nbsp;</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34203</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Grill cleaning. </td><td>High</td><td>10/23/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:13:11 PM</td><td>
</td><td>10/18/2022 11:51:13
AM</td><td>&nbsp;</td><td>MS.19.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34243</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;PPR pipe shall be realigned. </td><td>High</td><td>10/23/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:14:13 PM</td><td>
</td><td>10/18/2022 11:50:15
AM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>31615</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Valves name tags for chilled water pipes
are missing. </td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:50 AM</td><td> </td><td>10/18/2022 11:47:58
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>34217</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Chilled water pipes need more supports.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:31 PM</td><td> </td><td>10/18/2022 11:17:55
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34256</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipes thermal insulation need repairs.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:14:35 PM</td><td> </td><td>10/18/2022 11:17:37
AM</td><td>&nbsp;</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34202</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain pan insulation need adjustments.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:09 PM</td><td> </td><td>10/18/2022 11:12:21
AM</td><td>&nbsp;</td><td>MS.19.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34206</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:15 PM</td><td> </td><td>10/18/2022 11:11:51
AM</td><td>&nbsp;</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34208</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation need repairs.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:18 PM</td><td> </td><td>10/18/2022 11:11:09
AM</td><td>&nbsp;</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34205</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Rusty pipe need painting. </td><td>High</td><td>10/23/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:13:14 PM</td><td>
</td><td>10/18/2022 11:10:37
AM</td><td>&nbsp;</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>31166</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Valves name tags are missing. </td><td>High</td><td>6/8/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:54:16 PM</td><td>
</td><td>10/18/2022 11:07:39
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31180</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing name tags for chilled water valves.
</td><td>High</td><td>6/8/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:54:53 PM</td><td> </td><td>10/18/2022 11:07:12
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31197</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Valves name tags are missing. </td><td>High</td><td>6/8/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:55:32 PM</td><td>
</td><td>10/18/2022 11:06:29
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31220</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Valves name tags are missing. </td><td>High</td><td>6/8/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:56:41 PM</td><td>
</td><td>10/18/2022 11:04:33
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>34201</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Filter cleaning. </td><td>High</td><td>10/23/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:13:08 PM</td><td>
</td><td>10/18/2022 11:03:40
AM</td><td>&nbsp;</td><td>MS.19.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34216</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/23/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:13:29 PM</td><td>
</td><td>10/18/2022 11:03:21
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34238</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipe thermal insulation need repairs.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:14:05 PM</td><td> </td><td>10/18/2022 11:02:08
AM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34251</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:14:26 PM</td><td> </td><td>10/18/2022 11:00:33
AM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34212</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation around sensors need repairs.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:23 PM</td><td> </td><td>10/18/2022 10:48:27
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34221</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation need to be repaired.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:37 PM</td><td> </td><td>10/18/2022 10:47:42
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34268</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Rusty drain pipe need painting and cleaning.
</td><td>High</td><td>10/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/17/2022 4:25:17 PM</td><td> </td><td>10/18/2022 10:45:18
AM</td><td>&nbsp;</td><td>MS.19.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>34261</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing FE. </td><td>High</td><td>10/24/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/17/2022 4:25:06 PM</td><td>
</td><td>10/18/2022 10:41:56 AM</td><td>&nbsp;</td><td>Level
+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>34241</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;PPR pipe labels. </td><td>High</td><td>10/23/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:14:09 PM</td><td>
</td><td>10/17/2022 4:51:24
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34242</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain pipe need cleaning. </td><td>High</td><td>10/23/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:14:11 PM</td><td>
</td><td>10/17/2022 4:49:49
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34199</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning for air grills. </td><td>High</td><td>10/23/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:13:05 PM</td><td>
</td><td>10/17/2022 4:48:30
PM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>34245</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air filter shall be cleaned. </td><td>High</td><td>10/23/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:14:16 PM</td><td>
</td><td>10/17/2022 4:47:34
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34246</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Chilled water pipes thermal insulation need repairs.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:14:18 PM</td><td> </td><td>10/17/2022 4:46:55
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34257</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air outlets need cleaning. </td><td>High</td><td>10/23/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:14:37 PM</td><td>
</td><td>10/17/2022 4:46:11
PM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34239</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air grill need cleaning. </td><td>High</td><td>10/23/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:14:06 PM</td><td>
</td><td>10/17/2022 4:45:36
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34244</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air grill need cleaning. </td><td>High</td><td>10/23/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:14:14 PM</td><td>
</td><td>10/17/2022 4:44:44
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34218</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation need repairs.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:13:32 PM</td><td> </td><td>10/17/2022 4:43:57
PM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>34258</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation need repairs.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:14:38 PM</td><td> </td><td>10/17/2022 4:43:04
PM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34236</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain pipe need cleaning. </td><td>High</td><td>10/23/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/16/2022 4:14:01 PM</td><td>
</td><td>10/17/2022 4:42:01
PM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32603</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;Missing gauge for
actutor</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/19/2022 10:58:45 AM</td><td> </td><td>10/17/2022 4:40:21
PM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32555</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:33:20 AM</td><td> </td><td>10/17/2022 4:40:05
PM</td><td>&nbsp;</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>34248</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Hydronic pipes labels are missing.
</td><td>High</td><td>10/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/16/2022 4:14:21 PM</td><td> </td><td>10/17/2022 4:38:49
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27403</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Media converter and rg45 patching and port mapping for card
reader</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:49 PM</td><td> </td><td>10/17/2022 4:04:14
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27404</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Media converter and patch and
label</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:50 PM</td><td> </td><td>10/17/2022 4:03:42
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27394</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No patching connections for device</td><td>High</td><td>3/14/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:08:33 PM</td><td>
</td><td>10/17/2022 4:03:01
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>32882</td><td>MECH</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Gpu not installed properly </td><td>High</td><td>10/11/2022
12:00:00 AM</td><td>mina.moussa</td><td>10/4/2022 4:15:08 PM</td><td>
</td><td>10/17/2022 4:01:39
PM</td><td>&nbsp;</td><td>MS.19.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>32959</td><td>FIRE EXIT</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete works missing access control devices
</td><td>High</td><td>10/12/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/5/2022
4:06:49 PM</td><td> </td><td>10/17/2022 4:01:26
PM</td><td>&nbsp;</td><td>MP.14.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>32888</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Faceplate alignment </td><td>High</td><td>10/11/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/4/2022 4:15:23 PM</td><td> </td><td>10/17/2022
4:01:01 PM</td><td>&nbsp;</td><td>Level +46.50</td><td>&nbsp;</td>
</tr><tr>
<td>32885</td><td>MECH</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing access control device</td><td>High</td><td>10/11/2022
12:00:00 AM</td><td>mina.moussa</td><td>10/4/2022 4:15:14 PM</td><td>
</td><td>10/17/2022 4:00:59
PM</td><td>&nbsp;</td><td>MS.19.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>32976</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing access control devices </td><td>High</td><td>10/12/2022
12:00:00 AM</td><td>mina.moussa</td><td>10/5/2022 4:07:16 PM</td><td>
</td><td>10/17/2022 4:00:03
PM</td><td>&nbsp;</td><td>MS.13.03.009</td><td>&nbsp;</td>
</tr><tr>
<td>32952</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing camera</td><td>High</td><td>10/12/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/5/2022 4:06:39 PM</td><td> </td><td>10/17/2022
3:59:47 PM</td><td>&nbsp;</td><td>MS.19.03.008</td><td>&nbsp;</td>
</tr><tr>
<td>27893</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lift management system not
done</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>3/12/2022 11:52:39 AM</td><td> </td><td>10/17/2022 3:59:23
PM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>13679</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Coil fins</td><td>&#39;Coil fins
need adjustment , door handles are broken , motors need cleaning
</td><td>Medium</td><td>12/10/2020 12:00:00
PM</td><td>ahmedsalem</td><td>11/30/2020 11:59:26 AM</td><td> </td><td>10/17/2022
3:12:49 PM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>20032</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;There are no accessibility for water supply
valves</td><td>High</td><td>8/5/2021 12:00:00
PM</td><td>ahmedsalem</td><td>7/29/2021 3:00:16 PM</td><td> </td><td>10/17/2022
3:12:48 PM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>20331</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Glasbau-Hahn GmbH Representative</td><td>MEP-
Mechanical</td><td>GENERAL SUPPORTS</td><td>Arrangement is not vertical /
horizontal</td><td>&#39;PPR pipe need support</td><td>High</td><td>8/11/2021
12:00:00 AM</td><td>ahmedsalem</td><td>8/4/2021 12:58:59 PM</td><td>
</td><td>10/17/2022 3:12:47
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>21944</td><td>CORE D2</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Incomplete work </td><td>High</td><td>8/30/2021
12:00:00 AM</td><td>ahmedsalem</td><td>8/23/2021 1:35:41 PM</td><td>
</td><td>10/17/2022 3:12:45
PM</td><td>&nbsp;</td><td>MC.18.02.D21</td><td>&nbsp;</td>
</tr><tr>
<td>28279</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>Goppion
Representative</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Work not finished yet. </td><td>Medium</td><td>4/29/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>4/19/2022 11:47:19 AM</td><td>
</td><td>10/17/2022 3:12:43
PM</td><td>&nbsp;</td><td>MS.13.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28348</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Glasbau-Hahn GmbH Representative</td><td>MEP-
Mechanical</td><td>Mechanical Pipework</td><td>General Snag</td><td>&#39;Incomplete
works. </td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:33 AM</td><td> </td><td>10/17/2022 3:12:42
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28361</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Coil fins need adjustment and inside
machine light is missing. The contractor shall check all machine doors handles.
</td><td>High</td><td>5/3/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:45:04 AM</td><td> </td><td>10/17/2022 3:12:41
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28371</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Installation
not to specification/drawing</td><td>&#39;Missing fire stop.
</td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:45:27 AM</td><td> </td><td>10/17/2022 3:12:39
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28373</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Installation
not to specification/drawing</td><td>&#39;Missing fire stop for all MEP
penetrations. </td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:45:33 AM</td><td> </td><td>10/17/2022 3:12:38
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28536</td><td>ELEC.</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Coil fins need to be adjusted. </td><td>High</td><td>5/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/9/2022 11:48:39 AM</td><td>
</td><td>10/17/2022 3:12:37
PM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>28714</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Fire sealant for duct penetration need repair.
</td><td>High</td><td>5/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:42 AM</td><td> </td><td>10/17/2022 3:12:35
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29010</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Coil fins shall be adjusted.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:09 PM</td><td> </td><td>10/17/2022 3:12:34
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29047</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Coil fins need adjustments.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:51 PM</td><td> </td><td>10/17/2022 3:12:33
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29137</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Coil fins.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:44 AM</td><td> </td><td>10/17/2022 3:12:31
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29138</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Coil fins.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:47 AM</td><td> </td><td>10/17/2022 3:12:30
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29188</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Pipe and air duct penetration. </td><td>High</td><td>5/29/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:59:04 AM</td><td>
</td><td>10/17/2022 3:12:29
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29255</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Coil fins shall be cleaned and
adjusted. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:16 PM</td><td> </td><td>10/17/2022 3:12:28
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30022</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing supports for PPR
pipes. </td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:36 AM</td><td> </td><td>10/17/2022 3:12:26
PM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>30652</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing valves name
tags. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:35 AM</td><td> </td><td>10/17/2022 3:12:25
PM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30797</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Elevators works not finished.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:21 PM</td><td> </td><td>10/17/2022 3:12:24
PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31372</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing name tags for chilled water pipes.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:55:06 AM</td><td> </td><td>10/17/2022 3:12:22
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31384</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing name tags for hydronic valves.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:55:32 AM</td><td> </td><td>10/17/2022 3:12:21
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31387</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing valves name tags. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:55:39 AM</td><td>
</td><td>10/17/2022 3:12:20
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31405</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing name tags for valves. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:56:15 AM</td><td>
</td><td>10/17/2022 3:12:19
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31427</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Valves name tags are missing. </td><td>High</td><td>6/9/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:57:02 AM</td><td>
</td><td>10/17/2022 3:12:17
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31454</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing valves name tags. </td><td>High</td><td>6/9/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 12:05:14 PM</td><td>
</td><td>10/17/2022 3:12:16
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31599</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing name tags for chilled water valves.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:21 AM</td><td> </td><td>10/17/2022 3:12:15
PM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31607</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Name tags for chilled water valves.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:35 AM</td><td> </td><td>10/17/2022 3:12:14
PM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31737</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing name tags for hydronic pipes.
</td><td>High</td><td>6/13/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:55:19 AM</td><td> </td><td>10/17/2022 3:12:12
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31763</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Hydronic valves name tags.
</td><td>High</td><td>6/13/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:56:15 AM</td><td> </td><td>10/17/2022 3:12:11
PM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31872</td><td>CORE E2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing name tags for hydronic valves.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:36 PM</td><td> </td><td>10/17/2022 3:12:10
PM</td><td>&nbsp;</td><td>MC.13.02.E21</td><td>&nbsp;</td>
</tr><tr>
<td>31892</td><td>CORE D3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Missing collar for HDPE pipe.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:25:14 PM</td><td> </td><td>10/17/2022 3:12:09
PM</td><td>&nbsp;</td><td>MC.13.02.D31</td><td>&nbsp;</td>
</tr><tr>
<td>31894</td><td>ELEC.</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Pipes penetrations shall be sealed.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:25:19 PM</td><td> </td><td>10/17/2022 3:12:07
PM</td><td>&nbsp;</td><td>MS.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>25020</td><td>TUT- (+45.00)</td><td>MU
L30</td><td>Closed</td><td>Glasbau-Hahn GmbH
Representative</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;S/C 5_016 - chipped paint to front lower L/H
corner</td><td>High</td><td>11/18/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>11/11/2021 8:30:50 AM</td><td>
</td><td>10/17/2022 2:33:32 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31995</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Snagging after removing protection cover
</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
12:14:09 PM</td><td> </td><td>10/17/2022 1:48:25
PM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>21036</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Inspection after removing protection
cover </td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/15/2021 11:14:15 AM</td><td> </td><td>10/17/2022 1:46:10
PM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>28199</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Remove protection from the
architrave.</td><td>Low</td><td>4/7/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/17/2022 11:29:30 AM</td><td> </td><td>10/17/2022 1:43:27
PM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>28329</td><td>CORE B2</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked Scratches should be repaired
</td><td>Low</td><td>5/17/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>4/26/2022
9:55:27 AM</td><td> </td><td>10/17/2022 1:41:14
PM</td><td>&nbsp;</td><td>MC.18.2A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>27316</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging after removing protection
film.</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/7/2022 12:06:31 PM</td><td> </td><td>10/17/2022 1:39:19
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>21147</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Remove protection cover
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:50:45 AM</td><td> </td><td>10/17/2022 1:37:20
PM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>27737</td><td>IT 7</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Raised Floor</td><td>General
Snag</td><td>&#39;Marked Gap between flooring and stair step to be adjusted
</td><td>Low</td><td>3/31/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2022
11:08:18 AM</td><td> </td><td>10/17/2022 11:23:51
AM</td><td>&nbsp;</td><td>MS.14.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27697</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Opening should be
closed.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 3:36:10 PM</td><td> </td><td>10/17/2022 11:23:25
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27676</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Opening should be
closed.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 3:35:27 PM</td><td> </td><td>10/17/2022 11:20:58
AM</td><td>&nbsp;</td><td>MS.14.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>23826</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Unacceptable gap /should be covered
</td><td>Low</td><td>11/10/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/20/2021 3:39:06 PM</td><td> </td><td>10/17/2022 10:52:01
AM</td><td>&nbsp;</td><td>Atrium - Internal Side</td><td>&nbsp;</td>
</tr><tr>
<td>30480</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging after removing
protection.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:37 AM</td><td> </td><td>10/17/2022 10:52:00
AM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30525</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Doors</
td><td>General Snag</td><td>&#39;Gasket should be adjusted
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:25 AM</td><td> </td><td>10/17/2022 10:51:59
AM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30818</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/8/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:25 AM</td><td> </td><td>10/17/2022 10:51:57
AM</td><td>&nbsp;</td><td>MA.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30847</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All Scratches need to repair and touch
up.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022
11:57:10 AM</td><td> </td><td>10/17/2022 10:51:56
AM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30885</td><td>CORE F5</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:07 PM</td><td> </td><td>10/17/2022 10:51:53
AM</td><td>&nbsp;</td><td>MC.14.02.F51</td><td>&nbsp;</td>
</tr><tr>
<td>30908</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:43 PM</td><td> </td><td>10/17/2022 10:51:52
AM</td><td>&nbsp;</td><td>MA.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30912</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:49 PM</td><td> </td><td>10/17/2022 10:51:51
AM</td><td>&nbsp;</td><td>MA.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>30916</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:54 PM</td><td> </td><td>10/17/2022 10:51:50
AM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>30919</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Dented
door frame should be adjusted and repainted.</td><td>Low</td><td>6/22/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/1/2022 3:50:59 PM</td><td> </td><td>10/17/2022
10:51:49 AM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>30922</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:51:03 PM</td><td> </td><td>10/17/2022 10:51:48
AM</td><td>&nbsp;</td><td>MS.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>30941</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:56:53 PM</td><td> </td><td>10/17/2022 10:51:47
AM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30942</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:56:55 PM</td><td> </td><td>10/17/2022 10:51:46
AM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>30946</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/8/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022
3:57:01 PM</td><td> </td><td>10/17/2022 10:51:45
AM</td><td>&nbsp;</td><td>MA.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30955</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022
3:57:14 PM</td><td> </td><td>10/17/2022 10:51:40
AM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30956</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022
3:57:16 PM</td><td> </td><td>10/17/2022 10:51:39
AM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31231</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up.</td><td>Low</td><td>6/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/2/2022 10:40:28 AM</td><td> </td><td>10/17/2022
10:51:38 AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31313</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 11:38:35 AM</td><td> </td><td>10/17/2022 10:51:35
AM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31577</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both sides
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
3:37:08 PM</td><td> </td><td>10/17/2022 10:51:34
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>32013</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Snagging after removing protection cover
</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
12:14:42 PM</td><td> </td><td>10/17/2022 10:51:33
AM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32001</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant is missing for marked part
</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
12:14:18 PM</td><td> </td><td>10/17/2022 9:34:49
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29940</td><td>ELEC.</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/26/2022 10:58:56 AM</td><td> </td><td>10/17/2022 9:34:23
AM</td><td>&nbsp;</td><td>MS.14.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29864</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 4:22:27 PM</td><td> </td><td>10/17/2022 9:33:52
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>29807</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing
accessories.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:06 PM</td><td> </td><td>10/17/2022 9:33:08
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29743</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:13:30 PM</td><td> </td><td>10/17/2022 9:32:41
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>21976</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire collar around HDPE pipe
</td><td>High</td><td>8/30/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/23/2021
1:36:43 PM</td><td> </td><td>10/17/2022 9:32:07
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21026</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around metal door architrave should be adjusted
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:13:52 AM</td><td> </td><td>10/17/2022 9:31:27
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>29751</td><td>ELEC.</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:13:48 PM</td><td> </td><td>10/17/2022 9:31:00
AM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>21674</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor needs cleaned and touch
up painting </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:25 AM</td><td> </td><td>10/17/2022 9:30:30
AM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>31855</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;INERGEN pipes wall penetrations.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 11:57:43 AM</td><td> </td><td>10/17/2022 8:18:58
AM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>32987</td><td>MECH</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing access control devices - tray cover and earthing
</td><td>High</td><td>10/12/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/5/2022
4:07:35 PM</td><td> </td><td>10/16/2022 10:40:26
AM</td><td>&nbsp;</td><td>MS.19.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>31917</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Missing collar for PPR pipe.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:33 PM</td><td> </td><td>10/16/2022 8:45:41
AM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28967</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil fins need to be adjusted. </td><td>High</td><td>5/24/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:32:40 PM</td><td>
</td><td>10/16/2022 8:44:44
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28941</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil fins need adjustments. </td><td>High</td><td>5/24/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:31:34 PM</td><td>
</td><td>10/16/2022 8:39:40
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30129</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing name tags for
chilled water valves. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:32 AM</td><td> </td><td>10/16/2022 8:38:08
AM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30649</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing name tags for
chilled water valves. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:30 AM</td><td> </td><td>10/16/2022 8:36:42
AM</td><td>&nbsp;</td><td>MQ.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29886</td><td>STAFF W.C./F</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Flush valve located in the middle
toilet need adjustment. </td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:54 PM</td><td> </td><td>10/16/2022 8:31:57
AM</td><td>&nbsp;</td><td>MW.19.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>30881</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Cleaning
door leaf and accessories from both sides.</td><td>Low</td><td>6/22/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>6/1/2022 3:50:01 PM</td><td> </td><td>10/16/2022
8:26:17 AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27928</td><td>STAFF W.C. CLEANERS STORE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Broken tile need to
replaced.</td><td>Low</td><td>4/3/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:39 AM</td><td> </td><td>10/16/2022 8:25:46
AM</td><td>&nbsp;</td><td>MW.19.2A.001D</td><td>&nbsp;</td>
</tr><tr>
<td>27709</td><td>STAFF W.C./F</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around MEP fixtures
</td><td>Low</td><td>3/31/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2022
11:07:33 AM</td><td> </td><td>10/16/2022 8:25:07
AM</td><td>&nbsp;</td><td>MW.19.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>27911</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>4/3/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:11 AM</td><td> </td><td>10/16/2022 8:24:38
AM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27677</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 3:35:29 PM</td><td> </td><td>10/16/2022 8:24:09
AM</td><td>&nbsp;</td><td>MS.14.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>10969</td><td>TUT-CORE B2</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General</td><td>&#39;Painting need to touch up / remove unused Mep
fixtures</td><td>Low</td><td>10/6/2020 12:00:00
AM</td><td>andrewjohn.rose</td><td>9/15/2020 12:04:53 PM</td><td>
</td><td>10/15/2022 10:02:15
AM</td><td>&nbsp;</td><td>MC.18.3A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>28201</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to
repair.</td><td>Low</td><td>4/7/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/17/2022 11:29:36 AM</td><td> </td><td>10/15/2022 8:32:02
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>33999</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:15:17 PM</td><td>
</td><td>10/13/2022 2:53:50
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33993</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain valves handles are missing.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:15:03 PM</td><td> </td><td>10/13/2022 2:52:52
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33984</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:14:42 PM</td><td>
</td><td>10/13/2022 2:52:15
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33971</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:13:59 PM</td><td> </td><td>10/13/2022 2:44:57
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33987</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning from inside. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:14:49 PM</td><td>
</td><td>10/13/2022 2:44:07
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34005</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning from outside. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:15:28 PM</td><td>
</td><td>10/13/2022 2:43:25
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34086</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Rusty support. </td><td>High</td><td>10/18/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:22:24 PM</td><td>
</td><td>10/13/2022 2:42:50
PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34085</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Rusty and dirty air duct. </td><td>High</td><td>10/18/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:22:22 PM</td><td>
</td><td>10/13/2022 2:42:06
PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34088</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipe cleaning. </td><td>High</td><td>10/18/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:22:27 PM</td><td>
</td><td>10/13/2022 2:41:13
PM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34094</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Loose pipe support. </td><td>High</td><td>10/18/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:22:36 PM</td><td>
</td><td>10/13/2022 2:40:23
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34093</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing pipe support. </td><td>High</td><td>10/18/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:22:35 PM</td><td>
</td><td>10/13/2022 2:39:31
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34091</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct holes need to be sealed. </td><td>High</td><td>10/18/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:22:32 PM</td><td>
</td><td>10/13/2022 2:38:42
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34090</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Support need to be painted. </td><td>High</td><td>10/18/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:22:31 PM</td><td>
</td><td>10/13/2022 2:37:55
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34089</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct access door need adjustments.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:22:29 PM</td><td> </td><td>10/13/2022 2:33:48
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34100</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Labels for PPR pipe is missing.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:22:46 PM</td><td> </td><td>10/13/2022 2:29:45
PM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34099</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipe need more supports and shall be cleaned.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:22:44 PM</td><td> </td><td>10/13/2022 2:28:22
PM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34098</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain pipe shall be cleaned. </td><td>High</td><td>10/18/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:22:43 PM</td><td>
</td><td>10/13/2022 2:27:12
PM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34101</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct insulation need repairs.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:22:47 PM</td><td> </td><td>10/13/2022 2:26:00
PM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34103</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Loose pipe support. </td><td>High</td><td>10/18/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:22:50 PM</td><td>
</td><td>10/13/2022 2:24:48
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34102</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipe insulation need repairs. </td><td>High</td><td>10/18/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:22:49 PM</td><td>
</td><td>10/13/2022 2:23:53
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34108</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation need repairs.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:22:58 PM</td><td> </td><td>10/13/2022 2:18:59
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34122</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air vent thermal insulation </td><td>High</td><td>10/18/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:23:21 PM</td><td>
</td><td>10/13/2022 2:17:19
PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34131</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing handle for drain valve.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:23:36 PM</td><td> </td><td>10/13/2022 2:13:32
PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34132</td><td>ELECTRICAL ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation for air duct need repairs.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:23:37 PM</td><td> </td><td>10/13/2022 2:13:00
PM</td><td>&nbsp;</td><td>MS.13.3A.014</td><td>&nbsp;</td>
</tr><tr>
<td>34051</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover should be installed properly
</td><td>High</td><td>10/17/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/10/2022
4:17:31 PM</td><td> </td><td>10/13/2022 11:49:41
AM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34045</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover trunk properly
</td><td>High</td><td>10/17/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/10/2022
4:17:21 PM</td><td> </td><td>10/13/2022 11:48:16
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34052</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fiber flexible should be installed properly
</td><td>High</td><td>10/17/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/10/2022
4:17:33 PM</td><td> </td><td>10/13/2022 11:47:46
AM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>34069</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Work not completed
</td><td>High</td><td>10/17/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/10/2022
4:17:59 PM</td><td> </td><td>10/13/2022 11:47:15
AM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32871</td><td>AHU</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete </td><td>High</td><td>10/11/2022
12:00:00 AM</td><td>mina.moussa</td><td>10/4/2022 4:14:48 PM</td><td>
</td><td>10/13/2022 11:46:29
AM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34113</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct need to be cleaned. </td><td>High</td><td>10/18/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:23:07 PM</td><td>
</td><td>10/13/2022 10:08:22
AM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34129</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning for pipes. </td><td>High</td><td>10/18/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:23:32 PM</td><td>
</td><td>10/13/2022 10:01:36
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34082</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing PPR pipe label. </td><td>High</td><td>10/18/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:22:17 PM</td><td>
</td><td>10/13/2022 10:00:55
AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34124</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain valve handle is missing. </td><td>High</td><td>10/18/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:23:24 PM</td><td>
</td><td>10/13/2022 10:00:10
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34126</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing handle for drain valve.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:23:27 PM</td><td> </td><td>10/13/2022 9:59:26
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34115</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain pan insulation need repairs.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:23:10 PM</td><td> </td><td>10/13/2022 9:58:45
AM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>34119</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Thermal insulation for air duct need
repairs. </td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:23:15 PM</td><td> </td><td>10/13/2022 9:57:49
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>34073</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct access door need repairs and adjustments.
</td><td>High</td><td>10/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/11/2022 12:22:03 PM</td><td> </td><td>10/13/2022 9:56:43
AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>34135</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing label for air duct. </td><td>High</td><td>10/18/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:23:42 PM</td><td>
</td><td>10/13/2022 9:55:35
AM</td><td>&nbsp;</td><td>MS.18.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>34136</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Support need paintings. </td><td>High</td><td>10/18/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:23:43 PM</td><td>
</td><td>10/13/2022 9:54:47
AM</td><td>&nbsp;</td><td>MS.18.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>31955</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Elevator works is not complete and
call buttons need to be adjusted. </td><td>High</td><td>6/28/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/21/2022 4:49:47 PM</td><td>
</td><td>10/13/2022 9:53:40
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>34015</td><td>CORRIDOR</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;No ventilation detected in this area.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:15:53 PM</td><td> </td><td>10/13/2022 9:48:41
AM</td><td>&nbsp;</td><td>MS.13.03.010</td><td>&nbsp;</td>
</tr><tr>
<td>32003</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked part should be finished properly /painting is needed
</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
12:14:21 PM</td><td> </td><td>10/13/2022 9:47:28
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>33960</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;No ventilation system detected.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:13:29 PM</td><td> </td><td>10/13/2022 9:46:52
AM</td><td>&nbsp;</td><td>MW.18.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>29671</td><td>ELEC.</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 12:05:41 PM</td><td> </td><td>10/13/2022 9:46:48
AM</td><td>&nbsp;</td><td>MS.19.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>29415</td><td>ELEC.</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 5:04:51 PM</td><td> </td><td>10/13/2022 9:46:21
AM</td><td>&nbsp;</td><td>MS.18.2A.020</td><td>&nbsp;</td>
</tr><tr>
<td>34123</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air filter need to be cleaned. </td><td>High</td><td>10/18/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:23:22 PM</td><td>
</td><td>10/13/2022 9:45:59
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29414</td><td>ELEC.</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door to
be closed properly and to be balanced </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 5:04:50 PM</td><td> </td><td>10/13/2022
9:45:53 AM</td><td>&nbsp;</td><td>MS.18.2A.020</td><td>&nbsp;</td>
</tr><tr>
<td>29436</td><td>LOBBY</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 5:05:44 PM</td><td> </td><td>10/13/2022 9:45:23
AM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>34104</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Dirty canvas and Rusty duct. </td><td>High</td><td>10/18/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/11/2022 12:22:52 PM</td><td>
</td><td>10/13/2022 9:45:15
AM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>21229</td><td>CORE D1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Marked parts need adjustment and repair
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
11:01:38 AM</td><td> </td><td>10/13/2022 9:44:28
AM</td><td>&nbsp;</td><td>MC.24.2A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>28404</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Glasbau-Hahn GmbH Representative</td><td>MEP-
Mechanical</td><td>Mechanical Pipework</td><td>Air vent/bottle to be
fitted</td><td>&#39;Pipes shall be adjusted and fixed properly and to add the
missing supports. </td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:03:59 PM</td><td> </td><td>10/13/2022 9:43:29
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>21226</td><td>CORE D1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy is missing
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
11:01:28 AM</td><td> </td><td>10/13/2022 9:39:25
AM</td><td>&nbsp;</td><td>MC.24.2A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>28310</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Glasbau-Hahn GmbH Representative</td><td>MEP-
Mechanical</td><td>GENERAL SUPPORTS</td><td>Arrangement is not vertical /
horizontal</td><td>&#39;Missing labels for the climate control piping.
</td><td>High</td><td>4/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:38 AM</td><td> </td><td>10/13/2022 9:37:20
AM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29785</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:15:19 PM</td><td> </td><td>10/13/2022 9:36:38
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29660</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Cutting
of door frame should be checked </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 12:05:23 PM</td><td> </td><td>10/13/2022
9:36:10 AM</td><td>&nbsp;</td><td>MS.19.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>21146</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need adjusted
and repair </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 10:50:44 AM</td><td> </td><td>10/13/2022 9:35:20
AM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>30048</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Incomplete piping works.
</td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:27:17 AM</td><td> </td><td>10/13/2022 9:34:54
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>21024</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant should be adjusted </td><td>Low</td><td>9/5/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/15/2021 11:13:47 AM</td><td> </td><td>10/13/2022
9:34:16 AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>29832</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company, Ltd.</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing
accessories.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:17:00 PM</td><td> </td><td>10/13/2022 9:33:15
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29779</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:14:43 PM</td><td> </td><td>10/13/2022 9:32:46
AM</td><td>&nbsp;</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29773</td><td>ELEC.</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:14:38 PM</td><td> </td><td>10/13/2022 9:32:14
AM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>29756</td><td>SHAFT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:14:01 PM</td><td> </td><td>10/13/2022 9:31:47
AM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29742</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:13:27 PM</td><td> </td><td>10/13/2022 9:31:14
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29737</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:13:13 PM</td><td> </td><td>10/13/2022 9:30:46
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30032</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Incomplete works.
</td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:52 AM</td><td> </td><td>10/13/2022 8:58:11
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32383</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:06 PM</td><td> </td><td>10/13/2022 7:55:30
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32185</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete works
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:48:22 AM</td><td> </td><td>10/13/2022 7:54:58
AM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>25287</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>Civil</td><td>Boundary
Walls</td><td>Alignment/Plumbness</td><td>&#39;Closing of shafts from the roof
</td><td>High</td><td>11/29/2021 12:00:00 AM</td><td>ahmedsalem</td><td>11/22/2021
11:58:49 AM</td><td> </td><td>10/12/2022 1:50:59 PM</td><td>&nbsp;</td><td>Museum
Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25372</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Civil</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing access ladder above duct to access
mechanical trades on the other side as per specs book 15 page 42
</td><td>High</td><td>11/30/2021 12:00:00 AM</td><td>ahmedsalem</td><td>11/23/2021
2:15:36 PM</td><td> </td><td>10/12/2022 1:50:57 PM</td><td>&nbsp;</td><td>Museum
Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25376</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Civil</td><td>Boundary
Walls</td><td>Alignment/Plumbness</td><td>&#39;Rain water will be collected in the
basin around the cable tray </td><td>High</td><td>11/30/2021 12:00:00
AM</td><td>ahmedsalem</td><td>11/23/2021 2:15:49 PM</td><td> </td><td>10/12/2022
1:50:56 PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25379</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Civil</td><td>General
Snag</td><td>General Snag</td><td>&#39;Closing of shafts on roof not as per
detail ,missing flashing for duct </td><td>High</td><td>11/30/2021 12:00:00
PM</td><td>ahmedsalem</td><td>11/23/2021 2:15:56 PM</td><td> </td><td>10/12/2022
1:50:55 PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>

<td>24297</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between stone floor and stone cladding
should be sealed </td><td>Low</td><td>11/16/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/26/2021 4:41:51 PM</td><td> </td><td>10/12/2022 1:27:34
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14863</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Fixed accessories</td><td>General</td><td>&#39;The accessories need fixed properly
</td><td>High</td><td>1/25/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>1/18/2021 1:19:18 PM</td><td>
</td><td>10/12/2022 1:16:01
PM</td><td>&nbsp;</td><td>MW.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15849</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Repair
sharp edges to the cistern access panels - all
cubicles</td><td>High</td><td>2/14/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/7/2021 10:57:09 AM</td><td>
</td><td>10/12/2022 1:15:53
PM</td><td>&nbsp;</td><td>MW.18.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>10954</td><td>TUT-CORE B3</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Painting need to touch up / missing Sealant between stairs &amp;
wall </td><td>Low</td><td>10/6/2020 12:00:00
AM</td><td>andrewjohn.rose</td><td>9/15/2020 12:03:33 PM</td><td>
</td><td>10/12/2022 1:15:36
PM</td><td>&nbsp;</td><td>MC.12.3A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>32300</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Missing
thrower</td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>hossamreda</td><td>7/17/2022 3:32:59 PM</td><td> </td><td>10/12/2022
1:13:50 PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>27559</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Opening should be
closed.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:18 AM</td><td> </td><td>10/12/2022 10:53:29
AM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>21025</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant should be adjusted </td><td>Low</td><td>9/5/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/15/2021 11:13:50 AM</td><td> </td><td>10/12/2022
10:52:41 AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21020</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>9/5/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/15/2021
11:13:37 AM</td><td> </td><td>10/12/2022 10:52:05
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>27727</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around cable trunk </td><td>Low</td><td>3/31/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2022 11:08:03 AM</td><td>
</td><td>10/12/2022 10:51:13
AM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>21541</td><td>TUT-CORE B3</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
9:51:41 AM</td><td> </td><td>10/12/2022 10:50:36
AM</td><td>&nbsp;</td><td>MC.12.03.B31</td><td>&nbsp;</td>
</tr><tr>
<td>16849</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Damage</td><td>&#39;Damaged accessories should be replaced
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:00:09 PM</td><td> </td><td>10/12/2022 10:49:56
AM</td><td>&nbsp;</td><td>MW.13.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>19460</td><td>TUT_SC_04_032</td><td>Goppion
Showcases</td><td>Closed</td><td>Goppion
Representative</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;See attached list</td><td>Low</td><td>7/19/2021 12:00:00
AM</td><td>Sherif Elabd</td><td>6/28/2021 1:26:50 PM</td><td> </td><td>10/12/2022
10:31:45 AM</td><td>Closed based on agreement from MEP department for
installation/testing the Nitrogen machine.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>9660</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Raceway and termination for fire cables
which will connect with solenoid valve ( inergen cylinder) not finished yet
</td><td>High</td><td>7/27/2020 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>7/20/2020 3:19:56 PM</td><td> </td><td>10/12/2022 9:17:15
AM</td><td>&nbsp;</td><td>MS.13.0G.008</td><td>&nbsp;</td>
</tr><tr>
<td>32876</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable conduit
</td><td>High</td><td>10/11/2022 12:00:00 AM</td><td>mina.moussa</td><td>10/4/2022
4:14:57 PM</td><td> </td><td>10/12/2022 9:16:29
AM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>32971</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;Tray
cover</td><td>High</td><td>10/12/2022 12:00:00
AM</td><td>mina.moussa</td><td>10/5/2022 4:07:08 PM</td><td> </td><td>10/12/2022
9:15:59 AM</td><td>&nbsp;</td><td>MS.13.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>32874</td><td>CORRIDOR</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flexible </td><td>High</td><td>10/11/2022
12:00:00 AM</td><td>mina.moussa</td><td>10/4/2022 4:14:53 PM</td><td>
</td><td>10/12/2022 9:14:35
AM</td><td>&nbsp;</td><td>MS.18.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>14285</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>Technica
Co.</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;Climate
control sensors and gateway installation is
incomplete</td><td>High</td><td>12/29/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>12/22/2020 9:47:15 AM</td><td> </td><td>10/12/2022 9:14:15
AM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>31905</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Missing fire sealant for fire
pipe. </td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:08 PM</td><td> </td><td>10/12/2022 8:56:01
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>31904</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Missing fire sealant for fire
pipe. </td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:06 PM</td><td> </td><td>10/12/2022 8:55:20
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>34019</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Labels for PPR pipes. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:15:59 PM</td><td>
</td><td>10/12/2022 8:53:58
AM</td><td>&nbsp;</td><td>MW.18.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>33962</td><td>CORRIDOR</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Labels for pipes are missing. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:13:33 PM</td><td>
</td><td>10/12/2022 8:52:26
AM</td><td>&nbsp;</td><td>MS.18.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>29721</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Penetration closing.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:21:00 PM</td><td> </td><td>10/12/2022 8:51:27
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29711</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Air
vent/bottle to be fitted</td><td>&#39;Pipe penetrations need to be sealed.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:41 PM</td><td> </td><td>10/12/2022 8:50:28
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29709</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Chilled
water Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Incomplete
civil works to seal pipes penetrations. </td><td>High</td><td>6/1/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/25/2022 12:20:36 PM</td><td>
</td><td>10/12/2022 8:46:58
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29702</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Duct penetration throw wall and slap need to be sealed.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:20 PM</td><td> </td><td>10/12/2022 8:45:50
AM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29272</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Penetration throw slap.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:56 PM</td><td> </td><td>10/12/2022 8:42:09
AM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>29217</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Stopping</td><td>Fire seal damaged</td><td>&#39;Missing fire sealant.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:51 AM</td><td> </td><td>10/12/2022 8:34:48
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29182</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Pipes penetrations. </td><td>High</td><td>5/29/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:58:56 AM</td><td>
</td><td>10/12/2022 8:33:48
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>28935</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;PPR pipes connections
need to be adjusted and supported correctly. </td><td>High</td><td>5/24/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:31:21 PM</td><td>
</td><td>10/12/2022 8:32:44
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28507</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Stopping</td><td>General Snag</td><td>&#39;Missing coaler around PPR pipe
penetration. </td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:38 PM</td><td> </td><td>10/12/2022 8:25:38
AM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28425</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;PPR pipe penetration has no coaler.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:46 PM</td><td> </td><td>10/12/2022 8:22:44
AM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28415</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Glasbau-Hahn GmbH Representative</td><td>MEP-
Mechanical</td><td>Condensate drain pipe</td><td>Installation not to
specification/drawing</td><td>&#39;Climate control pipes shall be fixed and
installed properly. </td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:23 PM</td><td> </td><td>10/12/2022 8:20:08
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>31199</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing differential pressure valve.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:55:36 PM</td><td> </td><td>10/12/2022 8:17:15
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>32045</td><td>CORE F2</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;No access for
entrance</td><td>High</td><td>7/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:02 AM</td><td> </td><td>10/11/2022
3:58:22 PM</td><td>&nbsp;</td><td>MC.19.03.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32073</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label and cover
box</td><td>High</td><td>7/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:45 AM</td><td> </td><td>10/11/2022
3:58:21 PM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32074</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:47 AM</td><td>
</td><td>10/11/2022 3:58:20
PM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32075</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:48 AM</td><td>
</td><td>10/11/2022 3:58:18
PM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32729</td><td>CORE F2</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>8/29/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>8/22/2022 4:22:33 PM</td><td>
</td><td>10/11/2022 3:58:10
PM</td><td>&nbsp;</td><td>MC.19.03.F21</td><td>&nbsp;</td>
</tr><tr>
<td>27518</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:29 AM</td><td> </td><td>10/11/2022 3:50:18
PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27640</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica
Co.</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;Work not
completed </td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:55 PM</td><td> </td><td>10/11/2022 3:06:15
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28311</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Glasbau-Hahn GmbH Representative</td><td>MEP-
Mechanical</td><td>GENERAL SUPPORTS</td><td>Arrangement is not vertical /
horizontal</td><td>&#39;PPR pipes need more supports to avoid pipes buckling.
</td><td>High</td><td>4/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:41 AM</td><td> </td><td>10/11/2022 2:02:06
PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>34027</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Hydronic pipes Insulation need repairs.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:16:11 PM</td><td> </td><td>10/11/2022 1:58:02
PM</td><td>&nbsp;</td><td>MS.19.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>34017</td><td>LIGHT WELL TO LOWER LEVEL</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;No ventilation detected in this toilet area.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:15:56 PM</td><td> </td><td>10/11/2022 1:56:20
PM</td><td>&nbsp;</td><td>MS.13.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>34026</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:16:09 PM</td><td>
</td><td>10/11/2022 1:54:43
PM</td><td>&nbsp;</td><td>MS.19.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>34018</td><td>LIGHT WELL TO LOWER LEVEL</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Floor drain cover need to be a installed.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:15:58 PM</td><td> </td><td>10/11/2022 1:53:43
PM</td><td>&nbsp;</td><td>MS.13.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>33959</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;FD cover need to be cleaned. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:13:27 PM</td><td>
</td><td>10/11/2022 1:52:50
PM</td><td>&nbsp;</td><td>MW.18.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>10940</td><td>TUT-CORE B1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Need to touch up
</td><td>Low</td><td>10/6/2020 12:00:00
AM</td><td>andrewjohn.rose</td><td>9/15/2020 12:02:22 PM</td><td>
</td><td>10/11/2022 10:32:12
AM</td><td>&nbsp;</td><td>MC.23.3A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>32000</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked parts around pipes should be closed
</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
12:14:16 PM</td><td> </td><td>10/11/2022 10:30:32
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29922</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Hinges should be cleaned from painting
</td><td>Low</td><td>6/16/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/26/2022
10:58:38 AM</td><td> </td><td>10/11/2022 10:29:42
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29797</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories should be clean from
painting.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:15:44 PM</td><td> </td><td>10/11/2022 10:29:12
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>27695</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 3:36:07 PM</td><td> </td><td>10/11/2022 10:28:39
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27691</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 3:36:00 PM</td><td> </td><td>10/11/2022 10:27:47
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>21630</td><td>CORE D3</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor should be adjusted and
repaired </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:24:17 AM</td><td> </td><td>10/11/2022 10:27:09
AM</td><td>&nbsp;</td><td>MC.13.01.D31</td><td>&nbsp;</td>
</tr><tr>
<td>32838</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Wood</
td><td>General Snag</td><td>&#39;Wall cladding not finished yet
</td><td>Low</td><td>10/2/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>9/11/2022 10:25:44 AM</td><td> </td><td>10/11/2022 8:02:46
AM</td><td>Done </td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>13185</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>Damage/dent/stains</td><td>&#39;Tiles needs repair /touch up
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:36:49 PM</td><td> </td><td>10/11/2022 7:48:39 AM</td><td>Sorry. I tried to
Rectify the item.</td><td>Level +46.50</td><td>&nbsp;</td>
</tr><tr>
<td>29281</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Pipe penetration
throw wall. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:07:23 PM</td><td> </td><td>10/10/2022 4:54:50
PM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>29300</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Missing collar.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:31 PM</td><td> </td><td>10/10/2022 4:53:54
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28402</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Glasbau-Hahn GmbH Representative</td><td>MEP-
Mechanical</td><td>Mechanical Pipework</td><td>General Snag</td><td>&#39;Incomplete
works. </td><td>High</td><td>5/4/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/27/2022 11:45:14 AM</td><td> </td><td>10/10/2022 4:52:47
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>33963</td><td>CORRIDOR</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipes cleaning. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:13:37 PM</td><td>
</td><td>10/10/2022 4:51:52
PM</td><td>&nbsp;</td><td>MS.18.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>34001</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;FD cover need to be cleaned. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:15:20 PM</td><td>
</td><td>10/10/2022 4:50:25
PM</td><td>&nbsp;</td><td>MW.13.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34016</td><td>CORRIDOR</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;FD cover need cleaning. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:15:55 PM</td><td>
</td><td>10/10/2022 4:50:06
PM</td><td>&nbsp;</td><td>MS.13.03.010</td><td>&nbsp;</td>
</tr><tr>
<td>33966</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation need repairs.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:13:46 PM</td><td> </td><td>10/10/2022 4:49:32
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33965</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation need repairs.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:13:42 PM</td><td> </td><td>10/10/2022 4:48:24
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33972</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation around Smoke detectors and sensors.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:14:01 PM</td><td> </td><td>10/10/2022 4:47:24
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34012</td><td>CORRIDOR</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation need to be repaired.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:15:48 PM</td><td> </td><td>10/10/2022 4:46:33
PM</td><td>&nbsp;</td><td>MS.13.03.010</td><td>&nbsp;</td>
</tr><tr>
<td>34000</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Valve handle is missing. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:15:19 PM</td><td>
</td><td>10/10/2022 4:45:43
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33953</td><td>SHAFT</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;No FF system detected. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:13:14 PM</td><td>
</td><td>10/10/2022 4:44:59
PM</td><td>&nbsp;</td><td>MS.13.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>33954</td><td>SERVICES</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;No ventilation system detected.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:13:16 PM</td><td> </td><td>10/10/2022 4:41:21
PM</td><td>&nbsp;</td><td>MS.13.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>33952</td><td>SHAFT</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;No ventilation system detected.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:13:12 PM</td><td> </td><td>10/10/2022 4:40:43
PM</td><td>&nbsp;</td><td>MS.13.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>34023</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Supports need painting. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:16:05 PM</td><td>
</td><td>10/10/2022 4:38:18
PM</td><td>&nbsp;</td><td>MS.19.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>34025</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Labels missing for air duct. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:16:08 PM</td><td>
</td><td>10/10/2022 4:37:21
PM</td><td>&nbsp;</td><td>MS.19.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>33980</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;PPR pipe label. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:14:35 PM</td><td>
</td><td>10/10/2022 4:36:39
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33998</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing labels for PPR pipes. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:15:15 PM</td><td>
</td><td>10/10/2022 4:34:34
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33983</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:14:41 PM</td><td>
</td><td>10/10/2022 4:33:55
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33981</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;PPR pipe label. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:14:37 PM</td><td>
</td><td>10/10/2022 4:31:52
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33982</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Valve handle is missing. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:14:39 PM</td><td>
</td><td>10/10/2022 4:30:20
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>34028</td><td>MECH</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Support need to be painted. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:16:13 PM</td><td>
</td><td>10/10/2022 4:13:33
PM</td><td>&nbsp;</td><td>MS.19.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>33985</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain valves handles are missing.
</td><td>High</td><td>10/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>10/9/2022 4:14:44 PM</td><td> </td><td>10/10/2022 4:12:30
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33988</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning from outside. </td><td>High</td><td>10/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:14:51 PM</td><td>
</td><td>10/10/2022 4:11:26
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33979</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Wrong label. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:14:34 PM</td><td>
</td><td>10/10/2022 3:35:20
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>33997</td><td>AHU</td><td>MU L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Wrong label. </td><td>High</td><td>10/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>10/9/2022 4:15:13 PM</td><td>
</td><td>10/10/2022 3:23:59
PM</td><td>&nbsp;</td><td>MS.13.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>24334</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain</
td><td>General Snag</td><td>&#39;EWS - 10 Discoloration between glass panels refer
to NCR 1092 - Q739</td><td>Low</td><td>11/17/2021 12:00:00
AM</td><td>mohamed.sami</td><td>10/27/2021 11:26:02 AM</td><td> </td><td>10/10/2022
2:29:13 PM</td><td>&nbsp;</td><td>Museum Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>15845</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>undulation/uneven surfaces</td><td>&#39;Gap between stone panel and
s/s inconsistent. Stone top edge uneven. Make the gap consistent along the junction
with a straight edge to the stone panels</td><td>High</td><td>2/14/2021 12:00:00
PM</td><td>andrewjohn.rose</td><td>2/7/2021 10:24:58 AM</td><td>
</td><td>10/10/2022 1:57:05
PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>16621</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;The structure not erected yet so all the sub-
sequence work not done</td><td>Low</td><td>3/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>2/20/2021 3:04:53 PM</td><td> </td><td>10/10/2022 1:57:04
PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>17981</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;Finishing MEDIA TABLE &quot;WRAPPING THE
BODY&quot; ( TUT_CIE_3_001 )</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 5:10:13 PM</td><td>
</td><td>10/10/2022 1:57:03 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17983</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;Finishing DRESSING THE KING ( TUT_CIE_3_002
)</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 5:14:02 PM</td><td>
</td><td>10/10/2022 1:57:01 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22823</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>Glasbau-Hahn GmbH
Representative</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;Open and close for the shrine installation @
TUT_SC_3_033</td><td>High</td><td>9/16/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>9/9/2021 11:39:49 AM</td><td>5
TUT_FO_02_01</td><td>10/10/2022 1:57:00
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25019</td><td>TUT- (+45.00)</td><td>MU
L30</td><td>Closed</td><td>Glasbau-Hahn GmbH
Representative</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;5_002 - paint repair to internal plinth to be
rectified</td><td>High</td><td>11/18/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>11/11/2021 8:26:28 AM</td><td>
</td><td>10/10/2022 1:56:59 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28068</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
properly</td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/15/2022 12:07:29 PM</td><td> </td><td>10/10/2022 1:56:58
PM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28080</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to touch up
</td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/15/2022
12:08:05 PM</td><td> </td><td>10/10/2022 1:56:57
PM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28081</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Marked area not leveled
</td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/15/2022
12:08:06 PM</td><td> </td><td>10/10/2022 1:56:55
PM</td><td>&nbsp;</td><td>MR.14.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>30429</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging after removing
protection.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:17 AM</td><td> </td><td>10/10/2022 1:56:54
PM</td><td>&nbsp;</td><td>MQ.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30463</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All Steel columns need to
repaint.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:09 AM</td><td> </td><td>10/10/2022 1:56:53
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30488</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to
repaint.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:49 AM</td><td> </td><td>10/10/2022 1:56:52
PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30490</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged door leaf need to
repair.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:52 AM</td><td> </td><td>10/10/2022 1:56:49
PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30494</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Door leaf and frame need to
repaint.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:43:03 AM</td><td> </td><td>10/10/2022 1:56:48
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30521</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Doors</
td><td>General Snag</td><td>&#39;Damaged part should be adjusted
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:18 AM</td><td> </td><td>10/10/2022 1:56:47
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30530</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Scratches onDoor need repair and touch up
painting </td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:45:33 AM</td><td> </td><td>10/10/2022 1:56:46
PM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30531</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Scratches onDoor need repair and touch up
painting </td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:45:34 AM</td><td> </td><td>10/10/2022 1:56:44
PM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30600</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/21/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/31/2022 11:51:24 AM</td><td> </td><td>10/10/2022
1:56:41 PM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30601</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/7/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:51:27 AM</td><td> </td><td>10/10/2022 1:56:40
PM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30682</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company, Ltd.</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches and painting defects should be
adjusted for both sides </td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:29 PM</td><td> </td><td>10/10/2022 1:56:39
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30839</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>Low</td><td>6/22/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/1/2022 11:56:48 AM</td><td> </td><td>10/10/2022
1:56:37 PM</td><td>&nbsp;</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30841</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Toothing between stone
tiles.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:56:54 AM</td><td> </td><td>10/10/2022 1:56:36
PM</td><td>&nbsp;</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30866</td><td>CORE F5</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Scratches need to touch up.</td><td>Low</td><td>6/22/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022 11:57:44 AM</td><td>
</td><td>10/10/2022 1:56:31
PM</td><td>&nbsp;</td><td>MC.14.02.F51</td><td>&nbsp;</td>
</tr><tr>
<td>30867</td><td>CORE F5</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damaged door leaf need to repair.</td><td>Low</td><td>6/22/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022 11:57:45 AM</td><td>
</td><td>10/10/2022 1:56:30
PM</td><td>&nbsp;</td><td>MC.14.02.F51</td><td>&nbsp;</td>
</tr><tr>
<td>30882</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:03 PM</td><td> </td><td>10/10/2022 1:56:29
PM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30888</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:12 PM</td><td> </td><td>10/10/2022 1:56:28
PM</td><td>&nbsp;</td><td>MR.14.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>30900</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Dented
door leaf to be adjusted.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:29 PM</td><td> </td><td>10/10/2022 1:56:26
PM</td><td>&nbsp;</td><td>MR.14.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30925</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:56:21 PM</td><td> </td><td>10/10/2022 1:56:25
PM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30929</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:56:31 PM</td><td> </td><td>10/10/2022 1:56:24
PM</td><td>&nbsp;</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30932</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022
3:56:39 PM</td><td> </td><td>10/10/2022 1:56:23
PM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30938</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:56:48 PM</td><td> </td><td>10/10/2022 1:56:22
PM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30952</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/8/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022
3:57:10 PM</td><td> </td><td>10/10/2022 1:56:21
PM</td><td>&nbsp;</td><td>MA.19.02.017</td><td>&nbsp;</td>
</tr><tr>
<td>31233</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
door door leaf and frame.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 10:40:33 AM</td><td> </td><td>10/10/2022 1:56:20
PM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31236</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
door leaf need to adjusted.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 10:40:41 AM</td><td> </td><td>10/10/2022 1:56:19
PM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31238</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting need to repair.</td><td>Low</td><td>6/23/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022 10:40:48 AM</td><td>
</td><td>10/10/2022 1:56:18
PM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31243</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
door leaf should be adjusted.</td><td>Low</td><td>6/23/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>6/2/2022 10:41:04 AM</td><td> </td><td>10/10/2022
1:56:17 PM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31256</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and defects paint need to
adjusted.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 10:41:41 AM</td><td> </td><td>10/10/2022 1:56:15
PM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31315</td><td>LOBBY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 11:38:39 AM</td><td> </td><td>10/10/2022 1:56:14
PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31320</td><td>PLANT</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
11:38:47 AM</td><td> </td><td>10/10/2022 1:56:12
PM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31624</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/5/2022 4:24:35 PM</td><td> </td><td>10/10/2022 1:56:11
PM</td><td>&nbsp;</td><td>MS.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27641</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica
Co.</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;No
cover</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:58 PM</td><td> </td><td>10/10/2022 1:03:48
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27845</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:35:07 PM</td><td> </td><td>10/10/2022 1:03:47
PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>21686</td><td>CORE B3-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wall painting needs touch up
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
11:25:41 AM</td><td> </td><td>10/10/2022 11:30:58
AM</td><td>&nbsp;</td><td>MC.12.01.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21665</td><td>TUT-CORE B3</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need adjustment and repair </td><td>Low</td><td>9/9/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021 11:25:12 AM</td><td>
</td><td>10/10/2022 11:30:32
AM</td><td>&nbsp;</td><td>MC.12.03.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21030</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Adjust and repaint around cabinet
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:14:00 AM</td><td> </td><td>10/10/2022 11:29:54
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21022</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:13:43 AM</td><td> </td><td>10/10/2022 11:29:15
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21019</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>Stain/scratch/dent on floor</td><td>&#39;Epoxy paint floor need
repair and touch up </td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/15/2021 11:13:35 AM</td><td> </td><td>10/10/2022 11:28:42
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>17038</td><td>ESCAPE ROUTE-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor need cleaning and touch up painting
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:29 PM</td><td> </td><td>10/10/2022 11:27:17
AM</td><td>&nbsp;</td><td>MQ.18.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>25363</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Remove the cementious from the
beams.</td><td>Low</td><td>12/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>11/22/2021 1:58:59 PM</td><td> </td><td>10/10/2022 11:26:32
AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>31939</td><td>CORE F2</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Elevator works not completed.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:18 PM</td><td> </td><td>10/10/2022 9:04:47
AM</td><td>&nbsp;</td><td>MC.19.03.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32833</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Gypsum Ceiling</td><td>General
Snag</td><td>&#39;Missing access door should be installed
</td><td>Low</td><td>10/2/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>9/11/2022 10:25:28 AM</td><td> </td><td>10/10/2022 9:00:46
AM</td><td>Done </td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32835</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Gypsum edges should be trimmed properly and
aligned </td><td>Low</td><td>10/2/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>9/11/2022 10:25:33 AM</td><td> </td><td>10/10/2022 9:00:45
AM</td><td>Done </td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>31918</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Elevator works not completed.
</td><td>High</td><td>6/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:37 PM</td><td> </td><td>10/10/2022 8:55:40
AM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>10579</td><td>TUT- (+45.00)</td><td>MU
L30</td><td>Closed</td><td>Glasbau-Hahn GmbH Representative</td><td>MEP-
Mechanical</td><td>HVAC</td><td>General Snag</td><td>&#39;Nitrogen connection to
corresponding showcases not yet done band A &amp; B</td><td>High</td><td>9/20/2020
12:00:00 PM</td><td>Kriton Katsamenis </td><td>9/13/2020 11:36:38 AM</td><td>
</td><td>10/9/2022 1:35:13 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27701</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing fire sealant.</td><td>Low</td><td>3/30/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>3/9/2022 3:36:17 PM</td><td> </td><td>10/9/2022
10:55:36 AM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>27700</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 3:36:15 PM</td><td> </td><td>10/9/2022 10:55:08
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27681</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 3:35:40 PM</td><td> </td><td>10/9/2022 10:54:35
AM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>27679</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 3:35:33 PM</td><td> </td><td>10/9/2022 10:53:31
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>21668</td><td>TUT-CORE B3</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Marked parts should be adjusted and
repaired </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:17 AM</td><td> </td><td>10/9/2022 10:50:40
AM</td><td>&nbsp;</td><td>MC.12.03.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21667</td><td>TUT-CORE B3</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor should be cleaned and
touchup painting is needed </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:15 AM</td><td> </td><td>10/9/2022 10:49:00
AM</td><td>&nbsp;</td><td>MC.12.03.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21137</td><td>CORE D2</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;epoxy painting floor need to repair
and touch up </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:50:25 AM</td><td> </td><td>10/9/2022 10:48:21
AM</td><td>&nbsp;</td><td>MC.18.01.D21</td><td>&nbsp;</td>
</tr><tr>
<td>14987</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint Floor</td><td>General
Snag</td><td>&#39;Repair and touch up for epoxy </td><td>Low</td><td>2/9/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>1/19/2021 11:35:58 AM</td><td>
</td><td>10/9/2022 10:46:02
AM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>27684</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 3:35:46 PM</td><td> </td><td>10/9/2022 10:45:09
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>20299</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Goppion
Representative</td><td>MEP-Mechanical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing back cover for climate control units
</td><td>High</td><td>8/11/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/4/2021
12:58:03 PM</td><td> </td><td>10/9/2022 10:38:09
AM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13676</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Goppion
Representative</td><td>MEP-Mechanical</td><td>MECHANICAL
SERVICES</td><td>Installation not to specification/drawing</td><td>&#39;Nitrogen
system is incomplete </td><td>Medium</td><td>12/10/2020 12:00:00
AM</td><td>ahmedsalem</td><td>11/30/2020 11:59:17 AM</td><td> </td><td>10/9/2022
10:36:42 AM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>20300</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Goppion
Representative</td><td>MEP-Mechanical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing casing &amp; incomplete work for climate control
systems</td><td>High</td><td>8/11/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/4/2021 12:58:07 PM</td><td> </td><td>10/9/2022
10:35:52 AM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13677</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Goppion
Representative</td><td>MEP-Mechanical</td><td>MECHANICAL
SERVICES</td><td>Installation not to specification/drawing</td><td>&#39;RH control
units are not installed , need cover </td><td>Medium</td><td>12/10/2020 12:00:00
AM</td><td>ahmedsalem</td><td>11/30/2020 11:59:22 AM</td><td> </td><td>10/9/2022
10:34:43 AM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>12110</td><td>VOID</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Need cleaning </td><td>High</td><td>10/11/2020 12:00:00
AM</td><td>ahmedsalem</td><td>10/4/2020 1:06:31 PM</td><td> </td><td>10/9/2022
10:32:15 AM</td><td>&nbsp;</td><td>MS.13.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>29952</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing valve actuator.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:01 PM</td><td> </td><td>10/9/2022 10:29:38
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29975</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Valve actuator is missing.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:48 PM</td><td> </td><td>10/9/2022 10:28:40
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29210</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Air
vent/bottle to be fitted</td><td>&#39;Pipes penetration shall be closed properly.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:42 AM</td><td> </td><td>10/9/2022 10:26:20
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>28990</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Chilled
water Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing fire
stop for pipes penetrations. </td><td>High</td><td>5/24/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:09:19 PM</td><td>
</td><td>10/9/2022 10:24:53
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>28427</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Chilled
water Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Penetration
throw slap shall be reviewed. </td><td>High</td><td>5/12/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:04:51 PM</td><td>
</td><td>10/9/2022 10:23:48
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28403</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Stopping</td><td>Fire seal damaged</td><td>&#39;Missing and damage fire stopping
and missing HILTI labels. </td><td>High</td><td>5/12/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:03:56 PM</td><td>
</td><td>10/9/2022 10:20:38
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>32862</td><td>FIRE LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flexible </td><td>High</td><td>10/11/2022
12:00:00 AM</td><td>mina.moussa</td><td>10/4/2022 4:14:32 PM</td><td>
</td><td>10/9/2022 9:41:20
AM</td><td>&nbsp;</td><td>MQ.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>32549</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Disconnect
tag</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:33:03 AM</td><td> </td><td>10/5/2022 4:52:25
PM</td><td>&nbsp;</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>13788</td><td>IT 2</td><td>MU
L25</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Raised
Floor</td><td>General Snag</td><td>&#39;Raised floor should be adjusted
</td><td>Low</td><td>12/21/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>12/1/2020
11:40:40 AM</td><td> </td><td>10/5/2022 12:31:09
PM</td><td>&nbsp;</td><td>MS.18.2A.022</td><td>&nbsp;</td>
</tr><tr>
<td>13739</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Touch up and cleaning
</td><td>Low</td><td>12/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>12/1/2020
11:38:29 AM</td><td> </td><td>10/5/2022 12:29:53
PM</td><td>&nbsp;</td><td>MS.18.2A.025</td><td>&nbsp;</td>
</tr><tr>
<td>13740</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Touch up and cleaning
</td><td>Low</td><td>12/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>12/1/2020
11:38:31 AM</td><td> </td><td>10/5/2022 12:29:51
PM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>21012</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Topping stainless steel handrail
should be alignment </td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/15/2021 11:13:12 AM</td><td> </td><td>10/5/2022 12:29:34
PM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21549</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 9:51:52 AM</td><td> </td><td>10/5/2022 12:29:32
PM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>22404</td><td>SERVICE ZONE 3</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Soffit</td><td>General
Snag</td><td>&#39;The insulation INS-07 at the slab soffit of the Museum 2nd floor
mezzanine (Bands A &amp; B) is totally damaged</td><td>High</td><td>9/1/2021
12:00:00 AM</td><td>Sherif Elabd</td><td>8/25/2021 3:53:12 PM</td><td>
</td><td>10/5/2022 12:29:27
PM</td><td>&nbsp;</td><td>MS.13.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>29315</td><td>CLEANERS</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame need to repair and touch up
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:14:56 PM</td><td> </td><td>10/5/2022 12:29:26
PM</td><td>&nbsp;</td><td>MW.18.2A.001D</td><td>&nbsp;</td>
</tr><tr>
<td>29316</td><td>W.C. /M</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame painting need to touch up
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:14:57 PM</td><td> </td><td>10/5/2022 12:29:24
PM</td><td>&nbsp;</td><td>MW.18.2A.001B</td><td>&nbsp;</td>
</tr><tr>
<td>29322</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged in door leaf should be repaired
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:15:07 PM</td><td> </td><td>10/5/2022 12:29:23
PM</td><td>&nbsp;</td><td>MW.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29330</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damage in door leaf and frame need to repair
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:15:21 PM</td><td> </td><td>10/5/2022 12:29:21
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29331</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door painting need to repair and touch up
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:15:23 PM</td><td> </td><td>10/5/2022 12:29:20
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29334</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged in door leaf need to repair
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:15:27 PM</td><td> </td><td>10/5/2022 12:29:19
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29335</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged in door frame need to repair and touch up
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:15:28 PM</td><td> </td><td>10/5/2022 12:29:18
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29337</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches need to repair and touch up painting
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:15:31 PM</td><td> </td><td>10/5/2022 12:29:17
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29341</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damages in door frame corners </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 1:15:37 PM</td><td>
</td><td>10/5/2022 12:29:16
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29342</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Twisted
metal door frame should be adjusted </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 1:15:39 PM</td><td> </td><td>10/5/2022
12:29:14 PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29343</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf not leveled with door frame </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 1:15:41 PM</td><td> </td><td>10/5/2022
12:29:13 PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29344</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damages in door leaf should be repaired
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:15:42 PM</td><td> </td><td>10/5/2022 12:29:12
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29346</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting should be
repaired.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:01 PM</td><td> </td><td>10/5/2022 12:29:11
PM</td><td>&nbsp;</td><td>MS.18.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>29347</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rough surface should be
adjusted.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:03 PM</td><td> </td><td>10/5/2022 12:29:10
PM</td><td>&nbsp;</td><td>MS.18.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>29353</td><td>EMERGENCY LIGHTING</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged door leaf should be
adjusted.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:12 PM</td><td> </td><td>10/5/2022 12:29:09
PM</td><td>&nbsp;</td><td>MS.18.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>29354</td><td>EMERGENCY LIGHTING</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective paint should be adjusted.</td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 4:19:14 PM</td><td>
</td><td>10/5/2022 12:29:08
PM</td><td>&nbsp;</td><td>MS.18.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>29357</td><td>MACHINE ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches and touch
up.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:18 PM</td><td> </td><td>10/5/2022 12:29:06
PM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>29358</td><td>MACHINE ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be
adjusted.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:20 PM</td><td> </td><td>10/5/2022 12:29:05
PM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>29359</td><td>MACHINE ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damage door
leaf.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:21 PM</td><td> </td><td>10/5/2022 12:29:04
PM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>29360</td><td>MACHINE ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Clearance between door leaf and frame should be same width
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
4:19:23 PM</td><td> </td><td>10/5/2022 12:29:03
PM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>29361</td><td>MACHINE ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;The door should be close
well.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:25 PM</td><td> </td><td>10/5/2022 12:29:02
PM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>29362</td><td>MACHINE ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Clearance between door leaf and frame should
be same width </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:26 PM</td><td> </td><td>10/5/2022 12:29:01
PM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>29363</td><td>MACHINE ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Defective painting need should be
adjusted.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:28 PM</td><td> </td><td>10/5/2022 12:29:00
PM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>29365</td><td>MACHINE ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy parts in door
leaf.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:31 PM</td><td> </td><td>10/5/2022 12:28:58
PM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>29366</td><td>MACHINE ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged door leaf and
frame.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:33 PM</td><td> </td><td>10/5/2022 12:28:57
PM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>29368</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches and defective paint should be
adjusted.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:35 PM</td><td> </td><td>10/5/2022 12:28:56
PM</td><td>&nbsp;</td><td>MS.18.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>29369</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;The area behind hinged need to
adjust.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:37 PM</td><td> </td><td>10/5/2022 12:28:55
PM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29371</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Clearance between door leaf and frame should be same width
.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
4:19:40 PM</td><td> </td><td>10/5/2022 12:28:54
PM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29374</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Frame not leveled.</td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 4:19:44 PM</td><td> </td><td>10/5/2022
12:28:52 PM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29375</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged door leaf and
frame.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:49 PM</td><td> </td><td>10/5/2022 12:28:51
PM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29377</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Defect painting should be
adjusted.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:52 PM</td><td> </td><td>10/5/2022 12:28:50
PM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29379</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Interface between door leaf and frame need to
leveled.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:54 PM</td><td> </td><td>10/5/2022 12:28:49
PM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29380</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged door leaf and
frame.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:56 PM</td><td> </td><td>10/5/2022 12:28:48
PM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29381</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches and defect panting should be
adjusted from both sides..</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:57 PM</td><td> </td><td>10/5/2022 12:28:47
PM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29382</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;The area behind the hinged door should be
finish well.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:59 PM</td><td> </td><td>10/5/2022 12:28:46
PM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29386</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damage door leaf and
frame.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:20:05 PM</td><td> </td><td>10/5/2022 12:28:45
PM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29429</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Wavy door leaf should be adjusted </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 5:05:31 PM</td><td>
</td><td>10/5/2022 12:28:44
PM</td><td>&nbsp;</td><td>MS.23.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29446</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs touch up painting </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 5:06:09 PM</td><td>
</td><td>10/5/2022 12:28:42
PM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29579</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Tape should removed and touch up painting is needed
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
11:37:31 AM</td><td> </td><td>10/5/2022 12:28:41
PM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29581</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be repaired and
adjusted</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:37:37 AM</td><td> </td><td>10/5/2022 12:28:40
PM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29582</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories need to
clean.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:37:38 AM</td><td> </td><td>10/5/2022 12:28:39
PM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29583</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Tape should be removed and cleaned/touch up painting is needed
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
11:37:39 AM</td><td> </td><td>10/5/2022 12:28:38
PM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29585</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be repaired and
adjusted</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:37:43 AM</td><td> </td><td>10/5/2022 12:28:37
PM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>29587</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches need to repair
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
11:37:46 AM</td><td> </td><td>10/5/2022 12:28:36
PM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29590</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged door leaf should be repaired and adjusted
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
11:37:51 AM</td><td> </td><td>10/5/2022 12:28:34
PM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>29591</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Doors
should be closed properly and should be balanced </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022 11:37:54 AM</td><td>
</td><td>10/5/2022 12:28:30
PM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>29595</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Defective paint need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:03 AM</td><td> </td><td>10/5/2022 12:28:28
PM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>29596</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf need to repair and touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:07 AM</td><td> </td><td>10/5/2022 12:28:27
PM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>29598</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be be repaired and
adjusted</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:17 AM</td><td> </td><td>10/5/2022 12:28:26
PM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29599</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damage door leaf need to
adjusted.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:18 AM</td><td> </td><td>10/5/2022 12:28:25
PM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29601</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:24 AM</td><td> </td><td>10/5/2022 12:28:23
PM</td><td>&nbsp;</td><td>MS.23.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29604</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;General cleaning and touch up painting for door
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
11:38:30 AM</td><td> </td><td>10/5/2022 12:28:21
PM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29612</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Defective paint need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:37 AM</td><td> </td><td>10/5/2022 12:28:20
PM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29613</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to
repaint.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:38 AM</td><td> </td><td>10/5/2022 12:28:19
PM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>29615</td><td>W.C. /M</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Defective paint need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:41 AM</td><td> </td><td>10/5/2022 12:28:18
PM</td><td>&nbsp;</td><td>MW.12.2A.001B</td><td>&nbsp;</td>
</tr><tr>
<td>29616</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged should be
adjusted.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:42 AM</td><td> </td><td>10/5/2022 12:28:17
PM</td><td>&nbsp;</td><td>MW.12.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29617</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged door leaf should be repaired and adjusted
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
11:38:43 AM</td><td> </td><td>10/5/2022 12:28:16
PM</td><td>&nbsp;</td><td>MS.12.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29618</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Scratches need to touch up.</td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022 11:38:44 AM</td><td>
</td><td>10/5/2022 12:28:14
PM</td><td>&nbsp;</td><td>MS.12.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29620</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Defective paint need to touch up.</td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022 11:38:45 AM</td><td>
</td><td>10/5/2022 12:28:13
PM</td><td>&nbsp;</td><td>MS.12.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29623</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be repaired and
adjusted</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:50 AM</td><td> </td><td>10/5/2022 12:28:12
PM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>29624</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:50 AM</td><td> </td><td>10/5/2022 12:28:11
PM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>29627</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Defective paint behind hanged need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:54 AM</td><td> </td><td>10/5/2022 12:28:10
PM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>29629</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:57 AM</td><td> </td><td>10/5/2022 12:28:09
PM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29630</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:59 AM</td><td> </td><td>10/5/2022 12:28:08
PM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29636</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Marked parts need touch up painting
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
11:39:06 AM</td><td> </td><td>10/5/2022 12:28:07
PM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>29638</td><td>STORAGE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:07 AM</td><td> </td><td>10/5/2022 12:28:06
PM</td><td>&nbsp;</td><td>MW.18.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>29639</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door need touch up painting for marked parts
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
11:39:08 AM</td><td> </td><td>10/5/2022 12:28:04
PM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29641</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be repaired and
adjusted</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:09 AM</td><td> </td><td>10/5/2022 12:28:03
PM</td><td>&nbsp;</td><td>MS.18.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29642</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:10 AM</td><td> </td><td>10/5/2022 12:28:02
PM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29643</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Wavy door leaf should be repaired and adjusted
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
11:39:11 AM</td><td> </td><td>10/5/2022 12:28:01
PM</td><td>&nbsp;</td><td>MS.18.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29645</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged door leaf should be repaired
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
11:39:12 AM</td><td> </td><td>10/5/2022 12:28:00
PM</td><td>&nbsp;</td><td>MS.18.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29646</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:13 AM</td><td> </td><td>10/5/2022 12:27:59
PM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29647</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be repaired and
adjusted</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:14 AM</td><td> </td><td>10/5/2022 12:27:58
PM</td><td>&nbsp;</td><td>MS.18.2A.012</td><td>&nbsp;</td>
</tr><tr>
<td>29649</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged frame and door leaf should be repaired and adjusted
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
11:39:16 AM</td><td> </td><td>10/5/2022 12:27:57
PM</td><td>&nbsp;</td><td>MS.18.2A.012</td><td>&nbsp;</td>
</tr><tr>
<td>29650</td><td>IT 2</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be
repaired</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:18 AM</td><td> </td><td>10/5/2022 12:27:55
PM</td><td>&nbsp;</td><td>MS.18.2A.022</td><td>&nbsp;</td>
</tr><tr>
<td>29652</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged part should be repaired </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022 11:39:22 AM</td><td>
</td><td>10/5/2022 12:27:54
PM</td><td>&nbsp;</td><td>MS.18.2A.024</td><td>&nbsp;</td>
</tr><tr>
<td>29653</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be repaired and
adjusted</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:24 AM</td><td> </td><td>10/5/2022 12:27:53
PM</td><td>&nbsp;</td><td>MS.18.2A.024</td><td>&nbsp;</td>
</tr><tr>
<td>29654</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting should be repaired and
adjusted</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:26 AM</td><td> </td><td>10/5/2022 12:27:51
PM</td><td>&nbsp;</td><td>MS.18.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29655</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged door should be repaired </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022 11:39:28 AM</td><td>
</td><td>10/5/2022 12:27:50
PM</td><td>&nbsp;</td><td>MS.18.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29960</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air filters. </td><td>High</td><td>6/2/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/26/2022 3:42:15 PM</td><td>
</td><td>10/5/2022 12:07:54
PM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>13693</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Goppion
Representative</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Installation not to
specification/drawing</td><td>&#39;Connection of temperature unit of show cases and
need cleaning over duct </td><td>High</td><td>12/7/2020 12:00:00
PM</td><td>ahmedsalem</td><td>11/30/2020 12:00:04 PM</td><td> </td><td>10/5/2022
12:07:02 PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>20312</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Goppion
Representative</td><td>MEP-Mechanical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Need support for PPR pipes</td><td>High</td><td>8/11/2021
12:00:00 AM</td><td>ahmedsalem</td><td>8/4/2021 12:58:28 PM</td><td>
</td><td>10/5/2022 11:55:47
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>13691</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Fire sealant around duct penetration for black steel duct
</td><td>High</td><td>12/7/2020 12:00:00 AM</td><td>ahmedsalem</td><td>11/30/2020
12:00:00 PM</td><td> </td><td>10/5/2022 11:10:38
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>21930</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Hose Reel
Cabinet</td><td>Fire extinguishers</td><td>&#39;Hose reel need adjustment
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/23/2021
1:35:20 PM</td><td> </td><td>10/5/2022 11:10:36
AM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21936</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Hose Reel
Cabinet</td><td>Fire extinguishers</td><td>&#39;Hose reel cabinet needs adjustment
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/23/2021
1:35:30 PM</td><td> </td><td>10/5/2022 11:10:30
AM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>28432</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing collar for fire stopping penetration in the wall
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:05:02 PM</td><td> </td><td>10/5/2022 11:10:21
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28925</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Stopping</td><td>Fire seal damaged</td><td>&#39;Pipes penetration need to be
sealed. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:02 PM</td><td> </td><td>10/5/2022 11:10:19
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29189</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Pipe penetration. </td><td>High</td><td>5/29/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:59:06 AM</td><td>
</td><td>10/5/2022 11:10:12
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29190</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Pipe penetration. </td><td>High</td><td>5/29/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:59:08 AM</td><td>
</td><td>10/5/2022 11:09:45
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29199</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Air
vent/bottle to be fitted</td><td>&#39;Pipe penetration.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:23 AM</td><td> </td><td>10/5/2022 11:09:23
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29201</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Stopping</td><td>General Snag</td><td>&#39;Pipe penetration.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:26 AM</td><td> </td><td>10/5/2022 11:09:17
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29202</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Stopping</td><td>General Snag</td><td>&#39;Pipes penetration.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:27 AM</td><td> </td><td>10/5/2022 11:09:16
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>21165</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Staircase</td><td>General
Snag</td><td>&#39;Bolt should be removed </td><td>Low</td><td>9/7/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/17/2021 10:56:15 AM</td><td> </td><td>10/5/2022
9:54:25 AM</td><td>&nbsp;</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>30023</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Installation not to specification/drawing</td><td>&#39;HDPE pipe
penetration. </td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:37 AM</td><td> </td><td>10/5/2022 9:53:58
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>27699</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 3:36:14 PM</td><td> </td><td>10/5/2022 9:53:28
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27698</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 3:36:12 PM</td><td> </td><td>10/5/2022 9:52:59
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27557</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:14 AM</td><td> </td><td>10/5/2022 9:52:31
AM</td><td>&nbsp;</td><td>MS.19.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>27905</td><td>IT 9</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>3/12/2022 11:53:02 AM</td><td> </td><td>10/4/2022 4:15:31
PM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>28041</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Many RJ45 patching is missing from Cisco switches to the
respective patch panels and patch panels,fiber patch cords labeling also
missing.Switches configuration also pending and incomplete port activation
</td><td>High</td><td>3/21/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/14/2022 1:33:51 PM</td><td> </td><td>10/4/2022 4:15:30
PM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28054</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Addressing and switch configuration and fiber cable and cat 6
termination </td><td>High</td><td>3/21/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/14/2022 1:52:34 PM</td><td> </td><td>10/4/2022 4:15:29
PM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>10949</td><td>TUT- ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing Sealant around metal door/ wall need to touch up
</td><td>Low</td><td>10/6/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/15/2020 12:03:11 PM</td><td>
</td><td>10/4/2022 4:13:23
PM</td><td>&nbsp;</td><td>MS.18.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>10948</td><td>TUT- ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Need repair </td><td>Low</td><td>10/6/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/15/2020 12:03:05 PM</td><td>
</td><td>10/4/2022 4:12:41
PM</td><td>&nbsp;</td><td>MS.18.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>10943</td><td>TUT- EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Need repair </td><td>Low</td><td>10/6/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/15/2020 12:02:38 PM</td><td>
</td><td>10/4/2022 4:12:21
PM</td><td>&nbsp;</td><td>MS.18.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>10967</td><td>TUT-CORE B2</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting need to touch up
</td><td>Low</td><td>10/6/2020 12:00:00
AM</td><td>andrewjohn.rose</td><td>9/15/2020 12:04:37 PM</td><td>
</td><td>10/4/2022 4:11:59
PM</td><td>&nbsp;</td><td>MC.18.3A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>10895</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>Glasbau-Hahn GmbH
Representative</td><td>MEP-ELV</td><td>STRUCTURED CABLING</td><td>Incomplete
Installation</td><td>&#39;Conduit and media hardware ICT cables installation is
incomplete in this areas. And lighting control data points also missing
</td><td>High</td><td>9/21/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/14/2020 3:57:45 PM</td><td> </td><td>10/4/2022 2:39:26
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10907</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Goppion
Representative</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Lighting control cables installation and sensor installation is
pending.Showcases on and off control are not pulled</td><td>High</td><td>9/21/2020
12:00:00 PM</td><td>Muthukumar Paramakrishnan</td><td>9/14/2020 4:00:21 PM</td><td>
</td><td>10/4/2022 2:39:24
PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>10908</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Media hardware ICT cables are not terminated and media hardware
devices also not installed.Also showcases climate control cables are not pulled and
gateway not installed </td><td>High</td><td>9/21/2020 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>9/14/2020 4:00:46 PM</td><td>
</td><td>10/4/2022 2:39:22
PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>14290</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Some of the exhibitions areas,screens installation has not been
done at wrapping the body and funery concessions and media tables
etc</td><td>High</td><td>12/29/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>12/22/2020 9:47:22 AM</td><td> </td><td>10/4/2022 2:39:21
PM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>21169</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>9/7/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/17/2021 10:56:23 AM</td><td> </td><td>10/4/2022
1:28:14 PM</td><td>&nbsp;</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>12094</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Cleaning and repair for epoxy
painting </td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>10/1/2020 2:16:29 PM</td><td> </td><td>10/4/2022 1:27:47
PM</td><td>&nbsp;</td><td>MS.17.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>19886</td><td>SERVICE ZONE2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Missing raceway above ceiling</td><td>High</td><td>8/4/2021
12:00:00 AM</td><td>Sameh Ibrahim El-Sawah</td><td>7/28/2021 11:39:47 AM</td><td>
</td><td>10/4/2022 11:34:05
AM</td><td>&nbsp;</td><td>MS.12.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27755</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Bending less than 90 not
allow</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:28 PM</td><td> </td><td>10/4/2022 11:34:04
AM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>28787</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;All wall penetration must be
sealed</td><td>High</td><td>5/19/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/12/2022 2:38:11 PM</td><td> </td><td>10/4/2022
11:34:03 AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30273</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:18 PM</td><td> </td><td>10/4/2022
11:34:01 AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>19524</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Missing hose
bib</td><td>High</td><td>7/6/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>6/30/2021 10:08:52 AM</td><td> </td><td>10/4/2022 11:17:18
AM</td><td>&nbsp;</td><td>Museum Roof Band B</td><td>&nbsp;</td>
</tr><tr>
<td>19528</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Missing hose bib and support need
adjustment </td><td>High</td><td>7/6/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>6/30/2021 10:08:59 AM</td><td> </td><td>10/4/2022 11:17:17
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>19532</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Missing hose bib and support need
adjustment </td><td>High</td><td>7/6/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>6/30/2021 10:09:07 AM</td><td> </td><td>10/4/2022 11:17:16
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>20316</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Civil work around duct not completed
</td><td>High</td><td>8/11/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/4/2021
12:58:33 PM</td><td> </td><td>10/4/2022 11:17:16
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>25275</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>11/29/2021 12:00:00 PM</td><td>ahmedsalem</td><td>11/22/2021
11:58:11 AM</td><td> </td><td>10/4/2022 11:17:15 AM</td><td>&nbsp;</td><td>Museum
Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25285</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Wire mesh is rusted ,need to change and need goose neck
</td><td>High</td><td>11/29/2021 12:00:00 PM</td><td>ahmedsalem</td><td>11/22/2021
11:58:44 AM</td><td> </td><td>10/4/2022 11:17:14 AM</td><td>&nbsp;</td><td>Museum
Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25296</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Installation not to
specification/drawing</td><td>&#39;Need ladder above black steel duct to access
mechanical trades </td><td>High</td><td>11/29/2021 12:00:00
AM</td><td>ahmedsalem</td><td>11/22/2021 11:59:10 AM</td><td> </td><td>10/4/2022
11:17:13 AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25301</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Cladding need adjustment and repair
</td><td>High</td><td>11/29/2021 12:00:00 PM</td><td>ahmedsalem</td><td>11/22/2021
11:59:27 AM</td><td> </td><td>10/4/2022 11:17:12 AM</td><td>&nbsp;</td><td>Museum
Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25303</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Alignment of PPR pipes and support needs
to be fixed </td><td>High</td><td>11/29/2021 12:00:00
PM</td><td>ahmedsalem</td><td>11/22/2021 11:59:32 AM</td><td> </td><td>10/4/2022
11:17:11 AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25383</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Incomplete duct work </td><td>High</td><td>11/30/2021 12:00:00
PM</td><td>ahmedsalem</td><td>11/23/2021 2:16:09 PM</td><td> </td><td>10/4/2022
11:17:10 AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25402</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing air vent -
Missing valve handle - pipe is not fixed to support</td><td>High</td><td>12/1/2021
12:00:00 PM</td><td>ahmedsalem</td><td>11/24/2021 2:45:43 PM</td><td>
</td><td>10/4/2022 11:17:09 AM</td><td>&nbsp;</td><td>Museum Roof Band
A</td><td>&nbsp;</td>
</tr><tr>
<td>28335</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Missing coaler for pipes. </td><td>High</td><td>5/3/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>4/26/2022 11:43:57 AM</td><td>
</td><td>10/4/2022 11:17:07
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28339</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Pipe penetration throw wall shall be closed by proper fire
sealant. </td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:08 AM</td><td> </td><td>10/4/2022 11:17:06
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28693</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Coil fins shall be adjusted.
</td><td>High</td><td>5/17/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:47:43 PM</td><td> </td><td>10/4/2022 11:17:04
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29961</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coils fins need adjustment and cleaning.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:16 PM</td><td> </td><td>10/4/2022 11:17:02
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>30039</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Air
vent/bottle to be fitted</td><td>&#39;Missing collar for PPR pipe penetration.
</td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:27:02 AM</td><td> </td><td>10/4/2022 11:17:01
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30041</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Air
vent/bottle to be fitted</td><td>&#39;PPR pipes penetrations.
</td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:27:06 AM</td><td> </td><td>10/4/2022 11:17:00
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30047</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;PPR pipes penetrations throw walls need to be sealed.
</td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:27:15 AM</td><td> </td><td>10/4/2022 11:16:59
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30051</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Pipe penetration throw the slap. </td><td>High</td><td>6/5/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/29/2022 11:27:24 AM</td><td>
</td><td>10/4/2022 11:16:58
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>16373</td><td>CORE F3</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Hose Reel
Cabinet</td><td>Fire extinguishers</td><td>&#39;Missing hose rack and fire
extinguisher </td><td>High</td><td>2/21/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>2/14/2021 3:07:51 PM</td><td> </td><td>10/4/2022 8:48:17
AM</td><td>&nbsp;</td><td>MC.14.0G.F31</td><td>&nbsp;</td>
</tr><tr>
<td>13293</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>Roschmann</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Missing cladding
</td><td>Low</td><td>11/25/2020 12:00:00 AM</td><td>sally.george</td><td>11/4/2020
4:17:51 PM</td><td> </td><td>10/3/2022 4:32:06 PM</td><td>Done </td><td>Level
+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>11026</td><td>TUT-CORE B1</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company, Ltd.</td><td>MEP-
Electrical</td><td>WIRING ACCESSORIES</td><td>General Snag</td><td>&#39;Lock cable
and access control cables are not terminated including bus
cables</td><td>High</td><td>9/22/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/15/2020 4:12:35 PM</td><td> </td><td>10/3/2022 3:06:54
PM</td><td>&nbsp;</td><td>MC.23.3A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>17995</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;Installing RFID Tag
and Humidity sensors at the showcases</td><td>High</td><td>5/31/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>5/24/2021 5:40:44 PM</td><td> </td><td>10/3/2022
3:06:53 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21138</td><td>CORE D2</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 10:50:27 AM</td><td> </td><td>10/3/2022 12:32:14
PM</td><td>&nbsp;</td><td>MC.18.02.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21140</td><td>CORE D2</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Marked part not leveled
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
10:50:30 AM</td><td> </td><td>10/3/2022 12:32:13
PM</td><td>&nbsp;</td><td>MC.18.02.D21</td><td>&nbsp;</td>
</tr><tr>
<td>27328</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Marked joint should be aligned
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022
12:12:13 PM</td><td> </td><td>10/3/2022 12:32:12
PM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27329</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Glass door frame need touch up painting
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:15 PM</td><td> </td><td>10/3/2022 12:32:10
PM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27330</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Rubber from inside should be fixed properly
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022
12:12:17 PM</td><td> </td><td>10/3/2022 12:32:09
PM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27331</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Wrong cutting for rubber and missing parts
should be installed and adjusted </td><td>Low</td><td>3/28/2022 12:00:00
PM</td><td>mohamed.sami</td><td>3/7/2022 12:12:20 PM</td><td> </td><td>10/3/2022
12:32:08 PM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27332</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Marked parts need touch up painting
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:24 PM</td><td> </td><td>10/3/2022 12:32:07
PM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27364</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Marked gaps should be sealed
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:13:26 PM</td><td> </td><td>10/3/2022 12:32:06
PM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>29106</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Bubbles under linoleum floor tiles should
be adjusted </td><td>Low</td><td>6/9/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/19/2022 12:04:25 PM</td><td> </td><td>10/3/2022 12:32:05
PM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30132</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>6/20/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022 11:37:36 AM</td><td>
</td><td>10/3/2022 12:32:03
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30230</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Toothing between mirror
panel.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 1:03:05 PM</td><td> </td><td>10/3/2022 12:32:02
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30237</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be
adjusted</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 3:35:21 PM</td><td> </td><td>10/3/2022 12:32:01
PM</td><td>&nbsp;</td><td>MA.19.02.021</td><td>&nbsp;</td>
</tr><tr>
<td>30240</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be
adjusted</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 3:35:27 PM</td><td> </td><td>10/3/2022 12:32:00
PM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30243</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both sides
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
3:35:33 PM</td><td> </td><td>10/3/2022 12:31:59
PM</td><td>&nbsp;</td><td>MA.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30246</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
3:35:38 PM</td><td> </td><td>10/3/2022 12:31:58
PM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30250</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be
adjusted</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 3:35:44 PM</td><td> </td><td>10/3/2022 12:31:57
PM</td><td>&nbsp;</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30256</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be
adjusted</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 3:35:54 PM</td><td> </td><td>10/3/2022 12:31:56
PM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30259</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be
adjusted</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 3:36:12 PM</td><td> </td><td>10/3/2022 12:31:55
PM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30260</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/20/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/30/2022 3:36:14 PM</td><td> </td><td>10/3/2022
12:31:53 PM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30265</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects to be adjusted
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
3:36:23 PM</td><td> </td><td>10/3/2022 12:31:52
PM</td><td>&nbsp;</td><td>MR.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30267</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame need to clean and touch up
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
3:36:26 PM</td><td> </td><td>10/3/2022 12:31:51
PM</td><td>&nbsp;</td><td>MA.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30579</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:50:36 AM</td><td> </td><td>10/3/2022 12:31:50
PM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30582</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:50:42 AM</td><td> </td><td>10/3/2022 12:31:49
PM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30587</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted
</td><td>Low</td><td>6/7/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:50:51 AM</td><td> </td><td>10/3/2022 12:31:48
PM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30589</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/7/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:50:54 AM</td><td> </td><td>10/3/2022 12:31:46
PM</td><td>&nbsp;</td><td>MA.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30594</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:51:06 AM</td><td> </td><td>10/3/2022 12:31:45
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30597</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/7/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:51:17 AM</td><td> </td><td>10/3/2022 12:31:44
PM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30604</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both sides
</td><td>Low</td><td>6/7/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:51:32 AM</td><td> </td><td>10/3/2022 12:31:43
PM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30612</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:51:39 AM</td><td> </td><td>10/3/2022 12:31:42
PM</td><td>&nbsp;</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30694</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame should be finished and painted
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
4:15:46 PM</td><td> </td><td>10/3/2022 12:31:39
PM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30695</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted for both
sides</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:48 PM</td><td> </td><td>10/3/2022 12:31:38
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30696</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company, Ltd.</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches and painting defects should be
adjusted for both sides </td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:48 PM</td><td> </td><td>10/3/2022 12:31:37
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30700</td><td>SHAFT</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company, Ltd.</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches and painting defects should be
adjusted for both sides </td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:52 PM</td><td> </td><td>10/3/2022 12:31:36
PM</td><td>&nbsp;</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30701</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted for both
sides</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:53 PM</td><td> </td><td>10/3/2022 12:31:35
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30702</td><td>SHAFT</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company, Ltd.</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Dented door leaf to be adjusted and
repainted.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:54 PM</td><td> </td><td>10/3/2022 12:31:34
PM</td><td>&nbsp;</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30704</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted for both
sides</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:57 PM</td><td> </td><td>10/3/2022 12:31:33
PM</td><td>&nbsp;</td><td>MA.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30709</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches and painting defects should be
adjusted for both sides </td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 4:16:03 PM</td><td> </td><td>10/3/2022 12:31:31
PM</td><td>&nbsp;</td><td>MA.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30710</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted for both
sides</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:16:03 PM</td><td> </td><td>10/3/2022 12:31:30
PM</td><td>&nbsp;</td><td>MA.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30717</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches and painting defects should be
adjusted for both sides </td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:16:11 PM</td><td> </td><td>10/3/2022 12:31:29
PM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30720</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted for both sides
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
4:16:15 PM</td><td> </td><td>10/3/2022 12:31:27
PM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30805</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:44:59 AM</td><td> </td><td>10/3/2022 12:31:26
PM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>30807</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/22/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/1/2022 11:45:02 AM</td><td> </td><td>10/3/2022
12:31:24 PM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>30808</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:04 AM</td><td> </td><td>10/3/2022 12:31:23
PM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>30811</td><td>STORE</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:09 AM</td><td> </td><td>10/3/2022 12:31:22
PM</td><td>&nbsp;</td><td>MA.19.02.024</td><td>&nbsp;</td>
</tr><tr>
<td>30815</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/8/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:19 AM</td><td> </td><td>10/3/2022 12:31:20
PM</td><td>&nbsp;</td><td>MA.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30821</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/8/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:30 AM</td><td> </td><td>10/3/2022 12:31:19
PM</td><td>&nbsp;</td><td>MA.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30830</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:44 AM</td><td> </td><td>10/3/2022 12:31:18
PM</td><td>&nbsp;</td><td>MA.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31290</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and defective paint should be
adjusted.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 11:36:00 AM</td><td> </td><td>10/3/2022 12:31:16
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>31291</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 11:37:49 AM</td><td> </td><td>10/3/2022 12:31:15
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>31295</td><td>PLANT</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
11:37:57 AM</td><td> </td><td>10/3/2022 12:31:14
PM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31298</td><td>PLANT</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 11:38:03 AM</td><td> </td><td>10/3/2022 12:31:13
PM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31301</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 11:38:09 AM</td><td> </td><td>10/3/2022 12:31:12
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31305</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 11:38:17 AM</td><td> </td><td>10/3/2022 12:31:11
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31306</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 11:38:19 AM</td><td> </td><td>10/3/2022 12:31:10
PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31309</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 11:38:24 AM</td><td> </td><td>10/3/2022 12:31:08
PM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>31574</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 3:37:04 PM</td><td> </td><td>10/3/2022 12:31:07
PM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31709</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>Unilex Sign
Systems</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Scratches should be repaired
</td><td>Low</td><td>6/27/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022
11:52:31 AM</td><td> </td><td>10/3/2022 12:31:06
PM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>21031</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Alignment of sealant joint
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:14:02 AM</td><td> </td><td>10/3/2022 10:58:38
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21018</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>Joint finish</td><td>&#39;Missing sealant between stairs and
flooring </td><td>Low</td><td>9/5/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/15/2021 11:13:29 AM</td><td> </td><td>10/3/2022 10:56:45
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21016</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding line and stainless handrail
should be finished </td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/15/2021 11:13:24 AM</td><td> </td><td>10/3/2022 10:54:11
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>26744</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Alignment and Level not followed</td><td>&#39;No faceplate labeling
and faceplate needs to be fixed properly </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:45:50 PM</td><td>
</td><td>10/3/2022 10:48:19
AM</td><td>&nbsp;</td><td>MR.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>26758</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Alignment and Level not followed</td><td>&#39;Cat6a cables needs to
be pulled and terminated.Also face plate fixing is incomplete
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:46:11 PM</td><td> </td><td>10/3/2022 10:47:33
AM</td><td>&nbsp;</td><td>MA.19.02.023</td><td>&nbsp;</td>
</tr><tr>
<td>26972</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Data outlet sockets needs to be replaced and face plate cover
needs to be installed </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:48 PM</td><td> </td><td>10/3/2022 10:46:43
AM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>26983</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Face plate cover damaged and its needs to be replaced
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:01:07 PM</td><td> </td><td>10/3/2022 10:45:51
AM</td><td>&nbsp;</td><td>MA.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>26984</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Data port Face plate labeling should be done
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:01:08 PM</td><td> </td><td>10/3/2022 10:45:01
AM</td><td>&nbsp;</td><td>MA.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>32441</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete works
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:30:33 PM</td><td> </td><td>10/2/2022 4:43:23
PM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32191</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag</td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:29 AM</td><td>
</td><td>10/2/2022 4:43:00
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32581</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag</td><td>High</td><td>7/25/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>7/18/2022 11:34:31 AM</td><td>
</td><td>10/2/2022 4:42:49
PM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>31931</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Elevators works not completed yet.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:07 PM</td><td> </td><td>10/2/2022 3:12:36
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>15240</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Fire fighting valves not connected with electrical
cable</td><td>High</td><td>1/31/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>1/24/2021 11:48:55 AM</td><td> </td><td>10/2/2022 3:09:57
PM</td><td>&nbsp;</td><td>MS.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>31969</td><td>CORE G1</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Shaft door is closed, shall be opened to check the works
inside. </td><td>High</td><td>7/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>7/5/2022 11:27:04 AM</td><td> </td><td>10/2/2022 3:03:37
PM</td><td>&nbsp;</td><td>MC.25.01.G11</td><td>&nbsp;</td>
</tr><tr>
<td>28401</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing labels for MEP trades.
</td><td>High</td><td>5/4/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/27/2022 11:45:13 AM</td><td> </td><td>10/2/2022 3:02:26
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32462</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Canvas needs adjustment </td><td>High</td><td>7/25/2022 12:00:00
AM</td><td>hossamreda</td><td>7/18/2022 10:02:16 AM</td><td> </td><td>10/2/2022
2:47:03 PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>21109</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need repair and
adjusted </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:49:22 AM</td><td> </td><td>10/2/2022 12:18:06
PM</td><td>&nbsp;</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21023</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Waving concrete wall</td><td>Low</td><td>9/5/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/15/2021 11:13:45 AM</td><td> </td><td>10/2/2022
12:15:56 PM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21021</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Anchor should be removed </td><td>Low</td><td>9/5/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/15/2021 11:13:39 AM</td><td> </td><td>10/2/2022
12:15:06 PM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21014</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Inner angle should be finished
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:13:17 AM</td><td> </td><td>10/2/2022 12:14:15
PM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21013</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding line should be finished
</td><td>Low</td><td>9/5/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/15/2021
11:13:15 AM</td><td> </td><td>10/2/2022 12:13:46
PM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>27311</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Broken glass tile need to
replaced.</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/7/2022 12:06:24 PM</td><td> </td><td>10/2/2022 12:11:37
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>20998</td><td>CORE B1 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy paint floor need to Repair and
touch </td><td>Low</td><td>9/5/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/15/2021 11:12:21 AM</td><td> </td><td>10/1/2022 9:36:03
AM</td><td>&nbsp;</td><td>MC.23.02.B11</td><td>&nbsp;</td>
</tr><tr>
<td>29788</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories should be clean from
painting.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:15:33 PM</td><td> </td><td>9/29/2022 10:41:27
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29428</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Marked part To be replaced </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 5:05:29 PM</td><td>
</td><td>9/29/2022 10:40:54
AM</td><td>&nbsp;</td><td>MS.23.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>30685</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/21/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/31/2022 4:15:33 PM</td><td> </td><td>9/29/2022
10:38:25 AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30959</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/22/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/1/2022 3:57:21 PM</td><td> </td><td>9/29/2022
10:37:19 AM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>21034</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Repair and touch up for wall painting
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:14:11 AM</td><td> </td><td>9/29/2022 10:36:10
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21033</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Waving wall painting
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:14:08 AM</td><td> </td><td>9/29/2022 10:35:03
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21032</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Interface between gypsum wall and
concrete should be leveled </td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/15/2021 11:14:05 AM</td><td> </td><td>9/29/2022 10:34:25
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>10942</td><td>TUT-CORE B1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Painting need to touch up/ missing Sealant between walls &amp;
ceiling </td><td>Low</td><td>10/6/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/15/2020 12:02:35 PM</td><td>
</td><td>9/29/2022 10:33:39
AM</td><td>&nbsp;</td><td>MC.23.3A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>29388</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damaged hardware accessories.</td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 4:20:08 PM</td><td>
</td><td>9/29/2022 10:31:25
AM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29589</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories need to clean
cleaned.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:37:51 AM</td><td> </td><td>9/29/2022 10:29:57
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27705</td><td>GEM CAVE EXP.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 3:36:28 PM</td><td> </td><td>9/29/2022 10:02:02
AM</td><td>&nbsp;</td><td>MP.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>26943</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Data cables termination are not done under the reception table
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:02 PM</td><td> </td><td>9/29/2022 9:59:44
AM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>24339</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steel works at roof</td><td>Paint
Stains</td><td>&#39;Steel structure columns need to clean and touch up
</td><td>Low</td><td>11/3/2021 12:00:00 AM</td><td>mohamed.sami</td><td>10/27/2021
11:26:14 AM</td><td> </td><td>9/29/2022 9:59:11 AM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>24336</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steel works at roof</td><td>Paint
finish</td><td>&#39;Remove stains and cleaning for steel structure
</td><td>Low</td><td>11/17/2021 12:00:00 AM</td><td>mohamed.sami</td><td>10/27/2021
11:26:06 AM</td><td> </td><td>9/29/2022 9:58:53 AM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>31060</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:23:07 PM</td><td> </td><td>9/29/2022 9:53:51
AM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>19892</td><td>SERVICE ZONE2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;Most
of conduits not tightened and should be tightened for future work and
repulling</td><td>High</td><td>8/4/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>7/28/2021 12:14:52 PM</td><td> </td><td>9/29/2022 9:44:43
AM</td><td>&nbsp;</td><td>MS.12.2A.004</td><td>&nbsp;</td>
</tr><tr>

<td>27232</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing lighting fixtures </td><td>Low</td><td>3/27/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:50:51 PM</td><td> </td><td>9/29/2022
9:42:13 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27805</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lifting management
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:15 PM</td><td> </td><td>9/29/2022 9:40:23
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>26944</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Few cat6a cables are not pulled and faceplate fixtures are not
installed </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:03 PM</td><td> </td><td>9/29/2022 9:39:30
AM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>31001</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label system to be installed
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:20:44 PM</td><td> </td><td>9/29/2022 9:38:48
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31025</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:21:24 PM</td><td> </td><td>9/29/2022
9:38:07 AM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>31022</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Face plate and
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:21:20 PM</td><td> </td><td>9/29/2022
9:36:40 AM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>31771</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>CABLE LADDER</td><td>General
Snag</td><td>&#39;Tray should be cover at mechanical
room</td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/6/2022 2:07:10 PM</td><td> </td><td>9/29/2022
9:35:36 AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31773</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>CABLE LADDER</td><td>General
Snag</td><td>&#39;Tray should be cover at mechanical
room</td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/6/2022 2:07:13 PM</td><td> </td><td>9/29/2022
9:34:55 AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>32851</td><td>LOBBY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Face plate not installed for fire alarm
devices</td><td>High</td><td>9/18/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>9/11/2022 1:15:04 PM</td><td> </td><td>9/29/2022 8:50:27
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32573</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:34:15 AM</td><td> </td><td>9/29/2022 8:50:07
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32564</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:33:49 AM</td><td> </td><td>9/29/2022 8:49:55
AM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32501</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;Do’s should to install
properly</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:54 AM</td><td> </td><td>9/29/2022 8:49:39
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32841</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-
Mechanical</td><td>Ductwork</td><td>General Snag</td><td>&#39;Removal of painting
from air grills </td><td>High</td><td>9/18/2022 12:00:00
AM</td><td>hossamreda</td><td>9/11/2022 10:29:52 AM</td><td> </td><td>9/29/2022
8:28:19 AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>5689</td><td>TUT-CORE B1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Removing loose material/ Epoxy
painting need to touch up </td><td>Low</td><td>10/24/2019 12:00:00
AM</td><td>Michael Mahfouz</td><td>10/3/2019 11:29:25 AM</td><td>
</td><td>9/29/2022 8:24:48
AM</td><td>&nbsp;</td><td>MC.23.3A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>12058</td><td>SERVICE DELIVERY-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up - CIR not submitted </td><td>Low</td><td>10/22/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020 2:14:38 PM</td><td>
</td><td>9/28/2022 3:57:43
PM</td><td>&nbsp;</td><td>MQ.18.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>12064</td><td>SERVICE TUNNEL (A)-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up - CIR not submitted </td><td>Low</td><td>10/22/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020 2:14:53 PM</td><td>
</td><td>9/28/2022 3:57:42
PM</td><td>&nbsp;</td><td>MQ.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>12068</td><td>SERVICE DELIVERY-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to repair and touch up -CIR not submitted
</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
2:15:02 PM</td><td> </td><td>9/28/2022 3:57:40
PM</td><td>&nbsp;</td><td>MQ.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>12069</td><td>SERVICE DELIVERY-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up - refer to comments CIR no
215109</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>10/1/2020 2:15:05 PM</td><td> </td><td>9/28/2022 3:57:39
PM</td><td>&nbsp;</td><td>MQ.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>12070</td><td>SERVICE DELIVERY-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up - CIR not submitted </td><td>Low</td><td>10/22/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020 2:15:08 PM</td><td>
</td><td>9/28/2022 3:57:37
PM</td><td>&nbsp;</td><td>MQ.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>12092</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories- door leaf and frame need touch up refer to CIR no
215107</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>10/1/2020 2:16:20 PM</td><td> </td><td>9/28/2022 3:57:36
PM</td><td>&nbsp;</td><td>MS.17.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16765</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to adjustment
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
10:23:16 AM</td><td> </td><td>9/28/2022 3:57:29
PM</td><td>&nbsp;</td><td>ME.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16766</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Window reveal not aligned
</td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021
10:23:18 AM</td><td> </td><td>9/28/2022 3:57:27
PM</td><td>&nbsp;</td><td>ME.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16830</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Door Hardware</td><td>General</td><td>&#39;Pull
handles should be aligned from outside and inside </td><td>Low</td><td>3/31/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021 12:59:28 PM</td><td>
</td><td>9/28/2022 3:57:26
PM</td><td>&nbsp;</td><td>MW.13.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>16834</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Lock Mechanism</td><td>&#39;Broken partition should be repaired
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
12:59:36 PM</td><td> </td><td>9/28/2022 3:57:25
PM</td><td>&nbsp;</td><td>MW.13.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>16839</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
12:59:46 PM</td><td> </td><td>9/28/2022 3:57:23
PM</td><td>&nbsp;</td><td>MW.13.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>16840</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Horizontal joints are not leveled
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
12:59:47 PM</td><td> </td><td>9/28/2022 3:57:22
PM</td><td>&nbsp;</td><td>MW.13.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>16846</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Vanity
Counter Top</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:00:03 PM</td><td> </td><td>9/28/2022 3:57:20
PM</td><td>&nbsp;</td><td>MW.13.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>16853</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Horizontal joints are not leveled
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:00:19 PM</td><td> </td><td>9/28/2022 3:57:19
PM</td><td>&nbsp;</td><td>MW.13.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>16854</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:00:22 PM</td><td> </td><td>9/28/2022 3:57:18
PM</td><td>&nbsp;</td><td>MW.13.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>16858</td><td>WC /DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>General Snag</td><td>&#39;Toothing between tiles
</td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021
1:00:30 PM</td><td> </td><td>9/28/2022 3:57:16
PM</td><td>&nbsp;</td><td>MW.13.01.001C</td><td>&nbsp;</td>
</tr><tr>
<td>16877</td><td>MALE SHOWER/ LOCKERS-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>General Snag</td><td>&#39;The strip should be the same width
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:01:07 PM</td><td> </td><td>9/28/2022 3:57:14
PM</td><td>&nbsp;</td><td>MW.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16880</td><td>WC LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Edges should be aligned </td><td>Low</td><td>3/31/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>3/10/2021 1:01:12 PM</td><td> </td><td>9/28/2022
3:57:13 PM</td><td>&nbsp;</td><td>MW.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16884</td><td>WC LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:01:20 PM</td><td> </td><td>9/28/2022 3:57:11
PM</td><td>&nbsp;</td><td>MW.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16894</td><td>WOOD-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Discoloration in marked
parts</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/10/2021 1:01:40 PM</td><td> </td><td>9/28/2022 3:57:10
PM</td><td>&nbsp;</td><td>ME.12.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>16915</td><td>TEXTILE-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Damages should be replaced
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:02:21 PM</td><td> </td><td>9/28/2022 3:57:08
PM</td><td>&nbsp;</td><td>ME.12.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>16916</td><td>TEXTILE-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Discoloration between floor tiles
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:02:23 PM</td><td> </td><td>9/28/2022 3:57:07
PM</td><td>&nbsp;</td><td>ME.12.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20899</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>Civil</td><td>General
Snag</td><td>General Snag</td><td>&#39;General cleaning and house keeping ,need to
clean above duct and AHU </td><td>High</td><td>8/18/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/11/2021 11:48:08 AM</td><td> </td><td>9/28/2022
3:57:06 PM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>16927</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access panels need touch up painting /wavy painting should be
adjusted </td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/10/2021 1:02:47 PM</td><td> </td><td>9/28/2022 3:57:05
PM</td><td>&nbsp;</td><td>ME.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20906</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>Civil</td><td>Boundary
Walls</td><td>Alignment/Plumbness</td><td>&#39;Duct penetration not as per
spec.</td><td>High</td><td>8/18/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/11/2021 11:48:24 AM</td><td> </td><td>9/28/2022
3:57:05 PM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>20907</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Civil</td><td>Boundary
Walls</td><td>Alignment/Plumbness</td><td>&#39;Cleaning &amp; house keeping
</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/11/2021
11:48:27 AM</td><td> </td><td>9/28/2022 3:57:04
PM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>16958</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access door should be adjusted </td><td>Low</td><td>4/1/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>3/11/2021 12:25:58 PM</td><td>
</td><td>9/28/2022 3:57:04
PM</td><td>&nbsp;</td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>16960</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Edge is not aligned </td><td>Low</td><td>4/1/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>3/11/2021 12:26:03 PM</td><td> </td><td>9/28/2022
3:57:03 PM</td><td>&nbsp;</td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>16961</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling is not leveled (wavy)</td><td>Low</td><td>4/1/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>3/11/2021 12:26:04 PM</td><td>
</td><td>9/28/2022 3:57:02
PM</td><td>&nbsp;</td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>16962</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wall painting need touch up
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:26:08 PM</td><td> </td><td>9/28/2022 3:57:01
PM</td><td>&nbsp;</td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>16965</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Edges are not aligned
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:26:30 PM</td><td> </td><td>9/28/2022 3:56:59
PM</td><td>&nbsp;</td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>16966</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wavy painting should be adjusted
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:26:46 PM</td><td> </td><td>9/28/2022 3:56:58
PM</td><td>&nbsp;</td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>17026</td><td>WC / DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:33:59 PM</td><td> </td><td>9/28/2022 3:56:57
PM</td><td>&nbsp;</td><td>MW.12.01.001E</td><td>&nbsp;</td>
</tr><tr>
<td>17034</td><td>WC LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Painting need touch up
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:19 PM</td><td> </td><td>9/28/2022 3:56:56
PM</td><td>&nbsp;</td><td>MW.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>17039</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls painting need touchup
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:32 PM</td><td> </td><td>9/28/2022 3:56:55
PM</td><td>&nbsp;</td><td>ME.12.01.010</td><td>&nbsp;</td>
</tr><tr>
<td>17040</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Edge and corner should be aligned
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:34 PM</td><td> </td><td>9/28/2022 3:56:54
PM</td><td>&nbsp;</td><td>ME.12.01.010</td><td>&nbsp;</td>
</tr><tr>
<td>17041</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wavy painting should be adjusted
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:35 PM</td><td> </td><td>9/28/2022 3:56:53
PM</td><td>&nbsp;</td><td>ME.12.01.010</td><td>&nbsp;</td>
</tr><tr>
<td>17052</td><td>MEETING-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wavy painting should be adjusted
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:35:10 PM</td><td> </td><td>9/28/2022 3:56:51
PM</td><td>&nbsp;</td><td>ME.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20170</td><td>AHU-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our pervious comments on CIR </td><td>Low</td><td>8/24/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/3/2021 3:37:55 PM</td><td> </td><td>9/28/2022
3:56:50 PM</td><td>&nbsp;</td><td>MS.18.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20188</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Some tiles have stains should be changed
</td><td>Low</td><td>8/24/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/3/2021
3:38:47 PM</td><td> </td><td>9/28/2022 3:56:49
PM</td><td>&nbsp;</td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>21131</td><td>CORE B2-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to repair
and adjusted </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:50:13 AM</td><td> </td><td>9/28/2022 3:56:48
PM</td><td>&nbsp;</td><td>MC.18.01.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21133</td><td>CORE B2-Band B</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:50:17 AM</td><td> </td><td>9/28/2022 3:56:46
PM</td><td>&nbsp;</td><td>MC.18.01.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21557</td><td>CORE B3-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
9:52:02 AM</td><td> </td><td>9/28/2022 3:56:45
PM</td><td>&nbsp;</td><td>MC.12.01.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21687</td><td>CORE B3-Band B</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:25:42 AM</td><td> </td><td>9/28/2022 3:56:44
PM</td><td>&nbsp;</td><td>MC.12.01.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21689</td><td>CORE B3-Band B</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joints should be adjusted and
repaired </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:44 AM</td><td> </td><td>9/28/2022 3:56:43
PM</td><td>&nbsp;</td><td>MC.12.01.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21953</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Incomplete work </td><td>High</td><td>8/30/2021
12:00:00 AM</td><td>ahmedsalem</td><td>8/23/2021 1:35:57 PM</td><td>
</td><td>9/28/2022 2:56:03
PM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21935</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Incomplete work </td><td>High</td><td>8/30/2021
12:00:00 AM</td><td>ahmedsalem</td><td>8/23/2021 1:35:28 PM</td><td>
</td><td>9/28/2022 2:55:20
PM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>25650</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Missing two false ceiling panels
</td><td>Low</td><td>1/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:52:46 AM</td><td> </td><td>9/28/2022 12:23:03
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25467</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Damages</td><td>&#39;Damaged two tiles should be replaced
</td><td>Low</td><td>12/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>12/7/2021
12:24:48 PM</td><td> </td><td>9/28/2022 12:20:37
PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>17462</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Tiles should be leveled
</td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021
1:53:23 PM</td><td> </td><td>9/28/2022 12:06:10 PM</td><td>Changed by IWS-01
type</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17461</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Deformed panels should be replaced
</td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021
1:53:21 PM</td><td> </td><td>9/28/2022 12:05:52 PM</td><td>changed by IWS-01
type</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>14685</td><td>Temple Garden-Band A</td><td>Temple
Garden</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Joints to be adjusted/toothing
tiles</td><td>High</td><td>1/17/2021 12:00:00
AM</td><td>mohamed.sami</td><td>1/10/2021 2:30:58 PM</td><td> </td><td>9/28/2022
12:04:40 PM</td><td>&nbsp;</td><td>Band A</td><td>&nbsp;</td>
</tr><tr>
<td>20066</td><td>WC / DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Fixed accessories</td><td>General</td><td>&#39;Grip bar verticality should be
adjusted </td><td>Low</td><td>8/23/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/2/2021 4:14:48 PM</td><td> </td><td>9/28/2022 11:14:24
AM</td><td>&nbsp;</td><td>MW.12.01.001E</td><td>&nbsp;</td>
</tr><tr>
<td>28194</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to
repair.</td><td>Low</td><td>4/7/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/17/2022 11:29:21 AM</td><td> </td><td>9/28/2022 11:13:10
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>32837</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Wood</
td><td>General Snag</td><td>&#39;Protection cover should be removed
</td><td>Low</td><td>10/2/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>9/11/2022 10:25:39 AM</td><td> </td><td>9/28/2022 10:24:48
AM</td><td>Done</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>30671</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Elevator works not finished yet.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:53:09 AM</td><td> </td><td>9/28/2022 9:08:34
AM</td><td>&nbsp;</td><td>MQ.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31944</td><td>CORE F1</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Elevator works not finished and call point
need alignment. </td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:26 PM</td><td> </td><td>9/28/2022 9:01:06
AM</td><td>&nbsp;</td><td>MC.24.03.F11</td><td>&nbsp;</td>
</tr><tr>
<td>31971</td><td>CORE G1</td><td>MU
L10</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Elevator works not finished yet.
</td><td>High</td><td>7/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>7/5/2022 11:27:07 AM</td><td> </td><td>9/28/2022 8:50:33
AM</td><td>&nbsp;</td><td>MC.25.01.G11</td><td>&nbsp;</td>
</tr><tr>
<td>24195</td><td>Bay-03 (from level +37.5 to +43.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Travellator</td><td>General
Snag</td><td>&#39;Cleaning and housekeeping </td><td>High</td><td>11/2/2021
12:00:00 AM</td><td>Kriton Katsamenis </td><td>10/26/2021 1:22:40 PM</td><td>
</td><td>9/28/2022 8:20:18 AM</td><td>&nbsp;</td><td>@ Grand
Stair</td><td>&nbsp;</td>
</tr><tr>
<td>31412</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air filters. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:56:28 AM</td><td>
</td><td>9/28/2022 8:15:11
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27507</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Marked joints should be aligned
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022
4:42:11 PM</td><td> </td><td>9/27/2022 2:36:32
PM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>27510</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Bended tiles should be replaced
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022
4:42:17 PM</td><td> </td><td>9/27/2022 2:35:09
PM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>27511</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Damaged tiles should be replaced
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022
4:42:19 PM</td><td> </td><td>9/27/2022 2:34:39
PM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>32839</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-
Mechanical</td><td>Ductwork</td><td>General Snag</td><td>&#39;Remove tape and
painting from air grills </td><td>High</td><td>9/18/2022 12:00:00
AM</td><td>hossamreda</td><td>9/11/2022 10:29:48 AM</td><td> </td><td>9/27/2022
2:07:14 PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>30456</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to repair and touch
up.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:57 AM</td><td> </td><td>9/27/2022 10:44:11
AM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30190</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All walls need to touch up and
repaint.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 11:50:57 AM</td><td> </td><td>9/27/2022 10:42:59
AM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30142</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor should be repaired and repainted
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
11:37:47 AM</td><td> </td><td>9/27/2022 10:40:30
AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30136</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls should be repaint</td><td>Low</td><td>6/20/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/30/2022 11:37:40 AM</td><td> </td><td>9/27/2022
10:38:58 AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30554</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;All walls need repair and repaint
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:19 AM</td><td> </td><td>9/27/2022 10:37:53
AM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>16826</td><td>PAPYRUS-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked cracks should be repaired
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
12:59:19 PM</td><td> </td><td>9/27/2022 10:20:11
AM</td><td>&nbsp;</td><td>ME.12.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>16833</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Ironmongrey/accessories and its operation</td><td>&#39;Partition
should be fixed properly </td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/10/2021 12:59:34 PM</td><td> </td><td>9/27/2022 10:19:36
AM</td><td>&nbsp;</td><td>MW.13.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>32012</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked parts should be finished properly
</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
12:14:39 PM</td><td> </td><td>9/27/2022 10:09:25
AM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>28840</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All joints between door leaf and frame
should be same width.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:41 AM</td><td> </td><td>9/27/2022 10:08:41
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>32739</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s Museum</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Exhibition works </td><td>General
Snag</td><td>&#39;Archeology wall/All joints and connections should be adjusted
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:52:08 PM</td><td> </td><td>9/27/2022 10:03:21 AM</td><td>Based on Eng. Ayman
Hiekal instructions</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27917</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unused electrical boxes need to
close.</td><td>Low</td><td>4/3/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:20 AM</td><td> </td><td>9/27/2022 9:59:53
AM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27304</td><td>LOBBY</td><td>MU L25</td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Toothing between tiles need to
adjusted.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/7/2022 12:06:12 PM</td><td> </td><td>9/27/2022 9:59:25
AM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>16970</td><td>LOBBY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Damaged tile should be replaced </td><td>Low</td><td>4/1/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021 12:27:01 PM</td><td>
</td><td>9/27/2022 9:18:38 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16971</td><td>LOBBY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling level should be adjusted </td><td>Low</td><td>4/1/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021 12:27:10 PM</td><td>
</td><td>9/27/2022 9:18:06 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>20038</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Need ladder for passing to the other side from
duct</td><td>High</td><td>8/5/2021 12:00:00 PM</td><td>ahmedsalem</td><td>7/29/2021
3:00:26 PM</td><td> </td><td>9/26/2022 4:06:19
PM</td><td>&nbsp;</td><td>MS.23.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>31162</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil fins shall be cleaning and adjusted.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:54:05 PM</td><td> </td><td>9/26/2022 4:06:18
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31221</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coils fins shall be adjusted. </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:56:46 PM</td><td>
</td><td>9/26/2022 4:06:17
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31378</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air filters. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:55:17 AM</td><td>
</td><td>9/26/2022 4:06:16
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31403</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire Stopping</td><td>Installation not to
specification/drawing</td><td>&#39;Missing collar for HDPE pipe penetration.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:11 AM</td><td> </td><td>9/26/2022 4:06:15
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31413</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil fins need to be cleaned and adjusted.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:30 AM</td><td> </td><td>9/26/2022 4:06:12
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31433</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air filters. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:57:13 AM</td><td>
</td><td>9/26/2022 4:06:11
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31446</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air filters. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:57:45 AM</td><td>
</td><td>9/26/2022 4:06:10
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31749</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil fins shall be cleaned and adjusted.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:55:47 AM</td><td> </td><td>9/26/2022 4:06:09
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31860</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Sealing around duct penetration.
</td><td>High</td><td>6/14/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 11:57:51 AM</td><td> </td><td>9/26/2022 4:06:08
PM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>14947</td><td>PLANT</td><td>MU L10</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Coil fins</td><td>&#39;Coil
fins need adjustment </td><td>High</td><td>1/25/2021 12:00:00
PM</td><td>ahmedsalem</td><td>1/18/2021 3:58:55 PM</td><td> </td><td>9/26/2022
2:57:21 PM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>21052</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Filters need installation and cleaning
</td><td>High</td><td>8/22/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/15/2021
1:23:43 PM</td><td> </td><td>9/26/2022 2:57:20
PM</td><td>&nbsp;</td><td>MS.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>21080</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Bag filter damaged need changing </td><td>High</td><td>8/22/2021
12:00:00 AM</td><td>ahmedsalem</td><td>8/15/2021 1:24:41 PM</td><td>
</td><td>9/26/2022 2:57:19
PM</td><td>&nbsp;</td><td>MS.18.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>21291</td><td>PLANT</td><td>MU L10</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Bag filters need changing </td><td>High</td><td>8/24/2021
12:00:00 AM</td><td>ahmedsalem</td><td>8/17/2021 4:06:04 PM</td><td>
</td><td>9/26/2022 2:57:18
PM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>21297</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Bag filter is damaged and filters need installation
</td><td>High</td><td>8/24/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/17/2021
4:06:20 PM</td><td> </td><td>9/26/2022 2:57:16
PM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21308</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil fins need adjustment and bag filters need changing
</td><td>High</td><td>8/24/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/17/2021
4:06:54 PM</td><td> </td><td>9/26/2022 2:57:15
PM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21381</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Bag filter need to change and metallic filter need installation
for ahu 108</td><td>High</td><td>8/25/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/18/2021 11:40:37 AM</td><td> </td><td>9/26/2022
2:57:14 PM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>21776</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Missing supports for PPR pipes and fire sealant around
it</td><td>High</td><td>8/26/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/19/2021
11:48:11 AM</td><td> </td><td>9/26/2022 2:54:18
PM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>31911</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing fire hose thrower.
</td><td>High</td><td>6/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:22 PM</td><td> </td><td>9/26/2022 2:54:17
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>20834</td><td>AHU-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Alignment/Plumbness</
td><td>&#39;Filters need installation</td><td>High</td><td>8/17/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/10/2021 3:31:19 PM</td><td> </td><td>9/26/2022
2:52:41 PM</td><td>&nbsp;</td><td>MS.18.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>31145</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Need cleaning and remove painting.
</td><td>High</td><td>6/8/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:34 PM</td><td> </td><td>9/26/2022 2:07:32
PM</td><td>&nbsp;</td><td>MS.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>20829</td><td>IT-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing thermostat for
FCU</td><td>High</td><td>8/17/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/10/2021
12:10:27 PM</td><td> </td><td>9/26/2022 2:04:26
PM</td><td>&nbsp;</td><td>MS.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>19988</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire fighting
</td><td>High</td><td>8/5/2021 12:00:00 PM</td><td>ahmedsalem</td><td>7/29/2021
1:05:18 PM</td><td> </td><td>9/26/2022 2:00:57
PM</td><td>&nbsp;</td><td>MS.18.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>31795</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing collar for HDPE pipe. </td><td>High</td><td>6/13/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:32:12 PM</td><td>
</td><td>9/26/2022 1:44:00
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>32641</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Canvas needs adjustment </td><td>High</td><td>7/26/2022 12:00:00
AM</td><td>hossamreda</td><td>7/19/2022 11:37:44 AM</td><td> </td><td>9/26/2022
1:26:11 PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32466</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Duct insulation needs repair </td><td>High</td><td>7/25/2022
12:00:00 PM</td><td>hossamreda</td><td>7/18/2022 10:02:23 AM</td><td>
</td><td>9/26/2022 1:25:59
PM</td><td>&nbsp;</td><td>MS.18.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32840</td><td>LOBBY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Adjustment of air grill </td><td>High</td><td>9/18/2022 12:00:00
AM</td><td>hossamreda</td><td>9/11/2022 10:29:50 AM</td><td> </td><td>9/26/2022
11:46:51 AM</td><td>Ceiling closed</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14163</td><td>WORKSHOP</td><td>CCB
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Floor boxes need touch up paint/covers to be
closed properly</td><td>High</td><td>12/23/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>12/16/2020 4:02:57 PM</td><td> </td><td>9/25/2022 4:24:18
PM</td><td>&nbsp;</td><td>CA.07.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>14167</td><td>COORD. MNGRS/ ASS. MNGRS</td><td>CCB
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Floor boxes need touch up paint/covers to be
closed properly</td><td>High</td><td>12/23/2020 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>12/16/2020 4:03:07 PM</td><td> </td><td>9/25/2022 4:24:17
PM</td><td>&nbsp;</td><td>CA.02.01.012</td><td>&nbsp;</td>
</tr><tr>
<td>14169</td><td>LEADING ACTOR/ MUSIC. DIR.</td><td>CCB
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Floor boxes need touch up paint/covers to be
closed properly</td><td>High</td><td>12/23/2020 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>12/16/2020 4:03:13 PM</td><td> </td><td>9/25/2022 4:24:16
PM</td><td>&nbsp;</td><td>CA.02.01.011</td><td>&nbsp;</td>
</tr><tr>
<td>14171</td><td>STAGE MNGR/ ASS. MNGR</td><td>CCB
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Floor boxes need touch up paint/covers to be
closed</td><td>High</td><td>12/23/2020 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>12/16/2020 4:03:20 PM</td><td> </td><td>9/25/2022 4:24:14
PM</td><td>&nbsp;</td><td>CA.02.01.010</td><td>&nbsp;</td>
</tr><tr>
<td>15485</td><td>AUDITORIUM FOYER</td><td>CCB
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>2/3/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>1/27/2021 11:45:04 AM</td><td> </td><td>9/25/2022
4:24:14 PM</td><td>&nbsp;</td><td>CA.08.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>17612</td><td>CORRIDOR</td><td>CCB
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;WiFi Cable is not terminated, access control
cables and devices not installed </td><td>High</td><td>5/12/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>5/5/2021 12:41:23 PM</td><td> </td><td>9/25/2022
4:24:13 PM</td><td>&nbsp;</td><td>CS.02.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>18930</td><td>EDUCATIONAL AUDITORIUM</td><td>CCB
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Scratches on floor box and dent should be
repaired </td><td>Low</td><td>7/5/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>6/14/2021 12:06:43 PM</td><td> </td><td>9/25/2022 4:24:12
PM</td><td>&nbsp;</td><td>CE.08.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>6768</td><td>LIFT MOTOR ROOM</td><td>AT CONNEC
L49</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Opening to be closed by fire rated material
</td><td>Low</td><td>1/14/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>12/24/2019 11:17:11 AM</td><td> </td><td>9/25/2022 3:50:42
PM</td><td>&nbsp;</td><td>SN.00.01.07</td><td>&nbsp;</td>
</tr><tr>
<td>19473</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof -
Cladding</td><td>Cell loose / not aligned</td><td>&#39;Three joints should be
regular at row no 7,9&amp;11</td><td>Low</td><td>7/20/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/29/2021 10:17:30 AM</td><td> </td><td>9/25/2022
3:49:59 PM</td><td>&nbsp;</td><td>Museum Roof Band B</td><td>&nbsp;</td>
</tr><tr>
<td>27576</td><td>SERVICE ZONE 7</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire sealant
</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/9/2022
11:33:58 AM</td><td> </td><td>9/25/2022 3:47:22
PM</td><td>&nbsp;</td><td>MS.14.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27574</td><td>SERVICE ZONE 7</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:54 AM</td><td> </td><td>9/25/2022 3:46:54
PM</td><td>&nbsp;</td><td>MS.14.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27556</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:12 AM</td><td> </td><td>9/25/2022 3:46:14
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27549</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:32:59 AM</td><td> </td><td>9/25/2022 3:45:36
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>12136</td><td>ELEC. ROOM-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Air
vent/bottle to be fitted</td><td>&#39;Need support on u
traps</td><td>High</td><td>10/11/2020 12:00:00
PM</td><td>ahmedsalem</td><td>10/4/2020 1:07:37 PM</td><td> </td><td>9/25/2022
2:14:37 PM</td><td>&nbsp;</td><td>MS.18.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16881</td><td>WC LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Joints is not aligned and should be adjusted
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:01:14 PM</td><td> </td><td>9/25/2022 9:36:35
AM</td><td>&nbsp;</td><td>MW.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>29318</td><td>W.C. /M</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged should be repaired and touch up painting
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:15:00 PM</td><td> </td><td>9/25/2022 9:34:41
AM</td><td>&nbsp;</td><td>MW.18.2A.001B</td><td>&nbsp;</td>
</tr><tr>
<td>32172</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:03 AM</td><td>
</td><td>9/25/2022 8:20:55
AM</td><td>&nbsp;</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32182</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:17 AM</td><td>
</td><td>9/25/2022 8:20:49
AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32445</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:40 PM</td><td>
</td><td>9/25/2022 8:20:34
AM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28184</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>GI CONDUIT
&amp; ACCESSSORIES</td><td>General Snag</td><td>&#39;Missing
Labels</td><td>High</td><td>3/24/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/17/2022 11:20:40 AM</td><td> </td><td>9/22/2022 3:36:20
PM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>31271</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wiring device should aligned
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/2/2022
11:14:38 AM</td><td> </td><td>9/22/2022 3:36:19
PM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>32084</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover and
label</td><td>High</td><td>7/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:01 AM</td><td> </td><td>9/22/2022
3:36:18 PM</td><td>&nbsp;</td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>32125</td><td>CORE G1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Remove unused cables
</td><td>High</td><td>7/13/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022
4:23:25 PM</td><td> </td><td>9/22/2022 3:36:17
PM</td><td>&nbsp;</td><td>MC.25.02.G11</td><td>&nbsp;</td>
</tr><tr>
<td>32129</td><td>CORE G1</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label and cleaning lighting fixtures
</td><td>High</td><td>7/13/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022
4:23:30 PM</td><td> </td><td>9/22/2022 3:36:15
PM</td><td>&nbsp;</td><td>MC.25.01.G11</td><td>&nbsp;</td>
</tr><tr>
<td>32132</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Box label and cleaning lighting fixtures
</td><td>High</td><td>7/13/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022
4:23:34 PM</td><td> </td><td>9/22/2022 3:36:14
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25460</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Missing pgt for some parts
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/7/2021
12:24:38 PM</td><td> </td><td>9/22/2022 2:52:58
PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>10668</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Tile to be removed /remove the steel
bar</td><td>Low</td><td>10/4/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/13/2020 4:50:54 PM</td><td> </td><td>9/22/2022
2:50:16 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>30792</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;No differential pressure sensors installed.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:12 PM</td><td> </td><td>9/22/2022 1:36:31
PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>16764</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;CCL not submitted
</td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021
10:23:14 AM</td><td> </td><td>9/22/2022 12:19:02
PM</td><td>&nbsp;</td><td>ME.12.01.009</td><td>&nbsp;</td>
</tr><tr>
<td>21106</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Close opening </td><td>Low</td><td>9/7/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/17/2021 10:49:16 AM</td><td> </td><td>9/22/2022
12:17:53 PM</td><td>&nbsp;</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21222</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Marked part should be removed
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
11:01:17 AM</td><td> </td><td>9/22/2022 12:17:23
PM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>27363</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Wrong cutting should be adjusted
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:13:23 PM</td><td> </td><td>9/22/2022 12:11:28
PM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>32010</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Tape should be removed/touch up painting
</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
12:14:36 PM</td><td> </td><td>9/22/2022 12:00:01
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32008</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Missing epoxy for marked
</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
12:14:32 PM</td><td> </td><td>9/22/2022 11:59:24
AM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32006</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Touch up painting is needed
</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
12:14:29 PM</td><td> </td><td>9/22/2022 11:58:16
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32005</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Missing epoxy
</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
12:14:27 PM</td><td> </td><td>9/22/2022 11:56:28
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32004</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Cleaning is needed between concrete steps and
stainless handrail (at all levels)</td><td>Low</td><td>7/26/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>7/5/2022 12:14:25 PM</td><td> </td><td>9/22/2022
11:55:44 AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>31993</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Missing epoxy paint for marked
parts</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 12:14:05 PM</td><td> </td><td>9/22/2022 11:55:07
AM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>6767</td><td>SECURITY CONTROL</td><td>AT CONNEC
L49</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Repair sealant/ joints to be filled with grout
</td><td>Low</td><td>1/14/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>12/24/2019 11:17:08 AM</td><td> </td><td>9/22/2022 10:43:19
AM</td><td>&nbsp;</td><td>SN.00.01.08</td><td>&nbsp;</td>
</tr><tr>
<td>6774</td><td>ESCAPE TUNNEL</td><td>ARTIFACT
TUNNEL</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant for construction joint
</td><td>Low</td><td>1/14/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>12/24/2019 11:17:26 AM</td><td> </td><td>9/22/2022 10:43:18
AM</td><td>&nbsp;</td><td>SN.00.01.10</td><td>&nbsp;</td>
</tr><tr>
<td>6775</td><td>SERVICE TUNNEL</td><td>ARTIFACT
TUNNEL</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Should be expansion joint </td><td>Low</td><td>1/14/2020 12:00:00
PM</td><td>Marios Ioannou,</td><td>12/24/2019 11:17:28 AM</td><td>
</td><td>9/22/2022 10:43:17
AM</td><td>&nbsp;</td><td>SN.00.01.11</td><td>&nbsp;</td>
</tr><tr>
<td>6776</td><td>SERVICE TUNNEL</td><td>ARTIFACT
TUNNEL</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Repair sealant for construction joint
</td><td>Low</td><td>1/14/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>12/24/2019 11:17:31 AM</td><td> </td><td>9/22/2022 10:43:16
AM</td><td>&nbsp;</td><td>SN.00.01.11</td><td>&nbsp;</td>
</tr><tr>
<td>6779</td><td>SERVICE TUNNEL</td><td>AT CONNEC
L49</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Joints to be filled with grout </td><td>Low</td><td>1/14/2020
12:00:00 AM</td><td>Marios Ioannou,</td><td>12/24/2019 11:17:37 AM</td><td>
</td><td>9/22/2022 10:43:15
AM</td><td>&nbsp;</td><td>SN.00.01.03</td><td>&nbsp;</td>
</tr><tr>
<td>6784</td><td>ELECTRICAL ROOM</td><td>AT CONNEC
L45</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Repair block joints/ repair sealant
</td><td>Low</td><td>1/14/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>12/24/2019 11:17:51 AM</td><td> </td><td>9/22/2022 10:43:14
AM</td><td>&nbsp;</td><td>SN.00.0G.03</td><td>&nbsp;</td>
</tr><tr>
<td>12629</td><td>KITCHEN ZONE 8 (FINISHED BY TENANT)
(CORE&amp;SHELL)</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Damaged glazing should be
changed</td><td>Low</td><td>11/15/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/25/2020 3:46:35 PM</td><td> </td><td>9/22/2022 10:43:13
AM</td><td>&nbsp;</td><td>CS.07.0G.011</td><td>&nbsp;</td>
</tr><tr>
<td>16427</td><td>OUTDOOR TERRACE_02</td><td>PR
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>Cracks in glass</td><td>&#39;Damaged glazing
panel</td><td>Low</td><td>3/7/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/14/2021 3:48:18 PM</td><td> </td><td>9/22/2022 10:43:12
AM</td><td>&nbsp;</td><td>SP.00.0G.21</td><td>&nbsp;</td>
</tr><tr>
<td>17422</td><td>Lett-able retail space</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>Cracks in glass</td><td>&#39;Broken two panels should be
replaced </td><td>Low</td><td>5/9/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>4/18/2021 1:46:08 PM</td><td> </td><td>9/22/2022 10:43:11
AM</td><td>&nbsp;</td><td>CR.03.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>17423</td><td>Lett-able retail space</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>Cracks in glass</td><td>&#39;Damaged glazing panel should
be changed </td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>4/18/2021 1:46:11 PM</td><td> </td><td>9/22/2022 10:43:11
AM</td><td>&nbsp;</td><td>CR.03.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>19184</td><td>3DTHEAT.ST.ROOF GARDEN</td><td>CCB
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Accessories are missing
</td><td>Low</td><td>7/8/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>6/17/2021
3:50:51 PM</td><td> </td><td>9/22/2022 10:43:09
AM</td><td>&nbsp;</td><td>CX.03.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>21230</td><td>CORE D1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete floor should be the same level
with stone floor </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 11:01:40 AM</td><td> </td><td>9/22/2022 10:25:28
AM</td><td>&nbsp;</td><td>MC.24.2A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>30920</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be closed well properly.</td><td>Low</td><td>6/22/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/1/2022 3:51:00 PM</td><td> </td><td>9/22/2022
10:19:52 AM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>25339</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint is not aligned and should be
leveled.</td><td>Low</td><td>12/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>11/22/2021 1:57:39 PM</td><td> </td><td>9/22/2022 10:18:53
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>31988</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Wall</
td><td>General Snag</td><td>&#39;Marked part should be finished properly after
signage installation </td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 12:13:57 PM</td><td> </td><td>9/22/2022 10:18:15
AM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29856</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories need to clean from
painting.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:20:21 PM</td><td> </td><td>9/22/2022 10:17:00
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>29818</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective painting around hinges and
handle</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:30 PM</td><td> </td><td>9/22/2022 10:16:31
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>28189</td><td>CORE F1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to
clean.</td><td>Low</td><td>4/7/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/17/2022 11:29:13 AM</td><td> </td><td>9/22/2022 10:14:45
AM</td><td>&nbsp;</td><td>MC.24.03.F11</td><td>&nbsp;</td>
</tr><tr>
<td>28188</td><td>CORE F1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to repair and touch
up.</td><td>Low</td><td>4/7/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/17/2022
11:29:12 AM</td><td> </td><td>9/22/2022 10:13:51
AM</td><td>&nbsp;</td><td>MC.24.03.F11</td><td>&nbsp;</td>
</tr><tr>
<td>32834</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Access door should be painted
</td><td>Low</td><td>10/2/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>9/11/2022 10:25:31 AM</td><td> </td><td>9/22/2022 7:16:41
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32831</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Marked gypsum ceiling board should be painted
</td><td>Low</td><td>10/2/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>9/11/2022 10:25:23 AM</td><td> </td><td>9/21/2022 3:38:49
PM</td><td>Done </td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>30846</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gasket should be
adjusted.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:06 AM</td><td> </td><td>9/21/2022 1:12:48
PM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30524</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Doors</
td><td>General Snag</td><td>&#39;Marked part should be adjusted (to be uniform and
aligned)</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:45:24 AM</td><td> </td><td>9/21/2022 1:12:16
PM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30806</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;All
hardware accessories and door leaf need to clean </td><td>Low</td><td>6/22/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022 11:45:01 AM</td><td>
</td><td>9/21/2022 1:11:17
PM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>21500</td><td>B.O.H-SERVICE TUNNEL - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Remove storage material and cleaning
</td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/18/2021
2:12:54 PM</td><td> </td><td>9/21/2022 1:10:43
PM</td><td>&nbsp;</td><td>MS.23.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>21204</td><td>CORE D2</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked part should be adjusted and repaired
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
10:57:50 AM</td><td> </td><td>9/21/2022 1:09:57
PM</td><td>&nbsp;</td><td>MC.18.02.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21166</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Opening should be closed </td><td>Low</td><td>9/7/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/17/2021 10:56:17 AM</td><td> </td><td>9/21/2022
1:09:17 PM</td><td>&nbsp;</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21112</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door frame
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:49:32 AM</td><td> </td><td>9/21/2022 1:08:45
PM</td><td>&nbsp;</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21108</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:49:19 AM</td><td> </td><td>9/21/2022 1:07:16
PM</td><td>&nbsp;</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>30054</td><td>OPEN PLAN OFFICES</td><td>CCB
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>DNP (Defects Notification
Period)</td><td>General Snag</td><td>General Snag</td><td>&#39;Refer to letter
12430 item(4) leakage from roof into 3rd floor band B water is accumulated with no
floor drains existed</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>5/29/2022 4:54:39 PM</td><td> </td><td>9/21/2022 11:57:42
AM</td><td>&nbsp;</td><td>CO.07.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>30055</td><td>AUDITORIUM LOBBY</td><td>CCB
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>DNP (Defects Notification
Period)</td><td>General Snag</td><td>General Snag</td><td>&#39;Refer to letter no
12430 items no(2&amp;14) leakage from ceiling at cinema’s entrance corridor
</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>5/29/2022
4:54:41 PM</td><td> </td><td>9/21/2022 11:57:40
AM</td><td>&nbsp;</td><td>CA.07.01.015</td><td>&nbsp;</td>
</tr><tr>
<td>30057</td><td>Core D4</td><td>CCB
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>DNP (Defects Notification
Period)</td><td>General Snag</td><td>General Snag</td><td>&#39;Refer to letter no
12430 items (13)leakage inside the elevator pits</td><td>Low</td><td>6/5/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>5/29/2022 4:54:44 PM</td><td>
</td><td>9/21/2022 11:57:39 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>30058</td><td>ENVIRO. LOBBY</td><td>CCB
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>DNP (Defects Notification
Period)</td><td>General Snag</td><td>General Snag</td><td>&#39;Refer to letter no
12430 items (1&amp;3) leakage from the roof into the elevator
pit</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>5/29/2022 4:54:46 PM</td><td> </td><td>9/21/2022 11:57:38
AM</td><td>&nbsp;</td><td>CA.08.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>30059</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>DNP (Defects Notification
Period)</td><td>General Snag</td><td>General Snag</td><td>&#39;Refer to letter
no12430 item(10) leakage from ceiling band C third floor (sky
light)</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>5/29/2022 4:54:49 PM</td><td> </td><td>9/21/2022 11:57:37
AM</td><td>&nbsp;</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>30060</td><td>STAFF ROOF GARDEN</td><td>CCB
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>DNP (Defects Notification
Period)</td><td>General Snag</td><td>General Snag</td><td>&#39;Refer to letter no
12430 item (8) leakage from terrace ceiling band B</td><td>Low</td><td>6/19/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>5/29/2022 4:54:51 PM</td><td>
</td><td>9/21/2022 11:57:36
AM</td><td>&nbsp;</td><td>CX.07.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>30061</td><td>DIRECTORS ROOF GARDEN</td><td>CCB
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>DNP (Defects Notification
Period)</td><td>General Snag</td><td>General Snag</td><td>&#39;Refer to letter no
12430 item(11) leakage from upper roof </td><td>Low</td><td>6/5/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>5/29/2022 4:54:53 PM</td><td> </td><td>9/21/2022
11:57:35 AM</td><td>&nbsp;</td><td>CX.07.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>30062</td><td>VISITOR STAIRS</td><td>CCB
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>DNP (Defects Notification
Period)</td><td>General Snag</td><td>General Snag</td><td>&#39;Refer to letter no
12430 items(6)band E leakage into vip area</td><td>Low</td><td>6/19/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>5/29/2022 4:54:54 PM</td><td> </td><td>9/21/2022
11:57:33 AM</td><td>&nbsp;</td><td>CA.03.03.E41</td><td>&nbsp;</td>
</tr><tr>
<td>31994</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked part should be finished properly (to be
checked at all levels)</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 12:14:06 PM</td><td> </td><td>9/21/2022 10:02:25
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>31317</td><td>PLANT</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/2/2022 11:38:42 AM</td><td> </td><td>9/21/2022
10:01:39 AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30884</td><td>CORE F5</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:06 PM</td><td> </td><td>9/21/2022 9:59:35
AM</td><td>&nbsp;</td><td>MC.14.02.F51</td><td>&nbsp;</td>
</tr><tr>
<td>30569</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly and to be balanced </td><td>Low</td><td>6/21/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022 11:46:49 AM</td><td>
</td><td>9/21/2022 9:58:42
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>28087</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum wall should be leveled with
concrete wall </td><td>Low</td><td>4/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/15/2022 12:08:15 PM</td><td> </td><td>9/21/2022 9:57:41
AM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28086</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Marks like finger,brush,water leakage etc..</td><td>&#39;Marked
part should be adjusted and repaired </td><td>Low</td><td>4/5/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>3/15/2022 12:08:14 PM</td><td> </td><td>9/21/2022
9:56:48 AM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28085</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to cleaning
and touch up </td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/15/2022 12:08:12 PM</td><td> </td><td>9/21/2022 9:55:51
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28083</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing Sealant around metal door frame
</td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/15/2022
12:08:09 PM</td><td> </td><td>9/21/2022 9:53:44
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28082</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Gypsum wall should be leveled with concrete
wall </td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/15/2022 12:08:08 PM</td><td> </td><td>9/21/2022 9:53:14
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28069</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy flooring need cleaning and
touch up painting </td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/15/2022 12:07:30 PM</td><td> </td><td>9/21/2022 9:52:11
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>21231</td><td>CORE D1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Marked part needs surface preparation
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
11:01:42 AM</td><td> </td><td>9/21/2022 9:51:38
AM</td><td>&nbsp;</td><td>MC.24.2A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>21161</td><td>CORE D1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to Touch up and
repainting </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 10:51:16 AM</td><td> </td><td>9/21/2022 9:48:17
AM</td><td>&nbsp;</td><td>MC.24.2A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>12079</td><td>IT-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Raised
Floor</td><td>General Snag</td><td>&#39;Raised floor should be adjusted and
cleaning </td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>10/1/2020 2:15:43 PM</td><td> </td><td>9/21/2022 9:47:38
AM</td><td>&nbsp;</td><td>MS.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>9448</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>HVAC</td><td>General Snag</td><td>&#39;Missing
tag names for valves</td><td>High</td><td>7/15/2020 12:00:00
PM</td><td>hossamreda</td><td>7/8/2020 4:28:50 PM</td><td> </td><td>9/21/2022
8:37:22 AM</td><td>&nbsp;</td><td>MS.18.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>9443</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>HVAC</td><td>Identification Labels not
provided / missing</td><td>&#39;Missing identification labels and tag names for
valves </td><td>High</td><td>7/15/2020 12:00:00
PM</td><td>hossamreda</td><td>7/8/2020 4:28:34 PM</td><td> </td><td>9/21/2022
8:37:08 AM</td><td>&nbsp;</td><td>MS.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>9432</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>HVAC</td><td>Identification Labels not
provided / missing</td><td>&#39;Missing labels and tag names for for valves
</td><td>High</td><td>7/15/2020 12:00:00 PM</td><td>hossamreda</td><td>7/8/2020
4:27:55 PM</td><td> </td><td>9/21/2022 8:37:04
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>9415</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>HVAC</td><td>Identification Labels not
provided / missing</td><td>&#39;Missing labels and tag names for valves
</td><td>High</td><td>7/15/2020 12:00:00 PM</td><td>hossamreda</td><td>7/8/2020
4:26:29 PM</td><td> </td><td>9/21/2022 8:36:28
AM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>9408</td><td>PLANT</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>HVAC</td><td>General Snag</td><td>&#39;Missing
labels for CHWPs and tag names for valves </td><td>High</td><td>7/15/2020 12:00:00
PM</td><td>hossamreda</td><td>7/8/2020 4:26:00 PM</td><td> </td><td>9/21/2022
8:36:11 AM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>9405</td><td>PLANT</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>HVAC</td><td>General Snag</td><td>&#39;Missing
labels and tag names for valves </td><td>High</td><td>7/15/2020 12:00:00
PM</td><td>hossamreda</td><td>7/8/2020 4:25:49 PM</td><td> </td><td>9/21/2022
8:08:59 AM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>32830</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting should be finished
</td><td>Low</td><td>10/2/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>9/11/2022 10:25:20 AM</td><td> </td><td>9/20/2022 3:08:52
PM</td><td>Done </td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>21203</td><td>CORE D2</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked pipe should be removed </td><td>Low</td><td>9/7/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021 10:57:48 AM</td><td>
</td><td>9/20/2022 12:25:19
PM</td><td>&nbsp;</td><td>MC.18.02.D21</td><td>&nbsp;</td>
</tr><tr>
<td>30722</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/21/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/31/2022 4:16:17 PM</td><td> </td><td>9/20/2022
11:06:02 AM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>29619</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:45 AM</td><td> </td><td>9/20/2022 11:05:26
AM</td><td>&nbsp;</td><td>MW.12.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>21142</td><td>CORE D2</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to repair
and touch up </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 10:50:35 AM</td><td> </td><td>9/20/2022 11:04:23
AM</td><td>&nbsp;</td><td>MC.18.02.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21141</td><td>CORE D2</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
10:50:32 AM</td><td> </td><td>9/20/2022 11:03:40
AM</td><td>&nbsp;</td><td>MC.18.02.D21</td><td>&nbsp;</td>
</tr><tr>
<td>32809</td><td>Library - Exhibition - Band
B</td><td>Exhibition - Children&#39;s Museum</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Exhibition works </td><td>General
Snag</td><td>&#39;Joints cutting around All blugs should be adjusted
</td><td>Low</td><td>9/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/31/2022
11:32:50 AM</td><td> </td><td>9/20/2022 11:01:29
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21560</td><td>CORE B3-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to level
and repair </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 9:52:06 AM</td><td> </td><td>9/20/2022 11:01:11
AM</td><td>&nbsp;</td><td>MC.12.01.B31</td><td>&nbsp;</td>
</tr><tr>
<td>32807</td><td>Library - Exhibition - Band
B</td><td>Exhibition - Children&#39;s Museum</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Exhibition works </td><td>General
Snag</td><td>&#39;Marked parts around all blugs should be adjusted
</td><td>Low</td><td>9/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/31/2022
11:32:46 AM</td><td> </td><td>9/20/2022 11:01:08
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21168</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>9/7/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/17/2021 10:56:21 AM</td><td> </td><td>9/20/2022
11:00:29 AM</td><td>&nbsp;</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>30777</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing labels for PPR
pipes. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:42 PM</td><td> </td><td>9/20/2022 8:40:26
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30790</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for PPR pipe.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:08 PM</td><td> </td><td>9/20/2022 8:38:39
AM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>30795</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for PPR pipes.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:18 PM</td><td> </td><td>9/20/2022 8:35:03
AM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>

<td>8393</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Rusted lovers and columns of canopies need to touch up - missing
parts of lovers - missing cir </td><td>Low</td><td>2/12/2020 12:00:00
AM</td><td>Kerolos Nagy Tawfik</td><td>1/22/2020 3:59:12 PM</td><td>
</td><td>9/19/2022 3:21:46 PM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>25210</td><td>Temple Garden-Band F</td><td>Temple
Garden</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Stainless covered need to adjusted.</td><td>Low</td><td>12/6/2021
12:00:00 AM</td><td>Moussa Nageh Khella</td><td>11/15/2021 11:34:42 AM</td><td>
</td><td>9/19/2022 3:21:24 PM</td><td>Done </td><td>Band F</td><td>&nbsp;</td>
</tr><tr>
<td>26688</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:13 PM</td><td> </td><td>9/19/2022 1:05:01 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27053</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges to be repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:17:42 PM</td><td> </td><td>9/19/2022 1:05:00 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27061</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Upper copping to aligned and uniform
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:00 PM</td><td> </td><td>9/19/2022 1:04:59 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27135</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Bad repair should be adjusted and finished
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:05:58 PM</td><td> </td><td>9/19/2022 1:04:58 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27159</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Poor repair should be adjusted and finished
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:49 PM</td><td> </td><td>9/19/2022 1:04:57 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27176</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:07:23 PM</td><td> </td><td>9/19/2022 1:04:56 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27180</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:07:33 PM</td><td> </td><td>9/19/2022 1:04:55 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>32706</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Based on PMC visit on 15-8-22, the marked
repair to be improved</td><td>Low</td><td>9/5/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/15/2022 4:29:50 PM</td><td> </td><td>9/19/2022 1:04:54
PM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>32708</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Based on PMC visit on 15-8-22, marked part
to be closed </td><td>Low</td><td>9/5/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/15/2022 4:29:53 PM</td><td> </td><td>9/19/2022 1:04:52
PM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>32711</td><td>Solar Boat - South Elevation</td><td>South
Elevation</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Aluminum mullion to be cleaned from the
intumescent drops </td><td>Low</td><td>9/6/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/16/2022 3:59:43 PM</td><td> </td><td>9/19/2022 1:04:51
PM</td><td>&nbsp;</td><td>Solar Boat - South Elevation</td><td>&nbsp;</td>
</tr><tr>
<td>32717</td><td>Solar Boat - Main Elevation</td><td>Main
Elevation</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked exposed stone thickness should be
repaired</td><td>Low</td><td>9/6/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/16/2022 3:59:51 PM</td><td> </td><td>9/19/2022 1:04:49
PM</td><td>&nbsp;</td><td>Solar Boat - Main Elevation</td><td>&nbsp;</td>
</tr><tr>
<td>32718</td><td>Solar Boat - Main Elevation</td><td>Main
Elevation</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Scratches to be repaired
</td><td>Low</td><td>9/6/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/16/2022
3:59:51 PM</td><td> </td><td>9/19/2022 1:04:48 PM</td><td>&nbsp;</td><td>Solar Boat
- Main Elevation</td><td>&nbsp;</td>
</tr><tr>
<td>32720</td><td>Solar Boat - Main Elevation</td><td>Main
Elevation</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked gap to be closed
</td><td>Low</td><td>9/6/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/16/2022
3:59:56 PM</td><td> </td><td>9/19/2022 1:04:47 PM</td><td>&nbsp;</td><td>Solar Boat
- Main Elevation</td><td>&nbsp;</td>
</tr><tr>
<td>32722</td><td>Solar Boat - Main Elevation</td><td>Main
Elevation</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Dust sealer to be applied to edges of stone
tiles</td><td>Low</td><td>9/6/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/16/2022 3:59:57 PM</td><td> </td><td>9/19/2022 1:04:46
PM</td><td>&nbsp;</td><td>Solar Boat - Main Elevation</td><td>&nbsp;</td>
</tr><tr>
<td>9187</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 12B - joints not aligned/ panels need
cleaning </td><td>Low</td><td>7/8/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>6/17/2020 11:39:37 AM</td><td> </td><td>9/19/2022 11:36:48
AM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>12143</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Bag filters</td><td>&#39;Need
cleaning (general snag )</td><td>High</td><td>10/11/2020 12:00:00
PM</td><td>ahmedsalem</td><td>10/4/2020 1:07:54 PM</td><td> </td><td>9/19/2022
11:28:50 AM</td><td>&nbsp;</td><td>MS.17.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20020</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;The coil fins adjustment &amp;
cleaning</td><td>High</td><td>8/5/2021 12:00:00
PM</td><td>ahmedsalem</td><td>7/29/2021 2:59:52 PM</td><td> </td><td>9/19/2022
11:28:50 AM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>20624</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Filter need installation
propely</td><td>High</td><td>8/16/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/9/2021 4:24:58 PM</td><td> </td><td>9/19/2022
11:28:49 AM</td><td>&nbsp;</td><td>MS.17.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20810</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Must install properly
</td><td>High</td><td>8/17/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/10/2021
12:10:00 PM</td><td> </td><td>9/19/2022 11:28:47
AM</td><td>&nbsp;</td><td>MS.17.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20821</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Bag filter is damaged need to
change</td><td>High</td><td>8/17/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/10/2021 12:10:16 PM</td><td> </td><td>9/19/2022
11:28:46 AM</td><td>&nbsp;</td><td>MS.17.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20835</td><td>AHU-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Alignment/Plumbness</
td><td>&#39;Fins need adjustment &amp; coils need
cleaning</td><td>High</td><td>8/17/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/10/2021 3:31:20 PM</td><td> </td><td>9/19/2022
11:28:43 AM</td><td>&nbsp;</td><td>MS.18.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>22090</td><td>CORE B3-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>Civil</td><td>Boundary
Walls</td><td>Alignment/Plumbness</td><td>&#39;Need rigid support for cleaning-
out</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/23/2021
3:58:10 PM</td><td> </td><td>9/19/2022 11:28:42
AM</td><td>&nbsp;</td><td>MC.12.01.B31</td><td>&nbsp;</td>
</tr><tr>
<td>22092</td><td>CORE B3-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>Civil</td><td>Boundary
Walls</td><td>Alignment/Plumbness</td><td>&#39;Must remove scaffolding
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/23/2021
3:58:11 PM</td><td> </td><td>9/19/2022 11:28:41
AM</td><td>&nbsp;</td><td>MC.12.01.B31</td><td>&nbsp;</td>
</tr><tr>
<td>28312</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Ductwork</
td><td>Access door missing</td><td>&#39;Motorized damper actuator is not installed
properly. </td><td>High</td><td>4/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:49:04 AM</td><td> </td><td>9/19/2022 11:28:38
AM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28719</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Ductwork</
td><td>Access door missing</td><td>&#39;Motorized dumpers actuators have some
missing parts. </td><td>High</td><td>5/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:54 AM</td><td> </td><td>9/19/2022 11:28:35
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28969</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dampers actuators have some missing parts.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:44 PM</td><td> </td><td>9/19/2022 11:28:34
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28978</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Damper actuator not installed.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:33:03 PM</td><td> </td><td>9/19/2022 11:28:33
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29171</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Motorized dampers actuators has missing
parts. </td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:54 AM</td><td> </td><td>9/19/2022 11:28:32
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29240</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dampers actuators have some missing parts.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:38 PM</td><td> </td><td>9/19/2022 11:28:32
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29894</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Incomplete elevators works.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:30:11 PM</td><td> </td><td>9/19/2022 11:28:31
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>17974</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General</td><td>&#39;Rectification architrave / Mullions
metal cladding</td><td>High</td><td>5/31/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>5/24/2021 4:57:33 PM</td><td> </td><td>9/19/2022
11:25:27 AM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>25457</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;The remaining works and rubbish at double slab
should be removed </td><td>Low</td><td>12/28/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/7/2021 12:20:56 PM</td><td> </td><td>9/19/2022
11:25:26 AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25459</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;One tile should be sitted
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/7/2021
12:24:37 PM</td><td> </td><td>9/19/2022 11:25:25
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25232</td><td>Temple Garden-Band E</td><td>Temple
Garden</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged mesh panels cladding need to repair
or replaced.</td><td>Low</td><td>12/7/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/16/2021 2:42:13 PM</td><td> </td><td>9/19/2022 11:18:48
AM</td><td>I closed by mistake. Sorry. You can open again</td><td>Band
E</td><td>&nbsp;</td>
</tr><tr>
<td>29845</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories should be
cleaned.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:17:23 PM</td><td> </td><td>9/19/2022 10:11:13
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>29837</td><td>RISER</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories should be
cleaned.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:17:08 PM</td><td> </td><td>9/19/2022 10:09:57
AM</td><td>&nbsp;</td><td>MS.25.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29732</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/1/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
3:12:58 PM</td><td> </td><td>9/19/2022 10:09:26
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>27568</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Stair need to repair and touch
up.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/9/2022
11:33:40 AM</td><td> </td><td>9/19/2022 10:07:55
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>27567</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to repair and touch
up.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/9/2022
11:33:38 AM</td><td> </td><td>9/19/2022 10:07:12
AM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>21162</td><td>CORE D1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>alignment/level</td><td>&#39;Gypsum wall not leveled with concrete
wall </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:51:18 AM</td><td> </td><td>9/19/2022 10:06:31
AM</td><td>&nbsp;</td><td>MC.24.2A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>31255</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 10:41:37 AM</td><td> </td><td>9/19/2022 10:05:43
AM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>21159</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>alignment/level</td><td>&#39;Gypsum wall not leveled with concrete
wall </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:51:12 AM</td><td> </td><td>9/19/2022 10:05:15
AM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32020</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to repair and touch
up.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
3:56:27 PM</td><td> </td><td>9/19/2022 10:02:41
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>25362</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Edges of steel ceiling should be
aligned.</td><td>Low</td><td>12/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>11/22/2021 1:58:54 PM</td><td> </td><td>9/19/2022 9:12:57
AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25361</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Angel of ceiling should be
adjusted.</td><td>Low</td><td>12/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>11/22/2021 1:58:50 PM</td><td> </td><td>9/19/2022 9:12:25
AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>18318</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;False ceiling is not leveled vertically
with stone cladding </td><td>Low</td><td>6/23/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/2/2021 11:40:05 AM</td><td> </td><td>9/18/2022
6:05:14 PM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>21125</td><td>B.O.H-CORE B2 - Band B</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Inspection after removing protection
cover </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:50:00 AM</td><td> </td><td>9/18/2022 6:04:49
PM</td><td>&nbsp;</td><td>MC.18.02.B21</td><td>&nbsp;</td>
</tr><tr>
<td>26963</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;RJ45 patch cords should not be visible near
the WiFi and WiFi labeling should be done</td><td>High</td><td>3/9/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/2/2022 4:00:31 PM</td><td>
</td><td>9/18/2022 4:21:16
PM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14600</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Identification Labels not provided</td><td>&#39;all the
Wifi,CCTV,RFID Receiver device labeling not provided at
site</td><td>High</td><td>1/7/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>12/31/2020 10:06:50 AM</td><td> </td><td>9/18/2022 4:19:52
PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>18000</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;RFID receiver and Wifi devices permanent labeling and port
mapping to complete</td><td>High</td><td>6/1/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>5/25/2021 7:34:48 AM</td><td> </td><td>9/18/2022
4:19:00 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14626</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>CABLE BASKET
TRAY</td><td>General Snag</td><td>&#39;Relocated Reception desk- ICT cabling,
paging stations installation and its associated
terminations.</td><td>High</td><td>1/11/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>1/4/2021 11:48:02 AM</td><td> </td><td>9/18/2022 4:13:15
PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>21000</td><td>CORE B1 - Band B</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Inspection after removing protection
cover </td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/15/2021 11:12:27 AM</td><td> </td><td>9/18/2022 12:10:57
PM</td><td>&nbsp;</td><td>MC.23.02.B11</td><td>&nbsp;</td>
</tr><tr>
<td>31881</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;PPR pipe penetration throw the slap shall be sealed.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:54 PM</td><td> </td><td>9/18/2022 12:10:56
PM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>32737</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s Museum</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Exhibition works </td><td>General
Snag</td><td>&#39;Archeology wall/ Defective parts and dents and scratches to be
removed </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:05 PM</td><td> </td><td>9/18/2022
12:10:55 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32738</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s Museum</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Exhibition works </td><td>General
Snag</td><td>&#39;Archeology wall/ Around all sockets should be
adjusted</td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:06 PM</td><td> </td><td>9/18/2022
12:10:54 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32746</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</
td><td>Exhibition works </td><td>General Snag</td><td>&#39;Archeology wall top
cladding Substandard (upper &amp;lower)interface between cladding and
ceiling/wall</td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:21 PM</td><td> </td><td>9/18/2022
12:10:53 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32808</td><td>Library - Exhibition - Band
B</td><td>Exhibition - Children&#39;s Museum</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Exhibition works </td><td>General
Snag</td><td>&#39;Marked edge to be adjusted </td><td>Low</td><td>9/21/2022
12:00:00 AM</td><td>mohamed.sami</td><td>8/31/2022 11:32:47 AM</td><td>
</td><td>9/18/2022 12:10:52 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32810</td><td>Library - Exhibition - Band
B</td><td>Exhibition - Children&#39;s Museum</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Exhibition works </td><td>General
Snag</td><td>&#39;Joints should be seated and adjusted
</td><td>Low</td><td>9/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/31/2022
11:32:52 AM</td><td> </td><td>9/18/2022 12:10:51
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32812</td><td>Kids Stage - Exhibition - Band B
</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Edge should be trim
</td><td>Low</td><td>9/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/31/2022
11:32:55 AM</td><td> </td><td>9/18/2022 12:10:50
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32814</td><td>Kids Stage - Exhibition - Band B
</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Marked part to be smooth and adjusted
</td><td>Low</td><td>9/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/31/2022
11:32:58 AM</td><td> </td><td>9/18/2022 12:10:49
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32815</td><td>Kids Stage - Exhibition - Band B
</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Marked parts to be leveled
</td><td>Low</td><td>9/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/31/2022
11:32:59 AM</td><td> </td><td>9/18/2022 12:10:47
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32823</td><td>The Palm Garden - Exhibition - Band
A</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Custom corridor bunches / All bunches need touch
up painting </td><td>Low</td><td>9/22/2022 12:00:00
AM</td><td>mohamed.sami</td><td>9/1/2022 10:46:58 AM</td><td> </td><td>9/18/2022
12:10:46 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>29319</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf painting need to touch up
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:15:02 PM</td><td> </td><td>9/18/2022 11:22:25
AM</td><td>&nbsp;</td><td>MW.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>31625</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/5/2022 4:24:39 PM</td><td> </td><td>9/18/2022 11:21:00
AM</td><td>&nbsp;</td><td>MS.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30898</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:27 PM</td><td> </td><td>9/18/2022 11:20:34
AM</td><td>&nbsp;</td><td>MR.14.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30580</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:50:38 AM</td><td> </td><td>9/18/2022 11:20:00
AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29420</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Tape
should be removed </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 5:04:57 PM</td><td> </td><td>9/18/2022 11:19:31
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27565</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail need to touch
up.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/9/2022
11:33:33 AM</td><td> </td><td>9/18/2022 11:18:32
AM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>21724</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Closing unused electrical boxes</td><td>Low</td><td>9/9/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021 11:28:05 AM</td><td>
</td><td>9/18/2022 11:17:57
AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21617</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>9/9/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/19/2021 11:23:56 AM</td><td> </td><td>9/18/2022
11:17:27 AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>12039</td><td>AHU-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting need repair and touch
up </td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>10/1/2020 2:13:41 PM</td><td> </td><td>9/18/2022 11:16:33
AM</td><td>&nbsp;</td><td>MS.18.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>32629</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing handles of the drain
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:37:20 AM</td><td> </td><td>9/18/2022 7:58:45
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32511</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Insulation Damaged</td><td>&#39;Drain pipe not insulated so it
should be installed insulation &amp;send CIR for insulation
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:10 AM</td><td> </td><td>9/18/2022 7:48:26
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32623</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Duct insulation needs repair </td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:37:09 AM</td><td>
</td><td>9/18/2022 7:48:00
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32628</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Missing labels for CHWPs</td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:37:18 AM</td><td>
</td><td>9/18/2022 7:47:11
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32640</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Duct insulation needs repair </td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:37:42 AM</td><td>
</td><td>9/18/2022 7:44:35
AM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>30065</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Broken glazed panel must be
replaced</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.sami</td><td>5/30/2022 9:03:43 AM</td><td> </td><td>9/17/2022
11:37:00 AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>10454</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
sealant around metal door </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:11:54 PM</td><td> </td><td>9/17/2022
11:29:48 AM</td><td>Done </td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>19399</td><td>SCULPTURE ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All the Cables were not pulled inside the Rack and still lot of
media hardware installation is pending and peerless device installation also
pending </td><td>High</td><td>6/29/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>6/22/2021 4:30:42 PM</td><td> </td><td>9/17/2022 11:10:19
AM</td><td>&nbsp;</td><td>MK.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>19396</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Still power cables were not pulled for the media hardware rack
and ICT cables were not terminated within the Rack and still missing many media
hardware devices installation </td><td>High</td><td>6/29/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>6/22/2021 4:30:37 PM</td><td>
</td><td>9/17/2022 11:10:13
AM</td><td>&nbsp;</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31683</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing name tags for valves.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:36 PM</td><td> </td><td>9/17/2022 11:07:22
AM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31685</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing name tags for valves.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:40 PM</td><td> </td><td>9/17/2022 11:06:53
AM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31688</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing valves name tags.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:46 PM</td><td> </td><td>9/17/2022 11:06:26
AM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31691</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing name tags for valves.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:52 PM</td><td> </td><td>9/17/2022 11:05:31
AM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31695</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing valves name tags.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:27:00 PM</td><td> </td><td>9/17/2022 11:04:58
AM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>10898</td><td>TUT- TUTANKAMEN GALLERY(+46.50)</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Incomplete Installation</td><td>&#39;Incomplete media hardware
cabling and devices installation and lighting control data cables
termination</td><td>High</td><td>9/21/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/14/2020 3:58:49 PM</td><td> </td><td>9/17/2022 10:44:25
AM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>10910</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Incomplete Installation</td><td>&#39; Media hardware ICT cables are
not pulled up to end locations and termination also not
done</td><td>High</td><td>9/21/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/14/2020 4:01:09 PM</td><td> </td><td>9/17/2022 10:44:25
AM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>11963</td><td>IT-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing Labels
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
11:26:26 AM</td><td> </td><td>9/17/2022 10:44:24
AM</td><td>&nbsp;</td><td>MS.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>26754</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:03 PM</td><td>
</td><td>9/17/2022 10:44:22
AM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>26759</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:13 PM</td><td>
</td><td>9/17/2022 10:44:21
AM</td><td>&nbsp;</td><td>MA.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>26762</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:18 PM</td><td>
</td><td>9/17/2022 10:44:20
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>26782</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;CCTV camera has not installed yet in the ceiling and cable
termination also pending </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:59 PM</td><td>
</td><td>9/17/2022 10:44:18
AM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>26937</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
done </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 3:59:49 PM</td><td> </td><td>9/17/2022 10:44:17
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>26939</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
done </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 3:59:56 PM</td><td> </td><td>9/17/2022 10:44:16
AM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>26945</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
done </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:05 PM</td><td> </td><td>9/17/2022 10:44:16
AM</td><td>&nbsp;</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>26948</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Digital signage Screens are not installed yet
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:09 PM</td><td> </td><td>9/17/2022 10:44:15
AM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>27398</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control </td><td>High</td><td>3/14/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:08:40 PM</td><td>
</td><td>9/17/2022 10:44:14
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>27401</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control and media converter
</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:46 PM</td><td> </td><td>9/17/2022 10:44:12
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31262</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/2/2022
11:14:22 AM</td><td> </td><td>9/17/2022 10:44:12
AM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31910</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing cover for termination
box.</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:20 PM</td><td> </td><td>9/17/2022 8:56:20
AM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32852</td><td>LOBBY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label for fire
alarm</td><td>High</td><td>9/18/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>9/11/2022 1:15:06 PM</td><td> </td><td>9/15/2022 3:45:59
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32855</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>Petrokima</td><td>MEP-
Electrical</td><td>General Snag</td><td>General Snag</td><td>&#39;Label for fire
alarm devices </td><td>High</td><td>9/18/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>9/11/2022 1:15:16 PM</td><td> </td><td>9/15/2022 3:45:19
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32514</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Insulation</td><td>&#39;Insulation
need repair</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:16 AM</td><td> </td><td>9/15/2022 3:19:38
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>19389</td><td>PAINTING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Rack installation is incomplete and media hardware cables were
not pulled for the classrooms and screens installation also pending
</td><td>High</td><td>6/29/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>6/22/2021 4:30:25 PM</td><td> </td><td>9/15/2022 2:52:32
PM</td><td>&nbsp;</td><td>MK.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>26979</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Faceplate cover and labeling needs to be done
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:58 PM</td><td> </td><td>9/15/2022 2:51:04
PM</td><td>&nbsp;</td><td>MA.19.02.017</td><td>&nbsp;</td>
</tr><tr>
<td>26952</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Data outlet cables are not pulled and termination also not done
yet </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:15 PM</td><td> </td><td>9/15/2022 2:50:22
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>

<td>26160</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges and scratches should be repaired
</td><td>Low</td><td>3/8/2022 12:00:00 PM</td><td>Marios Ioannou,</td><td>2/15/2022
1:45:08 PM</td><td> </td><td>9/15/2022 1:09:33
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26705</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked tile should be fixed properly
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:41 PM</td><td> </td><td>9/15/2022 1:09:32 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26707</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Edge should be aligned and uniform
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:43 PM</td><td> </td><td>9/15/2022 1:09:31 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26710</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Below edge should be aligned
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:47 PM</td><td> </td><td>9/15/2022 1:09:29 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27080</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Interface between stone cladding and glazing
should be aligned and uniform </td><td>Low</td><td>3/23/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/2/2022 4:18:36 PM</td><td> </td><td>9/15/2022
1:09:28 PM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27117</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Joints should be aligned and
uniform </td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:05:18 PM</td><td> </td><td>9/15/2022
1:09:27 PM</td><td>&nbsp;</td><td>Glazing Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>27118</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Copping edge is not fixation
(missing)</td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:05:20 PM</td><td> </td><td>9/15/2022
1:09:26 PM</td><td>&nbsp;</td><td>Glazing Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>27119</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Glazing edge should be aligned
and uniform </td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:05:22 PM</td><td> </td><td>9/15/2022
1:09:25 PM</td><td>&nbsp;</td><td>Glazing Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>27120</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Louvers should be leveled (all
louvers)</td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:05:25 PM</td><td> </td><td>9/15/2022
1:09:24 PM</td><td>&nbsp;</td><td>Glazing Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>27121</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Poor gasket should be adjusted
(along glazing wall)</td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:05:28 PM</td><td> </td><td>9/15/2022
1:09:23 PM</td><td>&nbsp;</td><td>Glazing Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>27122</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Missing cladding at marked
parts</td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:05:29 PM</td><td> </td><td>9/15/2022
1:09:22 PM</td><td>&nbsp;</td><td>Glazing Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>27123</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Missing fixation
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:05:32 PM</td><td> </td><td>9/15/2022 1:09:21 PM</td><td>&nbsp;</td><td>Glazing
Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>27124</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Marked edge should be aligned and
uniform </td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:05:34 PM</td><td> </td><td>9/15/2022
1:09:19 PM</td><td>&nbsp;</td><td>Glazing Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>27126</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Marked interface should be
uniform and aligned </td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:05:37 PM</td><td> </td><td>9/15/2022
1:09:17 PM</td><td>&nbsp;</td><td>Glazing Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>27127</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Horizontal joints should be
aligned and leveled </td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:05:40 PM</td><td> </td><td>9/15/2022
1:09:16 PM</td><td>&nbsp;</td><td>Glazing Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>27128</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Poor Gasket should be adjusted
and leveled at triangle vertices(for all along glazing
wall)</td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:05:43 PM</td><td> </td><td>9/15/2022
1:09:15 PM</td><td>&nbsp;</td><td>Glazing Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>27129</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Marked joints should be aligned
and leveled (for all joints)</td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:05:46 PM</td><td> </td><td>9/15/2022
1:09:13 PM</td><td>&nbsp;</td><td>Glazing Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>27130</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Interface between Loures and
glazing should be leveled and-adjusted(for all
lovers)</td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:05:48 PM</td><td> </td><td>9/15/2022
1:09:12 PM</td><td>&nbsp;</td><td>Glazing Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>27131</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Snagging for glazing facade after
cleaning </td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:05:50 PM</td><td> </td><td>9/15/2022
1:09:11 PM</td><td>&nbsp;</td><td>Glazing Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>27132</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Metal cladding should be aligned
and leveled </td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:05:52 PM</td><td> </td><td>9/15/2022
1:09:10 PM</td><td>&nbsp;</td><td>Glazing Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>27133</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Marked edge should be aligned and
uniform </td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:05:54 PM</td><td> </td><td>9/15/2022
1:09:09 PM</td><td>&nbsp;</td><td>Glazing Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>32698</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Based on PMC visit on 8-8-22 ,General
comment it is noticed that the surfaces of vertical cladding of the ripple benches
are pitted,and white salted patches are visible</td><td>Low</td><td>8/30/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>8/9/2022 3:37:01 PM</td><td>
</td><td>9/15/2022 1:09:08 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>29825</td><td>STAFF W.C./F</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged need to
repair.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:43 PM</td><td> </td><td>9/15/2022 12:57:34
PM</td><td>&nbsp;</td><td>MW.19.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>25528</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Electrical boxes should be fixed and seated
properly </td><td>Low</td><td>12/30/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:52:50 PM</td><td> </td><td>9/15/2022
11:40:10 AM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25743</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing control panel should be
installed.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:39:43 PM</td><td> </td><td>9/15/2022
11:40:09 AM</td><td>&nbsp;</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25757</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Control panel should be oriented and aligned
properly.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:40:15 PM</td><td> </td><td>9/15/2022
11:40:08 AM</td><td>&nbsp;</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25770</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing rivet on control panel should be
installed.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:40:50 PM</td><td> </td><td>9/15/2022
11:40:06 AM</td><td>&nbsp;</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25786</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fixation anchor for floor should be
installed.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 3:26:47 PM</td><td> </td><td>9/15/2022
11:40:05 AM</td><td>&nbsp;</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25789</td><td>GRAND STAIR - Travellator</td><td>MU
L30</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing control panel should be
installed.</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 3:26:51 PM</td><td> </td><td>9/15/2022
11:40:04 AM</td><td>&nbsp;</td><td>Travelator</td><td>&nbsp;</td>
</tr><tr>
<td>25878</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked parts should be fixed properly
</td><td>Low</td><td>2/13/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/23/2022
11:59:11 AM</td><td> </td><td>9/15/2022 11:39:57
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>30715</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 4:16:09 PM</td><td> </td><td>9/15/2022 11:13:57
AM</td><td>&nbsp;</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30706</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:58 PM</td><td> </td><td>9/15/2022 11:12:54
AM</td><td>&nbsp;</td><td>MA.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30241</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 3:35:29 PM</td><td> </td><td>9/15/2022 11:12:20
AM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>32026</td><td>CORE G1</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to touch up and
repair.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:56:39 PM</td><td> </td><td>9/15/2022 11:06:31
AM</td><td>&nbsp;</td><td>MC.25.01.G11</td><td>&nbsp;</td>
</tr><tr>
<td>32023</td><td>CORE G1</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to repair and touch
up.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
3:56:33 PM</td><td> </td><td>9/15/2022 10:48:49
AM</td><td>&nbsp;</td><td>MC.25.02.G11</td><td>&nbsp;</td>
</tr><tr>
<td>30939</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/8/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:56:50 PM</td><td> </td><td>9/15/2022 10:46:34
AM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30926</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:56:24 PM</td><td> </td><td>9/15/2022 10:45:50
AM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30906</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:39 PM</td><td> </td><td>9/15/2022 10:45:22
AM</td><td>&nbsp;</td><td>MR.14.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>30904</td><td>PREPARATION</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:36 PM</td><td> </td><td>9/15/2022 10:44:54
AM</td><td>&nbsp;</td><td>MR.14.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30901</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:31 PM</td><td> </td><td>9/15/2022 10:44:27
AM</td><td>&nbsp;</td><td>MR.14.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30896</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:24 PM</td><td> </td><td>9/15/2022 10:44:01
AM</td><td>&nbsp;</td><td>MR.14.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>30868</td><td>CORE F5</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing hardware accessories.</td><td>Low</td><td>6/22/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022 11:57:46 AM</td><td>
</td><td>9/15/2022 10:43:30
AM</td><td>&nbsp;</td><td>MC.14.02.F51</td><td>&nbsp;</td>
</tr><tr>
<td>21115</td><td>CORE B2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>Level difference</td><td>&#39;Epoxy painting floor not
leveled</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:49:38 AM</td><td> </td><td>9/15/2022 10:42:02
AM</td><td>&nbsp;</td><td>MC.18.2A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>13818</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Repair , cleaning and touch up for
epoxy painting floor including stair landing </td><td>Low</td><td>12/21/2020
12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020 11:42:02 AM</td><td>
</td><td>9/15/2022 10:40:04
AM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27294</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail need to touch
up.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/7/2022
12:05:55 PM</td><td> </td><td>9/15/2022 10:39:01
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13896</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Touch up for floor/general cleaning
</td><td>High</td><td>12/9/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>12/2/2020
11:09:55 AM</td><td> </td><td>9/15/2022 10:38:20
AM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>30948</td><td>STORE</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/8/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:57:04 PM</td><td> </td><td>9/15/2022 10:37:48
AM</td><td>&nbsp;</td><td>MA.19.02.026</td><td>&nbsp;</td>
</tr><tr>
<td>30935</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/8/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:56:43 PM</td><td> </td><td>9/15/2022 10:37:21
AM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30933</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/22/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/1/2022 3:56:40 PM</td><td> </td><td>9/15/2022
10:33:55 AM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30891</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:16 PM</td><td> </td><td>9/15/2022 10:32:52
AM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30845</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door should be closed
well.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:04 AM</td><td> </td><td>9/15/2022 10:32:17
AM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30829</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:42 AM</td><td> </td><td>9/15/2022 10:31:38
AM</td><td>&nbsp;</td><td>MA.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30596</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/7/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/31/2022 11:51:14 AM</td><td> </td><td>9/15/2022
10:30:15 AM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30591</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/21/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/31/2022 11:51:00 AM</td><td> </td><td>9/15/2022
10:29:43 AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30541</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked cable should be removed
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:50 AM</td><td> </td><td>9/15/2022 10:29:11
AM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>27579</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:34:04 AM</td><td> </td><td>9/15/2022 10:28:13
AM</td><td>&nbsp;</td><td>MS.19.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>28198</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to repair and touch
up.</td><td>Low</td><td>4/7/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/17/2022
11:29:28 AM</td><td> </td><td>9/15/2022 10:27:17
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>28197</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Waving ceiling need to
repair.</td><td>Low</td><td>4/7/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/17/2022 11:29:27 AM</td><td> </td><td>9/15/2022 10:26:17
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>28196</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to
repair.</td><td>Low</td><td>4/7/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/17/2022 11:29:25 AM</td><td> </td><td>9/15/2022 10:22:59
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>28193</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to repair and touch
up.</td><td>Low</td><td>4/7/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/17/2022
11:29:20 AM</td><td> </td><td>9/15/2022 10:21:30
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>28192</td><td>CORE F1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to repair and touch
up.</td><td>Low</td><td>4/7/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/17/2022
11:29:18 AM</td><td> </td><td>9/15/2022 10:19:56
AM</td><td>&nbsp;</td><td>MC.24.03.F11</td><td>&nbsp;</td>
</tr><tr>
<td>28187</td><td>CORE F1</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail stainless par should be
adjusted.</td><td>Low</td><td>4/7/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/17/2022 11:29:10 AM</td><td> </td><td>9/15/2022 10:18:29
AM</td><td>&nbsp;</td><td>MC.24.03.F11</td><td>&nbsp;</td>
</tr><tr>
<td>17035</td><td>STORAGE-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor need cleaning and touch up painting
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:22 PM</td><td> </td><td>9/15/2022 10:17:36
AM</td><td>&nbsp;</td><td>MS.13.01.008</td><td>&nbsp;</td>
</tr><tr>
<td>12084</td><td>ELEC. ROOM-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Flooring need repair
</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
2:15:55 PM</td><td> </td><td>9/15/2022 10:16:15
AM</td><td>&nbsp;</td><td>MS.18.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>12080</td><td>IT-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Repair for wall and painting
</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
2:15:45 PM</td><td> </td><td>9/15/2022 10:15:32
AM</td><td>&nbsp;</td><td>MS.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>28936</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing labels for PPR
pipes. </td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:24 PM</td><td> </td><td>9/15/2022 8:54:22
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29077</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Labels for PPR pipes are missing.
</td><td>High</td><td>5/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:25 AM</td><td> </td><td>9/15/2022 8:50:00
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29174</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica
Co.</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing labels for PPR pipes. </td><td>High</td><td>5/29/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:58:43 AM</td><td>
</td><td>9/15/2022 8:45:58
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>31882</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing PPR pipes
support.</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:56 PM</td><td> </td><td>9/15/2022 8:27:41
AM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>32795</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Touch Screen travelling Cable is not
installed
/Cable and device management are not done</td><td>High</td><td>9/6/2022 12:00:00
AM</td><td>mina.moussa</td><td>8/30/2022 1:28:29 PM</td><td> </td><td>9/14/2022
4:45:29 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14439</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Bag filter is
missing</td><td>High</td><td>1/2/2021 12:00:00
AM</td><td>ahmedsalem</td><td>12/26/2020 11:38:49 AM</td><td> </td><td>9/14/2022
4:39:27 PM</td><td>&nbsp;</td><td>MS.18.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>18181</td><td>AHU - Band B</td><td>MU
L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Coil fins</td><td>&#39;Repair
fins &amp;Ahu lighting should to connected</td><td>High</td><td>6/3/2021 12:00:00
AM</td><td>Kriton Katsamenis </td><td>5/27/2021 12:07:03 PM</td><td>
</td><td>9/14/2022 4:39:25
PM</td><td>&nbsp;</td><td>MS.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>21587</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Repair gasket &amp; adjustment pre filter
&amp; change the bag filter</td><td>High</td><td>8/26/2021 12:00:00
AM</td><td>Kriton Katsamenis </td><td>8/19/2021 10:36:32 AM</td><td>
</td><td>9/14/2022 4:39:24
PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31655</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing thermal insulation for condensate
drain pipes. </td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:37 PM</td><td> </td><td>9/14/2022 4:39:22
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31657</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39; Al ex name tags are missing.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:41 PM</td><td> </td><td>9/14/2022 4:39:21
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31682</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for pipes.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:35 PM</td><td> </td><td>9/14/2022 4:39:20
PM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31687</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for pipes.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:44 PM</td><td> </td><td>9/14/2022 4:39:19
PM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31689</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Pipes thermal insulation need repairs.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:48 PM</td><td> </td><td>9/14/2022 4:39:17
PM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31690</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:50 PM</td><td> </td><td>9/14/2022 4:39:13
PM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31693</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for pipes.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:55 PM</td><td> </td><td>9/14/2022 4:35:11
PM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>32776</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;The chariots/edges should be adjusted
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:53:10 PM</td><td> </td><td>9/14/2022 4:22:22 PM</td><td>Flashing angles &amp;
covers were done based on Eng. Ayman instruction to BOJV
coordinator</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32799</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>9/6/2022 12:00:00 AM</td><td>mina.moussa</td><td>8/30/2022
1:28:38 PM</td><td> </td><td>9/14/2022 3:57:46
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27388</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;BMS interface for lifting system not
done</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:23 PM</td><td> </td><td>9/14/2022 3:56:56
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>11838</td><td>SECURITY ROOM</td><td>GATE 7 TYPE 2
GF</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic/
Porcelain Floor Tile</td><td>General Snag</td><td>&#39;Color variation in tiles
</td><td>High</td><td>10/5/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/28/2020 1:51:46 PM</td><td> </td><td>9/14/2022 1:45:23
PM</td><td>Done </td><td>GT7.02.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>17882</td><td>GUARD ROOM</td><td>GATE 7 TYPE 2
GF</td><td>Closed</td><td>Alu Guarantee
Systems</td><td>Architectural</td><td>Windows</td><td>General
Snag</td><td>&#39;Cleaning windows outer side</td><td>High</td><td>5/27/2021
12:00:00 PM</td><td>Amr Nofal</td><td>5/20/2021 1:10:23 PM</td><td>
</td><td>9/14/2022 1:45:22 PM</td><td>Done
</td><td>GT7.02.0G.05</td><td>&nbsp;</td>
</tr><tr>
<td>32016</td><td>Pump Room</td><td>IT
GF</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Leakage around pipe should be repaired
</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>7/5/2022
1:43:01 PM</td><td> </td><td>9/14/2022 1:45:20 PM</td><td>Done
</td><td>IT.00.0B.01</td><td>&nbsp;</td>
</tr><tr>
<td>24249</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Frame need to adjustment/not flush with stone
cladding </td><td>Low</td><td>11/16/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>10/26/2021 4:25:07 PM</td><td> </td><td>9/14/2022 1:30:08
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22146</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Wall -
stone cladding</td><td>Not aligned</td><td>&#39;Gap between stone cladding and
balustrade not equal </td><td>Low</td><td>9/13/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>8/23/2021 4:36:55 PM</td><td> </td><td>9/14/2022 12:32:54
PM</td><td>&nbsp;</td><td>South Facade- CCB</td><td>&nbsp;</td>
</tr><tr>
<td>22151</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;Edges are not aligned and should be adjusted
</td><td>Low</td><td>9/13/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/23/2021 4:37:37 PM</td><td> </td><td>9/14/2022 12:32:53
PM</td><td>&nbsp;</td><td>South Facade- CCB</td><td>&nbsp;</td>
</tr><tr>
<td>22728</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Facade -
Stone Cladding</td><td>Grooves</td><td>&#39;Stone cladding tiles need to be leveled
</td><td>Low</td><td>9/27/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>9/6/2021
3:42:03 PM</td><td> </td><td>9/14/2022 12:32:52 PM</td><td>&nbsp;</td><td>MU -
North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>22810</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Louvre tiles not aligned with concrete
</td><td>Low</td><td>9/29/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>9/8/2021
12:17:03 PM</td><td> </td><td>9/14/2022 12:32:51 PM</td><td>&nbsp;</td><td>MU -
North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23787</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Short tile should be extended
</td><td>Low</td><td>11/8/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/18/2021 4:29:11 PM</td><td> </td><td>9/14/2022 12:32:49
PM</td><td>&nbsp;</td><td>Atrium - Internal Side</td><td>&nbsp;</td>
</tr><tr>
<td>23825</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Marked part should be extended to the wall
</td><td>Low</td><td>11/10/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/20/2021 3:39:04 PM</td><td> </td><td>9/14/2022 12:32:48
PM</td><td>&nbsp;</td><td>Atrium - Internal Side</td><td>&nbsp;</td>
</tr><tr>

<td>23894</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>11/14/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>10/24/2021 12:20:10 PM</td><td>
</td><td>9/14/2022 12:32:47 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24052</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Alico</
td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Incomplete
work /work area </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:39:24 PM</td><td> </td><td>9/14/2022 12:32:45
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23769</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Review the dwg for the ending of stone
</td><td>Low</td><td>11/4/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/14/2021 3:46:48 PM</td><td> </td><td>9/14/2022 12:32:36
PM</td><td>Done </td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23823</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Short tile should be extended
</td><td>Low</td><td>11/10/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/20/2021 3:39:01 PM</td><td> </td><td>9/14/2022 12:32:35
PM</td><td>Done </td><td>Atrium - Internal Side</td><td>&nbsp;</td>
</tr><tr>
<td>31965</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Defective tiles must be repaired / replaced
</td><td>Low</td><td>7/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>6/26/2022 1:46:25 PM</td><td> </td><td>9/14/2022 12:32:34
PM</td><td>Done </td><td>Atrium - Internal Side</td><td>&nbsp;</td>
</tr><tr>
<td>17454</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39;Missing tiles should be installed </td><td>Low</td><td>5/9/2021
12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021 1:53:06 PM</td><td>
</td><td>9/14/2022 11:14:14
AM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17459</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Tiles are missing should be installed
</td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021
1:53:17 PM</td><td> </td><td>9/14/2022 11:14:03
AM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>26850</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Egyptian Industrial System (EIS)</td><td>MEP-
Electrical</td><td>General Snag</td><td>General Snag</td><td>&#39;Damaged has been
observed in earth cable and should be replaced and earth cables should be
fixed</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 4:39:12 PM</td><td> </td><td>9/14/2022 10:20:53
AM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>31277</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:46 AM</td><td> </td><td>9/14/2022
10:20:51 AM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31284</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire label</td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:57 AM</td><td>
</td><td>9/14/2022 10:20:50
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31283</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:56 AM</td><td> </td><td>9/14/2022
10:07:42 AM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30951</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:57:08 PM</td><td> </td><td>9/14/2022 10:04:28
AM</td><td>&nbsp;</td><td>MA.19.02.017</td><td>&nbsp;</td>
</tr><tr>
<td>30945</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/8/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:57:00 PM</td><td> </td><td>9/14/2022 10:03:11
AM</td><td>&nbsp;</td><td>MA.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30914</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:52 PM</td><td> </td><td>9/14/2022 10:02:44
AM</td><td>&nbsp;</td><td>MA.19.02.015</td><td>&nbsp;</td>
</tr><tr>
<td>30911</td><td>STORE</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:47 PM</td><td> </td><td>9/14/2022 10:02:16
AM</td><td>&nbsp;</td><td>MA.19.02.025</td><td>&nbsp;</td>
</tr><tr>
<td>30909</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:44 PM</td><td> </td><td>9/14/2022 10:01:37
AM</td><td>&nbsp;</td><td>MA.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30507</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked edge should be aligned and uniform
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:44:48 AM</td><td> </td><td>9/14/2022 9:58:34
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30138</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling should be repaint </td><td>Low</td><td>6/20/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/30/2022 11:37:43 AM</td><td> </td><td>9/14/2022
9:57:41 AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29812</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly to be balanced </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:16:17 PM</td><td> </td><td>9/14/2022
9:51:31 AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29419</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door to
be closed properly and balanced </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 5:04:55 PM</td><td> </td><td>9/14/2022
9:50:52 AM</td><td>&nbsp;</td><td>MS.18.2A.021</td><td>&nbsp;</td>
</tr><tr>
<td>29398</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 5:04:30 PM</td><td> </td><td>9/14/2022 9:50:25
AM</td><td>&nbsp;</td><td>MS.18.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>29394</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly and balanced </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 5:04:25 PM</td><td> </td><td>9/14/2022
9:49:56 AM</td><td>&nbsp;</td><td>MS.13.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27573</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:51 AM</td><td> </td><td>9/14/2022 9:49:14
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27571</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:47 AM</td><td> </td><td>9/14/2022 9:48:47
AM</td><td>&nbsp;</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27570</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:45 AM</td><td> </td><td>9/14/2022 9:48:20
AM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>27569</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:41 AM</td><td> </td><td>9/14/2022 9:47:53
AM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27546</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 11:32:55 AM</td><td> </td><td>9/14/2022 9:47:27
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>27544</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:32:51 AM</td><td> </td><td>9/14/2022 9:47:00
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>27287</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>Low</td><td>3/28/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>3/7/2022 12:05:45 PM</td><td> </td><td>9/14/2022
9:46:31 AM</td><td>&nbsp;</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>27286</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/7/2022 12:05:43 PM</td><td> </td><td>9/14/2022 9:46:04
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>30317</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Patch cord </td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:27 PM</td><td>
</td><td>9/14/2022 9:45:52
AM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31003</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:20:46 PM</td><td> </td><td>9/14/2022 9:45:50
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31282</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unused box should be
closed</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:55 AM</td><td> </td><td>9/14/2022
9:45:49 AM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31285</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover tray and remove unused box and label
for box and as manufactured drawings should be
attached</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:59 AM</td><td> </td><td>9/14/2022
9:45:46 AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31286</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;All material should be removed
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/2/2022
11:15:00 AM</td><td> </td><td>9/14/2022 9:45:44
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31288</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover tray and and unused box should be
removed </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:15:02 AM</td><td> </td><td>9/14/2022
9:45:42 AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>32695</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Based on PMC visit on 4-8-22 ,accessories is missing
</td><td>Low</td><td>8/25/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/4/2022
12:53:30 PM</td><td> </td><td>9/14/2022 9:45:38
AM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>16763</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
10:23:13 AM</td><td> </td><td>9/14/2022 9:44:50
AM</td><td>&nbsp;</td><td>ME.12.01.009</td><td>&nbsp;</td>
</tr><tr>
<td>31287</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:15:01 AM</td><td> </td><td>9/14/2022
9:44:39 AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>32800</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Outlet labels and patching management are
not done / fiber protection</td><td>High</td><td>9/6/2022 12:00:00
AM</td><td>mina.moussa</td><td>8/30/2022 1:28:39 PM</td><td> </td><td>9/14/2022
9:01:54 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28703</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing labels for PPR pipes.
</td><td>High</td><td>5/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:27 AM</td><td> </td><td>9/14/2022 8:59:26
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28731</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing labels for PPR pipe.
</td><td>High</td><td>5/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:46:14 AM</td><td> </td><td>9/14/2022 8:58:14
AM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>31684</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for PPR pipe.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:39 PM</td><td> </td><td>9/14/2022 8:48:15
AM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31645</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Air duct thermal insulation need repairs.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:20 PM</td><td> </td><td>9/14/2022 8:46:12
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31532</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Cylinder hoses are not connected.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:25 PM</td><td> </td><td>9/14/2022 8:36:13
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31533</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Cylinder hoses are not connected.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:26 PM</td><td> </td><td>9/14/2022 8:35:26
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31887</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing labels for PPR
pipes.</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:25:05 PM</td><td> </td><td>9/14/2022 8:33:23
AM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>31677</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Valves name tags are missing.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:22 PM</td><td> </td><td>9/14/2022 8:24:25
AM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>32790</td><td>The Palm Garden - Exhibition - Band
A</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rack should either mounted on wall or
installed on wheels.
/cables management is not done
/All pvc conduits and boxes should replaced by EMT</td><td>High</td><td>9/6/2022
12:00:00 AM</td><td>mina.moussa</td><td>8/30/2022 1:28:14 PM</td><td>
</td><td>9/13/2022 4:05:42 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21564</td><td>CORE B3</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 9:52:11 AM</td><td> </td><td>9/13/2022 4:04:04
PM</td><td>&nbsp;</td><td>MC.12.0G.B31</td><td>&nbsp;</td>
</tr><tr>

<td>24064</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Acciona</
td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Snagging for
marked area after removing of storage materials/in-completed items
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:39:45 PM</td><td> </td><td>9/13/2022 4:04:03
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25521</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Uneven levels of panels stone cladding
installation </td><td>Low</td><td>12/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/9/2021 12:52:40 PM</td><td> </td><td>9/13/2022
4:04:02 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27344</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Ceiling</
td><td>General Snag</td><td>&#39;Marked gaps (between walls and ceiling)should be
aligned </td><td>Low</td><td>3/28/2022 12:00:00
PM</td><td>mohamed.sami</td><td>3/7/2022 12:12:45 PM</td><td> </td><td>9/13/2022
4:04:01 PM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27356</td><td>LOBBY</td><td>MU L20</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>3/28/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022 12:13:10 PM</td><td>
</td><td>9/13/2022 4:04:00
PM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27369</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Damaged tiles should be replaced
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:13:37 PM</td><td> </td><td>9/13/2022 4:03:59
PM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27371</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Work is not completed
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:13:41 PM</td><td> </td><td>9/13/2022 4:03:58
PM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27484</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Toothing between tiles should be adjusted
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022
4:41:29 PM</td><td> </td><td>9/13/2022 4:03:57
PM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28885</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need to repair and touch up </td><td>Low</td><td>6/7/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/17/2022 11:46:50 AM</td><td> </td><td>9/13/2022
4:03:56 PM</td><td>&nbsp;</td><td>MA.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28888</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Interface between Door leaf and frame should be leveled
</td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/17/2022
11:46:55 AM</td><td> </td><td>9/13/2022 4:03:54
PM</td><td>&nbsp;</td><td>MA.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28901</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need repair and touch up </td><td>Low</td><td>6/7/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/17/2022 11:47:18 AM</td><td> </td><td>9/13/2022
4:03:53 PM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28902</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be closed properly </td><td>Low</td><td>6/7/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/17/2022 11:47:19 AM</td><td> </td><td>9/13/2022
4:03:52 PM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28905</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
bottom of door leafs should be adjusted </td><td>Low</td><td>6/7/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/17/2022 11:47:25 AM</td><td> </td><td>9/13/2022
4:03:51 PM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30144</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling should be repaint </td><td>Low</td><td>6/20/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/30/2022 11:37:49 AM</td><td> </td><td>9/13/2022
4:03:50 PM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30253</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be
adjusted</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 3:35:49 PM</td><td> </td><td>9/13/2022 4:03:49
PM</td><td>&nbsp;</td><td>MR.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30263</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
3:36:19 PM</td><td> </td><td>9/13/2022 4:03:48
PM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30451</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gypsum wall should be
leveled.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:50 AM</td><td> </td><td>9/13/2022 4:03:47
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30455</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Access door should be
adjusted.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:56 AM</td><td> </td><td>9/13/2022 4:03:46
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30457</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Grill should be
aligned.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:59 AM</td><td> </td><td>9/13/2022 4:03:45
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30458</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Edge should be aligned
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:42:00 AM</td><td> </td><td>9/13/2022 4:03:44
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30459</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Crack need to
repair.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:02 AM</td><td> </td><td>9/13/2022 4:03:43
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30460</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling edge need to
adjusted.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:03 AM</td><td> </td><td>9/13/2022 4:03:39
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30534</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked edge should be aligned </td><td>Low</td><td>6/21/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022 11:45:39 AM</td><td>
</td><td>9/13/2022 4:03:38
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30535</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:41 AM</td><td> </td><td>9/13/2022 4:03:37
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30540</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wall need repair and touch up painting
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:48 AM</td><td> </td><td>9/13/2022 4:03:36
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30544</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling painting should be adjusted
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:02 AM</td><td> </td><td>9/13/2022 4:03:35
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30711</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Door leaf should be balanced and closed
properly.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 4:16:04 PM</td><td> </td><td>9/13/2022 4:03:34
PM</td><td>&nbsp;</td><td>MA.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30714</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing accessories </td><td>Low</td><td>6/21/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/31/2022 4:16:07 PM</td><td> </td><td>9/13/2022
4:03:33 PM</td><td>&nbsp;</td><td>MA.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30716</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches and painting defects should be
adjusted for both sides </td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:16:09 PM</td><td> </td><td>9/13/2022 4:03:32
PM</td><td>&nbsp;</td><td>MA.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30810</td><td>STORE</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/8/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:08 AM</td><td> </td><td>9/13/2022 4:03:31
PM</td><td>&nbsp;</td><td>MA.19.02.023</td><td>&nbsp;</td>
</tr><tr>
<td>30812</td><td>STORE</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>6/8/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:11 AM</td><td> </td><td>9/13/2022 4:03:30
PM</td><td>&nbsp;</td><td>MA.19.02.024</td><td>&nbsp;</td>
</tr><tr>
<td>30816</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>6/8/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:21 AM</td><td> </td><td>9/13/2022 4:03:29
PM</td><td>&nbsp;</td><td>MA.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30823</td><td>STORE</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/8/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:33 AM</td><td> </td><td>9/13/2022 4:03:27
PM</td><td>&nbsp;</td><td>MA.19.02.023</td><td>&nbsp;</td>
</tr><tr>
<td>30824</td><td>STORE</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>6/8/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:35 AM</td><td> </td><td>9/13/2022 4:03:26
PM</td><td>&nbsp;</td><td>MA.19.02.023</td><td>&nbsp;</td>
</tr><tr>
<td>30826</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/8/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:38 AM</td><td> </td><td>9/13/2022 4:03:25
PM</td><td>&nbsp;</td><td>MA.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30827</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>6/8/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:39 AM</td><td> </td><td>9/13/2022 4:03:24
PM</td><td>&nbsp;</td><td>MA.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30832</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both sides
</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
11:45:47 AM</td><td> </td><td>9/13/2022 4:03:23
PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30833</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:49 AM</td><td> </td><td>9/13/2022 4:03:21
PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30834</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Carpet should be leveled with floor
boxes.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:56:36 AM</td><td> </td><td>9/13/2022 4:03:20
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30892</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame should be
finished.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:17 PM</td><td> </td><td>9/13/2022 4:03:18
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30893</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf should be closed well
properly.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:19 PM</td><td> </td><td>9/13/2022 4:03:17
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30894</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame and accessories hardware should be cleaned
properly.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:21 PM</td><td> </td><td>9/13/2022 4:03:15
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30895</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:23 PM</td><td> </td><td>9/13/2022 4:03:12
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31322</td><td>STORE</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022
11:38:53 AM</td><td> </td><td>9/13/2022 4:03:11
PM</td><td>&nbsp;</td><td>MA.19.02.022</td><td>&nbsp;</td>
</tr><tr>
<td>31562</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 3:36:46 PM</td><td> </td><td>9/13/2022 4:03:10
PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31563</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:36:49 PM</td><td> </td><td>9/13/2022 4:03:09
PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31565</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 3:36:54 PM</td><td> </td><td>9/13/2022 4:03:08
PM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31568</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 3:36:57 PM</td><td> </td><td>9/13/2022 4:03:07
PM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31712</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Vanity</td><td>General
Snag</td><td>&#39;Discoloration between colors </td><td>Low</td><td>6/27/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022 11:52:36 AM</td><td>
</td><td>9/13/2022 4:03:06
PM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>32747</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</
td><td>Exhibition works </td><td>General Snag</td><td>&#39;Archeology wall top
cladding All Bubbles should be removed </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:22 PM</td><td> </td><td>9/13/2022
4:03:05 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32749</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</
td><td>Exhibition works </td><td>General Snag</td><td>&#39;Archeology wall top
cladding/Wavy panels should be adjusted </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:26 PM</td><td> </td><td>9/13/2022
4:03:03 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21126</td><td>B.O.H-CORE B2 - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:50:02 AM</td><td> </td><td>9/13/2022 4:01:03
PM</td><td>Done </td><td>MC.18.02.B21</td><td>&nbsp;</td>
</tr><tr>
<td>32793</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable management is not
done</td><td>High</td><td>9/6/2022 12:00:00
AM</td><td>mina.moussa</td><td>8/30/2022 1:28:20 PM</td><td> </td><td>9/13/2022
3:59:08 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24326</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof
Tiles</td><td>Slope</td><td>&#39;Gap between horizontal panels and inclined panels
should be aligned </td><td>Low</td><td>11/17/2021 12:00:00
AM</td><td>mohamed.sami</td><td>10/27/2021 11:25:48 AM</td><td> </td><td>9/13/2022
2:04:07 PM</td><td>&nbsp;</td><td>Museum Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>25482</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Stone</
td><td>General Snag</td><td>&#39;Work should be finished
</td><td>Low</td><td>12/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>12/8/2021
1:40:50 PM</td><td> </td><td>9/13/2022 2:03:38 PM</td><td>Based on the agreement
from Eng. Ayman Heikal</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25544</td><td>CORRIDOR</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Work should be finished
</td><td>Low</td><td>12/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:57:29 PM</td><td> </td><td>9/13/2022 2:03:14 PM</td><td>Based on the agreement
from Eng. Ayman Heikal</td><td>MS.18.03.006</td><td>&nbsp;</td>
</tr><tr>

<td>23912</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Acciona</
td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>Low</td><td>11/14/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>10/24/2021 12:59:18 PM</td><td>
</td><td>9/13/2022 1:59:58 PM</td><td>Based on the agreement from Eng. Ayman
Heikal</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>30819</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>6/8/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:45:27 AM</td><td> </td><td>9/13/2022 9:52:29
AM</td><td>&nbsp;</td><td>MA.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30505</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Flooring need to cleaning.</td><td>Low</td><td>6/21/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/31/2022 11:43:21 AM</td><td> </td><td>9/13/2022
9:51:46 AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>21212</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Holes should be closed </td><td>Low</td><td>9/7/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/17/2021 10:58:11 AM</td><td> </td><td>9/13/2022
9:50:32 AM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21209</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Overall finishes</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
10:58:02 AM</td><td> </td><td>9/13/2022 9:50:02
AM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21208</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Overall finishes</td><td>&#39;Marked part should be adjusted and
repaired </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 10:58:00 AM</td><td> </td><td>9/13/2022 9:49:28
AM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>31648</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Thermal is auction for air ducts need
repairs. </td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:24 PM</td><td> </td><td>9/13/2022 9:01:26
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31651</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;PPR pipes has no labels.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:29 PM</td><td> </td><td>9/13/2022 8:55:28
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31670</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Valves name tags.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:09 PM</td><td> </td><td>9/13/2022 8:53:35
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31658</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Unit need cleaning.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:43 PM</td><td> </td><td>9/13/2022 8:47:08
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31782</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Chilled water valves name tags.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:31:50 PM</td><td> </td><td>9/13/2022 8:46:12
AM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>31680</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Fire pipe need touchup paintings.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:27 PM</td><td> </td><td>9/13/2022 8:44:11
AM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31679</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove the papers from above air diffuser.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:26 PM</td><td> </td><td>9/13/2022 8:43:10
AM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>32796</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete
work</td><td>High</td><td>9/6/2022 12:00:00
AM</td><td>mina.moussa</td><td>8/30/2022 1:28:32 PM</td><td> </td><td>9/12/2022
2:52:23 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32798</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Network Switch not
fixed</td><td>High</td><td>9/6/2022 12:00:00
AM</td><td>mina.moussa</td><td>8/30/2022 1:28:36 PM</td><td> </td><td>9/12/2022
2:51:18 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32804</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s Museum</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Exhibition Works</td><td>General
Snag</td><td>&#39;Outlet Faceplate is not installed</td><td>High</td><td>9/6/2022
12:00:00 AM</td><td>mina.moussa</td><td>8/30/2022 1:28:49 PM</td><td>
</td><td>9/12/2022 2:47:03 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32801</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Modernlite</td><td>MEP-Electrical</td><td>Exhibition
Works</td><td>General Snag</td><td>&#39;Outlet Faceplate is not
installed</td><td>High</td><td>9/6/2022 12:00:00
AM</td><td>mina.moussa</td><td>8/30/2022 1:28:41 PM</td><td> </td><td>9/12/2022
2:43:50 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>19469</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof -
Cladding</td><td>Fixing missing</td><td>&#39;Missing panels should be installed
</td><td>Low</td><td>7/20/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/29/2021
10:17:22 AM</td><td> </td><td>9/12/2022 2:34:18 PM</td><td>&nbsp;</td><td>Museum
Roof Band B</td><td>&nbsp;</td>
</tr><tr>
<td>32756</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Scroll library table/Table surface should be
polished </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:39 PM</td><td> </td><td>9/12/2022
1:51:10 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32820</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Custom bunches/edges to be unified as
perDWGs</td><td>Low</td><td>9/21/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/31/2022 11:33:08 AM</td><td> </td><td>9/12/2022
1:51:05 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32775</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;The chariots/ Wheels should be fixed properly
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:53:08 PM</td><td> </td><td>9/12/2022 1:50:59
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32821</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Custom bunches / edges should be trim and
aligned </td><td>Low</td><td>9/21/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/31/2022 11:33:10 AM</td><td> </td><td>9/12/2022
1:50:52 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32786</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Frame 1/Missing handles
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:53:25 PM</td><td> </td><td>9/12/2022 1:50:11 PM</td><td>Color based on direct
instruction from Eng. Ayman Heikal to BOJV</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>8533</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>3/18/2020 12:00:00
AM</td><td>Ayman Ahmed Mostafa</td><td>3/11/2020 12:26:00 PM</td><td>
</td><td>9/12/2022 1:46:06
PM</td><td>&nbsp;</td><td>MW.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>31686</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for pipes.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:43 PM</td><td> </td><td>9/12/2022 1:44:09
PM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>14474</td><td>B.O.H-SERVICE TUNNEL (A) - Band A</td><td>MU
L20</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing labels of numbers of fire dampers
and identification labels of valves </td><td>High</td><td>1/2/2021 12:00:00
AM</td><td>ahmedsalem</td><td>12/26/2020 11:40:31 AM</td><td> </td><td>9/12/2022
1:43:22 PM</td><td>&nbsp;</td><td>MQ.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31662</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Pipes need touchup paintings.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:50 PM</td><td> </td><td>9/12/2022 1:42:09
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31660</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for PPR pipes.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:46 PM</td><td> </td><td>9/12/2022 1:41:25
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31659</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;PPR pipes shall be cleaned.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:45 PM</td><td> </td><td>9/12/2022 1:40:49
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31663</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;FM200 cylinders shall be cleaned.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:52 PM</td><td> </td><td>9/12/2022 1:40:09
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31692</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Fire pipes need touchup painting.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:54 PM</td><td> </td><td>9/12/2022 1:39:05
PM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31642</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for pipes.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:17 PM</td><td> </td><td>9/12/2022 1:38:16
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31640</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;CO2 cylinders need cleaning.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:16 PM</td><td> </td><td>9/12/2022 1:37:38
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31636</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air ducts.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:10 PM</td><td> </td><td>9/12/2022 1:37:04
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31634</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Fire pipes need touchup painting.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:08 PM</td><td> </td><td>9/12/2022 1:36:19
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>27910</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lifting management system not done
</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed Samir</td><td>3/12/2022
11:53:11 AM</td><td> </td><td>9/12/2022 12:10:37
PM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>12007</td><td>SERVICE DELIVERY-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;RFID receiver should be installed on higher level in order to any
clashes with other services </td><td>High</td><td>10/8/2020 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>10/1/2020 11:58:45 AM</td><td>
</td><td>9/12/2022 12:09:06
PM</td><td>&nbsp;</td><td>MQ.18.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>28174</td><td>Core G2</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work WiFi label and media converter and patching
</td><td>High</td><td>3/23/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/16/2022 3:55:08 PM</td><td> </td><td>9/12/2022 12:06:58
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25350</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Waving metal ceiling should be
adjusted.</td><td>Low</td><td>12/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>11/22/2021 1:58:13 PM</td><td> </td><td>9/12/2022 11:16:27
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>30598</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/7/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:51:19 AM</td><td> </td><td>9/12/2022 11:11:37
AM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>25969</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Interface between stone cladding and flooring
should be closed </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 12:10:16 PM</td><td> </td><td>9/12/2022
11:08:45 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23746</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Door leaf</td><td>General</td><td>&#39;Metal
door need touch up painting </td><td>Low</td><td>11/3/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>10/13/2021 4:16:40 PM</td><td>
</td><td>9/12/2022 11:07:45 AM</td><td>Changed from outside only</td><td>MU - North
Facade</td><td>&nbsp;</td>
</tr><tr>
<td>30618</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:51:44 AM</td><td> </td><td>9/12/2022 11:05:41
AM</td><td>&nbsp;</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30590</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/7/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:50:58 AM</td><td> </td><td>9/12/2022 11:03:31
AM</td><td>&nbsp;</td><td>MA.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27370</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Different textures tiles should be
replaced </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 12:13:39 PM</td><td> </td><td>9/12/2022
11:01:35 AM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27367</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Marked joints should be aligned and
uniform </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 12:13:31 PM</td><td> </td><td>9/12/2022
11:00:18 AM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27365</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Marked tiles should be leveled to be
flushed with cladding </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 12:13:28 PM</td><td> </td><td>9/12/2022
10:59:16 AM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27346</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Marked joints should be aligned and uniform
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:49 PM</td><td> </td><td>9/12/2022 10:58:33
AM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30035</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Missing fire sealant for pipes
penetrations. </td><td>High</td><td>6/5/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:56 AM</td><td> </td><td>9/12/2022 10:56:13
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>17975</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;Finishing VALLEY OF THE KINGS MODEL
( TUT_CIE_1_004 ) with Screens and graphics</td><td>High</td><td>5/31/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 4:58:24 PM</td><td> </td><td>9/12/2022
10:55:32 AM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>32700</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Based on PMC visit on 14-8-22 the marked
part should be cleaned </td><td>Low</td><td>9/4/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/14/2022 1:06:36 PM</td><td> </td><td>9/12/2022 10:55:30
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>29687</td><td>CORE E1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be closed properly and balance </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 12:06:04 PM</td><td> </td><td>9/12/2022
10:55:18 AM</td><td>&nbsp;</td><td>MC.24.2A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>29682</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be closed properly </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 12:05:57 PM</td><td> </td><td>9/12/2022
10:54:44 AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29666</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need to closed properly </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 12:05:33 PM</td><td> </td><td>9/12/2022
10:54:15 AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>29664</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need to balance and closed properly </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 12:05:29 PM</td><td> </td><td>9/12/2022
10:53:43 AM</td><td>&nbsp;</td><td>MS.19.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29628</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:56 AM</td><td> </td><td>9/12/2022 10:53:05
AM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>29421</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly and should be balanced </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 5:04:58 PM</td><td>
</td><td>9/12/2022 10:51:50
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27581</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Opening need to close
</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/9/2022
11:34:10 AM</td><td> </td><td>9/12/2022 10:51:23
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>27566</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to touch
up.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/9/2022
11:33:36 AM</td><td> </td><td>9/12/2022 10:50:17
AM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>10939</td><td>TUT-CORE B1</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting need to touch up/
remove loose material </td><td>Low</td><td>10/6/2020 12:00:00
AM</td><td>andrewjohn.rose</td><td>9/15/2020 12:02:19 PM</td><td>
</td><td>9/12/2022 10:47:49
AM</td><td>&nbsp;</td><td>MC.23.3A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>14705</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Short tiles to be
replaced</td><td>High</td><td>1/17/2021 12:00:00
PM</td><td>mohamed.sami</td><td>1/10/2021 2:31:42 PM</td><td> </td><td>9/12/2022
10:47:46 AM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14706</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Cracked tiles to be
replaced</td><td>High</td><td>1/17/2021 12:00:00
PM</td><td>mohamed.sami</td><td>1/10/2021 2:31:45 PM</td><td> </td><td>9/12/2022
10:47:45 AM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14708</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Toothing tiles</td><td>High</td><td>1/17/2021
12:00:00 PM</td><td>mohamed.sami</td><td>1/10/2021 2:31:52 PM</td><td>
</td><td>9/12/2022 10:47:44
AM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14709</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tiles to be
replaced</td><td>High</td><td>1/17/2021 12:00:00
PM</td><td>mohamed.sami</td><td>1/10/2021 2:31:57 PM</td><td> </td><td>9/12/2022
10:47:43 AM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>17412</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Irregular interface between
IWS-07and EWS-04</td><td>Low</td><td>5/6/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/15/2021 10:30:00 AM</td><td> </td><td>9/12/2022
10:47:42 AM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17444</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Marked panel should be leveled
</td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021
1:52:37 PM</td><td> </td><td>9/12/2022 10:47:41
AM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17446</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Interface between EWS-04 and EWS-
19,EWS-15 , stone floor and AM-06</td><td>Low</td><td>5/9/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/18/2021 1:52:44 PM</td><td> </td><td>9/12/2022
10:47:40 AM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>25434</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Interface between stone cladding and glazing
panels should be aligned and leveled </td><td>Low</td><td>12/28/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/7/2021 12:20:17 PM</td><td> </td><td>9/12/2022
10:47:39 AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25446</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Stains on white concrete should be removed
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/7/2021
12:20:37 PM</td><td> </td><td>9/12/2022 10:47:38
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25452</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Edges at both sides should be aligned
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/7/2021
12:20:47 PM</td><td> </td><td>9/12/2022 10:47:37
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25464</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>De-Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Damages to be rectified or replaced</td><td>&#39;Broken tile
should be replaced </td><td>Low</td><td>12/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/7/2021 12:24:44 PM</td><td> </td><td>9/12/2022
10:47:36 AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25465</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>De-Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Poor execution</td><td>&#39;Poor repair for stone edges
</td><td>Low</td><td>12/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>12/7/2021
12:24:45 PM</td><td> </td><td>9/12/2022 10:47:35
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>27305</td><td>LOBBY</td><td>MU L25</td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Marked tile need to adjusted.</td><td>Low</td><td>3/28/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>3/7/2022 12:06:14 PM</td><td>
</td><td>9/12/2022 10:45:49
AM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>20094</td><td>MEETING-Band B</td><td>MU
L10</td><td>Closed</td><td>T and D design</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Gap between carpet and wooden skirting
</td><td>Low</td><td>8/23/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:29 PM</td><td> </td><td>9/12/2022 10:42:07
AM</td><td>&nbsp;</td><td>ME.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20085</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>T and D design</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;The gap between skirting and carpet should
be adjusted </td><td>Low</td><td>8/23/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/2/2021 4:15:12 PM</td><td> </td><td>9/12/2022 10:41:28
AM</td><td>&nbsp;</td><td>ME.12.01.008</td><td>&nbsp;</td>
</tr><tr>
<td>16922</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:02:35 PM</td><td> </td><td>9/12/2022 10:39:01
AM</td><td>&nbsp;</td><td>ME.12.01.009</td><td>&nbsp;</td>
</tr><tr>
<td>29918</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly/to be balanced </td><td>Low</td><td>6/16/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/26/2022 10:58:20 AM</td><td> </td><td>9/12/2022
10:38:06 AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29399</td><td>IT 5</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly and should be balanced </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 5:04:31 PM</td><td>
</td><td>9/12/2022 10:37:31
AM</td><td>&nbsp;</td><td>MS.18.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>28511</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Acoustic
Walling</td><td>General Snag</td><td>&#39;Chilled water pipe penetration throw wall
not closed. </td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:46 PM</td><td> </td><td>9/12/2022 10:34:52
AM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27927</td><td>STAFF W.C. CLEANERS STORE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing Sealant between ceiling angle and
ceramic wall </td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:38 AM</td><td> </td><td>9/12/2022 10:33:57
AM</td><td>&nbsp;</td><td>MW.19.2A.001D</td><td>&nbsp;</td>
</tr><tr>
<td>30610</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/7/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:51:37 AM</td><td> </td><td>9/12/2022 10:33:17
AM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>24325</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof
Tiles</td><td>Slope</td><td>&#39;Marked Angel should be fixed properly
</td><td>Low</td><td>11/17/2021 12:00:00 AM</td><td>mohamed.sami</td><td>10/27/2021
11:25:45 AM</td><td> </td><td>9/12/2022 9:43:19 AM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>29184</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica
Co.</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing labels for pipes. </td><td>High</td><td>5/29/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:58:58 AM</td><td>
</td><td>9/12/2022 9:11:11
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29215</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing labels for pipes.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:49 AM</td><td> </td><td>9/12/2022 9:09:47
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>17445</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Gasket is missing
</td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021
1:52:41 PM</td><td> </td><td>9/12/2022 9:03:36
AM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>29273</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for PPR pipes.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:58 PM</td><td> </td><td>9/12/2022 9:03:28
AM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>17443</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Joint should be regular and
aligned/toothing in horizontal joint should be leveled
</td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021
1:52:34 PM</td><td> </td><td>9/12/2022 9:02:25
AM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17442</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Joints should be regular and
aligned </td><td>Low</td><td>5/9/2021 12:00:00
AM</td><td>mohamed.sami</td><td>4/18/2021 1:52:31 PM</td><td> </td><td>9/12/2022
9:02:10 AM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>29285</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Labeling for microclimate control pipes
are missing. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:07:30 PM</td><td> </td><td>9/12/2022 8:56:01
AM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>24318</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof
Tiles</td><td>Groove alignment</td><td>&#39;Joint between mesh panels should be
aligned and leveled </td><td>Low</td><td>11/3/2021 12:00:00
AM</td><td>mohamed.sami</td><td>10/27/2021 11:25:31 AM</td><td> </td><td>9/12/2022
8:53:37 AM</td><td>&nbsp;</td><td>Museum Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>29873</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Labels for PPR pipes missing.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:34 PM</td><td> </td><td>9/12/2022 8:52:46
AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>25355</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint of metal ceiling should be aligned and
same width.</td><td>Low</td><td>12/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>11/22/2021 1:58:28 PM</td><td> </td><td>9/12/2022 8:51:41
AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>30052</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Labels for PPR pipes.
</td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:27:26 AM</td><td> </td><td>9/12/2022 8:20:36
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>19940</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Floor Drain Cover</td><td>&#39;Floor drain is under duct and must be
relocated</td><td>High</td><td>8/5/2021 12:00:00
AM</td><td>ahmedsalem</td><td>7/29/2021 1:03:38 PM</td><td> </td><td>9/11/2022
3:31:49 PM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>18174</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Adjustment the fire
sprinkler</td><td>High</td><td>6/3/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>5/27/2021 12:06:46 PM</td><td> </td><td>9/11/2022 3:30:03
PM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>26942</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Floor boxes data outlet termination and faceplate fixtures are
not installed and cat6a cables are damaged and needs to replaced the cover and
junction boxes cover </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:00 PM</td><td> </td><td>9/11/2022 3:16:34
PM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>26947</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Floor boxes data outlet termination and faceplate fixtures are
not installed </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:07 PM</td><td> </td><td>9/11/2022 3:16:25
PM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>26950</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Floor boxes fiber cables termination and faceplate fixtures are
not installed yet and wall data outlet faceplate not fixed yet
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:12 PM</td><td> </td><td>9/11/2022 3:16:19
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>26957</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Floor boxes data outlet termination and faceplate cover not
installed yet </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:23 PM</td><td> </td><td>9/11/2022 3:16:17
PM</td><td>&nbsp;</td><td>MT.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>26978</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi labeling and port mapping is not done yet
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:56 PM</td><td> </td><td>9/11/2022 3:16:14
PM</td><td>&nbsp;</td><td>MA.19.02.017</td><td>&nbsp;</td>
</tr><tr>
<td>26994</td><td>W.C</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No speakers labeling </td><td>High</td><td>3/9/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/2/2022 4:01:23 PM</td><td>
</td><td>9/11/2022 3:16:12
PM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27386</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No media converter for card reader and door controller
</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:19 PM</td><td> </td><td>9/11/2022 3:16:10
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>16936</td><td>LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Un complete work</td><td>High</td><td>3/18/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>3/11/2021 11:40:29 AM</td><td>
</td><td>9/11/2022 3:10:15
PM</td><td>&nbsp;</td><td>ME.12.01.011</td><td>&nbsp;</td>
</tr><tr>
<td>26727</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No speakers labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:45:34 PM</td><td>
</td><td>9/11/2022 3:10:14
PM</td><td>&nbsp;</td><td>MA.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>26938</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;RFID and WiFi labeling and port mapping is not done yet
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 3:59:51 PM</td><td> </td><td>9/11/2022 3:10:12
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>26946</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi labeling and port mapping is not done
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:06 PM</td><td> </td><td>9/11/2022 3:10:11
PM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>26951</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All ceiling WiFi,speakers,RFID and door controllers are not
labeled </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:14 PM</td><td> </td><td>9/11/2022 3:10:10
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>26971</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi and speakers labeling should be done
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:46 PM</td><td> </td><td>9/11/2022 3:10:09
PM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>26974</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No speakers labeling </td><td>High</td><td>3/9/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/2/2022 4:00:50 PM</td><td>
</td><td>9/11/2022 3:10:04
PM</td><td>&nbsp;</td><td>MA.19.02.015</td><td>&nbsp;</td>
</tr><tr>
<td>31601</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Sealant around pipe penetration
not done. </td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:24 AM</td><td> </td><td>9/11/2022 3:07:13
PM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31609</td><td>PLANT</td><td>MU L20</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil fins shall be cleaned and adjusted.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:38 AM</td><td> </td><td>9/11/2022 3:07:12
PM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31851</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;INERGEN pipes penetration shall be
sealed. </td><td>High</td><td>6/14/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 11:57:36 AM</td><td> </td><td>9/11/2022 3:07:11
PM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>13246</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Missing glass
panel</td><td>Low</td><td>11/25/2020 12:00:00
AM</td><td>sally.george</td><td>11/4/2020 11:22:56 AM</td><td> </td><td>9/11/2022
2:02:10 PM</td><td>Glass panel installed</td><td>Level +49.50</td><td>&nbsp;</td>
</tr><tr>
<td>13179</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>Damage/dent/stains</td><td>&#39;Damaged tiles /tiles need repair
and touchup </td><td>High</td><td>11/10/2020 12:00:00
AM</td><td>sally.george</td><td>11/3/2020 4:36:33 PM</td><td> </td><td>9/11/2022
1:57:11 PM</td><td>IWS-07 panels were replaced with IWS-01 Cladding ,no repair or
touch up needed</td><td>Level +46.50</td><td>&nbsp;</td>
</tr><tr>
<td>13176</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Walls tiles need properly fixation
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:36:26 PM</td><td> </td><td>9/11/2022 1:56:54 PM</td><td>IWS-07 Panels changed To
IWS-01 ,Fixed properly now</td><td>Level +46.50</td><td>&nbsp;</td>
</tr><tr>
<td>13097</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing cladding beside the door</td><td>Low</td><td>11/24/2020
12:00:00 AM</td><td>sally.george</td><td>11/3/2020 12:45:38 PM</td><td>
</td><td>9/11/2022 1:56:36 PM</td><td>Cladding
done</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>13075</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Missing cladding
</td><td>Low</td><td>11/24/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
12:43:14 PM</td><td> </td><td>9/11/2022 1:56:18 PM</td><td>Cladding
done</td><td>Level +49.50</td><td>&nbsp;</td>
</tr><tr>
<td>13180</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Missing wall tiles cladding
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:36:35 PM</td><td> </td><td>9/11/2022 1:56:04 PM</td><td>Cladding tiles
done</td><td>Level +46.50</td><td>&nbsp;</td>
</tr><tr>
<td>13145</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Work is not finished/missing cladding
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:35:15 PM</td><td> </td><td>9/11/2022 1:55:42 PM</td><td>IWS-01 work is
finished</td><td>Level +46.50</td><td>&nbsp;</td>
</tr><tr>
<td>13076</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>Damage/dent/stains</td><td>&#39;Stains and discoloring in marked
tiles</td><td>Low</td><td>11/24/2020 12:00:00
AM</td><td>sally.george</td><td>11/3/2020 12:43:17 PM</td><td> </td><td>9/11/2022
1:55:04 PM</td><td>Cladding changed</td><td>Level +49.50</td><td>&nbsp;</td>
</tr><tr>
<td>13224</td><td>(OLD) EXIT/LOBBY</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Tiles need touch up/general cleaning
</td><td>Low</td><td>11/25/2020 12:00:00 AM</td><td>sally.george</td><td>11/4/2020
11:21:18 AM</td><td> </td><td>9/11/2022 1:52:06 PM</td><td>Cladding changed and
adjusted</td><td>MP.19.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>13077</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Irregular joints
</td><td>Low</td><td>11/24/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
12:43:20 PM</td><td> </td><td>9/11/2022 1:50:01 PM</td><td>Joint aligned ,alico
work done</td><td>Level +49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25206</td><td>Temple Garden-Band F</td><td>Temple
Garden</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Mesh cladding need to fixed
properly.</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/15/2021 11:34:30 AM</td><td> </td><td>9/11/2022 1:49:21
PM</td><td>Mesh cladding panel fixed properly now</td><td>Band
F</td><td>&nbsp;</td>
</tr><tr>
<td>13815</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Scratches</td><td>&#39;CIR not submitted
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:41:51 AM</td><td> </td><td>9/11/2022 1:46:40
PM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13894</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Not submitted cir for handrail
</td><td>High</td><td>12/9/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/2/2020
11:09:45 AM</td><td> </td><td>9/11/2022 1:45:27
PM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>25209</td><td>Temple Garden-Band F</td><td>Temple
Garden</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Steel cladding panel need to fixed
properly.</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/15/2021 11:34:39 AM</td><td> </td><td>9/11/2022 1:44:19
PM</td><td>Mesh panel fixed properly</td><td>Band F</td><td>&nbsp;</td>
</tr><tr>
<td>28138</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof
Tiles</td><td>Groove alignment</td><td>&#39;Marked joints should be aligned and
same width </td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/16/2022 12:09:40 PM</td><td> </td><td>9/11/2022 1:44:02
PM</td><td>&nbsp;</td><td>Museum Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>24317</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof
Tiles</td><td>Chipped/damaged</td><td>&#39;Exposed structure should be cutting
</td><td>Low</td><td>11/17/2021 12:00:00 AM</td><td>mohamed.sami</td><td>10/27/2021
11:25:30 AM</td><td> </td><td>9/11/2022 1:43:37 PM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>28135</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof
Tiles</td><td>Groove alignment</td><td>&#39;Marked joints should be same width
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/16/2022
12:09:35 PM</td><td> </td><td>9/11/2022 1:43:00 PM</td><td>&nbsp;</td><td>Museum
Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>17096</td><td>ELEVATOR (B3)</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Scratches onElevator door should be
repaired </td><td>Low</td><td>4/8/2021 12:00:00
AM</td><td>sally.george</td><td>3/18/2021 11:40:36 AM</td><td> </td><td>9/11/2022
1:16:26 PM</td><td>&nbsp;</td><td>ELEVATOR (B3)</td><td>&nbsp;</td>
</tr><tr>
<td>25511</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All Inclined speaker should be vertical
</td><td>Low</td><td>12/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/8/2021
1:41:58 PM</td><td> </td><td>9/11/2022 12:48:01
PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25497</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Exposed cable should be checked
</td><td>Low</td><td>12/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/8/2021
1:41:22 PM</td><td> </td><td>9/11/2022 12:47:54
PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25665</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Exposed cable should be checked
</td><td>Low</td><td>12/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:53:11 AM</td><td> </td><td>9/11/2022 12:47:10
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25565</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Exposed cable should be checked
</td><td>Low</td><td>12/16/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:58:15 PM</td><td> </td><td>9/11/2022 12:46:55 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25493</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Exposed cable should be checked
</td><td>Low</td><td>12/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/8/2021
1:41:13 PM</td><td> </td><td>9/11/2022 12:46:32
PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>21006</td><td>CORE B1 - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Inner angle should be adjusted and
finished </td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/15/2021 11:12:45 AM</td><td> </td><td>9/11/2022 11:41:17
AM</td><td>Done </td><td>MC.23.02.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21007</td><td>CORE B1 - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Topping stainless steel handrail
should be alignment </td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/15/2021 11:12:49 AM</td><td> </td><td>9/11/2022 11:41:15
AM</td><td>Done </td><td>MC.23.02.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21685</td><td>CORE B3-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor should be cleaned and
repaired/touch up painting </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:39 AM</td><td> </td><td>9/11/2022 11:30:32
AM</td><td>&nbsp;</td><td>MC.12.01.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21562</td><td>CORE B3</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to touch up
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
9:52:09 AM</td><td> </td><td>9/11/2022 11:29:32
AM</td><td>&nbsp;</td><td>MC.12.0G.B31</td><td>&nbsp;</td>
</tr><tr>
<td>16469</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Stone cladding not flush with stainless steel
frame</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/15/2021 11:34:22 AM</td><td> </td><td>9/11/2022 11:28:00
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21221</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked joint should be the same
width </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 11:01:14 AM</td><td> </td><td>9/11/2022 11:25:38
AM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>21219</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
11:01:09 AM</td><td> </td><td>9/11/2022 11:24:50
AM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>21218</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked angle should be adjusted and
repair </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 11:01:06 AM</td><td> </td><td>9/11/2022 11:24:09
AM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>21217</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked joint should be finished
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
11:01:04 AM</td><td> </td><td>9/11/2022 11:22:40
AM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>31251</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 10:41:28 AM</td><td> </td><td>9/11/2022 11:21:30
AM</td><td>&nbsp;</td><td>MT.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30522</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Doors</
td><td>General Snag</td><td>&#39;Damaged part should be adjusted
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:20 AM</td><td> </td><td>9/11/2022 11:19:51
AM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30268</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 3:36:28 PM</td><td> </td><td>9/11/2022 11:19:08
AM</td><td>&nbsp;</td><td>MA.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30261</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 3:36:16 PM</td><td> </td><td>9/11/2022 11:18:21
AM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30254</td><td>STORE</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 3:35:51 PM</td><td> </td><td>9/11/2022 11:16:45
AM</td><td>&nbsp;</td><td>MR.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30251</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 3:35:45 PM</td><td> </td><td>9/11/2022 11:15:48
AM</td><td>&nbsp;</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28841</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gasket should be
adjusted.</td><td>Low</td><td>6/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:43 AM</td><td> </td><td>9/11/2022 11:15:15
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27476</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Final coat is not done
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:14 PM</td><td> </td><td>9/11/2022 11:14:48
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30257</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 3:35:56 PM</td><td> </td><td>9/11/2022 11:14:23
AM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28839</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf need to close
well.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:40 AM</td><td> </td><td>9/11/2022 11:12:16
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>23793</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Gaps should be adjusted and closed </td><td>Low</td><td>11/8/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/18/2021 4:29:19 PM</td><td>
</td><td>9/11/2022 10:40:32 AM</td><td>&nbsp;</td><td>MU - North
Facade</td><td>&nbsp;</td>
</tr><tr>
<td>25529</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked tile should be leveled
</td><td>Low</td><td>12/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:52:52 PM</td><td> </td><td>9/11/2022 10:35:05 AM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25535</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Sealant should be regular
</td><td>Low</td><td>12/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>12/9/2021
12:52:59 PM</td><td> </td><td>9/11/2022 10:34:22 AM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25444</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>Accessories and its operational</td><td>&#39;Missing
stainless cladding (for fixation)to be installed </td><td>Low</td><td>12/28/2021
12:00:00 PM</td><td>mohamed.sami</td><td>12/7/2021 12:20:34 PM</td><td>
</td><td>9/11/2022 10:33:53
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>26172</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Edge corners should be aligned and straight (
checked for 3 benches)</td><td>Low</td><td>3/10/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/17/2022 10:39:06 AM</td><td> </td><td>9/11/2022
10:33:39 AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>32805</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;ICT floor box outlet not installed
</td><td>High</td><td>9/6/2022 12:00:00 AM</td><td>mina.moussa</td><td>8/30/2022
1:28:51 PM</td><td> </td><td>9/11/2022 9:21:42
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>9179</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 8B - Panels need cleaning / panels not
aligned / light between joints </td><td>Low</td><td>7/8/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>6/17/2020 11:39:18 AM</td><td>
</td><td>9/11/2022 8:47:06 AM</td><td>&nbsp;</td><td>Stiletto - wall
B</td><td>&nbsp;</td>
</tr><tr>
<td>28322</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Condensate water drain insulation missing.
</td><td>High</td><td>4/26/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:49:43 AM</td><td> </td><td>9/11/2022 8:45:20
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>14451</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;PPR &amp; HDPE need to be alignment
</td><td>High</td><td>1/2/2021 12:00:00 PM</td><td>ahmedsalem</td><td>12/26/2020
11:39:34 AM</td><td> </td><td>9/8/2022 1:24:21
PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>21678</td><td>CORE B3 - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joints should be adjusted and
repaired </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:30 AM</td><td> </td><td>9/8/2022 1:24:20
PM</td><td>&nbsp;</td><td>MC.12.02.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21679</td><td>CORE B3 - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked part should be leveled
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
11:25:32 AM</td><td> </td><td>9/8/2022 1:24:19
PM</td><td>&nbsp;</td><td>MC.12.02.B31</td><td>&nbsp;</td>
</tr><tr>
<td>31627</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories</td><td>Low</td><td>6/26/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/5/2022 4:24:45 PM</td><td> </td><td>9/8/2022 1:24:18
PM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31628</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/26/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/5/2022 4:24:50 PM</td><td> </td><td>9/8/2022 1:24:17
PM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31629</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/26/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/5/2022 4:24:53 PM</td><td> </td><td>9/8/2022 1:24:16
PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31633</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/26/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/5/2022 4:25:07 PM</td><td> </td><td>9/8/2022 1:24:14
PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31641</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both sides
</td><td>Low</td><td>6/26/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/5/2022
4:25:16 PM</td><td> </td><td>9/8/2022 1:24:13
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>32732</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s Museum</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>Exhibition works </td><td>General
Snag</td><td>&#39;Reception desk /Missing sockets covers should be installed
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:51:54 PM</td><td> </td><td>9/8/2022 1:24:12
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32733</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Reception desk /Shift edges should be adjusted
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:51:56 PM</td><td> </td><td>9/8/2022 1:24:10
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32740</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Archeology table/ All joints and edges should be
leveled and adjusted for back graphic </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:09 PM</td><td> </td><td>9/8/2022
1:24:07 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32741</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Archeology table/ Access door joints should be
unified </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:11 PM</td><td> </td><td>9/8/2022
1:24:06 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32742</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Archeology table/ Touch up painting for marked
parts </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:13 PM</td><td> </td><td>9/8/2022
1:24:04 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32743</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Archeology table/ Lag and irregular discipline
for mechanism of graphic for time line table</td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:14 PM</td><td> </td><td>9/8/2022
1:24:03 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32744</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Archeology table/ Marked joints should be
uniform and regular </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:16 PM</td><td> </td><td>9/8/2022
1:24:02 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32748</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</
td><td>Exhibition works </td><td>General Snag</td><td>&#39;Archeology wall top
cladding All joints should be leveled and adjusted </td><td>Low</td><td>9/20/2022
12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:24 PM</td><td>
</td><td>9/8/2022 1:24:01 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32753</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 6/ Marked joint to be uniform and
regular </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:33 PM</td><td> </td><td>9/8/2022
1:24:00 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32763</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame4/Closure around column should be
finished </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:50 PM</td><td> </td><td>9/8/2022
1:23:59 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32767</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 4/Marked joints should be uniform
and regular </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:56 PM</td><td> </td><td>9/8/2022
1:23:58 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32771</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 3/Closure around columns should be
finished (upper/lower parts)</td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:53:02 PM</td><td> </td><td>9/8/2022
1:23:56 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32781</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 2/Marked part should be leveled
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:53:18 PM</td><td> </td><td>9/8/2022 1:23:55
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32782</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 2/Closure around column is needed
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:53:20 PM</td><td> </td><td>9/8/2022 1:23:54
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32787</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Frame 1/Uneven level for fixation
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:53:27 PM</td><td> </td><td>9/8/2022 1:23:53
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32811</td><td>Library - Exhibition - Band
B</td><td>Exhibition - Children&#39;s Museum</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Exhibition works </td><td>General
Snag</td><td>&#39;Bubbles should be adjusted </td><td>Low</td><td>9/21/2022
12:00:00 AM</td><td>mohamed.sami</td><td>8/31/2022 11:32:53 AM</td><td>
</td><td>9/8/2022 1:23:52 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32813</td><td>Kids Stage - Exhibition - Band B
</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Marked gap should be regular and leveled
</td><td>Low</td><td>9/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/31/2022
11:32:56 AM</td><td> </td><td>9/8/2022 1:23:51
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32816</td><td>Kids Stage - Exhibition - Band B
</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Marked joint to be adjusted
</td><td>Low</td><td>9/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/31/2022
11:33:01 AM</td><td> </td><td>9/8/2022 1:23:50
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32817</td><td>Kids Stage - Exhibition - Band B
</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Defective parts to be adjusted
</td><td>Low</td><td>9/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/31/2022
11:33:02 AM</td><td> </td><td>9/8/2022 1:23:48
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32818</td><td>Kids Stage - Exhibition - Band B
</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Mirror edge to be leveled
(flushed)</td><td>Low</td><td>9/21/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/31/2022 11:33:04 AM</td><td> </td><td>9/8/2022
1:23:47 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32819</td><td>Library - Exhibition - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Marked edges to be uniform
</td><td>Low</td><td>9/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/31/2022
11:33:06 AM</td><td> </td><td>9/8/2022 1:23:46
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32825</td><td>The Palm Garden - Exhibition - Band
A</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Color should be verified
</td><td>Low</td><td>9/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>9/1/2022
10:47:01 AM</td><td> </td><td>9/8/2022 1:23:45
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32826</td><td>The Palm Garden - Exhibition - Band
A</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Need touch up painting
</td><td>Low</td><td>9/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>9/1/2022
10:47:02 AM</td><td> </td><td>9/8/2022 1:23:44
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32827</td><td>The Palm Garden - Exhibition - Band
A</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Color should be verified
</td><td>Low</td><td>9/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>9/1/2022
10:47:03 AM</td><td> </td><td>9/8/2022 1:23:43
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32828</td><td>The Palm Garden - Exhibition - Band
A</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Marked parts need touch up painting
</td><td>Low</td><td>9/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>9/1/2022
10:47:05 AM</td><td> </td><td>9/8/2022 1:23:42
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32802</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s Museum</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Exhibition Works</td><td>General
Snag</td><td>&#39;cable manage and termination</td><td>High</td><td>9/6/2022
12:00:00 AM</td><td>mina.moussa</td><td>8/30/2022 1:28:43 PM</td><td>
</td><td>9/8/2022 11:47:33 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>30513</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:04 AM</td><td> </td><td>9/8/2022 10:47:43
AM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30511</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;All
walls need touch up painting </td><td>Low</td><td>6/21/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/31/2022 11:44:57 AM</td><td> </td><td>9/8/2022
10:47:16 AM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30422</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged stone
tiles.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:01 AM</td><td> </td><td>9/8/2022 10:46:47
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28911</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete floor need repair and touch up for
dust sealer </td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/17/2022 11:47:35 AM</td><td> </td><td>9/8/2022 10:46:20
AM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27457</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>3/28/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022 4:40:42 PM</td><td>
</td><td>9/8/2022 10:45:54
AM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30118</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;All
Walls need touch up painting </td><td>Low</td><td>6/20/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/30/2022 11:37:20 AM</td><td> </td><td>9/8/2022
10:44:47 AM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27689</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 3:35:55 PM</td><td> </td><td>9/8/2022 10:43:51
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27688</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Opening should be
closed.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 3:35:53 PM</td><td> </td><td>9/8/2022 10:43:25
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27562</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring should be
cleaned.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:27 AM</td><td> </td><td>9/8/2022 10:42:56
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32777</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;The Throne/marked joint should be adjusted
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:53:11 PM</td><td> </td><td>9/8/2022 10:21:43
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28176</td><td>Core G2</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Media converter not installed </td><td>High</td><td>3/23/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/16/2022 3:55:13 PM</td><td>
</td><td>9/8/2022 9:49:27 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27630</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;No
patching for panel</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:37 PM</td><td> </td><td>9/8/2022 9:46:25
AM</td><td>&nbsp;</td><td>MS.19.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>18100</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All
floor boxes should be replaced</td><td>High</td><td>6/2/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>5/26/2021 11:46:12 AM</td><td>
</td><td>9/8/2022 9:40:51 AM</td><td>Closed as per corrective action of the rated
NCR</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18101</td><td>SCULPTURE ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All
floor boxes should be replaced</td><td>High</td><td>6/2/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>5/26/2021 11:46:14 AM</td><td>
</td><td>9/8/2022 9:40:50 AM</td><td>Closed as per corrective action of the rated
NCR</td><td>MK.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>18109</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All
floor boxes should be replaced</td><td>High</td><td>6/2/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>5/26/2021 11:46:30 AM</td><td>
</td><td>9/8/2022 9:40:48 AM</td><td>Closed as per corrective action of the rated
NCR</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18112</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All
floor boxes should be replaced</td><td>High</td><td>6/2/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>5/26/2021 11:46:35 AM</td><td>
</td><td>9/8/2022 9:40:46 AM</td><td>Closed as per corrective action of the rated
NCR</td><td>MS.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18114</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All
floor boxes should be replaced</td><td>High</td><td>6/2/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>5/26/2021 11:46:39 AM</td><td>
</td><td>9/8/2022 9:40:43 AM</td><td>Closed as per corrective action of the rated
NCR</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28175</td><td>Core G2</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Patching and cover box and labeling and incomplete work
</td><td>High</td><td>3/23/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/16/2022 3:55:11 PM</td><td> </td><td>9/8/2022 9:40:42
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18116</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All
floor boxes should be replaced</td><td>High</td><td>6/2/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>5/26/2021 11:46:43 AM</td><td>
</td><td>9/8/2022 9:40:41 AM</td><td>Closed as per corrective action of the rated
NCR</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18118</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Power
Sockets</td><td>Curtain motors</td><td>&#39;All floor boxes should be replaced as
shown in photos </td><td>High</td><td>6/2/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>5/26/2021 11:46:47 AM</td><td> </td><td>9/8/2022 9:40:38
AM</td><td>Closed as per corrective action of the rated
NCR</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28091</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Earthing
System</td><td>General Snag</td><td>&#39;Defective all tape should be replaced
</td><td>High</td><td>3/22/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/15/2022 3:17:08 PM</td><td> </td><td>9/8/2022 9:40:36
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>28202</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CONTAINMENT
SUPPORT SYSTEM</td><td>General Snag</td><td>&#39;Missing
Labels</td><td>High</td><td>3/24/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/17/2022 11:28:04 AM</td><td> </td><td>9/8/2022 9:40:34
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>30356</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Patch cords should be
installed</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:25 PM</td><td> </td><td>9/8/2022
9:40:33 AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>32124</td><td>CORE G1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Box to be fixed and cover and
label</td><td>High</td><td>7/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>7/6/2022 4:23:24 PM</td><td> </td><td>9/8/2022
9:40:31 AM</td><td>&nbsp;</td><td>MC.25.02.G11</td><td>&nbsp;</td>
</tr><tr>
<td>32127</td><td>CORE G1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label and cleaning lighting fixtures
</td><td>High</td><td>7/13/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022
4:23:28 PM</td><td> </td><td>9/8/2022 9:40:30
AM</td><td>&nbsp;</td><td>MC.25.02.G11</td><td>&nbsp;</td>
</tr><tr>
<td>28177</td><td>Core G2</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;RFID labeling and patching </td><td>High</td><td>3/23/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/16/2022 3:55:15 PM</td><td>
</td><td>9/8/2022 9:39:17 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>30161</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Shaft need to be cleaned. </td><td>High</td><td>6/6/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/30/2022 11:38:11 AM</td><td>
</td><td>9/8/2022 8:10:25
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30174</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Shaft need to be
cleaned. </td><td>High</td><td>6/6/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:27 AM</td><td> </td><td>9/8/2022 8:08:30
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>31539</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Drainage System</td><td>General
Snag</td><td>&#39;Missing collar for HDPE pipe penetration.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:39 PM</td><td> </td><td>9/8/2022 8:07:11
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>26689</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>Cracks</td><td>&#39;Cracks should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:14 PM</td><td> </td><td>9/7/2022 3:24:07 PM</td><td>Done </td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26698</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:30 PM</td><td> </td><td>9/7/2022 3:24:04 PM</td><td>Done </td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26703</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Edges should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:40 PM</td><td> </td><td>9/7/2022 3:23:54 PM</td><td>Done </td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26704</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:40 PM</td><td> </td><td>9/7/2022 3:23:53 PM</td><td>Done </td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26815</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing tile should be installed
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:31 PM</td><td> </td><td>9/7/2022 3:23:50 PM</td><td>Done </td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27044</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joints should be aligned and uniform
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:17:25 PM</td><td> </td><td>9/7/2022 3:23:49 PM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27050</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:17:37 PM</td><td> </td><td>9/7/2022 3:23:47 PM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27060</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:17:56 PM</td><td> </td><td>9/7/2022 3:23:45 PM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27066</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:11 PM</td><td> </td><td>9/7/2022 3:23:44 PM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27073</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked edge should be aligned and leveled
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:21 PM</td><td> </td><td>9/7/2022 3:23:43 PM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27077</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joints should be aligned and leveled
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:30 PM</td><td> </td><td>9/7/2022 3:23:41 PM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27078</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joints should be with the same width
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:32 PM</td><td> </td><td>9/7/2022 3:23:40 PM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27081</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joint should be adjusted
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:38 PM</td><td> </td><td>9/7/2022 3:23:39 PM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27082</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked edges should be repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:40 PM</td><td> </td><td>9/7/2022 3:23:31 PM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27083</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joint should be adjusted (to be
leveled)</td><td>Low</td><td>3/23/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/2/2022 4:18:42 PM</td><td> </td><td>9/7/2022
3:23:30 PM</td><td>Done </td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27084</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Wooden piece to be removed
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:44 PM</td><td> </td><td>9/7/2022 3:23:29 PM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>31963</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Broken tiles no (11,12,13,14,15,16,17,18)should be
repaired/replaced </td><td>Low</td><td>6/30/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>6/23/2022 3:01:47 PM</td><td> </td><td>9/7/2022 3:23:28
PM</td><td>Done </td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>31964</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Broken tiles no (1,2,3,4,5,6,7,8,9&amp;10)should be
repaired/replaced </td><td>Low</td><td>7/14/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>6/23/2022 3:01:52 PM</td><td> </td><td>9/7/2022 3:23:20
PM</td><td>Done </td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>31968</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be repaired/replaced
</td><td>Low</td><td>7/25/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>7/4/2022
2:20:35 PM</td><td> </td><td>9/7/2022 3:23:19 PM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>32664</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be repaired/replaced
</td><td>Low</td><td>8/11/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>7/21/2022 2:55:23 PM</td><td> </td><td>9/7/2022 3:23:18
PM</td><td>Done </td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>32703</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Based on PMC visit on15-8-22 the shown tiles
are still broken #36,40</td><td>Low</td><td>9/5/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/15/2022 4:29:42 PM</td><td> </td><td>9/7/2022 3:23:10
PM</td><td>Done </td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>32704</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Based on PMC visit on15-8-22 the shown tiles
are still broken #33&amp;34</td><td>Low</td><td>9/5/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/15/2022 4:29:45 PM</td><td> </td><td>9/7/2022 3:23:08
PM</td><td>Done </td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>32705</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Based on PMC visit on 15-8-22 the shown tiles
are still broken #19,24,25&amp;26</td><td>Low</td><td>9/5/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>8/15/2022 4:29:47 PM</td><td> </td><td>9/7/2022
3:23:07 PM</td><td>Done </td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>29849</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Accessories should be clean from
painting.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:19:53 PM</td><td> </td><td>9/7/2022 12:29:36
PM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>16477</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Grill is not aligned
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:39 AM</td><td> </td><td>9/7/2022 12:29:07
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16485</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39; Broken tiles should be replaced
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:51 AM</td><td> </td><td>9/7/2022 12:29:06
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21644</td><td>CORE D3</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Floor needs touch up painting
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:24:40 AM</td><td> </td><td>9/7/2022 12:29:05
PM</td><td>&nbsp;</td><td>MC.13.0G.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21651</td><td>CORE D3</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Inspection after remove it the
cover</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:24:50 AM</td><td> </td><td>9/7/2022 12:29:04
PM</td><td>&nbsp;</td><td>MC.13.0G.D31</td><td>&nbsp;</td>
</tr><tr>
<td>22047</td><td>CORE D3</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>Civil</td><td>Boundary
Walls</td><td>Alignment/Plumbness</td><td>&#39;Shaft need cleaning
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/23/2021
3:57:30 PM</td><td> </td><td>9/7/2022 12:29:03
PM</td><td>&nbsp;</td><td>MC.13.0G.D31</td><td>&nbsp;</td>
</tr><tr>
<td>32029</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Welding joint should be finished
properly.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:56:45 PM</td><td> </td><td>9/7/2022 12:29:02
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>29748</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly to be balanced </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:13:36 PM</td><td> </td><td>9/7/2022
12:28:58 PM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>29747</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories should be clean from
painting.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:13:36 PM</td><td> </td><td>9/7/2022 12:28:19
PM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>28074</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail should be fixed properly
</td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/15/2022
12:07:41 PM</td><td> </td><td>9/7/2022 12:27:34
PM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>27925</td><td>STAFF W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceramic Walls need to
clean.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:35 AM</td><td> </td><td>9/7/2022 12:27:03
PM</td><td>&nbsp;</td><td>MW.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27715</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall Painting</td><td>General
Snag</td><td>&#39;Wall painting need to touch up </td><td>Low</td><td>3/31/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022 11:07:44 AM</td><td>
</td><td>9/7/2022 12:26:34
PM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27683</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Concrete need to
repair.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 3:35:44 PM</td><td> </td><td>9/7/2022 12:23:26
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27577</td><td>GEM CAVE EXP.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 11:34:01 AM</td><td> </td><td>9/7/2022 12:22:36
PM</td><td>&nbsp;</td><td>MP.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27563</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire sealant
</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/9/2022
11:33:30 AM</td><td> </td><td>9/7/2022 12:22:02
PM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>27558</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:16 AM</td><td> </td><td>9/7/2022 12:21:23
PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27279</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Broken ceramic tile should be
replaced.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/7/2022 12:05:30 PM</td><td> </td><td>9/7/2022 12:20:51
PM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27270</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy flooring paint need to adjusted
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/7/2022
12:05:17 PM</td><td> </td><td>9/7/2022 12:20:17
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32755</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 6/Defective parts should be removed
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:52:37 PM</td><td> </td><td>9/7/2022 12:12:17
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32754</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 6/ Defective panel should be
replaced </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:35 PM</td><td> </td><td>9/7/2022
12:11:53 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32761</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 5/Defective part should be adjusted
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:52:46 PM</td><td> </td><td>9/7/2022 12:11:40
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24374</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>DB</td><td>General Snag</td><td>&#39;Touch up
painting for panels </td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh
Ibrahim El-Sawah</td><td>10/27/2021 11:52:57 AM</td><td> </td><td>9/7/2022 11:44:36
AM</td><td>&nbsp;</td><td>Museum Roof Band B</td><td>&nbsp;</td>
</tr><tr>
<td>27526</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Coupling should be replaced
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:41 AM</td><td> </td><td>9/7/2022 11:44:35
AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>28399</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>WIRING
ACCESSORIES</td><td>General Snag</td><td>&#39;Wire connection not complete.
</td><td>High</td><td>5/4/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/27/2022 11:45:09 AM</td><td> </td><td>9/7/2022 11:44:33
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>30325</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Install patch
cord</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:43 PM</td><td> </td><td>9/7/2022
11:44:31 AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30968</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;No earth cable</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:19:50 PM</td><td>
</td><td>9/7/2022 11:44:30
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>31028</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:21:30 PM</td><td> </td><td>9/7/2022 11:44:28
AM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>31774</td><td>B.O.H-CORE A2 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>General Snag</td><td>&#39;Buttom plate should be installed at all
corridor </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/6/2022 2:07:14 PM</td><td> </td><td>9/7/2022
11:44:27 AM</td><td>&nbsp;</td><td>MC.18.02.A21</td><td>&nbsp;</td>
</tr><tr>
<td>32058</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:24 AM</td><td>
</td><td>9/7/2022 11:44:26
AM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32803</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s Museum</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Exhibition Works</td><td>General
Snag</td><td>&#39;Floor box outlets are not installed</td><td>High</td><td>9/6/2022
12:00:00 AM</td><td>mina.moussa</td><td>8/30/2022 1:28:46 PM</td><td>
</td><td>9/7/2022 11:44:25 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22811</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Loose panel should be fixed properly
</td><td>Low</td><td>9/29/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>9/8/2021
12:17:04 PM</td><td> </td><td>9/7/2022 11:00:51 AM</td><td>&nbsp;</td><td>MU -
North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>24666</td><td>Mankauras - Phase 4</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Metal flashing is missing under metal
mesh</td><td>Low</td><td>11/22/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/1/2021 11:32:55 AM</td><td> </td><td>9/7/2022 10:55:09
AM</td><td>&nbsp;</td><td>Mankauras - Phase 4</td><td>&nbsp;</td>
</tr><tr>
<td>13754</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Touch up and cleaning
</td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:39:15 AM</td><td> </td><td>9/7/2022 10:54:24
AM</td><td>&nbsp;</td><td>MS.18.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>25593</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
and smooth </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:51:31 AM</td><td> </td><td>9/7/2022
9:48:07 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25449</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Missing tiles should be installed
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/7/2021
12:20:42 PM</td><td> </td><td>9/7/2022 9:47:40
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>26175</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Bad repair should be finished
</td><td>Low</td><td>3/10/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/17/2022
10:39:12 AM</td><td> </td><td>9/7/2022 9:47:24
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25504</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Gap
between stone cladding and flooring should be regular and sealed
</td><td>Low</td><td>12/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/8/2021
1:41:39 PM</td><td> </td><td>9/7/2022 9:47:10
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25481</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Damages to be rectified or replaced</td><td>&#39;Two Broken tiles
should be replaced </td><td>Low</td><td>12/29/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/8/2021 1:40:48 PM</td><td> </td><td>9/7/2022
9:46:30 AM</td><td>Repaired, but not replaced.</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25660</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Toothing should be removed </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:53:01 AM</td><td> </td><td>9/7/2022
9:44:53 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10695</td><td>TUT- (+45.00)</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Cleaning for stone tiles /missing Sealant
</td><td>Low</td><td>10/4/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/13/2020 4:52:51 PM</td><td> </td><td>9/7/2022
9:43:46 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>29385</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Clearance between door leaf and frame should be same
width.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:20:03 PM</td><td> </td><td>9/7/2022 9:39:09
AM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29384</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between frame door and wall
concrete should be adjusted.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:20:02 PM</td><td> </td><td>9/7/2022 9:38:43
AM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>31713</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Vanity</td><td>General
Snag</td><td>&#39;Sealer roller traces should be repaired
</td><td>Low</td><td>6/27/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/6/2022
11:52:38 AM</td><td> </td><td>9/7/2022 9:36:19
AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>25356</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Edge not aligned and should be
adjusted.</td><td>Low</td><td>12/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>11/22/2021 1:58:31 PM</td><td> </td><td>9/7/2022 9:34:35
AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25353</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Metal edges should be
cutting.</td><td>Low</td><td>12/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>11/22/2021 1:58:22 PM</td><td> </td><td>9/7/2022 9:33:58
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25351</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint should be aligned and same
width.</td><td>Low</td><td>12/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>11/22/2021 1:58:17 PM</td><td> </td><td>9/7/2022 9:33:29
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>28140</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof
Tiles</td><td>Chipped/damaged</td><td>&#39;Cutting exposed supports
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/16/2022
12:09:43 PM</td><td> </td><td>9/7/2022 9:33:02 AM</td><td>&nbsp;</td><td>Museum
Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>25352</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Metal edges should be
cutting.</td><td>Low</td><td>12/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>11/22/2021 1:58:20 PM</td><td> </td><td>9/7/2022 9:32:31
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25348</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Metal edges should be
cutting.</td><td>Low</td><td>12/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>11/22/2021 1:58:06 PM</td><td> </td><td>9/7/2022 9:32:04
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25358</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Metal edge should be
cutting.</td><td>Low</td><td>12/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>11/22/2021 1:58:40 PM</td><td> </td><td>9/7/2022 9:31:38
AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25357</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Metal edges should be cutting
</td><td>Low</td><td>12/13/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>11/22/2021
1:58:34 PM</td><td> </td><td>9/7/2022 9:31:12 AM</td><td>&nbsp;</td><td>Museum Roof
Band D</td><td>&nbsp;</td>
</tr><tr>
<td>28170</td><td>CORE F3</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;RFID not installed properly and patching and missing
antenna</td><td>High</td><td>3/23/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/16/2022 3:55:02 PM</td><td> </td><td>9/7/2022 9:20:22
AM</td><td>&nbsp;</td><td>MC.14.0G.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32770</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 3/Marked joints should be adjusted
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:53:00 PM</td><td> </td><td>9/6/2022 4:34:35
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24059</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Acciona</
td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;In completed
items</td><td>Low</td><td>11/15/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:39:36 PM</td><td> </td><td>9/6/2022 4:28:02
PM</td><td>Closed based on approved SKE-299524</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28386</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling penetration need to be sealed with a
proper fire sealant. </td><td>High</td><td>5/4/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/27/2022 11:44:46 AM</td><td> </td><td>9/6/2022 3:06:35
PM</td><td>&nbsp;</td><td>MS.19.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>32558</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label and should be installed properly
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:33:33 AM</td><td> </td><td>9/6/2022 2:34:57
PM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32219</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:49:04 AM</td><td>
</td><td>9/6/2022 2:34:34
PM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>32220</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Not installed
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:49:06 AM</td><td> </td><td>9/6/2022 2:34:22
PM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>32201</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:41 AM</td><td>
</td><td>9/6/2022 2:34:14
PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>31987</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked part should be finished properly (at all
levels)</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 12:13:55 PM</td><td> </td><td>9/6/2022 2:15:43
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29870</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Hardware accessories need to clean </td><td>Low</td><td>6/15/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022 4:22:35 PM</td><td>
</td><td>9/6/2022 2:15:01
PM</td><td>&nbsp;</td><td>MS.19.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29831</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories should be
cleaned.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:59 PM</td><td> </td><td>9/6/2022 2:14:33
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29809</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories should be
cleaned.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:11 PM</td><td> </td><td>9/6/2022 2:14:07
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29736</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories should be clean from
painting.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:13:10 PM</td><td> </td><td>9/6/2022 2:12:37
PM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>27686</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall need to
repair.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 3:35:50 PM</td><td> </td><td>9/6/2022 2:12:09
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27680</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All Wall painting need to
repair.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 3:35:37 PM</td><td> </td><td>9/6/2022 2:11:41
PM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>27575</td><td>SERVICE ZONE 7</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Black work need to
repair.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:56 AM</td><td> </td><td>9/6/2022 2:11:05
PM</td><td>&nbsp;</td><td>MS.14.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27315</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint is not same
width.</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/7/2022 12:06:29 PM</td><td> </td><td>9/6/2022 2:10:19
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27309</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gasket should be
adjusted.</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/7/2022 12:06:21 PM</td><td> </td><td>9/6/2022 2:07:03
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27314</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Marked panel should be fixed
well.</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/7/2022 12:06:28 PM</td><td> </td><td>9/6/2022 2:06:36
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27310</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Glass door should be
clean.</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/7/2022 12:06:22 PM</td><td> </td><td>9/6/2022 2:06:05
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27284</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to touch up
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/7/2022
12:05:39 PM</td><td> </td><td>9/6/2022 2:05:15
PM</td><td>&nbsp;</td><td>MS.18.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27283</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/7/2022 12:05:37 PM</td><td> </td><td>9/6/2022 2:04:43
PM</td><td>&nbsp;</td><td>MS.18.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>24443</td><td>Bay-04 (from level +43.5 to +49.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Touch up painting
</td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:06 AM</td><td> </td><td>9/6/2022 2:01:12
PM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>28303</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Differential pressure not connected.
</td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:24 AM</td><td> </td><td>9/6/2022 1:49:06
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28664</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Ductwork</
td><td>Access door missing</td><td>&#39;Chilled water valve actuator not installed.
</td><td>High</td><td>5/17/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:40:09 PM</td><td> </td><td>9/6/2022 1:47:49
PM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29056</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>5/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/18/2022 11:56:02 AM</td><td> </td><td>9/6/2022 1:46:26
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>31991</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Marked parts should be repaired and
repainted </td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 12:14:01 PM</td><td> </td><td>9/6/2022 1:25:11
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>31992</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Repair is needed for marked parts
</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
12:14:03 PM</td><td> </td><td>9/6/2022 1:25:08
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32735</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Reception desk/Loos panel to be fixed properly
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:51:59 PM</td><td> </td><td>9/6/2022 1:19:47
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32734</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Reception desk /Unleveled panels should be
adjusted </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:51:58 PM</td><td> </td><td>9/6/2022
1:19:22 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32822</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;Archeology bunches/need touch up painting
</td><td>Low</td><td>9/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/31/2022
11:33:12 AM</td><td> </td><td>9/6/2022 1:19:10
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32783</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 2/Marked part should be fixed
properly </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:53:21 PM</td><td> </td><td>9/6/2022
1:18:47 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>9595</td><td>IT ROOM</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
door need repair and adjustment /missing cir for hardware
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:47:44 PM</td><td> </td><td>9/6/2022 1:18:24
PM</td><td>&nbsp;</td><td>MS.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>9600</td><td>VOID</td><td>MU GF </td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
leaf need repair and door need adjustment /missing cir for hardware
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:48:00 PM</td><td> </td><td>9/6/2022 1:18:23
PM</td><td>&nbsp;</td><td>MS.13.0G.006</td><td>&nbsp;</td>
</tr><tr>
<td>32774</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Nadim</td><td>Architectural</td><td>Exhibition works
</td><td>General Snag</td><td>&#39;The chariots/ Marked parts should be fixed
properly </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:53:07 PM</td><td> </td><td>9/6/2022
1:18:22 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>9607</td><td>VOID</td><td>MU GF </td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
damaged need repair door leaf need adjustment with frame
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:48:20 PM</td><td> </td><td>9/6/2022 1:18:20
PM</td><td>&nbsp;</td><td>MS.13.0G.005</td><td>&nbsp;</td>
</tr><tr>
<td>9608</td><td>VOID</td><td>MU GF </td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
door need repair /missing cir for hardware </td><td>Low</td><td>8/10/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>7/20/2020 1:48:24 PM</td><td> </td><td>9/6/2022
1:18:19 PM</td><td>&nbsp;</td><td>MS.13.0G.005</td><td>&nbsp;</td>
</tr><tr>
<td>9616</td><td> PLANT</td><td>MU GF </td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need adjustment door need touchup /missing cir for hardware
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:48:58 PM</td><td> </td><td>9/6/2022 1:18:18
PM</td><td>&nbsp;</td><td>MS.13.0G.011</td><td>&nbsp;</td>
</tr><tr>
<td>9618</td><td> PLANT</td><td>MU GF </td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
need touch up /missing cir for hardware </td><td>Low</td><td>8/10/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>7/20/2020 1:49:09 PM</td><td> </td><td>9/6/2022
1:18:17 PM</td><td>&nbsp;</td><td>MS.13.0G.014</td><td>&nbsp;</td>
</tr><tr>
<td>9633</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
need painting /missing cir for hardware </td><td>Low</td><td>8/10/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>7/20/2020 1:49:55 PM</td><td> </td><td>9/6/2022
1:18:16 PM</td><td>&nbsp;</td><td>MS.12.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>9636</td><td>SERVICE TUNNEL</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
need touch up and door leaf need adjustment with Fram/missing cir for hardware
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:50:06 PM</td><td> </td><td>9/6/2022 1:18:15
PM</td><td>&nbsp;</td><td>MQ.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>21134</td><td>CORE D2</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 10:50:19 AM</td><td> </td><td>9/6/2022 1:18:14
PM</td><td>&nbsp;</td><td>MC.18.01.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21135</td><td>CORE D2</td><td>MU
L10</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Inspection after removing protection
cover </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 10:50:21 AM</td><td> </td><td>9/6/2022 1:18:14
PM</td><td>&nbsp;</td><td>MC.18.01.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21565</td><td>CORE B3</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to touch up
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
9:52:13 AM</td><td> </td><td>9/6/2022 1:18:08
PM</td><td>&nbsp;</td><td>MC.12.0G.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21576</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 9:52:42 AM</td><td> </td><td>9/6/2022 1:18:07
PM</td><td>&nbsp;</td><td>MS.12.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>21645</td><td>CORE D3</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Floor is not leveled
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:24:41 AM</td><td> </td><td>9/6/2022 1:18:06
PM</td><td>&nbsp;</td><td>MC.13.0G.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21649</td><td>CORE D3</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;painting works are not finished yet (for all
core walls)</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:24:47 AM</td><td> </td><td>9/6/2022 1:18:05
PM</td><td>&nbsp;</td><td>MC.13.0G.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21700</td><td>CORE B3</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Scratches on stainless/cleaning is needed
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:25:55 AM</td><td> </td><td>9/6/2022 1:18:04
PM</td><td>&nbsp;</td><td>MC.12.0G.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21701</td><td>CORE B3</td><td>MU
BA</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail is not aligned
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:25:56 AM</td><td> </td><td>9/6/2022 1:18:03
PM</td><td>&nbsp;</td><td>MC.12.0B.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21703</td><td>CORE B3</td><td>MU
BA</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joints should be adjusted and
repaired </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:59 AM</td><td> </td><td>9/6/2022 1:18:02
PM</td><td>&nbsp;</td><td>MC.12.0B.B31</td><td>&nbsp;</td>
</tr><tr>
<td>22045</td><td>CORE D3</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>Civil</td><td>Boundary
Walls</td><td>Alignment/Plumbness</td><td>&#39;Need support
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/23/2021
3:57:29 PM</td><td> </td><td>9/6/2022 1:18:01
PM</td><td>&nbsp;</td><td>MC.13.0G.D31</td><td>&nbsp;</td>
</tr><tr>
<td>22198</td><td>MALE PRAYER ROOM</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on CIR</td><td>Low</td><td>9/14/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/24/2021 11:47:32 AM</td><td> </td><td>9/6/2022 1:18:00
PM</td><td>&nbsp;</td><td>MG.13.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>25880</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked part to be checked
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
11:59:14 AM</td><td> </td><td>9/6/2022 1:17:58
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25881</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked edge should be aligned/trim
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
11:59:16 AM</td><td> </td><td>9/6/2022 1:17:57
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25919</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Covered area is not checked </td><td>Low</td><td>2/13/2022
12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022 12:09:29 PM</td><td>
</td><td>9/6/2022 1:17:56 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25964</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked part is not as per shop drawing
</td><td>Low</td><td>2/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022
12:08:06 PM</td><td> </td><td>9/6/2022 1:17:55
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25968</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;rope should be
removed</td><td>Low</td><td>2/14/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/24/2022 12:08:14 PM</td><td> </td><td>9/6/2022
1:17:54 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25990</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Flashing should be uniform and
aligned </td><td>Low</td><td>2/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/25/2022 11:39:00 AM</td><td> </td><td>9/6/2022
1:17:53 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26102</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Irregular cutting and notch not as per
drawing.</td><td>Low</td><td>2/24/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/3/2022 2:25:54 PM</td><td> </td><td>9/6/2022
1:17:52 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28064</td><td>CORE F3</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>4/5/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>3/15/2022 12:07:21 PM</td><td>
</td><td>9/6/2022 1:17:51
PM</td><td>&nbsp;</td><td>MC.14.0G.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28066</td><td>CORE F3</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked handrail should be aligned
</td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/15/2022
12:07:24 PM</td><td> </td><td>9/6/2022 1:17:50
PM</td><td>&nbsp;</td><td>MC.14.0G.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28067</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
good </td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/15/2022 12:07:27 PM</td><td> </td><td>9/6/2022 1:17:48
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28076</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>4/5/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/15/2022
12:07:58 PM</td><td> </td><td>9/6/2022 1:17:47
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28077</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to repair and touch
up </td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/15/2022
12:08:00 PM</td><td> </td><td>9/6/2022 1:17:46
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28078</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to cleaning
and touch up </td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/15/2022 12:08:02 PM</td><td> </td><td>9/6/2022 1:17:45
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32699</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Based on PMC visit on 14-8-22,the marked
tile should be aligned </td><td>Low</td><td>9/4/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/14/2022 1:06:34 PM</td><td> </td><td>9/6/2022 1:17:42
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>30537</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked edge should be adjusted </td><td>Low</td><td>6/21/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022 11:45:44 AM</td><td>
</td><td>9/6/2022 11:00:36
AM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30681</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Defected
cover should be adjusted and installed properly </td><td>Low</td><td>6/21/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022 4:15:27 PM</td><td>
</td><td>9/6/2022 10:58:18
AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30542</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Defective painting should be repaired
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:51 AM</td><td> </td><td>9/6/2022 10:57:10
AM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30214</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall need to
repair.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:20:47 PM</td><td> </td><td>9/6/2022 10:56:39
AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30140</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked parts around metal door should be adjusted and repaint
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
11:37:44 AM</td><td> </td><td>9/6/2022 10:56:12
AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30235</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Traces sealer should be cleaned.</td><td>Low</td><td>6/20/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022 1:06:07 PM</td><td>
</td><td>9/6/2022 10:55:15
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>21148</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to be adjusted and
repainting </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 10:50:47 AM</td><td> </td><td>9/6/2022 10:52:00
AM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21690</td><td>CORE B3-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wall painting needs adjustment and repair
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
11:25:45 AM</td><td> </td><td>9/6/2022 10:26:17
AM</td><td>&nbsp;</td><td>MC.12.01.B31</td><td>&nbsp;</td>
</tr><tr>
<td>20176</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Repair and repainted
</td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/3/2021
3:38:09 PM</td><td> </td><td>9/6/2022 10:25:33
AM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>21666</td><td>TUT-CORE B3</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Interface should be leveled </td><td>Low</td><td>9/9/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021 11:25:13 AM</td><td>
</td><td>9/6/2022 10:24:11
AM</td><td>&nbsp;</td><td>MC.12.03.B31</td><td>&nbsp;</td>
</tr><tr>
<td>19905</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Scratches</td><td>&#39;Stainless steel bars should be leveled
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:24:58 AM</td><td> </td><td>9/6/2022 10:22:51
AM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>19901</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Paint finish</td><td>&#39;Stainless steel bars not leveled
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:24:52 AM</td><td> </td><td>9/6/2022 10:22:07
AM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>19900</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Toothing between stainless bars
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:24:50 AM</td><td> </td><td>9/6/2022 10:21:32
AM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>20878</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>Civil</td><td>Boundary
Walls</td><td>Alignment/Plumbness</td><td>&#39;Cleaning &amp; house keeping
</td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/11/2021
11:47:27 AM</td><td> </td><td>9/6/2022 9:44:48
AM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>32659</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Not
Installed/Completed</td><td>&#39;Missing labels for
CHWPs</td><td>High</td><td>7/26/2022 12:00:00
AM</td><td>hossamreda</td><td>7/19/2022 11:38:26 AM</td><td> </td><td>9/6/2022
8:59:16 AM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32538</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Add pipe
label</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:58 AM</td><td> </td><td>9/6/2022 8:57:38
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32465</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Missing labels for CHWPs</td><td>High</td><td>7/25/2022
12:00:00 PM</td><td>hossamreda</td><td>7/18/2022 10:02:21 AM</td><td>
</td><td>9/6/2022 8:57:24
AM</td><td>&nbsp;</td><td>MS.18.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32292</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing labels for all pipes
</td><td>High</td><td>7/24/2022 12:00:00 PM</td><td>hossamreda</td><td>7/17/2022
3:32:47 PM</td><td> </td><td>9/6/2022 8:57:11
AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>18501</td><td>ELECTRICAL ROOM</td><td>GATE 7 TYPE 2
GF</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Control box should be leveled and installed
properly </td><td>Low</td><td>6/29/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>6/8/2021 1:31:14 PM</td><td> </td><td>9/6/2022 8:07:40
AM</td><td>&nbsp;</td><td>GT7.02.0G.06</td><td>&nbsp;</td>
</tr><tr>

<td>24219</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>STS</
td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;Missing work
the cables not terminated yet </td><td>High</td><td>11/2/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>10/26/2021 3:35:25 PM</td><td> </td><td>9/6/2022
8:07:38 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32430</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:15 PM</td><td>
</td><td>9/5/2022 4:11:36
PM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32193</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:31 AM</td><td>
</td><td>9/5/2022 4:11:16
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32187</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:24 AM</td><td>
</td><td>9/5/2022 4:10:36
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>31775</td><td>B.O.H-CORE A2 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>General Snag</td><td>&#39;Cable tray at all corridor must. Be with
cover as per specs </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/6/2022 2:07:15 PM</td><td> </td><td>9/5/2022
3:23:41 PM</td><td>&nbsp;</td><td>MC.18.02.A21</td><td>&nbsp;</td>
</tr><tr>
<td>27412</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Data cable termination </td><td>High</td><td>3/14/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:09:03 PM</td><td>
</td><td>9/5/2022 3:10:26
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30543</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum wall should be adjusted
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:54 AM</td><td> </td><td>9/5/2022 3:06:31
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30539</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Defective paint should be repaired </td><td>Low</td><td>6/21/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022 11:45:47 AM</td><td>
</td><td>9/5/2022 3:05:57
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30432</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy gypsum board should be
adjusted.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:22 AM</td><td> </td><td>9/5/2022 3:03:26
PM</td><td>&nbsp;</td><td>MR.14.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30448</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Defected paint need to
repair.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:46 AM</td><td> </td><td>9/5/2022 3:01:53
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30130</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Sealer traces should be repaired </td><td>Low</td><td>6/20/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022 11:37:34 AM</td><td>
</td><td>9/5/2022 3:01:00
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30099</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Defective painting should be repaired
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
11:37:01 AM</td><td> </td><td>9/5/2022 2:59:41
PM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30229</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Traces seller need to
clean.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 1:02:57 PM</td><td> </td><td>9/5/2022 2:57:51
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30134</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Vanity</td><td>General
Snag</td><td>&#39;Sealer traces should be repaired </td><td>Low</td><td>6/20/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022 11:37:38 AM</td><td>
</td><td>9/5/2022 2:57:23
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30472</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling need to leveled and
adjusted.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:23 AM</td><td> </td><td>9/5/2022 2:55:58
PM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>30106</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Defective painting should be repaired
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
11:37:08 AM</td><td> </td><td>9/5/2022 2:51:54
PM</td><td>&nbsp;</td><td>MA.19.02.020</td><td>&nbsp;</td>
</tr><tr>
<td>32752</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 6/ Light leakage should be adjusted
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:52:32 PM</td><td> </td><td>9/5/2022 12:26:42
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32751</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 6/ Loose panel should be fixed
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:52:29 PM</td><td> </td><td>9/5/2022 12:26:29
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32760</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame5/Touch up painting is needed for
marked part</td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:45 PM</td><td> </td><td>9/5/2022
12:26:21 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32759</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 5/Marked part to be fixed properly
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:52:43 PM</td><td> </td><td>9/5/2022 12:26:14
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32757</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame5/Repair is needed for wheel
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:52:40 PM</td><td> </td><td>9/5/2022 12:26:06
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32762</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39; Frame 4/Marked parts should be adjusted
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:52:48 PM</td><td> </td><td>9/5/2022 12:25:54
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32758</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 4/Marked part should be fixed
properly </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:42 PM</td><td> </td><td>9/5/2022
12:25:42 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32784</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 2/Loose panel should be fixed
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:53:22 PM</td><td> </td><td>9/5/2022 12:25:24
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32780</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 2/Combine the crown installation
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:53:17 PM</td><td> </td><td>9/5/2022 12:25:16
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32768</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 3/Marked part should be fixed
properly </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:52:57 PM</td><td> </td><td>9/5/2022
12:24:51 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32772</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 3/Hear their stories button is
missing</td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:53:03 PM</td><td> </td><td>9/5/2022
12:24:37 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32769</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 3/Loose panel should be fixed
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:52:59 PM</td><td> </td><td>9/5/2022 12:24:29
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32789</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 1/Toothing in marked part should be
adjusted </td><td>Low</td><td>9/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>8/30/2022 12:53:30 PM</td><td> </td><td>9/5/2022
12:23:57 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32788</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 1/Loos panel and missing support
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:53:28 PM</td><td> </td><td>9/5/2022 12:23:50
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32785</td><td>Main Exhibition Gallery - Band
B</td><td>Exhibition - Children&#39;s
Museum</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Exhibition
works </td><td>General Snag</td><td>&#39;Frame 1/Marked part should be replaced
</td><td>Low</td><td>9/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>8/30/2022
12:53:24 PM</td><td> </td><td>9/5/2022 12:23:43
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22726</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>False Ceiling Tiles</td><td>Alignment of
tiles</td><td>&#39;Gap around false ceiling should be same width
</td><td>Low</td><td>9/27/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>9/6/2021
3:42:01 PM</td><td> </td><td>9/5/2022 12:22:35 PM</td><td>&nbsp;</td><td>MU - North
Facade</td><td>&nbsp;</td>
</tr><tr>
<td>22724</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Staircase Handrail</td><td>Overall
finishes</td><td>&#39;Gap between balustrade and stone cladding should be same
width </td><td>Low</td><td>9/27/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>9/6/2021 3:41:59 PM</td><td> </td><td>9/5/2022 12:22:24
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23747</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked vertical joints should be closed
</td><td>Low</td><td>11/3/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:41 PM</td><td> </td><td>9/5/2022 12:21:42
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23794</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked gaps should be closed
</td><td>Low</td><td>11/8/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/18/2021 4:29:20 PM</td><td> </td><td>9/5/2022 12:21:25
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23771</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Review the detail for marked parts
</td><td>Low</td><td>11/4/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/14/2021 3:46:51 PM</td><td> </td><td>9/5/2022 12:21:17
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>

<td>23872</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Stone cover should be flushed with stone flooring
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:19:35 PM</td><td> </td><td>9/5/2022 12:20:31
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21566</td><td>CORE B3</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
9:52:14 AM</td><td> </td><td>9/5/2022 12:10:34
PM</td><td>&nbsp;</td><td>MC.12.0G.B31</td><td>&nbsp;</td>
</tr><tr>
<td>17050</td><td>MEETING-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Cracks should be repaired
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:51 PM</td><td> </td><td>9/5/2022 12:09:33
PM</td><td>&nbsp;</td><td>ME.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32009</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;(All handrail at all levels) should
be cleaned and polished </td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 12:14:35 PM</td><td> </td><td>9/5/2022 12:08:35
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>30560</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Signage</td><td>Not
Installed/Completed</td><td>&#39;Signage is missing </td><td>Low</td><td>6/21/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022 11:46:34 AM</td><td>
</td><td>9/5/2022 12:07:56
PM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28065</td><td>CORE F3</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Epoxy flooring need repair and touch up
painting </td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/15/2022 12:07:23 PM</td><td> </td><td>9/5/2022 12:06:26
PM</td><td>&nbsp;</td><td>MC.14.0G.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32014</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;(At all levels)Tape should be removed from MEP
fixtures </td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 12:14:43 PM</td><td> </td><td>9/5/2022 12:02:38
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32011</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy flooring should be cleaned and
touch up painting is needed </td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 12:14:38 PM</td><td> </td><td>9/5/2022 12:01:47
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>28746</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked parts should be closed </td><td>Low</td><td>6/1/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/11/2022 11:48:04 AM</td><td>
</td><td>9/5/2022 12:00:47
PM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>28804</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy gypsum ceiling should be
adjusted.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:46:51 AM</td><td> </td><td>9/5/2022 12:00:17
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>32007</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Touch up painting is needed
</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
12:14:30 PM</td><td> </td><td>9/5/2022 11:59:46
AM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>27923</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Flooring need to clean.</td><td>Low</td><td>4/3/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>3/13/2022 11:48:31 AM</td><td> </td><td>9/5/2022
11:57:44 AM</td><td>&nbsp;</td><td>MS.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27922</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
painting.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:29 AM</td><td> </td><td>9/5/2022 11:50:01
AM</td><td>&nbsp;</td><td>MS.13.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27920</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling need to touch
up.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/13/2022
11:48:26 AM</td><td> </td><td>9/5/2022 11:49:30
AM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27919</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/13/2022
11:48:24 AM</td><td> </td><td>9/5/2022 11:49:01
AM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27916</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling need to touch
up.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/13/2022
11:48:18 AM</td><td> </td><td>9/5/2022 11:48:19
AM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>21202</td><td>CORE D2</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
10:57:46 AM</td><td> </td><td>9/5/2022 11:39:59 AM</td><td>Done
</td><td>MC.18.02.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21206</td><td>CORE D2</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Stainless architrave inspection after removing
the protection cover</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:57:54 AM</td><td> </td><td>9/5/2022 11:39:54
AM</td><td>Done </td><td>MC.18.02.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21207</td><td>CORE D2</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
10:57:58 AM</td><td> </td><td>9/5/2022 11:39:53 AM</td><td>Done
</td><td>MC.18.02.D21</td><td>&nbsp;</td>
</tr><tr>
<td>27345</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Final coat is not done
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022
12:12:47 PM</td><td> </td><td>9/5/2022 11:39:52 AM</td><td>Done
</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27347</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39; Marked part should be leveled
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022
12:12:51 PM</td><td> </td><td>9/5/2022 11:39:51 AM</td><td>Done
</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27349</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Snagging after cleaning
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:56 PM</td><td> </td><td>9/5/2022 11:39:49 AM</td><td>Done
</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27357</td><td>LOBBY</td><td>MU L20</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Short tile should be extended </td><td>Low</td><td>3/28/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022 12:13:12 PM</td><td>
</td><td>9/5/2022 11:39:48 AM</td><td>Done
</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27455</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Final coat is not done </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 4:40:39 PM</td><td> </td><td>9/5/2022
11:39:43 AM</td><td>Done </td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28079</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/15/2022
12:08:04 PM</td><td> </td><td>9/5/2022 11:39:40 AM</td><td>Done
</td><td>MR.14.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>28833</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy gypsum wall should be
leveled.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:32 AM</td><td> </td><td>9/5/2022 11:39:31
AM</td><td>Done </td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30840</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail should be
finished.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:56:50 AM</td><td> </td><td>9/5/2022 11:39:23
AM</td><td>Done </td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30842</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Grouting should be
finished.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:56:56 AM</td><td> </td><td>9/5/2022 11:39:18
AM</td><td>Done </td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30849</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy gypsum ceiling should be
adjusted.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:14 AM</td><td> </td><td>9/5/2022 11:39:16
AM</td><td>Done </td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30851</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to repair and touch
up.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
11:57:19 AM</td><td> </td><td>9/5/2022 11:39:15 AM</td><td>Done
</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30852</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Angle should be
aligned.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:21 AM</td><td> </td><td>9/5/2022 11:39:14
AM</td><td>Done </td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30854</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing floor
finish.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:25 AM</td><td> </td><td>9/5/2022 11:39:12
AM</td><td>Done </td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30857</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy gypsum ceiling should be
adjusted.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:31 AM</td><td> </td><td>9/5/2022 11:39:06
AM</td><td>Done </td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30859</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy gypsum wall should be
adjusted.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:33 AM</td><td> </td><td>9/5/2022 11:39:03
AM</td><td>Done </td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30860</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing floor
finish.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:35 AM</td><td> </td><td>9/5/2022 11:39:02
AM</td><td>Done </td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30886</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning door leaf and hardware accessories from both
sides.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:09 PM</td><td> </td><td>9/5/2022 11:39:00
AM</td><td>Done </td><td>MR.14.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31241</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Traces roller sealer should be
adjusted.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 10:40:58 AM</td><td> </td><td>9/5/2022 11:38:58
AM</td><td>Done </td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>25239</td><td>Temple Garden-Band D</td><td>Temple
Garden</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Stainless steel cladding need to
cleaning.</td><td>Low</td><td>12/7/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/16/2021 2:42:32 PM</td><td> </td><td>9/5/2022 11:26:57
AM</td><td>&nbsp;</td><td>Band D</td><td>&nbsp;</td>
</tr><tr>
<td>21675</td><td>CORE B3 - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail is not aligned and should
be adjusted </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:26 AM</td><td> </td><td>9/5/2022 11:15:11
AM</td><td>&nbsp;</td><td>MC.12.02.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21677</td><td>CORE B3 - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
11:25:28 AM</td><td> </td><td>9/5/2022 11:15:10
AM</td><td>&nbsp;</td><td>MC.12.02.B31</td><td>&nbsp;</td>
</tr><tr>
<td>31559</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects should be adjusted from both
sides</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:36:41 PM</td><td> </td><td>9/5/2022 11:15:09
AM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>14321</td><td>B.O.H-CORRIDOR - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need touch up /missing hardware accessories </td><td>High</td><td>12/31/2020
12:00:00 AM</td><td>Adel Nassrat</td><td>12/24/2020 1:22:23 PM</td><td>
</td><td>9/5/2022 10:21:40 AM</td><td>Done
</td><td>MS.18.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>14322</td><td>B.O.H-ARTEFACTS - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need touch up </td><td>High</td><td>12/31/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>12/24/2020 1:22:25 PM</td><td> </td><td>9/5/2022
10:21:39 AM</td><td>Done </td><td>MQ.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14349</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need touch up </td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/24/2020 1:24:06 PM</td><td> </td><td>9/5/2022
10:21:38 AM</td><td>Done </td><td>MS.23.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>14353</td><td>B.O.H-WET DELIVERY TUNNEL - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need touch up </td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/24/2020 1:24:17 PM</td><td> </td><td>9/5/2022
10:21:37 AM</td><td>Done </td><td>MQ.23.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14375</td><td>B.O.H-ARTEFACTS LOBBY - Band A</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need touch up </td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:25:10 PM</td><td> </td><td>9/5/2022 10:21:36
AM</td><td>Done </td><td>MQ.23.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>16045</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Missing fire sealant around duct</td><td>High</td><td>2/16/2021
12:00:00 PM</td><td>Kriton Katsamenis </td><td>2/9/2021 4:43:16 PM</td><td>
</td><td>9/5/2022 10:21:35 AM</td><td>Done
</td><td>MS.23.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18265</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Damaged tile should be repaired
</td><td>Low</td><td>6/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>5/31/2021
4:11:13 PM</td><td> </td><td>9/5/2022 10:21:34 AM</td><td>Done
</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19711</td><td>NAPPY CHANGE ROOM- Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>Chipped/dent</td><td>&#39;Toothing between ceramic tiles
</td><td>Low</td><td>7/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>7/7/2021
1:30:01 PM</td><td> </td><td>9/5/2022 10:21:33 AM</td><td>Done
</td><td>MS.12.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>21123</td><td>B.O.H-CORE B2 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Repair and repainting for epoxy
painting floor</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 10:49:56 AM</td><td> </td><td>9/5/2022 10:21:32
AM</td><td>Done.</td><td>MC.18.02.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21180</td><td>B.O.H-CORE B2 - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Vertical joints should be adjusted
and repaired </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:56:49 AM</td><td> </td><td>9/5/2022 10:21:30
AM</td><td>Done </td><td>MC.18.02.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21182</td><td>B.O.H-CORE B2 - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:56:54 AM</td><td> </td><td>9/5/2022 10:21:29 AM</td><td>Done
</td><td>MC.18.02.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21188</td><td>B.O.H-CORE B2 - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joint should be adjusted and
repaired </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:57:09 AM</td><td> </td><td>9/5/2022 10:21:28
AM</td><td>Done </td><td>MC.18.02.B21</td><td>&nbsp;</td>
</tr><tr>
<td>30116</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;All
Walls need touch up painting </td><td>Low</td><td>6/6/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 11:37:17 AM</td><td> </td><td>9/5/2022 10:21:27
AM</td><td>Done </td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30495</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Door leaf and frame need to
repaint.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:43:05 AM</td><td> </td><td>9/5/2022 10:21:26
AM</td><td>Done </td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30500</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Door leaf and frame need to
repaint.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:43:13 AM</td><td> </td><td>9/5/2022 10:21:25
AM</td><td>Done </td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31482</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame need touch up painting
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
3:24:56 PM</td><td> </td><td>9/5/2022 10:21:24 AM</td><td>Done
</td><td>MS.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31553</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and Defected painting should be adjusted
properly.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:36:19 PM</td><td> </td><td>9/5/2022 10:21:22
AM</td><td>Done </td><td>MS.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31800</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Pipe penetration shall be sealed. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:32:21 PM</td><td>
</td><td>9/5/2022 10:21:21 AM</td><td>Done
</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31801</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Pipe penetration shall be sealed. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:32:22 PM</td><td>
</td><td>9/5/2022 10:21:20 AM</td><td>Done
</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>22085</td><td>IT ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Fire alarm cables not terminated yet
</td><td>High</td><td>8/30/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/23/2021 3:58:05 PM</td><td> </td><td>9/5/2022 9:50:19
AM</td><td>&nbsp;</td><td>MS.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>22117</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Fire alarm cables not terminated yet
</td><td>High</td><td>8/30/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/23/2021 3:58:39 PM</td><td> </td><td>9/5/2022 9:49:47
AM</td><td>&nbsp;</td><td>MS.13.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>18391</td><td>External South Fence</td><td>South
Fence</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Sliding gate installation is incomplete with
all required wiring </td><td>High</td><td>6/13/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>6/6/2021 3:32:24 PM</td><td> </td><td>9/5/2022 9:41:49
AM</td><td>&nbsp;</td><td>External South Fence</td><td>&nbsp;</td>
</tr><tr>
<td>22036</td><td>FIRE CONTROL ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>Fire Alarm</td><td>Asset
number missing</td><td>&#39;Work not ready </td><td>High</td><td>8/30/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/23/2021 3:57:23 PM</td><td>
</td><td>9/5/2022 9:38:59
AM</td><td>&nbsp;</td><td>MB.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27619</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-ELV</td><td>Security</
td><td>General Snag</td><td>&#39;Incomplete work </td><td>High</td><td>3/16/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:53:21 PM</td><td>
</td><td>9/5/2022 9:18:29
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>26990</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;RJ45 patching needs to be done from the data
outlet to easy check panels and data port activation needs to be
done</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:01:17 PM</td><td> </td><td>9/5/2022 9:10:30
AM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>27899</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Patching is
missing</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>3/12/2022 11:52:50 AM</td><td> </td><td>9/5/2022 9:09:12
AM</td><td>&nbsp;</td><td>MS.14.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>27783</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing secure data activation and
patching</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:33:44 PM</td><td> </td><td>9/5/2022 9:08:52
AM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>19933</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing access control device and label ,
missing ICT labels , missing cctv final label</td><td>High</td><td>8/5/2021
12:00:00 AM</td><td>Mohamed Samir</td><td>7/29/2021 11:44:54 AM</td><td>
</td><td>9/5/2022 9:07:45
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28204</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;incomplete
work</td><td>High</td><td>3/24/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/17/2022 11:36:07 AM</td><td> </td><td>9/5/2022 9:07:06
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29074</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Missing two way valve actuator.
</td><td>High</td><td>5/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/18/2022 11:56:33 AM</td><td> </td><td>9/5/2022 8:15:07
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>28677</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to specification/drawing</td><td>&#39;Hydronic
control valve actuator not installed. </td><td>High</td><td>5/17/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:41:46 PM</td><td>
</td><td>9/5/2022 8:14:07
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28341</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Differential pressure feed to be
connected. </td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:13 AM</td><td> </td><td>9/5/2022 8:09:36
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28526</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Ductwork</
td><td>Access door missing</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>5/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:20 AM</td><td> </td><td>9/5/2022 8:08:30
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>20192</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Walls painting not finished
</td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/3/2021
3:38:53 PM</td><td> </td><td>9/4/2022 4:06:24
PM</td><td>&nbsp;</td><td>MS.13.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>20191</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum wall need repair
</td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/3/2021
3:38:51 PM</td><td> </td><td>9/4/2022 4:04:09
PM</td><td>&nbsp;</td><td>MS.13.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>9593</td><td>WET DELIVERY TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wall need cleaning and touch up </td><td>Low</td><td>8/10/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020 1:47:38 PM</td><td>
</td><td>9/4/2022 4:01:25
PM</td><td>&nbsp;</td><td>MQ.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>30850</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy gypsum wall should be
adjusted.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:16 AM</td><td> </td><td>9/4/2022 2:34:54
PM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30447</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to touch
up.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:45 AM</td><td> </td><td>9/4/2022 2:31:16
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>17046</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Edges are not aligned
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:44 PM</td><td> </td><td>9/4/2022 2:05:04
PM</td><td>&nbsp;</td><td>ME.12.01.008</td><td>&nbsp;</td>
</tr><tr>
<td>29761</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/1/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
3:14:12 PM</td><td> </td><td>9/4/2022 1:58:34
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>20092</td><td>LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Crack should be repaired
</td><td>Low</td><td>8/23/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:26 PM</td><td> </td><td>9/4/2022 1:58:08
PM</td><td>&nbsp;</td><td>ME.12.01.011</td><td>&nbsp;</td>
</tr><tr>
<td>17045</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls painting need touchup
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:42 PM</td><td> </td><td>9/4/2022 1:56:55
PM</td><td>&nbsp;</td><td>ME.12.01.008</td><td>&nbsp;</td>
</tr><tr>
<td>17060</td><td>LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls painting need touchup painting
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:35:26 PM</td><td> </td><td>9/4/2022 1:55:59
PM</td><td>&nbsp;</td><td>ME.12.01.011</td><td>&nbsp;</td>
</tr><tr>
<td>30423</td><td>LOBBY</td><td>MU L20</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Floor should be finished well.</td><td>Low</td><td>6/21/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022 11:41:03 AM</td><td>
</td><td>9/4/2022 1:55:17
PM</td><td>&nbsp;</td><td>MQ.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30158</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked joint should be aligned </td><td>Low</td><td>6/20/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022 11:38:06 AM</td><td>
</td><td>9/4/2022 1:54:42
PM</td><td>&nbsp;</td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30528</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Doors</
td><td>General Snag</td><td>&#39;Door should be closed properly
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:30 AM</td><td> </td><td>9/4/2022 1:53:54
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30527</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Doors</
td><td>General Snag</td><td>&#39;Door should be closed properly
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:28 AM</td><td> </td><td>9/4/2022 1:53:25
PM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>29584</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes should be
closed.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:37:42 AM</td><td> </td><td>9/4/2022 1:52:37
PM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27710</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall Painting</td><td>General
Snag</td><td>&#39;Wall painting need to touch up </td><td>Low</td><td>3/31/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022 11:07:35 AM</td><td>
</td><td>9/4/2022 1:52:10
PM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>27702</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 3:36:23 PM</td><td> </td><td>9/4/2022 1:51:44
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27692</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail welding joint should be
finished.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 3:36:02 PM</td><td> </td><td>9/4/2022 1:50:23
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27678</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail welding joint should be
finished.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 3:35:31 PM</td><td> </td><td>9/4/2022 1:49:57
PM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>27555</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:09 AM</td><td> </td><td>9/4/2022 1:49:28
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>21463</td><td>Glazing Wall Internal Side</td><td>Glazing
wall</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steelwork</td><td>General Snag</td><td>&#39;Steel
structure need cleaning and touch up </td><td>Low</td><td>9/8/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>8/18/2021 11:43:53 AM</td><td> </td><td>9/4/2022
1:46:16 PM</td><td>&nbsp;</td><td>Glazing Wall Internal Side</td><td>&nbsp;</td>
</tr><tr>
<td>21456</td><td>Glazing Wall Internal Side</td><td>Glazing
wall</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steelwork</td><td>General Snag</td><td>&#39;Steel
should be repainted </td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/18/2021 11:43:46 AM</td><td> </td><td>9/4/2022 1:45:48
PM</td><td>&nbsp;</td><td>Glazing Wall Internal Side</td><td>&nbsp;</td>
</tr><tr>

<td>24216</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>Fire Alarm</td><td>General Snag</td><td>&#39;Missing work
( fire cables not terminated yet)</td><td>High</td><td>11/2/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>10/26/2021 3:35:18 PM</td><td> </td><td>9/4/2022
10:15:15 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21510</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Pass o Matt not installed and cat6a cables patching not done up
to the devices </td><td>High</td><td>8/25/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/18/2021 3:15:11 PM</td><td> </td><td>9/4/2022 10:11:18
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28257</td><td>Parking Level-P4</td><td>Parking
Levels</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Loop detector data cable and power not
pulled yet</td><td>High</td><td>3/29/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/22/2022 2:42:55 PM</td><td> </td><td>9/4/2022 9:47:42
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32429</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:14 PM</td><td>
</td><td>9/4/2022 8:48:00
AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32591</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover and
label</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:34:51 AM</td><td> </td><td>9/4/2022 8:44:33
AM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29543</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Floor boxes are missing
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>sally.george</td><td>5/25/2022
9:55:48 AM</td><td> </td><td>9/1/2022 1:09:36
PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30576</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need repair and touch up painting
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:47:01 AM</td><td> </td><td>9/1/2022 12:25:58
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30568</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need repair and touch up painting
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:48 AM</td><td> </td><td>9/1/2022 12:25:04
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>18282</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Defective facia and missing screws
</td><td>Low</td><td>6/22/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/1/2021
4:10:32 PM</td><td> </td><td>9/1/2022 11:08:53 AM</td><td>Done
</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18288</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Gap between Stainless steel frame not
consistent </td><td>Low</td><td>6/22/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/1/2021 4:10:43 PM</td><td> </td><td>9/1/2022
11:08:49 AM</td><td>Done </td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18298</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Air gap should be aligned
</td><td>Low</td><td>6/22/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/1/2021
4:10:58 PM</td><td> </td><td>9/1/2022 11:08:47 AM</td><td>Done
</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31581</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted
properly.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 3:37:14 PM</td><td> </td><td>9/1/2022 11:08:45
AM</td><td>Done </td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>27472</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Windows</
td><td>General Snag</td><td>&#39;Damaged glass panel </td><td>Low</td><td>3/28/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022 4:41:06 PM</td><td>
</td><td>9/1/2022 10:58:34
AM</td><td>&nbsp;</td><td>MA.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27458</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Windows</
td><td>General Snag</td><td>&#39;Glass panel is missing
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022
4:40:44 PM</td><td> </td><td>9/1/2022 10:57:56
AM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30499</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing sealant around door frame.</td><td>Low</td><td>6/21/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022 11:43:11 AM</td><td>
</td><td>9/1/2022 10:56:03
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30574</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant is missing (surrounded
area)</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:46:57 AM</td><td> </td><td>9/1/2022 10:55:11
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>27913</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unused electrical boxes need to
close.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:14 AM</td><td> </td><td>9/1/2022 10:53:09
AM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27580</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
Sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:34:08 AM</td><td> </td><td>9/1/2022 10:52:34
AM</td><td>&nbsp;</td><td>MS.19.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>27281</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to
repair.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/7/2022 12:05:33 PM</td><td> </td><td>9/1/2022 10:51:59
AM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27278</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to finish
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/7/2022
12:05:28 PM</td><td> </td><td>9/1/2022 10:51:21
AM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27277</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/7/2022 12:05:26 PM</td><td> </td><td>9/1/2022 10:50:36
AM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27260</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Support not
vertical.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/7/2022 12:04:58 PM</td><td> </td><td>9/1/2022 10:50:05
AM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29781</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
3:14:47 PM</td><td> </td><td>9/1/2022 10:49:24
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29775</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
3:14:39 PM</td><td> </td><td>9/1/2022 10:48:57
AM</td><td>&nbsp;</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29373</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting should be
finished.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:43 PM</td><td> </td><td>9/1/2022 10:47:41
AM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29352</td><td>EMERGENCY LIGHTING</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cracked should be
repair.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:11 PM</td><td> </td><td>9/1/2022 10:45:25
AM</td><td>&nbsp;</td><td>MS.18.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>29350</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Frame painting need to
finish.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:07 PM</td><td> </td><td>9/1/2022 10:44:28
AM</td><td>&nbsp;</td><td>MS.18.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>18033</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Doors
inspection after removing the protection cover</td><td>Low</td><td>6/15/2021
12:00:00 PM</td><td>mohamed.sami</td><td>5/25/2021 12:38:25 PM</td><td>
</td><td>9/1/2022 10:06:30 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18196</td><td>AHU - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Civil</td><td>Boundary
Walls</td><td>Alignment/Plumbness</td><td>&#39;The sealant around Ff
pipe</td><td>High</td><td>6/3/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>5/27/2021 12:07:33 PM</td><td> </td><td>9/1/2022 10:06:29
AM</td><td>&nbsp;</td><td>MS.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18315</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Flooring -
Rubber flooring</td><td>General</td><td>&#39;Floor inspection after removing the
protection cover </td><td>Low</td><td>6/9/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/2/2021 11:40:00 AM</td><td> </td><td>9/1/2022
10:06:26 AM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19710</td><td>NAPPY CHANGE ROOM- Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>Damaged</td><td>&#39;Damaged two tiles
</td><td>Low</td><td>7/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>7/7/2021
1:30:00 PM</td><td> </td><td>9/1/2022 10:06:24
AM</td><td>&nbsp;</td><td>MS.12.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>21551</td><td>CORE B3 - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 9:51:55 AM</td><td> </td><td>9/1/2022 10:06:22
AM</td><td>&nbsp;</td><td>MC.12.02.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21552</td><td>CORE B3 - Band B</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Inspection after removing protection
cover </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 9:51:56 AM</td><td> </td><td>9/1/2022 10:06:19
AM</td><td>&nbsp;</td><td>MC.12.02.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21553</td><td>CORE B3 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Adjustment and repair for painting
around metal door frame </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 9:51:57 AM</td><td> </td><td>9/1/2022 10:06:15
AM</td><td>&nbsp;</td><td>MC.12.02.B31</td><td>&nbsp;</td>
</tr><tr>
<td>32697</td><td>B.O.H-CORE A2 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Based on PMC visit on 7–8-22 ,repair is
needed for defective parts marked on the photos </td><td>Low</td><td>8/28/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>8/7/2022 1:03:48 PM</td><td>
</td><td>9/1/2022 10:04:26 AM</td><td>Done
</td><td>MC.18.02.A21</td><td>&nbsp;</td>
</tr><tr>
<td>18284</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>Missing</td><td>&#39;Missing panel</td><td>Low</td><td>6/22/2021
12:00:00 AM</td><td>mohamed.sami</td><td>6/1/2021 4:10:35 PM</td><td>
</td><td>9/1/2022 9:54:25
AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18286</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Stainless steel cover should be aligned
</td><td>Low</td><td>6/22/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/1/2021
4:10:38 PM</td><td> </td><td>9/1/2022 9:54:24
AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>32676</td><td>BREAKOUT AREA - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Based on PMC visit on 2-8-22 the marked
panels should be leveled and uniform </td><td>Low</td><td>8/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>8/2/2022 1:42:47 PM</td><td> </td><td>9/1/2022
9:54:19 AM</td><td>&nbsp;</td><td>ME.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>32677</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Based on PMC visit on2-8-22,the marked
tiles should be cleaned </td><td>Low</td><td>8/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/2/2022 1:42:48 PM</td><td> </td><td>9/1/2022 9:54:18
AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>32678</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Based on PMC visit on2-8-22,the marked
edges should be aligned and uniform </td><td>Low</td><td>8/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>8/2/2022 2:03:15 PM</td><td> </td><td>9/1/2022
9:54:17 AM</td><td>&nbsp;</td><td>ME.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>32690</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Based on PMC visit on2-8-22 ,all access
doors edges should be adjusted </td><td>Low</td><td>8/24/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>8/3/2022 2:43:57 PM</td><td> </td><td>9/1/2022
9:54:15 AM</td><td>&nbsp;</td><td>MW.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>32691</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Based on
PMC visit on2-8-22 damaged handle should be repaired/replaced
</td><td>Low</td><td>8/24/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/3/2022
2:43:59 PM</td><td> </td><td>9/1/2022 9:53:58
AM</td><td>&nbsp;</td><td>MW.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18291</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Flooring -
Rubber flooring</td><td>General</td><td>&#39;Floor inspection after removing the
protection cover </td><td>Low</td><td>6/8/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/1/2021 4:10:47 PM</td><td> </td><td>9/1/2022
7:39:55 AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18468</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Carpet
Floor</td><td>General Snag</td><td>&#39;Floor inspection after remove protection
cover </td><td>Low</td><td>6/28/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/7/2021 4:09:34 PM</td><td> </td><td>9/1/2022
7:37:37 AM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18086</td><td>CORRIDOR- Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Interface between walls and floors at both sides should be
regular </td><td>Low</td><td>6/15/2021 12:00:00
PM</td><td>mohamed.sami</td><td>5/25/2021 12:39:47 PM</td><td> </td><td>9/1/2022
7:36:43 AM</td><td>&nbsp;</td><td>MS.12.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>19709</td><td>NAPPY CHANGE ROOM- Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>Grout</td><td>&#39;Grouting need to touch up
</td><td>Low</td><td>7/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>7/7/2021
1:29:58 PM</td><td> </td><td>9/1/2022 7:35:28
AM</td><td>&nbsp;</td><td>MS.12.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18065</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;Corners
and reveals should be cut/trim and adjusted properly </td><td>Low</td><td>6/15/2021
12:00:00 PM</td><td>mohamed.sami</td><td>5/25/2021 12:39:15 PM</td><td>
</td><td>9/1/2022 7:35:11 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32385</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label </td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:29:09 PM</td><td>
</td><td>9/1/2022 7:21:25
AM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32428</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:12 PM</td><td>
</td><td>9/1/2022 7:19:44
AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32389</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be protected
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:15 PM</td><td> </td><td>9/1/2022 7:18:54
AM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32205</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover and flexible
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:48:46 AM</td><td> </td><td>9/1/2022 7:18:30
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32590</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/18/2022 11:34:49 AM</td><td>
</td><td>9/1/2022 7:16:43
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32439</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Faceplate </td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:30 PM</td><td>
</td><td>9/1/2022 7:16:19
AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32421</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:02 PM</td><td>
</td><td>9/1/2022 7:15:58
AM</td><td>&nbsp;</td><td>MS.19.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29209</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Pipes fixed in a very
bad way. </td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:40 AM</td><td> </td><td>8/31/2022 12:46:14
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29753</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Hardware accessories need to clean </td><td>Low</td><td>6/15/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022 3:13:50 PM</td><td>
</td><td>8/31/2022 12:17:49
PM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>29744</td><td>ELEC.</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need to balance and closed properly </td><td>Low</td><td>6/1/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:13:31 PM</td><td> </td><td>8/31/2022
12:16:29 PM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28380</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire sealant for trunk penetration.
</td><td>High</td><td>5/4/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/27/2022 11:44:33 AM</td><td> </td><td>8/31/2022 12:16:05
PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>27736</td><td>IT 7</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall Painting</td><td>General
Snag</td><td>&#39;Wall painting need to touch up </td><td>Low</td><td>3/31/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022 11:08:17 AM</td><td>
</td><td>8/31/2022 12:15:29
PM</td><td>&nbsp;</td><td>MS.14.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27716</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>3/31/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022
11:07:46 AM</td><td> </td><td>8/31/2022 12:14:48
PM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27268</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/7/2022 12:05:13 PM</td><td> </td><td>8/31/2022 12:14:16
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29905</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door accessories need to clean </td><td>Low</td><td>6/16/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/26/2022 10:18:43 AM</td><td>
</td><td>8/31/2022 12:13:48
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27921</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Unused electrical boxes need to
close.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:28 AM</td><td> </td><td>8/31/2022 12:13:13
PM</td><td>&nbsp;</td><td>MS.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27918</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire sealant need to
repair.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:22 AM</td><td> </td><td>8/31/2022 12:10:53
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27915</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing grouting for ceramic
tiles.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:17 AM</td><td> </td><td>8/31/2022 12:09:43
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27914</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceramic tile flooring and walls need to
cleaning.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:16 AM</td><td> </td><td>8/31/2022 12:09:10
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27912</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls and ceiling need to touch
up.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/13/2022
11:48:13 AM</td><td> </td><td>8/31/2022 12:08:28
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29862</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All accessories should be cleaned </td><td>Low</td><td>6/1/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022 4:22:24 PM</td><td>
</td><td>8/31/2022 12:07:40
PM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>29858</td><td>ELEC ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All accessories should be cleaned </td><td>Low</td><td>6/1/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022 4:22:16 PM</td><td>
</td><td>8/31/2022 12:07:13
PM</td><td>&nbsp;</td><td>MS.19.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>29769</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
3:14:29 PM</td><td> </td><td>8/31/2022 12:06:47
PM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>29746</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Hardware accessories need to clean </td><td>Low</td><td>6/1/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022 3:13:35 PM</td><td>
</td><td>8/31/2022 12:06:07
PM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>29734</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Hardware accessories need to clean </td><td>Low</td><td>6/1/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022 3:13:07 PM</td><td>
</td><td>8/31/2022 12:05:36
PM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29680</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All accessories should be cleaned </td><td>Low</td><td>6/15/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022 12:05:55 PM</td><td>
</td><td>8/31/2022 12:04:41
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29662</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
12:05:26 PM</td><td> </td><td>8/31/2022 12:04:13
PM</td><td>&nbsp;</td><td>MS.19.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>28519</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire stopping for PPR pipes
penetration. </td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:59 PM</td><td> </td><td>8/31/2022 12:03:46
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28514</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Pipe penetration need to be closed by
suitable fire stopping material. </td><td>High</td><td>5/15/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/8/2022 4:15:52 PM</td><td>
</td><td>8/31/2022 12:03:18
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27572</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy need to
repair.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:49 AM</td><td> </td><td>8/31/2022 12:02:51
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27554</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:08 AM</td><td> </td><td>8/31/2022 12:02:19
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27552</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall need to repair and touch
up.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/9/2022
11:33:04 AM</td><td> </td><td>8/31/2022 12:01:42
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27303</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy paint need to repair
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/7/2022
12:06:10 PM</td><td> </td><td>8/31/2022 12:01:13
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27298</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy paint need to
repair.</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/7/2022 12:06:03 PM</td><td> </td><td>8/31/2022 12:00:40
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27297</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Marked part need to
repair.</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/7/2022 12:06:01 PM</td><td> </td><td>8/31/2022 12:00:13
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27282</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Marked part need to repair
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/7/2022
12:05:35 PM</td><td> </td><td>8/31/2022 11:56:23
AM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27280</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceramic floor and wall need to
clean.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/7/2022 12:05:32 PM</td><td> </td><td>8/31/2022 11:54:47
AM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29835</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories should be
cleaned.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:17:04 PM</td><td> </td><td>8/31/2022 11:53:42
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27733</td><td>IT 7</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
frame corners need to adjusted</td><td>Low</td><td>3/31/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>3/10/2022 11:08:11 AM</td><td> </td><td>8/31/2022
11:53:05 AM</td><td>&nbsp;</td><td>MS.14.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27723</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
frame connection should be adjusted </td><td>Low</td><td>3/31/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>3/10/2022 11:07:56 AM</td><td> </td><td>8/31/2022
11:52:20 AM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27704</td><td>GEM CAVE EXP.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall need to
repair.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 3:36:25 PM</td><td> </td><td>8/31/2022 11:51:27
AM</td><td>&nbsp;</td><td>MP.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27703</td><td>GEM CAVE EXP.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 3:36:24 PM</td><td> </td><td>8/31/2022 11:49:26
AM</td><td>&nbsp;</td><td>MP.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27696</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 3:36:09 PM</td><td> </td><td>8/31/2022 11:48:55
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27694</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 3:36:06 PM</td><td> </td><td>8/31/2022 11:48:24
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27693</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 3:36:04 PM</td><td> </td><td>8/31/2022 11:47:57
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27690</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy flooring need to
repair.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 3:35:57 PM</td><td> </td><td>8/31/2022 11:47:26
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>12129</td><td>AHU - Band B- B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Missing hoses and actuators for
Inergen system </td><td>High</td><td>10/11/2020 12:00:00
AM</td><td>ahmedsalem</td><td>10/4/2020 1:07:18 PM</td><td> </td><td>8/31/2022
11:20:53 AM</td><td>&nbsp;</td><td>MS.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>13837</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Pipe insulation is damaged and incomplete
</td><td>High</td><td>12/8/2020 12:00:00 PM</td><td>ahmedsalem</td><td>12/1/2020
12:20:44 PM</td><td> </td><td>8/31/2022 11:20:52
AM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>16809</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Finishing of lifts</td><td>High</td><td>3/17/2021
12:00:00 AM</td><td>ahmedsalem</td><td>3/10/2021 11:35:27 AM</td><td>
</td><td>8/31/2022 11:20:51
AM</td><td>&nbsp;</td><td>ME.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20044</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil need cleaning &amp; fins need adjustment
</td><td>High</td><td>8/5/2021 12:00:00 AM</td><td>ahmedsalem</td><td>7/29/2021
3:00:39 PM</td><td> </td><td>8/31/2022 11:20:50
AM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>20047</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;The door is clashing with pressure
gauge</td><td>High</td><td>8/5/2021 12:00:00
PM</td><td>ahmedsalem</td><td>7/29/2021 3:00:43 PM</td><td> </td><td>8/31/2022
11:20:49 AM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>20053</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Cleaning for AHU</td><td>High</td><td>8/5/2021 12:00:00
PM</td><td>ahmedsalem</td><td>7/29/2021 3:00:53 PM</td><td> </td><td>8/31/2022
11:20:48 AM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>28281</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Differential pressure sensor need to be
connected. </td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:47:25 AM</td><td> </td><td>8/31/2022 11:20:47
AM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28396</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Motorized dampers actuators not
installed and damaged. </td><td>High</td><td>5/4/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/27/2022 11:45:03 AM</td><td> </td><td>8/31/2022 11:20:46
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>28444</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Ductwork</
td><td>Access door missing</td><td>&#39;Dampers actuators have some missing parts.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:05:33 PM</td><td> </td><td>8/31/2022 11:20:45
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28447</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Ductwork</
td><td>Access door missing</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:05:51 PM</td><td> </td><td>8/31/2022 11:20:45
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28474</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Ductwork</
td><td>Access door missing</td><td>&#39;Damper actuators have some missing parts.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:43 PM</td><td> </td><td>8/31/2022 11:20:44
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28500</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Motorized damper actuator has missing
parts. </td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:26 PM</td><td> </td><td>8/31/2022 11:20:43
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28527</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Ductwork</
td><td>Access door missing</td><td>&#39;Dampers actuators have some missing parts.
</td><td>High</td><td>5/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:21 AM</td><td> </td><td>8/31/2022 11:20:42
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28540</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Ductwork</
td><td>Access door missing</td><td>&#39;Dampers actuators have some missing parts.
</td><td>High</td><td>5/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:46 AM</td><td> </td><td>8/31/2022 11:20:41
AM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>28689</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Motorized air dampers actuators have
some missing parts. </td><td>High</td><td>5/17/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:47:36 PM</td><td> </td><td>8/31/2022 11:20:40
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28772</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Actuator for motorized dampers have
some missing parts. </td><td>High</td><td>5/19/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/12/2022 11:48:02 AM</td><td> </td><td>8/31/2022 11:20:37
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28953</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dampers actuators have missing parts and
some of the are not connected. </td><td>High</td><td>5/24/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:32:08 PM</td><td>
</td><td>8/31/2022 11:20:36
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28954</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:11 PM</td><td> </td><td>8/31/2022 11:20:35
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28979</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Dampers actuators have some missing
parts. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:33:05 PM</td><td> </td><td>8/31/2022 11:20:30
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29020</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dampers actuators have some missing parts.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:42 PM</td><td> </td><td>8/31/2022 11:20:29
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29038</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Damper actuators have some missing
parts. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:34 PM</td><td> </td><td>8/31/2022 11:20:29
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29039</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Dampers actuators not installed.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:35 PM</td><td> </td><td>8/31/2022 11:20:28
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29092</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Motorized damper actuators have some
missing parts. </td><td>High</td><td>5/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:52 AM</td><td> </td><td>8/31/2022 11:20:25
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29148</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Motorized dampers actuators has some
missing parts. </td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:11 AM</td><td> </td><td>8/31/2022 11:20:24
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29154</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:22 AM</td><td> </td><td>8/31/2022 11:20:23
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29208</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Pipes shall be aligned.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:38 AM</td><td> </td><td>8/31/2022 11:20:22
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29262</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Motorized dampers actuators have some
missing parts. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:33 PM</td><td> </td><td>8/31/2022 11:20:20
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>31726</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil fins shall be cleaned and adjusted.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:54:58 AM</td><td> </td><td>8/31/2022 11:20:16
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31840</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil fins need cleaning and adjustments.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:33:33 PM</td><td> </td><td>8/31/2022 11:20:13
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>28407</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;INERGEN Clean agent works not finished
yet. </td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:05 PM</td><td> </td><td>8/31/2022 8:57:26
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>28614</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall Painting</td><td>General
Snag</td><td>&#39;Wall painting need to touch up </td><td>Low</td><td>5/31/2022
12:00:00 PM</td><td>Kerolos Nagy Tawfik</td><td>5/10/2022 4:27:44 PM</td><td>
</td><td>8/30/2022 4:20:07 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>28615</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up </td><td>Low</td><td>5/31/2022 12:00:00
PM</td><td>Kerolos Nagy Tawfik</td><td>5/10/2022 4:27:46 PM</td><td>
</td><td>8/30/2022 4:20:06 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>28626</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing around metal door
</td><td>Low</td><td>5/31/2022 12:00:00 PM</td><td>sally.george</td><td>5/10/2022
4:28:17 PM</td><td> </td><td>8/30/2022 4:20:04 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28628</td><td>SHAFT</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>5/31/2022
12:00:00 PM</td><td>sally.george</td><td>5/10/2022 4:28:23 PM</td><td>
</td><td>8/30/2022 4:19:59 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28629</td><td>SHAFT</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>5/31/2022 12:00:00
PM</td><td>sally.george</td><td>5/10/2022 4:28:26 PM</td><td> </td><td>8/30/2022
4:19:56 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28630</td><td>SHAFT</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair is needed for marked
part</td><td>Low</td><td>5/31/2022 12:00:00
PM</td><td>sally.george</td><td>5/10/2022 4:28:29 PM</td><td> </td><td>8/30/2022
4:19:52 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28631</td><td>SHAFT</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Floor to be cleaned and repaint
</td><td>Low</td><td>5/31/2022 12:00:00 PM</td><td>sally.george</td><td>5/10/2022
4:28:31 PM</td><td> </td><td>8/30/2022 4:19:48 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28636</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>5/31/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>5/10/2022 4:28:51 PM</td><td> </td><td>8/30/2022 4:19:46
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>28637</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>5/31/2022
12:00:00 PM</td><td>sally.george</td><td>5/10/2022 4:28:51 PM</td><td>
</td><td>8/30/2022 4:19:45 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28638</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete flooring need to repair
</td><td>Low</td><td>5/31/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>5/10/2022 4:28:55 PM</td><td> </td><td>8/30/2022 4:19:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>29522</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>6/15/2022 12:00:00
PM</td><td>sally.george</td><td>5/25/2022 9:54:39 AM</td><td> </td><td>8/30/2022
4:19:42 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>29523</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>6/15/2022 12:00:00
PM</td><td>sally.george</td><td>5/25/2022 9:54:42 AM</td><td> </td><td>8/30/2022
4:19:41 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>29525</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing handrail and work is not
completed </td><td>Low</td><td>6/15/2022 12:00:00
PM</td><td>sally.george</td><td>5/25/2022 9:55:15 AM</td><td> </td><td>8/30/2022
4:19:39 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>29537</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Sealant is missing
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>sally.george</td><td>5/25/2022
9:55:36 AM</td><td> </td><td>8/30/2022 4:19:38 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>29539</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Marked part should be adjusted and leveled
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>sally.george</td><td>5/25/2022
9:55:40 AM</td><td> </td><td>8/30/2022 4:19:37 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MT.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29540</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wall need touch up painting </td><td>Low</td><td>6/15/2022
12:00:00 PM</td><td>sally.george</td><td>5/25/2022 9:55:42 AM</td><td>
</td><td>8/30/2022 4:19:34 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MT.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29542</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls should be repainted </td><td>Low</td><td>6/15/2022 12:00:00
PM</td><td>sally.george</td><td>5/25/2022 9:55:45 AM</td><td> </td><td>8/30/2022
4:19:32 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>29545</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door need touch up painting </td><td>Low</td><td>6/15/2022
12:00:00 PM</td><td>sally.george</td><td>5/25/2022 9:55:51 AM</td><td>
</td><td>8/30/2022 4:19:30 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29546</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>6/15/2022 12:00:00
PM</td><td>sally.george</td><td>5/25/2022 9:55:53 AM</td><td> </td><td>8/30/2022
4:19:28 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29505</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing Sealant around Mep fixtures
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:30:05 AM</td><td> </td><td>8/30/2022 4:08:05
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>24600</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Unequal gaps width between stair steps
</td><td>Low</td><td>11/20/2021 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>10/30/2021 4:17:56 PM</td><td> </td><td>8/30/2022 3:42:50
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>5475</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Missing Epoxy painting
</td><td>Low</td><td>10/10/2019 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/19/2019 3:20:18 PM</td><td> </td><td>8/30/2022 3:34:09
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>5485</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing sealant around MEP fixtures
</td><td>Low</td><td>10/10/2019 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/19/2019 3:20:36 PM</td><td> </td><td>8/30/2022 3:34:09
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>5489</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around MEP Fixtures
</td><td>Low</td><td>10/10/2019 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/19/2019 3:20:45 PM</td><td> </td><td>8/30/2022 3:34:09
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>5486</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories &amp; door leaf and frame need to touch up
</td><td>Low</td><td>10/10/2019 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/19/2019 3:20:39 PM</td><td> </td><td>8/30/2022 3:31:07
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>5487</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
sealant around metal door </td><td>Low</td><td>10/10/2019 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/19/2019 3:20:42 PM</td><td> </td><td>8/30/2022
3:31:07 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>5488</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Unused bolts &amp; holes to be repaired
</td><td>Low</td><td>10/10/2019 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/19/2019 3:20:43 PM</td><td> </td><td>8/30/2022 3:31:07
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>5490</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Painting need to touch up </td><td>Low</td><td>10/10/2019
12:00:00 AM</td><td>Michael Mahfouz</td><td>9/19/2019 3:20:47 PM</td><td>
</td><td>8/30/2022 3:31:07 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>10444</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Remove scaffolding and storage material
</td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:11:29 PM</td><td> </td><td>8/30/2022 3:31:07
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>10449</td><td>CORE E1</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Fittings</
td><td>General Snag</td><td>&#39;Missing fittings </td><td>Low</td><td>10/3/2020
12:00:00 AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:11:41 PM</td><td>
</td><td>8/30/2022 3:31:07 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MC.24.2A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>10451</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:11:46 PM</td><td> </td><td>8/30/2022
3:31:07 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>10456</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around MEP Fixtures
</td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:11:59 PM</td><td> </td><td>8/30/2022 3:31:07
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>10458</td><td>ELEC.</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:12:04 PM</td><td> </td><td>8/30/2022
3:31:07 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>10459</td><td>SHAFT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:12:06 PM</td><td> </td><td>8/30/2022
3:31:07 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>10462</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:12:15 PM</td><td> </td><td>8/30/2022
3:31:07 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>10465</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting need to touch up
</td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:12:24 PM</td><td> </td><td>8/30/2022 3:31:07
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>10467</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:12:29 PM</td><td> </td><td>8/30/2022
3:31:07 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>11012</td><td>MALE PRAYER ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;Gab
to be closed </td><td>Low</td><td>10/6/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/15/2020 3:59:10 PM</td><td> </td><td>8/30/2022 3:31:07
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MG.13.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>10473</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Damaged block work/ missing sealant around Mep Fixtures
</td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:12:47 PM</td><td> </td><td>8/30/2022 3:29:48
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>10474</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Missing gypsum ceiling/ work not finished
yet </td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:12:50 PM</td><td> </td><td>8/30/2022 3:29:48
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>10477</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Fixed accessories</td><td>General</td><td>&#39;Missing bathroom fixed accessories
</td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:12:57 PM</td><td> </td><td>8/30/2022 3:29:47
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>10478</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>Dr Greish - High Custom Craft Company.
HCC</td><td>Architectural</td><td>Mirrors</td><td>General Snag</td><td>&#39;Missing
Mirror </td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:12:59 PM</td><td> </td><td>8/30/2022 3:29:47
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>10487</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around Mep Fixtures
</td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:13:20 PM</td><td> </td><td>8/30/2022 3:29:47
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.18.2A.020</td><td>&nbsp;</td>
</tr><tr>
<td>10495</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Remove scaffolding and storage
material/ epoxy painting need to touch up / concrete floor need repair
</td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:13:40 PM</td><td> </td><td>8/30/2022 3:29:47
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>10505</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Fittings</
td><td>General Snag</td><td>&#39;Missing fittings </td><td>Low</td><td>10/3/2020
12:00:00 AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:14:04 PM</td><td>
</td><td>8/30/2022 3:29:47 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>10554</td><td>LOBBY</td><td>MU L25</td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39;Missing false ceiling </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 2:11:12 PM</td><td> </td><td>8/30/2022
3:29:47 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13604</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up </td><td>Low</td><td>12/14/2020 12:00:00
AM</td><td>Kerolos Nagy Tawfik</td><td>11/23/2020 3:44:52 PM</td><td>
</td><td>8/30/2022 3:29:47 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>13608</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>Stain/scratch/dent on floor</td><td>&#39;Epoxy paint floor need
cleaning and touch up </td><td>Low</td><td>12/14/2020 12:00:00 AM</td><td>Kerolos
Nagy Tawfik</td><td>11/23/2020 3:45:15 PM</td><td> </td><td>8/30/2022 3:29:47
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>15615</td><td>FIRST AID 2</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Linoleum flooring ( flooring tile should be
adhesive - relation between stone and linoleum should be flushed
)</td><td>Low</td><td>2/22/2021 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/1/2021 11:30:53 AM</td><td> </td><td>8/30/2022 3:29:47
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MG.12.0G.007</td><td>&nbsp;</td>
</tr><tr>
<td>28624</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories and hardware </td><td>Low</td><td>5/31/2022 12:00:00
AM</td><td>sally.george</td><td>5/10/2022 4:28:10 PM</td><td> </td><td>8/30/2022
3:29:47 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28627</td><td>SHAFT</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Bolts should be removed and repaired
</td><td>Low</td><td>5/31/2022 12:00:00 AM</td><td>sally.george</td><td>5/10/2022
4:28:20 PM</td><td> </td><td>8/30/2022 3:29:47 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28632</td><td>SHAFT</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Bolts to be removed and repaired </td><td>Low</td><td>5/31/2022
12:00:00 AM</td><td>sally.george</td><td>5/10/2022 4:28:37 PM</td><td>
</td><td>8/30/2022 3:27:44 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28633</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>5/31/2022
12:00:00 AM</td><td>sally.george</td><td>5/10/2022 4:28:40 PM</td><td>
</td><td>8/30/2022 3:27:44 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28634</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint Floor</td><td>General
Snag</td><td>&#39;Floor to be cleaned and repaired if needed
</td><td>Low</td><td>5/31/2022 12:00:00 AM</td><td>sally.george</td><td>5/10/2022
4:28:44 PM</td><td> </td><td>8/30/2022 3:27:44 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28635</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Repair is needed for marked parts </td><td>Low</td><td>5/31/2022
12:00:00 AM</td><td>sally.george</td><td>5/10/2022 4:28:48 PM</td><td>
</td><td>8/30/2022 3:27:43 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28640</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to clean
and touch up </td><td>Low</td><td>5/31/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/10/2022 4:28:57 PM</td><td> </td><td>8/30/2022 3:27:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>28641</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be finished properly </td><td>Low</td><td>5/31/2022 12:00:00
AM</td><td>sally.george</td><td>5/10/2022 4:28:58 PM</td><td> </td><td>8/30/2022
3:27:43 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28644</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to touch up
and cleaning </td><td>Low</td><td>5/31/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/10/2022 4:29:01 PM</td><td> </td><td>8/30/2022 3:27:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>28646</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door accessories </td><td>Low</td><td>5/31/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/10/2022 4:29:02 PM</td><td> </td><td>8/30/2022 3:27:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28648</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>5/31/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/10/2022 4:29:04 PM</td><td> </td><td>8/30/2022 3:27:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>28649</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked text should be removed </td><td>Low</td><td>5/31/2022
12:00:00 AM</td><td>sally.george</td><td>5/10/2022 4:29:05 PM</td><td>
</td><td>8/30/2022 3:27:43 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>29448</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to touch up
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:29:07 AM</td><td> </td><td>8/30/2022 3:27:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29449</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail need to repaint
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:08 AM</td><td> </td><td>8/30/2022 3:27:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29450</td><td>ELEC.</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos
Nagy Tawfik</td><td>5/25/2022 9:29:10 AM</td><td> </td><td>8/30/2022 3:27:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>29451</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:11 AM</td><td> </td><td>8/30/2022 3:27:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29452</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:29:13 AM</td><td> </td><td>8/30/2022 3:27:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>29454</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around MEP fixtures
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:29:17 AM</td><td> </td><td>8/30/2022 3:27:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29455</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to
cleaning.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:18 AM</td><td> </td><td>8/30/2022 3:27:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>29456</td><td>SHAFT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos
Nagy Tawfik</td><td>5/25/2022 9:29:18 AM</td><td> </td><td>8/30/2022 3:27:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29457</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos
Nagy Tawfik</td><td>5/25/2022 9:29:21 AM</td><td> </td><td>8/30/2022 3:27:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29458</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to
cleaning.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:21 AM</td><td> </td><td>8/30/2022 3:27:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29459</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to
cleaning.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:22 AM</td><td> </td><td>8/30/2022 3:27:43
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>29460</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:24 AM</td><td> </td><td>8/30/2022 3:25:56
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>29461</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to repair
and touch up </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:29:25 AM</td><td> </td><td>8/30/2022 3:25:56
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29463</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame need to touch up
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:29:27 AM</td><td> </td><td>8/30/2022 3:25:56
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>29465</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around MEP fixtures
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:29:29 AM</td><td> </td><td>8/30/2022 3:25:56
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>29466</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to
cleaning.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:29 AM</td><td> </td><td>8/30/2022 3:25:56
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29467</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:31 AM</td><td> </td><td>8/30/2022 3:25:56
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29468</td><td>ELEC.</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos
Nagy Tawfik</td><td>5/25/2022 9:29:32 AM</td><td> </td><td>8/30/2022 3:25:56
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>29470</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing sealant around MEP fixtures
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:29:34 AM</td><td> </td><td>8/30/2022 3:25:56
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29472</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Steel ladder painting need to touch up
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:29:36 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29473</td><td>IT 7</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Door leaf and frame need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:36 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.14.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29474</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos
Nagy Tawfik</td><td>5/25/2022 9:29:37 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29475</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:38 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.14.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29476</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos
Nagy Tawfik</td><td>5/25/2022 9:29:39 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29478</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to repair
and touch up </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:29:41 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29479</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing accessories and
hardware.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:41 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29481</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around MEP fixtures
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:29:43 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>29484</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to
cleaning.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:46 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.14.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29485</td><td>ELEC.</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos
Nagy Tawfik</td><td>5/25/2022 9:29:46 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>29486</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
Hardware accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos
Nagy Tawfik</td><td>5/25/2022 9:29:47 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29487</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:48 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.14.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29488</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete flooring need to repair
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:29:50 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29489</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to
cleaning.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:50 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29491</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete flooring need to repair and touch
up </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:29:52 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29492</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to
cleaning.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:53 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29495</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing Sealant around MEP Duct</td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>Kerolos Nagy Tawfik</td><td>5/25/2022 9:29:56 AM</td><td>
</td><td>8/30/2022 3:25:55 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29497</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame need to touch up
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:29:58 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29498</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to clean and
repair.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:59 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29500</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:01 AM</td><td> </td><td>8/30/2022 3:25:55
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.18.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>10453</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:11:52 PM</td><td> </td><td>8/30/2022
3:24:20 PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>17109</td><td>ELEVATOR (B3)</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Marked edges should be repaired
</td><td>Low</td><td>4/8/2021 12:00:00 AM</td><td>sally.george</td><td>3/18/2021
11:41:30 AM</td><td> </td><td>8/30/2022 3:23:37 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the Engineer</td><td>ELEVATOR
(B3)</td><td>&nbsp;</td>
</tr><tr>

<td>24838</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing gravel need to installed.</td><td>Low</td><td>11/28/2021
12:00:00 AM</td><td>Moussa Nageh Khella</td><td>11/7/2021 4:15:16 PM</td><td>
</td><td>8/30/2022 3:23:37 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24844</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing gravel need to installed </td><td>Low</td><td>11/28/2021
12:00:00 AM</td><td>Moussa Nageh Khella</td><td>11/7/2021 4:15:27 PM</td><td>
</td><td>8/30/2022 3:23:37 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24855</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing gravel and Geo cell need to
installed.</td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/7/2021 4:15:48 PM</td><td> </td><td>8/30/2022 3:23:37
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26433</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Undulation/uneven surfaces</td><td>&#39;Toothing between stone
cladding tiles should be leveled </td><td>Low</td><td>3/16/2022 12:00:00
AM</td><td>Kerolos Nagy Tawfik</td><td>2/23/2022 4:31:03 PM</td><td>
</td><td>8/30/2022 3:23:37 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26436</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Damaged</td><td>&#39;Interface between stone cladding and louvre
not equal </td><td>Low</td><td>3/2/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:09 PM</td><td> </td><td>8/30/2022 3:23:37
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26446</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Grooves</td><td>&#39;Unequal joints should be same width
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:28 PM</td><td> </td><td>8/30/2022 3:23:37
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26448</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Damaged</td><td>&#39;Interface between stone cladding and louvre
not equal </td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:32 PM</td><td> </td><td>8/30/2022 3:23:37
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26451</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Grooves</td><td>&#39;Unequal joints should be the same width
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:39 PM</td><td> </td><td>8/30/2022 3:23:37
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26452</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Damaged</td><td>&#39;Stone cladding should be cutting aligned
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:40 PM</td><td> </td><td>8/30/2022 3:23:37
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>28566</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Access door need to
adjusted.</td><td>Low</td><td>5/30/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:51 PM</td><td> </td><td>8/30/2022 3:23:37
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>28567</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch up
</td><td>Low</td><td>5/30/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:52 PM</td><td> </td><td>8/30/2022 3:23:37
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>28568</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>5/30/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:54 PM</td><td> </td><td>8/30/2022 3:23:37
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>28569</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing lighting
fixtures.</td><td>Low</td><td>5/30/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:56 PM</td><td> </td><td>8/30/2022 3:23:37
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>28570</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to cleaning and touch
up.</td><td>Low</td><td>5/30/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:59 PM</td><td> </td><td>8/30/2022 3:23:37
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>28571</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch up
.</td><td>Low</td><td>5/30/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:20:01 PM</td><td> </td><td>8/30/2022 3:23:37
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MA.19.02.020</td><td>&nbsp;</td>
</tr><tr>
<td>28572</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to
cleaning.</td><td>Low</td><td>5/30/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:20:03 PM</td><td> </td><td>8/30/2022 3:23:37
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MA.19.02.020</td><td>&nbsp;</td>
</tr><tr>
<td>28581</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories and hardware </td><td>Low</td><td>5/30/2022 12:00:00
AM</td><td>sally.george</td><td>5/9/2022 4:21:09 PM</td><td> </td><td>8/30/2022
3:23:37 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28582</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories and hardware </td><td>Low</td><td>5/30/2022 12:00:00
AM</td><td>sally.george</td><td>5/9/2022 4:21:10 PM</td><td> </td><td>8/30/2022
3:23:36 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28595</td><td>STORE</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories and hardware </td><td>Low</td><td>5/30/2022 12:00:00
AM</td><td>sally.george</td><td>5/9/2022 4:21:37 PM</td><td> </td><td>8/30/2022
3:23:36 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MA.19.02.023</td><td>&nbsp;</td>
</tr><tr>
<td>28600</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories and hardware </td><td>Low</td><td>5/30/2022 12:00:00
AM</td><td>sally.george</td><td>5/9/2022 4:21:46 PM</td><td> </td><td>8/30/2022
3:23:36 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MA.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28601</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories and hardware </td><td>Low</td><td>5/30/2022 12:00:00
AM</td><td>sally.george</td><td>5/9/2022 4:21:47 PM</td><td> </td><td>8/30/2022
3:23:36 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MA.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28605</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Door
Hardware</td><td>General</td><td>&#39;Missing accessories and hardware
</td><td>Low</td><td>5/30/2022 12:00:00 AM</td><td>sally.george</td><td>5/9/2022
4:21:55 PM</td><td> </td><td>8/30/2022 3:23:36 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28613</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint Floor</td><td>General
Snag</td><td>&#39;Epoxy painting floor need to cleaning and touch up
</td><td>Low</td><td>5/31/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/10/2022 4:27:42 PM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>28616</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing door accessories and hardware
</td><td>Low</td><td>5/31/2022 12:00:00 AM</td><td>sally.george</td><td>5/10/2022
4:27:46 PM</td><td> </td><td>8/30/2022 3:23:36 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MA.19.02.024</td><td>&nbsp;</td>
</tr><tr>
<td>28617</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing door accessories and hardware
</td><td>Low</td><td>5/31/2022 12:00:00 AM</td><td>sally.george</td><td>5/10/2022
4:27:48 PM</td><td> </td><td>8/30/2022 3:23:36 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MA.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>28618</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>5/31/2022
12:00:00 AM</td><td>sally.george</td><td>5/10/2022 4:27:49 PM</td><td>
</td><td>8/30/2022 3:23:36 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MA.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>28620</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
Door accessories and hardware </td><td>Low</td><td>5/31/2022 12:00:00
AM</td><td>sally.george</td><td>5/10/2022 4:27:57 PM</td><td> </td><td>8/30/2022
3:23:36 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MA.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>29501</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to repair
and touch up </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:30:02 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29502</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:02 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.18.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29504</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:04 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.18.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29506</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to
cleaning.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:06 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.18.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29507</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing Sealant around Mep fixtures
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:30:07 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>29508</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:07 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>29509</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to
repair.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:09 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>29510</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need repair and
touch up </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:30:09 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29511</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:10 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>29512</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to
cleaning.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:13 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>29513</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:14 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29514</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to repair and touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:16 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29515</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to
cleaning.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:18 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29516</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to
repair.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:20 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29519</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to
cleaning.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:28 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29520</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:30 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29521</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to cleaning
.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:32 AM</td><td> </td><td>8/30/2022 3:23:36
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29526</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:55:16 AM</td><td> </td><td>8/30/2022
3:23:36 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>29527</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Plates should be fixed properly
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>sally.george</td><td>5/25/2022
9:55:17 AM</td><td> </td><td>8/30/2022 3:23:36 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>29531</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Cover is missing </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>sally.george</td><td>5/25/2022 9:55:24 AM</td><td>
</td><td>8/30/2022 3:23:36 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>29532</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>sally.george</td><td>5/25/2022 9:55:27 AM</td><td>
</td><td>8/30/2022 3:23:35 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>29533</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Covers are missing
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>sally.george</td><td>5/25/2022
9:55:28 AM</td><td> </td><td>8/30/2022 3:23:35 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>29534</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked part should be repaired and adjusted
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>sally.george</td><td>5/25/2022
9:55:30 AM</td><td> </td><td>8/30/2022 3:23:35 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>29535</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door need touch up painting </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>sally.george</td><td>5/25/2022 9:55:32 AM</td><td>
</td><td>8/30/2022 3:23:35 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>29536</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing for marked parts
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>sally.george</td><td>5/25/2022
9:55:34 AM</td><td> </td><td>8/30/2022 3:23:35 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>29538</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:55:38 AM</td><td> </td><td>8/30/2022
3:19:35 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MT.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29541</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Signage</td><td>Not
Installed/Completed</td><td>&#39;Signage is missing </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>sally.george</td><td>5/25/2022 9:55:43 AM</td><td>
</td><td>8/30/2022 3:19:34 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>29547</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant is missing for marked
parts</td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:55:55 AM</td><td> </td><td>8/30/2022
3:19:34 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MS.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>29548</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:55:56 AM</td><td> </td><td>8/30/2022
3:19:34 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MS.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>29549</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Covers are missing </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>sally.george</td><td>5/25/2022 9:55:58 AM</td><td>
</td><td>8/30/2022 3:19:34 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MS.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>29552</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:58:05 AM</td><td> </td><td>8/30/2022
3:19:34 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MA.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>29553</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Flooring
hinges should be fixed properly </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:58:07 AM</td><td> </td><td>8/30/2022
3:19:34 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>29554</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:58:09 AM</td><td> </td><td>8/30/2022
3:19:34 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>29555</td><td>STORE</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:58:11 AM</td><td> </td><td>8/30/2022
3:19:34 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MA.19.02.026</td><td>&nbsp;</td>
</tr><tr>
<td>29557</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:58:15 AM</td><td> </td><td>8/30/2022
3:19:34 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MA.19.02.017</td><td>&nbsp;</td>
</tr><tr>
<td>29560</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing around metal door
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>sally.george</td><td>5/25/2022
9:58:22 AM</td><td> </td><td>8/30/2022 3:19:34 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29564</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:58:28 AM</td><td> </td><td>8/30/2022
3:19:34 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MA.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>29568</td><td>STORE</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:58:34 AM</td><td> </td><td>8/30/2022
3:19:34 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MA.19.02.025</td><td>&nbsp;</td>
</tr><tr>
<td>29569</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door accessories </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:58:36 AM</td><td> </td><td>8/30/2022
3:19:34 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MA.19.02.015</td><td>&nbsp;</td>
</tr><tr>
<td>29571</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant should be adjusted </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>sally.george</td><td>5/25/2022 9:58:39 AM</td><td>
</td><td>8/30/2022 3:19:34 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>26450</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Chipped/dent</td><td>&#39;Toothing between stone cladding tiles
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:36 PM</td><td> </td><td>8/30/2022 3:19:34
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>29530</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Roschmann</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Marked joints should be finished
properly </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:55:23 AM</td><td> </td><td>8/30/2022
3:19:34 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>29529</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Roschmann</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Damage panel should be replaced
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>sally.george</td><td>5/25/2022
9:55:21 AM</td><td> </td><td>8/30/2022 3:19:34 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>29528</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Roschmann</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Marked parts should be cleaned
and adjusted </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:55:19 AM</td><td> </td><td>8/30/2022
3:19:34 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>28650</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Missing ceiling tiles should be
installed </td><td>Low</td><td>5/31/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/10/2022 4:29:06 PM</td><td> </td><td>8/30/2022 3:19:34
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>10503</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:13:59 PM</td><td> </td><td>8/30/2022
3:19:34 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>10488</td><td>ELEC.</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:13:22 PM</td><td> </td><td>8/30/2022
3:19:34 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MS.18.2A.020</td><td>&nbsp;</td>
</tr><tr>
<td>10476</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:12:54 PM</td><td> </td><td>8/30/2022
3:19:34 PM</td><td>The Snag can be considered closed based on Punsh Listing with
the Engineer</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>9440</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>HVAC</td><td>Identification Labels not
provided / missing</td><td>&#39;Missing labels and tag names for valves
</td><td>High</td><td>7/15/2020 12:00:00 AM</td><td>hossamreda</td><td>7/8/2020
4:28:22 PM</td><td> </td><td>8/30/2022 3:19:28 PM</td><td>Considered closed based
on snagging by the Engineer.</td><td>MS.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>9484</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>HVAC</td><td>Identification Labels not
provided / missing</td><td>&#39;Missing tag names for
valves</td><td>High</td><td>7/15/2020 12:00:00
AM</td><td>hossamreda</td><td>7/8/2020 4:31:22 PM</td><td> </td><td>8/30/2022
3:19:10 PM</td><td>Considered closed based on snagging by the Engineer
</td><td>MS.17.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>13093</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Missing cladding
</td><td>Low</td><td>11/24/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
12:45:12 PM</td><td> </td><td>8/30/2022 3:14:20 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the
Engineer</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>9189</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Missing water test for sky light / missing
CIR Approved for glass </td><td>Low</td><td>7/8/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>6/17/2020 11:39:41 AM</td><td> </td><td>8/30/2022 3:14:20
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9190</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Missing CIR approved for metal panels for
modules 12B , 11B , 10B , 9B , 8B ,7B , 6B , 5B , 4B , 3B , 2B and 1B
.</td><td>Low</td><td>7/9/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>6/18/2020 11:28:56 AM</td><td> </td><td>8/30/2022 3:14:20
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9181</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 9B - Panels need cleaning/ remove
losses material/ light between joints </td><td>Low</td><td>7/8/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>6/17/2020 11:39:23 AM</td><td>
</td><td>8/30/2022 3:14:20 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9172</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Damaged panels/ panels need cleaning / light
between joints </td><td>Low</td><td>7/8/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>6/17/2020 11:39:03 AM</td><td> </td><td>8/30/2022 3:14:20
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9175</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 6B - Panels not aligned/ light between
joints/ panels need cleaning </td><td>Low</td><td>7/8/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>6/17/2020 11:39:10 AM</td><td>
</td><td>8/30/2022 3:14:20 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9171</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 3B - joints not aligned/ panels need
cleaning/ light between joints </td><td>Low</td><td>7/8/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>6/17/2020 11:39:00 AM</td><td>
</td><td>8/30/2022 3:14:20 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9170</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 2B - joints not aligned / damaged
panels/ light between joints </td><td>Low</td><td>7/8/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>6/17/2020 11:38:57 AM</td><td>
</td><td>8/30/2022 3:14:20 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9169</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 1B - Panels need cleaning/ light
between joints </td><td>Low</td><td>7/8/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>6/17/2020 11:38:55 AM</td><td> </td><td>8/30/2022 3:14:20
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9177</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Damaged metal panels/ joints not aligned /
light between joints </td><td>Low</td><td>7/8/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>6/17/2020 11:39:14 AM</td><td> </td><td>8/30/2022 3:14:20
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>9182</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 10B - Panels not aligned/ panels need
cleaning / lighting between panels joints </td><td>Low</td><td>7/8/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>6/17/2020 11:39:26 AM</td><td>
</td><td>8/30/2022 3:14:20 PM</td><td>The Snag can be considered closed based on
Punsh Listing with the Engineer</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>25202</td><td>Temple Garden-Band F</td><td>Temple
Garden</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing lighting fixtures panels need to
installed.</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/15/2021 11:34:17 AM</td><td> </td><td>8/30/2022 3:11:59
PM</td><td>The Snag can be considered closed based on Punsh Listing with the
Engineer</td><td>Band F</td><td>&nbsp;</td>
</tr><tr>
<td>9173</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Module 5B - joints not aligned/ panels need
cleaning/ light between tiles / remove losses material
</td><td>Low</td><td>7/8/2020 12:00:00 AM</td><td>Michael Mahfouz</td><td>6/17/2020
11:39:06 AM</td><td> </td><td>8/30/2022 3:11:52 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the Engineer</td><td>Stiletto - wall
B</td><td>&nbsp;</td>
</tr><tr>
<td>9184</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Panels not aligned/ panels need cleaning
</td><td>Low</td><td>7/8/2020 12:00:00 PM</td><td>Michael Mahfouz</td><td>6/17/2020
11:39:33 AM</td><td> </td><td>8/30/2022 3:11:45 PM</td><td>The Snag can be
considered closed based on Punsh Listing with the Engineer</td><td>Stiletto - wall
B</td><td>&nbsp;</td>
</tr><tr>
<td>9272</td><td>SERVICE DELIVERY</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up </td><td>Low</td><td>7/29/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>7/8/2020 9:30:51 AM</td><td> </td><td>8/30/2022
3:09:19 PM</td><td>&nbsp;</td><td>MQ.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>29496</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:57 AM</td><td> </td><td>8/29/2022 4:00:18
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29494</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:55 AM</td><td> </td><td>8/29/2022 4:00:14
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29477</td><td>IT 7</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Flooring need to cleaning and touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:40 AM</td><td> </td><td>8/29/2022 4:00:10
PM</td><td>&nbsp;</td><td>MS.14.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29462</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:26 AM</td><td> </td><td>8/29/2022 4:00:05
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29577</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover is missing
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>sally.george</td><td>5/25/2022
10:00:06 AM</td><td> </td><td>8/29/2022 3:59:55
PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>29576</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor needs cleaning and should be
repainted </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:58:49 AM</td><td> </td><td>8/29/2022
3:59:50 PM</td><td>&nbsp;</td><td>MA.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>29575</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Flooring hinge should be adjusted </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>sally.george</td><td>5/25/2022 9:58:47 AM</td><td>
</td><td>8/29/2022 3:59:40
PM</td><td>&nbsp;</td><td>MA.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>29574</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>sally.george</td><td>5/25/2022 9:58:45 AM</td><td>
</td><td>8/29/2022 3:59:31
PM</td><td>&nbsp;</td><td>MA.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>29573</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls and columns need touch up painting
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>sally.george</td><td>5/25/2022
9:58:43 AM</td><td> </td><td>8/29/2022 3:58:42
PM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>29572</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Repaired should be improved </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>sally.george</td><td>5/25/2022 9:58:41 AM</td><td>
</td><td>8/29/2022 3:58:34
PM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>29570</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Cell need touch up painting </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>sally.george</td><td>5/25/2022 9:58:38 AM</td><td>
</td><td>8/29/2022 3:58:27
PM</td><td>&nbsp;</td><td>MA.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>29567</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor should be repaired and repainted
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>sally.george</td><td>5/25/2022
9:58:33 AM</td><td> </td><td>8/29/2022 3:58:20
PM</td><td>&nbsp;</td><td>MA.19.02.025</td><td>&nbsp;</td>
</tr><tr>
<td>29566</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked joint should be adjusted </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>sally.george</td><td>5/25/2022 9:58:31 AM</td><td>
</td><td>8/29/2022 3:58:15
PM</td><td>&nbsp;</td><td>MA.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>29565</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>sally.george</td><td>5/25/2022 9:58:29 AM</td><td>
</td><td>8/29/2022 3:58:11
PM</td><td>&nbsp;</td><td>MA.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>29563</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Lighting fixtures should be fixed properly
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>sally.george</td><td>5/25/2022
9:58:26 AM</td><td> </td><td>8/29/2022 3:58:06
PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>29562</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Around fire alarm should be adjusted
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>sally.george</td><td>5/25/2022
9:58:25 AM</td><td> </td><td>8/29/2022 3:58:01
PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>29559</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Repair is needed for marked part
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>sally.george</td><td>5/25/2022
9:58:20 AM</td><td> </td><td>8/29/2022 3:57:55
PM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29558</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>sally.george</td><td>5/25/2022
9:58:17 AM</td><td> </td><td>8/29/2022 3:57:45
PM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29551</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>sally.george</td><td>5/25/2022 9:58:04 AM</td><td>
</td><td>8/29/2022 3:57:39
PM</td><td>&nbsp;</td><td>MA.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>29550</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>sally.george</td><td>5/25/2022 9:56:00 AM</td><td>
</td><td>8/29/2022 3:57:35
PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>29556</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>sally.george</td><td>5/25/2022 9:58:12 AM</td><td>
</td><td>8/29/2022 3:57:31
PM</td><td>&nbsp;</td><td>MA.19.02.017</td><td>&nbsp;</td>
</tr><tr>
<td>29524</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting works are not completed /walls need
touch up painting </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:55:12 AM</td><td> </td><td>8/29/2022
3:57:26 PM</td><td>&nbsp;</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>21682</td><td>CORE B3 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Marked parts should be adjusted and
repaired </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:35 AM</td><td> </td><td>8/29/2022 11:48:32
AM</td><td>&nbsp;</td><td>MC.12.02.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21680</td><td>CORE B3 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Floor should be adjustment and
repaired/touch up painting </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:34 AM</td><td> </td><td>8/29/2022 11:47:14
AM</td><td>&nbsp;</td><td>MC.12.02.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21027</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Architrave not leveled with concrete wall
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:13:54 AM</td><td> </td><td>8/29/2022 11:38:29
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21028</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Architrave not leveled with concrete wall
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:13:56 AM</td><td> </td><td>8/29/2022 11:38:01
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21029</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around architrave </td><td>Low</td><td>9/5/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021 11:13:58 AM</td><td>
</td><td>8/29/2022 11:37:33
AM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21720</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy paint floor need to clean and
touch up </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:27:56 AM</td><td> </td><td>8/29/2022 11:36:38
AM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21612</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>9/9/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/19/2021 11:23:49 AM</td><td> </td><td>8/29/2022
11:35:13 AM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21611</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>9/9/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/19/2021 11:23:48 AM</td><td> </td><td>8/29/2022
11:34:46 AM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>30575</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Missing fire sealant for marked parts
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:59 AM</td><td> </td><td>8/29/2022 11:31:09
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30563</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;All walls need repair and touch up painting
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:39 AM</td><td> </td><td>8/29/2022 11:30:39
AM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28764</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor needs repair and touch up
</td><td>Low</td><td>6/1/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/11/2022
11:48:27 AM</td><td> </td><td>8/29/2022 11:30:01
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>29678</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to cleaning
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
12:05:52 PM</td><td> </td><td>8/29/2022 11:29:03
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29675</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
12:05:47 PM</td><td> </td><td>8/29/2022 11:28:36
AM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29672</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories should be cleaned
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
12:05:42 PM</td><td> </td><td>8/29/2022 11:27:55
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29929</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged door
leaf.</td><td>Low</td><td>6/16/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/26/2022 10:58:45 AM</td><td> </td><td>8/29/2022 11:26:39
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>21711</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Area around metal door should be finished
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:26:12 AM</td><td> </td><td>8/29/2022 11:25:51
AM</td><td>&nbsp;</td><td>MS.12.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>21710</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Area around metal door should be adjusted and repaired
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:26:10 AM</td><td> </td><td>8/29/2022 11:25:13
AM</td><td>&nbsp;</td><td>MS.12.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>21563</td><td>CORE B3</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
9:52:10 AM</td><td> </td><td>8/29/2022 11:18:51
AM</td><td>&nbsp;</td><td>MC.12.0G.B31</td><td>&nbsp;</td>
</tr><tr>
<td>30571</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Final coat is not done
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:52 AM</td><td> </td><td>8/29/2022 10:26:14
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30498</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing flooring epoxy.</td><td>Low</td><td>6/21/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/31/2022 11:43:09 AM</td><td> </td><td>8/29/2022
10:25:44 AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>27296</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/7/2022 12:05:59 PM</td><td> </td><td>8/29/2022 10:25:01
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29860</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All accessories should be cleaned </td><td>Low</td><td>6/1/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022 4:22:21 PM</td><td>
</td><td>8/29/2022 10:23:52
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>29836</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes need to
close.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:17:06 PM</td><td> </td><td>8/29/2022 10:23:21
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29663</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
12:05:27 PM</td><td> </td><td>8/29/2022 10:22:24
AM</td><td>&nbsp;</td><td>MS.19.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>27744</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling need to repair and painting
</td><td>Low</td><td>3/31/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022
11:08:29 AM</td><td> </td><td>8/29/2022 10:21:56
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27743</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>General Snag</td><td>&#39;Missing sealant between walls and
ceiling </td><td>Low</td><td>3/31/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/10/2022 11:08:27 AM</td><td> </td><td>8/29/2022 10:21:20
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27742</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Floor Tile</td><td>Cleaning</td><td>&#39;Ceramic flooring tiles need to cleaning
</td><td>Low</td><td>3/31/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022
11:08:25 AM</td><td> </td><td>8/29/2022 10:20:45
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27731</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Unused electrical boxes should be closed
</td><td>Low</td><td>3/31/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022
11:08:08 AM</td><td> </td><td>8/29/2022 10:19:54
AM</td><td>&nbsp;</td><td>MS.14.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27728</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wall need to surface preparation </td><td>Low</td><td>3/31/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022 11:08:04 AM</td><td>
</td><td>8/29/2022 10:19:25
AM</td><td>&nbsp;</td><td>MS.14.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27726</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Unused electrical boxes should be closed
</td><td>Low</td><td>3/31/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022
11:08:01 AM</td><td> </td><td>8/29/2022 10:18:54
AM</td><td>&nbsp;</td><td>MS.14.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27719</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant between block work and ceiling
</td><td>Low</td><td>3/31/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022
11:07:50 AM</td><td> </td><td>8/29/2022 10:18:24
AM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27718</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall Painting</td><td>General
Snag</td><td>&#39;Wall painting need to touch up </td><td>Low</td><td>3/31/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022 11:07:49 AM</td><td>
</td><td>8/29/2022 10:17:46
AM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28256</td><td>Parking Level-P4</td><td>Parking
Levels</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work LED display and power and
data cable not installed yet </td><td>High</td><td>3/29/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/22/2022 2:42:54 PM</td><td>
</td><td>8/29/2022 10:17:26 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27717</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around duct </td><td>Low</td><td>3/31/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022 11:07:47 AM</td><td>
</td><td>8/29/2022 10:17:06
AM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27547</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall need to
repair.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:32:56 AM</td><td> </td><td>8/29/2022 10:16:37
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>29592</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Architrave angle should be closed.</td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022 11:37:55 AM</td><td>
</td><td>8/29/2022 10:16:07
AM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>29378</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Accessories should be adjusted.</td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 4:19:53 PM</td><td>
</td><td>8/29/2022 10:15:30
AM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29351</td><td>EMERGENCY LIGHTING</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All accessories should be
cleaned.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:09 PM</td><td> </td><td>8/29/2022 10:14:59
AM</td><td>&nbsp;</td><td>MS.18.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>29349</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All accessories should be
cleaned.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:05 PM</td><td> </td><td>8/29/2022 10:14:32
AM</td><td>&nbsp;</td><td>MS.18.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>29324</td><td>CORE B2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Marked angles should be closed </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 1:15:13 PM</td><td>
</td><td>8/29/2022 10:14:06
AM</td><td>&nbsp;</td><td>MC.18.2A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>29314</td><td>CLEANERS</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Stainless steel hinges should be cleaned from painting
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:14:54 PM</td><td> </td><td>8/29/2022 10:13:23
AM</td><td>&nbsp;</td><td>MW.18.2A.001D</td><td>&nbsp;</td>
</tr><tr>
<td>27741</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around pipes </td><td>Low</td><td>3/31/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022 11:08:24 AM</td><td>
</td><td>8/29/2022 10:12:53
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27269</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to repair and touch up
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/7/2022
12:05:14 PM</td><td> </td><td>8/29/2022 10:12:20
AM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>12564</td><td>CORE B4</td><td>CCB
GF</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Lifts work is incomplete
</td><td>High</td><td>11/1/2020 12:00:00 AM</td><td>ahmedsalem</td><td>10/25/2020
11:49:20 AM</td><td> </td><td>8/29/2022 8:46:11
AM</td><td>&nbsp;</td><td>CC.07.0G.B41</td><td>&nbsp;</td>
</tr><tr>
<td>28347</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Cladding is missing.
</td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:30 AM</td><td> </td><td>8/29/2022 8:27:58
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>16414</td><td>SCHOLAR RECEPTION</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Incomplete work of
lifts</td><td>High</td><td>2/21/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>2/14/2021 3:10:10 PM</td><td> </td><td>8/29/2022 8:25:27
AM</td><td>&nbsp;</td><td>MR.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>28612</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>5/31/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>5/10/2022 4:27:39 PM</td><td> </td><td>8/29/2022 7:23:19
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>28611</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Carpet Floor</td><td>General
Snag</td><td>&#39;Missing carpet floor </td><td>Low</td><td>5/31/2022 12:00:00
PM</td><td>Kerolos Nagy Tawfik</td><td>5/10/2022 4:27:38 PM</td><td>
</td><td>8/29/2022 7:23:15
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>28608</td><td>STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>5/31/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>5/10/2022 4:27:32 PM</td><td> </td><td>8/29/2022 7:23:11
AM</td><td>&nbsp;</td><td>MR.14.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28603</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>5/30/2022
12:00:00 PM</td><td>sally.george</td><td>5/9/2022 4:21:51 PM</td><td>
</td><td>8/29/2022 7:23:06
AM</td><td>&nbsp;</td><td>MA.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28602</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor to be cleaned and repaint
</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>sally.george</td><td>5/9/2022
4:21:49 PM</td><td> </td><td>8/29/2022 7:23:02
AM</td><td>&nbsp;</td><td>MA.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28597</td><td>CURATOR</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Carpet Floor</td><td>General
Snag</td><td>&#39;Carpet is missing </td><td>Low</td><td>5/30/2022 12:00:00
PM</td><td>sally.george</td><td>5/9/2022 4:21:41 PM</td><td> </td><td>8/29/2022
7:22:58 AM</td><td>&nbsp;</td><td>MA.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28596</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;All
walls need touch up painting </td><td>Low</td><td>5/30/2022 12:00:00
PM</td><td>sally.george</td><td>5/9/2022 4:21:39 PM</td><td> </td><td>8/29/2022
7:22:48 AM</td><td>&nbsp;</td><td>MA.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28594</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Cleaning and repair if needed
</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>sally.george</td><td>5/9/2022
4:21:35 PM</td><td> </td><td>8/29/2022 7:22:43
AM</td><td>&nbsp;</td><td>MA.19.02.023</td><td>&nbsp;</td>
</tr><tr>
<td>28587</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant joints to be adjusted </td><td>Low</td><td>5/30/2022
12:00:00 PM</td><td>sally.george</td><td>5/9/2022 4:21:19 PM</td><td>
</td><td>8/29/2022 7:22:39
AM</td><td>&nbsp;</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28586</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>5/30/2022
12:00:00 PM</td><td>sally.george</td><td>5/9/2022 4:21:17 PM</td><td>
</td><td>8/29/2022 7:22:36
AM</td><td>&nbsp;</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28583</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Electrical box should be fixed properly
</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>sally.george</td><td>5/9/2022
4:21:11 PM</td><td> </td><td>8/29/2022 7:22:31
AM</td><td>&nbsp;</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28580</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Missing skirting to be installed and
finished properly </td><td>Low</td><td>5/30/2022 12:00:00
PM</td><td>sally.george</td><td>5/9/2022 4:21:07 PM</td><td> </td><td>8/29/2022
7:22:27 AM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28578</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need repair and touch up painting
</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>sally.george</td><td>5/9/2022
4:21:04 PM</td><td> </td><td>8/29/2022 7:22:23
AM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28577</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Cleaning is needed for all windows
</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>sally.george</td><td>5/9/2022
4:21:02 PM</td><td> </td><td>8/29/2022 7:22:19
AM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28576</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Flooring need to cleaning.</td><td>Low</td><td>5/30/2022 12:00:00
PM</td><td>Moussa Nageh Khella</td><td>5/9/2022 4:20:17 PM</td><td>
</td><td>8/29/2022 7:22:13
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28575</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Walls painting need to touch up.</td><td>Low</td><td>5/30/2022
12:00:00 PM</td><td>Moussa Nageh Khella</td><td>5/9/2022 4:20:14 PM</td><td>
</td><td>8/29/2022 7:22:08
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28574</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Walls painting need to touch up.</td><td>Low</td><td>5/30/2022
12:00:00 PM</td><td>Moussa Nageh Khella</td><td>5/9/2022 4:20:11 PM</td><td>
</td><td>8/29/2022 7:22:05
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28573</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Holes need to close and repaint.</td><td>Low</td><td>5/30/2022
12:00:00 PM</td><td>Moussa Nageh Khella</td><td>5/9/2022 4:20:08 PM</td><td>
</td><td>8/29/2022 7:21:55
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28565</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch
up.</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:49 PM</td><td> </td><td>8/29/2022 7:21:51
AM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28564</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing electrical
cover.</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:46 PM</td><td> </td><td>8/29/2022 7:21:47
AM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28562</td><td>STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch
up.</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:43 PM</td><td> </td><td>8/29/2022 7:21:43
AM</td><td>&nbsp;</td><td>MR.14.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28561</td><td>STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling painting need to touch
up.</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:40 PM</td><td> </td><td>8/29/2022 7:21:38
AM</td><td>&nbsp;</td><td>MR.14.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>29517</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Concrete need to repair and touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:22 AM</td><td> </td><td>8/28/2022 3:43:11
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29490</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:51 AM</td><td> </td><td>8/28/2022 3:43:07
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29469</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:33 AM</td><td> </td><td>8/28/2022 3:43:04
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29464</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to cleaning
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:27 AM</td><td> </td><td>8/28/2022 3:42:59
PM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>10491</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>9/12/2020 1:13:28 PM</td><td> </td><td>8/28/2022
3:42:35 PM</td><td>&nbsp;</td><td>MS.18.2A.021</td><td>&nbsp;</td>
</tr><tr>
<td>10464</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing bolts/ plates not fixed
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:12:22 PM</td><td> </td><td>8/28/2022 3:42:31
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>10463</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete floor need repair
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:12:18 PM</td><td> </td><td>8/28/2022 3:42:26
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>10461</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete stair need repair
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:12:13 PM</td><td> </td><td>8/28/2022 3:42:22
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>10460</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Missing access door for opening
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:12:10 PM</td><td> </td><td>8/28/2022 3:42:17
PM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29669</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing Sealant around metal door frame
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
12:05:37 PM</td><td> </td><td>8/28/2022 1:15:37
PM</td><td>&nbsp;</td><td>MS.19.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>29667</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
12:05:34 PM</td><td> </td><td>8/28/2022 1:13:08
PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>29658</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
12:05:20 PM</td><td> </td><td>8/28/2022 1:12:39
PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>29657</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Cutting
of door frame should be checked </td><td>Low</td><td>6/15/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/25/2022 12:05:18 PM</td><td> </td><td>8/28/2022
1:12:11 PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>27582</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:34:13 AM</td><td> </td><td>8/28/2022 1:10:40
PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>27561</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:25 AM</td><td> </td><td>8/28/2022 1:09:36
PM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>27295</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Marked part need to repair and touch
up.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/7/2022
12:05:57 PM</td><td> </td><td>8/28/2022 1:09:07
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27288</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/7/2022 12:05:46 PM</td><td> </td><td>8/28/2022 1:08:21
PM</td><td>&nbsp;</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>27285</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to
clean.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/7/2022 12:05:41 PM</td><td> </td><td>8/28/2022 1:07:47
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>21160</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door frame
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:51:13 AM</td><td> </td><td>8/28/2022 1:07:13
PM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>21158</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around door frame need to adjust
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:51:10 AM</td><td> </td><td>8/28/2022 1:06:46
PM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>21155</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around door frame need to be adjusted
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:51:04 AM</td><td> </td><td>8/28/2022 1:06:18
PM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>29944</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes should be
closed.</td><td>Low</td><td>6/16/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/26/2022 10:59:06 AM</td><td> </td><td>8/28/2022 1:05:50
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29939</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes should be
closed.</td><td>Low</td><td>6/16/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/26/2022 10:58:55 AM</td><td> </td><td>8/28/2022 1:05:07
PM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29866</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/1/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
4:22:30 PM</td><td> </td><td>8/28/2022 1:04:29
PM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>29799</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing Sealant around door
frame.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:15:47 PM</td><td> </td><td>8/28/2022 1:03:56
PM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>27578</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire sealant
</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/9/2022
11:34:02 AM</td><td> </td><td>8/28/2022 1:03:27
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27553</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail welding joint should be
finished.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:06 AM</td><td> </td><td>8/28/2022 1:02:59
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27551</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:02 AM</td><td> </td><td>8/28/2022 1:02:31
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27550</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Opening should be
closed.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:01 AM</td><td> </td><td>8/28/2022 1:02:04
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27548</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 11:32:57 AM</td><td> </td><td>8/28/2022 1:01:36
PM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>29805</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing Sealant around door
leaf.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/25/2022 3:15:58 PM</td><td> </td><td>8/28/2022 1:01:07
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29768</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:14:27 PM</td><td> </td><td>8/28/2022
1:00:35 PM</td><td>&nbsp;</td><td>MS.19.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>27313</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Different pattern need to replaced
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/7/2022
12:06:26 PM</td><td> </td><td>8/28/2022 12:59:55
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27302</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/7/2022 12:06:09 PM</td><td> </td><td>8/28/2022 12:59:24
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27301</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Marked part need to
repair.</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/7/2022 12:06:08 PM</td><td> </td><td>8/28/2022 12:58:57
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>21167</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
architrave should be flushed with wall</td><td>Low</td><td>9/7/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/17/2021 10:56:19 AM</td><td> </td><td>8/28/2022
12:58:10 PM</td><td>&nbsp;</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21111</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Architrave not leveled with concrete wall
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:49:30 AM</td><td> </td><td>8/28/2022 12:57:42
PM</td><td>&nbsp;</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>29931</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes need to
close.</td><td>Low</td><td>6/16/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/26/2022 10:58:47 AM</td><td> </td><td>8/28/2022 12:56:51
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29786</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
3:15:26 PM</td><td> </td><td>8/28/2022 12:56:19
PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>29764</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/1/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/25/2022
3:14:18 PM</td><td> </td><td>8/28/2022 12:55:53
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27932</td><td>STAFF W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to clean and touch
up.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/13/2022
11:48:46 AM</td><td> </td><td>8/28/2022 12:55:25
PM</td><td>&nbsp;</td><td>MW.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27930</td><td>STAFF W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Access door opening need to
painting.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:42 AM</td><td> </td><td>8/28/2022 12:54:51
PM</td><td>&nbsp;</td><td>MW.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27929</td><td>STAFF W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to
clean.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:41 AM</td><td> </td><td>8/28/2022 12:54:15
PM</td><td>&nbsp;</td><td>MW.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27926</td><td>STAFF W.C. CLEANERS STORE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling need to
painting.</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:36 AM</td><td> </td><td>8/28/2022 12:53:36
PM</td><td>&nbsp;</td><td>MW.19.2A.001D</td><td>&nbsp;</td>
</tr><tr>
<td>27740</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around door frame </td><td>Low</td><td>3/31/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022 11:08:22 AM</td><td>
</td><td>8/28/2022 12:52:52
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27739</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Floors</td><td>Rough
surface</td><td>&#39;Flooring need to cleaning </td><td>Low</td><td>3/31/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022 11:08:21 AM</td><td>
</td><td>8/28/2022 12:52:07
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27729</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Floors</td><td>Rough
surface</td><td>&#39;Flooring should be cleaning </td><td>Low</td><td>3/31/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022 11:08:05 AM</td><td>
</td><td>8/28/2022 12:51:40
PM</td><td>&nbsp;</td><td>MS.14.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27707</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Raised
Floor</td><td>Cleaning</td><td>&#39;Raised floor need to cleaning
</td><td>Low</td><td>3/31/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2022
11:07:29 AM</td><td> </td><td>8/28/2022 12:51:02
PM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>27687</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire
sealant.</td><td>Low</td><td>3/30/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/9/2022 3:35:52 PM</td><td> </td><td>8/28/2022 12:50:34
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27564</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All joints welding should be finished
</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/9/2022
11:33:32 AM</td><td> </td><td>8/28/2022 12:50:06
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>17051</td><td>MEETING-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Corner should be aligned
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:35:04 PM</td><td> </td><td>8/28/2022 12:49:39
PM</td><td>&nbsp;</td><td>ME.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>17044</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Cracks should be repaired
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:40 PM</td><td> </td><td>8/28/2022 12:48:59
PM</td><td>&nbsp;</td><td>ME.12.01.008</td><td>&nbsp;</td>
</tr><tr>
<td>17043</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Covers should be installed </td><td>Low</td><td>4/1/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>3/11/2021 12:34:39 PM</td><td> </td><td>8/28/2022
12:48:30 PM</td><td>&nbsp;</td><td>ME.12.01.008</td><td>&nbsp;</td>
</tr><tr>
<td>12020</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair for concrete floor and cleaning
</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
2:12:42 PM</td><td> </td><td>8/28/2022 11:36:48
AM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>14980</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Repair and touch up for epoxy paint
floor </td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>1/19/2021 11:35:42 AM</td><td> </td><td>8/28/2022 11:36:47
AM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>13720</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>General Snag</td><td>&#39;Metal flexible conduit should be
replaced by emt conduit</td><td>High</td><td>12/8/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/1/2020 10:36:04 AM</td><td> </td><td>8/28/2022 9:48:51
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32055</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:20 AM</td><td>
</td><td>8/28/2022 9:48:48
AM</td><td>&nbsp;</td><td>MS.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>32113</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:46 AM</td><td>
</td><td>8/28/2022 9:48:45
AM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32114</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire face
plate</td><td>High</td><td>7/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:47 AM</td><td> </td><td>8/28/2022
9:48:40 AM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>28652</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>5/31/2022
12:00:00 PM</td><td>sally.george</td><td>5/10/2022 4:29:09 PM</td><td>
</td><td>8/28/2022 7:36:54
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28651</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Repair is needed for marked parts </td><td>Low</td><td>5/31/2022
12:00:00 PM</td><td>sally.george</td><td>5/10/2022 4:29:07 PM</td><td>
</td><td>8/28/2022 7:36:49
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28647</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked parts should be repaired </td><td>Low</td><td>5/31/2022
12:00:00 PM</td><td>sally.george</td><td>5/10/2022 4:29:04 PM</td><td>
</td><td>8/28/2022 7:36:43
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28645</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Repair is needed for marked parts </td><td>Low</td><td>5/31/2022
12:00:00 PM</td><td>sally.george</td><td>5/10/2022 4:29:02 PM</td><td>
</td><td>8/28/2022 7:36:37
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28643</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Exposed concrete should be removed </td><td>Low</td><td>5/31/2022
12:00:00 PM</td><td>sally.george</td><td>5/10/2022 4:29:00 PM</td><td>
</td><td>8/28/2022 7:36:18
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28642</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint Floor</td><td>General
Snag</td><td>&#39;Floor needs cleaning and repaint </td><td>Low</td><td>5/31/2022
12:00:00 PM</td><td>sally.george</td><td>5/10/2022 4:28:59 PM</td><td>
</td><td>8/28/2022 7:36:12
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28623</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Missing skirting
</td><td>Low</td><td>5/31/2022 12:00:00 PM</td><td>sally.george</td><td>5/10/2022
4:28:08 PM</td><td> </td><td>8/28/2022 7:36:00
AM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28622</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>5/31/2022
12:00:00 PM</td><td>sally.george</td><td>5/10/2022 4:28:06 PM</td><td>
</td><td>8/28/2022 7:35:56
AM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28621</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Storage materials to be removed
</td><td>Low</td><td>5/31/2022 12:00:00 PM</td><td>sally.george</td><td>5/10/2022
4:28:03 PM</td><td> </td><td>8/28/2022 7:35:51
AM</td><td>&nbsp;</td><td>MA.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>28619</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>5/31/2022
12:00:00 PM</td><td>sally.george</td><td>5/10/2022 4:27:55 PM</td><td>
</td><td>8/28/2022 7:35:46
AM</td><td>&nbsp;</td><td>MA.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>28610</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Skirting should be fixed properly
</td><td>Low</td><td>5/31/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>5/10/2022 4:27:36 PM</td><td> </td><td>8/28/2022 7:35:41
AM</td><td>&nbsp;</td><td>MQ.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28609</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Skirting should be cleaned and touch up
</td><td>Low</td><td>5/31/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>5/10/2022 4:27:34 PM</td><td> </td><td>8/28/2022 7:35:38
AM</td><td>&nbsp;</td><td>MQ.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28607</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>5/30/2022
12:00:00 PM</td><td>sally.george</td><td>5/9/2022 4:22:01 PM</td><td>
</td><td>8/28/2022 7:35:33
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28606</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Floor need cleaning repair if needed
</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>sally.george</td><td>5/9/2022
4:21:58 PM</td><td> </td><td>8/28/2022 7:35:28
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28604</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked parts to be adjusted and repaired
</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>sally.george</td><td>5/9/2022
4:21:53 PM</td><td> </td><td>8/28/2022 7:35:24
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28599</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting (all
walls)</td><td>Low</td><td>5/30/2022 12:00:00
PM</td><td>sally.george</td><td>5/9/2022 4:21:44 PM</td><td> </td><td>8/28/2022
7:35:19 AM</td><td>&nbsp;</td><td>MA.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28598</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling need touch up painting </td><td>Low</td><td>5/30/2022
12:00:00 PM</td><td>sally.george</td><td>5/9/2022 4:21:43 PM</td><td>
</td><td>8/28/2022 7:35:15
AM</td><td>&nbsp;</td><td>MA.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28593</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Sealant is missing
</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>sally.george</td><td>5/9/2022
4:21:34 PM</td><td> </td><td>8/28/2022 7:35:08
AM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28592</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;All
walls and columns need touch up painting </td><td>Low</td><td>5/30/2022 12:00:00
PM</td><td>sally.george</td><td>5/9/2022 4:21:31 PM</td><td> </td><td>8/28/2022
7:34:57 AM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28591</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked holes should be closed if not needed
</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>sally.george</td><td>5/9/2022
4:21:28 PM</td><td> </td><td>8/28/2022 7:34:53
AM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28590</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access doors to be seated properly </td><td>Low</td><td>5/30/2022
12:00:00 PM</td><td>sally.george</td><td>5/9/2022 4:21:26 PM</td><td>
</td><td>8/28/2022 7:34:48
AM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28589</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;MEP fixtures should be fixed properly
</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>sally.george</td><td>5/9/2022
4:21:24 PM</td><td> </td><td>8/28/2022 7:34:44
AM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28588</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling need touch up painting </td><td>Low</td><td>5/30/2022
12:00:00 PM</td><td>sally.george</td><td>5/9/2022 4:21:21 PM</td><td>
</td><td>8/28/2022 7:34:39
AM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28559</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Access door need to
adjusted.</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:32 PM</td><td> </td><td>8/28/2022 7:34:34
AM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28558</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Removing tape around glazing and doors
.</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:31 PM</td><td> </td><td>8/28/2022 7:34:29
AM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28557</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling paint need to touch
up.</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:28 PM</td><td> </td><td>8/28/2022 7:34:22
AM</td><td>&nbsp;</td><td>MA.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28556</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing
skirting.</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:27 PM</td><td> </td><td>8/28/2022 7:34:02
AM</td><td>&nbsp;</td><td>MA.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28555</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint need to
painting.</td><td>Low</td><td>5/30/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:25 PM</td><td> </td><td>8/28/2022 7:33:56
AM</td><td>&nbsp;</td><td>MA.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>13381</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Joints is not aligned/to be adjusted
</td><td>Low</td><td>11/26/2020 12:00:00 PM</td><td>sally.george</td><td>11/5/2020
12:22:32 PM</td><td> </td><td>8/28/2022 7:33:24
AM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>32461</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Duct insulation needs repair </td><td>High</td><td>7/25/2022
12:00:00 PM</td><td>hossamreda</td><td>7/18/2022 10:02:15 AM</td><td>
</td><td>8/27/2022 1:21:13
PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32620</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;CHWPs insulation needs repair </td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:36:59 AM</td><td>
</td><td>8/27/2022 1:21:12
PM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32621</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Duct insulation needs repair </td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:37:05 AM</td><td>
</td><td>8/27/2022 1:21:11
PM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>29482</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:44 AM</td><td> </td><td>8/27/2022 8:49:04
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29480</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to touch
up.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:42 AM</td><td> </td><td>8/27/2022 8:48:54
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29471</td><td>IT 7</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing accessories.</td><td>Low</td><td>6/15/2022 12:00:00
PM</td><td>Moussa Nageh Khella</td><td>5/25/2022 9:29:34 AM</td><td>
</td><td>8/27/2022 8:48:38
AM</td><td>&nbsp;</td><td>MS.14.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>10452</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
sealant around metal door </td><td>Low</td><td>10/3/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>9/12/2020 1:11:48 PM</td><td> </td><td>8/25/2022
3:11:15 PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>20955</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing ict outlet label</td><td>High</td><td>8/18/2021 12:00:00
PM</td><td>Mohamed Samir</td><td>8/11/2021 11:59:14 AM</td><td> </td><td>8/25/2022
2:18:40 PM</td><td>&nbsp;</td><td>MS.19.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>18192</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Coil fins</td><td>&#39;The fins
should be repaired &amp; missing lighting for AHU</td><td>High</td><td>6/3/2021
12:00:00 AM</td><td>Kriton Katsamenis </td><td>5/27/2021 12:07:24 PM</td><td>
</td><td>8/25/2022 11:49:45
AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>

<td>26799</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Drainage System</td><td>General
Snag</td><td>&#39;Contractor should review location of manholes
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>ahmedsalem</td><td>3/1/2022
4:13:10 PM</td><td> </td><td>8/25/2022 11:49:44
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>30782</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Duct penetration need to be
sealed. </td><td>High</td><td>6/6/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:53 PM</td><td> </td><td>8/25/2022 11:49:31
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31226</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Motorized damper actuators have missing
parts. </td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:56:58 PM</td><td> </td><td>8/25/2022 11:49:28
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31447</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil fins shall be cleaned and adjusted.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:57:49 AM</td><td> </td><td>8/25/2022 11:49:27
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31455</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dampers Actuators have some missing parts.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:05:22 PM</td><td> </td><td>8/25/2022 11:49:26
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31650</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;No thermal insulation for PPR pipes.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:26 PM</td><td> </td><td>8/25/2022 11:49:24
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31678</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Chilled water pipes insulation need
repairs. </td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:24 PM</td><td> </td><td>8/25/2022 11:49:22
AM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31733</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damper actuators have missing parts.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:55:12 AM</td><td> </td><td>8/25/2022 11:49:21
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31817</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil fins shall be cleaned and adjusted.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:50 PM</td><td> </td><td>8/25/2022 11:49:19
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>28017</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;All Walls need touch up painting
</td><td>Low</td><td>4/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/14/2022
11:39:03 AM</td><td> </td><td>8/25/2022 11:10:19 AM</td><td>Done
</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28018</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked bottom parts(all) need repair and touch
up painting </td><td>Low</td><td>4/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>3/14/2022 11:39:05 AM</td><td> </td><td>8/25/2022
11:10:18 AM</td><td>Done </td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28797</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy gypsum ceiling should be
adjusted.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:46:39 AM</td><td> </td><td>8/25/2022 11:10:17
AM</td><td>Done </td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28800</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy should be
adjusted.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:46:44 AM</td><td> </td><td>8/25/2022 11:10:16
AM</td><td>Done </td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28801</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to touch
up.</td><td>Low</td><td>6/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/15/2022
11:46:46 AM</td><td> </td><td>8/25/2022 11:10:14 AM</td><td>Done
</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28805</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling edge should be
aligned.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:46:52 AM</td><td> </td><td>8/25/2022 11:10:04
AM</td><td>Done </td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28806</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gypsum wall should be leveled
</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/15/2022
11:46:53 AM</td><td> </td><td>8/25/2022 11:10:03 AM</td><td>Done
</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28807</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting should be
adjusted.</td><td>Low</td><td>6/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/15/2022 11:46:55 AM</td><td> </td><td>8/25/2022 11:10:02
AM</td><td>Done </td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28810</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to touch
up.</td><td>Low</td><td>6/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/15/2022
11:46:59 AM</td><td> </td><td>8/25/2022 11:10:01 AM</td><td>Done
</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28827</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to touch
up.</td><td>Low</td><td>6/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/15/2022
11:47:23 AM</td><td> </td><td>8/25/2022 11:10:00 AM</td><td>Done
</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28887</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be closed properly </td><td>Low</td><td>6/7/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/17/2022 11:46:53 AM</td><td> </td><td>8/25/2022
11:09:59 AM</td><td>Done </td><td>MA.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28900</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
part should be adjusted </td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/17/2022 11:47:15 AM</td><td> </td><td>8/25/2022 11:09:56
AM</td><td>Done </td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28904</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>Undulation /uneven surfaces</td><td>&#39;Friction between door leaf
and flooring should be adjusted </td><td>Low</td><td>6/7/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/17/2022 11:47:23 AM</td><td> </td><td>8/25/2022
11:09:54 AM</td><td>Done </td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28908</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Marked wavy gypsum board edge should be
adjusted </td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/17/2022 11:47:29 AM</td><td> </td><td>8/25/2022 11:09:52
AM</td><td>Done </td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28909</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wavy concrete columns should be adjusted
</td><td>Low</td><td>6/7/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/17/2022
11:47:31 AM</td><td> </td><td>8/25/2022 11:09:27 AM</td><td>Done
</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29102</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Furniture</td><td>Damaged</
td><td>&#39;Sealant around sink should be adjusted </td><td>Low</td><td>6/9/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/19/2022 12:04:17 PM</td><td>
</td><td>8/25/2022 11:09:25 AM</td><td>Done
</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>29107</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum board should be adjusted
</td><td>Low</td><td>6/9/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:28 PM</td><td> </td><td>8/25/2022 11:09:24 AM</td><td>Done
</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29109</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39; Cracks should be repaired
</td><td>Low</td><td>6/9/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:31 PM</td><td> </td><td>8/25/2022 11:09:23 AM</td><td>Done
</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29110</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>6/9/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:34 PM</td><td> </td><td>8/25/2022 11:09:21 AM</td><td>Done
</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29114</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum board should be adjusted
</td><td>Low</td><td>6/9/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:43 PM</td><td> </td><td>8/25/2022 11:09:20 AM</td><td>Done
</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29115</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>6/9/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:45 PM</td><td> </td><td>8/25/2022 11:09:19 AM</td><td>Done
</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29118</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum board should be adjusted
</td><td>Low</td><td>6/9/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:50 PM</td><td> </td><td>8/25/2022 11:09:18 AM</td><td>Done
</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30149</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked part need touch up painting
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
11:37:56 AM</td><td> </td><td>8/25/2022 11:09:16 AM</td><td>Done
</td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30151</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
11:37:58 AM</td><td> </td><td>8/25/2022 11:09:16 AM</td><td>Done
</td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30156</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wavy walls should be adjusted </td><td>Low</td><td>6/20/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022 11:38:04 AM</td><td>
</td><td>8/25/2022 11:09:14 AM</td><td>Done
</td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30166</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum wall should be adjusted
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
11:38:15 AM</td><td> </td><td>8/25/2022 11:09:11 AM</td><td>Done
</td><td>MQ.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30169</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked joint between wall and skirting
should be aligned </td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 11:38:19 AM</td><td> </td><td>8/25/2022 11:09:10
AM</td><td>Done </td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30171</td><td>LOBBY</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Wall - Skirting</td><td>Other
Snag</td><td>&#39;Joint between carpet and skirting should be leveled
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
11:38:21 AM</td><td> </td><td>8/25/2022 11:09:09 AM</td><td>Done
</td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30216</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy gypsum
wall.</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 12:21:00 PM</td><td> </td><td>8/25/2022 11:09:08
AM</td><td>Done </td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30217</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall edges should be
aligned.</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 12:21:12 PM</td><td> </td><td>8/25/2022 11:09:07
AM</td><td>Done </td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30220</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall edges and corner should be
aligned.</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 12:21:28 PM</td><td> </td><td>8/25/2022 11:09:06
AM</td><td>Done </td><td>MQ.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30223</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall edges should be
aligned.</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 1:00:05 PM</td><td> </td><td>8/25/2022 11:09:05
AM</td><td>Done </td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30232</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy gypsum
wall.</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 1:03:34 PM</td><td> </td><td>8/25/2022 11:09:04
AM</td><td>Done </td><td>MQ.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30233</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Corner should be
aligned.</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 1:03:55 PM</td><td> </td><td>8/25/2022 11:09:03
AM</td><td>Done </td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30514</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked edges should be aligned and uniform
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:05 AM</td><td> </td><td>8/25/2022 11:08:53 AM</td><td>Done
</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31701</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Repair and touch up painting for marked parts
</td><td>Low</td><td>6/27/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022
11:52:18 AM</td><td> </td><td>8/25/2022 11:08:50 AM</td><td>Done
</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31703</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Wavy part should be adjusted
</td><td>Low</td><td>6/27/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022
11:52:21 AM</td><td> </td><td>8/25/2022 11:08:47 AM</td><td>Done
</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>11771</td><td>ELECTRICAL ROOM</td><td>GATE 7 TYPE 2
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No accessibility for ict trunks, missing ict faceplate, no outlet
label, trunk sharp edge, electrical label, no rack
labels</td><td>High</td><td>10/5/2020 12:00:00 AM</td><td>Mohamed
Samir</td><td>9/28/2020 12:11:16 PM</td><td> </td><td>8/25/2022 10:13:12
AM</td><td>&nbsp;</td><td>GT7.02.0G.06</td><td>&nbsp;</td>
</tr><tr>
<td>14295</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;CCTV device labeling and port mapping not done for all
cameras</td><td>High</td><td>12/29/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>12/22/2020 9:47:28 AM</td><td> </td><td>8/25/2022 10:12:14
AM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>17617</td><td>Core B5</td><td>CCB
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>5/12/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>5/5/2021 12:42:06 PM</td><td> </td><td>8/25/2022
10:12:07 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17854</td><td>Temple Garden-Band C</td><td>Temple
Garden</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Temple Garden CCTV cameras, Public Address system horn speaker
installation is incomplete. Outdoor rack fiber connection also missing from Pyramid
restaurant hub room.</td><td>High</td><td>5/27/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>5/20/2021 8:55:24 AM</td><td> </td><td>8/25/2022 10:12:06
AM</td><td>&nbsp;</td><td>Band C</td><td>&nbsp;</td>
</tr><tr>
<td>17856</td><td>Temple Garden-Band C</td><td>Temple
Garden</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Temple Garden CCTV cameras, Public Address
system horn speaker installation is incomplete. Outdoor rack fiber connection also
missing from Pyramid restaurant hub room and nearest outdoor
rack.</td><td>High</td><td>5/27/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>5/20/2021 9:04:43 AM</td><td> </td><td>8/25/2022 10:12:05
AM</td><td>&nbsp;</td><td>Band C</td><td>&nbsp;</td>
</tr><tr>
<td>26755</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:05 PM</td><td>
</td><td>8/25/2022 10:11:54
AM</td><td>&nbsp;</td><td>MA.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>26763</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;BMS Temperature or pressure sensor
connections are missing in some places.In some cases termination is incomplete and
backbox cover needs to be fixed</td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:22 PM</td><td>
</td><td>8/25/2022 10:11:44
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>26980</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
done yet </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:01:01 PM</td><td> </td><td>8/25/2022 10:11:40
AM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>27378</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Power cable connections not done for scada
panel</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:05 PM</td><td> </td><td>8/25/2022 10:11:39
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>27399</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No power socket for media converter of
cctv</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:42 PM</td><td> </td><td>8/25/2022 10:11:34
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>27405</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;BMS devices
labeling</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:51 PM</td><td> </td><td>8/25/2022 10:11:27
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27413</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Sensor cover not installed and flexible
should installed properly</td><td>High</td><td>3/14/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:09:05 PM</td><td>
</td><td>8/25/2022 10:11:22
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>27414</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;Cable
trunk cover</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:09:07 PM</td><td> </td><td>8/25/2022 10:11:21
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>27416</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;RFID label </td><td>High</td><td>3/14/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:09:13 PM</td><td>
</td><td>8/25/2022 10:11:20
AM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27813</td><td>SERVICE ZONE 7</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;No patching</td><td>High</td><td>3/17/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:34:25 PM</td><td>
</td><td>8/25/2022 10:11:18
AM</td><td>&nbsp;</td><td>MS.14.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28166</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi label and patching </td><td>High</td><td>3/23/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/16/2022 3:54:57 PM</td><td>
</td><td>8/25/2022 10:11:17
AM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32730</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Acoustic Walling</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>8/29/2022 12:00:00
AM</td><td>melad.salah</td><td>8/22/2022 7:25:09 PM</td><td> </td><td>8/25/2022
10:06:56 AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>32486</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Insulation should to repaired &amp;
cleaning</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:31 AM</td><td> </td><td>8/25/2022 9:08:48
AM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32487</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Duct insulation not finish</td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>Sherif Boshra Ghaly</td><td>7/18/2022 11:28:32 AM</td><td>
</td><td>8/25/2022 9:08:03
AM</td><td>&nbsp;</td><td>MS.14.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32467</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Damaged CHWPs insulation </td><td>High</td><td>7/25/2022
12:00:00 PM</td><td>hossamreda</td><td>7/18/2022 10:02:25 AM</td><td>
</td><td>8/25/2022 9:04:20
AM</td><td>&nbsp;</td><td>MS.18.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32213</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be protected
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:48:57 AM</td><td> </td><td>8/24/2022 4:26:57
PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32212</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label and
cover</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:48:56 AM</td><td> </td><td>8/24/2022 4:26:49
PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32202</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:43 AM</td><td>
</td><td>8/24/2022 4:26:07
PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32200</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td> National Steel Fabrication NSF</td><td>MEP-
Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David
Noshy Naguib</td><td>7/17/2022 11:48:40 AM</td><td> </td><td>8/24/2022 4:25:50
PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29518</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to
clean.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:30:24 AM</td><td> </td><td>8/24/2022 3:49:14
PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29503</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
accessories should be adjusted </td><td>Low</td><td>6/15/2022 12:00:00
PM</td><td>Kerolos Nagy Tawfik</td><td>5/25/2022 9:30:03 AM</td><td>
</td><td>8/24/2022 3:49:09
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29499</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to repair
and touch up </td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:30:00 AM</td><td> </td><td>8/24/2022 3:49:05
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29493</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete flooring need to repair
</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>5/25/2022 9:29:54 AM</td><td> </td><td>8/24/2022 3:48:59
PM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>29483</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing Sealant around door frame </td><td>Low</td><td>6/15/2022
12:00:00 PM</td><td>Kerolos Nagy Tawfik</td><td>5/25/2022 9:29:44 AM</td><td>
</td><td>8/24/2022 3:48:54
PM</td><td>&nbsp;</td><td>MS.19.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>29453</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to
cleaning.</td><td>Low</td><td>6/15/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>5/25/2022 9:29:15 AM</td><td> </td><td>8/24/2022 3:48:46
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>10506</td><td>LOBBY</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door not installed yet </td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:14:07 PM</td><td> </td><td>8/24/2022 3:47:08
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>10504</td><td>LOBBY</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door not installed yet </td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:14:01 PM</td><td> </td><td>8/24/2022 3:47:03
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>10485</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Remove loose material from concrete ceiling
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:13:16 PM</td><td> </td><td>8/24/2022 3:46:58
PM</td><td>&nbsp;</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>10484</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Damaged block work/ missing sealant around Mep Fixtures
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:13:13 PM</td><td> </td><td>8/24/2022 3:46:49
PM</td><td>&nbsp;</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>10483</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>9/12/2020 1:13:10 PM</td><td> </td><td>8/24/2022
3:46:45 PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>10480</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Concrete wall need surface preparation
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:13:04 PM</td><td> </td><td>8/24/2022 3:46:40
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>10479</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Damaged block work/ missing sealant around Mep Fixtures
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:13:02 PM</td><td> </td><td>8/24/2022 3:46:34
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>10472</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>9/12/2020 1:12:44 PM</td><td> </td><td>8/24/2022
3:46:29 PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>10470</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing handrails
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:12:39 PM</td><td> </td><td>8/24/2022 3:46:25
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>10469</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Pouring concrete for door fixation
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:12:35 PM</td><td> </td><td>8/24/2022 3:46:16
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>10468</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Remove scaffolding and storage material
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:12:31 PM</td><td> </td><td>8/24/2022 3:46:11
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>10457</td><td>GEM CAVE EXP.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing handrails
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:12:02 PM</td><td> </td><td>8/24/2022 3:46:05
PM</td><td>&nbsp;</td><td>MP.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>10450</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Remove scaffolding and storage material
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:11:44 PM</td><td> </td><td>8/24/2022 3:46:00
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>10448</td><td>CORE E1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>9/12/2020 1:11:39 PM</td><td> </td><td>8/24/2022
3:45:55 PM</td><td>&nbsp;</td><td>MC.24.2A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>10447</td><td>CORE E1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Pouring
concrete for metal door </td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:11:37 PM</td><td> </td><td>8/24/2022 3:45:50
PM</td><td>&nbsp;</td><td>MC.24.2A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>10445</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Remove scaffolding and storage material
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:11:32 PM</td><td> </td><td>8/24/2022 3:45:45
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>10443</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Pouring concrete / floor need surface
preparation </td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:11:26 PM</td><td> </td><td>8/24/2022 3:45:36
PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>10442</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>9/12/2020 1:11:23 PM</td><td> </td><td>8/24/2022
3:45:29 PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>10441</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
sealant around metal door </td><td>Low</td><td>10/3/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>9/12/2020 1:11:21 PM</td><td> </td><td>8/24/2022
3:45:19 PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>10440</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around Mep Fixtures
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:11:19 PM</td><td> </td><td>8/24/2022 3:45:11
PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>21725</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor meet to clean
and touch up </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:28:07 AM</td><td> </td><td>8/24/2022 9:26:30
AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>30586</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/21/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/31/2022 11:50:48 AM</td><td> </td><td>8/24/2022
9:24:15 AM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31296</td><td>PLANT</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be closed properly </td><td>Low</td><td>6/23/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>6/2/2022 11:37:59 AM</td><td> </td><td>8/24/2022
9:23:26 AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>21620</td><td>CORE D3</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>9/9/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/19/2021 11:24:01 AM</td><td> </td><td>8/24/2022
9:22:21 AM</td><td>&nbsp;</td><td>MC.13.02.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21618</td><td>CORE D3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor should be adjusted and
repaired/repainted </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:23:58 AM</td><td> </td><td>8/24/2022 9:21:48
AM</td><td>&nbsp;</td><td>MC.13.02.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21634</td><td>CORE D3</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor should be repaired and
adjusted/repainted </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:24:24 AM</td><td> </td><td>8/24/2022 9:21:17
AM</td><td>&nbsp;</td><td>MC.13.01.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21624</td><td>CORE D3</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor needs cleaning and touch
up painting </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:24:08 AM</td><td> </td><td>8/24/2022 9:17:36
AM</td><td>&nbsp;</td><td>MC.13.01.D31</td><td>&nbsp;</td>
</tr><tr>
<td>28139</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof
Tiles</td><td>Chipped/damaged</td><td>&#39;Marked edge should be aligned
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/16/2022
12:09:41 PM</td><td> </td><td>8/24/2022 9:15:26 AM</td><td>&nbsp;</td><td>Museum
Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>28136</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof
Tiles</td><td>Chipped/damaged</td><td>&#39;Loose tile should be fixed properly
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/16/2022
12:09:37 PM</td><td> </td><td>8/24/2022 9:14:59 AM</td><td>&nbsp;</td><td>Museum
Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>25354</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing blanking should be
installed.</td><td>Low</td><td>12/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>11/22/2021 1:58:25 PM</td><td> </td><td>8/24/2022 9:14:31
AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25319</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof
Tiles</td><td>Chipped/damaged</td><td>&#39;Missing mesh panel
</td><td>Low</td><td>11/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>11/22/2021
12:00:16 PM</td><td> </td><td>8/24/2022 9:14:05 AM</td><td>&nbsp;</td><td>Museum
Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>32513</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Insulation need
repair &amp; painted the strainer before installation for removing
rusted</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:13 AM</td><td> </td><td>8/23/2022 4:16:45
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32510</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Insulation Damaged</td><td>&#39;Insulation not completed
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:08 AM</td><td> </td><td>8/23/2022 4:16:24
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32498</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Insulation should
repaired</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:50 AM</td><td> </td><td>8/23/2022 4:15:24
PM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32481</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Insulation need
repair</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:21 AM</td><td> </td><td>8/23/2022 4:15:12
PM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32455</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>INSULATION</
td><td>Items are damaged</td><td>&#39;Damaged duct insulation and cladding
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>hossamreda</td><td>7/18/2022
10:01:59 AM</td><td> </td><td>8/23/2022 4:15:00
PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32516</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Insulation</td><td>&#39;Insulation
need repair</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:20 AM</td><td> </td><td>8/23/2022 4:14:39
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>23139</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
repair should be adjusted</td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:50:34 AM</td><td> </td><td>8/23/2022 3:29:08
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24906</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Metal trim to be installed and aligned
properly.</td><td>Low</td><td>11/30/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/9/2021 11:31:15 AM</td><td> </td><td>8/23/2022 3:29:07
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25053</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;
Metal trim should be aligned and fixed properly </td><td>Low</td><td>12/2/2021
12:00:00 PM</td><td>Amr Nofal</td><td>11/11/2021 10:43:17 AM</td><td>
</td><td>8/23/2022 3:29:05 PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26205</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Area not
cleaned/finished.</td><td>&#39;Snagging after removing storage material
</td><td>Low</td><td>3/10/2022 12:00:00 PM</td><td>Amr Nofal</td><td>2/17/2022
12:15:59 PM</td><td> </td><td>8/23/2022 3:29:04 PM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27056</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Interface between onyx tiles and stone
cladding should be aligned and uniform </td><td>Low</td><td>3/23/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/2/2022 4:17:47 PM</td><td> </td><td>8/23/2022
3:29:02 PM</td><td>Done </td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27064</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Wooden pieces should be removed
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:06 PM</td><td> </td><td>8/23/2022 3:29:00 PM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27069</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Fixation to be checked
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:15 PM</td><td> </td><td>8/23/2022 3:28:58 PM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27079</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:34 PM</td><td> </td><td>8/23/2022 3:28:57 PM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27138</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Incomplete work
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:04 PM</td><td> </td><td>8/23/2022 3:28:55 PM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>31899</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Damages to be rectified or replaced</td><td>&#39;Broken tiles
should be replaced at pyramid 2</td><td>Low</td><td>7/5/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>6/14/2022 2:48:34 PM</td><td> </td><td>8/23/2022
3:28:53 PM</td><td>Done </td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>32669</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Repair of the concrete grille is not accepted
</td><td>Low</td><td>8/22/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/1/2022
4:28:24 PM</td><td> </td><td>8/23/2022 3:28:52 PM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32671</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Repair of verticality of fence footing edges
</td><td>Low</td><td>8/22/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/1/2022
4:28:28 PM</td><td> </td><td>8/23/2022 3:28:50 PM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32673</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Wall needs touch up painting
</td><td>Low</td><td>8/22/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/1/2022
4:39:45 PM</td><td> </td><td>8/23/2022 3:28:49 PM</td><td>Done
</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>32674</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Repair and touch up of the wall
paint</td><td>Low</td><td>8/22/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/1/2022 4:39:48 PM</td><td> </td><td>8/23/2022 3:28:47
PM</td><td>Done </td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>32675</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Expansion joint is missing from footing
</td><td>Low</td><td>8/22/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/1/2022
4:39:49 PM</td><td> </td><td>8/23/2022 3:28:45 PM</td><td>Done
</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>32707</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Based on PMC visit on 15-8-22, marked edge to
be aligned </td><td>Low</td><td>9/5/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/15/2022 4:29:51 PM</td><td> </td><td>8/23/2022 3:28:44
PM</td><td>Done </td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>32709</td><td>Solar Boat - Main Elevation</td><td>Main
Elevation</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Remove marked protection sheet at second
floor </td><td>Low</td><td>9/6/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/16/2022 3:59:41 PM</td><td> </td><td>8/23/2022 3:28:42
PM</td><td>Done </td><td>Solar Boat - Main Elevation</td><td>&nbsp;</td>
</tr><tr>
<td>32710</td><td>Solar Boat - Main Elevation</td><td>Main
Elevation</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Metal plate
(S/S cladding)</td><td>General Snag</td><td>&#39;Missing sealant for marked part
between mullions at second floor </td><td>Low</td><td>9/6/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>8/16/2022 3:59:42 PM</td><td> </td><td>8/23/2022
3:28:41 PM</td><td>Done </td><td>Solar Boat - Main Elevation</td><td>&nbsp;</td>
</tr><tr>
<td>32712</td><td>Solar Boat - Main Elevation</td><td>Main
Elevation</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Missing sealant between stainless cladding from
internal side</td><td>Low</td><td>9/6/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/16/2022 3:59:45 PM</td><td> </td><td>8/23/2022 3:28:40
PM</td><td>Done </td><td>Solar Boat - Main Elevation</td><td>&nbsp;</td>
</tr><tr>
<td>32719</td><td>Solar Boat - Main Elevation</td><td>Main
Elevation</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing stone cladding
</td><td>Low</td><td>9/6/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/16/2022
3:59:53 PM</td><td> </td><td>8/23/2022 3:28:38 PM</td><td>Done </td><td>Solar Boat
- Main Elevation</td><td>&nbsp;</td>
</tr><tr>
<td>32721</td><td>Solar Boat - Main Elevation</td><td>Main
Elevation</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant between stainless steel and
glazing panels </td><td>Low</td><td>9/6/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/16/2022 3:59:56 PM</td><td> </td><td>8/23/2022 3:28:37
PM</td><td>Done </td><td>Solar Boat - Main Elevation</td><td>&nbsp;</td>
</tr><tr>
<td>12021</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Repair for walls and touch up for all
painting </td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>10/1/2020 2:12:48 PM</td><td> </td><td>8/23/2022 3:26:21
PM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>14966</td><td>PLANT</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on previous CIR</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>1/19/2021 11:35:08 AM</td><td> </td><td>8/23/2022 3:26:20
PM</td><td>&nbsp;</td><td>MS.20.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>14972</td><td>PLANT</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on previous CIR</td><td>Low</td><td>1/26/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>1/19/2021 11:35:20 AM</td><td> </td><td>8/23/2022 3:26:19
PM</td><td>&nbsp;</td><td>MS.20.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14993</td><td>STORAGE</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on previous CIR</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>1/19/2021 11:36:09 AM</td><td> </td><td>8/23/2022 3:26:17
PM</td><td>&nbsp;</td><td>MS.19.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>14995</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on previous CIR</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>1/19/2021 11:36:13 AM</td><td> </td><td>8/23/2022 3:26:16
PM</td><td>&nbsp;</td><td>MS.19.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20219</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:05 PM</td><td> </td><td>8/23/2022 3:26:15
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20237</td><td>WC /F</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>General Snag</td><td>&#39;Toothing between ceramic wall tiles
</td><td>Low</td><td>8/25/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:26 PM</td><td> </td><td>8/23/2022 3:26:14
PM</td><td>&nbsp;</td><td>MW.18.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20248</td><td>WC /F</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;As
previous comments(CIR comments)</td><td>Low</td><td>8/25/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/4/2021 12:05:40 PM</td><td> </td><td>8/23/2022
3:26:12 PM</td><td>&nbsp;</td><td>MW.18.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20255</td><td>WC /M</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>General Snag</td><td>&#39;Toothing between ceramic wall tiles
</td><td>Low</td><td>8/25/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:48 PM</td><td> </td><td>8/23/2022 3:26:11
PM</td><td>&nbsp;</td><td>MW.18.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>20480</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on CIR </td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/8/2021 12:08:19 PM</td><td> </td><td>8/23/2022 3:26:09
PM</td><td>&nbsp;</td><td>MQ.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20484</td><td>W.C. /M</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Floor Tile</td><td>Cracks</td><td>&#39;Broken two tiles should be replaced
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:24 PM</td><td> </td><td>8/23/2022 3:26:08
PM</td><td>&nbsp;</td><td>MW.14.01.002B</td><td>&nbsp;</td>
</tr><tr>
<td>20488</td><td>W.C. /M</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>Cracks</td><td>&#39;Broken one tile should be replaced
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:27 PM</td><td> </td><td>8/23/2022 3:26:08
PM</td><td>&nbsp;</td><td>MW.14.01.002B</td><td>&nbsp;</td>
</tr><tr>
<td>20510</td><td>W.C. /F</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:49 PM</td><td> </td><td>8/23/2022 3:26:07
PM</td><td>&nbsp;</td><td>MW.14.01.002A</td><td>&nbsp;</td>
</tr><tr>
<td>20512</td><td>W.C. /F</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:50 PM</td><td> </td><td>8/23/2022 3:26:06
PM</td><td>&nbsp;</td><td>MW.14.01.002A</td><td>&nbsp;</td>
</tr><tr>
<td>20553</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>Scratches</td><td>&#39;Scratches need to touch up
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:31 PM</td><td> </td><td>8/23/2022 3:26:05
PM</td><td>&nbsp;</td><td>MQ.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20556</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>Scratches</td><td>&#39;Scratches sliding door need to touch up
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:34 PM</td><td> </td><td>8/23/2022 3:26:04
PM</td><td>&nbsp;</td><td>MQ.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20712</td><td>TEMP EXHIBITION CURATOR</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:15 PM</td><td> </td><td>8/23/2022 3:26:03
PM</td><td>&nbsp;</td><td>MT.14.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>23764</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Metal cladding</td><td>General</td><td>&#39;Flashing to be fixed properly
</td><td>Low</td><td>11/3/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:17:08 PM</td><td> </td><td>8/23/2022 3:26:02
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>32667</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;The texture paint to be more rough for all
walls</td><td>Low</td><td>8/18/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>7/28/2022 1:19:38 PM</td><td> </td><td>8/23/2022 3:26:01
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>32684</td><td>LIBRARY ADMIN</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Painting</td><td>General
Snag</td><td>&#39;Based on PMC visit on 3-8-22 all walls should be painted with
rough texture</td><td>Low</td><td>8/24/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/3/2022 12:21:09 PM</td><td> </td><td>8/23/2022 3:26:00
PM</td><td>&nbsp;</td><td>MR.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32693</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Based on PMC visit on 4-8-22,General comment for all door leaves
at the location of using the temporary chain (BandsD,E,F Back of house area)
scratches shown in attached photos must be repainted </td><td>Low</td><td>8/25/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>8/4/2022 12:53:27 PM</td><td>
</td><td>8/23/2022 3:25:59
PM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>29614</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Wavy door leaf should be repaired and adjusted
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
11:38:39 AM</td><td> </td><td>8/23/2022 10:51:20
AM</td><td>&nbsp;</td><td>MS.12.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29611</td><td>SERVICE ZONE 1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door need touch up painting </td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022 11:38:36 AM</td><td>
</td><td>8/23/2022 10:51:15
AM</td><td>&nbsp;</td><td>MS.12.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>20946</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All of
floor boxes and junctions boxes are rusted and should be replaced
</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:45 AM</td><td> </td><td>8/23/2022 10:34:16
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20949</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;wiring
devices not installed and not terminated in all floor
boxes</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:49 AM</td><td> </td><td>8/23/2022 10:34:15
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>30967</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:19:48 PM</td><td> </td><td>8/23/2022
10:34:14 AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>31769</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>CABLE LADDER</td><td>General
Snag</td><td>&#39;Tray should be cover at mechanical
room</td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/6/2022 2:07:08 PM</td><td> </td><td>8/23/2022
10:34:13 AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>32680</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Based on PMC visit on 2-8-22,covers should
be installed </td><td>Low</td><td>8/23/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/2/2022 4:39:23 PM</td><td> </td><td>8/23/2022 10:34:12
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>32681</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Based on PMC visit 2-8-22, incomplete works
should be finished </td><td>Low</td><td>8/23/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/2/2022 4:39:24 PM</td><td> </td><td>8/23/2022 10:34:11
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>30712</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/21/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/31/2022 4:16:04 PM</td><td> </td><td>8/23/2022
10:21:25 AM</td><td>&nbsp;</td><td>MA.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28755</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Floor should be repaired and repaint
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022
11:48:14 AM</td><td> </td><td>8/23/2022 10:21:07
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31647</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/26/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/5/2022 4:25:24 PM</td><td> </td><td>8/23/2022
10:20:54 AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30104</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling need touch up painting </td><td>Low</td><td>6/20/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022 11:37:06 AM</td><td>
</td><td>8/23/2022 10:20:33
AM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>30101</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Protection covers should be removed (for all MEP
fixtures)</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 11:37:03 AM</td><td> </td><td>8/23/2022 10:20:26
AM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31319</td><td>PLANT</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/2/2022 11:38:46 AM</td><td> </td><td>8/23/2022
10:20:09 AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30489</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door should be closed properly/to be
balanced.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:51 AM</td><td> </td><td>8/23/2022 10:19:46
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28222</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs touch up painting </td><td>Low</td><td>4/10/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/20/2022 12:04:14 PM</td><td>
</td><td>8/23/2022 10:19:28
AM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>31257</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed well properly.</td><td>Low</td><td>6/23/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022 10:41:43 AM</td><td>
</td><td>8/23/2022 10:19:18
AM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31254</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed well properly.</td><td>Low</td><td>6/23/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022 10:41:34 AM</td><td>
</td><td>8/23/2022 10:19:06
AM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30564</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor needs repair and touch up painting
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:41 AM</td><td> </td><td>8/23/2022 10:18:50
AM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31250</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed well properly.</td><td>Low</td><td>6/23/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022 10:41:26 AM</td><td>
</td><td>8/23/2022 10:18:42
AM</td><td>&nbsp;</td><td>MT.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>32039</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging handrail after removing
protection.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:57:08 PM</td><td> </td><td>8/23/2022 10:18:30
AM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>30473</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to touch
up.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:25 AM</td><td> </td><td>8/23/2022 10:18:02
AM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>30949</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Gap between door leaf and frame should be same width
</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022
3:57:05 PM</td><td> </td><td>8/23/2022 10:17:43
AM</td><td>&nbsp;</td><td>MA.19.02.017</td><td>&nbsp;</td>
</tr><tr>
<td>30913</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed well properly </td><td>Low</td><td>6/22/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/1/2022 3:50:50 PM</td><td> </td><td>8/23/2022
10:17:33 AM</td><td>&nbsp;</td><td>MA.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>30469</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy gypsum board should be
adjusted.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:19 AM</td><td> </td><td>8/23/2022 10:17:22
AM</td><td>&nbsp;</td><td>MA.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30836</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to touch
up.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
11:56:40 AM</td><td> </td><td>8/23/2022 10:16:40
AM</td><td>&nbsp;</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30835</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
11:56:38 AM</td><td> </td><td>8/23/2022 10:16:04
AM</td><td>&nbsp;</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30903</td><td>PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Dented door leaf to be adjusted.</td><td>Low</td><td>6/22/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022 3:50:35 PM</td><td>
</td><td>8/23/2022 10:15:42
AM</td><td>&nbsp;</td><td>MR.14.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30431</td><td>PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Access door need to
adjusted.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:20 AM</td><td> </td><td>8/23/2022 10:15:24
AM</td><td>&nbsp;</td><td>MR.14.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30518</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing around metal doors
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:13 AM</td><td> </td><td>8/23/2022 10:14:40
AM</td><td>&nbsp;</td><td>MR.14.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31234</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Sealer roller traces should be
adjusted.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 10:40:36 AM</td><td> </td><td>8/23/2022 10:13:54
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31246</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Seller rolls tracers should be
adjusted.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 10:41:16 AM</td><td> </td><td>8/23/2022 10:13:41
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31240</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wrong cutting around electrical
box.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 10:40:55 AM</td><td> </td><td>8/23/2022 10:12:55
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30927</td><td>LOBBY</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/22/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/1/2022 3:56:26 PM</td><td> </td><td>8/23/2022
10:12:27 AM</td><td>&nbsp;</td><td>MQ.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30930</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/22/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/1/2022 3:56:34 PM</td><td> </td><td>8/23/2022
10:11:51 AM</td><td>&nbsp;</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>20717</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor needs touch up painting and repair
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:23 PM</td><td> </td><td>8/23/2022 10:10:02
AM</td><td>&nbsp;</td><td>MQ.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>21625</td><td>CORE D3</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Marked part needs adjustment and
repair </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:24:10 AM</td><td> </td><td>8/23/2022 10:00:03
AM</td><td>&nbsp;</td><td>MC.13.01.D31</td><td>&nbsp;</td>
</tr><tr>
<td>32688</td><td>FEMALE W.C.</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Based on PMC visit on 3-8-22 ,gypsum
ceiling should be fixed properly and to be adjusted at both sides (reflection of
mirror)</td><td>Low</td><td>8/24/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/3/2022 2:00:29 PM</td><td> </td><td>8/23/2022 9:58:27
AM</td><td>&nbsp;</td><td>MW.14.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>31985</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door to
be closed properly/ to be balanced </td><td>Low</td><td>7/26/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>7/5/2022 12:13:52 PM</td><td> </td><td>8/23/2022
9:56:29 AM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>31644</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/26/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/5/2022
4:25:20 PM</td><td> </td><td>8/23/2022 9:52:00
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31307</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
11:38:21 AM</td><td> </td><td>8/23/2022 9:51:27
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30889</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning door leaf and frame and accessories from both
sides.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:13 PM</td><td> </td><td>8/23/2022 9:50:15
AM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30876</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Painting need to touch up.</td><td>Low</td><td>6/22/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>6/1/2022 11:57:59 AM</td><td> </td><td>8/23/2022
9:49:45 AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30226</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting should be repair and touch up
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
1:02:21 PM</td><td> </td><td>8/23/2022 9:48:51
AM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>28758</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need repair and touch up painting
</td><td>Low</td><td>6/1/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/11/2022
11:48:19 AM</td><td> </td><td>8/23/2022 9:48:08
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28756</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need repair and touch up painting
</td><td>Low</td><td>6/1/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/11/2022
11:48:16 AM</td><td> </td><td>8/23/2022 9:47:30
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>28749</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>6/1/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/11/2022 11:48:07 AM</td><td>
</td><td>8/23/2022 9:46:54
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>28738</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>6/1/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/11/2022 11:47:53 AM</td><td>
</td><td>8/23/2022 9:46:21
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>17008</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Shadow gaps should be cleaned </td><td>Low</td><td>4/1/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021 12:33:16 PM</td><td>
</td><td>8/23/2022 9:45:12
AM</td><td>&nbsp;</td><td>MW.12.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>16875</td><td>MALE SHOWER/ LOCKERS-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Floor Tile</td><td>Chipped</td><td>&#39;Marked tile is broken should be replaced
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:01:02 PM</td><td> </td><td>8/23/2022 9:44:40
AM</td><td>&nbsp;</td><td>MW.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16976</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Joint is not the same width
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:32:03 PM</td><td> </td><td>8/23/2022 9:43:06
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>31303</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to adjusted from both
sides</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 11:38:12 AM</td><td> </td><td>8/23/2022 9:41:15
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30721</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Door leaf should be balanced and closed
properly.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 4:16:17 PM</td><td> </td><td>8/23/2022 9:40:34
AM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30269</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Gaps
between door leaf and frame should be same width </td><td>Low</td><td>6/20/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022 3:36:30 PM</td><td>
</td><td>8/23/2022 9:39:58
AM</td><td>&nbsp;</td><td>MA.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30249</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Gap
between door leaf and frame should be same width </td><td>Low</td><td>6/20/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022 3:35:42 PM</td><td>
</td><td>8/23/2022 9:39:26
AM</td><td>&nbsp;</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30244</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Gap
between door leaf and frame should be same width </td><td>Low</td><td>6/20/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022 3:35:34 PM</td><td>
</td><td>8/23/2022 9:38:54
AM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30238</td><td>STORE</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Gap
between door leaf and frame should be same width </td><td>Low</td><td>6/20/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022 3:35:23 PM</td><td>
</td><td>8/23/2022 9:38:11
AM</td><td>&nbsp;</td><td>MA.19.02.021</td><td>&nbsp;</td>
</tr><tr>
<td>28057</td><td>Core G2</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;All welding joints should be
finished properly </td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/15/2022 10:53:45 AM</td><td> </td><td>8/23/2022 9:24:34
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17009</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling painting need touch up </td><td>Low</td><td>4/1/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021 12:33:18 PM</td><td>
</td><td>8/23/2022 9:22:50
AM</td><td>&nbsp;</td><td>MW.12.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>28211</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Remove all dents and marks and cracks
should be repaired and repaint </td><td>Low</td><td>4/10/2022 12:00:00
PM</td><td>mohamed.sami</td><td>3/20/2022 12:03:52 PM</td><td> </td><td>8/23/2022
9:19:15 AM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30504</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Floor need to repair.</td><td>Low</td><td>6/21/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/31/2022 11:43:19 AM</td><td> </td><td>8/23/2022
9:18:30 AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30207</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Marked part should be repaired and
leveled.</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 12:03:43 PM</td><td> </td><td>8/23/2022 9:16:32
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30205</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring should be
repaired.</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 12:02:43 PM</td><td> </td><td>8/23/2022 9:15:24
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>28760</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint Floor</td><td>General
Snag</td><td>&#39;General cleaning </td><td>Low</td><td>6/1/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/11/2022 11:48:21 AM</td><td> </td><td>8/23/2022
9:14:57 AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>29356</td><td>EMERGENCY LIGHTING</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes should be
closed.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:17 PM</td><td> </td><td>8/23/2022 9:04:39
AM</td><td>&nbsp;</td><td>MS.18.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>29848</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes need to
close.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:19:16 PM</td><td> </td><td>8/23/2022 9:02:44
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>29610</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes should be
closed.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:36 AM</td><td> </td><td>8/23/2022 9:02:02
AM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29443</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door to be closed properly to be balanced
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
5:06:04 PM</td><td> </td><td>8/23/2022 9:00:21
AM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29609</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door should be closed
properly.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:35 AM</td><td> </td><td>8/23/2022 8:59:34
AM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29321</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Painting around hinges need to touch up
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:15:04 PM</td><td> </td><td>8/23/2022 8:58:41
AM</td><td>&nbsp;</td><td>MW.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29826</td><td>STAFF W.C./F</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes should be
closed.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:46 PM</td><td> </td><td>8/23/2022 8:57:59
AM</td><td>&nbsp;</td><td>MW.19.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>29823</td><td>STAFF W.C./F</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes should be
closed.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:38 PM</td><td> </td><td>8/23/2022 8:57:17
AM</td><td>&nbsp;</td><td>MW.19.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>29817</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes should be
closed.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:29 PM</td><td> </td><td>8/23/2022 8:56:32
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29811</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes should be
closed.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:15 PM</td><td> </td><td>8/23/2022 8:55:46
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29828</td><td>STAFF W.C./F</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes need to
close.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:53 PM</td><td> </td><td>8/23/2022 8:54:48
AM</td><td>&nbsp;</td><td>MW.19.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>28130</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Roof
Tiles</td><td>Level difference</td><td>&#39;Wavy aluminum cladding should be
leveled </td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/16/2022 12:09:25 PM</td><td> </td><td>8/23/2022 8:53:45
AM</td><td>&nbsp;</td><td>Museum Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>28133</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Roof
Tiles</td><td>Level difference</td><td>&#39;Wavy top of cladding should be aligned
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/16/2022
12:09:31 PM</td><td> </td><td>8/23/2022 8:53:19 AM</td><td>&nbsp;</td><td>Museum
Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>28883</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>GENERAL
SUPPORTS</td><td>Arrangement is not vertical / horizontal</td><td>&#39;Pipes and
hoses need more supports and arrangements. </td><td>High</td><td>5/23/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/16/2022 4:07:31 PM</td><td>
</td><td>8/23/2022 8:12:01
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>30042</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;PPR. Pipes need
Adjustments. </td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:27:07 AM</td><td> </td><td>8/23/2022 8:08:14
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>14758</td><td>Desert Land</td><td>Desert
Land</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable dressing is not done for cat6a cables
and fiber cables </td><td>High</td><td>1/19/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>1/12/2021 3:30:37 PM</td><td> </td><td>8/22/2022 3:10:24
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14762</td><td>Desert Land</td><td>Desert
Land</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete cat6a/fiber cable pulling and
Termination and CCTV Camera installation also not done yet.Power cables were not
pulled for fiber media converter </td><td>High</td><td>1/19/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>1/12/2021 3:30:58 PM</td><td>
</td><td>8/22/2022 3:10:23 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17853</td><td>Pyramid Climb</td><td>Pyramid
Climb</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Khufu Stairs CCTV cameras, Public Address system horn speaker
installation is incomplete. Outdoor rack fiber connection also missing from Pyramid
restaurant hub room.cat6A cable distribution from the outdoor rack to cameras
locations also not done.</td><td>High</td><td>5/27/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>5/20/2021 8:52:32 AM</td><td>
</td><td>8/22/2022 3:10:21 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18839</td><td>CORE F6</td><td>CCB
L10</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/20/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>6/13/2021 9:49:47 AM</td><td> </td><td>8/22/2022
3:10:20 PM</td><td>&nbsp;</td><td>CC.08.01.F61</td><td>&nbsp;</td>
</tr><tr>
<td>19170</td><td>MAIN IT ROOM</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Incomplete Installation</td><td>&#39;Server naming is missing and
switches uplink and switches labeling also not done yet.And switches configuration
is not done and fiber patch cords should be dressed and it should be installed in
the enclosed conduit or cable trunks </td><td>High</td><td>6/24/2021 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>6/17/2021 11:56:00 AM</td><td>
</td><td>8/22/2022 3:10:19
PM</td><td>&nbsp;</td><td>CS.07.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>19171</td><td>MAIN IT ROOM</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Incomplete Installation</td><td>&#39;Missing inter rack cabling and
clarity how to intend to provide connection from fiber MDF rack to another
rack.missing many fiber uplink connection for all hub rooms .only 3 patch cords
only patched</td><td>High</td><td>6/24/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>6/17/2021 11:56:03 AM</td><td> </td><td>8/22/2022 3:10:18
PM</td><td>&nbsp;</td><td>CS.07.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>19175</td><td>MAIN IT ROOM</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Incomplete Installation</td><td>&#39;Fiber cable termination and
dressing of fiber cables are incomplete and permanent labeling also not
done.</td><td>High</td><td>6/24/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>6/17/2021 11:56:14 AM</td><td> </td><td>8/22/2022 3:10:17
PM</td><td>&nbsp;</td><td>CS.07.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>17829</td><td>RESTAURANT 5 (FINISHED BY TENANT)
(CORE&amp;SHELL)</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Broken edge</td><td>High</td><td>5/17/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>5/10/2021 11:50:29 AM</td><td>
</td><td>8/22/2022 11:30:39 AM</td><td>Done
</td><td>CR.07.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>18620</td><td>FIRE TRUNCK/SERVICE</td><td>MFPC
GF</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced</td><td>Low</td><td>6/30/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>6/9/2021 3:23:06 PM</td><td>
</td><td>8/22/2022 11:30:38 AM</td><td>Done
</td><td>DS.03.0G.44</td><td>&nbsp;</td>
</tr><tr>
<td>18622</td><td>FIRE TRUNCK/SERVICE</td><td>MFPC
GF</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;The relations between stone wall and block wall should be closed
</td><td>Low</td><td>6/30/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>6/9/2021
3:23:09 PM</td><td> </td><td>8/22/2022 11:30:36 AM</td><td>Done
</td><td>DS.03.0G.44</td><td>&nbsp;</td>
</tr><tr>
<td>24614</td><td>Mankauras - Phase 3A</td><td>Mankauras Stair
and Wall</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Lighting fixtures should be aligned with panel
edge</td><td>Low</td><td>11/21/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/31/2021 4:17:24 PM</td><td> </td><td>8/22/2022 11:30:35
AM</td><td>Done </td><td>Mankauras - Phase 3A</td><td>&nbsp;</td>
</tr><tr>
<td>25090</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>GEOTECH
Tensar</td><td>Architectural</td><td>Brick/Blockwork</td><td>General
Snag</td><td>&#39;Cracks should be treated</td><td>Low</td><td>11/21/2021 12:00:00
PM</td><td>Amr Nofal</td><td>11/14/2021 10:29:09 AM</td><td> </td><td>8/22/2022
11:30:30 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25109</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>GEOTECH
Tensar</td><td>Architectural</td><td>Brick/Blockwork</td><td>General
Snag</td><td>&#39;Cracks should be repaired</td><td>Low</td><td>12/5/2021 12:00:00
PM</td><td>Amr Nofal</td><td>11/14/2021 10:30:33 AM</td><td> </td><td>8/22/2022
11:30:28 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26691</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:18 PM</td><td> </td><td>8/22/2022 11:30:27 AM</td><td>Done </td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26702</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:36 PM</td><td> </td><td>8/22/2022 11:30:25 AM</td><td>Done </td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26709</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone cladding</td><td>Damages to be
rectified or replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:46 PM</td><td> </td><td>8/22/2022 11:30:24 AM</td><td>Done </td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26822</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Different textures of tiles should be
replaced </td><td>Low</td><td>3/22/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/1/2022 4:31:44 PM</td><td> </td><td>8/22/2022
11:30:23 AM</td><td>Done </td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27074</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing tile should be installed
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:23 PM</td><td> </td><td>8/22/2022 11:30:22 AM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27075</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Wooden plate to be removed
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:26 PM</td><td> </td><td>8/22/2022 11:30:20 AM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27076</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:29 PM</td><td> </td><td>8/22/2022 11:30:19 AM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27151</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Poor repair should be adjusted and finished
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:33 PM</td><td> </td><td>8/22/2022 11:30:17 AM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27171</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Interface between stone flooring and stone cladding should be
aligned </td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:07:12 PM</td><td> </td><td>8/22/2022
11:30:14 AM</td><td>Done </td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>32679</td><td>Mankauras - Phase 3A</td><td>Mankauras Stair
and Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring
- stone</td><td>General</td><td>&#39;Based on PMC visit on 2-8-22,the marked step
should be fixed properly </td><td>Low</td><td>8/23/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/2/2022 4:22:24 PM</td><td> </td><td>8/22/2022 11:30:13
AM</td><td>Done </td><td>Mankauras - Phase 3A</td><td>&nbsp;</td>
</tr><tr>
<td>32682</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Based on PMC visit on 2-8-22,defective painting
should be repaired </td><td>Low</td><td>8/23/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/2/2022 4:39:27 PM</td><td> </td><td>8/22/2022 11:30:11
AM</td><td>Done </td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>

<td>23877</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>11/14/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>10/24/2021 12:19:42 PM</td><td>
</td><td>8/21/2022 4:56:12 PM</td><td>Permanent deduction
made.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23897</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>11/14/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>10/24/2021 12:20:15 PM</td><td>
</td><td>8/21/2022 4:55:41 PM</td><td>Permanent deduction
made.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24294</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>11/16/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/26/2021 4:41:46 PM</td><td>
</td><td>8/21/2022 4:55:10 PM</td><td>Permanent deduction
made.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24279</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>11/16/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/26/2021 4:41:19 PM</td><td>
</td><td>8/21/2022 4:54:42 PM</td><td>Permanent deduction
made.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24038</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>11/15/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:39:00 PM</td><td>
</td><td>8/21/2022 4:54:13 PM</td><td>Permanent deduction
made.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31021</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:21:19 PM</td><td> </td><td>8/21/2022 2:12:49
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>32049</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:11 AM</td><td>
</td><td>8/21/2022 2:12:48
PM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>32050</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:13 AM</td><td>
</td><td>8/21/2022 2:12:47
PM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>32051</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>7/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:14 AM</td><td> </td><td>8/21/2022
2:12:46 PM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>32052</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>7/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:15 AM</td><td> </td><td>8/21/2022
2:12:45 PM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>32053</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>7/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:17 AM</td><td> </td><td>8/21/2022
2:12:44 PM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>32494</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;The hose should to install properly
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:45 AM</td><td> </td><td>8/21/2022 1:52:32
PM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>12023</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Doors
need to touch up - refer to comments on CIR no
215109</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>10/1/2020 2:12:56 PM</td><td> </td><td>8/21/2022 12:04:45
PM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>12043</td><td>MACHINE ACCESS ROOM</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up - refer to comments CIR no
215108</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/1/2020 2:13:54 PM</td><td> </td><td>8/21/2022 12:04:44
PM</td><td>&nbsp;</td><td>MS.18.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>12047</td><td>PLANT</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up - refer to comments CIR no
215108</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/1/2020 2:14:06 PM</td><td> </td><td>8/21/2022 12:04:42
PM</td><td>&nbsp;</td><td>MS.13.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>12051</td><td>VOID</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up - refer to comments CIR no
215108</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/1/2020 2:14:19 PM</td><td> </td><td>8/21/2022 12:04:41
PM</td><td>&nbsp;</td><td>MS.13.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20249</td><td>WC /M</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Floor Tile</td><td>Cracks</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>8/25/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:40 PM</td><td> </td><td>8/21/2022 12:04:40
PM</td><td>&nbsp;</td><td>MW.18.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>14470</td><td>B.O.H-SERVICE TUNNEL (A) - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing fire collar around PPR pipe
</td><td>High</td><td>1/2/2021 12:00:00 PM</td><td>ahmedsalem</td><td>12/26/2020
11:40:22 AM</td><td> </td><td>8/21/2022 8:08:16
AM</td><td>&nbsp;</td><td>MQ.23.02.001</td><td>&nbsp;</td>
</tr><tr>

<td>24842</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing gravel need to installed.</td><td>Low</td><td>11/28/2021
12:00:00 AM</td><td>Moussa Nageh Khella</td><td>11/7/2021 4:15:24 PM</td><td>
</td><td>8/20/2022 3:33:12 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10490</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:13:26 PM</td><td> </td><td>8/20/2022
3:22:37 PM</td><td>Done </td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32391</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be protected
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:18 PM</td><td> </td><td>8/18/2022 2:24:37
PM</td><td>&nbsp;</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32390</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover and label
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:16 PM</td><td> </td><td>8/18/2022 2:24:10
PM</td><td>&nbsp;</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32380</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged flexible and cable should be laying
in trunk</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:00 PM</td><td> </td><td>8/18/2022 2:23:21
PM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32392</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:29:20 PM</td><td>
</td><td>8/18/2022 2:22:59
PM</td><td>&nbsp;</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32382</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label and cover
box</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:05 PM</td><td> </td><td>8/18/2022 2:22:55
PM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32399</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:29:31 PM</td><td>
</td><td>8/18/2022 2:21:21
PM</td><td>&nbsp;</td><td>MS.13.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32386</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover and label
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:10 PM</td><td> </td><td>8/18/2022 2:20:00
PM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>20499</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on CIR </td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/8/2021 12:08:38 PM</td><td> </td><td>8/18/2022 1:28:39
PM</td><td>&nbsp;</td><td>MT.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20694</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>8/31/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/10/2021 11:40:04 AM</td><td> </td><td>8/18/2022
1:28:36 PM</td><td>&nbsp;</td><td>MR.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20753</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy painting should be adjusted
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:13 PM</td><td> </td><td>8/18/2022 1:28:34
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20755</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum wall should be adjusted
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:16 PM</td><td> </td><td>8/18/2022 1:28:32
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20763</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum wall should be adjusted
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:28 PM</td><td> </td><td>8/18/2022 1:28:04
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>22233</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Damaged stainless steel frame need to touch
up </td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/24/2021 11:48:40 AM</td><td> </td><td>8/18/2022 1:28:01
PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>32687</td><td>MALE W.C.</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Based on PMC visit on 3-8-22,Loose tile
should be fixed properly </td><td>Low</td><td>8/24/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/3/2022 1:51:08 PM</td><td> </td><td>8/18/2022 1:28:00
PM</td><td>&nbsp;</td><td>MW.14.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>11710</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Discoloration between
tiles</td><td>Low</td><td>10/18/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>9/27/2020 4:40:38 PM</td><td> </td><td>8/18/2022 1:25:19
PM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16262</td><td>VIP RECEPTION</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Scratches on elevator leaf/protecting tape should
be removed</td><td>Low</td><td>2/21/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/14/2021 2:00:40 PM</td><td> </td><td>8/18/2022 1:25:17
PM</td><td>&nbsp;</td><td>MV.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16272</td><td>VIP RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration of
tiles</td><td>Low</td><td>2/21/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/14/2021 2:01:17 PM</td><td> </td><td>8/18/2022 1:25:14
PM</td><td>&nbsp;</td><td>MV.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16339</td><td>SCHOLAR RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wavy painting should be adjusted
/vertical crack should be adjusted </td><td>Low</td><td>3/7/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>2/14/2021 2:03:56 PM</td><td> </td><td>8/18/2022
1:25:12 PM</td><td>&nbsp;</td><td>MR.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16460</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;</td><td>Low</td><td>3/8/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>2/15/2021 9:18:02 AM</td><td> </td><td>8/18/2022
1:25:10 PM</td><td>&nbsp;</td><td>MG.14.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>16572</td><td>TOILET</td><td>MU GF </td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Saggaing</td><td>&#39;Waving gypsum ceiling
</td><td>Low</td><td>2/22/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:52:01 AM</td><td> </td><td>8/18/2022 1:24:55
PM</td><td>&nbsp;</td><td>MW.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>18354</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy edge should be leveled
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:36:27 PM</td><td> </td><td>8/18/2022 1:24:53
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20202</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on cir </td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/4/2021 12:04:50 PM</td><td> </td><td>8/18/2022 1:24:51
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20208</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wavy painting should be adjusted
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:56 PM</td><td> </td><td>8/18/2022 1:24:49
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20213</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on cir </td><td>Low</td><td>8/25/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/4/2021 12:05:00 PM</td><td> </td><td>8/18/2022 1:24:48
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20215</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on CIR </td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/4/2021 12:05:01 PM</td><td> </td><td>8/18/2022 1:24:46
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20240</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;As previous Comments in CIR </td><td>Low</td><td>8/25/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>8/4/2021 12:05:29 PM</td><td>
</td><td>8/18/2022 1:24:45
PM</td><td>&nbsp;</td><td>MQ.18.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20336</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked part needs adjustment and repair
(edge and area behind the false ceiling)</td><td>Low</td><td>8/26/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/5/2021 12:14:37 PM</td><td> </td><td>8/18/2022
1:24:43 PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20381</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Painting is missing
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:46 PM</td><td> </td><td>8/18/2022 1:24:41
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20500</td><td>TEMP EXH STORAGE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Ceiling needs touch up painting
</td><td>Low</td><td>8/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:39 PM</td><td> </td><td>8/18/2022 1:24:29
PM</td><td>&nbsp;</td><td>MT.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20528</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>8/29/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021 12:09:05 PM</td><td>
</td><td>8/18/2022 1:24:28
PM</td><td>&nbsp;</td><td>MT.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20538</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on CIR </td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/8/2021 12:09:16 PM</td><td> </td><td>8/18/2022 1:24:15
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20549</td><td>ELEC.</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on CIR </td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/8/2021 12:09:27 PM</td><td> </td><td>8/18/2022 1:24:13
PM</td><td>&nbsp;</td><td>MS.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20559</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on CIR </td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/8/2021 12:09:36 PM</td><td> </td><td>8/18/2022 1:24:10
PM</td><td>&nbsp;</td><td>MQ.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20564</td><td>UNIVERSAL DISABLED W.C.</td><td>MU
L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling should be leveled </td><td>Low</td><td>8/29/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/8/2021 12:09:43 PM</td><td> </td><td>8/18/2022
1:24:09 PM</td><td>&nbsp;</td><td>MW.14.01.001C</td><td>&nbsp;</td>
</tr><tr>
<td>20600</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail works are not finished yet
</td><td>Low</td><td>8/30/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/9/2021
9:42:07 AM</td><td> </td><td>8/18/2022 1:24:07
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20684</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
11:39:44 AM</td><td> </td><td>8/18/2022 1:24:06
PM</td><td>&nbsp;</td><td>MQ.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20693</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>8/31/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/10/2021 11:40:01 AM</td><td> </td><td>8/18/2022
1:24:04 PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20697</td><td>LIBRARY ADMIN</td><td>MU
L10</td><td>Closed</td><td>T and D design</td><td>Architectural</td><td>Carpet
Floor</td><td>General Snag</td><td>&#39;Carpet flooring around floor boxes need
adjustment </td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/10/2021 11:40:09 AM</td><td> </td><td>8/18/2022 1:23:51
PM</td><td>&nbsp;</td><td>MR.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20702</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Painting need repair and repainting
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
11:41:03 AM</td><td> </td><td>8/18/2022 1:23:49
PM</td><td>&nbsp;</td><td>MR.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20740</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wall should be
repainted</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/10/2021 12:02:55 PM</td><td> </td><td>8/18/2022 1:23:44
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20757</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked part should be adjusted and repaired
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:19 PM</td><td> </td><td>8/18/2022 1:23:14
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20758</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy wall should be adjusted
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:20 PM</td><td> </td><td>8/18/2022 1:23:11
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20759</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked part should be adjusted
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:22 PM</td><td> </td><td>8/18/2022 1:23:10
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20760</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum walls should be adjusted
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:24 PM</td><td> </td><td>8/18/2022 1:23:05
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20766</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs touch up painting /missing painting for access door
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:33 PM</td><td> </td><td>8/18/2022 1:22:53
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20767</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Marked edge is not aligned and should be
adjusted </td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/10/2021 12:03:34 PM</td><td> </td><td>8/18/2022 1:22:52
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20768</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy gypsum ceiling should be adjusted
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:35 PM</td><td> </td><td>8/18/2022 1:22:50
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20776</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:48 PM</td><td> </td><td>8/18/2022 1:22:48
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20777</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>8/17/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:50 PM</td><td> </td><td>8/18/2022 1:22:46
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21573</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around MEP Fixtures </td><td>Low</td><td>9/9/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021 9:52:31 AM</td><td>
</td><td>8/18/2022 1:22:44
PM</td><td>&nbsp;</td><td>MS.12.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>21656</td><td>LOBBY</td><td>MU GF </td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments in CIR </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 11:24:58 AM</td><td> </td><td>8/18/2022 1:22:42
PM</td><td>&nbsp;</td><td>MC.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21661</td><td>LOBBY</td><td>MU GF </td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Tiles are missing </td><td>Low</td><td>9/9/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/19/2021 11:25:05 AM</td><td> </td><td>8/18/2022
1:22:40 PM</td><td>&nbsp;</td><td>MC.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22183</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/14/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/24/2021
11:47:04 AM</td><td> </td><td>8/18/2022 1:22:38
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>22185</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>alignment/level</td><td>&#39;Damaged gypsum wall need repair and
adjusted </td><td>Low</td><td>9/14/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/24/2021 11:47:07 AM</td><td> </td><td>8/18/2022 1:22:36
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>22216</td><td>FIRST AID 3</td><td>MU GF
</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Interface between stone and linoleum should
be covered</td><td>Low</td><td>9/14/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/24/2021 11:48:01 AM</td><td> </td><td>8/18/2022 1:22:34
PM</td><td>&nbsp;</td><td>MG.12.0G.008</td><td>&nbsp;</td>
</tr><tr>
<td>22238</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Rough edges of lighting grove should
be smooth </td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/24/2021 11:48:58 AM</td><td> </td><td>8/18/2022 1:22:19
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>22279</td><td>FIRST AID 2</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
Rubber flooring</td><td>General</td><td>&#39;Interface between rubber floor and
stone floor should be covered </td><td>Low</td><td>9/14/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/24/2021 11:49:56 AM</td><td> </td><td>8/18/2022
1:22:14 PM</td><td>&nbsp;</td><td>MG.12.0G.007</td><td>&nbsp;</td>
</tr><tr>
<td>22287</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Flooring - Rubber
flooring</td><td>General</td><td>&#39;Bubbles under floor
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:50:08 AM</td><td> </td><td>8/18/2022 1:22:12
PM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22310</td><td>OPERATIONAL OFFICE</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Edges are not aligned and should be adjusted
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:50:40 AM</td><td> </td><td>8/18/2022 1:22:11
PM</td><td>&nbsp;</td><td>MG.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>23744</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Marked joint is not aligned
and should be adjusted </td><td>Low</td><td>11/3/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:37 PM</td><td> </td><td>8/18/2022 1:22:09
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23790</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Interface between stone cladding should be
aligned and the gap should be minimized </td><td>Low</td><td>11/8/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/18/2021 4:29:15 PM</td><td>
</td><td>8/18/2022 1:22:08 PM</td><td>&nbsp;</td><td>Atrium - Internal
Side</td><td>&nbsp;</td>
</tr><tr>

<td>24260</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Alico</
td><td>Architectural</td><td>Glass partion and door</td><td>General
Snag</td><td>&#39;Stainless cladding should be flushed
EWS-08</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/26/2021 4:40:44 PM</td><td> </td><td>8/18/2022 1:22:07
PM</td><td>&nbsp;</td><td>Bridge</td><td>&nbsp;</td>
</tr><tr>
<td>27938</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;Marked
gypsum wall should be adjusted and gap should be closed
</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/13/2022
12:22:57 PM</td><td> </td><td>8/18/2022 1:22:05
PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27943</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting (for all stair
walls </td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 12:23:07 PM</td><td> </td><td>8/18/2022 1:22:00
PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>32686</td><td>UNIVERSAL DISABLED W.C.</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Based on PMC visit on 3-8-22 the stone
cladding for marked parts should be extended </td><td>Low</td><td>8/24/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>8/3/2022 1:42:44 PM</td><td>
</td><td>8/18/2022 1:21:56
PM</td><td>&nbsp;</td><td>MW.14.01.001C</td><td>&nbsp;</td>
</tr><tr>
<td>26949</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
done </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:10 PM</td><td> </td><td>8/18/2022 10:25:29
AM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>26969</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
completed </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:43 PM</td><td> </td><td>8/18/2022 10:25:24
AM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>26733</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Card reader installation is incomplete
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:45:41 PM</td><td> </td><td>8/18/2022 10:25:12
AM</td><td>&nbsp;</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>27391</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control </td><td>High</td><td>3/14/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:08:29 PM</td><td>
</td><td>8/18/2022 10:25:07
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>27395</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:35 PM</td><td> </td><td>8/18/2022 10:25:00
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>26965</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and card reader,green break
glass unit device not installed yet </td><td>High</td><td>3/9/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/2/2022 4:00:36 PM</td><td>
</td><td>8/18/2022 10:24:32
AM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>26967</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
completed </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:40 PM</td><td> </td><td>8/18/2022 10:24:25
AM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>26977</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
completed </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:55 PM</td><td> </td><td>8/18/2022 10:24:11
AM</td><td>&nbsp;</td><td>MA.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>26956</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
done </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:21 PM</td><td> </td><td>8/18/2022 10:23:53
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>26953</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
done </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:17 PM</td><td> </td><td>8/18/2022 10:23:39
AM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>26954</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
done </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:18 PM</td><td> </td><td>8/18/2022 10:23:34
AM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>26960</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
done </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:27 PM</td><td> </td><td>8/18/2022 10:20:45
AM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>26964</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
completed </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:33 PM</td><td> </td><td>8/18/2022 10:20:11
AM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>26936</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
done and flexible pipes should be installed for RJ45 connection
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 3:59:48 PM</td><td> </td><td>8/18/2022 10:19:55
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>27897</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi not installed </td><td>High</td><td>3/19/2022 12:00:00
AM</td><td>Mohamed Samir</td><td>3/12/2022 11:52:46 AM</td><td> </td><td>8/18/2022
10:18:19 AM</td><td>&nbsp;</td><td>MS.14.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>27898</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cable management not done </td><td>High</td><td>3/19/2022
12:00:00 AM</td><td>Mohamed Samir</td><td>3/12/2022 11:52:47 AM</td><td>
</td><td>8/18/2022 10:17:50
AM</td><td>&nbsp;</td><td>MS.14.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>27888</td><td>IT 7</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>3/12/2022 11:52:30 AM</td><td> </td><td>8/18/2022 10:17:22
AM</td><td>&nbsp;</td><td>MS.14.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>15334</td><td>EL. ROOM</td><td>CCB
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Empty conduits , no ICT outlet labels, WiFi media converter is
not installed</td><td>High</td><td>2/2/2021 12:00:00 PM</td><td>Mohamed
Samir</td><td>1/26/2021 3:20:30 PM</td><td> </td><td>8/18/2022 10:07:08
AM</td><td>&nbsp;</td><td>CS.02.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>26746</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Alignment and Level not followed</td><td>&#39;WiFi labeling is
missing and no port mapping details and port activation needs to be
done</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:45:51 PM</td><td> </td><td>8/18/2022 10:05:30
AM</td><td>&nbsp;</td><td>MR.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>26941</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
done yet </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 3:59:58 PM</td><td> </td><td>8/18/2022 10:02:02
AM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>27625</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;No labeling for wifi</td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:53:30 PM</td><td>
</td><td>8/18/2022 10:01:26 AM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>27804</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:14 PM</td><td> </td><td>8/18/2022 10:01:20
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>27896</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices are missing
</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed Samir</td><td>3/12/2022
11:52:44 AM</td><td> </td><td>8/18/2022 10:00:49
AM</td><td>&nbsp;</td><td>MS.14.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>27890</td><td>VOID</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cable management not done </td><td>High</td><td>3/19/2022
12:00:00 AM</td><td>Mohamed Samir</td><td>3/12/2022 11:52:34 AM</td><td>
</td><td>8/18/2022 10:00:36
AM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27900</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices are missing
</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed Samir</td><td>3/12/2022
11:52:52 AM</td><td> </td><td>8/18/2022 9:58:33
AM</td><td>&nbsp;</td><td>MS.14.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>27601</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All access control devices are not terminated
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:52:49 PM</td><td> </td><td>8/18/2022 9:58:22
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27903</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>3/19/2022 12:00:00
AM</td><td>Mohamed Samir</td><td>3/12/2022 11:52:57 AM</td><td> </td><td>8/18/2022
9:57:57 AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27608</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All access control devices are not terminated
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:01 PM</td><td> </td><td>8/18/2022 9:57:42
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27603</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All hanging cables should be installed within
trunk</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:52:52 PM</td><td> </td><td>8/18/2022 9:57:22
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27612</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;The data outlet should be installed near the camera and long open
patching is not allowed </td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:53:08 PM</td><td>
</td><td>8/18/2022 9:55:50
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27616</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Port activation for BMS and flexible conduit
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:16 PM</td><td> </td><td>8/18/2022 9:54:33
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27617</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;WiFi labeling </td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:53:17 PM</td><td>
</td><td>8/18/2022 9:53:56
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27618</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All hanging cables should installed within cable
trunk</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:19 PM</td><td> </td><td>8/18/2022 9:53:47
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27621</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Cabling should be protected by flexible conduit
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:23 PM</td><td> </td><td>8/18/2022 9:50:41
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27800</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:09 PM</td><td> </td><td>8/18/2022 9:50:25
AM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>19935</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing ICT labels, missing cctv final labels, missing access
control door contact </td><td>High</td><td>8/5/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>7/29/2021 11:45:02 AM</td><td> </td><td>8/18/2022 9:49:57
AM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27799</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All the cat6a cables and fiber cables should be pulled inside the
rack and terminated on the respective patch panels.prober dressing and patching
needs to be done </td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:07 PM</td><td> </td><td>8/17/2022 4:38:46
PM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27801</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV cables termination,Patching and port mapping is not done for
camera </td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:10 PM</td><td> </td><td>8/17/2022 4:38:45
PM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28042</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All the pulled cat6a cables should be routed inside the rack and
terminated in the patch panels and labeling also needs to be done
</td><td>High</td><td>3/21/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/14/2022 1:33:53 PM</td><td> </td><td>8/17/2022 4:38:44
PM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28045</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All the pulled cables outside the rack and needs to be
dressed,terminated and labeling also.And network switches patch cords and cat6a and
fiber patch panels labeling also missing </td><td>High</td><td>3/21/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/14/2022 1:36:04 PM</td><td>
</td><td>8/17/2022 4:38:43
PM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28051</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;The cable should be dropping to rack and addressing and labeling
and termination </td><td>High</td><td>3/21/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/14/2022 1:52:25 PM</td><td> </td><td>8/17/2022 4:38:42
PM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>15613</td><td>FIRST AID 3</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Linoleum flooring ( flooring tile should be
adhesive - relation between stone and linoleum should be flushed
)</td><td>Low</td><td>2/8/2021 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>2/1/2021 11:30:48 AM</td><td> </td><td>8/17/2022 4:15:35
PM</td><td>Done </td><td>MG.12.0G.008</td><td>&nbsp;</td>
</tr><tr>
<td>15633</td><td>DOCTOR</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Linoleum flooring (linoleum is not adhesive
/joint between floor and wall/relation between linoleum and stone should be
flashed /leveling should be adjusted /should be adjusted joints /edge cutting
should be aligned </td><td>Low</td><td>2/22/2021 12:00:00
PM</td><td>sally.george</td><td>2/1/2021 11:37:35 AM</td><td> </td><td>8/17/2022
4:15:34 PM</td><td>Done </td><td>MG.12.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>15635</td><td>STORE</td><td>MU GF
</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Linoleum flooring (linoleum is not adhesive
/damaged flooring joint between floor and wall/relation between linoleum and stone
should be flashed </td><td>Low</td><td>2/22/2021 12:00:00
AM</td><td>sally.george</td><td>2/1/2021 11:37:39 AM</td><td> </td><td>8/17/2022
4:15:33 PM</td><td>Done </td><td>MG.12.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>15668</td><td>FIRST AID 1</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Linoleum flooring (linoleum is not adhesive
/damaged flooring joint between floor and wall/relation between linoleum and stone
should be flashed </td><td>Low</td><td>2/8/2021 12:00:00
PM</td><td>sally.george</td><td>2/1/2021 1:39:27 PM</td><td> </td><td>8/17/2022
4:15:32 PM</td><td>Done </td><td>MG.12.0G.005</td><td>&nbsp;</td>
</tr><tr>
<td>28207</td><td>CORE F1</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Camera not installed and outlet
label</td><td>High</td><td>3/24/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/17/2022 1:51:00 PM</td><td> </td><td>8/17/2022 12:58:04
PM</td><td>&nbsp;</td><td>MC.24.03.F11</td><td>&nbsp;</td>
</tr><tr>
<td>28208</td><td>CORE F1</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi labeling and patch </td><td>High</td><td>3/24/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/17/2022 1:51:01 PM</td><td>
</td><td>8/17/2022 12:56:21
PM</td><td>&nbsp;</td><td>MC.24.03.F11</td><td>&nbsp;</td>
</tr><tr>
<td>28276</td><td>Ground Floor</td><td>Ground
Floor</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;The works are ongoing for front (East)
facade. Therefore this facade will be re-snagged once the work
finished.</td><td>Low</td><td>4/20/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/30/2022 10:53:38 AM</td><td> </td><td>8/17/2022 12:25:26
PM</td><td>&nbsp;</td><td>Solar Boat Building</td><td>&nbsp;</td>
</tr><tr>
<td>28275</td><td>Ground Floor</td><td>Ground
Floor</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;The works are ongoing for left side (South)
facade. Therefore this facade will be re-snagged once the work
finished.</td><td>Low</td><td>4/20/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/30/2022 10:53:36 AM</td><td> </td><td>8/17/2022 12:24:40
PM</td><td>&nbsp;</td><td>Solar Boat Building</td><td>&nbsp;</td>
</tr><tr>
<td>28274</td><td>Ground Floor</td><td>Ground
Floor</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;The works are ongoing for right side(North )
facade. Therefore this facade will be re-snagged once the work
finished.</td><td>Low</td><td>4/20/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/30/2022 10:53:35 AM</td><td> </td><td>8/17/2022 12:24:08
PM</td><td>&nbsp;</td><td>Solar Boat Building</td><td>&nbsp;</td>
</tr><tr>
<td>19931</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing WiFi device, missing cctv final label , missing access
control devices and labels </td><td>High</td><td>8/5/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>7/29/2021 11:44:43 AM</td><td> </td><td>8/17/2022
11:37:14 AM</td><td>&nbsp;</td><td>MS.18.2A.024</td><td>&nbsp;</td>
</tr><tr>
<td>27637</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All access control devices are not terminated
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:50 PM</td><td> </td><td>8/17/2022 11:37:13
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>27638</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All access control devices are not
terminated</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:52 PM</td><td> </td><td>8/17/2022 11:37:12
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27782</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing secure data patching </td><td>High</td><td>3/17/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:33:42 PM</td><td>
</td><td>8/17/2022 11:37:11
AM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>27784</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Lighting control secure data patching missing
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:33:45 PM</td><td> </td><td>8/17/2022 11:37:10
AM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>27798</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cat6a cables should be routed inside the conduit and this cables
to be terminated with Keystone or RJ45.port mapping also missing
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:06 PM</td><td> </td><td>8/17/2022 11:37:09
AM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27808</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi device installation not done and
label</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:18 PM</td><td> </td><td>8/17/2022 11:37:08
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27820</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:34 PM</td><td> </td><td>8/17/2022 11:37:07
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>27823</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing data outlet and bus
cabling</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:38 PM</td><td> </td><td>8/17/2022 11:37:06
AM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27825</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cable should be protected by Flexible
conduit</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:40 PM</td><td> </td><td>8/17/2022 11:37:05
AM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>27826</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:41 PM</td><td> </td><td>8/17/2022 11:37:04
AM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27827</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:43 PM</td><td> </td><td>8/17/2022 11:37:03
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27830</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing bus cabling and data outlet
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:48 PM</td><td> </td><td>8/17/2022 11:37:02
AM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>27832</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:50 PM</td><td> </td><td>8/17/2022 11:37:01
AM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>27833</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No data outlet and bus cabling </td><td>High</td><td>3/17/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:34:51 PM</td><td>
</td><td>8/17/2022 11:37:00
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27834</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:53 PM</td><td> </td><td>8/17/2022 11:36:59
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27836</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi device not installed and patching
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:55 PM</td><td> </td><td>8/17/2022 11:36:58
AM</td><td>&nbsp;</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27838</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:58 PM</td><td> </td><td>8/17/2022 11:36:57
AM</td><td>&nbsp;</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27841</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:35:02 PM</td><td> </td><td>8/17/2022 11:36:56
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27902</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices are missing
</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed Samir</td><td>3/12/2022
11:52:55 AM</td><td> </td><td>8/17/2022 11:36:55
AM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>16472</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Joints not aligned
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:30 AM</td><td> </td><td>8/17/2022 11:04:03 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21643</td><td>CORE D3</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Marked parts need adjustment and repair
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:24:38 AM</td><td> </td><td>8/17/2022 11:03:59 AM</td><td>Done
</td><td>MC.13.0G.D31</td><td>&nbsp;</td>
</tr><tr>
<td>32584</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>7/25/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>7/18/2022 11:34:35 AM</td><td>
</td><td>8/17/2022 10:24:18
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32575</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label and
cover</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:34:19 AM</td><td> </td><td>8/17/2022 10:17:22
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32548</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing earth jumper for
trunk</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:33:01 AM</td><td> </td><td>8/17/2022 10:16:52
AM</td><td>&nbsp;</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32551</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>7/25/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>7/18/2022 11:33:09 AM</td><td>
</td><td>8/17/2022 10:16:35
AM</td><td>&nbsp;</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32565</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/18/2022 11:33:53 AM</td><td>
</td><td>8/17/2022 10:14:48
AM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>12954</td><td>VISITOR LIFTS</td><td>CCB
L30</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Incomplete installation of
lift</td><td>High</td><td>11/8/2020 12:00:00
AM</td><td>ahmedsalem</td><td>11/1/2020 3:12:17 PM</td><td> </td><td>8/16/2022
1:41:51 PM</td><td>&nbsp;</td><td>CC.08.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>21081</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire Extinguishers</td><td>General
Snag</td><td>&#39;Incomplete inergen installation </td><td>High</td><td>8/22/2021
12:00:00 PM</td><td>ahmedsalem</td><td>8/15/2021 1:24:52 PM</td><td>
</td><td>8/16/2022 1:40:18
PM</td><td>&nbsp;</td><td>MS.18.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>30198</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to
repair.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:00:41 PM</td><td> </td><td>8/16/2022 12:01:53
PM</td><td>&nbsp;</td><td>MA.19.02.020</td><td>&nbsp;</td>
</tr><tr>
<td>28219</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Metal trim need need adjustment </td><td>Low</td><td>4/10/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/20/2022 12:04:09 PM</td><td>
</td><td>8/16/2022 11:57:02
AM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>32040</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to touch
up.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
3:57:10 PM</td><td> </td><td>8/16/2022 11:10:24
AM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>32696</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Based on PMC visit on 7-8-22, repair around floor door box is
needed </td><td>Low</td><td>8/28/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/7/2022 1:03:46 PM</td><td> </td><td>8/16/2022 11:00:29
AM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>32692</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Based on PMC visit on2-8-22 ,the marked
parts for gypsum ceiling (reflected by mirror )to be adjusted and checked in all
bathrooms</td><td>Low</td><td>8/24/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/3/2022 2:55:06 PM</td><td> </td><td>8/16/2022 10:58:58
AM</td><td>&nbsp;</td><td>MW.13.002.002</td><td>&nbsp;</td>
</tr><tr>
<td>31711</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked part should be closed
</td><td>Low</td><td>6/27/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/6/2022
11:52:34 AM</td><td> </td><td>8/16/2022 10:58:00
AM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30461</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All Skirting need to touch
up.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:05 AM</td><td> </td><td>8/16/2022 10:55:40
AM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>20700</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>alignment/level</td><td>&#39;Corner should be aligned
</td><td>Low</td><td>8/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/10/2021
11:40:55 AM</td><td> </td><td>8/16/2022 10:54:13
AM</td><td>&nbsp;</td><td>MR.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20699</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Repair and repainting for wall painting
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
11:40:46 AM</td><td> </td><td>8/16/2022 10:53:13
AM</td><td>&nbsp;</td><td>MR.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>19607</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Damages</td><td>&#39;Gypsum board edge need adjustment
</td><td>Low</td><td>7/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/30/2021
1:26:30 PM</td><td> </td><td>8/16/2022 10:51:59
AM</td><td>&nbsp;</td><td>MW.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>32694</td><td>WC /F</td><td>MU L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Gypsum Ceiling</td><td>General
Snag</td><td>&#39;Based on PMC visit on 4-8-22 ,the gypsum ceiling should be
adjusted (reflected by mirror)</td><td>Low</td><td>8/25/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>8/4/2022 12:53:28 PM</td><td> </td><td>8/16/2022
10:51:00 AM</td><td>&nbsp;</td><td>MW.18.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>17061</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Scratches on tiles should be repaired
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:35:56 PM</td><td> </td><td>8/16/2022 10:45:10
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>17054</td><td>LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing around doors </td><td>Low</td><td>4/1/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>3/11/2021 12:35:14 PM</td><td>
</td><td>8/16/2022 10:44:27
AM</td><td>&nbsp;</td><td>ME.12.01.011</td><td>&nbsp;</td>
</tr><tr>
<td>22290</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Interface between gypsum wall and stone
floor should be aligned </td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/24/2021 11:50:12 AM</td><td> </td><td>8/16/2022 10:43:46
AM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22286</td><td>FIRST AID 1</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
Rubber flooring</td><td>General</td><td>&#39;Interface between stone floor and
rubber floor should be covered </td><td>Low</td><td>9/14/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/24/2021 11:50:06 AM</td><td> </td><td>8/16/2022
10:42:59 AM</td><td>&nbsp;</td><td>MG.12.0G.005</td><td>&nbsp;</td>
</tr><tr>
<td>22274</td><td>STORE</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
Rubber flooring</td><td>General</td><td>&#39;Interface between rubber floor and
stone floor should be covered </td><td>Low</td><td>9/14/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/24/2021 11:49:50 AM</td><td> </td><td>8/16/2022
10:42:29 AM</td><td>&nbsp;</td><td>MG.12.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>22211</td><td>DOCTOR</td><td>MU GF
</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Interface between linoleum and stone
flooring should be covered </td><td>Low</td><td>9/14/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/24/2021 11:47:55 AM</td><td> </td><td>8/16/2022 10:41:55
AM</td><td>&nbsp;</td><td>MG.12.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>27958</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>Stone
counter</td><td>General</td><td>&#39;Joints between flooring and counter should be
closed </td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 12:23:39 PM</td><td> </td><td>8/16/2022 10:41:15
AM</td><td>&nbsp;</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>20506</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Panels need to touch up
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:43 PM</td><td> </td><td>8/16/2022 10:40:32
AM</td><td>&nbsp;</td><td>MQ.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14970</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Repair and cleaning for epoxy
floor</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>1/19/2021 11:35:17 AM</td><td> </td><td>8/16/2022 10:39:31
AM</td><td>&nbsp;</td><td>MS.20.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14967</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting should be cleaned
</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>1/19/2021
11:35:10 AM</td><td> </td><td>8/16/2022 10:38:55
AM</td><td>&nbsp;</td><td>MS.20.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>31429</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil fins shall be cleaned and adjusted.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:57:06 AM</td><td> </td><td>8/16/2022 10:32:31
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>32170</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete works and
label</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:48:01 AM</td><td> </td><td>8/16/2022 7:44:28
AM</td><td>&nbsp;</td><td>MS.18.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32178</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:11 AM</td><td>
</td><td>8/16/2022 7:44:11
AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32552</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/18/2022 11:33:12 AM</td><td>
</td><td>8/16/2022 7:44:03
AM</td><td>&nbsp;</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32423</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:06 PM</td><td>
</td><td>8/15/2022 4:50:19
PM</td><td>&nbsp;</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32414</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:29:52 PM</td><td>
</td><td>8/15/2022 4:48:09
PM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32417</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:29:56 PM</td><td>
</td><td>8/15/2022 4:47:53
PM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>31960</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Broken tiles no (36,37,38,39,40&amp;41)should be
repaired/replaced </td><td>Low</td><td>6/30/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>6/23/2022 3:01:34 PM</td><td> </td><td>8/15/2022 4:29:56
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>31961</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Broken tiles no (27,28,29,30,31,32,33,34&amp;35)should be
repaired/replaced </td><td>Low</td><td>6/30/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>6/23/2022 3:01:38 PM</td><td> </td><td>8/15/2022 4:29:55
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>31962</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Broken tiles no (19,20,21,22,23,24,25&amp;26)should be
repaired/replaced </td><td>Low</td><td>6/30/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>6/23/2022 3:01:43 PM</td><td> </td><td>8/15/2022 4:29:54
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>32411</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:29:47 PM</td><td>
</td><td>8/15/2022 3:51:55
PM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32572</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete installation
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:34:12 AM</td><td> </td><td>8/15/2022 3:51:46
PM</td><td>&nbsp;</td><td>MS.14.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32420</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Hole to be closed
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:30:00 PM</td><td> </td><td>8/15/2022 3:49:12
PM</td><td>&nbsp;</td><td>MS.19.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32422</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:03 PM</td><td>
</td><td>8/15/2022 3:48:58
PM</td><td>&nbsp;</td><td>MS.19.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32567</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/18/2022 11:33:59 AM</td><td>
</td><td>8/15/2022 3:48:39
PM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32588</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/18/2022 11:34:45 AM</td><td>
</td><td>8/15/2022 3:48:23
PM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>19924</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing BMS termination, missing ICT labels, missing access
control door contact, missing WiFi batch cord and final label
</td><td>High</td><td>8/5/2021 12:00:00 PM</td><td>Mohamed Samir</td><td>7/29/2021
11:43:42 AM</td><td> </td><td>8/15/2022 3:35:34
PM</td><td>&nbsp;</td><td>MS.23.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>19926</td><td>EMERGENCY LIGHTING</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing WiFi device </td><td>High</td><td>8/5/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>7/29/2021 11:43:51 AM</td><td> </td><td>8/15/2022
3:35:33 PM</td><td>&nbsp;</td><td>MS.18.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>26848</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Pull box should be fixed and missing
label</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 4:39:09 PM</td><td> </td><td>8/15/2022 3:35:32
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27387</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:21 PM</td><td> </td><td>8/15/2022 3:35:31
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27643</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;No labeling for WiFi</td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:54:00 PM</td><td>
</td><td>8/15/2022 3:35:30
PM</td><td>&nbsp;</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>27646</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All access control devices are not terminated
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:54:04 PM</td><td> </td><td>8/15/2022 3:35:28
PM</td><td>&nbsp;</td><td>MS.18.2A.020</td><td>&nbsp;</td>
</tr><tr>
<td>27967</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination </td><td>High</td><td>3/20/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:22:52 PM</td><td>
</td><td>8/15/2022 3:35:27
PM</td><td>&nbsp;</td><td>MS.13.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27968</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi label </td><td>High</td><td>3/20/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:22:54 PM</td><td>
</td><td>8/15/2022 3:35:26
PM</td><td>&nbsp;</td><td>MS.13.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27969</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Patching </td><td>High</td><td>3/20/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:22:55 PM</td><td>
</td><td>8/15/2022 3:35:25
PM</td><td>&nbsp;</td><td>MS.13.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27970</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV camera labels </td><td>High</td><td>3/20/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:22:56 PM</td><td>
</td><td>8/15/2022 3:35:24
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27971</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination </td><td>High</td><td>3/20/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:22:58 PM</td><td>
</td><td>8/15/2022 3:35:23
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27978</td><td>IT 5</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Power strip should be installed within the rack,not outside.the
rack should be closed with door.</td><td>High</td><td>3/20/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:23:09 PM</td><td>
</td><td>8/15/2022 3:35:22
PM</td><td>&nbsp;</td><td>MS.18.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>27981</td><td>IT 5</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Rack door cannot be installed due to cables projected outside the
racks and cables dressing should be done properly </td><td>High</td><td>3/20/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:23:14 PM</td><td>
</td><td>8/15/2022 3:35:20
PM</td><td>&nbsp;</td><td>MS.18.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>27982</td><td>IT 5</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;The pulled cat6a cables within hub room needs to be dressed
within the cable trunks and terminated on the Rack patch
panels</td><td>High</td><td>3/20/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/13/2022 4:23:15 PM</td><td> </td><td>8/15/2022 3:35:19
PM</td><td>&nbsp;</td><td>MS.18.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>27984</td><td>IT 5</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All the pulled cables within rack should be terminated within the
rack patch panels</td><td>High</td><td>3/20/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/13/2022 4:23:19 PM</td><td> </td><td>8/15/2022 3:35:18
PM</td><td>&nbsp;</td><td>MS.18.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>27988</td><td>IT 5</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Card reader cable termination and field devices installation is
incomplete </td><td>High</td><td>3/20/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/13/2022 4:23:26 PM</td><td> </td><td>8/15/2022 3:35:17
PM</td><td>&nbsp;</td><td>MS.18.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>27995</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi label </td><td>High</td><td>3/20/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:23:37 PM</td><td>
</td><td>8/15/2022 3:35:16
PM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>27997</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination </td><td>High</td><td>3/20/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:23:40 PM</td><td>
</td><td>8/15/2022 3:35:15
PM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>31072</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:26 PM</td><td> </td><td>8/15/2022
3:35:14 PM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>32126</td><td>CORE G1</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 4:23:27 PM</td><td>
</td><td>8/15/2022 3:35:13
PM</td><td>&nbsp;</td><td>MC.25.02.G11</td><td>&nbsp;</td>
</tr><tr>
<td>32128</td><td>CORE G1</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 4:23:29 PM</td><td>
</td><td>8/15/2022 3:35:11
PM</td><td>&nbsp;</td><td>MC.25.01.G11</td><td>&nbsp;</td>
</tr><tr>
<td>32435</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:23 PM</td><td>
</td><td>8/15/2022 3:35:10
PM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28137</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof
Tiles</td><td>Chipped/damaged</td><td>&#39;Missing mesh
panels</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/16/2022 12:09:38 PM</td><td> </td><td>8/15/2022 3:31:32
PM</td><td>&nbsp;</td><td>Museum Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>26694</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:26 PM</td><td> </td><td>8/15/2022 2:34:17 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26700</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:33 PM</td><td> </td><td>8/15/2022 2:34:16 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26806</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edge should be adjusted
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:11 PM</td><td> </td><td>8/15/2022 2:34:15 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26807</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Edge should be aligned
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:13 PM</td><td> </td><td>8/15/2022 2:34:13 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26810</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>AluMisr</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joints should be adjusted
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:18 PM</td><td> </td><td>8/15/2022 2:34:12 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26811</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joint should be adjusted
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:20 PM</td><td> </td><td>8/15/2022 2:34:11 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26812</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:23 PM</td><td> </td><td>8/15/2022 2:34:10 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26813</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:27 PM</td><td> </td><td>8/15/2022 2:34:09 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26816</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Interface should be adjusted
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:32 PM</td><td> </td><td>8/15/2022 2:34:08 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26818</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:37 PM</td><td> </td><td>8/15/2022 2:34:07 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26820</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked part should be trim
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:41 PM</td><td> </td><td>8/15/2022 2:34:06 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26821</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>AluMisr</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Joint between Louvers and stone should be the
same width </td><td>Low</td><td>3/22/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/1/2022 4:31:43 PM</td><td> </td><td>8/15/2022
2:34:05 PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26824</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked repair should be adjusted
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:48 PM</td><td> </td><td>8/15/2022 2:34:04 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26825</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:50 PM</td><td> </td><td>8/15/2022 2:34:03 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26826</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Cracks should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:52 PM</td><td> </td><td>8/15/2022 2:34:02 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26827</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joint should be adjusted
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:54 PM</td><td> </td><td>8/15/2022 2:34:02 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26828</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:57 PM</td><td> </td><td>8/15/2022 2:34:01 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26829</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:59 PM</td><td> </td><td>8/15/2022 2:34:00 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26830</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>AluMisr</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked louver should be removed
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:32:01 PM</td><td> </td><td>8/15/2022 2:33:59 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26833</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:32:06 PM</td><td> </td><td>8/15/2022 2:33:58 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26834</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:32:09 PM</td><td> </td><td>8/15/2022 2:33:56 PM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27034</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:17:02 PM</td><td> </td><td>8/15/2022 2:33:55 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27037</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joints should be uniform and aligned
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:17:08 PM</td><td> </td><td>8/15/2022 2:33:54 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27039</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked edge should be uniform and aligned
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:17:13 PM</td><td> </td><td>8/15/2022 2:33:53 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27041</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked interface should be aligned and
uniform </td><td>Low</td><td>3/23/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/2/2022 4:17:18 PM</td><td> </td><td>8/15/2022
2:33:52 PM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27043</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Drawing to be checked for cutting of edge
tiles</td><td>Low</td><td>3/23/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/2/2022 4:17:23 PM</td><td> </td><td>8/15/2022
2:33:51 PM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27047</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>AluMisr</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Louvers should be leveled
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:17:31 PM</td><td> </td><td>8/15/2022 2:33:50 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27049</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>AluMisr</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Interface between Louvers and stone should be
unified </td><td>Low</td><td>3/23/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/2/2022 4:17:34 PM</td><td> </td><td>8/15/2022
2:33:49 PM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27070</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing tile</td><td>Low</td><td>3/23/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022 4:18:17 PM</td><td>
</td><td>8/15/2022 2:33:47 PM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27071</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:18 PM</td><td> </td><td>8/15/2022 2:33:46 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27072</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joints should be aligned and leveled
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:20 PM</td><td> </td><td>8/15/2022 2:33:45 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27139</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>AluMisr</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Interface between stone cladding and lovers
should be uniform and aligned </td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:06:06 PM</td><td> </td><td>8/15/2022
2:33:44 PM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27140</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Joints should be uniform and aligned
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:08 PM</td><td> </td><td>8/15/2022 2:33:43 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27141</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked tiles should be repaired
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:10 PM</td><td> </td><td>8/15/2022 2:33:42 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27143</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:14 PM</td><td> </td><td>8/15/2022 2:33:41 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27148</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joints to be aligned
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:28 PM</td><td> </td><td>8/15/2022 2:33:39 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27150</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;To be checked </td><td>Low</td><td>3/24/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022 12:06:32 PM</td><td>
</td><td>8/15/2022 2:33:39 PM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27156</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joint should be aligned and uniform
(same width)</td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:06:43 PM</td><td> </td><td>8/15/2022
2:33:37 PM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27164</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Poor repair should be adjusted
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:59 PM</td><td> </td><td>8/15/2022 2:33:36 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27166</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:07:03 PM</td><td> </td><td>8/15/2022 2:33:34 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27167</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joint should be aligned and uniform
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:07:04 PM</td><td> </td><td>8/15/2022 2:33:33 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27168</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Fixation to be checked
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:07:06 PM</td><td> </td><td>8/15/2022 2:33:32 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27175</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>AluMisr</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Interface width between Lou res and stone
cladding should be with the same width </td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:07:21 PM</td><td> </td><td>8/15/2022
2:33:30 PM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27179</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing tiles should be installed
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:07:31 PM</td><td> </td><td>8/15/2022 2:33:29 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>31958</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Broken tiles no (48,49,50&amp;51)should be repaired/replaced
</td><td>Low</td><td>6/30/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>6/23/2022 3:01:26 PM</td><td> </td><td>8/15/2022 2:33:28
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>31959</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Broken tiles no (42,43,44,45,46&amp;47)should be
repaired/replaced </td><td>Low</td><td>6/30/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>6/23/2022 3:01:29 PM</td><td> </td><td>8/15/2022 2:33:27
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>31966</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be repaired/replaced
</td><td>Low</td><td>7/18/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>6/27/2022 3:58:11 PM</td><td> </td><td>8/15/2022 2:33:26
PM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>32592</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be repaired/replaced
</td><td>Low</td><td>8/8/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>7/18/2022
4:28:15 PM</td><td> </td><td>8/15/2022 2:33:25 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>32668</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be repaired/replaced
</td><td>Low</td><td>8/18/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>7/28/2022 1:24:18 PM</td><td> </td><td>8/15/2022 2:33:24
PM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>14601</td><td>TUT-CORE B1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Installation not to
specification/drawing</td><td>&#39;Seismic support need installation
</td><td>High</td><td>1/7/2021 12:00:00 PM</td><td>ahmedsalem</td><td>12/31/2020
12:59:28 PM</td><td> </td><td>8/15/2022 12:46:15
PM</td><td>&nbsp;</td><td>MC.23.3A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>24454</td><td>Bay-02 (from level +31.5 to +37.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Rock</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Broken glass
</td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:30 AM</td><td> </td><td>8/15/2022 12:43:44
PM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>30050</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;PPR pipes need adjustments.
</td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:27:22 AM</td><td> </td><td>8/15/2022 12:34:38
PM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>17003</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Toothing between tiles
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:32:57 PM</td><td> </td><td>8/15/2022 11:52:26 AM</td><td>Done
</td><td>MW.12.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>17010</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:33:21 PM</td><td> </td><td>8/15/2022 11:52:25 AM</td><td>Done
</td><td>MW.12.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>17011</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Toothing between tiles
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:33:23 PM</td><td> </td><td>8/15/2022 11:52:24 AM</td><td>Done
</td><td>MW.12.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>17024</td><td>WC / DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Wrong cutting/tile should be replaced
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:33:55 PM</td><td> </td><td>8/15/2022 11:52:20 AM</td><td>Done
</td><td>MW.12.01.001E</td><td>&nbsp;</td>
</tr><tr>
<td>20756</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wall needs adjustment and repair
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:18 PM</td><td> </td><td>8/15/2022 11:52:05 AM</td><td>Done
</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20764</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Ceiling needs touch up painting
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:29 PM</td><td> </td><td>8/15/2022 11:52:00 AM</td><td>Done
</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20765</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling painting need touch up painting
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:31 PM</td><td> </td><td>8/15/2022 11:51:59
AM</td><td>Done.</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>22227</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Stone Edge not aligned
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:48:15 AM</td><td> </td><td>8/15/2022 11:51:50 AM</td><td>Done
</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>24194</td><td>Bay-04 (from level +43.5 to +49.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Missing guide rail
for the rail </td><td>High</td><td>11/2/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>10/26/2021 1:22:32 PM</td><td> </td><td>8/15/2022 11:44:17
AM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>24442</td><td>Bay-03 (from level +37.5 to +43.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Missing guide rail
for the rail </td><td>High</td><td>11/4/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:03 AM</td><td> </td><td>8/15/2022 11:44:17
AM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>24470</td><td>Bay-01 (from level +25.5 to +31.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Missing guide for
the rail </td><td>High</td><td>11/4/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:41:02 AM</td><td> </td><td>8/15/2022 11:44:15
AM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>28353</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Damage pipes insulation.
</td><td>High</td><td>5/3/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:46 AM</td><td> </td><td>8/15/2022 11:44:14
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28364</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Hydronic piping thermal
insulation is totally damaged. </td><td>High</td><td>5/3/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>4/26/2022 11:45:11 AM</td><td>
</td><td>8/15/2022 11:44:13
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28508</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Piping need more support and need more
adjustment. </td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:40 PM</td><td> </td><td>8/15/2022 11:44:12
AM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28870</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing gauges and thermometers for AHU hock up connection.
</td><td>High</td><td>5/23/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:07:08 PM</td><td> </td><td>8/15/2022 11:44:11
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29243</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for hydronic
pipes. </td><td>High</td><td>5/30/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:49 PM</td><td> </td><td>8/15/2022 11:44:06
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32578</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable to be protected
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:34:24 AM</td><td> </td><td>8/15/2022 8:50:31
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32571</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover and
label</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:34:10 AM</td><td> </td><td>8/15/2022 8:50:09
AM</td><td>&nbsp;</td><td>MS.14.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>14941</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Sprinkler
System</td><td>Drain valve</td><td>&#39;Incomplete inergen system
</td><td>High</td><td>1/25/2021 12:00:00 AM</td><td>ahmedsalem</td><td>1/18/2021
3:58:36 PM</td><td> </td><td>8/15/2022 8:10:31
AM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>28349</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing insulation for condensate drain
pipes. </td><td>High</td><td>5/3/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:37 AM</td><td> </td><td>8/15/2022 8:09:21
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32431</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete works </td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:17 PM</td><td>
</td><td>8/14/2022 4:10:49
PM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32418</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:29:58 PM</td><td>
</td><td>8/14/2022 4:10:06
PM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32197</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete works </td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:36 AM</td><td>
</td><td>8/14/2022 4:09:53
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29578</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 10:00:08 AM</td><td> </td><td>8/14/2022
2:28:18 PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>25901</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;all welding joints for supports and
posts should be smooth and finished properly </td><td>Low</td><td>2/13/2022
12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022 11:59:58 AM</td><td>
</td><td>8/14/2022 1:06:44 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25492</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Remaining mortar between stone steps should be removed
</td><td>Low</td><td>12/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/8/2021
1:41:11 PM</td><td> </td><td>8/14/2022 12:55:00
PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25508</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Remaining mortar between stone steps should be removed
</td><td>Low</td><td>12/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/8/2021
1:41:51 PM</td><td> </td><td>8/14/2022 12:54:58
PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25518</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>De-Marble</td><td>Architectural</td><td>Signage</
td><td>Not Installed/Completed</td><td>&#39;Marked letters should be seated and
leveled properly </td><td>Low</td><td>12/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/9/2021 12:52:36 PM</td><td> </td><td>8/14/2022
12:54:57 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25519</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>De-Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Uneven levels of stone panels cladding
insulation </td><td>Low</td><td>12/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/9/2021 12:52:38 PM</td><td> </td><td>8/14/2022
12:54:56 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25522</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Sealant should be aligned and
regular </td><td>Low</td><td>12/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/9/2021 12:52:41 PM</td><td> </td><td>8/14/2022
12:54:53 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25523</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Irregular thickness borders
around EWS-06 should be adjusted </td><td>Low</td><td>12/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/9/2021 12:52:43 PM</td><td> </td><td>8/14/2022
12:54:52 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25525</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked louvers with different shape should
be replaced </td><td>Low</td><td>12/30/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:52:46 PM</td><td> </td><td>8/14/2022
12:54:51 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25526</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Mortar between stone steps should be
removed </td><td>Low</td><td>12/30/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:52:47 PM</td><td> </td><td>8/14/2022
12:54:49 PM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25538</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Interface between ceiling and
stainless steel copping should be regular - @Bridge</td><td>Low</td><td>12/30/2021
12:00:00 AM</td><td>mohamed.sami</td><td>12/9/2021 12:57:16 PM</td><td>
</td><td>8/14/2022 12:54:47 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25539</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Discoloration between false
ceiling tiles </td><td>Low</td><td>12/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/9/2021 12:57:19 PM</td><td> </td><td>8/14/2022
12:54:43 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25540</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing sealant around access door
</td><td>Low</td><td>12/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>12/9/2021
12:57:21 PM</td><td> </td><td>8/14/2022 12:54:42
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25548</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>Damage/dent/stains</td><td>&#39;Useless stainless
steel plate should be removed </td><td>Low</td><td>12/30/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:57:38 PM</td><td> </td><td>8/14/2022
12:54:41 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25555</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Remaining mortar between stone steps should be removed
</td><td>Low</td><td>12/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:57:52 PM</td><td> </td><td>8/14/2022 12:54:39 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25597</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Interface between stone steps and stainless
cladding should be regular </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:51:38 AM</td><td> </td><td>8/14/2022
12:54:38 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25601</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Remaining Mortar between steps should be
removed </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:51:44 AM</td><td> </td><td>8/14/2022
12:54:36 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25605</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked opening should be closed
</td><td>Low</td><td>1/4/2022 12:00:00 AM</td><td>mohamed.sami</td><td>12/14/2021
10:51:50 AM</td><td> </td><td>8/14/2022 12:54:35
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25607</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Interface between wall cladding and floor
cladding should be sealed </td><td>Low</td><td>1/4/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/14/2021 10:51:53 AM</td><td> </td><td>8/14/2022
12:54:34 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25609</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Marked the tiles should be leveled and
adjusted </td><td>Low</td><td>1/4/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/14/2021 10:51:56 AM</td><td> </td><td>8/14/2022
12:54:33 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25610</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between stone cladding and glazing
panels should be closed </td><td>Low</td><td>1/4/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/14/2021 10:51:57 AM</td><td> </td><td>8/14/2022
12:54:31 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25611</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Joint should be aligned and uniform
</td><td>Low</td><td>1/4/2022 12:00:00 AM</td><td>mohamed.sami</td><td>12/14/2021
10:51:59 AM</td><td> </td><td>8/14/2022 12:54:30
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25612</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Joint between horizontal cladding and
vertical cladding should be regular and uniform </td><td>Low</td><td>1/4/2022
12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021 10:52:00 AM</td><td>
</td><td>8/14/2022 12:54:28 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25619</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked opening should be closed</td><td>Low</td><td>1/4/2022
12:00:00 AM</td><td>mohamed.sami</td><td>12/14/2021 10:52:09 AM</td><td>
</td><td>8/14/2022 12:54:27 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25622</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Joint between horizontal cladding and
vertical cladding should be regular and uniform </td><td>Low</td><td>1/4/2022
12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021 10:52:13 AM</td><td>
</td><td>8/14/2022 12:54:26 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25637</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between stone cladding and glazing
should be closed </td><td>Low</td><td>1/4/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/14/2021 10:52:27 AM</td><td> </td><td>8/14/2022
12:54:25 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25639</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked tiles to be finished
</td><td>Low</td><td>1/4/2022 12:00:00 AM</td><td>mohamed.sami</td><td>12/14/2021
10:52:28 AM</td><td> </td><td>8/14/2022 12:54:23
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25645</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Remaining mortar between stone steps should be removed
</td><td>Low</td><td>12/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:52:37 AM</td><td> </td><td>8/14/2022 12:54:21
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25646</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloration between stone tiles
</td><td>Low</td><td>1/4/2022 12:00:00 AM</td><td>mohamed.sami</td><td>12/14/2021
10:52:39 AM</td><td> </td><td>8/14/2022 12:54:20
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25656</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Remaining mortar between stone steps should be removed
</td><td>Low</td><td>12/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:52:55 AM</td><td> </td><td>8/14/2022 12:54:18
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25658</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Remaining mortar between stone steps should be removed
</td><td>Low</td><td>12/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:52:58 AM</td><td> </td><td>8/14/2022 12:54:17
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25664</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Remaining mortar between stone steps should be removed
</td><td>Low</td><td>12/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:53:09 AM</td><td> </td><td>8/14/2022 12:54:15
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25666</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Remaining mortar between stone steps should be removed
</td><td>Low</td><td>1/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:53:12 AM</td><td> </td><td>8/14/2022 12:54:14
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25746</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between glazing panels and
stilettos models should be adjusted @ Bridge - St. no.
5</td><td>Low</td><td>1/12/2022 12:00:00 AM</td><td>mohamed.sami</td><td>12/22/2021
1:39:51 PM</td><td> </td><td>8/14/2022 12:54:13
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25749</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Not-leveled panels should be adjusted.-
Bridge at St. #5</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:39:57 PM</td><td> </td><td>8/14/2022
12:54:11 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25873</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between stone flooring and EWS-19
should be unified and uniform</td><td>Low</td><td>2/13/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/23/2022 11:59:01 AM</td><td> </td><td>8/14/2022
12:54:10 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25890</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>2/13/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/23/2022
11:59:36 AM</td><td> </td><td>8/14/2022 12:54:07
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25902</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Toothing between panels should be
adjusted </td><td>Low</td><td>2/13/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/23/2022 12:00:00 PM</td><td> </td><td>8/14/2022
12:54:04 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25906</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>Not aligned</td><td>&#39;Marked joints should be regular and
leveled </td><td>Low</td><td>2/13/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/23/2022 12:08:05 PM</td><td> </td><td>8/14/2022
12:54:03 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25907</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>Not aligned</td><td>&#39;Marked panels should be leveled
</td><td>Low</td><td>2/13/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/23/2022
12:08:13 PM</td><td> </td><td>8/14/2022 12:54:02
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25913</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Remove
existing mortar between stone steps </td><td>Low</td><td>2/13/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/23/2022 12:08:53 PM</td><td> </td><td>8/14/2022
12:54:01 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25914</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between stone tiles </td><td>Low</td><td>2/13/2022
12:00:00 AM</td><td>mohamed.sami</td><td>1/23/2022 12:08:58 PM</td><td>
</td><td>8/14/2022 12:53:59 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25922</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between marked stone tiles
</td><td>Low</td><td>2/13/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/23/2022
12:09:47 PM</td><td> </td><td>8/14/2022 12:53:58
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25923</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Existing mortar between stone steps should be removed
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
12:09:52 PM</td><td> </td><td>8/14/2022 12:53:57
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25941</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Toothing between glazing panels
should be adjusted </td><td>Low</td><td>2/14/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/24/2022 10:42:51 AM</td><td> </td><td>8/14/2022
12:53:56 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25947</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Interface between CLG-03 and EWS-19</td><td>Low</td><td>2/14/2022
12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022 12:07:36 PM</td><td>
</td><td>8/14/2022 12:53:54 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25962</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Toothing between marked tiles should be adjusted
</td><td>Low</td><td>2/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022
12:08:03 PM</td><td> </td><td>8/14/2022 12:53:53
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25979</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Remove
existing mortar between stone steps </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 12:10:38 PM</td><td> </td><td>8/14/2022
12:53:50 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25984</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Exposed mortar between stone steps should be removed
</td><td>Low</td><td>2/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022
12:10:51 PM</td><td> </td><td>8/14/2022 12:53:49
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26000</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;The vertical joints between
glazing and stone should be uniform and regular and horizontal joint should be
regular and leveled </td><td>Low</td><td>2/15/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/25/2022 11:39:18 AM</td><td> </td><td>8/14/2022
12:53:46 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26019</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Existing mortar between stone steps should be removed
</td><td>Low</td><td>2/15/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/25/2022
11:52:07 AM</td><td> </td><td>8/14/2022 12:53:45
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26030</td><td>PLANT</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Existing mortar between stone steps should be removed
</td><td>Low</td><td>2/15/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/25/2022
11:52:33 AM</td><td> </td><td>8/14/2022 12:53:44
PM</td><td>&nbsp;</td><td>MS.13.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>26038</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Existing mortar between stone steps should be removed
</td><td>Low</td><td>2/16/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/26/2022
11:15:34 AM</td><td> </td><td>8/14/2022 12:53:43
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26044</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Existing mortar between stone steps should be removed
</td><td>Low</td><td>2/16/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/26/2022
11:15:45 AM</td><td> </td><td>8/14/2022 12:53:42
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26053</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Substandard Interface between EWS-19
stone flooring should be unified and uniform </td><td>Low</td><td>2/21/2022
12:00:00 AM</td><td>mohamed.sami</td><td>1/31/2022 11:37:38 AM</td><td>
</td><td>8/14/2022 12:53:40 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26054</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Interface between CLG-03 and Ews-19
should be uniform and regular </td><td>Low</td><td>2/21/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/31/2022 11:37:40 AM</td><td> </td><td>8/14/2022
12:53:39 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26055</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Panels and joints should be vertical
</td><td>Low</td><td>2/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/31/2022
11:37:43 AM</td><td> </td><td>8/14/2022 12:53:38
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26056</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Marked joint to be unified and uniform
</td><td>Low</td><td>2/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/31/2022
11:37:45 AM</td><td> </td><td>8/14/2022 12:53:36
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26057</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Misalignment between EWS-19 and stone
joints </td><td>Low</td><td>2/21/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/31/2022 11:37:47 AM</td><td> </td><td>8/14/2022
12:53:35 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26066</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Substandard interface between stairs and handrail copping
</td><td>Low</td><td>2/7/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/31/2022
11:58:06 AM</td><td> </td><td>8/14/2022 12:53:33
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26072</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Existing mortar between stone steps should be
removed </td><td>Low</td><td>2/21/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/31/2022 11:58:21 AM</td><td> </td><td>8/14/2022
12:53:32 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26079</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Existing mortar between stone steps should be removed
</td><td>Low</td><td>2/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/31/2022
11:58:37 AM</td><td> </td><td>8/14/2022 12:53:31
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26081</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding point ,connection part for
elbows and vertical support should be smooth and finished properly
</td><td>Low</td><td>2/8/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/1/2022
11:48:22 AM</td><td> </td><td>8/14/2022 12:53:30
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26082</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Toothing between glazing panels
</td><td>Low</td><td>2/22/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/1/2022
11:48:25 AM</td><td> </td><td>8/14/2022 12:53:28
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26084</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding point ,connection part for
elbows and vertical support should be smooth and finished properly
</td><td>Low</td><td>2/22/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/1/2022
11:48:31 AM</td><td> </td><td>8/14/2022 12:53:27
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26086</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Defected part should be adjusted
</td><td>Low</td><td>2/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/1/2022
11:48:35 AM</td><td> </td><td>8/14/2022 12:53:26
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26090</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Spacing between cover plates and
copping should be equal </td><td>Low</td><td>2/22/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/1/2022 11:48:50 AM</td><td> </td><td>8/14/2022
12:53:25 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26093</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Wrong cutting for stainless steel
copping should be adjusted </td><td>Low</td><td>2/22/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/1/2022 11:49:00 AM</td><td> </td><td>8/14/2022
12:53:24 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26099</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Irregular interface between CLG tiles and
stone cladding </td><td>Low</td><td>2/24/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/3/2022 2:25:34 PM</td><td> </td><td>8/14/2022
12:53:23 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26101</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>De-Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Edge should be trim and
aligned.</td><td>Low</td><td>2/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/3/2022 2:25:52 PM</td><td> </td><td>8/14/2022
12:53:21 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26110</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Blank slides not equal at both of side for
louvre panels</td><td>Low</td><td>2/24/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/3/2022 2:26:18 PM</td><td> </td><td>8/14/2022
12:53:20 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26111</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>2/24/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/3/2022
2:26:20 PM</td><td> </td><td>8/14/2022 12:53:19
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32563</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/18/2022 11:33:47 AM</td><td>
</td><td>8/14/2022 12:00:23
PM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32381</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;To be installed properly
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:02 PM</td><td> </td><td>8/14/2022 11:59:06
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32577</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/18/2022 11:34:22 AM</td><td>
</td><td>8/14/2022 11:58:33
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32407</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label </td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:29:41 PM</td><td>
</td><td>8/14/2022 11:58:23
AM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32413</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:29:51 PM</td><td>
</td><td>8/14/2022 11:58:06
AM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32576</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label and faceplate
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:34:20 AM</td><td> </td><td>8/14/2022 11:57:51
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32432</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:19 PM</td><td>
</td><td>8/14/2022 11:57:43
AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32434</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:21 PM</td><td>
</td><td>8/14/2022 11:57:24
AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32436</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth jumper </td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:25 PM</td><td>
</td><td>8/14/2022 11:55:13
AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32437</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:27 PM</td><td>
</td><td>8/14/2022 11:54:48
AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32442</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:35 PM</td><td>
</td><td>8/14/2022 11:54:31
AM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>12109</td><td>WC /F</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Missing collars for PPR pipes</td><td>High</td><td>10/11/2020
12:00:00 AM</td><td>ahmedsalem</td><td>10/4/2020 1:06:28 PM</td><td>
</td><td>8/14/2022 10:24:30
AM</td><td>&nbsp;</td><td>MW.18.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>21216</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around metal door is missing
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
11:01:02 AM</td><td> </td><td>8/14/2022 10:16:24
AM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21150</td><td>CORE D2</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door frame
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
10:50:51 AM</td><td> </td><td>8/14/2022 10:15:48
AM</td><td>&nbsp;</td><td>MC.18.03.D21</td><td>&nbsp;</td>
</tr><tr>
<td>31631</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/26/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/5/2022
4:25:00 PM</td><td> </td><td>8/14/2022 10:10:39
AM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31237</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame and accessories need to clean from both
sides.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 10:40:43 AM</td><td> </td><td>8/14/2022 10:10:10
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28831</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall angle need to
aligned.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:29 AM</td><td> </td><td>8/14/2022 10:08:57
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28215</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>4/10/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/20/2022
12:04:02 PM</td><td> </td><td>8/14/2022 10:06:54
AM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>28213</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Repair and touch up painting are needed
for marked joints</td><td>Low</td><td>4/10/2022 12:00:00
PM</td><td>mohamed.sami</td><td>3/20/2022 12:03:57 PM</td><td> </td><td>8/14/2022
10:06:19 AM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>28212</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>4/10/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/20/2022
12:03:55 PM</td><td> </td><td>8/14/2022 10:05:46
AM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>32608</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Insulation need repair</td><td>High</td><td>7/26/2022 12:00:00
AM</td><td>Sherif Boshra Ghaly</td><td>7/19/2022 10:58:55 AM</td><td>
</td><td>8/14/2022 7:48:26
AM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32626</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing insulation
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:37:14 AM</td><td> </td><td>8/14/2022 7:48:12
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32634</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Damaged insulation </td><td>High</td><td>7/26/2022 12:00:00
AM</td><td>hossamreda</td><td>7/19/2022 11:37:30 AM</td><td> </td><td>8/14/2022
7:47:25 AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32630</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;CHWPs insulation needs repair </td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:37:23 AM</td><td>
</td><td>8/14/2022 7:47:13
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32632</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Not
Installed/Completed</td><td>&#39;Duct insulation need to be completed and repaired
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:37:27 AM</td><td> </td><td>8/14/2022 7:47:02
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>26453</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Damaged</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:43 PM</td><td> </td><td>8/13/2022 11:36:42
AM</td><td>Done </td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>21009</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Scratches</td><td>&#39;Support should be vertical
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:12:59 AM</td><td> </td><td>8/13/2022 9:05:43
AM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>20994</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Threshold</td><td>General
Snag</td><td>&#39;Missing threshold</td><td>Low</td><td>9/5/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/15/2021 11:12:05 AM</td><td> </td><td>8/13/2022
9:04:48 AM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>29625</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories need to
clean.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:52 AM</td><td> </td><td>8/13/2022 9:03:44
AM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>31253</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame and accessories need to clean from both
sides.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 10:41:32 AM</td><td> </td><td>8/13/2022 9:01:40
AM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30684</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cleaning door leaf and accessories from both
sides.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:32 PM</td><td> </td><td>8/13/2022 9:01:08
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30482</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to touch
up.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:40 AM</td><td> </td><td>8/13/2022 9:00:30
AM</td><td>&nbsp;</td><td>MT.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28739</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint Floor</td><td>General
Snag</td><td>&#39;General cleaning is needed </td><td>Low</td><td>6/1/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/11/2022 11:47:55 AM</td><td> </td><td>8/13/2022
8:59:48 AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>17005</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Handles
should be aligned </td><td>Low</td><td>4/1/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/11/2021 12:33:08 PM</td><td> </td><td>8/13/2022 8:57:37
AM</td><td>&nbsp;</td><td>MW.12.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>17029</td><td>WC CLEANERS STORE-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Ceiling painting need touch up
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:05 PM</td><td> </td><td>8/13/2022 8:54:05
AM</td><td>&nbsp;</td><td>MW.12.01.001D</td><td>&nbsp;</td>
</tr><tr>
<td>17018</td><td>WC / DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Painting should be adjusted </td><td>Low</td><td>4/1/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021 12:33:41 PM</td><td>
</td><td>8/13/2022 8:53:24
AM</td><td>&nbsp;</td><td>MW.12.01.001E</td><td>&nbsp;</td>
</tr><tr>
<td>16997</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Painting should be adjusted </td><td>Low</td><td>4/1/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021 12:32:44 PM</td><td>
</td><td>8/13/2022 8:52:58
AM</td><td>&nbsp;</td><td>MW.12.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>20093</td><td>MEETING-Band B</td><td>MU
L10</td><td>Closed</td><td>T and D design</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Touch up above nails
</td><td>Low</td><td>8/23/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:27 PM</td><td> </td><td>8/13/2022 8:52:14
AM</td><td>&nbsp;</td><td>ME.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20536</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches should be repaired </td><td>Low</td><td>8/29/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021 12:09:14 PM</td><td>
</td><td>8/13/2022 8:50:55
AM</td><td>&nbsp;</td><td>MQ.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20497</td><td>IT 3</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall Painting</td><td>General
Snag</td><td>&#39;Wall painting need to touch up </td><td>Low</td><td>8/15/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021 12:08:36 PM</td><td>
</td><td>8/13/2022 8:50:05
AM</td><td>&nbsp;</td><td>MS.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20495</td><td>IT 3</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Raised
Floor</td><td>Level difference</td><td>&#39;Raised floor need to install properly
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:35 PM</td><td> </td><td>8/13/2022 8:49:41
AM</td><td>&nbsp;</td><td>MS.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>12228</td><td>Pyramid Climb</td><td>Pyramid
Climb</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>Scratches</td><td>&#39;Scratches at stainless
plate</td><td>Low</td><td>11/1/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/11/2020 1:36:35 PM</td><td> </td><td>8/11/2022 1:19:08
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>12230</td><td>Pyramid Climb</td><td>Pyramid
Climb</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Complete electrical works
</td><td>Low</td><td>11/1/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>10/11/2020
1:37:44 PM</td><td> </td><td>8/11/2022 1:19:07
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>12231</td><td>Pyramid Climb</td><td>Pyramid
Climb</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Staircase Handrail</td><td>Overall
finishes</td><td>&#39;Handrail not alignment </td><td>Low</td><td>11/1/2020
12:00:00 AM</td><td>Adel Nassrat</td><td>10/11/2020 1:38:08 PM</td><td>
</td><td>8/11/2022 1:19:06 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32449</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Caver and
label</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:30:48 PM</td><td> </td><td>8/11/2022 1:17:14
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>9596</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
need touch up and adjustment /missing cir for hardware
</td><td>Low</td><td>8/10/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>7/20/2020
1:47:51 PM</td><td> </td><td>8/11/2022 12:12:32
PM</td><td>&nbsp;</td><td>MS.13.0G.008</td><td>&nbsp;</td>
</tr><tr>
<td>9598</td><td>VOID</td><td>MU GF </td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
door need repair and adjustment </td><td>Low</td><td>8/10/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>7/20/2020 1:47:55 PM</td><td> </td><td>8/11/2022
12:12:30 PM</td><td>&nbsp;</td><td>MS.13.0G.006</td><td>&nbsp;</td>
</tr><tr>
<td>9599</td><td>VOID</td><td>MU GF </td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
door need repair </td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>7/20/2020 1:47:58 PM</td><td> </td><td>8/11/2022 12:12:29
PM</td><td>&nbsp;</td><td>MS.13.0G.006</td><td>&nbsp;</td>
</tr><tr>
<td>9601</td><td>VOID</td><td>MU GF </td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
need touch up </td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>7/20/2020 1:48:03 PM</td><td> </td><td>8/11/2022 12:12:28
PM</td><td>&nbsp;</td><td>MS.13.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>9606</td><td> PLANT</td><td>MU GF </td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need adjustment with frame and need touch up </td><td>Low</td><td>8/10/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020 1:48:17 PM</td><td>
</td><td>8/11/2022 12:12:27
PM</td><td>&nbsp;</td><td>MS.13.0G.014</td><td>&nbsp;</td>
</tr><tr>
<td>9621</td><td>FEMALE PRAYER ROOM</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need adjustment with frame and touch up for painting
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:49:19 PM</td><td> </td><td>8/11/2022 12:12:26
PM</td><td>&nbsp;</td><td>MG.13.0G.005</td><td>&nbsp;</td>
</tr><tr>
<td>9623</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
need touchup and door need adjustment /missing cir for hardware
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:49:27 PM</td><td> </td><td>8/11/2022 12:12:25
PM</td><td>&nbsp;</td><td>MS.13.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>9626</td><td>STORAGE</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Cleaning
for hinges/missing cir for hardware </td><td>Low</td><td>8/10/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>7/20/2020 1:49:34 PM</td><td> </td><td>8/11/2022
12:12:23 PM</td><td>&nbsp;</td><td>MS.13.0G.009</td><td>&nbsp;</td>
</tr><tr>
<td>9628</td><td>STORAGE</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Repair around wall access hatch </td><td>Low</td><td>8/10/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020 1:49:40 PM</td><td>
</td><td>8/11/2022 12:12:22
PM</td><td>&nbsp;</td><td>MS.13.0G.009</td><td>&nbsp;</td>
</tr><tr>
<td>9629</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
need touch up /missing cir for hardware </td><td>Low</td><td>8/10/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>7/20/2020 1:49:44 PM</td><td> </td><td>8/11/2022
12:12:21 PM</td><td>&nbsp;</td><td>MS.12.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>9630</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need adjustment within frame/missing cir for hardware
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:49:46 PM</td><td> </td><td>8/11/2022 12:12:19
PM</td><td>&nbsp;</td><td>MS.12.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>9632</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need adjustment with frame /missing cir for hardware
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:49:52 PM</td><td> </td><td>8/11/2022 12:12:18
PM</td><td>&nbsp;</td><td>MS.12.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>9635</td><td>SERVICE TUNNEL</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
in door leaf</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>7/20/2020 1:50:02 PM</td><td> </td><td>8/11/2022 12:12:17
PM</td><td>&nbsp;</td><td>MQ.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>9642</td><td>AHU/PLANT</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need adjustment with frame/door leaf need touchup /cleaning for hinges
/missing cir for hardware </td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>7/20/2020 1:50:29 PM</td><td> </td><td>8/11/2022 12:12:14
PM</td><td>&nbsp;</td><td>MS.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>9643</td><td>AHU/PLANT</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need adjustment with frame /painting need touch up /missing cir for hardware
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:50:40 PM</td><td> </td><td>8/11/2022 12:12:13
PM</td><td>&nbsp;</td><td>MS.12.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>9645</td><td>AHU/PLANT</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf painting need touch up /missing cir for hardware
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:50:51 PM</td><td> </td><td>8/11/2022 12:12:11
PM</td><td>&nbsp;</td><td>MS.12.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16496</td><td>ESCAPE TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Surface and repair for flooring
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:04 AM</td><td> </td><td>8/11/2022 12:12:10
PM</td><td>&nbsp;</td><td>MQ.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16498</td><td>ESCAPE TUNNEL</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Waving gypsum ceiling
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:06 AM</td><td> </td><td>8/11/2022 12:12:09
PM</td><td>&nbsp;</td><td>MQ.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16512</td><td>ESCAPE TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Painting</td><td>General
Snag</td><td>&#39;Painting need touch up </td><td>Low</td><td>3/8/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>2/15/2021 11:35:30 AM</td><td> </td><td>8/11/2022
12:12:08 PM</td><td>&nbsp;</td><td>MQ.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21692</td><td>CORE B3</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:25:47 AM</td><td> </td><td>8/11/2022 12:12:07
PM</td><td>&nbsp;</td><td>MC.12.0G.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21694</td><td>CORE B3</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joints should be adjusted and
repaired </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:48 AM</td><td> </td><td>8/11/2022 12:12:06
PM</td><td>&nbsp;</td><td>MC.12.0G.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21697</td><td>CORE B3</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:25:51 AM</td><td> </td><td>8/11/2022 12:12:05
PM</td><td>&nbsp;</td><td>MC.12.0G.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21699</td><td>CORE B3</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joints should be adjusted and
repaired </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:53 AM</td><td> </td><td>8/11/2022 12:12:04
PM</td><td>&nbsp;</td><td>MC.12.0G.B31</td><td>&nbsp;</td>
</tr><tr>
<td>22213</td><td>DOCTOR</td><td>MU GF
</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>Damaged tile</td><td>&#39;Damaged linoleum
flooring</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/24/2021 11:47:57 AM</td><td> </td><td>8/11/2022 12:12:03
PM</td><td>&nbsp;</td><td>MG.12.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>22217</td><td>FIRST AID 3</td><td>MU GF
</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>Damaged tile</td><td>&#39;Damaged linoleum flooring
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:48:03 AM</td><td> </td><td>8/11/2022 12:12:02
PM</td><td>&nbsp;</td><td>MG.12.0G.008</td><td>&nbsp;</td>
</tr><tr>
<td>22276</td><td>STORE</td><td>MU GF
</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Flooring - Rubber
flooring</td><td>Other Snag</td><td>&#39;Air bubbles under floor should be adjusted
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:52 AM</td><td> </td><td>8/11/2022 12:12:01
PM</td><td>&nbsp;</td><td>MG.12.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>22282</td><td>FIRST AID 2</td><td>MU GF
</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Flooring - Rubber
flooring</td><td>General</td><td>&#39;Bubbles under floor should be adjusted
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:50:01 AM</td><td> </td><td>8/11/2022 12:12:00
PM</td><td>&nbsp;</td><td>MG.12.0G.007</td><td>&nbsp;</td>
</tr><tr>
<td>22288</td><td>FIRST AID 1</td><td>MU GF
</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Flooring - Rubber
flooring</td><td>General</td><td>&#39;Damaged floor should be repaired
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:50:09 AM</td><td> </td><td>8/11/2022 12:11:58
PM</td><td>&nbsp;</td><td>MG.12.0G.005</td><td>&nbsp;</td>
</tr><tr>
<td>16831</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Shadow gap should be cleaned </td><td>Low</td><td>3/31/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021 12:59:30 PM</td><td>
</td><td>8/11/2022 11:32:01 AM</td><td>Done
</td><td>MW.13.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>16848</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>opening and closing adjusting</td><td>&#39;Cubicle partition
should be fixed properly </td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/10/2021 1:00:08 PM</td><td> </td><td>8/11/2022 11:31:50
AM</td><td>Done </td><td>MW.13.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>16851</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Wrong cutting/tile should be replaced
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:00:14 PM</td><td> </td><td>8/11/2022 11:31:49 AM</td><td>Done
</td><td>MW.13.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>16855</td><td>WC /DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Painting need touch up </td><td>Low</td><td>3/31/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>3/10/2021 1:00:24 PM</td><td> </td><td>8/11/2022
11:31:43 AM</td><td>Done </td><td>MW.13.01.001C</td><td>&nbsp;</td>
</tr><tr>
<td>16862</td><td>FEMALE SHOWERS/ LOCKERS-BAnd B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Shadow gap angle joint should be rectified
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:00:36 PM</td><td> </td><td>8/11/2022 11:31:41 AM</td><td>Done
</td><td>MW.13.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>16874</td><td>MALE SHOWER/ LOCKERS-Band B</td><td>MU
L10</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>opening and closing adjusting</td><td>&#39;Partition should be
fixed properly </td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/10/2021 1:01:00 PM</td><td> </td><td>8/11/2022 11:31:36
AM</td><td>Done </td><td>MW.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16892</td><td>WOOD-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Joints should be adjusted
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:01:36 PM</td><td> </td><td>8/11/2022 11:31:28 AM</td><td>Done
</td><td>ME.12.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>16899</td><td>POTTERY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Joint should be adjusted
</td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021
1:01:50 PM</td><td> </td><td>8/11/2022 11:31:26 AM</td><td>Done
</td><td>ME.12.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>16907</td><td>TEXTILE-Band A</td><td>MU
L10</td><td>Closed</td><td>Daghash Tents</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Wavy curtain should be adjusted
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:02:06 PM</td><td> </td><td>8/11/2022 11:31:25 AM</td><td>Done
</td><td>ME.12.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>16917</td><td>TEXTILE-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Joints should be adjusted
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:02:25 PM</td><td> </td><td>8/11/2022 11:31:23 AM</td><td>Done
</td><td>ME.12.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>16920</td><td>JEWELLERY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Linoleum joint should be adjusted
</td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021
1:02:31 PM</td><td> </td><td>8/11/2022 11:31:22 AM</td><td>Done
</td><td>ME.12.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16964</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting /cir is not
submitted </td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/11/2021 12:26:22 PM</td><td> </td><td>8/11/2022 11:31:11
AM</td><td>Done </td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>21683</td><td>CORE B3-Band B</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail is not aligned and should
be adjusted </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:37 AM</td><td> </td><td>8/11/2022 11:31:05
AM</td><td>Done </td><td>MC.12.01.B31</td><td>&nbsp;</td>
</tr><tr>
<td>31261</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete works
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/2/2022
11:14:20 AM</td><td> </td><td>8/11/2022 11:17:27
AM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>32054</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:19 AM</td><td>
</td><td>8/11/2022 11:17:26
AM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32056</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:21 AM</td><td>
</td><td>8/11/2022 11:17:25
AM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32057</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:23 AM</td><td>
</td><td>8/11/2022 11:17:24
AM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32081</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:57 AM</td><td>
</td><td>8/11/2022 11:17:23
AM</td><td>&nbsp;</td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>32091</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:12 AM</td><td>
</td><td>8/11/2022 11:17:21
AM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32131</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 4:23:33 PM</td><td>
</td><td>8/11/2022 11:17:20 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21901</td><td>SERVICE TUNNEL</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All ict labels are missing, utp outlet should be behind the
camera </td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>Mohamed
Samir</td><td>8/23/2021 10:53:06 AM</td><td> </td><td>8/11/2022 10:09:35
AM</td><td>&nbsp;</td><td>MQ.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>21905</td><td>WET DELIVERY TUNNEL</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Outlet should be behind the camera</td><td>High</td><td>8/30/2021
12:00:00 PM</td><td>Mohamed Samir</td><td>8/23/2021 10:53:14 AM</td><td>
</td><td>8/11/2022 10:09:34
AM</td><td>&nbsp;</td><td>MQ.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21910</td><td>VOID</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing all ict labels </td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>Mohamed Samir</td><td>8/23/2021 10:53:21 AM</td><td> </td><td>8/11/2022
10:09:33 AM</td><td>&nbsp;</td><td>MS.13.0G.005</td><td>&nbsp;</td>
</tr><tr>
<td>21915</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing ict labels missing BMS panel
schedule </td><td>High</td><td>8/30/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>8/23/2021 10:53:29 AM</td><td> </td><td>8/11/2022 10:09:32
AM</td><td>&nbsp;</td><td>MS.13.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>22375</td><td>STORE</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing labels </td><td>High</td><td>9/1/2021 12:00:00
PM</td><td>Sameh Ibrahim El-Sawah</td><td>8/25/2021 11:53:35 AM</td><td>
</td><td>8/11/2022 10:09:30
AM</td><td>&nbsp;</td><td>MG.12.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>26728</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Faceplate fixation and labeling needs to be done
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:45:36 PM</td><td> </td><td>8/11/2022 10:09:29
AM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>26730</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;WiFi labeling is not done and port mapping also pending
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:45:37 PM</td><td> </td><td>8/11/2022 10:09:28
AM</td><td>&nbsp;</td><td>MA.19.02.021</td><td>&nbsp;</td>
</tr><tr>
<td>26738</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:45:45 PM</td><td>
</td><td>8/11/2022 10:09:26
AM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>26740</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:45:47 PM</td><td>
</td><td>8/11/2022 10:09:24
AM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>26742</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Alignment and Level not followed</td><td>&#39;WiFi labeling is not
done </td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:45:48 PM</td><td> </td><td>8/11/2022 10:09:23
AM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>26748</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:45:53 PM</td><td>
</td><td>8/11/2022 10:09:22
AM</td><td>&nbsp;</td><td>MA.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>26750</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:45:56 PM</td><td>
</td><td>8/11/2022 10:09:21
AM</td><td>&nbsp;</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>26751</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Floor boxes cat6a cables terminations and
face plate fixtures not installed and floor boxes top cover not installed yet
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:46:00 PM</td><td> </td><td>8/11/2022 10:09:20
AM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>26753</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:02 PM</td><td>
</td><td>8/11/2022 10:09:19
AM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>26756</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:07 PM</td><td>
</td><td>8/11/2022 10:09:18
AM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>26760</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:14 PM</td><td>
</td><td>8/11/2022 10:09:17
AM</td><td>&nbsp;</td><td>MA.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>26761</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Alignment and Level not followed</td><td>&#39;Cat6a cables needs to
be terminated and faceplate needs to be fixed properly
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:46:16 PM</td><td> </td><td>8/11/2022 10:09:16
AM</td><td>&nbsp;</td><td>MA.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>26765</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:25 PM</td><td>
</td><td>8/11/2022 10:09:15
AM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>26766</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:27 PM</td><td>
</td><td>8/11/2022 10:09:14
AM</td><td>&nbsp;</td><td>MR.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>26767</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices card reader installation is
incomplete including the cable termination and labeling
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:46:29 PM</td><td> </td><td>8/11/2022 10:09:13
AM</td><td>&nbsp;</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>26768</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:31 PM</td><td>
</td><td>8/11/2022 10:09:12
AM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>26769</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:33 PM</td><td>
</td><td>8/11/2022 10:09:11
AM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>26770</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Floor boxes cat6a cables are not pulled
and floor boxes cover needs to be installed </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:35 PM</td><td>
</td><td>8/11/2022 10:09:10
AM</td><td>&nbsp;</td><td>MA.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>26771</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:37 PM</td><td>
</td><td>8/11/2022 10:09:09
AM</td><td>&nbsp;</td><td>MA.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>26773</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;CCTV camera cables termination and camera installation has not
completed yet</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:46:40 PM</td><td> </td><td>8/11/2022 10:09:08
AM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>26774</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control cables termination and field devices have not been
installed yet .field devices including card reader,Request to exist push buttons
and green break glass unit </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:42 PM</td><td>
</td><td>8/11/2022 10:09:07
AM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>26775</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Floor boxes cat6a cables terminations and
face plate fixtures and cover installation needs to be done
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:46:44 PM</td><td> </td><td>8/11/2022 10:09:06
AM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>26777</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control cables termination and field devices have not been
installed yet .field devices including card reader,Request to exist push buttons
and green break glass unit </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:49 PM</td><td>
</td><td>8/11/2022 10:09:05
AM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>26778</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control cables termination and field devices have not been
installed yet </td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:46:50 PM</td><td> </td><td>8/11/2022 10:09:04
AM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>26779</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control cables termination and field devices have not been
installed yet </td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:46:52 PM</td><td> </td><td>8/11/2022 10:09:03
AM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>26780</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Cat6a cables were not pulled in some of
the back boxes and face plate alignment is not done properly .Also floor boxes
cat6a/fiber cables terminations are not yet done under reception desk
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:46:55 PM</td><td> </td><td>8/11/2022 10:09:02
AM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>26781</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;CCTV camera has not installed yet </td><td>High</td><td>3/8/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:57 PM</td><td>
</td><td>8/11/2022 10:09:01
AM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>26783</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control card reader,Green break glass unit and request to
exit button have not been installed yet.Also cables termination and labeling is
incomplete </td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:47:01 PM</td><td> </td><td>8/11/2022 10:09:00
AM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>26932</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Faceplate fixtures are not installed and labeling also not done
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 3:59:42 PM</td><td> </td><td>8/11/2022 10:08:59
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>26933</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi labeling and port mapping is not done
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 3:59:43 PM</td><td> </td><td>8/11/2022 10:08:58
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>26934</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control cables termination and device installation is not
done </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 3:59:44 PM</td><td> </td><td>8/11/2022 10:08:57
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>26958</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi labeling and port mapping is not done
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:24 PM</td><td> </td><td>8/11/2022 10:08:55
AM</td><td>&nbsp;</td><td>MT.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>26970</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Speaker cables termination and speakers are not installed yet
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:45 PM</td><td> </td><td>8/11/2022 10:08:54
AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>26973</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi labeling and port mapping is not done
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:49 PM</td><td> </td><td>8/11/2022 10:08:53
AM</td><td>&nbsp;</td><td>MA.19.02.015</td><td>&nbsp;</td>
</tr><tr>
<td>26975</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi labeling and port mapping is not done
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:51 PM</td><td> </td><td>8/11/2022 10:08:52
AM</td><td>&nbsp;</td><td>MA.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>26986</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Data points Face plate should be fixed properly
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:01:11 PM</td><td> </td><td>8/11/2022 10:08:51
AM</td><td>&nbsp;</td><td>MA.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>26992</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi labeling and port mapping is not done yet
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:01:20 PM</td><td> </td><td>8/11/2022 10:08:50
AM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>26995</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/9/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/2/2022 4:01:25 PM</td><td>
</td><td>8/11/2022 10:08:49
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>26996</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/9/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/2/2022 4:01:26 PM</td><td>
</td><td>8/11/2022 10:08:48
AM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>26997</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;WiFi labeling and port mapping is not
done yet and WiFi has not been activated </td><td>High</td><td>3/9/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/2/2022 4:01:28 PM</td><td>
</td><td>8/11/2022 10:08:47
AM</td><td>&nbsp;</td><td>MR.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>26998</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation is incomplete including
the cable termination and labeling </td><td>High</td><td>3/9/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/2/2022 4:01:29 PM</td><td>
</td><td>8/11/2022 10:08:46
AM</td><td>&nbsp;</td><td>MR.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>26999</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Floor boxes data cables were not pulled
yet and termination,face plate fixtures also not installed .Also top cover needs to
be fixed for the floor boxes</td><td>High</td><td>3/9/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/2/2022 4:01:31 PM</td><td>
</td><td>8/11/2022 10:08:45
AM</td><td>&nbsp;</td><td>MR.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27372</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Lifting management system cabling not completed
</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:07:56 PM</td><td> </td><td>8/11/2022 10:08:44
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27374</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No media not patching fiber and
utp</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:07:59 PM</td><td> </td><td>8/11/2022 10:08:43
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27375</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>CABLE BASKET
TRAY</td><td>Alignment and Level not followed</td><td>&#39;No patching for fiber
and utp and no media</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:01 PM</td><td> </td><td>8/11/2022 10:08:42
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27379</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Label</td><td>High</td><td>3/14/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:08:07 PM</td><td>
</td><td>8/11/2022 10:08:41
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>27385</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No media converter for voice outlet
</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:17 PM</td><td> </td><td>8/11/2022 10:08:40
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27397</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No media converter </td><td>High</td><td>3/14/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:08:38 PM</td><td>
</td><td>8/11/2022 10:08:37
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>27402</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Mcc getway data outlet not done and FCU
getway</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:47 PM</td><td> </td><td>8/11/2022 10:08:36
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27406</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control termination and field devices installation
</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:53 PM</td><td> </td><td>8/11/2022 10:08:35
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27407</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Media converter not installed and patching not
done</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:55 PM</td><td> </td><td>8/11/2022 10:08:34
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27408</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Port activation and label of WiFi device and port patch
</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:56 PM</td><td> </td><td>8/11/2022 10:08:33
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27409</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi label </td><td>High</td><td>3/14/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:08:59 PM</td><td>
</td><td>8/11/2022 10:08:32
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27411</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Port activation and WiFi label not
done</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:09:02 PM</td><td> </td><td>8/11/2022 10:08:32
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27415</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control </td><td>High</td><td>3/14/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:09:09 PM</td><td>
</td><td>8/11/2022 10:08:31
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>27417</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No Faceplate no label</td><td>High</td><td>3/14/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:09:15 PM</td><td>
</td><td>8/11/2022 10:08:30
AM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27418</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control devices and door
controller</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:09:16 PM</td><td> </td><td>8/11/2022 10:08:29
AM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27419</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi label</td><td>High</td><td>3/14/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:09:18 PM</td><td>
</td><td>8/11/2022 10:08:28
AM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>32617</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Duct insulation needs repair </td><td>High</td><td>7/26/2022
12:00:00 PM</td><td>hossamreda</td><td>7/19/2022 11:36:54 AM</td><td>
</td><td>8/11/2022 8:08:51
AM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32536</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Insulation for drain pan need
repair</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:55 AM</td><td> </td><td>8/11/2022 8:08:30
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32518</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Insulation</td><td>&#39;Insulation
should repair</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:24 AM</td><td> </td><td>8/11/2022 8:05:08
AM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32393</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:29:22 PM</td><td>
</td><td>8/10/2022 4:36:04
PM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32176</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Patch cords </td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:09 AM</td><td>
</td><td>8/10/2022 4:35:52
PM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>11711</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Edge of stone not aligned
</td><td>Low</td><td>10/18/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>9/27/2020
4:40:40 PM</td><td> </td><td>8/10/2022 1:42:28
PM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>11726</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Door frame and
architrave</td><td>Damages to be rectified or replaced</td><td>&#39;Scratches for
stainless steel architrave - damaged stainless frame- remove protective
tabe</td><td>Low</td><td>10/18/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>9/27/2020 4:41:52 PM</td><td> </td><td>8/10/2022 1:42:19
PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>11737</td><td>OPERATIONAL OFFICE</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloration between tiles - gap between
interface stainless and stone - cutting of marble bigger than box of glass
door.</td><td>Low</td><td>10/18/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>9/27/2020 4:42:33 PM</td><td> </td><td>8/10/2022 1:42:18
PM</td><td>&nbsp;</td><td>MG.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>16263</td><td>VIP RECEPTION</td><td>MU GF
</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Shadow gaps angle are not leveled </td><td>Low</td><td>2/21/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021 2:00:43 PM</td><td>
</td><td>8/10/2022 1:42:17
PM</td><td>&nbsp;</td><td>MV.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16265</td><td>VIP RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access panel should be adjusted </td><td>Low</td><td>2/21/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>2/14/2021 2:00:51 PM</td><td>
</td><td>8/10/2022 1:42:16
PM</td><td>&nbsp;</td><td>MV.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16267</td><td>VIP RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wavy painting should be adjusted </td><td>Low</td><td>2/21/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021 2:00:58 PM</td><td>
</td><td>8/10/2022 1:42:15
PM</td><td>&nbsp;</td><td>MV.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16270</td><td>VIP RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Edges are not aligned should be adjusted
</td><td>Low</td><td>2/21/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:01:10 PM</td><td> </td><td>8/10/2022 1:42:14
PM</td><td>&nbsp;</td><td>MV.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16274</td><td>VIP RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration of
tiles</td><td>Low</td><td>2/21/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/14/2021 2:01:33 PM</td><td> </td><td>8/10/2022 1:42:09
PM</td><td>&nbsp;</td><td>MV.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16281</td><td>FIRE CONTROL ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked part should be adjusted </td><td>Low</td><td>3/7/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021 2:02:03 PM</td><td>
</td><td>8/10/2022 1:42:08
PM</td><td>&nbsp;</td><td>MB.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16282</td><td>FIRE CONTROL ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Access panels need adjustment
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:02:05 PM</td><td> </td><td>8/10/2022 1:42:07
PM</td><td>&nbsp;</td><td>MB.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16283</td><td>FIRE CONTROL ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wall painting need touch up
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:02:07 PM</td><td> </td><td>8/10/2022 1:42:06
PM</td><td>&nbsp;</td><td>MB.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16284</td><td>FIRE CONTROL ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Crack on wall should be repaired
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:02:10 PM</td><td> </td><td>8/10/2022 1:42:05
PM</td><td>&nbsp;</td><td>MB.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16285</td><td>FIRE CONTROL ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Joints are not aligned
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:02:13 PM</td><td> </td><td>8/10/2022 1:42:04
PM</td><td>&nbsp;</td><td>MB.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16286</td><td>FIRE CONTROL ROOM</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Repair should be adjusted
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:02:16 PM</td><td> </td><td>8/10/2022 1:42:02
PM</td><td>&nbsp;</td><td>MB.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16287</td><td>FIRE CONTROL ROOM</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Edge is not aligned
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:02:23 PM</td><td> </td><td>8/10/2022 1:42:01
PM</td><td>&nbsp;</td><td>MB.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16289</td><td>FIRE CONTROL ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Around manholes needs adjustment
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:02:29 PM</td><td> </td><td>8/10/2022 1:42:00
PM</td><td>&nbsp;</td><td>MB.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16292</td><td>W.C./M</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Vanity Counter
Top</td><td>General Snag</td><td>&#39;vanity top is broken
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:02:37 PM</td><td> </td><td>8/10/2022 1:41:59
PM</td><td>&nbsp;</td><td>MW.14.0G.002B</td><td>&nbsp;</td>
</tr><tr>
<td>16293</td><td>W.C./M</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Discoloration of
tiles</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/14/2021 2:02:41 PM</td><td> </td><td>8/10/2022 1:41:58
PM</td><td>&nbsp;</td><td>MW.14.0G.002B</td><td>&nbsp;</td>
</tr><tr>
<td>16297</td><td>W.C./M</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Stone cladding is not flashed with door
frame</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/14/2021 2:02:48 PM</td><td> </td><td>8/10/2022 1:41:57
PM</td><td>&nbsp;</td><td>MW.14.0G.002B</td><td>&nbsp;</td>
</tr><tr>
<td>16303</td><td>W.C./M</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Repair need adjustment
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:03:03 PM</td><td> </td><td>8/10/2022 1:41:56
PM</td><td>&nbsp;</td><td>MW.14.0G.002B</td><td>&nbsp;</td>
</tr><tr>
<td>16306</td><td>W.C./M</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Sealer roller
traces</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/14/2021 2:03:07 PM</td><td> </td><td>8/10/2022 1:41:56
PM</td><td>&nbsp;</td><td>MW.14.0G.002B</td><td>&nbsp;</td>
</tr><tr>
<td>16308</td><td>UNIVERSAL DISABLED W.C.</td><td>MU GF
</td><td>Closed</td><td>Dr Greish - High Custom Craft Company.
HCC</td><td>Architectural</td><td>Mirrors</td><td>General
Snag</td><td>&#39;Scratches on mirror </td><td>Low</td><td>3/7/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>2/14/2021 2:03:11 PM</td><td> </td><td>8/10/2022
1:41:54 PM</td><td>&nbsp;</td><td>MW.14.0G.002C</td><td>&nbsp;</td>
</tr><tr>
<td>16324</td><td>SCHOLAR RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Inspection after remove the protection
cover</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/14/2021 2:03:34 PM</td><td> </td><td>8/10/2022 1:41:53
PM</td><td>&nbsp;</td><td>MR.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16328</td><td>SCHOLAR RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Grill and access panels should e adjusted
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:03:38 PM</td><td> </td><td>8/10/2022 1:41:52
PM</td><td>&nbsp;</td><td>MR.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16330</td><td>SCHOLAR RECEPTION</td><td>MU GF
</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling edges are not aligned should be adjusted
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:03:41 PM</td><td> </td><td>8/10/2022 1:41:51
PM</td><td>&nbsp;</td><td>MR.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16336</td><td>SCHOLAR RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Sealant joint should be adjusted
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:03:47 PM</td><td> </td><td>8/10/2022 1:41:50
PM</td><td>&nbsp;</td><td>MR.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16337</td><td>SCHOLAR RECEPTION</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Gypsum board wall to be rectified
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:03:48 PM</td><td> </td><td>8/10/2022 1:41:49
PM</td><td>&nbsp;</td><td>MR.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16355</td><td>SCHOLAR RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:04:59 PM</td><td> </td><td>8/10/2022 1:41:46
PM</td><td>&nbsp;</td><td>MR.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16364</td><td>W.C./F</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:05:36 PM</td><td> </td><td>8/10/2022 1:41:45
PM</td><td>&nbsp;</td><td>MW.14.0G.002A</td><td>&nbsp;</td>
</tr><tr>
<td>16367</td><td>W.C./F</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration of tiles
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:05:49 PM</td><td> </td><td>8/10/2022 1:41:44
PM</td><td>&nbsp;</td><td>MW.14.0G.002A</td><td>&nbsp;</td>
</tr><tr>
<td>16371</td><td>W.C./F</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Painting
cir not submitted for all doors </td><td>Low</td><td>3/7/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>2/14/2021 2:06:02 PM</td><td> </td><td>8/10/2022
1:41:43 PM</td><td>&nbsp;</td><td>MW.14.0G.002A</td><td>&nbsp;</td>
</tr><tr>
<td>16459</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Edges are not aligned/should be adjusted
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
9:17:59 AM</td><td> </td><td>8/10/2022 1:41:43
PM</td><td>&nbsp;</td><td>MG.14.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>16505</td><td>TOILET CLEANERS STORE</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Discoloring between stone tiles
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:18 AM</td><td> </td><td>8/10/2022 1:41:42
PM</td><td>&nbsp;</td><td>MW.14.0G.003D</td><td>&nbsp;</td>
</tr><tr>
<td>16513</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Bathroom -
Vanity top</td><td>General</td><td>&#39;Sealer roll
traces</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/15/2021 11:35:30 AM</td><td> </td><td>8/10/2022 1:41:40
PM</td><td>&nbsp;</td><td>MW.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16515</td><td>TOILET CLEANERS STORE</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Stone cladding is not flashed with door
frame</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/15/2021 11:35:36 AM</td><td> </td><td>8/10/2022 1:41:40
PM</td><td>&nbsp;</td><td>MW.14.0G.003D</td><td>&nbsp;</td>
</tr><tr>
<td>16517</td><td>TOILET CLEANERS STORE</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration of tiles
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:39 AM</td><td> </td><td>8/10/2022 1:41:39
PM</td><td>&nbsp;</td><td>MW.14.0G.003D</td><td>&nbsp;</td>
</tr><tr>
<td>16518</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Bathroom -
Vanity top</td><td>General</td><td>&#39;Discoloring between vanity
tiles</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/15/2021 11:35:39 AM</td><td> </td><td>8/10/2022 1:41:38
PM</td><td>&nbsp;</td><td>MW.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16519</td><td>TOILET</td><td>MU GF </td><td>Closed</td><td>Dr
Greish - High Custom Craft Company.
HCC</td><td>Architectural</td><td>Mirrors</td><td>General
Snag</td><td>&#39;Toothing mirrors</td><td>Low</td><td>3/8/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>2/15/2021 11:35:41 AM</td><td> </td><td>8/10/2022
1:41:37 PM</td><td>&nbsp;</td><td>MW.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16521</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Discoloration of tiles (bathroom no 11from
entrance)</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/15/2021 11:35:45 AM</td><td> </td><td>8/10/2022 1:41:36
PM</td><td>&nbsp;</td><td>MW.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16522</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Toothing tiles should be adjusted
(1st,2nd ,5th)bathroom from entrance </td><td>Low</td><td>3/8/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>2/15/2021 11:35:48 AM</td><td> </td><td>8/10/2022
1:41:35 PM</td><td>&nbsp;</td><td>MW.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16526</td><td>DISABLED FACILITY</td><td>MU GF
</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Scratch/stains</td><td>&#39;Scratches at partition need to touch
up </td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:55 AM</td><td> </td><td>8/10/2022 1:41:34
PM</td><td>&nbsp;</td><td>MG.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16527</td><td>DISABLED FACILITY</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Discoloration of tiles
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:56 AM</td><td> </td><td>8/10/2022 1:41:33
PM</td><td>&nbsp;</td><td>MG.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16528</td><td>DISABLED FACILITY</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Access panels</td><td>&#39;Waving gypsum ceiling
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:58 AM</td><td> </td><td>8/10/2022 1:41:32
PM</td><td>&nbsp;</td><td>MG.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16529</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Sealer roller
traces</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/15/2021 11:35:59 AM</td><td> </td><td>8/10/2022 1:41:31
PM</td><td>&nbsp;</td><td>MW.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16534</td><td>DISABLED FACILITY</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Fixed accessories</td><td>General</td><td>&#39;Missing some screws ( bar need to
fixed properly )</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/15/2021 11:36:09 AM</td><td> </td><td>8/10/2022 1:41:30
PM</td><td>&nbsp;</td><td>MG.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16535</td><td>DISABLED FACILITY</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Discoloration of tiles
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:11 AM</td><td> </td><td>8/10/2022 1:41:29
PM</td><td>&nbsp;</td><td>MG.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16536</td><td>DISABLED FACILITY</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Fixed accessories</td><td>General</td><td>&#39;Joints around accessories and holes
should be filled grout </td><td>Low</td><td>2/22/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>2/15/2021 11:36:14 AM</td><td> </td><td>8/10/2022 1:41:28
PM</td><td>&nbsp;</td><td>MG.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16538</td><td>DISABLED FACILITY</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Sealer roller
traces</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/15/2021 11:36:17 AM</td><td> </td><td>8/10/2022 1:41:27
PM</td><td>&nbsp;</td><td>MG.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16539</td><td>W.C. LOBBY</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Edges of air gap should be aligned
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:18 AM</td><td> </td><td>8/10/2022 1:41:27
PM</td><td>&nbsp;</td><td>MG.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16540</td><td>DISABLED FACILITY</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Stone cladding is not flashed with door
frame </td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>2/15/2021 11:36:19 AM</td><td> </td><td>8/10/2022 1:41:26
PM</td><td>&nbsp;</td><td>MG.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16552</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Bathroom -
Vanity top</td><td>General</td><td>&#39;Sealer roll traces
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:39 AM</td><td> </td><td>8/10/2022 1:41:24
PM</td><td>&nbsp;</td><td>MW.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16555</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Bathroom -
Vanity top</td><td>General</td><td>&#39;Discoloring between vanity tiles
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:43 AM</td><td> </td><td>8/10/2022 1:41:23
PM</td><td>&nbsp;</td><td>MW.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16557</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Discoloring between stone tiles
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:46 AM</td><td> </td><td>8/10/2022 1:41:21
PM</td><td>&nbsp;</td><td>MW.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16563</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Damage</td><td>&#39;Damaged upper and lower edges
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:59 AM</td><td> </td><td>8/10/2022 1:41:20
PM</td><td>&nbsp;</td><td>MW.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16564</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:37:00 AM</td><td> </td><td>8/10/2022 1:41:19
PM</td><td>&nbsp;</td><td>MW.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16566</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Tile Joints</td><td>&#39;Joints should be adjusted
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:37:02 AM</td><td> </td><td>8/10/2022 1:41:18
PM</td><td>&nbsp;</td><td>MG.14.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>16568</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Discoloring between false ceiling tiles
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:37:04 AM</td><td> </td><td>8/10/2022 1:41:16
PM</td><td>&nbsp;</td><td>MG.14.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>16571</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration of tiles
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:37:10 AM</td><td> </td><td>8/10/2022 1:41:15
PM</td><td>&nbsp;</td><td>MW.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>22188</td><td>FEMALE PRAYER ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Stainless steel skirting not aligned
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:47:10 AM</td><td> </td><td>8/10/2022 1:41:12
PM</td><td>&nbsp;</td><td>MG.13.0G.005</td><td>&nbsp;</td>
</tr><tr>
<td>22196</td><td>FEMALE WASH ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Painting on floor should be removed
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:47:29 AM</td><td> </td><td>8/10/2022 1:41:11
PM</td><td>&nbsp;</td><td>MS.13.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>22246</td><td>MALE WASH ROOM</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments in CIR </td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/24/2021 11:49:10 AM</td><td> </td><td>8/10/2022 1:41:10
PM</td><td>&nbsp;</td><td>MS.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22249</td><td>MALE WASH ROOM</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:15 AM</td><td> </td><td>8/10/2022 1:41:09
PM</td><td>&nbsp;</td><td>MS.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22251</td><td>MALE WASH ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Painting on stone should be removed
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:18 AM</td><td> </td><td>8/10/2022 1:41:08
PM</td><td>&nbsp;</td><td>MS.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22256</td><td>MALE PRAYER ROOM</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Ceiling is not leveled
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:25 AM</td><td> </td><td>8/10/2022 1:41:07
PM</td><td>&nbsp;</td><td>MG.13.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>22258</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Skirting</td><td>Not aligned with drywall</td><td>&#39;Skirting is not aligned
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:28 AM</td><td> </td><td>8/10/2022 1:41:06
PM</td><td>&nbsp;</td><td>MG.13.0G.003

</td><td>&nbsp;</td>
</tr><tr>
<td>22259</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Skirting</td><td>Not aligned with drywall</td><td>&#39;Skirting is not aligned
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:29 AM</td><td> </td><td>8/10/2022 1:41:05
PM</td><td>&nbsp;</td><td>MG.13.0G.003
</td><td>&nbsp;</td>
</tr><tr>
<td>22263</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:34 AM</td><td> </td><td>8/10/2022 1:41:04
PM</td><td>&nbsp;</td><td>MG.13.0G.003

</td><td>&nbsp;</td>
</tr><tr>
<td>22265</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Internal sone is not leveled with external
stone</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/24/2021 11:49:37 AM</td><td> </td><td>8/10/2022 1:41:03
PM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22266</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:38 AM</td><td> </td><td>8/10/2022 1:41:02
PM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22271</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Fixed accessories</td><td>General</td><td>&#39;Marked bar should be fixed properly
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:45 AM</td><td> </td><td>8/10/2022 1:41:01
PM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22272</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Fixed accessories</td><td>General</td><td>&#39;Grip bar should be fixed properly
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:47 AM</td><td> </td><td>8/10/2022 1:41:00
PM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22293</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:50:16 AM</td><td> </td><td>8/10/2022 1:40:59
PM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22295</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:50:18 AM</td><td> </td><td>8/10/2022 1:40:58
PM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22307</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:50:35 AM</td><td> </td><td>8/10/2022 1:40:56
PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22309</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Skirting is not aligned/toothing
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:50:38 AM</td><td> </td><td>8/10/2022 1:40:55
PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>24881</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Skirting should be aligned
</td><td>Low</td><td>11/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>11/8/2021
12:12:18 PM</td><td> </td><td>8/10/2022 1:40:53
PM</td><td>&nbsp;</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>24886</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Marked joint should be aligned and
uniform </td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>11/8/2021 12:12:28 PM</td><td> </td><td>8/10/2022 1:40:52
PM</td><td>&nbsp;</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>24890</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>11/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>11/8/2021
12:12:35 PM</td><td> </td><td>8/10/2022 1:40:51
PM</td><td>&nbsp;</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>24894</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>AC grill not
aligned</td><td>&#39;AC grill not aligned </td><td>Low</td><td>11/29/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>11/8/2021 12:15:32 PM</td><td> </td><td>8/10/2022
1:40:50 PM</td><td>&nbsp;</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>24896</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Edges of Gypsum ceiling not aligned
</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>11/8/2021
12:15:37 PM</td><td> </td><td>8/10/2022 1:40:49
PM</td><td>&nbsp;</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27942</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>4/3/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/13/2022
12:23:05 PM</td><td> </td><td>8/10/2022 1:40:48
PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27947</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;The distance between copping and
handrail is unequal (not leveled)</td><td>Low</td><td>4/3/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>3/13/2022 12:23:16 PM</td><td> </td><td>8/10/2022
1:40:45 PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27948</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked joints should be with the
same width (be aligned)</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 12:23:18 PM</td><td> </td><td>8/10/2022 1:40:44
PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27950</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Sharp lower copping edges should be
adjusted (for all handrail)</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 12:23:22 PM</td><td> </td><td>8/10/2022 1:40:43
PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27952</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Cutting around lighting fixture
should be adjusted (all handrail)</td><td>Low</td><td>4/3/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>3/13/2022 12:23:26 PM</td><td> </td><td>8/10/2022
1:40:42 PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27963</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>Stone
counter</td><td>General</td><td>&#39;White dents </td><td>Low</td><td>4/3/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>3/13/2022 12:23:51 PM</td><td>
</td><td>8/10/2022 1:40:41
PM</td><td>&nbsp;</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>32556</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:33:24 AM</td><td> </td><td>8/10/2022 11:25:24
AM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32214</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:59 AM</td><td>
</td><td>8/10/2022 11:25:12
AM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>32204</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover and flexible
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:48:45 AM</td><td> </td><td>8/10/2022 11:24:42
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32550</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be
protected</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:33:05 AM</td><td> </td><td>8/10/2022 11:24:34
AM</td><td>&nbsp;</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32169</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label </td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:00 AM</td><td>
</td><td>8/10/2022 11:24:02
AM</td><td>&nbsp;</td><td>MS.18.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32426</td><td>ELECTRICAL ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:10 PM</td><td>
</td><td>8/10/2022 11:23:28
AM</td><td>&nbsp;</td><td>MS.13.3A.014</td><td>&nbsp;</td>
</tr><tr>
<td>32425</td><td>ELECTRICAL ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be protected
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:30:08 PM</td><td> </td><td>8/10/2022 11:23:16
AM</td><td>&nbsp;</td><td>MS.13.3A.014</td><td>&nbsp;</td>
</tr><tr>
<td>32396</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be protected
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:26 PM</td><td> </td><td>8/10/2022 11:22:38
AM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32560</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/18/2022 11:33:39 AM</td><td>
</td><td>8/10/2022 11:22:10
AM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32566</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting fixtures to be installed properly
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:33:56 AM</td><td> </td><td>8/10/2022 11:21:36
AM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32579</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable to be laying at
trunk</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:34:27 AM</td><td> </td><td>8/10/2022 11:21:23
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32210</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:53 AM</td><td>
</td><td>8/10/2022 11:21:07
AM</td><td>&nbsp;</td><td>MS.13.3A.011</td><td>&nbsp;</td>
</tr><tr>
<td>32424</td><td>ELECTRICAL ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>Marcos Motoshaleh Farag</td><td>7/17/2022 4:30:07 PM</td><td>
</td><td>8/10/2022 11:20:23
AM</td><td>&nbsp;</td><td>MS.13.3A.014</td><td>&nbsp;</td>
</tr><tr>
<td>32030</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to cleaning and
touch up </td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:56:47 PM</td><td> </td><td>8/10/2022 10:50:55
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32130</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 4:23:31 PM</td><td>
</td><td>8/10/2022 10:35:00 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32047</td><td>Core G3</td><td>MU GF
</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:06 AM</td><td>
</td><td>8/10/2022 10:34:22 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>29108</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Marked edge should be aligned
</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:30 PM</td><td> </td><td>8/10/2022 10:25:56
AM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28903</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Loose
handle should be fixed properly </td><td>Low</td><td>6/7/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/17/2022 11:47:20 AM</td><td> </td><td>8/10/2022
10:25:15 AM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27456</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant should be adjusted </td><td>Low</td><td>3/28/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022 4:40:40 PM</td><td>
</td><td>8/10/2022 10:11:20
AM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31623</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/5/2022
4:24:32 PM</td><td> </td><td>8/10/2022 10:09:53
AM</td><td>&nbsp;</td><td>MS.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31579</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
3:37:11 PM</td><td> </td><td>8/10/2022 10:09:22
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30923</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and hardware accessories need to clean from both
sides.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:51:05 PM</td><td> </td><td>8/10/2022 10:08:51
AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30509</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;All
walls need touch up painting </td><td>Low</td><td>6/21/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/31/2022 11:44:52 AM</td><td> </td><td>8/10/2022
10:07:01 AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30508</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Gypsum wall should be leveled with door
frame </td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:44:50 AM</td><td> </td><td>8/10/2022 10:06:22
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30506</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked edge should be aligned and uniform
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:44:46 AM</td><td> </td><td>8/10/2022 10:05:44
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31299</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/23/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>6/2/2022 11:38:05 AM</td><td> </td><td>8/10/2022
10:04:23 AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30680</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company, Ltd.</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf should be balanced and closed
properly.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:27 PM</td><td> </td><td>8/10/2022 10:03:51
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>28753</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need repair and touch up painting
</td><td>Low</td><td>6/1/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/11/2022
11:48:12 AM</td><td> </td><td>8/10/2022 10:02:49
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>32017</td><td>CORE G3</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cleaning is needed between concrete steps
and stainless handrail at all levels.</td><td>Low</td><td>7/26/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>7/5/2022 3:56:20 PM</td><td> </td><td>8/10/2022
10:01:07 AM</td><td>&nbsp;</td><td>MC.19.01.G31</td><td>&nbsp;</td>
</tr><tr>
<td>29800</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged accessories </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:15:49 PM</td><td> </td><td>8/10/2022
9:57:43 AM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>29435</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Flooring hinges should be adjusted </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 5:05:42 PM</td><td>
</td><td>8/10/2022 9:56:43
AM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29408</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly and to be balanced </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 5:04:41 PM</td><td>
</td><td>8/10/2022 9:56:07
AM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29857</td><td>ELEC ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Hinge
should be fixed properly </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 4:22:15 PM</td><td> </td><td>8/10/2022 9:55:26
AM</td><td>&nbsp;</td><td>MS.19.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>29686</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
accessories should be adjusted </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 12:06:03 PM</td><td> </td><td>8/10/2022
9:54:56 AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29673</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defective hardware accessories should be
adjusted</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 12:05:43 PM</td><td> </td><td>8/10/2022 9:54:29
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29447</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Tabes should be removed </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 5:06:32 PM</td><td> </td><td>8/10/2022
9:53:07 AM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29439</td><td>LOBBY</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Flush
bolt is not working </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 5:05:50 PM</td><td> </td><td>8/10/2022 9:52:40
AM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29432</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning is needed </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 5:05:36 PM</td><td> </td><td>8/10/2022
9:52:13 AM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>29431</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Tape to be removed and cleaned </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 5:05:35 PM</td><td>
</td><td>8/10/2022 9:51:47
AM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>29424</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Marked bolt to changed </td><td>Low</td><td>5/31/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 5:05:22 PM</td><td> </td><td>8/10/2022
9:51:12 AM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29422</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Tape should be removed and cleaned </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 5:05:00 PM</td><td>
</td><td>8/10/2022 9:49:59
AM</td><td>&nbsp;</td><td>MS.23.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29934</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Architrave should be fixed
well</td><td>Low</td><td>6/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/26/2022 10:58:50 AM</td><td> </td><td>8/10/2022 9:49:19
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29921</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
accessories </td><td>Low</td><td>6/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/26/2022 10:58:35 AM</td><td> </td><td>8/10/2022 9:48:52
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29923</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Holes should be closed.</td><td>Low</td><td>6/16/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/26/2022 10:58:38 AM</td><td> </td><td>8/10/2022
9:48:13 AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>29606</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes should be
closed.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:32 AM</td><td> </td><td>8/10/2022 9:47:37
AM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29345</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company, Ltd.</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged
accessories.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:00 PM</td><td> </td><td>8/10/2022 9:47:06
AM</td><td>&nbsp;</td><td>MS.18.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>21145</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door frame
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:50:41 AM</td><td> </td><td>8/10/2022 9:46:32
AM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21143</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door frame
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:50:37 AM</td><td> </td><td>8/10/2022 9:45:57
AM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>9675</td><td>IT ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Incomplete work for inergen system
</td><td>High</td><td>7/28/2020 12:00:00 PM</td><td>ahmedsalem</td><td>7/21/2020
11:57:04 AM</td><td> </td><td>8/10/2022 9:22:39
AM</td><td>&nbsp;</td><td>MS.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>32616</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Not
Installed/Completed</td><td>&#39;Missing CHWPs insulation
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:36:52 AM</td><td> </td><td>8/10/2022 8:34:41
AM</td><td>&nbsp;</td><td>MS.19.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32615</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;CHWPs insulation needs repair </td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:36:50 AM</td><td>
</td><td>8/10/2022 8:34:27
AM</td><td>&nbsp;</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32614</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Duct insulation needs repair</td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:36:47 AM</td><td>
</td><td>8/10/2022 8:34:12
AM</td><td>&nbsp;</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32613</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Duct insulation needs repair </td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:36:45 AM</td><td>
</td><td>8/10/2022 8:33:59
AM</td><td>&nbsp;</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32637</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Drain pipes insulation needs repair
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:37:36 AM</td><td> </td><td>8/10/2022 8:31:20
AM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32635</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;CHWPs insulation need repair </td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:37:33 AM</td><td>
</td><td>8/10/2022 8:31:06
AM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>

<td>25577</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced
</td><td>Low</td><td>1/3/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>12/13/2021 1:58:29 PM</td><td> </td><td>8/9/2022 3:42:48
PM</td><td>Repeated item #27233</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>10466</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
sealant around metal door </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:12:27 PM</td><td> </td><td>8/9/2022
11:50:23 AM</td><td>&nbsp;</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>10446</td><td>CORE E1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
sealant around metal door </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:11:34 PM</td><td> </td><td>8/9/2022
11:50:13 AM</td><td>&nbsp;</td><td>MC.24.2A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>32307</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 4:05:54 PM</td><td> </td><td>8/9/2022
11:50:03 AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>16490</td><td>Plant</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Epoxy paint floor need to touch up
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:56 AM</td><td> </td><td>8/9/2022 11:42:41
AM</td><td>&nbsp;</td><td>MS.19.0G.006</td><td>&nbsp;</td>
</tr><tr>
<td>21708</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Tiles should be leveled
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:26:07 AM</td><td> </td><td>8/9/2022 11:39:43
AM</td><td>&nbsp;</td><td>MS.12.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16882</td><td>WC LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Painting need touch up
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:01:16 PM</td><td> </td><td>8/9/2022 11:38:49
AM</td><td>&nbsp;</td><td>MW.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16879</td><td>WC LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Painting should be adjusted for marked parts
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:01:10 PM</td><td> </td><td>8/9/2022 11:38:00
AM</td><td>&nbsp;</td><td>MW.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16872</td><td>MALE SHOWER/ LOCKERS-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>General Snag</td><td>&#39;Repair is needed around MEP Fixtures
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:00:55 PM</td><td> </td><td>8/9/2022 11:37:10
AM</td><td>&nbsp;</td><td>MW.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16865</td><td>WC CLEANERS STORE-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Floor Tile</td><td>Cracks</td><td>&#39;Damaged tiles should be replaced
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:00:42 PM</td><td> </td><td>8/9/2022 11:36:00
AM</td><td>&nbsp;</td><td>MW.13.01.001D</td><td>&nbsp;</td>
</tr><tr>
<td>16864</td><td>WC CLEANERS STORE-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Damages tiles should be replaced </td><td>Low</td><td>3/31/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021 1:00:41 PM</td><td>
</td><td>8/9/2022 11:35:14
AM</td><td>&nbsp;</td><td>MW.13.01.001D</td><td>&nbsp;</td>
</tr><tr>
<td>16861</td><td>WC CLEANERS STORE-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs re painting </td><td>Low</td><td>3/31/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>3/10/2021 1:00:35 PM</td><td> </td><td>8/9/2022
11:34:28 AM</td><td>&nbsp;</td><td>MW.13.01.001D</td><td>&nbsp;</td>
</tr><tr>
<td>16842</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Shadow gap should be cleaned </td><td>Low</td><td>3/31/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021 12:59:52 PM</td><td>
</td><td>8/9/2022 11:33:53
AM</td><td>&nbsp;</td><td>MW.13.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>29855</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing Sealant around door
frame.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:20:18 PM</td><td> </td><td>8/9/2022 11:32:56
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>14788</td><td>Land of Egypt - Level +42.00</td><td>Land of
Egypt</td><td>Closed</td><td>Astron</td><td>Architectural</td><td>Steel
Gates</td><td>General Snag</td><td>&#39;Missing gate</td><td>Low</td><td>2/2/2021
12:00:00 PM</td><td>aymanhaddadin</td><td>1/13/2021 7:52:47 AM</td><td>
</td><td>8/9/2022 11:32:27 AM</td><td>Installation will be done by other
</td><td>Land of Egypt - Level +42.00</td><td>&nbsp;</td>
</tr><tr>
<td>23550</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Rusted tiles should be treated / replaced
</td><td>Low</td><td>10/12/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/21/2021
11:07:49 AM</td><td> </td><td>8/9/2022 11:32:26
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24959</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damage/missing geo cell should replaced/
installed.</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 11:28:34 AM</td><td> </td><td>8/9/2022 11:32:24
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25023</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Geo cell should be extended and fixed properly
</td><td>Low</td><td>11/18/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/11/2021
10:23:26 AM</td><td> </td><td>8/9/2022 11:32:23
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26159</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>Delta
Egypt</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Lighting fixtures stripes should be extended to the end
</td><td>Low</td><td>3/8/2022 12:00:00 PM</td><td>Marios Ioannou,</td><td>2/15/2022
1:45:05 PM</td><td> </td><td>8/9/2022 11:32:22
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26163</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Corner tiles should be as per shop drawing
</td><td>Low</td><td>3/8/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>2/15/2022
1:45:16 PM</td><td> </td><td>8/9/2022 11:32:21
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26167</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Snagging for cladding after removing the protection cover
</td><td>Low</td><td>3/8/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>2/15/2022
1:45:31 PM</td><td> </td><td>8/9/2022 11:32:20
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>29852</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damaged accessories.</td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:20:09 PM</td><td> </td><td>8/9/2022
11:32:14 AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>29844</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing Sealant around door
frame.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:17:21 PM</td><td> </td><td>8/9/2022 11:31:34
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>29838</td><td>RISER</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing Sealant around door
leaf.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:17:09 PM</td><td> </td><td>8/9/2022 11:30:47
AM</td><td>&nbsp;</td><td>MS.25.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29434</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Label to be cleared /readable </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 5:05:40 PM</td><td>
</td><td>8/9/2022 11:30:06
AM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29418</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 5:04:54 PM</td><td> </td><td>8/9/2022 11:29:23
AM</td><td>&nbsp;</td><td>MS.18.2A.021</td><td>&nbsp;</td>
</tr><tr>
<td>29364</td><td>MACHINE ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Holes should be closed.</td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 4:19:29 PM</td><td> </td><td>8/9/2022
11:28:50 AM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>29927</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>6/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/26/2022 10:58:44 AM</td><td> </td><td>8/9/2022 11:27:26
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29853</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes need to
close.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:20:11 PM</td><td> </td><td>8/9/2022 11:26:53
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>29843</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes should be
closed.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:17:19 PM</td><td> </td><td>8/9/2022 11:26:14
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>29839</td><td>RISER</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes should be
closed.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:17:11 PM</td><td> </td><td>8/9/2022 11:25:39
AM</td><td>&nbsp;</td><td>MS.25.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27732</td><td>IT 7</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around door frame </td><td>Low</td><td>3/31/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2022 11:08:10 AM</td><td>
</td><td>8/9/2022 11:24:36
AM</td><td>&nbsp;</td><td>MS.14.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>30425</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Remove protection from electrical boxes and
signage.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:08 AM</td><td> </td><td>8/9/2022 11:23:52
AM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>29758</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door frame
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:14:06 PM</td><td> </td><td>8/9/2022 11:23:07
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29733</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door frame
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
3:13:02 PM</td><td> </td><td>8/9/2022 11:22:14
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29406</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 5:04:39 PM</td><td> </td><td>8/9/2022 11:20:27
AM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32685</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing around metal door
</td><td>Low</td><td>8/24/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>8/3/2022
1:38:20 PM</td><td> </td><td>8/9/2022 11:19:15
AM</td><td>&nbsp;</td><td>MT.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20754</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked part should be adjusted and repaired
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:14 PM</td><td> </td><td>8/9/2022 11:18:36
AM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20550</td><td>MALE W.C.</td><td>MU
L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked parts need adjustment and repair
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:29 PM</td><td> </td><td>8/9/2022 11:17:58
AM</td><td>&nbsp;</td><td>MW.14.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>20533</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Opening around fire box should be adjusted
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:11 PM</td><td> </td><td>8/9/2022 11:17:16
AM</td><td>&nbsp;</td><td>MT.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>32043</td><td>CORE G3</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging flooring after removing
protection.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:57:16 PM</td><td> </td><td>8/9/2022 11:16:14
AM</td><td>&nbsp;</td><td>MC.19.01.G31</td><td>&nbsp;</td>
</tr><tr>
<td>32038</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging flooring after removing
protection.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:57:06 PM</td><td> </td><td>8/9/2022 11:15:35
AM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>32035</td><td>CORE G3</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging flooring after removing
protection.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:56:58 PM</td><td> </td><td>8/9/2022 11:14:51
AM</td><td>&nbsp;</td><td>MC.19.01.G31</td><td>&nbsp;</td>
</tr><tr>
<td>32025</td><td>CORE G1</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to cleaning and
touch up.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:56:36 PM</td><td> </td><td>8/9/2022 11:14:02
AM</td><td>&nbsp;</td><td>MC.25.01.G11</td><td>&nbsp;</td>
</tr><tr>
<td>32024</td><td>CORE G1</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail need to polishing and touch
up.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
3:56:34 PM</td><td> </td><td>8/9/2022 11:13:23
AM</td><td>&nbsp;</td><td>MC.25.01.G11</td><td>&nbsp;</td>
</tr><tr>
<td>32022</td><td>CORE G1</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to cleaning and
touch up.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:56:31 PM</td><td> </td><td>8/9/2022 11:12:48
AM</td><td>&nbsp;</td><td>MC.25.02.G11</td><td>&nbsp;</td>
</tr><tr>
<td>32021</td><td>CORE G1</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail need to polishing and
cleaning.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:56:29 PM</td><td> </td><td>8/9/2022 11:12:21
AM</td><td>&nbsp;</td><td>MC.25.02.G11</td><td>&nbsp;</td>
</tr><tr>
<td>32019</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Epoxy painting floor need to cleaning and
touch up.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:56:25 PM</td><td> </td><td>8/9/2022 11:11:53
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>32018</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail need to polishing and
cleaning.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:56:22 PM</td><td> </td><td>8/9/2022 10:34:15
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>29444</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning for doors is needed </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 5:06:07 PM</td><td>
</td><td>8/9/2022 10:33:28
AM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27933</td><td>STAFF W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing Sealant around door
frame.</td><td>Low</td><td>4/3/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/13/2022 11:48:47 AM</td><td> </td><td>8/9/2022 10:32:42
AM</td><td>&nbsp;</td><td>MW.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29908</td><td>IT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door accessories </td><td>Low</td><td>6/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/26/2022 10:18:48 AM</td><td> </td><td>8/9/2022 10:32:11
AM</td><td>&nbsp;</td><td>MS.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29907</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door accessories need to clean </td><td>Low</td><td>6/16/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/26/2022 10:18:46 AM</td><td>
</td><td>8/9/2022 10:31:40
AM</td><td>&nbsp;</td><td>MS.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29903</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door accessories need to clean </td><td>Low</td><td>6/2/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/26/2022 10:18:40 AM</td><td>
</td><td>8/9/2022 10:31:14
AM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>16857</td><td>WC /DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>General Snag</td><td>&#39;Tile should be replaced
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:00:28 PM</td><td> </td><td>8/9/2022 10:29:45
AM</td><td>&nbsp;</td><td>MW.13.01.001C</td><td>&nbsp;</td>
</tr><tr>
<td>28718</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>5/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:53 AM</td><td> </td><td>8/9/2022 8:29:32
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28662</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>5/17/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:40:06 PM</td><td> </td><td>8/9/2022 8:28:50
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28539</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Ductwork</
td><td>Access door missing</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>5/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:44 AM</td><td> </td><td>8/9/2022 8:28:01
AM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>14479</td><td>B.O.H-WET DELIVERY TUNNEL - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Need strap around duct insulation for duct drop
</td><td>High</td><td>1/2/2021 12:00:00 PM</td><td>ahmedsalem</td><td>12/26/2020
11:40:43 AM</td><td> </td><td>8/9/2022 8:15:42
AM</td><td>&nbsp;</td><td>MQ.23.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>32540</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Insulation</td><td>&#39;Insulation
need repair</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:30:02 AM</td><td> </td><td>8/9/2022 7:24:33
AM</td><td>&nbsp;</td><td>MS.19.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32529</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Insulation need repairs and missing angle
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:44 AM</td><td> </td><td>8/9/2022 7:24:17
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32527</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>General
Snag</td><td>&#39;Insulation need repair </td><td>High</td><td>7/25/2022 12:00:00
PM</td><td>Sherif Boshra Ghaly</td><td>7/18/2022 11:29:40 AM</td><td>
</td><td>8/9/2022 7:23:44
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32244</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>8/7/2022 12:00:00
AM</td><td>sally.george</td><td>7/17/2022 11:50:51 AM</td><td> </td><td>8/8/2022
4:10:06 PM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32395</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Panel schedule should be attached at
panels</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:24 PM</td><td> </td><td>8/8/2022 4:03:33
PM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32403</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Panel schedule should be attached
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:35 PM</td><td> </td><td>8/8/2022 4:03:26
PM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32402</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Panel schedule should be attached
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:29:34 PM</td><td> </td><td>8/8/2022 4:03:18
PM</td><td>&nbsp;</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32171</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Panel schedule should be attached
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:48:02 AM</td><td> </td><td>8/8/2022 4:03:09
PM</td><td>&nbsp;</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32217</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be protected
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:49:02 AM</td><td> </td><td>8/8/2022 4:03:00
PM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>32583</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Panel scheduled to be attached at all
panels</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/18/2022 11:34:33 AM</td><td> </td><td>8/8/2022 4:02:49
PM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32443</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Panel schedule should be attached at
panels</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>7/17/2022 4:30:37 PM</td><td> </td><td>8/8/2022 4:02:38
PM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32203</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Panel schedule should be attached at all
panels in the room</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:48:44 AM</td><td> </td><td>8/8/2022 4:02:29
PM</td><td>&nbsp;</td><td>MS.13.3A.011</td><td>&nbsp;</td>
</tr><tr>
<td>32189</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Panel schedule to be attached at all
panel</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:48:26 AM</td><td> </td><td>8/8/2022 4:02:20
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>15032</td><td>IT HUB ROOM</td><td>CCB
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cable dressing and missing cable trunks labeling everywhere in
the hub room </td><td>High</td><td>1/26/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>1/19/2021 4:18:04 PM</td><td> </td><td>8/8/2022 3:34:49
PM</td><td>&nbsp;</td><td>CS.07.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>24206</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Line array system is not terminated and tested yet - @Bridge
St.no. 2</td><td>High</td><td>11/2/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>10/26/2021 3:34:57 PM</td><td> </td><td>8/8/2022 3:34:46
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28155</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cctv camera not installed </td><td>High</td><td>3/23/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/16/2022 3:54:40 PM</td><td>
</td><td>8/8/2022 3:34:44
PM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32046</td><td>Core G3</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:05 AM</td><td>
</td><td>8/8/2022 3:34:43 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32048</td><td>Core G3</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>7/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:09 AM</td><td> </td><td>8/8/2022
3:34:42 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32076</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Box label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:50 AM</td><td>
</td><td>8/8/2022 3:34:41
PM</td><td>&nbsp;</td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>32077</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:51 AM</td><td>
</td><td>8/8/2022 3:34:40
PM</td><td>&nbsp;</td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>32079</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Box label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:53 AM</td><td>
</td><td>8/8/2022 3:34:39
PM</td><td>&nbsp;</td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>32082</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:59 AM</td><td>
</td><td>8/8/2022 3:34:38
PM</td><td>&nbsp;</td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>32083</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:00 AM</td><td>
</td><td>8/8/2022 3:34:37
PM</td><td>&nbsp;</td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>32085</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:03 AM</td><td>
</td><td>8/8/2022 3:34:36
PM</td><td>&nbsp;</td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>32086</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:05 AM</td><td>
</td><td>8/8/2022 3:34:35
PM</td><td>&nbsp;</td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>30934</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
3:56:42 PM</td><td> </td><td>8/8/2022 3:19:31
PM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30164</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Skirting need touch up
painting</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 11:38:13 AM</td><td> </td><td>8/8/2022 3:18:59
PM</td><td>&nbsp;</td><td>MQ.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30160</td><td>LOBBY</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Wall - Skirting</td><td>Other
Snag</td><td>&#39;Skirting need touch up painting </td><td>Low</td><td>6/20/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022 11:38:08 AM</td><td>
</td><td>8/8/2022 3:14:04
PM</td><td>&nbsp;</td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30173</td><td>LOBBY</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Wall - Skirting</td><td>Other
Snag</td><td>&#39;Skirting needs touch touch painting
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
11:38:24 AM</td><td> </td><td>8/8/2022 3:06:43
PM</td><td>&nbsp;</td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28842</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to
clean.</td><td>Low</td><td>6/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:44 AM</td><td> </td><td>8/8/2022 3:02:45
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>32041</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Gypsum board ceiling should be
finished.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:57:12 PM</td><td> </td><td>8/8/2022 3:01:52
PM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>30862</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to repair and
finish.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:38 AM</td><td> </td><td>8/8/2022 2:54:39
PM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30844</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame need to cleaning from
paint from both sides.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:02 AM</td><td> </td><td>8/8/2022 2:53:49
PM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30804</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
11:44:55 AM</td><td> </td><td>8/8/2022 2:53:23
PM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>28495</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Differential pressure sensor not
connected. </td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:18 PM</td><td> </td><td>8/8/2022 2:00:14
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>23173</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
tiles should be treated </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:51:17 AM</td><td> </td><td>8/8/2022 12:28:49
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>12273</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Slot drain installation is incomplete and
need cleaning </td><td>High</td><td>10/19/2020 12:00:00
AM</td><td>ahmedsalem</td><td>10/12/2020 9:25:38 AM</td><td> </td><td>8/8/2022
12:26:54 PM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21462</td><td>Internal Cladding of GA wall-
FC</td><td>Internal Cladding FC</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>9/8/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>8/18/2021 11:43:52 AM</td><td>
</td><td>8/8/2022 12:26:51 PM</td><td>&nbsp;</td><td>Internal Cladding of GA wall-
FC</td><td>&nbsp;</td>
</tr><tr>
<td>21469</td><td>Internal Cladding of GA wall-
FC</td><td>Internal Cladding
FC</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Bottom line should be repaired and
aligned </td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>8/18/2021 11:43:58 AM</td><td> </td><td>8/8/2022 12:26:51
PM</td><td>&nbsp;</td><td>Internal Cladding of GA wall- FC</td><td>&nbsp;</td>
</tr><tr>
<td>21472</td><td>Internal Cladding of GA wall-
FC</td><td>Internal Cladding
FC</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Facade stone cladding not aligned and not
completed </td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/18/2021 11:44:02 AM</td><td> </td><td>8/8/2022 12:26:50
PM</td><td>&nbsp;</td><td>Internal Cladding of GA wall- FC</td><td>&nbsp;</td>
</tr><tr>
<td>22694</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated properly </td><td>Low</td><td>9/27/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/6/2021 10:40:30 AM</td><td> </td><td>8/8/2022
12:26:49 PM</td><td>&nbsp;</td><td>Part 6</td><td>&nbsp;</td>
</tr><tr>
<td>22750</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
tiles should be treated properly </td><td>Low</td><td>9/28/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/7/2021 11:09:16 AM</td><td> </td><td>8/8/2022
12:26:48 PM</td><td>&nbsp;</td><td>Part 6</td><td>&nbsp;</td>
</tr><tr>
<td>22767</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
tiles should be treated properly</td><td>Low</td><td>9/28/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/7/2021 11:09:29 AM</td><td> </td><td>8/8/2022
12:26:47 PM</td><td>&nbsp;</td><td>Part 6</td><td>&nbsp;</td>
</tr><tr>
<td>23034</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/6/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/15/2021 11:31:29 AM</td><td> </td><td>8/8/2022
12:26:46 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23041</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/6/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/15/2021 11:31:41 AM</td><td> </td><td>8/8/2022
12:26:45 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23059</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/6/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/15/2021 11:32:11 AM</td><td> </td><td>8/8/2022
12:26:44 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23082</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Tile should be one piece
</td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/15/2021
11:32:48 AM</td><td> </td><td>8/8/2022 12:26:43
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23084</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Erosion and salted tiles should be treated
</td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/15/2021
11:32:51 AM</td><td> </td><td>8/8/2022 12:26:42
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23102</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated</td><td>Low</td><td>10/7/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/16/2021 11:49:48 AM</td><td> </td><td>8/8/2022
12:26:41 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23129</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Metal
trim should be flushed with stone copping </td><td>Low</td><td>9/23/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/16/2021 11:50:20 AM</td><td> </td><td>8/8/2022
12:26:40 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23131</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/7/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/16/2021 11:50:24 AM</td><td> </td><td>8/8/2022
12:26:39 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23132</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Metal
trim should be flushed with stone copping </td><td>Low</td><td>10/7/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/16/2021 11:50:25 AM</td><td> </td><td>8/8/2022
12:26:38 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23138</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/7/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/16/2021 11:50:34 AM</td><td> </td><td>8/8/2022
12:26:36 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23162</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Metal
trim should be flushed with stone </td><td>Low</td><td>10/7/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/16/2021 11:51:04 AM</td><td> </td><td>8/8/2022
12:26:34 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23164</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Metal
trim should be flushed with stone </td><td>Low</td><td>10/7/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/16/2021 11:51:07 AM</td><td> </td><td>8/8/2022
12:26:33 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23175</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable detail , level should be according design drawing
</td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/16/2021
11:51:18 AM</td><td> </td><td>8/8/2022 12:26:32
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23177</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable detail , level should be according design drawing
</td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/16/2021
11:51:21 AM</td><td> </td><td>8/8/2022 12:26:31
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23179</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Relation
between ripple bench and flooring should be aligned </td><td>Low</td><td>10/7/2021
12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021 11:51:23 AM</td><td>
</td><td>8/8/2022 12:26:30 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23182</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closer should be one tile
</td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/16/2021
11:51:28 AM</td><td> </td><td>8/8/2022 12:26:29
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23193</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closer should be followed design
drawing</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:51:42 AM</td><td> </td><td>8/8/2022 12:26:28
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23200</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated</td><td>Low</td><td>10/7/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/16/2021 11:51:56 AM</td><td> </td><td>8/8/2022
12:26:27 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23216</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/7/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/16/2021 11:52:36 AM</td><td> </td><td>8/8/2022
12:26:26 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23256</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closer for copping and cladding, pattern should be
according to design drawing </td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 12:05:56 PM</td><td> </td><td>8/8/2022 12:26:25
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23263</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closer should to be according design drawing
</td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/16/2021
12:06:08 PM</td><td> </td><td>8/8/2022 12:26:24
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23399</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/11/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/20/2021 11:15:18 AM</td><td> </td><td>8/8/2022
12:26:23 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23568</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discolored tiles should be treated / replaced
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:08:20 AM</td><td> </td><td>8/8/2022 12:26:23
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23647</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
ripple bench should be aligned with stone flooring </td><td>Low</td><td>10/13/2021
12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021 11:09:58 AM</td><td>
</td><td>8/8/2022 12:26:20 PM</td><td>&nbsp;</td><td>Part 6</td><td>&nbsp;</td>
</tr><tr>
<td>23648</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
ripple bench should be aligned with stone flooring </td><td>Low</td><td>10/13/2021
12:00:00 PM</td><td>Amr Nofal</td><td>9/22/2021 11:09:59 AM</td><td>
</td><td>8/8/2022 12:26:19 PM</td><td>&nbsp;</td><td>Part 6</td><td>&nbsp;</td>
</tr><tr>
<td>23657</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
bench level should be flushed with gravel </td><td>Low</td><td>10/13/2021 12:00:00
AM</td><td>Amr Nofal</td><td>9/22/2021 11:10:12 AM</td><td> </td><td>8/8/2022
12:26:18 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23658</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Ripple
bench should be aligned with stone flooring</td><td>Low</td><td>10/13/2021 12:00:00
AM</td><td>Amr Nofal</td><td>9/22/2021 11:10:14 AM</td><td> </td><td>8/8/2022
12:26:18 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23659</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Ripple
bench should be aligned with stone flooring </td><td>Low</td><td>10/13/2021
12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021 11:10:15 AM</td><td>
</td><td>8/8/2022 12:26:17 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23660</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
level should be flushed with gravel </td><td>Low</td><td>10/13/2021 12:00:00
AM</td><td>Amr Nofal</td><td>9/22/2021 11:10:17 AM</td><td> </td><td>8/8/2022
12:26:16 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23661</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
level should flushed with gravel </td><td>Low</td><td>10/13/2021 12:00:00
AM</td><td>Amr Nofal</td><td>9/22/2021 11:10:19 AM</td><td> </td><td>8/8/2022
12:26:14 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23662</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Ripple
bench should be aligned with stone flooring </td><td>Low</td><td>10/13/2021
12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021 11:10:20 AM</td><td>
</td><td>8/8/2022 12:26:13 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23663</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
level should be adjusted as per design drawing </td><td>Low</td><td>10/13/2021
12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021 11:10:23 AM</td><td>
</td><td>8/8/2022 12:26:12 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22430</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloration between stone tiles
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Mohamed
El-Sergany</td><td>8/29/2021 3:12:53 PM</td><td> </td><td>8/8/2022 12:23:51
PM</td><td>&nbsp;</td><td>Part 2</td><td>&nbsp;</td>
</tr><tr>
<td>27342</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Marked edge should be aligned and adjusted
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:42 PM</td><td> </td><td>8/8/2022 12:05:22 PM</td><td>Done
</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27343</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:43 PM</td><td> </td><td>8/8/2022 12:05:21 PM</td><td>Done
</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27489</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Final coat is not done
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:38 PM</td><td> </td><td>8/8/2022 12:05:14 PM</td><td>Done
</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28003</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>4/4/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/14/2022 11:38:37 AM</td><td>
</td><td>8/8/2022 12:05:13 PM</td><td>Done
</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>28237</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked edge should be aligned </td><td>Low</td><td>4/10/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/20/2022 12:04:46 PM</td><td>
</td><td>8/8/2022 12:05:12 PM</td><td>Done
</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28815</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wavy gypsum wall should be
adjusted.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:06 AM</td><td> </td><td>8/8/2022 12:05:11
PM</td><td>Done </td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28816</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to touch
up.</td><td>Low</td><td>6/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/15/2022
11:47:08 AM</td><td> </td><td>8/8/2022 12:05:11 PM</td><td>Done
</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28817</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall angle should be
aligned.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:09 AM</td><td> </td><td>8/8/2022 12:05:10
PM</td><td>Done </td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28818</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to touch
up.</td><td>Low</td><td>6/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/15/2022
11:47:11 AM</td><td> </td><td>8/8/2022 12:05:09 PM</td><td>Done
</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31699</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked part should be adjusted
</td><td>Low</td><td>6/27/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022
11:52:14 AM</td><td> </td><td>8/8/2022 12:05:03 PM</td><td>Done
</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31707</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;All
Walls need touch up painting </td><td>Low</td><td>6/27/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/6/2022 11:52:27 AM</td><td> </td><td>8/8/2022
12:05:01 PM</td><td>Done </td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>24109</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing patch cords in all cctv , cctv poles
plates gap should be sealed, cctv cables labels is missing
</td><td>High</td><td>11/2/2021 12:00:00 PM</td><td>Ahmed.Galal</td><td>10/26/2021
10:57:58 AM</td><td> </td><td>8/8/2022 11:14:52
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>27093</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;Cctv devices
labeling should be done with cables patching details
</td><td>High</td><td>3/10/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/3/2022 11:06:48 AM</td><td> </td><td>8/8/2022 11:14:52
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27094</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;Cctv devices
labeling should be done with cables patching details and port mapping also
</td><td>High</td><td>3/10/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/3/2022 11:06:49 AM</td><td> </td><td>8/8/2022 11:14:51
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>27095</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;Camera and WiFi
labeling should be done and port mapping is not done
</td><td>High</td><td>3/10/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/3/2022 11:06:51 AM</td><td> </td><td>8/8/2022 11:14:50
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31661</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing actuators.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:48 PM</td><td> </td><td>8/8/2022 9:02:23
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31546</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39; Missing cylinders actuators.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:35:52 PM</td><td> </td><td>8/8/2022 8:59:34
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31526</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing actuators.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:06 PM</td><td> </td><td>8/8/2022 8:57:22
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31523</td><td>PLANT</td><td>MU L20</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing actuators.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:31:58 PM</td><td> </td><td>8/8/2022 8:56:05
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31519</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing actuators.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:31:34 PM</td><td> </td><td>8/8/2022 8:54:55
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31510</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing actuators.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:55 PM</td><td> </td><td>8/8/2022 8:46:40
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>10471</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
sealant around metal door </td><td>Low</td><td>10/3/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>9/12/2020 1:12:41 PM</td><td> </td><td>8/8/2022
8:45:54 AM</td><td>Done</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>10475</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
sealant around metal doors</td><td>Low</td><td>10/3/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>9/12/2020 1:12:52 PM</td><td> </td><td>8/8/2022
8:45:51 AM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>10482</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
sealant around metal door </td><td>Low</td><td>10/3/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>9/12/2020 1:13:08 PM</td><td> </td><td>8/8/2022
8:45:49 AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>10489</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
sealant around metal door </td><td>Low</td><td>10/3/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>9/12/2020 1:13:24 PM</td><td> </td><td>8/8/2022
8:45:48 AM</td><td>Done</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29981</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Cylinders actuator missing.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:59 PM</td><td> </td><td>8/8/2022 8:45:35
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29706</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing actuator for INERGEN system.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:28 PM</td><td> </td><td>8/8/2022 8:43:24
AM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29295</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing cylinders actuator.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:23 PM</td><td> </td><td>8/8/2022 8:42:55
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28295</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Inergen actuator not installed.
</td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:08 AM</td><td> </td><td>8/8/2022 8:42:20
AM</td><td>&nbsp;</td><td>MS.18.2A.021</td><td>&nbsp;</td>
</tr><tr>
<td>29283</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;INERGEN actuator missing.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:07:27 PM</td><td> </td><td>8/8/2022 8:38:59
AM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>28290</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Actuator for INERGEN cylinders not
installed yet. </td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:47:57 AM</td><td> </td><td>8/8/2022 8:37:06
AM</td><td>&nbsp;</td><td>MS.18.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>14407</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing
actuators</td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>ahmedsalem</td><td>12/24/2020 3:23:28 PM</td><td> </td><td>8/8/2022
8:35:29 AM</td><td>&nbsp;</td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28875</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Hydronic pipes
insulation need repairs. </td><td>High</td><td>5/23/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/16/2022 4:07:17 PM</td><td>
</td><td>8/8/2022 8:33:09
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29994</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Chilled
water Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing INERGEN
actuator. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:25 PM</td><td> </td><td>8/8/2022 8:32:33
AM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>10917</td><td>Pyramid Garden</td><td>Pyramid
Garden</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing security and ICT devices not
installed.</td><td>High</td><td>9/22/2020 12:00:00 AM</td><td>David Noshy
Naguib</td><td>9/15/2020 8:03:33 AM</td><td> </td><td>8/8/2022 7:34:32
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32186</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover and
label</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:48:23 AM</td><td> </td><td>8/7/2022 4:25:57
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32180</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:14 AM</td><td>
</td><td>8/7/2022 4:25:41
PM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32177</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be protected
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:48:10 AM</td><td> </td><td>8/7/2022 4:25:19
PM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32167</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting fixture cover should be closed
well.</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:47:58 AM</td><td> </td><td>8/7/2022 4:24:02
PM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32190</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:27 AM</td><td>
</td><td>8/7/2022 4:23:35
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32194</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover and
label</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>David Noshy
Naguib</td><td>7/17/2022 11:48:32 AM</td><td> </td><td>8/7/2022 4:22:48
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>

<td>25578</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Area not
cleaned/finished.</td><td>&#39;Remove scaffolding for temporary
road</td><td>Low</td><td>1/3/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>12/13/2021 1:58:30 PM</td><td> </td><td>8/7/2022 3:02:06
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>29306</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing actuator cover.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:44 PM</td><td> </td><td>8/7/2022 1:06:37
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>14319</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need touch up </td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:22:20 PM</td><td> </td><td>8/7/2022 12:37:19
PM</td><td>&nbsp;</td><td>MS.23.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>14320</td><td>B.O.H-CORRIDOR - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need touch up </td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/24/2020 1:22:21 PM</td><td> </td><td>8/7/2022
12:37:18 PM</td><td>&nbsp;</td><td>MS.18.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>14323</td><td>B.O.H-ARTEFACTS - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame needs touch up </td><td>High</td><td>12/31/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>12/24/2020 1:22:27 PM</td><td> </td><td>8/7/2022
12:37:16 PM</td><td>&nbsp;</td><td>MQ.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14324</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need touch up </td><td>High</td><td>12/31/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>12/24/2020 1:22:29 PM</td><td> </td><td>8/7/2022 12:37:14
PM</td><td>&nbsp;</td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>14325</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need touch up </td><td>High</td><td>12/31/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>12/24/2020 1:22:37 PM</td><td> </td><td>8/7/2022 12:37:13
PM</td><td>&nbsp;</td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>14328</td><td>B.O.H-CORRIDOR - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need touch up </td><td>High</td><td>12/31/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>12/24/2020 1:23:12 PM</td><td> </td><td>8/7/2022
12:37:12 PM</td><td>&nbsp;</td><td>MS.18.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>14331</td><td>B.O.H-ELEC. SUB-STATION - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need touch up </td><td>High</td><td>12/31/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>12/24/2020 1:23:20 PM</td><td> </td><td>8/7/2022
12:37:11 PM</td><td>&nbsp;</td><td>MS.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>14335</td><td>B.O.H-ARTEFACTS - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need touch up paint </td><td>High</td><td>12/31/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>12/24/2020 1:23:34 PM</td><td> </td><td>8/7/2022
12:37:10 PM</td><td>&nbsp;</td><td>MQ.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14341</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need touch up </td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:23:49 PM</td><td> </td><td>8/7/2022 12:37:09
PM</td><td>&nbsp;</td><td>MS.23.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>14344</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>Acoustic seal
improper</td><td>&#39;Door leaf and frame need touch up
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:23:55 PM</td><td> </td><td>8/7/2022 12:37:08
PM</td><td>&nbsp;</td><td>MS.18.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>14345</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need touch up </td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/24/2020 1:23:57 PM</td><td> </td><td>8/7/2022
12:37:07 PM</td><td>&nbsp;</td><td>MS.18.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>14350</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need touch up </td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:09 PM</td><td> </td><td>8/7/2022 12:37:06
PM</td><td>&nbsp;</td><td>MS.23.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>14354</td><td>B.O.H-WET DELIVERY TUNNEL - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need touch up paint </td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:19 PM</td><td> </td><td>8/7/2022 12:37:06
PM</td><td>&nbsp;</td><td>MQ.23.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14355</td><td>B.O.H-WET DELIVERY TUNNEL - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need touch up </td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:21 PM</td><td> </td><td>8/7/2022 12:37:04
PM</td><td>&nbsp;</td><td>MQ.23.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14356</td><td>B.O.H-WET DELIVERY TUNNEL - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need touch up </td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:23 PM</td><td> </td><td>8/7/2022 12:37:03
PM</td><td>&nbsp;</td><td>MQ.23.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14373</td><td>B.O.H-ARTEFACTS LOBBY - Band A</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need touch up </td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:25:06 PM</td><td> </td><td>8/7/2022 12:37:02
PM</td><td>&nbsp;</td><td>MQ.23.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>14379</td><td>B.O.H-ARTEFACTS LOBBY - Band A</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need touch up </td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/24/2020 1:25:20 PM</td><td> </td><td>8/7/2022
12:36:59 PM</td><td>&nbsp;</td><td>MQ.23.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>14380</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need touch up </td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:25:25 PM</td><td> </td><td>8/7/2022 12:36:58
PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19562</td><td>AHU - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy paint floor need to repair and
touch up </td><td>Low</td><td>7/21/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/30/2021 1:25:27 PM</td><td> </td><td>8/7/2022
12:36:57 PM</td><td>&nbsp;</td><td>MS.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>21124</td><td>B.O.H-CORE B2 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need repair and
adjustment </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 10:49:59 AM</td><td> </td><td>8/7/2022 12:36:56
PM</td><td>&nbsp;</td><td>MC.18.02.B21</td><td>&nbsp;</td>
</tr><tr>
<td>23767</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Short metal trim should be extended
</td><td>Low</td><td>11/4/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/14/2021 3:46:45 PM</td><td> </td><td>8/7/2022 12:36:55
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>28765</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Floor should be leveled
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022
11:48:28 AM</td><td> </td><td>8/7/2022 12:36:54
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30201</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 12:01:28 PM</td><td> </td><td>8/7/2022 12:36:53
PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30202</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 12:01:46 PM</td><td> </td><td>8/7/2022 12:36:52
PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30203</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging doors after removing
protection.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:02:15 PM</td><td> </td><td>8/7/2022 12:36:51
PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31473</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly </td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:24:39 PM</td><td> </td><td>8/7/2022 12:36:50
PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31474</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door needs touch up painting </td><td>Low</td><td>6/23/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022 3:24:41 PM</td><td>
</td><td>8/7/2022 12:36:49
PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31476</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame need touch up painting
</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022
3:24:45 PM</td><td> </td><td>8/7/2022 12:36:48
PM</td><td>&nbsp;</td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31478</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged door leaf should be repaired
</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022
3:24:48 PM</td><td> </td><td>8/7/2022 12:36:47
PM</td><td>&nbsp;</td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31486</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need repair andtouch up painting from inside and outside
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
3:25:03 PM</td><td> </td><td>8/7/2022 12:36:46
PM</td><td>&nbsp;</td><td>MS.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31489</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly /to be balanced </td><td>Low</td><td>6/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/2/2022 3:25:09 PM</td><td> </td><td>8/7/2022
12:36:45 PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31490</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf needs repair andtouch up painting from inside and out
side </td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:25:10 PM</td><td> </td><td>8/7/2022 12:36:44
PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31491</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged door leaf should be repaired
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
3:25:12 PM</td><td> </td><td>8/7/2022 12:36:43
PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31493</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly to be balanced </td><td>Low</td><td>6/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/2/2022 3:25:16 PM</td><td> </td><td>8/7/2022
12:36:42 PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31494</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf needs touch up painting </td><td>Low</td><td>6/23/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022 3:25:17 PM</td><td>
</td><td>8/7/2022 12:36:41
PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31550</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and Defected painting should be adjusted
properly.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 3:36:12 PM</td><td> </td><td>8/7/2022 12:36:40
PM</td><td>&nbsp;</td><td>MS.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31554</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
door leaf should be adjusted.</td><td>Low</td><td>6/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/2/2022 3:36:23 PM</td><td> </td><td>8/7/2022
12:36:38 PM</td><td>&nbsp;</td><td>MS.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31557</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing painting for door leaf </td><td>Low</td><td>6/9/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022 3:36:33 PM</td><td>
</td><td>8/7/2022 12:36:37
PM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31558</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022
3:36:36 PM</td><td> </td><td>8/7/2022 12:36:36
PM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31566</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and Defected painting should be adjusted
properly.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:36:55 PM</td><td> </td><td>8/7/2022 12:36:35
PM</td><td>&nbsp;</td><td>MS.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31569</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and Defected painting should be adjusted
properly.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 3:36:59 PM</td><td> </td><td>8/7/2022 12:36:34
PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31575</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and Defected painting should be adjusted
properly.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 3:37:05 PM</td><td> </td><td>8/7/2022 12:36:33
PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31578</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and Defected painting should be adjusted
properly.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 3:37:10 PM</td><td> </td><td>8/7/2022 12:36:32
PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31582</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame and accessories need to clean from both
sides.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 3:37:16 PM</td><td> </td><td>8/7/2022 12:36:31
PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31584</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches and painting defects need to
adjusted.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:37:19 PM</td><td> </td><td>8/7/2022 12:36:28
PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31626</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/26/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/5/2022
4:24:43 PM</td><td> </td><td>8/7/2022 12:36:27
PM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31632</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/26/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/5/2022
4:25:02 PM</td><td> </td><td>8/7/2022 12:36:26
PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31635</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed properly </td><td>Low</td><td>6/26/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/5/2022 4:25:10 PM</td><td> </td><td>8/7/2022
12:36:25 PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>

<td>26785</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Drainage System</td><td>General
Snag</td><td>&#39;Cleaning for slot drain </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>ahmedsalem</td><td>3/1/2022 4:12:38 PM</td><td> </td><td>8/7/2022
12:05:23 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>32174</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:07 AM</td><td>
</td><td>8/7/2022 11:52:16
AM</td><td>&nbsp;</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32207</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth jumper </td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:49 AM</td><td>
</td><td>8/7/2022 11:50:40
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32206</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>David Noshy Naguib</td><td>7/17/2022 11:48:47 AM</td><td>
</td><td>8/7/2022 11:50:27
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>11998</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Secure data outlets patching not done and card reader cables
Termination and access control devices installation also not completed.Bus cables
are not pulled </td><td>High</td><td>10/8/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:58:12 AM</td><td> </td><td>8/7/2022 11:41:08
AM</td><td>&nbsp;</td><td>MS.13.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20667</td><td>TEMP EXHIBITION CURATOR</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing ICT WiFi labels, floor box is not terminated, access
control is not terminated </td><td>High</td><td>8/17/2021 12:00:00 PM</td><td>Sameh
Ibrahim El-Sawah</td><td>8/10/2021 11:18:18 AM</td><td> </td><td>8/7/2022 11:41:07
AM</td><td>&nbsp;</td><td>MT.14.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20674</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;, missing cctv, access control , ICT and wifi labels are missing
, missing floor boxes termination, all floor boxes is damaged and rusted, access
control lock not terminated, card reader is missing </td><td>High</td><td>8/17/2021
12:00:00 AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/10/2021 11:18:50 AM</td><td>
</td><td>8/7/2022 11:41:05
AM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20960</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing door lock cables , missing ict WiFi cctv and access
control labels . Missing floor box termination </td><td>High</td><td>8/18/2021
12:00:00 PM</td><td>Mohamed Samir</td><td>8/11/2021 11:59:26 AM</td><td>
</td><td>8/7/2022 11:41:02
AM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20961</td><td>LIBRARY ADMIN</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing WiFi labels, missing floor box termination
</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>8/11/2021
11:59:29 AM</td><td> </td><td>8/7/2022 11:41:01
AM</td><td>&nbsp;</td><td>MR.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20963</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing door contact, missing cctv WiFi and access control
labels.</td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>Mohamed
Samir</td><td>8/11/2021 11:59:34 AM</td><td> </td><td>8/7/2022 11:40:54
AM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>21787</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Data cables terminations are not yet done
properly and faceplate fixing also not done</td><td>High</td><td>8/26/2021 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>8/19/2021 3:25:31 PM</td><td>
</td><td>8/7/2022 11:40:53
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>21789</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Testing &amp;
Comissioning</td><td>General Snag</td><td>&#39;Lift management system cables were
not pulled up to elevators and lift management system testing and commissioning
also not done </td><td>High</td><td>8/26/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:25:36 PM</td><td> </td><td>8/7/2022 11:40:51
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>21791</td><td>W.C. /F</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Testing &amp;
Comissioning</td><td>General Snag</td><td>&#39;Public address system testing and
commissioning also not done and fiber patching from Museums data center and CMCR
also pending </td><td>High</td><td>8/26/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:25:39 PM</td><td> </td><td>8/7/2022 11:40:50
AM</td><td>&nbsp;</td><td>MW.14.01.002A</td><td>&nbsp;</td>
</tr><tr>
<td>21798</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Screens installation has not done yet for digital signage and
data sockets faceplate fixing also not done for
screens</td><td>High</td><td>8/26/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:26:07 PM</td><td> </td><td>8/7/2022 11:40:49
AM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21799</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All the floor boxes face plate fixing and port labeling are not
done for ICT points </td><td>High</td><td>8/26/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:26:16 PM</td><td> </td><td>8/7/2022 11:40:48
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21800</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing ICT WiFi labels, floor box is not terminated, access
control is not terminated </td><td>High</td><td>8/26/2021 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>8/19/2021 3:26:20 PM</td><td>
</td><td>8/7/2022 11:40:46
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21801</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All the floor boxes face plate fixing and port labeling are not
done for ICT points </td><td>High</td><td>8/26/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:26:27 PM</td><td> </td><td>8/7/2022 11:40:46
AM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21802</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing ICT WiFi labels, floor box is not terminated, access
control is not terminated </td><td>High</td><td>8/26/2021 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>8/19/2021 3:26:31 PM</td><td>
</td><td>8/7/2022 11:40:45
AM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>30005</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Closed door shall be snagged after finding
the keys. </td><td>High</td><td>6/2/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:44 PM</td><td> </td><td>8/7/2022 9:12:48
AM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>5484</td><td>B.O.H-ELEC. SUB-STATION - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Repair
block work &amp; Missing sealant around metal door </td><td>Low</td><td>10/10/2019
12:00:00 AM</td><td>Michael Mahfouz</td><td>9/19/2019 3:20:35 PM</td><td>
</td><td>8/4/2022 3:05:50
PM</td><td>&nbsp;</td><td>MS.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>5483</td><td>B.O.H-ELEC. SUB-STATION - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories &amp; Door leaf and frame need to touch up
</td><td>Low</td><td>10/10/2019 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/19/2019 3:20:33 PM</td><td> </td><td>8/4/2022 3:05:41
PM</td><td>&nbsp;</td><td>MS.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>12019</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
comments on CIR no 215107 </td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>10/1/2020 2:12:37 PM</td><td> </td><td>8/4/2022 12:38:35
PM</td><td>&nbsp;</td><td>MS.17.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>12033</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up - CIR not submitted </td><td>Low</td><td>10/22/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020 2:13:24 PM</td><td>
</td><td>8/4/2022 12:38:32
PM</td><td>&nbsp;</td><td>MS.18.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>12042</td><td>VOID</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up - refer to comments CIR no
215110</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/1/2020 2:13:52 PM</td><td> </td><td>8/4/2022 12:38:31
PM</td><td>&nbsp;</td><td>MS.13.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>12078</td><td>IT-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Repair for Sealant around metal door frame
</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020
2:15:41 PM</td><td> </td><td>8/4/2022 12:38:27
PM</td><td>&nbsp;</td><td>MS.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>12081</td><td>ELEC. ROOM-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up - CIR not submitted </td><td>Low</td><td>10/22/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020 2:15:48 PM</td><td>
</td><td>8/4/2022 12:38:26
PM</td><td>&nbsp;</td><td>MS.18.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>12085</td><td>ESCAPE ROUTE-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up - refer to comments CIR no
215107</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>10/1/2020 2:16:03 PM</td><td> </td><td>8/4/2022 12:38:24
PM</td><td>&nbsp;</td><td>MQ.18.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>12090</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Touch up for epoxy painting
</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020
2:16:13 PM</td><td> </td><td>8/4/2022 12:38:23
PM</td><td>&nbsp;</td><td>MS.17.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>14962</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on previous CIR</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>1/19/2021 11:35:00 AM</td><td> </td><td>8/4/2022 12:38:21
PM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>14975</td><td>GAS BOTTLE STORE</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on previous CIR</td><td>Low</td><td>1/26/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>1/19/2021 11:35:28 AM</td><td> </td><td>8/4/2022 12:38:19
PM</td><td>&nbsp;</td><td>MS.19.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>14981</td><td>PLANT</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on previous CIR</td><td>Low</td><td>1/26/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>1/19/2021 11:35:45 AM</td><td> </td><td>8/4/2022 12:38:18
PM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>14982</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on previous CIR</td><td>Low</td><td>1/26/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>1/19/2021 11:35:46 AM</td><td> </td><td>8/4/2022 12:38:16
PM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>14999</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on previous CIR</td><td>Low</td><td>2/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>1/19/2021 11:36:21 AM</td><td> </td><td>8/4/2022 12:38:13
PM</td><td>&nbsp;</td><td>MQ.19.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>15002</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on previous CIR </td><td>Low</td><td>2/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>1/19/2021 11:36:28 AM</td><td> </td><td>8/4/2022 12:38:12
PM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20165</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on CIR </td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/3/2021 3:37:48 PM</td><td> </td><td>8/4/2022 12:38:10
PM</td><td>&nbsp;</td><td>MS.19.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20166</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on CIR </td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/3/2021 3:37:49 PM</td><td> </td><td>8/4/2022 12:38:06
PM</td><td>&nbsp;</td><td>MS.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20171</td><td>CORE A3-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Final inspection after removing
protection tape </td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/3/2021 3:37:56 PM</td><td> </td><td>8/4/2022 12:38:04
PM</td><td>&nbsp;</td><td>MC.18.01.A31</td><td>&nbsp;</td>
</tr><tr>
<td>20231</td><td>WC /F</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Floor Tile</td><td>Cracks</td><td>&#39;Cracked tiles should be replaced
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:19 PM</td><td> </td><td>8/4/2022 12:38:03
PM</td><td>&nbsp;</td><td>MW.18.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20236</td><td>WC /F</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>Damaged</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:25 PM</td><td> </td><td>8/4/2022 12:38:02
PM</td><td>&nbsp;</td><td>MW.18.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20239</td><td>WC /M</td><td>MU L10</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on CIR</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/4/2021 12:05:28 PM</td><td> </td><td>8/4/2022 12:38:01
PM</td><td>&nbsp;</td><td>MW.18.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>20246</td><td>WC /F</td><td>MU
L10</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Lock Mechanism</td><td>&#39;Door should be closed properly
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:38 PM</td><td> </td><td>8/4/2022 12:37:58
PM</td><td>&nbsp;</td><td>MW.18.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20253</td><td>WC /M</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>Damaged</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:46 PM</td><td> </td><td>8/4/2022 12:37:56
PM</td><td>&nbsp;</td><td>MW.18.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>20682</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>8/31/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/10/2021 11:39:41 AM</td><td> </td><td>8/4/2022
12:37:55 PM</td><td>&nbsp;</td><td>MQ.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>21190</td><td>CORE B2-Band B</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joints need adjustment and repair
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:57:16 AM</td><td> </td><td>8/4/2022 12:37:54
PM</td><td>&nbsp;</td><td>MC.18.01.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21191</td><td>CORE B2-Band B</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:57:20 AM</td><td> </td><td>8/4/2022 12:37:52
PM</td><td>&nbsp;</td><td>MC.18.01.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21199</td><td>CORE D2</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail is not leveled
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
10:57:38 AM</td><td> </td><td>8/4/2022 12:37:51
PM</td><td>&nbsp;</td><td>MC.18.01.D21</td><td>&nbsp;</td>
</tr><tr>
<td>32032</td><td>CORE G3</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail need to polishing and
cleaning.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:56:52 PM</td><td> </td><td>8/4/2022 12:37:49
PM</td><td>&nbsp;</td><td>MC.19.01.G31</td><td>&nbsp;</td>
</tr><tr>
<td>32033</td><td>CORE G3</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to touch
up.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
3:56:55 PM</td><td> </td><td>8/4/2022 12:37:48
PM</td><td>&nbsp;</td><td>MC.19.01.G31</td><td>&nbsp;</td>
</tr><tr>
<td>32034</td><td>CORE G3</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail need to aligned
</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
3:56:56 PM</td><td> </td><td>8/4/2022 12:37:46
PM</td><td>&nbsp;</td><td>MC.19.01.G31</td><td>&nbsp;</td>
</tr><tr>
<td>32036</td><td>CORE G3</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail need to touch polishing and
cleaning.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:57:00 PM</td><td> </td><td>8/4/2022 12:37:45
PM</td><td>&nbsp;</td><td>MC.19.01.G31</td><td>&nbsp;</td>
</tr><tr>
<td>32042</td><td>CORE G3</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch
up.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
3:57:14 PM</td><td> </td><td>8/4/2022 12:37:43
PM</td><td>&nbsp;</td><td>MC.19.01.G31</td><td>&nbsp;</td>
</tr><tr>
<td>14836</td><td>B.O.H-ARTEFACTS - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing permanent labeling, missing back box
covers</td><td>High</td><td>1/24/2021 12:00:00 PM</td><td>Mohamed
Samir</td><td>1/17/2021 3:40:58 PM</td><td> </td><td>8/4/2022 12:02:36
PM</td><td>&nbsp;</td><td>MQ.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18096</td><td>PAINTING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All
floor boxes should be replaced</td><td>High</td><td>6/2/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>5/26/2021 11:46:05 AM</td><td>
</td><td>8/4/2022 12:02:35
PM</td><td>&nbsp;</td><td>MK.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19385</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Alignment and Level not followed</td><td>&#39;Fiber outlet face
plate labeling and port mapping is missing and some of the fiber patch cord visible
outside.it should be hidden.</td><td>High</td><td>6/29/2021 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>6/22/2021 4:30:18 PM</td><td>
</td><td>8/4/2022 12:02:34
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19386</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Media hardware devices installation is pending and cables are not
pulled </td><td>High</td><td>6/29/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>6/22/2021 4:30:20 PM</td><td> </td><td>8/4/2022 12:02:33
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19387</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control interface cables are not terminated and field
devices also not installed yet</td><td>High</td><td>6/29/2021 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>6/22/2021 4:30:22 PM</td><td>
</td><td>8/4/2022 12:02:32
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19390</td><td>PAINTING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All the floor boxes ICT cables are terminated and faceplate
fixation also not done and port mapping and permanent labeling also not
done</td><td>High</td><td>6/29/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>6/22/2021 4:30:27 PM</td><td> </td><td>8/4/2022 12:02:30
PM</td><td>&nbsp;</td><td>MK.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19391</td><td>PAINTING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All the floor boxes ICT cables are terminated and faceplate
fixation also not done and port mapping and permanent labeling also not
done</td><td>High</td><td>6/29/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>6/22/2021 4:30:29 PM</td><td> </td><td>8/4/2022 12:02:29
PM</td><td>&nbsp;</td><td>MK.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19392</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Audio
Technology</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Volume control labeling is not
done.</td><td>High</td><td>6/29/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>6/22/2021 4:30:30 PM</td><td> </td><td>8/4/2022 12:02:28
PM</td><td>&nbsp;</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19395</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;All the floor boxes ICT cables are terminated and faceplate
fixation also not done and port mapping and permanent labeling also not
done</td><td>High</td><td>6/29/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>6/22/2021 4:30:36 PM</td><td> </td><td>8/4/2022 12:02:27
PM</td><td>&nbsp;</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19397</td><td>SCULPTURE ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control devices installation is missing and access control
cables are not pulled yet</td><td>High</td><td>6/29/2021 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>6/22/2021 4:30:39 PM</td><td>
</td><td>8/4/2022 12:02:25
PM</td><td>&nbsp;</td><td>MK.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>19398</td><td>SCULPTURE ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Cctv and WiFi labeling is missing and speaker installation is
not done properly </td><td>High</td><td>6/29/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>6/22/2021 4:30:40 PM</td><td> </td><td>8/4/2022 12:02:24
PM</td><td>&nbsp;</td><td>MK.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>19400</td><td>SCULPTURE ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Faceplate labels are not there and some of floor boxes cables
were not pulled and all the ICT cables are not terminated within the floor box
</td><td>High</td><td>6/29/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>6/22/2021 4:30:43 PM</td><td> </td><td>8/4/2022 12:02:23
PM</td><td>&nbsp;</td><td>MK.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>19402</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Incomplete Installation</td><td>&#39;All the ICT cables were not
pulled in this area from the nearest hub room.Turnstile control and fire alarm
cables also not terminated </td><td>High</td><td>6/29/2021 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>6/22/2021 4:30:47 PM</td><td>
</td><td>8/4/2022 12:02:22
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19501</td><td>KINDERGARTEN - Band A</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No ICT ,camera , multimedia , floor boxes labels, multimedia
volume control back box is exposed should and be imbedded , multimedia rack is not
installed and Termination not done all systems not tested
yet</td><td>High</td><td>7/6/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>6/29/2021 1:19:20 PM</td><td> </td><td>8/4/2022 12:02:21
PM</td><td>&nbsp;</td><td>CLASSROOM 1</td><td>&nbsp;</td>
</tr><tr>
<td>19502</td><td>KINDERGARTEN CLASSROOM 2 - Band A</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No ICT ,camera , multimedia , floor boxes labels, multimedia
volume control back box is exposed should and be imbedded , multimedia rack is not
installed and Termination not done all systems not tested
yet</td><td>High</td><td>7/6/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>6/29/2021 1:19:22 PM</td><td> </td><td>8/4/2022 12:02:19
PM</td><td>&nbsp;</td><td>MK.12.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19503</td><td>KINDERGARTEN CLASSROOM 3 - Band A</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No ICT ,camera , multimedia , floor boxes labels, multimedia
volume control back box is exposed should and be imbedded , multimedia rack is not
installed and Termination not done all systems not tested
yet</td><td>High</td><td>7/6/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>6/29/2021 1:19:24 PM</td><td> </td><td>8/4/2022 12:02:18
PM</td><td>&nbsp;</td><td>MK.12.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>19504</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Digital signage screens and fiber media converter not installed,
ICT cctv WiFi labels are not done , door lock cable is exposed , all systems are
not tested </td><td>High</td><td>7/6/2021 12:00:00 PM</td><td>Mohamed
Samir</td><td>6/29/2021 1:19:25 PM</td><td> </td><td>8/4/2022 12:02:17
PM</td><td>&nbsp;</td><td>ME.12.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19507</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No camera access control WiFi labels or testing done
</td><td>High</td><td>7/6/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>6/29/2021
1:19:30 PM</td><td> </td><td>8/4/2022 12:02:16
PM</td><td>&nbsp;</td><td>ME.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19510</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No ICT ,camera , multimedia , floor boxes labels, multimedia
volume control back box is exposed should and be imbedded , multimedia rack is not
installed and Termination not done all systems not tested
yet</td><td>High</td><td>7/6/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>6/29/2021 1:19:34 PM</td><td> </td><td>8/4/2022 12:02:15
PM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19511</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All digital signage screens are not installed , all classrooms
access control system is not tested, door lock cables is exposed.
</td><td>High</td><td>7/6/2021 12:00:00 PM</td><td>Mohamed Samir</td><td>6/29/2021
1:19:35 PM</td><td> </td><td>8/4/2022 12:02:14
PM</td><td>&nbsp;</td><td>ME.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19512</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No ICT ,camera , multimedia , floor boxes labels, multimedia
volume control back box is exposed should and be imbedded , multimedia rack is not
installed and Termination not done all systems not tested
yet</td><td>High</td><td>7/6/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>6/29/2021 1:19:37 PM</td><td> </td><td>8/4/2022 12:02:12
PM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>19513</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No ICT ,camera , multimedia , floor boxes labels, multimedia
volume control back box is exposed should and be imbedded , multimedia rack is not
installed and Termination not done all systems not tested
yet</td><td>High</td><td>7/6/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>6/29/2021 1:19:39 PM</td><td> </td><td>8/4/2022 12:02:11
PM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>15248</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Internal lighting not connected for
AHU</td><td>High</td><td>1/31/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>1/24/2021 11:49:14 AM</td><td> </td><td>8/4/2022 11:44:06
AM</td><td>&nbsp;</td><td>MS.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>16052</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Electrical Connection for light inside AHU
</td><td>High</td><td>2/16/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>2/9/2021 4:43:30 PM</td><td> </td><td>8/4/2022 11:44:05
AM</td><td>&nbsp;</td><td>MS.23.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18175</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing indicator and call
button</td><td>High</td><td>6/3/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>5/27/2021 12:06:49 PM</td><td> </td><td>8/4/2022 11:44:04
AM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>13305</td><td>FIRST AID - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up </td><td>Low</td><td>11/26/2020 12:00:00
PM</td><td>Kerolos Nagy Tawfik</td><td>11/5/2020 11:45:32 AM</td><td>
</td><td>8/4/2022 9:08:12
AM</td><td>&nbsp;</td><td>MG.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>13359</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;The door
architrave need adjusted /door need touch up </td><td>Low</td><td>11/26/2020
12:00:00 PM</td><td>sally.george</td><td>11/5/2020 12:14:09 PM</td><td>
</td><td>8/4/2022 8:34:17
AM</td><td>&nbsp;</td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>13360</td><td>B.O.H-ARTEFACTS - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need touch up </td><td>Low</td><td>11/26/2020 12:00:00
PM</td><td>sally.george</td><td>11/5/2020 12:14:18 PM</td><td> </td><td>8/4/2022
8:34:16 AM</td><td>&nbsp;</td><td>MQ.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>13362</td><td>B.O.H-ARTEFACTS - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf need touch up </td><td>Low</td><td>11/26/2020 12:00:00
PM</td><td>sally.george</td><td>11/5/2020 12:14:25 PM</td><td> </td><td>8/4/2022
8:34:15 AM</td><td>&nbsp;</td><td>MQ.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>13365</td><td>B.O.H-ARTEFACTS - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need touch up </td><td>Low</td><td>11/26/2020 12:00:00
PM</td><td>sally.george</td><td>11/5/2020 12:14:35 PM</td><td> </td><td>8/4/2022
8:34:14 AM</td><td>&nbsp;</td><td>MQ.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>13369</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls and ceiling need repainting </td><td>Low</td><td>11/26/2020
12:00:00 PM</td><td>sally.george</td><td>11/5/2020 12:14:47 PM</td><td>
</td><td>8/4/2022 8:34:13
AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>15645</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Linoleum flooring (joints is not aligned
/leveling needs adjustment /flooring is not adhesive/joints between floor and walls
cladding -bubbles in floor</td><td>Low</td><td>2/22/2021 12:00:00
PM</td><td>sally.george</td><td>2/1/2021 11:38:04 AM</td><td> </td><td>8/4/2022
8:34:11 AM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>15647</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Linoleum flooring (joints is not aligned
/leveling needs adjustment /joints between floor and wall cladding /flooring is not
adhesive-bubbles in floor)</td><td>Low</td><td>2/22/2021 12:00:00
PM</td><td>sally.george</td><td>2/1/2021 11:38:12 AM</td><td> </td><td>8/4/2022
8:34:10 AM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>15670</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Linoleum flooring (leveling needs
adjustment/bubbles in floor/joints is not aligned /cutting around electrical boxes
is not aligned/damaged floor </td><td>Low</td><td>2/22/2021 12:00:00
PM</td><td>sally.george</td><td>2/1/2021 4:18:43 PM</td><td> </td><td>8/4/2022
8:34:09 AM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>8821</td><td>SPECIAL NEEDS GALLERY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories/</td><td>Low</td><td>4/6/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>3/16/2020 4:24:19 PM</td><td> </td><td>8/4/2022 8:13:22
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>11992</td><td>MACHINE ACCESS ROOM</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No permanent labeling and Cctv installation also not done
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:57:47 AM</td><td> </td><td>8/3/2022 4:38:56
PM</td><td>&nbsp;</td><td>MS.18.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>14763</td><td>Desert Land</td><td>Desert
Land</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;ELV Manhole is not visible and all the
manholes should be visible with sand level</td><td>High</td><td>1/19/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>1/12/2021 3:31:02 PM</td><td>
</td><td>8/3/2022 4:38:55 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>19509</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Camera and floor boxes labels are missing
</td><td>High</td><td>7/6/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>6/29/2021
1:19:32 PM</td><td> </td><td>8/3/2022 4:38:54
PM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19790</td><td>ELECTRICAL ROOM</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Active switches are not installed, fiber label is not done , UTP
cable labels are not done rack and faceplate side . </td><td>High</td><td>7/19/2021
12:00:00 AM</td><td>Mohamed Samir</td><td>7/12/2021 1:21:05 PM</td><td>
</td><td>8/3/2022 4:38:52
PM</td><td>&nbsp;</td><td>GT8.01.0G.15</td><td>&nbsp;</td>
</tr><tr>
<td>27818</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Field devices not terminated
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:31 PM</td><td> </td><td>8/3/2022 4:38:48
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>27819</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete termination
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:32 PM</td><td> </td><td>8/3/2022 4:38:47
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28241</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;wrong location of fire alarm
devices</td><td>High</td><td>3/28/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/21/2022 9:35:57 AM</td><td> </td><td>8/3/2022 4:38:44
PM</td><td>&nbsp;</td><td>MR.14.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>28363</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Condensate pipes thermal
insulation is missing. </td><td>High</td><td>5/3/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:45:08 AM</td><td> </td><td>8/3/2022 2:45:57
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>20521</td><td>MALE W.C.</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:57 PM</td><td> </td><td>8/3/2022 12:59:42
PM</td><td>&nbsp;</td><td>MW.14.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>20696</td><td>LIBRARY ADMIN</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air grill should be aligned
</td><td>Low</td><td>8/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/10/2021
11:40:07 AM</td><td> </td><td>8/3/2022 12:59:41
PM</td><td>&nbsp;</td><td>MR.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20509</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>Not aligned</td><td>&#39;Waving
panels</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/8/2021 12:08:47 PM</td><td> </td><td>8/3/2022 12:43:24
PM</td><td>&nbsp;</td><td>MQ.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20518</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling needs touch up painting
</td><td>Low</td><td>8/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:54 PM</td><td> </td><td>8/3/2022 12:43:24
PM</td><td>&nbsp;</td><td>MQ.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20519</td><td>MALE W.C.</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:56 PM</td><td> </td><td>8/3/2022 12:43:23
PM</td><td>&nbsp;</td><td>MW.14.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>20520</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Aluminum cladding should be leveled with
door architrave</td><td>Low</td><td>8/29/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/8/2021 12:08:57 PM</td><td> </td><td>8/3/2022 12:43:22
PM</td><td>&nbsp;</td><td>MT.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20524</td><td>FEMALE W.C.</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:01 PM</td><td> </td><td>8/3/2022 12:30:13
PM</td><td>&nbsp;</td><td>MW.14.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20525</td><td>FEMALE W.C.</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:02 PM</td><td> </td><td>8/3/2022 12:29:57
PM</td><td>&nbsp;</td><td>MW.14.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20530</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Sealer roller traces </td><td>Low</td><td>8/29/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/8/2021 12:09:08 PM</td><td> </td><td>8/3/2022
12:29:46 PM</td><td>&nbsp;</td><td>MT.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20532</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Wavy tile should be adjusted
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:09 PM</td><td> </td><td>8/3/2022 12:29:40
PM</td><td>&nbsp;</td><td>MT.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20534</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Marked part should be repaired
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:12 PM</td><td> </td><td>8/3/2022 12:29:23
PM</td><td>&nbsp;</td><td>MT.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20535</td><td>UNIVERSAL DISABLED W.C.</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:13 PM</td><td> </td><td>8/3/2022 12:29:16
PM</td><td>&nbsp;</td><td>MW.14.01.001C</td><td>&nbsp;</td>
</tr><tr>
<td>20537</td><td>UNIVERSAL DISABLED W.C.</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Wavy stone cladding
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:14 PM</td><td> </td><td>8/3/2022 12:29:07
PM</td><td>&nbsp;</td><td>MW.14.01.001C</td><td>&nbsp;</td>
</tr><tr>
<td>20541</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Marked edges should be repaired
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:20 PM</td><td> </td><td>8/3/2022 12:28:50
PM</td><td>&nbsp;</td><td>MQ.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20542</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy marked gypsum board
</td><td>Low</td><td>8/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:20 PM</td><td> </td><td>8/3/2022 12:28:44
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20545</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:23 PM</td><td> </td><td>8/3/2022 12:28:37
PM</td><td>&nbsp;</td><td>MQ.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20548</td><td>MALE W.C.</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Vanity</td><td>General
Snag</td><td>&#39;Sealer roller traces </td><td>Low</td><td>8/29/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/8/2021 12:09:26 PM</td><td> </td><td>8/3/2022
12:28:30 PM</td><td>&nbsp;</td><td>MW.14.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>20554</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>level</td><td>&#39;Architrave should be leveled
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:32 PM</td><td> </td><td>8/3/2022 12:28:12
PM</td><td>&nbsp;</td><td>MQ.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20555</td><td>MALE W.C.</td><td>MU
L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General Snag</td><td>&#39;The
edge should be leveled </td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/8/2021 12:09:32 PM</td><td> </td><td>8/3/2022 12:27:59
PM</td><td>&nbsp;</td><td>MW.14.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>20557</td><td>FEMALE W.C.</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Vanity</td><td>General
Snag</td><td>&#39;Broken vanity should be repaired </td><td>Low</td><td>8/29/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021 12:09:34 PM</td><td>
</td><td>8/3/2022 12:27:50
PM</td><td>&nbsp;</td><td>MW.14.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20568</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:51 PM</td><td> </td><td>8/3/2022 12:27:24
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20576</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:10:08 PM</td><td> </td><td>8/3/2022 12:27:11
PM</td><td>&nbsp;</td><td>MQ.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20604</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy wall should be adjusted
</td><td>Low</td><td>8/30/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/9/2021
9:42:10 AM</td><td> </td><td>8/3/2022 12:26:59
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20687</td><td>TEMP EXHIBITION CURATOR</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Repair and touch up painting around steel
structure </td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/10/2021 11:39:49 AM</td><td> </td><td>8/3/2022 12:26:47
PM</td><td>&nbsp;</td><td>MT.14.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20688</td><td>TEMP EXHIBITION CURATOR</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy gypsum ceiling board
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
11:39:51 AM</td><td> </td><td>8/3/2022 12:26:40
PM</td><td>&nbsp;</td><td>MT.14.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20701</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>alignment/level</td><td>&#39;Wavy gypsum wall need adjustment
</td><td>Low</td><td>8/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/10/2021
11:41:00 AM</td><td> </td><td>8/3/2022 12:24:30
PM</td><td>&nbsp;</td><td>MR.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20703</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>T and D design</td><td>Architectural</td><td>Carpet
Floor</td><td>General Snag</td><td>&#39;Carpet flooring around floor boxes need
adjustment </td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/10/2021 11:41:14 AM</td><td> </td><td>8/3/2022 12:24:11
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20704</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>T and D design</td><td>Architectural</td><td>Carpet
Floor</td><td>General Snag</td><td>&#39;Marked tiles need adjustment
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
11:41:18 AM</td><td> </td><td>8/3/2022 12:24:01
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20705</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>8/31/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021 12:02:04 PM</td><td>
</td><td>8/3/2022 12:23:54
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20711</td><td>TEMP EXHIBITION CURATOR</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum wall should be adjusted
</td><td>Low</td><td>8/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:14 PM</td><td> </td><td>8/3/2022 12:23:46
PM</td><td>&nbsp;</td><td>MT.14.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20713</td><td>TEMP EXHIBITION CURATOR</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy wall should be adjusted
</td><td>Low</td><td>8/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:17 PM</td><td> </td><td>8/3/2022 12:23:36
PM</td><td>&nbsp;</td><td>MT.14.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20725</td><td>LIBRARY ADMIN</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked part should be adjusted and repair
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:36 PM</td><td> </td><td>8/3/2022 12:23:22
PM</td><td>&nbsp;</td><td>MR.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20726</td><td>LIBRARY ADMIN</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum wall should be adjusted
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:37 PM</td><td> </td><td>8/3/2022 12:23:16
PM</td><td>&nbsp;</td><td>MR.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20733</td><td>LIBRARY ADMIN</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy wall should be aligned
</td><td>Low</td><td>8/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:46 PM</td><td> </td><td>8/3/2022 12:23:06
PM</td><td>&nbsp;</td><td>MR.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20741</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>Corners at right angles</td><td>&#39;Finishes works around windows are
not finished yet/(edges around windows should be
aligned)</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/10/2021 12:02:56 PM</td><td> </td><td>8/3/2022 12:22:56
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20743</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>Corners at right angles</td><td>&#39;Edges around Window should be
leveled </td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/10/2021 12:02:59 PM</td><td> </td><td>8/3/2022 12:22:47
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20746</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>alignment/level</td><td>&#39;Corner should be leveled and alignment
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:03 PM</td><td> </td><td>8/3/2022 12:22:38
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20749</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>alignment/level</td><td>&#39;Wavy gypsum board
</td><td>Low</td><td>8/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:07 PM</td><td> </td><td>8/3/2022 12:22:25
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20751</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy gypsum board
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:09 PM</td><td> </td><td>8/3/2022 12:22:17
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20752</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;grills are not aligned
</td><td>Low</td><td>8/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:11 PM</td><td> </td><td>8/3/2022 12:22:10
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>22186</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>alignment/level</td><td>&#39;Sealant need adjustment
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:47:08 AM</td><td> </td><td>8/3/2022 12:21:34
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>22187</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>alignment/level</td><td>&#39;Wavy gypsum wall need to adjusted and
repair</td><td>Low</td><td>9/14/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/24/2021 11:47:09 AM</td><td> </td><td>8/3/2022 12:21:25
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>30838</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting should be
finished.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:56:45 AM</td><td> </td><td>8/3/2022 12:21:17
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>22327</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Hose pipe need adjustment
</td><td>High</td><td>8/31/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/24/2021
3:05:20 PM</td><td> </td><td>8/3/2022 12:01:10
PM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>31364</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coils fins shall be cleaned and adjusted.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:47 AM</td><td> </td><td>8/3/2022 12:00:55
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>10455</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:11:56 PM</td><td> </td><td>8/3/2022
11:42:43 AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>31556</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
3:36:27 PM</td><td> </td><td>8/3/2022 11:06:57
AM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31321</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022
11:38:49 AM</td><td> </td><td>8/3/2022 11:06:26
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31318</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
11:38:44 AM</td><td> </td><td>8/3/2022 11:05:54
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31314</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
11:38:37 AM</td><td> </td><td>8/3/2022 11:05:25
AM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31310</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
11:38:29 AM</td><td> </td><td>8/3/2022 11:04:55
AM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31302</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022
11:38:11 AM</td><td> </td><td>8/3/2022 11:04:27
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31249</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame and accessories need to clean from both
sides.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 10:41:24 AM</td><td> </td><td>8/3/2022 11:03:55
AM</td><td>&nbsp;</td><td>MT.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30937</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022
3:56:46 PM</td><td> </td><td>8/3/2022 11:03:26
AM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30905</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning door leaf and hardware accessories from both
sides.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:38 PM</td><td> </td><td>8/3/2022 11:02:57
AM</td><td>&nbsp;</td><td>MR.14.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>30902</td><td>PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning door leaf and hardware accessories from both
sides.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:33 PM</td><td> </td><td>8/3/2022 11:02:13
AM</td><td>&nbsp;</td><td>MR.14.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30899</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning door leaf and hardware accessories from both
sides.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:28 PM</td><td> </td><td>8/3/2022 11:01:44
AM</td><td>&nbsp;</td><td>MR.14.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30870</td><td>CORE F5</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to repair and
finish.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:49 AM</td><td> </td><td>8/3/2022 11:01:08
AM</td><td>&nbsp;</td><td>MC.14.02.F51</td><td>&nbsp;</td>
</tr><tr>
<td>30705</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cleaning door leaf and frame and accessories
from both sides.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:57 PM</td><td> </td><td>8/3/2022 10:59:26
AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30699</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
4:15:51 PM</td><td> </td><td>8/3/2022 10:58:36
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30401</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Missing fire stop collar.
</td><td>High</td><td>6/6/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:36 PM</td><td> </td><td>8/3/2022 10:58:04
AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30493</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Accessories need to clean from
paint.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:43:02 AM</td><td> </td><td>8/3/2022 10:57:22
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30897</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning door leaf and hardware accessories from both
sides.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:25 PM</td><td> </td><td>8/3/2022 10:56:47
AM</td><td>&nbsp;</td><td>MR.14.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30557</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>T and D design</td><td>Architectural</td><td>Carpet
Floor</td><td>General Snag</td><td>&#39;All carpet just should be adjusted
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:28 AM</td><td> </td><td>8/3/2022 10:48:11
AM</td><td>&nbsp;</td><td>MT.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31583</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame and accessories need to clean from both
sides.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:37:17 PM</td><td> </td><td>8/3/2022 10:47:29
AM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30566</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Defective paint should be repaired
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:44 AM</td><td> </td><td>8/3/2022 10:46:15
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>21139</td><td>CORE D2</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>alignment/level</td><td>&#39;Gypsum wall not leveled with concrete
wall </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 10:50:29 AM</td><td> </td><td>8/3/2022 10:45:14
AM</td><td>&nbsp;</td><td>MC.18.02.D21</td><td>&nbsp;</td>
</tr><tr>
<td>27462</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant should be reapply </td><td>Low</td><td>3/28/2022 12:00:00
PM</td><td>mohamed.sami</td><td>3/7/2022 4:40:51 PM</td><td> </td><td>8/3/2022
10:44:45 AM</td><td>&nbsp;</td><td>MR.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30958</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
3:57:19 PM</td><td> </td><td>8/3/2022 10:43:52
AM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30954</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
3:57:13 PM</td><td> </td><td>8/3/2022 10:43:19
AM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30950</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
3:57:07 PM</td><td> </td><td>8/3/2022 10:42:48
AM</td><td>&nbsp;</td><td>MA.19.02.017</td><td>&nbsp;</td>
</tr><tr>
<td>30947</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
3:57:03 PM</td><td> </td><td>8/3/2022 10:42:19
AM</td><td>&nbsp;</td><td>MA.19.02.026</td><td>&nbsp;</td>
</tr><tr>
<td>30944</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
3:56:58 PM</td><td> </td><td>8/3/2022 10:41:50
AM</td><td>&nbsp;</td><td>MA.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30943</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
3:56:57 PM</td><td> </td><td>8/3/2022 10:41:21
AM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>30918</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning hardware accessories and door leaf from both
sides.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:58 PM</td><td> </td><td>8/3/2022 10:40:51
AM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>30915</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning hardware accessories and door from both
sides.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:53 PM</td><td> </td><td>8/3/2022 10:40:19
AM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>30910</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning door leaf and frame and
accessories.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:45 PM</td><td> </td><td>8/3/2022 10:39:50
AM</td><td>&nbsp;</td><td>MA.19.02.025</td><td>&nbsp;</td>
</tr><tr>
<td>30907</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning door leaf and frame and hardware accessories from both
sides.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:41 PM</td><td> </td><td>8/3/2022 10:39:17
AM</td><td>&nbsp;</td><td>MA.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30683</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
4:15:29 PM</td><td> </td><td>8/3/2022 10:38:45
AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30585</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:50:46 AM</td><td> </td><td>8/3/2022 10:38:17
AM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30547</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Protection cover should be removed
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:08 AM</td><td> </td><td>8/3/2022 10:37:47
AM</td><td>&nbsp;</td><td>MA.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>30474</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Remove protection from signage and
boxes.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:27 AM</td><td> </td><td>8/3/2022 10:37:11
AM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>29096</td><td>STORAGE</td><td>MU
L20</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Toothing between Skirting tiles should be
leveled </td><td>Low</td><td>6/9/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/19/2022 12:04:05 PM</td><td> </td><td>8/3/2022 10:35:57
AM</td><td>&nbsp;</td><td>MR.14.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28819</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Skirting need to touch
up.</td><td>Low</td><td>6/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/15/2022
11:47:12 AM</td><td> </td><td>8/3/2022 10:35:22
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31715</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Floor needs cleaning ,repair and
touch up painting </td><td>Low</td><td>6/27/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/6/2022 11:52:41 AM</td><td> </td><td>8/3/2022 10:34:51
AM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>31630</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/5/2022 4:24:57 PM</td><td> </td><td>8/3/2022 10:34:14
AM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30573</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need repair and touch up painting
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:55 AM</td><td> </td><td>8/3/2022 10:33:41
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>28897</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>6/7/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/17/2022
11:47:11 AM</td><td> </td><td>8/3/2022 10:31:46
AM</td><td>&nbsp;</td><td>MA.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31571</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame and accessories need to clean from both sides
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
3:37:01 PM</td><td> </td><td>8/3/2022 10:29:36
AM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30510</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs touch up painting </td><td>Low</td><td>6/21/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022 11:44:55 AM</td><td>
</td><td>8/3/2022 10:27:26
AM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30444</td><td>CATALOGUE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls need to touch up and
repaint.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:40 AM</td><td> </td><td>8/3/2022 10:26:47
AM</td><td>&nbsp;</td><td>MR.14.02.012- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30856</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Edge should be
adjusted.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:30 AM</td><td> </td><td>8/3/2022 10:26:05
AM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30210</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to touch
up.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:04:39 PM</td><td> </td><td>8/3/2022 10:25:30
AM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30211</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling painting need to touch
up.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:04:45 PM</td><td> </td><td>8/3/2022 10:24:36
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30090</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked parts need touch up painting
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
11:36:51 AM</td><td> </td><td>8/3/2022 10:24:00
AM</td><td>&nbsp;</td><td>MA.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30501</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Floor need to repair and leveled.</td><td>Low</td><td>6/21/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022 11:43:14 AM</td><td>
</td><td>8/3/2022 10:23:02
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>21488</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor needs cleaning and touch
up painting </td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/18/2021 2:12:28 PM</td><td> </td><td>8/3/2022 10:22:30
AM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>30572</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Fire sealant is missing for marked
parts</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:46:54 AM</td><td> </td><td>8/3/2022 10:21:53
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31316</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022
11:38:41 AM</td><td> </td><td>8/3/2022 10:21:23
AM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31258</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;door leaf and frame and accessories need to clean from
painting.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 10:41:47 AM</td><td> </td><td>8/3/2022 10:20:52
AM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31242</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame and accessories need to clean from both
sides.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 10:41:01 AM</td><td> </td><td>8/3/2022 10:20:20
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31230</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame and accessories should be
cleaned.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 10:40:24 AM</td><td> </td><td>8/3/2022 10:19:47
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30584</td><td>STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories , door leaf and frame need to clean
</td><td>Low</td><td>6/7/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:50:45 AM</td><td> </td><td>8/3/2022 10:19:08
AM</td><td>&nbsp;</td><td>MR.14.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30427</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:14 AM</td><td> </td><td>8/3/2022 10:18:29
AM</td><td>&nbsp;</td><td>MQ.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31304</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022
11:38:15 AM</td><td> </td><td>8/3/2022 10:01:46
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31300</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022
11:38:07 AM</td><td> </td><td>8/3/2022 10:01:14
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31297</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022
11:38:01 AM</td><td> </td><td>8/3/2022 10:00:49
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31294</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/9/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022
11:37:55 AM</td><td> </td><td>8/3/2022 10:00:23
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31293</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/9/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022
11:37:53 AM</td><td> </td><td>8/3/2022 9:59:55
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>31289</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame and accessories need to clean from both
sides.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 11:35:57 AM</td><td> </td><td>8/3/2022 9:59:19
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>30698</td><td>SHAFT</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cleaning door leaf and accessories from the
both sides.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:50 PM</td><td> </td><td>8/3/2022 9:58:49
AM</td><td>&nbsp;</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30697</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories,door leaf and frame need to clean
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
4:15:49 PM</td><td> </td><td>8/3/2022 9:58:14
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30693</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cleaning door leaf and accessories from both
sides.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:46 PM</td><td> </td><td>8/3/2022 9:57:42
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30208</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to
cleaning.</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 12:04:05 PM</td><td> </td><td>8/3/2022 9:57:05
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30206</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to touch
up.</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 12:03:09 PM</td><td> </td><td>8/3/2022 9:56:30
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30122</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked parts should be repaired and touch up painting
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
11:37:26 AM</td><td> </td><td>8/3/2022 9:55:48
AM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>17048</td><td>MEETING-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around metal door needs adjustment
</td><td>Low</td><td>4/1/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:47 PM</td><td> </td><td>8/3/2022 9:52:40
AM</td><td>&nbsp;</td><td>ME.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16268</td><td>VIP RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Sealer roller
traces</td><td>Low</td><td>2/21/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/14/2021 2:01:00 PM</td><td> </td><td>8/3/2022 9:51:25
AM</td><td>&nbsp;</td><td>MV.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>32028</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to touch
up.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022
3:56:43 PM</td><td> </td><td>8/3/2022 9:50:50
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16288</td><td>FIRE CONTROL ROOM</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Tile should be replaced
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:02:26 PM</td><td> </td><td>8/3/2022 9:49:55
AM</td><td>&nbsp;</td><td>MB.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>29416</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Snagging
after compilation ICT work </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 5:04:52 PM</td><td> </td><td>8/3/2022 9:48:08
AM</td><td>&nbsp;</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>29813</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing
accessories.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:16:19 PM</td><td> </td><td>8/3/2022 9:47:09
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29798</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:15:46 PM</td><td> </td><td>8/3/2022 9:46:41
AM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>29661</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Clearance between door leaf and frame should be same width
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
12:05:24 PM</td><td> </td><td>8/3/2022 9:46:13
AM</td><td>&nbsp;</td><td>MS.19.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29656</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door frame accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 12:05:16 PM</td><td> </td><td>8/3/2022 9:45:30
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>29340</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Clearance between door leaf and frame not same width
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:15:36 PM</td><td> </td><td>8/3/2022 9:44:33
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32457</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Incomplete CHWPs insulation </td><td>High</td><td>7/25/2022
12:00:00 PM</td><td>hossamreda</td><td>7/18/2022 10:02:03 AM</td><td>
</td><td>8/3/2022 8:37:48
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32459</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Incomplete CHWPs insulation </td><td>High</td><td>7/25/2022
12:00:00 PM</td><td>hossamreda</td><td>7/18/2022 10:02:07 AM</td><td>
</td><td>8/3/2022 8:37:37
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32605</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire hose should to install properly
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/19/2022 10:58:49 AM</td><td> </td><td>8/3/2022 8:36:14
AM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32656</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Hose reel needs adjustment
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:38:19 AM</td><td> </td><td>8/3/2022 8:36:02
AM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32454</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;CHWPs insulation needs adjustment and repair
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>hossamreda</td><td>7/18/2022
10:01:58 AM</td><td> </td><td>8/3/2022 8:35:13
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32539</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Insulation</td><td>&#39;Insulation
for pipe need repair</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif
Boshra Ghaly</td><td>7/18/2022 11:30:00 AM</td><td> </td><td>8/3/2022 8:31:56
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32537</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Insulation need repair &amp;
cleaning</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:57 AM</td><td> </td><td>8/3/2022 8:31:36
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>24715</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;Gap
between GRC cladding and concrete columns should be uniform
</td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:26 PM</td><td> </td><td>8/3/2022 7:26:35
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>22129</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Stone cladding not leveled with glazing
panels </td><td>Low</td><td>9/13/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>8/23/2021 4:36:27 PM</td><td> </td><td>8/2/2022 4:16:22
PM</td><td>&nbsp;</td><td>South Facade- CCB</td><td>&nbsp;</td>
</tr><tr>

<td>23882</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Direction</
td><td>Architectural</td><td>Glass partion and door</td><td>General
Snag</td><td>&#39;Dents should be repaired </td><td>Low</td><td>11/14/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>10/24/2021 12:19:51 PM</td><td>
</td><td>8/2/2022 4:16:21 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23893</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Lighting fixtures should be seated properly
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:20:09 PM</td><td> </td><td>8/2/2022 4:16:20
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24056</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Direction</
td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Gaps should
be aligned </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:39:31 PM</td><td> </td><td>8/2/2022 4:16:19
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24074</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Direction</
td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Gap should
be uniform </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:40:01 PM</td><td> </td><td>8/2/2022 4:16:18
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24092</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>level</td><td>&#39;Joint between grating and stainless steel
cladding should be regular </td><td>Low</td><td>11/15/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:40:52 PM</td><td> </td><td>8/2/2022
4:16:17 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24221</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;Missing
multimedia screens, missing all kiosk devices</td><td>High</td><td>11/2/2021
12:00:00 AM</td><td>Mohamed Samir</td><td>10/26/2021 3:35:31 PM</td><td>
</td><td>8/2/2022 4:16:16 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24619</td><td>Mankauras - Phase 3B</td><td>Mankauras Stair
and Wall</td><td>Closed</td><td>Cochrane</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gate needs touch up painting
</td><td>Low</td><td>11/21/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/31/2021 4:17:31 PM</td><td> </td><td>8/2/2022 4:16:14
PM</td><td>&nbsp;</td><td>Mankauras - Phase 3B</td><td>&nbsp;</td>
</tr><tr>
<td>24631</td><td>Mankauras - Phase 3B</td><td>Mankauras Stair
and Wall</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stone flooring should be cleaned
</td><td>Low</td><td>11/22/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/31/2021 4:17:48 PM</td><td> </td><td>8/2/2022 4:16:13
PM</td><td>&nbsp;</td><td>Mankauras - Phase 3B</td><td>&nbsp;</td>
</tr><tr>

<td>24633</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Gap
between statue and base should be closed </td><td>Low</td><td>11/21/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>10/31/2021 4:17:51 PM</td><td> </td><td>8/2/2022
4:16:12 PM</td><td>&nbsp;</td><td>Bridge</td><td>&nbsp;</td>
</tr><tr>
<td>24831</td><td>Mankauras - Phase 1</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Damaged</td><td>&#39;Marked joint should be aligned and uniform
</td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/7/2021 3:52:12 PM</td><td> </td><td>8/2/2022 4:16:10
PM</td><td>&nbsp;</td><td>Mankauras - Phase 1</td><td>&nbsp;</td>
</tr><tr>
<td>24832</td><td>Mankauras - Phase 1</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Copping is needed for marked part dwg to be
checked </td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/7/2021 3:52:14 PM</td><td> </td><td>8/2/2022 4:16:09
PM</td><td>&nbsp;</td><td>Mankauras - Phase 1</td><td>&nbsp;</td>
</tr><tr>
<td>25274</td><td>Mankauras - Phase 3A</td><td>Mankauras Stair
and Wall</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Damaged</td><td>&#39;Mis-alignment between GRC panels( surfaces)
&amp; EWS-13B
Irregular joints between GRC panels and EWS-13B</td><td>High</td><td>11/28/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>11/21/2021 11:19:08 AM</td><td>
</td><td>8/2/2022 4:16:08 PM</td><td>&nbsp;</td><td>Mankauras - Phase
3A</td><td>&nbsp;</td>
</tr><tr>
<td>31727</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Lighting not working. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:00 AM</td><td>
</td><td>8/2/2022 3:00:54
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31841</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Machine internal lighting not working.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:33:35 PM</td><td> </td><td>8/2/2022 2:54:20
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31818</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Internal lighting not working. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:32:52 PM</td><td>
</td><td>8/2/2022 2:53:38
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>18040</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Windows</
td><td>General Snag</td><td>&#39;Cladding and Ews03 is not parallel
</td><td>Low</td><td>6/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/25/2021
12:38:36 PM</td><td> </td><td>8/2/2022 12:39:05
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18051</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>6/15/2021
12:00:00 PM</td><td>mohamed.sami</td><td>5/25/2021 12:38:54 PM</td><td>
</td><td>8/2/2022 12:39:03 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18057</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>6/15/2021
12:00:00 PM</td><td>mohamed.sami</td><td>5/25/2021 12:39:04 PM</td><td>
</td><td>8/2/2022 12:39:02 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18071</td><td>CORRIDOR- Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Miss alignment between stone and aluminum cladding
</td><td>Low</td><td>6/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>5/25/2021
12:39:24 PM</td><td> </td><td>8/2/2022 12:39:00
PM</td><td>&nbsp;</td><td>MS.12.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>18072</td><td>CORRIDOR- Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Relations between ceiling and walls should be regular
</td><td>Low</td><td>6/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>5/25/2021
12:39:26 PM</td><td> </td><td>8/2/2022 12:38:58
PM</td><td>&nbsp;</td><td>MS.12.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>18073</td><td>CORRIDOR- Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Relations between ceiling and walls should be regular
</td><td>Low</td><td>6/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>5/25/2021
12:39:27 PM</td><td> </td><td>8/2/2022 12:38:57
PM</td><td>&nbsp;</td><td>MS.12.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>18075</td><td>CORRIDOR- Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Joints should be regular and panels should be leveled
</td><td>Low</td><td>6/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>5/25/2021
12:39:30 PM</td><td> </td><td>8/2/2022 12:38:56
PM</td><td>&nbsp;</td><td>MS.12.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>18078</td><td>CORRIDOR- Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Different texture should be unified
</td><td>Low</td><td>6/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>5/25/2021
12:39:35 PM</td><td> </td><td>8/2/2022 12:38:51
PM</td><td>&nbsp;</td><td>MS.12.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>18085</td><td>CORRIDOR- Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Modified panels should be replaced
</td><td>Low</td><td>6/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>5/25/2021
12:39:46 PM</td><td> </td><td>8/2/2022 12:38:50
PM</td><td>&nbsp;</td><td>MS.12.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>18087</td><td>CORRIDOR- Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Interface between iws07and walls should be regular
</td><td>Low</td><td>6/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/25/2021
12:39:49 PM</td><td> </td><td>8/2/2022 12:38:49
PM</td><td>&nbsp;</td><td>MS.12.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>18232</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Changed defect piece ( rough surface
)</td><td>Low</td><td>6/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>5/31/2021
4:05:11 PM</td><td> </td><td>8/2/2022 12:38:48
PM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18241</td><td>KINDERGARTEN - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Short horizontal frame should be replaced
</td><td>Low</td><td>6/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>5/31/2021
4:10:36 PM</td><td> </td><td>8/2/2022 12:38:47 PM</td><td>&nbsp;</td><td>CLASSROOM
1</td><td>&nbsp;</td>
</tr><tr>
<td>18251</td><td>KINDERGARTEN CLASSROOM 3 - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Screws are missing
</td><td>Low</td><td>6/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>5/31/2021
4:10:52 PM</td><td> </td><td>8/2/2022 12:38:46
PM</td><td>&nbsp;</td><td>MK.12.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>18279</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Cleaning stainless steel frames
</td><td>Low</td><td>6/22/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/1/2021
4:10:23 PM</td><td> </td><td>8/2/2022 12:38:45
PM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18281</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Aluminum with stainless steel frame not
leveled </td><td>Low</td><td>6/22/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/1/2021 4:10:29 PM</td><td> </td><td>8/2/2022
12:38:44 PM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18287</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Sliding
Doors</td><td>General Snag</td><td>&#39;Brush is not fixed properly
</td><td>Low</td><td>6/22/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/1/2021
4:10:40 PM</td><td> </td><td>8/2/2022 12:38:43
PM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18289</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>Damage/dent/stains</td><td>&#39;Change defected stainless steel
piece </td><td>Low</td><td>6/22/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/1/2021 4:10:44 PM</td><td> </td><td>8/2/2022
12:38:42 PM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18327</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Damaged</td><td>&#39;Stone cladding is not leveled with
GRC</td><td>Low</td><td>6/23/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/2/2021
11:40:20 AM</td><td> </td><td>8/2/2022 12:38:41
PM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18328</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Discoloring between stone tiles
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/2/2021
11:40:23 AM</td><td> </td><td>8/2/2022 12:38:40
PM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18334</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Stainless steel cover is not aligned
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/2/2021
11:40:42 AM</td><td> </td><td>8/2/2022 12:38:39
PM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18335</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Stainless steel frames need cleaning
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/2/2021
11:40:43 AM</td><td> </td><td>8/2/2022 12:38:37
PM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18336</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Missing glass mark label
</td><td>Low</td><td>6/23/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/2/2021
11:40:45 AM</td><td> </td><td>8/2/2022 12:38:35
PM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18338</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Difference in color
</td><td>Low</td><td>6/23/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/2/2021
11:40:48 AM</td><td> </td><td>8/2/2022 12:38:34
PM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18344</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Ceiling frame</td><td>&#39;Metal trims of ceiling are not
aligned </td><td>Low</td><td>6/23/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/2/2021 11:41:00 AM</td><td> </td><td>8/2/2022
12:38:32 PM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18454</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Missing nob of access doors
</td><td>Low</td><td>6/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/7/2021
4:08:54 PM</td><td> </td><td>8/2/2022 12:38:31
PM</td><td>&nbsp;</td><td>MW.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18577</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Discoloring between stone tiles
</td><td>Low</td><td>6/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/8/2021
4:32:47 PM</td><td> </td><td>8/2/2022 12:38:30
PM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18579</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Missing nob of access
door</td><td>Low</td><td>6/29/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/8/2021 4:32:53 PM</td><td> </td><td>8/2/2022
12:38:28 PM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18584</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Discoloring between stone tiles at second
partition </td><td>Low</td><td>6/29/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/8/2021 4:33:04 PM</td><td> </td><td>8/2/2022
12:38:27 PM</td><td>&nbsp;</td><td>MW.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18594</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Scratch/stains</td><td>&#39;Damaged and scratched HBL
</td><td>Low</td><td>6/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/8/2021
4:47:47 PM</td><td> </td><td>8/2/2022 12:38:25
PM</td><td>&nbsp;</td><td>MW.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18602</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Discoloring between stone tiles
</td><td>Low</td><td>6/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/8/2021
4:48:14 PM</td><td> </td><td>8/2/2022 12:38:23
PM</td><td>&nbsp;</td><td>MW.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18607</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloring between stone
tiles</td><td>Low</td><td>6/29/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/8/2021 4:48:28 PM</td><td> </td><td>8/2/2022
12:38:20 PM</td><td>&nbsp;</td><td>MW.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18662</td><td>KITCHEN - Band B</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Flooring -
Rubber flooring</td><td>General</td><td>&#39;Discoloring between skirting and
flooring </td><td>Low</td><td>6/30/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/9/2021 4:23:24 PM</td><td> </td><td>8/2/2022
12:38:18 PM</td><td>&nbsp;</td><td>MS.18.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>19120</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>7/7/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/16/2021
10:54:15 AM</td><td> </td><td>8/2/2022 12:38:16
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19428</td><td>BREAKOUT AREA - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Gap between aluminum cladding and flooring
not same width </td><td>Low</td><td>7/15/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/24/2021 11:55:26 AM</td><td> </td><td>8/2/2022
12:38:14 PM</td><td>&nbsp;</td><td>ME.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19429</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Defected panel should be changed
</td><td>Low</td><td>7/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/24/2021
11:55:27 AM</td><td> </td><td>8/2/2022 12:38:13
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19433</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>Not aligned</td><td>&#39;Gap between panels should be closed
</td><td>Low</td><td>7/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/24/2021
11:55:30 AM</td><td> </td><td>8/2/2022 12:38:12
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19434</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>Not aligned</td><td>&#39;Joint not aligned
</td><td>Low</td><td>7/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/24/2021
11:55:32 AM</td><td> </td><td>8/2/2022 12:38:11
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19438</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Defected panel need to adjust
</td><td>Low</td><td>7/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/24/2021
11:55:35 AM</td><td> </td><td>8/2/2022 12:38:10
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19440</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Screws are missing
</td><td>Low</td><td>7/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/24/2021
11:55:40 AM</td><td> </td><td>8/2/2022 12:38:08
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19441</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>Not aligned</td><td>&#39;Joints not aligned
</td><td>Low</td><td>7/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/24/2021
11:55:40 AM</td><td> </td><td>8/2/2022 12:38:06
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19442</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Tiles should be leveled
</td><td>Low</td><td>7/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/24/2021
11:55:42 AM</td><td> </td><td>8/2/2022 12:38:03
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19443</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Cleaning and remove painting dents
</td><td>Low</td><td>7/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/24/2021
11:55:43 AM</td><td> </td><td>8/2/2022 12:38:02
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19448</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Discoloring between stone tiles
</td><td>Low</td><td>7/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/24/2021
11:55:51 AM</td><td> </td><td>8/2/2022 12:38:01
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19575</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Missing nob of access
door</td><td>Low</td><td>7/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:25:44 PM</td><td> </td><td>8/2/2022
12:38:00 PM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19583</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Missing nob
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:57 PM</td><td> </td><td>8/2/2022 12:37:58
PM</td><td>&nbsp;</td><td>MW.13.002.002</td><td>&nbsp;</td>
</tr><tr>
<td>19596</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Bathroom -
Vanity top</td><td>General</td><td>&#39;Discoloring between two vanity top
</td><td>Low</td><td>7/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/30/2021
1:26:15 PM</td><td> </td><td>8/2/2022 12:37:57
PM</td><td>&nbsp;</td><td>MW.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19702</td><td>NURSERY- Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:29:47 PM</td><td> </td><td>8/2/2022 12:37:55
PM</td><td>&nbsp;</td><td>MK.12.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19712</td><td>QUIET ROOM - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:02 PM</td><td> </td><td>8/2/2022 12:37:54
PM</td><td>&nbsp;</td><td>MS.12.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>20503</td><td>TEMP EXH STORAGE</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Ceiling needs adjustment and repair
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:41 PM</td><td> </td><td>8/2/2022 11:58:12 AM</td><td>Done
</td><td>MT.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20516</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Shadow gap should be aligned
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:53 PM</td><td> </td><td>8/2/2022 11:58:11 AM</td><td>Done
</td><td>MQ.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20685</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Edges around door frame should be
straight and alignment </td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/10/2021 11:39:45 AM</td><td> </td><td>8/2/2022 11:58:05
AM</td><td>Done </td><td>MQ.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20686</td><td>TEMP EXHIBITION CURATOR</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Crack should be repair and repainting
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
11:39:46 AM</td><td> </td><td>8/2/2022 11:58:04 AM</td><td>Done
</td><td>MT.14.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20715</td><td>TEMP EXHIBITION CURATOR</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy wall should be adjusted
</td><td>Low</td><td>8/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:20 PM</td><td> </td><td>8/2/2022 11:57:52 AM</td><td>Done
</td><td>MT.14.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20716</td><td>TEMP EXHIBITION CURATOR</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy wall should be adjusted
</td><td>Low</td><td>8/17/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:22 PM</td><td> </td><td>8/2/2022 11:57:51 AM</td><td>Done
</td><td>MT.14.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20762</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked joint is not aligned and should be
adjusted </td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/10/2021 12:03:26 PM</td><td> </td><td>8/2/2022 11:57:45
AM</td><td>Done </td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>29203</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation for hydronic pipes. </td><td>High</td><td>5/29/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:59:30 AM</td><td>
</td><td>8/2/2022 8:18:27
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>20411</td><td>STORAGE</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;PRD isn’t working properly , motorized needs to be adjusted
</td><td>High</td><td>8/12/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/5/2021
1:44:49 PM</td><td> </td><td>8/2/2022 8:15:41
AM</td><td>&nbsp;</td><td>MW.18.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>23827</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Gap should be uniform (small
width)</td><td>Low</td><td>11/10/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/20/2021 3:39:07 PM</td><td> </td><td>8/1/2022 4:07:21
PM</td><td>&nbsp;</td><td>Atrium - Internal Side</td><td>&nbsp;</td>
</tr><tr>
<td>16468</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Joints of false ceiling tiles
not aligned </td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/15/2021 11:34:18 AM</td><td> </td><td>8/1/2022 3:42:55
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>8210</td><td>ASSISTANT DIRECTOR</td><td>CCB
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;WiFi not labeled,Lighting control and IT
outlet not terminated, iT floor box is not terminated,clash between voice
evacuation and light fixtures, door lock not installed
</td><td>High</td><td>1/19/2020 12:00:00 AM</td><td>Mohamed Samir</td><td>1/12/2020
4:31:48 PM</td><td> </td><td>8/1/2022 2:52:47
PM</td><td>&nbsp;</td><td>CO.02.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>12618</td><td>IT HUB ROOM</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>11/1/2020 12:00:00
AM</td><td>Ahmed.Galal</td><td>10/25/2020 3:46:02 PM</td><td> </td><td>8/1/2022
2:52:44 PM</td><td>&nbsp;</td><td>CS.07.0G.013</td><td>&nbsp;</td>
</tr><tr>
<td>15038</td><td>IT HUB ROOM</td><td>CCB
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Admin,museum and secure Rack earthing and
rack fires topping is not done yet.Rack earthing should be less than 1
ohms</td><td>High</td><td>1/26/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>1/19/2021 4:18:20 PM</td><td> </td><td>8/1/2022 2:52:43
PM</td><td>&nbsp;</td><td>CS.07.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>15039</td><td>IT HUB ROOM</td><td>CCB
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Network switches need two uplinks.however
switches shows only one uplink connection and another one link is missing from
backup data center </td><td>High</td><td>1/26/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>1/19/2021 4:18:24 PM</td><td> </td><td>8/1/2022 2:52:42
PM</td><td>&nbsp;</td><td>CS.07.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>15040</td><td>IT HUB ROOM</td><td>CCB
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Voice 110 block termination is incomplete
and 110 block not installed yet </td><td>High</td><td>1/26/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>1/19/2021 4:18:27 PM</td><td>
</td><td>8/1/2022 2:52:41
PM</td><td>&nbsp;</td><td>CS.07.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>15041</td><td>IT HUB ROOM</td><td>CCB
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Voice patch panels needs to be relocated
to Admin rack.Wrong arrangement done by STS.</td><td>High</td><td>1/26/2021
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>1/19/2021 4:18:29 PM</td><td>
</td><td>8/1/2022 2:52:40
PM</td><td>&nbsp;</td><td>CS.07.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>15042</td><td>IT HUB ROOM</td><td>CCB
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Missing fiber patch panels labeling and
missing patch panel numbers.Active network switches labeling everywhere in the
admin,museum and secure Racks.Rack cleaning also needs to be done.Fiber patch cord
dressing also needs to be fixed properly </td><td>High</td><td>1/26/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>1/19/2021 4:18:36 PM</td><td>
</td><td>8/1/2022 2:52:39
PM</td><td>&nbsp;</td><td>CS.07.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>15043</td><td>IT HUB ROOM</td><td>CCB
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Temporary patch cord needs to changed by
permanent patching,Rack front door should be closed completely by pushing the rack
arrangement rails inside the Racks.</td><td>High</td><td>1/26/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>1/19/2021 4:18:41 PM</td><td>
</td><td>8/1/2022 2:52:38
PM</td><td>&nbsp;</td><td>CS.07.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>16574</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Pull box label is missing, missing access control devices, BMS
panels are not terminated. </td><td>High</td><td>2/22/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>2/15/2021 4:34:04 PM</td><td> </td><td>8/1/2022
2:52:37 PM</td><td>&nbsp;</td><td>MS.14.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>16576</td><td>ESCAPE TUNNEL</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing access control devices , missing WiFi and final label
no cctv installed in this area</td><td>High</td><td>2/22/2021 12:00:00
PM</td><td>Mohamed Samir</td><td>2/15/2021 4:34:12 PM</td><td> </td><td>8/1/2022
2:52:36 PM</td><td>&nbsp;</td><td>MQ.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16581</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing final label for all ICT
trades</td><td>High</td><td>2/22/2021 12:00:00 PM</td><td>Mohamed
Samir</td><td>2/15/2021 4:34:37 PM</td><td> </td><td>8/1/2022 2:52:35
PM</td><td>&nbsp;</td><td>MG.14.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>16583</td><td>SCHOLAR RECEPTION</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing disable alarm cables label, missing cctv WiFi final
label, floor box is not terminated, digital signage is not installed, cctv is not
installed. </td><td>High</td><td>2/22/2021 12:00:00 PM</td><td>Mohamed
Samir</td><td>2/15/2021 4:34:50 PM</td><td> </td><td>8/1/2022 2:52:34
PM</td><td>&nbsp;</td><td>MR.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>17607</td><td>CORRIDOR</td><td>CCB
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Media converter is not installed, no WiFi or ict
labels</td><td>High</td><td>5/12/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>5/5/2021 12:33:33 PM</td><td> </td><td>8/1/2022
2:52:32 PM</td><td>&nbsp;</td><td>CS.02.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>18535</td><td>CORE D4</td><td>CCB
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/15/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>6/8/2021 1:42:11 PM</td><td> </td><td>8/1/2022
2:52:29 PM</td><td>&nbsp;</td><td>CC.08.01.D41</td><td>&nbsp;</td>
</tr><tr>
<td>18853</td><td>CORE B4</td><td>CCB
L30</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/20/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>6/13/2021 9:50:09 AM</td><td> </td><td>8/1/2022
2:52:28 PM</td><td>&nbsp;</td><td>CC.07.03.B41</td><td>&nbsp;</td>
</tr><tr>
<td>19153</td><td>IT HUB ROOM</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Alignment and Level not followed</td><td>&#39;Voice raiser patch
panel labeling is not done yet.still missing some of the cat6a cables labeling
also.Fiber patch panel labeling also not done yet.All the switches should have two
uplinks </td><td>High</td><td>6/24/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>6/17/2021 11:55:09 AM</td><td> </td><td>8/1/2022 2:52:27
PM</td><td>&nbsp;</td><td>CS.07.0G.014</td><td>&nbsp;</td>
</tr><tr>
<td>19168</td><td>MAIN IT ROOM</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Incomplete Installation</td><td>&#39;There is no labeling for
admin,museums and secure core switches and most of the fiber uplinks not
established yet and fiber patch cord labeling also missing and rack earthing also
not done yet</td><td>High</td><td>6/24/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>6/17/2021 11:55:54 AM</td><td> </td><td>8/1/2022 2:52:26
PM</td><td>&nbsp;</td><td>CS.07.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>20107</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing ICT WiFi cctv access control label’s, missing access
control reader installation. Missing floor box termination
</td><td>High</td><td>8/10/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/3/2021 11:29:13 AM</td><td> </td><td>8/1/2022 2:52:25
PM</td><td>&nbsp;</td><td>ME.12.01.009</td><td>&nbsp;</td>
</tr><tr>
<td>21808</td><td>CORE E2</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Lift management system cables are not
terminated and activation also not done </td><td>High</td><td>8/26/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>8/19/2021 3:26:43 PM</td><td>
</td><td>8/1/2022 2:52:24
PM</td><td>&nbsp;</td><td>MC.13.01.E21</td><td>&nbsp;</td>
</tr><tr>
<td>21817</td><td>CORE A6-Band A</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Lift management system cables are not
terminated and activation also not done </td><td>High</td><td>8/26/2021 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>8/19/2021 3:27:02 PM</td><td>
</td><td>8/1/2022 2:52:23
PM</td><td>&nbsp;</td><td>MC.12.01.A61</td><td>&nbsp;</td>
</tr><tr>
<td>21904</td><td>IT ROOM</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing ACCESS control panels schedule, missing ict
labels,missing rack labels,missing all rack side fiber cables label’s, missing
fiber patch panel label, </td><td>High</td><td>8/30/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>8/23/2021 10:53:12 AM</td><td> </td><td>8/1/2022
2:52:21 PM</td><td>&nbsp;</td><td>MS.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>26735</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Cctv camera installation is incomplete and labeling is not done
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:45:42 PM</td><td> </td><td>8/1/2022 2:52:21
PM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>26737</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Cctv labeling is missing </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:45:44 PM</td><td>
</td><td>8/1/2022 2:52:20
PM</td><td>&nbsp;</td><td>MR.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>26757</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Camera labeling and port mapping is not done and IP address
should not be mentioned on the cameras.</td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 3:46:09 PM</td><td>
</td><td>8/1/2022 2:52:19
PM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>26776</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;CCTV camera cables termination and camera installation has not
completed yet</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:46:47 PM</td><td> </td><td>8/1/2022 2:52:17
PM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>26940</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi and Cctv labeling should be done
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 3:59:57 PM</td><td> </td><td>8/1/2022 2:52:16
PM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>26991</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Most of the devices like CCTV,WiFi ,RFID and door controller has
not been installed yet </td><td>High</td><td>3/9/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/2/2022 4:01:19 PM</td><td>
</td><td>8/1/2022 2:52:15
PM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27591</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:52:34 PM</td><td> </td><td>8/1/2022 2:52:14
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27606</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Door controller need outlet and bus
cabling</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:52:57 PM</td><td> </td><td>8/1/2022 2:52:13
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27609</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Security</
td><td>General Snag</td><td>&#39;Incomplete work </td><td>High</td><td>3/16/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:53:02 PM</td><td>
</td><td>8/1/2022 2:52:12
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27629</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;No data outlet for door controller
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:36 PM</td><td> </td><td>8/1/2022 2:52:11
PM</td><td>&nbsp;</td><td>MS.19.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>27653</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Patching should be protected by flexible conduit and no label for
cabling</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:54:17 PM</td><td> </td><td>8/1/2022 2:52:10
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27657</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Security</
td><td>General Snag</td><td>&#39;BMS panel not completed terminated
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:54:25 PM</td><td> </td><td>8/1/2022 2:52:10
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27660</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Security</
td><td>General Snag</td><td>&#39;All most of BMS device not installed properly and
hanging and box of termination should be cover</td><td>High</td><td>3/16/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:54:34 PM</td><td>
</td><td>8/1/2022 2:52:09
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28157</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi label and patching </td><td>High</td><td>3/23/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/16/2022 3:54:43 PM</td><td>
</td><td>8/1/2022 2:52:08
PM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28167</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Camera label and cable should be
protected</td><td>High</td><td>3/23/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/16/2022 3:54:58 PM</td><td> </td><td>8/1/2022 2:52:06
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28171</td><td>CORE F3</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi label</td><td>High</td><td>3/23/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/16/2022 3:55:04 PM</td><td>
</td><td>8/1/2022 2:52:05
PM</td><td>&nbsp;</td><td>MC.14.0G.F31</td><td>&nbsp;</td>
</tr><tr>
<td>31377</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Internal cleaning. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:55:15 AM</td><td>
</td><td>8/1/2022 1:27:21
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>21394</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Water is close to electrical manhole
</td><td>High</td><td>8/25/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/18/2021
11:41:41 AM</td><td> </td><td>8/1/2022 1:25:36
PM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>31451</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Machine shall be cleaned from inside.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:58:00 AM</td><td> </td><td>8/1/2022 1:24:09
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30787</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing fire damper fire elevator core.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:03 PM</td><td> </td><td>8/1/2022 1:13:27
PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31989</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door </td><td>Low</td><td>7/26/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>7/5/2022 12:13:58 PM</td><td>
</td><td>8/1/2022 12:55:20
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>31479</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door fixation should be finished properly
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
3:24:50 PM</td><td> </td><td>8/1/2022 12:50:50
PM</td><td>&nbsp;</td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>22150</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Interface between stone wall and concrete
wall should be closed </td><td>Low</td><td>9/13/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>8/23/2021 4:37:35 PM</td><td> </td><td>8/1/2022 12:47:11
PM</td><td>&nbsp;</td><td>South Facade- CCB</td><td>&nbsp;</td>
</tr><tr>
<td>22156</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Interface between stone cladding and
concrete wall should be closed </td><td>Low</td><td>8/30/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>8/23/2021 4:37:46 PM</td><td> </td><td>8/1/2022
12:47:10 PM</td><td>&nbsp;</td><td>South Facade- CCB</td><td>&nbsp;</td>
</tr><tr>
<td>22158</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;Marked Edge should be aligned </td><td>Low</td><td>9/13/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>8/23/2021 4:37:51 PM</td><td>
</td><td>8/1/2022 12:47:09 PM</td><td>&nbsp;</td><td>South Facade-
CCB</td><td>&nbsp;</td>
</tr><tr>
<td>22163</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Interface between stone cladding and
concrete wall should be closed </td><td>Low</td><td>9/13/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>8/23/2021 4:37:59 PM</td><td> </td><td>8/1/2022
12:47:08 PM</td><td>&nbsp;</td><td>South Facade- CCB</td><td>&nbsp;</td>
</tr><tr>
<td>22173</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;The marked edges should be aligned </td><td>Low</td><td>9/13/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>8/23/2021 4:38:14 PM</td><td>
</td><td>8/1/2022 12:47:08 PM</td><td>&nbsp;</td><td>South Facade-
CCB</td><td>&nbsp;</td>
</tr><tr>
<td>22725</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Loose tile should be fixed properly
</td><td>Low</td><td>9/27/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>9/6/2021
3:42:00 PM</td><td> </td><td>8/1/2022 12:47:07 PM</td><td>&nbsp;</td><td>MU - North
Facade</td><td>&nbsp;</td>
</tr><tr>
<td>22739</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Curtain
Wall</td><td>Missing</td><td>&#39;Marked gap should be
covered</td><td>Low</td><td>9/27/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>9/6/2021 3:42:16 PM</td><td> </td><td>8/1/2022 12:47:05
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>22806</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
stone cladding</td><td>Not aligned</td><td>&#39;Stone cladding not aligned
</td><td>Low</td><td>9/29/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>9/8/2021
12:16:56 PM</td><td> </td><td>8/1/2022 12:47:04 PM</td><td>&nbsp;</td><td>MU -
North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>22817</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>XS Platforms</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;The rail not parallel with stone cladding
</td><td>Low</td><td>9/29/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>9/8/2021
12:17:12 PM</td><td> </td><td>8/1/2022 12:47:02 PM</td><td>&nbsp;</td><td>MU -
North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23739</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>Wall</
td><td>General Snag</td><td>&#39;Interface trim is needed between metal cladding
and concrete wall </td><td>Low</td><td>11/3/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:28 PM</td><td> </td><td>8/1/2022 12:47:01
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23740</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>Ceiling</
td><td>General Snag</td><td>&#39;Marked edge should be
aligned</td><td>Low</td><td>11/3/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:30 PM</td><td> </td><td>8/1/2022 12:46:57
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23749</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;Marked gap should be aligned </td><td>Low</td><td>11/3/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/13/2021 4:16:44 PM</td><td>
</td><td>8/1/2022 12:46:53 PM</td><td>&nbsp;</td><td>MU - North
Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23750</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Marked part should be fixed properly
</td><td>Low</td><td>11/3/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:45 PM</td><td> </td><td>8/1/2022 12:46:52
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23753</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked gap should be the same width
</td><td>Low</td><td>11/3/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:50 PM</td><td> </td><td>8/1/2022 12:46:51
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23754</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Stone should e leveled and aligned
</td><td>Low</td><td>11/3/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:51 PM</td><td> </td><td>8/1/2022 12:46:50
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23760</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Marked stone edge should be aligned
</td><td>Low</td><td>11/3/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:17:02 PM</td><td> </td><td>8/1/2022 12:46:49
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23763</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Staircase Handrail</td><td>Overall
finishes</td><td>&#39;Handrail should be extended to the floor
</td><td>Low</td><td>11/3/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:17:07 PM</td><td> </td><td>8/1/2022 12:46:47
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23786</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Short tiles should be extended </td><td>Low</td><td>11/8/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/18/2021 4:29:09 PM</td><td>
</td><td>8/1/2022 12:46:46 PM</td><td>&nbsp;</td><td>Atrium - Internal
Side</td><td>&nbsp;</td>
</tr><tr>
<td>23791</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Stone edge should be aligned and adjusted
</td><td>Low</td><td>11/8/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/18/2021 4:29:16 PM</td><td> </td><td>8/1/2022 12:46:42
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>29099</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Damaged</
td><td>&#39;Damaged shelf need to touch up </td><td>Low</td><td>6/9/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/19/2022 12:04:11 PM</td><td> </td><td>8/1/2022
12:36:15 PM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30692</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Defected
accessories should be adjusted and installed properly
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
4:15:45 PM</td><td> </td><td>8/1/2022 12:33:47
PM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30583</td><td>STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Marked gap at corner should be closed
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:50:44 AM</td><td> </td><td>8/1/2022 12:32:43
PM</td><td>&nbsp;</td><td>MR.14.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30192</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting around lighting fixtures need to
repair and repaint.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 11:59:49 AM</td><td> </td><td>8/1/2022 12:28:45
PM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31324</td><td>STORE</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be closed properly </td><td>Low</td><td>6/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/2/2022 11:38:56 AM</td><td> </td><td>8/1/2022
12:27:58 PM</td><td>&nbsp;</td><td>MA.19.02.022</td><td>&nbsp;</td>
</tr><tr>
<td>27333</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Marked part is not leveled
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:25 PM</td><td> </td><td>8/1/2022 12:27:15
PM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30191</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling cracks should be
repaired.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 11:59:44 AM</td><td> </td><td>8/1/2022 12:25:33
PM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>30108</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Edges around metal door should be aligned and adjusted
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
11:37:09 AM</td><td> </td><td>8/1/2022 12:25:03
PM</td><td>&nbsp;</td><td>MA.19.02.020</td><td>&nbsp;</td>
</tr><tr>
<td>29111</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:37 PM</td><td> </td><td>8/1/2022 12:24:21
PM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30516</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;All access doors should be adjusted and painted
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:08 AM</td><td> </td><td>8/1/2022 12:23:24
PM</td><td>&nbsp;</td><td>MR.14.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>29116</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Gypsum Ceiling</td><td>General
Snag</td><td>&#39;Gypsum board edge should be aligned </td><td>Low</td><td>6/9/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/19/2022 12:04:47 PM</td><td>
</td><td>8/1/2022 12:22:31
PM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30437</td><td>PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to repair and
repaint.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:29 AM</td><td> </td><td>8/1/2022 12:19:58
PM</td><td>&nbsp;</td><td>MR.14.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30890</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be closed well properly.</td><td>Low</td><td>6/22/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>6/1/2022 3:50:14 PM</td><td> </td><td>8/1/2022
12:18:11 PM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30688</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;All
hardware accessories , door leaf and frame need to clean
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
4:15:41 PM</td><td> </td><td>8/1/2022 12:16:31
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30515</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling painting should adjusted </td><td>Low</td><td>6/21/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022 11:45:07 AM</td><td>
</td><td>8/1/2022 12:14:38
PM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30581</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Hardware accessories, door leaf and frame need to clean
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:50:40 AM</td><td> </td><td>8/1/2022 12:13:24
PM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30940</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
3:56:51 PM</td><td> </td><td>8/1/2022 12:11:22
PM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30931</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
3:56:37 PM</td><td> </td><td>8/1/2022 12:09:29
PM</td><td>&nbsp;</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>13769</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked Opening if no need it should be closed
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:39:53 AM</td><td> </td><td>8/1/2022 12:06:21
PM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>27560</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail welding joint should be
finished.</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/9/2022 11:33:20 AM</td><td> </td><td>8/1/2022 12:05:36
PM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>19910</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Staircase</td><td>General
Snag</td><td>&#39;Missing stair ladder type C-03</td><td>Low</td><td>8/19/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021 11:25:06 AM</td><td>
</td><td>8/1/2022 12:05:05
PM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>27317</td><td>LOBBY</td><td>MU L25</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Poor grouting need to repair.</td><td>Low</td><td>3/28/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>3/7/2022 12:06:33 PM</td><td>
</td><td>8/1/2022 12:02:34
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29626</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Door should be closed properly.</td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022 11:38:53 AM</td><td>
</td><td>8/1/2022 12:01:44
PM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>29425</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 5:05:24 PM</td><td> </td><td>8/1/2022 12:01:07
PM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29868</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door closer </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 4:22:32 PM</td><td> </td><td>8/1/2022 12:00:36
PM</td><td>&nbsp;</td><td>MS.19.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29865</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 4:22:28 PM</td><td> </td><td>8/1/2022 12:00:04
PM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>29441</td><td>LOBBY</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 5:05:55 PM</td><td> </td><td>8/1/2022 11:59:34
AM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29433</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 5:05:38 PM</td><td> </td><td>8/1/2022 11:59:06
AM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>29430</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door to
be closed properly </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 5:05:33 PM</td><td> </td><td>8/1/2022 11:58:33
AM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>29423</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly and to be balanced </td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 5:05:04 PM</td><td>
</td><td>8/1/2022 11:58:00
AM</td><td>&nbsp;</td><td>MS.23.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29426</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 5:05:25 PM</td><td> </td><td>8/1/2022 11:57:29
AM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>32612</td><td>SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;No firefighting system detected
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:36:43 AM</td><td> </td><td>8/1/2022 11:34:38
AM</td><td>&nbsp;</td><td>MS.19.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32619</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;No firefighting system detected
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:36:57 AM</td><td> </td><td>8/1/2022 11:34:24
AM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32622</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;No firefighting system detected
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:37:07 AM</td><td> </td><td>8/1/2022 11:34:16
AM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32639</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;No firefighting system detected
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:37:40 AM</td><td> </td><td>8/1/2022 11:34:06
AM</td><td>&nbsp;</td><td>MS.13.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32643</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;No fire fighting system
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:37:48 AM</td><td> </td><td>8/1/2022 11:33:50
AM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32611</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;No firefighting system detected
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:36:41 AM</td><td> </td><td>8/1/2022 11:33:03
AM</td><td>&nbsp;</td><td>MS.19.3A.009</td><td>&nbsp;</td>
</tr><tr>
<td>32610</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguisher
system</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/19/2022 10:58:58 AM</td><td> </td><td>8/1/2022 11:27:13
AM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32598</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguisher
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/19/2022 10:58:33 AM</td><td> </td><td>8/1/2022 11:26:50
AM</td><td>&nbsp;</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32496</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire
extinguishers</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:47 AM</td><td> </td><td>8/1/2022 11:26:38
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32495</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguisher
system</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:46 AM</td><td> </td><td>8/1/2022 11:26:27
AM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32488</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguishers
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:33 AM</td><td> </td><td>8/1/2022 11:26:12
AM</td><td>&nbsp;</td><td>MS.14.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32469</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;No Fire Fighting system
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>hossamreda</td><td>7/18/2022
10:02:27 AM</td><td> </td><td>8/1/2022 11:25:55
AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32468</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;No fire fighting system
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>hossamreda</td><td>7/18/2022
10:02:26 AM</td><td> </td><td>8/1/2022 11:25:47
AM</td><td>&nbsp;</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32464</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;No Fire Fighting
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>hossamreda</td><td>7/18/2022
10:02:19 AM</td><td> </td><td>8/1/2022 11:25:36
AM</td><td>&nbsp;</td><td>MS.18.3A.010</td><td>&nbsp;</td>
</tr><tr>
<td>32463</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;No Fire Fighting
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>hossamreda</td><td>7/18/2022
10:02:18 AM</td><td> </td><td>8/1/2022 11:25:22
AM</td><td>&nbsp;</td><td>MS.13.3A.011</td><td>&nbsp;</td>
</tr><tr>
<td>32451</td><td>ELECTRICAL ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;No Fire Fighting
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>hossamreda</td><td>7/18/2022
10:01:53 AM</td><td> </td><td>8/1/2022 11:25:08
AM</td><td>&nbsp;</td><td>MS.13.3A.014</td><td>&nbsp;</td>
</tr><tr>
<td>32450</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;No Fire Fighting
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>hossamreda</td><td>7/18/2022
10:01:52 AM</td><td> </td><td>8/1/2022 11:25:01
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29801</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing glazing panel.</td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:15:50 PM</td><td> </td><td>8/1/2022
11:10:44 AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29787</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing hanged door frame.</td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/25/2022 3:15:31 PM</td><td> </td><td>8/1/2022
11:10:08 AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29941</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing accessories.</td><td>Low</td><td>6/16/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/26/2022 10:58:56 AM</td><td> </td><td>8/1/2022
11:09:26 AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29920</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/16/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/26/2022 10:58:29 AM</td><td> </td><td>8/1/2022 11:08:57
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29850</td><td>IT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company, Ltd.</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing hanged door
frame.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:19:58 PM</td><td> </td><td>8/1/2022 11:07:35
AM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>29404</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door should be closed properly and balanced
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
5:04:37 PM</td><td> </td><td>8/1/2022 11:06:55
AM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29402</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly and balanced </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 5:04:34 PM</td><td> </td><td>8/1/2022
11:05:58 AM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29395</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door should be closed properly </td><td>Low</td><td>5/31/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 5:04:26 PM</td><td>
</td><td>8/1/2022 11:03:43
AM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29391</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 5:04:22 PM</td><td> </td><td>8/1/2022 11:02:27
AM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29790</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:15:36 PM</td><td> </td><td>8/1/2022 11:01:17
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>13794</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Scratches</td><td>&#39;CIR not submitted
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:41:00 AM</td><td> </td><td>8/1/2022 11:00:24
AM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29936</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Door leaf should be close well.</td><td>Low</td><td>6/16/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/26/2022 10:58:51 AM</td><td>
</td><td>8/1/2022 10:59:40
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29930</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly /to be balanced </td><td>Low</td><td>6/16/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/26/2022 10:58:46 AM</td><td> </td><td>8/1/2022
10:58:16 AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29804</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Hinge is
missing </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 3:15:57 PM</td><td> </td><td>8/1/2022 10:54:44
AM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>29544</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/15/2022 12:00:00
AM</td><td>sally.george</td><td>5/25/2022 9:55:50 AM</td><td> </td><td>8/1/2022
10:54:20 AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18434</td><td>Pyramid Climb</td><td>Pyramid
Climb</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Poor grouting need to repair
</td><td>Low</td><td>6/28/2021 12:00:00 PM</td><td>aymanhaddadin</td><td>6/7/2021
10:14:53 AM</td><td> </td><td>8/1/2022 10:54:01 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18435</td><td>Pyramid Climb</td><td>Pyramid
Climb</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Polish and clean marble stains
</td><td>Low</td><td>6/28/2021 12:00:00 PM</td><td>aymanhaddadin</td><td>6/7/2021
10:15:15 AM</td><td> </td><td>8/1/2022 10:54:00 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22920</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Wheel marks should be removed
</td><td>Low</td><td>10/4/2021 12:00:00 AM</td><td>mohamed.sami</td><td>9/13/2021
4:02:52 PM</td><td> </td><td>8/1/2022 10:53:59 AM</td><td>Done </td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>23563</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Metal trim should be installed properly
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:08:09 AM</td><td> </td><td>8/1/2022 10:53:58 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23652</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
bench level should be flushed with gravel</td><td>Low</td><td>10/13/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/22/2021 11:10:05 AM</td><td> </td><td>8/1/2022
10:53:57 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23664</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gravel level should be flushed with stone
level</td><td>Low</td><td>10/13/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/22/2021 11:10:25 AM</td><td> </td><td>8/1/2022 10:53:56
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23709</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Metal trim is missing and should be adjusted
</td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/11/2021
10:29:20 AM</td><td> </td><td>8/1/2022 10:53:55 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23713</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Metal trim should be aligned and fixed properly
</td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/11/2021
10:29:26 AM</td><td> </td><td>8/1/2022 10:53:54 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23725</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Dust and stains should be cleaned
</td><td>Low</td><td>11/1/2021 12:00:00 AM</td><td>Amr Nofal</td><td>10/11/2021
10:37:50 AM</td><td> </td><td>8/1/2022 10:53:53 AM</td><td>Done </td><td>Part
11</td><td>&nbsp;</td>
</tr><tr>
<td>23726</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/11/2021
10:37:52 AM</td><td> </td><td>8/1/2022 10:53:52 AM</td><td>Done </td><td>Part
11</td><td>&nbsp;</td>
</tr><tr>
<td>29688</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 12:06:05 PM</td><td> </td><td>8/1/2022 10:53:51
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>

<td>25052</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>Hydrogreen</
td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Planted
slope bottom should be flushed with gravel level </td><td>Low</td><td>12/2/2021
12:00:00 AM</td><td>Amr Nofal</td><td>11/11/2021 10:43:16 AM</td><td>
</td><td>8/1/2022 10:53:51 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27042</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing tile</td><td>Low</td><td>3/23/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022 4:17:20 PM</td><td>
</td><td>8/1/2022 10:53:50 AM</td><td>Done </td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27045</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked edge should be uniform and aligned
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:17:27 PM</td><td> </td><td>8/1/2022 10:53:49 AM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27046</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked repair should be adjusted
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:17:29 PM</td><td> </td><td>8/1/2022 10:53:48 AM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27048</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joints should be aligned and uniform
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:17:33 PM</td><td> </td><td>8/1/2022 10:53:47 AM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27051</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Toothing between tiles
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:17:39 PM</td><td> </td><td>8/1/2022 10:53:45 AM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27052</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing tile</td><td>Low</td><td>3/23/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022 4:17:41 PM</td><td>
</td><td>8/1/2022 10:53:44 AM</td><td>Done </td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27065</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked repair to be adjusted
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:18:08 PM</td><td> </td><td>8/1/2022 10:53:43 AM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27149</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Interface between stone and flooring should
be aligned and uniform </td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:06:30 PM</td><td> </td><td>8/1/2022
10:53:42 AM</td><td>Done </td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27170</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joint should be with the same width
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:07:10 PM</td><td> </td><td>8/1/2022 10:53:38 AM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27172</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Poor repair should be adjusted and finished
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:07:15 PM</td><td> </td><td>8/1/2022 10:53:37 AM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27178</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked repair should be adjusted
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:07:28 PM</td><td> </td><td>8/1/2022 10:53:35 AM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>29677</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be closed properly after finishing ICT work
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022
12:05:50 PM</td><td> </td><td>8/1/2022 10:51:46
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27735</td><td>IT 7</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>3/31/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/10/2022 11:08:15 AM</td><td> </td><td>8/1/2022 10:50:46
AM</td><td>&nbsp;</td><td>MS.14.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27724</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>3/31/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/10/2022 11:07:58 AM</td><td> </td><td>8/1/2022 10:49:27
AM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27720</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>3/31/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/10/2022 11:07:51 AM</td><td> </td><td>8/1/2022 10:47:40
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30655</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
installation for hydronic pipes. </td><td>High</td><td>6/7/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/31/2022 11:52:42 AM</td><td>
</td><td>8/1/2022 10:13:05
AM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30661</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage air duct thermal insulation.
</td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:53 AM</td><td> </td><td>8/1/2022 10:12:26
AM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28653</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door accessories </td><td>Low</td><td>5/31/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>5/10/2022 4:30:05 PM</td><td> </td><td>8/1/2022 9:38:36
AM</td><td>Done</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>14443</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Insulation should to install properly
</td><td>High</td><td>1/2/2021 12:00:00 PM</td><td>ahmedsalem</td><td>12/26/2020
11:39:06 AM</td><td> </td><td>7/31/2022 4:07:28
PM</td><td>&nbsp;</td><td>MS.18.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>21524</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Pipes and duct insulation need repair
</td><td>High</td><td>8/25/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/18/2021
4:16:00 PM</td><td> </td><td>7/31/2022 4:07:27
PM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>31342</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil fins shall be adjusted and cleaned.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:04 AM</td><td> </td><td>7/31/2022 4:07:26
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>20921</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>Modernlite</td><td>MEP-Electrical</td><td>Power</
td><td>General Snag</td><td>&#39;Missing switch lighting and missing labels inside
the panels and panels schedule not existing and evacuation not installed yet and
tag number not installed </td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh
Ibrahim El-Sawah</td><td>8/11/2021 11:50:53 AM</td><td> </td><td>7/31/2022 1:45:24
PM</td><td>&nbsp;</td><td>MS.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>32059</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:26 AM</td><td>
</td><td>7/31/2022 1:45:23
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32060</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:28 AM</td><td>
</td><td>7/31/2022 1:45:22
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32115</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:48 AM</td><td>
</td><td>7/31/2022 1:45:21
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32117</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:52 AM</td><td>
</td><td>7/31/2022 1:45:20
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32118</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;C clips and touch up painting and label of
boxes</td><td>High</td><td>7/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:53 AM</td><td> </td><td>7/31/2022
1:45:19 PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>30887</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Defects
hardware accessories should be adjusted.</td><td>Low</td><td>6/22/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/1/2022 3:50:10 PM</td><td> </td><td>7/31/2022
1:26:22 PM</td><td>&nbsp;</td><td>MR.14.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31649</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/5/2022 4:25:26 PM</td><td> </td><td>7/31/2022 1:19:53
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31637</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/5/2022 4:25:12 PM</td><td> </td><td>7/31/2022 1:19:22
PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30853</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to
adjusted.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:23 AM</td><td> </td><td>7/31/2022 1:18:11
PM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30691</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cleaning door leaf and accessories from both
sides.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:44 PM</td><td> </td><td>7/31/2022 1:17:43
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30687</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cleaning door leaf and accessories from both
sides.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:41 PM</td><td> </td><td>7/31/2022 1:16:54
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30686</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories , door leaf and frame need to clean
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
4:15:38 PM</td><td> </td><td>7/31/2022 1:16:18
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30872</td><td>CORE F5</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing
sealant.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:53 AM</td><td> </td><td>7/31/2022 1:15:20
PM</td><td>&nbsp;</td><td>MC.14.02.F51</td><td>&nbsp;</td>
</tr><tr>
<td>30828</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
11:45:41 AM</td><td> </td><td>7/31/2022 1:14:44
PM</td><td>&nbsp;</td><td>MA.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30825</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/8/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
11:45:36 AM</td><td> </td><td>7/31/2022 1:14:14
PM</td><td>&nbsp;</td><td>MA.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30822</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/8/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
11:45:32 AM</td><td> </td><td>7/31/2022 1:13:47
PM</td><td>&nbsp;</td><td>MA.19.02.023</td><td>&nbsp;</td>
</tr><tr>
<td>30559</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Sealant is missing
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:32 AM</td><td> </td><td>7/31/2022 1:12:58
PM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30555</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Sealant is missing
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:20 AM</td><td> </td><td>7/31/2022 1:12:31
PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30548</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>Bleeding</td><td>&#39;Defective paint should be repaired
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:10 AM</td><td> </td><td>7/31/2022 1:12:00
PM</td><td>&nbsp;</td><td>MA.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>30496</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing sealant around door frame.</td><td>Low</td><td>6/21/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022 11:43:06 AM</td><td>
</td><td>7/31/2022 1:11:26
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30262</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
3:36:18 PM</td><td> </td><td>7/31/2022 1:10:36
PM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30185</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Defective paint need to repair
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
11:49:40 AM</td><td> </td><td>7/31/2022 1:09:49
PM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>28857</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to touch
up.</td><td>Low</td><td>6/6/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/16/2022
11:36:03 AM</td><td> </td><td>7/31/2022 1:08:54
PM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>32015</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal edges </td><td>Low</td><td>7/26/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>7/5/2022 12:14:45 PM</td><td>
</td><td>7/31/2022 1:08:20
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>30820</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
11:45:29 AM</td><td> </td><td>7/31/2022 1:07:52
PM</td><td>&nbsp;</td><td>MA.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30817</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/8/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
11:45:24 AM</td><td> </td><td>7/31/2022 1:06:38
PM</td><td>&nbsp;</td><td>MA.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30814</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/8/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
11:45:15 AM</td><td> </td><td>7/31/2022 1:06:10
PM</td><td>&nbsp;</td><td>MA.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30813</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/8/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
11:45:12 AM</td><td> </td><td>7/31/2022 1:05:40
PM</td><td>&nbsp;</td><td>MA.19.02.024</td><td>&nbsp;</td>
</tr><tr>
<td>30809</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
11:45:06 AM</td><td> </td><td>7/31/2022 1:05:06
PM</td><td>&nbsp;</td><td>MA.19.02.020</td><td>&nbsp;</td>
</tr><tr>
<td>30212</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Concrete need to repair and
repaint.</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 12:20:09 PM</td><td> </td><td>7/31/2022 1:03:59
PM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30124</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked parts need repair and touch up painting
</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/30/2022
11:37:28 AM</td><td> </td><td>7/31/2022 1:03:09
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>28892</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>6/7/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/17/2022
11:47:01 AM</td><td> </td><td>7/31/2022 1:02:32
PM</td><td>&nbsp;</td><td>MA.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28886</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Hardware
accessories should be cleaned </td><td>Low</td><td>6/7/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>5/17/2022 11:46:52 AM</td><td> </td><td>7/31/2022
1:01:50 PM</td><td>&nbsp;</td><td>MA.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31573</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around door frame.</td><td>Low</td><td>6/23/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022 3:37:03 PM</td><td>
</td><td>7/31/2022 12:59:46
PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30556</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor need repair and touch up painting
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:23 AM</td><td> </td><td>7/31/2022 12:58:00
PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28828</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Skirting need to touch
up.</td><td>Low</td><td>6/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/15/2022
11:47:25 AM</td><td> </td><td>7/31/2022 12:57:18
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28754</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;General cleaning is needed
</td><td>Low</td><td>6/1/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/11/2022
11:48:13 AM</td><td> </td><td>7/31/2022 12:56:38
PM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>14366</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Flooring needs touch up
</td><td>High</td><td>12/31/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:48 PM</td><td> </td><td>7/31/2022 12:55:58
PM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>29313</td><td>CLEANERS</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be closed properly </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 1:14:53 PM</td><td> </td><td>7/31/2022
11:37:34 AM</td><td>Done </td><td>MW.18.2A.001D</td><td>&nbsp;</td>
</tr><tr>
<td>29317</td><td>W.C. /M</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Hinges should be cleaned from painting
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:14:59 PM</td><td> </td><td>7/31/2022 11:37:31 AM</td><td>Done
</td><td>MW.18.2A.001B</td><td>&nbsp;</td>
</tr><tr>
<td>29320</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Hinges should be cleaned from painting
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:15:03 PM</td><td> </td><td>7/31/2022 11:37:30 AM</td><td>Done
</td><td>MW.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29326</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Stainless steel hinges need to clean
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:15:15 PM</td><td> </td><td>7/31/2022 11:37:29 AM</td><td>Done
</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29328</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be closed properly </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 1:15:18 PM</td><td> </td><td>7/31/2022
11:37:28 AM</td><td>Done </td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29332</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be closed properly </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 1:15:24 PM</td><td> </td><td>7/31/2022
11:37:26 AM</td><td>Done </td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29338</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 1:15:33 PM</td><td> </td><td>7/31/2022 11:37:25
AM</td><td>Done </td><td>MS.18.2A.024</td><td>&nbsp;</td>
</tr><tr>
<td>29339</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Scratches in door leaf should be repaired
</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022
1:15:35 PM</td><td> </td><td>7/31/2022 11:37:24 AM</td><td>Done
</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29348</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company, Ltd.</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;The door should be closed
well.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:04 PM</td><td> </td><td>7/31/2022 11:37:22
AM</td><td>Done </td><td>MS.18.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>29355</td><td>EMERGENCY LIGHTING</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;The area behind hanged should be
adjusted.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:16 PM</td><td> </td><td>7/31/2022 11:37:14
AM</td><td>Done </td><td>MS.18.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>29370</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All accessories should be
clean.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:38 PM</td><td> </td><td>7/31/2022 11:37:09
AM</td><td>Done </td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29376</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All accessories need to
clean.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:19:50 PM</td><td> </td><td>7/31/2022 11:37:08
AM</td><td>Done </td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29383</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All accessories should be cleaned from
painting.</td><td>Low</td><td>6/14/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/24/2022 4:20:01 PM</td><td> </td><td>7/31/2022 11:37:04
AM</td><td>Done </td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29387</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;The door should be closed well.</td><td>Low</td><td>6/14/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/24/2022 4:20:07 PM</td><td>
</td><td>7/31/2022 11:37:03 AM</td><td>Done
</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29597</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories need to clean from
paint.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:14 AM</td><td> </td><td>7/31/2022 11:36:59
AM</td><td>Done </td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>29605</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories need to
clean.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:31 AM</td><td> </td><td>7/31/2022 11:36:48
AM</td><td>Done </td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29621</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cleaning door leaf and frame.</td><td>Low</td><td>6/15/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/25/2022 11:38:46 AM</td><td>
</td><td>7/31/2022 11:36:44 AM</td><td>Done
</td><td>MS.12.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29622</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Accessories need to clean from
paint.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:49 AM</td><td> </td><td>7/31/2022 11:36:43
AM</td><td>Done </td><td>MS.12.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29631</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories need to clean from
paint.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:00 AM</td><td> </td><td>7/31/2022 11:36:40
AM</td><td>Done </td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29632</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint between door leaf and frame should be
same width.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:02 AM</td><td> </td><td>7/31/2022 11:36:39
AM</td><td>Done </td><td>MS.18.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29633</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;The area behind hanged should be
adjusted.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:03 AM</td><td> </td><td>7/31/2022 11:36:38
AM</td><td>Done </td><td>MS.18.2A.012</td><td>&nbsp;</td>
</tr><tr>
<td>29635</td><td>IT 2</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Accessories need to clean from
paint.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:05 AM</td><td> </td><td>7/31/2022 11:36:37
AM</td><td>Done </td><td>MS.18.2A.022</td><td>&nbsp;</td>
</tr><tr>
<td>29637</td><td>W.C. /M</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories need to clean from
paint.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:06 AM</td><td> </td><td>7/31/2022 11:36:36
AM</td><td>Done </td><td>MW.18.2A.001B</td><td>&nbsp;</td>
</tr><tr>
<td>29640</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door should be closed properly and should be
balanced </td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:09 AM</td><td> </td><td>7/31/2022 11:36:32
AM</td><td>Done </td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29644</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Accessories need to
clean.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:12 AM</td><td> </td><td>7/31/2022 11:36:30
AM</td><td>Done </td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29648</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;accessories need to
clean.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:39:14 AM</td><td> </td><td>7/31/2022 11:36:28
AM</td><td>Done </td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>11808</td><td>WAITING</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Color variation </td><td>High</td><td>10/5/2020
12:00:00 PM</td><td>Muthukumar Paramakrishnan</td><td>9/28/2020 1:41:46 PM</td><td>
</td><td>7/31/2022 11:35:23
AM</td><td>&nbsp;</td><td>GT8.01.0G.09</td><td>&nbsp;</td>
</tr><tr>
<td>11923</td><td>SECURITY ROOM</td><td>GATE 9 TYPE 2
GF</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic/
Porcelain Floor Tile</td><td>General Snag</td><td>&#39;Color variation
</td><td>High</td><td>10/6/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/29/2020 1:04:48 PM</td><td> </td><td>7/31/2022 11:35:22
AM</td><td>&nbsp;</td><td>GT9.02.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>11947</td><td>GATE HOUSE</td><td>GATE 1 TYPE 4
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Color variation
</td><td>Low</td><td>10/21/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>9/30/2020 10:48:51 AM</td><td> </td><td>7/31/2022 11:35:21
AM</td><td>&nbsp;</td><td>GT1.04.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>19151</td><td>GATE HOUSE</td><td>GATE 9 TYPE 4B
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Alignment and Level not followed</td><td>&#39;Fiber cables needs to
be pulled inside the outdoor rack and cables should not be visible.keep the cable
slack in the nearest manhole and no termination for the pulled
cables</td><td>High</td><td>6/24/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>6/17/2021 11:55:02 AM</td><td> </td><td>7/31/2022 11:35:20
AM</td><td>&nbsp;</td><td>GT9.04.0G.02</td><td>&nbsp;</td>
</tr><tr>
<td>19783</td><td>DRIVERS SUPERVISOR</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Utp labels is missing </td><td>High</td><td>7/19/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>7/12/2021 1:20:55 PM</td><td> </td><td>7/31/2022
11:35:19 AM</td><td>&nbsp;</td><td>GT8.01.0G.08</td><td>&nbsp;</td>
</tr><tr>
<td>19815</td><td>GATE HOUSE</td><td>GATE 9 TYPE 4A
GF</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Discoloration of the tile should be
replaced </td><td>Low</td><td>8/2/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>7/12/2021 4:26:24 PM</td><td> </td><td>7/31/2022 11:35:18
AM</td><td>&nbsp;</td><td>GT9.04.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>23799</td><td>Decorative Fence</td><td>East
Fences</td><td>Closed</td><td>Abo Alkhair</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Posts top level to be adjusted as per design
drawing </td><td>Low</td><td>11/8/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/18/2021 4:42:26 PM</td><td> </td><td>7/31/2022 11:35:16
AM</td><td>&nbsp;</td><td>Decorative Fence</td><td>&nbsp;</td>
</tr><tr>
<td>23802</td><td>Decorative Fence</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Concrete base should be centered with fence
post </td><td>Low</td><td>11/8/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/18/2021 4:42:31 PM</td><td> </td><td>7/31/2022 11:35:16
AM</td><td>&nbsp;</td><td>Decorative Fence</td><td>&nbsp;</td>
</tr><tr>
<td>23805</td><td>Decorative Fence</td><td>East
Fences</td><td>Closed</td><td>Abo Alkhair</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Decorative fence paint need to touch up and
cleaning </td><td>Low</td><td>11/8/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/18/2021 4:42:38 PM</td><td> </td><td>7/31/2022 11:35:14
AM</td><td>&nbsp;</td><td>Decorative Fence</td><td>&nbsp;</td>
</tr><tr>
<td>23845</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>Slope</td><td>&#39;Bottom level of slope concrete should covered
plain concrete of kerb stone </td><td>Low</td><td>11/14/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/24/2021 10:09:38 AM</td><td> </td><td>7/31/2022
11:35:13 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23934</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Broken Interlock should be repaired /replaced and
should be aligned </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 10:27:53 AM</td><td> </td><td>7/31/2022 11:35:13
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23969</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Kerb stone surface should be cleaned
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:31:12 AM</td><td> </td><td>7/31/2022 11:35:12
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23985</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Kerb stone surface should be cleaned
</td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
3:17:51 PM</td><td> </td><td>7/31/2022 11:35:10
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23995</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Kerb stone surface should be cleaned
</td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
3:18:12 PM</td><td> </td><td>7/31/2022 11:35:09
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24370</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Curb stone surface to be clean
properly.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/27/2021 11:41:35 AM</td><td> </td><td>7/31/2022 11:35:08
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>29122</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Kerbstone to be cleaned from joints
mortar</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>5/19/2022 1:28:47 PM</td><td> </td><td>7/31/2022 11:35:07
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>29123</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked repair is not accepted.stone to be
replaced </td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>5/19/2022 1:28:49 PM</td><td> </td><td>7/31/2022 11:35:06
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18369</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy gypsum board ceiling should be
leveled </td><td>Low</td><td>6/23/2021 12:00:00
PM</td><td>Mohamed.Halim</td><td>6/2/2021 2:37:01 PM</td><td> </td><td>7/28/2022
1:19:39 PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20439</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing lubricating gun for every 50 valve (
As per specs)</td><td>High</td><td>8/12/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/5/2021 2:50:06 PM</td><td> </td><td>7/28/2022
1:11:17 PM</td><td>&nbsp;</td><td>MS.23.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>18015</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gypsum ceiling and Air gap not aligned
</td><td>Low</td><td>6/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/25/2021
12:26:17 PM</td><td> </td><td>7/28/2022 11:42:55 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18043</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Windows</
td><td>General Snag</td><td>&#39;Reveals ,edges and joints around windows should
be aligned,adjusted and finished </td><td>Low</td><td>6/15/2021 12:00:00
PM</td><td>mohamed.sami</td><td>5/25/2021 12:38:42 PM</td><td> </td><td>7/28/2022
11:42:54 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18142</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting not finished yet
</td><td>Low</td><td>6/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021
11:56:34 AM</td><td> </td><td>7/28/2022 11:42:53 AM</td><td>Done
</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18160</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Painting works for all walls are not
finished </td><td>Low</td><td>6/16/2021 12:00:00
PM</td><td>mohamed.sami</td><td>5/26/2021 11:58:47 AM</td><td> </td><td>7/28/2022
11:42:52 AM</td><td>Done </td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18170</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Painting works for all walls are not
finished yet (cracks,traces)</td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:59:03 AM</td><td> </td><td>7/28/2022
11:42:51 AM</td><td>Done </td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18172</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Joints around all floor boxes should be
sealed and leveled </td><td>Low</td><td>6/16/2021 12:00:00
PM</td><td>mohamed.sami</td><td>5/26/2021 11:59:06 AM</td><td> </td><td>7/28/2022
11:42:50 AM</td><td>Done </td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18173</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Discoloration between
strips</td><td>Low</td><td>6/16/2021 12:00:00
PM</td><td>mohamed.sami</td><td>5/26/2021 11:59:07 AM</td><td> </td><td>7/28/2022
11:42:49 AM</td><td>Done </td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18213</td><td>KINDERGARTEN CLASSROOM 2 - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;rubber should be aligned
</td><td>Low</td><td>6/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>5/31/2021
4:04:32 PM</td><td> </td><td>7/28/2022 11:42:48 AM</td><td>Done
</td><td>MK.12.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18667</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
Rubber flooring</td><td>General</td><td>&#39;Floor inspection after removing the
protection cover </td><td>Low</td><td>6/16/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/9/2021 4:23:36 PM</td><td> </td><td>7/28/2022
11:42:45 AM</td><td>Done </td><td>ME.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18669</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>6/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/9/2021
4:23:40 PM</td><td> </td><td>7/28/2022 11:42:44 AM</td><td>Done
</td><td>ME.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18673</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gaps are not consistent
</td><td>Low</td><td>6/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/9/2021
4:23:47 PM</td><td> </td><td>7/28/2022 11:42:40 AM</td><td>Done
</td><td>ME.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19094</td><td>ESCAPE ROUTE - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Floor inspection after removing the
protection cover </td><td>Low</td><td>6/23/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/16/2021 10:53:33 AM</td><td> </td><td>7/28/2022
11:42:37 AM</td><td>Done </td><td>MQ.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19095</td><td>LOBBY- Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Floor inspection after removing the
protection cover </td><td>Low</td><td>6/23/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/16/2021 10:53:34 AM</td><td> </td><td>7/28/2022
11:42:36 AM</td><td>Done </td><td>MQ.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19586</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Scratch/stains</td><td>&#39;4th partition panel has three
scratches </td><td>Low</td><td>7/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:26:01 PM</td><td> </td><td>7/28/2022
11:42:35 AM</td><td>Done </td><td>MW.13.002.002</td><td>&nbsp;</td>
</tr><tr>
<td>19590</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>7/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/30/2021
1:26:07 PM</td><td> </td><td>7/28/2022 11:42:34 AM</td><td>Done
</td><td>MW.13.002.002</td><td>&nbsp;</td>
</tr><tr>
<td>19611</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
Rubber flooring</td><td>General</td><td>&#39;Inspection after removing protection
</td><td>Low</td><td>7/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/30/2021
1:26:37 PM</td><td> </td><td>7/28/2022 11:42:33 AM</td><td>Done
</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19704</td><td>NURSERY- Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Edges around glazing windows need to be
straight </td><td>Low</td><td>7/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>7/7/2021 1:29:51 PM</td><td> </td><td>7/28/2022
11:42:32 AM</td><td>Done </td><td>MK.12.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19723</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:17 PM</td><td> </td><td>7/28/2022 11:42:30 AM</td><td>Done
</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>17928</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>6/13/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>5/23/2021
12:54:13 PM</td><td> </td><td>7/28/2022 11:03:34
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>17929</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>6/13/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>5/23/2021
12:54:18 PM</td><td> </td><td>7/28/2022 11:03:33
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>17931</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>6/13/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>5/23/2021
12:54:27 PM</td><td> </td><td>7/28/2022 11:03:32
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>18345</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy ceiling should be leveled
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:35:41 PM</td><td> </td><td>7/28/2022 11:03:31
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>18346</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Ceiling around grill is not leveled
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:35:42 PM</td><td> </td><td>7/28/2022 11:03:30
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>18347</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Around lighting fixtures need touch up
painting (need adjustment)</td><td>Low</td><td>6/23/2021 12:00:00
PM</td><td>Mohamed.Halim</td><td>6/2/2021 2:35:48 PM</td><td> </td><td>7/28/2022
11:03:29 AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>18349</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Grill should be aligned
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:35:55 PM</td><td> </td><td>7/28/2022 11:03:28
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>18350</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Marked part should be horizontal
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:35:57 PM</td><td> </td><td>7/28/2022 11:03:27
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>18351</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Edge is not aligned
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:36:12 PM</td><td> </td><td>7/28/2022 11:03:26
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>18352</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy ceiling should be leveled
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:36:20 PM</td><td> </td><td>7/28/2022 11:03:25
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>18353</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy edge should be leveled
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:36:22 PM</td><td> </td><td>7/28/2022 11:03:24
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>18355</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy gypsum board ceiling should be
leveled </td><td>Low</td><td>6/23/2021 12:00:00
PM</td><td>Mohamed.Halim</td><td>6/2/2021 2:36:32 PM</td><td> </td><td>7/28/2022
11:03:20 AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>18356</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy ceiling should be leveled
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:36:35 PM</td><td> </td><td>7/28/2022 11:03:19
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>18357</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy ceiling should be leveled
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:36:36 PM</td><td> </td><td>7/28/2022 11:03:18
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>18359</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy ceiling should be leveled
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:36:42 PM</td><td> </td><td>7/28/2022 11:03:17
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>18360</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy ceiling should be leveled
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:36:44 PM</td><td> </td><td>7/28/2022 11:03:16
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>18361</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Grill should be aligned
</td><td>Low</td><td>6/23/2021 12:00:00 AM</td><td>Mohamed.Halim</td><td>6/2/2021
2:36:46 PM</td><td> </td><td>7/28/2022 11:03:15
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>18364</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Grill should be aligned
</td><td>Low</td><td>6/23/2021 12:00:00 AM</td><td>Mohamed.Halim</td><td>6/2/2021
2:36:50 PM</td><td> </td><td>7/28/2022 11:03:14
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>18365</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy gypsum board ceiling should be
leveled </td><td>Low</td><td>6/23/2021 12:00:00
PM</td><td>Mohamed.Halim</td><td>6/2/2021 2:36:51 PM</td><td> </td><td>7/28/2022
11:03:13 AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>18366</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Grills are not aligned
</td><td>Low</td><td>6/23/2021 12:00:00 AM</td><td>Mohamed.Halim</td><td>6/2/2021
2:36:54 PM</td><td> </td><td>7/28/2022 11:03:12
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>18367</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Ceiling painting works are not finished
yet</td><td>Low</td><td>6/23/2021 12:00:00
PM</td><td>Mohamed.Halim</td><td>6/2/2021 2:36:56 PM</td><td> </td><td>7/28/2022
11:03:11 AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>18368</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy gypsum board ceiling should be
leveled </td><td>Low</td><td>6/23/2021 12:00:00
PM</td><td>Mohamed.Halim</td><td>6/2/2021 2:36:58 PM</td><td> </td><td>7/28/2022
11:03:10 AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20200</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>Visible joint marks</td><td>&#39;Wavy gypsum board need to adjust
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:49 PM</td><td> </td><td>7/28/2022 11:03:09
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20209</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>Edges straight</td><td>&#39;Wavy edges should be aligned
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:57 PM</td><td> </td><td>7/28/2022 11:03:08
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20221</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum board
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:07 PM</td><td> </td><td>7/28/2022 11:03:06
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20223</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Edges should be aligned
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:09 PM</td><td> </td><td>7/28/2022 11:03:05
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20225</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wavy painting should be adjusted
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:12 PM</td><td> </td><td>7/28/2022 11:03:04
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20232</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joint should be aligned
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:20 PM</td><td> </td><td>7/28/2022 11:03:03
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20233</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked edge should be aligned
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:22 PM</td><td> </td><td>7/28/2022 11:03:02
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20335</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wavy painting should be adjusted </td><td>Low</td><td>8/26/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021 12:14:35 PM</td><td>
</td><td>7/28/2022 11:03:01
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20342</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Area around metal door should be adjusted
and repaired </td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/5/2021 12:14:46 PM</td><td> </td><td>7/28/2022 11:03:00
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20346</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum board wall should be adjusted
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:14:52 PM</td><td> </td><td>7/28/2022 11:02:59
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20357</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy wall should be adjusted
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:04 PM</td><td> </td><td>7/28/2022 11:02:58
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20359</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:09 PM</td><td> </td><td>7/28/2022 11:02:57
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20366</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:25 PM</td><td> </td><td>7/28/2022 11:02:55
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20367</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;The repair should be the same with tile
color </td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/5/2021 12:15:26 PM</td><td> </td><td>7/28/2022 11:02:54
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20369</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Holes on tile should be repaired
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:29 PM</td><td> </td><td>7/28/2022 11:02:53
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20371</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked part should be adjusted
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:32 PM</td><td> </td><td>7/28/2022 11:02:52
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20373</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked edge should be aligned
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:35 PM</td><td> </td><td>7/28/2022 11:02:51
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20378</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Marked joint needs repair and
adjustment /should be leveled </td><td>Low</td><td>8/26/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/5/2021 12:15:42 PM</td><td> </td><td>7/28/2022
11:02:50 AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20380</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Joints between walls and gypsum ceiling
should be the same width </td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/5/2021 12:15:44 PM</td><td> </td><td>7/28/2022 11:02:49
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20475</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>Not aligned</td><td>&#39;Marked Edge should be adjusted
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:10 PM</td><td> </td><td>7/28/2022 11:02:48
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20476</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>Not aligned</td><td>&#39;Wavy panel should be adjusted
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:11 PM</td><td> </td><td>7/28/2022 11:02:47
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20477</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>Not aligned</td><td>&#39;Metal cover edge should be aligned
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:13 PM</td><td> </td><td>7/28/2022 11:02:46
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20487</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Joint between gypsum ceiling and metal
ceiling should be adjusted and leveled </td><td>Low</td><td>8/29/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/8/2021 12:08:26 PM</td><td> </td><td>7/28/2022
11:02:45 AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>24412</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Finishing around air grill and need cleaning
</td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>ahmedsalem</td><td>10/27/2021
4:37:37 PM</td><td> </td><td>7/28/2022 9:43:44 AM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>24411</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Finishing around air grill and cleaning
</td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>ahmedsalem</td><td>10/27/2021
4:37:35 PM</td><td> </td><td>7/28/2022 9:43:14 AM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>29235</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:29 PM</td><td> </td><td>7/28/2022 9:42:06
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32471</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Duct insulation needs repair </td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>hossamreda</td><td>7/18/2022 10:02:31 AM</td><td>
</td><td>7/28/2022 8:10:28
AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32593</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguisher
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/19/2022 9:01:09 AM</td><td> </td><td>7/28/2022 8:10:09
AM</td><td>&nbsp;</td><td>MS.19.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>9650</td><td>WET DELIVERY TUNNEL</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Media converter installation is not approved,
</td><td>High</td><td>7/27/2020 12:00:00 PM</td><td>Mohamed Samir</td><td>7/20/2020
2:06:05 PM</td><td> </td><td>7/27/2022 4:33:45
PM</td><td>&nbsp;</td><td>MQ.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>12015</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Magnetic contact has not installed and lock cables are not
terminated and card reader IP addressing detail also not provided on the card
reader.Break glass unit installation conflicts with mechanical pipe installation
</td><td>High</td><td>10/8/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:59:17 AM</td><td> </td><td>7/27/2022 4:33:44
PM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>14761</td><td>Desert Land</td><td>Desert
Land</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cat6a cables should be pulled up to the
cameras and outdoor rack Termination also not done</td><td>High</td><td>1/19/2021
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>1/12/2021 3:30:53 PM</td><td>
</td><td>7/27/2022 4:33:43 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16580</td><td>W.C. LOBBY</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing final label </td><td>High</td><td>2/22/2021 12:00:00
PM</td><td>Mohamed Samir</td><td>2/15/2021 4:34:32 PM</td><td> </td><td>7/27/2022
4:33:42 PM</td><td>&nbsp;</td><td>MG.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>19929</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing BMS termination, missing access
control label and sensors </td><td>High</td><td>8/5/2021 12:00:00
PM</td><td>Mohamed Samir</td><td>7/29/2021 11:44:26 AM</td><td> </td><td>7/27/2022
4:33:41 PM</td><td>&nbsp;</td><td>MS.18.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>20119</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;Cables not
pulled</td><td>High</td><td>8/10/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/3/2021 11:29:31 AM</td><td> </td><td>7/27/2022 4:33:41
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20676</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing digital signage screens, missing cctv, ICT and wifi
labels are missing , missing floor boxes termination, all floor boxes is damaged
and rusted, hard of hearing Device’s not installed, PA speaker’s label’s not done
</td><td>High</td><td>8/17/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/10/2021 11:19:04 AM</td><td> </td><td>7/27/2022 4:33:40
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20966</td><td>W.C. /F</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Under raised floor cables should be managed, missing port mapping
and fluke test , under raised floor trunks filling ratio is rejected. Missing utp
and fiber labels , missing rack elevation drawings </td><td>High</td><td>8/18/2021
12:00:00 AM</td><td>Mohamed Samir</td><td>8/11/2021 11:59:47 AM</td><td>
</td><td>7/27/2022 4:33:39
PM</td><td>&nbsp;</td><td>MW.14.01.002A</td><td>&nbsp;</td>
</tr><tr>
<td>21234</td><td>TUT-CORE B1</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Adjust the insulation of control modules
and missing labels </td><td>High</td><td>8/24/2021 12:00:00 AM</td><td>Sameh
Ibrahim El-Sawah</td><td>8/17/2021 12:05:50 PM</td><td> </td><td>7/27/2022 4:33:38
PM</td><td>&nbsp;</td><td>MC.23.03.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21788</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Testing &amp;
Comissioning</td><td>General Snag</td><td>&#39;Turnstiles and digital signage
testing and commissioning and screens installation also not done yet
</td><td>High</td><td>8/26/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:25:34 PM</td><td> </td><td>7/27/2022 4:33:37
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>21793</td><td>W.C. /F</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All network switches installation is not done for all
museum,admin and security network and configuration also pending
</td><td>High</td><td>8/26/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:25:46 PM</td><td> </td><td>7/27/2022 4:33:36
PM</td><td>&nbsp;</td><td>MW.14.01.002A</td><td>&nbsp;</td>
</tr><tr>
<td>21911</td><td>VOID</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>Mohamed
Samir</td><td>8/23/2021 10:53:23 AM</td><td> </td><td>7/27/2022 4:33:35
PM</td><td>&nbsp;</td><td>MS.13.0G.007</td><td>&nbsp;</td>
</tr><tr>
<td>26955</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Camera labeling should be done,not the IP address
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:00:20 PM</td><td> </td><td>7/27/2022 4:33:35
PM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>26987</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi labeling and port mapping is not done yet
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:01:12 PM</td><td> </td><td>7/27/2022 4:33:34
PM</td><td>&nbsp;</td><td>MA.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>28165</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Camera not installed </td><td>High</td><td>3/23/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/16/2022 3:54:55 PM</td><td>
</td><td>7/27/2022 4:33:33
PM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>13674</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Pipes insulation need to complete
</td><td>Medium</td><td>12/10/2020 12:00:00
PM</td><td>ahmedsalem</td><td>11/30/2020 11:59:10 AM</td><td> </td><td>7/27/2022
4:14:18 PM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28344</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Damage thermal insulation.
</td><td>High</td><td>5/3/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:22 AM</td><td> </td><td>7/27/2022 4:14:15
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>31938</td><td>CORE F2</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Fire hose reel connection need adjustment.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:16 PM</td><td> </td><td>7/27/2022 4:14:12
PM</td><td>&nbsp;</td><td>MC.19.03.F21</td><td>&nbsp;</td>
</tr><tr>
<td>31984</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Hose reel connection need to be adjusted.
</td><td>High</td><td>7/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>7/5/2022 11:38:51 AM</td><td> </td><td>7/27/2022 4:14:11
PM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32061</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:29 AM</td><td>
</td><td>7/27/2022 2:33:56
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32062</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:31 AM</td><td>
</td><td>7/27/2022 2:33:55
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32063</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:32 AM</td><td>
</td><td>7/27/2022 2:33:54
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32064</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:33 AM</td><td>
</td><td>7/27/2022 2:33:53
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32065</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>7/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:35 AM</td><td> </td><td>7/27/2022
2:33:52 PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32066</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:36 AM</td><td>
</td><td>7/27/2022 2:33:52
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32067</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:38 AM</td><td>
</td><td>7/27/2022 2:33:51
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32068</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:39 AM</td><td>
</td><td>7/27/2022 2:33:50
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32069</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:40 AM</td><td>
</td><td>7/27/2022 2:33:49
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32070</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:42 AM</td><td>
</td><td>7/27/2022 2:33:48
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32071</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:43 AM</td><td>
</td><td>7/27/2022 2:33:47
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32072</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:44 AM</td><td>
</td><td>7/27/2022 2:33:46
PM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32078</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:52 AM</td><td>
</td><td>7/27/2022 2:33:45
PM</td><td>&nbsp;</td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>32080</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:24:55 AM</td><td>
</td><td>7/27/2022 2:33:44
PM</td><td>&nbsp;</td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>32090</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:10 AM</td><td>
</td><td>7/27/2022 2:33:43
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32121</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:59 AM</td><td>
</td><td>7/27/2022 2:33:42
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32122</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Touch up painting and c clips to be
installed and labels of boxs</td><td>High</td><td>7/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>7/6/2022 11:26:00 AM</td><td> </td><td>7/27/2022
2:33:41 PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>21785</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing
Extinguishers</td><td>High</td><td>8/26/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/19/2021 2:47:28 PM</td><td> </td><td>7/27/2022
1:39:00 PM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>30421</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:00 AM</td><td> </td><td>7/27/2022 12:53:49
PM</td><td>&nbsp;</td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>14372</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Flooring need cleaning/epoxy need
adjustment/missing epoxy painting under MEP unit</td><td>High</td><td>12/31/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>12/24/2020 1:25:04 PM</td><td>
</td><td>7/27/2022 12:53:06
PM</td><td>&nbsp;</td><td>MS.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>14337</td><td>B.O.H-ARTEFACTS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Flooring need repair and touch up
</td><td>High</td><td>12/31/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>12/24/2020 1:23:39 PM</td><td> </td><td>7/27/2022 12:52:18
PM</td><td>&nbsp;</td><td>MQ.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>20207</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>Edges straight</td><td>&#39;Gypsum board above skirting should be
adjusted and repaint </td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/4/2021 12:04:56 PM</td><td> </td><td>7/27/2022 11:58:14
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20214</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked part should be leveled
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:00 PM</td><td> </td><td>7/27/2022 11:58:11
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20216</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wall needs touch up painting
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:02 PM</td><td> </td><td>7/27/2022 11:58:10
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20338</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wall needs touch up painting /repair for
marked part above electrical box</td><td>Low</td><td>8/26/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/5/2021 12:14:39 PM</td><td> </td><td>7/27/2022
11:58:06 AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20340</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Crack should be repaired
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:14:42 PM</td><td> </td><td>7/27/2022 11:58:04
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20365</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:22 PM</td><td> </td><td>7/27/2022 11:58:03
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20368</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;The marked parts need adjustment and repair
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:28 PM</td><td> </td><td>7/27/2022 11:58:02
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20370</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>8/26/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:30 PM</td><td> </td><td>7/27/2022 11:57:59
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20374</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked joint should be aligned
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:36 PM</td><td> </td><td>7/27/2022 11:57:55
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20376</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:39 PM</td><td> </td><td>7/27/2022 11:57:54
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20377</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:40 PM</td><td> </td><td>7/27/2022 11:57:53
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20382</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy edge should be aligned
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:47 PM</td><td> </td><td>7/27/2022 11:57:46
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20539</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Gypsum ceiling should be leveled </td><td>Low</td><td>8/29/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021 12:09:17 PM</td><td>
</td><td>7/27/2022 11:57:39
AM</td><td>&nbsp;</td><td>MQ.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20540</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Cracked gypsum board need to repair
</td><td>Low</td><td>8/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:18 PM</td><td> </td><td>7/27/2022 11:57:38
AM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20695</td><td>LIBRARY ADMIN</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
11:40:06 AM</td><td> </td><td>7/27/2022 11:57:35
AM</td><td>&nbsp;</td><td>MR.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20731</td><td>LIBRARY ADMIN</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked part should be adjusted and repair
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:44 PM</td><td> </td><td>7/27/2022 11:57:19
AM</td><td>&nbsp;</td><td>MR.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20739</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked joint is not aligned
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:53 PM</td><td> </td><td>7/27/2022 11:57:16
AM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20742</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked cracks should be repaired
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:58 PM</td><td> </td><td>7/27/2022 11:57:10
AM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20748</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Cracked gypsum wall
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:05 PM</td><td> </td><td>7/27/2022 11:57:06
AM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21784</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguishers as per
approved drawings</td><td>High</td><td>8/26/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/19/2021 2:42:01 PM</td><td> </td><td>7/27/2022
11:40:00 AM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>25375</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Cladding need adjustment </td><td>High</td><td>11/30/2021
12:00:00 PM</td><td>ahmedsalem</td><td>11/23/2021 2:15:47 PM</td><td>
</td><td>7/27/2022 10:56:27 AM</td><td>&nbsp;</td><td>Museum Roof Band
A</td><td>&nbsp;</td>
</tr><tr>
<td>29177</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage thermal insulation for air ducts.
</td><td>High</td><td>5/29/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:58:48 AM</td><td> </td><td>7/27/2022 10:51:08
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>22391</td><td>EC- Transformers</td><td>EN GF
(Boiler)</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing Sealant between wall and ceiling
</td><td>Low</td><td>9/1/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/25/2021
12:15:15 PM</td><td> </td><td>7/27/2022 10:42:16 AM</td><td>Done </td><td>EC-
Transformers</td><td>&nbsp;</td>
</tr><tr>
<td>22407</td><td>Mezzanine - Energy Center </td><td>EN
Mezz</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing cover plate
</td><td>Low</td><td>9/16/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/26/2021 11:17:09 AM</td><td> </td><td>7/27/2022 10:42:15
AM</td><td>Done </td><td>Mezzanine - Energy Center </td><td>&nbsp;</td>
</tr><tr>
<td>32607</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Duct &amp; supports need
cleaning</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/19/2022 10:58:54 AM</td><td> </td><td>7/27/2022 9:57:15
AM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32597</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Duct to be
cleaned</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/19/2022 10:58:30 AM</td><td> </td><td>7/27/2022 9:56:52
AM</td><td>&nbsp;</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32595</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Duct should to
cleaned</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/19/2022 10:58:26 AM</td><td> </td><td>7/27/2022 9:56:46
AM</td><td>&nbsp;</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32517</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Supports should to clean &amp; install properly
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:22 AM</td><td> </td><td>7/27/2022 9:56:33
AM</td><td>&nbsp;</td><td>MS.19.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32282</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Nor firefighting system
</td><td>High</td><td>7/24/2022 12:00:00 PM</td><td>hossamreda</td><td>7/17/2022
3:32:31 PM</td><td> </td><td>7/27/2022 9:26:51
AM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>20558</td><td>FEMALE W.C.</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Vanity</td><td>General
Snag</td><td>&#39;Scratches on vanity should be repaired
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:36 PM</td><td> </td><td>7/27/2022 8:59:52
AM</td><td>&nbsp;</td><td>MW.14.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20709</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Repair is needed for marked part
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:10 PM</td><td> </td><td>7/27/2022 8:54:08
AM</td><td>&nbsp;</td><td>MQ.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>32027</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cleaning is needed between concrete steps
and stainless handrail at all levels.</td><td>Low</td><td>7/26/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>7/5/2022 3:56:41 PM</td><td> </td><td>7/27/2022
8:48:30 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16473</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around door frame need adjustment
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:32 AM</td><td> </td><td>7/27/2022 8:47:14
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16467</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Flooring not finished
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:15 AM</td><td> </td><td>7/27/2022 8:46:40
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16466</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wall not finished </td><td>Low</td><td>3/8/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>2/15/2021 11:34:13 AM</td><td> </td><td>7/27/2022
8:46:01 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16465</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing Sealant around door frame </td><td>Low</td><td>3/8/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021 11:34:11 AM</td><td>
</td><td>7/27/2022 8:45:21 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>29607</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing
sealant.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:33 AM</td><td> </td><td>7/26/2022 4:14:04
PM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29603</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing
sealant.</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/25/2022 11:38:28 AM</td><td> </td><td>7/26/2022 4:11:53
PM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29716</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Damage thermal
insulation for hot water pipe. </td><td>High</td><td>6/1/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/25/2022 12:20:50 PM</td><td>
</td><td>7/26/2022 4:09:53
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32509</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;AHU should
cleaned</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:07 AM</td><td> </td><td>7/26/2022 3:19:59
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32497</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to specification/drawing</td><td>&#39;Should to
install properly (slope of pipe)</td><td>High</td><td>7/25/2022 12:00:00
PM</td><td>Sherif Boshra Ghaly</td><td>7/18/2022 11:28:48 AM</td><td>
</td><td>7/26/2022 3:19:47
PM</td><td>&nbsp;</td><td>MS.14.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32483</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguishers
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:24 AM</td><td> </td><td>7/26/2022 3:19:22
PM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32544</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning for duct</td><td>High</td><td>7/25/2022 12:00:00
AM</td><td>Sherif Boshra Ghaly</td><td>7/18/2022 11:30:09 AM</td><td>
</td><td>7/26/2022 3:18:27
PM</td><td>&nbsp;</td><td>MS.19.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32541</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Review the silicon around duct</td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>Sherif Boshra Ghaly</td><td>7/18/2022 11:30:04 AM</td><td>
</td><td>7/26/2022 3:18:08
PM</td><td>&nbsp;</td><td>MS.19.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32530</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Duct need cleaning and sealed </td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>Sherif Boshra Ghaly</td><td>7/18/2022 11:29:46 AM</td><td>
</td><td>7/26/2022 3:17:51
PM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>11989</td><td>IT-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Camera labeling and port mapping is not done
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:57:38 AM</td><td> </td><td>7/26/2022 3:08:32
PM</td><td>&nbsp;</td><td>MS.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>11996</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cctv port mapping and devices naming scheme is missing
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:57:57 AM</td><td> </td><td>7/26/2022 3:08:31
PM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>12096</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Incomplete Installation</td><td>&#39;Floor junction box 8 fiber
cables Termination and permanent labeling has not been done yet
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Mohamed Samir</td><td>10/1/2020
3:03:15 PM</td><td> </td><td>7/26/2022 3:08:30
PM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16584</td><td>VIP RECEPTION</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing cctv and WiFi final label, digital signage is not
installed, elevator digital signage and cctv is not installed
</td><td>High</td><td>2/22/2021 12:00:00 PM</td><td>Mohamed Samir</td><td>2/15/2021
4:34:54 PM</td><td> </td><td>7/26/2022 3:08:28
PM</td><td>&nbsp;</td><td>MV.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>19162</td><td>SECURED DELIVERY CORRIDOR</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Floor boxes cabling is not done</td><td>High</td><td>6/24/2021
12:00:00 PM</td><td>Muthukumar Paramakrishnan</td><td>6/17/2021 11:55:36
AM</td><td> </td><td>7/26/2022 3:08:28
PM</td><td>&nbsp;</td><td>CB.07.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>19505</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi and , cctv , ict labels and testing are not
done</td><td>High</td><td>7/6/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>6/29/2021 1:19:26 PM</td><td> </td><td>7/26/2022 3:08:27
PM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19506</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Camera and WiFi labels and testing are not done
</td><td>High</td><td>7/6/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>6/29/2021
1:19:28 PM</td><td> </td><td>7/26/2022 3:08:26
PM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19930</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing termination on mcc and lcb , missing
access control devices, missing access control labels, cable management inside
trunk not done </td><td>High</td><td>8/5/2021 12:00:00 PM</td><td>Mohamed
Samir</td><td>7/29/2021 11:44:40 AM</td><td> </td><td>7/26/2022 3:08:25
PM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>20095</td><td>LOBBY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;New design for hololense is not installed
</td><td>High</td><td>8/10/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/3/2021 11:28:48 AM</td><td> </td><td>7/26/2022 3:08:24
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>20123</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>LIGHT FITTINGS(INTERNAL/ EXTERNAL/ EMERGENCY)</td><td>General
Snag</td><td>&#39;Missing labels</td><td>High</td><td>8/10/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/3/2021 11:29:36 AM</td><td>
</td><td>7/26/2022 3:08:23
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20679</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing digital signage screens, missing cctv, ICT and wifi
labels are missing , missing floor boxes termination, all floor boxes is damaged
and rusted</td><td>High</td><td>8/17/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>8/10/2021 11:19:17 AM</td><td> </td><td>7/26/2022 3:08:22
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21794</td><td>IT 3</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All cable tie needs to be cut and dressing should be done
properly .some of the cables are not terminated within the Rack and all face plate
labeling is missing and Rack door should be closed with proper keys
</td><td>High</td><td>8/26/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:25:53 PM</td><td> </td><td>7/26/2022 3:08:21
PM</td><td>&nbsp;</td><td>MS.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21795</td><td>W.C. /F</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All the fiber patch panels are hanging and there is no proper
fixation for fiber panels</td><td>High</td><td>8/26/2021 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>8/19/2021 3:25:56 PM</td><td>
</td><td>7/26/2022 3:08:20
PM</td><td>&nbsp;</td><td>MW.14.01.002A</td><td>&nbsp;</td>
</tr><tr>
<td>21900</td><td>CORE B3</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Short flexible
conduit</td><td>High</td><td>8/30/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>8/23/2021 10:53:04 AM</td><td> </td><td>7/26/2022 3:08:19
PM</td><td>&nbsp;</td><td>MC.12.0G.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21909</td><td>VOID</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing all ict labels missing media converters installation
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>Mohamed Samir</td><td>8/23/2021
10:53:19 AM</td><td> </td><td>7/26/2022 3:08:19
PM</td><td>&nbsp;</td><td>MS.13.0G.012</td><td>&nbsp;</td>
</tr><tr>
<td>21912</td><td> PLANT</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing all ict labels </td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>Mohamed Samir</td><td>8/23/2021 10:53:24 AM</td><td> </td><td>7/26/2022
3:08:17 PM</td><td>&nbsp;</td><td>MS.13.0G.011</td><td>&nbsp;</td>
</tr><tr>
<td>21913</td><td> PLANT</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing ict labels </td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>Mohamed Samir</td><td>8/23/2021 10:53:26 AM</td><td> </td><td>7/26/2022
3:08:16 PM</td><td>&nbsp;</td><td>MS.13.0G.014</td><td>&nbsp;</td>
</tr><tr>
<td>21914</td><td>WET DELIVERY TUNNEL</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All ict labels are missing </td><td>High</td><td>8/30/2021
12:00:00 PM</td><td>Mohamed Samir</td><td>8/23/2021 10:53:27 AM</td><td>
</td><td>7/26/2022 3:08:15
PM</td><td>&nbsp;</td><td>MQ.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21916</td><td>STORAGE</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing ict labels , rack management is not done
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>Mohamed Samir</td><td>8/23/2021
10:53:31 AM</td><td> </td><td>7/26/2022 3:08:14
PM</td><td>&nbsp;</td><td>MS.13.0G.009</td><td>&nbsp;</td>
</tr><tr>
<td>21917</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing ict labels, </td><td>High</td><td>8/30/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>8/23/2021 10:53:33 AM</td><td> </td><td>7/26/2022
3:08:13 PM</td><td>&nbsp;</td><td>MS.12.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>22052</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Work not ready and not inspected yet
</td><td>High</td><td>8/30/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/23/2021 3:57:34 PM</td><td> </td><td>7/26/2022 3:08:12
PM</td><td>&nbsp;</td><td>MS.14.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>22379</td><td>STORE</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>9/1/2021 12:00:00
PM</td><td>Sameh Ibrahim El-Sawah</td><td>8/25/2021 11:53:41 AM</td><td>
</td><td>7/26/2022 3:08:11
PM</td><td>&nbsp;</td><td>MG.12.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>22380</td><td>FIRST AID 3</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing labels </td><td>High</td><td>9/1/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/25/2021 11:53:42 AM</td><td>
</td><td>7/26/2022 3:08:10
PM</td><td>&nbsp;</td><td>MG.12.0G.008</td><td>&nbsp;</td>
</tr><tr>
<td>25391</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flexible ending should be sealed
</td><td>High</td><td>12/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>11/24/2021 11:16:42 AM</td><td> </td><td>7/26/2022 3:08:09
PM</td><td>&nbsp;</td><td>Museum Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>26772</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Camera labeling and port mapping is incomplete
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:46:39 PM</td><td> </td><td>7/26/2022 3:08:07
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27517</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Variable speed not installed yet
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:28 AM</td><td> </td><td>7/26/2022 3:08:07
PM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>27522</td><td>IT 5</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Fire Alarm</td><td>General
Snag</td><td>&#39;Work not ready </td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/9/2022 10:57:35 AM</td><td> </td><td>7/26/2022
3:08:06 PM</td><td>&nbsp;</td><td>MS.18.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>27531</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Work not inspected yet and the panels not
delivered yet </td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:48 AM</td><td> </td><td>7/26/2022 3:08:05
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27543</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Fire Alarm</td><td>General
Snag</td><td>&#39;Missing labels </td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/9/2022 10:58:05 AM</td><td> </td><td>7/26/2022
3:08:04 PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27592</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cabling should be protected by flexible conduit
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:52:36 PM</td><td> </td><td>7/26/2022 3:08:02
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27593</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Devices should be installed properly
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:52:37 PM</td><td> </td><td>7/26/2022 3:08:01
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27599</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Security</
td><td>General Snag</td><td>&#39;Incomplete work </td><td>High</td><td>3/16/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:52:46 PM</td><td>
</td><td>7/26/2022 3:08:00
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27615</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Security</
td><td>General Snag</td><td>&#39;Incomplete work </td><td>High</td><td>3/16/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:53:13 PM</td><td>
</td><td>7/26/2022 3:08:00
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27635</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Cabling should be protected by flexible conduit
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:46 PM</td><td> </td><td>7/26/2022 3:07:59
PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>27636</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Security</
td><td>General Snag</td><td>&#39;Not fully terminated
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:47 PM</td><td> </td><td>7/26/2022 3:07:58
PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>27651</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Cable should be protected by flexible conduit
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:54:13 PM</td><td> </td><td>7/26/2022 3:07:57
PM</td><td>&nbsp;</td><td>MS.18.2A.021</td><td>&nbsp;</td>
</tr><tr>
<td>27656</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Security</
td><td>General Snag</td><td>&#39;BMS panels not completed and fire alarm interface
also not done</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:54:24 PM</td><td> </td><td>7/26/2022 3:07:56
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27828</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work for termination
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:44 PM</td><td> </td><td>7/26/2022 3:07:55
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27829</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Field devices should be installed properly
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:47 PM</td><td> </td><td>7/26/2022 3:07:54
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27840</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete termination
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:35:01 PM</td><td> </td><td>7/26/2022 3:07:53
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27863</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete termination include fire
interface </td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:35:32 PM</td><td> </td><td>7/26/2022 3:07:52
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27864</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damage and flexible conduit </td><td>High</td><td>3/17/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:33 PM</td><td>
</td><td>7/26/2022 3:07:52
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27973</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete installation for devices and
cable should be protected by flexible conduit </td><td>High</td><td>3/20/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:23:01 PM</td><td>
</td><td>7/26/2022 3:07:51
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27975</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>3/20/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/13/2022 4:23:04 PM</td><td> </td><td>7/26/2022 3:07:50
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29224</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRAY</td><td>General Snag</td><td>&#39;All cables in mechanical rooms shell be with
covers</td><td>High</td><td>5/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/23/2022 11:30:29 AM</td><td> </td><td>7/26/2022
3:07:49 PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30752</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable tray should be covered
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:40:08 PM</td><td> </td><td>7/26/2022 3:07:48
PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31770</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>General Snag</td><td>&#39;Tray should be cover at mechanical
room</td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/6/2022 2:07:09 PM</td><td> </td><td>7/26/2022
3:07:47 PM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31772</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>CABLE LADDER</td><td>General
Snag</td><td>&#39;Tray should be cover at mechanical
room</td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/6/2022 2:07:12 PM</td><td> </td><td>7/26/2022
3:07:46 PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29147</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:09 AM</td><td> </td><td>7/26/2022 3:07:44
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>32087</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:07 AM</td><td>
</td><td>7/26/2022 3:07:44
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32088</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:08 AM</td><td>
</td><td>7/26/2022 3:07:43
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32089</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:09 AM</td><td>
</td><td>7/26/2022 3:07:42
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32092</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>7/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:13 AM</td><td> </td><td>7/26/2022
3:07:41 PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32093</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:15 AM</td><td>
</td><td>7/26/2022 3:07:40
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32094</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:17 AM</td><td>
</td><td>7/26/2022 3:07:39
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32095</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:18 AM</td><td>
</td><td>7/26/2022 3:07:38
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32096</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:19 AM</td><td>
</td><td>7/26/2022 3:07:37
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32097</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:21 AM</td><td>
</td><td>7/26/2022 3:07:36
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32098</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:22 AM</td><td>
</td><td>7/26/2022 3:07:35
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32099</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:23 AM</td><td>
</td><td>7/26/2022 3:07:35
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32100</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:25 AM</td><td>
</td><td>7/26/2022 3:07:34
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32101</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:26 AM</td><td>
</td><td>7/26/2022 3:07:33
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32102</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:28 AM</td><td>
</td><td>7/26/2022 3:07:32
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32103</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:30 AM</td><td>
</td><td>7/26/2022 3:07:31
PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32104</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Opening hole and box
label</td><td>High</td><td>7/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:32 AM</td><td> </td><td>7/26/2022
3:07:30 PM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32105</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:33 AM</td><td>
</td><td>7/26/2022 3:07:29
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32106</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:35 AM</td><td>
</td><td>7/26/2022 3:07:28
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32107</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:36 AM</td><td>
</td><td>7/26/2022 3:07:27
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32108</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:37 AM</td><td>
</td><td>7/26/2022 3:07:26
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32109</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label and clear painting
</td><td>High</td><td>7/13/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022
11:25:39 AM</td><td> </td><td>7/26/2022 3:07:25
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32110</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm label
</td><td>High</td><td>7/13/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022
11:25:41 AM</td><td> </td><td>7/26/2022 3:07:24
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32111</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label and clear
painting</td><td>High</td><td>7/13/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:42 AM</td><td> </td><td>7/26/2022
3:07:24 PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32112</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:44 AM</td><td>
</td><td>7/26/2022 3:07:23
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32116</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:50 AM</td><td>
</td><td>7/26/2022 3:07:22
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32119</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:55 AM</td><td>
</td><td>7/26/2022 3:07:21
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32120</td><td>CORE F2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>7/13/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>7/6/2022 11:25:57 AM</td><td>
</td><td>7/26/2022 3:07:20
PM</td><td>&nbsp;</td><td>MC.19.02.F21</td><td>&nbsp;</td>
</tr><tr>
<td>29027</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to
specification/drawing</td><td>&#39;Differential pressure sensors not connected.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:58 PM</td><td> </td><td>7/26/2022 3:06:09
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>22320</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Duct insulation need repair
</td><td>High</td><td>8/31/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/24/2021
3:05:09 PM</td><td> </td><td>7/26/2022 3:04:31
PM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>31610</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Internal lighting not working.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:40 AM</td><td> </td><td>7/26/2022 3:03:27
PM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>32478</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Any rusted tie
rod should to change</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif
Boshra Ghaly</td><td>7/18/2022 11:28:13 AM</td><td> </td><td>7/26/2022 2:52:26
PM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30723</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing accessories </td><td>Low</td><td>6/21/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/31/2022 4:16:21 PM</td><td> </td><td>7/26/2022
1:21:25 PM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>22631</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Drywall</td><td>Poor execution</td><td>&#39;Plaster board not closed and exposed
block to be rectified</td><td>High</td><td>9/8/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>9/1/2021 4:49:26 PM</td><td> </td><td>7/26/2022
1:03:20 PM</td><td>Attached photo for repair/rectifying is not related, It is a
repeated snag as it was closed before on 15 June 2022 for snag #18325, Check
previous snag number.</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>20744</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:00 PM</td><td> </td><td>7/26/2022 12:54:29
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20698</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>Edges straight</td><td>&#39;Edge should be aligned
</td><td>Low</td><td>8/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/10/2021
11:40:36 AM</td><td> </td><td>7/26/2022 12:53:34
PM</td><td>&nbsp;</td><td>MR.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>17031</td><td>WC LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Grouting should be adjusted
</td><td>Low</td><td>4/1/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:11 PM</td><td> </td><td>7/26/2022 12:52:54
PM</td><td>&nbsp;</td><td>MW.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>22236</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked part needs adjustment
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:48:55 AM</td><td> </td><td>7/26/2022 12:51:18
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>22184</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:47:05 AM</td><td> </td><td>7/26/2022 12:50:36
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20603</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>alignment/level</td><td>&#39;Gypsum board should be leveled
</td><td>Low</td><td>8/30/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/9/2021
9:42:10 AM</td><td> </td><td>7/26/2022 12:49:27
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20602</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Walls needTouch up painting and repair
</td><td>Low</td><td>8/30/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/9/2021
9:42:09 AM</td><td> </td><td>7/26/2022 12:48:50
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20601</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>alignment/level</td><td>&#39;Wavy gypsum wall should be leveled
</td><td>Low</td><td>8/30/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/9/2021
9:42:08 AM</td><td> </td><td>7/26/2022 12:48:10
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20577</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked joint should be aligned
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:10:09 PM</td><td> </td><td>7/26/2022 12:47:27
PM</td><td>&nbsp;</td><td>MQ.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20491</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Waving gypsum wall need to repair and
adjusted </td><td>Low</td><td>8/29/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/8/2021 12:08:30 PM</td><td> </td><td>7/26/2022 12:46:55
PM</td><td>&nbsp;</td><td>MQ.14.01.004</td><td>&nbsp;</td>
</tr><tr>

<td>23879</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Unfinished overflow
sides</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:19:46 PM</td><td> </td><td>7/26/2022 12:39:39
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24283</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Alico</
td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Metal mesh
should be cleaned </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/26/2021 4:41:26 PM</td><td> </td><td>7/26/2022 12:39:17
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18018</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>False Ceiling
Tiles</td><td>Saggaing</td><td>&#39;Connection between MEP fixtures and ceiling not
leveled </td><td>Low</td><td>6/15/2021 12:00:00
PM</td><td>mohamed.sami</td><td>5/25/2021 12:26:25 PM</td><td> </td><td>7/26/2022
12:27:31 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18340</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>False Ceiling
Tiles</td><td>Saggaing</td><td>&#39;MEP fixtures should be leveled
</td><td>Low</td><td>6/23/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/2/2021
11:40:52 AM</td><td> </td><td>7/26/2022 12:26:51
PM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18326</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edge </td><td>Low</td><td>6/23/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/2/2021 11:40:19 AM</td><td> </td><td>7/26/2022
12:25:43 PM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>22630</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General</
td><td>&#39;Sealent and plasterboard unacceptable</td><td>High</td><td>9/8/2021
12:00:00 AM</td><td>andrewjohn.rose</td><td>9/1/2021 4:47:48 PM</td><td>
</td><td>7/26/2022 12:24:59
PM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19556</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;MEP fixtures should be aligned
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:20 PM</td><td> </td><td>7/26/2022 12:23:41
PM</td><td>&nbsp;</td><td>MK.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>16843</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Painting need touch up </td><td>Low</td><td>3/31/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>3/10/2021 12:59:54 PM</td><td> </td><td>7/26/2022
11:45:37 AM</td><td>&nbsp;</td><td>MW.13.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>19093</td><td>STORAGE - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Carpet
Floor</td><td>General Snag</td><td>&#39;Check finishing of flooring
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/16/2021
10:53:32 AM</td><td> </td><td>7/26/2022 10:55:22
AM</td><td>&nbsp;</td><td>MK.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>21003</td><td>CORE B1 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing joint between gypsum wall and concrete wall
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:12:34 AM</td><td> </td><td>7/26/2022 10:53:49
AM</td><td>&nbsp;</td><td>MC.23.02.B11</td><td>&nbsp;</td>
</tr><tr>
<td>29101</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Missing shelves </td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/19/2022 12:04:15 PM</td><td> </td><td>7/26/2022 10:51:52
AM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28843</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Sealant around door frame should be
adjusted.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:45 AM</td><td> </td><td>7/26/2022 10:51:05
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31247</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to touch
up.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
10:41:19 AM</td><td> </td><td>7/26/2022 10:50:21
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31235</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to touch
up.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
10:40:38 AM</td><td> </td><td>7/26/2022 10:49:51
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30426</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All Skirting need to cleaning from painting
and protection.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:11 AM</td><td> </td><td>7/26/2022 10:49:08
AM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>21205</td><td>CORE D2</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around metal door is missing
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:57:52 AM</td><td> </td><td>7/26/2022 10:48:20
AM</td><td>&nbsp;</td><td>MC.18.02.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21186</td><td>B.O.H-CORE B2 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around metal door needs adjustment
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:57:03 AM</td><td> </td><td>7/26/2022 10:47:52
AM</td><td>&nbsp;</td><td>MC.18.02.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21185</td><td>B.O.H-CORE B2 - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
architrave should be flushed with wall</td><td>Low</td><td>9/7/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/17/2021 10:57:02 AM</td><td> </td><td>7/26/2022
10:47:21 AM</td><td>&nbsp;</td><td>MC.18.02.B21</td><td>&nbsp;</td>
</tr><tr>
<td>30858</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to touch
up.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
11:57:32 AM</td><td> </td><td>7/26/2022 10:46:08
AM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30533</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant should be cleaned and adjusted
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:37 AM</td><td> </td><td>7/26/2022 10:45:31
AM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30228</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Marked part need to fixed
well</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 1:02:41 PM</td><td> </td><td>7/26/2022 10:44:48
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30855</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing floor
sealant.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:28 AM</td><td> </td><td>7/26/2022 10:43:04
AM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30450</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Skirting should be
adjusted.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:49 AM</td><td> </td><td>7/26/2022 10:42:24
AM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>21127</td><td>B.O.H-CORE B2 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door frame
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:50:04 AM</td><td> </td><td>7/26/2022 10:41:07
AM</td><td>&nbsp;</td><td>MC.18.02.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21556</td><td>CORE B3 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
9:52:01 AM</td><td> </td><td>7/26/2022 10:40:24
AM</td><td>&nbsp;</td><td>MC.12.02.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21554</td><td>CORE B3 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked part not leveled </td><td>Low</td><td>9/9/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/19/2021 9:51:58 AM</td><td> </td><td>7/26/2022
10:39:42 AM</td><td>&nbsp;</td><td>MC.12.02.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21550</td><td>CORE B3 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
9:51:53 AM</td><td> </td><td>7/26/2022 10:38:44
AM</td><td>&nbsp;</td><td>MC.12.02.B31</td><td>&nbsp;</td>
</tr><tr>
<td>27504</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Final coat is not done </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 4:42:06 PM</td><td> </td><td>7/26/2022
10:37:46 AM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>21497</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/18/2021
2:12:50 PM</td><td> </td><td>7/26/2022 10:36:43
AM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>31292</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 11:37:52 AM</td><td> </td><td>7/26/2022 10:33:52
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>30435</td><td>PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:27 AM</td><td> </td><td>7/26/2022 10:33:19
AM</td><td>&nbsp;</td><td>MR.14.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30264</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Damaged
hardware accessories should be fixed properly </td><td>Low</td><td>6/20/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022 3:36:21 PM</td><td>
</td><td>7/26/2022 10:32:44
AM</td><td>&nbsp;</td><td>MR.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30255</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
3:35:52 PM</td><td> </td><td>7/26/2022 10:32:09
AM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30252</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
3:35:47 PM</td><td> </td><td>7/26/2022 10:31:37
AM</td><td>&nbsp;</td><td>MR.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30248</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
3:35:41 PM</td><td> </td><td>7/26/2022 10:31:07
AM</td><td>&nbsp;</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30120</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked part should be closed </td><td>Low</td><td>6/20/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022 11:37:22 AM</td><td>
</td><td>7/26/2022 10:30:26
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>28752</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>Cracks</td><td>&#39;Marked part should be repaired
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022
11:48:11 AM</td><td> </td><td>7/26/2022 10:29:44
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>28750</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor should be cleaned
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022
11:48:09 AM</td><td> </td><td>7/26/2022 10:29:11
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>28000</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor needs repair and repaint
</td><td>Low</td><td>4/4/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/14/2022
11:38:30 AM</td><td> </td><td>7/26/2022 10:28:33
AM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31488</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Tape should be removed </td><td>Low</td><td>6/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/2/2022 3:25:07 PM</td><td> </td><td>7/26/2022
10:27:43 AM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31323</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
11:38:55 AM</td><td> </td><td>7/26/2022 10:27:15
AM</td><td>&nbsp;</td><td>MA.19.02.022</td><td>&nbsp;</td>
</tr><tr>
<td>30718</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
4:16:11 PM</td><td> </td><td>7/26/2022 10:26:41
AM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30713</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories , door leaf and frame need to clean
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
4:16:06 PM</td><td> </td><td>7/26/2022 10:26:08
AM</td><td>&nbsp;</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31311</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 11:38:30 AM</td><td> </td><td>7/26/2022 10:23:59
AM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30570</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing around metal door
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:50 AM</td><td> </td><td>7/26/2022 10:23:17
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30479</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:35 AM</td><td> </td><td>7/26/2022 10:22:40
AM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30477</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing
sealant.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:32 AM</td><td> </td><td>7/26/2022 10:22:01
AM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31239</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories.</td><td>Low</td><td>6/23/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 10:40:51 AM</td><td> </td><td>7/26/2022 10:21:04
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30523</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Doors</
td><td>General Snag</td><td>&#39;Protection cover and tape should be removed
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:21 AM</td><td> </td><td>7/26/2022 10:20:28
AM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>31477</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Tape should be removed </td><td>Low</td><td>6/23/2022 12:00:00
PM</td><td>Adel Nassrat</td><td>6/2/2022 3:24:46 PM</td><td> </td><td>7/26/2022
10:02:10 AM</td><td>&nbsp;</td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31312</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 11:38:33 AM</td><td> </td><td>7/26/2022 9:58:26
AM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31308</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/9/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/2/2022 11:38:22 AM</td><td> </td><td>7/26/2022 9:57:52
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31244</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 10:41:09 AM</td><td> </td><td>7/26/2022 9:57:25
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31232</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 10:40:30 AM</td><td> </td><td>7/26/2022 9:56:39
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30551</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant is missing </td><td>Low</td><td>6/21/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022 11:46:14 AM</td><td>
</td><td>7/26/2022 9:55:56
AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30552</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling need touch up painting </td><td>Low</td><td>6/21/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022 11:46:16 AM</td><td>
</td><td>7/26/2022 9:54:53
AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30550</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant should be adjusted
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:13 AM</td><td> </td><td>7/26/2022 9:54:25
AM</td><td>&nbsp;</td><td>MA.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>30545</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing around metal door
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:04 AM</td><td> </td><td>7/26/2022 9:53:47
AM</td><td>&nbsp;</td><td>MA.19.02.025</td><td>&nbsp;</td>
</tr><tr>
<td>30492</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:43:00 AM</td><td> </td><td>7/26/2022 9:53:14
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30470</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Sealant need to
adjusted.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:20 AM</td><td> </td><td>7/26/2022 9:52:39
AM</td><td>&nbsp;</td><td>MA.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>28209</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>4/10/2022 12:00:00
PM</td><td>mohamed.sami</td><td>3/20/2022 12:03:47 PM</td><td> </td><td>7/26/2022
9:52:00 AM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30221</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall crack should be
repaired.</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 12:21:44 PM</td><td> </td><td>7/26/2022 9:51:34
AM</td><td>&nbsp;</td><td>MQ.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28553</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to
specification/drawing</td><td>&#39;Condensate drain pipe not insulated.
</td><td>High</td><td>5/16/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:49:13 AM</td><td> </td><td>7/26/2022 9:50:54
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28809</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Skirting need to touch up
.</td><td>Low</td><td>6/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/15/2022
11:46:58 AM</td><td> </td><td>7/26/2022 9:50:53
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28803</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Skirting need to touch
up.</td><td>Low</td><td>6/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/15/2022
11:46:49 AM</td><td> </td><td>7/26/2022 9:50:22
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30452</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Corner should be
adjusted.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:52 AM</td><td> </td><td>7/26/2022 9:49:11
AM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30865</td><td>CORE F5</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>6/1/2022
11:57:43 AM</td><td> </td><td>7/26/2022 9:48:40
AM</td><td>&nbsp;</td><td>MC.14.02.F51</td><td>&nbsp;</td>
</tr><tr>
<td>30837</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>6/22/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>6/1/2022 11:56:43 AM</td><td> </td><td>7/26/2022 9:48:08
AM</td><td>&nbsp;</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>28288</td><td>IT 5</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>AHU</
td><td>Access doors and lights</td><td>&#39;Motorized damper actuator not
connected. </td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:47:53 AM</td><td> </td><td>7/26/2022 9:40:54
AM</td><td>&nbsp;</td><td>MS.18.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>29090</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>5/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:49 AM</td><td> </td><td>7/26/2022 8:29:13
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>28973</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:53 PM</td><td> </td><td>7/26/2022 8:27:38
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32532</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;PPR pipes need adjustment
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:49 AM</td><td> </td><td>7/26/2022 8:16:59
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32477</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;CHWPs insulation needs repair </td><td>High</td><td>7/25/2022
12:00:00 PM</td><td>hossamreda</td><td>7/18/2022 10:03:04 AM</td><td>
</td><td>7/26/2022 8:16:28
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32476</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Not
Installed/Completed</td><td>&#39;Duct insulation needs repair
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>hossamreda</td><td>7/18/2022
10:02:39 AM</td><td> </td><td>7/26/2022 8:15:33
AM</td><td>&nbsp;</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32475</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Insulation needs repair </td><td>High</td><td>7/25/2022
12:00:00 PM</td><td>hossamreda</td><td>7/18/2022 10:02:38 AM</td><td>
</td><td>7/26/2022 8:15:05
AM</td><td>&nbsp;</td><td>MS.18.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32474</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;CHWPs insulation needs repair </td><td>High</td><td>7/25/2022
12:00:00 PM</td><td>hossamreda</td><td>7/18/2022 10:02:36 AM</td><td>
</td><td>7/26/2022 8:14:50
AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32473</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Missing labels for CHWPs</td><td>High</td><td>7/25/2022
12:00:00 PM</td><td>hossamreda</td><td>7/18/2022 10:02:34 AM</td><td>
</td><td>7/26/2022 8:14:29
AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32472</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing support for drain pipe and slope
needs adjustment </td><td>High</td><td>7/25/2022 12:00:00
PM</td><td>hossamreda</td><td>7/18/2022 10:02:32 AM</td><td> </td><td>7/26/2022
8:14:22 AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32460</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Missing labels for CHWPs</td><td>High</td><td>7/25/2022
12:00:00 PM</td><td>hossamreda</td><td>7/18/2022 10:02:10 AM</td><td>
</td><td>7/26/2022 8:13:45
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32648</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Duct support needs adjustment </td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:37:57 AM</td><td>
</td><td>7/26/2022 8:11:27
AM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32543</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning for damper</td><td>High</td><td>7/25/2022 12:00:00
AM</td><td>Sherif Boshra Ghaly</td><td>7/18/2022 11:30:07 AM</td><td>
</td><td>7/26/2022 8:11:24
AM</td><td>&nbsp;</td><td>MS.19.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32522</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Duct label need fixed </td><td>High</td><td>7/25/2022 12:00:00
AM</td><td>Sherif Boshra Ghaly</td><td>7/18/2022 11:29:30 AM</td><td>
</td><td>7/26/2022 8:10:07
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>21954</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Not
Installed/Completed</td><td>&#39;Missing duct insulation need insulation need
repair </td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/23/2021 1:35:59 PM</td><td> </td><td>7/25/2022
3:58:06 PM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>28370</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Installation not to specification/drawing</td><td>&#39;Missing
cladding for duct insulation. </td><td>High</td><td>5/3/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>4/26/2022 11:45:24 AM</td><td>
</td><td>7/25/2022 3:58:05
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28865</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensor connections.
</td><td>High</td><td>5/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:07:00 PM</td><td> </td><td>7/25/2022 3:58:04
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29198</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation. </td><td>High</td><td>5/29/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:22 AM</td><td> </td><td>7/25/2022 3:58:01
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29892</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air diffusers need to be aligned with the ceiling tiles.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:30:05 PM</td><td> </td><td>7/25/2022 3:57:54
PM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>17922</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>6/13/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>5/23/2021
12:53:52 PM</td><td> </td><td>7/25/2022 1:04:47
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>17926</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>6/13/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>5/23/2021
12:54:02 PM</td><td> </td><td>7/25/2022 1:04:46
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>18370</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy edge should be leveled
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:37:03 PM</td><td> </td><td>7/25/2022 1:04:22
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20193</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Patches/Touch up</td><td>&#39;Different texture need to touch up
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:40 PM</td><td> </td><td>7/25/2022 1:04:21
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20196</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:44 PM</td><td> </td><td>7/25/2022 1:04:19
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20197</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Repair and repainted besides movement
joints </td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/4/2021 12:04:45 PM</td><td> </td><td>7/25/2022 1:04:10
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20199</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked crack should be repaired
</td><td>Low</td><td>8/11/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:49 PM</td><td> </td><td>7/25/2022 1:04:01
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20201</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked parts need repair and repaint
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:50 PM</td><td> </td><td>7/25/2022 1:03:58
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20204</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Crack beside the joint should be repaired
</td><td>Low</td><td>8/11/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:52 PM</td><td> </td><td>7/25/2022 1:03:57
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20206</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked parts should be adjusted and repainted
</td><td>Low</td><td>8/11/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:54 PM</td><td> </td><td>7/25/2022 1:03:56
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20337</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wall needs touch up painting
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:14:38 PM</td><td> </td><td>7/25/2022 1:03:48
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20339</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy wall should be adjusted
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:14:40 PM</td><td> </td><td>7/25/2022 1:03:44
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20345</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Crack should be repaired
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:14:50 PM</td><td> </td><td>7/25/2022 1:03:41
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20349</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wall needs touch up painting
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:14:55 PM</td><td> </td><td>7/25/2022 1:03:40
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20351</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy wall should be adjusted
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:14:57 PM</td><td> </td><td>7/25/2022 1:03:39
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20353</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked crack should be repaired
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:00 PM</td><td> </td><td>7/25/2022 1:03:37
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20355</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wall should be repainted </td><td>Low</td><td>8/26/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/5/2021 12:15:02 PM</td><td> </td><td>7/25/2022
1:03:36 PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20356</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked part need adjustment and repair
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:03 PM</td><td> </td><td>7/25/2022 1:03:35
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>17032</td><td>WC LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Scratch should be repaired
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:13 PM</td><td> </td><td>7/25/2022 12:25:03
PM</td><td>&nbsp;</td><td>MW.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20714</td><td>TEMP EXHIBITION CURATOR</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Joints should be aligned
</td><td>Low</td><td>8/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:19 PM</td><td> </td><td>7/25/2022 12:23:17
PM</td><td>&nbsp;</td><td>MT.14.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20683</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Marked corner should be alignment
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
11:39:42 AM</td><td> </td><td>7/25/2022 12:20:16
PM</td><td>&nbsp;</td><td>MQ.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>16867</td><td>FEMALE SHOWERS/ LOCKERS-BAnd B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant around mirror and door should be adjusted
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:00:47 PM</td><td> </td><td>7/25/2022 12:19:35
PM</td><td>&nbsp;</td><td>MW.13.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>16863</td><td>WC CLEANERS STORE-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Grouting should be adjusted </td><td>Low</td><td>3/31/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021 1:00:39 PM</td><td>
</td><td>7/25/2022 12:18:40
PM</td><td>&nbsp;</td><td>MW.13.01.001D</td><td>&nbsp;</td>
</tr><tr>
<td>14573</td><td>Ticketing Piazza </td><td>Ticketing
Piazza</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Facade -
Stone Cladding</td><td>Stains</td><td>&#39;Crystal stains and rusted tiles
</td><td>Low</td><td>1/5/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>12/29/2020 11:06:42 AM</td><td> </td><td>7/25/2022 11:46:15
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17309</td><td>Ticketing Shed</td><td>Old ticketing shed
RO</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Roof -
Cladding</td><td>Cell loose / not aligned</td><td>&#39;Misalignment of metal shed
louvre plates </td><td>Low</td><td>5/3/2021 12:00:00
PM</td><td>aymanhaddadin</td><td>4/12/2021 11:58:13 AM</td><td> </td><td>7/25/2022
11:46:13 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17313</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Irregular joint between stainless steel
cladding and ceiling panels </td><td>Low</td><td>5/3/2021 12:00:00
AM</td><td>aymanhaddadin</td><td>4/12/2021 11:58:27 AM</td><td> </td><td>7/25/2022
11:46:11 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17320</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>Damage/dent/stains</td><td>&#39;Rusted stainless steel panels
</td><td>Low</td><td>5/3/2021 12:00:00 AM</td><td>aymanhaddadin</td><td>4/12/2021
11:58:47 AM</td><td> </td><td>7/25/2022 11:46:09
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27442</td><td>Ticketing Piazza</td><td>South Side Ticketing
Piazza</td><td>Closed</td><td>Unilex Sign
Systems</td><td>Architectural</td><td>Signage</td><td>damaged</td><td>&#39;Damages
and scratches should be repaired </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/7/2022 3:56:17 PM</td><td> </td><td>7/25/2022
11:46:04 AM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>27444</td><td>Ticketing Piazza</td><td>South Side Ticketing
Piazza</td><td>Closed</td><td>Unilex Sign
Systems</td><td>Architectural</td><td>Signage</td><td>damaged</td><td>&#39;Doors
should be adjusted properly </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/7/2022 3:56:22 PM</td><td> </td><td>7/25/2022
11:46:03 AM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>27448</td><td>Ticketing Piazza</td><td>South Side Ticketing
Piazza</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Copping tiles should be checked </td><td>Low</td><td>3/28/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/7/2022 3:56:29 PM</td><td>
</td><td>7/25/2022 11:46:02 AM</td><td>&nbsp;</td><td>South
Side</td><td>&nbsp;</td>
</tr><tr>
<td>26006</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Relation between stone and white concrete
should be uniform and unified </td><td>Low</td><td>2/15/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/25/2022 11:39:29 AM</td><td> </td><td>7/25/2022
10:16:42 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17969</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;HIS APPEARANCE &quot;GEM RECONST.&quot;
( TUT_CIE_2_005 )</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 4:53:02 PM</td><td> </td><td>7/25/2022
10:14:38 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17970</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;SEARCHING FOR HIS PARENTS ( TUT_CIE_2_015-24
)</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 4:54:47 PM</td><td> </td><td>7/25/2022
10:14:30 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17968</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;HIS APPEARANCE ( TUT_CIE_2_006-12
)</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 4:50:55 PM</td><td> </td><td>7/25/2022
10:14:22 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25546</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Edges and Joint between stone cladding and
flooring should be regular and adjusted </td><td>Low</td><td>12/30/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:57:34 PM</td><td> </td><td>7/25/2022
10:13:43 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14194</td><td>TUT_SC_01_003</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:12 PM</td><td> </td><td>7/25/2022
10:11:18 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14188</td><td>TUT_SC_01_016</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:04 PM</td><td> </td><td>7/25/2022
10:11:10 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14189</td><td>TUT_SC_01_001</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:05 PM</td><td> </td><td>7/25/2022
10:11:04 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14190</td><td>TUT_SC_01_018</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:07 PM</td><td> </td><td>7/25/2022
10:10:58 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14192</td><td>TUT_SC_01_017</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:10 PM</td><td> </td><td>7/25/2022
10:10:52 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14193</td><td>TUT_SC_01_002</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:11 PM</td><td> </td><td>7/25/2022
10:10:45 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14282</td><td>TUT_SC_04_030</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:56:04 PM</td><td> </td><td>7/25/2022
10:10:23 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14232</td><td>TUT_SC_04_027</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet /missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:55:06 PM</td><td> </td><td>7/25/2022
10:10:16 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14231</td><td>TUT_SC_04_028</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet /missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:55:05 PM</td><td> </td><td>7/25/2022
10:10:07 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14228</td><td>TUT_SC_04_002</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:55:01 PM</td><td> </td><td>7/25/2022
10:09:57 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14229</td><td>TUT_SC_04_034</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet /missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:55:02 PM</td><td> </td><td>7/25/2022
10:09:50 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14230</td><td>TUT_SC_04_006</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:55:03 PM</td><td> </td><td>7/25/2022
10:09:42 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14226</td><td>TUT_SC_04_004</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet /missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:58 PM</td><td> </td><td>7/25/2022
10:09:32 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14227</td><td>TUT_SC_04_005</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet /missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:59 PM</td><td> </td><td>7/25/2022
10:09:21 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14225</td><td>TUT_SC_04_038</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:56 PM</td><td> </td><td>7/25/2022
10:09:15 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14224</td><td>TUT_SC_04_018</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:55 PM</td><td> </td><td>7/25/2022
10:09:08 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14221</td><td>TUT_SC_04_037</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:50 PM</td><td> </td><td>7/25/2022
10:09:01 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14222</td><td>TUT_SC_04_019</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:52 PM</td><td> </td><td>7/25/2022
10:08:52 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14223</td><td>TUT_SC_04_036</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:53 PM</td><td> </td><td>7/25/2022
10:08:44 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14220</td><td>TUT_SC_04_031</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:49 PM</td><td> </td><td>7/25/2022
10:08:37 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14216</td><td>TUT_SC_04_015</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:44 PM</td><td> </td><td>7/25/2022
10:08:31 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14215</td><td>TUT_SC_04_014</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:42 PM</td><td> </td><td>7/25/2022
10:08:24 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14217</td><td>TUT_SC_04_039</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:45 PM</td><td> </td><td>7/25/2022
10:08:18 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14213</td><td>TUT_SC_04_007</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:39 PM</td><td> </td><td>7/25/2022
10:08:10 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14212</td><td>TUT_SC_04_009</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:38 PM</td><td> </td><td>7/25/2022
10:08:03 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14211</td><td>TUT_SC_04_033</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:37 PM</td><td> </td><td>7/25/2022
10:07:57 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14210</td><td>TUT_SC_04_012</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:35 PM</td><td> </td><td>7/25/2022
10:07:49 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14209</td><td>TUT_SC_04_025</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:34 PM</td><td> </td><td>7/25/2022
10:07:41 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14255</td><td>TUT_SC_04_008</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic,MEP works not choked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:55:37 PM</td><td> </td><td>7/25/2022
10:07:33 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14208</td><td>TUT_SC_04_024</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:32 PM</td><td> </td><td>7/25/2022
10:07:24 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14207</td><td>TUT_SC_04_023</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:31 PM</td><td> </td><td>7/25/2022
10:07:17 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14203</td><td>TUT_SC_04_026</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:25 PM</td><td> </td><td>7/25/2022
10:07:11 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14204</td><td>TUT_SC_04_032</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:27 PM</td><td> </td><td>7/25/2022
10:07:04 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14202</td><td>TUT_SC_01_013</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:24 PM</td><td> </td><td>7/25/2022
10:06:57 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14201</td><td>TUT_SC_01_012</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:22 PM</td><td> </td><td>7/25/2022
10:06:50 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14200</td><td>TUT_SC_01_007</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:21 PM</td><td> </td><td>7/25/2022
10:06:43 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14198</td><td>TUT_SC_01_006</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:18 PM</td><td> </td><td>7/25/2022
10:06:37 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14197</td><td>TUT_SC_01_010</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:16 PM</td><td> </td><td>7/25/2022
10:06:30 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14195</td><td>TUT_SC_01_009</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:14 PM</td><td> </td><td>7/25/2022
10:06:22 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14199</td><td>TUT_SC_01_008</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:19 PM</td><td> </td><td>7/25/2022
10:06:14 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14191</td><td>TUT_SC_01_011</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:08 PM</td><td> </td><td>7/25/2022
10:06:05 AM</td><td>Architectural comments are still subject to open snag #17961
and MEP comments are OK based on approvals from specialized departments
engineers.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32485</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Drain pipe
should to cleaned</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:29 AM</td><td> </td><td>7/25/2022 8:37:42
AM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32601</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct should to be cleaned from any
duct</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/19/2022 10:58:41 AM</td><td> </td><td>7/25/2022 8:34:03
AM</td><td>should cleaned properly ( please see your attached photo )
</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32271</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Canvases need adjustment </td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>hossamreda</td><td>7/17/2022 3:32:09 PM</td><td>
</td><td>7/25/2022 8:30:08
AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32279</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Not
Installed/Completed</td><td>&#39;Duct insulation need repairs
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>hossamreda</td><td>7/17/2022
3:32:26 PM</td><td> </td><td>7/25/2022 8:29:08
AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32281</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Not
Installed/Completed</td><td>&#39;Damaged insulation around grills
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>hossamreda</td><td>7/17/2022
3:32:30 PM</td><td> </td><td>7/25/2022 8:28:53
AM</td><td>&nbsp;</td><td>MS.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32470</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Duct support needs adjustment </td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>hossamreda</td><td>7/18/2022 10:02:29 AM</td><td>
</td><td>7/25/2022 8:28:45
AM</td><td>&nbsp;</td><td>MS.18.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32618</td><td>ELEC.</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Missing duct labels </td><td>High</td><td>7/26/2022 12:00:00
AM</td><td>hossamreda</td><td>7/19/2022 11:36:55 AM</td><td> </td><td>7/25/2022
8:25:52 AM</td><td>&nbsp;</td><td>MS.19.3A.008</td><td>&nbsp;</td>
</tr><tr>
<td>32624</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Canvases need adjustment </td><td>High</td><td>7/26/2022 12:00:00
AM</td><td>hossamreda</td><td>7/19/2022 11:37:11 AM</td><td> </td><td>7/25/2022
8:25:08 AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32631</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Closing holes in the duct </td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:37:25 AM</td><td>
</td><td>7/25/2022 8:24:51
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32645</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Canvases need adjustment </td><td>High</td><td>7/26/2022 12:00:00
AM</td><td>hossamreda</td><td>7/19/2022 11:37:52 AM</td><td> </td><td>7/25/2022
8:24:37 AM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32647</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Missing labels for duct </td><td>High</td><td>7/26/2022 12:00:00
AM</td><td>hossamreda</td><td>7/19/2022 11:37:56 AM</td><td> </td><td>7/25/2022
8:22:46 AM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32653</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Duct support need adjustment and painting
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:38:09 AM</td><td> </td><td>7/25/2022 8:21:21
AM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32280</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Not
Installed/Completed</td><td>&#39;Pipes insulation need repair and missing labels
</td><td>High</td><td>7/24/2022 12:00:00 PM</td><td>hossamreda</td><td>7/17/2022
3:32:28 PM</td><td> </td><td>7/25/2022 8:20:20
AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32286</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Insulation need repair and missing
labels for pipes </td><td>High</td><td>7/24/2022 12:00:00
PM</td><td>hossamreda</td><td>7/17/2022 3:32:39 PM</td><td> </td><td>7/25/2022
8:19:46 AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32294</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing insulation for chilled water
pipes </td><td>High</td><td>7/24/2022 12:00:00
PM</td><td>hossamreda</td><td>7/17/2022 3:32:51 PM</td><td> </td><td>7/25/2022
8:19:02 AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32456</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Missing labels for CHWPs</td><td>High</td><td>7/25/2022
12:00:00 PM</td><td>hossamreda</td><td>7/18/2022 10:02:01 AM</td><td>
</td><td>7/25/2022 8:18:46
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32625</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing labels for PPR pipes
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:37:13 AM</td><td> </td><td>7/25/2022 8:17:55
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32627</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing handle of the valve
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:37:16 AM</td><td> </td><td>7/25/2022 8:17:46
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32633</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Cleaning for drainage pipes
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:37:29 AM</td><td> </td><td>7/25/2022 8:17:35
AM</td><td>&nbsp;</td><td>MS.13.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32636</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing labels for PPR pipes
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:37:34 AM</td><td> </td><td>7/25/2022 8:17:15
AM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>32638</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Slope of drain pipe needs adjustment
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:37:38 AM</td><td> </td><td>7/25/2022 8:17:13
AM</td><td>&nbsp;</td><td>MS.13.3A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29263</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Valve actuator not installed.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:35 PM</td><td> </td><td>7/25/2022 8:10:03
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28722</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Two way valve
actuator not installed. </td><td>High</td><td>5/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:46:01 AM</td><td> </td><td>7/25/2022 8:09:04
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28365</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Hydronic valves
actuators are missing. </td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:45:13 AM</td><td> </td><td>7/25/2022 8:07:34
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>16504</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls needs repair </td><td>Low</td><td>3/8/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>2/15/2021 11:35:17 AM</td><td> </td><td>7/24/2022
4:49:02 PM</td><td>&nbsp;</td><td>MS.14.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>22269</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Toothing between tiles
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:42 AM</td><td> </td><td>7/24/2022 4:47:06
PM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27934</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked gaps should be closed
</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/13/2022
12:22:50 PM</td><td> </td><td>7/24/2022 4:45:52
PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>30689</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing hardware
accessories.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:43 PM</td><td> </td><td>7/24/2022 4:42:04
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30690</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:43 PM</td><td> </td><td>7/24/2022 4:41:38
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>31555</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door closure </td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:36:24 PM</td><td> </td><td>7/24/2022 4:30:08
PM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30879</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing fire sealant.</td><td>Low</td><td>6/22/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/1/2022 11:58:04 AM</td><td> </td><td>7/24/2022
4:29:15 PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30878</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing fire sealant.</td><td>Low</td><td>6/22/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/1/2022 11:58:02 AM</td><td> </td><td>7/24/2022
4:24:55 PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30593</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories ,door leaf and frame need to clean
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:51:04 AM</td><td> </td><td>7/24/2022 4:18:22
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30592</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door closure </td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:51:01 AM</td><td> </td><td>7/24/2022 4:17:50
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30486</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:46 AM</td><td> </td><td>7/24/2022 4:17:08
PM</td><td>&nbsp;</td><td>MT.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30213</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>6/20/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/30/2022 12:20:27 PM</td><td> </td><td>7/24/2022 4:16:39
PM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30428</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged gypsum wall need to
repair.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:15 AM</td><td> </td><td>7/24/2022 4:16:03
PM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31716</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>6/27/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022 11:52:43 AM</td><td>
</td><td>7/24/2022 4:14:50
PM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>21002</td><td>CORE B1 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Adjusted and repaint for wall painting
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:12:32 AM</td><td> </td><td>7/24/2022 4:14:12
PM</td><td>&nbsp;</td><td>MC.23.02.B11</td><td>&nbsp;</td>
</tr><tr>
<td>30864</td><td>CORE F5</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to
finish.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:41 AM</td><td> </td><td>7/24/2022 4:13:18
PM</td><td>&nbsp;</td><td>MC.14.02.F51</td><td>&nbsp;</td>
</tr><tr>
<td>30227</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Electrical box should be
leveled.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 1:02:35 PM</td><td> </td><td>7/24/2022 4:11:32
PM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30225</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 1:01:49 PM</td><td> </td><td>7/24/2022 4:11:01
PM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30209</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch up
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
12:04:21 PM</td><td> </td><td>7/24/2022 4:10:27
PM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30113</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked part should be closed </td><td>Low</td><td>6/20/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022 11:37:15 AM</td><td>
</td><td>7/24/2022 4:09:27
PM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31572</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
3:37:02 PM</td><td> </td><td>7/24/2022 4:06:40
PM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31570</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
3:37:00 PM</td><td> </td><td>7/24/2022 4:06:14
PM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31564</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
3:36:52 PM</td><td> </td><td>7/24/2022 4:05:33
PM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30433</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:23 AM</td><td> </td><td>7/24/2022 4:04:49
PM</td><td>&nbsp;</td><td>MR.14.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30266</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All Hardware accessories need to clean
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
3:36:24 PM</td><td> </td><td>7/24/2022 4:04:15
PM</td><td>&nbsp;</td><td>MR.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30258</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
3:36:03 PM</td><td> </td><td>7/24/2022 4:03:35
PM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29117</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:49 PM</td><td> </td><td>7/24/2022 4:02:35
PM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28014</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Marked parts need repair and repaint
</td><td>Low</td><td>4/4/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/14/2022
11:38:58 AM</td><td> </td><td>7/24/2022 4:01:57
PM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28798</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Sealant around door frame should be
adjusted.</td><td>Low</td><td>6/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/15/2022 11:46:41 AM</td><td> </td><td>7/24/2022 4:00:15
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28748</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair is needed for marked part
</td><td>Low</td><td>6/1/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/11/2022
11:48:06 AM</td><td> </td><td>7/24/2022 3:59:45
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>28220</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Cracks should be repaired </td><td>Low</td><td>4/10/2022 12:00:00
PM</td><td>mohamed.sami</td><td>3/20/2022 12:04:10 PM</td><td> </td><td>7/24/2022
3:59:05 PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>14362</td><td>B.O.H-SERVICE TUNNEL (B) - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Flooring need repair and touch up
</td><td>High</td><td>12/31/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:37 PM</td><td> </td><td>7/24/2022 3:58:31
PM</td><td>&nbsp;</td><td>MQ.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31710</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Missing sealant </td><td>Low</td><td>6/27/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022 11:52:32 AM</td><td>
</td><td>7/24/2022 3:57:41
PM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30503</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing epoxy for stair’s </td><td>Low</td><td>6/21/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/31/2022 11:43:18 AM</td><td> </td><td>7/24/2022
3:57:15 PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31252</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around door frame.</td><td>Low</td><td>6/23/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>6/2/2022 10:41:30 AM</td><td>
</td><td>7/24/2022 3:56:45
PM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30679</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company, Ltd.</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing hardware
accessories.</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>5/31/2022 4:15:26 PM</td><td> </td><td>7/24/2022 3:55:48
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30577</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked parts should be repaired </td><td>Low</td><td>6/21/2022
12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022 11:47:02 AM</td><td>
</td><td>7/24/2022 3:55:11
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30553</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Marked part is not finished yet
</td><td>Low</td><td>6/21/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:17 AM</td><td> </td><td>7/24/2022 3:54:28
PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>16374</td><td>CORE F3</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Incomplete work of
lift</td><td>High</td><td>2/21/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>2/14/2021 3:07:53 PM</td><td> </td><td>7/24/2022 9:02:09
AM</td><td>&nbsp;</td><td>MC.14.0G.F31</td><td>&nbsp;</td>
</tr><tr>
<td>32599</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing fire extinguisher system</td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>Sherif Boshra Ghaly</td><td>7/19/2022 10:58:35 AM</td><td>
</td><td>7/24/2022 8:53:23 AM</td><td>to be closed after sending &amp; approval for
CIR</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32508</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;The handle for AHU are
broken</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:05 AM</td><td> </td><td>7/24/2022 8:52:19
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32658</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;PPR pipes need alignment by adding extra
supports and supports need adjustment </td><td>High</td><td>7/26/2022 12:00:00
AM</td><td>hossamreda</td><td>7/19/2022 11:38:24 AM</td><td> </td><td>7/24/2022
8:49:24 AM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32521</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Seismic plates need painting and screw is rusted
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:29 AM</td><td> </td><td>7/24/2022 8:48:54
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32512</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Insulation Damaged</td><td>&#39;Rusted pipe should
painted</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:11 AM</td><td> </td><td>7/24/2022 8:48:33
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32491</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Support should to be cleaned &amp;
painting</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:40 AM</td><td> </td><td>7/24/2022 8:48:18
AM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32515</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Insulation</td><td>&#39;Should
close holes before insulation repair</td><td>High</td><td>7/25/2022 12:00:00
AM</td><td>Sherif Boshra Ghaly</td><td>7/18/2022 11:29:18 AM</td><td>
</td><td>7/24/2022 8:46:53
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32490</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Duct to be cleaned</td><td>High</td><td>7/25/2022 12:00:00
AM</td><td>Sherif Boshra Ghaly</td><td>7/18/2022 11:28:37 AM</td><td>
</td><td>7/24/2022 8:46:35
AM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32489</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Any holes should to closed</td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>Sherif Boshra Ghaly</td><td>7/18/2022 11:28:36 AM</td><td>
</td><td>7/24/2022 8:46:19
AM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32482</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Cleaning
duct</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:23 AM</td><td> </td><td>7/24/2022 8:45:30
AM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30660</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for air duct.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:51 AM</td><td> </td><td>7/24/2022 8:39:45
AM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>15360</td><td>PLANT</td><td>CCB
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Lamp isn’t connected for all
AHUs</td><td>High</td><td>2/2/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>1/26/2021 3:55:49 PM</td><td> </td><td>7/24/2022 8:32:41
AM</td><td>&nbsp;</td><td>CS.02.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>21955</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Cleaning over the duct </td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/23/2021 1:36:02 PM</td><td> </td><td>7/24/2022
7:44:22 AM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>28291</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Condensate drain not
installed yet. </td><td>Medium</td><td>4/29/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:47:59 AM</td><td> </td><td>7/24/2022 7:42:18
AM</td><td>&nbsp;</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>31448</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Internal lighting not working. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:57:51 AM</td><td>
</td><td>7/24/2022 7:39:37
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31426</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Internal lighting not connected. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:57:00 AM</td><td>
</td><td>7/24/2022 7:38:51
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31420</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Internal lighting not working. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:56:48 AM</td><td>
</td><td>7/24/2022 7:37:39
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31184</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Internal lighting not working. </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:55:06 PM</td><td>
</td><td>7/24/2022 7:36:39
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31163</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Internal lighting not working. </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:54:07 PM</td><td>
</td><td>7/24/2022 7:35:50
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31339</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Internal lighting not working. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:53:59 AM</td><td>
</td><td>7/24/2022 7:35:03
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31215</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Internal lighting not working. </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:56:23 PM</td><td>
</td><td>7/24/2022 7:33:14
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29260</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing insulation for drain pipes.
</td><td>High</td><td>5/30/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:26 PM</td><td> </td><td>7/24/2022 7:32:18
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28302</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Condensate drain pipe not insulated.
</td><td>Medium</td><td>4/29/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:22 AM</td><td> </td><td>7/24/2022 7:28:15
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28392</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing insulation for condensate water pipes.
</td><td>High</td><td>5/4/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/27/2022 11:44:56 AM</td><td> </td><td>7/24/2022 7:26:23
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>29298</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing thermal insulation for condensate
drain pipes. </td><td>High</td><td>5/30/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:28 PM</td><td> </td><td>7/24/2022 7:25:22
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32649</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Duct insulation need repair </td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:38:00 AM</td><td>
</td><td>7/23/2022 4:48:53
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32644</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Cleaning from above duct </td><td>High</td><td>7/26/2022 12:00:00
AM</td><td>hossamreda</td><td>7/19/2022 11:37:49 AM</td><td> </td><td>7/23/2022
4:48:19 PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32642</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Closing for holes in the duct </td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:37:46 AM</td><td>
</td><td>7/23/2022 4:48:03
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32650</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Duct support need adjustment </td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:38:01 AM</td><td>
</td><td>7/23/2022 4:47:03
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32458</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Canvas needs adjustment </td><td>High</td><td>7/25/2022 12:00:00
AM</td><td>hossamreda</td><td>7/18/2022 10:02:05 AM</td><td> </td><td>7/23/2022
4:45:58 PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32452</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Canvas needs adjustment </td><td>High</td><td>7/25/2022 12:00:00
AM</td><td>hossamreda</td><td>7/18/2022 10:01:55 AM</td><td> </td><td>7/23/2022
4:45:47 PM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32278</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Duct support missing </td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>hossamreda</td><td>7/17/2022 3:32:21 PM</td><td> </td><td>7/23/2022
4:45:29 PM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32663</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Touch up painting for fire pipes
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:38:32 AM</td><td> </td><td>7/23/2022 4:43:03
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32662</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Cleaning for drainage pipes
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:38:30 AM</td><td> </td><td>7/23/2022 4:42:48
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32661</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Not
Installed/Completed</td><td>&#39;Missing CHWPs insulation
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:38:29 AM</td><td> </td><td>7/23/2022 4:42:28
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32660</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;CHWPs insulation needs repair </td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:38:27 AM</td><td>
</td><td>7/23/2022 4:42:18
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32654</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Drain pipe supports need adjustment
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:38:11 AM</td><td> </td><td>7/23/2022 4:41:28
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32657</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;PPR pipes need cleaning and missing
labels </td><td>High</td><td>7/26/2022 12:00:00
AM</td><td>hossamreda</td><td>7/19/2022 11:38:22 AM</td><td> </td><td>7/23/2022
4:40:23 PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32652</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;HDPE pipe support needs adjustment
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:38:06 AM</td><td> </td><td>7/23/2022 4:39:47
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32646</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Seismic wires need adjustment </td><td>High</td><td>7/26/2022
12:00:00 AM</td><td>hossamreda</td><td>7/19/2022 11:37:54 AM</td><td>
</td><td>7/23/2022 4:38:37
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32651</td><td>ELEC. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Cleaning for HDPE pipes
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>hossamreda</td><td>7/19/2022
11:38:04 AM</td><td> </td><td>7/23/2022 4:36:55
PM</td><td>&nbsp;</td><td>MS.13.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32602</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing access door</td><td>High</td><td>7/26/2022 12:00:00
AM</td><td>Sherif Boshra Ghaly</td><td>7/19/2022 10:58:43 AM</td><td>
</td><td>7/23/2022 2:28:58
PM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32528</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Exhaust
Fan</td><td>General Snag</td><td>&#39;Duct support need painting
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:42 AM</td><td> </td><td>7/23/2022 2:28:46
PM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32506</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct should to
cleaned</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:02 AM</td><td> </td><td>7/23/2022 2:27:58
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32504</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;The plate should to painted &amp; cleaning
</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:59 AM</td><td> </td><td>7/23/2022 2:27:40
PM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>8816</td><td>ESCAPE ROUTE-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
door hardware accessories/door leaf &amp; frame need to touch up
</td><td>Low</td><td>4/6/2020 12:00:00 PM</td><td>Michael Mahfouz</td><td>3/16/2020
4:23:28 PM</td><td> </td><td>7/23/2022 10:37:07
AM</td><td>&nbsp;</td><td>MQ.18.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>32499</td><td>AHU/PLANTROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Cast iron pipe should to
painted</td><td>High</td><td>7/25/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:51 AM</td><td> </td><td>7/23/2022 9:05:01
AM</td><td>&nbsp;</td><td>MS.14.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32296</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Canvas need adjustment and cover of T&amp;C
holes</td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>hossamreda</td><td>7/17/2022 3:32:54 PM</td><td> </td><td>7/23/2022
9:03:04 AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32285</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Duct supports need adjustment </td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>hossamreda</td><td>7/17/2022 3:32:36 PM</td><td>
</td><td>7/23/2022 9:02:49
AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32453</td><td>EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Duct support needs adjustment </td><td>High</td><td>7/25/2022
12:00:00 AM</td><td>hossamreda</td><td>7/18/2022 10:01:56 AM</td><td>
</td><td>7/23/2022 9:01:11
AM</td><td>&nbsp;</td><td>MS.13.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>32298</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Lagging
missing/incomplete</td><td>&#39;Rock wool needs to be coverd by black steel
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>hossamreda</td><td>7/17/2022
3:32:57 PM</td><td> </td><td>7/23/2022 9:00:47
AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>11714</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;One broken
tile</td><td>Low</td><td>10/18/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>9/27/2020 4:41:07 PM</td><td> </td><td>7/21/2022 4:05:43
PM</td><td>the replacement of broken tile by another discolored tile is not
accepted, however the comment still subject to
snag#11710</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>30242</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf, frame and hardware accessories need to clean
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
3:35:31 PM</td><td> </td><td>7/21/2022 2:23:28
PM</td><td>&nbsp;</td><td>MA.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30239</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Hardware accessories need to clean </td><td>Low</td><td>6/20/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022 3:35:25 PM</td><td>
</td><td>7/21/2022 2:23:02
PM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30236</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
3:35:19 PM</td><td> </td><td>7/21/2022 2:22:31
PM</td><td>&nbsp;</td><td>MA.19.02.021</td><td>&nbsp;</td>
</tr><tr>
<td>31706</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Damaged part should be repaired
</td><td>Low</td><td>6/27/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022
11:52:26 AM</td><td> </td><td>7/21/2022 2:21:45
PM</td><td>&nbsp;</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31704</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wavy edge should be adjusted </td><td>Low</td><td>6/27/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022 11:52:22 AM</td><td>
</td><td>7/21/2022 2:21:09
PM</td><td>&nbsp;</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30869</td><td>CORE F5</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:48 AM</td><td> </td><td>7/21/2022 2:20:20
PM</td><td>&nbsp;</td><td>MC.14.02.F51</td><td>&nbsp;</td>
</tr><tr>
<td>30595</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:51:11 AM</td><td> </td><td>7/21/2022 2:19:47
PM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30588</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories and frame need to clean
</td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:50:53 AM</td><td> </td><td>7/21/2022 2:19:20
PM</td><td>&nbsp;</td><td>MA.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30578</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:50:34 AM</td><td> </td><td>7/21/2022 2:18:45
PM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30502</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Repair around door frame.</td><td>Low</td><td>6/21/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/31/2022 11:43:16 AM</td><td> </td><td>7/21/2022
2:18:04 PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30491</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Holes need to
close.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:58 AM</td><td> </td><td>7/21/2022 2:17:15
PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30194</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to touch up and
repair.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:00:33 PM</td><td> </td><td>7/21/2022 2:16:39
PM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>28759</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint Floor</td><td>General
Snag</td><td>&#39;Repair is needed for marked parts </td><td>Low</td><td>6/1/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022 11:48:20 AM</td><td>
</td><td>7/21/2022 2:15:41
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>14343</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Flooring need touch up
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:23:53 PM</td><td> </td><td>7/21/2022 2:14:14
PM</td><td>&nbsp;</td><td>MS.23.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>14340</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Flooring need touch up
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:23:47 PM</td><td> </td><td>7/21/2022 2:07:00
PM</td><td>&nbsp;</td><td>MS.23.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30957</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
screws should be installed </td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:57:18 PM</td><td> </td><td>7/21/2022 2:06:16
PM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30953</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
screws should be installed </td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:57:11 PM</td><td> </td><td>7/21/2022 2:05:46
PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30928</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022
3:56:29 PM</td><td> </td><td>7/21/2022 2:05:21
PM</td><td>&nbsp;</td><td>MQ.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30921</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing screws should be installed.</td><td>Low</td><td>6/22/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022 3:51:01 PM</td><td>
</td><td>7/21/2022 2:04:51
PM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30719</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cleaning door leaf and frame and accessories from both
sides.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 4:16:15 PM</td><td> </td><td>7/21/2022 2:04:21
PM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30707</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cleaning door leaf and frame and accessories
from both sides.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 4:16:00 PM</td><td> </td><td>7/21/2022 2:03:54
PM</td><td>&nbsp;</td><td>MA.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30245</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
3:35:36 PM</td><td> </td><td>7/21/2022 2:03:03
PM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30567</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Marked parts should be finished properly
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:46 AM</td><td> </td><td>7/21/2022 2:02:32
PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30200</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All Skirting should be
adjusted.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:01:09 PM</td><td> </td><td>7/21/2022 2:01:32
PM</td><td>&nbsp;</td><td>MA.19.02.020</td><td>&nbsp;</td>
</tr><tr>
<td>30196</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Skirting need be
adjusted.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:00:37 PM</td><td> </td><td>7/21/2022 2:00:56
PM</td><td>&nbsp;</td><td>MA.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30168</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked sealant joint should be adjusted
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
11:38:17 AM</td><td> </td><td>7/21/2022 2:00:17
PM</td><td>&nbsp;</td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28906</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories </td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/17/2022 11:47:26 AM</td><td> </td><td>7/21/2022 1:59:20
PM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>14346</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Flooring need touch up
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:00 PM</td><td> </td><td>7/21/2022 1:57:55
PM</td><td>&nbsp;</td><td>MS.18.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>30532</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant should be adjusted
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:36 AM</td><td> </td><td>7/21/2022 1:57:13
PM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>31560</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
3:36:43 PM</td><td> </td><td>7/21/2022 1:56:06
PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30936</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
screws should be installed </td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:56:45 PM</td><td> </td><td>7/21/2022 1:55:26
PM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30917</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Defected hardware accessories to be
adjusted.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:56 PM</td><td> </td><td>7/21/2022 1:54:39
PM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>30831</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories and door leaf need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022
11:45:46 AM</td><td> </td><td>7/21/2022 1:54:01
PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30476</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Floor need to
repair.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:30 AM</td><td> </td><td>7/21/2022 1:53:19
PM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>20124</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>General Snag</td><td>General Snag</td><td>&#39;Work not
ready</td><td>High</td><td>8/10/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/3/2021 11:29:38 AM</td><td> </td><td>7/21/2022 1:52:52
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20947</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All of
floor boxes and junctions boxes are rusted and should be replaced
</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:47 AM</td><td> </td><td>7/21/2022 1:52:51
PM</td><td>&nbsp;</td><td>MQ.19.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>22371</td><td>STORAGE-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work and all lighting fixtures
and ICT devices and fire devices not installed </td><td>High</td><td>9/1/2021
12:00:00 AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/25/2021 11:53:26 AM</td><td>
</td><td>7/21/2022 1:52:50
PM</td><td>&nbsp;</td><td>MS.13.01.008</td><td>&nbsp;</td>
</tr><tr>
<td>22373</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work and all wiring devices and
lighting fixtures not installed yet and it socket not installed and wireless point
not installed and wiring devices for fire alarm system
</td><td>High</td><td>9/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/25/2021 11:53:32 AM</td><td> </td><td>7/21/2022 1:52:49
PM</td><td>&nbsp;</td><td>MS.13.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>27529</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:46 AM</td><td> </td><td>7/21/2022 1:52:48
PM</td><td>&nbsp;</td><td>MS.13.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>30199</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Walls painting need to touch
up.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:00:57 PM</td><td> </td><td>7/21/2022 1:52:35
PM</td><td>&nbsp;</td><td>MA.19.02.020</td><td>&nbsp;</td>
</tr><tr>
<td>28698</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>6/1/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022 10:38:32 AM</td><td>
</td><td>7/21/2022 1:51:01
PM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27471</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:05 PM</td><td> </td><td>7/21/2022 1:50:19
PM</td><td>&nbsp;</td><td>MA.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30558</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>T and D design</td><td>Architectural</td><td>Carpet
Floor</td><td>General Snag</td><td>&#39;Carport around floor boxes should be glued
properly </td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:46:30 AM</td><td> </td><td>7/21/2022 1:49:21
PM</td><td>&nbsp;</td><td>MT.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30497</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Concrete need to repair.</td><td>Low</td><td>6/21/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/31/2022 11:43:07 AM</td><td> </td><td>7/21/2022
1:48:36 PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30483</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Skirting need to touch
up.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:42 AM</td><td> </td><td>7/21/2022 1:48:01
PM</td><td>&nbsp;</td><td>MT.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30247</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;hardware
accessories should be fixed properly </td><td>Low</td><td>6/20/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/30/2022 3:35:39 PM</td><td> </td><td>7/21/2022
1:47:35 PM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31487</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
accessories </td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:25:05 PM</td><td> </td><td>7/21/2022 1:46:36
PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>14361</td><td>B.O.H-SERVICE TUNNEL (A) - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Floor need touch up ,repair and cleaning
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:35 PM</td><td> </td><td>7/21/2022 1:45:28
PM</td><td>&nbsp;</td><td>MQ.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>14352</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Flooring need repair and touch up
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:15 PM</td><td> </td><td>7/21/2022 1:44:55
PM</td><td>&nbsp;</td><td>MS.23.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31714</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Missing fire sealant
</td><td>Low</td><td>6/27/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022
11:52:39 AM</td><td> </td><td>7/21/2022 1:44:08
PM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>30924</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022
3:55:52 PM</td><td> </td><td>7/21/2022 1:43:15
PM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30883</td><td>CORE F5</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Cleaning door leaf and hardware accessories from both
sides.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 3:50:04 PM</td><td> </td><td>7/21/2022 1:42:17
PM</td><td>&nbsp;</td><td>MC.14.02.F51</td><td>&nbsp;</td>
</tr><tr>
<td>22308</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:50:37 AM</td><td> </td><td>7/21/2022 12:47:22
PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16320</td><td>W.C./M</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stone floor need polishing
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:03:30 PM</td><td> </td><td>7/21/2022 12:46:38
PM</td><td>&nbsp;</td><td>MW.14.0G.002B</td><td>&nbsp;</td>
</tr><tr>
<td>16310</td><td>UNIVERSAL DISABLED W.C.</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Opening around MEP fixtures should be closed
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:03:14 PM</td><td> </td><td>7/21/2022 12:46:06
PM</td><td>&nbsp;</td><td>MW.14.0G.002C</td><td>&nbsp;</td>
</tr><tr>
<td>20565</td><td>UNIVERSAL DISABLED W.C.</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs touch up painting </td><td>Low</td><td>8/29/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021 12:09:44 PM</td><td>
</td><td>7/21/2022 12:41:23
PM</td><td>&nbsp;</td><td>MW.14.01.001C</td><td>&nbsp;</td>
</tr><tr>
<td>20217</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked part should be repaired and closed
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:03 PM</td><td> </td><td>7/21/2022 12:40:35
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20210</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked part should be adjusted and repainted
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:57 PM</td><td> </td><td>7/21/2022 12:39:53
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>14965</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up for dust sealer
</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>1/19/2021
11:35:07 AM</td><td> </td><td>7/21/2022 12:39:08
PM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>21631</td><td>CORE D3</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls are not finished and not repaired
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:24:19 AM</td><td> </td><td>7/21/2022 12:38:28
PM</td><td>&nbsp;</td><td>MC.13.01.D31</td><td>&nbsp;</td>
</tr><tr>
<td>20761</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Marked part should be closed
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:25 PM</td><td> </td><td>7/21/2022 12:37:18
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>10957</td><td>TUT- EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Need repair </td><td>Low</td><td>10/6/2020 12:00:00
AM</td><td>andrewjohn.rose</td><td>9/15/2020 12:03:41 PM</td><td>
</td><td>7/21/2022 12:36:52
PM</td><td>&nbsp;</td><td>MS.12.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>10961</td><td>TUT- EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling need repair/ remove loose material
</td><td>Low</td><td>10/6/2020 12:00:00
AM</td><td>andrewjohn.rose</td><td>9/15/2020 12:04:01 PM</td><td>
</td><td>7/21/2022 12:36:51
PM</td><td>&nbsp;</td><td>MS.18.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13007</td><td>TUT- ELEC.</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Painting need touch up/cleaning for MEP fixtures /filling the
hole</td><td>High</td><td>11/9/2020 12:00:00 AM</td><td>Sherif
Elabd</td><td>11/2/2020 1:11:40 PM</td><td> </td><td>7/21/2022 12:36:50
PM</td><td>&nbsp;</td><td>MS.18.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17959</td><td>TUT- Digital (+46.50)</td><td>MU
L30</td><td>Closed</td><td>Glasbau-Hahn GmbH
Representative</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;Installation of SC 6_001 and connection of
Nitrogen</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>5/24/2021 4:27:13 PM</td><td> </td><td>7/21/2022
12:36:49 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24034</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Interface between grating and stone should be leveled and
adjusted for elevation and plan</td><td>Low</td><td>11/15/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:38:53 PM</td><td>
</td><td>7/21/2022 12:36:47 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24284</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Alico</
td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Rearming of
works and debris on ceiling should be removed </td><td>Low</td><td>11/16/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/26/2021 4:41:28 PM</td><td>
</td><td>7/21/2022 12:36:46 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25018</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
Floor box</td><td>Damages to be rectified or replaced</td><td>&#39;Broken tile in
lid</td><td>High</td><td>11/18/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>11/11/2021 8:23:30 AM</td><td>
</td><td>7/21/2022 12:36:45
PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>25574</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Joint between stone cladding and flooring
should be regular and adjusted </td><td>Low</td><td>12/30/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:58:34 PM</td><td> </td><td>7/21/2022
12:36:44 PM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25884</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken Louvers should be replaced
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
11:59:23 AM</td><td> </td><td>7/21/2022 12:36:41
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>20750</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gypsum board edge not aligned
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:08 PM</td><td> </td><td>7/21/2022 12:36:41
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>25904</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Interface between stone and balustrade substandard should be
closed </td><td>Low</td><td>2/13/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/23/2022 12:00:05 PM</td><td> </td><td>7/21/2022
12:36:40 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25916</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Substandard interface between stairs and handrail copping
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
12:09:11 PM</td><td> </td><td>7/21/2022 12:36:38
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25927</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Irregular cutting around speaker and camera
should be adjusted </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 10:42:28 AM</td><td> </td><td>7/21/2022
12:36:36 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25975</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Obvious discoloration for marked two tiles
</td><td>Low</td><td>2/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022
12:10:29 PM</td><td> </td><td>7/21/2022 12:36:35
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26069</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Gaps between stone steps should be regular
</td><td>Low</td><td>2/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/31/2022
11:58:14 AM</td><td> </td><td>7/21/2022 12:36:33
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26181</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Irregular cut pieces should be adjusted
</td><td>Low</td><td>3/10/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/17/2022
10:40:04 AM</td><td> </td><td>7/21/2022 12:36:32
PM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>26182</td><td>Temple Garden Lobby</td><td>Temple Garden
stairs Level 3</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Irregular cutting around EWS-04 for 3 elevations
</td><td>Low</td><td>3/10/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/17/2022
10:40:11 AM</td><td> </td><td>7/21/2022 12:36:31
PM</td><td>&nbsp;</td><td>MP.23.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>20732</td><td>LIBRARY ADMIN</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Joint should be aligned
</td><td>Low</td><td>8/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:45 PM</td><td> </td><td>7/21/2022 12:35:46
PM</td><td>&nbsp;</td><td>MR.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20544</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Gypsum Ceiling</td><td>General
Snag</td><td>&#39;Gypsum board edge should be aligned
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:23 PM</td><td> </td><td>7/21/2022 12:35:08
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20543</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:21 PM</td><td> </td><td>7/21/2022 12:33:50
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20567</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Grouting joints should be the same width
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:49 PM</td><td> </td><td>7/21/2022 12:33:07
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20352</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Repair is needed for marked parts
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:14:59 PM</td><td> </td><td>7/21/2022 12:31:50
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20578</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked part needs adjustment and repaint
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:10:10 PM</td><td> </td><td>7/21/2022 12:30:50
PM</td><td>&nbsp;</td><td>MQ.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20546</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:25 PM</td><td> </td><td>7/21/2022 12:29:27
PM</td><td>&nbsp;</td><td>MQ.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20358</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Edges around windows are not finished
yet</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:07 PM</td><td> </td><td>7/21/2022 12:26:49
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16973</td><td>LOBBY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:27:13 PM</td><td> </td><td>7/21/2022 12:26:03
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17058</td><td>LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:35:21 PM</td><td> </td><td>7/21/2022 12:25:32
PM</td><td>&nbsp;</td><td>ME.12.01.011</td><td>&nbsp;</td>
</tr><tr>
<td>20379</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Marked parts need adjustment and repair
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:43 PM</td><td> </td><td>7/21/2022 12:24:20
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20605</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Gypsum Ceiling</td><td>General
Snag</td><td>&#39;Wavy edge should be aligned </td><td>Low</td><td>8/30/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/9/2021 9:42:11 AM</td><td>
</td><td>7/21/2022 12:23:33
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20730</td><td>LIBRARY ADMIN</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wall needs adjustment and repair
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:42 PM</td><td> </td><td>7/21/2022 12:22:50
PM</td><td>&nbsp;</td><td>MR.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>32031</td><td>CORE G3</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging handrail after removing
protection.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:56:49 PM</td><td> </td><td>7/21/2022 12:22:07
PM</td><td>&nbsp;</td><td>MC.19.01.G31</td><td>&nbsp;</td>
</tr><tr>
<td>32037</td><td>CORE G3</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging handrail after removing
protection.</td><td>Low</td><td>7/26/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/5/2022 3:57:02 PM</td><td> </td><td>7/21/2022 12:21:31
PM</td><td>&nbsp;</td><td>MC.19.01.G31</td><td>&nbsp;</td>
</tr><tr>
<td>20526</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Grouting joints should be the same width
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:02 PM</td><td> </td><td>7/21/2022 12:21:01
PM</td><td>&nbsp;</td><td>MT.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20579</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:10:12 PM</td><td> </td><td>7/21/2022 12:18:15
PM</td><td>&nbsp;</td><td>MQ.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20710</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Ceiling needs touch up painting /access
door is not finished yet </td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/10/2021 12:02:12 PM</td><td> </td><td>7/21/2022 12:16:59
PM</td><td>&nbsp;</td><td>MQ.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20690</td><td>RECEIVING AREA</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Access doors need painting
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
11:39:57 AM</td><td> </td><td>7/21/2022 12:16:37
PM</td><td>&nbsp;</td><td>MS.14.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20689</td><td>RECEIVING AREA</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Adjust and repair beside air
grill</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/10/2021 11:39:56 AM</td><td> </td><td>7/21/2022 12:16:32
PM</td><td>&nbsp;</td><td>MS.14.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>16838</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Stone tiles need polishing
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
12:59:43 PM</td><td> </td><td>7/21/2022 11:48:47 AM</td><td>Done
</td><td>MW.13.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>16878</td><td>WC LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Shadow gap detail to be checked </td><td>Low</td><td>3/31/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021 1:01:08 PM</td><td>
</td><td>7/21/2022 11:48:29 AM</td><td>Done
</td><td>MW.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16926</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Stone edge needs adjustment
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:02:44 PM</td><td> </td><td>7/21/2022 11:48:27 AM</td><td>Done
</td><td>ME.12.01.009</td><td>&nbsp;</td>
</tr><tr>
<td>17000</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>opening and closing adjusting</td><td>&#39;Partition should be
fixed properly </td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/11/2021 12:32:50 PM</td><td> </td><td>7/21/2022 11:48:21
AM</td><td>Done </td><td>MW.12.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>17013</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Grouting is missing
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:33:30 PM</td><td> </td><td>7/21/2022 11:48:10 AM</td><td>Done
</td><td>MW.12.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>17019</td><td>WC / DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Grouting need adjustment at corner and
around MEP fixtures </td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/11/2021 12:33:45 PM</td><td> </td><td>7/21/2022 11:48:04
AM</td><td>Done </td><td>MW.12.01.001E</td><td>&nbsp;</td>
</tr><tr>
<td>17020</td><td>WC / DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Wrong cutting/tile should be repaired
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:33:47 PM</td><td> </td><td>7/21/2022 11:48:03 AM</td><td>Done
</td><td>MW.12.01.001E</td><td>&nbsp;</td>
</tr><tr>
<td>17021</td><td>WC / DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Toothing between tiles
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:33:49 PM</td><td> </td><td>7/21/2022 11:48:02 AM</td><td>Done
</td><td>MW.12.01.001E</td><td>&nbsp;</td>
</tr><tr>
<td>17025</td><td>WC / DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Grouting need adjustment / missing grouting
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:33:57 PM</td><td> </td><td>7/21/2022 11:47:58 AM</td><td>Done
</td><td>MW.12.01.001E</td><td>&nbsp;</td>
</tr><tr>
<td>17028</td><td>WC CLEANERS STORE-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around metal door needs adjustment
</td><td>Low</td><td>4/1/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:03 PM</td><td> </td><td>7/21/2022 11:47:51
AM</td><td>Done.</td><td>MW.12.01.001D</td><td>&nbsp;</td>
</tr><tr>
<td>17042</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>Acoustic seal
improper</td><td>&#39;Sealant around metal door should be adjusted
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:37 PM</td><td> </td><td>7/21/2022 11:47:46 AM</td><td>Done
</td><td>ME.12.01.008</td><td>&nbsp;</td>
</tr><tr>
<td>17057</td><td>LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between tiles
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:35:19 PM</td><td> </td><td>7/21/2022 11:47:42 AM</td><td>Done
</td><td>ME.12.01.011</td><td>&nbsp;</td>
</tr><tr>
<td>21640</td><td>CORE D3</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:24:33 AM</td><td> </td><td>7/21/2022 11:47:40 AM</td><td>Done
</td><td>MC.13.0G.D31</td><td>&nbsp;</td>
</tr><tr>
<td>27939</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked copping should be aligned and
leveled </td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 12:22:59 PM</td><td> </td><td>7/21/2022 11:47:23
AM</td><td>Done </td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>31173</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil fins need adjustment and cleaning.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:54:36 PM</td><td> </td><td>7/21/2022 11:12:44
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31196</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Coil fins shall be cleaned and adjusted.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:55:30 PM</td><td> </td><td>7/21/2022 11:12:40
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31214</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air filters. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:56:21 PM</td><td>
</td><td>7/21/2022 11:12:39
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31792</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;No thermal insulation for fresh air ducts.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:07 PM</td><td> </td><td>7/21/2022 11:12:33
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>32609</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Piping &amp;support need cleaning
&amp; painting</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/19/2022 10:58:57 AM</td><td> </td><td>7/21/2022 8:22:06
AM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32600</td><td>STAIR PRESS. ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Wire for seismic should to install
properly</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/19/2022 10:58:38 AM</td><td> </td><td>7/21/2022 8:21:21
AM</td><td>&nbsp;</td><td>MS.19.3A.012</td><td>&nbsp;</td>
</tr><tr>
<td>32596</td><td>DISTRIBUTION VOID</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Seismic should to install properly
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/19/2022 10:58:28 AM</td><td> </td><td>7/21/2022 8:21:00
AM</td><td>&nbsp;</td><td>MS.19.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32520</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Plates should be cleaned </td><td>High</td><td>7/25/2022
12:00:00 PM</td><td>Sherif Boshra Ghaly</td><td>7/18/2022 11:29:27 AM</td><td>
</td><td>7/21/2022 8:16:58
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32484</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Cast iron should
to painting</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:27 AM</td><td> </td><td>7/21/2022 8:16:44
AM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32480</td><td>SHAFT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;FCU need
cleaning</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:18 AM</td><td> </td><td>7/21/2022 8:16:28
AM</td><td>&nbsp;</td><td>MS.14.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>32594</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguisher
</td><td>High</td><td>7/26/2022 12:00:00 AM</td><td>Sherif Boshra
Ghaly</td><td>7/19/2022 9:01:11 AM</td><td> </td><td>7/21/2022 8:16:02
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>21382</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Missing acoustic lining for exhaust duct (general snag ) for
mechanical rooms </td><td>High</td><td>8/25/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/18/2021 11:40:44 AM</td><td> </td><td>7/21/2022
8:08:03 AM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>21304</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Missing acoustic lining for exhaust duct
</td><td>High</td><td>8/24/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/17/2021
4:06:40 PM</td><td> </td><td>7/21/2022 8:07:27
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21585</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Adjust frame</td><td>High</td><td>8/26/2021
12:00:00 AM</td><td>Kriton Katsamenis </td><td>8/19/2021 10:36:29 AM</td><td>
</td><td>7/21/2022 8:04:16
AM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>32535</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Supporting &amp; fire piping need
cleaning &amp; painting</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif
Boshra Ghaly</td><td>7/18/2022 11:29:54 AM</td><td> </td><td>7/21/2022 7:59:59
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32533</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Support need cleaning &amp;
painting</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:51 AM</td><td> </td><td>7/21/2022 7:59:34
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32531</td><td>SMOKE FAN ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Cast iron pipes need painting
</td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:29:48 AM</td><td> </td><td>7/21/2022 7:59:12
AM</td><td>&nbsp;</td><td>MS.24.3A.006</td><td>&nbsp;</td>
</tr><tr>
<td>32492</td><td>CORE F2</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire pipe should to be cleaned &amp;
painting </td><td>High</td><td>7/25/2022 12:00:00 PM</td><td>Sherif Boshra
Ghaly</td><td>7/18/2022 11:28:41 AM</td><td> </td><td>7/21/2022 7:55:14
AM</td><td>&nbsp;</td><td>MC.14.3A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>32269</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;PPR pipes need alignment
</td><td>High</td><td>7/24/2022 12:00:00 PM</td><td>hossamreda</td><td>7/17/2022
3:32:06 PM</td><td> </td><td>7/21/2022 7:53:28
AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>16271</td><td>VIP RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Repair should be rectified
</td><td>Low</td><td>2/21/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:01:15 PM</td><td> </td><td>7/20/2022 4:24:31 PM</td><td>Done
</td><td>MV.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16290</td><td>TOILET CLEANERS STORE</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:02:32 PM</td><td> </td><td>7/20/2022 4:24:21 PM</td><td>Done
</td><td>MW.14.0G.003D</td><td>&nbsp;</td>
</tr><tr>
<td>16353</td><td>SCHOLAR RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Scratches on tiles should be repaired
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:04:46 PM</td><td> </td><td>7/20/2022 4:23:47 PM</td><td>Done
</td><td>MR.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16516</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Bathroom -
Vanity top</td><td>General</td><td>&#39;Scratches should be rectified
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:36 AM</td><td> </td><td>7/20/2022 4:23:37 PM</td><td>Done
</td><td>MW.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16550</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Bathroom -
Vanity top</td><td>General</td><td>&#39;Edge of vanity not aligned
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:37 AM</td><td> </td><td>7/20/2022 4:23:24 PM</td><td>Done
</td><td>MW.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16559</td><td>MALE DISABLED W.C.</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Stone cladding is not flashed with door
frame</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/15/2021 11:36:50 AM</td><td> </td><td>7/20/2022 4:23:21
PM</td><td>Done </td><td>MW.14.0G.004C</td><td>&nbsp;</td>
</tr><tr>
<td>22268</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked part is not leveled
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:41 AM</td><td> </td><td>7/20/2022 4:23:13 PM</td><td>Done
</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27964</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>Stone
counter</td><td>General</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/13/2022
12:23:53 PM</td><td> </td><td>7/20/2022 4:23:08 PM</td><td>Done
</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>28056</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
good </td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/15/2022 10:53:43 AM</td><td> </td><td>7/20/2022 4:23:06
PM</td><td>Done </td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>28058</td><td>Core G2</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
good </td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/15/2022 10:53:47 AM</td><td> </td><td>7/20/2022 4:22:58
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28063</td><td>Equipment Store</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Epoxy painting floor need to touch up and
cleaning </td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/15/2022 10:56:15 AM</td><td> </td><td>7/20/2022 4:22:57
PM</td><td>Done </td><td>MS.19.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>28287</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Condensate water
insulation missing. </td><td>Medium</td><td>4/29/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:47:50 AM</td><td> </td><td>7/20/2022 4:20:39
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>32265</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;No firefighting system detected
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>hossamreda</td><td>7/17/2022
3:31:59 PM</td><td> </td><td>7/20/2022 3:10:32
PM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32275</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;No firefighting system
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>hossamreda</td><td>7/17/2022
3:32:16 PM</td><td> </td><td>7/20/2022 3:10:06
PM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27753</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cleaning the dust and install tag
number</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:24 PM</td><td> </td><td>7/20/2022 2:36:00
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>27762</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Bending radius not considered
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:40 PM</td><td> </td><td>7/20/2022 2:35:58
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>30358</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Provide an TOC for all panel and panel
scheduled should be attached and internal labeling should be completed
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:31:29 PM</td><td> </td><td>7/20/2022 2:35:57
PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30962</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label and as manufacture drawing
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:19:40 PM</td><td> </td><td>7/20/2022 2:35:56
PM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>16759</td><td>JEWELLERY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Linoleum skirting not aligned
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
10:23:09 AM</td><td> </td><td>7/20/2022 12:06:50
PM</td><td>&nbsp;</td><td>ME.12.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16900</td><td>POTTERY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Joint between floor and door should be
adjusted </td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/10/2021 1:01:52 PM</td><td> </td><td>7/20/2022 12:06:48
PM</td><td>&nbsp;</td><td>ME.12.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>16903</td><td>PAPYRUS-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Discoloration for marked part
</td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021
1:01:58 PM</td><td> </td><td>7/20/2022 12:06:47
PM</td><td>&nbsp;</td><td>ME.12.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>16904</td><td>PAPYRUS-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Joint should be adjusted
</td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021
1:01:59 PM</td><td> </td><td>7/20/2022 12:06:46
PM</td><td>&nbsp;</td><td>ME.12.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>16925</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:02:42 PM</td><td> </td><td>7/20/2022 12:06:44
PM</td><td>&nbsp;</td><td>ME.12.01.009</td><td>&nbsp;</td>
</tr><tr>
<td>16930</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Joint between stone and glass
facade need adjustment </td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/10/2021 1:02:52 PM</td><td> </td><td>7/20/2022 12:06:43
PM</td><td>&nbsp;</td><td>ME.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16932</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:02:56 PM</td><td> </td><td>7/20/2022 12:06:42
PM</td><td>&nbsp;</td><td>ME.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>18358</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Access door should be adjusted
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:36:38 PM</td><td> </td><td>7/20/2022 12:06:41
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>18362</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy edge should be aligned
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:36:47 PM</td><td> </td><td>7/20/2022 12:06:40
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>18363</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy edge should be aligned
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:36:49 PM</td><td> </td><td>7/20/2022 12:06:39
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20071</td><td>POTTERY-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Skirting should be aligned
</td><td>Low</td><td>8/23/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:00 PM</td><td> </td><td>7/20/2022 12:06:36
PM</td><td>&nbsp;</td><td>ME.12.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20076</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked crack should be repaired
</td><td>Low</td><td>8/23/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:06 PM</td><td> </td><td>7/20/2022 12:06:35
PM</td><td>&nbsp;</td><td>ME.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20077</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Not aligned with drywall</td><td>&#39;Wall Skirting not aligned
</td><td>Low</td><td>8/23/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:06 PM</td><td> </td><td>7/20/2022 12:06:34
PM</td><td>&nbsp;</td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>20081</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Opening around marked cover should be
adjusted </td><td>Low</td><td>8/23/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/2/2021 4:15:09 PM</td><td> </td><td>7/20/2022 12:06:33
PM</td><td>&nbsp;</td><td>ME.12.01.009</td><td>&nbsp;</td>
</tr><tr>
<td>20086</td><td>WOOD-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;skirting not aligned
</td><td>Low</td><td>8/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:13 PM</td><td> </td><td>7/20/2022 12:06:32
PM</td><td>&nbsp;</td><td>ME.12.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20088</td><td>POTTERY-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Toothing between skirting
tiles</td><td>Low</td><td>8/23/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/2/2021 4:15:17 PM</td><td> </td><td>7/20/2022 12:06:31
PM</td><td>&nbsp;</td><td>ME.12.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20090</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>Quantum</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>level</td><td>&#39;Cover should be fixed properly
</td><td>Low</td><td>8/23/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:21 PM</td><td> </td><td>7/20/2022 12:06:30
PM</td><td>&nbsp;</td><td>ME.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20186</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Joints should be same width
</td><td>Low</td><td>8/24/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/3/2021
3:38:43 PM</td><td> </td><td>7/20/2022 12:06:29
PM</td><td>&nbsp;</td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>20194</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Corner should be straight and alignment
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:41 PM</td><td> </td><td>7/20/2022 12:06:28
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20195</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Repair around electrical boxes
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:43 PM</td><td> </td><td>7/20/2022 12:06:28
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20198</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Joint should be aligned
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:47 PM</td><td> </td><td>7/20/2022 12:06:26
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20218</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Edges should be aligned
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:03 PM</td><td> </td><td>7/20/2022 12:06:21
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20220</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Damages to be rectified or replaced</td><td>&#39;Broken tiles
should be replaced </td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/4/2021 12:05:06 PM</td><td> </td><td>7/20/2022 12:06:20
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20222</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Damages to be rectified or replaced</td><td>&#39;Broken tile
should be replaced </td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/4/2021 12:05:07 PM</td><td> </td><td>7/20/2022 12:06:20
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20227</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;The joint repair is not finished yet
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:14 PM</td><td> </td><td>7/20/2022 12:06:18
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20230</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;The repair color should be the same tile
color </td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/4/2021 12:05:19 PM</td><td> </td><td>7/20/2022 12:06:17
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20235</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Holes on marked tile should be repaired
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:23 PM</td><td> </td><td>7/20/2022 12:06:15
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20238</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Joints repair are not finished yet
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:27 PM</td><td> </td><td>7/20/2022 12:06:14
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20341</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Shadow gap needs adjustment and repair
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:14:44 PM</td><td> </td><td>7/20/2022 12:06:13
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20343</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked parts need adjustment and repaint
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:14:48 PM</td><td> </td><td>7/20/2022 12:06:11
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20344</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Joint is not aligned
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:14:49 PM</td><td> </td><td>7/20/2022 12:06:10
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20348</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Edge is not aligned
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:14:54 PM</td><td> </td><td>7/20/2022 12:06:08
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20350</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked edge is not aligned
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:14:56 PM</td><td> </td><td>7/20/2022 12:06:07
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21200</td><td>CORE D2</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joints should be adjusted and
repaired </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 10:57:40 AM</td><td> </td><td>7/20/2022 12:06:06
PM</td><td>&nbsp;</td><td>MC.18.01.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21201</td><td>CORE D2</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
10:57:43 AM</td><td> </td><td>7/20/2022 12:06:05
PM</td><td>&nbsp;</td><td>MC.18.01.D21</td><td>&nbsp;</td>
</tr><tr>
<td>25719</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Toothing between stone tiles should be adjusted
</td><td>Low</td><td>12/22/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/15/2021
1:50:24 PM</td><td> </td><td>7/20/2022 12:03:37 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25705</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Not aligned</td><td>&#39;Interface between stone flooring and
cladding should be closed and regular </td><td>Low</td><td>1/5/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/15/2021 1:49:52 PM</td><td> </td><td>7/20/2022
12:03:30 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22004</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Need cleaning for grill &amp;
duct</td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/23/2021 3:56:45 PM</td><td> </td><td>7/20/2022
11:56:25 AM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>16406</td><td>FIRE CONTROL ROOM</td><td>MU GF
</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Sprinkler
System</td><td>Sprinkler plate</td><td>&#39;Integrity test wasn’t done yet
</td><td>High</td><td>2/21/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>2/14/2021 3:09:50 PM</td><td> </td><td>7/20/2022 11:51:34
AM</td><td>&nbsp;</td><td>MB.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22805</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Remove exposed material between louvre
</td><td>Low</td><td>9/29/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>9/8/2021
12:16:55 PM</td><td> </td><td>7/20/2022 11:44:14 AM</td><td>&nbsp;</td><td>MU -
North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23742</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked tiles should be repaired/replaced and
fixed properly </td><td>Low</td><td>11/3/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:33 PM</td><td> </td><td>7/20/2022 11:44:13
AM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>24023</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Scratches on tiles should be repaired
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:38:33 PM</td><td> </td><td>7/20/2022 11:44:12
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24298</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Damaged /cracks should be repaired
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/26/2021 4:41:52 PM</td><td> </td><td>7/20/2022 11:44:11
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25439</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked joints should be aligned and regular
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/7/2021
12:20:25 PM</td><td> </td><td>7/20/2022 11:44:10
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25441</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken louver should be replaced
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/7/2021
12:20:28 PM</td><td> </td><td>7/20/2022 11:44:10
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25451</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Interface between stiletto and stone
flooring should be sealed and closed </td><td>Low</td><td>12/28/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/7/2021 12:20:46 PM</td><td> </td><td>7/20/2022
11:44:09 AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25453</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Interface between stone cladding and stone
floor should be sealed </td><td>Low</td><td>12/28/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/7/2021 12:20:48 PM</td><td> </td><td>7/20/2022
11:44:08 AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25455</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked edges should be repaired
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/7/2021
12:20:52 PM</td><td> </td><td>7/20/2022 11:44:07
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25543</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Joint between EXF-05 and FL-03 should be regular
and adjusted </td><td>Low</td><td>12/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/9/2021 12:57:27 PM</td><td> </td><td>7/20/2022
11:44:06 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25566</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>12/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:58:17 PM</td><td> </td><td>7/20/2022 11:44:05 AM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25570</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone cover of access door should be finished
</td><td>Low</td><td>12/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:58:24 PM</td><td> </td><td>7/20/2022 11:44:04 AM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25572</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Joint between EXF-05 and FL-03 should be regular
</td><td>Low</td><td>12/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:58:30 PM</td><td> </td><td>7/20/2022 11:44:03 AM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25727</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Toothing between stone tiles should be adjusted
</td><td>Low</td><td>1/5/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/15/2021
1:50:42 PM</td><td> </td><td>7/20/2022 11:44:02
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>28473</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to
specification/drawing</td><td>&#39;Condensate drain insulation not done yet.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:41 PM</td><td> </td><td>7/20/2022 11:24:07
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29004</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Condensate drain pipe not insulated.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:09:51 PM</td><td> </td><td>7/20/2022 11:24:06
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29030</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to
specification/drawing</td><td>&#39;Condensate drain pipes shall be insulated.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:13 PM</td><td> </td><td>7/20/2022 11:24:05
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29049</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Missing pulleys and bets.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:55 PM</td><td> </td><td>7/20/2022 11:24:04
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29052</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Insulation Damaged</td><td>&#39; Issuing insulation for
condensate drain pipes. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:12:01 PM</td><td> </td><td>7/20/2022 11:24:03
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29060</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to
specification/drawing</td><td>&#39;Condensate drain pipes shall be insulated.
</td><td>High</td><td>5/25/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/18/2022 11:56:10 AM</td><td> </td><td>7/20/2022 11:24:02
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>22321</td><td>CORE D2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing duct insulation
</td><td>High</td><td>8/31/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/24/2021
3:05:11 PM</td><td> </td><td>7/20/2022 10:57:21
AM</td><td>&nbsp;</td><td>MC.18.02.D21</td><td>&nbsp;</td>
</tr><tr>
<td>30770</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Damaged PRD.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:30 PM</td><td> </td><td>7/20/2022 10:57:19
AM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>31673</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Canvas need adjustment.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:15 PM</td><td> </td><td>7/20/2022 10:57:13
AM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31764</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage hydronic pipes thermal insulation.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:56:17 AM</td><td> </td><td>7/20/2022 10:57:11
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31829</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage thermal insulation for hydronic pipes.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:33:12 PM</td><td> </td><td>7/20/2022 10:57:09
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31914</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning for air duct.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:28 PM</td><td> </td><td>7/20/2022 10:57:04
AM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>15263</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Motorized volume dampers are without an
actutor</td><td>High</td><td>1/31/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>1/24/2021 11:49:42 AM</td><td> </td><td>7/20/2022 8:36:10
AM</td><td>&nbsp;</td><td>MS.20.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>31867</td><td>CORE E2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for chilled water
pipes. </td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:27 PM</td><td> </td><td>7/20/2022 8:33:16
AM</td><td>&nbsp;</td><td>MC.13.02.E21</td><td>&nbsp;</td>
</tr><tr>
<td>32273</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Support need adjustment
</td><td>High</td><td>7/24/2022 12:00:00 PM</td><td>hossamreda</td><td>7/17/2022
3:32:12 PM</td><td> </td><td>7/20/2022 8:21:23
AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32293</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Support need adjustment
</td><td>High</td><td>7/24/2022 12:00:00 PM</td><td>hossamreda</td><td>7/17/2022
3:32:50 PM</td><td> </td><td>7/20/2022 8:21:22
AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32295</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Floor Clean out Cover</td><td>&#39;Cleaning for FCO
</td><td>High</td><td>7/24/2022 12:00:00 PM</td><td>hossamreda</td><td>7/17/2022
3:32:53 PM</td><td> </td><td>7/20/2022 8:21:21
AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>31928</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;HDPE pipes used as drainage risers.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:02 PM</td><td> </td><td>7/20/2022 8:07:56
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>32263</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Support need painting </td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>hossamreda</td><td>7/17/2022 3:31:56 PM</td><td> </td><td>7/19/2022
11:38:47 AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32264</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Duct cleaning </td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>hossamreda</td><td>7/17/2022 3:31:58 PM</td><td> </td><td>7/19/2022
11:38:46 AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32266</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Duct need touchup painting </td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>hossamreda</td><td>7/17/2022 3:32:01 PM</td><td>
</td><td>7/19/2022 11:38:45
AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32270</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Seismic wires need adjustment for
fans</td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>hossamreda</td><td>7/17/2022 3:32:07 PM</td><td> </td><td>7/19/2022
11:38:44 AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>32274</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Supports need adjustment
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>hossamreda</td><td>7/17/2022
3:32:14 PM</td><td> </td><td>7/19/2022 11:38:43
AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32276</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Missing labels for duct </td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>hossamreda</td><td>7/17/2022 3:32:17 PM</td><td> </td><td>7/19/2022
11:38:42 AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32283</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Fire pipes need painting
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>hossamreda</td><td>7/17/2022
3:32:33 PM</td><td> </td><td>7/19/2022 11:38:40
AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32284</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>GENERAL
SUPPORTS</td><td>Arrangement is not vertical / horizontal</td><td>&#39;Support need
adjustment </td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>hossamreda</td><td>7/17/2022 3:32:34 PM</td><td> </td><td>7/19/2022
11:38:39 AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32287</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;HDPE need cleaning
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>hossamreda</td><td>7/17/2022
3:32:40 PM</td><td> </td><td>7/19/2022 11:38:38
AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32288</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing labels and access door </td><td>High</td><td>7/24/2022
12:00:00 AM</td><td>hossamreda</td><td>7/17/2022 3:32:42 PM</td><td>
</td><td>7/19/2022 11:38:37
AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32290</td><td>PLANT</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Pipes need touchup painting
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>hossamreda</td><td>7/17/2022
3:32:44 PM</td><td> </td><td>7/19/2022 11:38:36
AM</td><td>&nbsp;</td><td>MS.24.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>32297</td><td>W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Cleaning for HDPE pipes and adjustment of
support </td><td>High</td><td>7/24/2022 12:00:00
AM</td><td>hossamreda</td><td>7/17/2022 3:32:55 PM</td><td> </td><td>7/19/2022
11:38:35 AM</td><td>&nbsp;</td><td>MW.24.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>32299</td><td>CORE D1</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Drainage pipes need to be cleaned
</td><td>High</td><td>7/24/2022 12:00:00 AM</td><td>hossamreda</td><td>7/17/2022
3:32:58 PM</td><td> </td><td>7/19/2022 11:38:34
AM</td><td>&nbsp;</td><td>MC.24.3A.D11</td><td>&nbsp;</td>
</tr><tr>
<td>18146</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gypsum ceiling should be leveling
</td><td>Low</td><td>6/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021
11:56:44 AM</td><td> </td><td>7/19/2022 11:30:18 AM</td><td>Done
</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18147</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Lighting fixtures should be aligned and
leveled </td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:56:48 AM</td><td> </td><td>7/19/2022
11:30:17 AM</td><td>Done </td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18280</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Rusted top stainless steel frame
</td><td>Low</td><td>6/22/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/1/2021
4:10:27 PM</td><td> </td><td>7/19/2022 11:30:16 AM</td><td>Done
</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18332</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Joint is not aligned between stone
cladding and glazing panel </td><td>Low</td><td>6/23/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/2/2021 11:40:38 AM</td><td> </td><td>7/19/2022
11:30:14 AM</td><td>Done </td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19107</td><td>ESCAPE ROUTE - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air gap should be leveled and adjusted
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/16/2021
10:53:58 AM</td><td> </td><td>7/19/2022 11:30:13 AM</td><td>Done
</td><td>MQ.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19432</td><td>BREAKOUT AREA - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Gap should be aligned
</td><td>Low</td><td>7/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/24/2021
11:55:30 AM</td><td> </td><td>7/19/2022 11:30:12 AM</td><td>Done
</td><td>ME.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19444</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Joint should be regular
</td><td>Low</td><td>7/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/24/2021
11:55:43 AM</td><td> </td><td>7/19/2022 11:30:11 AM</td><td>Done
</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19722</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:16 PM</td><td> </td><td>7/19/2022 11:30:10 AM</td><td>Done
</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19725</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air gap not leveled with gypsum wall
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:20 PM</td><td> </td><td>7/19/2022 11:30:08 AM</td><td>Done
</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19727</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Close around MEP grills
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:23 PM</td><td> </td><td>7/19/2022 11:30:07 AM</td><td>Done
</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19732</td><td>SCULPTURE ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:32 PM</td><td> </td><td>7/19/2022 11:30:06 AM</td><td>Done
</td><td>MK.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>19736</td><td>SCULPTURE ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;MEP fixtures not leveled with gypsum
ceiling </td><td>Low</td><td>7/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>7/7/2021 1:30:37 PM</td><td> </td><td>7/19/2022
11:30:05 AM</td><td>Done </td><td>MK.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>22629</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
stone cladding</td><td>Damages to be rectified or replaced</td><td>&#39;External
stone panels to be replaced</td><td>High</td><td>9/8/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>9/1/2021 4:45:38 PM</td><td> </td><td>7/19/2022
11:30:04 AM</td><td>Done </td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>25887</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
11:59:29 AM</td><td> </td><td>7/19/2022 11:30:01 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25889</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>De-Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Repair should be finished properly
</td><td>Low</td><td>2/13/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/23/2022
11:59:34 AM</td><td> </td><td>7/19/2022 11:30:00 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25894</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Defected tiles should be replaced
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
11:59:43 AM</td><td> </td><td>7/19/2022 11:29:58 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25905</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
12:08:01 PM</td><td> </td><td>7/19/2022 11:29:55 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25934</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked part should be seated
properly </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 10:42:39 AM</td><td> </td><td>7/19/2022
11:29:55 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25936</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Defected part should be replaced
</td><td>Low</td><td>2/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022
10:42:42 AM</td><td> </td><td>7/19/2022 11:29:54 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26059</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Cutting around bracket to be regular
</td><td>Low</td><td>2/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/31/2022
11:37:52 AM</td><td> </td><td>7/19/2022 11:29:53 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26089</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Curved part of handrail should be
leveled and aligned </td><td>Low</td><td>2/22/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/1/2022 11:48:48 AM</td><td> </td><td>7/19/2022
11:29:47 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26104</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>De-Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Sealer roller traces should be
removed.</td><td>Low</td><td>2/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/3/2022 2:25:58 PM</td><td> </td><td>7/19/2022
11:29:45 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26105</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>De-Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Broken panel should be
replaced.</td><td>Low</td><td>2/24/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/3/2022 2:26:00 PM</td><td> </td><td>7/19/2022
11:29:44 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26107</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>De-Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Poor workmanship for repair should be
finished and adjusted properly.</td><td>Low</td><td>2/24/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/3/2022 2:26:06 PM</td><td> </td><td>7/19/2022
11:29:42 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>19514</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Floor Drain Cover</td><td>&#39;Missing floor drain cover for all
band</td><td>High</td><td>7/6/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>6/29/2021 3:53:09 PM</td><td> </td><td>7/19/2022 10:59:18
AM</td><td>&nbsp;</td><td>Museum Roof Band B</td><td>&nbsp;</td>
</tr><tr>
<td>19535</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Floor Drain Cover</td><td>&#39;Missing floor drain cover and need
cleaning along the whole band</td><td>High</td><td>7/6/2021 12:00:00
PM</td><td>Kriton Katsamenis </td><td>6/30/2021 10:09:14 AM</td><td>
</td><td>7/19/2022 10:59:17 AM</td><td>&nbsp;</td><td>Museum Roof Band
A</td><td>&nbsp;</td>
</tr><tr>
<td>24410</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Missing roof drain cover (general snag for
all roof drain in all band C)</td><td>High</td><td>11/3/2021 12:00:00
PM</td><td>ahmedsalem</td><td>10/27/2021 4:37:34 PM</td><td> </td><td>7/19/2022
10:59:16 AM</td><td>&nbsp;</td><td>Museum Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>25276</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Floor Drain Cover</td><td>&#39;Missing roof drain cover
</td><td>High</td><td>11/29/2021 12:00:00 PM</td><td>ahmedsalem</td><td>11/22/2021
11:58:16 AM</td><td> </td><td>7/19/2022 10:59:12 AM</td><td>&nbsp;</td><td>Museum
Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25292</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;General cleaning </td><td>High</td><td>11/29/2021 12:00:00
PM</td><td>ahmedsalem</td><td>11/22/2021 11:59:01 AM</td><td> </td><td>7/19/2022
10:59:11 AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25307</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Support needs adjustment not handling the duct
</td><td>High</td><td>11/29/2021 12:00:00 PM</td><td>ahmedsalem</td><td>11/22/2021
11:59:42 AM</td><td> </td><td>7/19/2022 10:59:08 AM</td><td>&nbsp;</td><td>Museum
Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25308</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Cladding is damaged </td><td>High</td><td>11/29/2021 12:00:00
PM</td><td>ahmedsalem</td><td>11/22/2021 11:59:46 AM</td><td> </td><td>7/19/2022
10:59:07 AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25373</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Handle of volume damper is not moving
</td><td>High</td><td>11/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>11/23/2021
2:15:39 PM</td><td> </td><td>7/19/2022 10:59:05 AM</td><td>&nbsp;</td><td>Museum
Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25381</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Missing roof drain in all band
</td><td>High</td><td>11/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>11/23/2021
2:16:03 PM</td><td> </td><td>7/19/2022 10:59:03 AM</td><td>&nbsp;</td><td>Museum
Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25406</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Floor Drain Cover</td><td>&#39;Missing roof drain
cover</td><td>High</td><td>12/12/2021 12:00:00
PM</td><td>ahmedsalem</td><td>12/5/2021 4:55:37 PM</td><td> </td><td>7/19/2022
10:59:02 AM</td><td>&nbsp;</td><td>Museum Roof Band B</td><td>&nbsp;</td>
</tr><tr>
<td>28149</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Floor Drain Cover</td><td>&#39;Missing roof drain cover in all
band</td><td>High</td><td>3/23/2022 12:00:00
PM</td><td>ahmedsalem</td><td>3/16/2022 2:40:28 PM</td><td> </td><td>7/19/2022
10:59:00 AM</td><td>&nbsp;</td><td>Museum Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>28153</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Installation not to
specification/drawing</td><td>&#39;Need silicon and better finishing for
cladding</td><td>High</td><td>3/23/2022 12:00:00
PM</td><td>ahmedsalem</td><td>3/16/2022 2:40:37 PM</td><td> </td><td>7/19/2022
10:59:00 AM</td><td>&nbsp;</td><td>Museum Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>31502</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguishers.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:34 PM</td><td> </td><td>7/19/2022 8:31:59
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>15244</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Internal lighting not connected for AHU (General
comment)</td><td>High</td><td>1/31/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>1/24/2021 11:49:04 AM</td><td> </td><td>7/19/2022 8:30:34
AM</td><td>&nbsp;</td><td>MS.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>31225</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Motor pulley is missing and belt shall be installed.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:56:56 PM</td><td> </td><td>7/19/2022 8:20:12
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>20265</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Pipe insulation need
repair </td><td>High</td><td>8/11/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/4/2021 12:57:00 PM</td><td> </td><td>7/18/2022
3:41:37 PM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28665</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Hydronic pipes insulation shall be repaired.
</td><td>High</td><td>5/17/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:40:10 PM</td><td> </td><td>7/18/2022 3:41:33
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28675</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage pipes thermal
insulation shall be repaired. </td><td>High</td><td>5/17/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:41:43 PM</td><td>
</td><td>7/18/2022 3:41:32
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28918</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing acoustic lining for air duct.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:30:45 PM</td><td> </td><td>7/18/2022 3:41:31
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29069</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing acoustic lining for all ex. Air ducts in this area.
</td><td>High</td><td>5/25/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/18/2022 11:56:25 AM</td><td> </td><td>7/18/2022 3:41:29
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29091</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Exhaust air duct has no acoustic lining.
</td><td>High</td><td>5/26/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:51 AM</td><td> </td><td>7/18/2022 3:41:28
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29150</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing acoustic lining for air duct.
</td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:14 AM</td><td> </td><td>7/18/2022 3:41:27
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29167</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing acoustic lining for air duct.
</td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:46 AM</td><td> </td><td>7/18/2022 3:41:26
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>9646</td><td>AHU/PLANT</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
frame need adjustment /missing cir for hardware </td><td>Low</td><td>8/10/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020 1:50:53 PM</td><td>
</td><td>7/18/2022 1:36:17
PM</td><td>&nbsp;</td><td>MS.12.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>11739</td><td>OPERATIONAL OFFICE</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting not submitted
yet</td><td>Low</td><td>10/18/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>9/27/2020 4:42:39 PM</td><td> </td><td>7/18/2022 1:36:14
PM</td><td>&nbsp;</td><td>MG.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>22194</td><td>FEMALE WASH ROOM</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:47:26 AM</td><td> </td><td>7/18/2022 1:36:10
PM</td><td>&nbsp;</td><td>MS.13.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>22195</td><td>FEMALE WASH ROOM</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:47:28 AM</td><td> </td><td>7/18/2022 1:36:09
PM</td><td>&nbsp;</td><td>MS.13.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>22243</td><td>FEMALE PRAYER ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:06 AM</td><td> </td><td>7/18/2022 1:36:08
PM</td><td>&nbsp;</td><td>MG.13.0G.005</td><td>&nbsp;</td>
</tr><tr>
<td>22247</td><td>MALE WASH ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Opening should be closed and repainted
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:12 AM</td><td> </td><td>7/18/2022 1:36:07
PM</td><td>&nbsp;</td><td>MS.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22250</td><td>MALE WASH ROOM</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Toothing between tiles
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:16 AM</td><td> </td><td>7/18/2022 1:36:06
PM</td><td>&nbsp;</td><td>MS.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22267</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:39 AM</td><td> </td><td>7/18/2022 1:36:05
PM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27953</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
cutting for marked steps and riser/ gap between stainless and steps should be
closed </td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 12:23:30 PM</td><td> </td><td>7/18/2022 1:35:56
PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27954</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Short stainless cladding should be
extended </td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 12:23:31 PM</td><td> </td><td>7/18/2022 1:35:55
PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>

<td>24740</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken and cracked tiles to be
replaced</td><td>High</td><td>11/11/2021 12:00:00
AM</td><td>mohamed.sami</td><td>11/4/2021 3:12:57 PM</td><td> </td><td>7/18/2022
12:20:11 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>30475</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing
sealant.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:28 AM</td><td> </td><td>7/18/2022 11:55:30
AM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>28899</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Missing sealant for marked joint
</td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/17/2022
11:47:14 AM</td><td> </td><td>7/18/2022 11:52:41
AM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18304</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;There is gap between air gap
and metal ceiling </td><td>Low</td><td>6/22/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/1/2021 4:11:09 PM</td><td> </td><td>7/18/2022
11:45:38 AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18301</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;GI sheet need to fixed properly
</td><td>Low</td><td>6/22/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/1/2021
4:11:04 PM</td><td> </td><td>7/18/2022 11:45:15
AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18303</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>False Ceiling
Tiles</td><td>Alignment of tiles</td><td>&#39;Ac grill and sprinkler not leveled
with the ceiling </td><td>Low</td><td>6/22/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/1/2021 4:11:07 PM</td><td> </td><td>7/18/2022
11:44:53 AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19585</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Inspection after cleaning for stone flooring
</td><td>Low</td><td>7/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/30/2021
1:25:59 PM</td><td> </td><td>7/18/2022 11:44:41
AM</td><td>&nbsp;</td><td>MW.13.002.002</td><td>&nbsp;</td>
</tr><tr>
<td>19574</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Inspection after cleaning
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:43 PM</td><td> </td><td>7/18/2022 11:44:23
AM</td><td>&nbsp;</td><td>MW.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18150</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Stains for marked parts ( handle from
outside and inside/closer)should be removed </td><td>Low</td><td>6/16/2021 12:00:00
PM</td><td>mohamed.sami</td><td>5/26/2021 11:58:32 AM</td><td> </td><td>7/18/2022
11:44:16 AM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>20996</td><td>CORE B1 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:12:11 AM</td><td> </td><td>7/18/2022 11:43:38
AM</td><td>&nbsp;</td><td>MC.23.02.B11</td><td>&nbsp;</td>
</tr><tr>
<td>14357</td><td>B.O.H-WET DELIVERY TUNNEL - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Flooring need touch up And repair
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:26 PM</td><td> </td><td>7/18/2022 11:42:57
AM</td><td>&nbsp;</td><td>MQ.23.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14329</td><td>B.O.H-CORRIDOR - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Flooring need repair and touch up
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:23:14 PM</td><td> </td><td>7/18/2022 11:42:18
AM</td><td>&nbsp;</td><td>MS.18.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>6888</td><td>LIFT SHAFT 01</td><td>AT CONNEC
L49</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts - Machine
room</td><td>Door lockable with caution sign</td><td>&#39;Contractor must complete
lifts work</td><td>Low</td><td>1/14/2020 12:00:00
AM</td><td>ahmedsalem</td><td>12/24/2019 4:03:19 PM</td><td> </td><td>7/18/2022
10:07:31 AM</td><td>&nbsp;</td><td>SN.00.01.10</td><td>&nbsp;</td>
</tr><tr>
<td>28417</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to
specification/drawing</td><td>&#39;Condensate drain insulation not done.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:31 PM</td><td> </td><td>7/18/2022 8:12:42
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>30037</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39; Issuing thermal insulation for
condensate drain pipes. </td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:59 AM</td><td> </td><td>7/18/2022 8:04:12
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29143</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Thermal insulation for condensate drain
pipes is missing. </td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:00 AM</td><td> </td><td>7/17/2022 4:45:58
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>28503</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to specification/drawing</td><td>&#39;Missing
insulation for drain pipes. </td><td>High</td><td>5/15/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/8/2022 4:15:32 PM</td><td>
</td><td>7/17/2022 4:43:00
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29245</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing insulation for condensate drain
pipes. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:57 PM</td><td> </td><td>7/17/2022 4:34:08
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29088</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39; Issuing her Al is auction for drain pipes.
</td><td>High</td><td>5/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:44 AM</td><td> </td><td>7/17/2022 4:29:28
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>28639</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor to be cleaned and repaint
</td><td>Low</td><td>5/31/2022 12:00:00 AM</td><td>sally.george</td><td>5/10/2022
4:28:55 PM</td><td> </td><td>7/16/2022 3:40:46 PM</td><td>Done
</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31811</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Condensate drain pipes shall be thermally insulated.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:41 PM</td><td> </td><td>7/7/2022 3:33:45
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31835</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Condensate drain shall be insulated.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:33:23 PM</td><td> </td><td>7/7/2022 3:33:15
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31827</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing thermal insulation for condensate drain pipes.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:33:08 PM</td><td> </td><td>7/7/2022 3:32:17
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>17062</td><td>DELIVERY LOBBY</td><td>CCB
GF</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Installation is incomplete and door need to change
</td><td>High</td><td>3/23/2021 12:00:00 AM</td><td>ahmedsalem</td><td>3/16/2021
11:22:44 AM</td><td> </td><td>7/7/2022 3:13:25
PM</td><td>&nbsp;</td><td>CB.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22935</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Slot drain should be fixed properly and be
aligned </td><td>Low</td><td>10/5/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/14/2021 11:12:47 AM</td><td> </td><td>7/7/2022 3:13:24
PM</td><td>&nbsp;</td><td>Part 7</td><td>&nbsp;</td>
</tr><tr>
<td>22938</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Slot drain should be aligned and fixed
properly </td><td>Low</td><td>10/5/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/14/2021 11:12:52 AM</td><td> </td><td>7/7/2022 3:13:23
PM</td><td>&nbsp;</td><td>Part 7</td><td>&nbsp;</td>
</tr><tr>
<td>22987</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Slot drain should e aligned and fixed
properly </td><td>Low</td><td>10/5/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/14/2021 11:14:12 AM</td><td> </td><td>7/7/2022 3:13:22
PM</td><td>&nbsp;</td><td>Part 11</td><td>&nbsp;</td>
</tr><tr>
<td>17992</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Floors</td><td>Adjacent stone shades are
not matching</td><td>&#39;Ramps and floor protection
dismantling</td><td>High</td><td>5/31/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>5/24/2021 5:34:27 PM</td><td> </td><td>7/7/2022
2:32:08 PM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>23755</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Capping should be fixed
properly </td><td>Low</td><td>11/3/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:54 PM</td><td> </td><td>7/7/2022 2:32:07
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23758</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Metal Trim</td><td>General</td><td>&#39;Metal flashing should be fixed properly
</td><td>Low</td><td>11/3/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:59 PM</td><td> </td><td>7/7/2022 2:32:06
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23784</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Broken edge should be repaired </td><td>Low</td><td>11/8/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/18/2021 4:29:07 PM</td><td>
</td><td>7/7/2022 2:32:05 PM</td><td>&nbsp;</td><td>Atrium - Internal
Side</td><td>&nbsp;</td>
</tr><tr>

<td>23890</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Tiles are missing </td><td>Low</td><td>11/14/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/24/2021 12:20:04 PM</td><td>
</td><td>7/7/2022 2:32:04 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23922</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Unilex
Sign
Systems</td><td>Architectural</td><td>Signage</td><td>damaged</td><td>&#39;Hair
crack should be repaired </td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:59:34 PM</td><td> </td><td>7/7/2022 2:32:03
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24015</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Scratches on tiles should be repaired
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:38:20 PM</td><td> </td><td>7/7/2022 2:32:02
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24020</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Stone
cover should be leveled with stone flooring </td><td>Low</td><td>11/15/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>10/25/2021 4:38:28 PM</td><td>
</td><td>7/7/2022 2:32:00 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24028</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Unilex
Sign
Systems</td><td>Architectural</td><td>Signage</td><td>damaged</td><td>&#39;Damaged
edge should be repaired </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:38:42 PM</td><td> </td><td>7/7/2022 2:31:59
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24032</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Metal trim should be aligned and uniform
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:38:49 PM</td><td> </td><td>7/7/2022 2:31:58
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24071</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Cracks on tiles should be repaired
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:39:57 PM</td><td> </td><td>7/7/2022 2:31:57
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24090</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Joint width between stainless steel and stone flooring should be
adjusted </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:40:47 PM</td><td> </td><td>7/7/2022 2:31:56
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24091</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>level</td><td>&#39;Toothing between stainless steel trim and
stone flooring should be leveled </td><td>Low</td><td>11/15/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:40:49 PM</td><td> </td><td>7/7/2022
2:31:55 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24264</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Glass partion and door</td><td>General
Snag</td><td>&#39;Copping should be aligned and uniform
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/26/2021 4:40:51 PM</td><td> </td><td>7/7/2022 2:31:52
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24296</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Stone cover should be flushed with stone flooring
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/26/2021 4:41:50 PM</td><td> </td><td>7/7/2022 2:31:51
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24425</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked stone tiles should be
replaced</td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>mohamed.sami</td><td>10/27/2021 4:44:10 PM</td><td> </td><td>7/7/2022
2:31:50 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24426</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked stone tiles should be replaced
</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>mohamed.sami</td><td>10/27/2021
4:44:16 PM</td><td> </td><td>7/7/2022 2:31:49
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24427</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken / cracked stone tiles should be replaced
</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>mohamed.sami</td><td>10/27/2021
4:44:22 PM</td><td> </td><td>7/7/2022 2:31:48
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24429</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked stone tiles should be replaced
</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>mohamed.sami</td><td>10/27/2021
4:44:32 PM</td><td> </td><td>7/7/2022 2:31:47
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24430</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked stone tiles should be replaced
</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>mohamed.sami</td><td>10/27/2021
4:44:44 PM</td><td> </td><td>7/7/2022 2:31:46
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24641</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken/ cracked tiles should be replaced
</td><td>Low</td><td>11/21/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/31/2021 4:30:07 PM</td><td> </td><td>7/7/2022 2:31:44
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25486</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Orientation and spacing between
plates should be aligned and unified </td><td>Low</td><td>12/29/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/8/2021 1:40:58 PM</td><td> </td><td>7/7/2022
2:31:43 PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25494</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Landing curvature</td><td>&#39;Two vertical supports not aligned
</td><td>Low</td><td>12/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/8/2021
1:41:16 PM</td><td> </td><td>7/7/2022 2:31:42
PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25496</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Landing curvature</td><td>&#39;Handrail not parallel
</td><td>Low</td><td>12/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/8/2021
1:41:20 PM</td><td> </td><td>7/7/2022 2:31:41
PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25498</td><td>ELEC.</td><td>MU L30</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Remaining mortar between stone steps should be removed
</td><td>Low</td><td>12/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/8/2021
1:41:25 PM</td><td> </td><td>7/7/2022 2:31:40
PM</td><td>&nbsp;</td><td>MS.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>25499</td><td>ELEC.</td><td>MU L30</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Short tile / gap should be closed </td><td>Low</td><td>12/29/2021
12:00:00 PM</td><td>mohamed.sami</td><td>12/8/2021 1:41:27 PM</td><td>
</td><td>7/7/2022 2:31:39
PM</td><td>&nbsp;</td><td>MS.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>25506</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Marked
joint should be same width </td><td>Low</td><td>12/29/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/8/2021 1:41:46 PM</td><td> </td><td>7/7/2022
2:31:38 PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25531</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Distance between posts should be
regular (parallel)</td><td>Low</td><td>12/30/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:52:54 PM</td><td> </td><td>7/7/2022
2:31:37 PM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25553</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked plates should be sited on
stone </td><td>Low</td><td>12/16/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:57:49 PM</td><td> </td><td>7/7/2022
2:31:35 PM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25559</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;First joint width should be typical
</td><td>Low</td><td>12/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:58:02 PM</td><td> </td><td>7/7/2022 2:31:34 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25560</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marking should be removed
</td><td>Low</td><td>12/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>12/9/2021
12:58:04 PM</td><td> </td><td>7/7/2022 2:31:33 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25563</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked plates should be sited on
stone </td><td>Low</td><td>12/16/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:58:11 PM</td><td> </td><td>7/7/2022
2:31:31 PM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25608</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Marked joints should be aligned and uniform
</td><td>Low</td><td>1/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:51:54 AM</td><td> </td><td>7/7/2022 2:31:30
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25615</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Posts should be polished
</td><td>Low</td><td>1/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:52:03 AM</td><td> </td><td>7/7/2022 2:31:29
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25632</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joint should be uniform and aligned
</td><td>Low</td><td>1/4/2022 12:00:00 AM</td><td>mohamed.sami</td><td>12/14/2021
10:52:23 AM</td><td> </td><td>7/7/2022 2:31:28
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25635</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Remaining mortar between stone steps should be removed
</td><td>Low</td><td>12/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:52:25 AM</td><td> </td><td>7/7/2022 2:31:27
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25642</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Spacers between posts and plates
should be regular </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:52:32 AM</td><td> </td><td>7/7/2022
2:31:25 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25661</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Orientation and spacing between
plates should be aligned and unified </td><td>Low</td><td>12/21/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:53:03 AM</td><td> </td><td>7/7/2022
2:31:24 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25662</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;elbows should be finished and smooth
</td><td>Low</td><td>12/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:53:05 AM</td><td> </td><td>7/7/2022 2:31:23
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25706</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Broken, to be replaced</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>1/5/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/15/2021
1:49:54 PM</td><td> </td><td>7/7/2022 2:31:21
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25716</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Sealant between stone skirting and stainless
steel should be unified </td><td>Low</td><td>12/22/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/15/2021 1:50:18 PM</td><td> </td><td>7/7/2022
2:31:20 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31976</td><td>Core G2</td><td>MU GF
</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;FD label is missing. </td><td>High</td><td>7/12/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>7/5/2022 11:38:38 AM</td><td>
</td><td>7/7/2022 2:26:27 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31974</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Fire pipe need cleaning and painting.
</td><td>High</td><td>7/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>7/5/2022 11:38:34 AM</td><td> </td><td>7/7/2022 2:25:37
PM</td><td>&nbsp;</td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>31970</td><td>CORE G1</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Fire extinguishers levels need to be checked for alignment.
</td><td>High</td><td>7/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>7/5/2022 11:27:05 AM</td><td> </td><td>7/7/2022 2:25:07
PM</td><td>&nbsp;</td><td>MC.25.01.G11</td><td>&nbsp;</td>
</tr><tr>
<td>31977</td><td>Core G2</td><td>MU GF
</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Fire pipe need cleaning and paintings.
</td><td>High</td><td>7/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>7/5/2022 11:38:40 AM</td><td> </td><td>7/7/2022 2:24:25
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31927</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;HDPE pipes support need to be checked.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:01 PM</td><td> </td><td>7/7/2022 2:11:12
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28544</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to
specification/drawing</td><td>&#39;Condensate drain pipe need thermal insulation.
</td><td>High</td><td>5/16/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:56 AM</td><td> </td><td>7/7/2022 2:10:20
PM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>29887</td><td>STAFF W.C./F</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Sprinklers covers shall be installed in all
three toilets areas. </td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:56 PM</td><td> </td><td>7/7/2022 2:09:14
PM</td><td>&nbsp;</td><td>MW.19.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>29888</td><td>STAFF W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Sprinkler covers not installed.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:57 PM</td><td> </td><td>7/7/2022 2:08:31
PM</td><td>&nbsp;</td><td>MW.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>31972</td><td>CORE G1</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;No FF system detected in this area.
</td><td>High</td><td>7/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>7/5/2022 11:27:08 AM</td><td> </td><td>7/7/2022 2:06:02
PM</td><td>&nbsp;</td><td>MC.25.01.G11</td><td>&nbsp;</td>
</tr><tr>
<td>14395</td><td>B.O.H-ELEC. SUB-STATION - Band B</td><td>MU
L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Lagging
missing/incomplete</td><td>&#39;No volume damper or
register</td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>ahmedsalem</td><td>12/24/2020 3:22:51 PM</td><td> </td><td>7/7/2022
12:02:20 PM</td><td>&nbsp;</td><td>MS.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>14571</td><td>Ticketing Piazza </td><td>Ticketing
Piazza</td><td>Closed</td><td>Unilex Sign
Systems</td><td>Architectural</td><td>Signage</td><td>damaged</td><td>&#39;Scratche
s at stainless steel signage </td><td>Low</td><td>1/5/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>12/29/2020 11:06:36 AM</td><td>
</td><td>7/7/2022 11:01:55 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23558</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
marble need to repolished </td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:01 AM</td><td> </td><td>7/7/2022 11:01:54
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24001</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Movement joints should be aligned and filled
properly </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 3:18:23 PM</td><td> </td><td>7/7/2022 11:01:53
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25000</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Tiles should eat as per drawing </td><td>Low</td><td>11/17/2021
12:00:00 PM</td><td>Amr Nofal</td><td>11/10/2021 4:00:10 PM</td><td>
</td><td>7/7/2022 11:01:52 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26831</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing tiles should be installed
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:32:02 PM</td><td> </td><td>7/7/2022 11:01:51 AM</td><td>Done </td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27058</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>AluMisr</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing tiles </td><td>Low</td><td>3/23/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022 4:17:51 PM</td><td>
</td><td>7/7/2022 11:01:50 AM</td><td>Done </td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27158</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked rods should be removed
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:48 PM</td><td> </td><td>7/7/2022 11:01:48 AM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27223</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;All the welded points for trays to
canopy should be treated properly </td><td>Low</td><td>3/27/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:39:53 PM</td><td> </td><td>7/7/2022
11:01:47 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27436</td><td>Ticketing Piazza</td><td>South Side Ticketing
Piazza</td><td>Closed</td><td>Unilex Sign
Systems</td><td>Architectural</td><td>Signage</td><td>damaged</td><td>&#39;Last
Signage letters got faded. To be written again.</td><td>Low</td><td>3/28/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/7/2022 3:56:04 PM</td><td>
</td><td>7/7/2022 11:01:46 AM</td><td>Done </td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>27443</td><td>Ticketing Piazza</td><td>South Side Ticketing
Piazza</td><td>Closed</td><td>Unilex Sign
Systems</td><td>Architectural</td><td>Signage</td><td>damaged</td><td>&#39;Doors
need to adjusted properly </td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/7/2022 3:56:19 PM</td><td> </td><td>7/7/2022 11:01:45
AM</td><td>Done </td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>27445</td><td>Ticketing Piazza</td><td>South Side Ticketing
Piazza</td><td>Closed</td><td>Unilex Sign
Systems</td><td>Architectural</td><td>Signage</td><td>damaged</td><td>&#39;Damages
should be repaired </td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/7/2022 3:56:24 PM</td><td> </td><td>7/7/2022 11:01:44
AM</td><td>Done </td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>23230</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Area should be cleaned
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:53:12 AM</td><td> </td><td>7/7/2022 10:53:18 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23708</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Missing/broken tiles should be
installed/replaced </td><td>Low</td><td>11/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>10/11/2021 10:29:18 AM</td><td> </td><td>7/7/2022 10:53:17
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>29893</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing FF system for this area. </td><td>High</td><td>6/1/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/25/2022 4:30:07 PM</td><td>
</td><td>7/7/2022 8:37:02 AM</td><td>&nbsp;</td><td>MC.25.2A.G11
</td><td>&nbsp;</td>
</tr><tr>
<td>31978</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;PPR pipes labels area missing. </td><td>High</td><td>7/12/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>7/5/2022 11:38:42 AM</td><td>
</td><td>7/7/2022 8:18:36
AM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>31980</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drainage pipe need cleaning and painting.
</td><td>High</td><td>7/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>7/5/2022 11:38:45 AM</td><td> </td><td>7/7/2022 8:17:34
AM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>27147</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Toothing between tiles should be adjusted
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:26 PM</td><td> </td><td>7/6/2022 4:52:28 PM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>31979</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct label is missing. </td><td>High</td><td>7/12/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>7/5/2022 11:38:43 AM</td><td>
</td><td>7/6/2022 4:36:12
PM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>28120</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steel works at roof</td><td>Paint
finish</td><td>&#39;Steel beams need to clean</td><td>Low</td><td>3/23/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>3/16/2022 12:09:06 PM</td><td>
</td><td>7/6/2022 4:33:10 PM</td><td>&nbsp;</td><td>Museum Roof Band
F</td><td>&nbsp;</td>
</tr><tr>
<td>28123</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steel works at roof</td><td>Paint
finish</td><td>&#39;Steel columns need to touch up painting
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/16/2022
12:09:12 PM</td><td> </td><td>7/6/2022 4:33:01 PM</td><td>&nbsp;</td><td>Museum
Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>19476</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
waterproofing</td><td>damaged</td><td>&#39;Repair for damaged sikafoam
</td><td>Low</td><td>7/6/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/29/2021
10:17:34 AM</td><td> </td><td>7/6/2022 4:32:54 PM</td><td>&nbsp;</td><td>Museum
Roof Band B</td><td>&nbsp;</td>
</tr><tr>
<td>19477</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
waterproofing</td><td>damaged</td><td>&#39;Sika PU foam need to sika guard coat
</td><td>Low</td><td>7/6/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/29/2021
10:17:37 AM</td><td> </td><td>7/6/2022 4:32:43 PM</td><td>&nbsp;</td><td>Museum
Roof Band B</td><td>&nbsp;</td>
</tr><tr>
<td>24342</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
waterproofing</td><td>damaged</td><td>&#39;Damaged sika foam need to repair
</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>mohamed.sami</td><td>10/27/2021
11:26:22 AM</td><td> </td><td>7/6/2022 4:32:31 PM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>31862</td><td>CORE E2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning for HDPE drainage pipes.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:16 PM</td><td> </td><td>7/6/2022 4:32:28
PM</td><td>&nbsp;</td><td>MC.13.02.E21</td><td>&nbsp;</td>
</tr><tr>
<td>23831</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Gaps between stone tiles should be covered (for all
wall)</td><td>Low</td><td>11/10/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/20/2021 3:39:15 PM</td><td> </td><td>7/6/2022 3:48:44
PM</td><td>&nbsp;</td><td>Atrium - Internal Side</td><td>&nbsp;</td>
</tr><tr>
<td>20771</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between tiles
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:41 PM</td><td> </td><td>7/6/2022 1:13:59
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20361</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:13 PM</td><td> </td><td>7/6/2022 1:09:24
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20252</td><td>WC /F</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Vanity Counter Top</td><td>General
Snag</td><td>&#39;Sealer roller traces </td><td>Low</td><td>8/25/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/4/2021 12:05:45 PM</td><td> </td><td>7/6/2022
1:07:06 PM</td><td>&nbsp;</td><td>MW.18.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20241</td><td>WC /M</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Bathroom - Vanity
top</td><td>General</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:32 PM</td><td> </td><td>7/6/2022 1:06:58
PM</td><td>&nbsp;</td><td>MW.18.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>26048</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked louver should be as per shop drawing
</td><td>Low</td><td>2/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/31/2022
11:37:25 AM</td><td> </td><td>7/6/2022 1:03:50
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26064</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Not symmetric louvre panel should be replaced
</td><td>Low</td><td>2/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/31/2022
11:58:01 AM</td><td> </td><td>7/6/2022 1:03:41
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>13675</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Rust of strainer cover </td><td>Medium</td><td>12/10/2020
12:00:00 PM</td><td>ahmedsalem</td><td>11/30/2020 11:59:13 AM</td><td>
</td><td>7/6/2022 11:58:23
AM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>20260</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Any damaged cladding need to change
</td><td>High</td><td>8/11/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/4/2021
12:56:50 PM</td><td> </td><td>7/6/2022 11:58:20
AM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>20268</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;General cleaning and house keeping for
mechanical equipments </td><td>High</td><td>8/11/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/4/2021 12:57:06 PM</td><td> </td><td>7/6/2022
11:58:13 AM</td><td>&nbsp;</td><td>MS.23.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28368</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Cladding for duct thermal insulation is missing for all AHUs
in this area. </td><td>High</td><td>5/3/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:45:20 AM</td><td> </td><td>7/6/2022 11:58:12
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28375</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Clash between thermal insulation for duct works and hot water
pipes. </td><td>High</td><td>5/3/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:45:37 AM</td><td> </td><td>7/6/2022 11:58:10
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28387</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing cladding. </td><td>High</td><td>5/4/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>4/27/2022 11:44:47 AM</td><td>
</td><td>7/6/2022 11:58:09
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>28679</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to
specification/drawing</td><td>&#39;Condensate drain pipes shall be thermally
insulated. </td><td>High</td><td>5/17/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:41:49 PM</td><td> </td><td>7/6/2022 11:58:07
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28860</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Thermal insulation
for condensate drain pipes are missing. </td><td>High</td><td>5/23/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/16/2022 4:06:52 PM</td><td>
</td><td>7/6/2022 11:58:06
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28879</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to specification/drawing</td><td>&#39;Missing
insulation for condensate drain pipes. </td><td>High</td><td>5/23/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/16/2022 4:07:25 PM</td><td>
</td><td>7/6/2022 11:58:05
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28927</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to
specification/drawing</td><td>&#39;Condensate water drain pipes need to be
thermally insulated. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:05 PM</td><td> </td><td>7/6/2022 11:58:03
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28943</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Insulation Damaged</td><td>&#39;Missing insulation for drain
pipes. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:39 PM</td><td> </td><td>7/6/2022 11:58:02
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28948</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Hydronic water pipes
insulation need repairs. </td><td>High</td><td>5/24/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:31:53 PM</td><td>
</td><td>7/6/2022 11:58:00
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28962</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Insulation Damaged</td><td>&#39;Missing thermal insulation for
drain pipes. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:28 PM</td><td> </td><td>7/6/2022 11:57:59
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29879</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing thermal insulation and missing
straps. </td><td>High</td><td>6/1/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:44 PM</td><td> </td><td>7/6/2022 11:57:53
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30388</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:13 PM</td><td> </td><td>7/6/2022 11:57:51
AM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30783</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Sprinkler
Heads</td><td>General Snag</td><td>&#39;Sprinkler cover need adjustments.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:54 PM</td><td> </td><td>7/6/2022 11:57:50
AM</td><td>&nbsp;</td><td>MT.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31227</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensor need to be
adjusted. </td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:57:00 PM</td><td> </td><td>7/6/2022 11:57:48
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31668</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Canvases shall be adjusted.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:05 PM</td><td> </td><td>7/6/2022 11:57:45
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>22999</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between tiles
</td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/15/2021
11:30:33 AM</td><td> </td><td>7/6/2022 11:36:36 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23277</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
12:06:33 PM</td><td> </td><td>7/6/2022 11:36:35 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23278</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor Grouting should be repaired
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
12:06:35 PM</td><td> </td><td>7/6/2022 11:36:33 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23279</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between stone
tiles</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
12:06:36 PM</td><td> </td><td>7/6/2022 11:36:31 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23280</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
12:06:39 PM</td><td> </td><td>7/6/2022 11:36:30 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23555</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/12/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/21/2021 11:07:55 AM</td><td> </td><td>7/6/2022 11:36:29
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23557</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/12/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:00 AM</td><td> </td><td>7/6/2022 11:36:28
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23669</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>9/29/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/22/2021
11:10:36 AM</td><td> </td><td>7/6/2022 11:36:27 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23671</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/13/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/22/2021
11:10:43 AM</td><td> </td><td>7/6/2022 11:36:25 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23727</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor cutting for stone edge
</td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/11/2021
10:37:53 AM</td><td> </td><td>7/6/2022 11:36:24 AM</td><td>Done </td><td>Part
11</td><td>&nbsp;</td>
</tr><tr>
<td>28243</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken step around lighting fixtures should
be repaired </td><td>Low</td><td>4/12/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/22/2022 12:25:17 PM</td><td> </td><td>7/6/2022 11:36:23
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28245</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;All damaged steps should be repaired
</td><td>Low</td><td>4/12/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/22/2022 12:25:46 PM</td><td> </td><td>7/6/2022 11:36:22
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28254</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;All broken edges should be
repaired</td><td>Low</td><td>4/12/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/22/2022 12:42:36 PM</td><td> </td><td>7/6/2022 11:36:20
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24386</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Earthing
System</td><td>General Snag</td><td>&#39;Earth jumper not installed
</td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>10/27/2021 11:53:15 AM</td><td> </td><td>7/6/2022 11:26:11
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>24392</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>LIGHT
FITTINGS(INTERNAL/ EXTERNAL/ EMERGENCY)</td><td>General Snag</td><td>&#39;Damage of
liquid tight and should be replaced </td><td>High</td><td>11/3/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>10/27/2021 11:53:22 AM</td><td>
</td><td>7/6/2022 11:26:10 AM</td><td>&nbsp;</td><td>Museum Roof Band
A</td><td>&nbsp;</td>
</tr><tr>
<td>24394</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>LIGHT
FITTINGS(INTERNAL/ EXTERNAL/ EMERGENCY)</td><td>General Snag</td><td>&#39;Missing
labels</td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>10/27/2021 11:53:25 AM</td><td> </td><td>7/6/2022 11:26:09
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>27383</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;No media converter nor
paching</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:14 PM</td><td> </td><td>7/6/2022 11:26:08
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28180</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>GI CONDUIT
&amp; ACCESSSORIES</td><td>Missing lid cover on GI Box</td><td>&#39;Cover all
junction boxes </td><td>High</td><td>3/24/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/17/2022 9:07:27 AM</td><td> </td><td>7/6/2022 11:26:06
AM</td><td>&nbsp;</td><td>Museum Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>28784</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rectified wrong for seismic sport
</td><td>High</td><td>5/19/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/12/2022 2:38:05 PM</td><td> </td><td>7/6/2022
11:26:05 AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30974</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:19:59 PM</td><td> </td><td>7/6/2022 11:26:04
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31259</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/2/2022
11:14:15 AM</td><td> </td><td>7/6/2022 11:26:02
AM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31973</td><td>CORE G1</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;No ventilation system detected in this area.
</td><td>High</td><td>7/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>7/5/2022 11:27:10 AM</td><td> </td><td>7/6/2022 8:56:50
AM</td><td>&nbsp;</td><td>MC.25.01.G11</td><td>&nbsp;</td>
</tr><tr>
<td>31983</td><td>CORE F3</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Fire damper label is missing. </td><td>High</td><td>7/12/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>7/5/2022 11:38:49 AM</td><td>
</td><td>7/6/2022 8:02:45
AM</td><td>&nbsp;</td><td>MC.14.03.F31</td><td>&nbsp;</td>
</tr><tr>
<td>31975</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct label is missing. </td><td>High</td><td>7/12/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>7/5/2022 11:38:36 AM</td><td>
</td><td>7/6/2022 8:01:20
AM</td><td>&nbsp;</td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>24230</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall speakers need to be
vertical.</td><td>Low</td><td>11/16/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>10/26/2021 4:24:36 PM</td><td> </td><td>7/6/2022 7:56:55
AM</td><td>Rectified by STS</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24239</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall speakers need to vertical
.</td><td>Low</td><td>11/16/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>10/26/2021 4:24:51 PM</td><td> </td><td>7/6/2022 7:56:41
AM</td><td>Rectified by STS</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28876</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Canvas connection need adjustment and threaded rods shall
removed. </td><td>High</td><td>5/23/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:07:21 PM</td><td> </td><td>7/5/2022 11:27:32
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28924</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:30:59 PM</td><td> </td><td>7/5/2022 11:27:28
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28960</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:22 PM</td><td> </td><td>7/5/2022 11:27:25
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29058</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to specification/drawing</td><td>&#39;Exhaust
air duct has no acoustic lining. </td><td>High</td><td>5/25/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/18/2022 11:56:07 AM</td><td>
</td><td>7/5/2022 11:27:23
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29066</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Fan dismantled from its base.
</td><td>High</td><td>5/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/18/2022 11:56:20 AM</td><td> </td><td>7/5/2022 11:27:22
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29067</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Missing bully and fan belt.
</td><td>High</td><td>5/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/18/2022 11:56:21 AM</td><td> </td><td>7/5/2022 11:27:20
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29170</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Canvases need adjustment or changing and
threaded rods shall be removed. </td><td>High</td><td>5/28/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/21/2022 11:01:52 AM</td><td>
</td><td>7/5/2022 11:27:19
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29254</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Canvases need adjustments.
</td><td>High</td><td>5/30/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:15 PM</td><td> </td><td>7/5/2022 11:27:15
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30663</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Flexible duct connectors need repairs and
adjustments. </td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:57 AM</td><td> </td><td>7/5/2022 11:27:12
AM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14303</td><td>TB RO</td><td>TB
RO</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Missing grouting at coping stone</td><td>Low</td><td>1/13/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>12/23/2020 2:18:34 PM</td><td>
</td><td>7/5/2022 11:14:25 AM</td><td>&nbsp;</td><td>Ticketing Building
Roof</td><td>&nbsp;</td>
</tr><tr>
<td>15293</td><td>DELIVERY LOBBY</td><td>CCB
GF</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Scratches on lift door should be repaired
</td><td>High</td><td>2/1/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>1/25/2021 12:05:50 PM</td><td> </td><td>7/5/2022 11:14:24
AM</td><td>&nbsp;</td><td>CB.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22429</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Broken, to be replaced</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Mohamed
El-Sergany</td><td>8/29/2021 3:12:46 PM</td><td> </td><td>7/5/2022 11:14:23
AM</td><td>&nbsp;</td><td>Part 2</td><td>&nbsp;</td>
</tr><tr>
<td>23752</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken tile should be repaired /replaced
</td><td>Low</td><td>11/3/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:48 PM</td><td> </td><td>7/5/2022 11:14:22
AM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>30646</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers heads covers are missing.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:26 AM</td><td> </td><td>7/5/2022 8:29:27
AM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>31154</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing thermal insulation for condensate pipes.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:47 PM</td><td> </td><td>7/5/2022 8:28:19
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31182</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing insulation for condensate drain pipes.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:55:01 PM</td><td> </td><td>7/5/2022 8:27:32
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31188</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain pipes shall be thermally insulated.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:55:13 PM</td><td> </td><td>7/5/2022 8:26:37
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31204</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing thermal installation for condensate drain pipes.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:55:53 PM</td><td> </td><td>7/5/2022 8:25:44
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31736</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing thermal insulation for condensate drain pipes.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:55:18 AM</td><td> </td><td>7/5/2022 8:23:37
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31762</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing insulation for drain pipes.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:56:13 AM</td><td> </td><td>7/5/2022 8:22:56
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>22908</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Joints should be same width
</td><td>Low</td><td>10/4/2021 12:00:00 AM</td><td>mohamed.sami</td><td>9/13/2021
4:02:40 PM</td><td> </td><td>7/4/2022 10:47:03 AM</td><td>Done </td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22910</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Bad grouting should be repaired
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:42 PM</td><td> </td><td>7/4/2022 10:47:01 AM</td><td>Done </td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22912</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/4/2021 12:00:00 AM</td><td>mohamed.sami</td><td>9/13/2021
4:02:43 PM</td><td> </td><td>7/4/2022 10:47:00 AM</td><td>Done </td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22914</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Cutting of stone edge should be aligned
</td><td>High</td><td>9/20/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:45 PM</td><td> </td><td>7/4/2022 10:46:58 AM</td><td>Done </td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22924</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Tiles are missing
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:59 PM</td><td> </td><td>7/4/2022 10:46:57 AM</td><td>Done </td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>22925</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Different textures for stone tiles
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:03:00 PM</td><td> </td><td>7/4/2022 10:46:56 AM</td><td>Done </td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>22926</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:03:02 PM</td><td> </td><td>7/4/2022 10:46:53 AM</td><td>Done </td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>23554</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Toothing between stone tiles </td><td>Low</td><td>9/28/2021
12:00:00 AM</td><td>Amr Nofal</td><td>9/21/2021 11:07:54 AM</td><td>
</td><td>7/4/2022 10:46:51 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23556</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Toothing between stone tiles </td><td>Low</td><td>10/12/2021
12:00:00 AM</td><td>Amr Nofal</td><td>9/21/2021 11:07:58 AM</td><td>
</td><td>7/4/2022 10:46:50 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23559</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Toothing between stone tiles </td><td>Low</td><td>10/12/2021
12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021 11:08:02 AM</td><td>
</td><td>7/4/2022 10:46:49 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23560</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/12/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:04 AM</td><td> </td><td>7/4/2022 10:46:47
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23561</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
grouting should be repaired </td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:06 AM</td><td> </td><td>7/4/2022 10:46:46
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23562</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Dust
and stains should be removed </td><td>Low</td><td>10/12/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/21/2021 11:08:08 AM</td><td> </td><td>7/4/2022
10:46:45 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23564</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:11 AM</td><td> </td><td>7/4/2022 10:46:43
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23668</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>10/13/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021
11:10:32 AM</td><td> </td><td>7/4/2022 10:46:42 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23670</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Dust and stains should be cleaned
</td><td>Low</td><td>10/13/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/22/2021
11:10:40 AM</td><td> </td><td>7/4/2022 10:46:40 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23676</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Poor cutting for stone
edge</td><td>Low</td><td>10/17/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/26/2021
10:19:59 AM</td><td> </td><td>7/4/2022 10:46:39 AM</td><td>Done </td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23678</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Dust and stains should be cleaned
</td><td>Low</td><td>10/17/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/26/2021
10:20:02 AM</td><td> </td><td>7/4/2022 10:46:38 AM</td><td>Done </td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23714</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>11/1/2021 12:00:00 AM</td><td>Amr Nofal</td><td>10/11/2021
10:29:28 AM</td><td> </td><td>7/4/2022 10:46:35 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23724</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>11/1/2021 12:00:00 AM</td><td>Amr Nofal</td><td>10/11/2021
10:37:48 AM</td><td> </td><td>7/4/2022 10:46:34 AM</td><td>Done </td><td>Part
11</td><td>&nbsp;</td>
</tr><tr>

<td>26792</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Drainage System</td><td>General
Snag</td><td>&#39;Damaged slot drain </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>ahmedsalem</td><td>3/1/2022 4:12:56 PM</td><td> </td><td>7/4/2022
10:39:07 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>28150</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Installation not to
specification/drawing</td><td>&#39;Rockwool needs better fixation and cladding
around</td><td>High</td><td>3/23/2022 12:00:00
PM</td><td>ahmedsalem</td><td>3/16/2022 2:40:30 PM</td><td> </td><td>7/4/2022
10:39:05 AM</td><td>&nbsp;</td><td>Museum Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>28151</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Installation not to
specification/drawing</td><td>&#39;Cladding need
adjustment</td><td>High</td><td>3/23/2022 12:00:00
PM</td><td>ahmedsalem</td><td>3/16/2022 2:40:32 PM</td><td> </td><td>7/4/2022
10:39:04 AM</td><td>&nbsp;</td><td>Museum Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>20440</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing lubricating gun for every 50
valve</td><td>High</td><td>8/12/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/5/2021 2:53:05 PM</td><td> </td><td>7/4/2022
10:35:09 AM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>16668</td><td> GAS RISER</td><td>CCB
GF</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;There is no lighting
system</td><td>High</td><td>3/14/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>3/7/2021 3:46:45 PM</td><td> </td><td>7/4/2022
10:34:07 AM</td><td>&nbsp;</td><td>CR.02.0G.009</td><td>&nbsp;</td>
</tr><tr>
<td>12496</td><td>ELEC. ROOM</td><td>MFPC
GF</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing cable and box label, missing fire
device cover, pulling cable not complete</td><td>High</td><td>10/29/2020 12:00:00
AM</td><td>Ahmed.Galal</td><td>10/22/2020 12:05:23 PM</td><td> </td><td>7/4/2022
10:33:34 AM</td><td>&nbsp;</td><td>DS.03.0G.55</td><td>&nbsp;</td>
</tr><tr>
<td>23707</td><td>Pyramid Ramp</td><td>Pyramid
Ramp</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Floor tiles and other finishes have not
been inspected. Area between Pyramid Ramp and Temple
Garden.</td><td>High</td><td>10/18/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/11/2021 9:53:41 AM</td><td> </td><td>7/4/2022 10:33:05
AM</td><td>This area will be included in the temple garden area</td><td>Pyramid
Ramp</td><td>&nbsp;</td>
</tr><tr>
<td>16678</td><td>ESCALATOR AREA</td><td>CCB
GF</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>3/14/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>3/7/2021 3:48:27 PM</td><td> </td><td>7/4/2022
10:32:32 AM</td><td>&nbsp;</td><td>CX.08.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>17863</td><td>ELECTRICAL SUBSTATION</td><td>PR
GF</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;SCADA
Panel activation for the Fiber loop cables and Simulation. SCADA Graphics not yet
done.</td><td>High</td><td>5/27/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>5/20/2021 9:21:56 AM</td><td> </td><td>7/4/2022 10:31:59
AM</td><td>&nbsp;</td><td>SP.00.0G.06</td><td>&nbsp;</td>
</tr><tr>
<td>25293</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Sprinkler
System</td><td>Drain valve</td><td>&#39;Need to remove cover from air vent and
gauge </td><td>High</td><td>11/29/2021 12:00:00
PM</td><td>ahmedsalem</td><td>11/22/2021 11:59:03 AM</td><td> </td><td>7/4/2022
8:18:14 AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>19682</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General Snag</td><td>&#39;Air
grill need cleaning </td><td>High</td><td>7/11/2021 12:00:00
PM</td><td>hossamreda</td><td>7/4/2021 2:36:36 PM</td><td> </td><td>7/4/2022
7:49:51 AM</td><td>&nbsp;</td><td>MW.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>19678</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Remove painting from air grills </td><td>High</td><td>7/11/2021
12:00:00 PM</td><td>hossamreda</td><td>7/4/2021 2:36:25 PM</td><td>
</td><td>7/4/2022 7:49:47
AM</td><td>&nbsp;</td><td>MW.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>14187</td><td>TUT_SC_04_041</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:03 PM</td><td> </td><td>7/3/2022
3:04:06 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14262</td><td>TUT_SC_04_016</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;/graphic,MEP works not checked yet/missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:55:44 PM</td><td> </td><td>7/3/2022
3:03:56 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14219</td><td>TUT_SC_04_040</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:48 PM</td><td> </td><td>7/3/2022
3:03:47 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14218</td><td>TUT_SC_04_013</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:46 PM</td><td> </td><td>7/3/2022
3:03:37 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14214</td><td>TUT_SC_04_017</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:41 PM</td><td> </td><td>7/3/2022
3:03:28 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14205</td><td>TUT_SC_04_022</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
PM</td><td>mohamed.sami</td><td>12/21/2020 2:54:28 PM</td><td> </td><td>7/3/2022
3:03:11 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14206</td><td>TUT_SC_04_021</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;graphic and MEP works not checked yet/ missing topic
label</td><td>High</td><td>12/28/2020 12:00:00
AM</td><td>mohamed.sami</td><td>12/21/2020 2:54:30 PM</td><td> </td><td>7/3/2022
3:02:58 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>30346</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;To be covered </td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:11 PM</td><td>
</td><td>7/3/2022 2:50:49
PM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30361</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Add c clips for fixation EMT flexible
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:31:33 PM</td><td> </td><td>7/3/2022 2:50:48
PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31276</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:45 AM</td><td> </td><td>7/3/2022
2:50:47 PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>17980</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;Finishing BACK-LIT GRAPH. TABLE &quot;HIS
HEALTH&quot; ( TUT_CIE_2_001-3 )</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 5:07:02 PM</td><td> </td><td>7/3/2022
2:50:17 PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>17979</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;Finishing BACK-LIT GRAPH. TABLE &quot;CARTER
MEDIA&quot; ( TUT_CIE_1_002 )</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 5:06:00 PM</td><td> </td><td>7/3/2022
2:50:03 PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>17978</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;Finishing BACK-LIT GRAPH. TABLE
&quot;DOCUMENTATION&quot; ( TUT_CIE_1_001 )</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 5:05:04 PM</td><td> </td><td>7/3/2022
2:49:58 PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>17976</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;Missing REACTIVE BACK-LIT BOX &quot;PEOPLE&quot; (
TUT_CIE_0_004 )</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 5:00:54 PM</td><td> </td><td>7/3/2022
2:49:38 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17990</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;Finishing ACCESSIBILITY TABLE &quot;LIFESTYLE
1&quot; ( TUT_CIE_4_001 ) and ACCESSIBILITY TABLE &quot;LIFESTYLE 2&quot;
( TUT_CIE_4_002 )</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 5:29:38 PM</td><td> </td><td>7/3/2022
2:49:24 PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>17988</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;Finishing ACCESSIBILITY TABLE &quot;MASK&quot;
( TUT_CIE_3_004 )</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 5:25:55 PM</td><td> </td><td>7/3/2022
2:49:04 PM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>17985</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;Finishing ACCESSIBILITY TABLE
&quot;DISCOVERY&quot; ( TUT_CIE_1_005 )</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 5:23:07 PM</td><td> </td><td>7/3/2022
2:48:52 PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>17991</td><td>TUT- (+45.00)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;Finishing ACCESSIBILITY TABLE &quot;REBIRTH&quot;
( TUT_CIE_5_001 )</td><td>High</td><td>5/31/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 5:30:47 PM</td><td> </td><td>7/3/2022
2:48:35 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17987</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;Finishing ACCESSIBILITY TABLE &quot;THRONE&quot; (
TUT_CIE_2_026 )</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 5:24:17 PM</td><td> </td><td>7/3/2022
2:48:14 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17989</td><td>TUT- (+45.00)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;Finishing ACCESSIBILITY TABLE &quot;FUNERAL&quot;
( TUT_CIE_3_005 )</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 5:27:07 PM</td><td> </td><td>7/3/2022
2:47:49 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16611</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;General for all tables the the sub contractor
didn’t finish the work to send CIR for cladding/lighting installation (arch and
electric)/power connection/graphic
This snag is valid for 16 Tables</td><td>Low</td><td>3/13/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>2/20/2021 2:47:52 PM</td><td> </td><td>7/3/2022
2:47:18 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31873</td><td>CORE E2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for air duct.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:39 PM</td><td> </td><td>7/3/2022 2:24:51
PM</td><td>&nbsp;</td><td>MC.13.02.E21</td><td>&nbsp;</td>
</tr><tr>
<td>31815</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Chilled water pipes thermal insulation need repairs.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:47 PM</td><td> </td><td>7/3/2022 2:06:19
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31796</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Chilled water pipe thermal insulation need repairs.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:14 PM</td><td> </td><td>7/3/2022 2:05:25
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31618</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing thermal insulation for condensate
drain pipes. </td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:55 AM</td><td> </td><td>7/3/2022 2:04:21
PM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30642</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation for chilled water pipes shall be replaced.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:21 AM</td><td> </td><td>7/3/2022 1:58:48
PM</td><td>&nbsp;</td><td>MQ.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29889</td><td>STAFF W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing air grill.
</td><td>High</td><td>6/1/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:59 PM</td><td> </td><td>7/3/2022 1:45:46
PM</td><td>&nbsp;</td><td>MW.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>31790</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;No thermal for FAD. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:32:05 PM</td><td>
</td><td>7/3/2022 1:44:15
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>28727</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to
specification/drawing</td><td>&#39;Condensate drain pipes shall be thermally
insulated. </td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:46:09 AM</td><td> </td><td>7/3/2022 1:43:37
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>25278</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Air vent closed by foam
</td><td>High</td><td>11/29/2021 12:00:00 PM</td><td>ahmedsalem</td><td>11/22/2021
11:58:19 AM</td><td> </td><td>7/3/2022 1:42:06 PM</td><td>&nbsp;</td><td>Museum
Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>30184</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire sprinklers covers are missing.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:49 AM</td><td> </td><td>7/3/2022 1:36:50
PM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30616</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing sprinkler cover plate.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:42 AM</td><td> </td><td>7/3/2022 1:36:17
PM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>30624</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing sprinkler head cover.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:53 AM</td><td> </td><td>7/3/2022 1:35:34
PM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>30626</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing sprinklers heads covers.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:56 AM</td><td> </td><td>7/3/2022 1:34:56
PM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>24399</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Gap is not aligned </td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>Moussa Nageh Khella</td><td>10/27/2021 4:26:15 PM</td><td>
</td><td>7/3/2022 1:15:01 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24227</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damaged ceiling tile need to
replaced.</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>10/26/2021 4:24:33 PM</td><td> </td><td>7/3/2022 1:14:19
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24229</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Metal ceiling not aligned.</td><td>Low</td><td>11/16/2021
12:00:00 PM</td><td>Moussa Nageh Khella</td><td>10/26/2021 4:24:35 PM</td><td>
</td><td>7/3/2022 1:14:18 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22128</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Sealer not done for marked part
</td><td>Low</td><td>9/13/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>8/23/2021 4:36:25 PM</td><td> </td><td>7/3/2022 12:37:20
PM</td><td>&nbsp;</td><td>South Facade- CCB</td><td>&nbsp;</td>
</tr><tr>
<td>22164</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;Cladding should be fixed properly </td><td>Low</td><td>9/13/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>8/23/2021 4:38:01 PM</td><td>
</td><td>7/3/2022 12:37:19 PM</td><td>&nbsp;</td><td>South Facade-
CCB</td><td>&nbsp;</td>
</tr><tr>
<td>22729</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/27/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>9/6/2021
3:42:04 PM</td><td> </td><td>7/3/2022 12:37:18 PM</td><td>&nbsp;</td><td>MU - North
Facade</td><td>&nbsp;</td>
</tr><tr>
<td>22737</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Facade -
Stone Cladding</td><td>Difference in colour/shade</td><td>&#39;There are difference
in shining between sealer application </td><td>Low</td><td>9/27/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>9/6/2021 3:42:14 PM</td><td> </td><td>7/3/2022
12:37:17 PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>22800</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
stone cladding</td><td>Not aligned</td><td>&#39;Stone tile should be aligned with
stainless steel profile</td><td>Low</td><td>9/29/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>9/8/2021 12:16:48 PM</td><td> </td><td>7/3/2022 12:37:16
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>22809</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Stainless steel should be cutting
aligned with louvre </td><td>Low</td><td>9/29/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>9/8/2021 12:17:01 PM</td><td> </td><td>7/3/2022 12:37:15
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23737</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Cladding is not leveled and the gap
should be the same width </td><td>Low</td><td>11/3/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:26 PM</td><td> </td><td>7/3/2022 12:37:14
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23738</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Cladding is not leveled
</td><td>Low</td><td>11/3/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:27 PM</td><td> </td><td>7/3/2022 12:37:13
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23762</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Gaps should be the same width
</td><td>Low</td><td>11/3/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:17:05 PM</td><td> </td><td>7/3/2022 12:37:12
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23795</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant is missing for marked parts
</td><td>Low</td><td>11/8/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/18/2021 4:29:22 PM</td><td> </td><td>7/3/2022 12:37:11
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>

<td>23874</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Joint between stone floor and stone cladding should be regular
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:19:38 PM</td><td> </td><td>7/3/2022 12:37:10
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23881</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Cracks should be repaired </td><td>Low</td><td>11/14/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/24/2021 12:19:50 PM</td><td>
</td><td>7/3/2022 12:37:09 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23886</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Stone cover should be flushed with stone
flooring</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:19:58 PM</td><td> </td><td>7/3/2022 12:37:09
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23891</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Stone of over flow is not finished
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:20:05 PM</td><td> </td><td>7/3/2022 12:37:06
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23892</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;All replaced tiles are polished and should be
matt</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:20:07 PM</td><td> </td><td>7/3/2022 12:37:05
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23913</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Gap between covers and stone should be closed
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:59:20 PM</td><td> </td><td>7/3/2022 12:37:03
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24024</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Stone should be leveled </td><td>Low</td><td>11/15/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:38:35 PM</td><td> </td><td>7/3/2022
12:37:01 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24040</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles </td><td>Low</td><td>11/15/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:39:03 PM</td><td> </td><td>7/3/2022
12:36:58 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24054</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Crack should be repaired </td><td>Low</td><td>11/15/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:39:27 PM</td><td> </td><td>7/3/2022
12:36:57 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24060</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Short tiles should be extended </td><td>Low</td><td>11/15/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:39:38 PM</td><td>
</td><td>7/3/2022 12:36:56 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24068</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Gaps
between stone cover and metal frame should be sealed
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:39:51 PM</td><td> </td><td>7/3/2022 12:36:55
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24072</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>11/15/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:39:58 PM</td><td>
</td><td>7/3/2022 12:36:54 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24076</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Joint should be regular and uniform
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:40:04 PM</td><td> </td><td>7/3/2022 12:36:54
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24080</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Stone covers should be flushed with stone flooring
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:40:13 PM</td><td> </td><td>7/3/2022 12:36:53
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24085</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Joints should be finished and should be aligned
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:40:22 PM</td><td> </td><td>7/3/2022 12:36:52
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24086</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken Edges should be repaired </td><td>Low</td><td>11/15/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:40:24 PM</td><td>
</td><td>7/3/2022 12:36:51 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24094</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>level</td><td>&#39;Interface between grating and stone flooring
should be leveled </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:40:56 PM</td><td> </td><td>7/3/2022 12:36:50
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24095</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Joint between overflow stone and grating should be regular and
aligned </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:40:57 PM</td><td> </td><td>7/3/2022 12:36:49
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24280</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles </td><td>Low</td><td>11/16/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/26/2021 4:41:21 PM</td><td> </td><td>7/3/2022
12:36:49 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24285</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between stone flooring with stone
cladding and corners should be sealed and closed </td><td>Low</td><td>11/16/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>10/26/2021 4:41:30 PM</td><td>
</td><td>7/3/2022 12:36:48 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24288</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Sealant joint should be regular ,leveled and smooth
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/26/2021 4:41:35 PM</td><td> </td><td>7/3/2022 12:36:47
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24292</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles </td><td>Low</td><td>11/16/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/26/2021 4:41:42 PM</td><td> </td><td>7/3/2022
12:36:46 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24423</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked stone tiles should be
replaced</td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>mohamed.sami</td><td>10/27/2021 4:43:59 PM</td><td> </td><td>7/3/2022
12:36:45 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24424</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked stone tiles should be
replaced</td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>mohamed.sami</td><td>10/27/2021 4:44:05 PM</td><td> </td><td>7/3/2022
12:36:44 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24640</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken/ cracked tiles should be replaced
</td><td>Low</td><td>11/21/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/31/2021 4:30:05 PM</td><td> </td><td>7/3/2022 12:36:35
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24642</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken/ cracked tiles should be replaced
</td><td>Low</td><td>11/21/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/31/2021 4:30:10 PM</td><td> </td><td>7/3/2022 12:36:33
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24643</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be replaced
</td><td>Low</td><td>11/21/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/31/2021 4:30:12 PM</td><td> </td><td>7/3/2022 12:36:32
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22443</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:13:35 PM</td><td> </td><td>7/3/2022 10:56:58 AM</td><td>Done </td><td>Part
2</td><td>&nbsp;</td>
</tr><tr>
<td>22502</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be adjusted
</td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/30/2021
11:04:09 AM</td><td> </td><td>7/3/2022 10:56:57 AM</td><td>Done </td><td>Part
6</td><td>&nbsp;</td>
</tr><tr>
<td>22504</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Cleaning is needed
</td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/30/2021
11:04:10 AM</td><td> </td><td>7/3/2022 10:56:56 AM</td><td>Done </td><td>Part
6</td><td>&nbsp;</td>
</tr><tr>
<td>22509</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/30/2021
11:04:14 AM</td><td> </td><td>7/3/2022 10:56:55 AM</td><td>Done </td><td>Part
6</td><td>&nbsp;</td>
</tr><tr>
<td>22586</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>Direction</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stainless steel gutter should be aligned
and fixed properly </td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/1/2021 10:49:22 AM</td><td> </td><td>7/3/2022 10:56:54
AM</td><td>Done </td><td>Part 5</td><td>&nbsp;</td>
</tr><tr>
<td>22995</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/15/2021
11:30:27 AM</td><td> </td><td>7/3/2022 10:56:53 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22996</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/15/2021
11:30:28 AM</td><td> </td><td>7/3/2022 10:56:52 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22997</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between tiles should be adjusted
</td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/15/2021
11:30:30 AM</td><td> </td><td>7/3/2022 10:56:51 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22998</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>10/6/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/15/2021
11:30:31 AM</td><td> </td><td>7/3/2022 10:56:50 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23000</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Area should be cleaned
</td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/15/2021
11:30:34 AM</td><td> </td><td>7/3/2022 10:56:49 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23002</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/15/2021
11:30:38 AM</td><td> </td><td>7/3/2022 10:56:48 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23003</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between tiles should be adjusted
</td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/15/2021
11:30:40 AM</td><td> </td><td>7/3/2022 10:56:47 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23004</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be adjusted
</td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/15/2021
11:30:42 AM</td><td> </td><td>7/3/2022 10:56:45 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23226</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:52:59 AM</td><td> </td><td>7/3/2022 10:56:44 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23227</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:53:03 AM</td><td> </td><td>7/3/2022 10:56:43 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23228</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:53:07 AM</td><td> </td><td>7/3/2022 10:56:42 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23229</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:53:09 AM</td><td> </td><td>7/3/2022 10:56:41 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26196</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Poor cutting for stone edge
</td><td>Low</td><td>3/10/2022 12:00:00 AM</td><td>Amr Nofal</td><td>2/17/2022
12:15:42 PM</td><td> </td><td>7/3/2022 10:56:40 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26279</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired </td><td>Low</td><td>3/15/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022 11:24:01 AM</td><td>
</td><td>7/3/2022 10:56:39 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26293</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired/treated
</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022
11:24:55 AM</td><td> </td><td>7/3/2022 10:56:38 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26295</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired/treated
</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022
11:25:03 AM</td><td> </td><td>7/3/2022 10:56:37 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26333</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/22/2022 3:28:51 PM</td><td> </td><td>7/3/2022
10:56:36 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26624</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be treated </td><td>Low</td><td>3/21/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022 11:12:48 AM</td><td>
</td><td>7/3/2022 10:56:35 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26725</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/22/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/1/2022 3:45:33 PM</td><td> </td><td>7/3/2022
10:56:34 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26892</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be treated </td><td>Low</td><td>3/23/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022 10:32:11 AM</td><td>
</td><td>7/3/2022 10:56:33 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27208</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken edges should be repaired </td><td>Low</td><td>3/27/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:39:26 PM</td><td>
</td><td>7/3/2022 10:56:32 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27222</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access panels are missing</td><td>Low</td><td>3/27/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:39:51 PM</td><td> </td><td>7/3/2022
10:56:31 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27226</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;All the welded points for trays to the
canopy be treated properly (sandpapered and paint)</td><td>Low</td><td>3/27/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:39:59 PM</td><td>
</td><td>7/3/2022 10:56:30 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27248</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;All stone cladding to be cleaned and sealer
adjusted to unify the color for all wall cladding </td><td>Low</td><td>3/27/2022
12:00:00 PM</td><td>Marios Ioannou,</td><td>3/6/2022 4:51:27 PM</td><td>
</td><td>7/3/2022 10:56:29 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>31967</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>
National Steel Fabrication NSF</td><td>Architectural</td><td>Acoustic
Walling</td><td>General Snag</td><td>&#39;</td><td>High</td><td>7/9/2022 12:00:00
AM</td><td>Mohamed Abdl Salam</td><td>7/2/2022 4:43:24 PM</td><td>
</td><td>7/2/2022 7:35:53
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13605</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing Sealant around metal door frame
</td><td>Low</td><td>12/14/2020 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>11/23/2020 3:44:59 PM</td><td> </td><td>7/2/2022 3:21:52
PM</td><td>Done </td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>30741</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Support should be fixed on
tray</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:39:39 PM</td><td> </td><td>6/29/2022
2:38:31 PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>20117</td><td>ESCAPE ROUTE-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;Work
not ready ( false ceiling not installed)</td><td>High</td><td>8/10/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/3/2021 11:29:28 AM</td><td>
</td><td>6/29/2022 2:38:05
PM</td><td>&nbsp;</td><td>MQ.18.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>27460</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting fixtures should be fixed properly
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:40:47 PM</td><td> </td><td>6/29/2022 2:38:04
PM</td><td>&nbsp;</td><td>MR.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30286</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:38 PM</td><td> </td><td>6/29/2022
2:38:02 PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30330</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Should installed properly
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:30:49 PM</td><td> </td><td>6/29/2022 2:38:00
PM</td><td>&nbsp;</td><td>MA.19.02.022</td><td>&nbsp;</td>
</tr><tr>
<td>30331</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Face plate</td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:50 PM</td><td>
</td><td>6/29/2022 2:37:58
PM</td><td>&nbsp;</td><td>MA.19.02.022</td><td>&nbsp;</td>
</tr><tr>
<td>30365</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wiring device should be sealed from any
openings </td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:39 PM</td><td> </td><td>6/29/2022
2:37:54 PM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30725</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:38:23 PM</td><td> </td><td>6/29/2022
2:37:49 PM</td><td>&nbsp;</td><td>MA.19.02.021</td><td>&nbsp;</td>
</tr><tr>
<td>30737</td><td>B.O.H-SERVICE TUNNEL (A) - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be installed inside tray
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:39:21 PM</td><td> </td><td>6/29/2022 2:37:46
PM</td><td>&nbsp;</td><td>MQ.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30750</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rod should be installed vertically
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:40:04 PM</td><td> </td><td>6/29/2022 2:37:38
PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30753</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be laying inside
tray</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:40:11 PM</td><td> </td><td>6/29/2022
2:37:36 PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30973</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire label</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:19:58 PM</td><td>
</td><td>6/29/2022 2:37:34
PM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31002</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth cable should be completed to earth
bar</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:45 PM</td><td> </td><td>6/29/2022
2:37:32 PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31006</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable tag</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:51 PM</td><td>
</td><td>6/29/2022 2:37:30
PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31010</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable arrangements and earth
jumber</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:58 PM</td><td> </td><td>6/29/2022
2:37:29 PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31013</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rod should be alignment
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:21:03 PM</td><td> </td><td>6/29/2022 2:37:26
PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31015</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:21:07 PM</td><td> </td><td>6/29/2022
2:37:21 PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>22465</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:14:16 PM</td><td> </td><td>6/29/2022 1:48:34 PM</td><td>Done </td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>22510</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/30/2021
11:04:16 AM</td><td> </td><td>6/29/2022 1:48:31 PM</td><td>Done </td><td>Part
6</td><td>&nbsp;</td>
</tr><tr>
<td>22621</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Bitted tiles should be replaced
</td><td>Low</td><td>9/22/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/1/2021
10:50:10 AM</td><td> </td><td>6/29/2022 1:48:30 PM</td><td>Done </td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>22830</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Slot drain should be adjusted and aligned
</td><td>Low</td><td>10/3/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/12/2021
10:47:56 AM</td><td> </td><td>6/29/2022 1:48:29 PM</td><td>Done </td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22834</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Bitted tiles should be replaced
</td><td>Low</td><td>10/3/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/12/2021
10:48:02 AM</td><td> </td><td>6/29/2022 1:48:28 PM</td><td>Done </td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22860</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Slot drain should be aligned with stone
flooring </td><td>Low</td><td>10/4/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/13/2021 11:21:40 AM</td><td> </td><td>6/29/2022 1:48:27
PM</td><td>Done </td><td>Part 9</td><td>&nbsp;</td>
</tr><tr>
<td>22901</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:35 PM</td><td> </td><td>6/29/2022 1:48:26 PM</td><td>Done </td><td>Part
5</td><td>&nbsp;</td>
</tr><tr>

<td>26298</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/22/2022 11:28:41 AM</td><td> </td><td>6/29/2022
1:48:24 PM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26299</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/22/2022 11:28:43 AM</td><td> </td><td>6/29/2022
1:48:24 PM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26305</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/22/2022 11:28:55 AM</td><td> </td><td>6/29/2022
1:48:22 PM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26308</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/22/2022 11:29:02 AM</td><td> </td><td>6/29/2022
1:48:21 PM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26310</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/22/2022 11:29:05 AM</td><td> </td><td>6/29/2022
1:48:20 PM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>30641</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Condensate drain
pipe is twisted and need to be adjusted. </td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/31/2022 11:52:19 AM</td><td>
</td><td>6/29/2022 1:43:34
PM</td><td>&nbsp;</td><td>MQ.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28350</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing differential pressure sensor.
</td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:39 AM</td><td> </td><td>6/29/2022 11:55:00
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28395</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Exhaust air duct not have acoustic lining as per SPECS.
</td><td>High</td><td>5/4/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/27/2022 11:45:01 AM</td><td> </td><td>6/29/2022 11:54:57
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>28469</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cladding for the insulated air duct not installed yet.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:31 PM</td><td> </td><td>6/29/2022 11:54:56
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28491</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Flexible duct connection shall be adjusted
and threaded rods shall be removed. </td><td>High</td><td>5/15/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/8/2022 4:15:12 PM</td><td>
</td><td>6/29/2022 11:54:55
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28949</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Canvases need adjustment and connection threaded rod shall be
removed. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:56 PM</td><td> </td><td>6/29/2022 11:54:52
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29175</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing labels for air ducts. </td><td>High</td><td>5/29/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:58:45 AM</td><td>
</td><td>6/29/2022 11:54:50
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>30030</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Hose reel connection need adjustments.
</td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:48 AM</td><td> </td><td>6/29/2022 11:54:49
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>11234</td><td>W.C. LOBBY</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Stained</td><td>&#39;Marked Stains and discoloring
</td><td>Low</td><td>10/13/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>9/22/2020 12:14:40 PM</td><td> </td><td>6/29/2022 11:46:40
AM</td><td>Permanent deduction has been
made.</td><td>CW.08.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>11386</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloring between
tiles</td><td>Low</td><td>10/14/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>9/23/2020 12:13:26 PM</td><td> </td><td>6/29/2022 11:44:08
AM</td><td>Permanent deduction has been
made.</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>11549</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloring between stone tiles
</td><td>Low</td><td>10/15/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>9/24/2020 12:07:57 PM</td><td> </td><td>6/29/2022 11:42:17
AM</td><td>Permanent deduction has been
made.</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>11582</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloring between tiles- broken
edges</td><td>Low</td><td>10/15/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>9/24/2020 12:08:43 PM</td><td> </td><td>6/29/2022 11:40:03
AM</td><td>Permanent deduction has been
made.</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>12472</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloring between tiles
</td><td>Low</td><td>11/12/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/22/2020 12:02:16 PM</td><td> </td><td>6/29/2022 11:38:02
AM</td><td>Permanent deduction has been
made.</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>13046</td><td>DIRECTORS ROOF GARDEN</td><td>CCB
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Color
variations </td><td>Low</td><td>11/23/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/2/2020 4:28:33 PM</td><td> </td><td>6/29/2022 11:34:30
AM</td><td>Permanent deduction has been
made.</td><td>CX.02.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>13061</td><td>DIRECTORS ROOF GARDEN</td><td>CCB
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Variations in stone tiles /black stains
</td><td>Low</td><td>11/23/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/2/2020 4:34:20 PM</td><td> </td><td>6/29/2022 11:32:18
AM</td><td>Permanent deduction has been
made.</td><td>CX.02.03.004</td><td>&nbsp;</td>
</tr><tr>
<td>13128</td><td>ENVIRO. LOBBY</td><td>CCB
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloring between tiles
</td><td>Low</td><td>11/24/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2020 3:09:31 PM</td><td> </td><td>6/29/2022 11:30:16
AM</td><td>Permanent deduction has been
made.</td><td>CA.08.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>13141</td><td>ENVIRO. LOBBY</td><td>CCB
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloring between tiles
</td><td>Low</td><td>11/24/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2020 3:13:09 PM</td><td> </td><td>6/29/2022 11:28:18
AM</td><td>Permanent deduction has been
made.</td><td>CA.03.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>24401</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
flooring need to cleaning.</td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>Moussa Nageh Khella</td><td>10/27/2021 4:26:18 PM</td><td>
</td><td>6/29/2022 11:27:20 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24408</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone flooring need to
cleaning.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>10/27/2021 4:26:29 PM</td><td> </td><td>6/29/2022 11:27:19
AM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>15423</td><td>ENVIRO. LOBBY</td><td>CCB
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloring between stone
tiles</td><td>Low</td><td>2/16/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>1/26/2021 4:25:01 PM</td><td> </td><td>6/29/2022 11:26:23
AM</td><td>Permanent deduction has been
made.</td><td>CA.08.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>13152</td><td>Level +45.00</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Joints between stone walls and floor need
adjustment </td><td>High</td><td>11/10/2020 12:00:00
PM</td><td>sally.george</td><td>11/3/2020 4:35:30 PM</td><td> </td><td>6/29/2022
11:26:02 AM</td><td>please check (MST-104123- 0159) for the approved
tolerances.</td><td>Level +45.00</td><td>&nbsp;</td>
</tr><tr>
<td>9176</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 7B - light between stone tiles /
discoloring between tiles </td><td>Low</td><td>7/8/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>6/17/2020 11:39:11 AM</td><td> </td><td>6/29/2022 11:25:21
AM</td><td>please check (MST-104123- 0159) for the approved
tolerances.</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>15710</td><td>3D THEATER FOYER</td><td>CCB
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Color discoloration
</td><td>Low</td><td>2/23/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>2/2/2021
4:10:54 PM</td><td> </td><td>6/29/2022 11:24:32 AM</td><td>Permanent deduction has
been made.</td><td>CT.03.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>15776</td><td>AUDITORIUM FOYER</td><td>CCB
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Color discoloration
</td><td>High</td><td>2/10/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/3/2021 4:03:42 PM</td><td> </td><td>6/29/2022 11:22:28
AM</td><td>Permanent deduction has been
made.</td><td>CA.08.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>15796</td><td>CONFERENCE FOYER</td><td>CCB
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between tiles
</td><td>High</td><td>2/10/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/3/2021 4:04:26 PM</td><td> </td><td>6/29/2022 11:07:10
AM</td><td>Permanent deduction has been
made.</td><td>CX.03.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>15993</td><td>CORRIDOR</td><td>CCB
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration of
tiles</td><td>Low</td><td>3/1/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/8/2021 4:45:39 PM</td><td> </td><td>6/29/2022 11:05:10
AM</td><td>Permanent deduction has been
made.</td><td>CS.02.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>18889</td><td>CORE F6</td><td>CCB
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>7/4/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>6/13/2021
12:10:32 PM</td><td> </td><td>6/29/2022 11:03:12 AM</td><td>Permanent deduction has
been made.</td><td>CC.08.01.F61</td><td>&nbsp;</td>
</tr><tr>
<td>19462</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>7/19/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>6/28/2021 4:17:28 PM</td><td> </td><td>6/29/2022 11:01:12
AM</td><td>Permanent deduction has been
made.</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16438</td><td>OUTDOOR TERRACE_02</td><td>PR
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;False ceiling need to clean ,
adjustment and leveling </td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>2/14/2021 3:49:54 PM</td><td> </td><td>6/29/2022 10:56:51
AM</td><td>Permanent Deduction has been
made.</td><td>SP.00.0G.21</td><td>&nbsp;</td>
</tr><tr>
<td>30874</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Around floor boxes should be
finished.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:56 AM</td><td> </td><td>6/29/2022 9:19:26
AM</td><td>&nbsp;</td><td>MS.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31135</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Area not
cleaned/finished.</td><td>&#39;Failure of concrete around pipe penetration.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:17 PM</td><td> </td><td>6/29/2022 9:19:05
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29264</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing cladding.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:37 PM</td><td> </td><td>6/29/2022 8:33:29
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29176</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing access door. </td><td>High</td><td>5/29/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:58:46 AM</td><td>
</td><td>6/29/2022 8:31:43
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>30021</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air ducts.
</td><td>High</td><td>6/5/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:33 AM</td><td> </td><td>6/29/2022 8:28:41
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>31787</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning for air duct.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:31:59 PM</td><td> </td><td>6/29/2022 8:27:58
AM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>29308</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Condensate drain pipes shall be
located inside the funnel with an elbow. </td><td>High</td><td>5/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/23/2022 4:32:48 PM</td><td>
</td><td>6/29/2022 8:26:45
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29293</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;FCU canvases damaged.
</td><td>High</td><td>5/30/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:20 PM</td><td> </td><td>6/29/2022 8:22:29
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>31590</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Fire damper seal shall be covered.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:05 AM</td><td> </td><td>6/29/2022 8:21:34
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30410</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:48 PM</td><td> </td><td>6/29/2022 8:16:46
AM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30635</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers heads covers shall be
installed. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:11 AM</td><td> </td><td>6/29/2022 8:15:13
AM</td><td>&nbsp;</td><td>MR.14.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30638</td><td>PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Sprinklers heads covers shall be installed.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:15 AM</td><td> </td><td>6/29/2022 8:12:08
AM</td><td>&nbsp;</td><td>MR.14.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30640</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers heads shall be installed.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:18 AM</td><td> </td><td>6/29/2022 8:05:48
AM</td><td>&nbsp;</td><td>MR.14.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>13025</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>MEP
Fixtures</td><td>Damaged</td><td>&#39;Need to clean all shafts
</td><td>High</td><td>11/9/2020 12:00:00 AM</td><td>ahmedsalem</td><td>11/2/2020
3:25:42 PM</td><td> </td><td>6/28/2022 4:41:28
PM</td><td>&nbsp;</td><td>MW.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>29013</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing acoustic lining for ex air duct.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:19 PM</td><td> </td><td>6/28/2022 4:41:20
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29033</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing acoustic lining for ex. Air duct.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:25 PM</td><td> </td><td>6/28/2022 4:41:19
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29040</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Canvases need adjustments and threaded rods shall be removed.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:38 PM</td><td> </td><td>6/28/2022 4:41:18
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29068</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Canvases need to be repaired or changed and
threaded rods shall be removed. </td><td>High</td><td>5/25/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/18/2022 11:56:23 AM</td><td>
</td><td>6/28/2022 4:41:16
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29085</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing canvas for duct connection.
</td><td>High</td><td>5/26/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:40 AM</td><td> </td><td>6/28/2022 4:41:15
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29086</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Canvases need repairs and threaded rods
shall removed. </td><td>High</td><td>5/26/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:41 AM</td><td> </td><td>6/28/2022 4:41:14
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29265</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal installation for air duct.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:39 PM</td><td> </td><td>6/28/2022 4:41:09
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30799</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Canvases need adjustments.
</td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:24 PM</td><td> </td><td>6/28/2022 4:41:08
PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31158</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Clash between air duct and hydronic pipes.
</td><td>High</td><td>6/8/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:53 PM</td><td> </td><td>6/28/2022 4:41:07
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31168</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dampers actuators have missing parts.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:54:22 PM</td><td> </td><td>6/28/2022 4:41:06
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31203</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dampers actuators have some missing parts.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:55:49 PM</td><td> </td><td>6/28/2022 4:41:05
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31341</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dampers actuators have missing parts.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:03 AM</td><td> </td><td>6/28/2022 4:41:02
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31379</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Motorized dampers actuators have some
missing parts. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:55:19 AM</td><td> </td><td>6/28/2022 4:41:01
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31434</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Motorized damper actuator have missing
parts. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:57:15 AM</td><td> </td><td>6/28/2022 4:41:00
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31452</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensors shall be
connected. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:58:03 AM</td><td> </td><td>6/28/2022 4:40:59
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31731</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Canvases shall be repaired and adjusted.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:55:08 AM</td><td> </td><td>6/28/2022 4:40:56
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31738</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage thermal insulation for hydronic pipes.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:55:21 AM</td><td> </td><td>6/28/2022 4:40:53
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31757</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Canvases shall be repaired and adjusted.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:56:02 AM</td><td> </td><td>6/28/2022 4:40:52
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31824</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Canvases shall be adjusted and repaired.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:33:02 PM</td><td> </td><td>6/28/2022 4:40:49
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31832</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:33:18 PM</td><td>
</td><td>6/28/2022 4:40:48
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31843</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Canvases need repairs. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:33:41 PM</td><td>
</td><td>6/28/2022 4:40:47
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>20531</td><td>UNIVERSAL DISABLED W.C.</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Grouting need adjustment
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:08 PM</td><td> </td><td>6/28/2022 2:55:49
PM</td><td>&nbsp;</td><td>MW.14.01.001C</td><td>&nbsp;</td>
</tr><tr>
<td>20547</td><td>CORRIDOR</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up for concrete flooring
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:25 PM</td><td> </td><td>6/28/2022 2:55:25
PM</td><td>&nbsp;</td><td>MS.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20551</td><td>ELEC.</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up for concrete flooring
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:29 PM</td><td> </td><td>6/28/2022 2:55:20
PM</td><td>&nbsp;</td><td>MS.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20189</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing Sealant around metal door frame
</td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/3/2021
3:38:48 PM</td><td> </td><td>6/28/2022 2:54:45
PM</td><td>&nbsp;</td><td>MS.13.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>16967</td><td>ESCAPE ROUTE-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls painting need touchup /vertical joint
should be aligned </td><td>Low</td><td>4/1/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/11/2021 12:26:50 PM</td><td> </td><td>6/28/2022 2:54:37
PM</td><td>&nbsp;</td><td>MQ.18.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20185</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up for dust sealer
</td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/3/2021
3:38:42 PM</td><td> </td><td>6/28/2022 2:54:21
PM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>20175</td><td>SERVICE DELIVERY-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Scratches</td><td>&#39;Welding line need to finish and touch up
</td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/3/2021
3:38:07 PM</td><td> </td><td>6/28/2022 2:54:08
PM</td><td>&nbsp;</td><td>MQ.18.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>20247</td><td>WC /M</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>To be repainted</td><td>&#39;Ceiling should be adjusted and repainted
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:38 PM</td><td> </td><td>6/28/2022 2:53:55
PM</td><td>&nbsp;</td><td>MW.18.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>20251</td><td>WC /F</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling needs adjustment and touchup painting
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:44 PM</td><td> </td><td>6/28/2022 2:53:50
PM</td><td>&nbsp;</td><td>MW.18.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>14991</td><td>STORAGE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up for flooring
</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>1/19/2021
11:36:06 AM</td><td> </td><td>6/28/2022 2:53:35
PM</td><td>&nbsp;</td><td>MS.19.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>14988</td><td>STORAGE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;CIR for painting not submitted
</td><td>Low</td><td>2/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>1/19/2021
11:35:59 AM</td><td> </td><td>6/28/2022 2:53:30
PM</td><td>&nbsp;</td><td>MS.19.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20492</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up for concrete flooring
sealer </td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/8/2021 12:08:31 PM</td><td> </td><td>6/28/2022 2:53:19
PM</td><td>&nbsp;</td><td>MQ.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20691</td><td>STORE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
11:39:59 AM</td><td> </td><td>6/28/2022 2:53:14
PM</td><td>&nbsp;</td><td>MT.14.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>14964</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Patches/Touch up</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>1/19/2021
11:35:05 AM</td><td> </td><td>6/28/2022 2:53:07
PM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>14978</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Missing Sealant around Mep fixtures </td><td>Low</td><td>2/9/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>1/19/2021 11:35:37 AM</td><td>
</td><td>6/28/2022 2:53:02
PM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>28061</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/15/2022
10:56:08 AM</td><td> </td><td>6/28/2022 2:52:55
PM</td><td>&nbsp;</td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>14969</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Opening around louvre should be clarified
</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>1/19/2021
11:35:14 AM</td><td> </td><td>6/28/2022 2:52:44
PM</td><td>&nbsp;</td><td>MS.20.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>28907</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Marked wavy gypsum board should be
leveled </td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/17/2022 11:47:28 AM</td><td> </td><td>6/28/2022 2:42:41
PM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30438</td><td>PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing floor
finish.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:31 AM</td><td> </td><td>6/28/2022 2:42:14
PM</td><td>&nbsp;</td><td>MR.14.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30434</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing floor
finish.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:25 AM</td><td> </td><td>6/28/2022 2:42:10
PM</td><td>&nbsp;</td><td>MR.14.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30519</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Missing floor
finishes</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:45:14 AM</td><td> </td><td>6/28/2022 2:42:05
PM</td><td>&nbsp;</td><td>MR.14.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>28096</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Broken access door should be replaced
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/16/2022
10:59:31 AM</td><td> </td><td>6/28/2022 2:41:43
PM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>30468</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Grill should be
aligned.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:17 AM</td><td> </td><td>6/28/2022 2:41:35
PM</td><td>&nbsp;</td><td>MA.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>28218</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Metal trim is missing </td><td>Low</td><td>4/10/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/20/2022 12:04:07 PM</td><td> </td><td>6/28/2022
2:41:22 PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>28011</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Broken /cracked metal trim should be
repaired</td><td>Low</td><td>4/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>3/14/2022 11:38:53 AM</td><td> </td><td>6/28/2022
2:40:56 PM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>28008</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked parts need touch up painting </td><td>Low</td><td>4/4/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/14/2022 11:38:48 AM</td><td>
</td><td>6/28/2022 2:40:50
PM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>27334</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Final coat is not done
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:27 PM</td><td> </td><td>6/28/2022 2:40:17
PM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27503</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Snagging after removing the scaffolding and
cleaned </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 4:42:04 PM</td><td> </td><td>6/28/2022
2:40:02 PM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>27475</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked parts need touch up painting
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:12 PM</td><td> </td><td>6/28/2022 2:39:53
PM</td><td>&nbsp;</td><td>MR.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18019</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Damaged ceiling
tiles</td><td>Low</td><td>6/15/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/25/2021 12:26:28 PM</td><td> </td><td>6/28/2022
2:27:59 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31580</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame and accessories need to clean from both
sides.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:37:12 PM</td><td> </td><td>6/28/2022 2:27:14
PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31576</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware accessories.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:37:07 PM</td><td> </td><td>6/28/2022 2:26:42
PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29100</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Furniture Leafs should be leveled </td><td>Low</td><td>6/9/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/19/2022 12:04:13 PM</td><td>
</td><td>6/28/2022 2:26:14
PM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>26764</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>Architectural</td><td>Ceiling -
Ceiling paint</td><td>Termination between finishes to be
rectified</td><td>&#39;RFID antenna gap should be adjusted with white cement or
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:46:23 PM</td><td> </td><td>6/28/2022 2:24:45
PM</td><td>&nbsp;</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30485</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Edges of ceiling need to
adjusted.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:44 AM</td><td> </td><td>6/28/2022 2:23:28
PM</td><td>&nbsp;</td><td>MT.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30484</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint should be
adjusted.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:43 AM</td><td> </td><td>6/28/2022 2:22:50
PM</td><td>&nbsp;</td><td>MT.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30481</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling trim need to clean from
paint.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:38 AM</td><td> </td><td>6/28/2022 2:22:12
PM</td><td>&nbsp;</td><td>MT.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>27479</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Gap should be closed and sealed /grouting is missing
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022
4:41:20 PM</td><td> </td><td>6/28/2022 2:21:45
PM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27358</td><td>LOBBY</td><td>MU L20</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/28/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022 12:13:14 PM</td><td>
</td><td>6/28/2022 2:20:57
PM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>14377</td><td>B.O.H-ARTEFACTS LOBBY - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up /work not finished
yet</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:25:15 PM</td><td> </td><td>6/28/2022 2:20:03
PM</td><td>&nbsp;</td><td>MQ.23.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28836</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing Sealant around door
frame.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:36 AM</td><td> </td><td>6/28/2022 2:19:22
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31702</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Should be adjusted
(toothing)</td><td>Low</td><td>6/27/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/6/2022 11:52:19 AM</td><td> </td><td>6/28/2022 2:18:44
PM</td><td>&nbsp;</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31696</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>T and D design</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;All skirting need touch up painting
</td><td>Low</td><td>6/27/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022
11:52:07 AM</td><td> </td><td>6/28/2022 2:18:12
PM</td><td>&nbsp;</td><td>MR.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30536</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked bolt should be removed </td><td>Low</td><td>6/21/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022 11:45:42 AM</td><td>
</td><td>6/28/2022 2:17:30
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30520</td><td>LIBRARY</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Wall - Skirting</td><td>Other
Snag</td><td>&#39;Joints between skirting and carpet should be leveled and adjusted
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:17 AM</td><td> </td><td>6/28/2022 2:17:00
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30449</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Crack should be
repaired.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:47 AM</td><td> </td><td>6/28/2022 2:16:31
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>20673</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All
floor boxes are rusted and should be replaced </td><td>High</td><td>8/17/2021
12:00:00 AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/10/2021 11:18:43 AM</td><td>
</td><td>6/28/2022 2:13:53
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20939</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;wiring
devices not installed and not terminated in all floor
boxes</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:33 AM</td><td> </td><td>6/28/2022 2:13:52
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20951</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;wiring
devices not installed and not terminated in all floor
boxes</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:52 AM</td><td> </td><td>6/28/2022 2:13:51
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>22372</td><td>ESCAPE ROUTE-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work all of lighting fixtures and
fire devices and ict devices not installed </td><td>High</td><td>9/1/2021 12:00:00
PM</td><td>Sameh Ibrahim El-Sawah</td><td>8/25/2021 11:53:27 AM</td><td>
</td><td>6/28/2022 2:13:50
PM</td><td>&nbsp;</td><td>MQ.18.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>30329</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire label </td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:48 PM</td><td>
</td><td>6/28/2022 2:13:49
PM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30339</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Threaded rod should be aligned
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:31:00 PM</td><td> </td><td>6/28/2022 2:13:48
PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31275</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Material should be removed
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/2/2022
11:14:43 AM</td><td> </td><td>6/28/2022 2:13:47
PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31278</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label and cover
box</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:48 AM</td><td> </td><td>6/28/2022
2:13:46 PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31279</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:49 AM</td><td> </td><td>6/28/2022
2:13:45 PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30445</td><td>CATALOGUE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint between skirting and carpet should be
leveled.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:42 AM</td><td> </td><td>6/28/2022 2:08:13
PM</td><td>&nbsp;</td><td>MR.14.02.012- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30440</td><td>CATALOGUE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:33 AM</td><td> </td><td>6/28/2022 2:07:28
PM</td><td>&nbsp;</td><td>MR.14.02.012- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30186</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All protection should be
removed.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 11:50:00 AM</td><td> </td><td>6/28/2022 2:06:47
PM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>31933</td><td>Core G3</td><td>MU GF
</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing Fire damper label.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:09 PM</td><td> </td><td>6/28/2022 1:53:14
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>30111</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling need touch up painting
</td><td>Low</td><td>6/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
11:37:13 AM</td><td> </td><td>6/28/2022 1:33:51
PM</td><td>&nbsp;</td><td>MA.19.02.020</td><td>&nbsp;</td>
</tr><tr>
<td>21457</td><td>Glazing Wall Internal Side</td><td>Glazing
wall</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>Wall
- Metal cladding</td><td>Damages to be rectified or replaced</td><td>&#39;Damaged
four panels should be replaced </td><td>Low</td><td>9/8/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>8/18/2021 11:43:47 AM</td><td>
</td><td>6/28/2022 1:32:30 PM</td><td>&nbsp;</td><td>Glazing Wall Internal
Side</td><td>&nbsp;</td>
</tr><tr>
<td>30453</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to touch
up.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:53 AM</td><td> </td><td>6/28/2022 1:32:25
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30446</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Access door need to touch
up.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:43 AM</td><td> </td><td>6/28/2022 1:31:47
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>28856</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All Skirting need to touch
up.</td><td>Low</td><td>6/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/16/2022
11:36:01 AM</td><td> </td><td>6/28/2022 1:31:19
PM</td><td>&nbsp;</td><td>MA.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31229</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around door frame.</td><td>Low</td><td>6/23/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022 10:40:21 AM</td><td>
</td><td>6/28/2022 1:30:08
PM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30464</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cleaning electrical boxes and grill from
paint.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:11 AM</td><td> </td><td>6/28/2022 1:29:29
PM</td><td>&nbsp;</td><td>MA.19.02.015</td><td>&nbsp;</td>
</tr><tr>
<td>30442</td><td>CATALOGUE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Grill should be
adjusted.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:36 AM</td><td> </td><td>6/28/2022 1:28:40
PM</td><td>&nbsp;</td><td>MR.14.02.012- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30224</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to repair and touch
up.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 1:01:22 PM</td><td> </td><td>6/28/2022 1:27:59
PM</td><td>&nbsp;</td><td>MA.19.02.017</td><td>&nbsp;</td>
</tr><tr>
<td>30097</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked joint should be closed </td><td>Low</td><td>6/20/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022 11:36:59 AM</td><td>
</td><td>6/28/2022 1:27:13
PM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14368</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up </td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/24/2020 1:24:53 PM</td><td> </td><td>6/28/2022
1:26:08 PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>14359</td><td>B.O.H-WET DELIVERY TUNNEL - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Touch up paint for walls/walls need repainting
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:30 PM</td><td> </td><td>6/28/2022 1:25:22
PM</td><td>&nbsp;</td><td>MQ.23.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31705</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy edge should be aligned and uniform
</td><td>Low</td><td>6/27/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022
11:52:24 AM</td><td> </td><td>6/28/2022 1:22:18
PM</td><td>&nbsp;</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31248</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around door frame.</td><td>Low</td><td>6/23/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022 10:41:22 AM</td><td>
</td><td>6/28/2022 1:21:13
PM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30466</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to touch
up.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:15 AM</td><td> </td><td>6/28/2022 1:18:57
PM</td><td>&nbsp;</td><td>MA.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30153</td><td>LOBBY</td><td>MU L20</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;Marked
crack should be repaired </td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 11:38:00 AM</td><td> </td><td>6/28/2022 1:18:18
PM</td><td>&nbsp;</td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30126</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Wall - Skirting</td><td>Other
Snag</td><td>&#39;Skirting is missing </td><td>Low</td><td>6/20/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/30/2022 11:37:30 AM</td><td> </td><td>6/28/2022
1:17:32 PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30095</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Damaged wall should be repaired
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
11:36:56 AM</td><td> </td><td>6/28/2022 1:16:54
PM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30093</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant is missing for marked
parts</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 11:36:54 AM</td><td> </td><td>6/28/2022 1:15:49
PM</td><td>&nbsp;</td><td>MS.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>28743</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked parts should be closed </td><td>Low</td><td>6/1/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022 11:48:00 AM</td><td>
</td><td>6/28/2022 1:14:37
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28230</td><td>CURATOR</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Wall - Skirting</td><td>Other
Snag</td><td>&#39;All joints need touch up </td><td>Low</td><td>4/10/2022 12:00:00
PM</td><td>mohamed.sami</td><td>3/20/2022 12:04:31 PM</td><td> </td><td>6/28/2022
1:13:17 PM</td><td>&nbsp;</td><td>MA.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31674</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Seismic restrains for AHU is missing.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:17 PM</td><td> </td><td>6/28/2022 1:11:20
PM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>21004</td><td>CORE B1 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Interface between gypsum wall and concrete wall should be leveled
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:12:37 AM</td><td> </td><td>6/28/2022 1:10:19
PM</td><td>&nbsp;</td><td>MC.23.02.B11</td><td>&nbsp;</td>
</tr><tr>
<td>30793</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;No seismic bracing installed for
pressurization fans. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:14 PM</td><td> </td><td>6/28/2022 1:10:10
PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30708</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
4:16:00 PM</td><td> </td><td>6/28/2022 1:08:51
PM</td><td>&nbsp;</td><td>MA.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31496</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Seismic restrains are missing.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:20 PM</td><td> </td><td>6/28/2022 1:08:33
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>30703</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
4:15:55 PM</td><td> </td><td>6/28/2022 1:08:18
PM</td><td>&nbsp;</td><td>MA.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30615</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:51:42 AM</td><td> </td><td>6/28/2022 1:07:47
PM</td><td>&nbsp;</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30607</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories and door frame need to clean
</td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:51:35 AM</td><td> </td><td>6/28/2022 1:06:47
PM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30599</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;All hardware accessories need to clean
</td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:51:22 AM</td><td> </td><td>6/28/2022 1:05:44
PM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30562</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked parts need repair and touch up painting
(surrounded)</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:46:37 AM</td><td> </td><td>6/28/2022 1:04:12
PM</td><td>&nbsp;</td><td>MT.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>21555</td><td>CORE B3 - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Gypsum wall not leveled with concrete wall
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
9:51:59 AM</td><td> </td><td>6/28/2022 1:02:16
PM</td><td>&nbsp;</td><td>MC.12.02.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21187</td><td>B.O.H-CORE B2 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wall needs touch up painting
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:57:05 AM</td><td> </td><td>6/28/2022 1:00:38
PM</td><td>&nbsp;</td><td>MC.18.02.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21183</td><td>B.O.H-CORE B2 - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Inclined supports should be adjusted
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:56:57 AM</td><td> </td><td>6/28/2022 12:59:56
PM</td><td>&nbsp;</td><td>MC.18.02.B21</td><td>&nbsp;</td>
</tr><tr>
<td>30659</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage drain pan thermal insulation
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:49 AM</td><td> </td><td>6/28/2022 12:59:53
PM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>20999</td><td>CORE B1 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Crack should be repaired
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:12:25 AM</td><td> </td><td>6/28/2022 12:58:58
PM</td><td>&nbsp;</td><td>MC.23.02.B11</td><td>&nbsp;</td>
</tr><tr>
<td>31767</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguishers.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:56:24 AM</td><td> </td><td>6/28/2022 12:57:53
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>14378</td><td>B.O.H-ARTEFACTS LOBBY - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Flooring need touch up
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:25:18 PM</td><td> </td><td>6/28/2022 12:57:24
PM</td><td>&nbsp;</td><td>MQ.23.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>14360</td><td>B.O.H-SERVICE TUNNEL (A) - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need repainting </td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/24/2020 1:24:32 PM</td><td> </td><td>6/28/2022
12:56:42 PM</td><td>&nbsp;</td><td>MQ.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28405</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Technica Co.</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing pipe support for
the elbow. </td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:01 PM</td><td> </td><td>6/28/2022 12:56:39
PM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>31697</td><td>CURATOR</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Wall - Skirting</td><td>Other
Snag</td><td>&#39;All skirting need touch up painting
</td><td>Low</td><td>6/27/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022
11:52:09 AM</td><td> </td><td>6/28/2022 12:56:05
PM</td><td>&nbsp;</td><td>MA.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>21184</td><td>B.O.H-CORE B2 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>9/7/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/17/2021 10:57:00 AM</td><td> </td><td>6/28/2022
12:54:06 PM</td><td>&nbsp;</td><td>MC.18.02.B21</td><td>&nbsp;</td>
</tr><tr>
<td>31708</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Joint should be adjusted
</td><td>Low</td><td>6/27/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022
11:52:29 AM</td><td> </td><td>6/28/2022 12:53:37
PM</td><td>&nbsp;</td><td>MR.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>16057</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing light inside AHU
</td><td>High</td><td>2/16/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>2/9/2021 4:43:42 PM</td><td> </td><td>6/28/2022 12:52:06
PM</td><td>&nbsp;</td><td>MS.23.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30384</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:06 PM</td><td> </td><td>6/28/2022 12:50:23
PM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30627</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing sprinklers heads covers.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:58 AM</td><td> </td><td>6/28/2022 12:49:16
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30629</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire sprinklers covers is missing.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:01 AM</td><td> </td><td>6/28/2022 12:48:39
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30630</td><td>ELECTRONIC LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Sprinklers covers is missing.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:02 AM</td><td> </td><td>6/28/2022 12:47:46
PM</td><td>&nbsp;</td><td>MR.14.02.009- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30633</td><td>CATALOGUE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers heads shall be installed.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:06 AM</td><td> </td><td>6/28/2022 12:46:18
PM</td><td>&nbsp;</td><td>MR.14.02.012- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30644</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers heads covers are missing.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:24 AM</td><td> </td><td>6/28/2022 12:43:33
PM</td><td>&nbsp;</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30561</td><td>TEMP. EXH. OFFICE</td><td>MU
L20</td><td>Closed</td><td>T and D design</td><td>Architectural</td><td>Carpet
Floor</td><td>General Snag</td><td>&#39;Carpet around boxes should be glued
properly</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:46:35 AM</td><td> </td><td>6/28/2022 12:42:54
PM</td><td>&nbsp;</td><td>MT.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30648</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing sprinklers heads covers.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:28 AM</td><td> </td><td>6/28/2022 12:42:48
PM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30454</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Edge should be
aligned.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:54 AM</td><td> </td><td>6/28/2022 12:42:27
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30675</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers covers not installed yet.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:53:14 AM</td><td> </td><td>6/28/2022 12:42:12
PM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30443</td><td>CATALOGUE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to touch
up.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:38 AM</td><td> </td><td>6/28/2022 12:41:50
PM</td><td>&nbsp;</td><td>MR.14.02.012- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30441</td><td>CATALOGUE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling painting need to touch up and
repaint.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:35 AM</td><td> </td><td>6/28/2022 12:41:13
PM</td><td>&nbsp;</td><td>MR.14.02.012- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30222</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to
repair.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:59:42 PM</td><td> </td><td>6/28/2022 12:40:39
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30774</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers heads covers are missing.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:36 PM</td><td> </td><td>6/28/2022 12:40:16
PM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28910</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Marked parts should be leveled
</td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/17/2022
11:47:33 AM</td><td> </td><td>6/28/2022 12:39:57
PM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28814</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting should be
adjusted.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:04 AM</td><td> </td><td>6/28/2022 12:39:05
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28813</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Around electrical panels should be
adjusted.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:03 AM</td><td> </td><td>6/28/2022 12:38:33
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31462</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers heads covers are missing.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:05:34 PM</td><td> </td><td>6/28/2022 12:38:06
PM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>28799</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting should be
adjusted.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:46:43 AM</td><td> </td><td>6/28/2022 12:37:55
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31469</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Sprinklers heads are not installed
yet. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:07:49 PM</td><td> </td><td>6/28/2022 12:37:21
PM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>28796</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling painting need to touch
up.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/15/2022
11:46:38 AM</td><td> </td><td>6/28/2022 12:37:14
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30880</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Repair concrete.</td><td>Low</td><td>6/22/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/1/2022 11:58:06 AM</td><td> </td><td>6/28/2022
12:36:09 PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30877</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Holes need to closed and repaint.</td><td>Low</td><td>6/22/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022 11:58:01 AM</td><td>
</td><td>6/28/2022 12:35:38
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30565</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant is missing </td><td>Low</td><td>6/21/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022 11:46:42 AM</td><td>
</td><td>6/28/2022 12:34:40
PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31863</td><td>CORE E2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Rusty and dirty pipes supports.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:18 PM</td><td> </td><td>6/28/2022 12:34:33
PM</td><td>&nbsp;</td><td>MC.13.02.E21</td><td>&nbsp;</td>
</tr><tr>
<td>30512</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked part should be repaired and re paint
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:00 AM</td><td> </td><td>6/28/2022 12:33:58
PM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30195</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All Wall painting need to touch
up.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:00:35 PM</td><td> </td><td>6/28/2022 12:32:41
PM</td><td>&nbsp;</td><td>MA.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31864</td><td>CORE E2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Support need paintings.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:20 PM</td><td> </td><td>6/28/2022 12:32:35
PM</td><td>&nbsp;</td><td>MC.13.02.E21</td><td>&nbsp;</td>
</tr><tr>
<td>31868</td><td>CORE E2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dismantled pipe supports.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:29 PM</td><td> </td><td>6/28/2022 12:28:58
PM</td><td>&nbsp;</td><td>MC.13.02.E21</td><td>&nbsp;</td>
</tr><tr>
<td>31869</td><td>CORE E2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Rusty drainage pipes.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:31 PM</td><td> </td><td>6/28/2022 12:27:54
PM</td><td>&nbsp;</td><td>MC.13.02.E21</td><td>&nbsp;</td>
</tr><tr>
<td>31871</td><td>CORE E2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for chilled water pipes.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:34 PM</td><td> </td><td>6/28/2022 12:26:28
PM</td><td>&nbsp;</td><td>MC.13.02.E21</td><td>&nbsp;</td>
</tr><tr>
<td>31875</td><td>CORE E2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Drain pan insulation damaged.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:44 PM</td><td> </td><td>6/28/2022 12:24:11
PM</td><td>&nbsp;</td><td>MC.13.02.E21</td><td>&nbsp;</td>
</tr><tr>
<td>13853</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Fire Sealant around black steel duct
</td><td>High</td><td>12/8/2020 12:00:00 PM</td><td>ahmedsalem</td><td>12/1/2020
12:21:46 PM</td><td> </td><td>6/28/2022 12:20:35
PM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30676</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing sprinklers covers.
</td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:53:16 AM</td><td> </td><td>6/28/2022 12:17:48
PM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31591</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Thermal insulation need repairs.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:07 AM</td><td> </td><td>6/28/2022 12:16:50
PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31865</td><td>CORE E2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;No firefighting system detected in this
area. </td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:22 PM</td><td> </td><td>6/28/2022 12:15:58
PM</td><td>&nbsp;</td><td>MC.13.02.E21</td><td>&nbsp;</td>
</tr><tr>
<td>20788</td><td>CORE B2-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Shaft door is closed contractor must be open
to check </td><td>High</td><td>8/17/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/10/2021 12:08:56 PM</td><td> </td><td>6/28/2022
12:05:21 PM</td><td>&nbsp;</td><td>MC.18.01.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21957</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Missing straps around insulation and insulation need repair
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/23/2021
1:36:06 PM</td><td> </td><td>6/28/2022 12:04:32
PM</td><td>&nbsp;</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>30672</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers heads covers shall be
installed. </td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:53:10 AM</td><td> </td><td>6/28/2022 12:02:08
PM</td><td>&nbsp;</td><td>MQ.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>24613</td><td>Mankauras - Phase 3A</td><td>Mankauras Stair
and Wall</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked panel edge should be repaired
</td><td>Low</td><td>11/21/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/31/2021 4:17:23 PM</td><td> </td><td>6/28/2022 11:56:49
AM</td><td>&nbsp;</td><td>Mankauras - Phase 3A</td><td>&nbsp;</td>
</tr><tr>
<td>30772</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Remove adhesive tapes from INERGEN
nozzles. </td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:33 PM</td><td> </td><td>6/28/2022 11:47:30
AM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>31185</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing thermal insulation for RAD.
</td><td>High</td><td>6/8/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:55:08 PM</td><td> </td><td>6/28/2022 11:46:40
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31456</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers heads covers are missing.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:05:24 PM</td><td> </td><td>6/28/2022 11:43:52
AM</td><td>&nbsp;</td><td>MA.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31458</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers heads covers are missing.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:05:28 PM</td><td> </td><td>6/28/2022 11:42:48
AM</td><td>&nbsp;</td><td>MA.19.02.026</td><td>&nbsp;</td>
</tr><tr>
<td>31464</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Sprinklers heads covers are
missing. </td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:07:04 PM</td><td> </td><td>6/28/2022 11:41:52
AM</td><td>&nbsp;</td><td>MA.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31459</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers heads covers are missing.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:05:29 PM</td><td> </td><td>6/28/2022 11:41:13
AM</td><td>&nbsp;</td><td>MA.19.02.017</td><td>&nbsp;</td>
</tr><tr>
<td>31466</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Sprinklers heads covers are
missing. </td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:07:42 PM</td><td> </td><td>6/28/2022 11:39:44
AM</td><td>&nbsp;</td><td>MA.19.02.025</td><td>&nbsp;</td>
</tr><tr>
<td>31467</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Sprinklers heads covers are
missing. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:07:45 PM</td><td> </td><td>6/28/2022 11:39:04
AM</td><td>&nbsp;</td><td>MA.19.02.015</td><td>&nbsp;</td>
</tr><tr>
<td>31468</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Sprinklers heads covers shall be
installed. </td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:07:47 PM</td><td> </td><td>6/28/2022 11:38:27
AM</td><td>&nbsp;</td><td>MA.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>31472</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Sprinklers heads covers are
missing. </td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:53:16 PM</td><td> </td><td>6/28/2022 11:37:04
AM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31589</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing insulation straps.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:04 AM</td><td> </td><td>6/28/2022 11:36:20
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>14577</td><td>Ticketing Piazza </td><td>Ticketing
Piazza</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Bad cutting for stone along glazing facade
</td><td>Low</td><td>1/19/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>12/29/2020 11:06:52 AM</td><td> </td><td>6/28/2022 11:34:51
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22170</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked tile is not aligned
</td><td>Low</td><td>9/13/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>8/23/2021 4:38:09 PM</td><td> </td><td>6/28/2022 11:34:49
AM</td><td>&nbsp;</td><td>South Facade- CCB</td><td>&nbsp;</td>
</tr><tr>
<td>22178</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Gaps Around brackets and wireless
device should be closed </td><td>Low</td><td>9/13/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>8/23/2021 4:38:23 PM</td><td> </td><td>6/28/2022 11:34:47
AM</td><td>&nbsp;</td><td>South Facade- CCB</td><td>&nbsp;</td>
</tr><tr>
<td>22314</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Uneven surface of the stone cladding
between the adjoining stones</td><td>Low</td><td>9/14/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>8/24/2021 2:34:05 PM</td><td> </td><td>6/28/2022
11:34:42 AM</td><td>&nbsp;</td><td>South Facade- CCB</td><td>&nbsp;</td>
</tr><tr>
<td>22735</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Facade -
Stone Cladding</td><td>Chipped/dent</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>9/27/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>9/6/2021
3:42:11 PM</td><td> </td><td>6/28/2022 11:34:40 AM</td><td>&nbsp;</td><td>MU -
North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23751</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>11/3/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:46 PM</td><td> </td><td>6/28/2022 11:34:37
AM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23768</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39;Gaps around false ceiling should be adjusted
</td><td>Low</td><td>11/4/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/14/2021 3:46:46 PM</td><td> </td><td>6/28/2022 11:34:35
AM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23780</td><td>Atrium - Internal Side</td><td>Atrium
Internal
Side</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Ceiling</
td><td>General Snag</td><td>&#39;Tile is missing </td><td>Low</td><td>11/8/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/18/2021 4:29:00 PM</td><td>
</td><td>6/28/2022 11:34:33 AM</td><td>&nbsp;</td><td>Atrium - Internal
Side</td><td>&nbsp;</td>
</tr><tr>
<td>24661</td><td>Mankauras - Phase 4</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Damaged panels should be repaired/replaced
panel (panel no9&amp;11)from GRC</td><td>Low</td><td>11/22/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>11/1/2021 11:32:48 AM</td><td>
</td><td>6/28/2022 11:34:17 AM</td><td>&nbsp;</td><td>Mankauras - Phase
4</td><td>&nbsp;</td>
</tr><tr>
<td>24665</td><td>Mankauras - Phase 4</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Metal flashing should be fixed properly
</td><td>Low</td><td>11/22/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/1/2021 11:32:54 AM</td><td> </td><td>6/28/2022 11:34:15
AM</td><td>Repeated snag 24666</td><td>Mankauras - Phase 4</td><td>&nbsp;</td>
</tr><tr>
<td>24822</td><td>Mankauras - Phase 1</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting fixtures should be aligned and
leveled </td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/7/2021 3:51:59 PM</td><td> </td><td>6/28/2022 11:34:13
AM</td><td>&nbsp;</td><td>Mankauras - Phase 1</td><td>&nbsp;</td>
</tr><tr>
<td>18924</td><td>LOBBY</td><td>CCB
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Walls tiles needs cleaning
</td><td>Low</td><td>6/21/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>6/14/2021 12:06:39 PM</td><td> </td><td>6/28/2022 11:28:43
AM</td><td>&nbsp;</td><td>CE.08.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>22565</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Grouting should be adjusted
</td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/30/2021
11:05:05 AM</td><td> </td><td>6/28/2022 11:28:40 AM</td><td>&nbsp;</td><td>Part
5</td><td>&nbsp;</td>
</tr><tr>
<td>22663</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Bitted tiles should be replaced
</td><td>Low</td><td>9/26/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/5/2021
10:19:26 AM</td><td> </td><td>6/28/2022 11:28:37 AM</td><td>&nbsp;</td><td>Part
4</td><td>&nbsp;</td>
</tr><tr>
<td>22666</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Bitted tiles should be replaced
</td><td>Low</td><td>9/26/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/5/2021
10:19:30 AM</td><td> </td><td>6/28/2022 11:28:35 AM</td><td>&nbsp;</td><td>Part
4</td><td>&nbsp;</td>
</tr><tr>
<td>22677</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Bitted stone tiles should be replaced
</td><td>Low</td><td>9/26/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/5/2021
10:19:44 AM</td><td> </td><td>6/28/2022 11:28:33 AM</td><td>&nbsp;</td><td>Part
3</td><td>&nbsp;</td>
</tr><tr>
<td>23535</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Rusted tile should be treated / replaced
</td><td>Low</td><td>10/12/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/21/2021
11:07:36 AM</td><td> </td><td>6/28/2022 11:28:32
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23542</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Stains should be cleaned
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:07:42 AM</td><td> </td><td>6/28/2022 11:28:30
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23548</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:07:47 AM</td><td> </td><td>6/28/2022 11:28:28
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23553</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Tiles hight should be as per design drawing
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:07:52 AM</td><td> </td><td>6/28/2022 11:28:27
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23804</td><td>Decorative Fence</td><td>East
Fences</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
cladding height should be as per approved detail ( cladding bottom line should be
flush with ground line ) </td><td>Low</td><td>11/8/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/18/2021 4:42:35 PM</td><td> </td><td>6/28/2022 11:26:53
AM</td><td>Done </td><td>Decorative Fence</td><td>&nbsp;</td>
</tr><tr>
<td>24349</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint width should be adjusted and joint
should be filled properly.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/27/2021 11:41:00 AM</td><td> </td><td>6/28/2022 11:26:52
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25144</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Saw cut joints need to cutting aligned
</td><td>Low</td><td>12/5/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/14/2021 4:02:57 PM</td><td> </td><td>6/28/2022 11:26:51
AM</td><td>Done </td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>

<td>26250</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired/replaced
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:25:09 PM</td><td> </td><td>6/28/2022 11:26:50 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26347</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Bitted tiles should be treated
</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022
3:29:11 PM</td><td> </td><td>6/28/2022 11:26:48 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26580</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/20/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/27/2022 11:27:19 AM</td><td> </td><td>6/28/2022
11:26:47 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26646</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/21/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/28/2022 3:15:58 PM</td><td> </td><td>6/28/2022
11:26:45 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26749</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/22/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/1/2022 3:45:54 PM</td><td> </td><td>6/28/2022
11:26:41 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26878</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/23/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/2/2022 10:31:19 AM</td><td> </td><td>6/28/2022
11:26:39 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27030</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/23/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/2/2022 4:15:51 PM</td><td> </td><td>6/28/2022
11:26:35 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27040</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Incomplete work
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:17:15 PM</td><td> </td><td>6/28/2022 11:26:32 AM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>

<td>27112</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing stone flooring tiles
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
11:09:06 AM</td><td> </td><td>6/28/2022 11:26:31 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27146</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>AluMisr</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing louver/water proofing needs repair
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:24 PM</td><td> </td><td>6/28/2022 11:26:29 AM</td><td>Done </td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27152</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Interface between onyx and stone tiles should
be uniform and aligned </td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:06:36 PM</td><td> </td><td>6/28/2022
11:26:28 AM</td><td>Done </td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>

<td>27181</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing sealant for marked movement joint
</td><td>Low</td><td>3/24/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/3/2022
3:01:19 PM</td><td> </td><td>6/28/2022 11:26:27 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27220</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;Marked edges should be aligned </td><td>Low</td><td>3/27/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:39:48 PM</td><td>
</td><td>6/28/2022 11:26:25 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>24902</td><td>Truck scanner - Roof and external
walls</td><td>Truck scanner Building</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Mechanical</td><td>Fire Extinguishers</td><td>Equipment</td><td>&#39;Missing fire
extinguishers </td><td>High</td><td>11/15/2021 12:00:00 AM</td><td>Kriton
Katsamenis </td><td>11/8/2021 3:32:00 PM</td><td> </td><td>6/28/2022 11:06:03
AM</td><td>&nbsp;</td><td>Truck scanner - Roof and external
walls</td><td>&nbsp;</td>
</tr><tr>
<td>31593</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:11 AM</td><td> </td><td>6/28/2022 10:55:15
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31595</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air ducts.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:14 AM</td><td> </td><td>6/28/2022 10:53:22
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31596</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Thermal insulation need repairs.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:16 AM</td><td> </td><td>6/28/2022 10:44:15
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>

<td>23883</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Miss polishing for marked edges </td><td>Low</td><td>11/14/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/24/2021 12:19:53 PM</td><td>
</td><td>6/28/2022 10:41:07 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23904</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
of Overflow is not finished </td><td>Low</td><td>11/14/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/24/2021 12:20:25 PM</td><td>
</td><td>6/28/2022 10:41:06 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23917</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Stone flooring need to cutting aligned
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:59:26 PM</td><td> </td><td>6/28/2022 10:41:05
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23926</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken edges of stone should be cutting aligned
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:59:41 PM</td><td> </td><td>6/28/2022 10:41:04
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24063</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Marked parts should be repaired </td><td>Low</td><td>11/15/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:39:43 PM</td><td>
</td><td>6/28/2022 10:41:02 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24067</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked edges should be polished
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:39:50 PM</td><td> </td><td>6/28/2022 10:41:01
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24070</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Joint should be regular and uniform
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:39:55 PM</td><td> </td><td>6/28/2022 10:40:59
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24081</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Stone edge should be aligned and uniform
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:40:15 PM</td><td> </td><td>6/28/2022 10:40:58
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24082</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Metal trim should be leveled </td><td>Low</td><td>11/15/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:40:17 PM</td><td>
</td><td>6/28/2022 10:40:57 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24257</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Glass partion and door</td><td>General
Snag</td><td>&#39;Joints between panels and vertical posts not accordance on some
parts( posts should be centered of glazing joints)</td><td>Low</td><td>11/16/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/26/2021 4:40:39 PM</td><td>
</td><td>6/28/2022 10:40:56 AM</td><td>&nbsp;</td><td>Bridge</td><td>&nbsp;</td>
</tr><tr>

<td>24422</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked stone tiles should be
replaced</td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>mohamed.sami</td><td>10/27/2021 4:43:53 PM</td><td> </td><td>6/28/2022
10:40:55 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24638</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken/ cracked tiles should be
replaced</td><td>Low</td><td>11/21/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/31/2021 4:30:01 PM</td><td> </td><td>6/28/2022 10:40:54
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31779</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Canvases need to be repaired and adjusted.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:31:44 PM</td><td> </td><td>6/28/2022 10:40:06
AM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>31759</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage thermal insulation for air ducts.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:56:06 AM</td><td> </td><td>6/28/2022 10:38:30
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31929</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Hydronic pipes thermal insulation need
repairs. </td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:04 PM</td><td> </td><td>6/28/2022 10:28:17
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28563</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing access
door.</td><td>Low</td><td>5/30/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:44 PM</td><td> </td><td>6/28/2022 10:00:24
AM</td><td>Done</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31909</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Missing fire damper label.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:18 PM</td><td> </td><td>6/28/2022 9:59:44
AM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>31382</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage air duct thermal installation.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:55:28 AM</td><td> </td><td>6/28/2022 9:55:55
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28986</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing thermal insulation for air duct.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:09:11 PM</td><td> </td><td>6/28/2022 9:54:24
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>31816</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:49 PM</td><td> </td><td>6/28/2022 9:50:33
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31755</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:57 AM</td><td>
</td><td>6/28/2022 9:45:46
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31874</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for chilled water
pipe. </td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:41 PM</td><td> </td><td>6/28/2022 9:22:58
AM</td><td>&nbsp;</td><td>MQ.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31368</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Canvases shall be adjusted. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:54:57 AM</td><td>
</td><td>6/28/2022 9:19:26
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>29965</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:25 PM</td><td> </td><td>6/28/2022 9:00:55
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28476</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Ductwork</
td><td>Access door missing</td><td>&#39;Differential pressure sensor not connected.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:46 PM</td><td> </td><td>6/28/2022 8:59:44
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>19962</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Fixation of the
gauge</td><td>High</td><td>8/5/2021 12:00:00
PM</td><td>ahmedsalem</td><td>7/29/2021 1:04:18 PM</td><td> </td><td>6/28/2022
8:58:24 AM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>20045</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing plastic tube for pressure
gauge</td><td>High</td><td>8/5/2021 12:00:00
AM</td><td>ahmedsalem</td><td>7/29/2021 3:00:40 PM</td><td> </td><td>6/28/2022
8:56:17 AM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>28919</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing acoustic lining for air ducts.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:30:49 PM</td><td> </td><td>6/28/2022 8:54:05
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>14484</td><td>B.O.H-WET DELIVERY TUNNEL - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Cable tray must not hang on duct supports
</td><td>High</td><td>1/2/2021 12:00:00 PM</td><td>ahmedsalem</td><td>12/26/2020
11:40:54 AM</td><td> </td><td>6/28/2022 8:51:19
AM</td><td>&nbsp;</td><td>MQ.23.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29271</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal installation for air ducts.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:52 PM</td><td> </td><td>6/28/2022 8:47:35
AM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>29257</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation for chilled water pipes. </td><td>High</td><td>5/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/23/2022 12:06:20 PM</td><td>
</td><td>6/28/2022 8:45:59
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29700</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;INERGEN control panel not powered.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:15 PM</td><td> </td><td>6/28/2022 8:32:09
AM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29292</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;FCU thermal insulation damaged.
</td><td>High</td><td>5/30/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:18 PM</td><td> </td><td>6/28/2022 8:31:02
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>31819</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Cleaning from inside. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:32:53 PM</td><td>
</td><td>6/28/2022 8:04:32
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31930</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing insulation for condensate drain.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:06 PM</td><td> </td><td>6/28/2022 8:01:51
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31932</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning. </td><td>High</td><td>6/28/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/21/2022 4:49:08 PM</td><td>
</td><td>6/28/2022 8:00:34 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31935</td><td>Core G3</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Fire pipes need cleaning and touchup
paintings. </td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:12 PM</td><td> </td><td>6/28/2022 7:59:58
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21493</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor needs cleaning and touch
up painting </td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/18/2021 2:12:34 PM</td><td> </td><td>6/27/2022 3:51:22
PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>14327</td><td>B.O.H-ELEC. SUB-STATION - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Flooring need touch up and repair
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:23:10 PM</td><td> </td><td>6/27/2022 3:50:42
PM</td><td>&nbsp;</td><td>MS.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>13827</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;CIR not submitted
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:42:54 AM</td><td> </td><td>6/27/2022 3:48:07
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>13822</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Scratches</td><td>&#39;No CIR submitted
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:42:10 AM</td><td> </td><td>6/27/2022 3:47:41
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>16896</td><td>POTTERY-Band A</td><td>MU
L10</td><td>Closed</td><td>Daghash Tents</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Cover is missing
</td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021
1:01:43 PM</td><td> </td><td>6/27/2022 3:34:37
PM</td><td>&nbsp;</td><td>ME.12.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>16889</td><td>WOOD-Band A</td><td>MU
L10</td><td>Closed</td><td>Daghash Tents</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Damaged curtain should be replaced
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:01:28 PM</td><td> </td><td>6/27/2022 3:33:59
PM</td><td>&nbsp;</td><td>ME.12.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>12045</td><td>MACHINE ACCESS ROOM</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing hardware accessories and sealant - refer to comments CIR
no 215109</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>10/1/2020 2:14:00 PM</td><td> </td><td>6/27/2022 3:33:11
PM</td><td>&nbsp;</td><td>MS.18.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>16829</td><td>ELEC. ROOM-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Painting need touch up </td><td>Low</td><td>3/31/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>3/10/2021 12:59:26 PM</td><td> </td><td>6/27/2022
3:31:07 PM</td><td>&nbsp;</td><td>MS.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>22240</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Grouting is missing </td><td>Low</td><td>9/14/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/24/2021 11:49:02 AM</td><td> </td><td>6/27/2022
3:30:24 PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20064</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Interface between Stainless skirting and
linoleum skirting should be adjusted </td><td>Low</td><td>8/23/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/2/2021 4:14:45 PM</td><td> </td><td>6/27/2022
3:29:11 PM</td><td>&nbsp;</td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>20211</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>Edges straight</td><td>&#39;Joint should be finished
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:58 PM</td><td> </td><td>6/27/2022 3:27:40
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20692</td><td>STORE</td><td>MU L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Gypsum Ceiling</td><td>General
Snag</td><td>&#39;Adjustment and repair for access
doors</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/10/2021 11:40:00 AM</td><td> </td><td>6/27/2022 3:25:06
PM</td><td>&nbsp;</td><td>MT.14.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20205</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Crack should be repaired
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:53 PM</td><td> </td><td>6/27/2022 3:23:51
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20203</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Patches/Touch up</td><td>&#39;Marked part has different texture
need to touch up </td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/4/2021 12:04:52 PM</td><td> </td><td>6/27/2022 3:23:15
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20254</td><td>WC /F</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Vanity Counter Top</td><td>General
Snag</td><td>&#39;Stone splash back is missing </td><td>Low</td><td>8/25/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>8/4/2021 12:05:47 PM</td><td>
</td><td>6/27/2022 3:22:23
PM</td><td>&nbsp;</td><td>MW.18.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>21536</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>Installation not to specification/drawing</td><td>&#39;Closing around
duct</td><td>High</td><td>8/25/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/18/2021 4:16:35 PM</td><td> </td><td>6/27/2022
3:21:35 PM</td><td>&nbsp;</td><td>MS.20.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20738</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Windows</td><td>General
Snag</td><td>&#39;Finishes work are not finished yet(edges around windows should be
aligned and repaint)</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/10/2021 12:02:52 PM</td><td> </td><td>6/27/2022 3:20:32
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20560</td><td>FEMALE W.C.</td><td>MU
L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked opening should be closed </td><td>Low</td><td>8/29/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021 12:09:37 PM</td><td>
</td><td>6/27/2022 3:19:45
PM</td><td>&nbsp;</td><td>MW.14.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20552</td><td>MALE W.C.</td><td>MU
L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Opening should be closed </td><td>Low</td><td>8/29/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/8/2021 12:09:31 PM</td><td> </td><td>6/27/2022
3:19:01 PM</td><td>&nbsp;</td><td>MW.14.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>14382</td><td>B.O.H-ARTEFACTS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguishers
</td><td>High</td><td>12/31/2020 12:00:00 PM</td><td>ahmedsalem</td><td>12/24/2020
3:22:23 PM</td><td> </td><td>6/27/2022 3:18:28
PM</td><td>&nbsp;</td><td>MQ.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>20505</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need repair and touchup painting
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:42 PM</td><td> </td><td>6/27/2022 3:18:26
PM</td><td>&nbsp;</td><td>MS.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>14414</td><td>B.O.H-CORE A2 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguishers
</td><td>High</td><td>12/31/2020 12:00:00 PM</td><td>ahmedsalem</td><td>12/24/2020
3:23:48 PM</td><td> </td><td>6/27/2022 3:17:41
PM</td><td>&nbsp;</td><td>MC.18.02.A21</td><td>&nbsp;</td>
</tr><tr>
<td>20486</td><td>W.C. /M</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>Grout</td><td>&#39;Joints should be filled grouting
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:26 PM</td><td> </td><td>6/27/2022 3:14:41
PM</td><td>&nbsp;</td><td>MW.14.01.002B</td><td>&nbsp;</td>
</tr><tr>
<td>14997</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Patches/Touch up</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>1/19/2021
11:36:18 AM</td><td> </td><td>6/27/2022 2:55:17
PM</td><td>&nbsp;</td><td>MS.19.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>14989</td><td>STORAGE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>1/19/2021
11:36:02 AM</td><td> </td><td>6/27/2022 2:54:47
PM</td><td>&nbsp;</td><td>MS.19.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20562</td><td>FEMALE W.C.</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs touch up painting </td><td>Low</td><td>8/29/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021 12:09:40 PM</td><td>
</td><td>6/27/2022 2:54:07
PM</td><td>&nbsp;</td><td>MW.14.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20561</td><td>FEMALE W.C.</td><td>MU
L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General Snag</td><td>&#39;The
edge should be leveled </td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/8/2021 12:09:38 PM</td><td> </td><td>6/27/2022 2:53:29
PM</td><td>&nbsp;</td><td>MW.14.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20212</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked edge should be aligned
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:04:59 PM</td><td> </td><td>6/27/2022 2:52:49
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>21623</td><td>CORE D3</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Painting works are not finished yet
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:24:06 AM</td><td> </td><td>6/27/2022 2:51:47
PM</td><td>&nbsp;</td><td>MC.13.01.D31</td><td>&nbsp;</td>
</tr><tr>
<td>20580</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked support should be removed </td><td>Low</td><td>8/29/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021 12:10:13 PM</td><td>
</td><td>6/27/2022 2:51:10
PM</td><td>&nbsp;</td><td>MQ.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20574</td><td>ELEC.</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:10:04 PM</td><td> </td><td>6/27/2022 2:50:39
PM</td><td>&nbsp;</td><td>MS.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20573</td><td>ELEC.</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked parts need adjustment and repaint
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:10:02 PM</td><td> </td><td>6/27/2022 2:50:03
PM</td><td>&nbsp;</td><td>MS.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20572</td><td>ELEC.</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Ladder needs touch up painting
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:10:00 PM</td><td> </td><td>6/27/2022 2:49:15
PM</td><td>&nbsp;</td><td>MS.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20571</td><td>CORRIDOR</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Joints should be aligned
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:58 PM</td><td> </td><td>6/27/2022 2:48:39
PM</td><td>&nbsp;</td><td>MS.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20570</td><td>CORRIDOR</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Vertical joints need adjustment and repair
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:56 PM</td><td> </td><td>6/27/2022 2:48:04
PM</td><td>&nbsp;</td><td>MS.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>29705</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Chilled water Piping and
Insulation</td><td>Insulation damaged</td><td>&#39;Threaded rod penetration throw
thermal insulation. </td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:25 PM</td><td> </td><td>6/27/2022 1:23:26
PM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>30071</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Sprinkler head cover is missing.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:07 AM</td><td> </td><td>6/27/2022 1:22:27
PM</td><td>&nbsp;</td><td>MA.19.02.021</td><td>&nbsp;</td>
</tr><tr>
<td>30025</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Condensate drain pipes shall be ended with
an elbow. </td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:40 AM</td><td> </td><td>6/27/2022 1:21:39
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>30654</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing labels for
chilled water pipes. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:40 AM</td><td> </td><td>6/27/2022 1:20:58
PM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31611</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Internal cleaning.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:42 AM</td><td> </td><td>6/27/2022 1:17:17
PM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>19880</td><td>SERVICE ZONE2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;No
raceway for cables - no cover for trunk - bending for conduits less than 90 degree
conduits not tightened </td><td>High</td><td>8/4/2021 12:00:00 AM</td><td>Sameh
Ibrahim El-Sawah</td><td>7/28/2021 11:36:52 AM</td><td> </td><td>6/27/2022 11:49:04
AM</td><td>&nbsp;</td><td>MS.12.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>19881</td><td>SERVICE ZONE2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Missing labels </td><td>High</td><td>8/4/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>7/28/2021 11:36:53 AM</td><td>
</td><td>6/27/2022 11:49:03
AM</td><td>&nbsp;</td><td>MS.12.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27377</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Beaker and temporary cable to be
removed</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:03 PM</td><td> </td><td>6/27/2022 11:49:01
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>27528</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:44 AM</td><td> </td><td>6/27/2022 11:49:00
AM</td><td>&nbsp;</td><td>MS.13.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27539</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete
work</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:58:00 AM</td><td> </td><td>6/27/2022 11:48:59
AM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30277</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:26 PM</td><td> </td><td>6/27/2022
11:48:58 AM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>30301</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Tray should be covered </td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:01 PM</td><td> </td><td>6/27/2022
11:48:57 AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30738</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover box </td><td>High</td><td>6/7/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022 4:39:25 PM</td><td>
</td><td>6/27/2022 11:48:56
AM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30740</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Support should be installed with aligned
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:39:37 PM</td><td> </td><td>6/27/2022 11:48:55
AM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30746</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth jumper have to be installed
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:39:55 PM</td><td> </td><td>6/27/2022 11:48:53
AM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30747</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Open hole should be closed
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:39:57 PM</td><td> </td><td>6/27/2022 11:48:50
AM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30749</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Support and rod should be installed properly
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:40:02 PM</td><td> </td><td>6/27/2022 11:48:49
AM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30762</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rod should be installed properly aligned
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:41:05 PM</td><td> </td><td>6/27/2022 11:48:48
AM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30767</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be laid on trunk
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:41:18 PM</td><td> </td><td>6/27/2022 11:48:47
AM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30960</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Temporary cable should be removed
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:19:37 PM</td><td> </td><td>6/27/2022 11:48:46
AM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>30983</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Rod should be alignment </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:12 PM</td><td> </td><td>6/27/2022
11:48:45 AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30986</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Support alignment and missing screws
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:20:17 PM</td><td> </td><td>6/27/2022 11:48:44
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30988</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Temporary cable should be removed </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:22 PM</td><td>
</td><td>6/27/2022 11:48:43
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31082</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover tray</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:45 PM</td><td>
</td><td>6/27/2022 11:48:41
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>18014</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air gap need to install properly
</td><td>Low</td><td>6/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/25/2021
12:26:15 PM</td><td> </td><td>6/27/2022 10:54:51
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18237</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling edge is not aligned </td><td>Low</td><td>6/21/2021
12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021 4:10:30 PM</td><td>
</td><td>6/27/2022 10:54:50
AM</td><td>&nbsp;</td><td>ME.12.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18249</td><td>KINDERGARTEN CLASSROOM 3 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Floor inspection after removing the
protection cover </td><td>Low</td><td>6/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/31/2021 4:10:48 PM</td><td> </td><td>6/27/2022
10:54:49 AM</td><td>&nbsp;</td><td>MK.12.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>18254</td><td>KINDERGARTEN CLASSROOM 3 - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Joints around floor boxes should be
adjusted </td><td>Low</td><td>6/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/31/2021 4:10:56 PM</td><td> </td><td>6/27/2022
10:54:48 AM</td><td>&nbsp;</td><td>MK.12.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>18255</td><td>KINDERGARTEN CLASSROOM 3 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Curtain walls inspection after removing the
protection cover </td><td>Low</td><td>6/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/31/2021 4:10:58 PM</td><td> </td><td>6/27/2022
10:54:46 AM</td><td>&nbsp;</td><td>MK.12.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>18300</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Metal Trim of ceiling should
be Leveled </td><td>Low</td><td>6/22/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/1/2021 4:11:03 PM</td><td> </td><td>6/27/2022
10:54:45 AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18302</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Toothing between false
ceiling tiles </td><td>Low</td><td>6/22/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/1/2021 4:11:06 PM</td><td> </td><td>6/27/2022
10:54:44 AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18321</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gypsum board is not flush with stone
cladding </td><td>Low</td><td>6/23/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/2/2021 11:40:10 AM</td><td> </td><td>6/27/2022
10:54:43 AM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18452</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Second Flush valve not leveled
</td><td>Low</td><td>6/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/7/2021
4:08:48 PM</td><td> </td><td>6/27/2022 10:54:41
AM</td><td>&nbsp;</td><td>MW.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18471</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air gap should be leveled
</td><td>Low</td><td>6/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/7/2021
4:09:41 PM</td><td> </td><td>6/27/2022 10:54:40
AM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18596</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Adjust alignment of gypsum ceiling
</td><td>Low</td><td>6/29/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/8/2021
4:47:51 PM</td><td> </td><td>6/27/2022 10:54:38
AM</td><td>&nbsp;</td><td>MW.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18597</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39; Broken edge and cracked gypsum ceiling
</td><td>Low</td><td>6/29/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/8/2021
4:47:53 PM</td><td> </td><td>6/27/2022 10:54:37
AM</td><td>&nbsp;</td><td>MW.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18598</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gap between Air grill and walls not same
width </td><td>Low</td><td>6/29/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/8/2021 4:47:57 PM</td><td> </td><td>6/27/2022
10:54:36 AM</td><td>&nbsp;</td><td>MW.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18599</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Shadow gap not aligned
</td><td>Low</td><td>6/29/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/8/2021
4:48:01 PM</td><td> </td><td>6/27/2022 10:54:34
AM</td><td>&nbsp;</td><td>MW.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18649</td><td>FIRST AID - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Damages</td><td>&#39;Air gap not aligned with gypsum wall
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:22:56 PM</td><td> </td><td>6/27/2022 10:54:33
AM</td><td>&nbsp;</td><td>MG.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18650</td><td>FIRST AID - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Damages</td><td>&#39;Ceiling not leveled
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:22:59 PM</td><td> </td><td>6/27/2022 10:54:32
AM</td><td>&nbsp;</td><td>MG.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18651</td><td>FIRST AID - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>AC grill not
aligned</td><td>&#39;AC grill not completed </td><td>Low</td><td>6/30/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/9/2021 4:23:01 PM</td><td> </td><td>6/27/2022
10:54:31 AM</td><td>&nbsp;</td><td>MG.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18655</td><td>KITCHEN - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Damaged</
td><td>&#39;Damaged leaping </td><td>Low</td><td>6/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/9/2021 4:23:10 PM</td><td> </td><td>6/27/2022
10:54:29 AM</td><td>&nbsp;</td><td>MS.18.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>18663</td><td>KITCHEN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
Rubber flooring</td><td>Not aligned</td><td>&#39;Joint should be filled
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:23:26 PM</td><td> </td><td>6/27/2022 10:54:28
AM</td><td>&nbsp;</td><td>MS.18.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>18666</td><td>KITCHEN - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air gap is not consistent
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:23:35 PM</td><td> </td><td>6/27/2022 10:54:26
AM</td><td>&nbsp;</td><td>MS.18.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>19085</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Electrical outlets alignment/loosely fixed</td><td>&#39;MEP
fixtures should be leveled </td><td>Low</td><td>7/7/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/16/2021 10:53:18 AM</td><td> </td><td>6/27/2022
10:54:25 AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19087</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air gap should be leveled on gypsum wall
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/16/2021
10:53:20 AM</td><td> </td><td>6/27/2022 10:54:23
AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19099</td><td>LOBBY- Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air gap should be leveled and fixed
properly </td><td>Low</td><td>7/7/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/16/2021 10:53:39 AM</td><td> </td><td>6/27/2022
10:54:22 AM</td><td>&nbsp;</td><td>MQ.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19115</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joint should be adjusted
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/16/2021
10:54:09 AM</td><td> </td><td>6/27/2022 10:54:21
AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19119</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around metal door needs adjustment
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/16/2021
10:54:14 AM</td><td> </td><td>6/27/2022 10:54:19
AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19423</td><td>BREAKOUT AREA - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;MEP fixtures need to be leveled
</td><td>Low</td><td>7/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/24/2021
11:55:18 AM</td><td> </td><td>6/27/2022 10:54:18
AM</td><td>&nbsp;</td><td>ME.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19435</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Marked cracks should be repaired
</td><td>Low</td><td>7/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/24/2021
11:55:32 AM</td><td> </td><td>6/27/2022 10:54:16
AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19445</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Electrical cover not leveled
</td><td>Low</td><td>7/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/24/2021
11:55:45 AM</td><td> </td><td>6/27/2022 10:54:15
AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19449</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Stainless steel cover not leveled on
flooring </td><td>Low</td><td>7/15/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/24/2021 11:55:53 AM</td><td> </td><td>6/27/2022
10:54:13 AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19451</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Gaps should be sealed
</td><td>Low</td><td>7/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/24/2021
11:55:59 AM</td><td> </td><td>6/27/2022 10:54:12
AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19452</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joint between panels not the same
width </td><td>Low</td><td>7/15/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/24/2021 11:56:02 AM</td><td> </td><td>6/27/2022
10:54:11 AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19456</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joint need to be same width
</td><td>Low</td><td>7/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/24/2021
11:56:10 AM</td><td> </td><td>6/27/2022 10:54:10
AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19561</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:26 PM</td><td> </td><td>6/27/2022 10:54:08
AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19572</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Shadow gap should be leveled
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:40 PM</td><td> </td><td>6/27/2022 10:54:07
AM</td><td>&nbsp;</td><td>MW.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19582</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gap between gypsum ceiling and stone
should be closed </td><td>Low</td><td>7/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:25:56 PM</td><td> </td><td>6/27/2022
10:54:06 AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19595</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Damages</td><td>&#39;Gaps between gypsum ceiling at cove lights and
stone cladding should be closed </td><td>Low</td><td>7/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:26:13 PM</td><td> </td><td>6/27/2022
10:54:05 AM</td><td>&nbsp;</td><td>MW.13.002.002</td><td>&nbsp;</td>
</tr><tr>
<td>19605</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Shadow gap should be leveled
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:26:27 PM</td><td> </td><td>6/27/2022 10:54:03
AM</td><td>&nbsp;</td><td>MW.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19617</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Damages</td><td>&#39;Shadow gap not leveled at gypsum wall
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:26:44 PM</td><td> </td><td>6/27/2022 10:54:02
AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19705</td><td>NURSERY- Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Electrical outlets alignment/loosely fixed</td><td>&#39;MEP
fixtures need to fixed properly and to be leveled </td><td>Low</td><td>7/28/2021
12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021 1:29:52 PM</td><td>
</td><td>6/27/2022 10:53:59
AM</td><td>&nbsp;</td><td>MK.12.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19706</td><td>NURSERY- Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Access panels</td><td>&#39;Access door need to fixed properly
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:29:54 PM</td><td> </td><td>6/27/2022 10:53:57
AM</td><td>&nbsp;</td><td>MK.12.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19713</td><td>QUIET ROOM - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>Edges straight</td><td>&#39;Corner edge should be straight
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:04 PM</td><td> </td><td>6/27/2022 10:53:54
AM</td><td>&nbsp;</td><td>MS.12.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19714</td><td>QUIET ROOM - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling Painting need to touch up
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:05 PM</td><td> </td><td>6/27/2022 10:53:53
AM</td><td>&nbsp;</td><td>MS.12.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19715</td><td>QUIET ROOM - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;MEP fixtures need to be leveled and fixed
properly </td><td>Low</td><td>7/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>7/7/2021 1:30:06 PM</td><td> </td><td>6/27/2022
10:53:51 AM</td><td>&nbsp;</td><td>MS.12.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19719</td><td>STORAGE -Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Surface preparation and painting dust
sealer pt-05 </td><td>Low</td><td>7/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>7/7/2021 1:30:12 PM</td><td> </td><td>6/27/2022
10:53:50 AM</td><td>&nbsp;</td><td>MS.12.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>19724</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Electrical outlets alignment/loosely fixed</td><td>&#39;Air Grills
and sounder not leveled with gypsum ceiling </td><td>Low</td><td>7/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>7/7/2021 1:30:19 PM</td><td> </td><td>6/27/2022
10:53:48 AM</td><td>&nbsp;</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19728</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Two gaps should be closed
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:25 PM</td><td> </td><td>6/27/2022 10:53:47
AM</td><td>&nbsp;</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19730</td><td>STORAGE - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Surface preparation and painting dust
sealer pt-05</td><td>Low</td><td>7/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>7/7/2021 1:30:27 PM</td><td> </td><td>6/27/2022
10:53:46 AM</td><td>&nbsp;</td><td>MK.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>19737</td><td>SCULPTURE ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gypsum edge not aligned
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:39 PM</td><td> </td><td>6/27/2022 10:53:45
AM</td><td>&nbsp;</td><td>MK.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>19738</td><td>SCULPTURE ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air gap not leveled on gypsum wall
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:40 PM</td><td> </td><td>6/27/2022 10:53:44
AM</td><td>&nbsp;</td><td>MK.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>19741</td><td>STORAGE - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air gap need to be leveled and adjusted
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:44 PM</td><td> </td><td>6/27/2022 10:53:42
AM</td><td>&nbsp;</td><td>MS.12.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19742</td><td>STORAGE - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Surface preparation and painting dust
sealer pt-05 </td><td>Low</td><td>7/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>7/7/2021 1:30:45 PM</td><td> </td><td>6/27/2022
10:53:41 AM</td><td>&nbsp;</td><td>MS.12.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19749</td><td>PAINTING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gypsum edge should be aligned
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:56 PM</td><td> </td><td>6/27/2022 10:53:39
AM</td><td>&nbsp;</td><td>MK.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19750</td><td>PAINTING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air gap not leveled on gypsum wall
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:57 PM</td><td> </td><td>6/27/2022 10:53:38
AM</td><td>&nbsp;</td><td>MK.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31217</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage thermal installation for hydronic pipes.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:56:34 PM</td><td> </td><td>6/27/2022 9:56:57
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18145</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gypsum ceiling edge should be aligned
</td><td>Low</td><td>6/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021
11:56:41 AM</td><td> </td><td>6/27/2022 9:54:42
AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18154</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;joint between walls and air gaps should be adjusted
</td><td>Low</td><td>6/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021
11:58:37 AM</td><td> </td><td>6/27/2022 9:54:40
AM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18155</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Marked joint should be aligned
</td><td>Low</td><td>6/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021
11:58:39 AM</td><td> </td><td>6/27/2022 9:54:39
AM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18157</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Joints around floor boxes should be
adjusted </td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:58:42 AM</td><td> </td><td>6/27/2022
9:54:37 AM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18162</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Plaster board should be repaired and make
surface preparation </td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:58:50 AM</td><td> </td><td>6/27/2022
9:54:36 AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18163</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Plaster board at upper part and corner
should be repaired and make a surface preparation </td><td>Low</td><td>6/16/2021
12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021 11:58:52 AM</td><td>
</td><td>6/27/2022 9:54:33
AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18227</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Flooring -
Rubber flooring</td><td>Damages to be rectified or replaced</td><td>&#39;Aligned
rubber around floor boxes</td><td>Low</td><td>6/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/31/2021 4:05:02 PM</td><td> </td><td>6/27/2022
9:54:32 AM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18674</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:23:49 PM</td><td> </td><td>6/27/2022 9:54:30
AM</td><td>&nbsp;</td><td>ME.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19106</td><td>ESCAPE ROUTE - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gypsum ceiling edges should be aligned
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/16/2021
10:53:56 AM</td><td> </td><td>6/27/2022 9:54:28
AM</td><td>&nbsp;</td><td>MQ.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31842</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Inside cleaning. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:33:36 PM</td><td>
</td><td>6/27/2022 8:54:26
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31870</td><td>CORE E2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Unit drain pipes need adjustments.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:32 PM</td><td> </td><td>6/27/2022 8:53:32
AM</td><td>&nbsp;</td><td>MC.13.02.E21</td><td>&nbsp;</td>
</tr><tr>
<td>28717</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing labels for
hydronic pipes. </td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:51 AM</td><td> </td><td>6/27/2022 8:51:57
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>24308</td><td>Mankauras - Phase 1</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Missing handle for the cover of the slot
drain service box</td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Kriton
Katsamenis </td><td>10/27/2021 9:13:32 AM</td><td> </td><td>6/27/2022 8:50:38
AM</td><td>&nbsp;</td><td>Mankauras - Phase 1</td><td>&nbsp;</td>
</tr><tr>
<td>31675</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Two way valve actuator was dismantled.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:18 PM</td><td> </td><td>6/27/2022 8:48:35
AM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31945</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Fire damper label is missing.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:28 PM</td><td> </td><td>6/27/2022 8:46:04
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>31940</td><td>CORE F1</td><td>MU
L30</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Fire damper label is missing.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:20 PM</td><td> </td><td>6/27/2022 8:44:57
AM</td><td>&nbsp;</td><td>MC.24.03.F11</td><td>&nbsp;</td>
</tr><tr>
<td>31908</td><td>CORE F2</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Missing label for fire dampers.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:16 PM</td><td> </td><td>6/27/2022 8:43:39
AM</td><td>&nbsp;</td><td>MC.19.2A.F21</td><td>&nbsp;</td>
</tr><tr>
<td>31915</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Missing fire damper label.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:30 PM</td><td> </td><td>6/27/2022 8:40:29
AM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>31916</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Missing fire damper label.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:31 PM</td><td> </td><td>6/27/2022 8:39:48
AM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>31950</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage duct thermal insulation.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:40 PM</td><td> </td><td>6/27/2022 8:39:02
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>31951</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage duct thermal insulation.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:41 PM</td><td> </td><td>6/27/2022 8:34:15
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>31953</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage duct thermal insulation.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:45 PM</td><td> </td><td>6/27/2022 8:31:07
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>31436</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing condensate drain thermal insulation.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:57:19 AM</td><td> </td><td>6/27/2022 8:29:32
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31397</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Air vent/bottle to
be fitted</td><td>&#39;Missing thermal insulation for drain pipes.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:55:58 AM</td><td> </td><td>6/27/2022 8:28:43
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31471</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Condensate drain thermal insulation is missing.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:53:14 PM</td><td> </td><td>6/27/2022 8:27:58
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18119</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing
labels</td><td>High</td><td>6/2/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>5/26/2021 11:46:48 AM</td><td> </td><td>6/26/2022 1:53:14
PM</td><td>&nbsp;</td><td>ME.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18122</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>Identification missing</td><td>&#39;Missing labels
</td><td>High</td><td>6/2/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>5/26/2021 11:46:54 AM</td><td> </td><td>6/26/2022 1:53:13
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19887</td><td>SERVICE ZONE2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Missing flexible conduits - no cover for pull boxes housekeeping
for cable trunk </td><td>High</td><td>8/4/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>7/28/2021 11:39:50 AM</td><td> </td><td>6/26/2022 1:53:11
PM</td><td>&nbsp;</td><td>MS.12.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27520</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work and panels not delivered yet
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:32 AM</td><td> </td><td>6/26/2022 1:53:10
PM</td><td>&nbsp;</td><td>MS.18.2A.020</td><td>&nbsp;</td>
</tr><tr>
<td>27530</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Bad workmanship and cables not secured
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:47 AM</td><td> </td><td>6/26/2022 1:53:07
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27540</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:58:01 AM</td><td> </td><td>6/26/2022 1:53:06
PM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27769</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work panels not fixed yet and not
termination </td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:53 PM</td><td> </td><td>6/26/2022 1:53:03
PM</td><td>&nbsp;</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27831</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not
followed</td><td>&#39;</td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:34:49 PM</td><td>
</td><td>6/26/2022 1:53:02
PM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>30334</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:54 PM</td><td> </td><td>6/26/2022
1:53:00 PM</td><td>&nbsp;</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30337</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;All outlets should be installed
aligned</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:58 PM</td><td> </td><td>6/26/2022
1:52:59 PM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30366</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire label and detector must be cleaned from
painting </td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:40 PM</td><td> </td><td>6/26/2022
1:52:57 PM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30727</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:38:28 PM</td><td> </td><td>6/26/2022
1:52:56 PM</td><td>&nbsp;</td><td>MS.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30976</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing socket
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:20:01 PM</td><td> </td><td>6/26/2022 1:52:55
PM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31029</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:21:33 PM</td><td> </td><td>6/26/2022 1:52:51
PM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31069</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover tray</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:22 PM</td><td>
</td><td>6/26/2022 1:52:50
PM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31117</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:42 PM</td><td> </td><td>6/26/2022
1:52:49 PM</td><td>&nbsp;</td><td>MR.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31266</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:31 AM</td><td> </td><td>6/26/2022
1:52:47 PM</td><td>&nbsp;</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31273</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:40 AM</td><td> </td><td>6/26/2022
1:52:46 PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>21001</td><td>CORE B1 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around door architrave
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:12:29 AM</td><td> </td><td>6/26/2022 12:29:52
PM</td><td>&nbsp;</td><td>MC.23.02.B11</td><td>&nbsp;</td>
</tr><tr>
<td>14351</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need repainting </td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/24/2020 1:24:12 PM</td><td> </td><td>6/26/2022
12:28:43 PM</td><td>&nbsp;</td><td>MS.23.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>29103</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Furniture</
td><td>Incomplete</td><td>&#39;Splash back not finished
</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:19 PM</td><td> </td><td>6/26/2022 12:27:37
PM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28912</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/17/2022
11:47:37 AM</td><td> </td><td>6/26/2022 12:26:56
PM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28853</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing Sealant around door
frame.</td><td>Low</td><td>6/6/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/16/2022 11:35:52 AM</td><td> </td><td>6/26/2022 12:19:52
PM</td><td>&nbsp;</td><td>MA.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28062</td><td>CORE G2</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy painting need to cleaning and
touch up </td><td>Low</td><td>4/5/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/15/2022 10:56:11 AM</td><td> </td><td>6/26/2022 12:18:29
PM</td><td>&nbsp;</td><td>MC.19.01.G21</td><td>&nbsp;</td>
</tr><tr>
<td>22966</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be adjusted
</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:13:37 AM</td><td> </td><td>6/26/2022 12:17:55 PM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>12292</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Double black at water features need finishing
</td><td>Low</td><td>11/2/2020 12:00:00 PM</td><td>Mohamed Samir</td><td>10/12/2020
3:10:04 PM</td><td> </td><td>6/26/2022 12:17:50
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22951</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be adjusted
</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:13:14 AM</td><td> </td><td>6/26/2022 12:17:44 PM</td><td>&nbsp;</td><td>Part
9</td><td>&nbsp;</td>
</tr><tr>
<td>22944</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Grouting should be adjusted
</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:13:02 AM</td><td> </td><td>6/26/2022 12:17:37 PM</td><td>&nbsp;</td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>22933</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Grouting should be adjusted
</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:12:43 AM</td><td> </td><td>6/26/2022 12:17:32 PM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22587</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>grouting quality</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/1/2021
10:49:23 AM</td><td> </td><td>6/26/2022 12:16:43 PM</td><td>&nbsp;</td><td>Part
5</td><td>&nbsp;</td>
</tr><tr>
<td>22595</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>grouting quality</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/1/2021
10:49:33 AM</td><td> </td><td>6/26/2022 12:16:37 PM</td><td>&nbsp;</td><td>Part
4</td><td>&nbsp;</td>
</tr><tr>
<td>22602</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>grouting quality</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/1/2021
10:49:44 AM</td><td> </td><td>6/26/2022 12:16:32 PM</td><td>&nbsp;</td><td>Part
3</td><td>&nbsp;</td>
</tr><tr>
<td>22614</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>grouting quality</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>9/22/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/1/2021
10:50:01 AM</td><td> </td><td>6/26/2022 12:16:27 PM</td><td>&nbsp;</td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>12046</td><td>MACHINE ACCESS ROOM</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Staircase</td><td>General
Snag</td><td>&#39;Stair CIR not submitted </td><td>Low</td><td>10/22/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>10/1/2020 2:14:03 PM</td><td> </td><td>6/26/2022
12:15:47 PM</td><td>&nbsp;</td><td>MS.18.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>20179</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing application for movement joint
</td><td>Low</td><td>8/24/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/3/2021
3:38:18 PM</td><td> </td><td>6/26/2022 12:14:21
PM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>30861</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing floor sealant
.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022
11:57:37 AM</td><td> </td><td>6/26/2022 12:05:41
PM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>28696</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around door should be adjusted
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022
10:38:17 AM</td><td> </td><td>6/26/2022 12:04:45
PM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>14381</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wall need touch up</td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/24/2020 1:25:27 PM</td><td> </td><td>6/26/2022
12:02:25 PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>20997</td><td>CORE B1 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Missing sealant at Joints between
flooring and stairs </td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/15/2021 11:12:15 AM</td><td> </td><td>6/26/2022 12:01:30
PM</td><td>&nbsp;</td><td>MC.23.02.B11</td><td>&nbsp;</td>
</tr><tr>
<td>14376</td><td>B.O.H-ARTEFACTS LOBBY - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant need adjustment </td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/24/2020 1:25:12 PM</td><td> </td><td>6/26/2022
12:00:34 PM</td><td>&nbsp;</td><td>MQ.23.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>14367</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Holes to be closed </td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/24/2020 1:24:51 PM</td><td> </td><td>6/26/2022
11:59:59 AM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>22239</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant is missing between wall and stainless handrail
</td><td>Low</td><td>9/14/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:00 AM</td><td> </td><td>6/26/2022 11:55:04
AM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20720</td><td>STORE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:28 PM</td><td> </td><td>6/26/2022 11:54:08
AM</td><td>&nbsp;</td><td>MT.14.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20719</td><td>STORE</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Joints should be aligned and repaired
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:26 PM</td><td> </td><td>6/26/2022 11:53:31
AM</td><td>&nbsp;</td><td>MT.14.01.006</td><td>&nbsp;</td>
</tr><tr>

<td>26337</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/22/2022 3:29:00 PM</td><td> </td><td>6/26/2022
11:50:40 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27214</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;All access panels are missing</td><td>Low</td><td>3/27/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:39:36 PM</td><td>
</td><td>6/26/2022 11:50:37 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27224</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access panels are missing</td><td>Low</td><td>3/27/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:39:55 PM</td><td> </td><td>6/26/2022
11:50:35 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>23901</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles </td><td>Low</td><td>11/14/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/24/2021 12:20:21 PM</td><td>
</td><td>6/26/2022 11:25:28 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23906</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;missing sealant between stone tiles
</td><td>Low</td><td>10/31/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:59:08 PM</td><td> </td><td>6/26/2022 11:25:25
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23907</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Fracture edges should be trim </td><td>Low</td><td>10/31/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/24/2021 12:59:10 PM</td><td>
</td><td>6/26/2022 11:25:24 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24031</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>11/15/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:38:47 PM</td><td>
</td><td>6/26/2022 11:25:23 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24035</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Edges should be adjusted </td><td>Low</td><td>11/15/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:38:55 PM</td><td>
</td><td>6/26/2022 11:25:21 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24036</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Joint should be uniform and aligned
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:38:56 PM</td><td> </td><td>6/26/2022 11:25:19
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24087</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Stone of overflow is not finished yet
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:40:26 PM</td><td> </td><td>6/26/2022 11:25:11
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24272</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Glass partion and door</td><td>General
Snag</td><td>&#39;Spaces between plates and lower cover is not-equal both
sides</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/26/2021 4:41:07 PM</td><td> </td><td>6/26/2022 11:25:10
AM</td><td>&nbsp;</td><td>Bridge</td><td>&nbsp;</td>
</tr><tr>

<td>24636</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken/ cracked tiles should be
replaced</td><td>Low</td><td>11/21/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/31/2021 4:29:56 PM</td><td> </td><td>6/26/2022 11:25:06
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24690</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be
replaced</td><td>Low</td><td>11/22/2021 12:00:00
AM</td><td>mohamed.sami</td><td>11/1/2021 4:34:50 PM</td><td> </td><td>6/26/2022
11:25:05 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24014</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be repaired/replaced
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:38:16 PM</td><td> </td><td>6/26/2022 10:36:20
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24029</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Irregular joints should be adjusted
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:38:44 PM</td><td> </td><td>6/26/2022 10:36:18
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24058</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Joints should be aligned and regular
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:39:34 PM</td><td> </td><td>6/26/2022 10:36:17
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24293</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Metal trim should be aligned and leveled
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/26/2021 4:41:44 PM</td><td> </td><td>6/26/2022 10:36:14
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24301</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Width of joints should be adjusted
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/26/2021 4:41:57 PM</td><td> </td><td>6/26/2022 10:36:13
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24302</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant is missing
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/26/2021 4:41:59 PM</td><td> </td><td>6/26/2022 10:36:12
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24304</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Marked parts at both side at the corners should be finished
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/26/2021 4:42:02 PM</td><td> </td><td>6/26/2022 10:36:10
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24710</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be replaced
</td><td>Low</td><td>11/24/2021 12:00:00 PM</td><td>mohamed.sami</td><td>11/3/2021
3:38:36 PM</td><td> </td><td>6/26/2022 10:36:09
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>8824</td><td>SPECIAL NEEDS GALLERY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Missing gypsum ceilings
</td><td>Low</td><td>4/6/2020 12:00:00 PM</td><td>Michael Mahfouz</td><td>3/16/2020
4:24:51 PM</td><td> </td><td>6/26/2022 10:18:31
AM</td><td>Done</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20718</td><td>RECEIVING AREA</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Joints should be aligned and repair
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:25 PM</td><td> </td><td>6/26/2022 9:22:24
AM</td><td>&nbsp;</td><td>MS.14.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>14974</td><td>GAS BOTTLE STORE</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing Sealant around metal door frame
</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>1/19/2021
11:35:24 AM</td><td> </td><td>6/26/2022 9:20:14
AM</td><td>&nbsp;</td><td>MS.19.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>14973</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing Sealant around metal door frame
</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>1/19/2021
11:35:21 AM</td><td> </td><td>6/26/2022 9:19:18
AM</td><td>&nbsp;</td><td>MS.20.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20483</td><td>W.C. /M</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Repair and repainted for ceiling painting
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:22 PM</td><td> </td><td>6/26/2022 9:18:42
AM</td><td>&nbsp;</td><td>MW.14.01.002B</td><td>&nbsp;</td>
</tr><tr>
<td>20508</td><td>W.C. /F</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Ceiling needs repair and touch up
painting </td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/8/2021 12:08:47 PM</td><td> </td><td>6/26/2022 9:18:01
AM</td><td>&nbsp;</td><td>MW.14.01.002A</td><td>&nbsp;</td>
</tr><tr>
<td>14994</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing Sealant around metal door frame
</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>1/19/2021
11:36:11 AM</td><td> </td><td>6/26/2022 9:15:55
AM</td><td>&nbsp;</td><td>MS.19.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20563</td><td>UNIVERSAL DISABLED W.C.</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around metal door needs adjustment
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:41 PM</td><td> </td><td>6/26/2022 9:13:18
AM</td><td>&nbsp;</td><td>MW.14.01.001C</td><td>&nbsp;</td>
</tr><tr>
<td>20522</td><td>FEMALE W.C.</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing Sealant around metal door frame
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:59 PM</td><td> </td><td>6/26/2022 9:11:58
AM</td><td>&nbsp;</td><td>MW.14.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20515</td><td>MALE W.C.</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around metal door frame need adjustment
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:53 PM</td><td> </td><td>6/26/2022 9:11:28
AM</td><td>&nbsp;</td><td>MW.14.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>20507</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor needs repair and touchup painting
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:45 PM</td><td> </td><td>6/26/2022 9:10:56
AM</td><td>&nbsp;</td><td>MS.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>14998</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up for concrete floor
</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>1/19/2021
11:36:19 AM</td><td> </td><td>6/26/2022 9:09:39
AM</td><td>&nbsp;</td><td>MS.19.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>14990</td><td>STORAGE</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Raised
Floor</td><td>General Snag</td><td>&#39;General cleaning for raised floor tiles and
under it </td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>1/19/2021 11:36:04 AM</td><td> </td><td>6/26/2022 9:08:57
AM</td><td>&nbsp;</td><td>MS.19.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>9174</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 6B - light between stone tiles/ stone
need cleaning </td><td>Low</td><td>7/8/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>6/17/2020 11:39:08 AM</td><td> </td><td>6/25/2022 9:24:04
AM</td><td>Cleaned</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>16605</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;General For all
* Graphic panel
• The sub- contractor did not finish the work to send CIR for cladding
This is snag is valid 7 Graphic panels</td><td>Low</td><td>3/13/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>2/20/2021 1:12:26 PM</td><td> </td><td>6/23/2022
2:49:22 PM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>12301</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing tree light fixtures,network switch
not installed,out door rack power not terminated,ICTcable inside manhole not
managed or labeled,fiber Termination not done,manhole ladder earth is
missing,outdoor cctv camera and WiFi is not
installed.</td><td>High</td><td>10/19/2020 12:00:00 AM</td><td>Mohamed
Samir</td><td>10/12/2020 3:39:57 PM</td><td> </td><td>6/23/2022 2:47:04
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24378</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>LIGHT
FITTINGS(INTERNAL/ EXTERNAL/ EMERGENCY)</td><td>General Snag</td><td>&#39;Missing
labels </td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>10/27/2021 11:53:02 AM</td><td> </td><td>6/23/2022 2:47:02
PM</td><td>&nbsp;</td><td>Museum Roof Band B</td><td>&nbsp;</td>
</tr><tr>
<td>24390</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>General Snag</td><td>&#39;Cleaning the trunk and arrange the
cables and cover the trunk</td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh
Ibrahim El-Sawah</td><td>10/27/2021 11:53:20 AM</td><td> </td><td>6/23/2022 2:47:01
PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>30303</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:04 PM</td><td> </td><td>6/23/2022
2:47:00 PM</td><td>&nbsp;</td><td>MS.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30304</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Need support </td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:05 PM</td><td>
</td><td>6/23/2022 2:46:59
PM</td><td>&nbsp;</td><td>MS.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30305</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Should be fixed properly
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:30:07 PM</td><td> </td><td>6/23/2022 2:46:58
PM</td><td>&nbsp;</td><td>MS.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30308</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Add Chanel support and rod
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:30:11 PM</td><td> </td><td>6/23/2022 2:46:57
PM</td><td>&nbsp;</td><td>MS.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>30312</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Covers and screw should be
installed</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:18 PM</td><td> </td><td>6/23/2022
2:46:56 PM</td><td>&nbsp;</td><td>MS.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>30315</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should laid on cable trunk
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:30:23 PM</td><td> </td><td>6/23/2022 2:46:55
PM</td><td>&nbsp;</td><td>MS.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>30332</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Outlet should be
aligned</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:52 PM</td><td> </td><td>6/23/2022
2:46:54 PM</td><td>&nbsp;</td><td>MA.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30352</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Should be fixed properly
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:31:19 PM</td><td> </td><td>6/23/2022 2:46:53
PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30362</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Add additional
rod</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:35 PM</td><td> </td><td>6/23/2022
2:46:52 PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30728</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label and cover
hole</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:38:30 PM</td><td> </td><td>6/23/2022
2:46:51 PM</td><td>&nbsp;</td><td>MS.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30743</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Hole to be closed
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:39:45 PM</td><td> </td><td>6/23/2022 2:46:50
PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30751</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable tag for MV cable should be installed
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:40:07 PM</td><td> </td><td>6/23/2022 2:46:49
PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30754</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Support must be aligned
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:40:14 PM</td><td> </td><td>6/23/2022 2:46:47
PM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30757</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable trunk should be
covered</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:40:43 PM</td><td> </td><td>6/23/2022
2:46:46 PM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30758</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover boxes</td><td>High</td><td>6/7/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022 4:40:51 PM</td><td>
</td><td>6/23/2022 2:46:45
PM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30763</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be installed inside
tray</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:41:07 PM</td><td> </td><td>6/23/2022
2:46:44 PM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30765</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be installed inside
tray</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:41:11 PM</td><td> </td><td>6/23/2022
2:46:43 PM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>13222</td><td>(OLD) EXIT/LOBBY</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing
tiles</td><td>Low</td><td>11/25/2020 12:00:00
PM</td><td>sally.george</td><td>11/4/2020 11:21:12 AM</td><td> </td><td>6/23/2022
1:22:01 PM</td><td>Rectified by HAZ</td><td>MP.19.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>24404</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Gap of metal ceiling is not
aligned.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>10/27/2021 4:26:23 PM</td><td> </td><td>6/23/2022 1:08:33
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24237</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Frame with stone cladding need to
repair.</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>10/26/2021 4:24:48 PM</td><td> </td><td>6/23/2022 1:08:28
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24235</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall speakers need to vertical
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>10/26/2021 4:24:45 PM</td><td> </td><td>6/23/2022 1:08:20
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25896</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked louver is not as shop drawing and
should be replaced</td><td>Low</td><td>2/13/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/23/2022 11:59:47 AM</td><td> </td><td>6/23/2022
12:58:47 PM</td><td>Rectified on site but not
replaced</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26073</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Toothing should be leveled and filled grouting
</td><td>Low</td><td>2/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/31/2022
11:58:23 AM</td><td> </td><td>6/23/2022 12:58:05
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21958</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Missing support on duct riser</td><td>High</td><td>8/30/2021
12:00:00 PM</td><td>ahmedsalem</td><td>8/23/2021 1:36:08 PM</td><td>
</td><td>6/23/2022 12:30:08
PM</td><td>&nbsp;</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>9520</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 5 A- joint between enter faces not
aligned </td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>7/14/2020 12:35:06 PM</td><td> </td><td>6/23/2022 12:05:21
PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9519</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Toothing between tiles/ damaged tiles / stone
need cleaning </td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>7/14/2020 12:35:03 PM</td><td> </td><td>6/23/2022 12:05:14
PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9518</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Joints not aligned/ toothing between tiles/
joint between enter face not aligned </td><td>Low</td><td>8/4/2020 12:00:00
PM</td><td>Sherif Elabd</td><td>7/14/2020 12:35:01 PM</td><td> </td><td>6/23/2022
12:05:06 PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9524</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Joints not aligned/ toothing between tiles/
rust stains at tiles </td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>7/14/2020 12:35:16 PM</td><td> </td><td>6/23/2022 12:04:54
PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9523</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges/ pitted tiles/ cracked tiles
</td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/14/2020
12:35:12 PM</td><td> </td><td>6/23/2022 12:04:44 PM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9522</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Damaged tiles/ broken edges
</td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/14/2020
12:35:10 PM</td><td> </td><td>6/23/2022 12:04:30 PM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9521</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Discoloring between tiles
</td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/14/2020
12:35:08 PM</td><td> </td><td>6/23/2022 12:04:22 PM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9531</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Discoloring between tiles
</td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/14/2020
12:35:33 PM</td><td> </td><td>6/23/2022 12:04:12 PM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9530</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Joints not aligned
</td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/14/2020
12:35:32 PM</td><td> </td><td>6/23/2022 12:04:01 PM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9529</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Stone need cleaning/ joints not regular
</td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/14/2020
12:35:30 PM</td><td> </td><td>6/23/2022 12:03:49 PM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9527</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Joint between enter face not aligned
</td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/14/2020
12:35:24 PM</td><td> </td><td>6/23/2022 12:03:39 PM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>9526</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Rust stains at tiles
</td><td>Low</td><td>8/4/2020 12:00:00 PM</td><td>Sherif Elabd</td><td>7/14/2020
12:35:22 PM</td><td> </td><td>6/23/2022 12:03:24 PM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>14871</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Fixed Mirror</td><td>General</td><td>&#39;Sealant need adjustment around mirror
frame</td><td>High</td><td>1/25/2021 12:00:00
PM</td><td>andrewjohn.rose</td><td>1/18/2021 1:19:44 PM</td><td> </td><td>6/23/2022
12:02:47 PM</td><td>&nbsp;</td><td>MW.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>20025</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing exhaust acoustic lining insulation
</td><td>High</td><td>8/5/2021 12:00:00 PM</td><td>ahmedsalem</td><td>7/29/2021
3:00:03 PM</td><td> </td><td>6/23/2022 11:55:00
AM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>28327</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;No firefighting equipment detected in
this area. </td><td>High</td><td>4/26/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:50:06 AM</td><td> </td><td>6/23/2022 11:54:56
AM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28682</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing acoustic lining for EX. air duct.
</td><td>High</td><td>5/17/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:41:53 PM</td><td> </td><td>6/23/2022 11:54:54
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29051</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Canvases need adjustments and threaded
connection rods shall be removed. </td><td>High</td><td>5/24/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:11:59 PM</td><td>
</td><td>6/23/2022 11:54:48
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29234</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Canvases shall be adjusted or changed.
</td><td>High</td><td>5/30/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:27 PM</td><td> </td><td>6/23/2022 11:54:46
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29310</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal installation for chilled
water pipes. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:54 PM</td><td> </td><td>6/23/2022 11:54:41
AM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>30102</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Remove tape from INERGEN nozzles.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:03 AM</td><td> </td><td>6/23/2022 11:54:40
AM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31160</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Canvases need adjustments. </td><td>High</td><td>6/8/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:53:59 PM</td><td>
</td><td>6/23/2022 11:54:38
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31179</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Canvases need adjustments or to be changed.
</td><td>High</td><td>6/8/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:54:51 PM</td><td> </td><td>6/23/2022 11:54:37
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31192</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Canvases need to be changed or adjusted.
</td><td>High</td><td>6/8/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:55:20 PM</td><td> </td><td>6/23/2022 11:54:36
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31212</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Canvases shall be adjusted and threaded rods shall be removed.
</td><td>High</td><td>6/8/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:56:17 PM</td><td> </td><td>6/23/2022 11:54:35
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31414</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Ex. Air duct has no acoustic lining.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:32 AM</td><td> </td><td>6/23/2022 11:54:33
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31419</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Internal cleaning. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:56:46 AM</td><td>
</td><td>6/23/2022 11:54:32
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31443</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Ex. Air duct has no acoustic lining.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:57:34 AM</td><td> </td><td>6/23/2022 11:54:30
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31620</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Canvases need to be changed.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:59 AM</td><td> </td><td>6/23/2022 11:54:29
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31720</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage duct thermal insulation. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:54:48 AM</td><td>
</td><td>6/23/2022 11:54:28
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>20975</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between two stone tiles
</td><td>Low</td><td>9/1/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/11/2021
12:00:59 PM</td><td> </td><td>6/23/2022 11:27:50
AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>20976</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>9/1/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>8/11/2021
12:01:02 PM</td><td> </td><td>6/23/2022 11:26:59
AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>16246</td><td>Food Court</td><td>Food
Court</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Tiles needs
adjustment</td><td>Low</td><td>3/4/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/11/2021 11:15:23 AM</td><td> </td><td>6/23/2022 11:23:20
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17314</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Ceiling tiles level/flush</td><td>&#39;Toothing between tiles
need to fixed properly </td><td>Low</td><td>5/3/2021 12:00:00
PM</td><td>aymanhaddadin</td><td>4/12/2021 11:58:32 AM</td><td> </td><td>6/23/2022
11:23:18 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22863</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Slot drain should be aligned with stone
flooring </td><td>Low</td><td>10/4/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/13/2021 11:21:44 AM</td><td> </td><td>6/23/2022 11:23:17
AM</td><td>&nbsp;</td><td>Part 9</td><td>&nbsp;</td>
</tr><tr>
<td>23856</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Marked joint should be filled properly and be aligned
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/24/2021
10:10:50 AM</td><td> </td><td>6/23/2022 11:23:16
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23941</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Joint should be aligned and filled properly
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:28:08 AM</td><td> </td><td>6/23/2022 11:23:15
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23944</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Joint should be aligned and filled properly
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:28:13 AM</td><td> </td><td>6/23/2022 11:23:14
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26272</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired/replaced
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:25:35 PM</td><td> </td><td>6/23/2022 11:23:06
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>22957</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be adjusted
</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:13:24 AM</td><td> </td><td>6/23/2022 11:21:04 AM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>22434</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Tiles should be cut properly
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Mohamed
El-Sergany</td><td>8/29/2021 3:13:02 PM</td><td> </td><td>6/23/2022 11:20:32
AM</td><td>&nbsp;</td><td>Part 1</td><td>&nbsp;</td>
</tr><tr>
<td>22673</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Bitted stone tiles
</td><td>Low</td><td>9/26/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/5/2021
10:19:39 AM</td><td> </td><td>6/23/2022 11:19:56 AM</td><td>&nbsp;</td><td>Part
3</td><td>&nbsp;</td>
</tr><tr>
<td>22882</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Different texture tile
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:19 PM</td><td> </td><td>6/23/2022 11:18:40 AM</td><td>&nbsp;</td><td>Part
9</td><td>&nbsp;</td>
</tr><tr>
<td>22416</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Broken, to be replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Mohamed
El-Sergany</td><td>8/29/2021 3:11:34 PM</td><td> </td><td>6/23/2022 11:17:25
AM</td><td>&nbsp;</td><td>Part 2</td><td>&nbsp;</td>
</tr><tr>
<td>22423</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloration between stone tiles
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Mohamed
El-Sergany</td><td>8/29/2021 3:12:12 PM</td><td> </td><td>6/23/2022 11:16:21
AM</td><td>&nbsp;</td><td>Part 3</td><td>&nbsp;</td>
</tr><tr>
<td>22418</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Broken, to be replaced</td><td>&#39;Broken tiles should be repaired
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Mohamed
El-Sergany</td><td>8/29/2021 3:11:42 PM</td><td> </td><td>6/23/2022 11:11:37
AM</td><td>&nbsp;</td><td>Part 2</td><td>&nbsp;</td>
</tr><tr>
<td>31949</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Rusty and dirty drain pipes.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:36 PM</td><td> </td><td>6/23/2022 9:24:06
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>30392</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:19 PM</td><td> </td><td>6/23/2022 9:22:11
AM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30394</td><td>STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:22 PM</td><td> </td><td>6/23/2022 9:20:29
AM</td><td>&nbsp;</td><td>MR.14.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30176</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Fire sprinklers covers not installed yet.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:32 AM</td><td> </td><td>6/23/2022 9:19:10
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30390</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:16 PM</td><td> </td><td>6/23/2022 9:17:33
AM</td><td>&nbsp;</td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31681</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing fire extinguishers.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:30 PM</td><td> </td><td>6/23/2022 9:15:54
AM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31954</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Missing label for FD.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:46 PM</td><td> </td><td>6/23/2022 9:15:13
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>31952</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing air ducts labels.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:44 PM</td><td> </td><td>6/23/2022 9:14:16
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>31948</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Duct holes shall be closed.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:34 PM</td><td> </td><td>6/23/2022 9:08:38
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>31947</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Fire dampers labels are missing.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:30 PM</td><td> </td><td>6/23/2022 9:06:40
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>31946</td><td>CORE F1</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Fire damper label is missing.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:29 PM</td><td> </td><td>6/23/2022 9:05:03
AM</td><td>&nbsp;</td><td>MC.25.2A.F11</td><td>&nbsp;</td>
</tr><tr>
<td>31912</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning for HDPE pipe.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:24 PM</td><td> </td><td>6/23/2022 9:03:35
AM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>31920</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning and touchup paintings for fire
pipe. </td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:41 PM</td><td> </td><td>6/23/2022 9:02:10
AM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>22008</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label for
pipes</td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/23/2021 3:56:50 PM</td><td> </td><td>6/23/2022
8:59:28 AM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>30178</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire sprinklers covers not installed
yet. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:37 AM</td><td> </td><td>6/23/2022 8:58:17
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30179</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire sprinklers covers are not
installed. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:40 AM</td><td> </td><td>6/23/2022 8:57:36
AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31943</td><td>CORE F1</td><td>MU
L30</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Missing label for fire damper.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:49:25 PM</td><td> </td><td>6/23/2022 8:55:30
AM</td><td>&nbsp;</td><td>MC.24.03.F11</td><td>&nbsp;</td>
</tr><tr>
<td>30183</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire sprinklers covers are missing.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:47 AM</td><td> </td><td>6/23/2022 8:54:34
AM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30371</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Sprinkler cover.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:51:38 PM</td><td> </td><td>6/23/2022 8:52:49
AM</td><td>&nbsp;</td><td>MA.19.02.024</td><td>&nbsp;</td>
</tr><tr>
<td>30397</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:29 PM</td><td> </td><td>6/23/2022 8:46:16
AM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>22074</td><td>TUT-CORE B3</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Touch up painting for
fire</td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/23/2021 3:57:57 PM</td><td> </td><td>6/23/2022
8:44:42 AM</td><td>&nbsp;</td><td>MC.12.03.B31</td><td>&nbsp;</td>
</tr><tr>
<td>30167</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire sprinklers covers shall be
installed. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:16 AM</td><td> </td><td>6/23/2022 8:43:38
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30373</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Sprinkler cover.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:51:43 PM</td><td> </td><td>6/23/2022 8:42:33
AM</td><td>&nbsp;</td><td>MA.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30374</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:51:48 PM</td><td> </td><td>6/23/2022 8:41:54
AM</td><td>&nbsp;</td><td>MA.19.02.020</td><td>&nbsp;</td>
</tr><tr>
<td>30376</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers cover.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:51:53 PM</td><td> </td><td>6/23/2022 8:40:49
AM</td><td>&nbsp;</td><td>MA.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30378</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinkler cover.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:51:55 PM</td><td> </td><td>6/23/2022 8:40:08
AM</td><td>&nbsp;</td><td>MA.19.02.023</td><td>&nbsp;</td>
</tr><tr>
<td>30379</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinkler cover.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:51:57 PM</td><td> </td><td>6/23/2022 8:39:11
AM</td><td>&nbsp;</td><td>MA.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30381</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:00 PM</td><td> </td><td>6/23/2022 8:38:28
AM</td><td>&nbsp;</td><td>MA.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30382</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:02 PM</td><td> </td><td>6/23/2022 8:36:13
AM</td><td>&nbsp;</td><td>MA.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30386</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:10 PM</td><td> </td><td>6/23/2022 8:29:08
AM</td><td>&nbsp;</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30398</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing covers for fire sprinklers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:30 PM</td><td> </td><td>6/23/2022 8:23:30
AM</td><td>&nbsp;</td><td>MQ.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30658</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage chilled water pipes thermal
insulation. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:47 AM</td><td> </td><td>6/23/2022 8:20:57
AM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30666</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39; Issuing labels for
chilled water pipes. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:53:01 AM</td><td> </td><td>6/23/2022 8:19:39
AM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30668</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Chilled water pipes
insulation damage. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:53:04 AM</td><td> </td><td>6/23/2022 8:18:17
AM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>22013</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Insulation for drain pan need repair
</td><td>High</td><td>8/30/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/23/2021
3:56:56 PM</td><td> </td><td>6/23/2022 8:16:50
AM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>22006</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing access door for fire damper
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/23/2021
3:56:48 PM</td><td> </td><td>6/23/2022 8:16:14
AM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>31913</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning and touchup painting for fire
pipe. </td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:25 PM</td><td> </td><td>6/23/2022 8:15:07
AM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>31921</td><td>CORE F3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning for plumbing pipes.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:47 PM</td><td> </td><td>6/23/2022 8:14:26
AM</td><td>&nbsp;</td><td>MC.14.02.F31</td><td>&nbsp;</td>
</tr><tr>
<td>31922</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Chilled water pipes thermal insulation need
repairs. </td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:49 PM</td><td> </td><td>6/23/2022 8:13:40
AM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>31923</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for chilled water pipes.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:52 PM</td><td> </td><td>6/23/2022 8:13:09
AM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>31925</td><td>CORE G3</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Chilled water pipes thermal insulation need
repairs. </td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:56 PM</td><td> </td><td>6/23/2022 8:09:23
AM</td><td>&nbsp;</td><td>MC.19.01.G31</td><td>&nbsp;</td>
</tr><tr>
<td>31926</td><td>CORE G3</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for chilled water pipes.
</td><td>High</td><td>6/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/21/2022 4:48:59 PM</td><td> </td><td>6/23/2022 8:08:32
AM</td><td>&nbsp;</td><td>MC.19.01.G31</td><td>&nbsp;</td>
</tr><tr>
<td>25864</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Toothing between False
ceiling tiles should be leveled </td><td>Low</td><td>2/10/2022 12:00:00
PM</td><td>Kerolos Nagy Tawfik</td><td>1/20/2022 12:03:10 PM</td><td>
</td><td>6/23/2022 7:40:42 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>20665</td><td>TEMP EXHIBITION CURATOR</td><td>MU
L10</td><td>Closed</td><td>Modernlite</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>Lighting Switches</td><td>&#39;Missing work (push buttons not
installed yet) for lighting control </td><td>High</td><td>8/17/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/10/2021 11:17:59 AM</td><td>
</td><td>6/22/2022 2:59:10
PM</td><td>&nbsp;</td><td>MT.14.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>27746</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>Identification missing</td><td>&#39;Fire alarm detector label
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:10 PM</td><td> </td><td>6/22/2022 2:59:09
PM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29044</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Lighting not working.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:46 PM</td><td> </td><td>6/22/2022 2:59:08
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>30291</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;As manufacture drawing should be attached and labeling
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:29:45 PM</td><td> </td><td>6/22/2022 2:59:07
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30299</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Support must be aligned and missing screws must be installed
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:29:58 PM</td><td> </td><td>6/22/2022 2:59:06
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30729</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Installed proper cover
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:38:32 PM</td><td> </td><td>6/22/2022 2:59:04
PM</td><td>&nbsp;</td><td>MS.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30732</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Label</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:38:39 PM</td><td> </td><td>6/22/2022
2:59:03 PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30734</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover tray</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:38:46 PM</td><td> </td><td>6/22/2022
2:59:02 PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30739</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:39:34 PM</td><td> </td><td>6/22/2022
2:59:01 PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30744</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label of box</td><td>High</td><td>6/7/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022 4:39:48 PM</td><td>
</td><td>6/22/2022 2:59:00
PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30745</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover box </td><td>High</td><td>6/7/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022 4:39:50 PM</td><td>
</td><td>6/22/2022 2:58:59
PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30756</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover box</td><td>High</td><td>6/7/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022 4:40:18 PM</td><td>
</td><td>6/22/2022 2:58:57
PM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30989</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Provide cable tag</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:23 PM</td><td> </td><td>6/22/2022
2:58:56 PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30992</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cable should fixed with 2 screws </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:28 PM</td><td>
</td><td>6/22/2022 2:58:55
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31024</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:21:22 PM</td><td> </td><td>6/22/2022
2:58:54 PM</td><td>&nbsp;</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>31032</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:22:27 PM</td><td> </td><td>6/22/2022 2:58:52
PM</td><td>&nbsp;</td><td>MA.19.02.026</td><td>&nbsp;</td>
</tr><tr>
<td>31061</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Buttom plate</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:09 PM</td><td>
</td><td>6/22/2022 2:58:51
PM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31065</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable tag</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:15 PM</td><td>
</td><td>6/22/2022 2:58:50
PM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31080</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Bottom plates</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:39 PM</td><td>
</td><td>6/22/2022 2:58:48
PM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31085</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover trunk</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:51 PM</td><td> </td><td>6/22/2022
2:58:46 PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31087</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Rod aligned </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:55 PM</td><td> </td><td>6/22/2022
2:58:44 PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31280</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover tray and label for
box</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:52 AM</td><td> </td><td>6/22/2022
2:58:43 PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31281</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:53 AM</td><td> </td><td>6/22/2022
2:58:42 PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31337</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Condensates drain shall be insulated.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:53:56 AM</td><td> </td><td>6/22/2022 2:41:45
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31374</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing insulation for drain pipes.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:55:10 AM</td><td> </td><td>6/22/2022 2:40:07
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30094</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers head covers shall be
installed. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:55 AM</td><td> </td><td>6/22/2022 2:33:25
PM</td><td>&nbsp;</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30091</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing sprinklers heads covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:52 AM</td><td> </td><td>6/22/2022 2:32:18
PM</td><td>&nbsp;</td><td>MA.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30098</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinkler head covers are missing.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:59 AM</td><td> </td><td>6/22/2022 2:30:29
PM</td><td>&nbsp;</td><td>MA.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30408</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Sprinklers covers missing.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:46 PM</td><td> </td><td>6/22/2022 2:29:04
PM</td><td>&nbsp;</td><td>MR.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30412</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:52 PM</td><td> </td><td>6/22/2022 2:28:30
PM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30414</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing fire sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:55 PM</td><td> </td><td>6/22/2022 2:27:52
PM</td><td>&nbsp;</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30420</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Missing sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:53:03 PM</td><td> </td><td>6/22/2022 2:26:56
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30678</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers heads covers shall be
installed. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:53:18 AM</td><td> </td><td>6/22/2022 2:26:05
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30110</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinkler head cover shall be
installed. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:11 AM</td><td> </td><td>6/22/2022 2:24:54
PM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30117</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers head covers shall be
installed. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:19 AM</td><td> </td><td>6/22/2022 2:19:39
PM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30125</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinkler head cover is missing.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:29 AM</td><td> </td><td>6/22/2022 2:17:49
PM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30131</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinkler cover is missing.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:34 AM</td><td> </td><td>6/22/2022 2:16:59
PM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>29025</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Lighting not working.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:54 PM</td><td> </td><td>6/22/2022 2:15:12
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>28342</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Inside machine lighting is missing.
</td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:16 AM</td><td> </td><td>6/22/2022 2:14:25
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28351</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Inside machine lighting is missing.
</td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:41 AM</td><td> </td><td>6/22/2022 2:13:53
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>21967</td><td>B.O.H-CORE B2 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door is closed
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/23/2021
1:36:28 PM</td><td> </td><td>6/22/2022 2:13:24
PM</td><td>&nbsp;</td><td>MC.18.02.B21</td><td>&nbsp;</td>
</tr><tr>
<td>29178</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing thermal insulation. </td><td>High</td><td>5/29/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:58:49 AM</td><td>
</td><td>6/22/2022 2:09:50
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>30417</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:58 PM</td><td> </td><td>6/22/2022 2:09:05
PM</td><td>&nbsp;</td><td>MR.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31360</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Thermal insulation shall be installed for drain pipes.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:40 AM</td><td> </td><td>6/22/2022 2:03:18
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27320</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Sprinklers covers are missing
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022
12:12:01 PM</td><td> </td><td>6/22/2022 2:02:01
PM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31358</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage hydronic pipes thermal insulation.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:36 AM</td><td> </td><td>6/22/2022 2:01:01
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27340</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sprinklers covers
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022
12:12:38 PM</td><td> </td><td>6/22/2022 1:59:55
PM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27469</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Sprinklers covers are missing
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022
4:41:02 PM</td><td> </td><td>6/22/2022 1:58:10
PM</td><td>&nbsp;</td><td>MA.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30405</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39; Issuing fire extinguisher and cabinet
shall be cleaned from inside. </td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/30/2022 4:52:42 PM</td><td>
</td><td>6/22/2022 1:57:09
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>12970</td><td>TUT- FIRE EXIT</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Fire stopping
incomplete</td><td>&#39;Missing fire collar around HDPE pipe
</td><td>High</td><td>11/9/2020 12:00:00 AM</td><td>ahmedsalem</td><td>11/2/2020
11:55:55 AM</td><td> </td><td>6/22/2022 1:56:13
PM</td><td>&nbsp;</td><td>MP.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>28111</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Sprinkler cover is missing
</td><td>Low</td><td>4/6/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/16/2022
10:59:59 AM</td><td> </td><td>6/22/2022 1:54:58
PM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29270</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation for chilled water pipes. </td><td>High</td><td>5/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/23/2022 12:06:49 PM</td><td>
</td><td>6/22/2022 1:53:40
PM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>28024</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;All sprinklers covers are missing
</td><td>Low</td><td>4/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/14/2022
11:39:19 AM</td><td> </td><td>6/22/2022 1:51:28
PM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30074</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinkler head cover missing.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:17 AM</td><td> </td><td>6/22/2022 1:46:12
PM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30076</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers covers shall be installed.
</td><td>High</td><td>6/6/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:23 AM</td><td> </td><td>6/22/2022 1:43:25
PM</td><td>&nbsp;</td><td>MA.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30084</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinkler head cover is missing.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:39 AM</td><td> </td><td>6/22/2022 1:42:23
PM</td><td>&nbsp;</td><td>MA.19.02.022</td><td>&nbsp;</td>
</tr><tr>
<td>13291</td><td>(OLD) SOLAR BOAT LOBBY</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Missing tiles cladding
</td><td>Low</td><td>11/25/2020 12:00:00 AM</td><td>sally.george</td><td>11/4/2020
4:17:45 PM</td><td> </td><td>6/22/2022 1:15:16
PM</td><td>&nbsp;</td><td>MP.19.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>8963</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 8A face 3 stone need repair
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>sally.george</td><td>4/28/2020
11:26:28 AM</td><td> </td><td>6/22/2022 1:15:11 PM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8965</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 8A face 2 stone need repair
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>sally.george</td><td>4/28/2020
11:26:34 AM</td><td> </td><td>6/22/2022 12:15:26 PM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8964</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 8A face 2 color variation
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>sally.george</td><td>4/28/2020
11:26:31 AM</td><td> </td><td>6/22/2022 12:15:21 PM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8938</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 9A face 2 color variations
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>4/28/2020 11:23:54 AM</td><td> </td><td>6/22/2022 12:15:12
PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8932</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 9A face 1 joints need adjustment
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>4/28/2020 11:22:51 AM</td><td> </td><td>6/22/2022 12:14:15
PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8935</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 7A face 2 color variations in stone
tiles </td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>4/28/2020 11:23:23 AM</td><td> </td><td>6/22/2022 12:04:31
PM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>25487</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked plates should be sited on
stone </td><td>Low</td><td>12/29/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/8/2021 1:41:00 PM</td><td> </td><td>6/22/2022
11:21:18 AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25533</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Distance between stainless plants
should be regular and plates should be fixed properly
</td><td>Low</td><td>12/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:52:57 PM</td><td> </td><td>6/22/2022 11:21:17 AM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25552</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Orientation and spacing between
plates should be aligned and unified </td><td>Low</td><td>12/16/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:57:48 PM</td><td> </td><td>6/22/2022
11:21:15 AM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25617</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Distance between plates should be
uniform </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:52:06 AM</td><td> </td><td>6/22/2022
11:21:14 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25641</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Plates should be sited on stone
</td><td>Low</td><td>1/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:52:30 AM</td><td> </td><td>6/22/2022 11:21:13
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25643</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail should checked and
addressed properly for levels and alignment </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:52:34 AM</td><td> </td><td>6/22/2022
11:21:10 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22439</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Slot drain should be aligned and fixed
properly </td><td>Low</td><td>9/19/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>8/29/2021 3:13:30 PM</td><td> </td><td>6/22/2022 11:19:56
AM</td><td>Done </td><td>Part 3</td><td>&nbsp;</td>
</tr><tr>
<td>22619</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Slot drain need to adjustment and alignment
</td><td>Low</td><td>9/22/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/1/2021
10:50:07 AM</td><td> </td><td>6/22/2022 11:19:54 AM</td><td>Done </td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>22651</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring
- stone</td><td>General</td><td>&#39;Slot drain should be aligned
</td><td>Low</td><td>9/26/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/5/2021
10:19:09 AM</td><td> </td><td>6/22/2022 11:19:53 AM</td><td>Done </td><td>Part
5</td><td>&nbsp;</td>
</tr><tr>
<td>22682</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Slot drain need to be aligned
</td><td>Low</td><td>9/26/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/5/2021
10:19:53 AM</td><td> </td><td>6/22/2022 11:19:52 AM</td><td>Done </td><td>Part
3</td><td>&nbsp;</td>
</tr><tr>
<td>22844</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Slot drain should be aligned
</td><td>Low</td><td>10/3/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/12/2021
10:48:16 AM</td><td> </td><td>6/22/2022 11:19:51 AM</td><td>Done </td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22878</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>grouting quality</td><td>&#39;Bad grouting should be repaired
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/13/2021
11:22:08 AM</td><td> </td><td>6/22/2022 11:19:49 AM</td><td>Done </td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>23644</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Movement joint should be cutting aligned and filled properly
</td><td>Low</td><td>10/13/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/22/2021
11:09:54 AM</td><td> </td><td>6/22/2022 11:19:48 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23679</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>10/17/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/26/2021
10:20:04 AM</td><td> </td><td>6/22/2022 11:19:47 AM</td><td>Done </td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>25088</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>GEOTECH
Tensar</td><td>Architectural</td><td>Brick/Blockwork</td><td>General
Snag</td><td>&#39;Surface should be cleaned and salt should be
removed</td><td>Low</td><td>11/21/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/14/2021 10:29:02 AM</td><td> </td><td>6/22/2022 11:19:46
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25110</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Staircase Handrail</td><td>Overall
finishes</td><td>&#39;Handrail should be cleaned and stains should be
removed</td><td>Low</td><td>12/5/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/14/2021 10:30:34 AM</td><td> </td><td>6/22/2022 11:19:45
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26246</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired/replaced
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:25:03 PM</td><td> </td><td>6/22/2022 11:19:43 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26252</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired/replaced
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:25:12 PM</td><td> </td><td>6/22/2022 11:19:42 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26254</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired/replaced
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:25:15 PM</td><td> </td><td>6/22/2022 11:19:41 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26264</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired/replaced
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:25:27 PM</td><td> </td><td>6/22/2022 11:19:39 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26270</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired/replaced
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:25:33 PM</td><td> </td><td>6/22/2022 11:19:38 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26273</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired/replaced
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:25:36 PM</td><td> </td><td>6/22/2022 11:19:37 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26868</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/23/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/2/2022 10:31:03 AM</td><td> </td><td>6/22/2022
11:19:36 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27229</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Missing access
panels</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/6/2022 4:40:05 PM</td><td> </td><td>6/22/2022 11:19:35
AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27244</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall - stone cladding</td><td>Damages to be
rectified or replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022
4:51:16 PM</td><td> </td><td>6/22/2022 11:19:33 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>23867</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Remains of work and debris should eat removed from ceiling
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:19:27 PM</td><td> </td><td>6/22/2022 10:56:59
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23887</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Check
if the cover is accessible or not</td><td>Low</td><td>11/14/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>10/24/2021 12:20:00 PM</td><td>
</td><td>6/22/2022 10:56:59 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23910</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Fracture edges should be trim </td><td>Low</td><td>11/14/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/24/2021 12:59:15 PM</td><td>
</td><td>6/22/2022 10:56:57 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24026</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Tiles should be installed </td><td>Low</td><td>11/15/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:38:38 PM</td><td>
</td><td>6/22/2022 10:56:56 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24051</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles </td><td>Low</td><td>11/15/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:39:23 PM</td><td>
</td><td>6/22/2022 10:56:55 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24065</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Stone edge should be regular and uniform
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:39:46 PM</td><td> </td><td>6/22/2022 10:56:54
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24099</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>S/S trimmer
flush</td><td>&#39;Metal trim not leveled with stone flooring
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:41:05 PM</td><td> </td><td>6/22/2022 10:56:53
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24635</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken/ cracked tiles should be
replaced</td><td>Low</td><td>11/7/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/31/2021 4:29:54 PM</td><td> </td><td>6/22/2022 10:56:49
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24707</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be replaced
</td><td>Low</td><td>11/10/2021 12:00:00 PM</td><td>mohamed.sami</td><td>11/3/2021
3:38:28 PM</td><td> </td><td>6/22/2022 10:56:48
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>8962</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 6A face 2 color variation
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>sally.george</td><td>4/28/2020
11:26:24 AM</td><td> </td><td>6/22/2022 9:47:02 AM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8959</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 6A face 2 stone tiles isn’t aligned
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>sally.george</td><td>4/28/2020
11:26:13 AM</td><td> </td><td>6/22/2022 9:46:58 AM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8958</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 6A face 3 color variation
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>sally.george</td><td>4/28/2020
11:26:10 AM</td><td> </td><td>6/22/2022 9:46:52 AM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8944</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 6A face 2 damaged stone
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>sally.george</td><td>4/28/2020
11:24:46 AM</td><td> </td><td>6/22/2022 9:46:47 AM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8952</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 3A face 2 color variation
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>sally.george</td><td>4/28/2020
11:25:36 AM</td><td> </td><td>6/22/2022 9:39:55 AM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8942</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 5A face 1 stone tiles not as Approved
DWG. </td><td>Low</td><td>5/19/2020 12:00:00
PM</td><td>sally.george</td><td>4/28/2020 11:24:36 AM</td><td> </td><td>6/22/2022
9:39:49 AM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8941</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 5A face 1 joint isn’t aligned
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>sally.george</td><td>4/28/2020
11:24:31 AM</td><td> </td><td>6/22/2022 9:39:45 AM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>29237</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Machine lighting not working.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:32 PM</td><td> </td><td>6/22/2022 9:35:06
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29268</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Lighting not working.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:46 PM</td><td> </td><td>6/22/2022 9:34:16
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>25866</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Bottom of mesh cladding should be aligned
</td><td>Low</td><td>2/10/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>1/20/2022 12:03:13 PM</td><td> </td><td>6/22/2022 9:33:13
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>8951</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 3A face 2 stone need repair
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>sally.george</td><td>4/28/2020
11:25:27 AM</td><td> </td><td>6/22/2022 9:33:01 AM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8950</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 3A face 2 stone tiles isn’t aligned
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>sally.george</td><td>4/28/2020
11:25:20 AM</td><td> </td><td>6/22/2022 9:32:54 AM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8949</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 3A face 3 damaged stone /joint isn’t
aligned </td><td>Low</td><td>5/19/2020 12:00:00
PM</td><td>sally.george</td><td>4/28/2020 11:25:16 AM</td><td> </td><td>6/22/2022
9:32:49 AM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8946</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 1A face 2 stone tiles not aligned
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>sally.george</td><td>4/28/2020
11:25:04 AM</td><td> </td><td>6/22/2022 9:32:44 AM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>8945</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 2A face 2 color variation
</td><td>Low</td><td>5/19/2020 12:00:00 PM</td><td>sally.george</td><td>4/28/2020
11:24:50 AM</td><td> </td><td>6/22/2022 9:32:25 AM</td><td>&nbsp;</td><td>Stiletto
- wall A</td><td>&nbsp;</td>
</tr><tr>
<td>28965</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Machine internal lighting not working.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:35 PM</td><td> </td><td>6/22/2022 9:32:20
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29008</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Internal lighting not working.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:04 PM</td><td> </td><td>6/22/2022 9:30:47
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>30656</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Water sprinkler used for fire fighting
inside electrical room. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:44 AM</td><td> </td><td>6/22/2022 9:14:33
AM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30650</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;No fire fighting system in this room.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:31 AM</td><td> </td><td>6/22/2022 9:13:43
AM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29729</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;No fire damper installed inside the wall.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:21:19 PM</td><td> </td><td>6/22/2022 9:13:06
AM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>13703</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV QC
MEP</td><td>MEP-Mechanical</td><td>AHU</td><td>General
cleanliness</td><td>&#39;Cleaning of motors inside AHU
</td><td>High</td><td>12/7/2020 12:00:00 PM</td><td>ahmedsalem</td><td>11/30/2020
12:00:34 PM</td><td> </td><td>6/22/2022 9:12:25
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>20318</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing aluminum angle on insulation
</td><td>High</td><td>8/11/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/4/2021
12:58:36 PM</td><td> </td><td>6/22/2022 9:10:06
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>31177</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:54:45 PM</td><td> </td><td>6/22/2022 8:50:57
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31187</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensor not connected.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:55:11 PM</td><td> </td><td>6/22/2022 8:49:47
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31435</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensors need to be
installed properly. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:57:17 AM</td><td> </td><td>6/22/2022 8:48:54
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31797</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensor not connected.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:16 PM</td><td> </td><td>6/22/2022 8:47:21
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31957</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>
National Steel Fabrication NSF</td><td>Architectural</td><td>Acoustic
Walling</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/28/2022 12:00:00
AM</td><td>Mohamed Abdl Salam</td><td>6/21/2022 4:59:45 PM</td><td>
</td><td>6/22/2022 8:44:09
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31814</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:46 PM</td><td> </td><td>6/22/2022 8:35:12
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31813</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain pan thermal insulation need repairs.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:44 PM</td><td> </td><td>6/22/2022 8:34:16
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31723</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air duct insulation need repairs. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:54:53 AM</td><td>
</td><td>6/22/2022 8:33:27
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31498</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Canvas need repairs.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:23 PM</td><td> </td><td>6/22/2022 8:26:03
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>31445</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage insulation and support shall be relocated to be outside.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:57:39 AM</td><td> </td><td>6/22/2022 8:24:50
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31417</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Actuators have some missing parts.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:43 AM</td><td> </td><td>6/22/2022 8:22:26
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31838</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dampers actuators have some missing parts.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:33:29 PM</td><td> </td><td>6/22/2022 8:21:41
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31760</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dampers actuators have some missing parts.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:56:08 AM</td><td> </td><td>6/22/2022 8:20:28
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31821</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Motorized dampers actuators have some
missing parts. </td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:57 PM</td><td> </td><td>6/22/2022 8:18:54
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30667</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensors not connected
and shall be fixed properly. </td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/31/2022 11:53:02 AM</td><td>
</td><td>6/22/2022 8:16:35
AM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29197</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation for hydronic pipes. </td><td>High</td><td>5/29/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:59:19 AM</td><td>
</td><td>6/22/2022 8:15:24
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>31613</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensors shall be
connected. </td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:45 AM</td><td> </td><td>6/22/2022 8:12:42
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>21581</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Drain insulation should to
repair</td><td>High</td><td>8/26/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>8/19/2021 10:36:23 AM</td><td> </td><td>6/22/2022 8:10:16
AM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31812</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Condensate drain pipe need adjustments.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:43 PM</td><td> </td><td>6/22/2022 8:07:30
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>5573</td><td>TUT- EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Removing loose material </td><td>Low</td><td>10/22/2019 12:00:00
AM</td><td>Michael Mahfouz</td><td>10/1/2019 11:22:37 AM</td><td>
</td><td>6/22/2022 8:06:55
AM</td><td>&nbsp;</td><td>MS.12.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>5587</td><td>TUT- EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Repair damaged concrete </td><td>Low</td><td>10/22/2019 12:00:00
AM</td><td>Michael Mahfouz</td><td>10/1/2019 11:23:11 AM</td><td>
</td><td>6/22/2022 8:06:49
AM</td><td>&nbsp;</td><td>MS.18.3A.004</td><td>&nbsp;</td>
</tr><tr>
<td>31545</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Chilled water Piping and
Insulation</td><td>Insulation damaged</td><td>&#39;Hydronic pipes insulation need
repairs. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:49 PM</td><td> </td><td>6/22/2022 8:06:00
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31808</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Fire hose need adjustments. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:32:36 PM</td><td>
</td><td>6/22/2022 8:05:17
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>28958</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Hydronic pipes labels
are missing. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:18 PM</td><td> </td><td>6/21/2022 5:00:17
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28971</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Chilled water pipes
insulation need some repairs and missing for gauges and thermometers connections.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:49 PM</td><td> </td><td>6/21/2022 5:00:14
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28673</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Flexible duct connector shall be adjusted or changed and
threaded rods shall be removed. </td><td>High</td><td>5/17/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:41:39 PM</td><td>
</td><td>6/21/2022 4:49:58
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28683</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Flexible air duct connection shall be adjusted or changed and
threaded rods shall be removed. </td><td>High</td><td>5/17/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:41:55 PM</td><td>
</td><td>6/21/2022 4:49:57
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29180</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Stopping</td><td>Fire seal damaged</td><td>&#39;Damage thermal insulation for
hydronic pipes. </td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:58:52 AM</td><td> </td><td>6/21/2022 4:49:52
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>30404</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire sprinklers covers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:41 PM</td><td> </td><td>6/21/2022 4:49:51
PM</td><td>&nbsp;</td><td>MA.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31349</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage duct thermal insulation. </td><td>High</td><td>6/9/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:54:20 AM</td><td>
</td><td>6/21/2022 4:49:50
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31831</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Pump shall be thermally insulated.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:33:16 PM</td><td> </td><td>6/21/2022 4:49:49
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>22399</td><td>LV- Panels</td><td>EN GF
(Boiler)</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing fire sealant around mechanical
pipe</td><td>Low</td><td>9/15/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/25/2021 12:15:41 PM</td><td> </td><td>6/21/2022 4:48:50
PM</td><td>&nbsp;</td><td>LV- Panels</td><td>&nbsp;</td>
</tr><tr>
<td>16918</td><td>JEWELLERY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Joint between floor and door should be
adjusted </td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/10/2021 1:02:27 PM</td><td> </td><td>6/21/2022 4:45:53
PM</td><td>&nbsp;</td><td>ME.12.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16977</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Short tiles </td><td>Low</td><td>4/1/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>3/11/2021 12:32:04 PM</td><td> </td><td>6/21/2022
4:45:52 PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16979</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Joint is not the same width </td><td>Low</td><td>4/1/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021 12:32:07 PM</td><td>
</td><td>6/21/2022 4:45:51
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16980</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Edge is not aligned </td><td>Low</td><td>4/1/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>3/11/2021 12:32:09 PM</td><td> </td><td>6/21/2022
4:45:50 PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16981</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Joint is not aligned </td><td>Low</td><td>4/1/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>3/11/2021 12:32:10 PM</td><td> </td><td>6/21/2022
4:45:49 PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>22289</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum wall should be adjusted
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:50:10 AM</td><td> </td><td>6/21/2022 4:45:48
PM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22301</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked edge is not aligned and should be
vertical </td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/24/2021 11:50:27 AM</td><td> </td><td>6/21/2022 4:45:48
PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>25820</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gap between stone flooring and handrail need
to adjustment.</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>1/3/2022 2:33:47 PM</td><td> </td><td>6/21/2022 4:34:39
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25818</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gap between stone flooring and handrail need
to adjustment.</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>1/3/2022 2:33:43 PM</td><td> </td><td>6/21/2022 4:34:35
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>8815</td><td>ESCAPE ROUTE-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door </td><td>Low</td><td>4/6/2020
12:00:00 PM</td><td>Michael Mahfouz</td><td>3/16/2020 4:23:24 PM</td><td>
</td><td>6/21/2022 3:38:20 PM</td><td>Done
</td><td>MQ.18.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>8817</td><td>ESCAPE ROUTE-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Painting need to touch up </td><td>Low</td><td>4/6/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>3/16/2020 4:23:33 PM</td><td> </td><td>6/21/2022
3:38:18 PM</td><td>Done </td><td>MQ.18.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>8818</td><td>ESCAPE ROUTE-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Missing gypsum ceilings
</td><td>Low</td><td>4/6/2020 12:00:00 PM</td><td>Michael Mahfouz</td><td>3/16/2020
4:23:46 PM</td><td> </td><td>6/21/2022 3:38:17 PM</td><td>Done
</td><td>MQ.18.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14579</td><td>Ticketing Piazza </td><td>Ticketing
Piazza</td><td>Closed</td><td>Unilex Sign
Systems</td><td>Architectural</td><td>Signage</td><td>damaged</td><td>&#39;Scratche
s at stainless steel signage </td><td>Low</td><td>1/19/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>12/29/2020 11:06:58 AM</td><td>
</td><td>6/21/2022 3:01:39 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>19804</td><td>GATE HOUSE</td><td>GATE 9 TYPE 4
GF</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Outside walls need touch up painting
</td><td>Low</td><td>7/19/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>7/12/2021 4:26:02 PM</td><td> </td><td>6/21/2022 3:01:38
PM</td><td>&nbsp;</td><td>GT.9.4.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>25158</td><td>Parking Level-P2</td><td>Parking
Levels</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Staircase Handrail</td><td>Overall
finishes</td><td>&#39;Handrail should be cleaned and stains should be removed
</td><td>Low</td><td>12/6/2021 12:00:00 PM</td><td>Amr Nofal</td><td>11/15/2021
10:17:02 AM</td><td> </td><td>6/21/2022 3:01:37
PM</td><td>&nbsp;</td><td>P2</td><td>&nbsp;</td>
</tr><tr>
<td>25160</td><td>Parking Level-P2</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between keystone and stair stone
should be cleaned and closed as per drawing for both
sides</td><td>Low</td><td>12/6/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/15/2021 10:17:04 AM</td><td> </td><td>6/21/2022 3:01:36
PM</td><td>&nbsp;</td><td>P2</td><td>&nbsp;</td>
</tr><tr>
<td>25161</td><td>Parking Level-P1</td><td>Parking
Levels</td><td>Closed</td><td>GEOTECH
Tensar</td><td>Architectural</td><td>Brick/Blockwork</td><td>General
Snag</td><td>&#39;Keystone should be cleaned and salt should be
removed</td><td>Low</td><td>11/22/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/15/2021 10:17:05 AM</td><td> </td><td>6/21/2022 3:01:35
PM</td><td>&nbsp;</td><td>P1</td><td>&nbsp;</td>
</tr><tr>
<td>25173</td><td>Parking Level-P2</td><td>Parking
Levels</td><td>Closed</td><td>GEOTECH
Tensar</td><td>Architectural</td><td>Brick/Blockwork</td><td>General
Snag</td><td>&#39;Keystone should be cleaned and salt should be
removed</td><td>Low</td><td>12/6/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/15/2021 10:17:19 AM</td><td> </td><td>6/21/2022 3:01:34
PM</td><td>&nbsp;</td><td>P2</td><td>&nbsp;</td>
</tr><tr>
<td>14756</td><td>Desert Land</td><td>Desert
Land</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Civil</td><td>General
Snag</td><td>General Snag</td><td>&#39;Manhole level has not been
</td><td>High</td><td>1/19/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>1/12/2021 3:30:26 PM</td><td> </td><td>6/21/2022 2:55:38
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17280</td><td>Pump Room</td><td>IT
GF</td><td>Closed</td><td>XERVON Egypt S.A.E</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>Stain/scratch/dent on floor</td><td>&#39;Touch up for scratches
at epoxy paint floor </td><td>Low</td><td>5/2/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>4/11/2021 3:05:55 PM</td><td> </td><td>6/21/2022 2:55:37
PM</td><td>&nbsp;</td><td>IT.00.0B.01</td><td>&nbsp;</td>
</tr><tr>
<td>17281</td><td>Lobby</td><td>IT GF</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Remove temporary wooden door and any repair will be done if
needed</td><td>Low</td><td>5/2/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>4/11/2021 3:05:57 PM</td><td> </td><td>6/21/2022 2:55:36
PM</td><td>&nbsp;</td><td>IT.00.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>22468</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Tiles are missing
</td><td>Low</td><td>9/19/2021 12:00:00 AM</td><td>Amr Nofal</td><td>8/29/2021
3:14:22 PM</td><td> </td><td>6/21/2022 2:55:35 PM</td><td>&nbsp;</td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>25094</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>GEOTECH
Tensar</td><td>Architectural</td><td>Brick/Blockwork</td><td>General
Snag</td><td>&#39;Surface should be cleaned and salt should be
removed</td><td>Low</td><td>11/21/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/14/2021 10:29:25 AM</td><td> </td><td>6/21/2022 2:55:34
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25117</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Staircase Handrail</td><td>Overall
finishes</td><td>&#39;Handrail should be cleaned and stains should be
removed</td><td>Low</td><td>12/5/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/14/2021 10:30:46 AM</td><td> </td><td>6/21/2022 2:55:33
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26222</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired </td><td>Low</td><td>3/14/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022 11:46:36 AM</td><td>
</td><td>6/21/2022 2:55:32 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26223</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired </td><td>Low</td><td>3/14/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022 11:46:37 AM</td><td>
</td><td>6/21/2022 2:55:31 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26225</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired </td><td>Low</td><td>3/14/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022 11:46:41 AM</td><td>
</td><td>6/21/2022 2:55:30 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26267</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/14/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/21/2022 3:25:29 PM</td><td> </td><td>6/21/2022
2:55:29 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26274</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired </td><td>Low</td><td>3/14/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022 3:25:38 PM</td><td>
</td><td>6/21/2022 2:55:28 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26686</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/22/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/1/2022 11:04:22 AM</td><td> </td><td>6/21/2022
2:55:28 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>28255</td><td>Parking Level-P4</td><td>Parking
Levels</td><td>Closed</td><td>GEOTECH
Tensar</td><td>Architectural</td><td>Brick/Blockwork</td><td>General
Snag</td><td>&#39;Salted block to be treated </td><td>Low</td><td>4/12/2022
12:00:00 PM</td><td>Marios Ioannou,</td><td>3/22/2022 1:37:32 PM</td><td>
</td><td>6/21/2022 2:55:27 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16914</td><td>TEXTILE-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Cleaning is needed for floor
</td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021
1:02:19 PM</td><td> </td><td>6/21/2022 1:07:45
PM</td><td>&nbsp;</td><td>ME.12.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>11788</td><td>DRIVER&#39;S REST AREA</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>Alu Guarantee
Systems</td><td>Architectural</td><td>Windows</td><td>General
Snag</td><td>&#39;Wrong mechanism for all windows </td><td>High</td><td>10/5/2020
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>9/28/2020 1:39:30 PM</td><td>
</td><td>6/21/2022 12:00:45
PM</td><td>&nbsp;</td><td>GT8.01.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>11799</td><td>DRIVERS SUPERVISOR</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>Alu Guarantee
Systems</td><td>Architectural</td><td>Windows</td><td>Defective
glass</td><td>&#39;Wrong mechanism </td><td>High</td><td>10/5/2020 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>9/28/2020 1:40:11 PM</td><td>
</td><td>6/21/2022 12:00:44
PM</td><td>&nbsp;</td><td>GT8.01.0G.08</td><td>&nbsp;</td>
</tr><tr>
<td>12286</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>Hydrogreen</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Plant for dead and missing
palms</td><td>Low</td><td>11/2/2020 12:00:00 PM</td><td>Mohamed
Samir</td><td>10/12/2020 3:09:40 PM</td><td> </td><td>6/21/2022 12:00:43
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16256</td><td>Food Court</td><td>Food
Court</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steelwork</td><td>General Snag</td><td>&#39;Steel
structure needs cleaning and touch up </td><td>Low</td><td>3/4/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>2/11/2021 11:16:13 AM</td><td>
</td><td>6/21/2022 12:00:42 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17361</td><td>TICKETING</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;False ceiling should be completed
</td><td>Low</td><td>5/3/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>4/12/2021
3:08:36 PM</td><td> </td><td>6/21/2022 12:00:41
PM</td><td>&nbsp;</td><td>CR.08.0G.005</td><td>&nbsp;</td>
</tr><tr>
<td>23807</td><td>Security Fence</td><td>East
Fences</td><td>Closed</td><td>Cochrane</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to touch up
</td><td>Low</td><td>11/10/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/20/2021
11:51:23 AM</td><td> </td><td>6/21/2022 12:00:40 PM</td><td>&nbsp;</td><td>Security
Fence</td><td>&nbsp;</td>
</tr><tr>
<td>23841</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Marked Area should be cleaned
</td><td>Low</td><td>11/14/2021 12:00:00 AM</td><td>Amr Nofal</td><td>10/24/2021
10:09:30 AM</td><td> </td><td>6/21/2022 12:00:39
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23959</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unacceptable detail (pole concrete base
should be allocated as per design drawing)</td><td>Low</td><td>11/15/2021 12:00:00
AM</td><td>Amr Nofal</td><td>10/25/2021 10:30:28 AM</td><td> </td><td>6/21/2022
12:00:38 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24160</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Pole concrete base should be allocated as
per design drawing </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:09:07 AM</td><td> </td><td>6/21/2022 12:00:37
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24168</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Pole concrete base to be allocated as per
design drawing </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:09:15 AM</td><td> </td><td>6/21/2022 12:00:36
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24359</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Pollards should be allocated as per design
drawing.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/27/2021 11:41:17 AM</td><td> </td><td>6/21/2022 12:00:35
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24784</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unaccepted location - bollards should be
allocated as per design drawing </td><td>Low</td><td>11/28/2021 12:00:00
PM</td><td>Amr Nofal</td><td>11/7/2021 11:32:03 AM</td><td> </td><td>6/21/2022
12:00:34 PM</td><td>&nbsp;</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>25624</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Stainless cladding should be leveled
</td><td>Low</td><td>1/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:52:16 AM</td><td> </td><td>6/21/2022 11:25:01
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25517</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Connections and elbows should be
finished and smooth </td><td>Low</td><td>12/30/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:52:35 PM</td><td> </td><td>6/21/2022
11:24:56 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25603</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Elbow and connections should be
smooth </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:51:46 AM</td><td> </td><td>6/21/2022
11:23:47 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25651</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Marked edge should be trimmed and leveled
</td><td>Low</td><td>1/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:52:47 AM</td><td> </td><td>6/21/2022 11:23:31
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25620</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Joint between false ceiling and stone
should be uniform and aligned </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:52:11 AM</td><td> </td><td>6/21/2022
11:23:02 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25616</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Elbow and connections should be
smooth </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:52:05 AM</td><td> </td><td>6/21/2022
11:22:53 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25551</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked connection should be finished
</td><td>Low</td><td>12/16/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:57:45 PM</td><td> </td><td>6/21/2022 11:21:48 AM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25532</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Connections and elbows should be
finished and smooth </td><td>Low</td><td>12/30/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:52:55 PM</td><td> </td><td>6/21/2022
11:21:32 AM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25713</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Garbage and remaining works should be removed
</td><td>Low</td><td>1/5/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/15/2021
1:50:11 PM</td><td> </td><td>6/21/2022 11:19:47
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14358</td><td>B.O.H-WET DELIVERY TUNNEL - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Missing Sealant around pipe
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:28 PM</td><td> </td><td>6/21/2022 11:02:01
AM</td><td>&nbsp;</td><td>MQ.23.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14580</td><td>Ticketing Piazza </td><td>Ticketing
Piazza</td><td>Closed</td><td>Unilex Sign
Systems</td><td>Architectural</td><td>Signage</td><td>Not
Installed/Completed</td><td>&#39;Need to fixed properly
</td><td>Low</td><td>1/19/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>12/29/2020 11:07:01 AM</td><td> </td><td>6/21/2022 10:50:19
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14587</td><td>Ticketing Piazza </td><td>Ticketing
Piazza</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Cracked Sealant need repair
</td><td>Low</td><td>1/19/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>12/29/2020 11:07:27 AM</td><td> </td><td>6/21/2022 10:49:03
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26026</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Marked Joint should be regular
</td><td>Low</td><td>2/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/25/2022
11:52:21 AM</td><td> </td><td>6/21/2022 10:42:45
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26108</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Irregular cutting around camera bracket
should be adjusted.</td><td>Low</td><td>2/24/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/3/2022 2:26:08 PM</td><td> </td><td>6/21/2022
10:41:34 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26100</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Remains should be
removed.</td><td>Low</td><td>2/24/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/3/2022 2:25:41 PM</td><td> </td><td>6/21/2022
10:41:25 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18169</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Gap should be closed /sealant should be
regular and smooth </td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:59:01 AM</td><td> </td><td>6/21/2022
10:34:04 AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18266</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General Snag</td><td>&#39;Air
gaps are not leveled with wall</td><td>Low</td><td>6/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/31/2021 4:11:15 PM</td><td> </td><td>6/21/2022
10:33:08 AM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18299</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Damages</td><td>&#39;Damaged
tiles</td><td>Low</td><td>6/22/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/1/2021 4:11:01 PM</td><td> </td><td>6/21/2022
10:32:38 AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18207</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air gaps should be leveled
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021
4:04:22 PM</td><td> </td><td>6/21/2022 10:32:25
AM</td><td>&nbsp;</td><td>ME.12.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28747</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Wooden plate should be covered </td><td>Low</td><td>6/1/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022 11:48:05 AM</td><td>
</td><td>6/21/2022 10:28:38
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>28741</td><td>SHAFT</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>6/1/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/11/2022 11:47:57 AM</td><td> </td><td>6/21/2022
10:28:07 AM</td><td>&nbsp;</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19971</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Missing labels on fire dampers </td><td>High</td><td>8/5/2021
12:00:00 PM</td><td>ahmedsalem</td><td>7/29/2021 1:04:38 PM</td><td>
</td><td>6/21/2022 9:16:35
AM</td><td>&nbsp;</td><td>MS.18.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>31836</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Cleaning. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:33:25 PM</td><td>
</td><td>6/21/2022 9:07:48
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>28497</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Humidification unit need cleaning.
</td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:21 PM</td><td> </td><td>6/21/2022 9:06:08
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>14612</td><td>TUT- EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Installation not to
specification/drawing</td><td>&#39;Duct insulation and duct penetrations need work
</td><td>High</td><td>1/7/2021 12:00:00 PM</td><td>ahmedsalem</td><td>1/4/2021
9:59:55 AM</td><td> </td><td>6/21/2022 9:02:29
AM</td><td>&nbsp;</td><td>MS.12.3A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29883</td><td>RISER</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;No fire fighting system detected in
this area. </td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:49 PM</td><td> </td><td>6/21/2022 8:52:26
AM</td><td>&nbsp;</td><td>MS.25.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28972</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain valve insulation. </td><td>High</td><td>5/24/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:32:51 PM</td><td>
</td><td>6/21/2022 8:42:32
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29179</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>5/29/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:58:51 AM</td><td>
</td><td>6/21/2022 8:42:00
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>24241</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Flooring need to be cleaned </td><td>Low</td><td>11/16/2021
12:00:00 PM</td><td>Moussa Nageh Khella</td><td>10/26/2021 4:24:54 PM</td><td>
</td><td>6/21/2022 8:30:23 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24238</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone flooring</td><td>Other Snag</td><td>&#39;Stone flooring need to clean
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>10/26/2021 4:24:50 PM</td><td> </td><td>6/21/2022 8:30:16
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>9192</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing CIR Approved for stone for modules
11A face (1,2,3) and 10A face (1,2,3)</td><td>Low</td><td>7/9/2020 12:00:00
PM</td><td>Michael Mahfouz</td><td>6/18/2020 11:28:59 AM</td><td>
</td><td>6/21/2022 8:30:06 AM</td><td>&nbsp;</td><td>Stiletto - wall
A</td><td>&nbsp;</td>
</tr><tr>
<td>9186</td><td>GRAND STAIR-Stiletto A</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 10A - joints not aligned so there is
light between module </td><td>Low</td><td>7/8/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>6/17/2020 11:39:35 AM</td><td> </td><td>6/21/2022 8:29:52
AM</td><td>&nbsp;</td><td>Stiletto - wall A</td><td>&nbsp;</td>
</tr><tr>
<td>20075</td><td>JEWELLERY-Band A</td><td>MU
L10</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked gap should be adjusted
</td><td>Low</td><td>8/23/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:05 PM</td><td> </td><td>6/20/2022 4:44:49
PM</td><td>&nbsp;</td><td>ME.12.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>31895</td><td>ELEC.</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;No firefighting system detected in
this area. </td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:25:21 PM</td><td> </td><td>6/20/2022 4:26:32
PM</td><td>&nbsp;</td><td>MS.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>21961</td><td>B.O.H-CORE B2 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Duct insulation need repair inside the
shaft</td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/23/2021 1:36:13 PM</td><td> </td><td>6/20/2022
4:20:39 PM</td><td>&nbsp;</td><td>MC.18.02.B21</td><td>&nbsp;</td>
</tr><tr>
<td>20033</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing labels for fire dampers </td><td>High</td><td>8/5/2021
12:00:00 PM</td><td>ahmedsalem</td><td>7/29/2021 3:00:17 PM</td><td>
</td><td>6/20/2022 4:16:11
PM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>13090</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Leveling for wall tiles need adjustment
</td><td>Low</td><td>11/24/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
12:45:01 PM</td><td> </td><td>6/20/2022 4:13:03
PM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>13091</td><td>LOBBY</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Work is not finished
yet</td><td>Low</td><td>11/24/2020 12:00:00
AM</td><td>sally.george</td><td>11/3/2020 12:45:07 PM</td><td> </td><td>6/20/2022
4:13:01 PM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>13098</td><td>LOBBY</td><td>MU L30</td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing metal ceiling </td><td>Low</td><td>11/24/2020 12:00:00
AM</td><td>sally.george</td><td>11/3/2020 12:45:40 PM</td><td> </td><td>6/20/2022
4:12:59 PM</td><td>&nbsp;</td><td>MP.24.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>13147</td><td>Level +45.00</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing glazing panels/missing metal
profile/panels need properly fixation </td><td>High</td><td>11/10/2020 12:00:00
AM</td><td>sally.george</td><td>11/3/2020 4:35:19 PM</td><td> </td><td>6/20/2022
4:12:58 PM</td><td>&nbsp;</td><td>Level +45.00</td><td>&nbsp;</td>
</tr><tr>
<td>13148</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints to be improved /work
is not finished yet </td><td>High</td><td>11/10/2020 12:00:00
AM</td><td>sally.george</td><td>11/3/2020 4:35:21 PM</td><td> </td><td>6/20/2022
4:12:56 PM</td><td>&nbsp;</td><td>Level +46.50</td><td>&nbsp;</td>
</tr><tr>
<td>13150</td><td>FIRE EXIT</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Irregular joints to be adjusted
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:35:26 PM</td><td> </td><td>6/20/2022 4:12:55
PM</td><td>&nbsp;</td><td>MP.14.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>13154</td><td>Level +45.00</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Damaged glazing facade
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:35:36 PM</td><td> </td><td>6/20/2022 4:12:53 PM</td><td>&nbsp;</td><td>Level
+45.00</td><td>&nbsp;</td>
</tr><tr>
<td>13159</td><td>Level +45.00</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Irregular joints to be adjusted
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:35:47 PM</td><td> </td><td>6/20/2022 4:12:51 PM</td><td>&nbsp;</td><td>Level
+45.00</td><td>&nbsp;</td>
</tr><tr>
<td>13160</td><td>Level +45.00</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;General cleaning for facade
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:35:49 PM</td><td> </td><td>6/20/2022 4:12:50 PM</td><td>&nbsp;</td><td>Level
+45.00</td><td>&nbsp;</td>
</tr><tr>
<td>13161</td><td>Level +45.00</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Joint to be adjusted
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:35:51 PM</td><td> </td><td>6/20/2022 4:12:49 PM</td><td>&nbsp;</td><td>Level
+45.00</td><td>&nbsp;</td>
</tr><tr>
<td>13163</td><td>Level +45.00</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Damaged glazing facade
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:35:55 PM</td><td> </td><td>6/20/2022 4:12:48 PM</td><td>&nbsp;</td><td>Level
+45.00</td><td>&nbsp;</td>
</tr><tr>
<td>13171</td><td>Level +45.00</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Grouting needs adjustment
</td><td>High</td><td>11/10/2020 12:00:00 PM</td><td>sally.george</td><td>11/3/2020
4:36:16 PM</td><td> </td><td>6/20/2022 4:12:47 PM</td><td>&nbsp;</td><td>Level
+45.00</td><td>&nbsp;</td>
</tr><tr>
<td>13172</td><td>Level +45.00</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing stainless handrail
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:36:18 PM</td><td> </td><td>6/20/2022 4:12:45 PM</td><td>&nbsp;</td><td>Level
+45.00</td><td>&nbsp;</td>
</tr><tr>
<td>13175</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing stainless handrail
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:36:24 PM</td><td> </td><td>6/20/2022 4:12:44 PM</td><td>&nbsp;</td><td>Level
+46.50</td><td>&nbsp;</td>
</tr><tr>
<td>13178</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing ceiling tiles installation/work not finished yet
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:36:29 PM</td><td> </td><td>6/20/2022 4:12:43 PM</td><td>&nbsp;</td><td>Level
+46.50</td><td>&nbsp;</td>
</tr><tr>
<td>13181</td><td>Level +45.00</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing glazing panels/metal profile
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:36:38 PM</td><td> </td><td>6/20/2022 4:12:41 PM</td><td>&nbsp;</td><td>Level
+45.00</td><td>&nbsp;</td>
</tr><tr>
<td>13195</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken floor tile/shortage in floor
tile/broken edge for wall tile</td><td>High</td><td>11/10/2020 12:00:00
PM</td><td>sally.george</td><td>11/3/2020 4:37:19 PM</td><td> </td><td>6/20/2022
4:12:39 PM</td><td>&nbsp;</td><td>Level +46.50</td><td>&nbsp;</td>
</tr><tr>
<td>13200</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing glazing panels/metal profile
</td><td>High</td><td>11/10/2020 12:00:00 AM</td><td>sally.george</td><td>11/3/2020
4:37:31 PM</td><td> </td><td>6/20/2022 4:12:36 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>13214</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Cladding to be completed</td><td>Low</td><td>11/25/2020 12:00:00
PM</td><td>sally.george</td><td>11/4/2020 11:20:39 AM</td><td> </td><td>6/20/2022
4:12:34 PM</td><td>&nbsp;</td><td>Level +46.50</td><td>&nbsp;</td>
</tr><tr>
<td>13215</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail needs touch up
</td><td>Low</td><td>11/25/2020 12:00:00 AM</td><td>sally.george</td><td>11/4/2020
11:20:43 AM</td><td> </td><td>6/20/2022 4:12:32 PM</td><td>&nbsp;</td><td>Level
+46.50</td><td>&nbsp;</td>
</tr><tr>
<td>13232</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Shortage in tiles/broken tile /missing
tiles</td><td>Low</td><td>11/25/2020 12:00:00
PM</td><td>sally.george</td><td>11/4/2020 11:21:54 AM</td><td> </td><td>6/20/2022
4:12:27 PM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>13274</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail needs touch up /joints
welding to be improved </td><td>Low</td><td>11/25/2020 12:00:00
AM</td><td>sally.george</td><td>11/4/2020 4:16:54 PM</td><td> </td><td>6/20/2022
4:12:22 PM</td><td>&nbsp;</td><td>Level +46.50</td><td>&nbsp;</td>
</tr><tr>
<td>13275</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Dent</td><td>&#39;Missing glazing panels /handrail needs properly
fixation </td><td>Low</td><td>11/25/2020 12:00:00
AM</td><td>sally.george</td><td>11/4/2020 4:16:58 PM</td><td> </td><td>6/20/2022
4:12:21 PM</td><td>&nbsp;</td><td>Level +46.50</td><td>&nbsp;</td>
</tr><tr>
<td>13278</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39; 2 Broken tile to be removed
</td><td>Low</td><td>11/11/2020 12:00:00 PM</td><td>sally.george</td><td>11/4/2020
4:17:06 PM</td><td> </td><td>6/20/2022 4:12:18 PM</td><td>&nbsp;</td><td>Level
+46.50</td><td>&nbsp;</td>
</tr><tr>
<td>13281</td><td>FIRE EXIT</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing ceiling tiles/work is not finished yet
</td><td>Low</td><td>11/25/2020 12:00:00 AM</td><td>sally.george</td><td>11/4/2020
4:17:14 PM</td><td> </td><td>6/20/2022 4:12:15
PM</td><td>&nbsp;</td><td>MP.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>13282</td><td>FIRE EXIT</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Missing tiles cladding
</td><td>Low</td><td>11/25/2020 12:00:00 AM</td><td>sally.george</td><td>11/4/2020
4:17:16 PM</td><td> </td><td>6/20/2022 4:12:14
PM</td><td>&nbsp;</td><td>MP.19.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>13286</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail needs touch up/welding
joint to be improved/missing accessories </td><td>Low</td><td>11/25/2020 12:00:00
AM</td><td>sally.george</td><td>11/4/2020 4:17:28 PM</td><td> </td><td>6/20/2022
4:12:12 PM</td><td>&nbsp;</td><td>Level +49.50</td><td>&nbsp;</td>
</tr><tr>
<td>13298</td><td>Level +49.50</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing glazing panels/panels needs
properly fixation </td><td>Low</td><td>11/25/2020 12:00:00
AM</td><td>sally.george</td><td>11/4/2020 4:18:20 PM</td><td> </td><td>6/20/2022
4:12:07 PM</td><td>&nbsp;</td><td>Level +49.50</td><td>&nbsp;</td>
</tr><tr>
<td>13302</td><td>Level +48.00</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing glazing panels/missing metal
profile/handrail needs properly fixation /work is not finished yet
</td><td>Low</td><td>11/11/2020 12:00:00 AM</td><td>sally.george</td><td>11/4/2020
4:18:48 PM</td><td> </td><td>6/20/2022 4:12:06 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>29146</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Machine internal lighting not working.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:06 AM</td><td> </td><td>6/20/2022 3:59:16
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29160</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Internal lighting not working.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:35 AM</td><td> </td><td>6/20/2022 3:54:46
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29078</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Internal lighting not working.
</td><td>High</td><td>5/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:27 AM</td><td> </td><td>6/20/2022 3:53:14
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>31890</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing fire extinguishers.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:25:10 PM</td><td> </td><td>6/20/2022 3:41:45
PM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>14681</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>Asset number missing</td><td>&#39;Missing
labels</td><td>High</td><td>1/17/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>1/10/2021 11:02:31 AM</td><td> </td><td>6/20/2022 2:03:41
PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14891</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CONTAINMENT
SUPPORT SYSTEM</td><td>Alignment and Level not followed</td><td>&#39;Missing labels
</td><td>High</td><td>1/25/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>1/18/2021 3:26:08 PM</td><td> </td><td>6/20/2022 2:03:40
PM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>14893</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRAY</td><td>General Snag</td><td>&#39;Tray not covered yet
</td><td>High</td><td>1/25/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>1/18/2021 3:26:16 PM</td><td> </td><td>6/20/2022 2:03:39
PM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20662</td><td>STORE</td><td>MU
L10</td><td>Closed</td><td>Modernlite</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Missing work ( push buttons not
installed yet)</td><td>High</td><td>8/17/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>8/10/2021 11:17:50 AM</td><td> </td><td>6/20/2022 2:03:38
PM</td><td>&nbsp;</td><td>MT.14.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20666</td><td>TEMP EXHIBITION CURATOR</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;Wiring
devices not installed yet and not terminated yet </td><td>High</td><td>8/17/2021
12:00:00 AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/10/2021 11:18:08 AM</td><td>
</td><td>6/20/2022 2:03:37
PM</td><td>&nbsp;</td><td>MT.14.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20669</td><td>TEMP EXHIBITION CURATOR</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All
floor boxes are rusted and should be replaced </td><td>High</td><td>8/17/2021
12:00:00 AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/10/2021 11:18:30 AM</td><td>
</td><td>6/20/2022 2:03:36
PM</td><td>&nbsp;</td><td>MT.14.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20930</td><td>ELEC.</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Missing lighting switch and missing tag number and missing panel
schedule and power cables not terminated yet and should be rested inside the
trunk</td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:17 AM</td><td> </td><td>6/20/2022 2:03:36
PM</td><td>&nbsp;</td><td>MS.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>21233</td><td>TUT-CORE B2</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>8/24/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/17/2021 12:05:48 PM</td><td> </td><td>6/20/2022 2:03:34
PM</td><td>&nbsp;</td><td>MC.18.03.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21235</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All
EMT conduits should be replaced by RGS conduit (this exposed area) and missing
labels </td><td>High</td><td>8/24/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>8/17/2021 12:05:51 PM</td><td> </td><td>6/20/2022 2:03:34
PM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>22356</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>9/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/25/2021 11:52:58 AM</td><td> </td><td>6/20/2022 2:03:33
PM</td><td>&nbsp;</td><td>MS.20.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>22357</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>9/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/25/2021 11:52:59 AM</td><td> </td><td>6/20/2022 2:03:32
PM</td><td>&nbsp;</td><td>MS.20.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>22377</td><td>STORE</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Lighting fixtures not installed yet
</td><td>High</td><td>9/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/25/2021 11:53:38 AM</td><td> </td><td>6/20/2022 2:03:31
PM</td><td>&nbsp;</td><td>MG.12.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>26841</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Race way and pulling cables and lighting
fixtures not terminated and installed yet</td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 4:38:58 PM</td><td>
</td><td>6/20/2022 2:03:30 PM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>28450</td><td>CORE E1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Lifts</td><td>General Snag</td><td>&#39;No
firefighting system detected in this area. </td><td>High</td><td>5/12/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:05:55 PM</td><td>
</td><td>6/20/2022 1:56:44
PM</td><td>&nbsp;</td><td>MC.24.2A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>5567</td><td>TUT-CORE B3</td><td>MU
L35</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Staircase</td><td>General
Snag</td><td>&#39;Missing Epoxy painting for stair </td><td>Low</td><td>10/22/2019
12:00:00 AM</td><td>Michael Mahfouz</td><td>10/1/2019 11:22:23 AM</td><td>
</td><td>6/20/2022 1:37:00
PM</td><td>&nbsp;</td><td>MC.12.3A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>24597</td><td>Mankauras - Phase 3A</td><td>Mankauras Stair
and Wall</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Toothing between lighting fixtures should be
adjusted properly </td><td>Low</td><td>11/20/2021 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>10/30/2021 4:17:45 PM</td><td> </td><td>6/20/2022 1:26:32
PM</td><td>&nbsp;</td><td>Mankauras - Phase 3A</td><td>&nbsp;</td>
</tr><tr>
<td>20313</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label for fire
dampers</td><td>High</td><td>8/11/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/4/2021 12:58:29 PM</td><td> </td><td>6/20/2022
11:39:46 AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>20641</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Air
vent/bottle to be fitted</td><td>&#39;Cover sprinkler need to
change</td><td>High</td><td>4/4/2022 12:00:00
PM</td><td>ahmedsalem</td><td>8/9/2021 4:25:25 PM</td><td> </td><td>6/20/2022
11:39:42 AM</td><td>&nbsp;</td><td>MW.13.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>21963</td><td>CORE B2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Duct support and insulation need adjustment
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/23/2021
1:36:17 PM</td><td> </td><td>6/20/2022 11:39:41
AM</td><td>&nbsp;</td><td>MC.18.2A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>28674</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Labels for hydronic
pipes is missing. </td><td>High</td><td>5/17/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:41:41 PM</td><td> </td><td>6/20/2022 11:39:39
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28866</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Thermal insulation
for chilled water pipes need repairs. </td><td>High</td><td>5/23/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/16/2022 4:07:02 PM</td><td>
</td><td>6/20/2022 11:39:37
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29135</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing cladding.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:41 AM</td><td> </td><td>6/20/2022 11:39:18
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29229</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for air ducts.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:15 PM</td><td> </td><td>6/20/2022 11:39:16
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29241</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for hydronic pipes.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:40 PM</td><td> </td><td>6/20/2022 11:39:13
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29244</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for air ducts.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:55 PM</td><td> </td><td>6/20/2022 11:39:11
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29266</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Chilled water pipes thermal installation
damage. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:43 PM</td><td> </td><td>6/20/2022 11:39:09
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>31381</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Canvases shall be repaired or replaced.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:55:24 AM</td><td> </td><td>6/20/2022 11:39:04
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31444</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Canvases shall be adjusted or changed.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:57:37 AM</td><td> </td><td>6/20/2022 11:39:02
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31616</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Chilled water pipes need repairs.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:52 AM</td><td> </td><td>6/20/2022 11:38:57
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>23779</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Columns and plinths cladding are missing
</td><td>Low</td><td>11/8/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/18/2021 4:28:59 PM</td><td> </td><td>6/20/2022 11:37:32
AM</td><td>&nbsp;</td><td>Atrium - Internal Side</td><td>&nbsp;</td>
</tr><tr>
<td>23782</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Joints are missing
</td><td>Low</td><td>11/8/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/18/2021 4:29:04 PM</td><td> </td><td>6/20/2022 11:37:31
AM</td><td>&nbsp;</td><td>Atrium - Internal Side</td><td>&nbsp;</td>
</tr><tr>
<td>23783</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Cladding is missing for marked part
</td><td>Low</td><td>11/8/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/18/2021 4:29:05 PM</td><td> </td><td>6/20/2022 11:37:29
AM</td><td>&nbsp;</td><td>Atrium - Internal Side</td><td>&nbsp;</td>
</tr><tr>
<td>23785</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Tile is missing </td><td>Low</td><td>11/8/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/18/2021 4:29:08 PM</td><td>
</td><td>6/20/2022 11:37:28 AM</td><td>&nbsp;</td><td>Atrium - Internal
Side</td><td>&nbsp;</td>
</tr><tr>
<td>6747</td><td>Corridor</td><td>TB GF</td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39;Angel not cut sharply </td><td>Low</td><td>1/13/2020 12:00:00
PM</td><td>Marios Ioannou,</td><td>12/23/2019 3:52:18 PM</td><td>
</td><td>6/20/2022 11:34:43
AM</td><td>&nbsp;</td><td>ST.00.0G.44</td><td>&nbsp;</td>
</tr><tr>
<td>17311</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Ceiling tiles level/flush</td><td>&#39;False ceiling should
be leveled with stainless steel panels </td><td>Low</td><td>5/3/2021 12:00:00
PM</td><td>aymanhaddadin</td><td>4/12/2021 11:58:20 AM</td><td> </td><td>6/20/2022
11:34:42 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22498</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken edge should be
repaired</td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>8/30/2021 11:04:04 AM</td><td> </td><td>6/20/2022 11:34:42
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22607</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Stainless drain should be lower than stone
flooring </td><td>Low</td><td>9/22/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/1/2021 10:49:50 AM</td><td> </td><td>6/20/2022 11:34:41
AM</td><td>&nbsp;</td><td>Part 2</td><td>&nbsp;</td>
</tr><tr>
<td>23282</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken edges should be
repaired</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 12:06:42 PM</td><td> </td><td>6/20/2022 11:34:40
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23636</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Dust and stains should be cleaned
</td><td>Low</td><td>10/13/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021
11:09:42 AM</td><td> </td><td>6/20/2022 11:34:39 AM</td><td>&nbsp;</td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>23674</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Dust and stains should be cleaned
</td><td>Low</td><td>10/17/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/26/2021
10:19:56 AM</td><td> </td><td>6/20/2022 11:34:38
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23689</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Dust and stains should be cleaned
</td><td>Low</td><td>10/17/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/26/2021
10:20:23 AM</td><td> </td><td>6/20/2022 11:34:37
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23697</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/19/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/28/2021
9:57:11 AM</td><td> </td><td>6/20/2022 11:34:36 AM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>24127</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Joints width ,alignment and filling should be
adjusted </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:08:10 AM</td><td> </td><td>6/20/2022 11:34:36
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24132</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Joint should be opened and filled properly
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:08:18 AM</td><td> </td><td>6/20/2022 11:34:35
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24133</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Joint should be aligned and filled properly
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:08:19 AM</td><td> </td><td>6/20/2022 11:34:34
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24136</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Joints should be aligned and filled properly
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:08:25 AM</td><td> </td><td>6/20/2022 11:34:33
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24907</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damaged geocell should be replaced to covered hole area
</td><td>Low</td><td>11/30/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/9/2021
11:51:49 AM</td><td> </td><td>6/20/2022 11:34:32
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25035</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Gravel stockpiles should be removed</td><td>Low</td><td>12/2/2021
12:00:00 AM</td><td>Amr Nofal</td><td>11/11/2021 10:23:43 AM</td><td>
</td><td>6/20/2022 11:34:31 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25089</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Area should be inspected after
removing storage material and cleaning</td><td>Low</td><td>12/5/2021 12:00:00
PM</td><td>Amr Nofal</td><td>11/14/2021 10:29:05 AM</td><td> </td><td>6/20/2022
11:34:30 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26221</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be should be repaired/replaced
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
11:46:34 AM</td><td> </td><td>6/20/2022 11:34:29
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26231</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be should be
repaired</td><td>Low</td><td>3/14/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/21/2022 11:46:55 AM</td><td> </td><td>6/20/2022
11:34:28 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26233</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired/replaced
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
11:47:00 AM</td><td> </td><td>6/20/2022 11:34:27
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26238</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired </td><td>Low</td><td>3/14/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022 11:47:10 AM</td><td>
</td><td>6/20/2022 11:34:26 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26466</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/17/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/24/2022 11:16:39 AM</td><td> </td><td>6/20/2022
11:34:25 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26473</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/17/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/24/2022 11:16:58 AM</td><td> </td><td>6/20/2022
11:34:24 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26521</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/17/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/24/2022 2:22:32 PM</td><td> </td><td>6/20/2022
11:34:23 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26660</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be treated </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 10:31:47 AM</td><td>
</td><td>6/20/2022 11:34:22 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26666</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 11:01:32 AM</td><td>
</td><td>6/20/2022 11:34:21 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26677</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/22/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/1/2022 11:04:07 AM</td><td> </td><td>6/20/2022
11:34:20 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27109</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 11:09:00 AM</td><td> </td><td>6/20/2022
11:34:20 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27197</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/24/2022 12:00:00
PM</td><td>mohamed.sami</td><td>3/3/2022 3:01:55 PM</td><td> </td><td>6/20/2022
11:34:19 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>25197</td><td>Parking Level-P1</td><td>Parking
Levels</td><td>Closed</td><td>GEOTECH
Tensar</td><td>Architectural</td><td>Brick/Blockwork</td><td>General
Snag</td><td>&#39;Keystone to be cleaned and salt to be removed
</td><td>Low</td><td>12/6/2021 12:00:00 PM</td><td>Amr Nofal</td><td>11/15/2021
10:17:49 AM</td><td> </td><td>6/20/2022 10:16:00
AM</td><td>&nbsp;</td><td>P1</td><td>&nbsp;</td>
</tr><tr>
<td>25176</td><td>Parking Level-P2</td><td>Parking
Levels</td><td>Closed</td><td>GEOTECH
Tensar</td><td>Architectural</td><td>Brick/Blockwork</td><td>General
Snag</td><td>&#39;Keystone to be cleaned and salt to be removed (along the side for
3 steps)</td><td>Low</td><td>12/6/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/15/2021 10:17:23 AM</td><td> </td><td>6/20/2022 10:15:27
AM</td><td>&nbsp;</td><td>P2</td><td>&nbsp;</td>
</tr><tr>
<td>25087</td><td>Parking Level-P4</td><td>Parking
Levels</td><td>Closed</td><td>GEOTECH
Tensar</td><td>Architectural</td><td>Brick/Blockwork</td><td>General
Snag</td><td>&#39;Surface should be cleaned and salt should be
removed</td><td>Low</td><td>11/21/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/14/2021 10:28:55 AM</td><td> </td><td>6/20/2022 10:13:20
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22422</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Mohamed
El-Sergany</td><td>8/29/2021 3:12:06 PM</td><td> </td><td>6/20/2022 10:01:05
AM</td><td>&nbsp;</td><td>Part 3</td><td>&nbsp;</td>
</tr><tr>
<td>22421</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stains should be removed
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Mohamed
El-Sergany</td><td>8/29/2021 3:12:00 PM</td><td> </td><td>6/20/2022 10:00:27
AM</td><td>&nbsp;</td><td>Part 3</td><td>&nbsp;</td>
</tr><tr>
<td>22437</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Slot drains should be aligned and fixed
properly </td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>8/29/2021 3:13:27 PM</td><td> </td><td>6/20/2022 9:59:31
AM</td><td>&nbsp;</td><td>Part 3</td><td>&nbsp;</td>
</tr><tr>
<td>22555</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Flooring -
stone</td><td>Installation of floor drain very poor</td><td>&#39;Slot drain should
be adjusted </td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>8/30/2021 11:04:54 AM</td><td> </td><td>6/20/2022 9:58:58
AM</td><td>&nbsp;</td><td>Part 5</td><td>&nbsp;</td>
</tr><tr>
<td>22557</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Slot drain should be adjusted and fixed properly
</td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/30/2021
11:04:55 AM</td><td> </td><td>6/20/2022 9:58:18 AM</td><td>&nbsp;</td><td>Part
5</td><td>&nbsp;</td>
</tr><tr>
<td>23699</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>10/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/28/2021
9:57:14 AM</td><td> </td><td>6/20/2022 9:57:04 AM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>20000</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Floor Drain Cover</td><td>&#39;Missing floor drain
</td><td>High</td><td>8/5/2021 12:00:00 AM</td><td>ahmedsalem</td><td>7/29/2021
1:05:39 PM</td><td> </td><td>6/20/2022 9:43:15
AM</td><td>&nbsp;</td><td>MS.18.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29247</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for air ducts.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:02 PM</td><td> </td><td>6/20/2022 9:40:48
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>31497</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;No automatic fire fighting system detected.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:21 PM</td><td> </td><td>6/20/2022 9:38:55
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>25321</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof
Tiles</td><td>Chipped/damaged</td><td>&#39;Missing blank tile
</td><td>Low</td><td>12/13/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>11/22/2021
12:00:22 PM</td><td> </td><td>6/20/2022 9:15:00 AM</td><td>&nbsp;</td><td>Museum
Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25346</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged sika foam should be
repaired.</td><td>Low</td><td>12/13/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>11/22/2021 1:57:59 PM</td><td> </td><td>6/20/2022 9:14:54
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>13673</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Handles are broken
</td><td>Medium</td><td>12/10/2020 12:00:00
PM</td><td>ahmedsalem</td><td>11/30/2020 11:59:06 AM</td><td> </td><td>6/19/2022
4:14:12 PM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13678</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV QC
MEP</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Need duct sealant and cladding adjustment
</td><td>Medium</td><td>12/10/2020 12:00:00
PM</td><td>ahmedsalem</td><td>11/30/2020 11:59:23 AM</td><td> </td><td>6/19/2022
4:14:06 PM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13840</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV QC
MEP</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Duct insulation need repair </td><td>High</td><td>12/8/2020
12:00:00 PM</td><td>ahmedsalem</td><td>12/1/2020 12:20:53 PM</td><td>
</td><td>6/19/2022 4:13:58
PM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13851</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Pipe insulation need repair and complete
</td><td>High</td><td>12/8/2020 12:00:00 PM</td><td>ahmedsalem</td><td>12/1/2020
12:21:43 PM</td><td> </td><td>6/19/2022 4:13:57
PM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>20301</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing acoustic lining for exhaust
duct</td><td>High</td><td>8/11/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/4/2021
12:58:11 PM</td><td> </td><td>6/19/2022 4:13:50
PM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>21980</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door is closed
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/23/2021
1:36:51 PM</td><td> </td><td>6/19/2022 4:13:49
PM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>28532</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Labels for chilled
water pipes is missing. </td><td>High</td><td>5/16/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:32 AM</td><td> </td><td>6/19/2022 4:13:48
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28533</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Flexible duct connector need repair and threaded rods shall be
removed. </td><td>High</td><td>5/16/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:35 AM</td><td> </td><td>6/19/2022 4:13:47
PM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>28988</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage her Al
insulation for chilled water pipes. </td><td>High</td><td>5/24/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:09:16 PM</td><td>
</td><td>6/19/2022 4:13:46
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29093</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Chilled water pipes insulation damaged.
</td><td>High</td><td>5/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:53 AM</td><td> </td><td>6/19/2022 4:13:46
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29248</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for hydronic pipes.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:04 PM</td><td> </td><td>6/19/2022 4:13:44
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29311</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for chilled water pipes.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:57 PM</td><td> </td><td>6/19/2022 4:13:43
PM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>29966</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Canvases need adjustments.
</td><td>High</td><td>6/2/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:27 PM</td><td> </td><td>6/19/2022 4:13:42
PM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29970</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing thermal insulation for drain pipes.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:37 PM</td><td> </td><td>6/19/2022 4:13:41
PM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>13648</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>DB</td><td>General Snag</td><td>&#39;Mis
coordinations between tap water and electrical
panels</td><td>High</td><td>12/7/2020 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>11/30/2020 10:58:49 AM</td><td> </td><td>6/19/2022 3:06:31
PM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13902</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRAY</td><td>General Snag</td><td>&#39;Tray should be covered as per specifications
</td><td>High</td><td>12/9/2020 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>12/2/2020 11:35:17 AM</td><td> </td><td>6/19/2022 3:06:30
PM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>14895</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>General Snag</td><td>&#39;Not allowed to install boxes on
trank</td><td>High</td><td>1/25/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>1/18/2021 3:26:22 PM</td><td> </td><td>6/19/2022 3:06:29
PM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>15730</td><td>MACHINE ROOM</td><td>MU
BA</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;missing cover boxes and labels , missing
termination and installation wiring device for fire alarm system and
IT</td><td>High</td><td>2/9/2021 12:00:00 AM</td><td>Ahmed.Galal</td><td>2/2/2021
4:32:35 PM</td><td> </td><td>6/19/2022 3:06:28
PM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>15731</td><td>ELECTRICAL ROOM</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing label missing panels
schedule</td><td>High</td><td>2/10/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>2/3/2021 11:20:36 AM</td><td> </td><td>6/19/2022
3:06:27 PM</td><td>&nbsp;</td><td>GT8.01.0G.18</td><td>&nbsp;</td>
</tr><tr>
<td>17814</td><td>VIP LOUNGE</td><td>CCB
L10</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>5/16/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>5/9/2021 11:59:23 AM</td><td> </td><td>6/19/2022
3:06:26 PM</td><td>&nbsp;</td><td>CV.02.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20106</td><td>ELEC. ROOM-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;Missing panel
schedule, missing breakers labels, missing pull box labels, floor junction box
should be replaced, cable tray shouldn’t cover tag number plat. Missing tag number
for electrical cables. </td><td>High</td><td>8/10/2021 12:00:00 PM</td><td>Sameh
Ibrahim El-Sawah</td><td>8/3/2021 11:29:09 AM</td><td> </td><td>6/19/2022 3:06:25
PM</td><td>&nbsp;</td><td>MS.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20118</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Electrical</td><td>Internal Lighting</td><td>General Snag</td><td>&#39;Exit sign
not installed yet </td><td>High</td><td>8/10/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/3/2021 11:29:29 AM</td><td> </td><td>6/19/2022 3:06:24
PM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20663</td><td>RECEIVING AREA</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Lighting switches not installed yet- sockets not alignment
</td><td>High</td><td>8/17/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/10/2021 11:17:53 AM</td><td> </td><td>6/19/2022 3:06:23
PM</td><td>&nbsp;</td><td>MS.14.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20927</td><td>LIBRARY ADMIN</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Missing lighting control switch and missing labels and all floor
boxes are rusted and should be replaced and wiring devices not installed and not
terminated yet </td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:06 AM</td><td> </td><td>6/19/2022 3:06:22
PM</td><td>&nbsp;</td><td>MR.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20929</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All of
floor boxes and junctions boxes are rested and should be replaced and most of the
wiring devices not installed and not terminated yet </td><td>High</td><td>8/18/2021
12:00:00 AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/11/2021 11:51:14 AM</td><td>
</td><td>6/19/2022 3:06:22
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20931</td><td>ELEC.</td><td>MU
L10</td><td>Closed</td><td>Modernlite</td><td>MEP-Electrical</td><td>Power</
td><td>Visual Damages</td><td>&#39;Water leakage inside panel and affected on the
module and face plate not installed and labels and panel schedules not installed
</td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:19 AM</td><td> </td><td>6/19/2022 3:06:21
PM</td><td>&nbsp;</td><td>MS.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20945</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All of
floor boxes and junctions boxes are rusted and should be replaced
</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:44 AM</td><td> </td><td>6/19/2022 3:06:20
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20948</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;wiring
devices not installed and not terminated in all floor
boxes</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:49 AM</td><td> </td><td>6/19/2022 3:06:19
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20953</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;wiring
devices not installed and not terminated in all floor
boxes</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:56 AM</td><td> </td><td>6/19/2022 3:06:18
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>22374</td><td>LOBBY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Defective floor boxes and should be replaced
</td><td>High</td><td>9/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/25/2021 11:53:34 AM</td><td> </td><td>6/19/2022 3:06:17
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27389</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm interface for lifting system not
done</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:08:25 PM</td><td> </td><td>6/19/2022 3:06:16
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>27523</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Panel scheduled and schematic diagram are missing
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:36 AM</td><td> </td><td>6/19/2022 3:06:15
PM</td><td>&nbsp;</td><td>MS.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27770</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:55 PM</td><td> </td><td>6/19/2022 3:06:14
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29223</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRAY</td><td>General Snag</td><td>&#39;Provide cable tags as per specs requirement
</td><td>High</td><td>5/30/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/23/2022 11:30:28 AM</td><td> </td><td>6/19/2022
3:06:14 PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30316</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Provide as manufacture shop drawing and
touch up painting and label to be installed and and approved TOC for panel
board</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:24 PM</td><td> </td><td>6/19/2022
3:06:13 PM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30335</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cleaning up painting
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:30:55 PM</td><td> </td><td>6/19/2022 3:06:12
PM</td><td>&nbsp;</td><td>MA.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30357</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Touch up painting
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:31:26 PM</td><td> </td><td>6/19/2022 3:06:11
PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30730</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;As manufacturer drawing and touch up
paint</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:38:34 PM</td><td> </td><td>6/19/2022
3:06:10 PM</td><td>&nbsp;</td><td>MS.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30760</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Work not completed
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:40:59 PM</td><td> </td><td>6/19/2022 3:06:09
PM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30964</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label and cover
box</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:19:44 PM</td><td> </td><td>6/19/2022
3:06:08 PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>30966</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth jumper </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:19:47 PM</td><td>
</td><td>6/19/2022 3:06:07
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>30969</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:19:52 PM</td><td> </td><td>6/19/2022
3:06:07 PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>30971</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Buttom plate and cover
tray</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:19:55 PM</td><td> </td><td>6/19/2022
3:06:06 PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>30980</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;As manufacture drawing should be attached
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:20:08 PM</td><td> </td><td>6/19/2022 3:06:05
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30982</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Support screws should be installed properly
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:20:11 PM</td><td> </td><td>6/19/2022 3:06:04
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30984</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Rod and support should be alignment
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:20:14 PM</td><td> </td><td>6/19/2022 3:06:03
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31009</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Complete set as manufacture
drawing</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:56 PM</td><td> </td><td>6/19/2022
3:06:02 PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31012</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;As manufacturers
drawing</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:21:01 PM</td><td> </td><td>6/19/2022
3:06:02 PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31019</td><td>CATALOGUE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Face plate</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:21:14 PM</td><td>
</td><td>6/19/2022 3:06:01 PM</td><td>&nbsp;</td><td>MR.14.02.012-
F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>31096</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:12 PM</td><td> </td><td>6/19/2022
3:06:00 PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>29312</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Acoustic Walling</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed Abdl
Salam</td><td>5/23/2022 9:22:25 PM</td><td> </td><td>6/19/2022 2:03:08
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29389</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Acoustic Walling</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>5/31/2022 12:00:00 AM</td><td>Mohamed Abdl
Salam</td><td>5/24/2022 4:40:01 PM</td><td> </td><td>6/19/2022 2:03:01
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29896</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Acoustic Walling</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed Abdl
Salam</td><td>5/25/2022 4:35:29 PM</td><td> </td><td>6/19/2022 1:50:43
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>31453</td><td>LOBBY</td><td>MU L20</td><td>Closed</td><td>
National Steel Fabrication NSF</td><td>Architectural</td><td>Acoustic
Walling</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed Abdl Salam</td><td>6/2/2022 11:59:51 AM</td><td>
</td><td>6/19/2022 1:49:08
PM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31898</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Acoustic Walling</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>6/21/2022 12:00:00 AM</td><td>Mohamed Abdl
Salam</td><td>6/14/2022 12:03:35 PM</td><td> </td><td>6/19/2022 1:49:01
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>9308</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Must be covered
</td><td>High</td><td>7/15/2020 12:00:00 AM</td><td>Ayman Ahmed
Mostafa</td><td>7/8/2020 3:26:27 PM</td><td> </td><td>6/19/2022 1:22:36
PM</td><td>&nbsp;</td><td>ME.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>22237</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;A accessories is missing
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:48:57 AM</td><td> </td><td>6/19/2022 12:07:23
PM</td><td>&nbsp;</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>28125</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
waterproofing</td><td>damaged</td><td>&#39;Damaged sika foam should be repaired
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/16/2022
12:09:16 PM</td><td> </td><td>6/19/2022 12:00:58 PM</td><td>&nbsp;</td><td>Museum
Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>28127</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
waterproofing</td><td>damaged</td><td>&#39;Damaged sika foam should be repaired
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/16/2022
12:09:19 PM</td><td> </td><td>6/19/2022 11:59:59 AM</td><td>&nbsp;</td><td>Museum
Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>20634</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing acoustic lining
for fresh &amp; exhaust</td><td>High</td><td>8/16/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/9/2021 4:25:14 PM</td><td> </td><td>6/19/2022
11:53:09 AM</td><td>&nbsp;</td><td>MS.17.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20824</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing acoustic lining for fresh &amp;
exhaust</td><td>High</td><td>8/17/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/10/2021 12:10:20 PM</td><td> </td><td>6/19/2022
11:53:07 AM</td><td>&nbsp;</td><td>MS.17.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21295</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing insulation
</td><td>High</td><td>8/24/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/17/2021
4:06:15 PM</td><td> </td><td>6/19/2022 11:53:06
AM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>30155</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;FCO cover is Rusty.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:03 AM</td><td> </td><td>6/19/2022 11:53:05
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>31201</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage thermal insulation for hydronic pipes.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:55:43 PM</td><td> </td><td>6/19/2022 11:53:02
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31346</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Canvases need to be adjusted or to be changed.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:12 AM</td><td> </td><td>6/19/2022 11:53:01
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31367</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Thermal insulation for hydronic pipes need repairs.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:55 AM</td><td> </td><td>6/19/2022 11:53:00
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31389</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39; Missing labels for hydronic pipes.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:55:42 AM</td><td> </td><td>6/19/2022 11:52:59
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31415</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Canvases need adjustments or to be replaced.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:37 AM</td><td> </td><td>6/19/2022 11:52:58
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31422</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Thermal installation need repairs. </td><td>High</td><td>6/9/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:56:52 AM</td><td>
</td><td>6/19/2022 11:52:57
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31428</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Canvases need to be adjusted or changed.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:57:05 AM</td><td> </td><td>6/19/2022 11:52:56
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31507</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;No fire fighting system detected in
this area. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:49 PM</td><td> </td><td>6/19/2022 11:52:53
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>12087</td><td>ESCAPE ROUTE-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting not submitted
</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020
2:16:07 PM</td><td> </td><td>6/19/2022 11:44:51 AM</td><td>Done
</td><td>MQ.18.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16993</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Short tiles/edges should be aligned </td><td>Low</td><td>4/1/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021 12:32:34 PM</td><td>
</td><td>6/19/2022 11:44:37 AM</td><td>Done
</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16994</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tile should be replaced </td><td>Low</td><td>4/1/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021 12:32:35 PM</td><td>
</td><td>6/19/2022 11:44:36 AM</td><td>Done
</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>27936</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked edges are not aligned
</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/13/2022
12:22:54 PM</td><td> </td><td>6/19/2022 11:44:06 AM</td><td>Done
</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27937</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked parts should be adjusted
</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/13/2022
12:22:55 PM</td><td> </td><td>6/19/2022 11:44:05 AM</td><td>Done
</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27940</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Copping should be leveled
</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/13/2022
12:23:02 PM</td><td> </td><td>6/19/2022 11:44:03 AM</td><td>Done
</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27945</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked gaps should be closed
</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/13/2022
12:23:12 PM</td><td> </td><td>6/19/2022 11:44:02 AM</td><td>Done
</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27946</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked parts should be fixed
properly </td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/13/2022 12:23:14 PM</td><td> </td><td>6/19/2022 11:44:01
AM</td><td>Done </td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27949</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked curves should be adjusted
</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/13/2022
12:23:20 PM</td><td> </td><td>6/19/2022 11:44:00 AM</td><td>Done
</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27951</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked cutting should be adjusted
</td><td>Low</td><td>4/3/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>3/13/2022
12:23:24 PM</td><td> </td><td>6/19/2022 11:43:58 AM</td><td>Done
</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>15721</td><td>3D THEATER FOYER</td><td>CCB
L10</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Fittings</
td><td>A/C Grills</td><td>&#39;Stainless steel needs adjustment
</td><td>Low</td><td>2/23/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>2/2/2021
4:11:23 PM</td><td> </td><td>6/19/2022 11:19:06
AM</td><td>&nbsp;</td><td>CT.03.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>17307</td><td>Ticketing Shed</td><td>Old ticketing shed
RO</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>Damage/dent/stains</td><td>&#39;Unacceptable finish detail
between stainless steel and stone coping </td><td>Low</td><td>5/3/2021 12:00:00
AM</td><td>aymanhaddadin</td><td>4/12/2021 11:58:08 AM</td><td> </td><td>6/19/2022
11:19:05 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17368</td><td>External North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>5/4/2021 12:00:00 PM</td><td>aymanhaddadin</td><td>4/13/2021
11:48:16 AM</td><td> </td><td>6/19/2022 11:19:04 AM</td><td>&nbsp;</td><td>External
North Fence</td><td>&nbsp;</td>
</tr><tr>
<td>17375</td><td>External North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>5/4/2021 12:00:00 PM</td><td>aymanhaddadin</td><td>4/13/2021
11:48:27 AM</td><td> </td><td>6/19/2022 11:19:03 AM</td><td>&nbsp;</td><td>External
North Fence</td><td>&nbsp;</td>
</tr><tr>
<td>19295</td><td>VISITOR STAIR
(CORE E5)</td><td>CCB L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Joint should be aligned (the same
width)</td><td>Low</td><td>7/12/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>6/21/2021 4:14:09 PM</td><td> </td><td>6/19/2022 11:19:02
AM</td><td>&nbsp;</td><td>CX.03.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>22447</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Metal trim should be leveled and flushed
with stone leveled </td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>8/29/2021 3:13:46 PM</td><td> </td><td>6/19/2022 11:19:01
AM</td><td>&nbsp;</td><td>Part 1</td><td>&nbsp;</td>
</tr><tr>
<td>22556</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/30/2021
11:04:54 AM</td><td> </td><td>6/19/2022 11:19:00 AM</td><td>&nbsp;</td><td>Part
5</td><td>&nbsp;</td>
</tr><tr>
<td>23611</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Grouting should be adjusted / filling the
missing grouting </td><td>Low</td><td>10/13/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/22/2021 11:06:58 AM</td><td> </td><td>6/19/2022 11:19:00
AM</td><td>&nbsp;</td><td>Part 8</td><td>&nbsp;</td>
</tr><tr>
<td>23677</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/17/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/26/2021
10:20:00 AM</td><td> </td><td>6/19/2022 11:18:59 AM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23706</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>10/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/28/2021
9:57:42 AM</td><td> </td><td>6/19/2022 11:18:58 AM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23728</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>11/1/2021 12:00:00 AM</td><td>Amr Nofal</td><td>10/11/2021
10:37:54 AM</td><td> </td><td>6/19/2022 11:18:57 AM</td><td>&nbsp;</td><td>Part
11</td><td>&nbsp;</td>
</tr><tr>
<td>24616</td><td>Mankauras - Phase 3B</td><td>Mankauras Stair
and Wall</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Facade -
GRC panels</td><td>Damaged</td><td>&#39;The gap between stone flooring and walls
cladding should be uniform </td><td>Low</td><td>11/21/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>10/31/2021 4:17:27 PM</td><td>
</td><td>6/19/2022 11:18:56 AM</td><td>&nbsp;</td><td>Mankauras - Phase
3B</td><td>&nbsp;</td>
</tr><tr>
<td>24658</td><td>Mankauras - Phase 3A</td><td>Mankauras Stair
and Wall</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting fixtures to be cleaned and adjusted
</td><td>Low</td><td>11/22/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/1/2021 11:32:43 AM</td><td> </td><td>6/19/2022 11:18:55
AM</td><td>&nbsp;</td><td>Mankauras - Phase 3A</td><td>&nbsp;</td>
</tr><tr>
<td>24680</td><td>Mankauras - Phase 3A</td><td>Mankauras Stair
and Wall</td><td>Closed</td><td>Rock</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Damaged</td><td>&#39;Big gap between grating and GRC panel
</td><td>Low</td><td>11/22/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/1/2021 11:35:40 AM</td><td> </td><td>6/19/2022 11:18:54
AM</td><td>&nbsp;</td><td>Mankauras - Phase 3A</td><td>&nbsp;</td>
</tr><tr>
<td>24687</td><td>Mankauras - Phase 4</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Difference in colour/shade</td><td>&#39;Toothing between GRC panels
should be leveled</td><td>Low</td><td>11/8/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/1/2021 11:36:10 AM</td><td> </td><td>6/19/2022 11:18:53
AM</td><td>&nbsp;</td><td>Mankauras - Phase 4</td><td>&nbsp;</td>
</tr><tr>
<td>24717</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Surface preparations needed
</td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:29 PM</td><td> </td><td>6/19/2022 11:18:52
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24719</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Floor should be cleaned and repainted
</td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:31 PM</td><td> </td><td>6/19/2022 11:18:52
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24722</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Damaged</td><td>&#39;Twisted panel should be adjusted (be aligned
with stone facing)</td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:35 PM</td><td> </td><td>6/19/2022 11:18:51
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24776</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting and joints need to
cleaning </td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/7/2021 11:31:49 AM</td><td> </td><td>6/19/2022 11:18:50
AM</td><td>&nbsp;</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>24827</td><td>Mankauras - Phase 1</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Damaged</td><td>&#39;Twisted panel should be adjusted
</td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/7/2021 3:52:06 PM</td><td> </td><td>6/19/2022 11:18:49
AM</td><td>&nbsp;</td><td>Mankauras - Phase 1</td><td>&nbsp;</td>
</tr><tr>

<td>26165</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Lighting fixtures should be cleaned and sealed as per the detail
( for all lighting fixtures)</td><td>Low</td><td>3/8/2022 12:00:00
PM</td><td>Marios Ioannou,</td><td>2/15/2022 1:45:24 PM</td><td> </td><td>6/19/2022
11:18:48 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26166</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Sealant is missing surrounding the metal frame
</td><td>Low</td><td>3/8/2022 12:00:00 PM</td><td>Marios Ioannou,</td><td>2/15/2022
1:45:27 PM</td><td> </td><td>6/19/2022 11:18:47
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>27227</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;Gaps around rods should be welded(check all the
joints)</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/6/2022 4:40:01 PM</td><td> </td><td>6/19/2022 11:18:46
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27252</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;Stainless steel corrosion should be treated
</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022
4:51:35 PM</td><td> </td><td>6/19/2022 11:18:46
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27438</td><td>Ticketing Piazza</td><td>South Side Ticketing
Piazza</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Flooring to be completed as per the interface
shop drawing.</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/7/2022 3:56:09 PM</td><td> </td><td>6/19/2022 11:18:45
AM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>18128</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Leveling of Mep fixtures
</td><td>Low</td><td>6/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021
11:55:53 AM</td><td> </td><td>6/19/2022 10:46:43
AM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18129</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air gap should be cleaned from dents
</td><td>Low</td><td>6/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021
11:55:56 AM</td><td> </td><td>6/19/2022 10:46:42
AM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18139</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Joint between iws 11 and gypsum wall
should be aligned and finished </td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:56:25 AM</td><td> </td><td>6/19/2022
10:46:42 AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18144</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Interface between ews 09 and gypsum
ceiling should be aligned </td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:56:38 AM</td><td> </td><td>6/19/2022
10:46:41 AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18149</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Air gaps should be extended
</td><td>Low</td><td>6/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021
11:58:30 AM</td><td> </td><td>6/19/2022 10:46:40
AM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18168</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Joint between glazed door and wall should be adjusted
</td><td>Low</td><td>6/16/2021 12:00:00 PM</td><td>mohamed.sami</td><td>5/26/2021
11:59:00 AM</td><td> </td><td>6/19/2022 10:46:39
AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18246</td><td>KINDERGARTEN CLASSROOM 2 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>Ceiling</td><td>General Snag</td><td>&#39;All
MEP fixtures should be fixed properly </td><td>Low</td><td>6/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/31/2021 4:10:44 PM</td><td> </td><td>6/19/2022
10:46:38 AM</td><td>&nbsp;</td><td>MK.12.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18257</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;Air
gaps should be leveled</td><td>Low</td><td>6/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/31/2021 4:11:01 PM</td><td> </td><td>6/19/2022
10:46:37 AM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18305</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;There is gap between air gap
and gypsum wall </td><td>Low</td><td>6/22/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/1/2021 4:11:10 PM</td><td> </td><td>6/19/2022
10:46:36 AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18311</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing rubber between aluminum tube
and glazing </td><td>Low</td><td>6/23/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/2/2021 11:39:52 AM</td><td> </td><td>6/19/2022
10:46:35 AM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18339</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Air gaps around columns should be
leveled </td><td>Low</td><td>6/23/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/2/2021 11:40:50 AM</td><td> </td><td>6/19/2022
10:46:34 AM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18580</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Missing gypsum board
</td><td>Low</td><td>6/29/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/8/2021
4:32:56 PM</td><td> </td><td>6/19/2022 10:46:33
AM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>19109</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Gasket should be adjusted
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/16/2021
10:54:03 AM</td><td> </td><td>6/19/2022 10:46:32
AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19111</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Glazing panels should be at the same
level </td><td>Low</td><td>7/7/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/16/2021 10:54:05 AM</td><td> </td><td>6/19/2022
10:46:31 AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19450</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Gasket rubber need adjustment
</td><td>Low</td><td>7/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/24/2021
11:55:56 AM</td><td> </td><td>6/19/2022 10:46:30
AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19453</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Stainless steel trim not leveled
</td><td>Low</td><td>7/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/24/2021
11:56:04 AM</td><td> </td><td>6/19/2022 10:46:29
AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19457</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Stainless steel cover not leveled on
flooring </td><td>Low</td><td>7/15/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/24/2021 11:56:12 AM</td><td> </td><td>6/19/2022
10:46:28 AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>23792</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Scratches/dents</td><td>&#39;Marked gap should be closed
</td><td>Low</td><td>11/8/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/18/2021 4:29:17 PM</td><td> </td><td>6/19/2022 10:46:27
AM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>

<td>23880</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Direction</
td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;stainless
cladding is short should be extended </td><td>Low</td><td>11/14/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/24/2021 12:19:47 PM</td><td>
</td><td>6/19/2022 10:46:26 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24049</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Direction</
td><td>Architectural</td><td>Glass partion and door</td><td>General
Snag</td><td>&#39;Copping should be aligned and leveled
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:39:19 PM</td><td> </td><td>6/19/2022 10:46:25
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24057</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Direction</
td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Marked parts
should be finished at inside </td><td>Low</td><td>11/15/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:39:33 PM</td><td>
</td><td>6/19/2022 10:46:24 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24073</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Direction</
td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Marked part
is not finished yet</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:40:00 PM</td><td> </td><td>6/19/2022 10:46:23
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24075</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Direction</
td><td>Architectural</td><td>Glass partion and door</td><td>General
Snag</td><td>&#39;Marked bases should be seated properly and wishers should be
hidden </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:40:03 PM</td><td> </td><td>6/19/2022 10:46:22
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24084</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Missing and loose tiles should be installed and fixed properly
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:40:21 PM</td><td> </td><td>6/19/2022 10:46:21
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24088</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Direction</
td><td>Architectural</td><td>Glass partion and door</td><td>General
Snag</td><td>&#39;Copping should be leveled </td><td>Low</td><td>11/15/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:40:28 PM</td><td>
</td><td>6/19/2022 10:46:20 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24639</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken/ cracked tiles should be replaced
</td><td>Low</td><td>11/21/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/31/2021 4:30:03 PM</td><td> </td><td>6/19/2022 10:46:19
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24691</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be
replaced</td><td>Low</td><td>11/22/2021 12:00:00
PM</td><td>mohamed.sami</td><td>11/1/2021 4:34:52 PM</td><td> </td><td>6/19/2022
10:46:18 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24701</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken,cracked / deformed tiles should be
replaced.</td><td>Low</td><td>11/23/2021 12:00:00
PM</td><td>mohamed.sami</td><td>11/2/2021 3:20:44 PM</td><td> </td><td>6/19/2022
10:46:17 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24702</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken,cracked / deformed tiles should be
replaced.</td><td>Low</td><td>11/23/2021 12:00:00
PM</td><td>mohamed.sami</td><td>11/2/2021 3:20:46 PM</td><td> </td><td>6/19/2022
10:46:15 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25594</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Distance between glazing panels
should be uniform </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:51:33 AM</td><td> </td><td>6/19/2022
10:46:14 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25595</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Copping should be uniform
</td><td>Low</td><td>1/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:51:34 AM</td><td> </td><td>6/19/2022 10:46:13
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25596</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Distance between plates and
stainless cladding should be uniform </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:51:36 AM</td><td> </td><td>6/19/2022
10:46:12 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25924</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>2/13/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/23/2022 12:09:57 PM</td><td> </td><td>6/19/2022
10:46:11 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25939</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;All welding joints for supports and
posts should be smooth and finished properly </td><td>Low</td><td>2/14/2022
12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022 10:42:48 AM</td><td>
</td><td>6/19/2022 10:46:10 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25963</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked joint should be aligned
</td><td>Low</td><td>2/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022
12:08:05 PM</td><td> </td><td>6/19/2022 10:46:09
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26025</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Damages to be rectified or replaced</td><td>&#39;Wrong cutting for
stone tile </td><td>Low</td><td>2/15/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/25/2022 11:52:18 AM</td><td> </td><td>6/19/2022
10:46:08 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26068</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Broken, to be replaced</td><td>&#39;Broken stone tiles should be
replaced </td><td>Low</td><td>2/21/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/31/2022 11:58:12 AM</td><td> </td><td>6/19/2022
10:46:07 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24833</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Lighting current need to fixation properly
.</td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/7/2021 4:15:08 PM</td><td> </td><td>6/19/2022 10:11:23
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24834</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing sealant need to installed.</td><td>Low</td><td>11/28/2021
12:00:00 AM</td><td>Moussa Nageh Khella</td><td>11/7/2021 4:15:10 PM</td><td>
</td><td>6/19/2022 10:11:22 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31810</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing fire extinguisher. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:32:39 PM</td><td>
</td><td>6/19/2022 9:49:25
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31809</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing fire extinguishers. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:32:38 PM</td><td>
</td><td>6/19/2022 9:47:08
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31638</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;All for extinguisher are missing.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:12 PM</td><td> </td><td>6/19/2022 9:46:12
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31373</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:55:08 AM</td><td> </td><td>6/19/2022 9:43:14
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31371</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Pipe thermal insulation need repairs.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:55:04 AM</td><td> </td><td>6/19/2022 9:41:02
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31370</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Pipes Thermal insulation need repairs.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:55:03 AM</td><td> </td><td>6/19/2022 9:40:02
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30029</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing 2.5 inch fire hose and fire
extinguisher. </td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:47 AM</td><td> </td><td>6/19/2022 9:37:39
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>31369</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Duct thermal insulation shall be repaired.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:58 AM</td><td> </td><td>6/19/2022 9:14:05
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31325</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing fire extinguishers. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:53:29 AM</td><td>
</td><td>6/19/2022 9:09:29
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30017</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Condensate drain pipes shall be ended with
elbows. </td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:26 AM</td><td> </td><td>6/19/2022 9:07:15
AM</td><td>&nbsp;</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>28480</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Missing fire extinguishers.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:54 PM</td><td> </td><td>6/19/2022 9:04:19
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28736</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>Installation not to specification/drawing</td><td>&#39;Missing
labels. </td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:46:21 AM</td><td> </td><td>6/19/2022 9:00:46
AM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>31666</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air ducts.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:57 PM</td><td> </td><td>6/19/2022 8:58:58
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>29256</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing insulation
for drain valves. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:18 PM</td><td> </td><td>6/19/2022 8:56:41
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29710</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation for chilled water pipes. </td><td>High</td><td>6/1/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/25/2022 12:20:38 PM</td><td>
</td><td>6/19/2022 8:55:18
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30613</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing labels for water
pipes. </td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:40 AM</td><td> </td><td>6/19/2022 8:51:26
AM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>30619</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Pipes shaft need cleaning and pipes need to be cleaned.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:45 AM</td><td> </td><td>6/19/2022 8:50:12
AM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>31664</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39; Issuing labels for air duct.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:54 PM</td><td> </td><td>6/19/2022 8:48:01
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>10481</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing handrails
</td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:13:06 PM</td><td> </td><td>6/18/2022 4:08:05
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>13378</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Curtain frame need touch up
</td><td>Low</td><td>11/26/2020 12:00:00 AM</td><td>sally.george</td><td>11/5/2020
12:22:23 PM</td><td> </td><td>6/18/2022 4:07:11
PM</td><td>Done</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>14477</td><td>B.O.H-WET DELIVERY TUNNEL - Band B</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Incomplete installation of
lift</td><td>High</td><td>1/2/2021 12:00:00
AM</td><td>ahmedsalem</td><td>12/26/2020 11:40:38 AM</td><td> </td><td>6/18/2022
9:34:11 AM</td><td>&nbsp;</td><td>MQ.23.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>12140</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts - Machine
room</td><td>Handrail around machine platform</td><td>&#39;Incomplete
installation</td><td>High</td><td>10/11/2020 12:00:00
AM</td><td>ahmedsalem</td><td>10/4/2020 1:07:46 PM</td><td> </td><td>6/18/2022
9:30:46 AM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>21939</td><td>CORE D2</td><td>MU
L10</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Incomplete work </td><td>High</td><td>8/30/2021
12:00:00 AM</td><td>ahmedsalem</td><td>8/23/2021 1:35:34 PM</td><td>
</td><td>6/18/2022 9:26:30
AM</td><td>&nbsp;</td><td>MC.18.01.D21</td><td>&nbsp;</td>
</tr><tr>
<td>22059</td><td>CORE D3</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete
work</td><td>High</td><td>8/30/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/23/2021 3:57:41 PM</td><td> </td><td>6/18/2022
9:21:48 AM</td><td>&nbsp;</td><td>MC.13.0G.D31</td><td>&nbsp;</td>
</tr><tr>
<td>9568</td><td>SERVICE DELIVERY</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Elevators work is not
finish</td><td>High</td><td>7/27/2020 12:00:00
AM</td><td>ahmedsalem</td><td>7/20/2020 11:43:11 AM</td><td> </td><td>6/18/2022
9:17:59 AM</td><td>&nbsp;</td><td>MQ.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>31858</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for air duct.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 11:57:48 AM</td><td> </td><td>6/18/2022 8:34:36
AM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>31854</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 11:57:41 AM</td><td> </td><td>6/18/2022 8:33:02
AM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>29949</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage duct thermal insulation.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:41:52 PM</td><td> </td><td>6/16/2022 3:19:20
PM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>24331</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steel works at roof</td><td>Paint
finish</td><td>&#39;Missing painting for steel structure
</td><td>Low</td><td>11/3/2021 12:00:00 AM</td><td>mohamed.sami</td><td>10/27/2021
11:25:56 AM</td><td> </td><td>6/16/2022 1:43:00 PM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>24323</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
waterproofing</td><td>damaged</td><td>&#39;Damaged sika foam need to repair
</td><td>Low</td><td>11/3/2021 12:00:00 PM</td><td>mohamed.sami</td><td>10/27/2021
11:25:41 AM</td><td> </td><td>6/16/2022 1:42:52 PM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>19636</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
insulation</td><td>damaged</td><td>&#39;Repair for damaged sika foam
</td><td>Low</td><td>7/25/2021 12:00:00 PM</td><td>mohamed.sami</td><td>7/4/2021
9:40:25 AM</td><td> </td><td>6/16/2022 1:42:44 PM</td><td>&nbsp;</td><td>Museum
Roof Band B</td><td>&nbsp;</td>
</tr><tr>
<td>21195</td><td>CORE B2-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need adjustment
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
10:57:29 AM</td><td> </td><td>6/16/2022 1:13:17
PM</td><td>&nbsp;</td><td>MC.18.01.B21</td><td>&nbsp;</td>
</tr><tr>
<td>15835</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>Chipped/dent</td><td>&#39;Make good and/or install new stonework
infills and to the gaps between the panels that is of a very poor quality of
workmanship.</td><td>High</td><td>2/13/2021 12:00:00
PM</td><td>andrewjohn.rose</td><td>2/6/2021 1:12:36 PM</td><td> </td><td>6/16/2022
1:13:09 PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>15836</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Install and make good to the poor quality stone work regarding
the infill pieces and the gaps</td><td>High</td><td>2/13/2021 12:00:00
PM</td><td>andrewjohn.rose</td><td>2/6/2021 1:17:59 PM</td><td> </td><td>6/16/2022
1:12:34 PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>21193</td><td>CORE B2-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked part needs adjustment and repair
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
10:57:25 AM</td><td> </td><td>6/16/2022 1:12:31
PM</td><td>&nbsp;</td><td>MC.18.01.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21192</td><td>CORE B2-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs touch up painting </td><td>Low</td><td>9/7/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021 10:57:23 AM</td><td>
</td><td>6/16/2022 1:11:37
PM</td><td>&nbsp;</td><td>MC.18.01.B21</td><td>&nbsp;</td>
</tr><tr>
<td>20087</td><td>PAPYRUS-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Toothing between skirting tiles
</td><td>Low</td><td>8/23/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:15 PM</td><td> </td><td>6/16/2022 1:11:05
PM</td><td>&nbsp;</td><td>ME.12.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20078</td><td>TEXTILE-Band A</td><td>MU
L10</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Damaged</
td><td>&#39;Close around plumbing pipes </td><td>Low</td><td>8/23/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/2/2021 4:15:07 PM</td><td> </td><td>6/16/2022
1:10:27 PM</td><td>&nbsp;</td><td>ME.12.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20069</td><td>PAPYRUS-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Marked gaps between skirting and walls
should be closed </td><td>Low</td><td>8/23/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/2/2021 4:14:56 PM</td><td> </td><td>6/16/2022 1:10:00
PM</td><td>&nbsp;</td><td>ME.12.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>23756</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Flashing is missing for marked part</td><td>Low</td><td>11/3/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>10/13/2021 4:16:56 PM</td><td>
</td><td>6/16/2022 1:07:53 PM</td><td>&nbsp;</td><td>MU - North
Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23757</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Stone cladding should be flushed with
concrete walls </td><td>Low</td><td>11/3/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:58 PM</td><td> </td><td>6/16/2022 1:07:47
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>29159</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for hydronic
pipes. </td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:33 AM</td><td> </td><td>6/16/2022 11:01:01
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29207</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>5/29/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:59:37 AM</td><td>
</td><td>6/16/2022 11:01:00
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29261</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Incomplete cladding works.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:30 PM</td><td> </td><td>6/16/2022 11:00:59
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>31200</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing labels for hydronic pipes. </td><td>High</td><td>6/8/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:55:40 PM</td><td>
</td><td>6/16/2022 11:00:57
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31390</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage pipes thermal insulation. </td><td>High</td><td>6/9/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:55:44 AM</td><td>
</td><td>6/16/2022 11:00:56
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31605</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air ducts.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:32 AM</td><td> </td><td>6/16/2022 11:00:55
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31785</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage hilled water pipes thermal
insulation. </td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:31:56 PM</td><td> </td><td>6/16/2022 11:00:54
AM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>31805</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage hydronic pipes thermal insulation.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:31 PM</td><td> </td><td>6/16/2022 11:00:53
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31847</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for chilled water
pipes. </td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 11:57:29 AM</td><td> </td><td>6/16/2022 11:00:52
AM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>17324</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Roof -
Cladding</td><td>Needs cleaning</td><td>&#39;Rusted louvre ceiling need to touch up
</td><td>Low</td><td>5/3/2021 12:00:00 AM</td><td>aymanhaddadin</td><td>4/12/2021
11:58:55 AM</td><td> </td><td>6/16/2022 10:44:14
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>20968</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Cleaning for false ceiling tiles
</td><td>Low</td><td>9/1/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>8/11/2021
12:00:41 PM</td><td> </td><td>6/16/2022 10:44:13
AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>20970</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Adjustment ceiling and fixed
properly </td><td>Low</td><td>9/1/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>8/11/2021 12:00:48 PM</td><td> </td><td>6/16/2022 10:44:12
AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>20971</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Toothing between false
ceiling tiles should be leveled </td><td>Low</td><td>9/1/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>8/11/2021 12:00:51 PM</td><td>
</td><td>6/16/2022 10:44:12
AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>20972</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Gap between stone cladding
and false ceiling should be same width </td><td>Low</td><td>9/1/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>8/11/2021 12:00:53 PM</td><td>
</td><td>6/16/2022 10:44:11
AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>20973</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Bottom Gap between stone flooring and
cleaning should be same width </td><td>Low</td><td>9/1/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>8/11/2021 12:00:55 PM</td><td>
</td><td>6/16/2022 10:44:10
AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>20979</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Stone bottom line should be aligned and
repaired </td><td>Low</td><td>9/1/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>8/11/2021 12:01:09 PM</td><td> </td><td>6/16/2022 10:44:09
AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>20981</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Gap between false ceiling and
stone cladding not the same </td><td>Low</td><td>9/1/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>8/11/2021 12:01:14 PM</td><td>
</td><td>6/16/2022 10:44:08
AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>20982</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Roof -
Cladding</td><td>Needs cleaning</td><td>&#39;Rusted roof louver need to touch up
</td><td>Low</td><td>9/1/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/11/2021
12:01:17 PM</td><td> </td><td>6/16/2022 10:44:08
AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>20990</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>level</td><td>&#39;Joint between stainless steel
cladding and false ceiling should be the same width </td><td>Low</td><td>9/1/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>8/11/2021 12:01:34 PM</td><td>
</td><td>6/16/2022 10:44:07 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22711</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
repair </td><td>Low</td><td>9/27/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/6/2021 10:40:55 AM</td><td> </td><td>6/16/2022 10:44:06
AM</td><td>&nbsp;</td><td>Part 6</td><td>&nbsp;</td>
</tr><tr>
<td>22745</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tile should be replaced</td><td>Low</td><td>9/28/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/7/2021 11:08:26 AM</td><td> </td><td>6/16/2022 10:44:05
AM</td><td>&nbsp;</td><td>Part 6</td><td>&nbsp;</td>
</tr><tr>
<td>23267</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
repair should be adjusted </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 12:06:15 PM</td><td> </td><td>6/16/2022 10:44:04
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23614</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Grouting should be adjusted and filling the
missing grouting </td><td>Low</td><td>10/13/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/22/2021 11:07:03 AM</td><td> </td><td>6/16/2022 10:44:01
AM</td><td>&nbsp;</td><td>Part 8</td><td>&nbsp;</td>
</tr><tr>
<td>23692</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/19/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/28/2021
9:57:03 AM</td><td> </td><td>6/16/2022 10:44:00 AM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23700</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Movement joint should be filled properly
</td><td>Low</td><td>10/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/28/2021
9:57:15 AM</td><td> </td><td>6/16/2022 10:43:59 AM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>26188</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Cutting edge should be adjusted </td><td>Low</td><td>3/10/2022
12:00:00 PM</td><td>Amr Nofal</td><td>2/17/2022 12:11:55 PM</td><td>
</td><td>6/16/2022 10:43:58 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26201</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Pitted tiles should be
treated</td><td>Low</td><td>3/10/2022 12:00:00 AM</td><td>Amr
Nofal</td><td>2/17/2022 12:15:52 PM</td><td> </td><td>6/16/2022 10:43:57
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26227</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles/edges should be repaired/replaced
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
11:46:47 AM</td><td> </td><td>6/16/2022 10:43:56
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26228</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be repaired </td><td>Low</td><td>3/14/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022 11:46:49 AM</td><td>
</td><td>6/16/2022 10:43:55 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26283</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>3/15/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022 11:24:07 AM</td><td>
</td><td>6/16/2022 10:43:54 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26378</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
11:21:35 AM</td><td> </td><td>6/16/2022 10:43:53
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26687</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:11 PM</td><td> </td><td>6/16/2022 10:43:52 AM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26692</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing tiles should be installed
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:24 PM</td><td> </td><td>6/16/2022 10:43:52 AM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26693</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>Not aligned</td><td>&#39;Missing onyx tiles
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:25 PM</td><td> </td><td>6/16/2022 10:43:51 AM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26697</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Remove exposed wire
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
12:16:30 PM</td><td> </td><td>6/16/2022 10:43:50 AM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26805</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:10 PM</td><td> </td><td>6/16/2022 10:43:49 AM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26809</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:16 PM</td><td> </td><td>6/16/2022 10:43:48 AM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26814</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing onyx tiles
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
4:31:29 PM</td><td> </td><td>6/16/2022 10:43:47 AM</td><td>&nbsp;</td><td>Tail
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27136</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Incomplete work
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:00 PM</td><td> </td><td>6/16/2022 10:43:46 AM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27137</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked interface/edge should be aligned and
flushed </td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:06:01 PM</td><td> </td><td>6/16/2022
10:43:45 AM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27145</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked tiles should be replaced
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:23 PM</td><td> </td><td>6/16/2022 10:43:43 AM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27153</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing tiles </td><td>Low</td><td>3/24/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022 12:06:38 PM</td><td>
</td><td>6/16/2022 10:43:41 AM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27154</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>AluMisr</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Protection cover to be removed
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:39 PM</td><td> </td><td>6/16/2022 10:43:40 AM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27155</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>AluMisr</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing louver</td><td>Low</td><td>3/24/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022 12:06:42 PM</td><td>
</td><td>6/16/2022 10:43:39 AM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27160</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:52 PM</td><td> </td><td>6/16/2022 10:43:38 AM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27161</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:53 PM</td><td> </td><td>6/16/2022 10:43:37 AM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27162</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Dent tile should be repaired
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:06:55 PM</td><td> </td><td>6/16/2022 10:43:36 AM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27169</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
12:07:08 PM</td><td> </td><td>6/16/2022 10:43:35 AM</td><td>&nbsp;</td><td>Ga
Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27173</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Incomplete work</td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 12:07:16 PM</td><td> </td><td>6/16/2022
10:43:34 AM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>

<td>27241</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Adjust all manhole covers should be sited
</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022
4:51:11 PM</td><td> </td><td>6/16/2022 10:43:33
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27441</td><td>Ticketing Piazza</td><td>South Side Ticketing
Piazza</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/7/2022
3:56:14 PM</td><td> </td><td>6/16/2022 10:43:32 AM</td><td>&nbsp;</td><td>South
Side</td><td>&nbsp;</td>
</tr><tr>
<td>28244</td><td>Parking Level-P4</td><td>Parking
Levels</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;All broken steps edges should be repaired
</td><td>Low</td><td>4/12/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/22/2022 12:25:35 PM</td><td> </td><td>6/16/2022 10:43:30
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28247</td><td>Parking Level-P4</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;All lighting poles should be cleaned
</td><td>Low</td><td>4/12/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/22/2022 12:26:35 PM</td><td> </td><td>6/16/2022 10:43:29
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>9651</td><td>WET DELIVERY TUNNEL</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Missing access control cable, cable trunk is not addressed
properly, </td><td>High</td><td>7/27/2020 12:00:00 PM</td><td>Mohamed
Samir</td><td>7/20/2020 2:06:08 PM</td><td> </td><td>6/16/2022 10:06:26
AM</td><td>&nbsp;</td><td>MQ.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>11759</td><td>GATE HOUSE</td><td>GATE 9 TYPE 4
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>10/5/2020 12:00:00 AM</td><td>Mohamed
Samir</td><td>9/28/2020 12:07:00 PM</td><td> </td><td>6/16/2022 10:06:24
AM</td><td>&nbsp;</td><td>GT.9.4.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>11761</td><td>GATE HOUSE</td><td>GATE 9 TYPE 3
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing camera.</td><td>High</td><td>10/5/2020 12:00:00
AM</td><td>Mohamed Samir</td><td>9/28/2020 12:07:16 PM</td><td> </td><td>6/16/2022
10:06:23 AM</td><td>&nbsp;</td><td>GT9.03.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>11763</td><td>ELECTRICAL ROOM</td><td>GATE 9 TYPE 2
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Rack installation not completed, trunk sharp edge, , no ict
faceplates</td><td>High</td><td>10/5/2020 12:00:00 AM</td><td>Mohamed
Samir</td><td>9/28/2020 12:07:43 PM</td><td> </td><td>6/16/2022 10:06:22
AM</td><td>&nbsp;</td><td>GT9.02.0G.06</td><td>&nbsp;</td>
</tr><tr>
<td>11873</td><td>GATE HOUSE 2</td><td>GATE 2 TYPE 4
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV camera patch cord installation and missing faceplate for I/O
jack</td><td>High</td><td>10/5/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/28/2020 2:43:05 PM</td><td> </td><td>6/16/2022 10:06:21
AM</td><td>&nbsp;</td><td>GT2.04.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>11880</td><td>GATE HOUSE</td><td>GATE 9 TYPE 4A
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Incomplete CCTV cables installation and fire alarm wiring
termination also not done </td><td>High</td><td>10/5/2020 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>9/28/2020 2:43:38 PM</td><td>
</td><td>6/16/2022 10:06:20
AM</td><td>&nbsp;</td><td>GT9.04.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>11890</td><td>GATE HOUSE 3</td><td>GATE 3 TYPE 4
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Alignment and Level not followed</td><td>&#39;Outdoor rack
installation is not done properly and Alignment should be
done</td><td>High</td><td>10/5/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/28/2020 2:44:28 PM</td><td> </td><td>6/16/2022 10:06:19
AM</td><td>&nbsp;</td><td>GT3.04.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>13719</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>XERVON Egypt S.A.E</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>General Snag</td><td>&#39;Metal flexible conduit should be
replaced by emt conduit </td><td>High</td><td>12/8/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/1/2020 10:36:02 AM</td><td> </td><td>6/16/2022 10:06:17
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>15735</td><td>WAITING</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Camera labels is missing
</td><td>High</td><td>2/10/2021 12:00:00 AM</td><td>Ahmed.Galal</td><td>2/3/2021
11:20:42 AM</td><td> </td><td>6/16/2022 10:06:13
AM</td><td>&nbsp;</td><td>GT8.01.0G.09</td><td>&nbsp;</td>
</tr><tr>
<td>15860</td><td>GATE HOUSE 2</td><td>GATE 2 TYPE 4
GF</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rack installation not finished, digital
signage screen not installed properly,cctv labels not
installed,</td><td>High</td><td>2/14/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>2/7/2021 11:48:03 AM</td><td> </td><td>6/16/2022 10:06:12
AM</td><td>&nbsp;</td><td>GT2.04.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>15862</td><td>GATE HOUSE 3</td><td>GATE 3 TYPE 4
GF</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing cctv point, missing ICT point ,
digital signage screen is not installed properly , met conduits not allowed
</td><td>High</td><td>2/14/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>2/7/2021
11:48:10 AM</td><td> </td><td>6/16/2022 10:06:10
AM</td><td>&nbsp;</td><td>GT3.04.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>15863</td><td>GATE HOUSE</td><td>GATE 9 TYPE 4A
GF</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing cctv faceplate , missing ICT labels
</td><td>High</td><td>2/14/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>2/7/2021
11:48:12 AM</td><td> </td><td>6/16/2022 10:06:09
AM</td><td>&nbsp;</td><td>GT9.04.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>15865</td><td>GATE HOUSE</td><td>GATE 9 TYPE 3
GF</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wire way is not installed correctly,no ICT
label , </td><td>High</td><td>2/14/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>2/7/2021 11:48:17 AM</td><td> </td><td>6/16/2022 10:06:08
AM</td><td>&nbsp;</td><td>GT9.03.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>17516</td><td>STAIR</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>5/11/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>5/4/2021 1:35:37 PM</td><td> </td><td>6/16/2022
10:06:07 AM</td><td>&nbsp;</td><td>CB.08.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>19173</td><td>MAIN IT ROOM</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Incomplete Installation</td><td>&#39;Many of the Core switches
fiber connections are missing in the SFP fiber trunks and patch cord labeling also
not done in All network racks and Rack earthing also not done yet.Fan power cable
not connected </td><td>High</td><td>6/24/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>6/17/2021 11:56:08 AM</td><td> </td><td>6/16/2022 10:06:04
AM</td><td>&nbsp;</td><td>CS.07.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>19780</td><td>CONTROL ROOM</td><td>GATE 9 TYPE 2
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Utp outlets are not terminated, access control cables not pulled
yet, camera labels are missing. Video wall and work station are not tested yet,
floor box labels are not done </td><td>High</td><td>7/19/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>7/12/2021 1:20:48 PM</td><td> </td><td>6/16/2022
10:06:03 AM</td><td>&nbsp;</td><td>GT9.02.0G.02</td><td>&nbsp;</td>
</tr><tr>
<td>19781</td><td>SECURITY ROOM</td><td>GATE 9 TYPE 2
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Camera labels are missing , utp cables labels are not installed ,
missing access control conduit cir </td><td>High</td><td>7/19/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>7/12/2021 1:20:50 PM</td><td> </td><td>6/16/2022
10:06:02 AM</td><td>&nbsp;</td><td>GT9.02.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>19782</td><td>ELECTRICAL ROOM</td><td>GATE 9 TYPE 2
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Utp cables labels is not done, ups outlet is not activated yet,
utp rack side labels is not as the approved scheme , access control panel and
cables are missing </td><td>High</td><td>7/19/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>7/12/2021 1:20:53 PM</td><td> </td><td>6/16/2022 10:06:00
AM</td><td>&nbsp;</td><td>GT9.02.0G.06</td><td>&nbsp;</td>
</tr><tr>
<td>19784</td><td>DRIVER&#39;S LUNCH ROOM</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Camera labels and utp labels are missing
</td><td>High</td><td>7/19/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>7/12/2021
1:20:56 PM</td><td> </td><td>6/16/2022 10:05:59
AM</td><td>&nbsp;</td><td>GT8.01.0G.02</td><td>&nbsp;</td>
</tr><tr>
<td>19785</td><td>DRIVER&#39;S LUNCH ROOM</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Camera labels is missing, utp cables labels are missing
</td><td>High</td><td>7/19/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>7/12/2021
1:20:57 PM</td><td> </td><td>6/16/2022 10:05:58
AM</td><td>&nbsp;</td><td>GT8.01.0G.02</td><td>&nbsp;</td>
</tr><tr>
<td>19788</td><td>SECURITY R2</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Camera label is not complete (patch number ), cables labels not
done </td><td>High</td><td>7/19/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>7/12/2021 1:21:01 PM</td><td> </td><td>6/16/2022 10:05:57
AM</td><td>&nbsp;</td><td>GT8.01.0G.11</td><td>&nbsp;</td>
</tr><tr>
<td>19789</td><td>SECURITY R1</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Camera and utp cables labels are not done
</td><td>High</td><td>7/19/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>7/12/2021
1:21:02 PM</td><td> </td><td>6/16/2022 10:05:56
AM</td><td>&nbsp;</td><td>GT8.01.0G.10</td><td>&nbsp;</td>
</tr><tr>
<td>19891</td><td>SERVICE ZONE2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Opening holes should be closed by replace the plate - wires
should be covered by metal flexible conduit </td><td>High</td><td>8/4/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>7/28/2021 11:48:34 AM</td><td>
</td><td>6/16/2022 10:05:54
AM</td><td>&nbsp;</td><td>MS.12.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>20671</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing ICT WiFi and access control label’s, missing access
control door contact, loose card reader </td><td>High</td><td>8/17/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/10/2021 11:18:37 AM</td><td>
</td><td>6/16/2022 10:05:53
AM</td><td>&nbsp;</td><td>MQ.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>21511</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;There is no labeling and port numbering for these CCTV points
</td><td>High</td><td>8/25/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/18/2021 3:15:19 PM</td><td> </td><td>6/16/2022 10:05:52
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21796</td><td>IT 3</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>CONTAINMENT SUPPORT SYSTEM</td><td>Alignment and
Level not followed</td><td>&#39;Need cable trunks dropping for all the network
racks in the hub rooms and all the cat6a cables and fiber cables are hanging
without any proper containment support system </td><td>High</td><td>8/26/2021
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>8/19/2021 3:26:03 PM</td><td>
</td><td>6/16/2022 10:05:51
AM</td><td>&nbsp;</td><td>MS.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21906</td><td>VOID</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control labels is missing </td><td>High</td><td>8/30/2021
12:00:00 PM</td><td>Mohamed Samir</td><td>8/23/2021 10:53:15 AM</td><td>
</td><td>6/16/2022 10:05:48
AM</td><td>&nbsp;</td><td>MS.13.0G.006</td><td>&nbsp;</td>
</tr><tr>
<td>21907</td><td>VOID</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing access control labels </td><td>High</td><td>8/30/2021
12:00:00 PM</td><td>Mohamed Samir</td><td>8/23/2021 10:53:16 AM</td><td>
</td><td>6/16/2022 10:05:47
AM</td><td>&nbsp;</td><td>MS.13.0G.006</td><td>&nbsp;</td>
</tr><tr>
<td>21908</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Mission ACCESS control labels </td><td>High</td><td>8/30/2021
12:00:00 PM</td><td>Mohamed Samir</td><td>8/23/2021 10:53:18 AM</td><td>
</td><td>6/16/2022 10:05:46
AM</td><td>&nbsp;</td><td>MS.13.0G.008</td><td>&nbsp;</td>
</tr><tr>
<td>22347</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>9/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/25/2021 11:52:38 AM</td><td> </td><td>6/16/2022 10:05:45
AM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>22348</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>9/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/25/2021 11:52:39 AM</td><td> </td><td>6/16/2022 10:05:44
AM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>22354</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>9/1/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/25/2021 11:52:56 AM</td><td>
</td><td>6/16/2022 10:05:42
AM</td><td>&nbsp;</td><td>MS.18.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>26732</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Security</
td><td>General Snag</td><td>&#39;WiFi labeling and port mapping is not done
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 3:45:39 PM</td><td> </td><td>6/16/2022 10:05:41
AM</td><td>&nbsp;</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>

<td>26858</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>Track
Intertech Joint Venture</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work for lighting fixtures and
termination.</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>3/2/2022 9:47:34 AM</td><td> </td><td>6/16/2022 10:05:40
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26989</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Floor boxes cover needs to be installed for
the ICT cables </td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/2/2022 4:01:15 PM</td><td> </td><td>6/16/2022 10:05:39
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27516</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Retie the cables and tag number not
installed </td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:26 AM</td><td> </td><td>6/16/2022 10:05:38
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>27521</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work and panel not fixed and
terminated </td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:33 AM</td><td> </td><td>6/16/2022 10:05:36
AM</td><td>&nbsp;</td><td>MS.18.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>27525</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work and panels not delivered yet
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:40 AM</td><td> </td><td>6/16/2022 10:05:35
AM</td><td>&nbsp;</td><td>MS.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27527</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work and panels not delivered
yet</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:42 AM</td><td> </td><td>6/16/2022 10:05:34
AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>27632</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;No network outlet for the panel</td><td>High</td><td>3/16/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:53:40 PM</td><td>
</td><td>6/16/2022 10:05:33
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>27634</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;No data outlet for panel</td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:53:44 PM</td><td>
</td><td>6/16/2022 10:05:32
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>27759</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Bad Workmanship for pulling cables
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:36 PM</td><td> </td><td>6/16/2022 10:05:31
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27781</td><td>STAFF W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>GI CONDUIT
&amp; ACCESSSORIES</td><td>Alignment and Level not followed</td><td>&#39;Change EMT
conduit to RGS</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 1:59:59 PM</td><td> </td><td>6/16/2022 10:05:29
AM</td><td>&nbsp;</td><td>MW.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27811</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover should be installed properly
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:22 PM</td><td> </td><td>6/16/2022 10:05:28
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27859</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:26 PM</td><td>
</td><td>6/16/2022 10:05:27
AM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28055</td><td>IT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Glass of FACP not installed and cable need
to be managed </td><td>High</td><td>3/21/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/14/2022 1:52:37 PM</td><td> </td><td>6/16/2022 10:05:25
AM</td><td>&nbsp;</td><td>MS.19.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>29946</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;INERGEN control panel not powered.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:41:42 PM</td><td> </td><td>6/16/2022 10:05:24
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>30298</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Bottom plate should be installed </td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:56 PM</td><td>
</td><td>6/16/2022 10:05:23
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30318</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire label </td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:28 PM</td><td>
</td><td>6/16/2022 10:05:21
AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30367</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire label</td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:41 PM</td><td>
</td><td>6/16/2022 10:05:20
AM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30742</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Buttom plate to be installed
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:39:43 PM</td><td> </td><td>6/16/2022 10:05:19
AM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30978</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Should be installed properly </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:06 PM</td><td>
</td><td>6/16/2022 10:05:18
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31008</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover and label of
box</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:54 PM</td><td> </td><td>6/16/2022
10:05:17 AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31033</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Alignment for fire
devices</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:28 PM</td><td> </td><td>6/16/2022
10:05:16 AM</td><td>&nbsp;</td><td>MA.19.02.026</td><td>&nbsp;</td>
</tr><tr>
<td>31036</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Face plate</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:31 PM</td><td>
</td><td>6/16/2022 10:05:15
AM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31043</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:41 PM</td><td> </td><td>6/16/2022
10:05:14 AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31051</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover and label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:54 PM</td><td> </td><td>6/16/2022
10:05:13 AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31063</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable lay inside
tray</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:12 PM</td><td> </td><td>6/16/2022
10:05:11 AM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31066</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tray should be
covered</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:17 PM</td><td> </td><td>6/16/2022
10:05:10 AM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31114</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:40 PM</td><td> </td><td>6/16/2022
10:05:08 AM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31118</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:43 PM</td><td> </td><td>6/16/2022
10:05:07 AM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31119</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:44 PM</td><td> </td><td>6/16/2022
10:05:05 AM</td><td>&nbsp;</td><td>MA.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31120</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:45 PM</td><td> </td><td>6/16/2022
10:05:04 AM</td><td>&nbsp;</td><td>MA.19.02.020</td><td>&nbsp;</td>
</tr><tr>
<td>31121</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:46 PM</td><td> </td><td>6/16/2022
10:05:02 AM</td><td>&nbsp;</td><td>MA.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31122</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:47 PM</td><td> </td><td>6/16/2022
10:05:00 AM</td><td>&nbsp;</td><td>MA.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31123</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:49 PM</td><td> </td><td>6/16/2022
10:04:59 AM</td><td>&nbsp;</td><td>MA.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31124</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:49 PM</td><td> </td><td>6/16/2022
10:04:57 AM</td><td>&nbsp;</td><td>MA.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31125</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:50 PM</td><td> </td><td>6/16/2022
10:04:55 AM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31126</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:52 PM</td><td> </td><td>6/16/2022
10:04:54 AM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31127</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:53 PM</td><td> </td><td>6/16/2022
10:04:53 AM</td><td>&nbsp;</td><td>MA.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31128</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:53 PM</td><td> </td><td>6/16/2022
10:04:52 AM</td><td>&nbsp;</td><td>MA.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31130</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:35:10 PM</td><td> </td><td>6/16/2022
10:04:50 AM</td><td>&nbsp;</td><td>MA.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31260</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:17 AM</td><td> </td><td>6/16/2022
10:04:49 AM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31265</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:28 AM</td><td> </td><td>6/16/2022
10:04:48 AM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31267</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:32 AM</td><td> </td><td>6/16/2022
10:04:47 AM</td><td>&nbsp;</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31268</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:33 AM</td><td> </td><td>6/16/2022
10:04:46 AM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31270</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:36 AM</td><td> </td><td>6/16/2022
10:04:44 AM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31272</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:39 AM</td><td> </td><td>6/16/2022
10:04:43 AM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31274</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:42 AM</td><td> </td><td>6/16/2022
10:04:42 AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>12063</td><td>SERVICE TUNNEL (B)-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and cleaning for concrete flooring
</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
2:14:50 PM</td><td> </td><td>6/16/2022 9:43:14
AM</td><td>&nbsp;</td><td>MQ.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20652</td><td>TEXTILE-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Acoustic
Walling</td><td>General Snag</td><td>&#39;Need to cut the C channel for
accessibility the access door </td><td>High</td><td>8/16/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/9/2021 4:25:37 PM</td><td> </td><td>6/16/2022
9:42:27 AM</td><td>&nbsp;</td><td>ME.12.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20084</td><td>TEXTILE-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Wall skirting not aligned
</td><td>Low</td><td>8/23/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:11 PM</td><td> </td><td>6/16/2022 9:37:07
AM</td><td>&nbsp;</td><td>ME.12.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20080</td><td>TEXTILE-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Toothing between skirting tiles
</td><td>Low</td><td>8/23/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:08 PM</td><td> </td><td>6/16/2022 9:36:07
AM</td><td>&nbsp;</td><td>ME.12.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20072</td><td>POTTERY-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Skirting should be fixed properly
</td><td>Low</td><td>8/23/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:02 PM</td><td> </td><td>6/16/2022 9:35:31
AM</td><td>&nbsp;</td><td>ME.12.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20068</td><td>WOOD-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Marked gaps between skirting and walls
should be closed </td><td>Low</td><td>8/23/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/2/2021 4:14:54 PM</td><td> </td><td>6/16/2022 9:35:00
AM</td><td>&nbsp;</td><td>ME.12.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20067</td><td>TEXTILE-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Marked gaps between walls and skirting
should be closed </td><td>Low</td><td>8/23/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/2/2021 4:14:51 PM</td><td> </td><td>6/16/2022 9:34:31
AM</td><td>&nbsp;</td><td>ME.12.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>17036</td><td>ESCAPE ROUTE-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling is hold</td><td>Low</td><td>4/1/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>3/11/2021 12:34:25 PM</td><td> </td><td>6/16/2022
9:34:02 AM</td><td>&nbsp;</td><td>MQ.18.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16827</td><td>POTTERY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Marked cracks should
repaired</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/10/2021 12:59:22 PM</td><td> </td><td>6/16/2022 9:32:26
AM</td><td>&nbsp;</td><td>ME.12.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>12067</td><td>SERVICE TUNNEL (A)-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair for concrete flooring
</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020
2:15:00 PM</td><td> </td><td>6/16/2022 9:31:34
AM</td><td>&nbsp;</td><td>MQ.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>12065</td><td>SERVICE TUNNEL (A)-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020
2:14:55 PM</td><td> </td><td>6/16/2022 9:30:57
AM</td><td>&nbsp;</td><td>MQ.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20770</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between tiles
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:39 PM</td><td> </td><td>6/16/2022 9:28:59
AM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20073</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Sagging at joint with excessive sealant</td><td>&#39;Missing
sealant between skirting tiles </td><td>Low</td><td>8/23/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/2/2021 4:15:02 PM</td><td> </td><td>6/16/2022
9:28:24 AM</td><td>&nbsp;</td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>20065</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Marked gaps should be closed
</td><td>Low</td><td>8/23/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/2/2021
4:14:47 PM</td><td> </td><td>6/16/2022 9:27:58
AM</td><td>&nbsp;</td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>20063</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Marked gaps should be closed
</td><td>Low</td><td>8/23/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/2/2021
4:14:43 PM</td><td> </td><td>6/16/2022 9:27:29
AM</td><td>&nbsp;</td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>17037</td><td>ESCAPE ROUTE-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Work is not finished yet
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:34:27 PM</td><td> </td><td>6/16/2022 9:27:02
AM</td><td>&nbsp;</td><td>MQ.18.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16908</td><td>TEXTILE-Band A</td><td>MU
L10</td><td>Closed</td><td>Daghash Tents</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Gap should be adjusted
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:02:09 PM</td><td> </td><td>6/16/2022 9:26:04
AM</td><td>&nbsp;</td><td>ME.12.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>30282</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:32 PM</td><td> </td><td>6/16/2022
8:39:33 AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31053</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire label</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:57 PM</td><td>
</td><td>6/16/2022 8:39:32
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>11720</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Sealer is visible
</td><td>Low</td><td>10/18/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>9/27/2020
4:41:28 PM</td><td> </td><td>6/16/2022 8:28:24
AM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>9640</td><td>SERVICE TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Flooring need cleaning and repair
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:50:15 PM</td><td> </td><td>6/16/2022 8:27:44
AM</td><td>&nbsp;</td><td>MQ.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>9612</td><td>VOID</td><td>MU GF </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint Floor</td><td>General
Snag</td><td>&#39;Floor need cleaning </td><td>Low</td><td>8/10/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>7/20/2020 1:48:45 PM</td><td> </td><td>6/16/2022
8:27:03 AM</td><td>&nbsp;</td><td>MS.13.0G.005</td><td>&nbsp;</td>
</tr><tr>
<td>22332</td><td>CORE D1</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Touch up painting
</td><td>High</td><td>8/31/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/24/2021
3:05:28 PM</td><td> </td><td>6/16/2022 8:18:22
AM</td><td>&nbsp;</td><td>MC.24.03.D11</td><td>&nbsp;</td>
</tr><tr>
<td>30034</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Dismantled fire pipe support.
</td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:55 AM</td><td> </td><td>6/16/2022 8:17:26
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>22067</td><td>TUT-CORE B3</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Touch up painting for fire
pipes</td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/23/2021 3:57:50 PM</td><td> </td><td>6/16/2022
8:16:30 AM</td><td>&nbsp;</td><td>MC.12.03.B31</td><td>&nbsp;</td>
</tr><tr>
<td>28510</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing handle for FF network drain
valve. </td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:44 PM</td><td> </td><td>6/16/2022 8:15:29
AM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28913</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cladding is missing for air duct insulation.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:30:34 PM</td><td> </td><td>6/16/2022 8:14:30
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29134</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing cladding.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:39 AM</td><td> </td><td>6/16/2022 8:12:14
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>30038</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire pipe support need adjustment.
</td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:27:01 AM</td><td> </td><td>6/16/2022 8:10:37
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>11807</td><td>ABLUTION AREA</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>Alu Guarantee
Systems</td><td>Architectural</td><td>Windows</td><td>General
Snag</td><td>&#39;Wrong mechanism </td><td>High</td><td>10/5/2020 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>9/28/2020 1:41:39 PM</td><td>
</td><td>6/15/2022 4:46:43
PM</td><td>&nbsp;</td><td>GT8.01.0G.03</td><td>&nbsp;</td>
</tr><tr>
<td>11824</td><td>SECURITY R2</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>Alu Guarantee
Systems</td><td>Architectural</td><td>Windows</td><td>General
Snag</td><td>&#39;Wrong mechanism </td><td>High</td><td>10/5/2020 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>9/28/2020 1:46:37 PM</td><td>
</td><td>6/15/2022 4:46:42
PM</td><td>&nbsp;</td><td>GT8.01.0G.11</td><td>&nbsp;</td>
</tr><tr>
<td>11827</td><td>SECURITY R1</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>Alu Guarantee
Systems</td><td>Architectural</td><td>Windows</td><td>General
Snag</td><td>&#39;Wrong mechanism </td><td>High</td><td>10/5/2020 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>9/28/2020 1:46:47 PM</td><td>
</td><td>6/15/2022 4:46:42
PM</td><td>&nbsp;</td><td>GT8.01.0G.10</td><td>&nbsp;</td>
</tr><tr>
<td>11856</td><td>KITCHENNETTE 02</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>Alu Guarantee
Systems</td><td>Architectural</td><td>Windows</td><td>General
Snag</td><td>&#39;Wrong mechanism </td><td>High</td><td>10/5/2020 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>9/28/2020 1:58:13 PM</td><td>
</td><td>6/15/2022 4:46:41
PM</td><td>&nbsp;</td><td>GT8.01.0G.12</td><td>&nbsp;</td>
</tr><tr>
<td>18431</td><td>Pyramid Climb</td><td>Pyramid
Climb</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Staircase Handrail</td><td>Landing
curvature</td><td>&#39;Properly aligned and install glass
panels</td><td>Low</td><td>6/28/2021 12:00:00
AM</td><td>aymanhaddadin</td><td>6/7/2021 10:13:16 AM</td><td> </td><td>6/15/2022
4:46:40 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26482</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;The marked are landscape should be finished as
per shop drawing </td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/24/2022 11:51:59 AM</td><td> </td><td>6/15/2022 4:46:39
PM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>
<td>26916</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work.</td><td>Low</td><td>3/23/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/2/2022 11:15:35 AM</td><td> </td><td>6/15/2022
4:46:38 PM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>
<td>27435</td><td>Entrance walls</td><td>Truck scanner
Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Area not
cleaned/finished.</td><td>&#39;Incomplete civil work for water meter chamber
</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>ahmedsalem</td><td>3/7/2022
2:55:03 PM</td><td> </td><td>6/15/2022 4:46:37
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27512</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Installation not to
specification/drawing</td><td>&#39;Missing fire hydrant protection pipe
</td><td>High</td><td>3/15/2022 12:00:00 AM</td><td>ahmedsalem</td><td>3/8/2022
4:11:20 PM</td><td> </td><td>6/15/2022 4:46:36 PM</td><td>&nbsp;</td><td>North
Side</td><td>&nbsp;</td>
</tr><tr>
<td>22010</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Need cleaning for grill &amp;
duct</td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/23/2021 3:56:53 PM</td><td> </td><td>6/15/2022
4:41:54 PM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>30012</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing air grill.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:57 PM</td><td> </td><td>6/15/2022 4:35:33
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>31186</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage thermal insulation for hadronic pipes.
</td><td>High</td><td>6/8/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:55:09 PM</td><td> </td><td>6/15/2022 4:34:27
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29032</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage air duct insulation and duct holes shall be closed
before repairing. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:22 PM</td><td> </td><td>6/15/2022 4:27:07
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>11315</td><td>GATE HOUSE 2</td><td>GATE 2 TYPE 4
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing connection to camera.</td><td>High</td><td>9/30/2020
12:00:00 AM</td><td>David Noshy Naguib</td><td>9/23/2020 11:56:46 AM</td><td>
</td><td>6/15/2022 4:00:54
PM</td><td>&nbsp;</td><td>GT2.04.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>11332</td><td>GATE HOUSE</td><td>GATE 9 TYPE 3
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing cable connection to CCTV
Camera.</td><td>High</td><td>9/30/2020 12:00:00 AM</td><td>David Noshy
Naguib</td><td>9/23/2020 11:57:48 AM</td><td> </td><td>6/15/2022 4:00:24
PM</td><td>&nbsp;</td><td>GT9.03.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>11306</td><td>GATE HOUSE 3</td><td>GATE 3 TYPE 4
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Rack not fixed well and its cables Termination not
done.</td><td>High</td><td>9/30/2020 12:00:00 AM</td><td>David Noshy
Naguib</td><td>9/23/2020 11:56:17 AM</td><td> </td><td>6/15/2022 4:00:02
PM</td><td>&nbsp;</td><td>GT3.04.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>11342</td><td>OFFICE</td><td>GATE 9 TYPE 2
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;ICT face plate to be adjusted
horizontally.</td><td>High</td><td>9/30/2020 12:00:00 AM</td><td>David Noshy
Naguib</td><td>9/23/2020 11:58:19 AM</td><td> </td><td>6/15/2022 3:58:55
PM</td><td>&nbsp;</td><td>GT9.02.0G.03</td><td>&nbsp;</td>
</tr><tr>
<td>11338</td><td>CONTROL ROOM</td><td>GATE 9 TYPE 2
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Racks not installed.</td><td>High</td><td>9/30/2020 12:00:00
AM</td><td>David Noshy Naguib</td><td>9/23/2020 11:58:06 AM</td><td>
</td><td>6/15/2022 3:58:30
PM</td><td>&nbsp;</td><td>GT9.02.0G.02</td><td>&nbsp;</td>
</tr><tr>
<td>11329</td><td>GATE HOUSE</td><td>GATE 9 TYPE 4B
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing labels for ICT devices.</td><td>High</td><td>9/30/2020
12:00:00 AM</td><td>David Noshy Naguib</td><td>9/23/2020 11:57:37 AM</td><td>
</td><td>6/15/2022 3:58:18
PM</td><td>&nbsp;</td><td>GT9.04.0G.02</td><td>&nbsp;</td>
</tr><tr>
<td>11327</td><td>GATE HOUSE</td><td>GATE 9 TYPE 4B
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing camera not installed.</td><td>High</td><td>9/30/2020
12:00:00 AM</td><td>David Noshy Naguib</td><td>9/23/2020 11:57:29 AM</td><td>
</td><td>6/15/2022 3:58:04
PM</td><td>&nbsp;</td><td>GT9.04.0G.02</td><td>&nbsp;</td>
</tr><tr>
<td>11326</td><td>GATE HOUSE</td><td>GATE 9 TYPE 4B
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing labels for devices.</td><td>High</td><td>9/30/2020
12:00:00 AM</td><td>David Noshy Naguib</td><td>9/23/2020 11:57:25 AM</td><td>
</td><td>6/15/2022 3:57:43
PM</td><td>&nbsp;</td><td>GT9.04.0G.02</td><td>&nbsp;</td>
</tr><tr>
<td>11304</td><td>GATE HOUSE 3</td><td>GATE 3 TYPE 4
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;ICT device and cable not
installed.</td><td>High</td><td>9/30/2020 12:00:00 AM</td><td>David Noshy
Naguib</td><td>9/23/2020 11:56:11 AM</td><td> </td><td>6/15/2022 3:51:14
PM</td><td>&nbsp;</td><td>GT3.04.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>11303</td><td>GATE HOUSE 3</td><td>GATE 3 TYPE 4
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV Camera cable connection not
done.</td><td>High</td><td>9/30/2020 12:00:00 AM</td><td>David Noshy
Naguib</td><td>9/23/2020 11:56:08 AM</td><td> </td><td>6/15/2022 3:50:55
PM</td><td>&nbsp;</td><td>GT3.04.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>31503</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;No automatic fire fighting system
detected. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:39 PM</td><td> </td><td>6/15/2022 2:40:39
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>29231</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:20 PM</td><td> </td><td>6/15/2022 2:21:47
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29230</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing cladding.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:18 PM</td><td> </td><td>6/15/2022 2:17:43
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28734</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>Installation not to specification/drawing</td><td>&#39;Missing
cladding. </td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:46:18 AM</td><td> </td><td>6/15/2022 2:16:25
PM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>30089</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers heads catcher some
paintings. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:50 AM</td><td> </td><td>6/15/2022 2:14:29
PM</td><td>&nbsp;</td><td>MA.19.02.022</td><td>&nbsp;</td>
</tr><tr>
<td>28914</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing labels for air ducts. </td><td>High</td><td>5/24/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:30:38 PM</td><td>
</td><td>6/15/2022 2:01:48
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>8862</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Third fix CIR
</td><td>High</td><td>3/24/2020 12:00:00 AM</td><td>Ayman Ahmed
Mostafa</td><td>3/17/2020 11:21:53 AM</td><td> </td><td>6/15/2022 1:56:07
PM</td><td>&nbsp;</td><td>MS.13.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>8864</td><td>STORAGE-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Third fix CIR
</td><td>High</td><td>3/24/2020 12:00:00 AM</td><td>Ayman Ahmed
Mostafa</td><td>3/17/2020 11:22:01 AM</td><td> </td><td>6/15/2022 1:55:59
PM</td><td>&nbsp;</td><td>MS.13.01.008</td><td>&nbsp;</td>
</tr><tr>
<td>22017</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;HDPE need
collar</td><td>High</td><td>8/30/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/23/2021 3:57:04 PM</td><td> </td><td>6/15/2022
1:55:12 PM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>14305</td><td>B.O.H-ARTEFACTS LOBBY - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguishers
</td><td>High</td><td>12/31/2020 12:00:00 PM</td><td>ahmedsalem</td><td>12/24/2020
1:06:48 PM</td><td> </td><td>6/15/2022 1:30:28
PM</td><td>&nbsp;</td><td>MQ.23.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31896</td><td>ELEC.</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Cleaning of drainage pipe.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:25:23 PM</td><td> </td><td>6/15/2022 1:29:06
PM</td><td>&nbsp;</td><td>MS.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>25520</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Louver with different shape should be
replaced </td><td>Low</td><td>12/30/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:52:39 PM</td><td> </td><td>6/15/2022
12:56:42 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>20808</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Must be located to be far from electrical
panel</td><td>High</td><td>8/17/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/10/2021 12:09:57 PM</td><td> </td><td>6/15/2022
12:44:33 PM</td><td>&nbsp;</td><td>MS.17.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20911</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguisher
</td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/11/2021
11:48:34 AM</td><td> </td><td>6/15/2022 12:44:31
PM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>22007</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Pipe insulation need repair
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/23/2021
3:56:49 PM</td><td> </td><td>6/15/2022 12:44:30
PM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>22015</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Insulation need repair for duct &amp;
pipe</td><td>High</td><td>8/30/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/23/2021 3:57:02 PM</td><td> </td><td>6/15/2022
12:44:29 PM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>22057</td><td>CORE D3</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cleaning of shaft and grills
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/23/2021
3:57:39 PM</td><td> </td><td>6/15/2022 12:44:29
PM</td><td>&nbsp;</td><td>MC.13.01.D31</td><td>&nbsp;</td>
</tr><tr>
<td>30013</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing air grill.
</td><td>High</td><td>6/2/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:58 PM</td><td> </td><td>6/15/2022 12:44:28
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30014</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage fire damper.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:44:00 PM</td><td> </td><td>6/15/2022 12:44:27
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30067</td><td>SHAFT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Drainage pipes
need cleaning and painting. </td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/30/2022 11:34:38 AM</td><td>
</td><td>6/15/2022 12:44:26
PM</td><td>&nbsp;</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30080</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinkler cover catch putty.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:30 AM</td><td> </td><td>6/15/2022 12:44:25
PM</td><td>&nbsp;</td><td>MA.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30605</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for chilled water pipes.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:32 AM</td><td> </td><td>6/15/2022 12:44:24
PM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>30621</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Paintings and discoloration for air
terminals. </td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:48 AM</td><td> </td><td>6/15/2022 12:44:23
PM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>30625</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Painting and discoloration of air grills.
</td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:54 AM</td><td> </td><td>6/15/2022 12:44:22
PM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>31142</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage hydronic pipes thermal insulation.
</td><td>High</td><td>6/8/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:30 PM</td><td> </td><td>6/15/2022 12:44:22
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31181</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for chilled water
pipes. </td><td>High</td><td>6/8/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:54:55 PM</td><td> </td><td>6/15/2022 12:44:21
PM</td><td>&nbsp;</td><td>MS.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31183</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage thermal installation for FAD.
</td><td>High</td><td>6/8/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:55:04 PM</td><td> </td><td>6/15/2022 12:44:20
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31352</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Clash between fire pipe and thermal insulation.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:26 AM</td><td> </td><td>6/15/2022 12:44:19
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31416</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage thermal insulation need repairs.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:39 AM</td><td> </td><td>6/15/2022 12:44:18
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31423</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air duct insulation need repairs. </td><td>High</td><td>6/9/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:56:54 AM</td><td>
</td><td>6/15/2022 12:44:16
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31437</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage chilled water pipe thermal insulation.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:57:20 AM</td><td> </td><td>6/15/2022 12:44:15
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31504</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Damage pipe thermal insulation.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:41 PM</td><td> </td><td>6/15/2022 12:44:14
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>31528</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Cylinders shall be cleaned.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:11 PM</td><td> </td><td>6/15/2022 12:44:13
PM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31780</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage the Al insulation for chilled water
pipes. </td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:31:46 PM</td><td> </td><td>6/15/2022 12:44:10
PM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>31784</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for air duct.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:31:54 PM</td><td> </td><td>6/15/2022 12:44:09
PM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>27327</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access panels should be fixed properly
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:12 PM</td><td> </td><td>6/15/2022 12:35:01
PM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27454</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access door should be fixed properly
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:40:35 PM</td><td> </td><td>6/15/2022 12:34:25
PM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30538</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access door should be leveled and adjusted
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:45 AM</td><td> </td><td>6/15/2022 12:32:48
PM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>28221</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access door needs adjustment </td><td>Low</td><td>4/10/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/20/2022 12:04:13 PM</td><td>
</td><td>6/15/2022 12:32:10
PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>28216</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Access door should be installed
</td><td>Low</td><td>4/10/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/20/2022
12:04:03 PM</td><td> </td><td>6/15/2022 12:31:37
PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>25942</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Stainless copping should be aligned
</td><td>Low</td><td>2/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022
10:42:52 AM</td><td> </td><td>6/15/2022 12:21:27
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25940</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Scratches and dents should be
adjusted </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 10:42:49 AM</td><td> </td><td>6/15/2022
12:21:18 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25937</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Distance between plates and
stainless cladding should be the width</td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 10:42:44 AM</td><td> </td><td>6/15/2022
12:21:10 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25943</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Gaps
between stone steps should be regular </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 10:46:10 AM</td><td> </td><td>6/15/2022
12:20:56 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25883</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Repair should be finished properly
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
11:59:20 AM</td><td> </td><td>6/15/2022 12:20:46
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25930</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken louver should be replaced
</td><td>Low</td><td>2/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022
10:42:33 AM</td><td> </td><td>6/15/2022 12:20:21 PM</td><td>Tiles were repaired but
not replaced</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25988</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Damaged tiles should be replaced
</td><td>Low</td><td>2/15/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/25/2022
11:38:57 AM</td><td> </td><td>6/15/2022 12:19:51
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>11883</td><td>GATE HOUSE</td><td>GATE 1 TYPE 4
RO</td><td>Closed</td><td>Cairo Communication System</td><td>Civil</td><td>General
Snag</td><td>General Snag</td><td>&#39;Hole opening needs to be fixed with concrete
</td><td>High</td><td>10/5/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/28/2020 2:43:56 PM</td><td> </td><td>6/15/2022 11:43:09
AM</td><td>&nbsp;</td><td>GT1.04.0R.01</td><td>&nbsp;</td>
</tr><tr>
<td>15994</td><td>CORRIDOR</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Leveling needs adjustment/general cleaning is needed
</td><td>Low</td><td>3/1/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>2/8/2021
4:45:42 PM</td><td> </td><td>6/15/2022 11:43:08
AM</td><td>&nbsp;</td><td>CS.02.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>16251</td><td>Food Court</td><td>Food
Court</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Aluminum cladding is not leveling and
should be adjusted </td><td>Low</td><td>3/4/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>2/11/2021 11:15:57 AM</td><td> </td><td>6/15/2022 11:43:07
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>19053</td><td>STAFF RECEPTION</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling should be adjusted </td><td>Low</td><td>7/6/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>6/15/2021 4:38:58 PM</td><td> </td><td>6/15/2022
11:43:05 AM</td><td>&nbsp;</td><td>CA.07.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>19073</td><td>BRIDGE</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Ceiling tiles should be adjusted
</td><td>Low</td><td>7/6/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>6/15/2021
4:39:25 PM</td><td> </td><td>6/15/2022 11:43:04
AM</td><td>&nbsp;</td><td>CA.02.01.009</td><td>&nbsp;</td>
</tr><tr>
<td>24002</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover level should be flush with interlock
level </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 3:18:25 PM</td><td> </td><td>6/15/2022 11:43:03
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24003</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gap height between slope concrete and stone
cladding should be adjusted as per design drawing </td><td>Low</td><td>11/15/2021
12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021 3:18:27 PM</td><td>
</td><td>6/15/2022 11:43:02 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24004</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint between kerbstone and concrete should
be aligned properly </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 3:18:29 PM</td><td> </td><td>6/15/2022 11:43:01
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24114</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gap width between concrete and kerb stone
should be as per shop drawing </td><td>Low</td><td>11/16/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/26/2021 11:07:47 AM</td><td> </td><td>6/15/2022
11:43:00 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24115</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Concrete level should be flushed with kerb
stone</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:07:49 AM</td><td> </td><td>6/15/2022 11:43:00
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24116</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between concrete and kerbstone
should be aligned and cleaned </td><td>Low</td><td>11/16/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/26/2021 11:07:51 AM</td><td> </td><td>6/15/2022
11:42:58 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24117</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cracks should be repaired
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:07:53 AM</td><td> </td><td>6/15/2022 11:42:57
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24118</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cracks should be repaired
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:07:55 AM</td><td> </td><td>6/15/2022 11:42:56
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24119</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint between interlock and kerbstone should
be aligned and leveled </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:07:57 AM</td><td> </td><td>6/15/2022 11:42:55
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24120</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Concrete floor needs touch up and cleaning
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:07:58 AM</td><td> </td><td>6/15/2022 11:42:54
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24121</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between concrete and kerbstone should
be aligned and cleaned </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:08:00 AM</td><td> </td><td>6/15/2022 11:42:53
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24162</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Surface of curb stone need to be cleaned /
curb stone around pole ligh</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:09:09 AM</td><td> </td><td>6/15/2022 11:42:53
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24720</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked gaps should be closed
</td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:32 PM</td><td> </td><td>6/15/2022 11:42:52
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>

<td>24949</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Handrail to be aligned.</td><td>Low</td><td>12/1/2021 12:00:00
AM</td><td>Amr Nofal</td><td>11/10/2021 11:28:02 AM</td><td> </td><td>6/15/2022
11:42:51 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24952</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Check post location as per shop
drawing.</td><td>Low</td><td>11/17/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 11:28:10 AM</td><td> </td><td>6/15/2022 11:42:50
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24957</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Check post location as per shop
drawing.</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 11:28:27 AM</td><td> </td><td>6/15/2022 11:42:49
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24970</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Metal trim to be installed and aligned
properly.</td><td>Low</td><td>11/17/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 11:29:10 AM</td><td> </td><td>6/15/2022 11:42:48
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24974</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Salted and erosion tiles should be
treated.</td><td>Low</td><td>11/17/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 3:59:09 PM</td><td> </td><td>6/15/2022 11:42:48
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24984</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Salted
and erosion tiles should be treated </td><td>Low</td><td>12/1/2021 12:00:00
AM</td><td>Amr Nofal</td><td>11/10/2021 3:59:49 PM</td><td> </td><td>6/15/2022
11:42:47 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24985</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Salted and erosion tiles should be
treated.</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 3:59:50 PM</td><td> </td><td>6/15/2022 11:42:46
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24987</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Salted
and erosion tiles should be treated </td><td>Low</td><td>12/1/2021 12:00:00
AM</td><td>Amr Nofal</td><td>11/10/2021 3:59:52 PM</td><td> </td><td>6/15/2022
11:42:45 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24996</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Metal trim should be aligned and fixed properly and missing parts
should be installed </td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 4:00:04 PM</td><td> </td><td>6/15/2022 11:42:44
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25043</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Metal trim should be aligned and fixed properly
</td><td>Low</td><td>12/2/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/11/2021
10:24:48 AM</td><td> </td><td>6/15/2022 11:42:43
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25061</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Metal trim should be aligned and fixed properly
</td><td>Low</td><td>12/2/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/11/2021
10:43:33 AM</td><td> </td><td>6/15/2022 11:42:42
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25068</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Metal trim should be aligned and fixed properly
</td><td>Low</td><td>12/2/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/11/2021
10:43:46 AM</td><td> </td><td>6/15/2022 11:42:41
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22638</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Wall - Metal cladding</td><td>Not
aligned</td><td>&#39;Joint between louvre and concrete wall not same width
</td><td>Low</td><td>9/25/2021 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>9/4/2021 4:11:35 PM</td><td> </td><td>6/15/2022 11:31:51
AM</td><td>Tolerances from White concrete</td><td>MU - North
Facade</td><td>&nbsp;</td>
</tr><tr>
<td>22640</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Wall - Metal cladding</td><td>Not
aligned</td><td>&#39;Joint between louvre and concrete wall not same width
</td><td>Low</td><td>9/25/2021 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>9/4/2021 4:11:38 PM</td><td> </td><td>6/15/2022 11:31:44
AM</td><td>Tolerances from White concrete</td><td>MU - North
Facade</td><td>&nbsp;</td>
</tr><tr>
<td>22644</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>LARA for buildings installation
works</td><td>Architectural</td><td>Wall - Metal cladding</td><td>Not
aligned</td><td>&#39;Joint between concrete wall and louvre not the same width
</td><td>Low</td><td>9/25/2021 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>9/4/2021 4:11:45 PM</td><td> </td><td>6/15/2022 11:31:36
AM</td><td>Tolerances from White concrete</td><td>MU - North
Facade</td><td>&nbsp;</td>
</tr><tr>
<td>15851</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>SANITARY
WARE</td><td>Misc See Below</td><td>&#39;Clean around and inside the cistern access
panel - unacceptable dirty condition. All cubicles</td><td>High</td><td>2/14/2021
12:00:00 AM</td><td>andrewjohn.rose</td><td>2/7/2021 11:03:10 AM</td><td>
</td><td>6/15/2022 11:21:19
AM</td><td>&nbsp;</td><td>MW.18.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15857</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Repair
the sharp edges to the cistern access panel or replace. Make sure that the locking
mechanism works. Clean to the inside area.</td><td>High</td><td>2/14/2021 12:00:00
PM</td><td>andrewjohn.rose</td><td>2/7/2021 11:38:10 AM</td><td> </td><td>6/15/2022
11:21:18 AM</td><td>&nbsp;</td><td>MW.18.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>17433</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Water test is not done
yet</td><td>Low</td><td>5/9/2021 12:00:00 AM</td><td>mohamed.sami</td><td>4/18/2021
1:52:02 PM</td><td> </td><td>6/15/2022 11:21:17
AM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>17447</td><td>Lobby</td><td>Temple Garden stairs Level
3</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Broken panel should be replaced
</td><td>Low</td><td>5/9/2021 12:00:00 PM</td><td>mohamed.sami</td><td>4/18/2021
1:52:47 PM</td><td> </td><td>6/15/2022 11:21:16
AM</td><td>&nbsp;</td><td>MP.23.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>18205</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air gap should be extended to door frame
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021
4:04:18 PM</td><td> </td><td>6/15/2022 11:21:12
AM</td><td>&nbsp;</td><td>ME.12.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18242</td><td>KINDERGARTEN - Band A</td><td>MU
L20</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General Snag</td><td>&#39;Air
gaps should be leveled with wall</td><td>Low</td><td>6/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/31/2021 4:10:38 PM</td><td> </td><td>6/15/2022
11:21:10 AM</td><td>&nbsp;</td><td>CLASSROOM 1</td><td>&nbsp;</td>
</tr><tr>
<td>18262</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>Ceiling</td><td>General Snag</td><td>&#39;All
MEP fixtures should be fixed properly </td><td>Low</td><td>6/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/31/2021 4:11:09 PM</td><td> </td><td>6/15/2022
11:21:09 AM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18319</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Stainless steel balustrades not
aligned with stone cladding </td><td>Low</td><td>6/23/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/2/2021 11:40:07 AM</td><td> </td><td>6/15/2022
11:21:05 AM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18342</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Toothing between false
ceiling tiles </td><td>Low</td><td>6/23/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/2/2021 11:40:56 AM</td><td> </td><td>6/15/2022
11:21:04 AM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18343</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Missing GI sheets
</td><td>Low</td><td>6/23/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/2/2021
11:40:58 AM</td><td> </td><td>6/15/2022 11:21:03
AM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18670</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;AC grill and lighting fixtures not
leveled </td><td>Low</td><td>6/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/9/2021 4:23:42 PM</td><td> </td><td>6/15/2022
11:21:02 AM</td><td>&nbsp;</td><td>ME.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18671</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gap between lighting fixtures and gypsum
wall need to close </td><td>Low</td><td>6/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/9/2021 4:23:44 PM</td><td> </td><td>6/15/2022
11:21:01 AM</td><td>&nbsp;</td><td>ME.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>25495</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Landing curvature</td><td>&#39;Two vertical supports not
aligned</td><td>Low</td><td>12/29/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/8/2021 1:41:18 PM</td><td> </td><td>6/15/2022
11:21:00 AM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25549</td><td>CORRIDOR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>Damage/dent/stains</td><td>&#39;Loose stainless steel
plate should be fixed properly </td><td>Low</td><td>12/30/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:57:40 PM</td><td> </td><td>6/15/2022
11:20:59 AM</td><td>&nbsp;</td><td>MS.18.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>25561</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked connection should be finished
</td><td>Low</td><td>12/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:58:06 PM</td><td> </td><td>6/15/2022 11:20:58 AM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25562</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Orientation and spacing between
plates should be aligned and unified </td><td>Low</td><td>12/16/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:58:09 PM</td><td> </td><td>6/15/2022
11:20:57 AM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25897</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Joint between stone cladding and reveal
should be regular </td><td>Low</td><td>2/13/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/23/2022 11:59:49 AM</td><td> </td><td>6/15/2022
11:20:56 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25911</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Chipped edges should be repaired </td><td>Low</td><td>2/13/2022
12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022 12:08:38 PM</td><td>
</td><td>6/15/2022 11:20:55 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25920</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Chipped edge should be repaired </td><td>Low</td><td>2/13/2022
12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022 12:09:34 PM</td><td>
</td><td>6/15/2022 11:20:54 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25932</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Irregular joint between stone cladding and
reveal and should be adjusted </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 10:42:36 AM</td><td> </td><td>6/15/2022
11:20:52 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25949</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Chipped edge should be trimmed
</td><td>Low</td><td>2/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022
12:07:40 PM</td><td> </td><td>6/15/2022 11:20:51
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25989</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Irregular cutting around camera should be
adjusted </td><td>Low</td><td>2/15/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/25/2022 11:38:58 AM</td><td> </td><td>6/15/2022
11:20:50 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25869</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Gap
between stone steps and concrete wall should be regular
</td><td>Low</td><td>2/10/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>1/20/2022 12:03:19 PM</td><td> </td><td>6/15/2022 11:20:19
AM</td><td>Repeated Snag # 26006. Please close</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>11969</td><td>IT-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Electrical</td><td>Earthing
System</td><td>Earth Conductor</td><td>&#39;Work not finished yet
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
11:26:35 AM</td><td> </td><td>6/15/2022 11:03:31
AM</td><td>&nbsp;</td><td>MS.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>16950</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>Identification missing</td><td>&#39;Missing labels
</td><td>High</td><td>3/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>3/11/2021 11:40:53 AM</td><td> </td><td>6/15/2022 11:03:30
AM</td><td>&nbsp;</td><td>ME.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>18099</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Clash between devices and the
door</td><td>High</td><td>6/2/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>5/26/2021 11:46:10 AM</td><td> </td><td>6/15/2022 11:03:28
AM</td><td>&nbsp;</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18102</td><td>SCULPTURE ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>Identification missing</td><td>&#39;Clash between horn -strobe
lighting and the door </td><td>High</td><td>6/2/2021 12:00:00 AM</td><td>Sameh
Ibrahim El-Sawah</td><td>5/26/2021 11:46:16 AM</td><td> </td><td>6/15/2022 11:03:27
AM</td><td>&nbsp;</td><td>MK.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>18113</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>Identification missing</td><td>&#39;Missing labels
</td><td>High</td><td>6/2/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>5/26/2021 11:46:37 AM</td><td> </td><td>6/15/2022 11:03:27
AM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18115</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>6/2/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>5/26/2021 11:46:41 AM</td><td> </td><td>6/15/2022 11:03:26
AM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18117</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing
labels</td><td>High</td><td>6/2/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>5/26/2021 11:46:45 AM</td><td> </td><td>6/15/2022 11:03:25
AM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>20916</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Missing labels and panel schedule and missing tag number for
cables</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:50:39 AM</td><td> </td><td>6/15/2022 11:03:24
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20920</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>Modernlite</td><td>MEP-Electrical</td><td>Power</
td><td>General Snag</td><td>&#39;Missing labels for fire alarm and missing tag
number and panels schedule inside the panel</td><td>High</td><td>8/18/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/11/2021 11:50:49 AM</td><td>
</td><td>6/15/2022 11:03:23
AM</td><td>&nbsp;</td><td>MS.19.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>30272</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:16 PM</td><td> </td><td>6/15/2022
11:03:22 AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30307</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Installed properly
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:30:10 PM</td><td> </td><td>6/15/2022 11:03:21
AM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30310</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rod should be aligned
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:30:14 PM</td><td> </td><td>6/15/2022 11:03:20
AM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30311</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Provide proper fitting for elbow
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:30:16 PM</td><td> </td><td>6/15/2022 11:03:19
AM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30313</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be laid on trunk and cover
should be installed </td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:19 PM</td><td> </td><td>6/15/2022
11:03:18 AM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30314</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unused openings should be
closed</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:21 PM</td><td> </td><td>6/15/2022
11:03:17 AM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30319</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;C clips should be installed properly
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:30:30 PM</td><td> </td><td>6/15/2022 11:03:16
AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30320</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label </td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:31 PM</td><td>
</td><td>6/15/2022 11:03:16
AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30321</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unused openings should be
closed</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:33 PM</td><td> </td><td>6/15/2022
11:03:15 AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30322</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Provide properly installation of covers of
cable tray</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:36 PM</td><td> </td><td>6/15/2022
11:03:14 AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30323</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be laying on cable tray
(complete missing part of cable tray)</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:40 PM</td><td> </td><td>6/15/2022
11:03:13 AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30324</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth jumper </td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:41 PM</td><td>
</td><td>6/15/2022 11:03:12
AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30326</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unused openings should be
sealed</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:44 PM</td><td> </td><td>6/15/2022
11:03:11 AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30327</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Should be
closed</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:45 PM</td><td> </td><td>6/15/2022
11:03:10 AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30364</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire label </td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:37 PM</td><td>
</td><td>6/15/2022 11:03:09
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30731</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:38:37 PM</td><td> </td><td>6/15/2022
11:03:08 AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30736</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:39:15 PM</td><td> </td><td>6/15/2022
11:03:07 AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30755</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Buttom plate should be installed
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:40:16 PM</td><td> </td><td>6/15/2022 11:03:07
AM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30764</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Buttom plate should be installed
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:41:09 PM</td><td> </td><td>6/15/2022 11:03:06
AM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30766</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Button plate</td><td>High</td><td>6/7/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022 4:41:13 PM</td><td>
</td><td>6/15/2022 11:03:05
AM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30972</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:19:57 PM</td><td> </td><td>6/15/2022
11:03:04 AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>30981</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire label</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:09 PM</td><td>
</td><td>6/15/2022 11:03:03
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30987</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Buttom plate</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:19 PM</td><td> </td><td>6/15/2022
11:03:01 AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30996</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:36 PM</td><td> </td><td>6/15/2022
11:03:01 AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30997</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:38 PM</td><td> </td><td>6/15/2022
11:03:00 AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31014</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:21:05 PM</td><td> </td><td>6/15/2022
11:02:59 AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31016</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:21:08 PM</td><td> </td><td>6/15/2022
11:02:58 AM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31038</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:22:34 PM</td><td> </td><td>6/15/2022 11:02:57
AM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31049</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Box cover and label
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:22:50 PM</td><td> </td><td>6/15/2022 11:02:56
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31050</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Face plate for
fire</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:53 PM</td><td> </td><td>6/15/2022
11:02:56 AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31054</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire face
plate</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:59 PM</td><td> </td><td>6/15/2022
11:02:55 AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31055</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire face
plate</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:00 PM</td><td> </td><td>6/15/2022
11:02:54 AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31056</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire label</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:01 PM</td><td>
</td><td>6/15/2022 11:02:53
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31059</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover tray</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:05 PM</td><td> </td><td>6/15/2022
11:02:52 AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31076</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:32 PM</td><td> </td><td>6/15/2022
11:02:51 AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>31083</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:46 PM</td><td> </td><td>6/15/2022
11:02:50 AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31097</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:14 PM</td><td> </td><td>6/15/2022
11:02:50 AM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31106</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:22 PM</td><td> </td><td>6/15/2022
11:02:49 AM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31113</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:39 PM</td><td> </td><td>6/15/2022
11:02:48 AM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14686</td><td>Temple Garden-Band A</td><td>Temple
Garden</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Deformed/defected tiles to be
replaced</td><td>High</td><td>1/17/2021 12:00:00
AM</td><td>mohamed.sami</td><td>1/10/2021 2:31:00 PM</td><td> </td><td>6/15/2022
10:04:51 AM</td><td>&nbsp;</td><td>Band A</td><td>&nbsp;</td>
</tr><tr>
<td>18140</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Joints around electrical boxes need to
adjust </td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:56:29 AM</td><td> </td><td>6/15/2022
10:04:50 AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18143</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Close marked opening- hide electrical
cable</td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:56:36 AM</td><td> </td><td>6/15/2022
10:04:49 AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18165</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access doors should be seated and fixed
properly</td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:58:55 AM</td><td> </td><td>6/15/2022
10:04:48 AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18259</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>Ceiling</td><td>General Snag</td><td>&#39;All
MEP fixtures should be fixed properly (to be flashed with
ceiling)</td><td>Low</td><td>6/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/31/2021 4:11:04 PM</td><td> </td><td>6/15/2022
10:04:46 AM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18313</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Aluminum trim need to fixed properly
on glazing </td><td>Low</td><td>6/23/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/2/2021 11:39:56 AM</td><td> </td><td>6/15/2022
10:04:45 AM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18325</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gap should be closed
</td><td>Low</td><td>6/23/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/2/2021
11:40:17 AM</td><td> </td><td>6/15/2022 10:04:44
AM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19110</td><td>ESCAPE ROUTE - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/16/2021
10:54:03 AM</td><td> </td><td>6/15/2022 10:04:42
AM</td><td>&nbsp;</td><td>MQ.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19691</td><td>SCULPTURE ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Missing shelf </td><td>Low</td><td>7/14/2021 12:00:00
AM</td><td>mohamed.sami</td><td>7/7/2021 1:29:31 PM</td><td> </td><td>6/15/2022
10:04:41 AM</td><td>&nbsp;</td><td>MK.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>19716</td><td>PAINTING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Missing shelf </td><td>Low</td><td>7/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>7/7/2021 1:30:08 PM</td><td> </td><td>6/15/2022
10:04:40 AM</td><td>&nbsp;</td><td>MK.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19718</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Missing shelf </td><td>Low</td><td>7/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>7/7/2021 1:30:11 PM</td><td> </td><td>6/15/2022
10:04:39 AM</td><td>&nbsp;</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30112</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Shaft and pipes shall be cleaned.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:13 AM</td><td> </td><td>6/15/2022 8:46:28
AM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30399</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire pipe shall be cleaned and touchup
painting. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:32 PM</td><td> </td><td>6/15/2022 8:43:27
AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30400</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;HDPE pipe shall be cleaned.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:34 PM</td><td> </td><td>6/15/2022 8:42:38
AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30603</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing labels for PPR.
Pipes. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:31 AM</td><td> </td><td>6/15/2022 8:41:11
AM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>31139</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing labels for hydronic pipes.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:24 PM</td><td> </td><td>6/15/2022 8:28:39
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31351</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Condensation water not drained, drain point may be clogged.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:24 AM</td><td> </td><td>6/15/2022 8:27:13
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31392</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage door sealant need to be replaced.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:55:48 AM</td><td> </td><td>6/15/2022 8:24:59
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31421</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Pipes thermal insulation need repairs.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:50 AM</td><td> </td><td>6/15/2022 8:21:27
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31404</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:14 AM</td><td> </td><td>6/15/2022 8:19:23
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31395</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Thermal insulation need repairs. </td><td>High</td><td>6/9/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:55:55 AM</td><td>
</td><td>6/15/2022 8:17:32
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31388</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage duct thermal insulation. </td><td>High</td><td>6/9/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:55:40 AM</td><td>
</td><td>6/15/2022 8:14:56
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31802</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain pipes need cleaning. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:32:24 PM</td><td>
</td><td>6/15/2022 8:13:57
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31529</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Hoses are not connected.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:13 PM</td><td> </td><td>6/15/2022 8:07:14
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30402</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Thermal insulation need repairs.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:38 PM</td><td> </td><td>6/14/2022 5:29:53
PM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>16905</td><td>PAPYRUS-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Marked joints between floor and door should
be adjusted </td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/10/2021 1:02:01 PM</td><td> </td><td>6/14/2022 3:45:30
PM</td><td>&nbsp;</td><td>ME.12.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20082</td><td>TEXTILE-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Missing sealant under skirting
</td><td>Low</td><td>8/23/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:10 PM</td><td> </td><td>6/14/2022 3:44:07
PM</td><td>&nbsp;</td><td>ME.12.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>16913</td><td>TEXTILE-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Joints should be adjusted
</td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021
1:02:18 PM</td><td> </td><td>6/14/2022 3:42:51
PM</td><td>&nbsp;</td><td>ME.12.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>16895</td><td>WOOD-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Joints should be adjusted between floor and
door </td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/10/2021 1:01:42 PM</td><td> </td><td>6/14/2022 3:42:45
PM</td><td>&nbsp;</td><td>ME.12.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>16909</td><td>TEXTILE-Band A</td><td>MU
L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Opening should be closed </td><td>Low</td><td>3/31/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>3/10/2021 1:02:10 PM</td><td> </td><td>6/14/2022
3:41:35 PM</td><td>&nbsp;</td><td>ME.12.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20173</td><td>SERVICE DELIVERY-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>8/24/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/3/2021
3:38:01 PM</td><td> </td><td>6/14/2022 3:39:14
PM</td><td>&nbsp;</td><td>MQ.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20172</td><td>SERVICE DELIVERY-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joints should be closed and finished well
</td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/3/2021
3:37:59 PM</td><td> </td><td>6/14/2022 3:38:48
PM</td><td>&nbsp;</td><td>MQ.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>12072</td><td>SERVICE DELIVERY-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Flooring need to repair and painting sealer
</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
2:15:12 PM</td><td> </td><td>6/14/2022 3:37:33
PM</td><td>&nbsp;</td><td>MQ.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>12056</td><td>SERVICE DELIVERY-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall Painting need to touch up
</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
2:14:32 PM</td><td> </td><td>6/14/2022 3:36:17
PM</td><td>&nbsp;</td><td>MQ.18.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>20498</td><td>TEMP EXH STORAGE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Painting is missing for access door
</td><td>Low</td><td>8/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:37 PM</td><td> </td><td>6/14/2022 3:30:42
PM</td><td>&nbsp;</td><td>MT.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20494</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>8/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:32 PM</td><td> </td><td>6/14/2022 3:30:29
PM</td><td>&nbsp;</td><td>MQ.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>14971</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Patches/Touch up</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>2/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>1/19/2021
11:35:18 AM</td><td> </td><td>6/14/2022 3:29:57
PM</td><td>&nbsp;</td><td>MS.20.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>30114</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;No ventilation system detected in this
area. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:15 AM</td><td> </td><td>6/14/2022 3:22:44
PM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>9597</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Floor need cleaning
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:47:53 PM</td><td> </td><td>6/14/2022 3:19:43
PM</td><td>&nbsp;</td><td>MS.13.0G.008</td><td>&nbsp;</td>
</tr><tr>
<td>28277</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Distance between Two sprinklers
need to be reviewed. </td><td>Medium</td><td>4/29/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:47:14 AM</td><td> </td><td>6/14/2022 3:04:54
PM</td><td>&nbsp;</td><td>MS.18.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>31438</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage air duct thermal insulation.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:57:23 AM</td><td> </td><td>6/14/2022 2:57:01
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>20926</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Missing lighting fixtures and missing labels for fire alarm
system </td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>8/11/2021 11:51:01 AM</td><td> </td><td>6/14/2022 2:45:13
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20933</td><td>CORRIDOR</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;Cables
should be rested inside the tray and EMT conduits should be replaced by RGS where
this area is back of house ( exposed area)</td><td>High</td><td>8/18/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/11/2021 11:51:23 AM</td><td>
</td><td>6/14/2022 2:45:12
PM</td><td>&nbsp;</td><td>MS.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>27534</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Work not inspected and panels not delivered
yet</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:53 AM</td><td> </td><td>6/14/2022 2:45:11
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27748</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work electro power contractor
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:13 PM</td><td> </td><td>6/14/2022 2:45:10
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27750</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work and panel not delivered and
cables not secured </td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:17 PM</td><td> </td><td>6/14/2022 2:45:09
PM</td><td>&nbsp;</td><td>MS.14.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>27761</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Bad workmanship for electro power contractor
NCR should be issued </td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:39 PM</td><td> </td><td>6/14/2022 2:45:08
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>27765</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work and panel not delivered
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:47 PM</td><td> </td><td>6/14/2022 2:45:07
PM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27773</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;For electro power incomplete work and panels
not fixed and termination </td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/10/2022 12:22:59 PM</td><td>
</td><td>6/14/2022 2:45:07
PM</td><td>&nbsp;</td><td>MS.19.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>30309</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Provide fixation c clips for flexible EMT
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:30:13 PM</td><td> </td><td>6/14/2022 2:45:06
PM</td><td>&nbsp;</td><td>MS.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>30328</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:47 PM</td><td> </td><td>6/14/2022
2:45:05 PM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30333</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:53 PM</td><td> </td><td>6/14/2022
2:45:04 PM</td><td>&nbsp;</td><td>MA.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30336</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:56 PM</td><td> </td><td>6/14/2022
2:45:03 PM</td><td>&nbsp;</td><td>MA.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30338</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire label</td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:59 PM</td><td>
</td><td>6/14/2022 2:45:02
PM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30759</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;C clips and cover box
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:40:56 PM</td><td> </td><td>6/14/2022 2:45:01
PM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30768</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:41:20 PM</td><td> </td><td>6/14/2022
2:45:00 PM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30965</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:19:45 PM</td><td> </td><td>6/14/2022
2:44:59 PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>30970</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:19:54 PM</td><td> </td><td>6/14/2022
2:44:59 PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>30975</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:00 PM</td><td> </td><td>6/14/2022
2:44:57 PM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30977</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rod and support should be installed properly
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:20:04 PM</td><td> </td><td>6/14/2022 2:44:56
PM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30985</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Unused openings </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:15 PM</td><td> </td><td>6/14/2022
2:44:55 PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30993</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Not allow use electrostatic connection
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:20:30 PM</td><td> </td><td>6/14/2022 2:44:54
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30995</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Bottom plate</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:35 PM</td><td> </td><td>6/14/2022
2:44:53 PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31005</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth jumper </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:50 PM</td><td>
</td><td>6/14/2022 2:44:52
PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31018</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:21:11 PM</td><td> </td><td>6/14/2022
2:44:51 PM</td><td>&nbsp;</td><td>MR.14.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31023</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:21:21 PM</td><td> </td><td>6/14/2022
2:44:50 PM</td><td>&nbsp;</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>31027</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:21:28 PM</td><td> </td><td>6/14/2022 2:44:49
PM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>31030</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:21:34 PM</td><td> </td><td>6/14/2022
2:44:48 PM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31034</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;EMT flexible not installed properly and hole
of box</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:29 PM</td><td> </td><td>6/14/2022
2:44:47 PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31040</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unused box</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:37 PM</td><td>
</td><td>6/14/2022 2:44:46
PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31047</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:48 PM</td><td> </td><td>6/14/2022
2:44:45 PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31048</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Unused box</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:49 PM</td><td> </td><td>6/14/2022
2:44:44 PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31071</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Box label</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:25 PM</td><td>
</td><td>6/14/2022 2:44:43
PM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31077</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:23:33 PM</td><td> </td><td>6/14/2022 2:44:42
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>31084</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:49 PM</td><td> </td><td>6/14/2022
2:44:41 PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31098</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:15 PM</td><td> </td><td>6/14/2022
2:44:40 PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31099</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:16 PM</td><td> </td><td>6/14/2022
2:44:39 PM</td><td>&nbsp;</td><td>MA.19.02.015</td><td>&nbsp;</td>
</tr><tr>
<td>31100</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:17 PM</td><td> </td><td>6/14/2022
2:44:38 PM</td><td>&nbsp;</td><td>MA.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>31101</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:17 PM</td><td> </td><td>6/14/2022
2:44:37 PM</td><td>&nbsp;</td><td>MA.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31102</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:18 PM</td><td> </td><td>6/14/2022
2:44:36 PM</td><td>&nbsp;</td><td>MA.19.02.017</td><td>&nbsp;</td>
</tr><tr>
<td>31103</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:19 PM</td><td> </td><td>6/14/2022
2:44:35 PM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>31104</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:20 PM</td><td> </td><td>6/14/2022
2:44:34 PM</td><td>&nbsp;</td><td>MA.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31105</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:21 PM</td><td> </td><td>6/14/2022
2:44:33 PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>31107</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:24 PM</td><td> </td><td>6/14/2022
2:44:32 PM</td><td>&nbsp;</td><td>MQ.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31108</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:25 PM</td><td> </td><td>6/14/2022
2:44:31 PM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>31109</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:26 PM</td><td> </td><td>6/14/2022
2:44:30 PM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31110</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:27 PM</td><td> </td><td>6/14/2022
2:44:29 PM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31111</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:28 PM</td><td> </td><td>6/14/2022
2:44:28 PM</td><td>&nbsp;</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31112</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:29 PM</td><td> </td><td>6/14/2022
2:44:28 PM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31718</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Motorized damper support shall be adjusted.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:54:44 AM</td><td> </td><td>6/14/2022 2:30:39
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31853</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct support closing access door.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 11:57:40 AM</td><td> </td><td>6/14/2022 2:29:34
PM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>31449</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage duct thermal insulation. </td><td>High</td><td>6/9/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:57:56 AM</td><td>
</td><td>6/14/2022 2:26:54
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>21863</td><td>Transformers</td><td>EN GF
(Ventilation)</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Fuel system interface not finished</td><td>High</td><td>8/29/2021
12:00:00 AM</td><td>Kriton Katsamenis </td><td>8/22/2021 2:50:36 PM</td><td>
</td><td>6/14/2022 1:38:07
PM</td><td>&nbsp;</td><td>Transformers</td><td>&nbsp;</td>
</tr><tr>
<td>28724</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;AHU related hydronic
piping thermal insulation shall be repaired. </td><td>High</td><td>5/18/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/11/2022 11:46:04 AM</td><td>
</td><td>6/14/2022 11:21:46
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29002</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage and missing air duct insulation.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:09:45 PM</td><td> </td><td>6/14/2022 11:19:43
AM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>19953</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Air vent is clashing with duct and
strainer is over cable tray </td><td>High</td><td>8/5/2021 12:00:00
PM</td><td>ahmedsalem</td><td>7/29/2021 1:03:58 PM</td><td> </td><td>6/14/2022
11:07:19 AM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28920</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing insulation for air duct.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:30:51 PM</td><td> </td><td>6/14/2022 11:07:14
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28946</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Labels are missing
for hydronic pipes. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:46 PM</td><td> </td><td>6/14/2022 11:07:13
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29071</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;No thermal insulation adhesive applied
before installation of thermal insulation and stick pins shall be adjusted.
</td><td>High</td><td>5/25/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/18/2022 11:56:29 AM</td><td> </td><td>6/14/2022 11:07:09
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>31136</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>6/8/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:53:19 PM</td><td>
</td><td>6/14/2022 11:07:05
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31210</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage air duct thermal insulation.
</td><td>High</td><td>6/8/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:56:11 PM</td><td> </td><td>6/14/2022 11:07:04
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31218</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing labels for air ducts. </td><td>High</td><td>6/8/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:56:36 PM</td><td>
</td><td>6/14/2022 11:07:03
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31219</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Duct need to be supported and adjusted.
</td><td>High</td><td>6/8/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:56:39 PM</td><td> </td><td>6/14/2022 11:07:02
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31592</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Select around fire dampers shall be covered
with black steel sheets. </td><td>High</td><td>6/12/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/5/2022 11:53:09 AM</td><td>
</td><td>6/14/2022 11:07:01
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31594</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air ducts.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:12 AM</td><td> </td><td>6/14/2022 11:07:00
AM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31717</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Condensate drain pipes shall be ended with elbows.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:54:41 AM</td><td> </td><td>6/14/2022 11:06:58
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31744</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing gauges. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:37 AM</td><td>
</td><td>6/14/2022 11:06:57
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>17369</td><td>External North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Surface preparation for concrete base should to be flush
</td><td>Low</td><td>5/4/2021 12:00:00 PM</td><td>aymanhaddadin</td><td>4/13/2021
11:48:17 AM</td><td> </td><td>6/14/2022 10:50:18 AM</td><td>&nbsp;</td><td>External
North Fence</td><td>&nbsp;</td>
</tr><tr>
<td>17370</td><td>External North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Repair for concrete base painting </td><td>Low</td><td>5/4/2021
12:00:00 PM</td><td>aymanhaddadin</td><td>4/13/2021 11:48:19 AM</td><td>
</td><td>6/14/2022 10:50:17 AM</td><td>&nbsp;</td><td>External North
Fence</td><td>&nbsp;</td>
</tr><tr>
<td>17373</td><td>External North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Cleaning for metal accessories </td><td>Low</td><td>5/4/2021
12:00:00 PM</td><td>aymanhaddadin</td><td>4/13/2021 11:48:24 AM</td><td>
</td><td>6/14/2022 10:50:15 AM</td><td>&nbsp;</td><td>External North
Fence</td><td>&nbsp;</td>
</tr><tr>
<td>24768</td><td>External North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Surface preparation for concrete base along the
fence </td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/7/2021 11:31:18 AM</td><td> </td><td>6/14/2022 10:50:14
AM</td><td>&nbsp;</td><td>External North Fence</td><td>&nbsp;</td>
</tr><tr>

<td>26168</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>Glasbau-Hahn
GmbH Representative</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;glazing panel is missing and should be installed
</td><td>Low</td><td>3/8/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>2/15/2022
1:45:35 PM</td><td> </td><td>6/14/2022 10:50:11
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26235</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles should be adjusted
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
11:47:04 AM</td><td> </td><td>6/14/2022 10:50:10
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26253</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tiles should be replaced/ repaired
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:25:14 PM</td><td> </td><td>6/14/2022 10:50:09
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26263</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39; Broken tiles should be replaced/ repaired
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:25:25 PM</td><td> </td><td>6/14/2022 10:50:08
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26275</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be repaired/replaced
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:25:40 PM</td><td> </td><td>6/14/2022 10:50:07
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26352</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced.</td><td>Low</td><td>3/15/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022 3:29:16 PM</td><td>
</td><td>6/14/2022 10:50:06 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26382</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
11:21:44 AM</td><td> </td><td>6/14/2022 10:50:06
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26529</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
2:22:44 PM</td><td> </td><td>6/14/2022 10:50:05
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26540</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing Sealant around stainless steel columns
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
2:22:58 PM</td><td> </td><td>6/14/2022 10:50:04
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26543</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/17/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022 2:23:03 PM</td><td>
</td><td>6/14/2022 10:50:02 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26589</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/27/2022
3:12:02 PM</td><td> </td><td>6/14/2022 10:50:02
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26591</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/27/2022
3:12:06 PM</td><td> </td><td>6/14/2022 10:50:01
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26592</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/27/2022
3:12:09 PM</td><td> </td><td>6/14/2022 10:50:00
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26610</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/28/2022
11:12:24 AM</td><td> </td><td>6/14/2022 10:49:59
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26613</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
11:12:31 AM</td><td> </td><td>6/14/2022 10:49:58
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26618</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
11:12:39 AM</td><td> </td><td>6/14/2022 10:49:57
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26625</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
11:12:51 AM</td><td> </td><td>6/14/2022 10:49:56
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26658</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles </td><td>Low</td><td>3/22/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/1/2022 10:31:43 AM</td><td> </td><td>6/14/2022
10:49:53 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26664</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 10:31:54 AM</td><td>
</td><td>6/14/2022 10:49:52 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26667</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 11:01:34 AM</td><td>
</td><td>6/14/2022 10:49:51 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26668</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 11:01:35 AM</td><td>
</td><td>6/14/2022 10:49:50 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26678</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloration between stone tiles
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
11:04:09 AM</td><td> </td><td>6/14/2022 10:49:49
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26679</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
11:04:11 AM</td><td> </td><td>6/14/2022 10:49:49
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26716</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 3:05:14 PM</td><td>
</td><td>6/14/2022 10:49:48 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26718</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 3:05:18 PM</td><td>
</td><td>6/14/2022 10:49:46 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26719</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 3:05:20 PM</td><td>
</td><td>6/14/2022 10:49:46 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26720</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 3:05:23 PM</td><td>
</td><td>6/14/2022 10:49:44 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26721</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 3:05:25 PM</td><td>
</td><td>6/14/2022 10:49:43 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26745</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloration between stone tiles
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
3:45:51 PM</td><td> </td><td>6/14/2022 10:49:42
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26867</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
10:31:01 AM</td><td> </td><td>6/14/2022 10:49:41
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26893</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/23/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022 10:32:13 AM</td><td>
</td><td>6/14/2022 10:49:40 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26896</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles </td><td>Low</td><td>3/23/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/2/2022 10:32:18 AM</td><td> </td><td>6/14/2022
10:49:39 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26898</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>3/23/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022 10:32:22 AM</td><td>
</td><td>6/14/2022 10:49:38 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27100</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
11:08:31 AM</td><td> </td><td>6/14/2022 10:49:37
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27103</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
11:08:50 AM</td><td> </td><td>6/14/2022 10:49:36
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>27115</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/24/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/3/2022
11:09:11 AM</td><td> </td><td>6/14/2022 10:49:35
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27183</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
3:01:25 PM</td><td> </td><td>6/14/2022 10:49:35
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27188</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
3:01:35 PM</td><td> </td><td>6/14/2022 10:49:33
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27198</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
3:01:58 PM</td><td> </td><td>6/14/2022 10:49:32
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27216</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Cleaning and testing are required for all water feature
</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022
4:39:41 PM</td><td> </td><td>6/14/2022 10:49:32
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27231</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022
4:50:50 PM</td><td> </td><td>6/14/2022 10:49:31
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27239</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced
</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022
4:51:07 PM</td><td> </td><td>6/14/2022 10:49:29
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27255</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;Joint of beam should be flushed </td><td>Low</td><td>3/27/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:51:40 PM</td><td>
</td><td>6/14/2022 10:49:28 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>29885</td><td>STAFF W.C. CLEANERS STORE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinkler deflector has putty.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:52 PM</td><td> </td><td>6/14/2022 8:55:13
AM</td><td>&nbsp;</td><td>MW.19.2A.001D</td><td>&nbsp;</td>
</tr><tr>
<td>29211</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing insulation.
</td><td>High</td><td>5/29/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:43 AM</td><td> </td><td>6/14/2022 8:35:43
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>31606</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Thermal insulation need repairs.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:33 AM</td><td> </td><td>6/14/2022 8:29:14
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31621</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Thermal insulation around access doors.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:54:01 AM</td><td> </td><td>6/14/2022 8:28:07
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31190</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage duct thermal insulation. </td><td>High</td><td>6/8/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:55:16 PM</td><td>
</td><td>6/14/2022 8:19:51
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31758</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air duct holes. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:56:04 AM</td><td>
</td><td>6/14/2022 8:17:36
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31848</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing valves handles for drain valves.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 11:57:31 AM</td><td> </td><td>6/14/2022 8:15:04
AM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>10570</td><td>TUT- SERVICES (RISER)</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Fire collars around HDPE
pipes</td><td>High</td><td>9/20/2020 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>9/13/2020 11:36:09 AM</td><td> </td><td>6/14/2022 8:12:37
AM</td><td>&nbsp;</td><td>MS.18.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>30128</td><td>ADMIN</td><td>MU L20</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Grout is missing for marked part </td><td>Low</td><td>6/20/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022 11:37:31 AM</td><td>
</td><td>6/13/2022 4:47:26
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>28232</td><td>CURATOR</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Wall - Skirting</td><td>Other
Snag</td><td>&#39;Skirting should be leveled and uniform
</td><td>Low</td><td>4/10/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/20/2022
12:04:36 PM</td><td> </td><td>6/13/2022 4:46:28
PM</td><td>&nbsp;</td><td>MA.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28231</td><td>CURATOR</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Carpet Floor</td><td>General
Snag</td><td>&#39;Carpet should be adjusted </td><td>Low</td><td>4/10/2022 12:00:00
PM</td><td>mohamed.sami</td><td>3/20/2022 12:04:33 PM</td><td> </td><td>6/13/2022
4:45:49 PM</td><td>&nbsp;</td><td>MA.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28004</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Gaps around access should be closed </td><td>Low</td><td>4/4/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/14/2022 11:38:38 AM</td><td>
</td><td>6/13/2022 4:44:51
PM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>21495</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor needs touch up paint
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/18/2021
2:12:37 PM</td><td> </td><td>6/13/2022 4:38:45
PM</td><td>&nbsp;</td><td>MS.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>14334</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Flooring need repair and touch up
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:23:32 PM</td><td> </td><td>6/13/2022 4:37:48
PM</td><td>&nbsp;</td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18032</td><td>CORRIDOR- Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Doors</
td><td>General Snag</td><td>&#39;Glass door is not installed yet
</td><td>Low</td><td>6/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/25/2021
12:38:23 PM</td><td> </td><td>6/13/2022 4:36:39
PM</td><td>&nbsp;</td><td>MS.12.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>14363</td><td>B.O.H-SERVICE TUNNEL (B) - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need repainrt for dust sealer /expansion joints to be
coverd</td><td>High</td><td>12/31/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:40 PM</td><td> </td><td>6/13/2022 4:35:30
PM</td><td>&nbsp;</td><td>MQ.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31475</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Tape should be removed </td><td>Low</td><td>6/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/2/2022 3:24:43 PM</td><td> </td><td>6/13/2022
4:34:42 PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28745</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint Floor</td><td>General
Snag</td><td>&#39;Repair is needed for marked parts </td><td>Low</td><td>6/1/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022 11:48:02 AM</td><td>
</td><td>6/13/2022 4:34:09
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31157</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing insulation straps. </td><td>High</td><td>6/8/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:53:52 PM</td><td>
</td><td>6/13/2022 4:23:54
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31159</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage and missing thermal insulation.
</td><td>High</td><td>6/8/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:56 PM</td><td> </td><td>6/13/2022 4:23:53
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31893</td><td>CORE D3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:25:16 PM</td><td> </td><td>6/13/2022 4:19:53
PM</td><td>&nbsp;</td><td>MC.13.02.D31</td><td>&nbsp;</td>
</tr><tr>
<td>30801</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove tape from air terminals.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:28 PM</td><td> </td><td>6/13/2022 4:18:51
PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31834</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing labels for insulated pipes.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:33:21 PM</td><td> </td><td>6/13/2022 4:17:37
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>21632</td><td>CORE D3</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing around metal door
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
11:24:21 AM</td><td> </td><td>6/13/2022 4:14:44
PM</td><td>&nbsp;</td><td>MC.13.01.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21529</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>Installation not to specification/drawing</td><td>&#39;Need collar
around HDPE pipe </td><td>High</td><td>8/25/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/18/2021 4:16:14 PM</td><td> </td><td>6/13/2022
4:14:14 PM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>21762</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire collar around HDPE pipe
</td><td>High</td><td>8/26/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/19/2021
11:47:37 AM</td><td> </td><td>6/13/2022 4:13:38
PM</td><td>&nbsp;</td><td>MS.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20481</td><td>TEMP EXH STORAGE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>8/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:20 PM</td><td> </td><td>6/13/2022 4:12:05
PM</td><td>&nbsp;</td><td>MT.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>14457</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Civil work incomplete around duct
openng</td><td>High</td><td>1/2/2021 12:00:00
PM</td><td>ahmedsalem</td><td>12/26/2020 11:39:47 AM</td><td> </td><td>6/13/2022
4:10:47 PM</td><td>&nbsp;</td><td>MS.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>20895</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door is defective
</td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/11/2021
11:48:01 AM</td><td> </td><td>6/13/2022 4:10:46
PM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>28684</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing cladding for air ducts. </td><td>High</td><td>5/17/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:41:56 PM</td><td>
</td><td>6/13/2022 4:10:45
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>30003</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Damage thermal
insulation for hot water pipes. </td><td>High</td><td>6/2/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/26/2022 3:43:41 PM</td><td>
</td><td>6/13/2022 4:10:44
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30007</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Condensation around
valve, insulation shall be added to prevent it. </td><td>High</td><td>6/2/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/26/2022 3:43:48 PM</td><td>
</td><td>6/13/2022 4:10:43
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30020</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Drain pipes need to be
cleaned. </td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:31 AM</td><td> </td><td>6/13/2022 4:10:42
PM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>30163</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;PPR pipes need supports.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:13 AM</td><td> </td><td>6/13/2022 4:10:41
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30172</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Pipes and valves
shall be cleaned. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:22 AM</td><td> </td><td>6/13/2022 4:10:40
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>31169</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage hydronic thermal insulation.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:54:26 PM</td><td> </td><td>6/13/2022 4:10:37
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31178</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage air duct thermal insulation need repairs.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:54:48 PM</td><td> </td><td>6/13/2022 4:10:36
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>20177</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up for concrete flooring
</td><td>Low</td><td>8/24/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/3/2021
3:38:11 PM</td><td> </td><td>6/13/2022 4:10:36
PM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>31328</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;RAD not insulated. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:53:35 AM</td><td>
</td><td>6/13/2022 4:10:35
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31588</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Sprinklers distance from ceiling shall be checked.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:02 AM</td><td> </td><td>6/13/2022 4:10:34
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31597</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Air duct insulation shall be repaired.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:18 AM</td><td> </td><td>6/13/2022 4:10:33
PM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31598</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for chilled water pipes.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:19 AM</td><td> </td><td>6/13/2022 4:10:33
PM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31600</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Chilled water pipes insulation shall be
repaired. </td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:23 AM</td><td> </td><td>6/13/2022 4:10:31
PM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31646</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Chilled water pipes need repairs.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:22 PM</td><td> </td><td>6/13/2022 4:10:30
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31654</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Chilled water pipes shall be repaired.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:36 PM</td><td> </td><td>6/13/2022 4:10:29
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31667</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Insulation for air ducts need repairs.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:02 PM</td><td> </td><td>6/13/2022 4:10:28
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31671</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Chilled water pipes insulation.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:11 PM</td><td> </td><td>6/13/2022 4:10:27
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31794</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Clean out located over cable tray and cable trunk.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:11 PM</td><td> </td><td>6/13/2022 4:10:25
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31885</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing seismic wire for fire pipe.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:25:02 PM</td><td> </td><td>6/13/2022 4:10:23
PM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>31889</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage floor drain cover.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:25:09 PM</td><td> </td><td>6/13/2022 4:10:21
PM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>20074</td><td>JEWELLERY-Band A</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Damaged parts should be repaired
</td><td>Low</td><td>8/23/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:03 PM</td><td> </td><td>6/13/2022 4:09:54
PM</td><td>&nbsp;</td><td>ME.12.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20070</td><td>POTTERY-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Sealant is missing at marked joint
</td><td>Low</td><td>8/23/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/2/2021
4:14:58 PM</td><td> </td><td>6/13/2022 4:09:07
PM</td><td>&nbsp;</td><td>ME.12.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>18348</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Painting is missing
</td><td>Low</td><td>6/23/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>6/2/2021
2:35:53 PM</td><td> </td><td>6/13/2022 4:08:15
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16860</td><td>WC CLEANERS STORE-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around door should be adjusted
</td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021
1:00:33 PM</td><td> </td><td>6/13/2022 4:07:13
PM</td><td>&nbsp;</td><td>MW.13.01.001D</td><td>&nbsp;</td>
</tr><tr>
<td>16859</td><td>WC /DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Floor Tile</td><td>Grouting quality</td><td>&#39;Grouting is missing
</td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021
1:00:31 PM</td><td> </td><td>6/13/2022 4:06:45
PM</td><td>&nbsp;</td><td>MW.13.01.001C</td><td>&nbsp;</td>
</tr><tr>
<td>16844</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Mirrors</td><td>General
Snag</td><td>&#39;Sealant around mirrors should be adjusted
</td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021
12:59:59 PM</td><td> </td><td>6/13/2022 4:06:00
PM</td><td>&nbsp;</td><td>MW.13.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>16832</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Mirrors</td><td>General
Snag</td><td>&#39;Sealant around mirror should be adjusted
</td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/10/2021
12:59:32 PM</td><td> </td><td>6/13/2022 4:05:29
PM</td><td>&nbsp;</td><td>MW.13.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>12093</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Touch up for wall painting
</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
2:16:24 PM</td><td> </td><td>6/13/2022 4:04:18
PM</td><td>&nbsp;</td><td>MS.17.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>13177</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Stone tiles need properly fixation
</td><td>High</td><td>11/10/2020 12:00:00 PM</td><td>sally.george</td><td>11/3/2020
4:36:28 PM</td><td> </td><td>6/13/2022 3:54:00 PM</td><td> Rectified by
HAZ</td><td>Level +46.50</td><td>&nbsp;</td>
</tr><tr>
<td>13143</td><td>Level +46.50</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Grouting joints needs adjustment
</td><td>High</td><td>11/10/2020 12:00:00 PM</td><td>sally.george</td><td>11/3/2020
4:35:10 PM</td><td> </td><td>6/13/2022 3:53:28 PM</td><td>Comment not valid
anymore</td><td>Level +46.50</td><td>&nbsp;</td>
</tr><tr>
<td>31878</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Fire pipes need cleaning and touchup
paintings. </td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:49 PM</td><td> </td><td>6/13/2022 1:49:17
PM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>31886</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;INERGEN pipes need cleaning and touchup
paintings. </td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:25:04 PM</td><td> </td><td>6/13/2022 1:45:31
PM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>31888</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Fire pipes need cleaning and touchup
paintings. </td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:25:07 PM</td><td> </td><td>6/13/2022 1:40:16
PM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>11965</td><td>IT-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Electrical</td><td>Earthing
System</td><td>Earth Conductor</td><td>&#39;Work not finished yet
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
11:26:30 AM</td><td> </td><td>6/13/2022 1:26:58
PM</td><td>&nbsp;</td><td>MS.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>11970</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Electrical</td><td>Earthing
System</td><td>General Snag</td><td>&#39;Earth jumper of earthing has not installed
yet </td><td>High</td><td>10/8/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/1/2020 11:26:38 AM</td><td> </td><td>6/13/2022 1:26:56
PM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>11973</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Electrical</td><td>Earthing
System</td><td>General Snag</td><td>&#39;Earth jumper of earthing has not installed
yet </td><td>High</td><td>10/8/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/1/2020 11:26:45 AM</td><td> </td><td>6/13/2022 1:26:55
PM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>14894</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Missing work
</td><td>High</td><td>1/25/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>1/18/2021 3:26:18 PM</td><td> </td><td>6/13/2022 1:26:54
PM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>16945</td><td>ELEC. ROOM-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>General Snag</td><td>&#39;Missing work/ cables not terminated
</td><td>High</td><td>3/18/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>3/11/2021 11:40:46 AM</td><td> </td><td>6/13/2022 1:26:52
PM</td><td>&nbsp;</td><td>MS.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16952</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>General Snag</td><td>&#39;Missing work ( glass ) fire
telephone</td><td>High</td><td>3/18/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>3/11/2021 11:40:56 AM</td><td> </td><td>6/13/2022 1:26:51
PM</td><td>&nbsp;</td><td>ME.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20661</td><td>STORE</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>8/17/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/10/2021 11:17:48 AM</td><td> </td><td>6/13/2022 1:26:50
PM</td><td>&nbsp;</td><td>MT.14.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20668</td><td>TEMP EXHIBITION CURATOR</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>8/17/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/10/2021 11:18:20 AM</td><td> </td><td>6/13/2022 1:26:49
PM</td><td>&nbsp;</td><td>MT.14.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20670</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>8/17/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/10/2021 11:18:32 AM</td><td> </td><td>6/13/2022 1:26:49
PM</td><td>&nbsp;</td><td>MQ.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20925</td><td>TEMP EXH STORAGE</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Missing lighting switches</td><td>High</td><td>8/18/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/11/2021 11:50:59 AM</td><td>
</td><td>6/13/2022 1:26:47
PM</td><td>&nbsp;</td><td>MT.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20941</td><td>W.C. /F</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>General Snag</td><td>&#39;Missing raceway and cables not terminated
yet</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:37 AM</td><td> </td><td>6/13/2022 1:26:44
PM</td><td>&nbsp;</td><td>MW.14.01.002A</td><td>&nbsp;</td>
</tr><tr>
<td>20942</td><td>IT 3</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Missing labels and panel schedule should be
updated</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>8/11/2021 11:51:39 AM</td><td> </td><td>6/13/2022 1:26:43
PM</td><td>&nbsp;</td><td>MS.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20943</td><td>W.C. /F</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Missing tag number</td><td>High</td><td>8/18/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/11/2021 11:51:41 AM</td><td>
</td><td>6/13/2022 1:26:42
PM</td><td>&nbsp;</td><td>MW.14.01.002A</td><td>&nbsp;</td>
</tr><tr>
<td>21736</td><td>TEMP EXHIBITION CURATOR</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;Missing fire fighting
panel for pre action system</td><td>High</td><td>8/26/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/19/2021 11:46:27 AM</td><td> </td><td>6/13/2022
1:26:41 PM</td><td>&nbsp;</td><td>MT.14.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>30278</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:27 PM</td><td> </td><td>6/13/2022
1:26:39 PM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>30279</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:28 PM</td><td> </td><td>6/13/2022
1:26:38 PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30280</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:30 PM</td><td> </td><td>6/13/2022
1:26:37 PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30283</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:34 PM</td><td> </td><td>6/13/2022
1:26:37 PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30290</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing work must be completed </td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:44 PM</td><td>
</td><td>6/13/2022 1:26:36
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30292</td><td>AHU</td><td>MU
L20</td><td>Closed</td><td>Egyptian Industrial System (EIS)</td><td>MEP-
Electrical</td><td>General Snag</td><td>General Snag</td><td>&#39;Main cable should
be installed at disconnect point </td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:47 PM</td><td> </td><td>6/13/2022
1:26:35 PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30293</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Disconnect label</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:49 PM</td><td> </td><td>6/13/2022
1:26:34 PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30294</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Unused openings </td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:50 PM</td><td> </td><td>6/13/2022
1:26:33 PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30295</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;C clips should be installed properly
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:29:52 PM</td><td> </td><td>6/13/2022 1:26:32
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30296</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Must be aligned </td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:53 PM</td><td> </td><td>6/13/2022
1:26:31 PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30297</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Earth jumper </td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:55 PM</td><td> </td><td>6/13/2022
1:26:30 PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30300</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:00 PM</td><td> </td><td>6/13/2022
1:26:27 PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30302</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:03 PM</td><td> </td><td>6/13/2022
1:26:26 PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30306</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cables should be laid on trunk</td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:30:09 PM</td><td>
</td><td>6/13/2022 1:26:25
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30342</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Should be
covered</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:05 PM</td><td> </td><td>6/13/2022
1:26:23 PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30724</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover and hole should be closed</td><td>High</td><td>6/7/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022 4:38:21 PM</td><td>
</td><td>6/13/2022 1:26:23
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30726</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Label</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:38:25 PM</td><td> </td><td>6/13/2022
1:26:22 PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30733</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Tag should be installed </td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:38:42 PM</td><td> </td><td>6/13/2022
1:26:21 PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30735</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work</td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/31/2022 4:38:55 PM</td><td> </td><td>6/13/2022
1:26:20 PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30748</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag has to been installed
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:39:59 PM</td><td> </td><td>6/13/2022 1:26:18
PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30761</td><td>B.O.H-ARTEFACTS TUNNEL - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;C clips should be installed properly
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/31/2022
4:41:01 PM</td><td> </td><td>6/13/2022 1:26:15
PM</td><td>&nbsp;</td><td>MQ.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30961</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label and cover
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:19:38 PM</td><td> </td><td>6/13/2022 1:26:12
PM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>30963</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tag of disconnect
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:19:43 PM</td><td> </td><td>6/13/2022 1:26:11
PM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>30979</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:07 PM</td><td> </td><td>6/13/2022
1:26:10 PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30990</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Unused hole of box</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:24 PM</td><td> </td><td>6/13/2022
1:26:09 PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30991</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;EMT flexible should install properly
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:20:26 PM</td><td> </td><td>6/13/2022 1:26:08
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30994</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover and label of box</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:32 PM</td><td> </td><td>6/13/2022
1:26:07 PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30998</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Screws should be properly installed
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:20:39 PM</td><td> </td><td>6/13/2022 1:26:04
PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30999</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:40 PM</td><td> </td><td>6/13/2022
1:26:04 PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31000</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover boxs</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:42 PM</td><td>
</td><td>6/13/2022 1:26:03
PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31004</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth jumper </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:20:48 PM</td><td>
</td><td>6/13/2022 1:26:02
PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31011</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rod should be alignment
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:20:59 PM</td><td> </td><td>6/13/2022 1:25:59
PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>31017</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:21:10 PM</td><td> </td><td>6/13/2022 1:25:57
PM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31026</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:21:25 PM</td><td> </td><td>6/13/2022 1:25:56
PM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>31031</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Face plate</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:25 PM</td><td>
</td><td>6/13/2022 1:25:55
PM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31035</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:22:30 PM</td><td> </td><td>6/13/2022 1:25:54
PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31041</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:22:38 PM</td><td> </td><td>6/13/2022 1:25:53
PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31042</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth and
cover</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:40 PM</td><td> </td><td>6/13/2022
1:25:53 PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31045</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:22:44 PM</td><td> </td><td>6/13/2022 1:25:52
PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31062</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Box label</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:11 PM</td><td>
</td><td>6/13/2022 1:25:50
PM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31064</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover box</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:13 PM</td><td>
</td><td>6/13/2022 1:25:49
PM</td><td>&nbsp;</td><td>MS.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31068</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Disconnect tag</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:21 PM</td><td>
</td><td>6/13/2022 1:25:48
PM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31074</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:23:30 PM</td><td> </td><td>6/13/2022 1:25:47
PM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31089</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:59 PM</td><td> </td><td>6/13/2022
1:25:45 PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31091</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Holes</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:03 PM</td><td> </td><td>6/13/2022
1:25:44 PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31094</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:09 PM</td><td> </td><td>6/13/2022
1:25:43 PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31095</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:11 PM</td><td> </td><td>6/13/2022
1:25:42 PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31746</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>CABLE LADDER</td><td>Alignment and Level not
followed</td><td>&#39;Internal lighting not working.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:55:42 AM</td><td> </td><td>6/13/2022 1:25:41
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31786</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing battery.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:31:57 PM</td><td> </td><td>6/13/2022 1:25:38
PM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>25892</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked parts should be leveled
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
11:59:40 AM</td><td> </td><td>6/13/2022 1:10:49
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25898</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked part should be smooth and
finished properly </td><td>Low</td><td>2/13/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/23/2022 11:59:51 AM</td><td> </td><td>6/13/2022
1:10:48 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25899</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;The distance between plates and
stainless should be the same </td><td>Low</td><td>2/13/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/23/2022 11:59:53 AM</td><td> </td><td>6/13/2022
1:10:47 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25900</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Gasket should be seated properly
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
11:59:55 AM</td><td> </td><td>6/13/2022 1:10:46
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25903</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Stainless copping should be adjusted
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
12:00:02 PM</td><td> </td><td>6/13/2022 1:10:44
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25938</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Gasket shoe seated properly along
handrail </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 10:42:46 AM</td><td> </td><td>6/13/2022
1:10:43 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>9504</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 8 B - discoloring between tiles/ need
cleaning / joints not aligned between tiles / damaged edges/ enter face joint
irregular </td><td>Low</td><td>8/2/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>7/12/2020 12:15:21 PM</td><td> </td><td>6/13/2022 12:52:53
PM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>18130</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Cracks at gypsum board
</td><td>Low</td><td>6/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021
11:55:59 AM</td><td> </td><td>6/13/2022 12:52:47
PM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18161</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Marked Gaps around speakers should be
closed </td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:58:49 AM</td><td> </td><td>6/13/2022
12:52:46 PM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18164</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Toothing in marked part should be adjusted
</td><td>Low</td><td>6/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021
11:58:54 AM</td><td> </td><td>6/13/2022 12:52:45
PM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18260</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling edge should be aligned </td><td>Low</td><td>6/21/2021
12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021 4:11:06 PM</td><td>
</td><td>6/13/2022 12:52:44
PM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18320</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gypsum board is not aligned with stone
cladding </td><td>Low</td><td>6/23/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/2/2021 11:40:09 AM</td><td> </td><td>6/13/2022
12:52:43 PM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18331</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Joints between stainless steel frame and
stone cladding are not aligned </td><td>Low</td><td>6/23/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/2/2021 11:40:34 AM</td><td> </td><td>6/13/2022
12:52:42 PM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18642</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Discoloring leaping </td><td>Low</td><td>6/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/9/2021 4:22:42 PM</td><td> </td><td>6/13/2022
12:52:41 PM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18653</td><td>KITCHEN - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Damaged</td><td>&#39;Gap
between cover and drawer</td><td>Low</td><td>6/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/9/2021 4:23:05 PM</td><td> </td><td>6/13/2022
12:52:40 PM</td><td>&nbsp;</td><td>MS.18.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>18654</td><td>KITCHEN - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Damaged</
td><td>&#39;Damaged drawers </td><td>Low</td><td>6/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/9/2021 4:23:08 PM</td><td> </td><td>6/13/2022
12:52:39 PM</td><td>&nbsp;</td><td>MS.18.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>18656</td><td>KITCHEN - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Different color at leaping </td><td>Low</td><td>6/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/9/2021 4:23:12 PM</td><td> </td><td>6/13/2022
12:52:37 PM</td><td>&nbsp;</td><td>MS.18.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>18657</td><td>KITCHEN - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Gap between horizontal shelf and vertical support
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:23:13 PM</td><td> </td><td>6/13/2022 12:52:36
PM</td><td>&nbsp;</td><td>MS.18.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>18658</td><td>KITCHEN - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Leaf is not flush </td><td>Low</td><td>6/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/9/2021 4:23:15 PM</td><td> </td><td>6/13/2022
12:52:35 PM</td><td>&nbsp;</td><td>MS.18.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>18659</td><td>KITCHEN - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Scratched shelfs </td><td>Low</td><td>6/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/9/2021 4:23:18 PM</td><td> </td><td>6/13/2022
12:52:34 PM</td><td>&nbsp;</td><td>MS.18.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>19083</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air gap not leveled on gypsum wall
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/16/2021
10:53:16 AM</td><td> </td><td>6/13/2022 12:52:33
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19084</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Access door not leveled
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/16/2021
10:53:17 AM</td><td> </td><td>6/13/2022 12:52:32
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19086</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Electrical outlets alignment/loosely fixed</td><td>&#39;Missing
lighting fixtures </td><td>Low</td><td>7/7/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/16/2021 10:53:19 AM</td><td> </td><td>6/13/2022
12:52:31 PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19563</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Damaged</td><td>&#39;Unit
not leveled vertically with block wall </td><td>Low</td><td>7/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:25:28 PM</td><td> </td><td>6/13/2022
12:52:29 PM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19565</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Damaged</
td><td>&#39;Damaged shelves should be rectified </td><td>Low</td><td>7/21/2021
12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021 1:25:31 PM</td><td>
</td><td>6/13/2022 12:52:28
PM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19566</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Damaged</
td><td>&#39;Damaged wooden leaf </td><td>Low</td><td>7/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:25:32 PM</td><td> </td><td>6/13/2022
12:52:27 PM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19567</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Shortage shelves </td><td>Low</td><td>7/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:25:34 PM</td><td> </td><td>6/13/2022
12:52:26 PM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19571</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Irregular gap should be same width
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:39 PM</td><td> </td><td>6/13/2022 12:52:24
PM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19614</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wrong cutting for air gap
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:26:40 PM</td><td> </td><td>6/13/2022 12:52:24
PM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>23770</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Marked part should be fixed
properly </td><td>Low</td><td>11/4/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>10/14/2021 3:46:49 PM</td><td> </td><td>6/13/2022 12:52:22
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23774</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39;Gaps around false ceiling should be adjusted
</td><td>Low</td><td>11/4/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/14/2021 3:46:56 PM</td><td> </td><td>6/13/2022 12:52:21
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23776</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39;Metal trim around false ceiling and gaps should be adjusted
</td><td>Low</td><td>11/4/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/14/2021 3:46:59 PM</td><td> </td><td>6/13/2022 12:52:20
PM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>

<td>24098</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Acciona</
td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Incomplete
work </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:41:03 PM</td><td> </td><td>6/13/2022 12:52:19
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25530</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken louver should be replaced
</td><td>Low</td><td>12/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:52:53 PM</td><td> </td><td>6/13/2022 12:52:13 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25541</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone cover of access door should be finished
</td><td>Low</td><td>12/16/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:57:23 PM</td><td> </td><td>6/13/2022 12:52:12
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25542</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Joint between stone flooring and plates should
be regular for both sides </td><td>Low</td><td>12/16/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:57:25 PM</td><td> </td><td>6/13/2022
12:52:11 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25547</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Remaining mortar between stone steps should be removed
</td><td>Low</td><td>12/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:57:36 PM</td><td> </td><td>6/13/2022 12:52:09 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25557</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Chipped edges should be trimmed
</td><td>Low</td><td>12/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:57:58 PM</td><td> </td><td>6/13/2022 12:52:07 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25564</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Remaining mortar between stone steps should be removed
</td><td>Low</td><td>12/16/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/9/2021
12:58:13 PM</td><td> </td><td>6/13/2022 12:52:06 PM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25628</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Interface between stone cladding and stair
should be regular </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:52:19 AM</td><td> </td><td>6/13/2022
12:52:02 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25630</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked joints and edges should be adjusted
</td><td>Low</td><td>1/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:52:20 AM</td><td> </td><td>6/13/2022 12:51:59
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25634</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>1/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/14/2021
10:52:24 AM</td><td> </td><td>6/13/2022 12:51:58
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25655</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Repair
for stone stair edges should be finished </td><td>Low</td><td>12/21/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:52:53 AM</td><td> </td><td>6/13/2022
12:51:54 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25657</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Repair
for stone stair edges should be finished </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:52:56 AM</td><td> </td><td>6/13/2022
12:51:53 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25659</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Repair
for stone stair edges should be finished </td><td>Low</td><td>12/21/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:53:00 AM</td><td> </td><td>6/13/2022
12:51:52 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25663</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Repair
for stone stair edges should be finished </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:53:08 AM</td><td> </td><td>6/13/2022
12:51:51 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25708</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Sealant between stone skirting and stainless
steel should be unified </td><td>Low</td><td>12/22/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/15/2021 1:49:59 PM</td><td> </td><td>6/13/2022
12:51:49 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25710</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing sealant between stone slides and
travelator should be completed </td><td>Low</td><td>12/22/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/15/2021 1:50:06 PM</td><td> </td><td>6/13/2022
12:51:48 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25717</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing sealant between stone slides and
travelator should be completed </td><td>Low</td><td>12/22/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/15/2021 1:50:20 PM</td><td> </td><td>6/13/2022
12:51:47 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25721</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Sealant between stone skirting and stainless
steel should be unified </td><td>Low</td><td>12/22/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/15/2021 1:50:29 PM</td><td> </td><td>6/13/2022
12:51:46 PM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25722</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing sealant between stone slides and
travelator should be completed </td><td>Low</td><td>12/22/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/15/2021 1:50:32 PM</td><td> </td><td>6/13/2022
12:51:45 PM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25875</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Short tiles should be extended
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
11:59:05 AM</td><td> </td><td>6/13/2022 12:51:44
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25885</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Repair should be finished properly
</td><td>Low</td><td>2/13/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/23/2022
11:59:25 AM</td><td> </td><td>6/13/2022 12:51:42
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25891</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
11:59:38 AM</td><td> </td><td>6/13/2022 12:51:40 PM</td><td>Repaired not replaced
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25910</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unequal gap width between stone steps
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
12:08:31 PM</td><td> </td><td>6/13/2022 12:51:39
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25912</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges should be repaired for all stone steps </td><td>Low</td><td>2/13/2022
12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022 12:08:44 PM</td><td>
</td><td>6/13/2022 12:51:38 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25915</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;
Broken tiles should be replaced </td><td>Low</td><td>2/13/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/23/2022 12:09:01 PM</td><td> </td><td>6/13/2022
12:51:37 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25917</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Remove
existing grout for marked joint </td><td>Low</td><td>2/13/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/23/2022 12:09:19 PM</td><td> </td><td>6/13/2022
12:51:36 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25918</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges should be repaired</td><td>Low</td><td>2/13/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/23/2022 12:09:22 PM</td><td> </td><td>6/13/2022
12:51:34 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25921</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges should be repaired </td><td>Low</td><td>2/13/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/23/2022 12:09:38 PM</td><td> </td><td>6/13/2022
12:51:33 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25929</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked rod should be removed
</td><td>Low</td><td>2/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022
10:42:32 AM</td><td> </td><td>6/13/2022 12:51:31
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25933</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>2/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022
10:42:37 AM</td><td> </td><td>6/13/2022 12:51:30
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25935</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Short step should be extended
</td><td>Low</td><td>2/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022
10:42:41 AM</td><td> </td><td>6/13/2022 12:51:29
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25944</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Bottom
chipped edges should be repaired </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 10:46:12 AM</td><td> </td><td>6/13/2022
12:51:26 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25945</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
edges should be repaired </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 10:46:13 AM</td><td> </td><td>6/13/2022
12:51:25 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25957</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Unilex Sign
Systems</td><td>Architectural</td><td>Signage</td><td>damaged</td><td>&#39;Crack
should be repaired </td><td>Low</td><td>2/14/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/24/2022 12:07:53 PM</td><td> </td><td>6/13/2022
12:51:24 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25958</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Unilex Sign
Systems</td><td>Architectural</td><td>Signage</td><td>Not
Installed/Completed</td><td>&#39;Toothing between Marked parts should be leveled
and adjusted </td><td>Low</td><td>2/14/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/24/2022 12:07:55 PM</td><td> </td><td>6/13/2022
12:51:23 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25960</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Short tiles around signage should be
extended </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 12:07:59 PM</td><td> </td><td>6/13/2022
12:51:22 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25967</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>Low</td><td>2/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022
12:08:11 PM</td><td> </td><td>6/13/2022 12:51:20
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25971</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Gap between stone flooring and cladding should
be sealed </td><td>Low</td><td>2/14/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/24/2022 12:10:20 PM</td><td> </td><td>6/13/2022
12:51:19 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25972</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Cutting of stone flooring beside sliding doors
should be aligned </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 12:10:23 PM</td><td> </td><td>6/13/2022
12:51:18 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25973</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>2/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022
12:10:25 PM</td><td> </td><td>6/13/2022 12:51:17
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25974</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing grouting for marked joints
</td><td>Low</td><td>2/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022
12:10:27 PM</td><td> </td><td>6/13/2022 12:51:16
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25976</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Joints
width between stone steps should be regular </td><td>Low</td><td>1/31/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 12:10:31 PM</td><td> </td><td>6/13/2022
12:51:14 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25977</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Bottom
chipped edges of stone steps should be repaired </td><td>Low</td><td>1/31/2022
12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022 12:10:33 PM</td><td>
</td><td>6/13/2022 12:51:13 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25978</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges should be repaired </td><td>Low</td><td>1/31/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 12:10:35 PM</td><td> </td><td>6/13/2022
12:51:12 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25980</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 12:10:39 PM</td><td> </td><td>6/13/2022
12:51:11 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25981</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Joints
width between stone steps should be regular </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 12:10:41 PM</td><td> </td><td>6/13/2022
12:51:10 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25982</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Bottom
chipped edges of stone steps should be repaired </td><td>Low</td><td>2/14/2022
12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022 12:10:43 PM</td><td>
</td><td>6/13/2022 12:51:08 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25983</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges should be repaired </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 12:10:46 PM</td><td> </td><td>6/13/2022
12:51:07 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25985</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Two
marked black stains should be </td><td>Low</td><td>2/14/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/24/2022 12:10:53 PM</td><td> </td><td>6/13/2022
12:51:06 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25994</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Sealant should be adjusted and
leveled </td><td>Low</td><td>2/15/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/25/2022 11:39:08 AM</td><td> </td><td>6/13/2022
12:51:05 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26007</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Defected and short tile should be replaced
</td><td>Low</td><td>2/15/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/25/2022
11:39:30 AM</td><td> </td><td>6/13/2022 12:51:04
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26011</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked edge should be leveled
</td><td>Low</td><td>2/15/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/25/2022
11:51:49 AM</td><td> </td><td>6/13/2022 12:51:03
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26027</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Gaps
between stone steps should be regular </td><td>Low</td><td>2/15/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/25/2022 11:52:23 AM</td><td> </td><td>6/13/2022
12:51:01 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26028</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;
Bottom chipped edges of stone steps should be repaired
</td><td>Low</td><td>2/15/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/25/2022
11:52:26 AM</td><td> </td><td>6/13/2022 12:50:59
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26029</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges for stone steps should be repaired </td><td>Low</td><td>2/15/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/25/2022 11:52:28 AM</td><td> </td><td>6/13/2022
12:50:58 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26031</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
and missing stone tiles should be installed </td><td>Low</td><td>2/15/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/25/2022 11:52:36 AM</td><td> </td><td>6/13/2022
12:50:57 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26032</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Unleveled tile should be adjusted
</td><td>Low</td><td>2/16/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/26/2022
11:15:21 AM</td><td> </td><td>6/13/2022 12:50:56
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26074</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Different texture should be replaced
</td><td>Low</td><td>2/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/31/2022
11:58:25 AM</td><td> </td><td>6/13/2022 12:50:50
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26080</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Gasket rubber should be sited
properly </td><td>Low</td><td>2/8/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/1/2022 11:48:20 AM</td><td> </td><td>6/13/2022
12:50:49 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26085</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Toothing between glazing panels
</td><td>Low</td><td>2/22/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/1/2022
11:48:33 AM</td><td> </td><td>6/13/2022 12:50:48
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26088</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Cutting of stainless steel handrail
should be finished </td><td>Low</td><td>2/22/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/1/2022 11:48:44 AM</td><td> </td><td>6/13/2022
12:50:47 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26091</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked cover plates should be sited
</td><td>Low</td><td>2/22/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/1/2022
11:48:54 AM</td><td> </td><td>6/13/2022 12:50:36
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>20993</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Lagging
missing/incomplete</td><td>&#39;Exhaust air grill from toilets is beside fresh air
intake ,both of ducts are above ceiling in closed area .contractor must review this
snag with technical office .</td><td>High</td><td>8/18/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/11/2021 2:58:23 PM</td><td> </td><td>6/13/2022
11:32:34 AM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>30123</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;No ventilation system detected.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:28 AM</td><td> </td><td>6/13/2022 11:16:26
AM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>22440</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Edges cutting should be aligned and
adjusted </td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>8/29/2021 3:13:31 PM</td><td> </td><td>6/13/2022 11:16:15
AM</td><td>&nbsp;</td><td>Part 2</td><td>&nbsp;</td>
</tr><tr>
<td>22448</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between tiles
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:13:47 PM</td><td> </td><td>6/13/2022 11:16:14 AM</td><td>&nbsp;</td><td>Part
2</td><td>&nbsp;</td>
</tr><tr>
<td>22449</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Edges cutting should be aligned and
adjusted </td><td>Low</td><td>9/19/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>8/29/2021 3:13:49 PM</td><td> </td><td>6/13/2022 11:16:13
AM</td><td>&nbsp;</td><td>Part 2</td><td>&nbsp;</td>
</tr><tr>
<td>22457</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor cutting edges for stone tiles
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:14:03 PM</td><td> </td><td>6/13/2022 11:16:12 AM</td><td>&nbsp;</td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>22550</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone floor need cleaning from stains
</td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/30/2021
11:04:50 AM</td><td> </td><td>6/13/2022 11:16:11 AM</td><td>&nbsp;</td><td>Part
5</td><td>&nbsp;</td>
</tr><tr>
<td>22672</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloration between stone tiles
</td><td>Low</td><td>9/26/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/5/2021
10:19:38 AM</td><td> </td><td>6/13/2022 11:16:09 AM</td><td>&nbsp;</td><td>Part
4</td><td>&nbsp;</td>
</tr><tr>
<td>22893</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken edges should be replaced
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:29 PM</td><td> </td><td>6/13/2022 11:16:09 AM</td><td>&nbsp;</td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>23044</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Marked
tile should be replaced </td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/15/2021 11:31:45 AM</td><td> </td><td>6/13/2022 11:16:07
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23091</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:49:22 AM</td><td> </td><td>6/13/2022 11:16:06
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23137</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges should be repaired </td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:50:31 AM</td><td> </td><td>6/13/2022 11:16:05
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23148</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closer should be one tile
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:50:48 AM</td><td> </td><td>6/13/2022 11:16:04
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23152</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges should be repaired </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:50:53 AM</td><td> </td><td>6/13/2022 11:16:03
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23156</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Interface between planted area and stone should be closed
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:50:57 AM</td><td> </td><td>6/13/2022 11:16:02
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23158</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closer should be one tile
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:51:00 AM</td><td> </td><td>6/13/2022 11:16:01
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23160</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
cutting for stone edges </td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:51:03 AM</td><td> </td><td>6/13/2022 11:16:00
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23161</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tile should be replaced </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:51:03 AM</td><td> </td><td>6/13/2022 11:15:59
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23166</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closer should be one tile
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:51:08 AM</td><td> </td><td>6/13/2022 11:15:58
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23252</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Bitted tiles should be replaced
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
12:00:31 PM</td><td> </td><td>6/13/2022 11:15:57
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23258</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
tiles should be treated </td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 12:06:00 PM</td><td> </td><td>6/13/2022 11:15:56
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23274</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Interface between stone flooring and
cladding should be closed properly </td><td>Low</td><td>10/7/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/16/2021 12:06:27 PM</td><td> </td><td>6/13/2022
11:15:55 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23565</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:13 AM</td><td> </td><td>6/13/2022 11:15:54
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23583</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/12/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:44 AM</td><td> </td><td>6/13/2022 11:15:53
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23585</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/12/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:48 AM</td><td> </td><td>6/13/2022 11:15:52
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23591</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closure should be one tile
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:08:58 AM</td><td> </td><td>6/13/2022 11:15:51
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23602</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Grouting should be adjusted/filling missing
grouting </td><td>Low</td><td>10/13/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/22/2021 11:06:41 AM</td><td> </td><td>6/13/2022 11:15:50
AM</td><td>&nbsp;</td><td>Part 9</td><td>&nbsp;</td>
</tr><tr>
<td>23626</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stains should be removed
</td><td>Low</td><td>10/13/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/22/2021
11:07:24 AM</td><td> </td><td>6/13/2022 11:15:49 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>23680</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>10/17/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/26/2021
10:20:07 AM</td><td> </td><td>6/13/2022 11:15:48 AM</td><td>&nbsp;</td><td>Part
9</td><td>&nbsp;</td>
</tr><tr>
<td>23694</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Dust and stains should be cleaned
</td><td>Low</td><td>10/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/28/2021
9:57:05 AM</td><td> </td><td>6/13/2022 11:15:47 AM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23698</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Dust and Stains should be cleaned
</td><td>Low</td><td>10/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/28/2021
9:57:13 AM</td><td> </td><td>6/13/2022 11:15:46 AM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23701</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor cutting for stone edge
</td><td>Low</td><td>10/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/28/2021
9:57:17 AM</td><td> </td><td>6/13/2022 11:15:45 AM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23735</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>grouting quality</td><td>&#39;Poor grouting need to
repair</td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/11/2021 10:38:06 AM</td><td> </td><td>6/13/2022 11:15:45
AM</td><td>&nbsp;</td><td>Part 11</td><td>&nbsp;</td>
</tr><tr>
<td>23810</td><td>Decorative Fence</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Surface preparation for concrete base
</td><td>Low</td><td>11/10/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/20/2021
11:51:56 AM</td><td> </td><td>6/13/2022 11:15:43
AM</td><td>&nbsp;</td><td>Decorative Fence</td><td>&nbsp;</td>
</tr><tr>
<td>23932</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Miss alignment for interlock joints for marked
areas </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 10:27:49 AM</td><td> </td><td>6/13/2022 11:15:42
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23935</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interlock should be leveled
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:27:55 AM</td><td> </td><td>6/13/2022 11:15:41
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23937</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked cracks should be repaired
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:27:58 AM</td><td> </td><td>6/13/2022 11:15:41
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23970</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Mortar between kerb stone tiles should be
adjusted properly </td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 10:31:18 AM</td><td> </td><td>6/13/2022 11:15:40
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23984</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between kerbstone and interlock
should be aligned properly </td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 3:17:49 PM</td><td> </td><td>6/13/2022 11:15:39
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23986</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Mortar between kerb stone tiles should be
adjusted properly </td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 3:17:53 PM</td><td> </td><td>6/13/2022 11:15:38
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23987</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cracked / broken kerb stone tiles should be
repaired / replaced </td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 3:17:56 PM</td><td> </td><td>6/13/2022 11:15:37
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23988</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Kerbstone should be curved properly
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
3:17:58 PM</td><td> </td><td>6/13/2022 11:15:35
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23991</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Kerbstone should be aligned
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
3:18:03 PM</td><td> </td><td>6/13/2022 11:15:34
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23993</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cracked / broken kerb stone tiles should be
repaired / replaced </td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 3:18:08 PM</td><td> </td><td>6/13/2022 11:15:33
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23994</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Mortar between kerb stone tiles should be
adjusted properly </td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 3:18:10 PM</td><td> </td><td>6/13/2022 11:15:32
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23996</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between kerbstone and interlock
should be aligned properly </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 3:18:14 PM</td><td> </td><td>6/13/2022 11:15:32
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23999</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;interlock tiles need cleaning from stains
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
3:18:20 PM</td><td> </td><td>6/13/2022 11:15:31
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24007</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Repair for damaged concrete around manhole
cover </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 3:18:34 PM</td><td> </td><td>6/13/2022 11:15:30
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24008</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between kerbstone and interlock
should aligned and adjusted properly </td><td>Low</td><td>11/15/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/25/2021 3:18:36 PM</td><td> </td><td>6/13/2022
11:15:29 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24009</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Filling interlock joints with sand
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
3:18:38 PM</td><td> </td><td>6/13/2022 11:15:28
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24110</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between concrete and kerbstone
should be aligned and leveled </td><td>Low</td><td>11/16/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/26/2021 11:07:42 AM</td><td> </td><td>6/13/2022
11:15:27 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24111</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Concrete floor needs touch up
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:07:43 AM</td><td> </td><td>6/13/2022 11:15:26
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24156</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cracks should be
repaired.</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:09:04 AM</td><td> </td><td>6/13/2022 11:15:25
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24158</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Curb stone should be curved and
smoothed.</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:09:05 AM</td><td> </td><td>6/13/2022 11:15:24
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24164</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint mortar need to be applied
properly</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:09:10 AM</td><td> </td><td>6/13/2022 11:15:23
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24169</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unacceptable curb
width.</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:09:17 AM</td><td> </td><td>6/13/2022 11:15:23
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24170</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Curb stone to be aligned with
road</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:09:18 AM</td><td> </td><td>6/13/2022 11:15:21
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24171</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Curb stone to be curved and smoothed
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:09:19 AM</td><td> </td><td>6/13/2022 11:15:20
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24172</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between interlock and curb stone
to be aligned and leveled properly.</td><td>Low</td><td>11/16/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/26/2021 11:09:21 AM</td><td> </td><td>6/13/2022
11:15:19 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24358</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Touchup and cleaning for concrete
surface.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/27/2021 11:41:15 AM</td><td> </td><td>6/13/2022 11:15:18
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24361</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unacceptable finish for slope concrete
should be adjusted and cleaning the area.</td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/27/2021 11:41:20 AM</td><td> </td><td>6/13/2022
11:15:16 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24362</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Concrete curb should be curved and smoothed
.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/27/2021
11:41:21 AM</td><td> </td><td>6/13/2022 11:15:15
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24363</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint width should be adjusted and aligned
as per design drawing.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/27/2021 11:41:23 AM</td><td> </td><td>6/13/2022 11:15:14
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24365</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All movement Joints width should be adjusted
and joint should be filled properly.</td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/27/2021 11:41:26 AM</td><td> </td><td>6/13/2022
11:15:14 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24366</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling and touch up for concrete
surface.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/27/2021 11:41:28 AM</td><td> </td><td>6/13/2022 11:15:13
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24367</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between curb stone and concrete
should be aligned and leveled properly.</td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/27/2021 11:41:30 AM</td><td> </td><td>6/13/2022
11:15:12 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24368</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between curb stone and interlock
should be aligned and leveled properly.</td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/27/2021 11:41:31 AM</td><td> </td><td>6/13/2022
11:15:11 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24369</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cracks should be
repaired.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/27/2021 11:41:33 AM</td><td> </td><td>6/13/2022 11:15:10
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>20622</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Installation
not to specification/drawing</td><td>&#39;Fire sealant need reinstall around PPR
pipes </td><td>High</td><td>8/16/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/9/2021 4:24:53 PM</td><td> </td><td>6/13/2022
10:54:48 AM</td><td>&nbsp;</td><td>MS.17.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>15246</td><td>AHU</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing the motor for the
damper</td><td>High</td><td>1/31/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>1/24/2021 11:49:08 AM</td><td> </td><td>6/13/2022 10:23:05
AM</td><td>&nbsp;</td><td>MS.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>31653</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Drain pan thermal insulation shall be
repaired. </td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:32 PM</td><td> </td><td>6/13/2022 9:41:35
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31672</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Fire pipes need cleaning and touchup
paintings. </td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:13 PM</td><td> </td><td>6/13/2022 9:38:47
AM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31676</td><td>B.O.H. - IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Pipes labels are missing.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:20 PM</td><td> </td><td>6/13/2022 9:38:04
AM</td><td>&nbsp;</td><td>MS.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31587</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Outside cleaning for AHU. </td><td>High</td><td>6/12/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/5/2022 11:53:00 AM</td><td>
</td><td>6/13/2022 9:29:00
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31652</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Condensate drain pipes shall be ended with
elbows. </td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:31 PM</td><td> </td><td>6/13/2022 9:28:07
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31665</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Thermal insulation for unit drain pan.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:55 PM</td><td> </td><td>6/13/2022 9:23:57
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31765</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing labels for air ducts. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:56:20 AM</td><td>
</td><td>6/13/2022 9:20:23
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31766</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire pipes need cleaning and touchup
paintings. </td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:56:22 AM</td><td> </td><td>6/13/2022 9:19:14
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31806</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage pipe support. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:32:32 PM</td><td>
</td><td>6/13/2022 9:16:59
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31828</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty machine base. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:33:10 PM</td><td>
</td><td>6/13/2022 9:13:52
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31837</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty and dirty pipe supports. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:33:27 PM</td><td>
</td><td>6/13/2022 9:05:23
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31879</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing seismic wires for FF pipes.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:51 PM</td><td> </td><td>6/13/2022 9:00:41
AM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>31880</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;HDPE drain pipes need cleaning.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:53 PM</td><td> </td><td>6/13/2022 8:59:14
AM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>31883</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Clean out cover located over cable
trays. </td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:58 PM</td><td> </td><td>6/13/2022 8:58:34
AM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>31884</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Cleaning of HDPE drain pipes.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:25:00 PM</td><td> </td><td>6/13/2022 8:52:22
AM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>31776</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air duct.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:31:37 PM</td><td> </td><td>6/13/2022 8:51:18
AM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>31206</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing labels for hydronic pipes. </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:55:59 PM</td><td>
</td><td>6/13/2022 8:50:12
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31856</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;No firefighting system detected in this
area. </td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 11:57:45 AM</td><td> </td><td>6/12/2022 4:56:14
PM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>13354</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;ceiling need repainting </td><td>Low</td><td>11/12/2020 12:00:00
AM</td><td>sally.george</td><td>11/5/2020 12:13:13 PM</td><td> </td><td>6/12/2022
4:36:11 PM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>20387</td><td>STORAGE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Contractor should review location of
drain valve for fire riser and routing of drain pipe it’s not accessible
</td><td>High</td><td>8/12/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/5/2021
1:44:11 PM</td><td> </td><td>6/12/2022 4:25:57
PM</td><td>&nbsp;</td><td>MW.12.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>29031</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation for hydronic pipes. </td><td>High</td><td>5/24/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:11:18 PM</td><td>
</td><td>6/12/2022 4:25:56
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>30127</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing labels for
chilled water pipes. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:31 AM</td><td> </td><td>6/12/2022 4:25:55
PM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30375</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Painting on air terminal.
</td><td>High</td><td>6/6/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:51:50 PM</td><td> </td><td>6/12/2022 4:25:53
PM</td><td>&nbsp;</td><td>MA.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30631</td><td>CATALOGUE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Putty and paintings on air terminals.
</td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:03 AM</td><td> </td><td>6/12/2022 4:25:52
PM</td><td>&nbsp;</td><td>MR.14.02.012- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30636</td><td>PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Painting and putty on air terminals.
</td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:12 AM</td><td> </td><td>6/12/2022 4:25:51
PM</td><td>&nbsp;</td><td>MR.14.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30653</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air ducts.
</td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:37 AM</td><td> </td><td>6/12/2022 4:25:50
PM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30789</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage air duct insulation.
</td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:07 PM</td><td> </td><td>6/12/2022 4:25:49
PM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>31144</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage thermal insulation for chilled water pipes.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:32 PM</td><td> </td><td>6/12/2022 4:25:48
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31152</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Canvases need adjustments. </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:53:44 PM</td><td>
</td><td>6/12/2022 4:25:47
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31457</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Air terminal was painted.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:05:26 PM</td><td> </td><td>6/12/2022 4:25:47
PM</td><td>&nbsp;</td><td>MA.19.02.026</td><td>&nbsp;</td>
</tr><tr>
<td>31463</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Slot diffusers have some dirty dots.
</td><td>High</td><td>6/9/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:05:42 PM</td><td> </td><td>6/12/2022 4:25:46
PM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>31614</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:48 AM</td><td> </td><td>6/12/2022 4:25:45
PM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31656</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Hydronic pipes labels are missing.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:25:39 PM</td><td> </td><td>6/12/2022 4:25:44
PM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31729</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Inside cleaning. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:03 AM</td><td>
</td><td>6/12/2022 4:25:41
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31750</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Inside cleaning. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:48 AM</td><td>
</td><td>6/12/2022 4:25:41
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31781</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Chilled water pipes labels are missing.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:31:48 PM</td><td> </td><td>6/12/2022 4:25:38
PM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>31788</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air ducts.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:01 PM</td><td> </td><td>6/12/2022 4:25:37
PM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>31830</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing labels for air ducts. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:33:15 PM</td><td>
</td><td>6/12/2022 4:25:36
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31833</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing labels for air ducts. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:33:19 PM</td><td>
</td><td>6/12/2022 4:25:35
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>19674</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>Identification missing</td><td>&#39;Missing labels
</td><td>High</td><td>7/11/2021 12:00:00 AM</td><td>Ayman Ahmed
Mostafa</td><td>7/4/2021 2:12:19 PM</td><td> </td><td>6/12/2022 4:18:31
PM</td><td>&nbsp;</td><td>MW.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>19677</td><td>ELEC.</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>Identification missing</td><td>&#39;Missing labels
</td><td>High</td><td>7/11/2021 12:00:00 AM</td><td>Ayman Ahmed
Mostafa</td><td>7/4/2021 2:15:24 PM</td><td> </td><td>6/12/2022 4:18:16
PM</td><td>&nbsp;</td><td>MS.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>12300</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Manhole cover label is wrong as attached,led
cover is missing, damaged ICT cable,manhole is not
clean</td><td>High</td><td>10/19/2020 12:00:00 PM</td><td>Mohamed
Samir</td><td>10/12/2020 3:39:45 PM</td><td> </td><td>6/12/2022 2:44:29
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14834</td><td>B.O.H-CORE A2 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing permanent labeling, gsm device not
installed, back box label is not completed, all media converter not installed.
</td><td>High</td><td>1/24/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>1/17/2021
3:40:54 PM</td><td> </td><td>6/12/2022 2:44:28
PM</td><td>&nbsp;</td><td>MC.18.02.A21</td><td>&nbsp;</td>
</tr><tr>
<td>14889</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;No labels, missing access control devices,
damaged cctv back box, camera IP address shouldn’t be written on the camera.
Missing trunk cover missing gsm cable</td><td>High</td><td>1/25/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>1/18/2021 3:25:57 PM</td><td> </td><td>6/12/2022
2:44:27 PM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>14897</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Internal Lighting</td><td>General
Snag</td><td>&#39;Missing work</td><td>High</td><td>1/25/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>1/18/2021 3:26:27 PM</td><td>
</td><td>6/12/2022 2:44:26
PM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>14898</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Missing
work</td><td>High</td><td>1/25/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>1/18/2021 3:26:28 PM</td><td> </td><td>6/12/2022 2:44:25
PM</td><td>&nbsp;</td><td>MS.19.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20672</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Poor workmanship and should be fixed-
missing labels </td><td>High</td><td>8/17/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/10/2021 11:18:39 AM</td><td> </td><td>6/12/2022 2:44:23
PM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20919</td><td>AHU</td><td>MU
L10</td><td>Closed</td><td>Modernlite</td><td>MEP-Electrical</td><td>Power</
td><td>General Snag</td><td>&#39;Work not ready and cover not finished for track
and missing tag number and missing panels schedule </td><td>High</td><td>8/18/2021
12:00:00 PM</td><td>Sameh Ibrahim El-Sawah</td><td>8/11/2021 11:50:47 AM</td><td>
</td><td>6/12/2022 2:44:22
PM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20922</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>Modernlite</td><td>MEP-Electrical</td><td>Power</
td><td>General Snag</td><td>&#39;Easy check panels not finished yet
</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:50:55 AM</td><td> </td><td>6/12/2022 2:44:21
PM</td><td>&nbsp;</td><td>MS.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20923</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:50:56 AM</td><td> </td><td>6/12/2022 2:44:20
PM</td><td>&nbsp;</td><td>MQ.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20924</td><td>TEMP EXH STORAGE</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:50:58 AM</td><td> </td><td>6/12/2022 2:44:20
PM</td><td>&nbsp;</td><td>MT.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20928</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:08 AM</td><td> </td><td>6/12/2022 2:44:19
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20938</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing works for pre
action</td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:32 AM</td><td> </td><td>6/12/2022 2:44:18
PM</td><td>&nbsp;</td><td>MQ.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20940</td><td>W.C. /F</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:35 AM</td><td> </td><td>6/12/2022 2:44:17
PM</td><td>&nbsp;</td><td>MW.14.01.002A</td><td>&nbsp;</td>
</tr><tr>
<td>20956</td><td>AHU</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing back box cover </td><td>High</td><td>8/18/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>8/11/2021 11:59:16 AM</td><td> </td><td>6/12/2022
2:44:16 PM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20958</td><td>TEMP EXH STORAGE</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing WiFi and rfid labels </td><td>High</td><td>8/18/2021
12:00:00 AM</td><td>Mohamed Samir</td><td>8/11/2021 11:59:19 AM</td><td>
</td><td>6/12/2022 2:44:14
PM</td><td>&nbsp;</td><td>MT.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20959</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing access control WiFi cctv labels.
</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>8/11/2021
11:59:21 AM</td><td> </td><td>6/12/2022 2:44:13
PM</td><td>&nbsp;</td><td>MQ.14.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>22355</td><td>CORE G3</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;EMT conduits should be replaced by RGS
conduits exposed area and missing labels </td><td>High</td><td>9/1/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/25/2021 11:52:57 AM</td><td>
</td><td>6/12/2022 2:44:11
PM</td><td>&nbsp;</td><td>MC.19.01.G31</td><td>&nbsp;</td>
</tr><tr>
<td>9570</td><td>CORE A4</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>MEP-Mechanical</td><td>Lifts</
td><td>General Snag</td><td>&#39;Elevators work is not
finish</td><td>High</td><td>7/27/2020 12:00:00
AM</td><td>ahmedsalem</td><td>7/20/2020 11:43:16 AM</td><td> </td><td>6/12/2022
2:34:10 PM</td><td>&nbsp;</td><td>MC.12.0G.A41</td><td>&nbsp;</td>
</tr><tr>
<td>29299</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Pipes shall be ended with elbow.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:30 PM</td><td> </td><td>6/12/2022 2:12:41
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>19676</td><td>W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>Identification missing</td><td>&#39; Missing labels
</td><td>High</td><td>7/11/2021 12:00:00 AM</td><td>Ayman Ahmed
Mostafa</td><td>7/4/2021 2:12:21 PM</td><td> </td><td>6/12/2022 1:20:05
PM</td><td>&nbsp;</td><td>MW.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>22206</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:47:48 AM</td><td> </td><td>6/12/2022 12:30:12
PM</td><td>&nbsp;</td><td>MG.13.0G.003

</td><td>&nbsp;</td>
</tr><tr>
<td>9625</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;General cleaning for floor
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:49:32 PM</td><td> </td><td>6/12/2022 12:27:48
PM</td><td>&nbsp;</td><td>MS.13.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>25368</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Repair sika
foam.</td><td>Low</td><td>12/13/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>11/22/2021 1:59:15 PM</td><td> </td><td>6/12/2022 12:26:41
PM</td><td>&nbsp;</td><td>Museum Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>25340</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing ceiling panels should be
installed.</td><td>Low</td><td>12/13/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>11/22/2021 1:57:41 PM</td><td> </td><td>6/12/2022 12:25:10
PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25309</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
insulation</td><td>damaged</td><td>&#39;Repair for damaged sika
foam</td><td>Low</td><td>12/13/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>11/22/2021 11:59:47 AM</td><td> </td><td>6/12/2022 12:24:36
PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>28129</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof
Tiles</td><td>Chipped/damaged</td><td>&#39;Missing mesh panels should be installed
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/16/2022
12:09:23 PM</td><td> </td><td>6/12/2022 12:22:51 PM</td><td>&nbsp;</td><td>Museum
Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>20243</td><td>WC /M</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Bathroom - Vanity
top</td><td>General</td><td>&#39;Gap should be closed
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:33 PM</td><td> </td><td>6/12/2022 12:19:57
PM</td><td>&nbsp;</td><td>MW.18.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>12030</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint Floor</td><td>General
Snag</td><td>&#39;Epoxy painting need to clean and touch up
</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020
2:13:14 PM</td><td> </td><td>6/12/2022 12:07:56 PM</td><td>Done
</td><td>MS.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>12074</td><td>AHU - Band B- B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Repair and painting for epoxy
paint</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>10/1/2020 2:15:31 PM</td><td> </td><td>6/12/2022 12:07:55
PM</td><td>Done </td><td>MS.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>16461</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Joint is not aligned
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
9:18:04 AM</td><td> </td><td>6/12/2022 12:07:54 PM</td><td>Done
</td><td>MG.14.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>16758</td><td>JEWELLERY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Interface between linoleum flooring and
skirting should be adjusted </td><td>Low</td><td>3/31/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/10/2021 10:23:08 AM</td><td> </td><td>6/12/2022 12:07:45
PM</td><td>Done </td><td>ME.12.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16934</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Grouting is missing
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
1:04:44 PM</td><td> </td><td>6/12/2022 12:07:44 PM</td><td>Done
</td><td>ME.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>17917</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>5/30/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>5/23/2021
12:53:38 PM</td><td> </td><td>6/12/2022 12:07:41 PM</td><td>Done
</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>17923</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>6/13/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>5/23/2021
12:53:54 PM</td><td> </td><td>6/12/2022 12:07:40 PM</td><td>Done
</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20089</td><td>JEWELLERY-Band A</td><td>MU
L10</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Damaged</
td><td>&#39;Opening around plumbing pipes should be closed
</td><td>Low</td><td>8/23/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/2/2021
4:15:18 PM</td><td> </td><td>6/12/2022 12:07:30 PM</td><td>Done
</td><td>ME.12.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20187</td><td>PAPYRUS-Band A</td><td>MU
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Missing Sealant between linoleum tiles
</td><td>Low</td><td>8/24/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/3/2021
3:38:45 PM</td><td> </td><td>6/12/2022 12:07:29 PM</td><td>Done
</td><td>ME.12.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20224</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Marked Scratches need repair
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:11 PM</td><td> </td><td>6/12/2022 12:07:24 PM</td><td>Done
</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20229</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Holes on tiles should be repaired
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:17 PM</td><td> </td><td>6/12/2022 12:07:22 PM</td><td>Done
</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20244</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>8/25/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:35 PM</td><td> </td><td>6/12/2022 12:07:21 PM</td><td>Done
</td><td>MQ.18.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20245</td><td>WC /M</td><td>MU L10</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Gypsum Ceiling</td><td>General
Snag</td><td>&#39;Gypsum ceiling need to alignment </td><td>Low</td><td>8/25/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021 12:05:35 PM</td><td>
</td><td>6/12/2022 12:07:19 PM</td><td>Done
</td><td>MW.18.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>20347</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum board should be adjusted
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:14:53 PM</td><td> </td><td>6/12/2022 12:07:14 PM</td><td>Done
</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20354</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked part behind the false ceiling painting is missing
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:01 PM</td><td> </td><td>6/12/2022 12:07:12 PM</td><td>Done
</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20375</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:38 PM</td><td> </td><td>6/12/2022 12:07:11 PM</td><td>Done
</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20493</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Grouting is missing
</td><td>Low</td><td>8/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:32 PM</td><td> </td><td>6/12/2022 12:07:09 PM</td><td>Done
</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>21128</td><td>CORE D2</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:50:06 AM</td><td> </td><td>6/12/2022 12:07:08 PM</td><td>Done
</td><td>MC.18.01.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21196</td><td>CORE D2</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wall painting should be finished
</td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021
10:57:31 AM</td><td> </td><td>6/12/2022 12:07:04 PM</td><td>Done
</td><td>MC.18.01.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21658</td><td>LOBBY</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls should be repainted </td><td>Low</td><td>9/9/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/19/2021 11:25:01 AM</td><td> </td><td>6/12/2022
12:06:55 PM</td><td>Done.</td><td>MC.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>25812</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between stone flooring and stone
cladding need to adjustment.</td><td>Low</td><td>1/24/2022 12:00:00
PM</td><td>Moussa Nageh Khella</td><td>1/3/2022 2:33:33 PM</td><td>
</td><td>6/12/2022 11:42:23 AM</td><td>Rectified by
HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>20874</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Installation
not to specification/drawing</td><td>&#39;Missing collar around HDPE pipe
</td><td>High</td><td>8/18/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/11/2021
11:47:18 AM</td><td> </td><td>6/12/2022 10:59:17
AM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>9567</td><td>SERVICE DELIVERY</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;There is no collar around HDPE pipes as
per Approved drawing </td><td>High</td><td>7/27/2020 12:00:00
PM</td><td>ahmedsalem</td><td>7/20/2020 11:43:08 AM</td><td> </td><td>6/12/2022
10:53:12 AM</td><td>&nbsp;</td><td>MQ.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>14412</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Missing fire extinguishers
</td><td>High</td><td>12/31/2020 12:00:00 PM</td><td>ahmedsalem</td><td>12/24/2020
3:23:44 PM</td><td> </td><td>6/12/2022 10:50:29
AM</td><td>&nbsp;</td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31722</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;FCU termination box cover. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:54:52 AM</td><td>
</td><td>6/12/2022 10:48:32
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30665</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air ducts.
</td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:53:00 AM</td><td> </td><td>6/12/2022 10:30:50
AM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30791</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing air ducts labels.
</td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:10 PM</td><td> </td><td>6/12/2022 10:29:34
AM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>31669</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for chilled water pipes.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 4:26:07 PM</td><td> </td><td>6/12/2022 10:26:16
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>

<td>24853</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Metal trim should be aligned .</td><td>Low</td><td>11/28/2021
12:00:00 AM</td><td>Moussa Nageh Khella</td><td>11/7/2021 4:15:44 PM</td><td>
</td><td>6/12/2022 10:25:45 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31777</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for chilled water pipes.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:31:40 PM</td><td> </td><td>6/12/2022 10:24:10
AM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>31778</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Labels for air ducts.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:31:42 PM</td><td> </td><td>6/12/2022 10:23:26
AM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>31783</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Labels for air ducts.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:31:52 PM</td><td> </td><td>6/12/2022 10:21:44
AM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>

<td>25588</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>12/20/2021 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>12/13/2021 1:59:03 PM</td><td> </td><td>6/12/2022 10:21:08
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>20273</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>GENERAL
SUPPORTS</td><td>Arrangement is not vertical / horizontal</td><td>&#39;Civil work
is incomplete around UPVC pipes</td><td>High</td><td>8/11/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/4/2021 12:57:14 PM</td><td> </td><td>6/12/2022
10:20:17 AM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30150</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;FCO cover is Rusty.
</td><td>High</td><td>6/6/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:56 AM</td><td> </td><td>6/12/2022 10:17:53
AM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31147</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Pipe support need adjustments. </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:53:37 PM</td><td>
</td><td>6/12/2022 9:33:23
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31149</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage thermal insulation for chilled water pipes.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:40 PM</td><td> </td><td>6/12/2022 9:31:56
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31164</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Outside cleaning. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:54:10 PM</td><td>
</td><td>6/12/2022 9:31:01
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31170</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain pipes shall be ended with elbows.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:54:29 PM</td><td> </td><td>6/12/2022 9:23:38
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31541</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing seismic for fire pipes.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:43 PM</td><td> </td><td>6/12/2022 9:21:42
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>21548</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Inspection after removing protection
cover </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 9:51:51 AM</td><td> </td><td>6/12/2022 9:20:31
AM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>16046</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing seismic for fire pipes
</td><td>High</td><td>2/16/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>2/9/2021 4:43:18 PM</td><td> </td><td>6/12/2022 9:14:34
AM</td><td>&nbsp;</td><td>MS.23.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>13865</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Mechanical</td><td>Sprinkler
System</td><td>Drain valve</td><td>&#39;Missing extinguishers
</td><td>High</td><td>12/9/2020 12:00:00 PM</td><td>ahmedsalem</td><td>12/2/2020
10:44:45 AM</td><td> </td><td>6/12/2022 9:13:17
AM</td><td>&nbsp;</td><td>MS.23.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>31146</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing seismic restrains for pipe branch.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:35 PM</td><td> </td><td>6/12/2022 9:07:44
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31602</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Rusty and dirty drain pipe.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:26 AM</td><td> </td><td>6/12/2022 9:07:17
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31719</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty duct support. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:54:45 AM</td><td>
</td><td>6/12/2022 9:01:45
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31724</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Clean out cover clashes with threaded rod.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:54:55 AM</td><td> </td><td>6/12/2022 9:00:42
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31728</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Outside cleaning. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:02 AM</td><td>
</td><td>6/12/2022 8:59:18
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31734</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty pipes supports. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:14 AM</td><td>
</td><td>6/12/2022 8:57:36
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31735</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty machine base. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:16 AM</td><td>
</td><td>6/12/2022 8:57:01
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31739</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing labels for PPR pipes. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:23 AM</td><td>
</td><td>6/12/2022 8:56:27
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31740</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;PPR pipes need cleaning. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:25 AM</td><td>
</td><td>6/12/2022 8:55:50
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31741</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty pipes. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:31 AM</td><td>
</td><td>6/12/2022 8:54:51
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31742</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain hose connection. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:33 AM</td><td>
</td><td>6/12/2022 8:54:13
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31743</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Humidifier shall be cleaned from inside and outside.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:55:35 AM</td><td> </td><td>6/12/2022 8:53:38
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31745</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Duct supports are rusty. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:39 AM</td><td>
</td><td>6/12/2022 8:50:28
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31748</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty pipes supports. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:45 AM</td><td>
</td><td>6/12/2022 8:49:26
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31751</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Outside cleaning. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:49 AM</td><td>
</td><td>6/12/2022 8:48:13
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31752</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing labels for PPR pipes. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:51 AM</td><td>
</td><td>6/12/2022 8:47:40
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31753</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Cleaning of humidifier from inside and outside.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:55:52 AM</td><td> </td><td>6/12/2022 8:47:02
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31754</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain hose connection. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:54 AM</td><td>
</td><td>6/12/2022 8:43:35
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31822</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty pipes supports. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:32:58 PM</td><td>
</td><td>6/12/2022 8:42:17
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>20609</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Installation not to specification/drawing</td><td>&#39;Contractor
must open all shaft access doors in all toilets in band A&amp; band B to check mech
trades</td><td>High</td><td>8/16/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/9/2021 4:24:36 PM</td><td> </td><td>6/12/2022
8:40:42 AM</td><td>&nbsp;</td><td>MW.12.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>9410</td><td>PLANT</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing CIR for
actuators</td><td>High</td><td>7/15/2020 12:00:00
PM</td><td>hossamreda</td><td>7/8/2020 4:26:05 PM</td><td> </td><td>6/12/2022
8:40:23 AM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>31761</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty and dirty machine base. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:56:10 AM</td><td>
</td><td>6/12/2022 8:35:02
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31803</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing seismic wires restrains for fire pipes.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:25 PM</td><td> </td><td>6/12/2022 8:34:13
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31825</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty machine base. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:33:04 PM</td><td>
</td><td>6/12/2022 8:30:32
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30121</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Floor drain shall be cleaned.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:26 AM</td><td> </td><td>6/12/2022 8:27:33
AM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30115</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Floor drain shall be cleaned.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:17 AM</td><td> </td><td>6/12/2022 8:27:05
AM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30107</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Floor Drain Cover</td><td>&#39;Floor drain shall be cleaned.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:09 AM</td><td> </td><td>6/12/2022 8:26:38
AM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30119</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Flush valve
cover need cleaning. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:21 AM</td><td> </td><td>6/12/2022 8:24:49
AM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31509</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Cylinders cleaning.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:53 PM</td><td> </td><td>6/12/2022 8:23:12
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31512</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Hoses not connected.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:59 PM</td><td> </td><td>6/12/2022 8:21:25
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31514</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing actuators.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:31:06 PM</td><td> </td><td>6/12/2022 8:19:43
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31517</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Cleaning of cylinders.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:31:19 PM</td><td> </td><td>6/12/2022 8:18:14
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31518</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Cleaning of cylinders.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:31:22 PM</td><td> </td><td>6/12/2022 8:17:30
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31521</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Hoses are not connected.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:31:49 PM</td><td> </td><td>6/12/2022 8:16:56
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31524</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Hoses are not connected.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:01 PM</td><td> </td><td>6/12/2022 8:15:21
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31525</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Cleaning of cylinders.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:04 PM</td><td> </td><td>6/12/2022 8:13:48
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31527</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Hoses are not connected.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:08 PM</td><td> </td><td>6/12/2022 8:12:58
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31608</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Copper tube connection shall be thermally
insulated to avoid condensation. </td><td>High</td><td>6/12/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/5/2022 11:53:36 AM</td><td>
</td><td>6/12/2022 8:11:14
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31617</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Drain pipes shall be ended with elbows.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:53 AM</td><td> </td><td>6/12/2022 8:10:09
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31622</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct thermal insulation.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:54:03 AM</td><td> </td><td>6/12/2022 8:09:17
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31725</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Chilled water pipes insulation. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:54:57 AM</td><td>
</td><td>6/12/2022 8:08:23
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31807</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Fire pipes need cleaning and touchup paintings.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:34 PM</td><td> </td><td>6/12/2022 8:07:03
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31823</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty duct supports. </td><td>High</td><td>6/13/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:33:00 PM</td><td>
</td><td>6/12/2022 8:05:07
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31826</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Condensate drain pipes shall be needed with elbows.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:33:06 PM</td><td> </td><td>6/12/2022 8:03:22
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>25814</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Broken stone flooring tile need to
replaced.</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>1/3/2022 2:33:36 PM</td><td> </td><td>6/11/2022 3:23:19
PM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>9168</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 1B - discoloring between tiles/
damaged edges need repair </td><td>Low</td><td>7/8/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>6/17/2020 11:38:52 AM</td><td> </td><td>6/11/2022 2:07:19
PM</td><td>Rectified by HAZ</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>25832</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Poor quality for marked corner should be
finished </td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>1/3/2022 2:36:50 PM</td><td> </td><td>6/11/2022 2:05:36
PM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25835</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing grouting for marked joint
</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>1/3/2022 2:36:58 PM</td><td> </td><td>6/11/2022 2:05:32
PM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25836</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Not aligned</td><td>&#39;Joints between stone stairs and stainless
steel should be regular </td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Kerolos
Nagy Tawfik</td><td>1/3/2022 2:37:01 PM</td><td> </td><td>6/11/2022 2:05:28
PM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25838</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>1/3/2022 2:37:04 PM</td><td> </td><td>6/11/2022 2:05:25
PM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25839</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Loose tile should be fixed properly
</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>1/3/2022 2:37:05 PM</td><td> </td><td>6/11/2022 2:05:20
PM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25840</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Broken, to be replaced</td><td>&#39;Missing stone tiles should be
installed </td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>1/3/2022 2:37:08 PM</td><td> </td><td>6/11/2022 2:05:17
PM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25863</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Broken, to be replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>2/10/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>1/20/2022 12:03:07 PM</td><td> </td><td>6/11/2022 2:05:13
PM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24405</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
flooring is broken need to replaced.</td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>Moussa Nageh Khella</td><td>10/27/2021 4:26:25 PM</td><td>
</td><td>6/11/2022 2:00:51 PM</td><td>Rectified by
HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24226</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Joint need filled with
grout.</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>10/26/2021 4:24:31 PM</td><td> </td><td>6/11/2022 2:00:40
PM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>13170</td><td>Level +45.00</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Missing stone tiles
</td><td>High</td><td>11/10/2020 12:00:00 PM</td><td>sally.george</td><td>11/3/2020
4:36:14 PM</td><td> </td><td>6/11/2022 1:36:04 PM</td><td>Rectified by HAZ
</td><td>Level +45.00</td><td>&nbsp;</td>
</tr><tr>
<td>25829</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Toothing between tiles should be adjusted
</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>1/3/2022 2:36:44 PM</td><td> </td><td>6/11/2022 11:21:03
AM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25824</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Toothing between stone floor tiles need to
repair </td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>1/3/2022 2:33:53 PM</td><td> </td><td>6/11/2022 11:20:52
AM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25821</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Broken stone floor tiles need to
replaced.</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>1/3/2022 2:33:48 PM</td><td> </td><td>6/11/2022 11:20:21
AM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25872</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing stone tiles should be installed
</td><td>Low</td><td>2/10/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>1/20/2022 12:03:27 PM</td><td> </td><td>6/11/2022 10:58:20
AM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25871</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Loosen stone tile should be fixed properly
</td><td>Low</td><td>2/10/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>1/20/2022 12:03:24 PM</td><td> </td><td>6/11/2022 10:58:14
AM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25868</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tile should be replaced </td><td>Low</td><td>2/10/2022 12:00:00 PM</td><td>Kerolos
Nagy Tawfik</td><td>1/20/2022 12:03:17 PM</td><td> </td><td>6/11/2022 10:58:09
AM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25867</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing grouting for marked joints
</td><td>Low</td><td>2/10/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>1/20/2022 12:03:15 PM</td><td> </td><td>6/11/2022 10:58:03
AM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25828</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Broken floor tile should be
replaced.</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>1/3/2022 2:34:02 PM</td><td> </td><td>6/11/2022 10:57:56
AM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25827</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Broken edges need to
repair.</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>1/3/2022 2:34:00 PM</td><td> </td><td>6/11/2022 10:57:50
AM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25826</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing floor tile need to
installed.</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>1/3/2022 2:33:57 PM</td><td> </td><td>6/11/2022 10:57:44
AM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25825</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Poor grouting need to
repair.</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>1/3/2022 2:33:55 PM</td><td> </td><td>6/11/2022 10:57:39
AM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25822</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Poor finishing need to
adjustment.</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>1/3/2022 2:33:50 PM</td><td> </td><td>6/11/2022 10:57:28
AM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25817</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Broken stone flooring tile need to
replaced.</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>1/3/2022 2:33:41 PM</td><td> </td><td>6/11/2022 10:57:09
AM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25816</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Broken stone flooring need to
replaced.</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>1/3/2022 2:33:39 PM</td><td> </td><td>6/11/2022 10:56:58
AM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25815</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between stone flooring and
handrail need to adjustment.</td><td>Low</td><td>1/24/2022 12:00:00
PM</td><td>Moussa Nageh Khella</td><td>1/3/2022 2:33:37 PM</td><td>
</td><td>6/11/2022 10:20:37 AM</td><td>Rectified by
HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25813</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between stone flooring and stone
cladding need to adjustment.</td><td>Low</td><td>1/24/2022 12:00:00
PM</td><td>Moussa Nageh Khella</td><td>1/3/2022 2:33:35 PM</td><td>
</td><td>6/11/2022 10:20:05 AM</td><td>Rectified by
HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25809</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Broken stone flooring tile need to
replaced.</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>1/3/2022 2:33:28 PM</td><td> </td><td>6/11/2022 10:19:36
AM</td><td>Rectified by HAZ</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31897</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>
National Steel Fabrication NSF</td><td>Architectural</td><td>Acoustic
Walling</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/15/2022 12:00:00
AM</td><td>Mohamed Abdl Salam</td><td>6/8/2022 4:38:56 PM</td><td>
</td><td>6/9/2022 5:05:13
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30771</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove adhesive tape from air terminals.
</td><td>High</td><td>6/7/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:31 PM</td><td> </td><td>6/9/2022 3:42:15
PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>22035</td><td>CORE D3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing duct insulation in side
shaft</td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/23/2021 3:57:15 PM</td><td> </td><td>6/9/2022
3:40:40 PM</td><td>&nbsp;</td><td>MC.13.02.D31</td><td>&nbsp;</td>
</tr><tr>
<td>30177</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove the tape from air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:34 AM</td><td> </td><td>6/9/2022 3:39:31
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>31789</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct holes shall be closed.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:03 PM</td><td> </td><td>6/9/2022 3:39:01
PM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>9557</td><td>WET DELIVERY TUNNEL</td><td>MU GF
</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Missing labels on fire dampers </td><td>High</td><td>7/27/2020
12:00:00 PM</td><td>ahmedsalem</td><td>7/20/2020 11:42:39 AM</td><td>
</td><td>6/9/2022 3:02:05
PM</td><td>&nbsp;</td><td>MQ.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>31329</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;SAD not insulated!</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:53:38 AM</td><td>
</td><td>6/9/2022 3:01:22
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>8563</td><td>CORE D3</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>3/18/2020 12:00:00
AM</td><td>Ayman Ahmed Mostafa</td><td>3/11/2020 12:26:37 PM</td><td>
</td><td>6/9/2022 1:33:24
PM</td><td>&nbsp;</td><td>MC.13.0G.D31</td><td>&nbsp;</td>
</tr><tr>
<td>31506</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39; No ventilation system detected.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:46 PM</td><td> </td><td>6/9/2022 1:16:44
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>31495</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;No ventilation system detected in this
area. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:18 PM</td><td> </td><td>6/9/2022 1:15:32
PM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31877</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;No ventilation system detected in this
area. </td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:47 PM</td><td> </td><td>6/9/2022 1:15:10
PM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>31876</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;No ventilation system detected in this
area. </td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 4:24:45 PM</td><td> </td><td>6/9/2022 1:14:19
PM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>23710</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>11/1/2021 12:00:00 AM</td><td>Amr Nofal</td><td>10/11/2021
10:29:22 AM</td><td> </td><td>6/9/2022 1:07:03
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22456</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Metal trim shoulder be fixed properly
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:14:01 PM</td><td> </td><td>6/9/2022 1:00:55 PM</td><td>&nbsp;</td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>

<td>24978</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Gravel should be filtered from
sand.</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 3:59:37 PM</td><td> </td><td>6/9/2022 12:57:47
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>27258</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;Remove protection tape</td><td>Low</td><td>3/27/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:51:47 PM</td><td> </td><td>6/9/2022
12:56:05 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27253</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;Remove protection tape </td><td>Low</td><td>3/27/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:51:37 PM</td><td> </td><td>6/9/2022
12:52:51 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>12159</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Pipe insulation need repair
</td><td>High</td><td>10/11/2020 12:00:00 PM</td><td>ahmedsalem</td><td>10/4/2020
1:08:42 PM</td><td> </td><td>6/9/2022 12:02:39
PM</td><td>&nbsp;</td><td>MS.17.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14935</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Access door of fire damper is not reachable
</td><td>High</td><td>1/25/2021 12:00:00 PM</td><td>ahmedsalem</td><td>1/18/2021
3:58:22 PM</td><td> </td><td>6/9/2022 12:02:38
PM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20636</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Drain pipe insulation
need to install properly </td><td>High</td><td>8/16/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/9/2021 4:25:17 PM</td><td> </td><td>6/9/2022
12:02:37 PM</td><td>&nbsp;</td><td>MS.17.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20860</td><td>AHU-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Drain pipe insulation need
repair</td><td>High</td><td>8/17/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/10/2021 3:31:58 PM</td><td> </td><td>6/9/2022
12:02:36 PM</td><td>&nbsp;</td><td>MS.18.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21285</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Not
Installed/Completed</td><td>&#39;Insulation for drain
</td><td>High</td><td>8/24/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/17/2021
4:05:43 PM</td><td> </td><td>6/9/2022 12:02:35
PM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>21328</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Missing No. of fire dampers labels
</td><td>High</td><td>8/24/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/17/2021
4:08:08 PM</td><td> </td><td>6/9/2022 12:02:33
PM</td><td>&nbsp;</td><td>MS.19.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>21780</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Missing labels on fire dampers </td><td>High</td><td>8/26/2021
12:00:00 PM</td><td>ahmedsalem</td><td>8/19/2021 11:48:20 AM</td><td>
</td><td>6/9/2022 12:02:32
PM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>29062</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage hydronic
piping insulation.</td><td>High</td><td>5/25/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/18/2022 11:56:14 AM</td><td> </td><td>6/9/2022 12:02:29
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29072</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Damage insulation and duct support shall
removed outside the insulation. </td><td>High</td><td>5/25/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/18/2022 11:56:30 AM</td><td>
</td><td>6/9/2022 12:02:25
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29081</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for hydronic pipes.
</td><td>High</td><td>5/26/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:33 AM</td><td> </td><td>6/9/2022 12:02:24
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29130</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for pipes.
</td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:32 AM</td><td> </td><td>6/9/2022 12:02:20
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29145</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage her Al insulation for hydronic
pipes. </td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:04 AM</td><td> </td><td>6/9/2022 12:02:19
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29157</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for hydronic pipes.
</td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:29 AM</td><td> </td><td>6/9/2022 12:02:18
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>30602</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Cleaning for floor drain cover.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:29 AM</td><td> </td><td>6/9/2022 12:02:17
PM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>30606</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning and house keeping for shaft and
pipes. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:34 AM</td><td> </td><td>6/9/2022 12:02:15
PM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>30622</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Pipes and flush valve shall be cleaned.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:50 AM</td><td> </td><td>6/9/2022 12:02:14
PM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>31209</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing labels for hydronic pipes. </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:56:08 PM</td><td>
</td><td>6/9/2022 12:02:11
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31732</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Labels for air ducts are missing.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:55:10 AM</td><td> </td><td>6/9/2022 12:02:07
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31756</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing labels for air ducts. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 11:55:59 AM</td><td>
</td><td>6/9/2022 12:02:06
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>21490</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor needs cleaning and touch
up painting </td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/18/2021 2:12:31 PM</td><td> </td><td>6/9/2022 11:10:18
AM</td><td>Done </td><td>MS.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>21494</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy floor needs cleaning and touch
up painting </td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/18/2021 2:12:36 PM</td><td> </td><td>6/9/2022 11:10:17
AM</td><td>Done </td><td>MS.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27339</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access door should be fixed properly
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:36 PM</td><td> </td><td>6/9/2022 11:10:16 AM</td><td>Done
</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27368</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Scratches on tiles should be replaced
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:13:35 PM</td><td> </td><td>6/9/2022 11:10:16 AM</td><td>Done
</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27493</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Damaged edges should be repaired </td><td>Low</td><td>3/28/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022 4:41:46 PM</td><td>
</td><td>6/9/2022 11:10:15 AM</td><td>Done
</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27506</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Marked tile should be aligned
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:42:09 PM</td><td> </td><td>6/9/2022 11:10:14 AM</td><td>Done
</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>27508</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Marked gap should be sealed
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:42:14 PM</td><td> </td><td>6/9/2022 11:10:13 AM</td><td>Done
</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>28234</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked edges should be aligned </td><td>Low</td><td>4/10/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/20/2022 12:04:40 PM</td><td>
</td><td>6/9/2022 11:10:12 AM</td><td>Done
</td><td>MA.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28235</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>4/10/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/20/2022 12:04:43 PM</td><td>
</td><td>6/9/2022 11:10:11 AM</td><td>Done
</td><td>MA.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28239</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling need touch up painting </td><td>Low</td><td>4/10/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/20/2022 12:04:49 PM</td><td>
</td><td>6/9/2022 11:10:10 AM</td><td>Done
</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28832</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to
repair.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:30 AM</td><td> </td><td>6/9/2022 11:10:09
AM</td><td>Done </td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28855</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to
repaint.</td><td>Low</td><td>6/6/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/16/2022 11:35:58 AM</td><td> </td><td>6/9/2022 11:10:08
AM</td><td>Done </td><td>MA.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>29098</td><td>STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:09 PM</td><td> </td><td>6/9/2022 11:10:05 AM</td><td>Done
</td><td>MR.14.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30218</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Access door need to touch
up.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:21:13 PM</td><td> </td><td>6/9/2022 11:10:03
AM</td><td>Done </td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31483</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Damaged door leaf should be repaired
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
3:24:58 PM</td><td> </td><td>6/9/2022 11:10:00 AM</td><td>Done
</td><td>MS.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31549</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf should be closed
properly.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:36:10 PM</td><td> </td><td>6/9/2022 11:09:59
AM</td><td>Done </td><td>MS.18.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31698</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant should be adjusted
</td><td>Low</td><td>6/27/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022
11:52:12 AM</td><td> </td><td>6/9/2022 11:09:59 AM</td><td>Done
</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31700</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked part should be closed
</td><td>Low</td><td>6/27/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/6/2022
11:52:15 AM</td><td> </td><td>6/9/2022 11:09:58 AM</td><td>Done
</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>14899</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Internal Lighting</td><td>General
Snag</td><td>&#39;Fixable conduits exceeded 180 cm</td><td>High</td><td>1/25/2021
12:00:00 AM</td><td>Sameh Ibrahim El-Sawah</td><td>1/18/2021 3:26:31 PM</td><td>
</td><td>6/9/2022 10:38:18
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14900</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Internal Lighting</td><td>General
Snag</td><td>&#39;Missing work </td><td>High</td><td>1/25/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>1/18/2021 3:26:33 PM</td><td>
</td><td>6/9/2022 10:38:17
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14901</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>Fire Alarm</td><td>General Snag</td><td>&#39;Missing
work</td><td>High</td><td>1/25/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>1/18/2021 3:26:35 PM</td><td> </td><td>6/9/2022 10:38:16
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14902</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>CABLE TRUNKING</td><td>General
Snag</td><td>&#39;Length of flexible exceeded 180 cm
</td><td>High</td><td>1/25/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>1/18/2021 3:26:37 PM</td><td> </td><td>6/9/2022 10:38:15
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14903</td><td>AHU</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing work
</td><td>High</td><td>1/25/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>1/18/2021 3:26:39 PM</td><td> </td><td>6/9/2022 10:38:15
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14904</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>CABLE TRUNKING</td><td>Incomplete
Installation</td><td>&#39;Cable trunk should be covered
</td><td>High</td><td>1/25/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>1/18/2021 3:26:41 PM</td><td> </td><td>6/9/2022 10:38:14
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14905</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>DB</td><td>General Snag</td><td>&#39;Panel
boards is missing </td><td>High</td><td>1/25/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>1/18/2021 3:26:43 PM</td><td> </td><td>6/9/2022 10:38:13
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14906</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>CABLE LADDER</td><td>General
Snag</td><td>&#39;Change the bending to pull boxes</td><td>High</td><td>1/25/2021
12:00:00 AM</td><td>Sameh Ibrahim El-Sawah</td><td>1/18/2021 3:26:44 PM</td><td>
</td><td>6/9/2022 10:38:12
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14907</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>CABLE TRAY</td><td>Incomplete
Installation</td><td>&#39;Tag numbers not installed yet
</td><td>High</td><td>1/25/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>1/18/2021 3:26:46 PM</td><td> </td><td>6/9/2022 10:38:11
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14908</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>CABLE TRAY</td><td>Incomplete
Installation</td><td>&#39;Tray should be covered</td><td>High</td><td>1/25/2021
12:00:00 AM</td><td>Sameh Ibrahim El-Sawah</td><td>1/18/2021 3:26:49 PM</td><td>
</td><td>6/9/2022 10:38:10
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14909</td><td>AHU</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing installation
</td><td>High</td><td>1/25/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>1/18/2021 3:26:51 PM</td><td> </td><td>6/9/2022 10:38:08
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20678</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Power
Sockets</td><td>General Snag</td><td>&#39;Not alignment - power sockets should be
covered</td><td>High</td><td>8/17/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>8/10/2021 11:19:10 AM</td><td> </td><td>6/9/2022 10:37:54
AM</td><td>&nbsp;</td><td>MQ.19.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>21097</td><td>Ticketing Piazza </td><td>Ticketing
Piazza</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing labels for all boxes and all boxes
must be cleaning ,close all comments in CIR</td><td>High</td><td>8/23/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>8/16/2021 11:54:46 AM</td><td> </td><td>6/9/2022
10:37:53 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24612</td><td>Mankauras - Phase 4</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Camera wrapping should be removed
</td><td>High</td><td>11/7/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>10/31/2021 10:58:28 AM</td><td> </td><td>6/9/2022 10:37:52
AM</td><td>&nbsp;</td><td>Mankauras - Phase 4</td><td>&nbsp;</td>
</tr><tr>
<td>26148</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Power
Sockets</td><td>General Snag</td><td>&#39;Cleaning and eliminate the rust from
floor boxes and missing labels </td><td>High</td><td>2/17/2022 12:00:00
AM</td><td>Mohamed Samir</td><td>2/10/2022 11:45:30 AM</td><td> </td><td>6/9/2022
10:37:49 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27450</td><td>Entrance walls</td><td>Truck scanner
Building</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete electrical work to be completed
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/7/2022
3:56:34 PM</td><td> </td><td>6/9/2022 10:37:45
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28792</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;All holes at boxes must be sealed
</td><td>High</td><td>5/19/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/12/2022 2:38:22 PM</td><td> </td><td>6/9/2022
10:37:44 AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>31039</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:36 PM</td><td> </td><td>6/9/2022
10:37:41 AM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31044</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:43 PM</td><td> </td><td>6/9/2022
10:37:40 AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31057</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Box label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:03 PM</td><td> </td><td>6/9/2022
10:37:39 AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31058</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Tag disconnect </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:04 PM</td><td> </td><td>6/9/2022
10:37:38 AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31073</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:27 PM</td><td> </td><td>6/9/2022
10:37:37 AM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31075</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:23:31 PM</td><td> </td><td>6/9/2022 10:37:36
AM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31078</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:23:36 PM</td><td> </td><td>6/9/2022 10:37:35
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>31088</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Disconnect tag</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:58 PM</td><td> </td><td>6/9/2022
10:37:33 AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31090</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Disconnect tag</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:01 PM</td><td> </td><td>6/9/2022
10:37:32 AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31093</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Earth jumper for MV ladder</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:07 PM</td><td> </td><td>6/9/2022
10:37:31 AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>29172</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing support for
valve. </td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:55 AM</td><td> </td><td>6/9/2022 9:58:39
AM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>16392</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing connection of the light inside the
AHU</td><td>High</td><td>2/21/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>2/14/2021 3:08:55 PM</td><td> </td><td>6/9/2022 9:57:38
AM</td><td>&nbsp;</td><td>MS.14.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>30083</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;No ventilation system detected in this
area. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:36 AM</td><td> </td><td>6/9/2022 9:55:37
AM</td><td>&nbsp;</td><td>MA.19.02.022</td><td>&nbsp;</td>
</tr><tr>
<td>31721</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Insulation strap closing the access door.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 11:54:50 AM</td><td> </td><td>6/9/2022 9:37:04
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>27266</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail not aligned and
leveled.</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/7/2022 12:05:09 PM</td><td> </td><td>6/9/2022 9:34:21
AM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>31465</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;No ventilation system detected in
this area. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 12:07:40 PM</td><td> </td><td>6/9/2022 9:31:28
AM</td><td>&nbsp;</td><td>MA.19.02.025</td><td>&nbsp;</td>
</tr><tr>
<td>27265</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail should be fixed
well.</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/7/2022 12:05:06 PM</td><td> </td><td>6/9/2022 9:28:47
AM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27263</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Handrail should be fixed
well.</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/7/2022 12:05:03 PM</td><td> </td><td>6/9/2022 9:28:09
AM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27262</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All welding connection should be finished
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/7/2022
12:05:01 PM</td><td> </td><td>6/9/2022 9:27:42
AM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27261</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;All connection need to finish
well.</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/7/2022 12:05:00 PM</td><td> </td><td>6/9/2022 9:27:13
AM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>19903</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Concrete ceiling need to repair </td><td>Low</td><td>8/19/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021 11:24:55 AM</td><td>
</td><td>6/9/2022 9:26:14
AM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>19902</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Paint finish</td><td>&#39;Welding line need to finish
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:24:54 AM</td><td> </td><td>6/9/2022 9:25:33
AM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>19899</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Stainless steel bar not leveled
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:24:48 AM</td><td> </td><td>6/9/2022 9:25:07
AM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>19898</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding line not finished
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:24:46 AM</td><td> </td><td>6/9/2022 9:23:41
AM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>13895</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Touch up for wall </td><td>High</td><td>12/9/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/2/2020 11:09:52 AM</td><td> </td><td>6/9/2022
9:22:56 AM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>13891</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing handrail
</td><td>High</td><td>12/9/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/2/2020
11:09:37 AM</td><td> </td><td>6/9/2022 9:22:22
AM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>13751</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>Cracks</td><td>&#39;Repair for concrete floor
</td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:39:08 AM</td><td> </td><td>6/9/2022 9:21:48
AM</td><td>&nbsp;</td><td>MS.18.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>13738</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Touch up for repair </td><td>Low</td><td>12/22/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/1/2020 11:38:26 AM</td><td> </td><td>6/9/2022
9:20:52 AM</td><td>&nbsp;</td><td>MS.18.2A.025</td><td>&nbsp;</td>
</tr><tr>
<td>31585</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame and accessories should be cleaned from both
sides l</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:37:21 PM</td><td> </td><td>6/9/2022 9:16:58
AM</td><td>&nbsp;</td><td>MS.18.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31567</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame and accessories need to clean from both
sides.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:36:56 PM</td><td> </td><td>6/9/2022 9:16:23
AM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31561</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame and accessories need to clean from both
sides.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:36:45 PM</td><td> </td><td>6/9/2022 9:15:40
AM</td><td>&nbsp;</td><td>MS.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31548</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame and accessories need to clean from both sides
</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022
3:36:08 PM</td><td> </td><td>6/9/2022 9:14:15
AM</td><td>&nbsp;</td><td>MS.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31481</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Tape should be removed </td><td>Low</td><td>6/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/2/2022 3:24:54 PM</td><td> </td><td>6/9/2022
9:13:14 AM</td><td>&nbsp;</td><td>MS.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31245</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Vanity should be fixed
well.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 10:41:13 AM</td><td> </td><td>6/9/2022 9:12:39
AM</td><td>&nbsp;</td><td>MQ.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30546</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:06 AM</td><td> </td><td>6/9/2022 9:11:41
AM</td><td>&nbsp;</td><td>MA.19.02.015</td><td>&nbsp;</td>
</tr><tr>
<td>30187</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting need to touch
up.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 11:50:14 AM</td><td> </td><td>6/9/2022 9:10:31
AM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>27465</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 4:40:55 PM</td><td> </td><td>6/9/2022
9:09:33 AM</td><td>&nbsp;</td><td>MR.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>21948</td><td>CORE D2</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire collar around HDPE pipes
</td><td>High</td><td>8/30/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/23/2021
1:35:47 PM</td><td> </td><td>6/9/2022 9:06:13
AM</td><td>&nbsp;</td><td>MC.18.02.D21</td><td>&nbsp;</td>
</tr><tr>
<td>13364</td><td>B.O.H-ARTEFACTS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need repainting </td><td>Low</td><td>11/26/2020 12:00:00
AM</td><td>sally.george</td><td>11/5/2020 12:14:31 PM</td><td> </td><td>6/9/2022
9:03:51 AM</td><td>Done </td><td>MQ.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30024</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Condensation drain pipes shall be ended
with elbows. </td><td>High</td><td>6/5/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:39 AM</td><td> </td><td>6/9/2022 9:03:37
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29187</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing thermal insulation.
</td><td>High</td><td>5/29/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:03 AM</td><td> </td><td>6/9/2022 9:02:52
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>28874</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing thermal
insulation for drain valves. </td><td>High</td><td>5/23/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/16/2022 4:07:14 PM</td><td>
</td><td>6/9/2022 8:59:40
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>9546</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate drain
pipe</td><td>Installation not to specification/drawing</td><td>&#39;The insulation
should to be repaired of drain </td><td>High</td><td>7/27/2020 12:00:00
PM</td><td>ahmedsalem</td><td>7/20/2020 11:42:14 AM</td><td> </td><td>6/9/2022
8:56:25 AM</td><td>&nbsp;</td><td>MS.13.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>22014</td><td>CORE D3</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Need labels for duct &amp;
pipe</td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/23/2021 3:57:00 PM</td><td> </td><td>6/9/2022
8:55:19 AM</td><td>&nbsp;</td><td>MC.13.03.D31</td><td>&nbsp;</td>
</tr><tr>
<td>31540</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Drainage System</td><td>General
Snag</td><td>&#39;Drain pipe need cleaning. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 3:32:41 PM</td><td>
</td><td>6/9/2022 8:54:07
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31441</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Condensate drain pipes shall be ended with elbows.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:57:30 AM</td><td> </td><td>6/9/2022 8:53:08
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31409</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty support. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:56:22 AM</td><td>
</td><td>6/9/2022 8:52:10
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31406</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Elastomeric insulation need adjustments.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:17 AM</td><td> </td><td>6/9/2022 8:51:05
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31386</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Seismic wire need to be tightened. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:55:37 AM</td><td>
</td><td>6/9/2022 8:50:03
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31375</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain pipe need more supports. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:55:12 AM</td><td>
</td><td>6/9/2022 8:48:18
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31353</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty drain points shall be treated, painted and insulated.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:27 AM</td><td> </td><td>6/9/2022 8:46:56
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31205</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Condensate drain pipes shall be ended with elbow.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:55:55 PM</td><td> </td><td>6/9/2022 8:45:45
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31156</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing air duct labels. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:53:50 PM</td><td>
</td><td>6/9/2022 8:43:49
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31153</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing elbow.</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:53:46 PM</td><td>
</td><td>6/9/2022 8:42:47
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31148</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air duct thermal insulation need repairs.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:39 PM</td><td> </td><td>6/9/2022 8:41:24
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31134</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain pipe need cleaning. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:53:16 PM</td><td>
</td><td>6/9/2022 8:40:24
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>9459</td><td>SERVICE TUNNEL (B)-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing CIR for seismic of Fire fighting
pipes </td><td>High</td><td>7/15/2020 12:00:00
AM</td><td>hossamreda</td><td>7/8/2020 4:29:29 PM</td><td> </td><td>6/9/2022
8:35:41 AM</td><td>&nbsp;</td><td>MQ.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>30623</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Floor drain
cover need cleaning. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:51 AM</td><td> </td><td>6/9/2022 8:33:09
AM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>30617</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Floor drain
shall be cleaned. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:44 AM</td><td> </td><td>6/9/2022 8:31:17
AM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>21660</td><td>LOBBY</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor needs adjustment and repair
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:25:04 AM</td><td> </td><td>6/9/2022 8:26:22
AM</td><td>&nbsp;</td><td>MC.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21540</td><td>LOBBY</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up for dust sealer
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
9:51:39 AM</td><td> </td><td>6/9/2022 8:25:45
AM</td><td>&nbsp;</td><td>MC.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>8637</td><td>IT ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing CIR of hose and actuators of Inergen
</td><td>Low</td><td>4/1/2020 12:00:00 AM</td><td>hossamreda</td><td>3/11/2020
12:37:29 PM</td><td> </td><td>6/9/2022 8:10:55
AM</td><td>&nbsp;</td><td>MS.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>8677</td><td>CORE B3</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Hose Reel
Cabinet</td><td>Hose reel</td><td>&#39;Missing fire extinguisher and fire hose
reel</td><td>Low</td><td>4/1/2020 12:00:00 AM</td><td>hossamreda</td><td>3/11/2020
12:39:47 PM</td><td> </td><td>6/9/2022 8:10:54
AM</td><td>&nbsp;</td><td>MC.12.0G.B31</td><td>&nbsp;</td>
</tr><tr>
<td>9591</td><td>AHU/PLANT</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>Installation not to specification/drawing</td><td>&#39;Thermostat is
broken </td><td>High</td><td>7/27/2020 12:00:00
PM</td><td>ahmedsalem</td><td>7/20/2020 11:44:19 AM</td><td> </td><td>6/8/2022
4:44:07 PM</td><td>&nbsp;</td><td>MS.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>14920</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Drainage System</td><td>Floor Clean out
Cover</td><td>&#39;Insulation on drain line </td><td>High</td><td>1/25/2021
12:00:00 AM</td><td>ahmedsalem</td><td>1/18/2021 3:57:45 PM</td><td>
</td><td>6/8/2022 4:44:06
PM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>21047</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Drain pipes insulation need repair
</td><td>High</td><td>8/22/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/15/2021
1:23:33 PM</td><td> </td><td>6/8/2022 4:44:05
PM</td><td>&nbsp;</td><td>MS.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>21087</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Pipes insulation need repair </td><td>High</td><td>8/22/2021
12:00:00 PM</td><td>ahmedsalem</td><td>8/15/2021 1:25:04 PM</td><td>
</td><td>6/8/2022 4:44:03
PM</td><td>&nbsp;</td><td>MS.13.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>21378</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Not
Installed/Completed</td><td>&#39;Missing insulation for drain pipes
</td><td>High</td><td>8/25/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/18/2021
11:40:26 AM</td><td> </td><td>6/8/2022 4:44:02
PM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>30072</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Air terminals had been painted.
</td><td>High</td><td>6/6/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:11 AM</td><td> </td><td>6/8/2022 4:44:01
PM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30075</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Slot diffusers has been painted.
</td><td>High</td><td>6/6/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:19 AM</td><td> </td><td>6/8/2022 4:44:00
PM</td><td>&nbsp;</td><td>MA.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30086</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Painting and putty on air diffusers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:42 AM</td><td> </td><td>6/8/2022 4:43:58
PM</td><td>&nbsp;</td><td>MA.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30087</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Painting and putty on air diffusers.
</td><td>High</td><td>6/6/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:46 AM</td><td> </td><td>6/8/2022 4:43:57
PM</td><td>&nbsp;</td><td>MA.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30088</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Painting and putty on slot diffusers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:48 AM</td><td> </td><td>6/8/2022 4:43:56
PM</td><td>&nbsp;</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>31331</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:53:42 AM</td><td>
</td><td>6/8/2022 4:43:51
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31347</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing labels for air ducts. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:54:16 AM</td><td>
</td><td>6/8/2022 4:43:49
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31348</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage hydronic pipes thermal installation shall be repaired.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:18 AM</td><td> </td><td>6/8/2022 4:43:48
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31354</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39; Issuing labels for hydronic pipes.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:30 AM</td><td> </td><td>6/8/2022 4:43:47
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31362</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain pipes shall be ended with elbows.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:43 AM</td><td> </td><td>6/8/2022 4:43:46
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31385</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage thermal insulation for pipes.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:55:35 AM</td><td> </td><td>6/8/2022 4:43:44
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31499</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Chilled water pipes
insulation need repairs. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:25 PM</td><td> </td><td>6/8/2022 4:43:43
PM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>31513</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Cleaning of cylinders.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:31:05 PM</td><td> </td><td>6/8/2022 4:43:41
PM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31516</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Hoses not connected.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:31:16 PM</td><td> </td><td>6/8/2022 4:43:40
PM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31537</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Chilled water pipes need repairs. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 3:32:36 PM</td><td>
</td><td>6/8/2022 4:43:39
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31543</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing seismic bracings for fire
pipes. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:45 PM</td><td> </td><td>6/8/2022 4:43:38
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>

<td>25513</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Uplight lighting fixtures are not
installed.</td><td>High</td><td>12/16/2021 12:00:00 AM</td><td>David Noshy
Naguib</td><td>12/9/2021 11:27:37 AM</td><td> </td><td>6/8/2022 4:17:38
PM</td><td>Installed</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>10496</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing stair handrails
</td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:13:42 PM</td><td> </td><td>6/8/2022 3:36:53
PM</td><td>Done </td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13603</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy paint floor need cleaning and
touch up </td><td>Low</td><td>12/14/2020 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>11/23/2020 3:44:49 PM</td><td> </td><td>6/8/2022 3:36:52
PM</td><td>Done </td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>13606</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Paint finish</td><td>&#39;Stainless handrail not finished need to
touch up </td><td>Low</td><td>12/14/2020 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>11/23/2020 3:45:05 PM</td><td> </td><td>6/8/2022 3:36:51
PM</td><td>Done </td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>26156</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Stainless steel plate should be flushed with stone flooring
</td><td>Low</td><td>3/8/2022 12:00:00 PM</td><td>Marios Ioannou,</td><td>2/15/2022
1:31:53 PM</td><td> </td><td>6/8/2022 3:08:15
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26161</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>Porviva/
Savita</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;Corners joints should be leveled and aligned
</td><td>Low</td><td>3/8/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>2/15/2022
1:45:10 PM</td><td> </td><td>6/8/2022 3:08:13
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26186</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Salted tiles should be treated </td><td>Low</td><td>3/10/2022
12:00:00 AM</td><td>Amr Nofal</td><td>2/17/2022 12:11:51 PM</td><td>
</td><td>6/8/2022 3:08:12 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26204</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Black stains should be removed
</td><td>Low</td><td>3/10/2022 12:00:00 PM</td><td>Amr Nofal</td><td>2/17/2022
12:15:57 PM</td><td> </td><td>6/8/2022 3:08:11
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>30219</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting around glazing need to
adjust.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:21:15 PM</td><td> </td><td>6/8/2022 3:08:11
PM</td><td>&nbsp;</td><td>MQ.13.02.002</td><td>&nbsp;</td>
</tr><tr>

<td>26220</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
11:38:34 AM</td><td> </td><td>6/8/2022 3:08:11
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26281</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Salted the should be treated </td><td>Low</td><td>3/15/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022 11:24:04 AM</td><td>
</td><td>6/8/2022 3:08:09 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26373</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
11:21:23 AM</td><td> </td><td>6/8/2022 3:08:09
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26375</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Scratches should be removed
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
11:21:28 AM</td><td> </td><td>6/8/2022 3:08:08
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26401</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
2:48:52 PM</td><td> </td><td>6/8/2022 3:08:07
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26469</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
11:16:47 AM</td><td> </td><td>6/8/2022 3:08:05
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26523</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Dents and stains should be removed
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
2:22:36 PM</td><td> </td><td>6/8/2022 3:08:05
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26525</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles </td><td>Low</td><td>3/17/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/24/2022 2:22:39 PM</td><td> </td><td>6/8/2022
3:08:04 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26533</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Improper cutting around manhole cover
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
2:22:49 PM</td><td> </td><td>6/8/2022 3:08:03
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26541</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Salted tiles should be treated </td><td>Low</td><td>3/17/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022 2:22:58 PM</td><td>
</td><td>6/8/2022 3:08:02 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26623</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Bitted tiles should be treated
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
11:12:48 AM</td><td> </td><td>6/8/2022 3:08:00
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26633</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
3:15:28 PM</td><td> </td><td>6/8/2022 3:07:59
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26647</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/28/2022
3:16:00 PM</td><td> </td><td>6/8/2022 3:07:59
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26675</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;paint stains should be removed
</td><td>Low</td><td>3/22/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/1/2022
11:04:04 AM</td><td> </td><td>6/8/2022 3:07:57
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26684</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Improper cutting around slot drain
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
11:04:19 AM</td><td> </td><td>6/8/2022 3:07:56
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26685</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Different textures between stone tiles
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
11:04:20 AM</td><td> </td><td>6/8/2022 3:07:56
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26722</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken broken edges should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
3:45:26 PM</td><td> </td><td>6/8/2022 3:07:54
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26723</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Not
aligned</td><td>&#39;Gap between stone and metal trim not consistent
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
3:45:29 PM</td><td> </td><td>6/8/2022 3:07:53
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26726</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
3:45:34 PM</td><td> </td><td>6/8/2022 3:07:52
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26731</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
3:45:38 PM</td><td> </td><td>6/8/2022 3:07:51
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26743</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing metal trim</td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 3:45:49 PM</td><td>
</td><td>6/8/2022 3:07:50 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26747</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be
treated</td><td>Low</td><td>3/22/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/1/2022 3:45:52 PM</td><td> </td><td>6/8/2022
3:07:49 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26873</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
10:31:12 AM</td><td> </td><td>6/8/2022 3:07:48
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26888</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Salted tiles should be treated </td><td>Low</td><td>3/23/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/2/2022 10:32:05 AM</td><td>
</td><td>6/8/2022 3:07:47 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26894</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Salted tiles should be treated </td><td>Low</td><td>3/23/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022 10:32:15 AM</td><td>
</td><td>6/8/2022 3:07:46 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27026</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Gap between stone and metal trim to be
consistent </td><td>Low</td><td>3/23/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/2/2022 4:15:42 PM</td><td> </td><td>6/8/2022
3:07:45 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27102</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
11:08:43 AM</td><td> </td><td>6/8/2022 3:07:43
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27105</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
11:08:53 AM</td><td> </td><td>6/8/2022 3:07:43
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27107</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
11:08:56 AM</td><td> </td><td>6/8/2022 3:07:41
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27184</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Gaps between stone cladding and flooring
should be closed </td><td>Low</td><td>3/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/3/2022 3:01:27 PM</td><td> </td><td>6/8/2022
3:07:40 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27185</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
3:01:29 PM</td><td> </td><td>6/8/2022 3:07:39
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27186</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Missing stone cladding tile
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
3:01:30 PM</td><td> </td><td>6/8/2022 3:07:38
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27194</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
3:01:49 PM</td><td> </td><td>6/8/2022 3:07:37
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27212</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;Joint workmanship is not good should be redone
</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022
4:39:33 PM</td><td> </td><td>6/8/2022 3:07:36
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27213</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;Protection covers should be removed
</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022
4:39:35 PM</td><td> </td><td>6/8/2022 3:07:35
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27217</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;Louvers should be trim and should be aligned
</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022
4:39:43 PM</td><td> </td><td>6/8/2022 3:07:34
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27250</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Metal plate (S/S cladding)</td><td>General
Snag</td><td>&#39;Remove protection tape </td><td>Low</td><td>3/27/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:51:31 PM</td><td> </td><td>6/8/2022
3:07:33 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>28226</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling need touch up painting </td><td>Low</td><td>4/10/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/20/2022 12:04:23 PM</td><td>
</td><td>6/8/2022 3:06:58
PM</td><td>&nbsp;</td><td>MA.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27362</td><td>LOBBY</td><td>MU L20</td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39; Marked gaps is not consistent </td><td>Low</td><td>3/28/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022 12:13:21 PM</td><td>
</td><td>6/8/2022 3:06:10
PM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27348</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Incomplete work
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:53 PM</td><td> </td><td>6/8/2022 3:04:40
PM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>14330</td><td>B.O.H-CORRIDOR - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need repainting </td><td>High</td><td>12/31/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>12/24/2020 1:23:17 PM</td><td> </td><td>6/8/2022
3:02:41 PM</td><td>&nbsp;</td><td>MS.18.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>31552</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf and frame should be cleaned from both
sides.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:36:17 PM</td><td> </td><td>6/8/2022 3:02:13
PM</td><td>&nbsp;</td><td>MS.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31484</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
should be closed properly /to be balanced </td><td>Low</td><td>6/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/2/2022 3:24:59 PM</td><td> </td><td>6/8/2022
2:55:35 PM</td><td>&nbsp;</td><td>MS.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31480</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Floor
hinge should be adjusted </td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:24:53 PM</td><td> </td><td>6/8/2022 2:54:45
PM</td><td>&nbsp;</td><td>MS.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>21507</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door frame
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/18/2021
2:13:02 PM</td><td> </td><td>6/8/2022 2:54:02
PM</td><td>&nbsp;</td><td>MS.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>21499</td><td>B.O.H-SERVICE TUNNEL - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Walls need to repaint
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/18/2021
2:12:53 PM</td><td> </td><td>6/8/2022 2:53:11
PM</td><td>&nbsp;</td><td>MS.23.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14371</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up paint </td><td>High</td><td>12/31/2020
12:00:00 AM</td><td>Adel Nassrat</td><td>12/24/2020 1:24:59 PM</td><td>
</td><td>6/8/2022 2:52:07
PM</td><td>&nbsp;</td><td>MS.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31586</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be balanced and closed well.</td><td>Low</td><td>6/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/2/2022 3:37:23 PM</td><td> </td><td>6/8/2022
2:51:14 PM</td><td>&nbsp;</td><td>MS.18.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31547</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
holes should be closed.</td><td>Low</td><td>6/23/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/2/2022 3:36:06 PM</td><td> </td><td>6/8/2022 2:50:16
PM</td><td>&nbsp;</td><td>MS.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>30875</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Epoxy painting floor need to touch
up.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>6/1/2022
11:57:58 AM</td><td> </td><td>6/8/2022 2:44:05
PM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30215</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to touch
up.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:20:49 PM</td><td> </td><td>6/8/2022 2:11:17
PM</td><td>&nbsp;</td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>29121</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Marked parts need repair and touch up for
painting </td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/19/2022 12:04:55 PM</td><td> </td><td>6/8/2022 2:08:26
PM</td><td>&nbsp;</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>29120</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to repair and touch
up </td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:54 PM</td><td> </td><td>6/8/2022 2:07:32
PM</td><td>&nbsp;</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>29105</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:22 PM</td><td> </td><td>6/8/2022 2:05:40
PM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>29104</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:20 PM</td><td> </td><td>6/8/2022 2:03:25
PM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>29097</td><td>STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:06 PM</td><td> </td><td>6/8/2022 2:01:31
PM</td><td>&nbsp;</td><td>MR.14.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28848</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Skirting need to touch
up.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/15/2022
11:47:53 AM</td><td> </td><td>6/8/2022 1:59:38
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28845</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall edges should be
aligned.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:48 AM</td><td> </td><td>6/8/2022 1:56:27
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28838</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Skirting need to touch
up.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/15/2022
11:47:38 AM</td><td> </td><td>6/8/2022 1:55:12
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28808</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint between skirting and floor should be
leveled.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:46:56 AM</td><td> </td><td>6/8/2022 1:54:05
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28802</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint between skirting and floor should be
leveled.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:46:48 AM</td><td> </td><td>6/8/2022 1:52:44
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28699</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Gap between skirting and carpet should be
leveled (surrounded )</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/11/2022 10:38:34 AM</td><td> </td><td>6/8/2022 1:52:00
PM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28227</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access doors should be fixed properly
</td><td>Low</td><td>4/10/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/20/2022
12:04:25 PM</td><td> </td><td>6/8/2022 1:48:24
PM</td><td>&nbsp;</td><td>MA.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28224</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>4/10/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/20/2022 12:04:17 PM</td><td>
</td><td>6/8/2022 1:37:47
PM</td><td>&nbsp;</td><td>MA.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28119</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling need touch up painting </td><td>Low</td><td>4/6/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/16/2022 11:00:14 AM</td><td>
</td><td>6/8/2022 1:37:17
PM</td><td>&nbsp;</td><td>MA.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28103</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Skirting should be leveled
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/16/2022
10:59:45 AM</td><td> </td><td>6/8/2022 1:36:30
PM</td><td>&nbsp;</td><td>MA.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>20234</td><td>WC /F</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Floor Tile</td><td>Grouting quality</td><td>&#39;Joints should be filled grouting
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:22 PM</td><td> </td><td>6/8/2022 1:25:07
PM</td><td>&nbsp;</td><td>MW.18.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20167</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>8/24/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/3/2021
3:37:50 PM</td><td> </td><td>6/8/2022 1:24:37
PM</td><td>&nbsp;</td><td>MS.13.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>12035</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall Painting</td><td>General
Snag</td><td>&#39;Wall painting need to touch up </td><td>Low</td><td>10/22/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020 2:13:30 PM</td><td>
</td><td>6/8/2022 1:22:31
PM</td><td>&nbsp;</td><td>MS.18.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>16841</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Stone is missing under basin
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
12:59:50 PM</td><td> </td><td>6/8/2022 1:21:27
PM</td><td>&nbsp;</td><td>MW.13.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>20226</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Close around electrical pipes </td><td>Low</td><td>8/25/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021 12:05:13 PM</td><td>
</td><td>6/8/2022 1:21:01
PM</td><td>&nbsp;</td><td>MQ.18.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20169</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up for concrete flooring
</td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/3/2021
3:37:53 PM</td><td> </td><td>6/8/2022 1:20:25
PM</td><td>&nbsp;</td><td>MS.13.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>16968</td><td>ESCAPE ROUTE-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor painting need repair and touch up
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:26:53 PM</td><td> </td><td>6/8/2022 1:19:00
PM</td><td>&nbsp;</td><td>MQ.18.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20250</td><td>WC /M</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Floor Tile</td><td>Grouting quality</td><td>&#39;Joints should be filled grouting
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:42 PM</td><td> </td><td>6/8/2022 1:17:57
PM</td><td>&nbsp;</td><td>MW.18.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>20228</td><td>WC /F</td><td>MU
L10</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Visible repair</td><td>&#39;Partition should be vertical
</td><td>Low</td><td>8/25/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/4/2021
12:05:15 PM</td><td> </td><td>6/8/2022 1:17:17
PM</td><td>&nbsp;</td><td>MW.18.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20168</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Edge should be aligned
</td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/3/2021
3:37:52 PM</td><td> </td><td>6/8/2022 1:16:23
PM</td><td>&nbsp;</td><td>MS.13.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>17919</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>5/30/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>5/23/2021
12:53:44 PM</td><td> </td><td>6/8/2022 1:15:22
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>17930</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>6/13/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>5/23/2021
12:54:21 PM</td><td> </td><td>6/8/2022 1:14:56
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>17908</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>5/30/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>5/23/2021
12:53:19 PM</td><td> </td><td>6/8/2022 1:14:17
PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14968</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Close opening around duct as per approved detail
</td><td>Low</td><td>2/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>1/19/2021
11:35:12 AM</td><td> </td><td>6/8/2022 1:13:43
PM</td><td>&nbsp;</td><td>MS.20.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>12036</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint Floor</td><td>General
Snag</td><td>&#39;Repair for epoxy painting and touch up
</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020
2:13:32 PM</td><td> </td><td>6/8/2022 1:13:18
PM</td><td>&nbsp;</td><td>MS.18.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20496</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Grouting is missing
</td><td>Low</td><td>8/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:35 PM</td><td> </td><td>6/8/2022 1:12:37
PM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20183</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing application for movement joint
</td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/3/2021
3:38:28 PM</td><td> </td><td>6/8/2022 1:11:33
PM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>16956</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Cracks should be repaired at access panel/around grill frame need
adjustment with ceiling </td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>3/11/2021 12:25:54 PM</td><td> </td><td>6/8/2022 1:10:52
PM</td><td>&nbsp;</td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>15005</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint Floor</td><td>General
Snag</td><td>&#39;Cleaning and repair for epoxy paint floor
</td><td>Low</td><td>2/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>1/19/2021
11:36:34 AM</td><td> </td><td>6/8/2022 1:09:36
PM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>12061</td><td>SERVICE TUNNEL (B)-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Walls painting need to touch up
</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
2:14:46 PM</td><td> </td><td>6/8/2022 1:08:50
PM</td><td>&nbsp;</td><td>MQ.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>12057</td><td>SERVICE DELIVERY-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Surface for flooring
</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
2:14:35 PM</td><td> </td><td>6/8/2022 1:08:10
PM</td><td>&nbsp;</td><td>MQ.18.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>12055</td><td>VOID</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall Painting</td><td>General
Snag</td><td>&#39;Wall painting need to touch up </td><td>Low</td><td>10/22/2020
12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020 2:14:30 PM</td><td>
</td><td>6/8/2022 1:07:27
PM</td><td>&nbsp;</td><td>MS.13.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>12053</td><td>VOID</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Concrete floor need to repair and painting
</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020
2:14:25 PM</td><td> </td><td>6/8/2022 1:06:34
PM</td><td>&nbsp;</td><td>MS.13.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>12050</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy need to clean and touch up
</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020
2:14:14 PM</td><td> </td><td>6/8/2022 1:05:42
PM</td><td>&nbsp;</td><td>MS.13.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>12049</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020
2:14:12 PM</td><td> </td><td>6/8/2022 1:04:54
PM</td><td>&nbsp;</td><td>MS.13.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>12044</td><td>MACHINE ACCESS ROOM</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Walls painting need to touch up
</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020
2:13:57 PM</td><td> </td><td>6/8/2022 1:04:07
PM</td><td>&nbsp;</td><td>MS.18.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>12041</td><td>VOID</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Flooring need repair and touch up</td><td>Low</td><td>10/22/2020
12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020 2:13:49 PM</td><td>
</td><td>6/8/2022 1:03:29
PM</td><td>&nbsp;</td><td>MS.13.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>12040</td><td>VOID</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall Painting</td><td>General
Snag</td><td>&#39;Wall Painting need to touch up </td><td>Low</td><td>10/22/2020
12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020 2:13:46 PM</td><td>
</td><td>6/8/2022 1:02:32
PM</td><td>&nbsp;</td><td>MS.13.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>16501</td><td>Plant</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Touch up andGeneral cleaning for floor
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:09 AM</td><td> </td><td>6/8/2022 1:01:08
PM</td><td>&nbsp;</td><td>MS.19.0G.005</td><td>&nbsp;</td>
</tr><tr>
<td>16475</td><td>Waste Store</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around door frame need to adjust
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:37 AM</td><td> </td><td>6/8/2022 1:00:15
PM</td><td>&nbsp;</td><td>MS.19.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16547</td><td>DISABLED FACILITY</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Around electrical boxes should be adjusted
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:31 AM</td><td> </td><td>6/8/2022 12:59:41
PM</td><td>&nbsp;</td><td>MG.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>21647</td><td>CORE D3</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Gypsum wall is not finished
yet</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
11:24:44 AM</td><td> </td><td>6/8/2022 12:59:14
PM</td><td>&nbsp;</td><td>MC.13.0G.D31</td><td>&nbsp;</td>
</tr><tr>
<td>22203</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;marked part need to repair and adjusted
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:47:39 AM</td><td> </td><td>6/8/2022 12:58:48
PM</td><td>&nbsp;</td><td>MG.13.0G.003

</td><td>&nbsp;</td>
</tr><tr>
<td>16551</td><td>W.C. LOBBY</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Painting need touch up
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:37 AM</td><td> </td><td>6/8/2022 12:58:19
PM</td><td>&nbsp;</td><td>MG.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16487</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Grouting is missing
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:53 AM</td><td> </td><td>6/8/2022 12:57:25
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16481</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:44 AM</td><td> </td><td>6/8/2022 12:56:49
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16479</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Repair need adjustment
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:42 AM</td><td> </td><td>6/8/2022 12:56:20
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22303</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Joints are not aligned
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:50:30 AM</td><td> </td><td>6/8/2022 12:51:18
PM</td><td>&nbsp;</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>26094</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Spacing between cover plates and
copping should be equal </td><td>Low</td><td>2/22/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/1/2022 11:49:03 AM</td><td> </td><td>6/8/2022
12:37:37 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26092</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Gasket rubber should be sited
properly </td><td>Low</td><td>2/22/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/1/2022 11:48:57 AM</td><td> </td><td>6/8/2022
12:37:30 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14858</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Signage</td><td>General Snag</td><td>&#39;Remove the sealant around
signage</td><td>High</td><td>1/25/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>1/18/2021 1:19:00 PM</td><td> </td><td>6/8/2022
12:32:32 PM</td><td>&nbsp;</td><td>MW.18.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15811</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Door
Hardware</td><td>General</td><td>&#39;Remove tape and make good to the ironmongery
(inside face)</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 9:01:45 AM</td><td> </td><td>6/8/2022
12:32:18 PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15809</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Door
Hardware</td><td>General</td><td>&#39;Remove tape and make good to the ironmongery
(outside face)</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 8:56:55 AM</td><td> </td><td>6/8/2022
12:32:02 PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15813</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Door
Hardware</td><td>General</td><td>&#39;Remove tape and make good to the ironmongery
(inside face)</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 9:12:26 AM</td><td> </td><td>6/8/2022
12:31:18 PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15814</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Door
Hardware</td><td>General</td><td>&#39;Remove tape and make good to the ironmongery
(outside face)</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 9:14:43 AM</td><td> </td><td>6/8/2022
12:31:11 PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14702</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Discoloration between tiles
</td><td>High</td><td>1/17/2021 12:00:00 PM</td><td>mohamed.sami</td><td>1/10/2021
2:31:33 PM</td><td> </td><td>6/8/2022 12:30:46
PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>25861</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Difference in colour/shade</td><td>&#39;Missing painting
</td><td>Low</td><td>2/8/2022 12:00:00 AM</td><td>Sherif Elabd</td><td>1/18/2022
1:55:04 PM</td><td> </td><td>6/8/2022 12:30:38
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16617</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;5of 10 elements inspected steel structure onlyCIR
No222961
This snag is valid for 10 of free standing elements/searching for his
parents</td><td>Low</td><td>3/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>2/20/2021 2:56:15 PM</td><td> </td><td>6/8/2022 12:30:32
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10640</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
louvre and tile to be removed /stone tiles need repair
</td><td>Low</td><td>10/4/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/13/2020 4:49:04 PM</td><td> </td><td>6/8/2022
12:30:19 PM</td><td>Panel is repaired but not
replaced</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14877</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>Ceiling</td><td>General Snag</td><td>&#39;The
light unit should be fixed properly </td><td>High</td><td>1/25/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>1/18/2021 1:19:54 PM</td><td> </td><td>6/8/2022
12:29:35 PM</td><td>&nbsp;</td><td>MW.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14868</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Filling sealant around
units</td><td>High</td><td>1/25/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>1/18/2021 1:19:34 PM</td><td> </td><td>6/8/2022
12:29:27 PM</td><td>&nbsp;</td><td>MW.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>17973</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;Finishing TUT TOMB ( TUT_CIE_1_003
)</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 4:57:23 PM</td><td> </td><td>6/8/2022
12:28:54 PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>16126</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>Mirage</td><td>Architectural</td><td>Steelwork</
td><td>General Snag</td><td>&#39;Foot rest not level - to be
level</td><td>High</td><td>2/17/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/10/2021 10:07:20 AM</td><td> </td><td>6/8/2022
12:28:22 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>15821</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Damages to be rectified or replaced</td><td>&#39;Joint between
stone panels not acceptable - not straight or uniform - repair and make
good</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 10:05:16 AM</td><td> </td><td>6/8/2022
12:28:04 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>15820</td><td>TUT- Digital (+46.50)</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Damages to be rectified or replaced</td><td>&#39;Unacceptable
visible chip to the top stone panel - replace</td><td>High</td><td>2/13/2021
12:00:00 AM</td><td>andrewjohn.rose</td><td>2/6/2021 10:02:34 AM</td><td>
</td><td>6/8/2022 12:27:56 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25404</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Other Snag</td><td>&#39;TUT TOMB
Issue is - Deflection/rotation of identified Beams.
Resolution is to strengthen the identified Beams.</td><td>Urgent</td><td>11/27/2021
12:00:00 AM</td><td>andrewjohn.rose</td><td>11/24/2021 3:47:01 PM</td><td>
</td><td>6/8/2022 12:27:49
PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>17982</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;Finishing MEDIA TABLE &quot;FUNERARY
PROCESSION&quot; ( TUT_CIE_3_003 )</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 5:13:07 PM</td><td> </td><td>6/8/2022
12:27:34 PM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>16620</td><td>TUT- TUTANKAMEN GALLERY(+46.50)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>Architectural</td><td>Showcases</
td><td>General Snag</td><td>&#39;The subcontractor didn’t finish the work to send
CIR for cladding/lighting installation (arch and electric)/power
connection</td><td>Low</td><td>3/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>2/20/2021 2:56:19 PM</td><td> </td><td>6/8/2022 12:27:25
PM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>18024</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Discoloring between ceiling tiles
</td><td>Low</td><td>6/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>5/25/2021
12:26:41 PM</td><td> </td><td>6/8/2022 12:19:19
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18023</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Relation between ac grill and metal
trim ceiling not consistent and scratched</td><td>Low</td><td>6/15/2021 12:00:00
PM</td><td>mohamed.sami</td><td>5/25/2021 12:26:39 PM</td><td> </td><td>6/8/2022
12:19:09 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18022</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Cut piece rejected
</td><td>Low</td><td>6/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/25/2021
12:26:37 PM</td><td> </td><td>6/8/2022 12:18:57
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18208</td><td>KINDERGARTEN - Band A</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Glass
Door</td><td>General snag</td><td>&#39;Rubber around aluminum frame should be the
same width </td><td>Low</td><td>6/21/2021 12:00:00
PM</td><td>mohamed.sami</td><td>5/31/2021 4:04:24 PM</td><td> </td><td>6/8/2022
12:18:30 PM</td><td>&nbsp;</td><td>CLASSROOM 1</td><td>&nbsp;</td>
</tr><tr>
<td>18021</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Metal trim not leveled
</td><td>Low</td><td>6/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/25/2021
12:26:35 PM</td><td> </td><td>6/8/2022 11:52:50
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18055</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;repair
should be adjusted </td><td>Low</td><td>6/15/2021 12:00:00
PM</td><td>mohamed.sami</td><td>5/25/2021 12:39:01 PM</td><td> </td><td>6/8/2022
11:52:47 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18148</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Opening should be closed
</td><td>Low</td><td>6/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021
11:56:50 AM</td><td> </td><td>6/8/2022 11:52:46
AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18219</td><td>KINDERGARTEN CLASSROOM 3 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Saggaing</td><td>&#39;Gap between marked air gaps should be closed
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021
4:04:45 PM</td><td> </td><td>6/8/2022 11:52:45
AM</td><td>&nbsp;</td><td>MK.12.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>18224</td><td>KINDERGARTEN CLASSROOM 3 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Repair for cracks gypsum wall
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021
4:04:56 PM</td><td> </td><td>6/8/2022 11:52:44
AM</td><td>&nbsp;</td><td>MK.12.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>18648</td><td>FIRST AID - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;MEP fixtures should be leveled
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:22:54 PM</td><td> </td><td>6/8/2022 11:52:42
AM</td><td>&nbsp;</td><td>MG.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18652</td><td>FIRST AID - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:23:03 PM</td><td> </td><td>6/8/2022 11:52:41
AM</td><td>&nbsp;</td><td>MG.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19108</td><td>ESCAPE ROUTE - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant need to touch up </td><td>Low</td><td>7/7/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/16/2021 10:54:01 AM</td><td> </td><td>6/8/2022
11:52:40 AM</td><td>&nbsp;</td><td>MQ.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19537</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Repair crack around sounder
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:24:54 PM</td><td> </td><td>6/8/2022 11:52:39
AM</td><td>&nbsp;</td><td>MK.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19538</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Wooden skirting not leveled with carpet
floor </td><td>Low</td><td>7/7/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:24:55 PM</td><td> </td><td>6/8/2022
11:52:37 AM</td><td>&nbsp;</td><td>MK.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19539</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:24:57 PM</td><td> </td><td>6/8/2022 11:52:36
AM</td><td>&nbsp;</td><td>MK.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19581</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gypsum Corner should be rectified
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:54 PM</td><td> </td><td>6/8/2022 11:52:35
AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19610</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>Unilex Sign Systems</td><td>Architectural</td><td>Wall -
Signage</td><td>Wrong Signage translation</td><td>&#39;Signage need adjustment
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:26:34 PM</td><td> </td><td>6/8/2022 11:52:34
AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19721</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Column edges should be straight and
aligned </td><td>Low</td><td>7/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>7/7/2021 1:30:15 PM</td><td> </td><td>6/8/2022
11:52:32 AM</td><td>&nbsp;</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19735</td><td>SCULPTURE ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Two Gaps should be closed
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:36 PM</td><td> </td><td>6/8/2022 11:52:30
AM</td><td>&nbsp;</td><td>MK.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>22740</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>False Ceiling
Tiles</td><td>Saggaing</td><td>&#39;gap should be the same
width</td><td>Low</td><td>9/27/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>9/6/2021 3:42:17 PM</td><td> </td><td>6/8/2022 11:52:28
AM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>22818</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>False Ceiling Tiles</td><td>Alignment of
tiles</td><td>&#39;False Ceiling trim should be aligned with white concrete
</td><td>Low</td><td>9/29/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>9/8/2021
12:17:13 PM</td><td> </td><td>6/8/2022 11:52:27 AM</td><td>&nbsp;</td><td>MU -
North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23748</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Joint should be aligned </td><td>Low</td><td>11/3/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/13/2021 4:16:43 PM</td><td> </td><td>6/8/2022
11:52:25 AM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>26014</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Marked
hole should be closed </td><td>Low</td><td>2/15/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/25/2022 11:51:55 AM</td><td> </td><td>6/8/2022
11:52:24 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26045</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Joint between reveal and stone cladding
should be regular and uniform </td><td>Low</td><td>2/21/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/31/2022 11:37:18 AM</td><td> </td><td>6/8/2022
11:52:23 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26062</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Blank slides not equal at both of side for
louvre panels </td><td>Low</td><td>2/21/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/31/2022 11:57:57 AM</td><td> </td><td>6/8/2022
11:52:22 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26083</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Copping should be leveled and
aligned </td><td>Low</td><td>2/22/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/1/2022 11:48:27 AM</td><td> </td><td>6/8/2022
11:52:16 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26087</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Copping should be leveled and
aligned </td><td>Low</td><td>2/22/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/1/2022 11:48:40 AM</td><td> </td><td>6/8/2022
11:52:06 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26095</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked cover plate should be sited
</td><td>Low</td><td>2/22/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/1/2022
11:49:05 AM</td><td> </td><td>6/8/2022 11:52:00
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26096</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Irregular cutting should be finished
</td><td>Low</td><td>2/22/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/1/2022
11:49:07 AM</td><td> </td><td>6/8/2022 11:51:58
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26113</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Irregular joint between inclined reveal and
stone cladding should be aligned.</td><td>Low</td><td>2/24/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/3/2022 2:26:25 PM</td><td> </td><td>6/8/2022
11:51:53 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31793</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing thermal insulation for RAD.
</td><td>High</td><td>6/13/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/6/2022 4:32:09 PM</td><td> </td><td>6/8/2022 11:32:07
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31791</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;No thermal insulation for RAD. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:32:06 PM</td><td>
</td><td>6/8/2022 11:30:13
AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>29715</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing pipe support.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:49 PM</td><td> </td><td>6/8/2022 11:28:41
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>31131</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Valve actuator need to be adjusted.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:10 PM</td><td> </td><td>6/8/2022 11:26:52
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31133</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:14 PM</td><td> </td><td>6/8/2022 11:25:56
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31140</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Chilled pipes thermal insulation need repairs and Rusty piece
shall be changed and painted. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:53:26 PM</td><td>
</td><td>6/8/2022 11:24:53
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31172</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage drain hose shall be changed.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:54:34 PM</td><td> </td><td>6/8/2022 11:21:49
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31335</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty drain points shall be treated, painted and insulated.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:53:53 AM</td><td> </td><td>6/8/2022 11:21:12
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31859</td><td>Corridor - MO-18.02-.003 - Band E</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing air grill.
</td><td>High</td><td>6/14/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/7/2022 11:57:50 AM</td><td> </td><td>6/8/2022 11:19:02
AM</td><td>&nbsp;</td><td>Corridor - MO-18.02-.003</td><td>&nbsp;</td>
</tr><tr>
<td>15259</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing fire collar </td><td>High</td><td>1/31/2021 12:00:00
AM</td><td>Kriton Katsamenis </td><td>1/24/2021 11:49:35 AM</td><td>
</td><td>6/8/2022 11:11:15
AM</td><td>&nbsp;</td><td>MS.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>28672</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing cladding for air ducts.
</td><td>High</td><td>5/17/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:41:36 PM</td><td> </td><td>6/8/2022 11:09:57
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28669</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing aluminum cladding. </td><td>High</td><td>5/17/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:40:18 PM</td><td>
</td><td>6/8/2022 11:09:27
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28530</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Cladding for air ducts are not installed yet.
</td><td>High</td><td>5/16/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:27 AM</td><td> </td><td>6/8/2022 11:08:37
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>8429</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>Roschmann</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Damaged glass panel/ missing flashing
</td><td>Low</td><td>2/19/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>1/29/2020 4:25:44 PM</td><td> </td><td>6/8/2022 10:57:44
AM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>8445</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Roschmann</td><td>Architectural</td><td>Curtain</
td><td>General Snag</td><td>&#39;Damaged marked panel
</td><td>Low</td><td>2/20/2020 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>1/30/2020 10:39:55 AM</td><td> </td><td>6/8/2022 10:57:43
AM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>11961</td><td>AHU - Band B- B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Control module has not installed yet
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
11:26:16 AM</td><td> </td><td>6/8/2022 10:33:04
AM</td><td>&nbsp;</td><td>MS.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>11976</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>Bathroom downlights</td><td>&#39;Photo cell for lighting control
not inspected yet</td><td>High</td><td>10/8/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>10/1/2020 11:26:49 AM</td><td> </td><td>6/8/2022 10:33:02
AM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>12008</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;ICT data outlets permanent labeling is incomplete
</td><td>High</td><td>10/8/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:58:49 AM</td><td> </td><td>6/8/2022 10:33:01
AM</td><td>&nbsp;</td><td>MS.19.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>12009</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Wireless access point port mapping and no labels for the RJ45
patch cords</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:58:53 AM</td><td> </td><td>6/8/2022 10:33:00
AM</td><td>&nbsp;</td><td>MS.19.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>12012</td><td>AHU</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Permanent labeling and port mapping for data outlets are not done
</td><td>High</td><td>10/8/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:59:01 AM</td><td> </td><td>6/8/2022 10:32:59
AM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>12013</td><td>AHU</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;BMS temperature sensors are hanging.There is
no connection with the Ahu units.No labeling for BMS field devices
</td><td>High</td><td>10/8/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:59:05 AM</td><td> </td><td>6/8/2022 10:32:57
AM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>13906</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRAY</td><td>General Snag</td><td>&#39;Trays should be covered as per
specifications </td><td>High</td><td>12/9/2020 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>12/2/2020 11:35:26 AM</td><td> </td><td>6/8/2022 10:32:56
AM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>14892</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;No labels, missing access control devices,
damaged cctv back box, camera IP address shouldn’t be written on the camera.
Missing trunk cover missing gsm cable</td><td>High</td><td>1/25/2021 12:00:00
PM</td><td>Mohamed Samir</td><td>1/18/2021 3:26:16 PM</td><td> </td><td>6/8/2022
10:32:55 AM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>16586</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>Identification missing</td><td>&#39;Complete
work</td><td>High</td><td>2/23/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>2/16/2021 2:55:20 PM</td><td> </td><td>6/8/2022 10:32:53
AM</td><td>&nbsp;</td><td>MS.14.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>16946</td><td>ELEC. ROOM-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>General Snag</td><td>&#39;Missing work ( easy check
panel)</td><td>High</td><td>3/18/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>3/11/2021 11:40:47 AM</td><td> </td><td>6/8/2022 10:32:52
AM</td><td>&nbsp;</td><td>MS.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16951</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Missing lighting fixtures for handrail
lighting </td><td>High</td><td>3/18/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>3/11/2021 11:40:55 AM</td><td> </td><td>6/8/2022 10:32:52
AM</td><td>&nbsp;</td><td>ME.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20110</td><td>JEWELLERY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>DB</td><td>General Snag</td><td>&#39;Cleaning
the panel - panel schedule should be updated </td><td>High</td><td>8/10/2021
12:00:00 PM</td><td>Sameh Ibrahim El-Sawah</td><td>8/3/2021 11:29:18 AM</td><td>
</td><td>6/8/2022 10:32:49
AM</td><td>&nbsp;</td><td>ME.12.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20112</td><td>POTTERY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>DB</td><td>General Snag</td><td>&#39;Cleaning
the panel - missing labels </td><td>High</td><td>8/10/2021 12:00:00
PM</td><td>Sameh Ibrahim El-Sawah</td><td>8/3/2021 11:29:21 AM</td><td>
</td><td>6/8/2022 10:32:48
AM</td><td>&nbsp;</td><td>ME.12.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20113</td><td>WOOD-Band A</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>8/10/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/3/2021 11:29:22 AM</td><td> </td><td>6/8/2022 10:32:47
AM</td><td>&nbsp;</td><td>ME.12.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20675</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Adjust the lighting fixtures- missing labels
for fire alarm system</td><td>High</td><td>8/17/2021 12:00:00 PM</td><td>Sameh
Ibrahim El-Sawah</td><td>8/10/2021 11:18:51 AM</td><td> </td><td>6/8/2022 10:32:46
AM</td><td>&nbsp;</td><td>MQ.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20915</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Control module not installed yet and missing labels for fire
alarm and missing tag number and missing labels and missing panel schedule inside
the panel</td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>Sameh Ibrahim El-
Sawah</td><td>8/11/2021 11:50:38 AM</td><td> </td><td>6/8/2022 10:32:45
AM</td><td>&nbsp;</td><td>MS.13.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20917</td><td>AHU</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing control module and missing labels
</td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:50:42 AM</td><td> </td><td>6/8/2022 10:32:44
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20934</td><td>CORRIDOR</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;Not
allowed to install pvc conduit in exposed area should be replaced by
RGS</td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/11/2021 11:51:25 AM</td><td> </td><td>6/8/2022 10:32:43
AM</td><td>&nbsp;</td><td>MS.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>22107</td><td> PLANT</td><td>MU GF
</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire Alarm</td><td>Asset
number missing</td><td>&#39;Missing labels </td><td>High</td><td>8/30/2021 12:00:00
PM</td><td>Sameh Ibrahim El-Sawah</td><td>8/23/2021 3:58:25 PM</td><td>
</td><td>6/8/2022 10:32:42
AM</td><td>&nbsp;</td><td>MS.13.0G.011</td><td>&nbsp;</td>
</tr><tr>
<td>22369</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Incomplete work (missing control
module )</td><td>High</td><td>9/1/2021 12:00:00 PM</td><td>Sameh Ibrahim El-
Sawah</td><td>8/25/2021 11:53:22 AM</td><td> </td><td>6/8/2022 10:32:41
AM</td><td>&nbsp;</td><td>MS.13.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>25290</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;Cable penetration
opening need adjustment -collect water </td><td>High</td><td>11/29/2021 12:00:00
AM</td><td>ahmedsalem</td><td>11/22/2021 11:58:54 AM</td><td> </td><td>6/8/2022
10:32:38 AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25385</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>General Snag</td><td>&#39;Defective cables trunk should be
replaced </td><td>High</td><td>12/1/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>11/24/2021 11:16:28 AM</td><td> </td><td>6/8/2022 10:32:36
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25394</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover the junction boxes and cover the
trunk</td><td>High</td><td>12/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>11/24/2021 11:16:50 AM</td><td> </td><td>6/8/2022 10:32:34
AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25395</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Change the cover of cable trunk where is
defective </td><td>High</td><td>12/1/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>11/24/2021 11:16:51 AM</td><td> </td><td>6/8/2022 10:32:32
AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25396</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fix the liquid
tight</td><td>High</td><td>12/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>11/24/2021 11:16:53 AM</td><td> </td><td>6/8/2022 10:32:30
AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25397</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Eliminate the protection and covered the
horn </td><td>High</td><td>12/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>11/24/2021 11:16:55 AM</td><td> </td><td>6/8/2022 10:32:29
AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25398</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover all the boxes
</td><td>High</td><td>12/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>11/24/2021 11:16:58 AM</td><td> </td><td>6/8/2022 10:32:28
AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>28786</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Provide button slide under each 2
parts</td><td>High</td><td>5/19/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/12/2022 2:38:09 PM</td><td> </td><td>6/8/2022
10:32:27 AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>31020</td><td>CATALOGUE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:21:16 PM</td><td> </td><td>6/8/2022 10:32:26
AM</td><td>&nbsp;</td><td>MR.14.02.012- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>31037</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:33 PM</td><td> </td><td>6/8/2022
10:32:25 AM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31046</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:22:45 PM</td><td> </td><td>6/8/2022 10:32:24
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31129</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:35:09 PM</td><td> </td><td>6/8/2022 10:32:23
AM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31263</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/2/2022 11:14:24 AM</td><td> </td><td>6/8/2022
10:32:22 AM</td><td>&nbsp;</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31264</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete works
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/2/2022
11:14:26 AM</td><td> </td><td>6/8/2022 10:32:21
AM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31269</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/2/2022
11:14:35 AM</td><td> </td><td>6/8/2022 10:32:20
AM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>11043</td><td>TUT- EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>WIRING
ACCESSORIES</td><td>General Snag</td><td>&#39;Cables should be installed within the
cable trunks </td><td>High</td><td>9/22/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>9/15/2020 4:13:49 PM</td><td> </td><td>6/8/2022 9:21:01
AM</td><td>&nbsp;</td><td>MS.18.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>12000</td><td>VOID</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;Card
reader Termination and devices installation not done
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:58:18 AM</td><td> </td><td>6/8/2022 9:20:57
AM</td><td>&nbsp;</td><td>MS.13.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>14890</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;Cable
trunk color miss attached, missing ICT labels, missing bms panels termination.
</td><td>High</td><td>1/25/2021 12:00:00 PM</td><td>Mohamed Samir</td><td>1/18/2021
3:26:03 PM</td><td> </td><td>6/8/2022 9:20:55
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>17616</td><td>CORE F6</td><td>CCB
L10</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>5/12/2021 12:00:00
PM</td><td>Ahmed.Galal</td><td>5/5/2021 12:42:04 PM</td><td> </td><td>6/8/2022
9:20:52 AM</td><td>&nbsp;</td><td>CC.08.01.F61</td><td>&nbsp;</td>
</tr><tr>
<td>20954</td><td>AHU</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing gsm cables, missing ict and BMS labels
</td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>Mohamed Samir</td><td>8/11/2021
11:59:12 AM</td><td> </td><td>6/8/2022 9:20:51
AM</td><td>&nbsp;</td><td>MS.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>20964</td><td>CORRIDOR</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing wifi and access control labels , access control lock is
not terminated, </td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>Mohamed
Samir</td><td>8/11/2021 11:59:37 AM</td><td> </td><td>6/8/2022 9:20:50
AM</td><td>&nbsp;</td><td>MS.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20965</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing WiFi , access control and cctv labels
</td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>Mohamed Samir</td><td>8/11/2021
11:59:39 AM</td><td> </td><td>6/8/2022 9:20:48
AM</td><td>&nbsp;</td><td>MQ.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20967</td><td>LOBBY</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing WiFi and access control labels
</td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>Mohamed Samir</td><td>8/11/2021
11:59:49 AM</td><td> </td><td>6/8/2022 9:20:47
AM</td><td>&nbsp;</td><td>MT.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>21803</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Screens installation has not done yet for digital signage and
data sockets faceplate fixing also not done for
screens</td><td>High</td><td>8/26/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:26:33 PM</td><td> </td><td>6/8/2022 9:20:46
AM</td><td>&nbsp;</td><td>MQ.19.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>25882</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Electrical box to be checked
</td><td>Low</td><td>2/13/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/23/2022
11:59:18 AM</td><td> </td><td>6/8/2022 9:20:46
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26060</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Electrical cover is missing
</td><td>Low</td><td>2/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/31/2022
11:37:54 AM</td><td> </td><td>6/8/2022 9:20:44
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26149</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;PA cables are not terminated, PA labels is missing, cctv labels
is not installed </td><td>High</td><td>2/17/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>2/10/2022 11:45:35 AM</td><td> </td><td>6/8/2022 9:20:43
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27809</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover should be installed properly
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:20 PM</td><td> </td><td>6/8/2022 9:20:42
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27851</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work for pulling cable</td><td>High</td><td>3/17/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:16 PM</td><td>
</td><td>6/8/2022 9:20:42
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>27854</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cable not pulled </td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:19 PM</td><td>
</td><td>6/8/2022 9:20:41
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>27855</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:21 PM</td><td>
</td><td>6/8/2022 9:20:40
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>28168</td><td>CORE F3</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi not installed </td><td>High</td><td>3/23/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/16/2022 3:54:59 PM</td><td>
</td><td>6/8/2022 9:20:37
AM</td><td>&nbsp;</td><td>MC.14.01.F31</td><td>&nbsp;</td>
</tr><tr>
<td>31092</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover box</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:24:06 PM</td><td> </td><td>6/8/2022
9:20:35 AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30608</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct labels missing.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:36 AM</td><td> </td><td>6/8/2022 9:20:05
AM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>30609</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct holes shall be closed.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:37 AM</td><td> </td><td>6/8/2022 9:17:50
AM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>30611</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing air duct labels.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:38 AM</td><td> </td><td>6/8/2022 9:16:33
AM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>31132</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Thermal installation shall be continued to the ends.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:12 PM</td><td> </td><td>6/8/2022 9:06:57
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>9563</td><td>SERVICE TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;No collar on pipes at wall penetration
</td><td>High</td><td>7/27/2020 12:00:00 PM</td><td>ahmedsalem</td><td>7/20/2020
11:42:55 AM</td><td> </td><td>6/8/2022 9:05:40
AM</td><td>&nbsp;</td><td>MQ.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>25834</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Boxes should be sitted and fixed
properly </td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>1/3/2022 2:36:56 PM</td><td> </td><td>6/8/2022 8:56:52
AM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25862</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
stone</td><td>Broken, to be replaced</td><td>&#39;Bolts should be removed and make
a repair </td><td>Low</td><td>2/10/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>1/20/2022 12:03:06 PM</td><td> </td><td>6/8/2022 8:56:49
AM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31424</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Humidifier unit shall be cleaned from inside and outside.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:56 AM</td><td> </td><td>6/8/2022 8:34:32
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31138</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Tie raps shall be removed. </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:53:22 PM</td><td>
</td><td>6/8/2022 8:33:06
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31171</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain hose not connected. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:54:31 PM</td><td>
</td><td>6/8/2022 8:28:54
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29898</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Acoustic Walling</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>6/1/2022 12:00:00
AM</td><td>george.ragheb</td><td>5/25/2022 6:36:19 PM</td><td> </td><td>6/8/2022
8:14:52 AM</td><td>this is snag not exist</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31798</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;No firefighting system detected. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:32:17 PM</td><td>
</td><td>6/7/2022 4:44:11
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>10543</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Work not finished yet/ handrail need
touch up </td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:15:33 PM</td><td> </td><td>6/7/2022 3:58:04
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>26437</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Damaged</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:11 PM</td><td> </td><td>6/7/2022 3:57:59
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26438</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Damaged</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:13 PM</td><td> </td><td>6/7/2022 3:57:54
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26439</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Chipped/dent</td><td>&#39;Toothing between stone cladding tiles
should be leveled </td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:15 PM</td><td> </td><td>6/7/2022 3:57:52
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26441</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Damaged</td><td>&#39;Missing stone cladding tiles
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:19 PM</td><td> </td><td>6/7/2022 3:57:49
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26442</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Damaged</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:21 PM</td><td> </td><td>6/7/2022 3:57:46
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26443</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Stains</td><td>&#39;Bubbles between 3M and glass
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:23 PM</td><td> </td><td>6/7/2022 3:57:43
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26444</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Stains</td><td>&#39;Epoxy bubbles between glass and
stone</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:25 PM</td><td> </td><td>6/7/2022 3:57:38
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26445</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Damaged</td><td>&#39;Missing onyx tiles
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:27 PM</td><td> </td><td>6/7/2022 3:57:36
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26447</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Damaged</td><td>&#39;Missing stone tile should be installed
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:30 PM</td><td> </td><td>6/7/2022 3:57:33
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26449</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Damaged</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:34 PM</td><td> </td><td>6/7/2022 3:57:29
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26454</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Damaged</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:46 PM</td><td> </td><td>6/7/2022 3:57:25
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26455</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Cracks</td><td>&#39;Bitted tiles should be treated
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:48 PM</td><td> </td><td>6/7/2022 3:57:23
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26456</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Damaged</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:50 PM</td><td> </td><td>6/7/2022 3:57:21
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>28584</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Skirting need touch up painting and
finished properly </td><td>Low</td><td>5/30/2022 12:00:00
AM</td><td>sally.george</td><td>5/9/2022 4:21:14 PM</td><td> </td><td>6/7/2022
3:56:54 PM</td><td>&nbsp;</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>26434</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Damaged</td><td>&#39;Missing stone cladding tile
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:05 PM</td><td> </td><td>6/7/2022 3:54:44
PM</td><td>Done </td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26435</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Facade - Stone
Cladding</td><td>Damaged</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>2/23/2022 4:31:07 PM</td><td> </td><td>6/7/2022 3:54:42
PM</td><td>Done </td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>24909</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wedge barriers and bollards not
installed.</td><td>High</td><td>11/16/2021 12:00:00 AM</td><td>David Noshy
Naguib</td><td>11/9/2021 2:23:10 PM</td><td> </td><td>6/7/2022 3:54:13
PM</td><td>&nbsp;</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>
<td>31492</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Tapes should be removed </td><td>Low</td><td>6/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/2/2022 3:25:14 PM</td><td> </td><td>6/7/2022
3:52:53 PM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>28781</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Clips to be installed before
box</td><td>High</td><td>5/19/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>5/12/2022 1:28:17 PM</td><td> </td><td>6/7/2022 3:49:28
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>16474</td><td>Waste Store</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Bathroom -
Vanity top</td><td>General</td><td>&#39;Repair and filling joint between vanity and
ceramic cladding </td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>2/15/2021 11:34:35 AM</td><td> </td><td>6/7/2022 3:46:23
PM</td><td>&nbsp;</td><td>MS.19.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16492</td><td>Plant</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Epoxy paint floor need to touch up
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:58 AM</td><td> </td><td>6/7/2022 3:45:38
PM</td><td>&nbsp;</td><td>MS.19.0G.006</td><td>&nbsp;</td>
</tr><tr>
<td>13358</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door/adjustments above door
architrave </td><td>Low</td><td>11/26/2020 12:00:00
AM</td><td>sally.george</td><td>11/5/2020 12:14:05 PM</td><td> </td><td>6/7/2022
3:17:00 PM</td><td>Done</td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19634</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steel works at roof</td><td>Paint
Stains</td><td>&#39;Steel structure need to clean and touch up
</td><td>Low</td><td>7/25/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/4/2021
9:40:23 AM</td><td> </td><td>6/7/2022 3:12:13 PM</td><td>&nbsp;</td><td>Museum Roof
Band B</td><td>&nbsp;</td>
</tr><tr>
<td>19628</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Remove storage material
</td><td>Low</td><td>7/25/2021 12:00:00 PM</td><td>mohamed.sami</td><td>7/4/2021
9:40:15 AM</td><td> </td><td>6/7/2022 3:12:04 PM</td><td>&nbsp;</td><td>Museum Roof
Band B</td><td>&nbsp;</td>
</tr><tr>
<td>19619</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
insulation</td><td>damaged</td><td>&#39;Detail should be checked
</td><td>Low</td><td>7/25/2021 12:00:00 PM</td><td>mohamed.sami</td><td>7/4/2021
9:40:03 AM</td><td> </td><td>6/7/2022 3:11:57 PM</td><td>&nbsp;</td><td>Museum Roof
Band B</td><td>&nbsp;</td>
</tr><tr>
<td>24333</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
waterproofing</td><td>damaged</td><td>&#39;Damaged sika foam need to repair
</td><td>Low</td><td>11/3/2021 12:00:00 PM</td><td>mohamed.sami</td><td>10/27/2021
11:26:00 AM</td><td> </td><td>6/7/2022 3:11:50 PM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>18020</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Wrong cutting trim
</td><td>Low</td><td>6/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/25/2021
12:26:30 PM</td><td> </td><td>6/7/2022 2:32:49
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18017</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Ceiling tiles not leveled
</td><td>Low</td><td>6/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/25/2021
12:26:22 PM</td><td> </td><td>6/7/2022 2:32:39
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>19558</td><td>CORRIDOR - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Fire alarm not leveled
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:22 PM</td><td> </td><td>6/7/2022 2:30:20
PM</td><td>&nbsp;</td><td>MS.18.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>14332</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing Sealant around metal door
</td><td>High</td><td>12/31/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>12/24/2020 1:23:26 PM</td><td> </td><td>6/7/2022 2:30:05
PM</td><td>&nbsp;</td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>31485</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Tape should be removed </td><td>Low</td><td>6/23/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>6/2/2022 3:25:01 PM</td><td> </td><td>6/7/2022
2:28:19 PM</td><td>&nbsp;</td><td>MS.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28554</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing floor cover
.</td><td>Low</td><td>5/30/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:22 PM</td><td> </td><td>6/7/2022 2:13:05
PM</td><td>&nbsp;</td><td>MA.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28560</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing flooring
cover.</td><td>Low</td><td>5/30/2022 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>5/9/2022 4:19:36 PM</td><td> </td><td>6/7/2022 2:12:30
PM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28579</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Floor boxes are missing
</td><td>Low</td><td>5/30/2022 12:00:00 AM</td><td>sally.george</td><td>5/9/2022
4:21:05 PM</td><td> </td><td>6/7/2022 2:11:55
PM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28585</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Floor boxes are missing
</td><td>Low</td><td>5/30/2022 12:00:00 AM</td><td>sally.george</td><td>5/9/2022
4:21:16 PM</td><td> </td><td>6/7/2022 2:11:23
PM</td><td>&nbsp;</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28625</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Floor boxes covers are missing
</td><td>Low</td><td>5/31/2022 12:00:00 AM</td><td>sally.george</td><td>5/10/2022
4:28:13 PM</td><td> </td><td>6/7/2022 2:11:09
PM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>26065</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Short panel should be adjusted
</td><td>Low</td><td>2/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/31/2022
11:58:03 AM</td><td> </td><td>6/7/2022 1:17:19
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26046</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken louver should be replaced
</td><td>Low</td><td>2/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/31/2022
11:37:20 AM</td><td> </td><td>6/7/2022 1:17:05 PM</td><td>Repaired by proper
finish</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25987</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Joint between stone cladding should be
adjusted </td><td>Low</td><td>2/15/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/25/2022 11:38:55 AM</td><td> </td><td>6/7/2022
12:57:54 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26050</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Joint between stone cladding and stone
flooring should be uniform and unified </td><td>Low</td><td>2/21/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/31/2022 11:37:30 AM</td><td> </td><td>6/7/2022
12:44:11 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26035</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Gaps
between stone steps should be regular </td><td>Low</td><td>2/16/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/26/2022 11:15:28 AM</td><td> </td><td>6/7/2022
12:40:49 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26033</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>2/16/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/26/2022 11:15:24 AM</td><td> </td><td>6/7/2022
12:40:18 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31799</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;No ventilation system detected. </td><td>High</td><td>6/13/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/6/2022 4:32:19 PM</td><td>
</td><td>6/7/2022 12:33:15
PM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31536</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain pan insulation damage. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 3:32:34 PM</td><td>
</td><td>6/7/2022 12:25:36
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>29057</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to specification/drawing</td><td>&#39;Duct
herbal insulation need repairs. </td><td>High</td><td>5/25/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/18/2022 11:56:05 AM</td><td>
</td><td>6/7/2022 12:19:47
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29149</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation.
</td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:12 AM</td><td> </td><td>6/7/2022 12:19:46
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>31343</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Cleaning from outside. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:54:06 AM</td><td>
</td><td>6/7/2022 12:19:05
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31344</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Cleaning from inside. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:54:08 AM</td><td>
</td><td>6/7/2022 12:18:18
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31356</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Cleaning and touchup paintings for fire pipes.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:33 AM</td><td> </td><td>6/7/2022 12:17:23
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31359</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;INERGEN pipes need cleaning and touchup painting.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:38 AM</td><td> </td><td>6/7/2022 12:16:20
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31366</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Humidification unit shall be cleaned from inside and outside.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:52 AM</td><td> </td><td>6/7/2022 12:15:31
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31376</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Outside cleaning. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:55:13 AM</td><td>
</td><td>6/7/2022 12:14:20
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>24199</td><td>Bay-02 (from level +31.5 to +37.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Incomplete duct
and insulation work and no approved CIR yet</td><td>High</td><td>11/2/2021 12:00:00
PM</td><td>Kriton Katsamenis </td><td>10/26/2021 1:23:09 PM</td><td>
</td><td>6/7/2022 12:12:35 PM</td><td>&nbsp;</td><td>@ Grand
Stair</td><td>&nbsp;</td>
</tr><tr>
<td>31141</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage drain pan thermal insulation.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:27 PM</td><td> </td><td>6/7/2022 11:58:16
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31143</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing labels for PPR pipes. </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:53:31 PM</td><td>
</td><td>6/7/2022 11:58:15
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31150</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty end cap shall be replaced and insulated.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:42 PM</td><td> </td><td>6/7/2022 11:58:14
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31151</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain pan thermal insulation. </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:53:43 PM</td><td>
</td><td>6/7/2022 11:58:13
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31165</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Inside cleaning. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:54:12 PM</td><td>
</td><td>6/7/2022 11:58:12
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31174</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Cleaning from inside. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:54:38 PM</td><td>
</td><td>6/7/2022 11:58:11
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31175</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Outside cleaning. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:54:41 PM</td><td>
</td><td>6/7/2022 11:58:10
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31189</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Humidifier shall be cleaned from inside and outside.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:55:14 PM</td><td> </td><td>6/7/2022 11:58:09
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31191</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain hose not connected properly. </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:55:17 PM</td><td>
</td><td>6/7/2022 11:58:08
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31193</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty machine base. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:55:23 PM</td><td>
</td><td>6/7/2022 11:58:07
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31195</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Cleaning from outside. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:55:28 PM</td><td>
</td><td>6/7/2022 11:58:06
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31202</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Cleaning from inside. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:55:46 PM</td><td>
</td><td>6/7/2022 11:58:05
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31207</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Humidifier shall be cleaned from inside and outside.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:56:02 PM</td><td> </td><td>6/7/2022 11:58:04
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31208</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain hose not connected. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:56:06 PM</td><td>
</td><td>6/7/2022 11:58:02
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31213</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty machine base shall be treated and painted.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:56:19 PM</td><td> </td><td>6/7/2022 11:58:01
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31222</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain points shall be insulated. </td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:56:49 PM</td><td>
</td><td>6/7/2022 11:58:00
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31223</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Outside cleaning. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:56:51 PM</td><td>
</td><td>6/7/2022 11:57:59
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31224</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Cleaning from inside. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:56:53 PM</td><td>
</td><td>6/7/2022 11:57:58
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31228</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage thermal installation for hydronic pipes.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:57:03 PM</td><td> </td><td>6/7/2022 11:57:56
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31603</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Rusty machine base.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:28 AM</td><td> </td><td>6/7/2022 11:57:54
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31604</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing seismic restrains for fire pipes.
</td><td>High</td><td>6/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:30 AM</td><td> </td><td>6/7/2022 11:57:53
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31619</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air ducts.
</td><td>High</td><td>6/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>6/5/2022 11:53:57 AM</td><td> </td><td>6/7/2022 11:57:52
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>10630</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Chipped edges / joints not regular
</td><td>Low</td><td>10/4/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/13/2020 3:59:59 PM</td><td> </td><td>6/7/2022
11:39:57 AM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>10700</td><td>TUT- ELECTRICAL HUB</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Fire stopping
</td><td>High</td><td>9/21/2020 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>9/14/2020 11:22:39 AM</td><td> </td><td>6/7/2022 11:39:54
AM</td><td>&nbsp;</td><td>MS.12.3A.002</td><td>&nbsp;</td>
</tr><tr>
<td>10701</td><td>TUT-CORE B3</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Fire collar on HDPE
pipe</td><td>High</td><td>9/21/2020 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>9/14/2020 11:22:41 AM</td><td> </td><td>6/7/2022 11:39:53
AM</td><td>&nbsp;</td><td>MC.12.3A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>10704</td><td>TUT-CORE B3</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire stopping</td><td>High</td><td>9/21/2020
12:00:00 PM</td><td>Kriton Katsamenis </td><td>9/14/2020 11:22:53 AM</td><td>
</td><td>6/7/2022 11:39:49
AM</td><td>&nbsp;</td><td>MC.12.3A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>10768</td><td>TUT- EQUIPMENT ROOM</td><td>MU
L35</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>Area not
cleaned/finished.</td><td>&#39;</td><td>High</td><td>9/21/2020 12:00:00
AM</td><td>Kriton Katsamenis </td><td>9/14/2020 11:26:15 AM</td><td>
</td><td>6/7/2022 11:39:48
AM</td><td>&nbsp;</td><td>MS.23.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>10785</td><td>TUT- W.C. LOBBY</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Toilet</td><td>General</td><td>&#39;Cleaning </td><td>High</td><td>9/21/2020
12:00:00 AM</td><td>Kriton Katsamenis </td><td>9/14/2020 11:27:11 AM</td><td>
</td><td>6/7/2022 11:39:47
AM</td><td>&nbsp;</td><td>MW.23.3A.001</td><td>&nbsp;</td>
</tr><tr>
<td>10946</td><td>TUT- SERVICE ZONE</td><td>MU
L35</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Remove storage material/ need cleaning
</td><td>Low</td><td>10/6/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/15/2020 12:02:52 PM</td><td> </td><td>6/7/2022
11:39:46 AM</td><td>&nbsp;</td><td>MS.18.3A.005</td><td>&nbsp;</td>
</tr><tr>
<td>14567</td><td>TUT- BREAK OUT SPACE</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Edges of two tiles need repair- one louvre
joint need adjusted ( refer to snag no 10824 )</td><td>Low</td><td>1/18/2021
12:00:00 PM</td><td>mohamed.sami</td><td>12/28/2020 1:46:46 PM</td><td>
</td><td>6/7/2022 11:39:44
AM</td><td>&nbsp;</td><td>MP.18.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>14688</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Loose
handles to be fixed properly</td><td>High</td><td>1/17/2021 12:00:00
AM</td><td>mohamed.sami</td><td>1/10/2021 2:31:04 PM</td><td> </td><td>6/7/2022
11:39:42 AM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14875</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked parts on tiles should be repaired
</td><td>High</td><td>1/25/2021 12:00:00
PM</td><td>andrewjohn.rose</td><td>1/18/2021 1:19:51 PM</td><td> </td><td>6/7/2022
11:39:39 AM</td><td>&nbsp;</td><td>MW.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15815</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Flooring -
stone flooring</td><td>General</td><td>&#39;Floor not ground - grind and paint
(Porviva)</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 9:43:15 AM</td><td> </td><td>6/7/2022
11:39:38 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>15819</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Steelwork</td><td>General
Snag</td><td>&#39;Clean, make good to the finish of all of the mullions. Redo all
of the metal floor plates to conform to the approved
drawings</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 10:00:42 AM</td><td> </td><td>6/7/2022
11:39:37 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>15823</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>Chipped/dent</td><td>&#39;make good or replace stone panels that are
uneven /chipped edges</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 10:11:45 AM</td><td> </td><td>6/7/2022
11:39:35 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>15824</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Clean all dust from all
surfaces - unacceptable standard at present</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 10:21:22 AM</td><td> </td><td>6/7/2022
11:39:34 AM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15825</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;The complete Artefact Tunnel
floor to be cleaned to an acceptable standard</td><td>High</td><td>2/13/2021
12:00:00 AM</td><td>andrewjohn.rose</td><td>2/6/2021 10:25:45 AM</td><td>
</td><td>6/7/2022 11:39:33
AM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15840</td><td>TUT- Digital (+49.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Clean the Roschmann EPDM and the s/s panel . This
is to be done for all 4 of the EPDMs.</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 1:33:10 PM</td><td> </td><td>6/7/2022
11:39:31 AM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>16125</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Toothing to the leading edge to be
corrected</td><td>High</td><td>2/17/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/10/2021 10:02:42 AM</td><td> </td><td>6/7/2022
11:39:30 AM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>17999</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Installing Lift panels to the
lift in artefact connection room</td><td>High</td><td>5/31/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>5/24/2021 5:48:34 PM</td><td> </td><td>6/7/2022
11:39:28 AM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>24818</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Wall</td><td>Damaged</td><td>&#39;Broken louvre tile adjacent to the
ramp</td><td>High</td><td>11/14/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>11/7/2021 3:39:26 PM</td><td> </td><td>6/7/2022
11:39:27 AM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>24819</td><td>TUT- (+45.00)</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Wall</td><td>Damaged</td><td>&#39;Broken tile on end
wall</td><td>High</td><td>11/14/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>11/7/2021 3:40:53 PM</td><td> </td><td>6/7/2022
11:39:26 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>13631</td><td>Temple Garden-Band A</td><td>Temple
Garden</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>CABLE BASKET
TRAY</td><td>General Snag</td><td>&#39;Incomplete work for access door
system</td><td>High</td><td>12/6/2020 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>11/29/2020 10:48:23 AM</td><td> </td><td>6/7/2022 10:50:22
AM</td><td>&nbsp;</td><td>Band A</td><td>&nbsp;</td>
</tr><tr>
<td>17846</td><td>ELECTRICAL ROOM</td><td>GATE 7 TYPE 2
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control long range reader has been installed. However the
Access control field devices are not installed yet in the Gate 7 and T&amp;C also
not done.</td><td>High</td><td>5/27/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>5/20/2021 8:19:51 AM</td><td> </td><td>6/7/2022 10:50:17
AM</td><td>&nbsp;</td><td>GT7.02.0G.06</td><td>&nbsp;</td>
</tr><tr>
<td>11958</td><td>SERVICE DELIVERY-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-ELV</td><td>CABLE BASKET
TRAY</td><td>General Snag</td><td>&#39;Cleaning all trays from dust and rubbish
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
11:25:50 AM</td><td> </td><td>6/7/2022 9:57:42
AM</td><td>&nbsp;</td><td>MQ.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>11960</td><td>CORE B2-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-ELV</td><td>LV WIRES AND
CABLES</td><td>Incomplete Installation</td><td>&#39;Metal flexible conduit should
be replaced by emt rigid conduits</td><td>High</td><td>10/8/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>10/1/2020 11:26:08 AM</td><td> </td><td>6/7/2022
9:57:40 AM</td><td>&nbsp;</td><td>MC.18.01.B21</td><td>&nbsp;</td>
</tr><tr>
<td>11962</td><td>AHU - Band B- B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
11:26:19 AM</td><td> </td><td>6/7/2022 9:57:39
AM</td><td>&nbsp;</td><td>MS.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>11964</td><td>AHU - Band B- B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Control module has not installed yet
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
11:26:26 AM</td><td> </td><td>6/7/2022 9:57:38
AM</td><td>&nbsp;</td><td>MS.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>11978</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>Bathroom downlights</td><td>&#39;Photo cell for lighting control
not inspected yet</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>10/1/2020 11:26:51 AM</td><td> </td><td>6/7/2022 9:57:37
AM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>11991</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;No card reader installation and missing
thermostat labels .BMS temperature sensors hanging and no pipe connection to the
AHU unit </td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:57:45 AM</td><td> </td><td>6/7/2022 9:57:35
AM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>11994</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Access control card reader Termination and devices installation
is not done yet </td><td>High</td><td>10/8/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:57:53 AM</td><td> </td><td>6/7/2022 9:57:33
AM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>11995</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Card reader Termination and card reader installation is not done
</td><td>High</td><td>10/8/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:57:55 AM</td><td> </td><td>6/7/2022 9:57:30
AM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>11999</td><td>VOID</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;WiFi
data outlets labeling is not done WiFi Port mapping and naming scheme also not done
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:58:15 AM</td><td> </td><td>6/7/2022 9:57:29
AM</td><td>&nbsp;</td><td>MS.13.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>12004</td><td>SERVICE DELIVERY-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing CCTV and WiFi device labeling and
port mapping also not done </td><td>High</td><td>10/8/2020 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>10/1/2020 11:58:36 AM</td><td>
</td><td>6/7/2022 9:57:28
AM</td><td>&nbsp;</td><td>MQ.18.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>16577</td><td>MALE DISABLED W.C.</td><td>MU GF
</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing disable alarm cables labels
</td><td>High</td><td>2/22/2021 12:00:00 PM</td><td>Mohamed Samir</td><td>2/15/2021
4:34:25 PM</td><td> </td><td>6/7/2022 9:57:25
AM</td><td>&nbsp;</td><td>MW.14.0G.004C</td><td>&nbsp;</td>
</tr><tr>
<td>16579</td><td>DISABLED FACILITY</td><td>MU GF
</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing disable alarm cables labels
</td><td>High</td><td>2/22/2021 12:00:00 PM</td><td>Mohamed Samir</td><td>2/15/2021
4:34:31 PM</td><td> </td><td>6/7/2022 9:57:24
AM</td><td>&nbsp;</td><td>MG.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16939</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>Egyptian Industrial System (EIS)</td><td>MEP-
Electrical</td><td>Earthing System</td><td>Earth Conductor</td><td>&#39;Remove
bushing and and coupling </td><td>High</td><td>3/18/2021 12:00:00 AM</td><td>Sameh
Ibrahim El-Sawah</td><td>3/11/2021 11:40:35 AM</td><td> </td><td>6/7/2022 9:57:23
AM</td><td>&nbsp;</td><td>MS.17.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16953</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Power
Sockets</td><td>General Snag</td><td>&#39;Socket not alignment and should be
adjusted </td><td>High</td><td>3/18/2021 12:00:00 PM</td><td>Sameh Ibrahim El-
Sawah</td><td>3/11/2021 11:41:05 AM</td><td> </td><td>6/7/2022 9:57:22
AM</td><td>&nbsp;</td><td>ME.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20096</td><td>ESCAPE ROUTE-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing cctv labels </td><td>High</td><td>8/10/2021 12:00:00
PM</td><td>Sameh Ibrahim El-Sawah</td><td>8/3/2021 11:28:49 AM</td><td>
</td><td>6/7/2022 9:57:21
AM</td><td>&nbsp;</td><td>MQ.18.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20109</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Handrail lighting not installed yet
</td><td>High</td><td>8/10/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/3/2021 11:29:17 AM</td><td> </td><td>6/7/2022 9:57:20
AM</td><td>&nbsp;</td><td>ME.12.01.009</td><td>&nbsp;</td>
</tr><tr>
<td>21237</td><td>CORE D2</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All
EMT conduits should be replaced by RGS conduit (this exposed area) and missing
labels</td><td>High</td><td>8/24/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/17/2021 12:05:54 PM</td><td> </td><td>6/7/2022 9:57:17
AM</td><td>&nbsp;</td><td>MC.18.01.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21797</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Screens installation has not done yet for digital signage and
data sockets faceplate fixing also not done for
screens</td><td>High</td><td>8/26/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:26:05 PM</td><td> </td><td>6/7/2022 9:57:16
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21816</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;No cables installed within the floor
boxes </td><td>High</td><td>8/26/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:27:00 PM</td><td> </td><td>6/7/2022 9:57:15
AM</td><td>&nbsp;</td><td>ME.12.01.009</td><td>&nbsp;</td>
</tr><tr>
<td>31052</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Earth jumper </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:22:56 PM</td><td> </td><td>6/7/2022
9:57:13 AM</td><td>&nbsp;</td><td>MS.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>31067</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover box</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:18 PM</td><td>
</td><td>6/7/2022 9:57:11
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31070</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Support of lighting fixtures
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022
4:23:24 PM</td><td> </td><td>6/7/2022 9:57:10
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>31079</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover box</td><td>High</td><td>6/8/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:38 PM</td><td>
</td><td>6/7/2022 9:57:09
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31086</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:23:53 PM</td><td> </td><td>6/7/2022
9:57:08 AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31538</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Dismantled duct support. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 3:32:38 PM</td><td>
</td><td>6/7/2022 9:37:16
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31500</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Water leaks from machine base.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:29 PM</td><td> </td><td>6/7/2022 9:26:33
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>31505</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Drain pipe need to be painted.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:30:45 PM</td><td> </td><td>6/7/2022 9:25:22
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>31534</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Drain pipes need to be cleaned and
painted. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:28 PM</td><td> </td><td>6/7/2022 9:24:42
AM</td><td>&nbsp;</td><td>MS.19.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>31535</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Drainage System</td><td>General
Snag</td><td>&#39;Clean out located over electric panel.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:29 PM</td><td> </td><td>6/7/2022 9:22:17
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31544</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Chilled water Piping and
Insulation</td><td>Insulation damaged</td><td>&#39;INERGEN pipes supports need
touchup paintings. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 3:32:48 PM</td><td> </td><td>6/7/2022 9:20:17
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>14326</td><td>B.O.H-ELEC. SUB-STATION - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up </td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/24/2020 1:22:40 PM</td><td> </td><td>6/7/2022
8:20:26 AM</td><td>&nbsp;</td><td>MS.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>12029</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Touch up for repair of block wall </td><td>Low</td><td>10/22/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020 2:13:12 PM</td><td>
</td><td>6/7/2022 8:12:09
AM</td><td>&nbsp;</td><td>MS.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>12028</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing Sealant around metal door frame
</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
2:13:08 PM</td><td> </td><td>6/7/2022 8:11:42
AM</td><td>&nbsp;</td><td>MS.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>12076</td><td>AHU - Band B- B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Missing Sealant around pipe </td><td>Low</td><td>10/22/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020 2:15:36 PM</td><td>
</td><td>6/7/2022 8:10:26
AM</td><td>&nbsp;</td><td>MS.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>12075</td><td>AHU - Band B- B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
2:15:33 PM</td><td> </td><td>6/7/2022 8:09:57
AM</td><td>&nbsp;</td><td>MS.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>9558</td><td>WET DELIVERY TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;No collar on pipe penetration
</td><td>High</td><td>7/27/2020 12:00:00 AM</td><td>ahmedsalem</td><td>7/20/2020
11:42:41 AM</td><td> </td><td>6/6/2022 9:28:04
PM</td><td>&nbsp;</td><td>MQ.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>30614</td><td>CORE F4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Painting and discoloration for air
terminal. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:41 AM</td><td> </td><td>6/6/2022 9:22:01
PM</td><td>&nbsp;</td><td>MC.14.02.F41</td><td>&nbsp;</td>
</tr><tr>
<td>31396</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Duct access door need to be adjusted.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:55:57 AM</td><td> </td><td>6/6/2022 9:20:36
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>13307</td><td>FIRST AID - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Floors</td><td>Rough
surface</td><td>&#39;Flooring not finished </td><td>Low</td><td>11/26/2020 12:00:00
AM</td><td>Kerolos Nagy Tawfik</td><td>11/5/2020 11:45:38 AM</td><td>
</td><td>6/6/2022 4:48:03
PM</td><td>&nbsp;</td><td>MG.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>11689</td><td>OPERATIONAL OFFICE</td><td>MU GF
</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Mechanical</td><td>Sprinkler
Heads</td><td>General Snag</td><td>&#39;All sprinkler heads must be not painted and
have clearance gap between head and ceiling </td><td>High</td><td>10/4/2020
12:00:00 PM</td><td>ahmedsalem</td><td>9/27/2020 3:19:45 PM</td><td>
</td><td>6/6/2022 4:33:45
PM</td><td>&nbsp;</td><td>MG.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>25837</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Toothing between stone tiles should be adjusted
</td><td>Low</td><td>1/24/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>1/3/2022 2:37:02 PM</td><td> </td><td>6/6/2022 4:10:07
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>11974</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Electrical</td><td>CABLE
TRAY</td><td>General Snag</td><td>&#39;Cable tray not covered yet
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
11:26:47 AM</td><td> </td><td>6/6/2022 3:07:32
PM</td><td>&nbsp;</td><td>MS.17.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>11979</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-ELV</td><td>CABLE BASKET
TRAY</td><td>General Snag</td><td>&#39;Cable tray and trunk should be
covered</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>10/1/2020 11:26:56 AM</td><td> </td><td>6/6/2022 3:07:05
PM</td><td>&nbsp;</td><td>MS.17.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>12001</td><td>AHU - Band B- B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;This room is not ready for snagging and
inspections since it is not ready</td><td>High</td><td>10/8/2020 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>10/1/2020 11:58:25 AM</td><td>
</td><td>6/6/2022 3:05:17
PM</td><td>&nbsp;</td><td>MS.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>12002</td><td>IT-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Access control cable Termination is not done
.</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:58:27 AM</td><td> </td><td>6/6/2022 3:04:18
PM</td><td>&nbsp;</td><td>MS.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>12003</td><td>SERVICE DELIVERY-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cable trunks labeling and top cover installation is not
done</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:58:31 AM</td><td> </td><td>6/6/2022 3:02:13
PM</td><td>&nbsp;</td><td>MQ.18.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>12011</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Card reader installation has not been done and Termination also
missing and floor junction box needs to be covered with metal
sheet.</td><td>High</td><td>10/8/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:58:59 AM</td><td> </td><td>6/6/2022 3:02:01
PM</td><td>&nbsp;</td><td>MS.19.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>12018</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Secure,Admin data and voice data sockets
permanent labeling has not been done</td><td>High</td><td>10/8/2020 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>10/1/2020 11:59:32 AM</td><td>
</td><td>6/6/2022 3:01:32
PM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>20099</td><td>BREAK OUT AREA-Band A</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing WiFi labels, loose PA speaker
</td><td>High</td><td>8/10/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/3/2021 11:28:53 AM</td><td> </td><td>6/6/2022 3:01:14
PM</td><td>&nbsp;</td><td>ME.12.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>20101</td><td>WOOD-Band A</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing cctv WiFi labels, door lock cables shouldn’t be visible
</td><td>High</td><td>8/10/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/3/2021 11:28:57 AM</td><td> </td><td>6/6/2022 3:01:12
PM</td><td>&nbsp;</td><td>ME.12.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>20104</td><td>JEWELLERY-Band A</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing cctv labels, door lock cables shouldn’t be visible
</td><td>High</td><td>8/10/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/3/2021 11:29:01 AM</td><td> </td><td>6/6/2022 3:00:56
PM</td><td>&nbsp;</td><td>ME.12.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20108</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Missing fire alarm labels, fire
telephone not terminated, shutter door missing raceway and devices
</td><td>High</td><td>8/10/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/3/2021 11:29:16 AM</td><td> </td><td>6/6/2022 2:59:21
PM</td><td>&nbsp;</td><td>ME.12.01.009</td><td>&nbsp;</td>
</tr><tr>
<td>21814</td><td>AHU - Band B- B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>PANELS AND
DISTRIBUTION BOARDS</td><td>General Snag</td><td>&#39;HVAC cooling system;UPS data
sockets and inergen system not installed for this security
room</td><td>High</td><td>8/26/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:26:55 PM</td><td> </td><td>6/6/2022 2:58:58
PM</td><td>&nbsp;</td><td>MS.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>21815</td><td>AHU - Band B- B.O.H</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Digital signage containment and cabling
is not done and screen installation also not done.Digital signage rack installation
is pending </td><td>High</td><td>8/26/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:26:58 PM</td><td> </td><td>6/6/2022 2:58:30
PM</td><td>&nbsp;</td><td>MS.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>21819</td><td>ELEC.</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Exposed Magnetic contact cables should not be visible.it should
be protected with u clamp or conduit.malfunctioning can be done through cutting the
magnetic cables.Also access control cables were not terminated
</td><td>High</td><td>8/26/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:27:13 PM</td><td> </td><td>6/6/2022 2:57:55
PM</td><td>&nbsp;</td><td>MS.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>21820</td><td>LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Exposed Magnetic contact cables should not be visible.it should
be protected with u clamp or conduit.malfunctioning can be done through cutting the
magnetic cables and there is a gap between door and magnetic contact after closing
the door </td><td>High</td><td>8/26/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:27:16 PM</td><td> </td><td>6/6/2022 2:57:48
PM</td><td>&nbsp;</td><td>ME.12.01.011</td><td>&nbsp;</td>
</tr><tr>
<td>12014</td><td>AHU</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Thermostat labels are missing
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:59:07 AM</td><td> </td><td>6/6/2022 2:56:18
PM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>12010</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;No labels for
thermostats</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>10/1/2020 11:58:55 AM</td><td> </td><td>6/6/2022 2:56:11
PM</td><td>&nbsp;</td><td>MS.19.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20098</td><td>WC LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing wifi label </td><td>High</td><td>8/10/2021 12:00:00
PM</td><td>Sameh Ibrahim El-Sawah</td><td>8/3/2021 11:28:52 AM</td><td>
</td><td>6/6/2022 2:56:02
PM</td><td>&nbsp;</td><td>MW.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20105</td><td>ELEC. ROOM-Band B</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing ICT and access control labels, missing pull box cover and
labels </td><td>High</td><td>8/10/2021 12:00:00 PM</td><td>Sameh Ibrahim El-
Sawah</td><td>8/3/2021 11:29:05 AM</td><td> </td><td>6/6/2022 2:55:55
PM</td><td>&nbsp;</td><td>MS.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>10921</td><td>Pyramid Garden</td><td>Pyramid
Garden</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;ACP not
Installed.</td><td>High</td><td>9/22/2020 12:00:00 AM</td><td>David Noshy
Naguib</td><td>9/15/2020 8:55:39 AM</td><td> </td><td>6/6/2022 2:37:48
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10664</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;General cleaning/remove the protection tape
</td><td>Low</td><td>10/4/2020 12:00:00
AM</td><td>andrewjohn.rose</td><td>9/13/2020 4:50:39 PM</td><td> </td><td>6/6/2022
1:42:04 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10826</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Ews06 -3 Sealant need adjustment / joint
need adjustment / missing gasket / missing water test</td><td>Low</td><td>10/5/2020
12:00:00 PM</td><td>andrewjohn.rose</td><td>9/14/2020 12:19:40 PM</td><td>
</td><td>6/6/2022 1:42:03
PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>10971</td><td>TUT- ELEC.</td><td>MU
L30</td><td>Closed</td><td>Astron</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Need cleaning &amp; repaint
</td><td>Low</td><td>10/6/2020 12:00:00
AM</td><td>andrewjohn.rose</td><td>9/15/2020 12:05:03 PM</td><td> </td><td>6/6/2022
1:42:01 PM</td><td>&nbsp;</td><td>MS.18.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>13005</td><td>TUT- BREAK OUT SPACE</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;Broken
tiles to be replaced </td><td>High</td><td>11/9/2020 12:00:00 PM</td><td>Sherif
Elabd</td><td>11/2/2020 1:11:33 PM</td><td> </td><td>6/6/2022 1:42:00
PM</td><td>Repaired, not replaced as no access for
installing</td><td>MP.18.03.003</td><td>&nbsp;</td>
</tr><tr>
<td>14683</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Comments in attached
photo</td><td>High</td><td>1/17/2021 12:00:00
AM</td><td>mohamed.sami</td><td>1/10/2021 2:30:53 PM</td><td> </td><td>6/6/2022
1:41:59 PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14684</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Tiles to be rested</td><td>High</td><td>1/17/2021 12:00:00
AM</td><td>mohamed.sami</td><td>1/10/2021 2:30:55 PM</td><td> </td><td>6/6/2022
1:41:57 PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14700</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;General cleaning for
joint</td><td>High</td><td>1/17/2021 12:00:00
AM</td><td>mohamed.sami</td><td>1/10/2021 2:31:29 PM</td><td> </td><td>6/6/2022
1:41:56 PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14704</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Irregular joints to be adjusted
</td><td>High</td><td>1/17/2021 12:00:00 AM</td><td>mohamed.sami</td><td>1/10/2021
2:31:38 PM</td><td> </td><td>6/6/2022 1:41:55
PM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>14879</td><td>TUT- W.C. LOBBY</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Signage</td><td>Not
Installed/Completed</td><td>&#39;Remove the sealant around
signage</td><td>High</td><td>1/25/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>1/18/2021 1:19:57 PM</td><td> </td><td>6/6/2022
1:41:54 PM</td><td>&nbsp;</td><td>MW.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15837</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Glass
partion and door</td><td>Stains/Scratches/Damage</td><td>&#39;All of the Adaptation
anchor plates to be cleaned</td><td>High</td><td>2/13/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/6/2021 1:22:00 PM</td><td> </td><td>6/6/2022
1:41:53 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>15843</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Missing stone infill below metal panel and
next to grill. Needs to be installed as level 45 and previously
agreed</td><td>High</td><td>2/14/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>2/7/2021 10:16:06 AM</td><td> </td><td>6/6/2022
1:41:51 PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>17962</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Not finished CLOUD CEILING ( TUT_FO_0_200
)</td><td>High</td><td>6/30/2021 12:00:00
AM</td><td>robertszymanski</td><td>5/24/2021 4:40:14 PM</td><td> </td><td>6/6/2022
1:41:50 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18002</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Reception Desk to be installed</td><td>High</td><td>6/1/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>5/25/2021 7:42:44 AM</td><td> </td><td>6/6/2022
1:41:49 PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>24432</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General</
td><td>&#39;Further to the cleaning of the Cloud by the vacuum - the stains to the
fabric are to be cleaned and removed in various
locations.</td><td>Urgent</td><td>10/31/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>10/28/2021 8:29:58 AM</td><td> </td><td>6/6/2022
1:41:48 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24462</td><td>Bay-01 (from level +25.5 to +31.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Missing ladder for
access</td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:45 AM</td><td> </td><td>6/6/2022 1:15:19
PM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>15308</td><td>MACHINE ROOM</td><td>MU
BA</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Not ready for
snag</td><td>High</td><td>2/1/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>1/25/2021 4:37:57 PM</td><td> </td><td>6/6/2022 1:04:32
PM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>29882</td><td>RISER</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;No ventilation system detected in this
area. </td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:48 PM</td><td> </td><td>6/6/2022 12:48:35
PM</td><td>&nbsp;</td><td>MS.25.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>24446</td><td>Bay-03 (from level +37.5 to +43.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;General cleaning
of the motor </td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:12 AM</td><td> </td><td>6/6/2022 12:34:45
PM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>24445</td><td>Bay-04 (from level +43.5 to +49.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;General cleaning
of the motor </td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:10 AM</td><td> </td><td>6/6/2022 12:34:04
PM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>24450</td><td>Bay-02 (from level +31.5 to +37.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;General cleaning
for the motor </td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>10/28/2021 11:40:21 AM</td><td> </td><td>6/6/2022 12:33:05
PM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>28704</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage and missing thermal insulation for chilled water piping.
</td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:29 AM</td><td> </td><td>6/6/2022 11:57:12
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28729</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation for chilled water pipes. </td><td>High</td><td>5/18/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/11/2022 11:46:11 AM</td><td>
</td><td>6/6/2022 11:57:07
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28730</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation for hydronic pipes. </td><td>High</td><td>5/18/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/11/2022 11:46:13 AM</td><td>
</td><td>6/6/2022 11:57:06
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28930</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Chilled water pipes
insulation need repairs. </td><td>High</td><td>5/24/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:31:10 PM</td><td>
</td><td>6/6/2022 11:57:05
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29075</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Rusty insulation due to water condensation.
</td><td>High</td><td>5/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:22 AM</td><td> </td><td>6/6/2022 11:57:04
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29089</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing thermal insulation for the drain
valves. </td><td>High</td><td>5/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:46 AM</td><td> </td><td>6/6/2022 11:57:03
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29139</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Labels for air ducts.
</td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:49 AM</td><td> </td><td>6/6/2022 11:57:00
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29153</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage air duct thermal insulation.
</td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:20 AM</td><td> </td><td>6/6/2022 11:56:59
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29304</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Air duct thermal insulation damaged.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:41 PM</td><td> </td><td>6/6/2022 11:56:58
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29305</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Damage air duct insulation and missing
AD. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:42 PM</td><td> </td><td>6/6/2022 11:56:56
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30157</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;FCO cover is rusted.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:05 AM</td><td> </td><td>6/6/2022 11:56:53
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30673</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Slot diffusers joints need adjustments.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:53:11 AM</td><td> </td><td>6/6/2022 11:56:48
AM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30779</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing seismic bracing for FF pipes.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:46 PM</td><td> </td><td>6/6/2022 11:56:47
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30780</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal installation for air ducts.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:49 PM</td><td> </td><td>6/6/2022 11:56:46
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30794</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal installation need repairs.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:16 PM</td><td> </td><td>6/6/2022 11:56:45
AM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31350</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing labels for PPR pipes. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:54:22 AM</td><td>
</td><td>6/6/2022 11:56:42
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31383</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing air duct labels. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:55:30 AM</td><td>
</td><td>6/6/2022 11:56:41
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31391</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39; Is sing labels for air ducts. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:55:46 AM</td><td>
</td><td>6/6/2022 11:56:39
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31393</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty support. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:55:50 AM</td><td>
</td><td>6/6/2022 11:56:38
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31399</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Air vent/bottle to
be fitted</td><td>&#39;Missing labels for PPR pipes. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:56:03 AM</td><td>
</td><td>6/6/2022 11:56:37
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31410</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Condensate drain pipes shall be ended with elbows.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:24 AM</td><td> </td><td>6/6/2022 11:56:36
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31432</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty machine base shall be cleaned and painted.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:57:11 AM</td><td> </td><td>6/6/2022 11:56:30
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31442</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty and dirty machine base shall be cleaned and painted.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:57:32 AM</td><td> </td><td>6/6/2022 11:56:29
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>21496</td><td>B.O.H-PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Pre snagging after removing storage material
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/18/2021
2:12:49 PM</td><td> </td><td>6/6/2022 11:53:49
AM</td><td>&nbsp;</td><td>MS.18.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>27336</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Snagging after removing protection cover
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:30 PM</td><td> </td><td>6/6/2022 11:53:46
AM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27353</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Missing sealant </td><td>Low</td><td>3/28/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022 12:13:03 PM</td><td>
</td><td>6/6/2022 11:53:42
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27360</td><td>LOBBY</td><td>MU L20</td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39;Marked tiles should be fixed properly
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:13:17 PM</td><td> </td><td>6/6/2022 11:53:41
AM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27361</td><td>LOBBY</td><td>MU L20</td><td>Closed</td><td>Al
Dhabi Contracting</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39;Short tiles should be replaced </td><td>Low</td><td>3/28/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022 12:13:19 PM</td><td>
</td><td>6/6/2022 11:53:40
AM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27366</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Cladding is missing
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:13:29 PM</td><td> </td><td>6/6/2022 11:53:39
AM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27459</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Carpet
Floor</td><td>General Snag</td><td>&#39;Snagging after removing protection cover
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:40:46 PM</td><td> </td><td>6/6/2022 11:53:38
AM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>27463</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Snagging after removing protection cover
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:40:52 PM</td><td> </td><td>6/6/2022 11:53:37
AM</td><td>&nbsp;</td><td>MR.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27464</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Snagging after completion of the work
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:40:54 PM</td><td> </td><td>6/6/2022 11:53:35
AM</td><td>&nbsp;</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27466</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Carpet
Floor</td><td>General Snag</td><td>&#39;Snagging after removing protection cover
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:40:57 PM</td><td> </td><td>6/6/2022 11:53:34
AM</td><td>&nbsp;</td><td>MR.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27468</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Carpet
Floor</td><td>General Snag</td><td>&#39;Snagging after removing protection cover
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:01 PM</td><td> </td><td>6/6/2022 11:53:33
AM</td><td>&nbsp;</td><td>MA.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27482</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Vanity Counter Top</td><td>General
Snag</td><td>&#39;Snagging after removing protection cover and cleaning
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:26 PM</td><td> </td><td>6/6/2022 11:53:32
AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27483</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>Dr
Greish - High Custom Craft Company.
HCC</td><td>Architectural</td><td>Mirrors</td><td>General Snag</td><td>&#39;Missing
mirrors</td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 4:41:28 PM</td><td> </td><td>6/6/2022
11:53:31 AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27485</td><td>W.C</td><td>MU
L20</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Damage</td><td>&#39;Cleaning is required
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:31 PM</td><td> </td><td>6/6/2022 11:53:30
AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27486</td><td>W.C</td><td>MU
L20</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Damage</td><td>&#39;Marked parts to be leveled and adjusted
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:33 PM</td><td> </td><td>6/6/2022 11:53:29
AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27488</td><td>W.C</td><td>MU
L20</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Damage</td><td>&#39;Damaged cubicle should be replaced
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:36 PM</td><td> </td><td>6/6/2022 11:53:28
AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27492</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Grouting is missing and should be adjusted
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:43 PM</td><td> </td><td>6/6/2022 11:53:27
AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27494</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Toothing between tiles should be adjusted
</td><td>Low</td><td>3/28/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/7/2022
4:41:48 PM</td><td> </td><td>6/6/2022 11:53:26
AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27495</td><td>W.C</td><td>MU
L20</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Damage</td><td>&#39;Repair for marked
part</td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 4:41:50 PM</td><td> </td><td>6/6/2022
11:53:25 AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27496</td><td>W.C</td><td>MU
L20</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Damage</td><td>&#39;Cleaning is needed
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:51 PM</td><td> </td><td>6/6/2022 11:53:24
AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27497</td><td>W.C</td><td>MU
L20</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Damage</td><td>&#39;Cubicle should be fixed properly
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:52 PM</td><td> </td><td>6/6/2022 11:53:23
AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27498</td><td>W.C</td><td>MU
L20</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Damage</td><td>&#39;Screw is missing
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:54 PM</td><td> </td><td>6/6/2022 11:53:22
AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27499</td><td>W.C</td><td>MU
L20</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Damage</td><td>&#39;Cubicle door should be aligned
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:56 PM</td><td> </td><td>6/6/2022 11:53:21
AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27500</td><td>W.C</td><td>MU
L20</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Damage</td><td>&#39;Damaged cubicle partition should be replaced
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:58 PM</td><td> </td><td>6/6/2022 11:53:20
AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27502</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Final coat is not done </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 4:42:02 PM</td><td> </td><td>6/6/2022
11:53:19 AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27505</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing around metal doors
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:42:08 PM</td><td> </td><td>6/6/2022 11:53:16
AM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>28002</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;All
bottom parts need repair and touch up painting </td><td>Low</td><td>4/4/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/14/2022 11:38:34 AM</td><td>
</td><td>6/6/2022 11:53:15
AM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>28005</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Concrete columns painting should be the same with the walls color
(white)</td><td>Low</td><td>4/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>3/14/2022 11:38:42 AM</td><td> </td><td>6/6/2022
11:53:14 AM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>28006</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked cracks should be repaired and touch up painting
</td><td>Low</td><td>4/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/14/2022
11:38:44 AM</td><td> </td><td>6/6/2022 11:53:13
AM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>28009</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access panels should be fixed properly
</td><td>Low</td><td>4/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/14/2022
11:38:50 AM</td><td> </td><td>6/6/2022 11:53:12
AM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>28010</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Marked cracks should be repaired
</td><td>Low</td><td>4/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/14/2022
11:38:52 AM</td><td> </td><td>6/6/2022 11:53:11
AM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>28019</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Marked part should be repaired
</td><td>Low</td><td>4/4/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/14/2022
11:39:07 AM</td><td> </td><td>6/6/2022 11:53:10
AM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28021</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling need touch up painting </td><td>Low</td><td>4/4/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/14/2022 11:39:11 AM</td><td>
</td><td>6/6/2022 11:53:09
AM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28093</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling need touch up painting </td><td>Low</td><td>4/6/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/16/2022 10:59:26 AM</td><td>
</td><td>6/6/2022 11:53:08
AM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>28094</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access doors should be fixed properly
</td><td>Low</td><td>4/6/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/16/2022
10:59:28 AM</td><td> </td><td>6/6/2022 11:53:07
AM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>28097</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked parts need repair and touch up painting
</td><td>Low</td><td>4/6/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/16/2022
10:59:33 AM</td><td> </td><td>6/6/2022 11:53:06
AM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>28098</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Column color should be the same wall color
(white)</td><td>Low</td><td>4/6/2022 12:00:00
PM</td><td>mohamed.sami</td><td>3/16/2022 10:59:35 AM</td><td> </td><td>6/6/2022
11:53:05 AM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>28099</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>4/6/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/16/2022 10:59:37 AM</td><td>
</td><td>6/6/2022 11:53:04
AM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>28104</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant needs repair and adjusted and should be matching with
wall color </td><td>Low</td><td>4/6/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/16/2022 10:59:47 AM</td><td> </td><td>6/6/2022
11:53:03 AM</td><td>&nbsp;</td><td>MA.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28117</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked joint should be uniform and aligned
</td><td>Low</td><td>4/6/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/16/2022
11:00:10 AM</td><td> </td><td>6/6/2022 11:53:02
AM</td><td>&nbsp;</td><td>MA.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28214</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;All columns color are not the same walls
color (should be white)</td><td>Low</td><td>4/10/2022 12:00:00
PM</td><td>mohamed.sami</td><td>3/20/2022 12:03:59 PM</td><td> </td><td>6/6/2022
11:53:01 AM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>28225</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked omega should be removed </td><td>Low</td><td>4/10/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/20/2022 12:04:19 PM</td><td>
</td><td>6/6/2022 11:53:00
AM</td><td>&nbsp;</td><td>MA.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28228</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Wall - Skirting</td><td>Other
Snag</td><td>&#39;All joints need touch up painting and finished properly
</td><td>Low</td><td>4/10/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/20/2022
12:04:27 PM</td><td> </td><td>6/6/2022 11:52:59
AM</td><td>&nbsp;</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28229</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Wall - Skirting</td><td>Other
Snag</td><td>&#39;Skirting should be leveled and uniform
</td><td>Low</td><td>4/10/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/20/2022
12:04:29 PM</td><td> </td><td>6/6/2022 11:52:58
AM</td><td>&nbsp;</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28233</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs touch up painting </td><td>Low</td><td>4/10/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/20/2022 12:04:38 PM</td><td>
</td><td>6/6/2022 11:52:57
AM</td><td>&nbsp;</td><td>MA.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28238</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked part need repair and touch up
</td><td>Low</td><td>4/10/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/20/2022
12:04:47 PM</td><td> </td><td>6/6/2022 11:52:56
AM</td><td>&nbsp;</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28240</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wall painting is still in process
</td><td>Low</td><td>4/10/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/20/2022
12:04:51 PM</td><td> </td><td>6/6/2022 11:52:55
AM</td><td>&nbsp;</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28697</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant joint should be adjusted and cleaned
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022
10:38:21 AM</td><td> </td><td>6/6/2022 11:52:54
AM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28826</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gypsum wall should be
leveled.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:21 AM</td><td> </td><td>6/6/2022 11:52:52
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28834</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Skirting should be
aligned.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:33 AM</td><td> </td><td>6/6/2022 11:52:52
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28844</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Waving at gypsum wall should be leveled
.</td><td>Low</td><td>6/5/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/15/2022
11:47:46 AM</td><td> </td><td>6/6/2022 11:52:51
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28893</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Gypsum Ceiling</td><td>General
Snag</td><td>&#39;Wavy marked part should be adjusted </td><td>Low</td><td>6/7/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/17/2022 11:47:02 AM</td><td>
</td><td>6/6/2022 11:52:50
AM</td><td>&nbsp;</td><td>MA.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30085</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Protection covers should be removed
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
11:36:40 AM</td><td> </td><td>6/6/2022 11:52:48
AM</td><td>&nbsp;</td><td>MA.19.02.026</td><td>&nbsp;</td>
</tr><tr>
<td>30189</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Flooring need to repair and touch
up.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 11:50:47 AM</td><td> </td><td>6/6/2022 11:52:47
AM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>30231</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Shadow gap should be
cleaned.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 1:03:08 PM</td><td> </td><td>6/6/2022 11:52:47
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30430</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging doors after removing
protection.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:19 AM</td><td> </td><td>6/6/2022 11:52:46
AM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30467</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Grill need to clean from
paint.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:16 AM</td><td> </td><td>6/6/2022 11:52:44
AM</td><td>&nbsp;</td><td>MA.19.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30549</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor need repair and touch up painting
</td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:46:11 AM</td><td> </td><td>6/6/2022 11:52:43
AM</td><td>&nbsp;</td><td>MA.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>12961</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>MEP-Electrical</td><td>CONTAINMENT
SUPPORT SYSTEM</td><td>General Snag</td><td>&#39;All metal flexible conduit should
be replaced by RGS conduits</td><td>High</td><td>11/9/2020 12:00:00
AM</td><td>Ayman Ahmed Mostafa</td><td>11/2/2020 11:51:38 AM</td><td>
</td><td>6/6/2022 10:51:27 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16955</td><td>LOBBY-Band A</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing work</td><td>High</td><td>3/18/2021 12:00:00
PM</td><td>Sameh Ibrahim El-Sawah</td><td>3/11/2021 11:41:08 AM</td><td>
</td><td>6/6/2022 10:43:46
AM</td><td>&nbsp;</td><td>ME.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>10903</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>Audio Technology</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Incomplete Installation</td><td>&#39;This room is not ready for
snagging.goppion store</td><td>High</td><td>9/21/2020 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>9/14/2020 3:59:31 PM</td><td>
</td><td>6/6/2022 9:59:18
AM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>10913</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;Missing sliding gate
interface cabling connection and laser cut system installation .Also power sockets
installation for laser systems works are incomplete </td><td>High</td><td>9/21/2020
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>9/14/2020 4:01:18 PM</td><td>
</td><td>6/6/2022 9:59:16
AM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>11971</td><td>ELEC. ROOM-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Electrical</td><td>CABLE
TRAY</td><td>General Snag</td><td>&#39;Cable tray has not covered
yet</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>10/1/2020 11:26:38 AM</td><td> </td><td>6/6/2022 9:59:15
AM</td><td>&nbsp;</td><td>MS.18.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>11977</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Electrical</td><td>CABLE
TRAY</td><td>General Snag</td><td>&#39;Cable tray not covered yet
</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
11:26:49 AM</td><td> </td><td>6/6/2022 9:59:13
AM</td><td>&nbsp;</td><td>MS.17.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>11980</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-ELV</td><td>CABLE BASKET
TRAY</td><td>General Snag</td><td>&#39;Cable tray and trunk should be
covered</td><td>High</td><td>10/8/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>10/1/2020 11:27:00 AM</td><td> </td><td>6/6/2022 9:59:12
AM</td><td>&nbsp;</td><td>MS.17.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>14289</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Beacons installation is not done at
site</td><td>High</td><td>12/29/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>12/22/2020 9:47:20 AM</td><td> </td><td>6/6/2022 9:59:11
AM</td><td>Duplicated</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>14291</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Public addressing system data outlets faceplate location conflict
with speakers.faceplate direction needs to be changed
</td><td>High</td><td>12/29/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>12/22/2020 9:47:24 AM</td><td> </td><td>6/6/2022 9:59:10
AM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>14293</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Public address system speakers alignment is not done properly
</td><td>High</td><td>12/29/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>12/22/2020 9:47:26 AM</td><td> </td><td>6/6/2022 9:59:09
AM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>14596</td><td>TUT- TUTANKAMEN GALLERY(+46.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>13 A Double Socket
Outlets</td><td>&#39;Power point not connected to floor box at Cinema BOX.BOJV to
identify which cable is dedicated for Media Hardware.</td><td>High</td><td>1/7/2021
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>12/31/2020 9:31:11
AM</td><td> </td><td>6/6/2022 9:59:08
AM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>14597</td><td>TUT- (+46.50)</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Line Array speakers RJ45 patch cord connections conflict with
speaker locations. This will leads to bend redious the patch cord and it could
damage the Keystone module pins due to heavy tension of these patch
cords</td><td>High</td><td>1/7/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>12/31/2020 9:37:23 AM</td><td> </td><td>6/6/2022 9:59:07
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14624</td><td>TUT- Digital (+46.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General</td><td>&#39;Voice evacuation UPS serving the voice evacuation
speakers has not been installed.</td><td>High</td><td>1/11/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>1/4/2021 11:46:56 AM</td><td> </td><td>6/6/2022
9:59:06 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14680</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>Asset number missing</td><td>&#39;Missing labels
</td><td>High</td><td>1/17/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>1/10/2021 11:02:29 AM</td><td> </td><td>6/6/2022 9:59:04
AM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15844</td><td>SECURITY ROOM</td><td>GATE 9 TYPE 2
GF</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39; fire telephone Break glass not installed
</td><td>High</td><td>2/14/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>2/7/2021
10:19:42 AM</td><td> </td><td>6/6/2022 9:59:02
AM</td><td>&nbsp;</td><td>GT9.02.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>16947</td><td>ELEC. ROOM-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>General Snag</td><td>&#39;Cable trunk not
covered</td><td>High</td><td>3/18/2021 12:00:00 PM</td><td>Sameh Ibrahim El-
Sawah</td><td>3/11/2021 11:40:48 AM</td><td> </td><td>6/6/2022 9:59:01
AM</td><td>&nbsp;</td><td>MS.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>18003</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Media Hardware equipment&#39;s Power
connection to the floor boxes to complete</td><td>High</td><td>6/1/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>5/25/2021 7:47:57 AM</td><td> </td><td>6/6/2022
9:58:58 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18005</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General</td><td>&#39;Indoor GSM antenna
activations</td><td>High</td><td>6/1/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>5/25/2021 7:59:24 AM</td><td> </td><td>6/6/2022
9:58:57 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18007</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General</td><td>&#39;Voice evacuation UPS serving the voice evacuation
speakers to complete</td><td>High</td><td>6/1/2021 12:00:00
AM</td><td>andrewjohn.rose</td><td>5/25/2021 8:02:11 AM</td><td> </td><td>6/6/2022
9:58:56 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18395</td><td>GUARD ROOM</td><td>GATE 7 TYPE 2
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Floor boxes Termination is incomplete and access control panels
also not installed yet .Also workstation patch cord connection and fiber
Termination also not done</td><td>High</td><td>6/13/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>6/6/2021 3:32:36 PM</td><td>
</td><td>6/6/2022 9:58:55
AM</td><td>&nbsp;</td><td>GT7.02.0G.05</td><td>&nbsp;</td>
</tr><tr>
<td>19787</td><td>WAITING</td><td>GATE 8 TYPE 1
GF</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;Phone glass is missing
, manual station is deeply damaged , outdoor labels is loose
</td><td>High</td><td>7/19/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>7/12/2021
1:21:00 PM</td><td> </td><td>6/6/2022 9:58:54
AM</td><td>&nbsp;</td><td>GT8.01.0G.09</td><td>&nbsp;</td>
</tr><tr>
<td>21238</td><td>CORE B2-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;All
EMT conduits should be replaced by RGS conduit (this exposed area) and missing
labels </td><td>High</td><td>8/24/2021 12:00:00 PM</td><td>Sameh Ibrahim El-
Sawah</td><td>8/17/2021 12:05:55 PM</td><td> </td><td>6/6/2022 9:58:51
AM</td><td>&nbsp;</td><td>MC.18.01.B21</td><td>&nbsp;</td>
</tr><tr>
<td>24203</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Missing lighting fixtures ( not
delivered yet)</td><td>High</td><td>11/2/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>10/26/2021 3:34:51 PM</td><td> </td><td>6/6/2022 9:58:50
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24207</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;The lighting fixtures not inspected yet
where the mock-up is rejected</td><td>High</td><td>11/2/2021 12:00:00
AM</td><td>Mohamed Samir</td><td>10/26/2021 3:34:59 PM</td><td> </td><td>6/6/2022
9:58:49 AM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>24208</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Acciona</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;The lighting fixtures ( delta
supplier)not inspected yet (where the mock-up is
rejected)</td><td>High</td><td>11/2/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>10/26/2021 3:35:00 PM</td><td> </td><td>6/6/2022 9:58:48
AM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>30274</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:21 PM</td><td> </td><td>6/6/2022
9:58:47 AM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30275</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unused openings
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:29:23 PM</td><td> </td><td>6/6/2022 9:58:46
AM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30276</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:25 PM</td><td> </td><td>6/6/2022
9:58:45 AM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>30281</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Closed box</td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:31 PM</td><td>
</td><td>6/6/2022 9:58:44
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30341</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tie rape should installed for cable
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:31:03 PM</td><td> </td><td>6/6/2022 9:58:41
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30343</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Opening should be closed of
box</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:07 PM</td><td> </td><td>6/6/2022
9:58:40 AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30344</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Should be closed
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:31:08 PM</td><td> </td><td>6/6/2022 9:58:39
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30345</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Earth jumper cables should be installed
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:31:09 PM</td><td> </td><td>6/6/2022 9:58:38
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30347</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unused boxes should be
removed</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:12 PM</td><td> </td><td>6/6/2022
9:58:37 AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30348</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Should be
sealed</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:14 PM</td><td> </td><td>6/6/2022
9:58:36 AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30349</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;EMT flexible should rectified and opening
should be closed</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:15 PM</td><td> </td><td>6/6/2022
9:58:35 AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30350</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Should be aligned
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:31:16 PM</td><td> </td><td>6/6/2022 9:58:34
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30351</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Should be
covered</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:18 PM</td><td> </td><td>6/6/2022
9:58:33 AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30353</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should
protected</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:20 PM</td><td> </td><td>6/6/2022
9:58:32 AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30354</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing screws should be installed
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:31:22 PM</td><td> </td><td>6/6/2022 9:58:31
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30355</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover box and clips should rectified
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:31:24 PM</td><td> </td><td>6/6/2022 9:58:30
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30359</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;All unused openings for box’s should be
closed</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:30 PM</td><td> </td><td>6/6/2022
9:58:29 AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30360</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Should be properly
fixed</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:32 PM</td><td> </td><td>6/6/2022
9:58:28 AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30363</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Threaded Rod must aligned and rectified
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:31:36 PM</td><td> </td><td>6/6/2022 9:58:27
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29162</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning from upper side.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:37 AM</td><td> </td><td>6/6/2022 9:25:17
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29282</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Cleaning for
drainage pipe. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:07:25 PM</td><td> </td><td>6/6/2022 9:24:21
AM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>28552</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to
specification/drawing</td><td>&#39;Condensate drain pipe need elbow and the funnel
shall be fixed to the drain point cover. </td><td>High</td><td>5/16/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/9/2022 11:49:11 AM</td><td>
</td><td>6/6/2022 9:22:55
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>31333</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty supports. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:53:46 AM</td><td>
</td><td>6/6/2022 9:20:47
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31334</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain pipes shall be ended with elbow.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:53:51 AM</td><td> </td><td>6/6/2022 9:19:53
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31336</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty supports. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:53:55 AM</td><td>
</td><td>6/6/2022 9:18:25
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31338</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Door handle. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:53:58 AM</td><td>
</td><td>6/6/2022 9:17:25
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31340</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Motorized damper shall be supported.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:01 AM</td><td> </td><td>6/6/2022 9:16:01
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31361</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty support. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:54:41 AM</td><td>
</td><td>6/6/2022 9:13:21
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31363</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty supports shall be treated and painted.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:54:45 AM</td><td> </td><td>6/6/2022 9:11:28
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31411</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty machine base shall be treated and painted.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:26 AM</td><td> </td><td>6/6/2022 9:10:37
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31418</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Outside cleaning. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:56:45 AM</td><td>
</td><td>6/6/2022 9:08:50
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31450</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Machine shall be cleaned from outside.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:57:58 AM</td><td> </td><td>6/6/2022 9:05:35
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31470</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;PPR water pipes has no labels. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 12:53:13 PM</td><td>
</td><td>6/6/2022 9:04:04
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30069</td><td>SHAFT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:00 AM</td><td> </td><td>6/6/2022 9:03:25
AM</td><td>&nbsp;</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30781</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for all air ducts.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:51 PM</td><td> </td><td>6/6/2022 9:00:34
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30796</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air duct.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:19 PM</td><td> </td><td>6/6/2022 8:58:44
AM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31408</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Air vent/bottle to
be fitted</td><td>&#39;Rusty and dirty drain pipes. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:56:21 AM</td><td>
</td><td>6/6/2022 8:56:43
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31551</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around door frame.</td><td>Low</td><td>6/23/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>6/2/2022 3:36:15 PM</td><td>
</td><td>6/6/2022 8:54:53
AM</td><td>&nbsp;</td><td>MS.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>31326</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Humidification unit shall be cleaned from inside and outside.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:53:30 AM</td><td> </td><td>6/6/2022 8:50:13
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31327</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain hose. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:53:33 AM</td><td>
</td><td>6/6/2022 8:49:13
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>29336</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf should be closed properly </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 1:15:29 PM</td><td> </td><td>6/6/2022
8:49:08 AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29333</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Door leaf need to repaint </td><td>Low</td><td>6/14/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/24/2022 1:15:25 PM</td><td> </td><td>6/6/2022
8:48:17 AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>13741</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Repair </td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/1/2020 11:38:35 AM</td><td> </td><td>6/6/2022 8:47:50
AM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>31332</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty machine base. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:53:44 AM</td><td>
</td><td>6/6/2022 8:47:44
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>17861</td><td>IT ROOM</td><td>PR
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Temple garden CCTV cameras, Public Address system horn speaker
cabling which are feeding from Pyramid restaurant hub room is still incomplete.
Fiber cables also not pulled yet.</td><td>High</td><td>5/27/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>5/20/2021 9:19:25 AM</td><td>
</td><td>6/6/2022 8:45:30 AM</td><td>&nbsp;</td><td>SP.00.0G.04</td><td>&nbsp;</td>
</tr><tr>
<td>31394</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Motor pulley need to be painted. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:55:52 AM</td><td>
</td><td>6/6/2022 8:44:06
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31398</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Air vent/bottle to
be fitted</td><td>&#39;Humidifier shall be cleaned from inside and outside.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:01 AM</td><td> </td><td>6/6/2022 8:42:57
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31402</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire Stopping</td><td>Installation not to
specification/drawing</td><td>&#39;Drain hose shall be installed properly.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:09 AM</td><td> </td><td>6/6/2022 8:42:08
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31425</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Drain hose not installed properly. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:56:58 AM</td><td>
</td><td>6/6/2022 8:41:21
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31430</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Outside cleaning. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:57:08 AM</td><td>
</td><td>6/6/2022 8:39:41
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31431</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Inside cleaning. </td><td>High</td><td>6/9/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:57:10 AM</td><td>
</td><td>6/6/2022 8:38:48
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31439</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;PPR water pipes has no labels. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:57:25 AM</td><td>
</td><td>6/6/2022 8:36:54
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31440</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Water pipe shall be aligned. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:57:28 AM</td><td>
</td><td>6/6/2022 8:36:18
AM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>9378</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
hardware /door need touch up</td><td>Low</td><td>7/29/2020 12:00:00
AM</td><td>sally.george</td><td>7/8/2020 3:58:07 PM</td><td> </td><td>6/6/2022
7:28:42 AM</td><td>&nbsp;</td><td>MQ.18.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>9377</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wall need touch up and cleaning </td><td>Low</td><td>7/29/2020
12:00:00 PM</td><td>sally.george</td><td>7/8/2020 3:58:02 PM</td><td>
</td><td>6/6/2022 7:28:26
AM</td><td>&nbsp;</td><td>MQ.18.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>30487</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging doors after removing
protection.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:48 AM</td><td> </td><td>6/5/2022 4:25:30
PM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30848</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging door after removing
protection.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:12 AM</td><td> </td><td>6/5/2022 4:25:28
PM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30873</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging door after removing
protection.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:54 AM</td><td> </td><td>6/5/2022 4:25:27
PM</td><td>&nbsp;</td><td>MS.14.02.003</td><td>&nbsp;</td>
</tr><tr>

<td>24904</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV QC
CIVIL</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damaged Geo cell should be
replaced.</td><td>Low</td><td>11/30/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/9/2021 11:31:09 AM</td><td> </td><td>6/5/2022 4:21:47
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24905</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV QC
CIVIL</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Gravel under planted area to be
removed.</td><td>Low</td><td>11/30/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/9/2021 11:31:12 AM</td><td> </td><td>6/5/2022 4:21:45
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24916</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Stabilizing system is not working, Geo cells is
missing</td><td>High</td><td>11/16/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/9/2021 2:51:55 PM</td><td> </td><td>6/5/2022 4:21:43
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24917</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Stabilizing system is not working, Geo cells is damaged and
missing.</td><td>High</td><td>11/16/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/9/2021 3:06:18 PM</td><td> </td><td>6/5/2022 4:21:41
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24918</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Stabilizing system is not working, Geo cells is damaged and
missing.</td><td>High</td><td>11/16/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/9/2021 3:42:03 PM</td><td> </td><td>6/5/2022 4:21:39
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24919</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Stabilizing system is not working, Geo cells is damaged and
missing.</td><td>High</td><td>11/16/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/9/2021 3:49:56 PM</td><td> </td><td>6/5/2022 4:21:38
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24920</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;20 to 80 cm of geo-cells is missing in gravel edge.
Geo-cells edge is not fixed properly</td><td>High</td><td>11/16/2021 12:00:00
AM</td><td>Amr Nofal</td><td>11/9/2021 3:57:30 PM</td><td> </td><td>6/5/2022
4:21:37 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24921</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;20 to 80 cm of geo-cells is missing in gravel edge.
Geo-cells edge is not fixed properly</td><td>High</td><td>11/16/2021 12:00:00
AM</td><td>Amr Nofal</td><td>11/9/2021 4:11:18 PM</td><td> </td><td>6/5/2022
4:21:36 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24922</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;20 to 80 cm of geo-cells is missing in gravel edge.
Geo-cells edge is not fixed properly</td><td>High</td><td>11/16/2021 12:00:00
AM</td><td>Amr Nofal</td><td>11/9/2021 4:23:03 PM</td><td> </td><td>6/5/2022
4:21:34 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24925</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Erosion on stone should be treated/replaced along handrail
</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/10/2021
11:26:22 AM</td><td> </td><td>6/5/2022 4:21:33
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24935</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Geo
cell should be extended and fixed properly </td><td>Low</td><td>12/1/2021 12:00:00
AM</td><td>Amr Nofal</td><td>11/10/2021 11:26:40 AM</td><td> </td><td>6/5/2022
4:21:31 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24946</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Geo
cell should be fixed properly </td><td>Low</td><td>12/1/2021 12:00:00
AM</td><td>Amr Nofal</td><td>11/10/2021 11:26:58 AM</td><td> </td><td>6/5/2022
4:21:30 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24954</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Poor grouting copping stone should be
repaired.</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 11:28:19 AM</td><td> </td><td>6/5/2022 4:21:29
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24956</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Relation between steel post and stone should be as per shop
drawing ./ check shop drawing.</td><td>Low</td><td>12/1/2021 12:00:00
AM</td><td>Amr Nofal</td><td>11/10/2021 11:28:24 AM</td><td> </td><td>6/5/2022
4:21:28 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24961</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV QC
CIVIL</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Geo cell should be extended to metal
trim.</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 11:28:41 AM</td><td> </td><td>6/5/2022 4:21:26
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24962</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV QC
CIVIL</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Geo cell should be extended around
palms.</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 11:28:43 AM</td><td> </td><td>6/5/2022 4:21:25
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24963</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV QC
CIVIL</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Geo cell should be fixed properly.</td><td>Low</td><td>12/1/2021
12:00:00 AM</td><td>Amr Nofal</td><td>11/10/2021 11:28:46 AM</td><td>
</td><td>6/5/2022 4:21:24 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24964</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV QC
CIVIL</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Geo cell should be extended to the marble
stone.</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 11:28:48 AM</td><td> </td><td>6/5/2022 4:21:23
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24991</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Salted
and erosion tiles should’ve treated </td><td>Low</td><td>12/1/2021 12:00:00
AM</td><td>Amr Nofal</td><td>11/10/2021 3:59:57 PM</td><td> </td><td>6/5/2022
4:21:14 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24998</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Geo cell should be extended to the stone and fixed properly
</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/10/2021
4:00:07 PM</td><td> </td><td>6/5/2022 4:21:13
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25001</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Tiles
should eat as per drawing </td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/10/2021 4:00:11 PM</td><td> </td><td>6/5/2022 4:21:10
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25002</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Tiles
should eat as per drawing </td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 4:00:12 PM</td><td> </td><td>6/5/2022 4:21:09
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25004</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Salted
and erosion tiles should be treated </td><td>Low</td><td>12/1/2021 12:00:00
AM</td><td>Amr Nofal</td><td>11/10/2021 4:00:15 PM</td><td> </td><td>6/5/2022
4:21:08 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25007</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Grouting should be adjusted </td><td>Low</td><td>12/1/2021
12:00:00 AM</td><td>Amr Nofal</td><td>11/10/2021 4:00:19 PM</td><td>
</td><td>6/5/2022 4:21:07 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25008</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Stone tilling should be as per shop shop
drawing.</td><td>Low</td><td>12/1/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/10/2021 4:00:20 PM</td><td> </td><td>6/5/2022 4:21:05
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25013</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Poor repair should be treated .</td><td>Low</td><td>12/1/2021
12:00:00 AM</td><td>Amr Nofal</td><td>11/10/2021 4:00:31 PM</td><td>
</td><td>6/5/2022 4:21:05 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25022</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Geocell should be extended to the slope edge and fixed properly
</td><td>Low</td><td>12/2/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/11/2021
10:23:25 AM</td><td> </td><td>6/5/2022 4:21:04
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25025</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Geocell should be extended to the edge and fixed properly
</td><td>Low</td><td>11/18/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/11/2021
10:23:29 AM</td><td> </td><td>6/5/2022 4:21:02
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25028</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Geocell should be extended to the edge and fixed
properly</td><td>Low</td><td>12/2/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/11/2021 10:23:33 AM</td><td> </td><td>6/5/2022 4:21:01
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25034</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Geocell should be extended to the edge and fixed properly
</td><td>Low</td><td>12/2/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/11/2021
10:23:42 AM</td><td> </td><td>6/5/2022 4:21:00
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25041</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Geocell should be extended to the edge and fixed properly
</td><td>Low</td><td>11/18/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/11/2021
10:24:38 AM</td><td> </td><td>6/5/2022 4:20:58
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25058</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Geo
cell should be extended and fixed properly </td><td>Low</td><td>12/2/2021 12:00:00
AM</td><td>Amr Nofal</td><td>11/11/2021 10:43:28 AM</td><td> </td><td>6/5/2022
4:20:57 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>27777</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>Cochrane</
td><td>Architectural</td><td>General Snag</td><td>General Snag</td><td>&#39;Damaged
security fence should be repaired </td><td>Low</td><td>3/31/2022 12:00:00
AM</td><td>Rory MacRory</td><td>3/10/2022 12:25:52 PM</td><td> </td><td>6/5/2022
4:20:56 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>9273</td><td>AHU-Band B-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Must inspect the cable and raceway of motion
detector (photocell)</td><td>High</td><td>7/15/2020 12:00:00 AM</td><td>Ayman Ahmed
Mostafa</td><td>7/8/2020 3:24:53 PM</td><td> </td><td>6/5/2022 3:42:04
PM</td><td>&nbsp;</td><td>MS.18.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>15686</td><td>3D THEATER FOYER</td><td>CCB
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>Cracks in glass</td><td>&#39;Missing Sealant under glazing panels
</td><td>Low</td><td>2/23/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>2/2/2021
4:09:42 PM</td><td> </td><td>6/5/2022 2:40:53
PM</td><td>&nbsp;</td><td>CT.03.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20992</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Alignment and stability of glass
balustrades panels</td><td>Low</td><td>9/1/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/11/2021 12:01:38 PM</td><td> </td><td>6/5/2022 2:40:52
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21459</td><td>Glazing Wall Internal Side</td><td>Glazing
wall</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;Cladding is missing /access are missing
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/18/2021
11:43:49 AM</td><td> </td><td>6/5/2022 2:40:50 PM</td><td>&nbsp;</td><td>Glazing
Wall Internal Side</td><td>&nbsp;</td>
</tr><tr>
<td>22139</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Facade -
Stone Cladding</td><td>Cleaning</td><td>&#39;Cleaning stone from exposed sealant
</td><td>Low</td><td>9/13/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>8/23/2021 4:36:43 PM</td><td> </td><td>6/5/2022 2:40:49
PM</td><td>&nbsp;</td><td>South Facade- CCB</td><td>&nbsp;</td>
</tr><tr>
<td>23933</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interlock should be leveled with tree grill
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:27:51 AM</td><td> </td><td>6/5/2022 2:40:48
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23942</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Poor concrete repair should be adjusted
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:28:10 AM</td><td> </td><td>6/5/2022 2:40:46
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23954</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Curb stone should be allied with
road.</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 10:30:14 AM</td><td> </td><td>6/5/2022 2:40:45
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23956</td><td>Security Fence</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between interlock and curb stone
need to aligned</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 10:30:20 AM</td><td> </td><td>6/5/2022 2:40:45
PM</td><td>&nbsp;</td><td>Security Fence</td><td>&nbsp;</td>
</tr><tr>
<td>23957</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interlock leveled should be flush with curb
stone </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 10:30:25 AM</td><td> </td><td>6/5/2022 2:40:43
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23958</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Pole should be at the center of the base
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:30:27 AM</td><td> </td><td>6/5/2022 2:40:42
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23961</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged Tree grill need to repaired or
replaced.</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 10:30:35 AM</td><td> </td><td>6/5/2022 2:40:41
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23962</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Poor cutting for interlock need to
adjustment.</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 10:30:37 AM</td><td> </td><td>6/5/2022 2:40:40
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23963</td><td>Security Fence</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Curb stone should be allied with
road.</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 10:30:40 AM</td><td> </td><td>6/5/2022 2:40:39
PM</td><td>&nbsp;</td><td>Security Fence</td><td>&nbsp;</td>
</tr><tr>
<td>23965</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between interlock and curb stone
need to aligned </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 10:30:47 AM</td><td> </td><td>6/5/2022 2:40:38
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23967</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between interlock and curbstone
need to be aligned </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 10:30:54 AM</td><td> </td><td>6/5/2022 2:40:37
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23973</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interlock not parallel
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:31:26 AM</td><td> </td><td>6/5/2022 2:40:36
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24124</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interlock to be leveled
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:08:05 AM</td><td> </td><td>6/5/2022 2:40:35
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24125</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked part should be repaired
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:08:06 AM</td><td> </td><td>6/5/2022 2:40:33
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24128</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Concrete needs touch up /cleaning
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:08:12 AM</td><td> </td><td>6/5/2022 2:40:30
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24129</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Cracks should be repaired
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:08:14 AM</td><td> </td><td>6/5/2022 2:40:29
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24130</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between concrete and kerb stone should
be aligned and cleaned </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:08:16 AM</td><td> </td><td>6/5/2022 2:40:27
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24148</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between concrete and kerb stone should
be aligned and cleaned </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:08:49 AM</td><td> </td><td>6/5/2022 2:40:26
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24177</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cracked interlock to be replaced
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:09:30 AM</td><td> </td><td>6/5/2022 2:40:25
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24346</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between curb stone and concrete
should be aligned and leveled properly.</td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/27/2021 11:40:54 AM</td><td> </td><td>6/5/2022
2:40:24 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24348</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between curb stone and concrete
should be aligned and leveled properly.</td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/27/2021 11:40:58 AM</td><td> </td><td>6/5/2022
2:40:23 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24350</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Touchup and cleaning for concrete
surface</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/27/2021 11:41:02 AM</td><td> </td><td>6/5/2022 2:40:21
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24351</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Curb stone should be aligned with
road.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/27/2021 11:41:03 AM</td><td> </td><td>6/5/2022 2:40:20
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24353</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between curb stone and interlock
should be aligned and leveled properly.</td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/27/2021 11:41:07 AM</td><td> </td><td>6/5/2022
2:40:19 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24354</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Concrete curb should be curved and smoothed
.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/27/2021
11:41:08 AM</td><td> </td><td>6/5/2022 2:40:18
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24209</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Missing lighting fixtures ( not delivered
yet)</td><td>High</td><td>11/2/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>10/26/2021 3:35:02 PM</td><td> </td><td>6/5/2022 2:23:01
PM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>24210</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Missing lighting fixtures (not delivered yet
)</td><td>High</td><td>11/2/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>10/26/2021 3:35:07 PM</td><td> </td><td>6/5/2022 2:23:00
PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>27814</td><td>SERVICE ZONE 7</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Trunk should be covered
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:26 PM</td><td> </td><td>6/5/2022 2:22:58
PM</td><td>&nbsp;</td><td>MS.14.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>27835</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:54 PM</td><td> </td><td>6/5/2022 2:22:57
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27847</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover should installed </td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:10 PM</td><td>
</td><td>6/5/2022 2:22:56
PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28785</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;All hole must be
sealed</td><td>High</td><td>5/19/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/12/2022 2:38:07 PM</td><td> </td><td>6/5/2022
2:22:55 PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28788</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Threaded rod must be vertical
</td><td>High</td><td>5/19/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/12/2022 2:38:14 PM</td><td> </td><td>6/5/2022
2:22:54 PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28789</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unused box’s and conduit she’ll be removed
</td><td>High</td><td>5/19/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/12/2022 2:38:16 PM</td><td> </td><td>6/5/2022
2:22:53 PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28790</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;All screws must be well tightened
</td><td>High</td><td>5/19/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/12/2022 2:38:18 PM</td><td> </td><td>6/5/2022
2:22:52 PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28791</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Screws must be well tightened and unused
clips should be removed</td><td>High</td><td>5/19/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/12/2022 2:38:20 PM</td><td> </td><td>6/5/2022
2:22:51 PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>30284</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:35 PM</td><td> </td><td>6/5/2022
2:22:50 PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30285</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:37 PM</td><td> </td><td>6/5/2022
2:22:49 PM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30287</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing earth jumper
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:29:40 PM</td><td> </td><td>6/5/2022 2:22:48
PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30288</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Should be installed properly
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:29:41 PM</td><td> </td><td>6/5/2022 2:22:47
PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30289</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable should be protected
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022
4:29:43 PM</td><td> </td><td>6/5/2022 2:22:46
PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>25748</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>XS Platforms</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing cover should be checked. @
Bridge</td><td>Low</td><td>1/12/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/22/2021 1:39:55 PM</td><td> </td><td>6/5/2022
2:05:21 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10624</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>Roschmann</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Need cleaning / damaged glass to be removed
</td><td>Low</td><td>10/4/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/13/2020 3:58:38 PM</td><td> </td><td>6/5/2022
1:35:02 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25458</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Roschmann</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Water test for left side connection for EWS-01 is
not succeeded </td><td>Low</td><td>12/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/7/2021 12:20:58 PM</td><td> </td><td>6/5/2022
1:34:56 PM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>24467</td><td>Bay-01 (from level +25.5 to +31.5)</td><td>MU
Travellators and Moving walkways</td><td>Closed</td><td>Schindler</td><td>MEP-
Mechanical</td><td>Travellator</td><td>General Snag</td><td>&#39;Side rubber rail
needs cleaning </td><td>High</td><td>11/4/2021 12:00:00 AM</td><td>Kriton
Katsamenis </td><td>10/28/2021 11:40:56 AM</td><td> </td><td>6/5/2022 1:31:27
PM</td><td>&nbsp;</td><td>@ Grand Stair</td><td>&nbsp;</td>
</tr><tr>
<td>31400</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire Stopping</td><td>Installation not to
specification/drawing</td><td>&#39;Missing labels for air ducts.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:05 AM</td><td> </td><td>6/5/2022 1:30:02
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28742</td><td>SHAFT</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;General cleaning is needed
</td><td>Low</td><td>6/1/2022 12:00:00 PM</td><td>Adel Nassrat</td><td>5/11/2022
11:47:58 AM</td><td> </td><td>6/5/2022 12:53:36
PM</td><td>&nbsp;</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28092</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Sealant is missing
</td><td>Low</td><td>4/6/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/16/2022
10:59:24 AM</td><td> </td><td>6/5/2022 12:52:41
PM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>30632</td><td>CATALOGUE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Adhesive tapes shall be removed from air
terminals. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:05 AM</td><td> </td><td>6/5/2022 12:10:33
PM</td><td>&nbsp;</td><td>MR.14.02.012- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30634</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Adhesive tapes shall be removed from
air terminals. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:08 AM</td><td> </td><td>6/5/2022 12:09:50
PM</td><td>&nbsp;</td><td>MR.14.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>31380</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty support need to be painted. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:55:21 AM</td><td>
</td><td>6/5/2022 12:08:07
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31401</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire Stopping</td><td>Installation not to
specification/drawing</td><td>&#39;Damage thermal insulation need repairs.
</td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:07 AM</td><td> </td><td>6/5/2022 12:07:20
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>12293</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring
- stone</td><td>General</td><td>&#39;Adjust gutter of water features
</td><td>Low</td><td>11/2/2020 12:00:00 PM</td><td>Mohamed Samir</td><td>10/12/2020
3:10:06 PM</td><td> </td><td>6/5/2022 12:06:20
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22758</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closer should be one
tile</td><td>Low</td><td>9/28/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/7/2021
11:09:22 AM</td><td> </td><td>6/5/2022 12:05:58 PM</td><td>&nbsp;</td><td>Part
6</td><td>&nbsp;</td>
</tr><tr>
<td>22898</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:33 PM</td><td> </td><td>6/5/2022 12:05:50 PM</td><td>&nbsp;</td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>22936</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Cutting edges should be aligned
</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:12:49 AM</td><td> </td><td>6/5/2022 12:05:49 PM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>23032</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should be treated/replaced
</td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/15/2021
11:31:24 AM</td><td> </td><td>6/5/2022 12:05:48
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23040</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Marked
tile as per DWG should be 2tiles</td><td>Low</td><td>10/6/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/15/2021 11:31:38 AM</td><td> </td><td>6/5/2022
12:05:42 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23043</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should be treated or replaced
</td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/15/2021
11:31:44 AM</td><td> </td><td>6/5/2022 12:05:32
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23056</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should be
treated</td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/15/2021 11:32:06 AM</td><td> </td><td>6/5/2022 12:05:31
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23063</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Rusted
tile should be replaced </td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/15/2021 11:32:19 AM</td><td> </td><td>6/5/2022 12:05:29
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>31407</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Damage thermal insulation and holes shall be closed before
repairing. </td><td>High</td><td>6/9/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/2/2022 11:56:19 AM</td><td> </td><td>6/5/2022 12:04:40
PM</td><td>&nbsp;</td><td>MS.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28293</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage pipe
insulation. </td><td>Medium</td><td>4/29/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:04 AM</td><td> </td><td>6/5/2022 11:54:41
AM</td><td>&nbsp;</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>28431</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage insulation. </td><td>High</td><td>5/12/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:05:00 PM</td><td>
</td><td>6/5/2022 11:54:40
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28663</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinklers installation shall be
checked for the maximum distance. </td><td>High</td><td>5/17/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:40:08 PM</td><td>
</td><td>6/5/2022 11:54:39
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29151</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Canvases need adjustment and threaded rods
shall be removed. </td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:15 AM</td><td> </td><td>6/5/2022 11:54:36
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29954</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing supply air duct and diffuser.
</td><td>High</td><td>6/2/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:04 PM</td><td> </td><td>6/5/2022 11:54:33
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29964</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damaged thermal insulation for hydronic
pipes. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:24 PM</td><td> </td><td>6/5/2022 11:54:31
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>30036</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing funnel.
</td><td>High</td><td>6/5/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:58 AM</td><td> </td><td>6/5/2022 11:54:30
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30046</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>6/5/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:27:14 AM</td><td> </td><td>6/5/2022 11:54:29
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30159</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Floor drain need cleaning.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:08 AM</td><td> </td><td>6/5/2022 11:54:27
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30175</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Painting on air diffusers shall be removed.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:30 AM</td><td> </td><td>6/5/2022 11:54:26
AM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30180</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Adjust air diffusers connection spacing.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:42 AM</td><td> </td><td>6/5/2022 11:54:24
AM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30372</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Putty and paintings on air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:51:41 PM</td><td> </td><td>6/5/2022 11:54:23
AM</td><td>&nbsp;</td><td>MA.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30628</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Adhesive tapes shall be removed from air
terminals. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:51:59 AM</td><td> </td><td>6/5/2022 11:54:22
AM</td><td>&nbsp;</td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30776</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing seismic bracing for black steel
duct. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:40 PM</td><td> </td><td>6/5/2022 11:54:21
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30784</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Labels are missing for air ducts.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:56 PM</td><td> </td><td>6/5/2022 11:54:18
AM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30785</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Seismic bracings are missing for all
1” branches lines. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:58 PM</td><td> </td><td>6/5/2022 11:54:16
AM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30786</td><td>ARTEFACT DELIVERY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation need repairs.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:01 PM</td><td> </td><td>6/5/2022 11:54:15
AM</td><td>&nbsp;</td><td>MQ.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30788</td><td>CORE G3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing seismic bracing for FF pipes.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:05 PM</td><td> </td><td>6/5/2022 11:54:14
AM</td><td>&nbsp;</td><td>MC.19.02.G31</td><td>&nbsp;</td>
</tr><tr>
<td>30798</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing lab,es for air ducts.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:23 PM</td><td> </td><td>6/5/2022 11:54:11
AM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30802</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for air duct.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:31 PM</td><td> </td><td>6/5/2022 11:54:10
AM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31155</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty drain pipes. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:53:49 PM</td><td>
</td><td>6/5/2022 11:54:09
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31198</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty pipes supports. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:55:34 PM</td><td>
</td><td>6/5/2022 11:54:08
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31330</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39; Issuing labels for air duct. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:53:39 AM</td><td>
</td><td>6/5/2022 11:54:06
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>31365</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing labels for air ducts. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 11:54:51 AM</td><td>
</td><td>6/5/2022 11:54:05
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>31542</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Drainage System</td><td>General
Snag</td><td>&#39;Missing clean out plug piece. </td><td>High</td><td>6/9/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>6/2/2022 3:32:44 PM</td><td>
</td><td>6/5/2022 11:54:04
AM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>11735</td><td>OPERATIONAL OFFICE</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Painting around lighting need to adjusted - edge
of gypsum ceiling should be alignment - marked corner need to adjust
</td><td>Low</td><td>10/18/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>9/27/2020
4:42:23 PM</td><td> </td><td>6/5/2022 11:43:25
AM</td><td>&nbsp;</td><td>MG.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>12022</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Missing Sealant around MEP fixtures
</td><td>Low</td><td>10/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020
2:12:52 PM</td><td> </td><td>6/5/2022 11:43:23
AM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>12032</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing Sealant around door frame </td><td>Low</td><td>10/22/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020 2:13:20 PM</td><td>
</td><td>6/5/2022 11:43:22
AM</td><td>&nbsp;</td><td>MS.18.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>12060</td><td>SERVICE TUNNEL (B)-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Missing Sealant around pipe </td><td>Low</td><td>10/22/2020
12:00:00 AM</td><td>Adel Nassrat</td><td>10/1/2020 2:14:43 PM</td><td>
</td><td>6/5/2022 11:43:20
AM</td><td>&nbsp;</td><td>MQ.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>14963</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Close around duct according to approved
detail</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>1/19/2021 11:35:02 AM</td><td> </td><td>6/5/2022 11:43:19
AM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>14983</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Close Sealant around metal door frame
</td><td>Low</td><td>2/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>1/19/2021
11:35:48 AM</td><td> </td><td>6/5/2022 11:43:18
AM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>14985</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Close fire Sealant around pipes </td><td>Low</td><td>2/9/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>1/19/2021 11:35:53 AM</td><td>
</td><td>6/5/2022 11:43:16
AM</td><td>&nbsp;</td><td>MS.19.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>14996</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Close around MEP fixtures </td><td>Low</td><td>2/9/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>1/19/2021 11:36:15 AM</td><td> </td><td>6/5/2022
11:43:15 AM</td><td>&nbsp;</td><td>MS.19.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>15004</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall Painting</td><td>Patches/Touch
up</td><td>&#39;Touch up for wall painting </td><td>Low</td><td>2/9/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>1/19/2021 11:36:32 AM</td><td> </td><td>6/5/2022
11:43:14 AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16978</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Interface between wall cladding should be finished
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:32:06 PM</td><td> </td><td>6/5/2022 11:43:08
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16982</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Marked edge should be repaired </td><td>Low</td><td>4/1/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021 12:32:12 PM</td><td>
</td><td>6/5/2022 11:43:07
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>17004</td><td>WC /M-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Grouting is missing
</td><td>Low</td><td>4/1/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>3/11/2021
12:33:00 PM</td><td> </td><td>6/5/2022 11:43:05
AM</td><td>&nbsp;</td><td>MW.12.01.001B</td><td>&nbsp;</td>
</tr><tr>
<td>17007</td><td>WC /F Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Vanity
Counter Top</td><td>General Snag</td><td>&#39;Vanity top should be fixed properly
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:33:14 PM</td><td> </td><td>6/5/2022 11:43:03
AM</td><td>&nbsp;</td><td>MW.12.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>17015</td><td>WC / DISABLED-Band B</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Grouting need adjustment around handle and
MEP fixtures </td><td>Low</td><td>4/1/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/11/2021 12:33:36 PM</td><td> </td><td>6/5/2022 11:43:02
AM</td><td>&nbsp;</td><td>MW.12.01.001E</td><td>&nbsp;</td>
</tr><tr>
<td>17909</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>5/30/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>5/23/2021
12:53:20 PM</td><td> </td><td>6/5/2022 11:42:58
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>17911</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>5/30/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>5/23/2021
12:53:25 PM</td><td> </td><td>6/5/2022 11:42:57
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>17915</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>5/30/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>5/23/2021
12:53:34 PM</td><td> </td><td>6/5/2022 11:42:56
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>17916</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>5/30/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>5/23/2021
12:53:36 PM</td><td> </td><td>6/5/2022 11:42:55
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>17924</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Toothing between tiles
</td><td>Low</td><td>6/13/2021 12:00:00 PM</td><td>Mohamed.Halim</td><td>5/23/2021
12:53:56 PM</td><td> </td><td>6/5/2022 11:42:53
AM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20164</td><td>ELEC. ROOM</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/3/2021
3:37:46 PM</td><td> </td><td>6/5/2022 11:42:52
AM</td><td>&nbsp;</td><td>MS.19.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20363</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between tiles should be adjusted
</td><td>Low</td><td>8/26/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/5/2021
12:15:18 PM</td><td> </td><td>6/5/2022 11:42:47
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20485</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Marked edge should be aligned
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:25 PM</td><td> </td><td>6/5/2022 11:42:45
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20511</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Joints should be same width
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:08:49 PM</td><td> </td><td>6/5/2022 11:42:42
AM</td><td>&nbsp;</td><td>MQ.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20523</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles </td><td>Low</td><td>8/29/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/8/2021 12:08:59 PM</td><td> </td><td>6/5/2022
11:42:41 AM</td><td>&nbsp;</td><td>MT.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>20527</td><td>FEMALE W.C.</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Damages to be rectified or replaced</td><td>&#39;Broken tile
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:04 PM</td><td> </td><td>6/5/2022 11:42:40
AM</td><td>&nbsp;</td><td>MW.14.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20529</td><td>FEMALE W.C.</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Grouting need adjustment
</td><td>Low</td><td>8/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/8/2021
12:09:06 PM</td><td> </td><td>6/5/2022 11:42:38
AM</td><td>&nbsp;</td><td>MW.14.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>20727</td><td>LIBRARY ADMIN</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Windows</td><td>General
Snag</td><td>&#39;Marked edges are not finished yet </td><td>Low</td><td>8/31/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021 12:02:38 PM</td><td>
</td><td>6/5/2022 11:42:37
AM</td><td>&nbsp;</td><td>MR.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20774</td><td>TEMP EXHIBITION II</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:45 PM</td><td> </td><td>6/5/2022 11:42:35
AM</td><td>&nbsp;</td><td>MT.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>21129</td><td>CORE B2-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around pipe </td><td>Low</td><td>9/7/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/17/2021 10:50:07 AM</td><td>
</td><td>6/5/2022 11:42:33
AM</td><td>&nbsp;</td><td>MC.18.01.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21323</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Area not
cleaned/finished.</td><td>&#39;Missing fire collar around HDPE pipe
</td><td>High</td><td>8/24/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/17/2021
4:07:36 PM</td><td> </td><td>6/5/2022 11:42:32
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>22197</td><td>MALE PRAYER ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around metal door need to touch up
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:47:30 AM</td><td> </td><td>6/5/2022 11:42:31
AM</td><td>&nbsp;</td><td>MG.13.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>22200</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need touch up
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:47:35 AM</td><td> </td><td>6/5/2022 11:42:30
AM</td><td>&nbsp;</td><td>MG.13.0G.003

</td><td>&nbsp;</td>
</tr><tr>
<td>22252</td><td>MALE PRAYER ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Marked part should be adjusted
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:19 AM</td><td> </td><td>6/5/2022 11:42:29
AM</td><td>&nbsp;</td><td>MG.13.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>24893</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Air gap should be fixed properly
</td><td>Low</td><td>11/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>11/8/2021
12:15:31 PM</td><td> </td><td>6/5/2022 9:59:06
AM</td><td>&nbsp;</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16502</td><td>TOILET CLEANERS STORE</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Shadow gap not aligned
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:11 AM</td><td> </td><td>6/5/2022 9:59:00
AM</td><td>&nbsp;</td><td>MW.14.0G.003D</td><td>&nbsp;</td>
</tr><tr>
<td>16291</td><td>TOILET CLEANERS STORE</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around metal door need adjustment
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:02:34 PM</td><td> </td><td>6/5/2022 9:58:47
AM</td><td>&nbsp;</td><td>MW.14.0G.003D</td><td>&nbsp;</td>
</tr><tr>
<td>16299</td><td>W.C./M</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Painting need touch up </td><td>Low</td><td>3/7/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>2/14/2021 2:02:52 PM</td><td> </td><td>6/5/2022
9:58:37 AM</td><td>&nbsp;</td><td>MW.14.0G.002B</td><td>&nbsp;</td>
</tr><tr>
<td>16543</td><td>MALE DISABLED W.C.</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Edge of gypsum ceiling need adjustment
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:22 AM</td><td> </td><td>6/5/2022 9:58:27
AM</td><td>&nbsp;</td><td>MW.14.0G.004C</td><td>&nbsp;</td>
</tr><tr>
<td>16510</td><td>ESCAPE TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around metal door needs adjustment
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:27 AM</td><td> </td><td>6/5/2022 9:58:16
AM</td><td>&nbsp;</td><td>MQ.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16494</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Patches/Touch up</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:00 AM</td><td> </td><td>6/5/2022 9:58:08
AM</td><td>&nbsp;</td><td>MS.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>9622</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
sealant around metal door and needtouch up </td><td>Low</td><td>8/10/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>7/20/2020 1:49:24 PM</td><td> </td><td>6/5/2022
9:57:53 AM</td><td>&nbsp;</td><td>MS.13.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>31211</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty supports. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:56:14 PM</td><td>
</td><td>6/5/2022 8:59:11
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31167</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Rusty pipes supports. </td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>6/1/2022 4:54:20 PM</td><td>
</td><td>6/5/2022 8:57:46
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30775</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct support need adjustment.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:38 PM</td><td> </td><td>6/5/2022 8:53:38
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30049</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Fire pipes need cleaning and touchup
painting. </td><td>High</td><td>6/5/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:27:19 AM</td><td> </td><td>6/5/2022 8:51:05
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30031</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage duct thermal insulation.
</td><td>High</td><td>6/5/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:50 AM</td><td> </td><td>6/5/2022 8:48:57
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30027</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing labels for
chilled water pipes. </td><td>High</td><td>6/5/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:43 AM</td><td> </td><td>6/5/2022 8:47:56
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29195</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage thermal insulation for duct and holes shall be closed.
</td><td>High</td><td>5/29/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:16 AM</td><td> </td><td>6/5/2022 8:44:58
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29165</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation.
</td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:43 AM</td><td> </td><td>6/5/2022 8:43:54
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>28944</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39; Missing insulation for air duct.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:41 PM</td><td> </td><td>6/5/2022 8:42:36
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28517</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Missing thermal insulation. </td><td>High</td><td>5/15/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/8/2022 4:15:56 PM</td><td>
</td><td>6/5/2022 8:41:15
AM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28412</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Duct thermal insulation not complete.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:16 PM</td><td> </td><td>6/5/2022 8:39:59
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>28410</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Insulation not done. </td><td>High</td><td>5/12/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:04:13 PM</td><td>
</td><td>6/5/2022 8:34:48
AM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28521</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing insulation for this part.
</td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:16:03 PM</td><td> </td><td>6/5/2022 8:33:27
AM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>30082</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Tape shall be removed from the air
diffusers. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:34 AM</td><td> </td><td>6/5/2022 8:32:00
AM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30092</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Remove tape from air grills.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:53 AM</td><td> </td><td>6/5/2022 8:31:17
AM</td><td>&nbsp;</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30096</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove tape from air diffusers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:57 AM</td><td> </td><td>6/5/2022 8:30:35
AM</td><td>&nbsp;</td><td>MA.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30103</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove tape from air diffusers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:05 AM</td><td> </td><td>6/5/2022 8:27:41
AM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30403</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Remove adhesive tape from air
terminals. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:39 PM</td><td> </td><td>6/5/2022 8:26:58
AM</td><td>&nbsp;</td><td>MA.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30407</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove adhesive tape from air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:45 PM</td><td> </td><td>6/5/2022 8:26:09
AM</td><td>&nbsp;</td><td>MR.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30409</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove adhesive tapes from air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:47 PM</td><td> </td><td>6/5/2022 8:25:19
AM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30411</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove adhesive tapes from air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:49 PM</td><td> </td><td>6/5/2022 8:24:47
AM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30413</td><td>STAFF KITCHEN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove tape from air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:53 PM</td><td> </td><td>6/5/2022 8:24:08
AM</td><td>&nbsp;</td><td>MR.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30415</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove tape from air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:56 PM</td><td> </td><td>6/5/2022 8:23:38
AM</td><td>&nbsp;</td><td>MA.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30416</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove tape from slot diffusers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:57 PM</td><td> </td><td>6/5/2022 8:23:09
AM</td><td>&nbsp;</td><td>MR.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30637</td><td>PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Adhesive tapes shall be removed from
removed from air terminals. </td><td>High</td><td>6/7/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/31/2022 11:52:14 AM</td><td>
</td><td>6/5/2022 8:22:40
AM</td><td>&nbsp;</td><td>MR.14.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30647</td><td>GRAPHIC&#39;S PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Remove adhesive tapes from air
terminals. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:27 AM</td><td> </td><td>6/5/2022 8:22:11
AM</td><td>&nbsp;</td><td>MR.14.02.001- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30645</td><td>GRAPHIC&#39;S WORKSHOP</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Remove adhesive tapes from air
terminals. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:25 AM</td><td> </td><td>6/5/2022 8:21:24
AM</td><td>&nbsp;</td><td>MR.14.02.002- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30643</td><td>RESEARCHER&#39;S STAIR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Adhesive tape on air terminals shall be
removed. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:23 AM</td><td> </td><td>6/5/2022 8:20:26
AM</td><td>&nbsp;</td><td>MR.14.02.007- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30639</td><td>PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Adhesive tapes shall be removed.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:17 AM</td><td> </td><td>6/5/2022 8:19:21
AM</td><td>&nbsp;</td><td>MR.14.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30670</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove adhesive tapes from air diffusers.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:53:07 AM</td><td> </td><td>6/5/2022 8:18:32
AM</td><td>&nbsp;</td><td>MQ.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30674</td><td>LOBBY / BREAK OUT SPACE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Adhesive tapes shall be removed from slot
diffusers. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:53:12 AM</td><td> </td><td>6/5/2022 8:17:07
AM</td><td>&nbsp;</td><td>MR.14.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30677</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove adhesive tapes from the air
terminals. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:53:17 AM</td><td> </td><td>6/5/2022 8:16:35
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>31137</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Fire pipes need cleaning and touchup paintings.
</td><td>High</td><td>6/8/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>6/1/2022 4:53:20 PM</td><td> </td><td>6/5/2022 8:14:17
AM</td><td>&nbsp;</td><td>MS.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29284</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;INERGEN cylinders hose connections.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:07:28 PM</td><td> </td><td>6/4/2022 10:23:33
PM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>30045</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Drain valve handle is missing.
</td><td>High</td><td>6/5/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:27:12 AM</td><td> </td><td>6/4/2022 10:23:31
PM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30143</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove tape from air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:49 AM</td><td> </td><td>6/4/2022 10:23:31
PM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30146</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove tape from air diffusers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:51 AM</td><td> </td><td>6/4/2022 10:23:30
PM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30385</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Adhesive tapes on air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:08 PM</td><td> </td><td>6/4/2022 10:23:29
PM</td><td>&nbsp;</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30387</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Air terminals adhesive tapes.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:11 PM</td><td> </td><td>6/4/2022 10:23:28
PM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30389</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Adhesive tapes on air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:14 PM</td><td> </td><td>6/4/2022 10:23:27
PM</td><td>&nbsp;</td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30391</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Air terminals adhesive tapes.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:17 PM</td><td> </td><td>6/4/2022 10:23:26
PM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30393</td><td>STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Air terminals tape.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:20 PM</td><td> </td><td>6/4/2022 10:23:25
PM</td><td>&nbsp;</td><td>MR.14.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>30395</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Remove tape from air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:25 PM</td><td> </td><td>6/4/2022 10:23:24
PM</td><td>&nbsp;</td><td>MQ.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30396</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Remove adhesive tapes from air
terminals. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:27 PM</td><td> </td><td>6/4/2022 10:23:23
PM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30418</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove adhesive tape from slot diffusers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:53:00 PM</td><td> </td><td>6/4/2022 10:23:22
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30419</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove tape from diffusers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:53:01 PM</td><td> </td><td>6/4/2022 10:23:21
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30651</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Rusty and dirty
drainage pipe. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:33 AM</td><td> </td><td>6/4/2022 10:23:20
PM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30657</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Support need painting.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:45 AM</td><td> </td><td>6/4/2022 10:23:20
PM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30773</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove adhesive tapes from air terminals.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:35 PM</td><td> </td><td>6/4/2022 10:23:19
PM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30778</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct support need painting.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:42:44 PM</td><td> </td><td>6/4/2022 10:23:18
PM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>5481</td><td>B.O.H-ELEC. SUB-STATION - Band B</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Repair
block work &amp; Missing sealant around Metal Door </td><td>Low</td><td>10/10/2019
12:00:00 AM</td><td>Michael Mahfouz</td><td>9/19/2019 3:20:29 PM</td><td>
</td><td>6/4/2022 8:31:16
AM</td><td>&nbsp;</td><td>MS.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>5479</td><td>B.O.H-ELEC. SUB-STATION - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Unused bolts to be removed &amp; painting need to touch up
</td><td>Low</td><td>10/10/2019 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/19/2019 3:20:26 PM</td><td> </td><td>6/4/2022 8:31:08
AM</td><td>&nbsp;</td><td>MS.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>5478</td><td>B.O.H-ELEC. SUB-STATION - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Crack to be repaired &amp; holes to be repaired
</td><td>Low</td><td>10/10/2019 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/19/2019 3:20:24 PM</td><td> </td><td>6/4/2022 8:31:00
AM</td><td>&nbsp;</td><td>MS.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>21502</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on CIR </td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/18/2021 2:12:56 PM</td><td> </td><td>6/2/2022 3:37:25
PM</td><td>Done </td><td>MS.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>29959</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct support need adjustment.
</td><td>High</td><td>6/2/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:13 PM</td><td> </td><td>6/2/2022 3:32:56
PM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29980</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air suits.
</td><td>High</td><td>6/2/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:58 PM</td><td> </td><td>6/2/2022 3:32:54
PM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>30170</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Floor drain
shall be cleaned. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:20 AM</td><td> </td><td>6/2/2022 3:32:51
PM</td><td>&nbsp;</td><td>MA.19.02.019</td><td>&nbsp;</td>
</tr><tr>
<td>30662</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Ex. Fans need cleaning and rusty base shall
be treated and painted. </td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:55 AM</td><td> </td><td>6/2/2022 3:32:50
PM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>21491</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;refer to
our comments in our CIR</td><td>Low</td><td>8/25/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/18/2021 2:12:32 PM</td><td> </td><td>6/2/2022 3:25:22
PM</td><td>&nbsp;</td><td>MS.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>21492</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;refer to
our comments in our CIR</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/18/2021 2:12:33 PM</td><td> </td><td>6/2/2022 3:25:20
PM</td><td>&nbsp;</td><td>MS.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>21505</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our comments on CIR</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/18/2021 2:13:00 PM</td><td> </td><td>6/2/2022 3:25:19
PM</td><td>&nbsp;</td><td>MS.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>30800</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire pipes need touchup painting.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 4:43:26 PM</td><td> </td><td>6/2/2022 12:15:53
PM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30664</td><td>LIFT ESCAPE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Touchup paintings for fire pipes.
</td><td>High</td><td>6/7/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/31/2022 11:52:58 AM</td><td> </td><td>6/2/2022 12:08:07
PM</td><td>&nbsp;</td><td>MQ.14.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30204</td><td>PLANT</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging doors after removing
protection.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:02:33 PM</td><td> </td><td>6/2/2022 11:38:59
AM</td><td>&nbsp;</td><td>MS.19.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>30478</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging doors after removing
protection.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:33 AM</td><td> </td><td>6/2/2022 11:38:58
AM</td><td>&nbsp;</td><td>MQ.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>26070</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Bottom chipped edges should be repaired
</td><td>Low</td><td>2/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/31/2022
11:58:16 AM</td><td> </td><td>6/2/2022 11:16:14
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26078</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges should be repaired </td><td>Low</td><td>2/21/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/31/2022 11:58:35 AM</td><td> </td><td>6/2/2022
11:15:57 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26077</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Bottom
chipped edges should be repaired </td><td>Low</td><td>2/21/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/31/2022 11:58:32 AM</td><td> </td><td>6/2/2022
11:15:49 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26076</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Gaps
between stone steps should be regular </td><td>Low</td><td>2/21/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/31/2022 11:58:30 AM</td><td> </td><td>6/2/2022
11:15:42 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26075</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>2/21/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/31/2022 11:58:28 AM</td><td> </td><td>6/2/2022
11:15:35 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26071</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>2/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/31/2022
11:58:18 AM</td><td> </td><td>6/2/2022 11:15:21
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18837</td><td>CORE F6</td><td>CCB
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/20/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>6/13/2021 9:49:42 AM</td><td> </td><td>6/2/2022
11:15:11 AM</td><td>&nbsp;</td><td>CC.08.01.F61</td><td>&nbsp;</td>
</tr><tr>
<td>18838</td><td>CORE F6</td><td>CCB
L10</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/20/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>6/13/2021 9:49:45 AM</td><td> </td><td>6/2/2022
11:15:10 AM</td><td>&nbsp;</td><td>CC.08.01.F61</td><td>&nbsp;</td>
</tr><tr>
<td>18840</td><td>CORE F7</td><td>CCB
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/20/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>6/13/2021 9:49:48 AM</td><td> </td><td>6/2/2022
11:15:09 AM</td><td>&nbsp;</td><td>CC.03.03.F71</td><td>&nbsp;</td>
</tr><tr>
<td>18849</td><td>STAFF LIFTS
(CORE B5)</td><td>CCB L30</td><td>Closed</td><td>Petrokima</td><td>MEP-
Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>6/20/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>6/13/2021 9:50:03 AM</td><td> </td><td>6/2/2022
11:15:08 AM</td><td>&nbsp;</td><td>CC.07.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>18850</td><td>STAFF LIFTS
(CORE B5)</td><td>CCB L30</td><td>Closed</td><td>Petrokima</td><td>MEP-
Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>6/20/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>6/13/2021 9:50:05 AM</td><td> </td><td>6/2/2022
11:15:07 AM</td><td>&nbsp;</td><td>CC.07.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>27524</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cable trays should be covered </td><td>High</td><td>3/16/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/9/2022 10:57:38 AM</td><td>
</td><td>6/2/2022 11:15:06
AM</td><td>&nbsp;</td><td>MS.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>31115</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:41 PM</td><td> </td><td>6/2/2022
11:15:04 AM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>31116</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire alarm wiring device should be
label</td><td>High</td><td>6/8/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>6/1/2022 4:25:42 PM</td><td> </td><td>6/2/2022
11:15:03 AM</td><td>&nbsp;</td><td>MA.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>26067</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Loose tile should be fixed properly
</td><td>Low</td><td>2/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/31/2022
11:58:08 AM</td><td> </td><td>6/2/2022 11:14:44
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26036</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges should be repaired </td><td>Low</td><td>2/16/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/26/2022 11:15:30 AM</td><td> </td><td>6/2/2022
11:14:31 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26034</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Interface between stone stone stairs and cladding should be
regular </td><td>Low</td><td>2/16/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/26/2022 11:15:26 AM</td><td> </td><td>6/2/2022
11:14:21 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26037</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Bottom
chipped edges should be repaired </td><td>Low</td><td>2/16/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/26/2022 11:15:32 AM</td><td> </td><td>6/2/2022
11:14:13 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26010</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Broken, to be replaced</td><td>&#39;Replace stone tiles due to
remaining mortar , holes and dowels </td><td>Low</td><td>2/16/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/25/2022 11:51:46 AM</td><td> </td><td>6/2/2022
11:14:01 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26042</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges should be repaired </td><td>Low</td><td>2/16/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/26/2022 11:15:42 AM</td><td> </td><td>6/2/2022
11:13:52 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26041</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Gaps
between stone steps should be regular </td><td>Low</td><td>2/16/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/26/2022 11:15:40 AM</td><td> </td><td>6/2/2022
11:13:43 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26040</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Joints
should be filled with grout </td><td>Low</td><td>2/16/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/26/2022 11:15:38 AM</td><td> </td><td>6/2/2022
11:13:33 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26039</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>2/16/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/26/2022 11:15:36 AM</td><td> </td><td>6/2/2022
11:13:22 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26043</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Bottom
chipped edges should be repaired </td><td>Low</td><td>2/16/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/26/2022 11:15:44 AM</td><td> </td><td>6/2/2022
11:13:07 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26015</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Missing grouting should be filled </td><td>Low</td><td>2/15/2022
12:00:00 PM</td><td>mohamed.sami</td><td>1/25/2022 11:51:57 AM</td><td>
</td><td>6/2/2022 11:12:55 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26020</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tile should be replaced </td><td>Low</td><td>2/15/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/25/2022 11:52:09 AM</td><td> </td><td>6/2/2022
11:12:26 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26018</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges for stone steps should be repaired </td><td>Low</td><td>2/1/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/25/2022 11:52:05 AM</td><td> </td><td>6/2/2022
11:12:17 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26017</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;
Bottom chipped edges of stone steps should be repaired
</td><td>Low</td><td>2/1/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/25/2022
11:52:03 AM</td><td> </td><td>6/2/2022 11:12:03
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26016</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Gaps
between stone steps should be regular </td><td>Low</td><td>2/1/2022 12:00:00
PM</td><td>mohamed.sami</td><td>1/25/2022 11:52:01 AM</td><td> </td><td>6/2/2022
11:11:41 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26052</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stains and traces should be removed
</td><td>Low</td><td>2/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/31/2022
11:37:35 AM</td><td> </td><td>6/2/2022 11:11:15
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26106</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Poor workmanship for repair should be
finished and adjusted properly.</td><td>Low</td><td>2/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/3/2022 2:26:02 PM</td><td> </td><td>6/2/2022
11:10:46 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28210</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;All joints should be refilled with sealant
</td><td>Low</td><td>4/10/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/20/2022
12:03:49 PM</td><td> </td><td>6/2/2022 11:09:38
AM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>30109</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Protection cover should be removed
</td><td>Low</td><td>6/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
11:37:11 AM</td><td> </td><td>6/2/2022 11:08:28
AM</td><td>&nbsp;</td><td>MA.19.02.024</td><td>&nbsp;</td>
</tr><tr>
<td>13811</td><td>IT</td><td>MU L25</td><td>Closed</td><td>Trade
Link</td><td>Architectural</td><td>Raised Floor</td><td>General
Snag</td><td>&#39;Toothing should be adjusted - cleaning
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:41:42 AM</td><td> </td><td>6/2/2022 10:59:29
AM</td><td>&nbsp;</td><td>MS.12.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30068</td><td>SHAFT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing labels for
hydronic pipes. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:35:53 AM</td><td> </td><td>6/1/2022 9:27:45
PM</td><td>&nbsp;</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>9784</td><td>Cooling Equipment - Part 2</td><td>EN GF
(Boiler)</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Pipes must be insulated
</td><td>High</td><td>8/2/2020 12:00:00 AM</td><td>ahmedsalem</td><td>7/26/2020
11:11:32 AM</td><td> </td><td>6/1/2022 8:06:13 PM</td><td>&nbsp;</td><td>Cooling
Equipment - Part 2</td><td>&nbsp;</td>
</tr><tr>
<td>28987</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing thermal insulation for air duct.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:09:13 PM</td><td> </td><td>6/1/2022 8:02:17
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>20466</td><td>TEMP EXHIBITION I</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Sprinkler
Heads</td><td>General Snag</td><td>&#39;Sprinkler cover needs adjustment to be 4mm
clearance </td><td>High</td><td>1/15/2022 12:00:00
PM</td><td>ahmedsalem</td><td>8/8/2021 11:47:53 AM</td><td> </td><td>6/1/2022
4:57:37 PM</td><td>&nbsp;</td><td>MT.13.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>28428</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage insulation for
CWP. </td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:53 PM</td><td> </td><td>6/1/2022 4:57:36
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28509</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage duct insulation shall be repaired.
</td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:42 PM</td><td> </td><td>6/1/2022 4:57:34
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29012</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation need repairs.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:17 PM</td><td> </td><td>6/1/2022 4:57:33
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29018</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Hydronic pipes
thermal insulation need repairs. </td><td>High</td><td>5/24/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:10:37 PM</td><td>
</td><td>6/1/2022 4:57:32
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29019</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Canvases need adjustment and threaded rods
need to be removed. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:40 PM</td><td> </td><td>6/1/2022 4:57:30
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29034</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing labels for air ducts. </td><td>High</td><td>5/24/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:11:26 PM</td><td>
</td><td>6/1/2022 4:57:27
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29156</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air duct works.
</td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:25 AM</td><td> </td><td>6/1/2022 4:57:26
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29169</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for ducts.
</td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:50 AM</td><td> </td><td>6/1/2022 4:57:25
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29173</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>5/29/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:58:42 AM</td><td>
</td><td>6/1/2022 4:57:23
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29880</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Condensate drain pipes shall have elbow end
inside the funnel. </td><td>High</td><td>6/1/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:46 PM</td><td> </td><td>6/1/2022 4:57:22
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>30044</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Thermal insulation
for hydronic pipes need repairs. </td><td>High</td><td>6/5/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/29/2022 11:27:11 AM</td><td>
</td><td>6/1/2022 4:57:21
PM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>30066</td><td>SHAFT</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing threaded rod
for pipes supports and other threaded rod need to be adjusted.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:34:18 AM</td><td> </td><td>6/1/2022 4:57:19
PM</td><td>&nbsp;</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30154</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove tape from air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:01 AM</td><td> </td><td>6/1/2022 4:57:15
PM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30165</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Air diffusers was painted.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:14 AM</td><td> </td><td>6/1/2022 4:57:14
PM</td><td>&nbsp;</td><td>MA.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30181</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove tape from air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:44 AM</td><td> </td><td>6/1/2022 4:57:13
PM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30182</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove the tape from the air terminal.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:38:46 AM</td><td> </td><td>6/1/2022 4:57:11
PM</td><td>&nbsp;</td><td>MB.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30369</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove adhesive tape from air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:51:34 PM</td><td> </td><td>6/1/2022 4:57:10
PM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>30377</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Air terminal has painting and putty.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:51:54 PM</td><td> </td><td>6/1/2022 4:57:08
PM</td><td>&nbsp;</td><td>MA.19.02.023</td><td>&nbsp;</td>
</tr><tr>
<td>30380</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Adhesive tapes on air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:51:58 PM</td><td> </td><td>6/1/2022 4:57:06
PM</td><td>&nbsp;</td><td>MA.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30383</td><td>ORGANIC STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Adhesive tapes on air terminals shall be
removed. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:04 PM</td><td> </td><td>6/1/2022 4:57:05
PM</td><td>&nbsp;</td><td>MA.14.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27624</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Should be covered</td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:53:29 PM</td><td>
</td><td>6/1/2022 4:55:17 PM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>27626</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Not covered</td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:53:32 PM</td><td>
</td><td>6/1/2022 4:55:15 PM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>27747</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover of cable trunk should be covered
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:11 PM</td><td> </td><td>6/1/2022 4:55:14
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27758</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Mis coordination for dwg there is no
lighting fixtures in this area</td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/10/2022 12:22:33 PM</td><td> </td><td>6/1/2022
4:55:12 PM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>27763</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work fire cable not terminated
yet</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:42 PM</td><td> </td><td>6/1/2022 4:55:11
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27802</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All raceway should installed to protect cables
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:11 PM</td><td> </td><td>6/1/2022 4:55:09
PM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>27803</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;All cables should be removed </td><td>High</td><td>3/17/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:34:13 PM</td><td>
</td><td>6/1/2022 4:55:08
PM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>27807</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cover the trunk</td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:34:17 PM</td><td>
</td><td>6/1/2022 4:55:06
PM</td><td>&nbsp;</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27817</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Field devices should be installed properly
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:30 PM</td><td> </td><td>6/1/2022 4:55:04
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>27837</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:34:57 PM</td><td>
</td><td>6/1/2022 4:55:03
PM</td><td>&nbsp;</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27842</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cable should be covered </td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:03 PM</td><td>
</td><td>6/1/2022 4:55:01
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27848</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Should be covered </td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:12 PM</td><td>
</td><td>6/1/2022 4:55:00
PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27856</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Should be covered</td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:22 PM</td><td>
</td><td>6/1/2022 4:54:59
PM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>27862</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No cover</td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/10/2022 3:35:31 PM</td><td>
</td><td>6/1/2022 4:54:58
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>30188</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging doors after removing
protection.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 11:50:26 AM</td><td> </td><td>6/1/2022 4:13:43
PM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>30465</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging doors after removing
protection.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:13 AM</td><td> </td><td>6/1/2022 4:11:05
PM</td><td>Done </td><td>MA.19.02.012</td><td>&nbsp;</td>
</tr><tr>
<td>30148</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Snagging for all doors after removing protection cover
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
11:37:54 AM</td><td> </td><td>6/1/2022 4:01:19
PM</td><td>&nbsp;</td><td>MR.14.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>30471</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging doors after removing
protection.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:22 AM</td><td> </td><td>6/1/2022 3:57:23
PM</td><td>&nbsp;</td><td>MA.19.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>30436</td><td>PREPARATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging doors after removing
protection.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:41:28 AM</td><td> </td><td>6/1/2022 3:51:11
PM</td><td>Done </td><td>MR.14.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>30439</td><td>CATALOGUE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging door after removing protection
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:41:32 AM</td><td> </td><td>6/1/2022 3:51:10 PM</td><td>Done
</td><td>MR.14.02.012- F.O.H(DEF)</td><td>&nbsp;</td>
</tr><tr>
<td>30462</td><td>LIBRARY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sealant around door
frame.</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/31/2022 11:42:07 AM</td><td> </td><td>6/1/2022 3:51:09
PM</td><td>Done </td><td>MR.14.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>30517</td><td>UNPACKING</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Snagging after removing protection cover
</td><td>Low</td><td>6/21/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/31/2022
11:45:10 AM</td><td> </td><td>6/1/2022 3:51:06 PM</td><td>Done
</td><td>MR.14.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>30863</td><td>CORE F5</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging door after removing
protection.</td><td>Low</td><td>6/22/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>6/1/2022 11:57:40 AM</td><td> </td><td>6/1/2022 3:51:05
PM</td><td>Done </td><td>MC.14.02.F51</td><td>&nbsp;</td>
</tr><tr>
<td>28512</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Incomplete duct thermal insulation.
</td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:47 PM</td><td> </td><td>6/1/2022 1:50:21
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28882</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Drain points
insulation. </td><td>High</td><td>5/23/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:07:29 PM</td><td> </td><td>6/1/2022 1:49:22
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28989</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Thermal insulation
applied above duct support. </td><td>High</td><td>5/24/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:09:17 PM</td><td>
</td><td>6/1/2022 1:48:38
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29022</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct thermal insulation missing.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:47 PM</td><td> </td><td>6/1/2022 1:47:25
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29164</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing support for motorized damper.
</td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:41 AM</td><td> </td><td>6/1/2022 1:45:59
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29168</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct holes shall be closed properly.
</td><td>High</td><td>5/28/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:48 AM</td><td> </td><td>6/1/2022 1:44:23
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29191</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Insulation covering duct support.
</td><td>High</td><td>5/29/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:09 AM</td><td> </td><td>6/1/2022 1:41:11
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29692</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning for air grills.
</td><td>High</td><td>6/1/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:19:58 PM</td><td> </td><td>6/1/2022 1:38:32
PM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29731</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning for air grills.
</td><td>High</td><td>6/1/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:21:24 PM</td><td> </td><td>6/1/2022 1:37:34
PM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29881</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39; Issuing labels for hydronic pipes.
</td><td>High</td><td>6/1/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:47 PM</td><td> </td><td>6/1/2022 1:36:43
PM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>29897</td><td>RISER</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing automatic air
vent valves.</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:57:31 PM</td><td> </td><td>6/1/2022 1:14:49
PM</td><td>&nbsp;</td><td>MS.25.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>11696</td><td>STORE</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Corner not aligned- rough surface need
to be smooth </td><td>Low</td><td>10/18/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>9/27/2020 4:40:03 PM</td><td> </td><td>6/1/2022 11:58:25
AM</td><td>Done </td><td>MG.12.0G.010</td><td>&nbsp;</td>
</tr><tr>
<td>16312</td><td>UNIVERSAL DISABLED W.C.</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Sealant width should be adjusted
</td><td>Low</td><td>3/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/14/2021
2:03:16 PM</td><td> </td><td>6/1/2022 11:58:23
AM</td><td>Done.</td><td>MW.14.0G.002C</td><td>&nbsp;</td>
</tr><tr>
<td>16318</td><td>UNIVERSAL DISABLED W.C.</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Damages should be repaired /corner edge
needs adjustment </td><td>Low</td><td>3/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>2/14/2021 2:03:24 PM</td><td> </td><td>6/1/2022 11:58:21
AM</td><td>Done </td><td>MW.14.0G.002C</td><td>&nbsp;</td>
</tr><tr>
<td>16322</td><td>W.C./M</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken threshold should be replaced
</td><td>Low</td><td>2/21/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:03:32 PM</td><td> </td><td>6/1/2022 11:58:20 AM</td><td>Done
</td><td>MW.14.0G.002B</td><td>&nbsp;</td>
</tr><tr>
<td>16530</td><td>DISABLED FACILITY</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Around electrical box need adjustment
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:01 AM</td><td> </td><td>6/1/2022 11:58:19 AM</td><td>Done
</td><td>MG.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16554</td><td>W.C. LOBBY</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Damaged part should be repaired
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:41 AM</td><td> </td><td>6/1/2022 11:58:18 AM</td><td>Done
</td><td>MG.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16558</td><td>MALE DISABLED W.C.</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Around electrical box need adjustment
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:47 AM</td><td> </td><td>6/1/2022 11:58:17 AM</td><td>Done
</td><td>MW.14.0G.004C</td><td>&nbsp;</td>
</tr><tr>
<td>22244</td><td>FEMALE PRAYER ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs touch up painting after installation of lighting
fixtures</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/24/2021 11:49:08 AM</td><td> </td><td>6/1/2022 11:58:15
AM</td><td>Done </td><td>MG.13.0G.005</td><td>&nbsp;</td>
</tr><tr>
<td>24897</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Wavy gypsum ceiling
</td><td>Low</td><td>11/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>11/8/2021
12:15:39 PM</td><td> </td><td>6/1/2022 11:58:07 AM</td><td>Done
</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>29884</td><td>RISER</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation for hydronic pipes. </td><td>High</td><td>6/1/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/25/2022 4:29:51 PM</td><td>
</td><td>6/1/2022 11:55:47
AM</td><td>&nbsp;</td><td>MS.25.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29948</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing thermal insulation corner.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:41:49 PM</td><td> </td><td>6/1/2022 11:55:43
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29957</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dismantled pipe hanger.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:09 PM</td><td> </td><td>6/1/2022 11:55:40
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28891</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Snagging after removing protection cover
</td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/17/2022
11:46:59 AM</td><td> </td><td>6/1/2022 11:45:57
AM</td><td>&nbsp;</td><td>MA.19.02.023</td><td>&nbsp;</td>
</tr><tr>
<td>30145</td><td>DELIVERY &amp; ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Snagging for all doors after removing protection
covers</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 11:37:51 AM</td><td> </td><td>6/1/2022 11:45:52
AM</td><td>&nbsp;</td><td>MQ.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30193</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging doors after removing
protection.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 12:00:08 PM</td><td> </td><td>6/1/2022 11:45:51
AM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>30197</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging doors after removing protection
</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/30/2022
12:00:39 PM</td><td> </td><td>6/1/2022 11:45:50
AM</td><td>&nbsp;</td><td>MA.19.02.020</td><td>&nbsp;</td>
</tr><tr>
<td>30234</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging doors after removing
protection.</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 1:05:47 PM</td><td> </td><td>6/1/2022 11:45:50
AM</td><td>&nbsp;</td><td>MQ.19.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14370</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:56 PM</td><td> </td><td>6/1/2022 11:26:59
AM</td><td>Check was done for wall repair
only</td><td>MS.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18214</td><td>KINDERGARTEN CLASSROOM 2 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Close two gaps between air gaps and
aluminum frame</td><td>Low</td><td>6/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/31/2021 4:04:34 PM</td><td> </td><td>6/1/2022
11:26:58 AM</td><td>&nbsp;</td><td>MK.12.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18293</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Touch up for wall painting
</td><td>Low</td><td>6/22/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/1/2021
4:10:51 PM</td><td> </td><td>6/1/2022 11:26:56
AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18294</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Repair for crack at gypsum wall
</td><td>Low</td><td>6/22/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/1/2021
4:10:52 PM</td><td> </td><td>6/1/2022 11:26:55
AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18310</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Missing screws
</td><td>Low</td><td>6/23/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/2/2021
11:39:50 AM</td><td> </td><td>6/1/2022 11:26:54
AM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18643</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Check gap between furniture and wall </td><td>Low</td><td>6/30/2021
12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021 4:22:45 PM</td><td>
</td><td>6/1/2022 11:26:52
AM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>19540</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:24:58 PM</td><td> </td><td>6/1/2022 11:26:47
AM</td><td>&nbsp;</td><td>MK.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19543</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Wooden skirting not leveled with carpet
floor </td><td>Low</td><td>7/7/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:25:02 PM</td><td> </td><td>6/1/2022
11:26:46 AM</td><td>&nbsp;</td><td>MK.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>19547</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Sounder should be leveled
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:07 PM</td><td> </td><td>6/1/2022 11:26:45
AM</td><td>&nbsp;</td><td>MK.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19548</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Wooden skirting not leveled with carpet
floor </td><td>Low</td><td>7/7/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:25:08 PM</td><td> </td><td>6/1/2022
11:26:44 AM</td><td>&nbsp;</td><td>MK.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19551</td><td>CORRIDOR - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Skirting not leveled with carpet flooring
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:13 PM</td><td> </td><td>6/1/2022 11:26:42
AM</td><td>&nbsp;</td><td>MS.18.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>19552</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Skirting</td><td>Not aligned with drywall</td><td>&#39;Skirting not leveled with
gypsum wall </td><td>Low</td><td>7/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:25:14 PM</td><td> </td><td>6/1/2022
11:26:41 AM</td><td>&nbsp;</td><td>MK.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19553</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Wooden skirting not leveled with carpet
floor </td><td>Low</td><td>7/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:25:16 PM</td><td> </td><td>6/1/2022
11:26:39 AM</td><td>&nbsp;</td><td>MK.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19564</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:30 PM</td><td> </td><td>6/1/2022 11:26:36
AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19568</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Shelf not installed </td><td>Low</td><td>7/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:25:35 PM</td><td> </td><td>6/1/2022
11:26:35 AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19570</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:37 PM</td><td> </td><td>6/1/2022 11:26:34
AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19584</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Fixed accessories</td><td>Not aligned</td><td>&#39;Accessories need to be leveled
on stone cladding </td><td>Low</td><td>7/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:25:58 PM</td><td> </td><td>6/1/2022
11:26:32 AM</td><td>&nbsp;</td><td>MW.13.002.002</td><td>&nbsp;</td>
</tr><tr>
<td>19608</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Damages</td><td>&#39;Gypsum board need repair around air grill
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:26:31 PM</td><td> </td><td>6/1/2022 11:26:31
AM</td><td>&nbsp;</td><td>MW.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19615</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;MEP fixtures should be leveled with
gypsum ceiling </td><td>Low</td><td>7/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:26:42 PM</td><td> </td><td>6/1/2022
11:26:30 AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>22813</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Facade
- Stone Cladding</td><td>Difference in colour/shade</td><td>&#39;Detail is needed
for covering this opening </td><td>Low</td><td>9/29/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>9/8/2021 12:17:07 PM</td><td> </td><td>6/1/2022 11:26:27
AM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>30078</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Air diffusers has putty and need to be
cleaned. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:27 AM</td><td> </td><td>6/1/2022 10:58:10
AM</td><td>&nbsp;</td><td>MA.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30135</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air ducts.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:38 AM</td><td> </td><td>6/1/2022 10:58:08
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30137</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Air duct need cleaning.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:42 AM</td><td> </td><td>6/1/2022 10:58:07
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30139</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Holes shall be closed.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:44 AM</td><td> </td><td>6/1/2022 10:58:06
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30141</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Support shall be cleaned and painted.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:46 AM</td><td> </td><td>6/1/2022 10:58:05
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30147</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove the tape from air diffusers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:53 AM</td><td> </td><td>6/1/2022 10:58:05
AM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30368</td><td>INORGANIC STORAGE 3</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;INERGEN nozzles need adjustments.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:51:32 PM</td><td> </td><td>6/1/2022 10:58:03
AM</td><td>&nbsp;</td><td>MA.19.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>30340</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Provide an approved TOC for fire fighting
system of electrical rooms</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:31:02 PM</td><td> </td><td>6/1/2022
9:23:42 AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>12108</td><td>WC /F</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Missing collar around Drainage pipe
</td><td>High</td><td>10/11/2020 12:00:00 AM</td><td>ahmedsalem</td><td>10/4/2020
1:06:26 PM</td><td> </td><td>6/1/2022 9:23:03
AM</td><td>&nbsp;</td><td>MW.18.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>21741</td><td>WC /F</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing collar around HDPE
pipe</td><td>High</td><td>8/26/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/19/2021 11:46:45 AM</td><td> </td><td>6/1/2022
9:22:06 AM</td><td>&nbsp;</td><td>MW.18.01.001A</td><td>&nbsp;</td>
</tr><tr>
<td>30073</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove the tapes from air diffusers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:16 AM</td><td> </td><td>6/1/2022 9:14:57
AM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30077</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Air diffusers has tapes.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:25 AM</td><td> </td><td>6/1/2022 9:14:17
AM</td><td>&nbsp;</td><td>MA.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30081</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove tape from air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:32 AM</td><td> </td><td>6/1/2022 9:13:20
AM</td><td>&nbsp;</td><td>MA.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>30100</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Remove tape from air diffusers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:01 AM</td><td> </td><td>6/1/2022 9:12:37
AM</td><td>&nbsp;</td><td>MA.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28974</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Clash between duct insulation and
cable tray. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:55 PM</td><td> </td><td>6/1/2022 9:09:19
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>30079</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Remove tape from air diffusers.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:29 AM</td><td> </td><td>6/1/2022 9:02:58
AM</td><td>&nbsp;</td><td>MA.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30133</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dismantled duct support.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:37:36 AM</td><td> </td><td>6/1/2022 9:02:13
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>30406</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove adhesive tape from air terminals.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:52:43 PM</td><td> </td><td>6/1/2022 9:01:03
AM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>5480</td><td>B.O.H-ELEC. SUB-STATION - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around Mep fixtures
</td><td>Low</td><td>10/10/2019 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/19/2019 3:20:27 PM</td><td> </td><td>6/1/2022 7:40:31
AM</td><td>&nbsp;</td><td>MS.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>5477</td><td>B.O.H-ELEC. SUB-STATION - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Removing loose material from ceiling
</td><td>Low</td><td>10/10/2019 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/19/2019 3:20:22 PM</td><td> </td><td>6/1/2022 7:40:24
AM</td><td>&nbsp;</td><td>MS.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>5476</td><td>B.O.H-ELEC. SUB-STATION - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Missing Epoxy painting
</td><td>Low</td><td>10/10/2019 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/19/2019 3:20:20 PM</td><td> </td><td>6/1/2022 7:40:16
AM</td><td>&nbsp;</td><td>MS.18.02.008</td><td>&nbsp;</td>
</tr><tr>

<td>25592</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Area not
cleaned/finished.</td><td>&#39;Remove scaffolding and storage material
</td><td>Low</td><td>1/3/2022 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>12/13/2021 1:59:14 PM</td><td> </td><td>6/1/2022 7:40:11
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>25408</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken stone should be repaired or replaced
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>sally.george</td><td>12/7/2021
10:15:12 AM</td><td> </td><td>6/1/2022 7:40:06
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>24595</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Scratches</td><td>&#39;Stainless steel handrail need to touch up
and cleaning </td><td>Low</td><td>11/20/2021 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>10/30/2021 4:17:41 PM</td><td> </td><td>6/1/2022 7:36:10
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>30370</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing ventilation system for this area.
</td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 4:51:37 PM</td><td> </td><td>5/31/2022 4:55:14
PM</td><td>&nbsp;</td><td>MA.19.02.024</td><td>&nbsp;</td>
</tr><tr>
<td>29717</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;HDPE pipe.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:52 PM</td><td> </td><td>5/31/2022 4:54:39
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>21979</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Incomplete work for duct in 1st floor
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/23/2021
1:36:50 PM</td><td> </td><td>5/31/2022 4:53:48
PM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>29220</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing thermal insulation. </td><td>High</td><td>5/29/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:59:56 AM</td><td>
</td><td>5/31/2022 4:41:51
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>30270</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/6/2022 12:00:00
AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:12 PM</td><td> </td><td>5/31/2022
4:41:25 PM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>30271</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cable should be laid on trunk </td><td>High</td><td>6/6/2022
12:00:00 AM</td><td>mohamed.khalil</td><td>5/30/2022 4:29:15 PM</td><td>
</td><td>5/31/2022 4:41:23
PM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>21574</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
9:52:35 AM</td><td> </td><td>5/31/2022 4:16:28
PM</td><td>&nbsp;</td><td>MS.12.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>28896</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Snagging after removing protection cover
</td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/17/2022
11:47:09 AM</td><td> </td><td>5/31/2022 4:16:25
PM</td><td>&nbsp;</td><td>MA.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>9801</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
fire labels for highlighting doors in plan</td><td>Low</td><td>8/24/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>8/3/2020 12:14:44 PM</td><td> </td><td>5/31/2022
3:21:37 PM</td><td>&nbsp;</td><td>MS.13.0G.008</td><td>&nbsp;</td>
</tr><tr>
<td>29876</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Installation of fire damper not as per
approvals. </td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:39 PM</td><td> </td><td>5/31/2022 2:35:09
PM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>28721</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage thermal insulation for air ducts need to be changed or
repaired. </td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:59 AM</td><td> </td><td>5/31/2022 2:09:06
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>14448</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fire fighting pipe need touch up
</td><td>High</td><td>1/2/2021 12:00:00 PM</td><td>ahmedsalem</td><td>12/26/2020
11:39:24 AM</td><td> </td><td>5/31/2022 2:05:34
PM</td><td>&nbsp;</td><td>MS.23.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29983</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39; Issuing FF system for this area.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:03 PM</td><td> </td><td>5/31/2022 2:04:24
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29984</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing FF system for this area.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:05 PM</td><td> </td><td>5/31/2022 2:03:55
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29042</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing thermal installation for air ducts.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:41 PM</td><td> </td><td>5/31/2022 1:47:52
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>13819</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Scratches</td><td>&#39;Refer to our previous comments on CIR
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:42:04 AM</td><td> </td><td>5/31/2022 1:15:14
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29988</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Chilled water pipes
insulation shall be sealed to avoid any condensations.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:15 PM</td><td> </td><td>5/31/2022 1:06:28
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30070</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;No ventilation system detected in this
area. </td><td>High</td><td>6/6/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/30/2022 11:36:05 AM</td><td> </td><td>5/31/2022 1:01:27
PM</td><td>&nbsp;</td><td>MA.19.02.021</td><td>&nbsp;</td>
</tr><tr>
<td>29872</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Drainage pipes need cleaning.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:33 PM</td><td> </td><td>5/31/2022 12:53:29
PM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>30004</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Pipe connection.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:42 PM</td><td> </td><td>5/31/2022 12:52:42
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>23960</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Tree grill need to touch
up.</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:30:32 AM</td><td> </td><td>5/31/2022 12:34:55
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22940</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Movement joint should be sealed
</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:12:55 AM</td><td> </td><td>5/31/2022 12:31:55 PM</td><td>&nbsp;</td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>17830</td><td>Retail space</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;This gap between stone cladding and glazing should be closed
</td><td>Low</td><td>5/17/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>5/10/2021 12:02:29 PM</td><td> </td><td>5/31/2022 12:22:37
PM</td><td>&nbsp;</td><td>CR.02.0G.xxx</td><td>&nbsp;</td>
</tr><tr>
<td>8052</td><td>STAFF ROOF GARDEN</td><td>CCB
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Ending gab not equal/ toothing
between panels/ rubber need adjustment </td><td>Low</td><td>1/30/2020 12:00:00
PM</td><td>Marios Ioannou,</td><td>1/9/2020 12:06:09 PM</td><td> </td><td>5/31/2022
12:20:13 PM</td><td>&nbsp;</td><td>CX.07.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>8071</td><td>DIRECTORS ROOF GARDEN</td><td>CCB
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Ending gab not equal
</td><td>Low</td><td>1/30/2020 12:00:00 PM</td><td>Marios Ioannou,</td><td>1/9/2020
12:06:57 PM</td><td> </td><td>5/31/2022 12:18:54
PM</td><td>&nbsp;</td><td>CX.12.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>11596</td><td>Retail space 01-04-05</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Broken in panel
</td><td>Low</td><td>10/15/2020 12:00:00 AM</td><td>Marios
Ioannou,</td><td>9/24/2020 12:09:12 PM</td><td> </td><td>5/31/2022 12:17:55
PM</td><td>&nbsp;</td><td>Retail Space -01,04,05</td><td>&nbsp;</td>
</tr><tr>
<td>12855</td><td>STAFF WC LOBBY</td><td>CCB
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>11/8/2020 12:00:00
PM</td><td>Ahmed.Galal</td><td>11/1/2020 11:45:58 AM</td><td> </td><td>5/31/2022
12:15:48 PM</td><td>&nbsp;</td><td>CW.08.03.001</td><td>&nbsp;</td>
</tr><tr>

<td>24960</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV QC
CIVIL</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Geo cell should be fixed properly.</td><td>Low</td><td>11/17/2021
12:00:00 AM</td><td>Amr Nofal</td><td>11/10/2021 11:28:37 AM</td><td>
</td><td>5/31/2022 12:13:57 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24973</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Metal trim should be aligned and fixed
properly.</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 3:59:06 PM</td><td> </td><td>5/31/2022 12:12:54
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25054</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Gravel
size should be as per drawing (material should be
replaced)</td><td>Low</td><td>12/2/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/11/2021 10:43:19 AM</td><td> </td><td>5/31/2022 12:09:22
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25040</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing metal should be installed for marked
part</td><td>Low</td><td>12/2/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/11/2021
10:24:30 AM</td><td> </td><td>5/31/2022 12:07:31
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>30019</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Drain pipe need to be
cleaned and painted. </td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:30 AM</td><td> </td><td>5/31/2022 12:06:08
PM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>29701</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Chilled water Piping and
Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal insulation for
chilled water pipes. </td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:17 PM</td><td> </td><td>5/31/2022 12:05:22
PM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>9566</td><td>SERVICE TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing pipes cladding and pipe
insulation need repair </td><td>High</td><td>7/27/2020 12:00:00
PM</td><td>ahmedsalem</td><td>7/20/2020 11:43:06 AM</td><td> </td><td>5/31/2022
12:04:21 PM</td><td>&nbsp;</td><td>MQ.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>15123</td><td>PROJECTOR ROOM</td><td>CCB
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Joints should be adjusted
</td><td>High</td><td>1/26/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>1/19/2021 4:54:27 PM</td><td> </td><td>5/31/2022 12:02:50
PM</td><td>&nbsp;</td><td>CE.07.01.018</td><td>&nbsp;</td>
</tr><tr>
<td>15125</td><td>STORAGE</td><td>CCB
L10</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Leveling needs adjustment/joints is not
aligned </td><td>High</td><td>1/26/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>1/19/2021 4:54:32 PM</td><td> </td><td>5/31/2022 12:01:56
PM</td><td>&nbsp;</td><td>CE.07.01.019</td><td>&nbsp;</td>
</tr><tr>
<td>15291</td><td>DIRECTORS ROOF GARDEN</td><td>CCB
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Ceiling</
td><td>General Snag</td><td>&#39;Irregular joints should be adjusted
</td><td>High</td><td>2/1/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>1/25/2021 12:05:42 PM</td><td> </td><td>5/31/2022 12:01:11
PM</td><td>&nbsp;</td><td>CX.07.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>22433</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Termination of sealant should be done properly
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Mohamed
El-Sergany</td><td>8/29/2021 3:13:00 PM</td><td> </td><td>5/31/2022 12:00:47
PM</td><td>&nbsp;</td><td>Part 1</td><td>&nbsp;</td>
</tr><tr>
<td>22432</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Poor application of grout around linear drain</td><td>&#39;Poor
grouting should be repaired </td><td>Low</td><td>9/19/2021 12:00:00
PM</td><td>Mohamed El-Sergany</td><td>8/29/2021 3:12:58 PM</td><td>
</td><td>5/31/2022 12:00:12 PM</td><td>&nbsp;</td><td>Part 1</td><td>&nbsp;</td>
</tr><tr>
<td>15689</td><td>3D THEATER FOYER</td><td>CCB
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Check pattern of marked stone tiles
</td><td>Low</td><td>2/23/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>2/2/2021
4:09:49 PM</td><td> </td><td>5/31/2022 11:59:31
AM</td><td>&nbsp;</td><td>CT.03.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>15750</td><td>ENVIRO. LOBBY</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Shadow gaps not same width
surrounding false ceiling </td><td>Low</td><td>2/24/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>2/3/2021 3:36:41 PM</td><td> </td><td>5/31/2022 11:58:32
AM</td><td>&nbsp;</td><td>CA.08.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>22442</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Grouting is missing
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:13:34 PM</td><td> </td><td>5/31/2022 11:58:03 AM</td><td>&nbsp;</td><td>Part
2</td><td>&nbsp;</td>
</tr><tr>
<td>22441</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Cleaning is needed for joints
</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:13:32 PM</td><td> </td><td>5/31/2022 11:57:46 AM</td><td>&nbsp;</td><td>Part
2</td><td>&nbsp;</td>
</tr><tr>
<td>15757</td><td>UNIVERSAL DISABLED W.C</td><td>CCB
L10</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Landing curvature</td><td>&#39;Handrail not the same level
</td><td>Low</td><td>2/24/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>2/3/2021
3:36:58 PM</td><td> </td><td>5/31/2022 11:57:32
AM</td><td>&nbsp;</td><td>CW.08.01.001C</td><td>&nbsp;</td>
</tr><tr>
<td>15759</td><td>CONFERENCE FOYER</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Shadow gap of false ceiling
not aligned </td><td>Low</td><td>2/24/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>2/3/2021 3:37:02 PM</td><td> </td><td>5/31/2022 11:56:51
AM</td><td>&nbsp;</td><td>CX.03.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>15770</td><td>AUDITORIUM FOYER</td><td>CCB
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Ceiling</
td><td>General Snag</td><td>&#39;Joints are not aligned/ceiling at corner need
adjustment</td><td>High</td><td>2/10/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/3/2021 4:03:27 PM</td><td> </td><td>5/31/2022 11:55:58
AM</td><td>&nbsp;</td><td>CA.08.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16152</td><td>CORE B4</td><td>CCB
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Door frame
and architrave</td><td>Termination between finishes to be
rectified</td><td>&#39;Architrave not aligned with concrete wall
</td><td>Low</td><td>3/3/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>2/10/2021
3:57:26 PM</td><td> </td><td>5/31/2022 11:54:46
AM</td><td>&nbsp;</td><td>CC.07.02.B41</td><td>&nbsp;</td>
</tr><tr>
<td>29947</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Touchup painting for INERGEN pipes.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:41:45 PM</td><td> </td><td>5/31/2022 11:53:38
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29951</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage elastomeric thermal insulation for
drain pan. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:41:59 PM</td><td> </td><td>5/31/2022 11:53:34
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29955</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Clash between seismic wire and chilled
water pipe. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:06 PM</td><td> </td><td>5/31/2022 11:53:33
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29956</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Fire pipes need cleaning and paintings.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:08 PM</td><td> </td><td>5/31/2022 11:53:32
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29967</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Condensate drain pipes shall be ended with
elbows. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:29 PM</td><td> </td><td>5/31/2022 11:53:28
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29968</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39; Issuing labels for air ducts.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:32 PM</td><td> </td><td>5/31/2022 11:53:27
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29969</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for PPR. Pipes.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:35 PM</td><td> </td><td>5/31/2022 11:53:26
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29972</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Labels for hydronic pipes is missing.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:42 PM</td><td> </td><td>5/31/2022 11:53:25
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29973</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Seismic restrains dismantled.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:45 PM</td><td> </td><td>5/31/2022 11:53:24
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29974</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Thermal insulation shall be continued and
isolated. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:46 PM</td><td> </td><td>5/31/2022 11:53:23
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29977</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Plastic straps attached to air filter shall
be removed. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:52 PM</td><td> </td><td>5/31/2022 11:53:22
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29978</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39; Issuing labels for
chilled water pipes. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:53 PM</td><td> </td><td>5/31/2022 11:53:21
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29979</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing labels for PPR
pipes. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:56 PM</td><td> </td><td>5/31/2022 11:53:21
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29982</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;INERGEN cylinders hoses not connected.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:02 PM</td><td> </td><td>5/31/2022 11:53:20
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>23711</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Tile is missing
</td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/11/2021
10:29:23 AM</td><td> </td><td>5/31/2022 11:53:15
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28793</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>Low</td><td>6/5/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/15/2022 11:46:33 AM</td><td> </td><td>5/31/2022
11:52:01 AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>17326</td><td>ESCALATOR AREA</td><td>CCB
GF</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;The gap between stone cladding and
white concrete should be aligned </td><td>Low</td><td>5/3/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>4/12/2021 3:07:42 PM</td><td> </td><td>5/31/2022
11:52:01 AM</td><td>&nbsp;</td><td>CX.08.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>28794</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>Low</td><td>6/5/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/15/2022 11:46:35 AM</td><td> </td><td>5/31/2022
11:52:00 AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28795</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame , Refer to CIR
comment .</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:46:36 AM</td><td> </td><td>5/31/2022 11:51:58
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28850</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging after removing
protection.</td><td>Low</td><td>6/6/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/16/2022 11:35:47 AM</td><td> </td><td>5/31/2022 11:51:57
AM</td><td>&nbsp;</td><td>MA.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28851</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging after removing
tape.</td><td>Low</td><td>6/6/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/16/2022 11:35:48 AM</td><td> </td><td>5/31/2022 11:51:55
AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28852</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Snagging after removing
protection.</td><td>Low</td><td>6/6/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/16/2022 11:35:50 AM</td><td> </td><td>5/31/2022 11:51:53
AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29095</td><td>PHOTO STUDIO</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Snagging after removing protection cover
</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:00 PM</td><td> </td><td>5/31/2022 11:51:51
AM</td><td>&nbsp;</td><td>MR.14.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>29112</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Snagging after removing protection cover
</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:39 PM</td><td> </td><td>5/31/2022 11:51:50
AM</td><td>&nbsp;</td><td>MR.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>29113</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Snagging after removing protection cover
</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:41 PM</td><td> </td><td>5/31/2022 11:51:49
AM</td><td>&nbsp;</td><td>MR.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29119</td><td>ADMIN</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Snagging after removing protection cover
</td><td>Low</td><td>6/9/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/19/2022
12:04:52 PM</td><td> </td><td>5/31/2022 11:51:47
AM</td><td>&nbsp;</td><td>MR.14.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>30162</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Signage</td><td>Not
Installed/Completed</td><td>&#39;Protection cover should be removed (for all
signages)</td><td>Low</td><td>6/20/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/30/2022 11:38:11 AM</td><td> </td><td>5/31/2022 11:51:46
AM</td><td>&nbsp;</td><td>MQ.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>17421</td><td>Retail space</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>Cracks in glass</td><td>&#39;Mullion need to be aligned
</td><td>Low</td><td>5/9/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>4/18/2021
1:46:05 PM</td><td> </td><td>5/31/2022 11:51:13
AM</td><td>&nbsp;</td><td>CR.08.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>17492</td><td>Banquet Kitchen</td><td>CCB
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Filling joints between stone cladding
</td><td>Low</td><td>5/17/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>4/26/2021 12:54:16 PM</td><td> </td><td>5/31/2022 11:49:20
AM</td><td>&nbsp;</td><td>CA.07.01.007</td><td>&nbsp;</td>
</tr><tr>

<td>26876</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Incomplete work around signage
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
10:31:16 AM</td><td> </td><td>5/31/2022 11:49:07
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>17831</td><td>Retail space</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;This gap should be closed </td><td>Low</td><td>5/31/2021 12:00:00
AM</td><td>Marios Ioannou,</td><td>5/10/2021 12:02:31 PM</td><td>
</td><td>5/31/2022 11:47:19
AM</td><td>&nbsp;</td><td>CR.02.0G.xxx</td><td>&nbsp;</td>
</tr><tr>
<td>18855</td><td>ENVIRO. LOBBY</td><td>CCB
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Repair for broken edges
</td><td>Low</td><td>7/4/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>6/13/2021
12:10:06 PM</td><td> </td><td>5/31/2022 11:46:22
AM</td><td>&nbsp;</td><td>CA.08.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>18910</td><td>LOBBY</td><td>CCB
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Floor finishes should be finished
</td><td>Low</td><td>7/5/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>6/14/2021
12:06:29 PM</td><td> </td><td>5/31/2022 11:45:32
AM</td><td>&nbsp;</td><td>CA.07.01.005</td><td>&nbsp;</td>
</tr><tr>

<td>26614</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
11:12:33 AM</td><td> </td><td>5/31/2022 11:45:28
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26605</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
11:12:11 AM</td><td> </td><td>5/31/2022 11:44:47
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>18923</td><td>LOBBY</td><td>CCB
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>General</td><td>&#39;Gap should be closed
</td><td>Low</td><td>7/5/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>6/14/2021
12:06:37 PM</td><td> </td><td>5/31/2022 11:44:43
AM</td><td>&nbsp;</td><td>CE.08.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>19005</td><td>EDUCATION CIRCULATION</td><td>CCB
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;The bottom joint should be at the same
level </td><td>Low</td><td>7/6/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>6/15/2021 12:21:16 PM</td><td> </td><td>5/31/2022 11:43:41
AM</td><td>&nbsp;</td><td>CE.07.01.020</td><td>&nbsp;</td>
</tr><tr>
<td>21452</td><td>Glazing Wall Internal Side</td><td>Glazing
wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Metal
plate (S/S cladding)</td><td>General Snag</td><td>&#39;Gap should be finished as
per DWG </td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>8/18/2021 11:43:43 AM</td><td> </td><td>5/31/2022 11:42:12
AM</td><td>&nbsp;</td><td>Glazing Wall Internal Side</td><td>&nbsp;</td>
</tr><tr>

<td>26729</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Filling gap between stone cladding and flooring
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
3:45:36 PM</td><td> </td><td>5/31/2022 11:42:12
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>21831</td><td>WEST Facade - CCB</td><td>CCB West
Facade</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Damaged</td><td>&#39;Marked panels not leveled ( toothing
)</td><td>Low</td><td>9/12/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/22/2021 12:13:36 PM</td><td> </td><td>5/31/2022 11:40:59
AM</td><td>&nbsp;</td><td>WEST Facade-CCB</td><td>&nbsp;</td>
</tr><tr>
<td>21833</td><td>WEST Facade - CCB</td><td>CCB West
Facade</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Damaged</td><td>&#39;Broken edges need to repair
</td><td>Low</td><td>9/12/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/22/2021 12:13:39 PM</td><td> </td><td>5/31/2022 11:40:08
AM</td><td>&nbsp;</td><td>WEST Facade-CCB</td><td>&nbsp;</td>
</tr><tr>
<td>21835</td><td>WEST Facade - CCB</td><td>CCB West
Facade</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Damaged</td><td>&#39;Broken edge need to repair
</td><td>Low</td><td>9/12/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/22/2021 12:13:41 PM</td><td> </td><td>5/31/2022 11:39:18
AM</td><td>&nbsp;</td><td>WEST Facade-CCB</td><td>&nbsp;</td>
</tr><tr>

<td>24945</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Missing Geo cell should be installed
</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/10/2021
11:26:57 AM</td><td> </td><td>5/31/2022 11:38:39
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21838</td><td>WEST Facade - CCB</td><td>CCB West
Facade</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Damaged</td><td>&#39;Joint not aligned need adjustment
</td><td>Low</td><td>9/12/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/22/2021 12:13:49 PM</td><td> </td><td>5/31/2022 11:38:28
AM</td><td>&nbsp;</td><td>WEST Facade-CCB</td><td>&nbsp;</td>
</tr><tr>

<td>24944</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Geo
cell should be fixed properly </td><td>Low</td><td>12/1/2021 12:00:00
AM</td><td>Amr Nofal</td><td>11/10/2021 11:26:55 AM</td><td> </td><td>5/31/2022
11:37:59 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21843</td><td>WEST Facade - CCB</td><td>CCB West
Facade</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Damaged</td><td>&#39;Joint not the same width need to be aligned
</td><td>Low</td><td>9/12/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/22/2021 12:14:03 PM</td><td> </td><td>5/31/2022 11:37:31
AM</td><td>&nbsp;</td><td>WEST Facade-CCB</td><td>&nbsp;</td>
</tr><tr>

<td>24966</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Edges of geo cell should be fixed
properly.</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 11:28:57 AM</td><td> </td><td>5/31/2022 11:37:09
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24936</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Geo
cell should be filtered from the sand </td><td>Low</td><td>12/1/2021 12:00:00
AM</td><td>Amr Nofal</td><td>11/10/2021 11:26:42 AM</td><td> </td><td>5/31/2022
11:36:37 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21845</td><td>WEST Facade - CCB</td><td>CCB West
Facade</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Difference in colour/shade</td><td>&#39;GRC panels need painting
</td><td>High</td><td>8/29/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/22/2021 12:14:08 PM</td><td> </td><td>5/31/2022 11:36:28
AM</td><td>&nbsp;</td><td>WEST Facade-CCB</td><td>&nbsp;</td>
</tr><tr>

<td>25059</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Gravel
size should be as per drawing</td><td>Low</td><td>12/2/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/11/2021 10:43:30 AM</td><td> </td><td>5/31/2022 11:35:51
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25056</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Gravel
should be filtered from sand</td><td>Low</td><td>12/2/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/11/2021 10:43:23 AM</td><td> </td><td>5/31/2022 11:35:27
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21898</td><td>WEST Facade - CCB</td><td>CCB West
Facade</td><td>Closed</td><td>El Banaon</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Damaged</td><td>&#39;GRC not leveled with glazing
facade</td><td>Low</td><td>9/12/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>8/22/2021 3:36:17 PM</td><td> </td><td>5/31/2022 11:35:22
AM</td><td>&nbsp;</td><td>WEST Facade-CCB</td><td>&nbsp;</td>
</tr><tr>

<td>25060</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Gravel
should be filtered from sand</td><td>Low</td><td>12/2/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/11/2021 10:43:31 AM</td><td> </td><td>5/31/2022 11:35:12
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18807</td><td>STAIR 04</td><td>MFPC
L10</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Door leaf</td><td>General</td><td>&#39;Door leaf
need touch up painting </td><td>Low</td><td>7/1/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>6/10/2021 3:40:37 PM</td><td> </td><td>5/31/2022 11:31:58
AM</td><td>&nbsp;</td><td>DS.03.01.77</td><td>&nbsp;</td>
</tr><tr>
<td>7487</td><td>GOODS AREA</td><td>MFPC
GF</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Cleaning epoxy painting
floor</td><td>Low</td><td>1/21/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>12/31/2019 3:43:47 PM</td><td> </td><td>5/31/2022 11:30:35
AM</td><td>&nbsp;</td><td>DS.04.0G.70</td><td>&nbsp;</td>
</tr><tr>

<td>24840</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Leveling of gravel need to
adjustment.</td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/7/2021 4:15:20 PM</td><td> </td><td>5/31/2022 9:08:25
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24841</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Metal trim not aligned need to
adjustment.</td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/7/2021 4:15:22 PM</td><td> </td><td>5/31/2022 9:08:24
AM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24843</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Leveling of gravel need to
adjustment.</td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/7/2021 4:15:25 PM</td><td> </td><td>5/31/2022 9:08:22
AM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24845</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing gravel need to installed </td><td>Low</td><td>11/28/2021
12:00:00 AM</td><td>Moussa Nageh Khella</td><td>11/7/2021 4:15:29 PM</td><td>
</td><td>5/31/2022 9:08:21 AM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24852</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>EL
Nasr</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Leveling of gravel need to
adjustment.</td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/7/2021 4:15:43 PM</td><td> </td><td>5/31/2022 9:08:19
AM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14023</td><td>IT HUB ROOM</td><td>CCB
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Mechanical</td><td>Sprinkler
Heads</td><td>General Snag</td><td>&#39;Clashing between sprinkler and smoke
detector </td><td>High</td><td>12/23/2020 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>12/16/2020 12:07:51 PM</td><td> </td><td>5/31/2022 9:00:55
AM</td><td>&nbsp;</td><td>CS.07.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>29997</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing isolation valve
for water hammer arrestor. </td><td>High</td><td>6/2/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/26/2022 3:43:30 PM</td><td>
</td><td>5/31/2022 8:56:26
AM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30033</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct support is missing.
</td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:53 AM</td><td> </td><td>5/31/2022 8:52:29
AM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28666</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Chilled and hot water pipes and hock up insulations need
repairs. </td><td>High</td><td>5/17/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:40:13 PM</td><td> </td><td>5/31/2022 8:48:46
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>30008</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;HDPE pipe need to be cleaned.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:50 PM</td><td> </td><td>5/31/2022 8:36:31
AM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29991</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Connection shall be reviewed and p trap
shall be added. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:20 PM</td><td> </td><td>5/31/2022 8:34:57
AM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29877</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Installation for fire damper not as per
approvals. </td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:41 PM</td><td> </td><td>5/31/2022 8:33:30
AM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>29193</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing insulation straps. </td><td>High</td><td>5/29/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:59:13 AM</td><td>
</td><td>5/31/2022 8:27:52
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29950</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing hose clamp.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:41:57 PM</td><td> </td><td>5/31/2022 8:18:56
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29953</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage and incomplete thermal insulation
for chilled water pipes. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:03 PM</td><td> </td><td>5/31/2022 8:15:16
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29958</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Seismic wires need to be tightened.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:12 PM</td><td> </td><td>5/31/2022 8:11:00
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29962</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning from outside.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:19 PM</td><td> </td><td>5/31/2022 8:09:47
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29963</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Drain hose not connected properly.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:42:20 PM</td><td> </td><td>5/31/2022 8:08:58
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>13883</td><td>EMERGENCY LIGHTING</td><td>MU
L25</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Clean out is not accessible
</td><td>High</td><td>12/9/2020 12:00:00 AM</td><td>ahmedsalem</td><td>12/2/2020
10:45:55 AM</td><td> </td><td>5/30/2022 4:53:19
PM</td><td>&nbsp;</td><td>MS.18.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>28300</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing labels for all MEP trades.
</td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:17 AM</td><td> </td><td>5/30/2022 4:53:18
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28659</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct insulation need repairs and missing access door.
</td><td>High</td><td>5/17/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:39:24 PM</td><td> </td><td>5/30/2022 4:53:17
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28715</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing labels for all ductworks.
</td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:46 AM</td><td> </td><td>5/30/2022 4:53:16
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28931</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;FCU air duct thermal insulation need
repairs. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:12 PM</td><td> </td><td>5/30/2022 4:53:13
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29055</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Air duct thermal insulation damaged and
shall be replaced. </td><td>High</td><td>5/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/18/2022 11:56:00 AM</td><td> </td><td>5/30/2022 4:53:12
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29070</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>5/25/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/18/2022 11:56:28 AM</td><td>
</td><td>5/30/2022 4:53:11
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29253</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct need more supports.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:13 PM</td><td> </td><td>5/30/2022 4:53:10
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29279</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation for chilled water pipes. </td><td>High</td><td>5/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/23/2022 12:07:17 PM</td><td>
</td><td>5/30/2022 4:53:09
PM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>29288</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Missing labeling
for drain pipes. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:05 PM</td><td> </td><td>5/30/2022 4:53:08
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29690</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing support for motorized dampers.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:19:52 PM</td><td> </td><td>5/30/2022 4:53:07
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29703</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39; Issuing labels for chilled water
pipes. </td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:21 PM</td><td> </td><td>5/30/2022 4:53:05
PM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29995</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation for chilled water pipes. </td><td>High</td><td>6/2/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/26/2022 3:43:27 PM</td><td>
</td><td>5/30/2022 4:53:04
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30028</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing labels for air ducts.
</td><td>High</td><td>6/5/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/29/2022 11:26:45 AM</td><td> </td><td>5/30/2022 4:53:03
PM</td><td>&nbsp;</td><td>MS.19.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28811</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>Low</td><td>6/5/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/15/2022 11:47:01 AM</td><td> </td><td>5/30/2022
3:36:37 PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28812</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame , Refer to CIR
comment .</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:02 AM</td><td> </td><td>5/30/2022 3:36:36
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28820</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>Low</td><td>6/5/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>5/15/2022 11:47:14 AM</td><td> </td><td>5/30/2022
3:36:35 PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28821</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame , Refer to CIR
comment .</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:15 AM</td><td> </td><td>5/30/2022 3:36:34
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28822</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame , Refer to CIR
comment .</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:16 AM</td><td> </td><td>5/30/2022 3:36:33
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28823</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame , Refer to CIR
comment .</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:17 AM</td><td> </td><td>5/30/2022 3:36:32
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28824</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Door leaf and frame , Refer to CIR
comment .</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:19 AM</td><td> </td><td>5/30/2022 3:36:32
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28837</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Refer to CIR comment to door leaf and frame
</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/15/2022
11:47:37 AM</td><td> </td><td>5/30/2022 3:36:31
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>15625</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Linoleum skirting ( missing some linoleum
skirting - joints between skirting tiles should be zero joint - skirting not
adhesive well - gap between flooring and skirting )</td><td>Low</td><td>2/22/2021
12:00:00 AM</td><td>Kerolos Nagy Tawfik</td><td>2/1/2021 11:31:11 AM</td><td>
</td><td>5/30/2022 3:32:10 PM</td><td>Done
</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>24341</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
waterproofing</td><td>incomplete</td><td>&#39;Missing sika foam
</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>mohamed.sami</td><td>10/27/2021
11:26:19 AM</td><td> </td><td>5/30/2022 3:00:42 PM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>24338</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>Paint Stains</td><td>&#39;Remove paint stains and touch up
</td><td>Low</td><td>11/3/2021 12:00:00 PM</td><td>mohamed.sami</td><td>10/27/2021
11:26:11 AM</td><td> </td><td>5/30/2022 3:00:11 PM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>24340</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
insulation</td><td>incomplete</td><td>&#39;Missing sika PU foam, sika fill (2
coats) for concrete beam above EWS-05 on longitudinal direction for whole digital
stream band B according to NCR-1079-Q726</td><td>High</td><td>11/3/2021 12:00:00
PM</td><td>mohamed.sami</td><td>10/27/2021 11:26:17 AM</td><td> </td><td>5/30/2022
2:59:20 PM</td><td>&nbsp;</td><td>Museum Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>28706</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing insulation for FCU air ducts.
</td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:31 AM</td><td> </td><td>5/30/2022 2:09:28
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28711</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing thermal insulation for air duct.
</td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:38 AM</td><td> </td><td>5/30/2022 2:08:03
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29250</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for water pipes.
</td><td>High</td><td>5/30/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:07 PM</td><td> </td><td>5/30/2022 2:06:03
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28725</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to
specification/drawing</td><td>&#39;Condensate drain pipes elbows shall be adjusted.
</td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:46:06 AM</td><td> </td><td>5/30/2022 2:03:41
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>16470</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Joint not aligned check drawings for pattern
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:24 AM</td><td> </td><td>5/30/2022 12:53:25
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25316</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steel works at roof</td><td>Paint
finish</td><td>&#39;Remove stains and cleaning for steel structure
</td><td>Low</td><td>11/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>11/22/2021
12:00:09 PM</td><td> </td><td>5/30/2022 12:52:00 PM</td><td>&nbsp;</td><td>Museum
Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25314</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steel works at roof</td><td>Paint
Stains</td><td>&#39;Steel structure columns need to clean and touch up
</td><td>Low</td><td>11/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>11/22/2021
12:00:03 PM</td><td> </td><td>5/30/2022 12:51:16 PM</td><td>&nbsp;</td><td>Museum
Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>24327</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof
Tiles</td><td>Slope</td><td>&#39;Missing ceiling mesh panels
</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>mohamed.sami</td><td>10/27/2021
11:25:49 AM</td><td> </td><td>5/30/2022 12:50:24 PM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>25335</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steel works at roof</td><td>Paint
Stains</td><td>&#39;Steel structure columns need to clean and touch up
</td><td>Low</td><td>11/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>11/22/2021
12:01:01 PM</td><td> </td><td>5/30/2022 12:49:20 PM</td><td>&nbsp;</td><td>Museum
Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>24335</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steel works at roof</td><td>Paint
finish</td><td>&#39;Missing painting for steel structure
</td><td>Low</td><td>11/17/2021 12:00:00 AM</td><td>mohamed.sami</td><td>10/27/2021
11:26:04 AM</td><td> </td><td>5/30/2022 12:48:02 PM</td><td>&nbsp;</td><td>Museum
Roof Band C</td><td>&nbsp;</td>
</tr><tr>
<td>27322</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Ceiling edge should be aligned and
uniform </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 12:12:04 PM</td><td> </td><td>5/30/2022
12:47:02 PM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27470</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Marked edge should be aligned
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:03 PM</td><td> </td><td>5/30/2022 12:46:20
PM</td><td>&nbsp;</td><td>MA.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27461</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling need touch up painting </td><td>Low</td><td>3/28/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022 4:40:49 PM</td><td>
</td><td>5/30/2022 12:40:52
PM</td><td>&nbsp;</td><td>MR.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27480</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling painting need touch up </td><td>Low</td><td>3/28/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022 4:41:22 PM</td><td>
</td><td>5/30/2022 12:38:33
PM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28013</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Joint should be adjusted
</td><td>Low</td><td>4/4/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/14/2022
11:38:56 AM</td><td> </td><td>5/30/2022 12:36:48
PM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28001</td><td>INORGANIC STORAGE 2</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Missing sealant /sealant need adjustment
</td><td>Low</td><td>4/4/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/14/2022
11:38:32 AM</td><td> </td><td>5/30/2022 12:36:18
PM</td><td>&nbsp;</td><td>MA.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>27487</td><td>W.C</td><td>MU
L20</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Damage</td><td>&#39;Cubicle should be fixed properly (closed
properly)</td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 4:41:34 PM</td><td> </td><td>5/30/2022
12:35:46 PM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27335</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>T and D design</td><td>Architectural</td><td>Carpet
Floor</td><td>General Snag</td><td>&#39;Carpet is missing
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:29 PM</td><td> </td><td>5/30/2022 12:34:11
PM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28236</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Metal trim needs adjustment </td><td>Low</td><td>4/10/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/20/2022 12:04:44 PM</td><td>
</td><td>5/30/2022 12:31:22
PM</td><td>&nbsp;</td><td>MA.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28223</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Joints should be aligned </td><td>Low</td><td>4/10/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/20/2022 12:04:16 PM</td><td> </td><td>5/30/2022
12:30:31 PM</td><td>&nbsp;</td><td>MA.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28016</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked edge should be aligned </td><td>Low</td><td>4/4/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/14/2022 11:39:01 AM</td><td>
</td><td>5/30/2022 12:29:49
PM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>27338</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked parts need touch up painting
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:33 PM</td><td> </td><td>5/30/2022 12:29:16
PM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27323</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked gaps should be closed </td><td>Low</td><td>3/28/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022 12:12:06 PM</td><td>
</td><td>5/30/2022 12:27:54
PM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28847</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint between skirting and floor should be
leveled.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:51 AM</td><td> </td><td>5/30/2022 12:26:24
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28116</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant needs adjustment and should be aligned
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/16/2022
11:00:09 AM</td><td> </td><td>5/30/2022 12:25:55
PM</td><td>&nbsp;</td><td>MA.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28115</td><td>CURATOR</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Wall - Skirting</td><td>Other
Snag</td><td>&#39;Skirting should be leveled </td><td>Low</td><td>4/6/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/16/2022 11:00:07 AM</td><td> </td><td>5/30/2022
12:25:19 PM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28114</td><td>CURATOR</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Wall - Skirting</td><td>Other
Snag</td><td>&#39;Corners should be finished properly </td><td>Low</td><td>4/6/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/16/2022 11:00:05 AM</td><td>
</td><td>5/30/2022 12:24:40
PM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28112</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Access door should be fixed properly
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/16/2022
11:00:01 AM</td><td> </td><td>5/30/2022 12:24:02
PM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28110</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Marked edges should be uniform and
aligned </td><td>Low</td><td>4/6/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/16/2022 10:59:58 AM</td><td> </td><td>5/30/2022
12:23:31 PM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28109</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Marked parts need touch up painting
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/16/2022
10:59:56 AM</td><td> </td><td>5/30/2022 12:22:58
PM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28105</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs touch up painting </td><td>Low</td><td>4/6/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/16/2022 10:59:49 AM</td><td>
</td><td>5/30/2022 12:22:31
PM</td><td>&nbsp;</td><td>MA.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28102</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Carpet Floor</td><td>General
Snag</td><td>&#39;Skirting should be leveled </td><td>Low</td><td>4/6/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/16/2022 10:59:43 AM</td><td> </td><td>5/30/2022
12:21:41 PM</td><td>&nbsp;</td><td>MA.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28101</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Carpet Floor</td><td>General
Snag</td><td>&#39;All joints and corners should be finished properly
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/16/2022
10:59:41 AM</td><td> </td><td>5/30/2022 12:21:11
PM</td><td>&nbsp;</td><td>MA.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28025</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access panels should be fixed properly
</td><td>Low</td><td>4/4/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/14/2022
11:39:20 AM</td><td> </td><td>5/30/2022 12:20:32
PM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28023</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked gaps(between metal trim and wall)should be adjusted and
closed </td><td>Low</td><td>4/4/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/14/2022 11:39:15 AM</td><td> </td><td>5/30/2022
12:19:17 PM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28022</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked parts(corners /edges)should be adjusted
</td><td>Low</td><td>4/4/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/14/2022
11:39:13 AM</td><td> </td><td>5/30/2022 12:18:37
PM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>18234</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Repair cracks at gypsum wall
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021
4:05:18 PM</td><td> </td><td>5/30/2022 12:17:38
PM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14339</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up and repair </td><td>High</td><td>12/31/2020
12:00:00 AM</td><td>Adel Nassrat</td><td>12/24/2020 1:23:45 PM</td><td>
</td><td>5/30/2022 12:17:36
PM</td><td>&nbsp;</td><td>MS.23.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28825</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling painting need to touch
up.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/15/2022
11:47:20 AM</td><td> </td><td>5/30/2022 12:16:28
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18131</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Small cut piece and repair to be
rectified </td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:56:02 AM</td><td> </td><td>5/30/2022
12:16:06 PM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18133</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Defective tape and damages need to repair
</td><td>Low</td><td>6/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021
11:56:07 AM</td><td> </td><td>5/30/2022 12:16:01
PM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18156</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Small cut piece /the cutting should be
from nearest floor joint </td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:58:40 AM</td><td> </td><td>5/30/2022
12:15:53 PM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18158</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Skirting should be leveled
</td><td>Low</td><td>6/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021
11:58:43 AM</td><td> </td><td>5/30/2022 12:15:46
PM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18209</td><td>KINDERGARTEN - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Close gap between air gap and aluminum
frame </td><td>Low</td><td>6/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/31/2021 4:04:26 PM</td><td> </td><td>5/30/2022
12:15:42 PM</td><td>&nbsp;</td><td>CLASSROOM 1</td><td>&nbsp;</td>
</tr><tr>
<td>18264</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Skirting should be fixed properly
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021
4:11:11 PM</td><td> </td><td>5/30/2022 12:15:30
PM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18309</td><td>EXTERNAL PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Patches/Touch up</td><td>&#39;Columns painting need to touch up
</td><td>Low</td><td>6/23/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/2/2021
11:39:47 AM</td><td> </td><td>5/30/2022 12:15:24
PM</td><td>&nbsp;</td><td>MX.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19112</td><td>ESCAPE ROUTE - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant needs to touch up </td><td>Low</td><td>7/7/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/16/2021 10:54:05 AM</td><td> </td><td>5/30/2022
12:15:00 PM</td><td>&nbsp;</td><td>MQ.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19569</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Stone counter
backsplash</td><td>General</td><td>&#39;Missing backsplash
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:36 PM</td><td> </td><td>5/30/2022 12:15:00
PM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19703</td><td>NURSERY- Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Column edges should be straight </td><td>Low</td><td>7/28/2021
12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021 1:29:49 PM</td><td>
</td><td>5/30/2022 12:14:59
PM</td><td>&nbsp;</td><td>MK.12.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19912</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Landing curvature</td><td>&#39;Elbow should be horizontal
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:25:09 AM</td><td> </td><td>5/30/2022 12:14:51
PM</td><td>&nbsp;</td><td>MS.18.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>19747</td><td>PAINTING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>Edges straight</td><td>&#39;Gypsum corner edges should be straight and
aligned </td><td>Low</td><td>7/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>7/7/2021 1:30:53 PM</td><td> </td><td>5/30/2022
12:14:42 PM</td><td>&nbsp;</td><td>MK.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>16500</td><td>ESCAPE TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:09 AM</td><td> </td><td>5/30/2022 12:12:29
PM</td><td>&nbsp;</td><td>MQ.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27326</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing cover </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 12:12:11 PM</td><td> </td><td>5/30/2022
12:08:26 PM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27324</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling need touch up painting </td><td>Low</td><td>3/28/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022 12:12:07 PM</td><td>
</td><td>5/30/2022 12:07:56
PM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28830</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall painting need to touch
up.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/15/2022
11:47:27 AM</td><td> </td><td>5/30/2022 12:06:35
PM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28106</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access doors should be fixed properly
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/16/2022
10:59:51 AM</td><td> </td><td>5/30/2022 12:04:03
PM</td><td>&nbsp;</td><td>MA.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28100</td><td>STUDY</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Carpet Floor</td><td>General
Snag</td><td>&#39;Marked pieces should be fixed properly
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/16/2022
10:59:39 AM</td><td> </td><td>5/30/2022 12:03:32
PM</td><td>&nbsp;</td><td>MA.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27509</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall
tiles</td><td>General Snag</td><td>&#39;Painting dents should be repaired
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:42:15 PM</td><td> </td><td>5/30/2022 12:02:53
PM</td><td>&nbsp;</td><td>MA.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>27354</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Missing labels </td><td>Low</td><td>3/28/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022 12:13:06 PM</td><td>
</td><td>5/30/2022 12:01:59
PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27352</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Sealer is missing
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:13:02 PM</td><td> </td><td>5/30/2022 12:01:18
PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>29871</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Labels for air duct missing.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:32 PM</td><td> </td><td>5/30/2022 12:00:10
PM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>27351</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>3/28/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022 12:13:00 PM</td><td>
</td><td>5/30/2022 11:56:08
AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>25345</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged water proofing should be
repaired.</td><td>Low</td><td>12/13/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>11/22/2021 1:57:55 PM</td><td> </td><td>5/30/2022 11:55:09
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>28898</td><td>SECURITY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up for concrete flooring
</td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/17/2022
11:47:12 AM</td><td> </td><td>5/30/2022 11:53:36
AM</td><td>&nbsp;</td><td>MA.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28895</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/17/2022
11:47:05 AM</td><td> </td><td>5/30/2022 11:52:41
AM</td><td>&nbsp;</td><td>MA.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28894</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/17/2022
11:47:03 AM</td><td> </td><td>5/30/2022 9:12:07
AM</td><td>&nbsp;</td><td>MA.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28890</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Remove protection tape
</td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/17/2022
11:46:58 AM</td><td> </td><td>5/30/2022 9:10:48
AM</td><td>&nbsp;</td><td>MA.19.02.023</td><td>&nbsp;</td>
</tr><tr>
<td>28889</td><td>STORE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up for concrete flooring
</td><td>Low</td><td>6/7/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/17/2022
11:46:56 AM</td><td> </td><td>5/30/2022 9:09:49
AM</td><td>&nbsp;</td><td>MA.19.02.023</td><td>&nbsp;</td>
</tr><tr>
<td>28835</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint between skirting and floor should be
leveled.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:35 AM</td><td> </td><td>5/30/2022 9:05:38
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>16553</td><td>W.C. LOBBY</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Joint is not aligned/should be adjusted
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:39 AM</td><td> </td><td>5/30/2022 9:05:03
AM</td><td>&nbsp;</td><td>MG.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>21178</td><td>CORE B2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wall is not leveled </td><td>Low</td><td>9/7/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/17/2021 10:56:45 AM</td><td> </td><td>5/30/2022
9:03:36 AM</td><td>&nbsp;</td><td>MC.18.2A.B21</td><td>&nbsp;</td>
</tr><tr>

<td>25422</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>Damage/dent/stains</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>12/28/2021 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>12/7/2021 10:17:52 AM</td><td> </td><td>5/30/2022 9:03:05
AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>21176</td><td>CORE B2</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joints should be adjusted and
repaired </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:56:40 AM</td><td> </td><td>5/30/2022 9:03:05
AM</td><td>&nbsp;</td><td>MC.18.2A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21175</td><td>CORE B2</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:56:37 AM</td><td> </td><td>5/30/2022 9:02:21
AM</td><td>&nbsp;</td><td>MC.18.2A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>28122</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Damaged screed should be
repaired</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/16/2022 12:09:10 PM</td><td> </td><td>5/30/2022 9:01:32
AM</td><td>&nbsp;</td><td>Museum Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>25337</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
waterproofing</td><td>incomplete</td><td>&#39;Missing sika PU foam, sika fill (2
coats) for concrete beam above EWS-05 on longitudinal direction for whole digital
stream band D according to NCR-1079-Q726</td><td>Low</td><td>12/13/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>11/22/2021 12:01:08 PM</td><td> </td><td>5/30/2022
9:00:57 AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25317</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
waterproofing</td><td>incomplete</td><td>&#39;Missing sika PU foam, sika fill (2
coats) for concrete beam above EWS-05 on longitudinal direction for whole digital
stream band D according to NCR-1079-Q726</td><td>Low</td><td>11/29/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>11/22/2021 12:00:12 PM</td><td> </td><td>5/30/2022
9:00:23 AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>28059</td><td>Core G2</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;All Walls need touch up painting
</td><td>Low</td><td>4/5/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/15/2022
10:53:50 AM</td><td> </td><td>5/30/2022 8:59:29
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16489</td><td>Equipment Store</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around metal door needs adjustment
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:55 AM</td><td> </td><td>5/30/2022 8:58:35
AM</td><td>&nbsp;</td><td>MS.19.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>23745</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Door leaf</td><td>General</td><td>&#39;Door
accessories are missing </td><td>Low</td><td>11/3/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:16:38 PM</td><td> </td><td>5/30/2022 8:57:28
AM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>19923</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Paint Stains</td><td>&#39;Handrail need to
finish</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/29/2021 11:25:25 AM</td><td> </td><td>5/30/2022 8:56:44
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>19922</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Paint Stains</td><td>&#39;Stainless steel bar not leveled
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:25:23 AM</td><td> </td><td>5/30/2022 8:56:14
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28846</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting around door frame should be
adjusted.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/15/2022 11:47:49 AM</td><td> </td><td>5/30/2022 8:55:26
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27319</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around door is missing </td><td>Low</td><td>3/28/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022 12:11:59 PM</td><td>
</td><td>5/30/2022 8:54:25
AM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28854</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling painting need to touch
up.</td><td>Low</td><td>6/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/16/2022
11:35:53 AM</td><td> </td><td>5/30/2022 8:53:41
AM</td><td>&nbsp;</td><td>MA.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>21489</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;The pre snagging will be after completion of the
work</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/18/2021 2:12:30 PM</td><td> </td><td>5/30/2022 8:53:03
AM</td><td>&nbsp;</td><td>MS.18.02.010</td><td>&nbsp;</td>
</tr><tr>
<td>21503</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/18/2021
2:12:58 PM</td><td> </td><td>5/30/2022 8:51:45
AM</td><td>&nbsp;</td><td>MS.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>21498</td><td>B.O.H-SERVICE TUNNEL - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls around metal frame need repair
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/18/2021
2:12:52 PM</td><td> </td><td>5/30/2022 8:51:00
AM</td><td>&nbsp;</td><td>MS.23.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19893</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing Sealant around metal door
frames</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>7/29/2021 11:24:38 AM</td><td> </td><td>5/30/2022 8:50:20
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>16569</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Around Access panels should be adjusted
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:37:05 AM</td><td> </td><td>5/30/2022 8:49:43
AM</td><td>&nbsp;</td><td>MW.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16567</td><td>TOILET</td><td>MU GF </td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Joint is not aligned </td><td>Low</td><td>3/8/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>2/15/2021 11:37:03 AM</td><td> </td><td>5/30/2022
8:48:49 AM</td><td>&nbsp;</td><td>MW.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16565</td><td>TOILET</td><td>MU GF
</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Ironmongrey/accessories and its operation</td><td>&#39;Loose
partition should be fixed properly </td><td>Low</td><td>3/8/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>2/15/2021 11:37:01 AM</td><td> </td><td>5/30/2022
8:48:11 AM</td><td>&nbsp;</td><td>MW.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>28829</td><td>ESCAPE ROUTE</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ceiling painting need to touch
up.</td><td>Low</td><td>6/5/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/15/2022
11:47:26 AM</td><td> </td><td>5/30/2022 8:46:35
AM</td><td>&nbsp;</td><td>MQ.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28700</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked grill should be leveled </td><td>Low</td><td>6/1/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022 10:39:03 AM</td><td>
</td><td>5/30/2022 8:45:45
AM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>22191</td><td>FEMALE WASH ROOM</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Saggaing</td><td>&#39;Opening should be closed
</td><td>Low</td><td>9/14/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/24/2021
11:47:15 AM</td><td> </td><td>5/30/2022 8:44:21
AM</td><td>&nbsp;</td><td>MS.13.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>22190</td><td>FEMALE WASH ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Marked part need to adjusted and
repaint</td><td>Low</td><td>9/14/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/24/2021 11:47:13 AM</td><td> </td><td>5/30/2022 8:43:10
AM</td><td>&nbsp;</td><td>MS.13.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>16545</td><td>MALE DISABLED W.C.</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Gypsum ceiling at cove light need painting
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:26 AM</td><td> </td><td>5/30/2022 8:42:17
AM</td><td>&nbsp;</td><td>MW.14.0G.004C</td><td>&nbsp;</td>
</tr><tr>
<td>14342</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up </td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/24/2020 1:23:51 PM</td><td> </td><td>5/30/2022
8:41:31 AM</td><td>&nbsp;</td><td>MS.23.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>16524</td><td>DISABLED FACILITY</td><td>MU GF
</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Visible repair</td><td>&#39;Marked partition need to fix properly
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:53 AM</td><td> </td><td>5/30/2022 8:40:45
AM</td><td>&nbsp;</td><td>MG.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16344</td><td>SCHOLAR RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Painting joints need adjustment
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:04:05 PM</td><td> </td><td>5/30/2022 8:40:02
AM</td><td>&nbsp;</td><td>MR.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>28128</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Roof
Tiles</td><td>Level difference</td><td>&#39;Loose tile should be fixed properly
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/16/2022
12:09:21 PM</td><td> </td><td>5/30/2022 8:38:53 AM</td><td>&nbsp;</td><td>Museum
Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>25342</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged water proofing should be
repaired.</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>11/22/2021 1:57:47 PM</td><td> </td><td>5/30/2022 8:37:54
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>21039</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Repair and touch up for painting
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:14:24 AM</td><td> </td><td>5/30/2022 8:36:55
AM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21037</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant </td><td>Low</td><td>9/5/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>8/15/2021 11:14:17 AM</td><td> </td><td>5/30/2022
8:35:55 AM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21035</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Edge should be straight and alignment
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:14:13 AM</td><td> </td><td>5/30/2022 8:35:18
AM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>21010</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Scratches</td><td>&#39;Inner angle should be finished
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:13:04 AM</td><td> </td><td>5/30/2022 8:34:36
AM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>20995</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Edge should be straight
</td><td>Low</td><td>9/5/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/15/2021
11:12:08 AM</td><td> </td><td>5/30/2022 8:33:55
AM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>13744</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Scratches</td><td>&#39;All welding need touch up - not aligned
</td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:38:46 AM</td><td> </td><td>5/30/2022 8:32:59
AM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28124</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
waterproofing</td><td>damaged</td><td>&#39;Damaged sika fill 100 need to touch up
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/16/2022
12:09:14 PM</td><td> </td><td>5/30/2022 8:32:14 AM</td><td>&nbsp;</td><td>Museum
Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>29280</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing insulation for air ducts.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:07:21 PM</td><td> </td><td>5/29/2022 10:21:33
PM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>29290</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Rusty chilled water pipes shall be repaired
and painted before repairing the insulation. </td><td>High</td><td>5/30/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/23/2022 4:32:12 PM</td><td>
</td><td>5/29/2022 10:19:27
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29714</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Bad workmanship for
pipes connections. </td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:47 PM</td><td> </td><td>5/29/2022 10:15:25
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29724</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Labels for PPR pipe.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:21:06 PM</td><td> </td><td>5/29/2022 10:12:23
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29725</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Labels for chilled water pipes.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:21:09 PM</td><td> </td><td>5/29/2022 10:11:22
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29226</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:08 PM</td><td> </td><td>5/29/2022 10:10:33
PM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>29707</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;INERGEN hoses not connected.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:30 PM</td><td> </td><td>5/29/2022 10:09:19
PM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29296</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;INERGEN system not connected to its
cylinders. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:25 PM</td><td> </td><td>5/29/2022 10:08:31
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29987</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Cleaning for air grills. </td><td>High</td><td>6/2/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/26/2022 3:43:13 PM</td><td>
</td><td>5/29/2022 9:56:50
PM</td><td>&nbsp;</td><td>MS.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29989</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Cleaning and touch up paintings for
INERGEN pipes. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:17 PM</td><td> </td><td>5/29/2022 9:50:21
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29990</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Cleaning for INERGEN cylinders.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:18 PM</td><td> </td><td>5/29/2022 9:49:42
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29992</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Termination box cover
is missing. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:22 PM</td><td> </td><td>5/29/2022 9:49:16
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29993</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Chilled
water Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Thermal
insulation shall cover all drain valve. </td><td>High</td><td>6/2/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/26/2022 3:43:23 PM</td><td>
</td><td>5/29/2022 9:48:21
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29996</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Cylinders hoses
connections not done. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:28 PM</td><td> </td><td>5/29/2022 9:46:07
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29998</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing labels for cold
and hot water pipes. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:33 PM</td><td> </td><td>5/29/2022 9:44:08
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30000</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Cleaning for HDPE pipes.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:36 PM</td><td> </td><td>5/29/2022 9:43:13
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30001</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;EWH cold water
connection is missing. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:37 PM</td><td> </td><td>5/29/2022 9:41:40
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30002</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39; Issuing handles for
water valves. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:39 PM</td><td> </td><td>5/29/2022 9:40:39
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30006</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing labels for
chilled water pipes. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:46 PM</td><td> </td><td>5/29/2022 9:35:50
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30009</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;PPR pipe need cleaning.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:52 PM</td><td> </td><td>5/29/2022 9:23:20
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>30011</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for PPR pipe.
</td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:55 PM</td><td> </td><td>5/29/2022 9:22:18
PM</td><td>&nbsp;</td><td>MW.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29878</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for air duct.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:42 PM</td><td> </td><td>5/29/2022 9:21:07
PM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>15261</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;There are rust pulley &amp; support should
to clean</td><td>High</td><td>1/31/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>1/24/2021 11:49:39 AM</td><td> </td><td>5/29/2022 9:19:48
PM</td><td>&nbsp;</td><td>MS.20.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>29054</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Sound attenuator supports.
</td><td>High</td><td>5/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/18/2022 11:55:58 AM</td><td> </td><td>5/29/2022 5:03:00
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29216</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage insulation. </td><td>High</td><td>5/29/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:59:50 AM</td><td>
</td><td>5/29/2022 5:02:59
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29986</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Touchup painting and cleaning for
INERGEN pipes. </td><td>High</td><td>6/2/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/26/2022 3:43:11 PM</td><td> </td><td>5/29/2022 4:31:36
PM</td><td>&nbsp;</td><td>MS.13.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29875</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Seismic wire need to be tightened.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:37 PM</td><td> </td><td>5/29/2022 4:30:31
PM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>29874</td><td>CORE D3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Fire pipes need cleaning and touchup
paintings. </td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:29:36 PM</td><td> </td><td>5/29/2022 4:29:55
PM</td><td>&nbsp;</td><td>MC.13.2A.D31</td><td>&nbsp;</td>
</tr><tr>
<td>29728</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing hinge.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:21:16 PM</td><td> </td><td>5/29/2022 4:28:33
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29294</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage insulation for drain pan.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:22 PM</td><td> </td><td>5/29/2022 4:23:43
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29691</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Pipes need cleaning and
painting inside the shaft.</td><td>High</td><td>6/1/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/25/2022 12:19:56 PM</td><td>
</td><td>5/29/2022 4:22:05
PM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>19987</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire fighting
</td><td>High</td><td>8/5/2021 12:00:00 PM</td><td>ahmedsalem</td><td>7/29/2021
1:05:16 PM</td><td> </td><td>5/29/2022 3:07:41
PM</td><td>&nbsp;</td><td>MS.18.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>28917</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Air duct insulation need repairs.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:30:43 PM</td><td> </td><td>5/29/2022 3:07:40
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28921</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing thermal
insulation for this part of air duct. </td><td>High</td><td>5/24/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:30:53 PM</td><td>
</td><td>5/29/2022 3:07:39
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29194</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage insulation. </td><td>High</td><td>5/29/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:59:14 AM</td><td>
</td><td>5/29/2022 3:07:38
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29200</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Remove lighting fixture.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:25 AM</td><td> </td><td>5/29/2022 3:07:37
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29287</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Rusted pipes and fitting shall be repaired
and close this issue before applying the insulation.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:12:41 PM</td><td> </td><td>5/29/2022 3:07:37
PM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>29890</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Dismantled support.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 4:30:00 PM</td><td> </td><td>5/29/2022 3:07:35
PM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>29895</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Rusty drain pipe. </td><td>High</td><td>6/1/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/25/2022 4:30:12 PM</td><td>
</td><td>5/29/2022 3:07:34
PM</td><td>&nbsp;</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>12499</td><td>DS.02.0G.26</td><td>MFPC
GF</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing cable and box label, missing fire
device cover, missing panels schedules </td><td>High</td><td>10/29/2020 12:00:00
PM</td><td>Ahmed.Galal</td><td>10/22/2020 12:05:52 PM</td><td> </td><td>5/29/2022
1:56:56 PM</td><td>&nbsp;</td><td>DS.02.0G.26</td><td>&nbsp;</td>
</tr><tr>
<td>24375</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>General Snag</td><td>&#39;Defective cables and should be replaced
or make megger test and cover the trunk</td><td>High</td><td>11/3/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>10/27/2021 11:52:59 AM</td><td>
</td><td>5/29/2022 1:56:54 PM</td><td>&nbsp;</td><td>Museum Roof Band
B</td><td>&nbsp;</td>
</tr><tr>
<td>24376</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>DB</td><td>General Snag</td><td>&#39;Panel
scheduled not existing inside the panels and missing labels
</td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>10/27/2021 11:53:00 AM</td><td> </td><td>5/29/2022 1:56:53
PM</td><td>&nbsp;</td><td>Museum Roof Band B</td><td>&nbsp;</td>
</tr><tr>
<td>26139</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Power
Sockets</td><td>General Snag</td><td>&#39;Missing accessories (
faceplate)</td><td>High</td><td>2/17/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>2/10/2022 11:45:03 AM</td><td> </td><td>5/29/2022 1:56:53
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26143</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>LIGHT
FITTINGS(INTERNAL/ EXTERNAL/ EMERGENCY)</td><td>General Snag</td><td>&#39;Light
fixture is not installed properly </td><td>High</td><td>2/17/2022 12:00:00
AM</td><td>Mohamed Samir</td><td>2/10/2022 11:45:14 AM</td><td> </td><td>5/29/2022
1:56:52 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26144</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>LIGHT
FITTINGS(INTERNAL/ EXTERNAL/ EMERGENCY)</td><td>General
Snag</td><td>&#39;Incomplete work the lighting fixtures not installed yet and there
are damage in outer sheath of cables and should be retested
</td><td>High</td><td>2/17/2022 12:00:00 AM</td><td>Mohamed Samir</td><td>2/10/2022
11:45:18 AM</td><td> </td><td>5/29/2022 1:56:51
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26145</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>2/17/2022 12:00:00 AM</td><td>Mohamed Samir</td><td>2/10/2022
11:45:20 AM</td><td> </td><td>5/29/2022 1:56:50
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14333</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up</td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/24/2020 1:23:29 PM</td><td> </td><td>5/29/2022
12:21:04 PM</td><td>&nbsp;</td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>14348</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing Sealant around Mep fixtures
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:04 PM</td><td> </td><td>5/29/2022 12:19:12
PM</td><td>&nbsp;</td><td>MS.18.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>14347</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch rp</td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/24/2020 1:24:02 PM</td><td> </td><td>5/29/2022
12:18:45 PM</td><td>&nbsp;</td><td>MS.18.02.013</td><td>&nbsp;</td>
</tr><tr>
<td>14338</td><td>B.O.H-SERVICE &amp; PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing Sealant around Mep fixtures
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:23:42 PM</td><td> </td><td>5/29/2022 11:34:43
AM</td><td>&nbsp;</td><td>MS.23.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>14369</td><td>B.O.H-PLANT - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing Sealant around Mep fixtures
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:24:54 PM</td><td> </td><td>5/29/2022 11:33:16
AM</td><td>&nbsp;</td><td>MS.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28436</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing support for motorized damper.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:05:11 PM</td><td> </td><td>5/29/2022 11:28:17
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28458</td><td>CORE E1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Motorized damper need to be supported.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:10 PM</td><td> </td><td>5/29/2022 11:28:16
AM</td><td>&nbsp;</td><td>MC.24.2A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>28525</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Chilled water piping
and hock up thermal insulation need repairs and have some missing parts.
</td><td>High</td><td>5/16/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:18 AM</td><td> </td><td>5/29/2022 11:28:14
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28654</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to specification/drawing</td><td>&#39;Missing
elbow for condensate pipes drain. </td><td>High</td><td>5/17/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:37:11 PM</td><td>
</td><td>5/29/2022 11:28:13
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28655</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Pipes insulation shall be repaired.
</td><td>High</td><td>5/17/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:37:12 PM</td><td> </td><td>5/29/2022 11:28:12
AM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28657</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing thermal insulation. </td><td>High</td><td>5/17/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:37:15 PM</td><td>
</td><td>5/29/2022 11:28:11
AM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28676</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Chilled water pipe
insulation need repairs. </td><td>High</td><td>5/17/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:41:44 PM</td><td>
</td><td>5/29/2022 11:28:07
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28686</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing labels. </td><td>High</td><td>5/17/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:47:31 PM</td><td>
</td><td>5/29/2022 11:28:06
AM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28708</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;AHU shall be cleaned from inside.
</td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:34 AM</td><td> </td><td>5/29/2022 11:28:04
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28720</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Flexible duct connectors shall be readjusted and the solid
connection points shall be removed. </td><td>High</td><td>5/18/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/11/2022 11:45:57 AM</td><td>
</td><td>5/29/2022 11:28:03
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28769</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing labels for hydronic pipes.
</td><td>High</td><td>5/19/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/12/2022 11:46:58 AM</td><td> </td><td>5/29/2022 11:28:02
AM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>28773</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation for pipes. </td><td>High</td><td>5/19/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/12/2022 1:13:30 PM</td><td> </td><td>5/29/2022 11:28:01
AM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>28994</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage insulation for chilled water pipes.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:09:28 PM</td><td> </td><td>5/29/2022 11:28:00
AM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>29016</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Labels for air ducts
are missing. </td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:31 PM</td><td> </td><td>5/29/2022 11:27:58
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29080</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air ducts.
</td><td>High</td><td>5/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:32 AM</td><td> </td><td>5/29/2022 11:27:54
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29124</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Seismic restrain wire shall be tightened.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:16 AM</td><td> </td><td>5/29/2022 11:27:53
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29132</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing air duct insulation.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:36 AM</td><td> </td><td>5/29/2022 11:27:51
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29163</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning from inside.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:39 AM</td><td> </td><td>5/29/2022 11:27:50
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29196</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Rusty support.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:17 AM</td><td> </td><td>5/29/2022 11:27:46
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29228</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing labels for all trades.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:12 PM</td><td> </td><td>5/29/2022 11:27:45
AM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>29232</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Labels for all air ducts.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:23 PM</td><td> </td><td>5/29/2022 11:27:43
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29246</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for air ducts.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:59 PM</td><td> </td><td>5/29/2022 11:27:42
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29252</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Humidification unit need to be cleaned.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:10 PM</td><td> </td><td>5/29/2022 11:27:38
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29269</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning from inside.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:47 PM</td><td> </td><td>5/29/2022 11:27:38
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29275</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing thermal
insulation for chilled water pipes. </td><td>High</td><td>5/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/23/2022 12:07:02 PM</td><td>
</td><td>5/29/2022 11:27:37
AM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>29276</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage duct thermal insulation.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:07:04 PM</td><td> </td><td>5/29/2022 11:27:36
AM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>29277</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing and damage thermal insulation for
chilled water pipes. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:07:08 PM</td><td> </td><td>5/29/2022 11:27:35
AM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>29278</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing labels for all trades.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:07:12 PM</td><td> </td><td>5/29/2022 11:27:34
AM</td><td>&nbsp;</td><td>MS.19.2A.009</td><td>&nbsp;</td>
</tr><tr>
<td>29307</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Drain pan insulation damaged.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:46 PM</td><td> </td><td>5/29/2022 11:27:32
AM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>29697</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage thermal
insulation for chilled water pipes. </td><td>High</td><td>6/1/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/25/2022 12:20:08 PM</td><td>
</td><td>5/29/2022 11:27:31
AM</td><td>&nbsp;</td><td>MS.14.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29718</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Pipes connection not done.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:53 PM</td><td> </td><td>5/29/2022 11:27:29
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29719</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Thermal insulation for air duct.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:57 PM</td><td> </td><td>5/29/2022 11:27:28
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>12298</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring
- stone</td><td>General</td><td>&#39;Missing stone tiles should be installed
</td><td>Low</td><td>11/2/2020 12:00:00 PM</td><td>Mohamed Samir</td><td>10/12/2020
3:10:30 PM</td><td> </td><td>5/29/2022 11:23:33
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22453</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor stone cutting should be adjusted
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:13:56 PM</td><td> </td><td>5/29/2022 11:23:32 AM</td><td>&nbsp;</td><td>Part
2</td><td>&nbsp;</td>
</tr><tr>
<td>22464</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stains should be removed
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:14:15 PM</td><td> </td><td>5/29/2022 11:23:31 AM</td><td>&nbsp;</td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>22507</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Edges cutting should be aligned and
adjusted </td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>8/30/2021 11:04:12 AM</td><td> </td><td>5/29/2022 11:23:30
AM</td><td>&nbsp;</td><td>Part 6</td><td>&nbsp;</td>
</tr><tr>
<td>22520</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Cutting edges should be adjusted and
aligned </td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>8/30/2021 11:04:23 AM</td><td> </td><td>5/29/2022 11:23:29
AM</td><td>&nbsp;</td><td>Part 6</td><td>&nbsp;</td>
</tr><tr>
<td>22537</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Metal trim should be aligned and fixed properly
</td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/30/2021
11:04:39 AM</td><td> </td><td>5/29/2022 11:23:28 AM</td><td>&nbsp;</td><td>Part
6</td><td>&nbsp;</td>
</tr><tr>
<td>22669</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor cutting edge should be repaired
</td><td>Low</td><td>9/26/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/5/2021
10:19:34 AM</td><td> </td><td>5/29/2022 11:23:27 AM</td><td>&nbsp;</td><td>Part
4</td><td>&nbsp;</td>
</tr><tr>
<td>22867</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>grouting quality</td><td>&#39;Bad grouting should be repaired
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/13/2021
11:21:50 AM</td><td> </td><td>5/29/2022 11:23:26 AM</td><td>&nbsp;</td><td>Part
9</td><td>&nbsp;</td>
</tr><tr>
<td>22922</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39; Broken tiles should be repaired
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:56 PM</td><td> </td><td>5/29/2022 11:23:24 AM</td><td>&nbsp;</td><td>Part
2</td><td>&nbsp;</td>
</tr><tr>
<td>23108</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
cutting for stone edges</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:49:58 AM</td><td> </td><td>5/29/2022 11:23:23
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23232</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Metal trim should be aligned and fixed properly
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:53:17 AM</td><td> </td><td>5/29/2022 11:23:21
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23283</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be
repaired</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 12:06:43 PM</td><td> </td><td>5/29/2022 11:23:20
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23719</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Metal trim should be aligned and fixed properly
</td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/11/2021
10:29:36 AM</td><td> </td><td>5/29/2022 11:23:18
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23731</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor cutting for stone edge should be
aligned </td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/11/2021 10:38:00 AM</td><td> </td><td>5/29/2022 11:23:17
AM</td><td>&nbsp;</td><td>Part 11</td><td>&nbsp;</td>
</tr><tr>
<td>24755</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Surface preparation for concrete
bases</td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/7/2021 11:30:26 AM</td><td> </td><td>5/29/2022 11:23:15
AM</td><td>&nbsp;</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>24759</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Joints between interlock should be filled by sand
</td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Amr Nofal</td><td>11/7/2021
11:30:35 AM</td><td> </td><td>5/29/2022 11:23:14
AM</td><td>&nbsp;</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>24760</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Surface of Kerpstone should be cleaned
</td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Amr Nofal</td><td>11/7/2021
11:30:41 AM</td><td> </td><td>5/29/2022 11:23:13
AM</td><td>&nbsp;</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>25100</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Kerb stone surface should be
cleaned</td><td>Low</td><td>12/5/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/14/2021 10:29:49 AM</td><td> </td><td>5/29/2022 11:23:11
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25101</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged kerb stone should be repaired /
replaced</td><td>Low</td><td>12/5/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/14/2021 10:29:54 AM</td><td> </td><td>5/29/2022 11:23:11
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25122</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Cleaning for interface between keystone and
interlock</td><td>Low</td><td>12/5/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/14/2021 10:30:53 AM</td><td> </td><td>5/29/2022 11:23:09
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26191</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Salted stone should be treated </td><td>Low</td><td>3/10/2022
12:00:00 PM</td><td>Amr Nofal</td><td>2/17/2022 12:12:01 PM</td><td>
</td><td>5/29/2022 11:23:07 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26217</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/21/2022
11:38:27 AM</td><td> </td><td>5/29/2022 11:23:07
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26268</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>3/14/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022 3:25:31 PM</td><td>
</td><td>5/29/2022 11:23:06 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26332</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022
3:28:49 PM</td><td> </td><td>5/29/2022 11:23:05
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26339</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Different textures should be
replaced.</td><td>Low</td><td>3/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/22/2022 3:29:02 PM</td><td> </td><td>5/29/2022
11:23:03 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26349</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Improper cut around slot drain
</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022
3:29:13 PM</td><td> </td><td>5/29/2022 11:23:03
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26396</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Improper cut and different textures for stone of
slot drain </td><td>Low</td><td>3/16/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/23/2022 11:22:13 AM</td><td> </td><td>5/29/2022
11:23:02 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26402</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39; Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
2:49:01 PM</td><td> </td><td>5/29/2022 11:23:00
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26410</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
2:49:46 PM</td><td> </td><td>5/29/2022 11:23:00
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26535</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Scratches should be repaired </td><td>Low</td><td>3/17/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022 2:22:52 PM</td><td>
</td><td>5/29/2022 11:22:59 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26537</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Pitted tiles should be treated </td><td>Low</td><td>3/17/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022 2:22:54 PM</td><td>
</td><td>5/29/2022 11:22:57 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26590</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Grouting between stone flooring and cladding
</td><td>Low</td><td>3/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/27/2022
3:12:03 PM</td><td> </td><td>5/29/2022 11:22:57
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26621</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
11:12:45 AM</td><td> </td><td>5/29/2022 11:22:56
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26715</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 3:05:11 PM</td><td>
</td><td>5/29/2022 11:22:54 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26784</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Area not
cleaned/finished.</td><td>&#39;Manhole cover needs cleaning and touch up painting
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>ahmedsalem</td><td>3/1/2022
4:12:37 PM</td><td> </td><td>5/29/2022 11:22:54
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27182</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
3:01:21 PM</td><td> </td><td>5/29/2022 11:22:52
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27215</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken edges should be repaired </td><td>Low</td><td>3/27/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:39:39 PM</td><td>
</td><td>5/29/2022 11:22:51 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27235</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing grouting </td><td>Low</td><td>3/27/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:50:57 PM</td><td>
</td><td>5/29/2022 11:22:50 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27236</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022
4:50:59 PM</td><td> </td><td>5/29/2022 11:22:49
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27237</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022
4:51:02 PM</td><td> </td><td>5/29/2022 11:22:48
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27246</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall - stone cladding</td><td>Damages to be
rectified or replaced</td><td>&#39;Broken edges should be replaced
</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022
4:51:24 PM</td><td> </td><td>5/29/2022 11:22:47
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>24069</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Stone cover should be flushed with stone flooring
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:39:54 PM</td><td> </td><td>5/29/2022 11:15:41
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24421</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked stone tiles should be
replaced</td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>mohamed.sami</td><td>10/27/2021 4:43:47 PM</td><td> </td><td>5/29/2022
11:15:40 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24634</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken/ cracked tiles should be
replaced</td><td>Low</td><td>11/21/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/31/2021 4:29:53 PM</td><td> </td><td>5/29/2022 11:15:39
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24637</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken/ cracked tiles should be
replaced</td><td>Low</td><td>11/21/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/31/2021 4:29:59 PM</td><td> </td><td>5/29/2022 11:15:38
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24692</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be replaced
</td><td>Low</td><td>11/22/2021 12:00:00 PM</td><td>mohamed.sami</td><td>11/1/2021
4:34:54 PM</td><td> </td><td>5/29/2022 11:15:37
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24694</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be replaced
</td><td>Low</td><td>11/8/2021 12:00:00 PM</td><td>mohamed.sami</td><td>11/1/2021
4:34:59 PM</td><td> </td><td>5/29/2022 11:15:36
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24704</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be replaced
</td><td>Low</td><td>11/24/2021 12:00:00 PM</td><td>mohamed.sami</td><td>11/3/2021
3:38:21 PM</td><td> </td><td>5/29/2022 11:15:31
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24705</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be replaced
</td><td>Low</td><td>11/24/2021 12:00:00 PM</td><td>mohamed.sami</td><td>11/3/2021
3:38:23 PM</td><td> </td><td>5/29/2022 11:15:30
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24706</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be
replaced</td><td>Low</td><td>11/24/2021 12:00:00
PM</td><td>mohamed.sami</td><td>11/3/2021 3:38:25 PM</td><td> </td><td>5/29/2022
11:15:29 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24708</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be replaced
</td><td>Low</td><td>11/24/2021 12:00:00 PM</td><td>mohamed.sami</td><td>11/3/2021
3:38:30 PM</td><td> </td><td>5/29/2022 11:15:24
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24709</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be replaced
</td><td>Low</td><td>11/10/2021 12:00:00 PM</td><td>mohamed.sami</td><td>11/3/2021
3:38:32 PM</td><td> </td><td>5/29/2022 11:15:23
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>11006</td><td>FEMALE WASH ROOM</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Gypsum ceiling need repair/ painting need
to touch up </td><td>Low</td><td>10/6/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/15/2020 3:58:42 PM</td><td> </td><td>5/28/2022 4:12:43
PM</td><td>&nbsp;</td><td>MS.13.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>13355</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Floor need touch up /cleaning
</td><td>Low</td><td>11/26/2020 12:00:00 AM</td><td>sally.george</td><td>11/5/2020
12:13:26 PM</td><td> </td><td>5/28/2022 3:32:30 PM</td><td>Done
</td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>29309</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;FF pipe support need to be adjusted.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:49 PM</td><td> </td><td>5/26/2022 5:19:09
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29302</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing handles for drain valves.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:35 PM</td><td> </td><td>5/26/2022 5:17:26
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29301</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Seismic restrains is missing.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:33 PM</td><td> </td><td>5/26/2022 5:16:19
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29291</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damaged thermal insulation for chilled
water pipes. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:14 PM</td><td> </td><td>5/26/2022 5:14:42
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29289</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Rusty drain pipe
shall be repaired and painted. </td><td>High</td><td>5/30/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/23/2022 4:32:07 PM</td><td>
</td><td>5/26/2022 5:12:24
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29286</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Rusty and dirty drain pipe and it’s
supports. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:07:32 PM</td><td> </td><td>5/26/2022 5:11:19
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29267</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning from outside and upper side.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:44 PM</td><td> </td><td>5/26/2022 5:07:14
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29259</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing duct AD.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:23 PM</td><td> </td><td>5/26/2022 5:05:29
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29251</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Humidification unit need to be cleaned.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:09 PM</td><td> </td><td>5/26/2022 5:02:58
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29239</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Internal cleaning required.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:36 PM</td><td> </td><td>5/26/2022 5:01:25
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29238</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning required.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:35 PM</td><td> </td><td>5/26/2022 4:58:57
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29152</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing insulation straps.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:18 AM</td><td> </td><td>5/26/2022 4:56:36
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29141</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning from outside.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:56 AM</td><td> </td><td>5/26/2022 4:55:30
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29028</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to specification/drawing</td><td>&#39;Cleaning
from inside. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:01 PM</td><td> </td><td>5/26/2022 4:54:59
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29015</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing support.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:24 PM</td><td> </td><td>5/26/2022 4:53:54
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29014</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dismantled support for air duct.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:21 PM</td><td> </td><td>5/26/2022 4:52:20
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29001</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;FCU duct insulation damaged. </td><td>High</td><td>5/24/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:09:42 PM</td><td>
</td><td>5/26/2022 4:45:28
PM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>29000</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation for chilled water pipes need repairs.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:09:39 PM</td><td> </td><td>5/26/2022 4:43:19
PM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>28999</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Hose connection need adjustment.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:09:38 PM</td><td> </td><td>5/26/2022 4:41:37
PM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>28998</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>5/24/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:09:36 PM</td><td>
</td><td>5/26/2022 4:39:59
PM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>28995</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct thermal insulation need repairs.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:09:30 PM</td><td> </td><td>5/26/2022 4:27:00
PM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>28929</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;FCU duct thermal installation need repairs.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:09 PM</td><td> </td><td>5/26/2022 4:21:12
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29722</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Label for HDPE pipe is missing.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:21:02 PM</td><td> </td><td>5/26/2022 4:00:58
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>

<td>26193</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/10/2022 12:00:00 AM</td><td>Amr Nofal</td><td>2/17/2022
12:15:37 PM</td><td> </td><td>5/26/2022 2:44:24
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26197</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Poor cutting for stone manhole cover
</td><td>Low</td><td>3/10/2022 12:00:00 AM</td><td>Amr Nofal</td><td>2/17/2022
12:15:44 PM</td><td> </td><td>5/26/2022 2:44:23
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26199</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39; Broken tiles should be replaced
</td><td>Low</td><td>3/10/2022 12:00:00 AM</td><td>Amr Nofal</td><td>2/17/2022
12:15:49 PM</td><td> </td><td>5/26/2022 2:44:22
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26202</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Cracked tiles should be treated
</td><td>Low</td><td>3/10/2022 12:00:00 AM</td><td>Amr Nofal</td><td>2/17/2022
12:15:54 PM</td><td> </td><td>5/26/2022 2:44:20
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26226</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles should be adjusted
</td><td>Low</td><td>3/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/21/2022
11:46:43 AM</td><td> </td><td>5/26/2022 2:44:09
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26248</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:25:07 PM</td><td> </td><td>5/26/2022 2:44:07
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26380</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
11:21:39 AM</td><td> </td><td>5/26/2022 2:44:06
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26395</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced/ repaired
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
11:22:10 AM</td><td> </td><td>5/26/2022 2:44:04
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26663</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken edges should be repaired </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 10:31:52 AM</td><td>
</td><td>5/26/2022 2:44:03 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27016</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Improper grouting around manhole cover and
column </td><td>Low</td><td>3/23/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/2/2022 4:15:21 PM</td><td> </td><td>5/26/2022
2:44:02 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27017</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:15:24 PM</td><td> </td><td>5/26/2022 2:44:01
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27021</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing sealant for joints
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:15:33 PM</td><td> </td><td>5/26/2022 2:43:59
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27211</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Broken edges should be repaired </td><td>Low</td><td>3/27/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:39:31 PM</td><td>
</td><td>5/26/2022 2:43:58 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>17867</td><td>HEAVY ARTEFACTS TUNNEL</td><td>PR
GF</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Security</
td><td>General Snag</td><td>&#39;Access Control field devices installation has not
been done. and Heavy Artifact road magnalock magnetic contact installation is still
pending.</td><td>High</td><td>5/27/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>5/20/2021 9:25:14 AM</td><td> </td><td>5/26/2022 2:27:24
PM</td><td>&nbsp;</td><td>SP.00.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>24381</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Earthing
System</td><td>General Snag</td><td>&#39;Missing
work</td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>10/27/2021 11:53:07 AM</td><td> </td><td>5/26/2022 2:27:23
PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>24384</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>General Snag</td><td>&#39;Cover of trunk should be replaced and
cleaning the trunk </td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh
Ibrahim El-Sawah</td><td>10/27/2021 11:53:12 AM</td><td> </td><td>5/26/2022 2:27:21
PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>24385</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>10/27/2021 11:53:13 AM</td><td> </td><td>5/26/2022 2:27:20
PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>24387</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>11/3/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>10/27/2021 11:53:16 AM</td><td>
</td><td>5/26/2022 2:27:18 PM</td><td>&nbsp;</td><td>Museum Roof Band
A</td><td>&nbsp;</td>
</tr><tr>
<td>24388</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>LIGHT
FITTINGS(INTERNAL/ EXTERNAL/ EMERGENCY)</td><td>General
Snag</td><td>&#39;Incomplete work </td><td>High</td><td>11/3/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>10/27/2021 11:53:17 AM</td><td>
</td><td>5/26/2022 2:27:17 PM</td><td>&nbsp;</td><td>Museum Roof Band
A</td><td>&nbsp;</td>
</tr><tr>
<td>24389</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Defective devices and there is no
protection </td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>10/27/2021 11:53:19 AM</td><td> </td><td>5/26/2022 2:27:16
PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>24391</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>General Snag</td><td>&#39;Missing labels
</td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>10/27/2021 11:53:21 AM</td><td> </td><td>5/26/2022 2:27:14
PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>24395</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing roof cameras raceway and device
</td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>10/27/2021 11:53:26 AM</td><td> </td><td>5/26/2022 2:27:13
PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25386</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Earthing
System</td><td>General Snag</td><td>&#39;Missing earth jumper
</td><td>High</td><td>12/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>11/24/2021 11:16:30 AM</td><td> </td><td>5/26/2022 2:27:12
PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25387</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing work and the horn should be secured
</td><td>High</td><td>12/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>11/24/2021 11:16:32 AM</td><td> </td><td>5/26/2022 2:27:10
PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25388</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;All lighting fixtures should be secured
</td><td>High</td><td>12/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>11/24/2021 11:16:34 AM</td><td> </td><td>5/26/2022 2:27:09
PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>26170</td><td>B.O.H. - MAIN IT ROOM - Band D</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Microsoft website Testing reports for integration and performance
for both front-end and back-end</td><td>High</td><td>2/23/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>2/16/2022 12:48:03 PM</td><td>
</td><td>5/26/2022 2:27:07
PM</td><td>&nbsp;</td><td>MS.19.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28757</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Wooden plate should be removed </td><td>Low</td><td>6/1/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022 11:48:17 AM</td><td>
</td><td>5/26/2022 1:48:25
PM</td><td>&nbsp;</td><td>MS.19.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>13757</td><td>MACHINE ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Touch up for repair </td><td>Low</td><td>12/22/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/1/2020 11:39:25 AM</td><td> </td><td>5/26/2022
1:44:12 PM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>20182</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Damages</td><td>&#39;Damaged tiles
</td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/3/2021
3:38:26 PM</td><td> </td><td>5/26/2022 1:39:19
PM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>28858</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Painting sealer around electrical
box.</td><td>Low</td><td>6/6/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/16/2022 11:36:05 AM</td><td> </td><td>5/26/2022 1:38:50
PM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28928</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Chilled water thermal
insulation need repairs. </td><td>High</td><td>5/24/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:31:07 PM</td><td>
</td><td>5/26/2022 1:22:06
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28916</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Chilled water pipes insulation need
repairs. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:30:42 PM</td><td> </td><td>5/26/2022 1:21:17
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28881</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing handles for
drain valves. </td><td>High</td><td>5/23/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:07:28 PM</td><td> </td><td>5/26/2022 1:20:31
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28873</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;General cleaning from inside.
</td><td>High</td><td>5/23/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:07:13 PM</td><td> </td><td>5/26/2022 1:19:56
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28864</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;General cleaning from inside.
</td><td>High</td><td>5/23/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:06:58 PM</td><td> </td><td>5/26/2022 1:18:45
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28862</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;General cleaning from outside. </td><td>High</td><td>5/23/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/16/2022 4:06:54 PM</td><td>
</td><td>5/26/2022 1:17:38
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28768</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cable tray supported by pipes seismic support.
</td><td>High</td><td>5/19/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/12/2022 11:46:38 AM</td><td> </td><td>5/26/2022 1:16:57
PM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>20009</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;The PPR pipe need
collars</td><td>High</td><td>8/5/2021 12:00:00
AM</td><td>ahmedsalem</td><td>7/29/2021 2:59:32 PM</td><td> </td><td>5/26/2022
1:15:45 PM</td><td>&nbsp;</td><td>MS.18.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>29303</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Thermal insulation for chilled water pipes
need repair. </td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:37 PM</td><td> </td><td>5/26/2022 1:13:41
PM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>29225</td><td>ESCAPE ROUTE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing seismic restrains for FF pipes.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:05:07 PM</td><td> </td><td>5/26/2022 1:12:35
PM</td><td>&nbsp;</td><td>MQ.19.2A.001
</td><td>&nbsp;</td>
</tr><tr>
<td>28661</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;AHU from inside shall be cleaned.
</td><td>High</td><td>5/17/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:40:04 PM</td><td> </td><td>5/26/2022 1:11:23
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28468</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain hose for the humidifier not connected from both sides.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:29 PM</td><td> </td><td>5/26/2022 1:09:42
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28460</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;General cleaning from inside and outside.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:13 PM</td><td> </td><td>5/26/2022 1:07:10
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>29133</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage insulation for chilled water pipes.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:37 AM</td><td> </td><td>5/26/2022 1:03:13
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29699</td><td>IT 7</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Air grills need to be cleaned. </td><td>High</td><td>6/1/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/25/2022 12:20:13 PM</td><td>
</td><td>5/26/2022 1:02:14
PM</td><td>&nbsp;</td><td>MS.14.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>29891</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Painting for black steel sheet. </td><td>High</td><td>6/1/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/25/2022 4:30:02 PM</td><td>
</td><td>5/26/2022 12:47:17
PM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>
<td>29730</td><td>CORE F3</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dismantled screws.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:21:22 PM</td><td> </td><td>5/26/2022 12:42:41
PM</td><td>&nbsp;</td><td>MC.14.2A.F31</td><td>&nbsp;</td>
</tr><tr>
<td>29713</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing pipe support.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:45 PM</td><td> </td><td>5/26/2022 12:35:22
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29726</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Labels for air ducts missing.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:21:11 PM</td><td> </td><td>5/26/2022 12:28:07
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29693</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage elastomeric insulation.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:19:59 PM</td><td> </td><td>5/26/2022 12:18:09
PM</td><td>&nbsp;</td><td>MS.14.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29274</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Wrong installation for return air grill.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 12:06:59 PM</td><td> </td><td>5/26/2022 12:14:14
PM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>29720</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Drain pan insulation damaged.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:58 PM</td><td> </td><td>5/26/2022 12:06:22
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29712</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Cleaning and painting for fire pipes.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:43 PM</td><td> </td><td>5/26/2022 12:05:05
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29708</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Dismantled pipe
support. </td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:32 PM</td><td> </td><td>5/26/2022 12:04:22
PM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>16269</td><td>VIP RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Painting edges need adjustment
</td><td>Low</td><td>2/21/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:01:04 PM</td><td> </td><td>5/26/2022 12:03:41 PM</td><td>Done
</td><td>MV.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16280</td><td>FIRE CONTROL ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Signage level should be
review</td><td>Low</td><td>3/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>2/14/2021 2:02:01 PM</td><td> </td><td>5/26/2022 12:03:40
PM</td><td>Done </td><td>MB.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16334</td><td>SCHOLAR RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need touch
up</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:03:45 PM</td><td> </td><td>5/26/2022 12:03:35 PM</td><td>Done
</td><td>MR.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>29704</td><td>VOID</td><td>MU L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Dismantled support for fire pipe.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:23 PM</td><td> </td><td>5/26/2022 12:03:33
PM</td><td>&nbsp;</td><td>MS.14.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>16342</td><td>SCHOLAR RECEPTION</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Opening around window needs adjustment
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:03:58 PM</td><td> </td><td>5/26/2022 12:03:31 PM</td><td>Done
</td><td>MR.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16509</td><td>ESCAPE TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant around metal door needs adjustment
</td><td>Low</td><td>2/22/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:25 AM</td><td> </td><td>5/26/2022 12:03:28 PM</td><td>Done
</td><td>MQ.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16531</td><td>DISABLED FACILITY</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Access panels</td><td>&#39;Access door should be adjusted properly
</td><td>Low</td><td>3/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>2/15/2021
11:36:02 AM</td><td> </td><td>5/26/2022 12:03:27 PM</td><td>Done
</td><td>MG.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>21702</td><td>CORE B3</td><td>MU
BA</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:25:58 AM</td><td> </td><td>5/26/2022 12:03:22 PM</td><td>Done
</td><td>MC.12.0B.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21707</td><td>CORE B3</td><td>MU
BA</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Floor should be cleaned and repaired
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:26:06 AM</td><td> </td><td>5/26/2022 12:03:22 PM</td><td>Done
</td><td>MC.12.0B.B31</td><td>&nbsp;</td>
</tr><tr>
<td>22199</td><td>MALE PRAYER ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:47:33 AM</td><td> </td><td>5/26/2022 12:03:20 PM</td><td>Done
</td><td>MG.13.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>22202</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>alignment/level</td><td>&#39;Marked gypsum wall not leveled
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:47:37 AM</td><td> </td><td>5/26/2022 12:03:19 PM</td><td>Done
</td><td>MG.13.0G.003

</td><td>&nbsp;</td>
</tr><tr>
<td>22223</td><td>FIRST AID 1</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:48:10 AM</td><td> </td><td>5/26/2022 12:03:17 PM</td><td>Done
</td><td>MG.12.0G.005</td><td>&nbsp;</td>
</tr><tr>
<td>22254</td><td>MALE PRAYER ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Touch up painting for ceiling after
installation of lighting fixtures </td><td>Low</td><td>9/14/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/24/2021 11:49:22 AM</td><td> </td><td>5/26/2022
12:03:13 PM</td><td>Done </td><td>MG.13.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>22255</td><td>MALE PRAYER ROOM</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Marked edge is not aligned and should be
adjusted </td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/24/2021 11:49:23 AM</td><td> </td><td>5/26/2022 12:03:12
PM</td><td>Done </td><td>MG.13.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>22284</td><td>FIRST AID 2</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Damaged walls should be repaired
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:50:03 AM</td><td> </td><td>5/26/2022 12:03:10 PM</td><td>Done
</td><td>MG.12.0G.007</td><td>&nbsp;</td>
</tr><tr>
<td>24880</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum board wall should be adjusted
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>11/8/2021
12:12:15 PM</td><td> </td><td>5/26/2022 12:03:09 PM</td><td>Done
</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>29695</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Duct thermal insulation missing.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:04 PM</td><td> </td><td>5/26/2022 12:01:46
PM</td><td>&nbsp;</td><td>MS.14.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29694</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing seismic restrains for FF
pipes. </td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:01 PM</td><td> </td><td>5/26/2022 12:00:01
PM</td><td>&nbsp;</td><td>MS.14.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29696</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39; Issuing labels for
chilled water pipes. </td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:20:05 PM</td><td> </td><td>5/26/2022 11:58:38
AM</td><td>&nbsp;</td><td>MS.14.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29727</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Exhaust
Fan</td><td>Exhaust Grill</td><td>&#39;Labels for exhaust fans.
</td><td>High</td><td>6/1/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/25/2022 12:21:14 PM</td><td> </td><td>5/26/2022 11:57:19
AM</td><td>&nbsp;</td><td>MW.14.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28766</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Thermal insulation need some repairs.
</td><td>High</td><td>5/19/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/12/2022 11:45:10 AM</td><td> </td><td>5/26/2022 11:52:43
AM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>28695</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs touch up painting </td><td>Low</td><td>6/1/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022 10:38:15 AM</td><td>
</td><td>5/26/2022 11:30:09
AM</td><td>&nbsp;</td><td>MA.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27350</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Sealer is missing </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 12:12:58 PM</td><td> </td><td>5/26/2022
11:26:20 AM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>20180</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Metal ceiling trim should be
aligned </td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/3/2021 3:38:20 PM</td><td> </td><td>5/26/2022 11:04:58
AM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>9631</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Close the opening in the ceiling </td><td>Low</td><td>8/10/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020 1:49:49 PM</td><td>
</td><td>5/26/2022 10:49:52
AM</td><td>&nbsp;</td><td>MS.12.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>28744</td><td>AHU</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Wooden plate should be removed </td><td>Low</td><td>6/1/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022 11:48:01 AM</td><td>
</td><td>5/26/2022 10:32:09
AM</td><td>&nbsp;</td><td>MS.19.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28740</td><td>SHAFT</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked hole should be closed </td><td>Low</td><td>6/1/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022 11:47:56 AM</td><td>
</td><td>5/26/2022 10:31:32
AM</td><td>&nbsp;</td><td>MS.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28859</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Concrete need to
repair.</td><td>Low</td><td>6/6/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>5/16/2022 11:36:10 AM</td><td> </td><td>5/26/2022 10:29:59
AM</td><td>&nbsp;</td><td>MS.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>28113</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Hole should be closed if not needed
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/16/2022
11:00:02 AM</td><td> </td><td>5/26/2022 10:27:53
AM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28107</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/16/2022
10:59:52 AM</td><td> </td><td>5/26/2022 10:27:19
AM</td><td>&nbsp;</td><td>MA.19.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28015</td><td>INORGANIC STORAGE 1</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Marked fixation should be removed
</td><td>Low</td><td>4/4/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/14/2022
11:39:00 AM</td><td> </td><td>5/26/2022 10:26:24
AM</td><td>&nbsp;</td><td>MA.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28118</td><td>STUDY</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access door needs adjustment </td><td>Low</td><td>4/6/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/16/2022 11:00:12 AM</td><td>
</td><td>5/26/2022 10:24:04
AM</td><td>&nbsp;</td><td>MA.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27490</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Vanity Counter Top</td><td>General
Snag</td><td>&#39;General cleaning is required </td><td>Low</td><td>3/28/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022 4:41:40 PM</td><td>
</td><td>5/26/2022 10:23:02
AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27325</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked rod should be removed </td><td>Low</td><td>3/28/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022 12:12:09 PM</td><td>
</td><td>5/26/2022 10:21:50
AM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>21506</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/18/2021
2:13:01 PM</td><td> </td><td>5/26/2022 10:11:43
AM</td><td>&nbsp;</td><td>MS.18.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>21508</td><td>B.O.H-PLANT - Band C</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/18/2021
2:13:04 PM</td><td> </td><td>5/26/2022 10:11:19
AM</td><td>&nbsp;</td><td>MS.18.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>20181</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Stains</td><td>&#39;Stains at ceiling tiles
</td><td>Low</td><td>8/24/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/3/2021
3:38:22 PM</td><td> </td><td>5/26/2022 10:05:27
AM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>24711</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>Signage</td><td>Not
Installed/Completed</td><td>&#39;Signage should be parallel to false ceiling joints
</td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:21 PM</td><td> </td><td>5/26/2022 10:00:37
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24716</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Concrete columns edges should be repaired
</td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:27 PM</td><td> </td><td>5/26/2022 9:59:29
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>14942</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Wrong installation for direction of air
flow of fcu ,wrong location of fcu </td><td>High</td><td>1/25/2021 12:00:00
PM</td><td>ahmedsalem</td><td>1/18/2021 3:58:38 PM</td><td> </td><td>5/26/2022
9:19:15 AM</td><td>&nbsp;</td><td>MS.19.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>25208</td><td>Temple Garden-Band F</td><td>Temple
Garden</td><td>Closed</td><td>Roschmann</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Glazing need to be
cleaned.</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/15/2021 11:34:37 AM</td><td> </td><td>5/26/2022 8:27:01
AM</td><td>&nbsp;</td><td>Band F</td><td>&nbsp;</td>
</tr><tr>
<td>29041</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing insulation straps. </td><td>High</td><td>5/24/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:11:39 PM</td><td>
</td><td>5/25/2022 5:44:05
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>28496</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;AHU need to be cleaned from inside.
</td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:19 PM</td><td> </td><td>5/25/2022 4:30:19
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28537</td><td>ELEC.</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;AHU need to be cleaned from inside.
</td><td>High</td><td>5/16/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:40 AM</td><td> </td><td>5/25/2022 4:30:18
PM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>28692</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;AHU shall be cleaned from inside.
</td><td>High</td><td>5/17/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:47:41 PM</td><td> </td><td>5/25/2022 4:30:17
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28950</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning from inside. </td><td>High</td><td>5/24/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:31:59 PM</td><td>
</td><td>5/25/2022 4:30:15
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29192</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Rusty cast iron pipe and it’s supports
shall be repaired and painted. </td><td>High</td><td>5/29/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:59:11 AM</td><td>
</td><td>5/25/2022 4:30:13
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>13356</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Repair for ceiling </td><td>Low</td><td>11/26/2020 12:00:00
AM</td><td>sally.george</td><td>11/5/2020 12:13:28 PM</td><td> </td><td>5/25/2022
4:23:13 PM</td><td>Done </td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>13357</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Repair for the holes/touch up for
walls</td><td>Low</td><td>11/26/2020 12:00:00
AM</td><td>sally.george</td><td>11/5/2020 12:14:01 PM</td><td> </td><td>5/25/2022
4:23:12 PM</td><td>Done </td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>26002</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Damaged gasket should be repaired
</td><td>Low</td><td>2/15/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/25/2022
11:39:21 AM</td><td> </td><td>5/25/2022 3:36:30 PM</td><td>Black silicon was
applied and installed instead of rubber gaskets</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27706</td><td>IT 9</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Door
leaf and frame need to touch up </td><td>Low</td><td>3/31/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>3/10/2022 11:07:27 AM</td><td> </td><td>5/25/2022
3:16:43 PM</td><td>&nbsp;</td><td>MS.19.2A.011</td><td>&nbsp;</td>
</tr><tr>

<td>26218</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/21/2022
11:38:29 AM</td><td> </td><td>5/25/2022 3:04:58
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26569</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/20/2022
12:00:00 PM</td><td>mohamed.sami</td><td>2/27/2022 11:26:59 AM</td><td>
</td><td>5/25/2022 3:04:57 PM</td><td>Done</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26608</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stones flooring need to cleaning
</td><td>Low</td><td>3/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/28/2022
11:12:19 AM</td><td> </td><td>5/25/2022 3:04:55
PM</td><td>Done</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26609</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/28/2022
11:12:21 AM</td><td> </td><td>5/25/2022 3:04:54
PM</td><td>Done</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26612</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Scratched tiles should be treated
</td><td>Low</td><td>3/21/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/28/2022
11:12:28 AM</td><td> </td><td>5/25/2022 3:04:50
PM</td><td>Done</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26615</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/21/2022
12:00:00 PM</td><td>mohamed.sami</td><td>2/28/2022 11:12:35 AM</td><td>
</td><td>5/25/2022 3:04:49 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26617</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/21/2022
12:00:00 PM</td><td>mohamed.sami</td><td>2/28/2022 11:12:37 AM</td><td>
</td><td>5/25/2022 3:04:48 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26619</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Salted tiles should be treated </td><td>Low</td><td>3/21/2022
12:00:00 PM</td><td>mohamed.sami</td><td>2/28/2022 11:12:40 AM</td><td>
</td><td>5/25/2022 3:04:47 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26620</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/21/2022
12:00:00 PM</td><td>mohamed.sami</td><td>2/28/2022 11:12:43 AM</td><td>
</td><td>5/25/2022 3:04:46 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26622</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/21/2022
12:00:00 PM</td><td>mohamed.sami</td><td>2/28/2022 11:12:45 AM</td><td>
</td><td>5/25/2022 3:04:45 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26626</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/21/2022
12:00:00 PM</td><td>mohamed.sami</td><td>2/28/2022 11:12:52 AM</td><td>
</td><td>5/25/2022 3:04:44 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26632</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/7/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/28/2022
3:15:26 PM</td><td> </td><td>5/25/2022 3:04:42
PM</td><td>Done</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26669</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/22/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/1/2022 11:01:37 AM</td><td>
</td><td>5/25/2022 3:04:41 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26674</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/22/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/1/2022
11:04:02 AM</td><td> </td><td>5/25/2022 3:04:40
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26681</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/22/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/1/2022
11:04:13 AM</td><td> </td><td>5/25/2022 3:04:39
PM</td><td>Done</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26683</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/22/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/1/2022
11:04:17 AM</td><td> </td><td>5/25/2022 3:04:38
PM</td><td>Done</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26717</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/22/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/1/2022 3:05:16 PM</td><td>
</td><td>5/25/2022 3:04:36 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26724</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/22/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/1/2022
3:45:31 PM</td><td> </td><td>5/25/2022 3:04:34
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26734</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/22/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/1/2022
3:45:41 PM</td><td> </td><td>5/25/2022 3:04:33
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26741</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/1/2022
3:45:47 PM</td><td> </td><td>5/25/2022 3:04:32
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26869</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;All broken tiles for this part to be replaced
</td><td>Low</td><td>3/23/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/2/2022
10:31:05 AM</td><td> </td><td>5/25/2022 3:04:30
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26872</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Improper cutting around cover
</td><td>Low</td><td>3/23/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/2/2022
10:31:10 AM</td><td> </td><td>5/25/2022 3:04:28
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26879</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/23/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/2/2022
10:31:20 AM</td><td> </td><td>5/25/2022 3:04:27
PM</td><td>Done</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26880</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/23/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/2/2022 10:31:50 AM</td><td>
</td><td>5/25/2022 3:04:26 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26885</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;All broken tiles in marked areas should be replaced
</td><td>Low</td><td>3/23/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/2/2022
10:31:59 AM</td><td> </td><td>5/25/2022 3:04:25
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26889</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/23/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/2/2022 10:32:06 AM</td><td>
</td><td>5/25/2022 3:04:23 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26890</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/23/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/2/2022 10:32:08 AM</td><td>
</td><td>5/25/2022 3:04:22 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26891</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/23/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/2/2022 10:32:10 AM</td><td>
</td><td>5/25/2022 3:04:21 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26895</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/23/2022
12:00:00 PM</td><td>mohamed.sami</td><td>3/2/2022 10:32:17 AM</td><td>
</td><td>5/25/2022 3:04:18 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27018</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/23/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/2/2022
4:15:26 PM</td><td> </td><td>5/25/2022 3:04:17
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27020</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/23/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/2/2022
4:15:31 PM</td><td> </td><td>5/25/2022 3:04:16
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27096</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/24/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/3/2022
11:08:13 AM</td><td> </td><td>5/25/2022 3:04:14
PM</td><td>Done</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>27104</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/24/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/3/2022
11:08:52 AM</td><td> </td><td>5/25/2022 3:04:13
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27116</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Movement joint should be extended
</td><td>Low</td><td>3/24/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/3/2022
11:09:13 AM</td><td> </td><td>5/25/2022 3:04:03
PM</td><td>Done</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27189</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/24/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/3/2022
3:01:37 PM</td><td> </td><td>5/25/2022 3:04:00
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27192</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/24/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/3/2022
3:01:45 PM</td><td> </td><td>5/25/2022 3:03:56
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27228</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Broken edges should be repaired </td><td>Low</td><td>3/27/2022
12:00:00 PM</td><td>Marios Ioannou,</td><td>3/6/2022 4:40:03 PM</td><td>
</td><td>5/25/2022 3:03:55 PM</td><td>Done</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27230</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/27/2022 12:00:00 PM</td><td>Marios Ioannou,</td><td>3/6/2022
4:50:47 PM</td><td> </td><td>5/25/2022 3:03:54
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27240</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Clean and seal all flooring
</td><td>Low</td><td>3/27/2022 12:00:00 PM</td><td>Marios Ioannou,</td><td>3/6/2022
4:51:09 PM</td><td> </td><td>5/25/2022 3:03:53
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>13653</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;Missing labels </td><td>High</td><td>12/7/2020 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>11/30/2020 10:58:59 AM</td><td>
</td><td>5/25/2022 1:58:07
PM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>24373</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing
labels</td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>10/27/2021 11:52:55 AM</td><td> </td><td>5/25/2022 1:58:06
PM</td><td>&nbsp;</td><td>Museum Roof Band B</td><td>&nbsp;</td>
</tr><tr>
<td>24393</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>General Snag</td><td>&#39;Defective cover trunk and should be
replaced </td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>10/27/2021 11:53:23 AM</td><td> </td><td>5/25/2022 1:58:05
PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25389</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Raceway not finished and termination not
finished yet</td><td>High</td><td>12/1/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>11/24/2021 11:16:37 AM</td><td> </td><td>5/25/2022 1:58:04
PM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>28280</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>LIGHT
FITTINGS(INTERNAL/ EXTERNAL/ EMERGENCY)</td><td>Lamp not Installed</td><td>&#39;AHU
lighting not installed. </td><td>Medium</td><td>4/29/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>4/19/2022 11:47:22 AM</td><td>
</td><td>5/25/2022 1:58:03
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28463</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;Lighting inside the
machine not installed. </td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:18 PM</td><td> </td><td>5/25/2022 1:58:01
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28471</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;Lighting inside AHU
not working. </td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:35 PM</td><td> </td><td>5/25/2022 1:58:00
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28494</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Lights not working inside the AHUs.
</td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:16 PM</td><td> </td><td>5/25/2022 1:57:59
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28535</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Machine lighting not working.
</td><td>High</td><td>5/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:37 AM</td><td> </td><td>5/25/2022 1:57:58
PM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>28712</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Lighting not working for AHU.
</td><td>High</td><td>5/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:40 AM</td><td> </td><td>5/25/2022 1:57:56
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28863</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;Internal lighting not
working. </td><td>High</td><td>5/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:06:56 PM</td><td> </td><td>5/25/2022 1:57:55
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28707</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Humidification unit shall be cleaned and closed properly.
</td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:33 AM</td><td> </td><td>5/25/2022 12:53:55
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28411</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing labels for all trades. </td><td>High</td><td>5/12/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:04:15 PM</td><td>
</td><td>5/25/2022 12:22:00
PM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>28443</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Flexible duct connector shall be repaired or replaced and
threaded connection rods shall be removed. </td><td>High</td><td>5/12/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:05:30 PM</td><td>
</td><td>5/25/2022 12:21:59
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28869</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;General cleaning from outside. </td><td>High</td><td>5/23/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/16/2022 4:07:07 PM</td><td>
</td><td>5/25/2022 12:21:58
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28934</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>Air
vent/bottle to be fitted</td><td>&#39;Humidifier shall be cleaned.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:18 PM</td><td> </td><td>5/25/2022 12:21:57
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28945</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Labels for air ducts are missing.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:44 PM</td><td> </td><td>5/25/2022 12:21:56
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28952</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Humidifier need to be cleaned from inside.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:06 PM</td><td> </td><td>5/25/2022 12:21:55
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28955</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Humidifier need cleaning. </td><td>High</td><td>5/24/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:32:12 PM</td><td>
</td><td>5/25/2022 12:21:54
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28957</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Air duct labels are
missing. </td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:16 PM</td><td> </td><td>5/25/2022 12:21:53
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28961</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Thermal insulation around shall be
repaired. </td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:25 PM</td><td> </td><td>5/25/2022 12:21:52
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28963</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Supports need painting.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:31 PM</td><td> </td><td>5/25/2022 12:21:51
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28966</td><td>PLANT</td><td>MU L25</td><td>Closed</td><td>TAB
- T&amp;C</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;General cleaning from inside. </td><td>High</td><td>5/24/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:32:37 PM</td><td>
</td><td>5/25/2022 12:21:50
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29007</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cleaning from outside the machine.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:01 PM</td><td> </td><td>5/25/2022 12:21:50
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29011</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning from inside the AHU.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:11 PM</td><td> </td><td>5/25/2022 12:21:49
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29023</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Humidifier unit need cleaning.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:49 PM</td><td> </td><td>5/25/2022 12:21:48
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29024</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Drain hose not connected.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:51 PM</td><td> </td><td>5/25/2022 12:21:47
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29035</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing labels for air ducts. </td><td>High</td><td>5/24/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:11:28 PM</td><td>
</td><td>5/25/2022 12:21:44
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29036</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing labels for chilled water pipes.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:30 PM</td><td> </td><td>5/25/2022 12:21:43
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29043</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Rusted motors rods. </td><td>High</td><td>5/24/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:11:43 PM</td><td>
</td><td>5/25/2022 12:21:43
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29050</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Cleaning for AHU from the inside.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:57 PM</td><td> </td><td>5/25/2022 12:21:42
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29053</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Chilled water pipe
insulation need repairs. </td><td>High</td><td>5/24/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:12:05 PM</td><td>
</td><td>5/25/2022 12:21:40
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29063</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning from outside.
</td><td>High</td><td>5/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/18/2022 11:56:16 AM</td><td> </td><td>5/25/2022 12:21:39
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29065</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Cleaning from inside the AHU.
</td><td>High</td><td>5/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/18/2022 11:56:19 AM</td><td> </td><td>5/25/2022 12:21:38
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29076</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Rusty machine base shall be repaired and
repainted. </td><td>High</td><td>5/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:24 AM</td><td> </td><td>5/25/2022 12:21:37
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29084</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning from inside.
</td><td>High</td><td>5/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:38 AM</td><td> </td><td>5/25/2022 12:21:37
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29094</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;MSD need supports. </td><td>High</td><td>5/26/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/19/2022 11:40:55 AM</td><td>
</td><td>5/25/2022 12:21:35
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29127</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Cleaning for humidification unit.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:23 AM</td><td> </td><td>5/25/2022 12:21:34
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29128</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Dusty air filter.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:25 AM</td><td> </td><td>5/25/2022 12:21:34
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29142</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Internal cleaning.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:58 AM</td><td> </td><td>5/25/2022 12:21:33
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29161</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Rusty base need to be sanded and painted.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:01:36 AM</td><td> </td><td>5/25/2022 12:21:30
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29166</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning. </td><td>High</td><td>5/28/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/21/2022 11:01:44 AM</td><td>
</td><td>5/25/2022 12:21:29
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29183</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing labels for ducts. </td><td>High</td><td>5/29/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:58:57 AM</td><td>
</td><td>5/25/2022 12:21:28
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29212</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Mechanical</td><td>Air
Handling Units</td><td>General Snag</td><td>&#39;Cleaning for humidification unit.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:45 AM</td><td> </td><td>5/25/2022 12:21:27
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29218</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>TAB -
T&amp;C</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Cleaning for humidification unit.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:53 AM</td><td> </td><td>5/25/2022 12:21:25
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>28761</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wall need touch up painting </td><td>Low</td><td>6/1/2022
12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022 11:48:23 AM</td><td>
</td><td>5/25/2022 11:57:53
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>27467</td><td>CURATOR</td><td>MU L20</td><td>Closed</td><td>T
and D design</td><td>Architectural</td><td>Wall - Skirting</td><td>Other
Snag</td><td>&#39;Skirting is missing </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 4:40:59 PM</td><td> </td><td>5/25/2022
11:56:18 AM</td><td>&nbsp;</td><td>MA.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27474</td><td>MEETING ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Access door should be fixed properly
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:09 PM</td><td> </td><td>5/25/2022 11:55:45
AM</td><td>&nbsp;</td><td>MR.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>29561</td><td>INORGANIC STORAGE 4</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked wire should be removed if not needed
</td><td>Low</td><td>6/15/2022 12:00:00 AM</td><td>sally.george</td><td>5/25/2022
9:58:23 AM</td><td> </td><td>5/25/2022 11:55:41
AM</td><td>&nbsp;</td><td>MA.19.02.014</td><td>&nbsp;</td>
</tr><tr>
<td>27481</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Cleaning is required </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 4:41:24 PM</td><td> </td><td>5/25/2022
11:54:35 AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27478</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Cleaning is required </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 4:41:18 PM</td><td> </td><td>5/25/2022
11:54:05 AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27491</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;General cleaning is required </td><td>Low</td><td>3/28/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022 4:41:41 PM</td><td>
</td><td>5/25/2022 11:53:07
AM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28763</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked part should be closed properly
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022
11:48:25 AM</td><td> </td><td>5/25/2022 11:51:28
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>28762</td><td>B.O.H - AHU - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked part should be closed
</td><td>Low</td><td>6/1/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>5/11/2022
11:48:24 AM</td><td> </td><td>5/25/2022 11:50:38
AM</td><td>&nbsp;</td><td>MS.19.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>21504</td><td>PLANT - Band D</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Marked repair need to finish </td><td>Low</td><td>9/8/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>8/18/2021 2:12:59 PM</td><td>
</td><td>5/25/2022 11:47:35
AM</td><td>&nbsp;</td><td>MS.18.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>13795</td><td>W.C. /M</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Mirrors</td><td>General
Snag</td><td>&#39;CIR not submitted </td><td>Low</td><td>12/21/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>12/1/2020 11:41:02 AM</td><td> </td><td>5/25/2022
11:39:37 AM</td><td>&nbsp;</td><td>MW.12.2A.001B</td><td>&nbsp;</td>
</tr><tr>
<td>13806</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;CIR not
submitted </td><td>Low</td><td>12/21/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>12/1/2020 11:41:31 AM</td><td> </td><td>5/25/2022 11:39:34
AM</td><td>&nbsp;</td><td>MW.12.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13813</td><td>IT</td><td>MU L25</td><td>Closed</td><td>Al-
Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;CIR not
submitted </td><td>Low</td><td>12/21/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>12/1/2020 11:41:46 AM</td><td> </td><td>5/25/2022 11:39:33
AM</td><td>&nbsp;</td><td>MS.12.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13820</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Scratches</td><td>&#39;No CIR
submitted</td><td>Low</td><td>12/21/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>12/1/2020 11:42:06 AM</td><td> </td><td>5/25/2022 11:39:31
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>13821</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Scratches</td><td>&#39;No CIR
submitted</td><td>Low</td><td>12/21/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>12/1/2020 11:42:08 AM</td><td> </td><td>5/25/2022 11:39:30
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>21561</td><td>CORE B3</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Opening should be closed </td><td>Low</td><td>9/9/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/19/2021 9:52:07 AM</td><td> </td><td>5/25/2022
11:33:41 AM</td><td>&nbsp;</td><td>MC.12.0G.B31</td><td>&nbsp;</td>
</tr><tr>
<td>17056</td><td>LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Edge should be aligned </td><td>Low</td><td>4/1/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>3/11/2021 12:35:17 PM</td><td> </td><td>5/25/2022
11:18:08 AM</td><td>&nbsp;</td><td>ME.12.01.011</td><td>&nbsp;</td>
</tr><tr>
<td>17055</td><td>LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked parts should be adjusted </td><td>Low</td><td>4/1/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021 12:35:15 PM</td><td>
</td><td>5/25/2022 11:17:42
AM</td><td>&nbsp;</td><td>ME.12.01.011</td><td>&nbsp;</td>
</tr><tr>
<td>16471</td><td>Core G1</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:27 AM</td><td> </td><td>5/25/2022 10:57:58
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16486</td><td>ELEC</td><td>MU GF </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall Painting</td><td>General
Snag</td><td>&#39;Wall painting need to touch up </td><td>Low</td><td>3/8/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021 11:34:52 AM</td><td>
</td><td>5/25/2022 10:55:04
AM</td><td>&nbsp;</td><td>MS.19.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16482</td><td>ELEC</td><td>MU GF </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint Floor</td><td>General
Snag</td><td>&#39;Epoxy paint floor need to touch up </td><td>Low</td><td>3/8/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021 11:34:45 AM</td><td>
</td><td>5/25/2022 10:54:30
AM</td><td>&nbsp;</td><td>MS.19.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>16484</td><td>Plant</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:47 AM</td><td> </td><td>5/25/2022 10:53:57
AM</td><td>&nbsp;</td><td>MS.19.0G.007</td><td>&nbsp;</td>
</tr><tr>
<td>16480</td><td>Plant</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Epoxy paint floor need to touch up
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:43 AM</td><td> </td><td>5/25/2022 10:53:33
AM</td><td>&nbsp;</td><td>MS.19.0G.007</td><td>&nbsp;</td>
</tr><tr>
<td>16491</td><td>Equipment Store</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up painting </td><td>Low</td><td>3/8/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021 11:34:58 AM</td><td>
</td><td>5/25/2022 10:53:00
AM</td><td>&nbsp;</td><td>MS.19.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16478</td><td>Waste Store</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:41 AM</td><td> </td><td>5/25/2022 10:51:20
AM</td><td>&nbsp;</td><td>MS.19.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>28060</td><td>Core G2</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing Sealant around electrical pipes
</td><td>Low</td><td>4/5/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/15/2022
10:56:06 AM</td><td> </td><td>5/25/2022 10:49:26
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16488</td><td>Plant</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:34:54 AM</td><td> </td><td>5/25/2022 10:48:47
AM</td><td>&nbsp;</td><td>MS.19.0G.007</td><td>&nbsp;</td>
</tr><tr>
<td>16266</td><td>VIP RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Painting need touch up
</td><td>Low</td><td>2/21/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:00:54 PM</td><td> </td><td>5/25/2022 10:45:14
AM</td><td>&nbsp;</td><td>MV.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>9647</td><td>AHU/PLANT</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Floor need cleaning and repair
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:50:59 PM</td><td> </td><td>5/25/2022 10:42:37
AM</td><td>&nbsp;</td><td>MS.12.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>21739</td><td>MACHINE ACCESS ROOM</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing fire Fighting
system</td><td>High</td><td>8/26/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/19/2021 11:46:38 AM</td><td> </td><td>5/25/2022
9:24:58 AM</td><td>&nbsp;</td><td>MS.18.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>28667</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Humidifier hose fixation clip. </td><td>High</td><td>5/17/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:40:15 PM</td><td>
</td><td>5/25/2022 9:13:36
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>29297</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Pipes joints.
</td><td>High</td><td>5/30/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/23/2022 4:32:27 PM</td><td> </td><td>5/25/2022 9:12:13
AM</td><td>&nbsp;</td><td>MS.14.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>20913</td><td>ESCAPE TUNNEL-Band A</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguisher
</td><td>High</td><td>8/18/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/11/2021
11:48:38 AM</td><td> </td><td>5/25/2022 9:11:05
AM</td><td>&nbsp;</td><td>SA.00.01.02</td><td>&nbsp;</td>
</tr><tr>
<td>28937</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Painting and cleaning for FF pipes.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:26 PM</td><td> </td><td>5/25/2022 9:06:28
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28939</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Rusty machine base need to be repaired and
to be painted. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:30 PM</td><td> </td><td>5/25/2022 9:02:08
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28940</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning from outside.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:32 PM</td><td> </td><td>5/25/2022 9:00:45
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28975</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Differential pressure sensor not
connected. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:57 PM</td><td> </td><td>5/25/2022 8:59:32
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28964</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Air duct thermal insulation need repairs.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:33 PM</td><td> </td><td>5/25/2022 8:52:48
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>12111</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Mechanical</td><td>Sprinkler
System</td><td>Sprinkler plate</td><td>&#39;Missing fire extinguishers
</td><td>High</td><td>10/11/2020 12:00:00 PM</td><td>ahmedsalem</td><td>10/4/2020
1:06:32 PM</td><td> </td><td>5/24/2022 5:43:04
PM</td><td>&nbsp;</td><td>MS.13.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>28938</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Dismantling air duct support. </td><td>High</td><td>5/24/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:31:28 PM</td><td>
</td><td>5/24/2022 5:42:15
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28932</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing labels for PPR
pipes. </td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:31:14 PM</td><td> </td><td>5/24/2022 4:21:29
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13755</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Refer to our previous comments on CIR
</td><td>Low</td><td>12/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>12/1/2020
11:39:20 AM</td><td> </td><td>5/24/2022 4:20:09 PM</td><td>Done
</td><td>MS.18.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>22431</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Stained</td><td>&#39;Stains should be removed
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Mohamed
El-Sergany</td><td>8/29/2021 3:12:56 PM</td><td> </td><td>5/24/2022 4:10:04
PM</td><td>&nbsp;</td><td>Part 2</td><td>&nbsp;</td>
</tr><tr>
<td>22526</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing metal trim</td><td>Low</td><td>9/20/2021
12:00:00 PM</td><td>Amr Nofal</td><td>8/30/2021 11:04:28 AM</td><td>
</td><td>5/24/2022 3:25:24 PM</td><td>&nbsp;</td><td>Part 6</td><td>&nbsp;</td>
</tr><tr>
<td>22841</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor Grouting should be repaired
</td><td>Low</td><td>10/3/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/12/2021
10:48:12 AM</td><td> </td><td>5/24/2022 3:25:17 PM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22891</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Discoloring between stone tiles
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:28 PM</td><td> </td><td>5/24/2022 3:25:16 PM</td><td>&nbsp;</td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>22917</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Grouting is missing
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:49 PM</td><td> </td><td>5/24/2022 3:25:15 PM</td><td>&nbsp;</td><td>Part
3</td><td>&nbsp;</td>
</tr><tr>
<td>22921</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/4/2021 12:00:00 AM</td><td>mohamed.sami</td><td>9/13/2021
4:02:54 PM</td><td> </td><td>5/24/2022 3:25:14 PM</td><td>&nbsp;</td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>23106</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Metal trim should be installed properly
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:49:56 AM</td><td> </td><td>5/24/2022 3:25:10
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23110</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closer should be one tile
</td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/16/2021
11:49:59 AM</td><td> </td><td>5/24/2022 3:25:07
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23113</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closer should be one tile
</td><td>Low</td><td>9/23/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/16/2021
11:50:02 AM</td><td> </td><td>5/24/2022 3:25:06
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23125</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closer should be one tile
</td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/16/2021
11:50:16 AM</td><td> </td><td>5/24/2022 3:25:04
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23140</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Discoloration between tiles should be treated or
replaced</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:50:38 AM</td><td> </td><td>5/24/2022 3:25:01
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23250</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Interface between metal trim and stone
should be closed </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 12:00:26 PM</td><td> </td><td>5/24/2022 3:25:00
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23265</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closer should be one tile
</td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/16/2021
12:06:12 PM</td><td> </td><td>5/24/2022 3:24:57
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26604</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Paint stains should be removed and cleaning
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
11:12:09 AM</td><td> </td><td>5/24/2022 3:24:51
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>17306</td><td>Ticketing Shed</td><td>Old ticketing shed
RO</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Missing stone coping </td><td>Low</td><td>5/3/2021 12:00:00
AM</td><td>aymanhaddadin</td><td>4/12/2021 11:58:06 AM</td><td> </td><td>5/24/2022
1:48:05 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23800</td><td>Decorative Fence</td><td>East
Fences</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
bases not aligned </td><td>Low</td><td>11/8/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/18/2021 4:42:28 PM</td><td> </td><td>5/24/2022 1:48:04
PM</td><td>&nbsp;</td><td>Decorative Fence</td><td>&nbsp;</td>
</tr><tr>
<td>24131</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between interlock and concrete should
be aligned and adjusted </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:08:17 AM</td><td> </td><td>5/24/2022 1:48:03
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24134</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Cracks should be repaired
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:08:21 AM</td><td> </td><td>5/24/2022 1:48:02
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24135</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Concrete needs touch up
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:08:23 AM</td><td> </td><td>5/24/2022 1:48:01
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24179</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint mortar need to be applied
properly.</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:09:35 AM</td><td> </td><td>5/24/2022 1:48:00
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24345</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Crackers should be repaired
</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/27/2021
11:40:52 AM</td><td> </td><td>5/24/2022 1:47:59
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25123</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Finishing for marked part should be
finished</td><td>Low</td><td>12/5/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/14/2021 10:30:55 AM</td><td> </td><td>5/24/2022 1:47:58
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>29087</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage thermal insulation for air duct.
</td><td>High</td><td>5/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:43 AM</td><td> </td><td>5/24/2022 1:39:14
PM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>21119</td><td>CORE B2</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>9/7/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/17/2021 10:49:47 AM</td><td> </td><td>5/24/2022 1:15:43
PM</td><td>&nbsp;</td><td>MC.18.2A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>28367</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Incomplete duct insulation. </td><td>High</td><td>5/3/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>4/26/2022 11:45:17 AM</td><td>
</td><td>5/24/2022 11:51:50
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28678</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to specification/drawing</td><td>&#39;Drain
valve handle not installed. </td><td>High</td><td>5/17/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:41:47 PM</td><td>
</td><td>5/24/2022 11:51:48
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28701</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinkler level shall be changed to
meet NFPA requirements. </td><td>High</td><td>5/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:25 AM</td><td> </td><td>5/24/2022 11:51:47
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28728</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Drain pan insulation need to be repaired.
</td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:46:10 AM</td><td> </td><td>5/24/2022 11:51:42
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28770</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing thermal insulation for duct.
</td><td>High</td><td>5/19/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/12/2022 11:47:00 AM</td><td> </td><td>5/24/2022 11:51:40
AM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>28982</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Canvases shall be adjusted. </td><td>High</td><td>5/24/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:33:13 PM</td><td>
</td><td>5/24/2022 11:51:39
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28983</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Canvases shall be adjusted. </td><td>High</td><td>5/24/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:33:14 PM</td><td>
</td><td>5/24/2022 11:51:38
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>26318</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area
</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing three poles
</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/22/2022 12:11:38 PM</td><td> </td><td>5/24/2022 10:25:05
AM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>26899</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area
</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>LIGHT FITTINGS(INTERNAL/
EXTERNAL/ EMERGENCY)</td><td>General Snag</td><td>&#39;Incomplete work ( lighting
poles not installed yet)</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/2/2022 11:15:07 AM</td><td> </td><td>5/24/2022 10:25:04
AM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>
<td>29026</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning from outside and upper side.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:10:56 PM</td><td> </td><td>5/24/2022 10:14:46
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29048</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning from outside.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:53 PM</td><td> </td><td>5/24/2022 10:10:46
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>21783</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;missing labels for fire alarm wiring devices
, all lighting fixtures must be alignment and balanced with ceiling , all floor
boxes must be cleaning , some floor boxes not finished cables pulling and
termination</td><td>High</td><td>8/26/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>8/19/2021 11:38:38 AM</td><td> </td><td>5/24/2022
10:08:51 AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>22054</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable trunk not covered
yet</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/23/2021 3:57:36 PM</td><td> </td><td>5/24/2022 10:08:50
AM</td><td>&nbsp;</td><td>MS.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>24382</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Earthing
System</td><td>General Snag</td><td>&#39;Incomplete work ( Al tape not installed
yet)</td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>10/27/2021 11:53:09 AM</td><td> </td><td>5/24/2022 10:08:49
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>26147</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Power
Sockets</td><td>General Snag</td><td>&#39;Missing accessories ( faceplate
)</td><td>High</td><td>2/17/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>2/10/2022 11:45:26 AM</td><td> </td><td>5/24/2022 10:08:48
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28980</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>Bathroom downlights</td><td>&#39;Both AHUs lighting are not
working. </td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:33:07 PM</td><td> </td><td>5/24/2022 10:08:47
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>29046</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Differential pressure sensors not
connected. </td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:11:49 PM</td><td> </td><td>5/24/2022 9:55:31
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29125</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dismantled support.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:20 AM</td><td> </td><td>5/24/2022 9:51:05
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29126</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Dismantled support.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:21 AM</td><td> </td><td>5/24/2022 9:49:54
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29185</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage thermal is auction and holes shall be closed.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:00 AM</td><td> </td><td>5/24/2022 9:45:33
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29186</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing duct AD.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:01 AM</td><td> </td><td>5/24/2022 9:44:30
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29213</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing insulation straps. </td><td>High</td><td>5/29/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:59:46 AM</td><td>
</td><td>5/24/2022 9:43:31
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29214</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing some insulation straps.
</td><td>High</td><td>5/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/22/2022 10:59:48 AM</td><td> </td><td>5/24/2022 9:42:36
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29219</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39; Missing AD. </td><td>High</td><td>5/29/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/22/2022 10:59:54 AM</td><td>
</td><td>5/24/2022 9:40:23
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29006</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing handles for drain valves.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:09:59 PM</td><td> </td><td>5/24/2022 9:34:37
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>29140</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;AHU base rusted.
</td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:51 AM</td><td> </td><td>5/24/2022 9:18:48
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29083</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Cleaning from outside.
</td><td>High</td><td>5/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/19/2022 11:40:36 AM</td><td> </td><td>5/24/2022 9:07:38
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>29129</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Damage elastomeric insulation for drain
pan. </td><td>High</td><td>5/28/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/21/2022 11:00:27 AM</td><td> </td><td>5/24/2022 9:03:09
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>18186</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;All grilles and cover plates of sprinklers
will be reinspected after final coat paint</td><td>High</td><td>6/3/2021 12:00:00
AM</td><td>Kriton Katsamenis </td><td>5/27/2021 12:07:14 PM</td><td>
</td><td>5/23/2022 4:53:59
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>28409</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing labels for all trades. </td><td>High</td><td>5/12/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:04:10 PM</td><td>
</td><td>5/23/2022 4:49:46
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28542</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Thermal insulation
for gauges stems not done. </td><td>High</td><td>5/16/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/9/2022 11:48:51 AM</td><td>
</td><td>5/23/2022 4:49:01
PM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>29005</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Connection for drain hose not done correctly.
</td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 4:09:53 PM</td><td> </td><td>5/23/2022 4:38:20
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27585</td><td>Ticketing Piazza</td><td>South Side Ticketing
Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Drainage System</td><td>General
Snag</td><td>&#39;Slot drain basin need adjustment </td><td>High</td><td>3/16/2022
12:00:00 AM</td><td>ahmedsalem</td><td>3/9/2022 11:45:37 AM</td><td>
</td><td>5/23/2022 4:32:59 PM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>22577</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Bitted tiles</td><td>Low</td><td>9/22/2021
12:00:00 PM</td><td>Amr Nofal</td><td>9/1/2021 10:49:05 AM</td><td>
</td><td>5/23/2022 2:20:15 PM</td><td>Done </td><td>Part 3</td><td>&nbsp;</td>
</tr><tr>
<td>22717</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39; broken
tiles should be replaced </td><td>Low</td><td>9/27/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/6/2021 10:41:09 AM</td><td> </td><td>5/23/2022 2:20:09
PM</td><td>Done </td><td>Part 6</td><td>&nbsp;</td>
</tr><tr>
<td>22956</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stains should be removed
</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:13:21 AM</td><td> </td><td>5/23/2022 2:20:08 PM</td><td>Done </td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>22980</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stains should be removed
</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:14:00 AM</td><td> </td><td>5/23/2022 2:20:06 PM</td><td>Done </td><td>Part
11</td><td>&nbsp;</td>
</tr><tr>
<td>23088</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:49:15 AM</td><td> </td><td>5/23/2022 2:20:05
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23615</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stains should be removed
</td><td>Low</td><td>10/13/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/22/2021
11:07:05 AM</td><td> </td><td>5/23/2022 2:19:56 PM</td><td>Done </td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>23693</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>10/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/28/2021
9:57:04 AM</td><td> </td><td>5/23/2022 2:19:53 PM</td><td>Done </td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23696</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/19/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/28/2021
9:57:09 AM</td><td> </td><td>5/23/2022 2:19:51 PM</td><td>Done </td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23705</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stains should be cleaned
</td><td>Low</td><td>10/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/28/2021
9:57:24 AM</td><td> </td><td>5/23/2022 2:19:49 PM</td><td>Done </td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23715</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>11/1/2021 12:00:00 AM</td><td>Amr Nofal</td><td>10/11/2021
10:29:30 AM</td><td> </td><td>5/23/2022 2:19:48 PM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23729</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/11/2021
10:37:56 AM</td><td> </td><td>5/23/2022 2:19:47 PM</td><td>Done </td><td>Part
11</td><td>&nbsp;</td>
</tr><tr>
<td>28877</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>GENERAL
SUPPORTS</td><td>Arrangement is not vertical / horizontal</td><td>&#39;Support
plate need painting. </td><td>High</td><td>5/23/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:07:22 PM</td><td> </td><td>5/23/2022 12:30:06
PM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28385</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing seismic
restrains for hot water pipes. </td><td>High</td><td>5/4/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>4/27/2022 11:44:44 AM</td><td>
</td><td>5/23/2022 12:07:45
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28455</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing labeling for all MEP trades in this areas.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:04 PM</td><td> </td><td>5/23/2022 12:07:43
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28486</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Chilled water pipes
insulation need repair. </td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:01 PM</td><td> </td><td>5/23/2022 12:07:42
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28541</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Hydronic pipes
insulation shall be repaired. </td><td>High</td><td>5/16/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/9/2022 11:48:48 AM</td><td>
</td><td>5/23/2022 12:07:40
PM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>28546</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing seismic support for FF pipes.
</td><td>High</td><td>5/16/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:59 AM</td><td> </td><td>5/23/2022 12:07:39
PM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>28668</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Humidifier drain not installed.
</td><td>High</td><td>5/17/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:40:17 PM</td><td> </td><td>5/23/2022 12:07:38
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28783</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;All screws of C clips must well tightened
</td><td>High</td><td>5/19/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>5/12/2022 1:28:22 PM</td><td> </td><td>5/23/2022 11:53:41
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28782</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Un used c
clips</td><td>High</td><td>5/19/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>5/12/2022 1:28:19 PM</td><td> </td><td>5/23/2022 11:53:38
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28780</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;All holes should be
closed</td><td>High</td><td>5/19/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>5/12/2022 1:28:15 PM</td><td> </td><td>5/23/2022 11:53:33
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28779</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;All holes must be
closed</td><td>High</td><td>5/19/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>5/12/2022 1:28:13 PM</td><td> </td><td>5/23/2022 11:53:29
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28778</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Must be
sealed</td><td>High</td><td>5/19/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>5/12/2022 1:28:11 PM</td><td> </td><td>5/23/2022 11:53:25
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28777</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Threaded rod should vertical
</td><td>High</td><td>5/19/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>5/12/2022 1:28:09 PM</td><td> </td><td>5/23/2022 11:53:21
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28776</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Connection between tray must be same
level</td><td>High</td><td>5/19/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>5/12/2022 1:28:07 PM</td><td> </td><td>5/23/2022 11:53:16
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28775</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unused material should be removed
</td><td>High</td><td>5/19/2022 12:00:00 AM</td><td>Marcos Motoshaleh
Farag</td><td>5/12/2022 1:28:05 PM</td><td> </td><td>5/23/2022 11:53:12
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28976</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;General cleaning and touchup painting
for FF pipes. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:59 PM</td><td> </td><td>5/23/2022 11:47:40
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>18107</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>Power</td><td>General Snag</td><td>&#39;Work
not ready </td><td>High</td><td>6/2/2021 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>5/26/2021 11:46:27 AM</td><td> </td><td>5/23/2022 11:30:40
AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18110</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Lighting fixtures should be alignment
</td><td>High</td><td>6/2/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>5/26/2021 11:46:31 AM</td><td> </td><td>5/23/2022 11:30:39
AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>24377</td><td>MU RO Band B</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Earthing
System</td><td>General Snag</td><td>&#39;Incomplete work for digital stream
C( lightning system)</td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh
Ibrahim El-Sawah</td><td>10/27/2021 11:53:01 AM</td><td> </td><td>5/23/2022
11:30:38 AM</td><td>&nbsp;</td><td>Museum Roof Band B</td><td>&nbsp;</td>
</tr><tr>
<td>24396</td><td>MU RO Band A</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Earthing
System</td><td>General Snag</td><td>&#39;Missing work ( work not finished
yet)</td><td>High</td><td>11/3/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>10/27/2021 11:53:28 AM</td><td> </td><td>5/23/2022 11:30:37
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25392</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Earthing
System</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>12/1/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>11/24/2021 11:16:44 AM</td><td> </td><td>5/23/2022 11:30:37
AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>26140</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Power
Sockets</td><td>General Snag</td><td>&#39;Missing accessories
(faceplate)</td><td>High</td><td>2/17/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>2/10/2022 11:45:06 AM</td><td> </td><td>5/23/2022 11:30:36
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27760</td><td>GEM CAVE EXP</td><td>MU
L25</td><td>Closed</td><td>Electro-Power</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Bad workmanship and cables not secured from
welding area and NCR should be issued </td><td>High</td><td>3/17/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/10/2022 12:22:38 PM</td><td>
</td><td>5/23/2022 11:30:33 AM</td><td>Work not finished yet
</td><td>MP.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28871</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Machine lighting not working.
</td><td>High</td><td>5/23/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:07:10 PM</td><td> </td><td>5/23/2022 11:30:32
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28951</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Internal machine lighting not working.
</td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:04 PM</td><td> </td><td>5/23/2022 11:30:31
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29061</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Internal lighting not working.
</td><td>High</td><td>5/25/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/18/2022 11:56:12 AM</td><td> </td><td>5/23/2022 11:30:30
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>

<td>25012</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Stone cladding Tilling should be as per shop
drawing.</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 4:00:25 PM</td><td> </td><td>5/23/2022 11:28:54
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17374</td><td>External North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Discoloring for painting of concrete
base</td><td>Low</td><td>5/4/2021 12:00:00
AM</td><td>aymanhaddadin</td><td>4/13/2021 11:48:26 AM</td><td> </td><td>5/23/2022
11:15:24 AM</td><td>Done </td><td>External North Fence</td><td>&nbsp;</td>
</tr><tr>
<td>23806</td><td>Security Fence</td><td>East
Fences</td><td>Closed</td><td>Cochrane</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Ground line should be aligned
</td><td>Low</td><td>11/10/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/20/2021
11:51:21 AM</td><td> </td><td>5/23/2022 11:15:23 AM</td><td>Done </td><td>Security
Fence</td><td>&nbsp;</td>
</tr><tr>
<td>23943</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Cracks should be repaired and treated
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:28:11 AM</td><td> </td><td>5/23/2022 11:15:21 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23945</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Cracks should be repaired and treated
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:28:15 AM</td><td> </td><td>5/23/2022 11:15:20 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23998</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Broken interlock tiles should be replaced
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
3:18:18 PM</td><td> </td><td>5/23/2022 11:15:19 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24137</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Gap width between kerbstone and concrete should
be as per drawing </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:08:27 AM</td><td> </td><td>5/23/2022 11:15:19
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24138</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Concrete level and kerbstone level should be
flushed </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:08:28 AM</td><td> </td><td>5/23/2022 11:15:18
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24139</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between concrete and kerbstone should
be aligned and cleaned </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:08:30 AM</td><td> </td><td>5/23/2022 11:15:16
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24140</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Concrete needs touch up
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:08:31 AM</td><td> </td><td>5/23/2022 11:15:15 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24184</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint mortar need to be applied
properly.</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:09:44 AM</td><td> </td><td>5/23/2022 11:15:14
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24754</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Concrete edges should be aligned
</td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Amr Nofal</td><td>11/7/2021
11:30:22 AM</td><td> </td><td>5/23/2022 11:15:13 AM</td><td>Done
</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>24775</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Inspection for concrete base
after grading the soil </td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/7/2021 11:31:48 AM</td><td> </td><td>5/23/2022 11:15:12
AM</td><td>Done </td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>25096</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Snagging after cleaning stairs</td><td>Low</td><td>12/5/2021
12:00:00 PM</td><td>Amr Nofal</td><td>11/14/2021 10:29:34 AM</td><td>
</td><td>5/23/2022 11:15:11 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25097</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Kerb stone surface should be
cleaned</td><td>Low</td><td>11/21/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/14/2021 10:29:38 AM</td><td> </td><td>5/23/2022 11:15:10
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25119</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Repair around
manhole</td><td>Low</td><td>12/5/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/14/2021 10:30:49 AM</td><td> </td><td>5/23/2022 11:15:09
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25121</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Curved kerbstone should be
smooth</td><td>Low</td><td>12/5/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/14/2021 10:30:52 AM</td><td> </td><td>5/23/2022 11:15:08
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25124</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interlock level should be flushed with interlock
level</td><td>Low</td><td>12/5/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/14/2021 10:30:56 AM</td><td> </td><td>5/23/2022 11:15:08
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>15606</td><td>AUDITORIUM FOYER</td><td>CCB
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Floor boxes are not terminated, no cctv ,
ict , WiFi labels, induction loop face plate is missing
</td><td>High</td><td>2/7/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>1/31/2021
4:32:29 PM</td><td> </td><td>5/23/2022 10:11:43
AM</td><td>&nbsp;</td><td>CA.08.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>19176</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Testing &amp;
Comissioning</td><td>General Snag</td><td>&#39;Speaker,Wifi,Digital signage and
CCTV testing and commissioning not done</td><td>High</td><td>6/24/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>6/17/2021 11:56:16 AM</td><td>
</td><td>5/23/2022 10:05:38
AM</td><td>&nbsp;</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21099</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;missing label for all boxes , IT cables not
pulled, missing cover boxes</td><td>High</td><td>8/23/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>8/16/2021 2:46:18 PM</td><td> </td><td>5/23/2022
10:04:16 AM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26849</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing labels</td><td>High</td><td>3/8/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 4:39:11 PM</td><td>
</td><td>5/23/2022 10:02:55 AM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>14288</td><td>TUT- (+49.50)</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;RFID tag installation within all showcases and artifacts are not
done yet </td><td>High</td><td>12/29/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>12/22/2020 9:47:19 AM</td><td> </td><td>5/23/2022 10:02:47
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14628</td><td>TUT- Digital (+49.50)</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control field devices installation and its activation is
pending. Also there is no fire alarm interface cable connections up to Door
controllers.

Card reader RJ45 crimping also not done. No labeling for the field
devices.</td><td>High</td><td>1/11/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>1/4/2021 11:56:16 AM</td><td> </td><td>5/23/2022 10:02:15
AM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>24205</td><td>BRIDGE</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Humidity sensor Nozzle is missing</td><td>High</td><td>11/2/2021
12:00:00 AM</td><td>Mohamed Samir</td><td>10/26/2021 3:34:55 PM</td><td>
</td><td>5/23/2022 10:01:57
AM</td><td>&nbsp;</td><td>MP.18.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>10894</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Incomplete Installation</td><td>&#39;Sliding gate control
termination is not done and access control devices ,CCTV devices are not installed
</td><td>High</td><td>9/21/2020 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>9/14/2020 3:57:34 PM</td><td> </td><td>5/23/2022 9:52:29
AM</td><td>&nbsp;</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>24861</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Bad finish painting need to
repair.</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>11/8/2021 11:46:22 AM</td><td> </td><td>5/23/2022 9:51:47
AM</td><td>Done </td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>
<td>26051</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing electrical covers should be
installed </td><td>Low</td><td>2/21/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/31/2022 11:37:33 AM</td><td> </td><td>5/23/2022
9:49:39 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26058</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Plug to be seated properly
</td><td>Low</td><td>2/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/31/2022
11:37:49 AM</td><td> </td><td>5/23/2022 9:49:19
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25879</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing electrical box
</td><td>Low</td><td>2/13/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/23/2022
11:59:12 AM</td><td> </td><td>5/23/2022 9:48:36
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25925</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Electrical box is missing
</td><td>Low</td><td>2/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022
10:42:26 AM</td><td> </td><td>5/23/2022 9:47:57
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25926</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Speaker should be aligned
</td><td>Low</td><td>2/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022
10:42:27 AM</td><td> </td><td>5/23/2022 9:47:53
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25956</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Speaker should be aligned
</td><td>Low</td><td>2/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022
12:07:51 PM</td><td> </td><td>5/23/2022 9:47:49
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26061</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Speaker should be aligned
</td><td>Low</td><td>2/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/31/2022
11:37:56 AM</td><td> </td><td>5/23/2022 9:42:04
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25876</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Speaker should be aligned
</td><td>Low</td><td>2/13/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/23/2022
11:59:07 AM</td><td> </td><td>5/23/2022 9:41:44
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25895</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Speaker should be aligned
</td><td>Low</td><td>2/13/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/23/2022
11:59:45 AM</td><td> </td><td>5/23/2022 9:41:13
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26146</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>2/17/2022 12:00:00 AM</td><td>Mohamed Samir</td><td>2/10/2022
11:45:23 AM</td><td> </td><td>5/23/2022 9:40:45
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>14620</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Testing &amp;
Comissioning</td><td>General Snag</td><td>&#39;Wi-Fi Testing and commissioning is
pending. Still some of the wireless access points are not
working</td><td>High</td><td>1/11/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>1/4/2021 11:36:19 AM</td><td> </td><td>5/23/2022 9:37:25
AM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>28265</td><td>Parking Level-P4</td><td>Parking
Levels</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Fiber patch card labeling and network
switches testing and commissioning not done yet </td><td>High</td><td>3/29/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/22/2022 2:43:09 PM</td><td>
</td><td>5/23/2022 9:37:21 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28269</td><td>Parking Level-P4</td><td>Parking
Levels</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;CCTV devices labeling and testing and
commissioning </td><td>High</td><td>3/29/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/22/2022 2:43:15 PM</td><td> </td><td>5/23/2022 9:37:17
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>19934</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing termination in both mcc and LCB.
</td><td>High</td><td>8/5/2021 12:00:00 PM</td><td>Mohamed Samir</td><td>7/29/2021
11:44:59 AM</td><td> </td><td>5/23/2022 9:37:06
AM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>17522</td><td>SERVICE ROOM</td><td>CCB
GF</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>Identification missing</td><td>&#39;All the BMS and fire alarm cables
were not terminated and no labels for BMS and fir alarm devices.BMS field devices
installation incomplete </td><td>High</td><td>5/11/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>5/4/2021 1:35:56 PM</td><td> </td><td>5/23/2022
9:36:54 AM</td><td>&nbsp;</td><td>CS.08.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>17520</td><td>SERVICE ROOM</td><td>CCB
GF</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>Identification missing</td><td>&#39;All the BMS devices removed and
kept above the AHU units</td><td>High</td><td>5/11/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>5/4/2021 1:35:47 PM</td><td> </td><td>5/23/2022
9:36:49 AM</td><td>&nbsp;</td><td>CS.08.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>28261</td><td>Parking Level-P4</td><td>Parking
Levels</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wrong focus and labeling and testing and
commissioning are not done yet </td><td>High</td><td>3/29/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/22/2022 2:43:01 PM</td><td>
</td><td>5/23/2022 9:36:44 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24223</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;Missing
turnstile installation </td><td>High</td><td>11/2/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>10/26/2021 3:35:42 PM</td><td> </td><td>5/23/2022 9:36:39
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24224</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;Missing
turnstiles insulation, missing left management system with travilator
</td><td>High</td><td>11/2/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>10/26/2021 3:35:46 PM</td><td> </td><td>5/23/2022 9:36:35
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28205</td><td>CORE F1</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;RFID label and testing and commissioning not done yet and cable
should be protected by flexible conduit </td><td>High</td><td>3/24/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/17/2022 1:50:55 PM</td><td>
</td><td>5/23/2022 9:36:31
AM</td><td>&nbsp;</td><td>MC.24.03.F11</td><td>&nbsp;</td>
</tr><tr>
<td>28179</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV Testing and commissioning not done yet and labeling
</td><td>High</td><td>3/23/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/16/2022 3:55:19 PM</td><td> </td><td>5/23/2022 9:36:26
AM</td><td>&nbsp;</td><td>Museum Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>28178</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV testing and commissioning not done yet and labeling
</td><td>High</td><td>3/23/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/16/2022 3:55:17 PM</td><td> </td><td>5/23/2022 9:36:22
AM</td><td>&nbsp;</td><td>Museum Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>28169</td><td>CORE F3</td><td>MU GF
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Camera label and testing and commissioning
</td><td>High</td><td>3/23/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/16/2022 3:55:01 PM</td><td> </td><td>5/23/2022 9:36:17
AM</td><td>&nbsp;</td><td>MC.14.0G.F31</td><td>&nbsp;</td>
</tr><tr>
<td>18397</td><td>CONTROL ROOM</td><td>GATE 7 TYPE 2
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Bollard control panel installation also pending
</td><td>High</td><td>6/13/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>6/6/2021 3:32:42 PM</td><td> </td><td>5/23/2022 9:36:13
AM</td><td>&nbsp;</td><td>GT7.02.0G.02</td><td>&nbsp;</td>
</tr><tr>
<td>15737</td><td>ENTRANCE</td><td>GATE 7 TYPE 2
GF</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Camera not installed in the design location
</td><td>High</td><td>2/10/2021 12:00:00 AM</td><td>Ahmed.Galal</td><td>2/3/2021
11:20:46 AM</td><td> </td><td>5/23/2022 9:36:10
AM</td><td>&nbsp;</td><td>GT7.02.0G.07</td><td>&nbsp;</td>
</tr><tr>
<td>18386</td><td>External South Fence</td><td>South
Fence</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;No port mapping and labeling
</td><td>High</td><td>6/13/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>6/6/2021 3:32:04 PM</td><td> </td><td>5/23/2022 9:35:55
AM</td><td>&nbsp;</td><td>External South Fence</td><td>&nbsp;</td>
</tr><tr>
<td>28499</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing drain hose for the humidification
system. </td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:23 PM</td><td> </td><td>5/23/2022 9:35:55
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>26480</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing Cctv camera.</td><td>Low</td><td>3/17/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>2/24/2022 11:51:57 AM</td><td>
</td><td>5/23/2022 9:35:51 AM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>
<td>26321</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>Cairo Communication
System</td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;Cctv
camera is missing.</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/22/2022 1:23:39 PM</td><td> </td><td>5/23/2022 9:35:47
AM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>26508</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing cctv camera need to
install.</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/24/2022 11:52:27 AM</td><td> </td><td>5/23/2022 9:35:43
AM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>
<td>26559</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Radar cat6a and power cables are not terminated and labeling also
not done</td><td>High</td><td>3/3/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/24/2022 3:39:46 PM</td><td> </td><td>5/23/2022 9:35:37
AM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>
<td>26566</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area
</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>CABLE BASKET
TRAY</td><td>General Snag</td><td>&#39;Camera installation is incomplete on the
wall side and RJ45 patching also needs to be done.IP addressing to be assigned
</td><td>High</td><td>3/3/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/24/2022 3:40:02 PM</td><td> </td><td>5/23/2022 9:35:12
AM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>
<td>27611</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Security</
td><td>General Snag</td><td>&#39;Devices should be installed properly
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:53:07 PM</td><td> </td><td>5/23/2022 9:35:08
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>28523</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Drain valve handles
are missing. </td><td>High</td><td>5/16/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:12 AM</td><td> </td><td>5/23/2022 9:35:06
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27652</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>Security</
td><td>General Snag</td><td>&#39;Box to covered and filed devices should be
protected by flexible conduit </td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:54:15 PM</td><td>
</td><td>5/23/2022 9:35:01
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27839</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Need flexible conduit and field devices
should be aligned </td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:59 PM</td><td> </td><td>5/23/2022 9:34:33
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28524</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Drain valve handles
are missing. </td><td>High</td><td>5/16/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:14 AM</td><td> </td><td>5/23/2022 9:34:29
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27607</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Termination not done and boxes should be covered
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:52:59 PM</td><td> </td><td>5/23/2022 9:34:29
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27605</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;Devices
should be terminated </td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:52:55 PM</td><td> </td><td>5/23/2022 9:34:03
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27597</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;Devices
should be installed properly </td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:52:43 PM</td><td>
</td><td>5/23/2022 9:33:59
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27620</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;Devices
should be installed properly </td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:53:22 PM</td><td>
</td><td>5/23/2022 9:33:54
AM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>27598</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;Devices
should be installed properly </td><td>High</td><td>3/16/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/9/2022 2:52:44 PM</td><td>
</td><td>5/23/2022 9:33:51
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>

<td>26552</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;CCTV
labeling,port mapping(not the IP address) and speakers testing and commissioning
also pending </td><td>High</td><td>3/3/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/24/2022 3:39:37 PM</td><td> </td><td>5/23/2022 9:33:47
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26551</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;CCTV
labeling,port mapping(not the IP address) and CCTV,WiFi ,speakers
activation,testing and commissioning also pending </td><td>High</td><td>3/3/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>2/24/2022 3:39:35 PM</td><td>
</td><td>5/23/2022 9:33:44 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26550</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;CCTV
labeling,port mapping(not the IP address) and CCTV,WiFi ,speakers
activation,testing and commissioning also pending </td><td>High</td><td>3/3/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>2/24/2022 3:39:33 PM</td><td>
</td><td>5/23/2022 9:33:39 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26549</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;CCTV
labeling,port mapping(not the IP address) and CCTV,WiFi ,speakers
activation,testing and commissioning also pending </td><td>High</td><td>3/3/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>2/24/2022 3:39:32 PM</td><td>
</td><td>5/23/2022 9:33:34 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26547</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;CCTV
labeling,port mapping(not the IP address) and CCTV,WiFi ,speakers
activation,testing and commissioning also pending </td><td>High</td><td>3/3/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>2/24/2022 3:39:30 PM</td><td>
</td><td>5/23/2022 9:33:31 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26546</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;CCTV
labeling,port mapping(not the IP address) and CCTV,WiFi ,speakers
activation,testing and commissioning also pending </td><td>High</td><td>3/3/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>2/24/2022 3:39:29 PM</td><td>
</td><td>5/23/2022 9:33:23 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26554</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;CCTV
labeling,port mapping(not the IP address) and speakers testing and commissioning
also pending </td><td>High</td><td>3/3/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/24/2022 3:39:39 PM</td><td> </td><td>5/23/2022 9:33:19
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26553</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;CCTV
labeling,port mapping(not the IP address) and speakers testing and commissioning
also pending </td><td>High</td><td>3/3/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/24/2022 3:39:38 PM</td><td> </td><td>5/23/2022 9:33:15
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>24215</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>Fire Alarm</td><td>General Snag</td><td>&#39;Missing work
</td><td>High</td><td>11/2/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>10/26/2021 3:35:16 PM</td><td> </td><td>5/23/2022 9:33:12
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26846</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Internal testing and commissioning not
finished yet and still in going </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 4:39:07 PM</td><td>
</td><td>5/23/2022 9:33:08 AM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26845</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing label and Internal testing and
commissioning not finished yet and still in going </td><td>High</td><td>3/8/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 4:39:05 PM</td><td>
</td><td>5/23/2022 9:33:04 AM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26842</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Labeling and Internal testing and
commissioning not finished yet and still in going </td><td>High</td><td>3/8/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 4:38:59 PM</td><td>
</td><td>5/23/2022 9:32:59 AM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26836</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing labels and Internal testing and
commissioning not finished yet and still in going </td><td>High</td><td>3/8/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 4:38:45 PM</td><td>
</td><td>5/23/2022 9:32:56 AM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>28658</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing handles for drain valves.
</td><td>High</td><td>5/17/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:39:22 PM</td><td> </td><td>5/23/2022 9:32:54
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>26837</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing label and Internal testing and
commissioning not finished yet and still in going </td><td>High</td><td>3/8/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 4:38:45 PM</td><td>
</td><td>5/23/2022 9:30:59 AM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26839</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Internal testing and commissioning not
finished yet and still in going </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 4:38:50 PM</td><td>
</td><td>5/23/2022 9:30:40 AM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26840</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>TAB - T&amp;C</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Internal testing and commissioning not
finished yet and still in going </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 4:38:51 PM</td><td>
</td><td>5/23/2022 9:30:36 AM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>26844</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing label and Internal testing and
commissioning not finished yet and still in going </td><td>High</td><td>3/8/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 4:39:04 PM</td><td>
</td><td>5/23/2022 9:30:33 AM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>14622</td><td>TUT- (+48.00)</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Testing &amp;
Comissioning</td><td>General Snag</td><td>&#39;CCTV Testing and commissioning is
incomplete at TUT galleries and All the TUT cameras should be monitored within
Security Command Control room and Museum Ground floor Security room. There is no
TCN submitted yet</td><td>High</td><td>1/11/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>1/4/2021 11:41:44 AM</td><td> </td><td>5/23/2022 9:30:29
AM</td><td>&nbsp;</td><td>MP.12.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>17843</td><td>SECURITY ROOM</td><td>GATE 7 TYPE 2
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;X-Ray Machines and Metal detector installation is incomplete and
Testing and commissioning also not started.
X-Ray machine Workstation data points activation also to be done at Security
room</td><td>High</td><td>5/27/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>5/20/2021 8:11:24 AM</td><td> </td><td>5/23/2022 9:30:25
AM</td><td>&nbsp;</td><td>GT7.02.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>21512</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Testing &amp;
Comissioning</td><td>General Snag</td><td>&#39;Wireless access point testing and
commissioning and labeling is not done</td><td>High</td><td>8/25/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>8/18/2021 3:15:22 PM</td><td>
</td><td>5/23/2022 9:30:21 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21513</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Testing &amp;
Comissioning</td><td>General Snag</td><td>&#39;Testing and commissioning is pending
for all turnstiles and integration with ticketing system and AWARE also pending
</td><td>High</td><td>8/25/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/18/2021 3:15:25 PM</td><td> </td><td>5/23/2022 9:30:17
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21514</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>Audio Technology</td><td>MEP-ELV</td><td>Testing &amp;
Comissioning</td><td>General Snag</td><td>&#39;Public address system testing and
commissioning is pending for all speakers in the ticketing shed and labeling for
these speakers also not done</td><td>High</td><td>8/25/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>8/18/2021 3:15:32 PM</td><td>
</td><td>5/23/2022 9:30:14 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21515</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>Cairo Communication
System</td><td>MEP-ELV</td><td>Testing &amp; Comissioning</td><td>General
Snag</td><td>&#39;CCTV testing and commissioning is not done properly
</td><td>High</td><td>8/25/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/18/2021 3:15:36 PM</td><td> </td><td>5/23/2022 9:30:10
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21516</td><td>Ticketing Piazza </td><td>Ticketing
Piazza</td><td>Closed</td><td>Cairo Communication
System</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;Labeling
and port mapping for this camera is not done and testing and commissioning is
pending for all CCTV cameras and cleaning of this camera
also</td><td>High</td><td>8/25/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/18/2021 3:15:38 PM</td><td> </td><td>5/23/2022 9:30:05
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>29059</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to specification/drawing</td><td>&#39;Machine
base is rusted and shall be sanded and painted. </td><td>High</td><td>5/25/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/18/2022 11:56:08 AM</td><td>
</td><td>5/23/2022 9:30:01
AM</td><td>&nbsp;</td><td>MS.19.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>21518</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Testing &amp;
Comissioning</td><td>General Snag</td><td>&#39;Public addressing system testing and
commissioning is pending and speakers labeling also missing
</td><td>High</td><td>8/25/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/18/2021 3:15:47 PM</td><td> </td><td>5/23/2022 9:30:00
AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>21519</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Testing &amp;
Comissioning</td><td>General Snag</td><td>&#39;Turnstile interface with fire alarm
panels and ticketing system are not done yet.And testing and commissioning is
pending </td><td>High</td><td>8/25/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/18/2021 3:15:49 PM</td><td> </td><td>5/23/2022 9:29:54
AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>21520</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>Cairo Communication
System</td><td>MEP-ELV</td><td>Testing &amp; Comissioning</td><td>General
Snag</td><td>&#39;Testing and commissioning for x ray machine,Body scanner and
metal detector is pending </td><td>High</td><td>8/25/2021 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>8/18/2021 3:15:52 PM</td><td>
</td><td>5/23/2022 9:29:49
AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>21521</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;No Labeling and SSID for this wireless access point and testing
and commissioning for ticketing shed WiFi has not been done yet
</td><td>High</td><td>8/25/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/18/2021 3:15:56 PM</td><td> </td><td>5/23/2022 9:29:46
AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>21522</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>Cairo Communication
System</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;Cctv
devices labeling,IP address port mapping,CCTV Testing and commissioning is
pending.</td><td>High</td><td>8/25/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/18/2021 3:16:00 PM</td><td> </td><td>5/23/2022 9:29:42
AM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>10909</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Audio Technology</td><td>MEP-ELV</td><td>WIRING
ACCESSORIES</td><td>Alignment and Level not followed</td><td>&#39;All the Line
array Speaker alignment and patch cords should be hidden.Also PA/SVA cables needs
to be replaced since the cable performance is unstable
</td><td>High</td><td>9/21/2020 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>9/14/2020 4:01:05 PM</td><td> </td><td>5/23/2022 9:29:38
AM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>19388</td><td>PAINTING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;CCTV and WiFi port mapping and Labeling is missing.Also
WiFi ,public addressing system and CCTV testing and commissioning also
pending</td><td>High</td><td>6/29/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>6/22/2021 4:30:24 PM</td><td> </td><td>5/23/2022 9:29:33
AM</td><td>&nbsp;</td><td>MK.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19401</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>Cairo Communication
System</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;CCTV
testing and commissioning is not done yet.there is no device labeling for CCTV
devices </td><td>High</td><td>6/29/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>6/22/2021 4:30:45 PM</td><td> </td><td>5/23/2022 9:29:22
AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>21363</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>WIRING
ACCESSORIES</td><td>Incomplete Installation</td><td>&#39;Wireless access point data
face plates are hanging and wireless access point height seems to be less .WAP
needs to be located at the higher level.testing and commissioning of wireless
devices also pending </td><td>High</td><td>8/25/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/18/2021 11:10:34 AM</td><td> </td><td>5/23/2022 9:29:11
AM</td><td>&nbsp;</td><td>South Facade- CCB</td><td>&nbsp;</td>
</tr><tr>
<td>28981</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Door handles shall be fixed. </td><td>High</td><td>5/24/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:33:10 PM</td><td>
</td><td>5/23/2022 9:28:55
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>21792</td><td>W.C. /F</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Testing &amp;
Comissioning</td><td>General Snag</td><td>&#39;Network switches and WiFi testing
and commissioning is pending for this M11 hub room</td><td>High</td><td>8/26/2021
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>8/19/2021 3:25:43 PM</td><td>
</td><td>5/23/2022 9:28:53
AM</td><td>&nbsp;</td><td>MW.14.01.002A</td><td>&nbsp;</td>
</tr><tr>
<td>21806</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Permanent labeling for these devices are not done for WiFi and
RFID and testing and commissioning also not done for WiFi ,CCTV and RFID system
</td><td>High</td><td>8/26/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:26:40 PM</td><td> </td><td>5/23/2022 9:28:50
AM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>21807</td><td>CORE F2</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Permanent labeling for these devices are not done for WiFi and
RFID and testing and commissioning also not done for WiFi ,CCTV and RFID system
</td><td>High</td><td>8/26/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:26:41 PM</td><td> </td><td>5/23/2022 9:28:32
AM</td><td>&nbsp;</td><td>MC.19.01.F21</td><td>&nbsp;</td>
</tr><tr>
<td>21809</td><td>CORE E2</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Permanent labeling for these devices are not done for WiFi and
RFID and testing and commissioning also not done for WiFi ,CCTV and RFID system
</td><td>High</td><td>8/26/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:26:44 PM</td><td> </td><td>5/23/2022 9:28:17
AM</td><td>&nbsp;</td><td>MC.13.01.E21</td><td>&nbsp;</td>
</tr><tr>
<td>21810</td><td>CORE D3</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Permanent labeling for these devices are not done for WiFi and
RFID and testing and commissioning also not done for WiFi ,CCTV and RFID system
</td><td>High</td><td>8/26/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:26:47 PM</td><td> </td><td>5/23/2022 9:28:13
AM</td><td>&nbsp;</td><td>MC.13.01.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21811</td><td>CORE D2</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cable terminations are not done for WiFi and Permanent labeling
for these CCTV,RFID and WiFi devices are not done and testing and commissioning
also not done for WiFi ,CCTV and RFID system </td><td>High</td><td>8/26/2021
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>8/19/2021 3:26:49 PM</td><td>
</td><td>5/23/2022 9:27:55
AM</td><td>&nbsp;</td><td>MC.18.01.D21</td><td>&nbsp;</td>
</tr><tr>
<td>21812</td><td>CORE B3-Band B</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Permanent labeling for these devices are not done for WiFi and
RFID and testing and commissioning also not done for WiFi ,CCTV and RFID system
</td><td>High</td><td>8/26/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:26:51 PM</td><td> </td><td>5/23/2022 9:27:39
AM</td><td>&nbsp;</td><td>MC.12.01.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21824</td><td>LOBBY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>General Snag</td><td>&#39;Wireless access points labeling and
active port mapping and testing and commissioning are
pending.</td><td>High</td><td>8/26/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:27:27 PM</td><td> </td><td>5/23/2022 9:27:35
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10900</td><td>TUT- Digital (+48.00)</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>STRUCTURED
CABLING</td><td>Incomplete Installation</td><td>&#39;This room is not ready for
snagging.CCTV and digital signage cables are not terminated and screens
installation also incomplete </td><td>High</td><td>9/21/2020 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>9/14/2020 3:59:08 PM</td><td>
</td><td>5/23/2022 9:27:30
AM</td><td>&nbsp;</td><td>MP.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>21804</td><td>ESCAPE ROUTE</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;RJ 45 patching not done and Cctv port mapping and labeling is not
done and testing and commissioning also not done </td><td>High</td><td>8/26/2021
12:00:00 PM</td><td>Muthukumar Paramakrishnan</td><td>8/19/2021 3:26:35 PM</td><td>
</td><td>5/23/2022 9:27:25
AM</td><td>&nbsp;</td><td>MQ.18.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>21805</td><td>ESCAPE TUNNEL</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cctv port mapping and labeling is not done and testing and
commissioning also not done </td><td>High</td><td>8/26/2021 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>8/19/2021 3:26:38 PM</td><td>
</td><td>5/23/2022 9:27:20
AM</td><td>&nbsp;</td><td>MQ.18.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>21813</td><td>CORE B2-Band B</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Permanent labeling for these devices are not done for WiFi and
RFID and testing and commissioning also not done for WiFi ,CCTV and RFID system
</td><td>High</td><td>8/26/2021 12:00:00 PM</td><td>Muthukumar
Paramakrishnan</td><td>8/19/2021 3:26:53 PM</td><td> </td><td>5/23/2022 9:27:16
AM</td><td>&nbsp;</td><td>MC.18.01.B21</td><td>&nbsp;</td>
</tr><tr>
<td>28970</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Door handle shall be
fixed. </td><td>High</td><td>5/24/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:32:46 PM</td><td> </td><td>5/23/2022 9:27:09
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>21821</td><td>LOBBY-Band B</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;CCTV and wireless access points devices labeling and testing and
commissioning also not done</td><td>High</td><td>8/26/2021 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>8/19/2021 3:27:17 PM</td><td>
</td><td>5/23/2022 9:27:06
AM</td><td>&nbsp;</td><td>ME.12.01.011</td><td>&nbsp;</td>
</tr><tr>
<td>21790</td><td>TEMP EXHIBITION LOBBY</td><td>MU
L10</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Testing &amp;
Comissioning</td><td>General Snag</td><td>&#39;Digital signage screens installation
and testing and commissioning is not done</td><td>High</td><td>8/26/2021 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>8/19/2021 3:25:38 PM</td><td>
</td><td>5/23/2022 9:27:02
AM</td><td>&nbsp;</td><td>MT.13.01.001</td><td>&nbsp;</td>
</tr><tr>

<td>26555</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;Basement
floor ICT rack fiber/cat6a cables terminations,Fluke testing and RJ45 patching are
not done and switches configuration and testing and commissioning also pending
</td><td>High</td><td>3/3/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/24/2022 3:39:40 PM</td><td> </td><td>5/23/2022 9:26:58
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26557</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;Lighting pole
CCTV cameras labeling and testing and commissioning is pending
</td><td>High</td><td>3/3/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/24/2022 3:39:42 PM</td><td> </td><td>5/23/2022 9:26:54
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26556</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;Lighting pole
4 CCTV cameras labeling are not done and testing and commissioning is pending
also</td><td>High</td><td>3/3/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/24/2022 3:39:41 PM</td><td> </td><td>5/23/2022 9:26:49
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26545</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;CCTV
labeling,port mapping(not the IP address) and CCTV,WiFi ,speakers
activation,testing and commissioning also pending </td><td>High</td><td>3/3/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>2/24/2022 3:39:28 PM</td><td>
</td><td>5/23/2022 9:26:44 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26548</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;CCTV
labeling,port mapping(not the IP address) and CCTV,WiFi ,speakers
activation,testing and commissioning also pending </td><td>High</td><td>3/3/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>2/24/2022 3:39:31 PM</td><td>
</td><td>5/23/2022 9:26:40 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27373</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV testing and commissioning </td><td>High</td><td>3/14/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:07:57 PM</td><td>
</td><td>5/23/2022 9:26:26
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27392</td><td>CORE E1</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lifting management system test and
commissioning and inter come and port activition</td><td>High</td><td>3/14/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:08:30 PM</td><td>
</td><td>5/23/2022 9:26:07
AM</td><td>&nbsp;</td><td>MC.24.02.E11</td><td>&nbsp;</td>
</tr><tr>
<td>28884</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;FF sprinkler level shall adjusted.
</td><td>High</td><td>5/23/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:07:32 PM</td><td> </td><td>5/23/2022 9:26:05
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>27410</td><td>ACCESS CONTROL SECURITY CHECK</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV testing and commissioning not completed
</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/7/2022 1:09:00 PM</td><td> </td><td>5/23/2022 9:26:03
AM</td><td>&nbsp;</td><td>MB.20.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19393</td><td>SCULPTURE ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;Access control system testing and commissioning also not done in
all the rooms</td><td>High</td><td>6/29/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>6/22/2021 4:30:31 PM</td><td> </td><td>5/23/2022 9:25:55
AM</td><td>&nbsp;</td><td>MK.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>27663</td><td>LOBBY</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Security</td><td>General
Snag</td><td>&#39;No labeling nor testing and commissioning for
cctv</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:54:39 PM</td><td> </td><td>5/23/2022 9:25:48
AM</td><td>&nbsp;</td><td>MQ.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>27815</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;CCTV camera label and texting and commissioning
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/10/2022 3:34:28 PM</td><td> </td><td>5/23/2022 9:25:44
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28723</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>Access Door in the kitchen store shaft</td><td>&#39;Humidifier drain
base not connected. </td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:46:03 AM</td><td> </td><td>5/23/2022 9:24:59
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>27889</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;BMS is not
tested</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed
Samir</td><td>3/12/2022 11:52:32 AM</td><td> </td><td>5/23/2022 9:24:54
AM</td><td>&nbsp;</td><td>MS.14.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>27908</td><td>CORE G1</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;BMS testing not done
</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed Samir</td><td>3/12/2022
11:53:09 AM</td><td> </td><td>5/23/2022 9:24:48
AM</td><td>&nbsp;</td><td>MC.25.2A.G11 </td><td>&nbsp;</td>
</tr><tr>
<td>28878</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to
specification/drawing</td><td>&#39;Humidifier drain hose connection shall be
revised. </td><td>High</td><td>5/23/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:07:23 PM</td><td> </td><td>5/23/2022 9:24:05
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>14619</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>Testing &amp;
Comissioning</td><td>General Snag</td><td>&#39;Public addressing system loop is not
working for the some of the speakers. Still STS using temporary purple color data
cables for the speakers activations. Some echo&#39;s reflected from surface of the
gallery walls.</td><td>High</td><td>1/11/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>1/4/2021 11:33:48 AM</td><td> </td><td>5/23/2022 9:21:19
AM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>28933</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;PPR pipes need
adjustment and supports. </td><td>High</td><td>5/24/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 1:31:16 PM</td><td>
</td><td>5/23/2022 9:19:10
AM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>17684</td><td>ENVIRO. LOBBY</td><td>CCB
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Face plate and exit fixtures and floor box
</td><td>High</td><td>5/12/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>5/5/2021
12:42:55 PM</td><td> </td><td>5/23/2022 9:06:17
AM</td><td>&nbsp;</td><td>CA.08.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>17769</td><td>ENVIRO. LOBBY</td><td>CCB
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Face plate and exit fixtures and floor box
</td><td>High</td><td>5/12/2021 12:00:00 PM</td><td>Mohamed Samir</td><td>5/5/2021
12:44:25 PM</td><td> </td><td>5/23/2022 9:01:26
AM</td><td>&nbsp;</td><td>CA.08.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>7948</td><td>PLANT</td><td>CCB
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cable tag is missing ,field devices is not
installed or terminated , flexible is damaged, pull box cover is missing, pull box
labels is missing, fire alarm device is missing, Bms panel is not
terminated.</td><td>High</td><td>1/15/2020 12:00:00 AM</td><td>Mohamed
Samir</td><td>1/8/2020 12:01:43 PM</td><td> </td><td>5/23/2022 8:58:37
AM</td><td>&nbsp;</td><td>CS.07.03.007</td><td>&nbsp;</td>
</tr><tr>
<td>17565</td><td>Retail space 01-04-05</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>5/11/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>5/4/2021 1:38:18 PM</td><td> </td><td>5/23/2022
8:58:28 AM</td><td>&nbsp;</td><td>Retail Space -01,04,05</td><td>&nbsp;</td>
</tr><tr>
<td>24817</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between interlock and manhole
cover should be adjusted.</td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Moussa
Nageh Khella</td><td>11/7/2021 1:09:48 PM</td><td> </td><td>5/23/2022 8:55:50
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10819</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Need cleaning/ missing water test for roof /
missing reveals </td><td>Low</td><td>10/5/2020 12:00:00
PM</td><td>andrewjohn.rose</td><td>9/14/2020 12:17:08 PM</td><td>
</td><td>5/22/2022 4:51:58
PM</td><td>&nbsp;</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>10833</td><td>TUT- LAND OF EGYPT</td><td>MU
L30</td><td>Closed</td><td>Roschmann</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Glass panels need cleaning/ sealant to be
cleaning/ damaged panels / missing water test / sealant joint not completed
</td><td>Low</td><td>10/5/2020 12:00:00
AM</td><td>andrewjohn.rose</td><td>9/14/2020 12:22:34 PM</td><td>
</td><td>5/22/2022 4:49:48 PM</td><td>Broken panel was replaced &amp; water test
was done by CIRs</td><td>MP.23.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>14713</td><td>TUT- ARTEFACTS BRIDGE</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Windows</
td><td>General Snag</td><td>&#39;Water tests not
done</td><td>High</td><td>1/18/2021 12:00:00 AM</td><td>Sherif
Elabd</td><td>1/11/2021 10:13:16 AM</td><td> </td><td>5/22/2022 4:46:21
PM</td><td>Water test was done for EWS-08 glazed panels (windows) as CIRs 223281-D
&amp; 225173-A.</td><td>MQ.23.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>15709</td><td>3D THEATER FOYER</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Metal ceiling need adjustment /cleaning
</td><td>Low</td><td>2/23/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>2/2/2021
4:10:51 PM</td><td> </td><td>5/22/2022 2:32:10
PM</td><td>&nbsp;</td><td>CT.03.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>17376</td><td>External North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Irregular concrete edge need to be aligned and
leveled</td><td>Low</td><td>5/4/2021 12:00:00
PM</td><td>aymanhaddadin</td><td>4/13/2021 11:48:31 AM</td><td> </td><td>5/22/2022
2:32:09 PM</td><td>&nbsp;</td><td>External North Fence</td><td>&nbsp;</td>
</tr><tr>
<td>19753</td><td>AUDITORIUM LOBBY</td><td>CCB
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>Signage</td><td>Not
Installed/Completed</td><td>&#39;Signage should be fixed properly
</td><td>Low</td><td>7/28/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>7/7/2021
4:44:45 PM</td><td> </td><td>5/22/2022 2:32:08
PM</td><td>&nbsp;</td><td>CA.07.01.015</td><td>&nbsp;</td>
</tr><tr>
<td>23838</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between kerb stone and interlock
should be flush </td><td>Low</td><td>10/31/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/24/2021 10:09:26 AM</td><td> </td><td>5/22/2022 2:32:07
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23849</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between kerb stone and interlock
should be aligned and adjusted </td><td>Low</td><td>11/14/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/24/2021 10:10:38 AM</td><td> </td><td>5/22/2022
2:32:06 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23855</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Concrete slope is not uniform </td><td>Low</td><td>11/14/2021
12:00:00 PM</td><td>Amr Nofal</td><td>10/24/2021 10:10:47 AM</td><td>
</td><td>5/22/2022 2:32:06 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23859</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between interlock and kerb stone should
be adjusted </td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/24/2021 10:10:55 AM</td><td> </td><td>5/22/2022 2:32:04
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23950</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Top and bottom lines of concrete should be aligned and cleaned
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:28:25 AM</td><td> </td><td>5/22/2022 2:32:04
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24143</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between concrete and kerbstone should
be aligned and cleaned </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:08:37 AM</td><td> </td><td>5/22/2022 2:32:01
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24145</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Concrete needs touch up
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:08:41 AM</td><td> </td><td>5/22/2022 2:32:00
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24147</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Gap width between interlock and concrete should
be as per shop drawing </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:08:46 AM</td><td> </td><td>5/22/2022 2:31:59
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24149</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between concrete level should be
flushed with interlock level</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:08:50 AM</td><td> </td><td>5/22/2022 2:31:58
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24763</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between planted area and kerbstone
should be aligned (exposed kerbstone should be the
same)</td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/7/2021 11:30:58 AM</td><td> </td><td>5/22/2022 2:31:57
PM</td><td>&nbsp;</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>24767</td><td>External North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Edges of concrete bases should be aligned along
the fence </td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/7/2021 11:31:16 AM</td><td> </td><td>5/22/2022 2:31:56
PM</td><td>&nbsp;</td><td>External North Fence</td><td>&nbsp;</td>
</tr><tr>
<td>24781</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between slope concrete and kerb
stone should be aligned </td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/7/2021 11:31:56 AM</td><td> </td><td>5/22/2022 2:31:55
PM</td><td>&nbsp;</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>24782</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between slope concrete and stone
should be closed properly </td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/7/2021 11:31:58 AM</td><td> </td><td>5/22/2022 2:31:54
PM</td><td>&nbsp;</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>25164</td><td>Parking Level-P1</td><td>Parking
Levels</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone should be cleaned and salt should be
removed </td><td>Low</td><td>11/22/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/15/2021 10:17:07 AM</td><td> </td><td>5/22/2022 2:31:54
PM</td><td>&nbsp;</td><td>P1</td><td>&nbsp;</td>
</tr><tr>
<td>25175</td><td>Parking Level-P2</td><td>Parking
Levels</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone should be cleaned and salt should be
removed </td><td>Low</td><td>12/6/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/15/2021 10:17:21 AM</td><td> </td><td>5/22/2022 2:31:53
PM</td><td>&nbsp;</td><td>P2</td><td>&nbsp;</td>
</tr><tr>
<td>26500</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Curb stone need to cleaning and
repair.</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/24/2022 11:52:19 AM</td><td> </td><td>5/22/2022 2:31:52
PM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>
<td>26519</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Plinth to be repaired
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/24/2022 11:52:43 AM</td><td> </td><td>5/22/2022 2:31:51
PM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>27433</td><td>Entrance walls</td><td>Truck scanner
Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Area not
cleaned/finished.</td><td>&#39;Missing manhole label</td><td>High</td><td>3/14/2022
12:00:00 AM</td><td>ahmedsalem</td><td>3/7/2022 2:55:00 PM</td><td>
</td><td>5/22/2022 2:31:50 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28538</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Door handle not connected to the inner part.
</td><td>High</td><td>5/16/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:42 AM</td><td> </td><td>5/22/2022 2:02:59
PM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>28464</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Humidifier drain hose not connected.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:20 PM</td><td> </td><td>5/22/2022 2:01:49
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>20736</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy wall should be adjusted
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:50 PM</td><td> </td><td>5/22/2022 1:46:36
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20734</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Damaged part should be repaired
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:47 PM</td><td> </td><td>5/22/2022 1:46:08
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>20729</td><td>LIBRARY ADMIN</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wall needs adjustment and repair
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:41 PM</td><td> </td><td>5/22/2022 1:45:25
PM</td><td>&nbsp;</td><td>MR.14.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>20737</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wall needs touch up painting
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:02:51 PM</td><td> </td><td>5/22/2022 1:44:34
PM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>13768</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Opening above metal door should close
it</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/1/2020 11:39:51 AM</td><td> </td><td>5/22/2022 1:40:37
PM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>13846</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Acoustic
Walling</td><td>General Snag</td><td>&#39;Missing fire collar around hdpe pipe
</td><td>High</td><td>12/8/2020 12:00:00 AM</td><td>ahmedsalem</td><td>12/1/2020
12:21:09 PM</td><td> </td><td>5/22/2022 1:37:12
PM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>21546</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
9:51:48 AM</td><td> </td><td>5/22/2022 1:31:43
PM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>19914</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Scratches</td><td>&#39;Corner should be right angle
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:25:11 AM</td><td> </td><td>5/22/2022 1:30:16
PM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>19909</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Sealant need to repair </td><td>Low</td><td>8/19/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>7/29/2021 11:25:04 AM</td><td> </td><td>5/22/2022
12:24:06 PM</td><td>&nbsp;</td><td>MS.18.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>19906</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Fire Sealant should be repaired </td><td>Low</td><td>8/19/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021 11:25:00 AM</td><td>
</td><td>5/22/2022 12:23:06
PM</td><td>&nbsp;</td><td>MS.23.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>13824</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Some holes need repair- touch up for dust seller on repaired
area</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/1/2020 11:42:17 AM</td><td> </td><td>5/22/2022 12:18:08
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>13782</td><td>W.C. /M</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Floor Tile</td><td>Cleaning</td><td>&#39;Ceramic tiles should be clean
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:40:26 AM</td><td> </td><td>5/22/2022 12:16:36
PM</td><td>&nbsp;</td><td>MW.18.2A.001B</td><td>&nbsp;</td>
</tr><tr>
<td>13770</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Missing sealant around mep Fixtures
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:39:59 AM</td><td> </td><td>5/22/2022 12:12:49
PM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>13765</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around mep Fixtures
</td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:39:44 AM</td><td> </td><td>5/22/2022 12:11:09
PM</td><td>&nbsp;</td><td>MS.18.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>13743</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>Cracks</td><td>&#39;Repair and touch up
</td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:38:40 AM</td><td> </td><td>5/22/2022 12:09:41
PM</td><td>&nbsp;</td><td>MS.23.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>13763</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair for sealant
</td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:39:38 AM</td><td> </td><td>5/22/2022 12:05:43
PM</td><td>&nbsp;</td><td>MS.18.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>13756</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Touch up for repair </td><td>Low</td><td>12/22/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/1/2020 11:39:22 AM</td><td> </td><td>5/22/2022
12:05:00 PM</td><td>&nbsp;</td><td>MS.18.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>14387</td><td>B.O.H-ARTEFACTS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Brick/Blockwork</td><td>Fire/acoustic
insulation missing</td><td>&#39;Missing fire sealant around fire damper
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>ahmedsalem</td><td>12/24/2020
3:22:32 PM</td><td> </td><td>5/22/2022 11:53:18
AM</td><td>&nbsp;</td><td>MQ.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>14404</td><td>B.O.H-PLANT - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>Fire/acoustic insulation
missing</td><td>&#39;Missing fire sealant </td><td>High</td><td>12/31/2020 12:00:00
AM</td><td>ahmedsalem</td><td>12/24/2020 3:23:18 PM</td><td> </td><td>5/22/2022
11:53:16 AM</td><td>&nbsp;</td><td>MS.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18225</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Flooring -
Rubber flooring</td><td>Not aligned</td><td>&#39;Joints between skirting and walls
should be zero joint </td><td>Low</td><td>6/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/31/2021 4:04:58 PM</td><td> </td><td>5/22/2022
11:53:13 AM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18226</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Flooring -
Rubber flooring</td><td>Not aligned</td><td>&#39;Joints between skirting tiles
should be zero joint </td><td>Low</td><td>6/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/31/2021 4:05:00 PM</td><td> </td><td>5/22/2022
11:53:11 AM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18229</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Repair for cracks and damaged gypsum wall
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021
4:05:05 PM</td><td> </td><td>5/22/2022 11:53:10
AM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18258</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Stone
Skirting</td><td>General Snag</td><td>&#39;Skirting should be leveled with floor
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021
4:11:03 PM</td><td> </td><td>5/22/2022 11:53:09
AM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18263</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Change the cutting piece with another one
to be matching with the both side</td><td>Low</td><td>6/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/31/2021 4:11:10 PM</td><td> </td><td>5/22/2022
11:53:07 AM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18267</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling painting need touch up ceiling
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021
4:11:16 PM</td><td> </td><td>5/22/2022 11:53:06
AM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18640</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:22:38 PM</td><td> </td><td>5/22/2022 11:53:04
AM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18647</td><td>FIRST AID - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:22:53 PM</td><td> </td><td>5/22/2022 11:53:03
AM</td><td>&nbsp;</td><td>MG.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18672</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Close opening at gypsum ceiling
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:23:45 PM</td><td> </td><td>5/22/2022 11:53:00
AM</td><td>&nbsp;</td><td>ME.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19103</td><td>AHU - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Epoxy paint floor need to touch up
and cleaning </td><td>Low</td><td>7/7/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/16/2021 10:53:47 AM</td><td> </td><td>5/22/2022
11:52:59 AM</td><td>&nbsp;</td><td>MS.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19425</td><td>BREAKOUT AREA - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Air gaps should be adjusted </td><td>Low</td><td>7/15/2021
12:00:00 AM</td><td>mohamed.sami</td><td>6/24/2021 11:55:23 AM</td><td>
</td><td>5/22/2022 11:52:57
AM</td><td>&nbsp;</td><td>ME.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19427</td><td>BREAKOUT AREA - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Air gaps should be adjusted </td><td>Low</td><td>7/15/2021
12:00:00 AM</td><td>mohamed.sami</td><td>6/24/2021 11:55:24 AM</td><td>
</td><td>5/22/2022 11:52:55
AM</td><td>&nbsp;</td><td>ME.12.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19591</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:26:08 PM</td><td> </td><td>5/22/2022 11:52:54
AM</td><td>&nbsp;</td><td>MW.13.002.002</td><td>&nbsp;</td>
</tr><tr>
<td>19594</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Damages</td><td>&#39;Close opening </td><td>Low</td><td>7/21/2021
12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021 1:26:11 PM</td><td>
</td><td>5/22/2022 11:52:53
AM</td><td>&nbsp;</td><td>MW.13.002.002</td><td>&nbsp;</td>
</tr><tr>
<td>19609</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant around metal door frames need to repair
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:26:33 PM</td><td> </td><td>5/22/2022 11:52:51
AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19612</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:26:38 PM</td><td> </td><td>5/22/2022 11:52:50
AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19613</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>Sagging</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:26:39 PM</td><td> </td><td>5/22/2022 11:52:49
AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19616</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Access door need to fixed properly
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:26:43 PM</td><td> </td><td>5/22/2022 11:52:47
AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19690</td><td>SCULPTURE ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Stone counter
backsplash</td><td>General</td><td>&#39;Missing back splash
</td><td>Low</td><td>7/14/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:29:29 PM</td><td> </td><td>5/22/2022 11:52:46
AM</td><td>&nbsp;</td><td>MK.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>19720</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Damaged</
td><td>&#39;Wooden furniture unit not leveled with gypsum wall
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:13 PM</td><td> </td><td>5/22/2022 11:52:45
AM</td><td>&nbsp;</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19726</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Stone counter
backsplash</td><td>General</td><td>&#39;Missing back splash
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:22 PM</td><td> </td><td>5/22/2022 11:52:43
AM</td><td>&nbsp;</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19734</td><td>SCULPTURE ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Column Edges should be straight and
aligned </td><td>Low</td><td>7/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>7/7/2021 1:30:35 PM</td><td> </td><td>5/22/2022
11:52:42 AM</td><td>&nbsp;</td><td>MK.13.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>19743</td><td>PAINTING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Damaged</
td><td>&#39;Broken corian edge should be repaired </td><td>Low</td><td>7/28/2021
12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021 1:30:47 PM</td><td>
</td><td>5/22/2022 11:52:41
AM</td><td>&nbsp;</td><td>MK.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19744</td><td>PAINTING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Corian vanity not leveled with gypsum wall
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:48 PM</td><td> </td><td>5/22/2022 11:52:40
AM</td><td>&nbsp;</td><td>MK.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19745</td><td>PAINTING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Bottom part need to fixed properly </td><td>Low</td><td>7/28/2021
12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021 1:30:50 PM</td><td>
</td><td>5/22/2022 11:52:38
AM</td><td>&nbsp;</td><td>MK.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>25480</td><td>FIRE EXIT</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Marked joint should be aligned
</td><td>Low</td><td>12/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/8/2021
1:40:44 PM</td><td> </td><td>5/22/2022 11:52:37
AM</td><td>&nbsp;</td><td>MP.18.03.006</td><td>&nbsp;</td>
</tr><tr>
<td>25483</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Irregular interface between cladding and stair steps
</td><td>Low</td><td>12/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>12/8/2021
1:40:52 PM</td><td> </td><td>5/22/2022 11:52:36 AM</td><td>&nbsp;</td><td>Level
+48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25568</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Joint between stone cladding and flooring
should be regular and adjusted </td><td>Low</td><td>12/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/9/2021 12:58:21 PM</td><td> </td><td>5/22/2022
11:52:35 AM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25571</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Joint between stone flooring and plates should
be regular for both sides </td><td>Low</td><td>12/30/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/9/2021 12:58:28 PM</td><td> </td><td>5/22/2022
11:52:33 AM</td><td>&nbsp;</td><td>Level +48.00</td><td>&nbsp;</td>
</tr><tr>
<td>25723</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Broken, to be replaced</td><td>&#39;One broken tile should be
replaced </td><td>Low</td><td>1/5/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/15/2021 1:50:33 PM</td><td> </td><td>5/22/2022
11:52:32 AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25724</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing grouting </td><td>Low</td><td>1/5/2022
12:00:00 PM</td><td>mohamed.sami</td><td>12/15/2021 1:50:36 PM</td><td>
</td><td>5/22/2022 11:52:31
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25728</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Sealant between stone skirting and stainless
steel should be unified </td><td>Low</td><td>1/5/2022 12:00:00
AM</td><td>mohamed.sami</td><td>12/15/2021 1:50:45 PM</td><td> </td><td>5/22/2022
11:52:30 AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25729</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Remaining grout should be removed
</td><td>Low</td><td>1/5/2022 12:00:00 PM</td><td>mohamed.sami</td><td>12/15/2021
1:50:47 PM</td><td> </td><td>5/22/2022 11:52:28
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25730</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing sealant between stone slides and
travelator should be completed </td><td>Low</td><td>1/5/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/15/2021 1:50:51 PM</td><td> </td><td>5/22/2022
11:52:27 AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25886</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Damaged sika fill foam should be repaired
</td><td>Low</td><td>2/13/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/23/2022
11:59:28 AM</td><td> </td><td>5/22/2022 11:52:26
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25999</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Metal flashing should be uniform
and regular </td><td>Low</td><td>2/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/25/2022 11:39:16 AM</td><td> </td><td>5/22/2022
11:52:25 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26001</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Fa&#231;ade -
Glazing/Framing</td><td>General Snag</td><td>&#39;Toothing between EWS-03c and
flashing should be adjusted and flushed </td><td>Low</td><td>2/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/25/2022 11:39:20 AM</td><td> </td><td>5/22/2022
11:52:24 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>13747</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing sealant </td><td>Low</td><td>12/22/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/1/2020 11:38:54 AM</td><td> </td><td>5/22/2022
11:33:54 AM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>20745</td><td>RARE BOOK LIBRARY</td><td>MU
L10</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Damaged part should be repaired
</td><td>Low</td><td>8/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021
12:03:02 PM</td><td> </td><td>5/22/2022 11:31:30
AM</td><td>&nbsp;</td><td>MR.14.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>16497</td><td>Plant</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Sealant around MEP fixtures is missing
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:05 AM</td><td> </td><td>5/22/2022 11:30:25
AM</td><td>&nbsp;</td><td>MS.19.0G.006</td><td>&nbsp;</td>
</tr><tr>
<td>16476</td><td>Waste Store</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Missing Sealant around duct</td><td>Low</td><td>3/8/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>2/15/2021 11:34:38 AM</td><td> </td><td>5/22/2022
11:29:45 AM</td><td>&nbsp;</td><td>MS.19.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>16261</td><td>LOBBY</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Corners should be adjusted </td><td>Low</td><td>2/21/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021 2:00:37 PM</td><td>
</td><td>5/22/2022 11:26:46
AM</td><td>&nbsp;</td><td>MW.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21545</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Adjust and repair for marked part
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
9:51:47 AM</td><td> </td><td>5/22/2022 11:25:48
AM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21179</td><td>CORE B2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wall needs touch up painting
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:56:47 AM</td><td> </td><td>5/22/2022 11:25:03
AM</td><td>&nbsp;</td><td>MC.18.2A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21114</td><td>CORE B2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021
10:49:36 AM</td><td> </td><td>5/22/2022 11:24:23
AM</td><td>&nbsp;</td><td>MC.18.2A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>19921</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Paint Stains</td><td>&#39;Stainless steel bar not aligned
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:25:21 AM</td><td> </td><td>5/22/2022 11:23:31
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28424</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing valves supports.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:45 PM</td><td> </td><td>5/22/2022 11:17:07
AM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>19920</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Paint Stains</td><td>&#39;Welding need to finish
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:25:20 AM</td><td> </td><td>5/22/2022 11:15:10
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>19919</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Paint Stains</td><td>&#39;Three stainless steel corner not leveled
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:25:18 AM</td><td> </td><td>5/22/2022 11:14:27
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>19918</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Paint Stains</td><td>&#39;Stainless steel bar nor vertical
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:25:17 AM</td><td> </td><td>5/22/2022 11:13:20
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>19917</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Stainless steel bar not aligned
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:25:16 AM</td><td> </td><td>5/22/2022 11:12:24
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>19916</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Paint finish</td><td>&#39;Welding line not finished
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:25:14 AM</td><td> </td><td>5/22/2022 11:11:25
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>19908</td><td>MACHINE ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door leaf
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:25:03 AM</td><td> </td><td>5/22/2022 11:10:34
AM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>19907</td><td>MACHINE ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Repair for marked hole</td><td>Low</td><td>8/19/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>7/29/2021 11:25:02 AM</td><td> </td><td>5/22/2022
11:08:59 AM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>19904</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing Sealant around electrical pipes
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:24:57 AM</td><td> </td><td>5/22/2022 11:08:03
AM</td><td>&nbsp;</td><td>MS.18.2A.016</td><td>&nbsp;</td>
</tr><tr>
<td>19897</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Fire Sealant need to repair </td><td>Low</td><td>8/19/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021 11:24:45 AM</td><td>
</td><td>5/22/2022 11:07:15
AM</td><td>&nbsp;</td><td>MS.18.2A.025</td><td>&nbsp;</td>
</tr><tr>
<td>19896</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Repair around pipes </td><td>Low</td><td>8/19/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>7/29/2021 11:24:43 AM</td><td> </td><td>5/22/2022
11:06:29 AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>19895</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Close marked openings </td><td>Low</td><td>8/19/2021 12:00:00
AM</td><td>Adel Nassrat</td><td>7/29/2021 11:24:41 AM</td><td> </td><td>5/22/2022
11:05:23 AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>19894</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Floors</td><td>Rough
surface</td><td>&#39;Missing Sealant around pipes </td><td>Low</td><td>8/19/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021 11:24:39 AM</td><td>
</td><td>5/22/2022 11:04:26
AM</td><td>&nbsp;</td><td>MS.23.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>13764</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Touch up for repair </td><td>Low</td><td>12/22/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/1/2020 11:39:41 AM</td><td> </td><td>5/22/2022
11:03:43 AM</td><td>&nbsp;</td><td>MS.18.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>13758</td><td>MACHINE ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>Cracks</td><td>&#39;Repair for concrete floor
</td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:39:27 AM</td><td> </td><td>5/22/2022 11:02:39
AM</td><td>&nbsp;</td><td>MS.13.0B.001</td><td>&nbsp;</td>
</tr><tr>
<td>13750</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Repair for sealant </td><td>Low</td><td>12/22/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/1/2020 11:39:04 AM</td><td> </td><td>5/22/2022
11:01:40 AM</td><td>&nbsp;</td><td>MS.18.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>13742</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Touch up for repair </td><td>Low</td><td>12/22/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/1/2020 11:38:37 AM</td><td> </td><td>5/22/2022
11:00:15 AM</td><td>&nbsp;</td><td>MS.23.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>10535</td><td>CLEANERS</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Fixed accessories</td><td>General</td><td>&#39;Missing bathroom fixed accessories
</td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:15:10 PM</td><td> </td><td>5/22/2022 10:07:47
AM</td><td>&nbsp;</td><td>MW.18.2A.001D</td><td>&nbsp;</td>
</tr><tr>
<td>21311</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Air Handling Units</td><td>General
Snag</td><td>&#39;Missing insulation for drain </td><td>High</td><td>8/24/2021
12:00:00 AM</td><td>ahmedsalem</td><td>8/17/2021 4:07:02 PM</td><td>
</td><td>5/22/2022 8:54:41
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>24857</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Fixation for signage on the wall need to be adjusted
.</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>11/8/2021 11:45:49 AM</td><td> </td><td>5/21/2022 1:48:14
PM</td><td>Done</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>
<td>24860</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Metal flashing corner should be
adjusted.</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>11/8/2021 11:46:19 AM</td><td> </td><td>5/21/2022 1:48:13
PM</td><td>Done</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>
<td>24862</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Interface between metal flashing and sandwich panel should be
adjusted.</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>11/8/2021 11:46:34 AM</td><td> </td><td>5/21/2022 1:48:11
PM</td><td>&nbsp;</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>
<td>24869</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Interface between metal flashing and sandwich Panel need to
adjusted.</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>11/8/2021 11:47:07 AM</td><td> </td><td>5/21/2022 1:48:09
PM</td><td>Done</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>
<td>24871</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Interface between metal flashing and sandwich panels should be
adjusted.</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>11/8/2021 11:47:25 AM</td><td> </td><td>5/21/2022 1:48:08
PM</td><td>&nbsp;</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>
<td>24872</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Bad finish painting need to
repair.</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>11/8/2021 11:47:33 AM</td><td> </td><td>5/21/2022 1:48:07
PM</td><td>Done</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>
<td>24873</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Bad finish painting for bottom of tie beam need to
repair.</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>11/8/2021 11:47:34 AM</td><td> </td><td>5/21/2022 1:48:05
PM</td><td>Done</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>
<td>24874</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Metal flashing corner should be
adjusted.</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>11/8/2021 11:47:36 AM</td><td> </td><td>5/21/2022 1:48:03
PM</td><td>Done</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>
<td>24875</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Gap between metal flashing and concrete wall need to
adjustment.</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>11/8/2021 11:47:38 AM</td><td> </td><td>5/21/2022 1:48:02
PM</td><td>Done</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>
<td>24879</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Gap between metal flashing and concrete wall need to
adjustment.</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>11/8/2021 11:48:18 AM</td><td> </td><td>5/21/2022 1:48:01
PM</td><td>&nbsp;</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>
<td>19941</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Stopping</td><td>General Snag</td><td>&#39;Missing fire collar around HDPE and PPR
pipes </td><td>High</td><td>8/5/2021 12:00:00
AM</td><td>ahmedsalem</td><td>7/29/2021 1:03:40 PM</td><td> </td><td>5/21/2022
11:02:07 AM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28488</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;No labels for hydronic pipes.
</td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:05 PM</td><td> </td><td>5/21/2022 11:02:04
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28505</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Insulation need
repair. </td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:35 PM</td><td> </td><td>5/21/2022 11:02:03
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28691</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Duct insulation shall be repaired before applying the
cladding. </td><td>High</td><td>5/17/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:47:39 PM</td><td> </td><td>5/21/2022 11:01:57
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28456</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Threaded rod penetrating thermal insulation.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:07 PM</td><td> </td><td>5/19/2022 2:53:12
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28690</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing acoustic lining for ex. Air duct.
</td><td>High</td><td>5/17/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:47:37 PM</td><td> </td><td>5/19/2022 2:50:26
PM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>15624</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Linoleum skirting ( missing some linoleum
skirting - joints between skirting tiles should be zero joint - skirting not
adhesive well - gap between flooring and skirting )</td><td>Low</td><td>2/22/2021
12:00:00 AM</td><td>Kerolos Nagy Tawfik</td><td>2/1/2021 11:31:08 AM</td><td>
</td><td>5/19/2022 2:20:15
PM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>22051</td><td>CORE D3</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing insulation
</td><td>High</td><td>8/30/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/23/2021
3:57:34 PM</td><td> </td><td>5/19/2022 12:15:22
PM</td><td>&nbsp;</td><td>MC.13.0G.D31</td><td>&nbsp;</td>
</tr><tr>
<td>19948</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Stopping</td><td>General Snag</td><td>&#39;Missing fire collar around HDPE pipe
</td><td>High</td><td>8/5/2021 12:00:00 AM</td><td>ahmedsalem</td><td>7/29/2021
1:03:49 PM</td><td> </td><td>5/19/2022 12:12:15
PM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28504</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing insulation for duct. </td><td>High</td><td>5/15/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/8/2022 4:15:33 PM</td><td>
</td><td>5/19/2022 12:05:15
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28670</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage thermal insulation shall be fixed before applying
cladding. </td><td>High</td><td>5/17/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:40:20 PM</td><td> </td><td>5/19/2022 12:03:06
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28671</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing labels. </td><td>High</td><td>5/17/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:41:35 PM</td><td>
</td><td>5/19/2022 12:02:03
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28732</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>Installation not to specification/drawing</td><td>&#39;Missing
labels. </td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:46:15 AM</td><td> </td><td>5/19/2022 12:00:46
PM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28733</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>Installation not to specification/drawing</td><td>&#39;Missing
thermal insulation for air duct. </td><td>High</td><td>5/18/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/11/2022 11:46:17 AM</td><td>
</td><td>5/19/2022 12:00:12
PM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28735</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>Installation not to specification/drawing</td><td>&#39;Missing
thermal insulation for air duct. </td><td>High</td><td>5/18/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/11/2022 11:46:19 AM</td><td>
</td><td>5/19/2022 11:59:31
AM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28304</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Canvas need repair or replacement.
</td><td>Medium</td><td>4/29/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:25 AM</td><td> </td><td>5/19/2022 11:41:20
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28384</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Damage insulation.
</td><td>High</td><td>5/4/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/27/2022 11:44:42 AM</td><td> </td><td>5/19/2022 11:41:18
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28416</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to specification/drawing</td><td>&#39;Chilled
water pipes insulation shall be repaired. </td><td>High</td><td>5/12/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:04:30 PM</td><td>
</td><td>5/19/2022 11:41:13
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>28420</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Insulation for duct works need repairs and to be completed.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:39 PM</td><td> </td><td>5/19/2022 11:41:12
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>28459</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Chilled water pipes insulation need repairs.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:12 PM</td><td> </td><td>5/19/2022 11:41:07
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28485</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Chilled water pipes
insulation damage. </td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:14:59 PM</td><td> </td><td>5/19/2022 11:41:06
AM</td><td>&nbsp;</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28501</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage insulation
need repair. </td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:28 PM</td><td> </td><td>5/19/2022 11:41:03
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28543</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Boxes not
fitted</td><td>&#39;Duct thermal insulation need repairs.
</td><td>High</td><td>5/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:53 AM</td><td> </td><td>5/19/2022 11:41:02
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28867</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Canvases need adjustment and threaded rods shall be removed.
</td><td>High</td><td>5/23/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/16/2022 4:07:04 PM</td><td> </td><td>5/19/2022 11:40:58
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>14583</td><td>Ticketing Piazza </td><td>Ticketing
Piazza</td><td>Closed</td><td>Hydrogreen</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Inclined palm</td><td>Low</td><td>1/19/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>12/29/2020 11:07:10 AM</td><td>
</td><td>5/19/2022 10:50:41 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22937</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/5/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/14/2021
11:12:50 AM</td><td> </td><td>5/19/2022 10:50:39 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>23184</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Toothing
between two tiles </td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:51:30 AM</td><td> </td><td>5/19/2022 10:50:38
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23260</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closer should be one tile
</td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/16/2021
12:06:03 PM</td><td> </td><td>5/19/2022 10:50:34
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23261</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tile should be replaced </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 12:06:05 PM</td><td> </td><td>5/19/2022 10:50:32
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23266</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closer should be one tile
</td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/16/2021
12:06:13 PM</td><td> </td><td>5/19/2022 10:50:31
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23271</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Tile should be replaced as per design
drawing pattern </td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 12:06:22 PM</td><td> </td><td>5/19/2022 10:50:29
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23272</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Erosion tiles should be treated
</td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/16/2021
12:06:24 PM</td><td> </td><td>5/19/2022 10:50:27
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23275</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Bitted tile should be replaced
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
12:06:29 PM</td><td> </td><td>5/19/2022 10:50:26
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23817</td><td>Security Fence</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Chamfered edge of concrete base should be
aligned </td><td>Low</td><td>11/10/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/20/2021 11:52:13 AM</td><td> </td><td>5/19/2022 10:50:24
AM</td><td>&nbsp;</td><td>Security Fence</td><td>&nbsp;</td>
</tr><tr>
<td>23836</td><td>Security Fence</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Kerb stone surface should be cleaned
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/24/2021
10:09:23 AM</td><td> </td><td>5/19/2022 10:50:23 AM</td><td>&nbsp;</td><td>Security
Fence</td><td>&nbsp;</td>
</tr><tr>
<td>23844</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cracked interlock should be repaired
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/24/2021
10:09:37 AM</td><td> </td><td>5/19/2022 10:50:22
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23851</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Upper and lower line of concrete should be aligned
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/24/2021
10:10:41 AM</td><td> </td><td>5/19/2022 10:50:21
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23861</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Kerbstone surface should be cleaned
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/24/2021
10:10:59 AM</td><td> </td><td>5/19/2022 10:50:20
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24151</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Concrete needs touch up </td><td>Low</td><td>11/16/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/26/2021 11:08:54 AM</td><td> </td><td>5/19/2022
10:50:18 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24152</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Interface between kerbstone and concrete should be aligned and
cleaned </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:08:55 AM</td><td> </td><td>5/19/2022 10:50:17
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24154</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Concrete needs touch up </td><td>Low</td><td>11/16/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/26/2021 11:08:59 AM</td><td> </td><td>5/19/2022
10:50:16 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24157</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Gaps between concrete and kerb stone should be as per shop
drawing </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:09:04 AM</td><td> </td><td>5/19/2022 10:50:15
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24186</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unacceptable curb
width.</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:09:48 AM</td><td> </td><td>5/19/2022 10:50:14
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24825</td><td>Mankauras - Phase 1</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stone flooring should be extended
</td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/7/2021 3:52:03 PM</td><td> </td><td>5/19/2022 10:50:13
AM</td><td>&nbsp;</td><td>Mankauras - Phase 1</td><td>&nbsp;</td>
</tr><tr>
<td>24876</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Bad finish painting need to repair and touch
up.</td><td>Low</td><td>11/29/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/8/2021 11:47:40 AM</td><td> </td><td>5/19/2022 9:04:08
AM</td><td>Done </td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>
<td>16419</td><td>VIP RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Sprinkler
System</td><td>Sprinkler plate</td><td>&#39;There should be a clearance between the
cover plate and the ceiling </td><td>High</td><td>2/21/2021 12:00:00
PM</td><td>Kriton Katsamenis </td><td>2/14/2021 3:10:23 PM</td><td>
</td><td>5/19/2022 8:16:58
AM</td><td>&nbsp;</td><td>MV.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27424</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Mechanical</td><td>Fire Extinguishers</td><td>Equipment</td><td>&#39;Wrong piping
and connection between fire hydrant and fire cabinet &amp; need to change piping
cause of rust &amp;incomplete work for valve box &amp;need painting for pipes
</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>ahmedsalem</td><td>3/7/2022
2:36:38 PM</td><td> </td><td>5/19/2022 8:14:31 AM</td><td>&nbsp;</td><td>South
Side</td><td>&nbsp;</td>
</tr><tr>
<td>16378</td><td>ESCAPE TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Sprinkler
System</td><td>Sprinkler plate</td><td>&#39;Remove painting from around sprinklers
</td><td>High</td><td>2/21/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>2/14/2021 3:08:03 PM</td><td> </td><td>5/19/2022 8:11:39
AM</td><td>&nbsp;</td><td>MQ.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>28713</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing handles for drain valves.
</td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:41 AM</td><td> </td><td>5/18/2022 6:00:03
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28435</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;All pressure gauges and thermometers not installed yet.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:05:09 PM</td><td> </td><td>5/18/2022 5:25:32
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28434</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;All pressure gauges and thermometers are missing.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:05:05 PM</td><td> </td><td>5/18/2022 5:24:09
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28433</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;All pressure gauges and thermometers are missing.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:05:04 PM</td><td> </td><td>5/18/2022 5:22:58
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28520</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Insulation need to be
adjusted. </td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:16:01 PM</td><td> </td><td>5/18/2022 5:21:39
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>14775</td><td>Land of Egypt - Level +42.00</td><td>Land of
Egypt</td><td>Closed</td><td>Hydrogreen</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Cleaning for cover of valve box
</td><td>High</td><td>1/19/2021 12:00:00 AM</td><td>ahmedsalem</td><td>1/12/2021
3:48:58 PM</td><td> </td><td>5/18/2022 5:18:44 PM</td><td>&nbsp;</td><td>Land of
Egypt - Level +42.00</td><td>&nbsp;</td>
</tr><tr>
<td>28710</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Holes in air duct shall be closed properly.
</td><td>High</td><td>5/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:37 AM</td><td> </td><td>5/18/2022 5:17:32
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28737</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>Installation not to specification/drawing</td><td>&#39;Return air
grill need to be adjusted. </td><td>High</td><td>5/18/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/11/2022 11:46:22 AM</td><td>
</td><td>5/18/2022 5:16:23
PM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28774</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing duct access door. </td><td>High</td><td>5/19/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/12/2022 1:13:31 PM</td><td>
</td><td>5/18/2022 5:15:27
PM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>9684</td><td>VOID</td><td>MU GF </td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguishers &amp; hose
must be adjustment </td><td>High</td><td>7/28/2020 12:00:00
PM</td><td>ahmedsalem</td><td>7/21/2020 11:57:24 AM</td><td> </td><td>5/18/2022
5:14:08 PM</td><td>&nbsp;</td><td>MS.13.0G.006</td><td>&nbsp;</td>
</tr><tr>
<td>28437</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage insulation. </td><td>High</td><td>5/12/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:05:13 PM</td><td>
</td><td>5/18/2022 4:57:04
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>20865</td><td>ADMIN-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Label for pipes &amp; insulation to install properly
</td><td>High</td><td>8/17/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/10/2021
3:32:05 PM</td><td> </td><td>5/18/2022 4:51:10
PM</td><td>&nbsp;</td><td>MS.13.01.007</td><td>&nbsp;</td>
</tr><tr>
<td>22055</td><td>CORE D3</td><td>MU
L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Installation not to
specification/drawing</td><td>&#39;Missing duct insulation
</td><td>High</td><td>8/30/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/23/2021
3:57:37 PM</td><td> </td><td>5/18/2022 4:49:57
PM</td><td>&nbsp;</td><td>MC.13.01.D31</td><td>&nbsp;</td>
</tr><tr>
<td>28413</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing funnel and drain point cover also is missing.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:19 PM</td><td> </td><td>5/18/2022 4:48:01
PM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>19994</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Fire
Stopping</td><td>General Snag</td><td>&#39;Missing fire collar for HDPE and PPR
pipes</td><td>High</td><td>8/5/2021 12:00:00
AM</td><td>ahmedsalem</td><td>7/29/2021 1:05:28 PM</td><td> </td><td>5/18/2022
3:25:25 PM</td><td>&nbsp;</td><td>MS.18.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>20132</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Chilled
water Piping and Insulation</td><td>Insulation damaged</td><td>&#39;PPR pipe need
collar </td><td>High</td><td>8/10/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/3/2021 11:43:52 AM</td><td> </td><td>5/18/2022
3:24:12 PM</td><td>&nbsp;</td><td>MS.18.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28484</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Duct thermal insulation damage.
</td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:14:57 PM</td><td> </td><td>5/18/2022 3:02:09
PM</td><td>&nbsp;</td><td>MS.19.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>29003</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing labels for PPR pipes. </td><td>High</td><td>5/24/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/17/2022 4:09:48 PM</td><td>
</td><td>5/18/2022 2:57:35
PM</td><td>&nbsp;</td><td>MS.19.2A.010</td><td>&nbsp;</td>
</tr><tr>
<td>28923</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing labels for
pipes. </td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:30:57 PM</td><td> </td><td>5/18/2022 2:53:01
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28915</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Missing labels for PPR
pipes. </td><td>High</td><td>5/24/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/17/2022 1:30:40 PM</td><td> </td><td>5/18/2022 2:52:15
PM</td><td>&nbsp;</td><td>MS.20.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28516</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Missing ventilation system for whole this area.
</td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:54 PM</td><td> </td><td>5/18/2022 12:20:51
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28397</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>5/4/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>4/27/2022 11:45:06 AM</td><td>
</td><td>5/18/2022 12:08:54
PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>18031</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Alignment of stone flooring with gypsum wall -
filling gap</td><td>Low</td><td>6/15/2021 12:00:00
PM</td><td>mohamed.sami</td><td>5/25/2021 12:27:06 PM</td><td> </td><td>5/18/2022
11:58:58 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18044</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>Porviva/Savita</td><td>Architectural</td><td>Wall</
td><td>General Snag</td><td>&#39;Aluminum gap filler is not installed
yet</td><td>Low</td><td>6/15/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/25/2021 12:38:43 PM</td><td> </td><td>5/18/2022
11:58:57 AM</td><td>As no instructions to do
that</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18132</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Defective Sealant need to adjust
</td><td>Low</td><td>6/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021
11:56:04 AM</td><td> </td><td>5/18/2022 11:58:56
AM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18297</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Cleaning for false ceiling tiles
</td><td>Low</td><td>6/22/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/1/2021
4:10:56 PM</td><td> </td><td>5/18/2022 11:58:54
AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18641</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Furniture</
td><td>Incomplete</td><td>&#39;Missing splash back</td><td>Low</td><td>6/30/2021
12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021 4:22:40 PM</td><td>
</td><td>5/18/2022 11:58:51
AM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18645</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:22:48 PM</td><td> </td><td>5/18/2022 11:58:49
AM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18664</td><td>KITCHEN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:23:28 PM</td><td> </td><td>5/18/2022 11:58:48
AM</td><td>&nbsp;</td><td>MS.18.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>18665</td><td>KITCHEN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:23:32 PM</td><td> </td><td>5/18/2022 11:58:46
AM</td><td>&nbsp;</td><td>MS.18.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>19116</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked part should be closed
</td><td>Low</td><td>7/7/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/16/2021
10:54:10 AM</td><td> </td><td>5/18/2022 11:58:45 AM</td><td>No instructions for
installation </td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19573</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:41 PM</td><td> </td><td>5/18/2022 11:58:44
AM</td><td>&nbsp;</td><td>MW.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19576</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Discoloring between stone tiles
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:47 PM</td><td> </td><td>5/18/2022 11:58:43
AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19580</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:52 PM</td><td> </td><td>5/18/2022 11:58:41
AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>19602</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>7/21/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/30/2021
1:26:23 PM</td><td> </td><td>5/18/2022 11:58:40
AM</td><td>&nbsp;</td><td>MW.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19618</td><td>CUSTODIAN - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>Damages</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:26:45 PM</td><td> </td><td>5/18/2022 11:58:39
AM</td><td>&nbsp;</td><td>MS.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>28306</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Chilled water pipe insulation need repair.
</td><td>Medium</td><td>4/29/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:31 AM</td><td> </td><td>5/18/2022 11:56:47
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28394</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage insulation for CWP. </td><td>High</td><td>5/4/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>4/27/2022 11:44:59 AM</td><td>
</td><td>5/18/2022 11:56:46
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>28548</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Chilled water pipe
insulation damage and need repairs. </td><td>High</td><td>5/16/2022 12:00:00
PM</td><td>Mohamed ElMahalawy</td><td>5/9/2022 11:49:02 AM</td><td>
</td><td>5/18/2022 11:56:37
AM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>12294</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Repair for grouting
</td><td>Low</td><td>11/2/2020 12:00:00 PM</td><td>Mohamed Samir</td><td>10/12/2020
3:10:12 PM</td><td> </td><td>5/18/2022 11:27:51
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21458</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cladding is missing
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/18/2021
11:43:48 AM</td><td> </td><td>5/18/2022 11:27:50 AM</td><td>&nbsp;</td><td>Glazing
Wall External Side</td><td>&nbsp;</td>
</tr><tr>
<td>21464</td><td>Internal Cladding of GA wall-
FC</td><td>Internal Cladding
FC</td><td>Closed</td><td>Alural</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Joint should be repaired to be the same
width </td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>8/18/2021 11:43:54 AM</td><td> </td><td>5/18/2022 11:27:49
AM</td><td>&nbsp;</td><td>Internal Cladding of GA wall- FC</td><td>&nbsp;</td>
</tr><tr>
<td>22620</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>9/22/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/1/2021
10:50:09 AM</td><td> </td><td>5/18/2022 11:27:48 AM</td><td>&nbsp;</td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>22888</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/4/2021 12:00:00 AM</td><td>mohamed.sami</td><td>9/13/2021
4:02:26 PM</td><td> </td><td>5/18/2022 11:27:48 AM</td><td>&nbsp;</td><td>Part
6</td><td>&nbsp;</td>
</tr><tr>
<td>22934</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/5/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/14/2021
11:12:45 AM</td><td> </td><td>5/18/2022 11:27:47 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22939</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/5/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/14/2021
11:12:53 AM</td><td> </td><td>5/18/2022 11:27:46 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>23566</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:15 AM</td><td> </td><td>5/18/2022 11:27:45
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23567</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:18 AM</td><td> </td><td>5/18/2022 11:27:44
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23569</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Missing
grouting between stone tiles </td><td>Low</td><td>10/12/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/21/2021 11:08:22 AM</td><td> </td><td>5/18/2022
11:27:43 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23596</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/13/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021
11:06:32 AM</td><td> </td><td>5/18/2022 11:27:42 AM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23603</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/13/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021
11:06:42 AM</td><td> </td><td>5/18/2022 11:27:42 AM</td><td>&nbsp;</td><td>Part
9</td><td>&nbsp;</td>
</tr><tr>
<td>23691</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/19/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/28/2021
9:56:58 AM</td><td> </td><td>5/18/2022 11:27:41 AM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23712</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Manhole should be flushed with stone floor
</td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/11/2021
10:29:25 AM</td><td> </td><td>5/18/2022 11:27:40
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23722</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/11/2021
10:29:42 AM</td><td> </td><td>5/18/2022 11:27:38
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23865</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Grouting and brooming should be apply properly
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/24/2021
10:11:06 AM</td><td> </td><td>5/18/2022 11:27:37
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23866</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Interface between fence base and concrete should be the same
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/24/2021
10:11:08 AM</td><td> </td><td>5/18/2022 11:27:36
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23946</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Poor repair for concrete edge </td><td>Low</td><td>11/15/2021
12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021 10:28:17 AM</td><td>
</td><td>5/18/2022 11:27:35 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24188</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joint mortar need to be applied
properly.</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:09:53 AM</td><td> </td><td>5/18/2022 11:27:33
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24360</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unacceptable detail and site should follow
design drawing.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/27/2021 11:41:19 AM</td><td> </td><td>5/18/2022 11:27:32
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24951</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Steel box should be rested in a
stone.</td><td>Low</td><td>11/17/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 11:28:08 AM</td><td> </td><td>5/18/2022 11:27:30
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24955</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Steel box should be rested in a
stone.</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 11:28:21 AM</td><td> </td><td>5/18/2022 11:27:29
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24958</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Missing cover stainless
accessories.</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 11:28:30 AM</td><td> </td><td>5/18/2022 11:27:28
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25150</td><td>Parking Level-P1</td><td>Parking
Levels</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Grouting should be adjusted </td><td>Low</td><td>12/6/2021
12:00:00 PM</td><td>Amr Nofal</td><td>11/15/2021 10:16:51 AM</td><td>
</td><td>5/18/2022 11:27:26 AM</td><td>&nbsp;</td><td>P1</td><td>&nbsp;</td>
</tr><tr>
<td>25156</td><td>Parking Level-P1</td><td>Parking
Levels</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone flooring should be cleaned and stains
should be removed </td><td>Low</td><td>11/22/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/15/2021 10:16:59 AM</td><td> </td><td>5/18/2022 11:27:25
AM</td><td>&nbsp;</td><td>P1</td><td>&nbsp;</td>
</tr><tr>
<td>25157</td><td>Parking Level-P2</td><td>Parking
Levels</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Grouting should be adjusted </td><td>Low</td><td>12/6/2021
12:00:00 PM</td><td>Amr Nofal</td><td>11/15/2021 10:17:00 AM</td><td>
</td><td>5/18/2022 11:27:24 AM</td><td>&nbsp;</td><td>P2</td><td>&nbsp;</td>
</tr><tr>
<td>25168</td><td>Parking Level-P1</td><td>Parking
Levels</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone flooring should be cleaned
</td><td>Low</td><td>11/22/2021 12:00:00 PM</td><td>Amr Nofal</td><td>11/15/2021
10:17:12 AM</td><td> </td><td>5/18/2022 11:27:22
AM</td><td>&nbsp;</td><td>P1</td><td>&nbsp;</td>
</tr><tr>
<td>25177</td><td>Parking Level-P2</td><td>Parking
Levels</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone flooring should be cleaned
</td><td>Low</td><td>12/6/2021 12:00:00 PM</td><td>Amr Nofal</td><td>11/15/2021
10:17:24 AM</td><td> </td><td>5/18/2022 11:27:20
AM</td><td>&nbsp;</td><td>P2</td><td>&nbsp;</td>
</tr><tr>
<td>9257</td><td>GRAND STAIR-Stiletto B</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Module 11 B - broken edges/ joints not
aligned/ stone need cleaning </td><td>Low</td><td>7/28/2020 12:00:00
PM</td><td>Sherif Elabd</td><td>7/7/2020 12:02:55 PM</td><td> </td><td>5/18/2022
11:13:45 AM</td><td>&nbsp;</td><td>Stiletto - wall B</td><td>&nbsp;</td>
</tr><tr>
<td>25450</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/7/2021
12:20:44 PM</td><td> </td><td>5/18/2022 11:13:42
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25454</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken edge should be repaired/fixed
properly </td><td>Low</td><td>12/28/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/7/2021 12:20:50 PM</td><td> </td><td>5/18/2022
11:13:41 AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25463</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>Not aligned</td><td>&#39;Miss alignment and irregular joint should
be aligned </td><td>Low</td><td>12/28/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/7/2021 12:24:42 PM</td><td> </td><td>5/18/2022
11:13:35 AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25466</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>General Snag</td><td>&#39;Discoloration for one glazing panel should
be checked </td><td>Low</td><td>12/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>12/7/2021 12:24:46 PM</td><td> </td><td>5/18/2022
11:13:34 AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25474</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Broken, to be replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/7/2021
12:24:59 PM</td><td> </td><td>5/18/2022 11:13:33
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25476</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Joint between FL-03 and EXF-05 should be
adjusted </td><td>Low</td><td>12/28/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/7/2021 12:25:03 PM</td><td> </td><td>5/18/2022
11:13:31 AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25484</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Sealer roller traces
</td><td>Low</td><td>12/29/2021 12:00:00 AM</td><td>mohamed.sami</td><td>12/8/2021
1:40:54 PM</td><td> </td><td>5/18/2022 11:13:30
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25502</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Edges should be trim
</td><td>Low</td><td>12/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/8/2021
1:41:35 PM</td><td> </td><td>5/18/2022 11:13:28
AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25503</td><td>ELEC.</td><td>MU L30</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Repair should be finished
</td><td>Low</td><td>12/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>12/8/2021
1:41:38 PM</td><td> </td><td>5/18/2022 11:13:27
AM</td><td>&nbsp;</td><td>MS.18.03.002</td><td>&nbsp;</td>
</tr><tr>
<td>25505</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Gap
should be closed </td><td>Low</td><td>12/29/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/8/2021 1:41:42 PM</td><td> </td><td>5/18/2022
11:13:25 AM</td><td>&nbsp;</td><td>Level+49.50</td><td>&nbsp;</td>
</tr><tr>
<td>25633</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Marked
lower edge should be aligned </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:52:23 AM</td><td> </td><td>5/18/2022
11:13:22 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25640</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
marked slide should be replaced </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:52:29 AM</td><td> </td><td>5/18/2022
11:13:21 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25644</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Repair
for stone stair edges should be finished </td><td>Low</td><td>12/21/2021 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:52:36 AM</td><td> </td><td>5/18/2022
11:13:19 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25647</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Joint between FL-03 and EXF-05 should be
adjusted </td><td>Low</td><td>1/4/2022 12:00:00
PM</td><td>mohamed.sami</td><td>12/14/2021 10:52:41 AM</td><td> </td><td>5/18/2022
11:13:18 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25877</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked joints should be adjusted
</td><td>Low</td><td>2/13/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/23/2022
11:59:09 AM</td><td> </td><td>5/18/2022 11:13:16
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25948</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked edge should be aligned
</td><td>Low</td><td>2/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022
12:07:38 PM</td><td> </td><td>5/18/2022 11:13:15
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25950</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Stone edge should be aligned
</td><td>Low</td><td>2/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022
12:07:41 PM</td><td> </td><td>5/18/2022 11:13:13
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25951</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Chipped edges should be trimmed
</td><td>Low</td><td>2/14/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/24/2022
12:07:43 PM</td><td> </td><td>5/18/2022 11:13:12
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25955</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Stains should be removed and cleaned
</td><td>Low</td><td>2/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022
12:07:50 PM</td><td> </td><td>5/18/2022 11:13:11
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26003</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked joints should be closed and regular
</td><td>Low</td><td>2/15/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/25/2022
11:39:23 AM</td><td> </td><td>5/18/2022 11:13:09
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26004</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Interface between stone and ceiling should be leveled and regular
</td><td>Low</td><td>2/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/25/2022
11:39:25 AM</td><td> </td><td>5/18/2022 11:13:08
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26008</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Stone edge should be trim and finished
properly </td><td>Low</td><td>2/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/25/2022 11:39:33 AM</td><td> </td><td>5/18/2022
11:13:07 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26023</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;repair should be finished
</td><td>Low</td><td>2/15/2022 12:00:00 PM</td><td>mohamed.sami</td><td>1/25/2022
11:52:15 AM</td><td> </td><td>5/18/2022 11:13:05
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22094</td><td>CORE B3-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing duct insulation
</td><td>High</td><td>8/30/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/23/2021
3:58:12 PM</td><td> </td><td>5/18/2022 10:08:55
AM</td><td>&nbsp;</td><td>MC.12.01.B31</td><td>&nbsp;</td>
</tr><tr>
<td>28337</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Stationer insulation not installed
properly. </td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:02 AM</td><td> </td><td>5/18/2022 9:57:56
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28688</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing access door. </td><td>High</td><td>5/17/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:47:34 PM</td><td>
</td><td>5/18/2022 9:57:00
AM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28522</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Ex. Air duct shall have acoustic lining.
</td><td>High</td><td>5/16/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:10 AM</td><td> </td><td>5/18/2022 9:56:21
AM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>22084</td><td>CORE B3 - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing duct insulation &amp; volume damper
handle need adjustment </td><td>High</td><td>8/30/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/23/2021 3:58:05 PM</td><td> </td><td>5/18/2022
9:49:40 AM</td><td>&nbsp;</td><td>MC.12.02.B31</td><td>&nbsp;</td>
</tr><tr>
<td>28849</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Duct support shall be out of thermal insulation.
</td><td>High</td><td>5/22/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/15/2022 11:58:37 AM</td><td> </td><td>5/18/2022 9:35:14
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28681</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;PPR pipe shall be adjusted and fixed properly.
</td><td>High</td><td>5/17/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:41:51 PM</td><td> </td><td>5/17/2022 4:59:20
PM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28449</td><td>CORE E1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;No ventilation system detected in this area.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:05:54 PM</td><td> </td><td>5/17/2022 4:56:00
PM</td><td>&nbsp;</td><td>MC.24.2A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>23803</td><td>Decorative Fence</td><td>East
Fences</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
cutting of stone edges not accepted </td><td>Low</td><td>11/8/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/18/2021 4:42:33 PM</td><td> </td><td>5/17/2022
4:46:10 PM</td><td>&nbsp;</td><td>Decorative Fence</td><td>&nbsp;</td>
</tr><tr>
<td>24355</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Curb stone surface to be clean
properly.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/27/2021 11:41:10 AM</td><td> </td><td>5/17/2022 4:46:09
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28513</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Insulation need
repair. </td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:50 PM</td><td> </td><td>5/17/2022 4:12:06
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>24246</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Joint
need filled with grout.</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Moussa
Nageh Khella</td><td>10/26/2021 4:25:02 PM</td><td> </td><td>5/17/2022 4:10:32
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>10486</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Remove scaffolding and storage material
</td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:13:18 PM</td><td> </td><td>5/17/2022 3:37:25
PM</td><td>&nbsp;</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>13612</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>General Snag</td><td>&#39;Missing epoxy paint floor
</td><td>Low</td><td>12/14/2020 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>11/23/2020 3:45:26 PM</td><td> </td><td>5/17/2022 3:37:23
PM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>13615</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Repair for damaged concrete and sealant
</td><td>Low</td><td>12/14/2020 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>11/23/2020 3:45:35 PM</td><td> </td><td>5/17/2022 3:37:21
PM</td><td>&nbsp;</td><td>MS.23.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>13616</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete flooring need surface preparation
and painting dust sealer pt-05</td><td>Low</td><td>12/14/2020 12:00:00
AM</td><td>Kerolos Nagy Tawfik</td><td>11/23/2020 3:45:38 PM</td><td>
</td><td>5/17/2022 3:37:20
PM</td><td>&nbsp;</td><td>MS.23.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28320</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing labels for all trades. </td><td>High</td><td>4/26/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>4/19/2022 11:49:34 AM</td><td>
</td><td>5/17/2022 1:33:31
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28355</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Clash between fire pipe and duct work
insulation. </td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:50 AM</td><td> </td><td>5/17/2022 1:33:28
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28360</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Machine door in not closing properly.
</td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:45:01 AM</td><td> </td><td>5/17/2022 1:33:24
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28702</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire fighting pipes seismic restrains
are missing. </td><td>High</td><td>5/18/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:26 AM</td><td> </td><td>5/17/2022 1:33:20
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>10534</td><td>W.C. /M</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Fixed accessories</td><td>General</td><td>&#39;Missing bathroom fixed accessories
</td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:15:08 PM</td><td> </td><td>5/17/2022 1:19:10
PM</td><td>&nbsp;</td><td>MW.18.2A.001B</td><td>&nbsp;</td>
</tr><tr>
<td>28705</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing thermal insulation for air duct.
</td><td>High</td><td>5/18/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/11/2022 11:45:30 AM</td><td> </td><td>5/17/2022 12:05:05
PM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28767</td><td>SHAFT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Supports for air duct are dismantled.
</td><td>High</td><td>5/19/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/12/2022 11:45:19 AM</td><td> </td><td>5/17/2022 12:04:10
PM</td><td>&nbsp;</td><td>MS.13.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>24250</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Joint
between stone cladding and glazing panels need to
finish.</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>10/26/2021 4:25:08 PM</td><td> </td><td>5/17/2022 11:59:21
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24248</td><td>GRAND STAIR</td><td>MU
L30</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Joint
need filled with grout.</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Moussa
Nageh Khella</td><td>10/26/2021 4:25:05 PM</td><td> </td><td>5/17/2022 11:59:13
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22594</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>Direction</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stainless steel gutter should be aligned
and fixed properly </td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/1/2021 10:49:32 AM</td><td> </td><td>5/17/2022 10:20:59
AM</td><td>&nbsp;</td><td>Part 4</td><td>&nbsp;</td>
</tr><tr>
<td>22601</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>Direction</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stainless steel gutter should be aligned
and fixed properly </td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/1/2021 10:49:42 AM</td><td> </td><td>5/17/2022 10:20:59
AM</td><td>&nbsp;</td><td>Part 3</td><td>&nbsp;</td>
</tr><tr>
<td>22609</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>Direction</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stainless steel gutter should be aligned
and fixed properly </td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/1/2021 10:49:53 AM</td><td> </td><td>5/17/2022 10:20:58
AM</td><td>&nbsp;</td><td>Part 2</td><td>&nbsp;</td>
</tr><tr>
<td>22615</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>Direction</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stainless steel gutter should be aligned
and fixed properly </td><td>Low</td><td>9/22/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/1/2021 10:50:02 AM</td><td> </td><td>5/17/2022 10:20:57
AM</td><td>&nbsp;</td><td>Part 1</td><td>&nbsp;</td>
</tr><tr>
<td>22831</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/3/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/12/2021
10:47:57 AM</td><td> </td><td>5/17/2022 10:20:56 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>

<td>26241</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tiles should be replaced/ repaired
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:24:51 PM</td><td> </td><td>5/17/2022 10:20:55
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26242</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:24:53 PM</td><td> </td><td>5/17/2022 10:20:54
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26243</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:24:57 PM</td><td> </td><td>5/17/2022 10:20:53
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26286</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Different textures /discoloration </td><td>Low</td><td>3/15/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022 11:24:11 AM</td><td>
</td><td>5/17/2022 10:20:51 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26303</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced/repaired
</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022
11:28:51 AM</td><td> </td><td>5/17/2022 10:20:50
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26334</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022
3:28:54 PM</td><td> </td><td>5/17/2022 10:20:49
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26343</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced.</td><td>Low</td><td>3/15/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022 3:29:06 PM</td><td>
</td><td>5/17/2022 10:20:48 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27023</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39; Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:15:37 PM</td><td> </td><td>5/17/2022 10:20:47
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27025</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Discoloration between stone tiles
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:15:41 PM</td><td> </td><td>5/17/2022 10:20:46
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27027</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:15:45 PM</td><td> </td><td>5/17/2022 10:20:45
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27029</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:15:49 PM</td><td> </td><td>5/17/2022 10:20:44
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27031</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:15:54 PM</td><td> </td><td>5/17/2022 10:20:43
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27032</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:15:57 PM</td><td> </td><td>5/17/2022 10:20:43
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26459</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
11:16:21 AM</td><td> </td><td>5/17/2022 10:04:31
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26461</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
11:16:25 AM</td><td> </td><td>5/17/2022 10:04:30
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26474</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
11:17:01 AM</td><td> </td><td>5/17/2022 10:04:27
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26628</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/21/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022 2:14:30 PM</td><td>
</td><td>5/17/2022 10:04:26 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26638</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
3:15:40 PM</td><td> </td><td>5/17/2022 10:04:25
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26639</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
3:15:43 PM</td><td> </td><td>5/17/2022 10:04:24
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26641</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
3:15:47 PM</td><td> </td><td>5/17/2022 10:04:23
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26642</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
3:15:50 PM</td><td> </td><td>5/17/2022 10:04:22
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>28418</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Flexible connections need insulation.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:33 PM</td><td> </td><td>5/17/2022 8:42:25
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>16409</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Sprinkler
System</td><td>Sprinkler plate</td><td>&#39;Adjustment of sprinkler
</td><td>High</td><td>2/21/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>2/14/2021 3:09:55 PM</td><td> </td><td>5/17/2022 8:40:04
AM</td><td>&nbsp;</td><td>MG.14.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>16415</td><td>SCHOLAR RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Sprinkler
System</td><td>Sprinkler plate</td><td>&#39;Remove tape from sprinklers
</td><td>High</td><td>2/21/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>2/14/2021 3:10:12 PM</td><td> </td><td>5/17/2022 8:39:13
AM</td><td>&nbsp;</td><td>MR.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>28429</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Sprinklers levels shall be adjusted.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:55 PM</td><td> </td><td>5/17/2022 8:32:25
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28726</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Condensate
drain pipe</td><td>Installation not to specification/drawing</td><td>&#39;Missing
cover and funnel for drain point. </td><td>High</td><td>5/18/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/11/2022 11:46:07 AM</td><td>
</td><td>5/17/2022 8:28:19
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28441</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Sprinkler level is not correct and
shall be modified to meet the NFPA requirements. </td><td>High</td><td>5/12/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:05:25 PM</td><td>
</td><td>5/17/2022 8:27:09
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28391</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage CWP insulation. </td><td>High</td><td>5/4/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>4/27/2022 11:44:54 AM</td><td>
</td><td>5/16/2022 4:07:33
PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>25870</td><td>PLANT</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>2/10/2022 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>1/20/2022 12:03:21 PM</td><td> </td><td>5/16/2022 11:53:05
AM</td><td>&nbsp;</td><td>MS.13.01.004</td><td>&nbsp;</td>
</tr><tr>
<td>13306</td><td>FIRST AID - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>11/26/2020 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>11/5/2020 11:45:35 AM</td><td> </td><td>5/16/2022 11:44:21
AM</td><td>&nbsp;</td><td>MG.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>24888</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked part should be adjusted
</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>11/8/2021
12:12:31 PM</td><td> </td><td>5/16/2022 11:36:11 AM</td><td>Done
</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>

<td>23878</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Stone covers should be flushed with stone flooring
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:19:44 PM</td><td> </td><td>5/16/2022 11:35:50
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23895</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>False Ceiling</td><td>General
snags</td><td>&#39;Toothing between tiles </td><td>Low</td><td>11/14/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/24/2021 12:20:11 PM</td><td>
</td><td>5/16/2022 11:35:49 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23919</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Gap between cover and stone should be closed
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:59:30 PM</td><td> </td><td>5/16/2022 11:35:48
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24013</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles </td><td>Low</td><td>11/15/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:38:15 PM</td><td>
</td><td>5/16/2022 11:35:48 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24018</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Gap between glazing panel and stone should be
uniform </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:38:25 PM</td><td> </td><td>5/16/2022 11:35:46
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24048</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Glass partion and door</td><td>General
Snag</td><td>&#39;Glazing panel should be fixed properly
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:39:18 PM</td><td> </td><td>5/16/2022 11:35:45
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24050</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Glass partion and door</td><td>General
Snag</td><td>&#39;Glazing panels and metal trim should be aligned
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:39:21 PM</td><td> </td><td>5/16/2022 11:35:44
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24079</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Gap between stone cover and metal frame should be sealed
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/25/2021 4:40:12 PM</td><td> </td><td>5/16/2022 11:35:43
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24290</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Stone cover should be leveled with stone flooring
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/26/2021 4:41:38 PM</td><td> </td><td>5/16/2022 11:35:42
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24703</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken,cracked / deformed tiles should be
replaced.</td><td>Low</td><td>11/23/2021 12:00:00
AM</td><td>mohamed.sami</td><td>11/2/2021 3:20:48 PM</td><td> </td><td>5/16/2022
11:35:41 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24739</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken,cracked / deformed tiles should be
replaced.</td><td>Low</td><td>11/10/2021 12:00:00
PM</td><td>mohamed.sami</td><td>11/3/2021 4:40:04 PM</td><td> </td><td>5/16/2022
11:35:31 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>27745</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Staircase Handrail</td><td>Overall
finishes</td><td>&#39;Damaged panel should be replaced
</td><td>Low</td><td>3/31/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/10/2022
11:53:28 AM</td><td> </td><td>5/16/2022 11:35:30
AM</td><td>&nbsp;</td><td>Bridge</td><td>&nbsp;</td>
</tr><tr>
<td>12907</td><td>DIRECTORS ROOF GARDEN</td><td>CCB
L30</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Tile is missing /the marked part is not aligned
</td><td>High</td><td>11/8/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/1/2020 12:22:49 PM</td><td> </td><td>5/16/2022 11:26:22
AM</td><td>&nbsp;</td><td>CX.07.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>19040</td><td>LIFT LOBBY</td><td>CCB
L10</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>Not aligned</td><td>&#39;Joint not aligned between stainless steel
frame and metal cladding </td><td>Low</td><td>7/6/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>6/15/2021 4:38:41 PM</td><td> </td><td>5/16/2022 11:26:19
AM</td><td>&nbsp;</td><td>CB.02.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>23947</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Cracks should be repaired and treated
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:28:19 AM</td><td> </td><td>5/16/2022 11:26:15
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23948</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Joint should be aligned and filled properly
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:28:20 AM</td><td> </td><td>5/16/2022 11:26:14
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23949</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Concrete surface need touch up and cleaning
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:28:23 AM</td><td> </td><td>5/16/2022 11:26:14
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23951</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Cracks should be repaired and treated
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:28:27 AM</td><td> </td><td>5/16/2022 11:26:13
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24141</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Cracks should be repaired
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:08:33 AM</td><td> </td><td>5/16/2022 11:26:11
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24142</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Joint should be adjusted
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:08:35 AM</td><td> </td><td>5/16/2022 11:26:11
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24352</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interlock tiles should be filled with
sand.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/27/2021 11:41:05 AM</td><td> </td><td>5/16/2022 11:26:10
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24772</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between planted area and kerbstone
should be aligned (exposed kerbstone should be the
same)</td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/7/2021 11:31:25 AM</td><td> </td><td>5/16/2022 11:26:08
AM</td><td>&nbsp;</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>

<td>24950</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Broken glazing to be replaced.</td><td>Low</td><td>12/1/2021
12:00:00 AM</td><td>Amr Nofal</td><td>11/10/2021 11:28:04 AM</td><td>
</td><td>5/16/2022 11:26:07 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25133</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between interlock and wall should be
leveled and uniform </td><td>Low</td><td>12/5/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/14/2021 3:54:05 PM</td><td> </td><td>5/16/2022 11:26:06
AM</td><td>&nbsp;</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>
<td>14784</td><td>Land of Egypt - Level +42.00</td><td>Land of
Egypt</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Un completed work
</td><td>Low</td><td>2/2/2021 12:00:00 PM</td><td>aymanhaddadin</td><td>1/13/2021
7:52:26 AM</td><td> </td><td>5/16/2022 8:43:22 AM</td><td>&nbsp;</td><td>Land of
Egypt - Level +42.00</td><td>&nbsp;</td>
</tr><tr>
<td>25344</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Repair for sealant for
plate.</td><td>Low</td><td>12/13/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>11/22/2021 1:57:53 PM</td><td> </td><td>5/16/2022 8:43:15
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>25369</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sika foam.
</td><td>Low</td><td>12/13/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>11/22/2021
1:59:18 PM</td><td> </td><td>5/16/2022 8:42:00 AM</td><td>&nbsp;</td><td>Museum
Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>28126</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
waterproofing</td><td>damaged</td><td>&#39;Missing sika foam
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/16/2022
12:09:18 PM</td><td> </td><td>5/16/2022 8:41:27 AM</td><td>&nbsp;</td><td>Museum
Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>25347</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing sika
foam.</td><td>Low</td><td>12/13/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>11/22/2021 1:58:03 PM</td><td> </td><td>5/16/2022 8:41:01
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>21672</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need adjustment and repair
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
11:25:23 AM</td><td> </td><td>5/16/2022 8:40:05
AM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>13789</td><td>IT 2</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall Painting</td><td>Patches/Touch
up</td><td>&#39;Touch up for wall painting </td><td>Low</td><td>12/21/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/1/2020 11:40:42 AM</td><td> </td><td>5/16/2022
8:39:31 AM</td><td>&nbsp;</td><td>MS.18.2A.022</td><td>&nbsp;</td>
</tr><tr>
<td>28680</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Humidifier hose fixation.
</td><td>High</td><td>5/17/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:41:50 PM</td><td> </td><td>5/16/2022 8:08:17
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>24868</td><td>Truck scanner - Roof and external
walls</td><td>Truck scanner Building</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Mechanical</td><td>Fire Extinguishers</td><td>Equipment</td><td>&#39;Missing fire
extinguishers according to Dwg (650723)</td><td>High</td><td>11/15/2021 12:00:00
AM</td><td>hossamreda</td><td>11/8/2021 11:47:00 AM</td><td> </td><td>5/16/2022
7:39:58 AM</td><td>&nbsp;</td><td>Truck scanner - Roof and external
walls</td><td>&nbsp;</td>
</tr><tr>
<td>28315</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;AHU door handles are broken. </td><td>High</td><td>4/26/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>4/19/2022 11:49:14 AM</td><td>
</td><td>5/15/2022 3:26:54
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>17564</td><td>IT HUB ROOM</td><td>CCB
GF</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>5/11/2021 12:00:00
PM</td><td>Ahmed.Galal</td><td>5/4/2021 1:38:15 PM</td><td> </td><td>5/15/2022
3:24:34 PM</td><td>&nbsp;</td><td>CS.07.0G.013</td><td>&nbsp;</td>
</tr><tr>
<td>18120</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>Fire
Alarm</td><td>General Snag</td><td>&#39;Missing
labels</td><td>High</td><td>6/2/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>5/26/2021 11:46:50 AM</td><td> </td><td>5/15/2022 3:24:33
PM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27337</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting fixtures should be fixed properly
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:31 PM</td><td> </td><td>5/15/2022 3:24:32
PM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27359</td><td>LOBBY</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;MEP fixtures and lighting fixtures should be
fixed properly </td><td>Low</td><td>3/28/2022 12:00:00
AM</td><td>mohamed.sami</td><td>3/7/2022 12:13:15 PM</td><td> </td><td>5/15/2022
3:24:32 PM</td><td>&nbsp;</td><td>MA.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27381</td><td>ELEC. SUB-STATION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cover trunk </td><td>High</td><td>3/14/2022
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>3/7/2022 1:08:10 PM</td><td>
</td><td>5/15/2022 3:24:31
PM</td><td>&nbsp;</td><td>MS.19.02.007</td><td>&nbsp;</td>
</tr><tr>
<td>27453</td><td>CURATOR</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting fixtures should be fixed properly
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:40:34 PM</td><td> </td><td>5/15/2022 3:24:30
PM</td><td>&nbsp;</td><td>MA.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>13309</td><td>FIRST AID - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Gypsum wall not finished
</td><td>Low</td><td>11/26/2020 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>11/5/2020 11:45:44 AM</td><td> </td><td>5/15/2022 12:53:45
PM</td><td>&nbsp;</td><td>MG.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>13308</td><td>FIRST AID - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>Visible touch-up not acceptable</td><td>&#39;Ceiling need to touch up
</td><td>Low</td><td>11/26/2020 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>11/5/2020 11:45:41 AM</td><td> </td><td>5/15/2022 12:53:37
PM</td><td>&nbsp;</td><td>MG.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>13823</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing Sealant around mep Fixtures
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:42:14 AM</td><td> </td><td>5/15/2022 11:58:42
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>13825</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Flooring need to repair including stairs
landing </td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/1/2020 11:42:49 AM</td><td> </td><td>5/15/2022 11:58:41
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>13826</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Flooring not leveled - need repair
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:42:52 AM</td><td> </td><td>5/15/2022 11:58:40
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>14336</td><td>B.O.H-ARTEFACTS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Opening to be closed/touch up paint around door
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/24/2020 1:23:37 PM</td><td> </td><td>5/15/2022 11:58:39
AM</td><td>&nbsp;</td><td>MQ.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19913</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Paint Stains</td><td>&#39;Welding line need to finish
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:25:10 AM</td><td> </td><td>5/15/2022 11:58:37
AM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>19915</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Paint finish</td><td>&#39;Welding line need to finish
</td><td>Low</td><td>8/19/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>7/29/2021
11:25:13 AM</td><td> </td><td>5/15/2022 11:58:36
AM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>21670</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Welding joints should be finished
</td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>8/19/2021
11:25:20 AM</td><td> </td><td>5/15/2022 11:58:35
AM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21671</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joints should be adjusted and
repaired </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:22 AM</td><td> </td><td>5/15/2022 11:58:34
AM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>16462</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Wavy painting need adjustment
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
9:18:05 AM</td><td> </td><td>5/15/2022 11:40:14
AM</td><td>&nbsp;</td><td>MG.14.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>16507</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;General cleaning for floor
</td><td>Low</td><td>3/8/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/15/2021
11:35:23 AM</td><td> </td><td>5/15/2022 11:40:13
AM</td><td>&nbsp;</td><td>MS.14.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>18050</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Interface should be regular ,aligned,leveled and clarified
</td><td>Low</td><td>6/15/2021 12:00:00 PM</td><td>mohamed.sami</td><td>5/25/2021
12:38:52 PM</td><td> </td><td>5/15/2022 11:40:08
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18206</td><td>BREAKOUT AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Corner edge should be aligned
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021
4:04:20 PM</td><td> </td><td>5/15/2022 11:40:07
AM</td><td>&nbsp;</td><td>ME.12.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18247</td><td>KINDERGARTEN CLASSROOM 2 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling painting need touch up painting
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021
4:10:46 PM</td><td> </td><td>5/15/2022 11:40:05
AM</td><td>&nbsp;</td><td>MK.12.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18587</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edge and cracked
stone</td><td>Low</td><td>6/29/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/8/2021 4:47:23 PM</td><td> </td><td>5/15/2022
11:40:04 AM</td><td>&nbsp;</td><td>MW.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18595</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Sprinkler cover not leveled
</td><td>Low</td><td>6/29/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/8/2021
4:47:49 PM</td><td> </td><td>5/15/2022 11:40:02
AM</td><td>&nbsp;</td><td>MW.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18600</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>6/29/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/8/2021
4:48:05 PM</td><td> </td><td>5/15/2022 11:40:01
AM</td><td>&nbsp;</td><td>MW.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18646</td><td>FIRST AID - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Repair for gap around electrical switch
</td><td>Low</td><td>6/30/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/9/2021
4:22:51 PM</td><td> </td><td>5/15/2022 11:39:59
AM</td><td>&nbsp;</td><td>MG.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18660</td><td>KITCHEN - Band B</td><td>MU
L20</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Furniture</
td><td>Incomplete</td><td>&#39;splash back is missing
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:23:21 PM</td><td> </td><td>5/15/2022 11:39:58
AM</td><td>&nbsp;</td><td>MS.18.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>18661</td><td>KITCHEN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring -
Rubber flooring</td><td>General</td><td>&#39;Gap between flooring and skirting
</td><td>Low</td><td>6/30/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/9/2021
4:23:22 PM</td><td> </td><td>5/15/2022 11:39:56
AM</td><td>&nbsp;</td><td>MS.18.02.011</td><td>&nbsp;</td>
</tr><tr>
<td>21569</td><td>CORE B3</td><td>MU
BA</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Refer to
our previous comments on CIR </td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 9:52:18 AM</td><td> </td><td>5/15/2022 11:39:54
AM</td><td>&nbsp;</td><td>MC.12.0B.B31</td><td>&nbsp;</td>
</tr><tr>
<td>21654</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls should be repainted </td><td>Low</td><td>9/9/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/19/2021 11:24:54 AM</td><td> </td><td>5/15/2022
11:39:53 AM</td><td>&nbsp;</td><td>MS.13.0G.013</td><td>&nbsp;</td>
</tr><tr>
<td>21655</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked parts should be repaired and adjusted
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:24:56 AM</td><td> </td><td>5/15/2022 11:39:52
AM</td><td>&nbsp;</td><td>MS.13.0G.013</td><td>&nbsp;</td>
</tr><tr>
<td>22201</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Marked edge not aligned
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:47:36 AM</td><td> </td><td>5/15/2022 11:39:50
AM</td><td>&nbsp;</td><td>MG.13.0G.003

</td><td>&nbsp;</td>
</tr><tr>
<td>22242</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked edges should be aligned
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:05 AM</td><td> </td><td>5/15/2022 11:39:49
AM</td><td>&nbsp;</td><td>MG.13.0G.003
</td><td>&nbsp;</td>
</tr><tr>
<td>24887</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>11/8/2021
12:12:29 PM</td><td> </td><td>5/15/2022 11:39:40
AM</td><td>&nbsp;</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>24889</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Wavy gypsum board wall
</td><td>Low</td><td>11/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>11/8/2021
12:12:33 PM</td><td> </td><td>5/15/2022 11:39:38
AM</td><td>&nbsp;</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>24895</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>11/8/2021
12:15:35 PM</td><td> </td><td>5/15/2022 11:39:37
AM</td><td>&nbsp;</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27959</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>Stone
counter</td><td>General</td><td>&#39; Marked repair should be finished properly
(color should be the same tile color)</td><td>Low</td><td>4/3/2022 12:00:00
AM</td><td>Adel Nassrat</td><td>3/13/2022 12:23:42 PM</td><td> </td><td>5/15/2022
11:39:35 AM</td><td>&nbsp;</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>27961</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>Deyar Interiors</td><td>Architectural</td><td>Stone
counter</td><td>General</td><td>&#39;Marked edges should be aligned
</td><td>Low</td><td>4/3/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/13/2022
12:23:47 PM</td><td> </td><td>5/15/2022 11:39:34
AM</td><td>&nbsp;</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>23587</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Termination between metal trim and stone should be adjusted as
per design drawing </td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:52 AM</td><td> </td><td>5/15/2022 11:22:11
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>7964</td><td>LIFT LOBBY</td><td>CCB
L30</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Details with bad
workmanship</td><td>Low</td><td>1/29/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>1/8/2020 12:12:48 PM</td><td> </td><td>5/15/2022 11:21:04
AM</td><td>&nbsp;</td><td>CC.02.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>12812</td><td>STAFF LIFT LOBBY</td><td>CCB
GF</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>Visible touch-up not acceptable</td><td>&#39;Scratches at metal
cladding need repair </td><td>Low</td><td>11/17/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/27/2020 4:22:54 PM</td><td> </td><td>5/15/2022 11:21:00
AM</td><td>&nbsp;</td><td>CB.02.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>17377</td><td>External North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Surface preparation for concrete
base</td><td>Low</td><td>5/4/2021 12:00:00
PM</td><td>aymanhaddadin</td><td>4/13/2021 11:48:33 AM</td><td> </td><td>5/15/2022
11:21:00 AM</td><td>&nbsp;</td><td>External North Fence</td><td>&nbsp;</td>
</tr><tr>
<td>22927</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>Hydrogreen</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Dead tree should be removed
</td><td>Low</td><td>10/5/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/14/2021
11:12:34 AM</td><td> </td><td>5/15/2022 11:20:59 AM</td><td>&nbsp;</td><td>Part
9</td><td>&nbsp;</td>
</tr><tr>
<td>23235</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be
replaced</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:53:23 AM</td><td> </td><td>5/15/2022 11:20:58
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23237</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:53:27 AM</td><td> </td><td>5/15/2022 11:20:57
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23240</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:53:35 AM</td><td> </td><td>5/15/2022 11:20:56
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23251</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/16/2021
12:00:28 PM</td><td> </td><td>5/15/2022 11:20:55
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23254</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken edges should be replaced
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
12:00:37 PM</td><td> </td><td>5/15/2022 11:20:54
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23593</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/13/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/22/2021
11:06:27 AM</td><td> </td><td>5/15/2022 11:20:53 AM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23594</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/13/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021
11:06:29 AM</td><td> </td><td>5/15/2022 11:20:52 AM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23600</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/13/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021
11:06:38 AM</td><td> </td><td>5/15/2022 11:20:51 AM</td><td>&nbsp;</td><td>Part
9</td><td>&nbsp;</td>
</tr><tr>
<td>23605</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/13/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/22/2021
11:06:47 AM</td><td> </td><td>5/15/2022 11:20:50 AM</td><td>&nbsp;</td><td>Part
9</td><td>&nbsp;</td>
</tr><tr>
<td>23606</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/13/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021
11:06:48 AM</td><td> </td><td>5/15/2022 11:20:49 AM</td><td>&nbsp;</td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>23609</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/13/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/22/2021
11:06:54 AM</td><td> </td><td>5/15/2022 11:20:48 AM</td><td>&nbsp;</td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>23621</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/13/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021
11:07:15 AM</td><td> </td><td>5/15/2022 11:20:48 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>23624</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/13/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021
11:07:20 AM</td><td> </td><td>5/15/2022 11:20:47 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>23627</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/13/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021
11:07:26 AM</td><td> </td><td>5/15/2022 11:20:46 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>23704</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/19/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/28/2021
9:57:22 AM</td><td> </td><td>5/15/2022 11:20:45 AM</td><td>&nbsp;</td><td>Part
10</td><td>&nbsp;</td>
</tr><tr>
<td>23997</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Remove storage material, scaffolding and
cleaning rubbish </td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/25/2021 3:18:16 PM</td><td> </td><td>5/15/2022 11:20:44
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24112</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interlock is missing
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:07:44 AM</td><td> </td><td>5/15/2022 11:20:43
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24113</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing manhole cover
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:07:46 AM</td><td> </td><td>5/15/2022 11:20:42
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24166</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Snagging after cleaning
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:09:12 AM</td><td> </td><td>5/15/2022 11:20:41
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24652</td><td>Mankauras - Phase 3A</td><td>Mankauras Stair
and Wall</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Staircase</td><td>General
Snag</td><td>&#39;Broken edges should be repaired </td><td>Low</td><td>11/22/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>11/1/2021 11:32:35 AM</td><td>
</td><td>5/15/2022 11:20:40 AM</td><td>&nbsp;</td><td>Mankauras - Phase
3A</td><td>&nbsp;</td>
</tr><tr>
<td>24721</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>11/24/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:34 PM</td><td> </td><td>5/15/2022 11:20:39
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24728</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Grating and flashing to be fixed properly
</td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:44 PM</td><td> </td><td>5/15/2022 11:20:38
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24736</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Grating should be fixed properly
</td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:58 PM</td><td> </td><td>5/15/2022 11:20:37
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24738</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Gap should be uniform
</td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:04:00 PM</td><td> </td><td>5/15/2022 11:20:36
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24828</td><td>Mankauras - Phase 1</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/7/2021 3:52:08 PM</td><td> </td><td>5/15/2022 11:20:35
AM</td><td>&nbsp;</td><td>Mankauras - Phase 1</td><td>&nbsp;</td>
</tr><tr>
<td>25135</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td>Unilex Sign
Systems</td><td>Architectural</td><td>Signage</td><td>Not
Installed/Completed</td><td>&#39;Signage to be cleaned
</td><td>Low</td><td>12/5/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/14/2021 3:54:09 PM</td><td> </td><td>5/15/2022 11:20:34
AM</td><td>&nbsp;</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>

<td>26194</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/10/2022 12:00:00 AM</td><td>Amr Nofal</td><td>2/17/2022
12:15:39 PM</td><td> </td><td>5/15/2022 11:20:33
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26665</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 11:01:31 AM</td><td>
</td><td>5/15/2022 11:20:33 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26802</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Area not
cleaned/finished.</td><td>&#39;Missing cover of manhole and the subject needs to be
written on it</td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>ahmedsalem</td><td>3/1/2022 4:13:18 PM</td><td> </td><td>5/15/2022
11:20:32 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26865</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
10:30:55 AM</td><td> </td><td>5/15/2022 11:20:31
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>24850</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Broken tile of glazing need to
replaced.</td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/7/2021 4:15:39 PM</td><td> </td><td>5/15/2022 10:21:57
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25211</td><td>Temple Garden-Band F</td><td>Temple
Garden</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Broken glass panels need to be
replaced.</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/15/2021 11:34:45 AM</td><td> </td><td>5/15/2022 10:21:56
AM</td><td>&nbsp;</td><td>Band F</td><td>&nbsp;</td>
</tr><tr>
<td>28490</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;No acoustic lining for exhaust air duct.
</td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:09 PM</td><td> </td><td>5/15/2022 9:47:29
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28379</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;No FF system detected in this area.
</td><td>High</td><td>5/4/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/27/2022 11:44:31 AM</td><td> </td><td>5/15/2022 9:46:34
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>28316</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;AHU handles are broken. </td><td>High</td><td>4/26/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>4/19/2022 11:49:16 AM</td><td>
</td><td>5/15/2022 9:46:05
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28515</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire fighting in this area.
</td><td>High</td><td>5/15/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:53 PM</td><td> </td><td>5/15/2022 9:45:31
AM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28482</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing thermal insulation for FAD.
</td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:14:54 PM</td><td> </td><td>5/15/2022 9:45:01
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>13609</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing Sealant around Mep fixtures
</td><td>Low</td><td>12/14/2020 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>11/23/2020 3:45:18 PM</td><td> </td><td>5/15/2022 8:55:42
AM</td><td>&nbsp;</td><td>MS.18.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28656</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing access door closing leg.
</td><td>High</td><td>5/17/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/10/2022 4:37:13 PM</td><td> </td><td>5/15/2022 8:33:10
AM</td><td>&nbsp;</td><td>MS.13.2A.008</td><td>&nbsp;</td>
</tr><tr>
<td>28534</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;AHU damper need to be cleaned. </td><td>High</td><td>5/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/9/2022 11:48:36 AM</td><td>
</td><td>5/15/2022 8:31:08
AM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>24870</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Bad finish painting need to
repair.</td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Moussa Nageh
Khella</td><td>11/8/2021 11:47:11 AM</td><td> </td><td>5/15/2022 8:13:01
AM</td><td>Done</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>

<td>25126</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Touch up painting for sand trap louver
</td><td>High</td><td>11/21/2021 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>11/14/2021 10:51:39 AM</td><td> </td><td>5/15/2022 8:09:06
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25424</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>12/7/2021 10:17:58 AM</td><td> </td><td>5/14/2022 11:05:41
AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>13390</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing painting </td><td>Low</td><td>11/26/2020 12:00:00
AM</td><td>sally.george</td><td>11/5/2020 12:27:12 PM</td><td> </td><td>5/14/2022
10:18:28 AM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>27423</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-
Mechanical</td><td>Exhaust Fan</td><td>Exhaust Grill</td><td>&#39;Missing grill to
to protect motors and fans from water and birds </td><td>High</td><td>3/14/2022
12:00:00 AM</td><td>ahmedsalem</td><td>3/7/2022 2:36:36 PM</td><td>
</td><td>5/12/2022 2:27:50 PM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>7949</td><td>GD. SECRET.</td><td>CCB
L30</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing pulled cables,missing fire alarm
cables termination,ICT OUTLET ARE MISSING </td><td>High</td><td>1/15/2020 12:00:00
PM</td><td>Mohamed Samir</td><td>1/8/2020 12:01:57 PM</td><td> </td><td>5/12/2022
2:02:55 PM</td><td>&nbsp;</td><td>CO.07.03.009</td><td>&nbsp;</td>
</tr><tr>
<td>16669</td><td>CR.08,0G.003</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>3/14/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>3/7/2021 3:46:52 PM</td><td> </td><td>5/12/2022
2:02:54 PM</td><td>&nbsp;</td><td>CR.08,0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>17567</td><td>IT</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;</td><td>High</td><td>5/11/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>5/4/2021 1:38:25 PM</td><td> </td><td>5/12/2022
2:02:53 PM</td><td>&nbsp;</td><td>CS.08.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>17569</td><td>ESCALATOR AREA</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>5/11/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>5/4/2021 1:38:29 PM</td><td> </td><td>5/12/2022
2:02:52 PM</td><td>&nbsp;</td><td>CX.08.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>18095</td><td>PAINTING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Damages in lighting fixtures
</td><td>High</td><td>6/2/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>5/26/2021 11:46:03 AM</td><td> </td><td>5/12/2022 2:02:50
PM</td><td>&nbsp;</td><td>MK.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18098</td><td>WOOD CARVING ART CLASS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Damages in lighting fixtures
</td><td>High</td><td>6/2/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>5/26/2021 11:46:08 AM</td><td> </td><td>5/12/2022 2:02:49
PM</td><td>&nbsp;</td><td>MK.13.02.002</td><td>&nbsp;</td>
</tr><tr>

<td>24218</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Electrical</td><td>Power</td><td>General
Snag</td><td>&#39;There ncr issued for electrical manhole and there aren’t drainage
inside the manhole</td><td>High</td><td>11/2/2021 12:00:00 AM</td><td>Mohamed
Samir</td><td>10/26/2021 3:35:23 PM</td><td> </td><td>5/12/2022 2:02:48
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26843</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rust has been observed in RGS (threaded)
should be cleaned and touch up and conduit should be more tightened and box should
be closed and cable trunk should cleaned and labeled and missing label and
defective lighting fixtures and connection </td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/1/2022 4:39:02 PM</td><td>
</td><td>5/12/2022 2:02:47 PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27321</td><td>STUDY AREA</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting fixtures to be fixed properly
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:03 PM</td><td> </td><td>5/12/2022 2:02:44
PM</td><td>&nbsp;</td><td>MA.13.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>27341</td><td>RECEPTION</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Covers are missing
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:12:40 PM</td><td> </td><td>5/12/2022 2:02:43
PM</td><td>&nbsp;</td><td>MA.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>27355</td><td>ELEC. ROOM</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Covers are missing
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
12:13:08 PM</td><td> </td><td>5/12/2022 2:02:42
PM</td><td>&nbsp;</td><td>MS.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27477</td><td>W.C</td><td>MU L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Lighting fixtures should be fixed properly
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/7/2022
4:41:16 PM</td><td> </td><td>5/12/2022 2:02:41
PM</td><td>&nbsp;</td><td>MW.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28095</td><td>HUMAN REMAINS STORAGE</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Lighting fixtures should be fixed properly
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/16/2022
10:59:29 AM</td><td> </td><td>5/12/2022 2:02:39
PM</td><td>&nbsp;</td><td>MA.19.02.013</td><td>&nbsp;</td>
</tr><tr>

<td>25050</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>Hydrogreen</
td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Missing
finishes material </td><td>Low</td><td>12/2/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/11/2021 10:43:11 AM</td><td> </td><td>5/12/2022 1:57:51
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>27779</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Cracks need repair </td><td>Low</td><td>3/31/2022 12:00:00
AM</td><td>Rory MacRory</td><td>3/10/2022 12:25:56 PM</td><td> </td><td>5/12/2022
1:57:50 PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23090</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Repair
should be adjusted </td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:49:20 AM</td><td> </td><td>5/12/2022 1:51:50
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23112</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges should be repaired </td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:50:01 AM</td><td> </td><td>5/12/2022 1:51:49
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23120</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
repair should be adjusted </td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:50:11 AM</td><td> </td><td>5/12/2022 1:51:48
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23123</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges should be repaired </td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:50:15 AM</td><td> </td><td>5/12/2022 1:51:46
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23292</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tile should be replaced </td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/20/2021 11:05:17 AM</td><td> </td><td>5/12/2022 1:51:45
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23319</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/11/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/20/2021 11:13:02 AM</td><td> </td><td>5/12/2022
1:51:44 PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23352</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/11/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/20/2021 11:13:59 AM</td><td> </td><td>5/12/2022
1:51:43 PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23355</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/11/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/20/2021 11:14:05 AM</td><td> </td><td>5/12/2022
1:51:43 PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23371</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
cladding is missing </td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/20/2021 11:14:31 AM</td><td> </td><td>5/12/2022 1:51:42
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23380</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/20/2021 11:14:45 AM</td><td> </td><td>5/12/2022 1:51:41
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23385</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/11/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/20/2021 11:14:54 AM</td><td> </td><td>5/12/2022
1:51:40 PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23427</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/11/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/20/2021 11:16:04 AM</td><td> </td><td>5/12/2022
1:51:39 PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23428</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should be treated or replaced
</td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/20/2021
11:16:07 AM</td><td> </td><td>5/12/2022 1:51:38 PM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23526</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Edge
repair should be adjusted </td><td>Low</td><td>10/12/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/21/2021 11:07:22 AM</td><td> </td><td>5/12/2022 1:51:36
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23528</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Grouting
should be adjusted </td><td>Low</td><td>10/12/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/21/2021 11:07:25 AM</td><td> </td><td>5/12/2022 1:51:35
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23529</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should should be treated or replaced
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:07:27 AM</td><td> </td><td>5/12/2022 1:51:34 PM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23530</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated</td><td>Low</td><td>10/12/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/21/2021 11:07:29 AM</td><td> </td><td>5/12/2022
1:51:33 PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23570</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
cutting for stone edges </td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:23 AM</td><td> </td><td>5/12/2022 1:51:32
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23571</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Metal trim should be installed properly
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:08:25 AM</td><td> </td><td>5/12/2022 1:51:31 PM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23968</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Kerb stone not aligned
</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:31:09 AM</td><td> </td><td>5/12/2022 1:51:30 PM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24126</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Missing interlock and kerbstone/sloped concrete
to be poured and finished </td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/26/2021 11:08:08 AM</td><td> </td><td>5/12/2022 1:51:29
PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24364</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Soil of canceled manhole should be graded
and concrete should be poured and finished.</td><td>Low</td><td>11/17/2021 12:00:00
PM</td><td>Amr Nofal</td><td>10/27/2021 11:41:24 AM</td><td> </td><td>5/12/2022
1:51:28 PM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24730</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stone steps should be extended
</td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:48 PM</td><td> </td><td>5/12/2022 1:51:27
PM</td><td>Done </td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24734</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stone flooring should be extended
/installed if missing </td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:55 PM</td><td> </td><td>5/12/2022 1:51:26
PM</td><td>Done </td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24824</td><td>Mankauras - Phase 1</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stone flooring should be extended
</td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/7/2021 3:52:02 PM</td><td> </td><td>5/12/2022 1:51:25
PM</td><td>Done </td><td>Mankauras - Phase 1</td><td>&nbsp;</td>
</tr><tr>

<td>26195</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/10/2022 12:00:00 AM</td><td>Amr Nofal</td><td>2/17/2022
12:15:41 PM</td><td> </td><td>5/12/2022 1:51:23 PM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26198</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>3/10/2022 12:00:00 AM</td><td>Amr Nofal</td><td>2/17/2022
12:15:47 PM</td><td> </td><td>5/12/2022 1:51:22 PM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26457</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
11:16:16 AM</td><td> </td><td>5/12/2022 1:51:21 PM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26468</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
11:16:44 AM</td><td> </td><td>5/12/2022 1:51:20 PM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26472</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
11:16:55 AM</td><td> </td><td>5/12/2022 1:51:19 PM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26530</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/17/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022 2:22:45 PM</td><td>
</td><td>5/12/2022 1:51:18 PM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27187</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;exposed mortar should be removed
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
3:01:32 PM</td><td> </td><td>5/12/2022 1:51:17 PM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>19458</td><td>TUT_SC_01_004</td><td>Goppion
Showcases</td><td>Closed</td><td>Pink
Group</td><td>Architectural</td><td>Showcases</td><td>General
Snag</td><td>&#39;Graphic is missing </td><td>Low</td><td>7/19/2021 12:00:00
AM</td><td>Sherif Elabd</td><td>6/28/2021 1:26:48 PM</td><td> </td><td>5/12/2022
1:14:11 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18011</td><td>RECEPTION- Band A</td><td>MU
L20</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>level</td><td>&#39;Stainless steel door need to be leveled
</td><td>Low</td><td>6/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/25/2021
12:26:06 PM</td><td> </td><td>5/12/2022 12:18:54
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18153</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Access door is missing </td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:58:36 AM</td><td> </td><td>5/12/2022
12:18:53 PM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18159</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Joints between walls and skirting should
be adjusted </td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:58:45 AM</td><td> </td><td>5/12/2022
12:18:51 PM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>18228</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021
4:05:04 PM</td><td> </td><td>5/12/2022 12:18:42
PM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18233</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Repair for edges
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021
4:05:13 PM</td><td> </td><td>5/12/2022 12:18:39
PM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18235</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Final coat not done
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021
4:05:19 PM</td><td> </td><td>5/12/2022 12:18:37
PM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18252</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Opening should be closed </td><td>Low</td><td>6/21/2021 12:00:00
PM</td><td>mohamed.sami</td><td>5/31/2021 4:10:53 PM</td><td> </td><td>5/12/2022
12:18:34 PM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18261</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs touch up painting </td><td>Low</td><td>6/21/2021
12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021 4:11:07 PM</td><td>
</td><td>5/12/2022 12:17:55
PM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>28294</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct access door not installed correctly.
</td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:06 AM</td><td> </td><td>5/12/2022 11:48:21
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28502</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing chilled water
pipes insulation. </td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:30 PM</td><td> </td><td>5/12/2022 11:48:04
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>13607</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Paint finish</td><td>&#39;Handrail need to touch up
</td><td>Low</td><td>12/14/2020 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>11/23/2020 3:45:12 PM</td><td> </td><td>5/12/2022 10:41:03
AM</td><td>&nbsp;</td><td>MS.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13613</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Remove temporary block and install shaker
plate</td><td>Low</td><td>12/14/2020 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>11/23/2020 3:45:29 PM</td><td> </td><td>5/12/2022 10:41:03
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>13372</td><td>KINDERGARTEN CLASSROOM 5 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need repainting /repair </td><td>Low</td><td>11/26/2020
12:00:00 AM</td><td>sally.george</td><td>11/5/2020 12:14:58 PM</td><td>
</td><td>5/12/2022 10:33:17
AM</td><td>&nbsp;</td><td>MK.17.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>28338</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Insulation for duct need to be repaired.
</td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:05 AM</td><td> </td><td>5/12/2022 8:19:45
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28529</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Thermal insulation around duct access door need to be
repaired. </td><td>High</td><td>5/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:25 AM</td><td> </td><td>5/12/2022 8:16:32
AM</td><td>&nbsp;</td><td>MS.13.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28297</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Chilled water pipe section insulation shall be changed with new
ones. </td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:12 AM</td><td> </td><td>5/11/2022 4:36:48
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28549</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Missing thermal insulation. </td><td>High</td><td>5/16/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/9/2022 11:49:04 AM</td><td>
</td><td>5/11/2022 4:34:05
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28340</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing upper support.
</td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:11 AM</td><td> </td><td>5/11/2022 4:33:11
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28492</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air duct cladding obstruct the AHU door movement.
</td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:13 PM</td><td> </td><td>5/11/2022 4:22:42
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28483</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage insulation.
</td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:14:55 PM</td><td> </td><td>5/11/2022 4:15:43
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>17110</td><td>ELEVATOR (B3)</td><td>MU GF
</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Foreign material
(wire)</td><td>High</td><td>3/25/2021 12:00:00
PM</td><td>hossamreda</td><td>3/18/2021 11:53:32 AM</td><td> </td><td>5/11/2022
4:14:39 PM</td><td>&nbsp;</td><td>ELEVATOR (B3)</td><td>&nbsp;</td>
</tr><tr>
<td>13375</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;ceiling needs touch up painting /repair
</td><td>Low</td><td>11/26/2020 12:00:00 AM</td><td>sally.george</td><td>11/5/2020
12:22:15 PM</td><td> </td><td>5/11/2022 4:14:21
PM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>13376</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need repainting </td><td>Low</td><td>11/26/2020 12:00:00
AM</td><td>sally.george</td><td>11/5/2020 12:22:18 PM</td><td> </td><td>5/11/2022
4:14:21 PM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>13379</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Painting need touch up for
walls and ceiling </td><td>Low</td><td>11/26/2020 12:00:00
AM</td><td>sally.george</td><td>11/5/2020 12:22:27 PM</td><td> </td><td>5/11/2022
4:14:20 PM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>15623</td><td>ADMIN &amp; FIRST AID - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Linoleum skirting ( missing some linoleum
skirting - joints between skirting tiles should be zero joint - skirting not
adhesive well - gap between flooring and skirting )</td><td>Low</td><td>2/22/2021
12:00:00 AM</td><td>Kerolos Nagy Tawfik</td><td>2/1/2021 11:31:06 AM</td><td>
</td><td>5/11/2022 4:14:18
PM</td><td>&nbsp;</td><td>MK.17.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>14593</td><td>Ticketing Piazza </td><td>Ticketing
Piazza</td><td>Closed</td><td>HAZ / Marble</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Basin is defective and Cover of basin is
missing </td><td>High</td><td>1/5/2021 12:00:00
AM</td><td>ahmedsalem</td><td>12/29/2020 11:33:08 AM</td><td> </td><td>5/11/2022
3:57:26 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>5482</td><td>B.O.H-ELEC. SUB-STATION - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing sealant around Mep fixtures
</td><td>Low</td><td>10/10/2019 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/19/2019 3:20:31 PM</td><td> </td><td>5/11/2022 2:47:56
PM</td><td>&nbsp;</td><td>MS.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>26847</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing label and boxes should be
fixed</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 4:39:08 PM</td><td> </td><td>5/11/2022 2:08:53
PM</td><td>&nbsp;</td><td>Tail Wall</td><td>&nbsp;</td>
</tr><tr>
<td>28324</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage insulation and air leakage detected.
</td><td>High</td><td>4/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:49:51 AM</td><td> </td><td>5/11/2022 1:51:57
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28377</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Access door need to be adjusted and to clear the support from
its way. </td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:45:45 AM</td><td> </td><td>5/11/2022 1:50:54
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28359</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Damage insulation.
</td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:59 AM</td><td> </td><td>5/11/2022 11:46:38
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28378</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Air grills need adjustment. </td><td>High</td><td>5/4/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>4/27/2022 11:44:30 AM</td><td>
</td><td>5/11/2022 11:46:37
AM</td><td>&nbsp;</td><td>MS.19.2A.014</td><td>&nbsp;</td>
</tr><tr>
<td>28446</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Chilled water pipes insulation need repairs and the defected
insulation parts shall be replaced. </td><td>High</td><td>5/12/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:05:49 PM</td><td>
</td><td>5/11/2022 11:46:33
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28467</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Flexible duct connectors (canvases) need repair or replacement
and the connected rods shall be removed. </td><td>High</td><td>5/12/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:06:27 PM</td><td>
</td><td>5/11/2022 11:46:31
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28477</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage insulation and support need to be painted.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:48 PM</td><td> </td><td>5/11/2022 11:46:30
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28506</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage thermal insulation for air duct.
</td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:36 PM</td><td> </td><td>5/11/2022 11:46:28
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28545</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire pipes need cleaning and painting.
</td><td>High</td><td>5/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:48:57 AM</td><td> </td><td>5/11/2022 11:46:27
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28547</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire pipes need cleaning and painting.
</td><td>High</td><td>5/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:49:00 AM</td><td> </td><td>5/11/2022 11:46:26
AM</td><td>&nbsp;</td><td>MS.19.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>28550</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Fire pipes need cleaning and painting.
</td><td>High</td><td>5/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:49:05 AM</td><td> </td><td>5/11/2022 11:46:25
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28685</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage CHW pipes
insulation shall be repaired. </td><td>High</td><td>5/17/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/10/2022 4:42:50 PM</td><td>
</td><td>5/11/2022 11:46:23
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>15922</td><td>ENVIRO.LOBBY</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing tile/ceiling need cleaning/leveling needs adjustment edge
is not aligned </td><td>Low</td><td>2/28/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>2/7/2021 4:36:12 PM</td><td> </td><td>5/11/2022 11:09:47
AM</td><td>Done </td><td>CA.08.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>18861</td><td>ENVIRO. LOBBY</td><td>CCB
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>False Ceiling
Tiles</td><td>Alignment of tiles</td><td>&#39;Cutting exposed bolts and joint
should be aligned </td><td>Low</td><td>7/4/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>6/13/2021 12:10:11 PM</td><td> </td><td>5/11/2022 11:09:46
AM</td><td>Done </td><td>CA.08.01.005</td><td>&nbsp;</td>
</tr><tr>
<td>22436</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Edges cutting should be aligned and
adjusted </td><td>Low</td><td>9/19/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>8/29/2021 3:13:24 PM</td><td> </td><td>5/11/2022 11:09:42
AM</td><td>Done </td><td>Part 3</td><td>&nbsp;</td>
</tr><tr>
<td>22458</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:14:05 PM</td><td> </td><td>5/11/2022 11:09:41 AM</td><td>Done </td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>22833</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stains should be removed
</td><td>Low</td><td>10/3/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/12/2021
10:48:00 AM</td><td> </td><td>5/11/2022 11:09:40 AM</td><td>Done </td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22946</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stains should be removed
</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:13:06 AM</td><td> </td><td>5/11/2022 11:09:39 AM</td><td>Done </td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>23305</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/11/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/20/2021 11:12:38 AM</td><td> </td><td>5/11/2022
11:09:37 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23337</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/11/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/20/2021 11:13:33 AM</td><td> </td><td>5/11/2022
11:09:36 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23547</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Bad edge
repair shop be adjusted </td><td>Low</td><td>10/12/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/21/2021 11:07:46 AM</td><td> </td><td>5/11/2022 11:09:34
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23549</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/12/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/21/2021 11:07:48 AM</td><td> </td><td>5/11/2022
11:09:33 AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23551</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should treated or replaced
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:07:50 AM</td><td> </td><td>5/11/2022 11:09:31 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23582</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/12/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:42 AM</td><td> </td><td>5/11/2022 11:09:30
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23588</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tile should be replaced </td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:53 AM</td><td> </td><td>5/11/2022 11:09:29
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23590</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:56 AM</td><td> </td><td>5/11/2022 11:09:28
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23613</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/13/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021
11:07:01 AM</td><td> </td><td>5/11/2022 11:09:26 AM</td><td>Done </td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>24648</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>11/22/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/1/2021 11:32:30 AM</td><td> </td><td>5/11/2022 11:09:25
AM</td><td>Done </td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24676</td><td>Mankauras - Phase 3A</td><td>Mankauras Stair
and Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring
- stone</td><td>General</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>11/22/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/1/2021 11:35:21 AM</td><td> </td><td>5/11/2022 11:09:23
AM</td><td>Done </td><td>Mankauras - Phase 3A</td><td>&nbsp;</td>
</tr><tr>
<td>24830</td><td>Mankauras - Phase 1</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Short tile should be extended
</td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/7/2021 3:52:11 PM</td><td> </td><td>5/11/2022 11:09:22
AM</td><td>Done </td><td>Mankauras - Phase 1</td><td>&nbsp;</td>
</tr><tr>

<td>26392</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
11:22:04 AM</td><td> </td><td>5/11/2022 11:09:21 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26498</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Interlock need to cleaning.</td><td>Low</td><td>3/17/2022
12:00:00 PM</td><td>Marios Ioannou,</td><td>2/24/2022 11:52:16 AM</td><td>
</td><td>5/11/2022 11:09:20 AM</td><td>Done </td><td>North Side</td><td>&nbsp;</td>
</tr><tr>

<td>26524</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/17/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022 2:22:37 PM</td><td>
</td><td>5/11/2022 11:09:19 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26526</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
2:22:39 PM</td><td> </td><td>5/11/2022 11:09:18 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26528</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/17/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022 2:22:42 PM</td><td>
</td><td>5/11/2022 11:09:17 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26538</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Filling grouting around stainless steel columns
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
2:22:55 PM</td><td> </td><td>5/11/2022 11:09:16 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26571</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/20/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/27/2022 11:27:05 AM</td><td>
</td><td>5/11/2022 11:09:14 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26573</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/20/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/27/2022 11:27:10 AM</td><td>
</td><td>5/11/2022 11:09:13 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26579</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/20/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/27/2022 11:27:17 AM</td><td>
</td><td>5/11/2022 11:09:12 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26581</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/20/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/27/2022 11:27:20 AM</td><td>
</td><td>5/11/2022 11:09:11 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26583</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/27/2022
11:27:25 AM</td><td> </td><td>5/11/2022 11:09:10 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26585</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/20/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/27/2022 11:27:30 AM</td><td>
</td><td>5/11/2022 11:09:08 AM</td><td>Done </td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26595</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Area not
cleaned/finished.</td><td>&#39;Snagging after removing storage material
</td><td>Low</td><td>3/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/27/2022
3:12:16 PM</td><td> </td><td>5/11/2022 11:09:07 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26596</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/27/2022
3:12:18 PM</td><td> </td><td>5/11/2022 11:09:06 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26602</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/27/2022
3:12:35 PM</td><td> </td><td>5/11/2022 11:09:04 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26636</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
3:15:35 PM</td><td> </td><td>5/11/2022 11:09:03 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26903</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Touch up for the pole.</td><td>Low</td><td>3/23/2022 12:00:00
PM</td><td>Marios Ioannou,</td><td>3/2/2022 11:15:14 AM</td><td> </td><td>5/11/2022
11:09:02 AM</td><td>Done </td><td>North Side</td><td>&nbsp;</td>
</tr><tr>
<td>26907</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Touch up and repair for pole.</td><td>Low</td><td>3/23/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/2/2022 11:15:20 AM</td><td>
</td><td>5/11/2022 11:09:00 AM</td><td>Done </td><td>North Side</td><td>&nbsp;</td>
</tr><tr>
<td>26919</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Touch up for cctv pole.</td><td>Low</td><td>3/23/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/2/2022 11:15:39 AM</td><td> </td><td>5/11/2022
11:08:59 AM</td><td>Done </td><td>North Side</td><td>&nbsp;</td>
</tr><tr>

<td>27190</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing stone tile
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
3:01:39 PM</td><td> </td><td>5/11/2022 11:08:58 AM</td><td>Done
</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>19606</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Gypsum ceiling at cove light need to paint
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:26:28 PM</td><td> </td><td>5/11/2022 10:40:46
AM</td><td>&nbsp;</td><td>MW.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18171</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Marked joint between curtain and floor
should be sealed </td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:59:04 AM</td><td> </td><td>5/11/2022
10:40:00 AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>24820</td><td>Mankauras - Phase 1</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;The 2cm high stone strip isn’t aligned with
the stone step above.</td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/7/2021 3:51:56 PM</td><td> </td><td>5/11/2022 10:38:32
AM</td><td>&nbsp;</td><td>Mankauras - Phase 1</td><td>&nbsp;</td>
</tr><tr>
<td>24829</td><td>Mankauras - Phase 1</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken edge should be repaired
</td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/7/2021 3:52:09 PM</td><td> </td><td>5/11/2022 10:38:22
AM</td><td>&nbsp;</td><td>Mankauras - Phase 1</td><td>&nbsp;</td>
</tr><tr>
<td>24602</td><td>Mankauras - Phase 3A</td><td>Mankauras Stair
and Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring
- stone</td><td>General</td><td>&#39;Unequal gaps between stair steps
</td><td>Low</td><td>11/20/2021 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>10/30/2021 4:18:01 PM</td><td> </td><td>5/11/2022 7:32:28
AM</td><td>&nbsp;</td><td>Mankauras - Phase 3A</td><td>&nbsp;</td>
</tr><tr>
<td>24599</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>11/20/2021 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>10/30/2021 4:17:53 PM</td><td> </td><td>5/11/2022 7:32:20
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>13363</td><td>B.O.H-ARTEFACTS - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Repair above the door from inner and outer side/missing sealant
around metal door </td><td>Low</td><td>11/26/2020 12:00:00
AM</td><td>sally.george</td><td>11/5/2020 12:14:27 PM</td><td> </td><td>5/11/2022
7:32:16 AM</td><td>&nbsp;</td><td>MQ.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>8523</td><td>WET DELIVERY TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around Mep Fixtures / painting need touch up
</td><td>Low</td><td>4/1/2020 12:00:00 PM</td><td>Michael Mahfouz</td><td>3/11/2020
11:52:48 AM</td><td> </td><td>5/11/2022 7:32:10
AM</td><td>&nbsp;</td><td>MQ.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>6870</td><td>SERVICE TUNNEL</td><td>AT CONNEC
L49</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>General
Snag</td><td>&#39;Missing duct insulation </td><td>Low</td><td>1/14/2020 12:00:00
AM</td><td>ahmedsalem</td><td>12/24/2019 4:02:30 PM</td><td> </td><td>5/10/2022
4:57:06 PM</td><td>&nbsp;</td><td>SN.00.01.03</td><td>&nbsp;</td>
</tr><tr>
<td>28489</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;No labels for air ducts.
</td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:08 PM</td><td> </td><td>5/10/2022 4:47:46
PM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28319</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Gauges stems shall be insulated.
</td><td>High</td><td>4/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:49:29 AM</td><td> </td><td>5/10/2022 4:43:57
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28321</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;FCU duct not insulated. </td><td>High</td><td>4/26/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>4/19/2022 11:49:37 AM</td><td>
</td><td>5/10/2022 4:43:56
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28325</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage chilled water
pipe insulation. </td><td>High</td><td>4/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:49:59 AM</td><td> </td><td>5/10/2022 4:43:56
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28357</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Duct flexible connection need to be
adjusted. </td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:53 AM</td><td> </td><td>5/10/2022 4:43:55
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28400</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage thermal insulation. </td><td>High</td><td>5/4/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>4/27/2022 11:45:11 AM</td><td>
</td><td>5/10/2022 4:43:54
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28440</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Thermal insulation for duct works need some repairs and holes
in the duct shall be closed before repairing the insulation.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:05:22 PM</td><td> </td><td>5/10/2022 4:43:53
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28466</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;AHU body and related duct works need to be cleaned and duct
supports need painting. </td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:25 PM</td><td> </td><td>5/10/2022 4:43:49
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28472</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Chilled water pipes
insulation need repair. </td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:37 PM</td><td> </td><td>5/10/2022 4:43:48
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>24337</td><td>MU RO Band C</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Curtain
Wall</td><td>Missing</td><td>&#39;Missing water test for
EWS-05</td><td>Low</td><td>11/17/2021 12:00:00
AM</td><td>mohamed.sami</td><td>10/27/2021 11:26:08 AM</td><td> </td><td>5/10/2022
2:57:03 PM</td><td>Although of the parts from axis S18.50-S19.00, S22.50-S22.75,
S23.25-S23.5 &amp; S23.75-S24.25 according to CIRs 222590 &amp; 222361 were
excluded and
not checked however the comment closed based on ITP 106106</td><td>Museum Roof
Band C</td><td>&nbsp;</td>
</tr><tr>
<td>25234</td><td>Temple Garden-Band E</td><td>Temple
Garden</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Mesh ceiling panels need to
cleaning.</td><td>Low</td><td>12/7/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/16/2021 2:42:18 PM</td><td> </td><td>5/10/2022 2:49:31
PM</td><td>&nbsp;</td><td>Band E</td><td>&nbsp;</td>
</tr><tr>
<td>25241</td><td>Temple Garden-Band D</td><td>Temple
Garden</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Mesh cladding panels need to
cleaning.</td><td>Low</td><td>12/7/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/16/2021 2:42:38 PM</td><td> </td><td>5/10/2022 2:49:29
PM</td><td>&nbsp;</td><td>Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25242</td><td>Temple Garden-Band D</td><td>Temple
Garden</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Mesh ceiling panels need to
cleaning.</td><td>Low</td><td>12/7/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/16/2021 2:42:41 PM</td><td> </td><td>5/10/2022 2:49:28
PM</td><td>&nbsp;</td><td>Band D</td><td>&nbsp;</td>
</tr><tr>
<td>24762</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>Hydrogreen</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Missing plants at end of triangle (verbena
plants) along side walk</td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/7/2021 11:30:54 AM</td><td> </td><td>5/10/2022 2:44:16
PM</td><td>&nbsp;</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>

<td>25038</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>Hydrogreen</
td><td>Architectural</td><td>General Snag</td><td>General Snag</td><td>&#39;Missing
plants should be installed </td><td>Low</td><td>12/2/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/11/2021 10:24:17 AM</td><td> </td><td>5/10/2022 2:44:14
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25062</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>Hydrogreen</
td><td>Architectural</td><td>General Snag</td><td>General</td><td>&#39;Missing
plants should be installed </td><td>Low</td><td>12/2/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/11/2021 10:43:35 AM</td><td> </td><td>5/10/2022 2:44:13
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>18465</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Discoloring between stone tiles
</td><td>Low</td><td>6/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/7/2021
4:09:28 PM</td><td> </td><td>5/10/2022 12:29:46
PM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18166</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Sealant is missing for marked parts
</td><td>Low</td><td>6/16/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/26/2021
11:58:57 AM</td><td> </td><td>5/10/2022 11:39:31
AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18167</td><td>KINDERGARTEN CLASSROOM 6 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Floor
tiles</td><td>General Snag</td><td>&#39;Sealant between glazed door and floor
should be adjusted </td><td>Low</td><td>6/16/2021 12:00:00
AM</td><td>mohamed.sami</td><td>5/26/2021 11:58:58 AM</td><td> </td><td>5/10/2022
11:39:30 AM</td><td>&nbsp;</td><td>MK.17.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18467</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Threshold</td><td>Not in
level</td><td>&#39;Check relation between threshold and carpet floor ( level )
</td><td>Low</td><td>6/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/7/2021
4:09:32 PM</td><td> </td><td>5/10/2022 11:39:28
AM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18586</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone Flooring to be check after cleaning
</td><td>Low</td><td>6/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/8/2021
4:33:15 PM</td><td> </td><td>5/10/2022 11:39:27
AM</td><td>&nbsp;</td><td>MW.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18588</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>6/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/8/2021
4:47:27 PM</td><td> </td><td>5/10/2022 11:39:26
AM</td><td>&nbsp;</td><td>MW.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>18605</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Filing joint </td><td>Low</td><td>6/29/2021
12:00:00 PM</td><td>mohamed.sami</td><td>6/8/2021 4:48:24 PM</td><td>
</td><td>5/10/2022 11:39:25
AM</td><td>&nbsp;</td><td>MW.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18606</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Filling joints </td><td>Low</td><td>6/29/2021
12:00:00 PM</td><td>mohamed.sami</td><td>6/8/2021 4:48:26 PM</td><td>
</td><td>5/10/2022 11:39:23
AM</td><td>&nbsp;</td><td>MW.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18608</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>6/29/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/8/2021
4:48:32 PM</td><td> </td><td>5/10/2022 11:39:22
AM</td><td>&nbsp;</td><td>MW.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19550</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:11 PM</td><td> </td><td>5/10/2022 11:39:21
AM</td><td>&nbsp;</td><td>MK.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19555</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:18 PM</td><td> </td><td>5/10/2022 11:39:20
AM</td><td>&nbsp;</td><td>MK.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19560</td><td>CORRIDOR - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:24 PM</td><td> </td><td>5/10/2022 11:39:18
AM</td><td>&nbsp;</td><td>MS.18.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>22727</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Missing elevator
signage</td><td>Low</td><td>9/27/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>9/6/2021 3:42:02 PM</td><td> </td><td>5/10/2022 11:39:17
AM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23759</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Stone cladding should be aligned
</td><td>Low</td><td>11/3/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/13/2021 4:17:01 PM</td><td> </td><td>5/10/2022 11:39:15
AM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>24649</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Facade - GRC
panels</td><td>Damaged</td><td>&#39;Gap between GRC and aluminum frame should be
adjusted </td><td>Low</td><td>11/22/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/1/2021 11:32:31 AM</td><td> </td><td>5/10/2022 11:39:14
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24672</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring
- stone</td><td>General</td><td>&#39;Gap between stone flooring and slot drain
should be closed</td><td>Low</td><td>11/22/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/1/2021 11:34:52 AM</td><td> </td><td>5/10/2022 11:39:12
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24725</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Gap between grating and stone should be sealed
</td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:40 PM</td><td> </td><td>5/10/2022 11:39:11
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24726</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant is missing
</td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:41 PM</td><td> </td><td>5/10/2022 11:39:06
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24727</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stone should be extended
</td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:43 PM</td><td> </td><td>5/10/2022 11:39:05
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24731</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken stone should be repaired/replaced
</td><td>Low</td><td>11/24/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:49 PM</td><td> </td><td>5/10/2022 11:39:04
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24732</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Staircase Handrail</td><td>Overall
finishes</td><td>&#39;Marked base plate should be aligned
</td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:51 PM</td><td> </td><td>5/10/2022 11:39:02
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24733</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Sealant is missing between the slot drain and
stone flooring </td><td>Low</td><td>11/24/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/3/2021 4:03:53 PM</td><td> </td><td>5/10/2022 11:39:01
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>24821</td><td>Mankauras - Phase 1</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>11/28/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>11/7/2021 3:51:58 PM</td><td> </td><td>5/10/2022 11:39:00
AM</td><td>&nbsp;</td><td>Mankauras - Phase 1</td><td>&nbsp;</td>
</tr><tr>
<td>24823</td><td>Mankauras - Phase 1</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Sealant is missing between slot drain and
stone flooring </td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/7/2021 3:52:01 PM</td><td> </td><td>5/10/2022 11:38:59
AM</td><td>&nbsp;</td><td>Mankauras - Phase 1</td><td>&nbsp;</td>
</tr><tr>
<td>25952</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Toothing between tiles should be adjusted
</td><td>Low</td><td>2/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022
12:07:45 PM</td><td> </td><td>5/10/2022 11:38:55
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23332</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/20/2021 11:13:24 AM</td><td> </td><td>5/10/2022 11:30:21
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26190</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Missing grouting/grouting should be adjusted
</td><td>Low</td><td>3/10/2022 12:00:00 AM</td><td>Amr Nofal</td><td>2/17/2022
12:11:59 PM</td><td> </td><td>5/10/2022 11:30:20
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>17378</td><td>External North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing backer rod and Sealant </td><td>Low</td><td>5/4/2021
12:00:00 PM</td><td>aymanhaddadin</td><td>4/13/2021 11:48:34 AM</td><td>
</td><td>5/10/2022 11:29:40 AM</td><td>&nbsp;</td><td>External North
Fence</td><td>&nbsp;</td>
</tr><tr>
<td>22313</td><td>South Facade- CCB</td><td>CCB South
Facade</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
stone cladding</td><td>General</td><td>&#39;Uneven surface of the stone cladding
between the adjoining stones</td><td>Low</td><td>9/14/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>8/24/2021 2:34:04 PM</td><td> </td><td>5/10/2022
11:29:39 AM</td><td>&nbsp;</td><td>South Facade- CCB</td><td>&nbsp;</td>
</tr><tr>
<td>23304</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Grouting
should be adjusted </td><td>Low</td><td>10/11/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/20/2021 11:12:36 AM</td><td> </td><td>5/10/2022 11:29:38
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23306</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should be treated or replaced
</td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/20/2021
11:12:40 AM</td><td> </td><td>5/10/2022 11:29:37
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23316</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Bad
repair edge should be adjusted </td><td>Low</td><td>10/11/2021 12:00:00
AM</td><td>Amr Nofal</td><td>9/20/2021 11:12:57 AM</td><td> </td><td>5/10/2022
11:29:37 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23318</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
grouting should be adjusted </td><td>Low</td><td>10/11/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/20/2021 11:13:00 AM</td><td> </td><td>5/10/2022 11:29:36
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23320</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should be treated or replaced
</td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/20/2021
11:13:04 AM</td><td> </td><td>5/10/2022 11:29:35
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23334</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Cutting
stone edges should be aligned and adjusted </td><td>Low</td><td>10/11/2021 12:00:00
AM</td><td>Amr Nofal</td><td>9/20/2021 11:13:28 AM</td><td> </td><td>5/10/2022
11:28:45 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23335</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
grouting should be adjusted </td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/20/2021 11:13:30 AM</td><td> </td><td>5/10/2022 11:28:44
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23545</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Grouting
should be adjusted </td><td>Low</td><td>10/12/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/21/2021 11:07:45 AM</td><td> </td><td>5/10/2022 11:28:43
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23584</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:46 AM</td><td> </td><td>5/10/2022 11:28:42
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24794</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Surface preparation for concrete
stairs</td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/7/2021 11:32:21 AM</td><td> </td><td>5/10/2022 11:28:42
AM</td><td>&nbsp;</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>

<td>25027</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>Hydrogreen</
td><td>Architectural</td><td>General Snag</td><td>General Snag</td><td>&#39;Missing
planting should be installed </td><td>Low</td><td>12/2/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/11/2021 10:23:32 AM</td><td> </td><td>5/10/2022 11:28:41
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25037</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>Hydrogreen</
td><td>Architectural</td><td>General Snag</td><td>General Snag</td><td>&#39;Missing
plants should be installed </td><td>Low</td><td>11/18/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/11/2021 10:24:13 AM</td><td> </td><td>5/10/2022 11:28:40
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25141</td><td>Truck scanner - Roof and external
walls</td><td>Truck scanner Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall Painting</td><td>General
Snag</td><td>&#39;Accessories should be aligned </td><td>Low</td><td>12/5/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>11/14/2021 4:02:48 PM</td><td>
</td><td>5/10/2022 11:28:38 AM</td><td>&nbsp;</td><td>Truck scanner - Roof and
external walls</td><td>&nbsp;</td>
</tr><tr>
<td>25142</td><td>Truck scanner - Roof and external
walls</td><td>Truck scanner Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall Painting</td><td>Paint
quality</td><td>&#39;Wall painting need to touch up </td><td>Low</td><td>11/21/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>11/14/2021 4:02:52 PM</td><td>
</td><td>5/10/2022 11:28:36 AM</td><td>&nbsp;</td><td>Truck scanner - Roof and
external walls</td><td>&nbsp;</td>
</tr><tr>

<td>26200</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Crystal vanes from edge to edge not accepted
should be replaced </td><td>Low</td><td>3/10/2022 12:00:00 AM</td><td>Amr
Nofal</td><td>2/17/2022 12:15:50 PM</td><td> </td><td>5/10/2022 11:27:34
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26416</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Painting need to touch up </td><td>Low</td><td>3/16/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>2/23/2022 4:01:08 PM</td><td> </td><td>5/10/2022
11:27:33 AM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>26507</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Manholes Covers are missing
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/24/2022 11:52:26 AM</td><td> </td><td>5/10/2022 11:27:32
AM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>

<td>26640</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing stone flooring tiles
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
3:15:44 PM</td><td> </td><td>5/10/2022 11:27:31
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26643</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing grouting for stone joints
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
3:15:52 PM</td><td> </td><td>5/10/2022 11:27:30
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26870</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Incomplete work around lighting pole
</td><td>Low</td><td>3/9/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
10:31:07 AM</td><td> </td><td>5/10/2022 11:27:29
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26914</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Broken interlock tiles need to repair or replaced
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/2/2022
11:15:32 AM</td><td> </td><td>5/10/2022 11:27:29 AM</td><td>&nbsp;</td><td>North
Side</td><td>&nbsp;</td>
</tr><tr>
<td>27191</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
3:01:42 PM</td><td> </td><td>5/10/2022 11:27:28
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>16277</td><td>VIP RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Joints should be aligned /grouting is
missing </td><td>Low</td><td>2/21/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>2/14/2021 2:01:52 PM</td><td> </td><td>5/10/2022 11:19:43
AM</td><td>Done </td><td>MV.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>9594</td><td>WET DELIVERY TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Floor need cleaning
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:47:41 PM</td><td> </td><td>5/10/2022 11:18:11 AM</td><td>Done
</td><td>MQ.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16408</td><td>FIRE CONTROL ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Sprinkler
System</td><td>Sprinkler plate</td><td>&#39;Remove painting from Inergen nozzle
</td><td>High</td><td>2/21/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>2/14/2021 3:09:54 PM</td><td> </td><td>5/10/2022 11:17:36
AM</td><td>&nbsp;</td><td>MB.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>24903</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>Sprinkler
Heads</td><td>General Snag</td><td>&#39;Remove tape or paint from cover
plate</td><td>High</td><td>11/15/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>11/8/2021 3:32:01 PM</td><td> </td><td>5/10/2022 11:17:23
AM</td><td>&nbsp;</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>20721</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tile should be replaced </td><td>Low</td><td>8/31/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021 12:02:30 PM</td><td>
</td><td>5/10/2022 11:17:08 AM</td><td>Done
</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>21572</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door frame
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
9:52:25 AM</td><td> </td><td>5/10/2022 11:17:07 AM</td><td>Done
</td><td>MS.12.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>21650</td><td>CORE D3</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing </td><td>Low</td><td>9/9/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/19/2021 11:24:49 AM</td><td> </td><td>5/10/2022
11:17:05 AM</td><td>Done </td><td>MC.13.0G.D31</td><td>&nbsp;</td>
</tr><tr>
<td>21652</td><td>ELEC. ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing around metal door
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:24:51 AM</td><td> </td><td>5/10/2022 11:17:02 AM</td><td>Done
</td><td>MS.13.0G.013</td><td>&nbsp;</td>
</tr><tr>
<td>21657</td><td>LOBBY</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Sealant is missing around metal
doors</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:00 AM</td><td> </td><td>5/10/2022 11:17:00
AM</td><td>Done </td><td>MC.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21659</td><td>LOBBY</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked part should be repaired </td><td>Low</td><td>9/9/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021 11:25:02 AM</td><td>
</td><td>5/10/2022 11:16:58 AM</td><td>Done
</td><td>MC.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22229</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Marked sealant around architrave need to
adjusted </td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/24/2021 11:48:32 AM</td><td> </td><td>5/10/2022 11:16:57
AM</td><td>Done </td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22232</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Marked parts need to adjusted and
repair</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/24/2021 11:48:37 AM</td><td> </td><td>5/10/2022 11:16:55
AM</td><td>Done </td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22261</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs touch up painting </td><td>Low</td><td>9/14/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021 11:49:31 AM</td><td>
</td><td>5/10/2022 11:16:54 AM</td><td>Done </td><td>MG.13.0G.003

</td><td>&nbsp;</td>
</tr><tr>
<td>22262</td><td>CORRIDOR</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Repair is needed </td><td>Low</td><td>9/14/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/24/2021 11:49:33 AM</td><td> </td><td>5/10/2022
11:16:52 AM</td><td>Done </td><td>MG.13.0G.003
</td><td>&nbsp;</td>
</tr><tr>
<td>22302</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting (for all
walls)</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/24/2021 11:50:28 AM</td><td> </td><td>5/10/2022 11:16:50
AM</td><td>Done </td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>18644</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>Deyar
Interiors</td><td>Architectural</td><td>Furniture</td><td>Incomplete</
td><td>&#39;Missing shelves </td><td>Low</td><td>6/30/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/9/2021 4:22:47 PM</td><td> </td><td>5/10/2022
10:29:39 AM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>19542</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;Repair around sounder
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:00 PM</td><td> </td><td>5/10/2022 10:29:37
AM</td><td>&nbsp;</td><td>MK.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>19544</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:03 PM</td><td> </td><td>5/10/2022 10:29:36
AM</td><td>&nbsp;</td><td>MK.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>19545</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:04 PM</td><td> </td><td>5/10/2022 10:29:34
AM</td><td>&nbsp;</td><td>MK.18.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>19546</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Corner sealant need adjustment </td><td>Low</td><td>7/21/2021
12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021 1:25:05 PM</td><td>
</td><td>5/10/2022 10:29:32
AM</td><td>&nbsp;</td><td>MK.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19549</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:10 PM</td><td> </td><td>5/10/2022 10:29:30
AM</td><td>&nbsp;</td><td>MK.18.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19554</td><td>ADMIN - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:17 PM</td><td> </td><td>5/10/2022 10:29:29
AM</td><td>&nbsp;</td><td>MK.18.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>13745</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up
</td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:38:48 AM</td><td> </td><td>5/10/2022 10:03:14
AM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>13746</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Repair </td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/1/2020 11:38:51 AM</td><td> </td><td>5/10/2022 10:03:13
AM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>13748</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Repair </td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/1/2020 11:38:56 AM</td><td> </td><td>5/10/2022 10:03:12
AM</td><td>&nbsp;</td><td>MS.23.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13766</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>Cracks</td><td>&#39;Repair and touch up for dust sealer
</td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:39:47 AM</td><td> </td><td>5/10/2022 10:03:11
AM</td><td>&nbsp;</td><td>MS.18.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>13767</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Touch up for repair around metal door frame
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:39:49 AM</td><td> </td><td>5/10/2022 10:03:10
AM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>13771</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up for concrete floor
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:40:01 AM</td><td> </td><td>5/10/2022 10:03:09
AM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>21669</td><td>CORE B3</td><td>MU
L25</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Handrail is not aligned and should
be adjusted </td><td>Low</td><td>9/9/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/19/2021 11:25:19 AM</td><td> </td><td>5/10/2022 10:03:08
AM</td><td>&nbsp;</td><td>MC.12.2A.B31</td><td>&nbsp;</td>
</tr><tr>
<td>27545</td><td>ELEC ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wall need to touch up
</td><td>Low</td><td>3/30/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/9/2022
11:32:53 AM</td><td> </td><td>5/10/2022 10:03:06
AM</td><td>&nbsp;</td><td>MS.19.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>19508</td><td>ESCAPE ROUTE - Band B</td><td>MU
L20</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;WiFi , access control labels and testing not done
</td><td>High</td><td>7/6/2021 12:00:00 AM</td><td>Mohamed Samir</td><td>6/29/2021
1:19:31 PM</td><td> </td><td>5/10/2022 9:49:50
AM</td><td>&nbsp;</td><td>MQ.18.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>27594</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Devices should be installed properly
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/9/2022 2:52:39 PM</td><td> </td><td>5/10/2022 9:49:48
AM</td><td>&nbsp;</td><td>MS.25.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>9656</td><td>WET DELIVERY TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV QC MEP</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Most of conduits should be properly
tightened</td><td>High</td><td>7/27/2020 12:00:00 AM</td><td>Kriton Katsamenis
</td><td>7/20/2020 3:19:51 PM</td><td> </td><td>5/10/2022 9:42:15
AM</td><td>&nbsp;</td><td>MQ.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22081</td><td>IT ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing support for conduits
</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/23/2021 3:58:02 PM</td><td> </td><td>5/10/2022 9:42:12
AM</td><td>&nbsp;</td><td>MS.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>22089</td><td>VOID</td><td>MU GF </td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;Clash between trunk and HVAC
system</td><td>High</td><td>8/30/2021 12:00:00 PM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/23/2021 3:58:09 PM</td><td> </td><td>5/10/2022 9:42:11
AM</td><td>&nbsp;</td><td>MS.13.0G.007</td><td>&nbsp;</td>
</tr><tr>
<td>22118</td><td>STORAGE</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing
labels</td><td>High</td><td>8/30/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/23/2021 3:58:40 PM</td><td> </td><td>5/10/2022 9:42:09
AM</td><td>&nbsp;</td><td>MS.13.0G.009</td><td>&nbsp;</td>
</tr><tr>
<td>28551</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>Petrokima</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;No actuator installed
for CW&amp; HW valves. </td><td>High</td><td>5/16/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/9/2022 11:49:08 AM</td><td> </td><td>5/10/2022 9:05:38
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>25865</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Toothing between ceiling
tiles should be leveled </td><td>Low</td><td>2/10/2022 12:00:00 AM</td><td>Kerolos
Nagy Tawfik</td><td>1/20/2022 12:03:11 PM</td><td> </td><td>5/10/2022 9:03:59
AM</td><td>Done </td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28334</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Damage insulation around duct access
door. </td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:43:55 AM</td><td> </td><td>5/10/2022 8:51:44
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28498</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Loose pipe support.
</td><td>High</td><td>5/15/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/8/2022 4:15:22 PM</td><td> </td><td>5/10/2022 8:50:03
AM</td><td>&nbsp;</td><td>MS.19.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>24877</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Gap between shutter door and concrete wall need
adjustment.</td><td>Low</td><td>11/29/2021 12:00:00 AM</td><td>Moussa Nageh
Khella</td><td>11/8/2021 11:47:41 AM</td><td> </td><td>5/10/2022 8:48:39
AM</td><td>Done</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>

<td>25429</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Metal trim should be fixed properly
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>12/7/2021 10:18:15 AM</td><td> </td><td>5/10/2022 8:48:28
AM</td><td>Done</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>28333</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Damage duct insulation.
</td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:43:52 AM</td><td> </td><td>5/10/2022 8:41:36
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28332</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Insulation around duct AD is not done
properly. </td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:43:44 AM</td><td> </td><td>5/10/2022 8:40:31
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28479</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Missing seismic
support. </td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:52 PM</td><td> </td><td>5/10/2022 8:38:59
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>24596</td><td>Mankauras - Phase 2</td><td>Mankauras Stair and
Wall</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Wall - Metal
cladding</td><td>Not aligned</td><td>&#39;Unequal gaps between mesh panels and
stone </td><td>Low</td><td>11/20/2021 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>10/30/2021 4:17:43 PM</td><td> </td><td>5/10/2022 8:28:20
AM</td><td>&nbsp;</td><td>Mankauras - Phase 2</td><td>&nbsp;</td>
</tr><tr>
<td>28452</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing handles for drain valves.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:05:59 PM</td><td> </td><td>5/10/2022 8:27:57
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28445</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;AHU doors handles are broken. </td><td>High</td><td>5/12/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:05:46 PM</td><td>
</td><td>5/10/2022 8:27:16
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28439</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Drain valves handles are missing.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:05:17 PM</td><td> </td><td>5/10/2022 8:24:36
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28438</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage duct insulation need to be repaired.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:05:15 PM</td><td> </td><td>5/10/2022 8:23:21
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28323</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Incomplete insulation for ducts.
</td><td>High</td><td>4/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:49:47 AM</td><td> </td><td>5/10/2022 8:21:24
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>21299</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Mechanical Pipework</td><td>General
Snag</td><td>&#39;Drain of fire is far from floor drain
</td><td>High</td><td>8/24/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/17/2021
4:06:26 PM</td><td> </td><td>5/10/2022 8:18:14
AM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>28518</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Thermal insulation need repair. </td><td>High</td><td>5/15/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/8/2022 4:15:58 PM</td><td>
</td><td>5/10/2022 8:17:07
AM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28408</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Thermal insulation need repair.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:08 PM</td><td> </td><td>5/10/2022 8:15:59
AM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>9559</td><td>WET DELIVERY TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Missing fire
extinguishers</td><td>High</td><td>7/27/2020 12:00:00
PM</td><td>ahmedsalem</td><td>7/20/2020 11:42:43 AM</td><td> </td><td>5/10/2022
8:07:38 AM</td><td>&nbsp;</td><td>MQ.13.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>10546</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Concrete wall need repair </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:15:41 PM</td><td> </td><td>5/9/2022
2:24:59 PM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>10549</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Doors</td><td>General
Snag</td><td>&#39;Missing sealant around metal door </td><td>Low</td><td>10/3/2020
12:00:00 AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:15:51 PM</td><td>
</td><td>5/9/2022 2:24:17
PM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>25893</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked tiles should be replaced by louver as
per shop drawing</td><td>Low</td><td>2/13/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/23/2022 11:59:41 AM</td><td> </td><td>5/9/2022
2:07:15 PM</td><td>Based on AM2.324 on DWG-150128 &amp; 150129 Rev.
C</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26112</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Wrong panels installation should be louvre
panels </td><td>Low</td><td>2/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/3/2022 2:26:22 PM</td><td> </td><td>5/9/2022
2:07:03 PM</td><td>Based on AM2.324 on DWG-150128 &amp; 150129 Rev.
C</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28307</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;FCU insulation need repairs. </td><td>Medium</td><td>4/29/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>4/19/2022 11:48:33 AM</td><td>
</td><td>5/9/2022 11:49:32
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28346</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Flexible duct connection is damaged and
shall be replaced. </td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:28 AM</td><td> </td><td>5/9/2022 11:49:31
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28356</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Missing insulation belts and
corners.</td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:52 AM</td><td> </td><td>5/9/2022 11:49:30
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28369</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Installation not to specification/drawing</td><td>&#39;Damage
insulation. </td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:45:22 AM</td><td> </td><td>5/9/2022 11:49:29
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28374</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Installation not to specification/drawing</td><td>&#39;Missing
chilled water pipe thermal insulation. </td><td>High</td><td>5/3/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>4/26/2022 11:45:35 AM</td><td>
</td><td>5/9/2022 11:49:28
AM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28383</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Damage insulation.
</td><td>High</td><td>5/4/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/27/2022 11:44:38 AM</td><td> </td><td>5/9/2022 11:49:27
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>28388</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage insulation. </td><td>High</td><td>5/4/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>4/27/2022 11:44:49 AM</td><td>
</td><td>5/9/2022 11:49:25
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>28426</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Insulation around duct access door need repairs.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:50 PM</td><td> </td><td>5/9/2022 11:49:24
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28462</td><td>CORE E1</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Flexible duct connector need repair or to be replaced and the
connected threaded rods shall be removed. </td><td>High</td><td>5/12/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:06:17 PM</td><td>
</td><td>5/9/2022 11:49:18
AM</td><td>&nbsp;</td><td>MC.24.2A.E11</td><td>&nbsp;</td>
</tr><tr>
<td>28478</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage thermal insulation need repairs.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:50 PM</td><td> </td><td>5/9/2022 11:49:14
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>18460</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Cleaning and remove tape
</td><td>Low</td><td>6/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/7/2021
4:09:11 PM</td><td> </td><td>5/9/2022 11:39:31
AM</td><td>&nbsp;</td><td>MW.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18466</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>6/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/7/2021
4:09:30 PM</td><td> </td><td>5/9/2022 11:39:30
AM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18470</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>6/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/7/2021
4:09:39 PM</td><td> </td><td>5/9/2022 11:39:29
AM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18472</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Corners and Edges should be aligned
</td><td>Low</td><td>6/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/7/2021
4:09:44 PM</td><td> </td><td>5/9/2022 11:39:27
AM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18581</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>6/29/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/8/2021
4:32:57 PM</td><td> </td><td>5/9/2022 11:39:25
AM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18604</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Vanity</td><td>General
Snag</td><td>&#39;Filling joint around steel bracket </td><td>Low</td><td>6/29/2021
12:00:00 PM</td><td>mohamed.sami</td><td>6/8/2021 4:48:20 PM</td><td>
</td><td>5/9/2022 11:39:21
AM</td><td>&nbsp;</td><td>MW.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19117</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;Gap
around electrical box should be closed </td><td>Low</td><td>7/7/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/16/2021 10:54:11 AM</td><td> </td><td>5/9/2022
11:39:20 AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19447</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Joint between stone cladding and flooring
need to be aligned </td><td>Low</td><td>7/15/2021 12:00:00
PM</td><td>mohamed.sami</td><td>6/24/2021 11:55:49 AM</td><td> </td><td>5/9/2022
11:39:18 AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19587</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Partion align and plumb</td><td>&#39;Gap between HPL partition and
stone cladding should be closed </td><td>Low</td><td>7/21/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:26:02 PM</td><td> </td><td>5/9/2022
11:39:17 AM</td><td>&nbsp;</td><td>MW.13.002.002</td><td>&nbsp;</td>
</tr><tr>
<td>19729</td><td>STORAGE - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;Switches
should be fixed properly </td><td>Low</td><td>7/28/2021 12:00:00
AM</td><td>mohamed.sami</td><td>7/7/2021 1:30:26 PM</td><td> </td><td>5/9/2022
11:39:15 AM</td><td>&nbsp;</td><td>MK.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>19731</td><td>STORAGE - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>7/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>7/7/2021
1:30:29 PM</td><td> </td><td>5/9/2022 11:39:14
AM</td><td>&nbsp;</td><td>MK.13.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>25928</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Repair for marked
part</td><td>Low</td><td>2/14/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/24/2022 10:42:30 AM</td><td> </td><td>5/9/2022
11:39:12 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25953</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Toothing between tiles should be adjusted
</td><td>Low</td><td>2/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022
12:07:47 PM</td><td> </td><td>5/9/2022 11:39:11
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25961</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Toothing between tiles should be adjusted
</td><td>Low</td><td>2/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022
12:08:01 PM</td><td> </td><td>5/9/2022 11:39:10
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25965</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked joints should be adjusted and
finished properly </td><td>Low</td><td>2/14/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/24/2022 12:08:08 PM</td><td> </td><td>5/9/2022
11:39:09 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25993</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Interface between stone cladding and steps
should be uniform and regular </td><td>Low</td><td>2/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/25/2022 11:39:06 AM</td><td> </td><td>5/9/2022
11:39:07 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25995</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Large gap between ceiling and stone should be closed
</td><td>Low</td><td>2/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/25/2022
11:39:10 AM</td><td> </td><td>5/9/2022 11:39:06
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25996</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Defected tiles should be replaced </td><td>Low</td><td>2/15/2022
12:00:00 AM</td><td>mohamed.sami</td><td>1/25/2022 11:39:11 AM</td><td>
</td><td>5/9/2022 11:39:04 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25997</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Toothing between tiles should be adjusted and leveled
</td><td>Low</td><td>2/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/25/2022
11:39:13 AM</td><td> </td><td>5/9/2022 11:39:02
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26024</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges should be replaced
</td><td>Low</td><td>2/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/25/2022
11:52:17 AM</td><td> </td><td>5/9/2022 11:39:00
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26047</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked parts to be finished properly
</td><td>Low</td><td>2/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/31/2022
11:37:23 AM</td><td> </td><td>5/9/2022 11:38:59
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26103</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Substandard joint should be
regular.</td><td>Low</td><td>2/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/3/2022 2:25:56 PM</td><td> </td><td>5/9/2022
11:38:57 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26109</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Irregular cutting around electrical
plugs</td><td>Low</td><td>2/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/3/2022 2:26:11 PM</td><td> </td><td>5/9/2022
11:38:56 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22459</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:14:07 PM</td><td> </td><td>5/9/2022 11:13:04 AM</td><td>&nbsp;</td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>22461</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:14:11 PM</td><td> </td><td>5/9/2022 11:13:03 AM</td><td>&nbsp;</td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>22462</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:14:12 PM</td><td> </td><td>5/9/2022 11:13:02 AM</td><td>&nbsp;</td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>22513</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Poor application of grout around linear drain</td><td>&#39;Poor
grouting should be repaired </td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>8/30/2021 11:04:18 AM</td><td> </td><td>5/9/2022 11:13:01
AM</td><td>&nbsp;</td><td>Part 6</td><td>&nbsp;</td>
</tr><tr>
<td>22535</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Marked part needs good repair
</td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/30/2021
11:04:38 AM</td><td> </td><td>5/9/2022 11:13:00 AM</td><td>&nbsp;</td><td>Part
6</td><td>&nbsp;</td>
</tr><tr>
<td>22598</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor cutting for stone
edges</td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/1/2021
10:49:38 AM</td><td> </td><td>5/9/2022 11:12:59 AM</td><td>&nbsp;</td><td>Part
4</td><td>&nbsp;</td>
</tr><tr>
<td>22840</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stains should be removed
</td><td>Low</td><td>10/3/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/12/2021
10:48:11 AM</td><td> </td><td>5/9/2022 11:12:58 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22843</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Metal trim should be flush with stone
</td><td>Low</td><td>10/3/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/12/2021
10:48:15 AM</td><td> </td><td>5/9/2022 11:12:57 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22868</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Missing sealant
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/13/2021
11:21:51 AM</td><td> </td><td>5/9/2022 11:12:55 AM</td><td>&nbsp;</td><td>Part
9</td><td>&nbsp;</td>
</tr><tr>
<td>23159</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should be treated or replaced
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:51:01 AM</td><td> </td><td>5/9/2022 11:12:54
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23286</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Termination of metal trim should be as per design drawing
</td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/20/2021
11:04:58 AM</td><td> </td><td>5/9/2022 11:12:53
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23338</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Discoloration between tiles should be treated or
replaced </td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/20/2021 11:13:34 AM</td><td> </td><td>5/9/2022 11:12:53
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23340</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Termination of metal trim should be as per
drawing </td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/20/2021 11:13:39 AM</td><td> </td><td>5/9/2022 11:12:52
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23341</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Termination of metal trim should be as per
drawing </td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/20/2021 11:13:41 AM</td><td> </td><td>5/9/2022 11:12:50
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23349</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Bad
repair for stone edge should be adjusted </td><td>Low</td><td>10/11/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/20/2021 11:13:54 AM</td><td> </td><td>5/9/2022
11:12:49 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23351</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
grouting should be adjusted </td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/20/2021 11:13:58 AM</td><td> </td><td>5/9/2022 11:12:47
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23353</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should treated or replaced
</td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/20/2021
11:14:01 AM</td><td> </td><td>5/9/2022 11:12:46
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23356</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced </td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/20/2021 11:14:07 AM</td><td> </td><td>5/9/2022 11:12:45
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23379</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Unacceptable closure pattern should be as per drawing
</td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/20/2021
11:14:44 AM</td><td> </td><td>5/9/2022 11:12:44
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23382</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
grouting should be adjusted </td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/20/2021 11:14:49 AM</td><td> </td><td>5/9/2022 11:12:43
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23384</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tile should be replaced </td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/20/2021 11:14:52 AM</td><td> </td><td>5/9/2022 11:12:42
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23386</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should be treated or replaced
</td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/20/2021
11:14:56 AM</td><td> </td><td>5/9/2022 11:12:41
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23388</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Termination of metal trim should be as per
drawing </td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/20/2021 11:15:00 AM</td><td> </td><td>5/9/2022 11:12:39
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23398</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should be treated or replaced
</td><td>Low</td><td>10/11/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/20/2021
11:15:16 AM</td><td> </td><td>5/9/2022 11:12:38
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23425</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
repair for stone edges should be adjusted </td><td>Low</td><td>10/11/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/20/2021 11:16:00 AM</td><td> </td><td>5/9/2022
11:12:37 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23580</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Termination between metal trim and stone should be adjusted as
per design drawing </td><td>Low</td><td>9/28/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:39 AM</td><td> </td><td>5/9/2022 11:12:35
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23581</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Termination between metal trim and stone should be adjusted as
per design drawing </td><td>Low</td><td>9/28/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/21/2021 11:08:41 AM</td><td> </td><td>5/9/2022 11:12:34
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23592</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Termination for metal trim should be adjusted as per design
drawing </td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/21/2021 11:09:00 AM</td><td> </td><td>5/9/2022 11:12:33
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23622</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Missing tiles should be installed
</td><td>Low</td><td>10/13/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/22/2021
11:07:17 AM</td><td> </td><td>5/9/2022 11:12:32 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>23630</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/13/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021
11:09:33 AM</td><td> </td><td>5/9/2022 11:12:31 AM</td><td>&nbsp;</td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>24765</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>Hydrogreen</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Settlement soil should be treated
</td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/7/2021
11:31:10 AM</td><td> </td><td>5/9/2022 11:12:28
AM</td><td>&nbsp;</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>24778</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between interlock and kerb stone
should be aligned </td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/7/2021 11:31:52 AM</td><td> </td><td>5/9/2022 11:12:26
AM</td><td>&nbsp;</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>25134</td><td>Truck scanner - Ground Floor</td><td>Truck
scanner Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interface between interlock and wall should be
leveled and uniform </td><td>Low</td><td>12/5/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>11/14/2021 3:54:08 PM</td><td> </td><td>5/9/2022 11:12:25
AM</td><td>&nbsp;</td><td>Truck scanner - Ground Floor</td><td>&nbsp;</td>
</tr><tr>
<td>26324</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Repair and sealant is needed at all bottom construction
joints.</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/22/2022 1:23:46 PM</td><td> </td><td>5/9/2022 11:12:24
AM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>26383</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tiles should be replaced/ repaired
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
11:21:46 AM</td><td> </td><td>5/9/2022 11:12:23
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26426</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Painting need to touch up and repair
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/23/2022 4:01:28 PM</td><td> </td><td>5/9/2022 11:12:21
AM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>

<td>26586</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing sealant between slot drain and stone
flooring </td><td>Low</td><td>3/20/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/27/2022 11:27:30 AM</td><td> </td><td>5/9/2022
11:12:20 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26644</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing sealant between slot drain and stone
flooring </td><td>Low</td><td>3/21/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/28/2022 3:15:54 PM</td><td> </td><td>5/9/2022
11:12:19 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27028</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/23/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/2/2022
4:15:46 PM</td><td> </td><td>5/9/2022 11:12:18
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27033</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing grouting for stone joints
</td><td>Low</td><td>3/23/2022 12:00:00 PM</td><td>mohamed.sami</td><td>3/2/2022
4:16:00 PM</td><td> </td><td>5/9/2022 11:12:17
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>9638</td><td>SERVICE DELIVERY</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up </td><td>Low</td><td>8/10/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>7/20/2020 1:50:11 PM</td><td> </td><td>5/9/2022
10:45:10 AM</td><td>Done </td><td>MQ.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>9639</td><td>SERVICE TUNNEL</td><td>MU GF
</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Walls need touch up </td><td>Low</td><td>8/10/2020 12:00:00
PM</td><td>Adel Nassrat</td><td>7/20/2020 1:50:13 PM</td><td> </td><td>5/9/2022
10:45:09 AM</td><td>Done </td><td>MQ.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>9641</td><td>AHU/PLANT</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy Paint
Floor</td><td>General Snag</td><td>&#39;Floor need cleaning and repair
</td><td>Low</td><td>8/10/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>7/20/2020
1:50:18 PM</td><td> </td><td>5/9/2022 10:45:07 AM</td><td>Done
</td><td>MS.12.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>11728</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Painting around lighting fixtures should be
adjusted </td><td>Low</td><td>10/18/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>9/27/2020 4:41:57 PM</td><td> </td><td>5/9/2022 10:45:06
AM</td><td>Done.</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>11730</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;waving for gypsum board ceiling
</td><td>Low</td><td>10/18/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>9/27/2020
4:42:02 PM</td><td> </td><td>5/9/2022 10:45:05 AM</td><td>Done
</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>11732</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Edge of ceiling need to
adjust</td><td>Low</td><td>10/18/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>9/27/2020 4:42:07 PM</td><td> </td><td>5/9/2022 10:45:04
AM</td><td>Done </td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16972</td><td>LOBBY-Band B-Hololens</td><td>MU
L10</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Repair should be adjusted
</td><td>Low</td><td>4/1/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021
12:27:11 PM</td><td> </td><td>5/9/2022 10:45:01 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>20707</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Grouting joint needs adjustment </td><td>Low</td><td>8/31/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>8/10/2021 12:02:07 PM</td><td>
</td><td>5/9/2022 10:44:59 AM</td><td>Done
</td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>21696</td><td>CORE B3</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Inclined support should be adjusted
</td><td>Low</td><td>9/9/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/19/2021
11:25:50 AM</td><td> </td><td>5/9/2022 10:44:55 AM</td><td>Done
</td><td>MC.12.0G.B31</td><td>&nbsp;</td>
</tr><tr>
<td>22218</td><td>FIRST AID 3</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>Paint quality</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:48:04 AM</td><td> </td><td>5/9/2022 10:44:52 AM</td><td>Done
</td><td>MG.12.0G.008</td><td>&nbsp;</td>
</tr><tr>
<td>22219</td><td>FIRST AID 3</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:48:05 AM</td><td> </td><td>5/9/2022 10:44:51 AM</td><td>Done
</td><td>MG.12.0G.008</td><td>&nbsp;</td>
</tr><tr>
<td>22231</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>Al Barakah</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Marked part need to adjusted and aligned
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:48:35 AM</td><td> </td><td>5/9/2022 10:44:49 AM</td><td>Done
</td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22241</td><td>LOBBY</td><td>MU L10</td><td>Closed</td><td>HAZ
/ Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Broken edge</td><td>Low</td><td>9/14/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>8/24/2021 11:49:03 AM</td><td> </td><td>5/9/2022
10:44:48 AM</td><td>Done </td><td>MR.14.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>27955</td><td>CHILDREN`S RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Marked part is not leveled and
should be adjusted </td><td>Low</td><td>4/3/2022 12:00:00 AM</td><td>Adel
Nassrat</td><td>3/13/2022 12:23:33 PM</td><td> </td><td>5/9/2022 10:44:43
AM</td><td>Done </td><td>MK.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>28448</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Humidifier drain not connected.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:05:53 PM</td><td> </td><td>5/9/2022 9:10:27
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28475</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Door handles are broken. </td><td>High</td><td>5/12/2022
12:00:00 PM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:06:45 PM</td><td>
</td><td>5/9/2022 8:50:53
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27427</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>Hydrogreen</td><td>MEP-
Mechanical</td><td>Mechanical Pipework</td><td>Installation not to
specification/drawing</td><td>&#39;Incomplete irrigation network and valve box
</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>ahmedsalem</td><td>3/7/2022
2:36:44 PM</td><td> </td><td>5/9/2022 8:22:11 AM</td><td>&nbsp;</td><td>North
Side</td><td>&nbsp;</td>
</tr><tr>
<td>28292</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Chilled water
Piping and Insulation</td><td>Insulation damaged</td><td>&#39;Damage insulation
need repairs. </td><td>Medium</td><td>4/29/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:01 AM</td><td> </td><td>5/9/2022 8:19:55
AM</td><td>&nbsp;</td><td>MS.18.2A.019</td><td>&nbsp;</td>
</tr><tr>
<td>28454</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing thermal insulation for chilled water pipes.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:06:02 PM</td><td> </td><td>5/9/2022 8:10:09
AM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28414</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Thermal insulation shall be repaired.
</td><td>High</td><td>5/12/2022 12:00:00 PM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:21 PM</td><td> </td><td>5/9/2022 8:08:26
AM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>28393</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage ductwork. </td><td>High</td><td>5/4/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>4/27/2022 11:44:58 AM</td><td>
</td><td>5/8/2022 4:42:39
PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>28398</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Damage insulation. </td><td>High</td><td>5/4/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>4/27/2022 11:45:07 AM</td><td>
</td><td>5/8/2022 4:41:40
PM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>27432</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Mechanical</td><td>Fire Extinguishers</td><td>Equipment</td><td>&#39;Missing
surface box , fire hydrant need cleaning , touchup painting
</td><td>High</td><td>3/14/2022 12:00:00 AM</td><td>ahmedsalem</td><td>3/7/2022
2:36:55 PM</td><td> </td><td>5/8/2022 4:39:50 PM</td><td>&nbsp;</td><td>South
Side</td><td>&nbsp;</td>
</tr><tr>
<td>28331</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Damage thermal insulation.
</td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:43:41 AM</td><td> </td><td>5/8/2022 4:33:32
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28419</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Flexible connection shall be replaced.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:35 PM</td><td> </td><td>5/8/2022 4:13:19
PM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>27426</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-
Mechanical</td><td>Fire Extinguishers</td><td>Equipment</td><td>&#39;Need
cleaning , missing surface box for fire hydrant </td><td>High</td><td>3/14/2022
12:00:00 AM</td><td>ahmedsalem</td><td>3/7/2022 2:36:42 PM</td><td>
</td><td>5/8/2022 1:29:56 PM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>
<td>28421</td><td>UNDERCROFT SERV.PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Air vent/bottle to be fitted</td><td>&#39;Valve is not usable.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:04:40 PM</td><td> </td><td>5/8/2022 1:29:11
PM</td><td>&nbsp;</td><td>MS.19.2A.007</td><td>&nbsp;</td>
</tr><tr>
<td>28358</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>General Snag</td><td>&#39;Insulation belts cover the access door.
</td><td>High</td><td>5/3/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/26/2022 11:44:54 AM</td><td> </td><td>5/8/2022 1:27:52
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28372</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Mechanical
Pipework</td><td>Installation not to specification/drawing</td><td>&#39;Wrong
installation for duct access door. </td><td>High</td><td>5/3/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>4/26/2022 11:45:31 AM</td><td>
</td><td>5/8/2022 1:26:17
PM</td><td>&nbsp;</td><td>MS.19.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28406</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;All fire fighting pipes shall be
cleaned and touchup painting. </td><td>High</td><td>5/12/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:04:02 PM</td><td>
</td><td>5/8/2022 1:24:53
PM</td><td>&nbsp;</td><td>MS.19.2A.018</td><td>&nbsp;</td>
</tr><tr>
<td>28442</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Duct insulation need repair around the access door.
</td><td>High</td><td>5/12/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>5/5/2022 12:05:27 PM</td><td> </td><td>5/8/2022 1:22:36
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28465</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;AHU doors handles are broken. </td><td>High</td><td>5/12/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>5/5/2022 12:06:22 PM</td><td>
</td><td>5/8/2022 1:18:23
PM</td><td>&nbsp;</td><td>MS.19.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>28284</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>GENERAL
SUPPORTS</td><td>Arrangement is not vertical / horizontal</td><td>&#39;PPR pipe
need alignment and leveling. </td><td>Medium</td><td>4/29/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>4/19/2022 11:47:43 AM</td><td>
</td><td>5/8/2022 1:15:01
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>22452</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be removed
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:13:54 PM</td><td> </td><td>5/8/2022 12:31:54 PM</td><td>&nbsp;</td><td>Part
2</td><td>&nbsp;</td>
</tr><tr>
<td>22454</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:13:57 PM</td><td> </td><td>5/8/2022 12:31:53 PM</td><td>&nbsp;</td><td>Part
2</td><td>&nbsp;</td>
</tr><tr>
<td>22460</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:14:09 PM</td><td> </td><td>5/8/2022 12:31:52 PM</td><td>&nbsp;</td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>22584</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>grouting quality</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>9/22/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/1/2021
10:49:19 AM</td><td> </td><td>5/8/2022 12:31:51 PM</td><td>&nbsp;</td><td>Part
2</td><td>&nbsp;</td>
</tr><tr>
<td>22876</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stains should be removed
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/13/2021
11:22:05 AM</td><td> </td><td>5/8/2022 12:31:49 PM</td><td>&nbsp;</td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>22911</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Marked part should be repaired
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:43 PM</td><td> </td><td>5/8/2022 12:31:48 PM</td><td>&nbsp;</td><td>Part
4</td><td>&nbsp;</td>
</tr><tr>
<td>22923</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between tiles should be adjusted
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:57 PM</td><td> </td><td>5/8/2022 12:31:44 PM</td><td>&nbsp;</td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>23089</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Grouting
should be adjusted </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:49:17 AM</td><td> </td><td>5/8/2022 12:31:43
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23100</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Erosion
and salted tiles should be treated </td><td>Low</td><td>10/7/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/16/2021 11:49:43 AM</td><td> </td><td>5/8/2022
12:31:37 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23101</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should be treated or replaced
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:49:46 AM</td><td> </td><td>5/8/2022 12:31:35
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23104</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should treated or replaced
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:49:54 AM</td><td> </td><td>5/8/2022 12:31:34
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23117</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Metal
trim should be flushed with stone copping </td><td>Low</td><td>10/7/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/16/2021 11:50:07 AM</td><td> </td><td>5/8/2022
12:31:30 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23130</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
grouting should be repaired </td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:50:23 AM</td><td> </td><td>5/8/2022 12:31:22
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23133</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Short
tile should be replaced </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:50:27 AM</td><td> </td><td>5/8/2022 12:31:20
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23134</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should be treated or replaced
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:50:28 AM</td><td> </td><td>5/8/2022 12:31:19
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23628</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Movement joint should sealed and extended
</td><td>Low</td><td>10/13/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/22/2021
11:07:28 AM</td><td> </td><td>5/8/2022 12:31:17 PM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>23734</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Dust and Stains should be cleaned
</td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/11/2021
10:38:05 AM</td><td> </td><td>5/8/2022 12:31:15 PM</td><td>&nbsp;</td><td>Part
11</td><td>&nbsp;</td>
</tr><tr>

<td>26185</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Grouting is missing </td><td>Low</td><td>3/10/2022 12:00:00
AM</td><td>Amr Nofal</td><td>2/17/2022 12:11:49 PM</td><td> </td><td>5/8/2022
12:31:14 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26354</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Different textures should be
replaced.</td><td>Low</td><td>3/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/22/2022 3:29:19 PM</td><td> </td><td>5/8/2022
12:31:05 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26471</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Improper cutting around manhole cover
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
11:16:52 AM</td><td> </td><td>5/8/2022 12:31:00
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26672</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
11:03:59 AM</td><td> </td><td>5/8/2022 12:30:52
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26673</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Improper cutting around manhole cover
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
11:04:01 AM</td><td> </td><td>5/8/2022 12:30:51
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26739</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Poor application of grouting should be adjusted
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
3:45:45 PM</td><td> </td><td>5/8/2022 12:30:47
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26752</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
3:46:01 PM</td><td> </td><td>5/8/2022 12:30:46
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26861</td><td>Glazing Wall External Side</td><td>Glazing
wall</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Touch up painting for welding
</td><td>High</td><td>3/9/2022 12:00:00 AM</td><td>Mohamed Samir</td><td>3/2/2022
9:47:38 AM</td><td> </td><td>5/8/2022 12:30:45 PM</td><td>&nbsp;</td><td>Glazing
Wall External Side</td><td>&nbsp;</td>
</tr><tr>

<td>26887</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Cutting around lighting fixtures should be adjusted
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
10:32:03 AM</td><td> </td><td>5/8/2022 12:30:44
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26897</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken edges should be repaired </td><td>Low</td><td>3/23/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022 10:32:20 AM</td><td>
</td><td>5/8/2022 12:30:42 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27024</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:15:39 PM</td><td> </td><td>5/8/2022 12:30:41
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27098</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Painting stains should be removed
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
11:08:21 AM</td><td> </td><td>5/8/2022 12:30:38
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>27113</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Improper cutting around manhole cover
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
11:09:07 AM</td><td> </td><td>5/8/2022 12:30:37
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27195</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
3:01:52 PM</td><td> </td><td>5/8/2022 12:30:35
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27196</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone need cleaning
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
3:01:54 PM</td><td> </td><td>5/8/2022 12:30:34
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27243</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Wall - stone cladding</td><td>Damages to be
rectified or replaced</td><td>&#39;Broken edges should be replaced
</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022
4:51:15 PM</td><td> </td><td>5/8/2022 12:30:30
PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27254</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Missing stone tile </td><td>Low</td><td>3/27/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:51:39 PM</td><td> </td><td>5/8/2022
12:30:29 PM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26420</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Interlock need to leveled properly </td><td>Low</td><td>3/16/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>2/23/2022 4:01:14 PM</td><td>
</td><td>5/8/2022 11:41:45 AM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>26490</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Surface preparation and cleaning is needed for
concrete base(along the fence)</td><td>Low</td><td>3/17/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>2/24/2022 11:52:08 AM</td><td> </td><td>5/8/2022
11:41:44 AM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>
<td>14594</td><td>Ticketing Piazza </td><td>Ticketing
Piazza</td><td>Closed</td><td>HAZ / Marble</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;Cleaning ,adjustment and finishing around
slot drains </td><td>High</td><td>1/5/2021 12:00:00
AM</td><td>ahmedsalem</td><td>12/29/2020 11:33:20 AM</td><td> </td><td>5/8/2022
11:19:41 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17310</td><td>Ticketing Shed</td><td>Old ticketing shed
RO</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Earthing
System</td><td>Visual Damages</td><td>&#39;Damaged earthing system need to
adjustment </td><td>Low</td><td>5/3/2021 12:00:00
AM</td><td>aymanhaddadin</td><td>4/12/2021 11:58:18 AM</td><td> </td><td>5/8/2022
10:55:55 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21509</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Electrical and fire alarm cables are not
terminated </td><td>High</td><td>8/25/2021 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>8/18/2021 3:15:08 PM</td><td> </td><td>5/8/2022 10:55:54
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23822</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Electrical</td><td>General Snag</td><td>General
Snag</td><td>&#39;missing some label for back boxes , End bushing for all flexible
must be installed,missing lighting fixtures fixation in some area in
wall</td><td>High</td><td>10/27/2021 12:00:00
PM</td><td>Ahmed.Galal</td><td>10/20/2021 2:56:06 PM</td><td> </td><td>5/5/2022
3:31:24 PM</td><td>&nbsp;</td><td>Atrium - Internal Side</td><td>&nbsp;</td>
</tr><tr>
<td>26838</td><td>Pyramid Wall</td><td>Pyramid
Wall</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete
work</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/1/2022 4:38:49 PM</td><td> </td><td>5/5/2022 3:31:23
PM</td><td>&nbsp;</td><td>Ga Wall</td><td>&nbsp;</td>
</tr><tr>
<td>27536</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>General Snag</td><td>&#39;Cover the cable trunk
</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:56 AM</td><td> </td><td>5/5/2022 3:31:22
PM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>25334</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steel works at roof</td><td>Paint
finish</td><td>&#39;Remove stains and cleaning for steel structure
</td><td>Low</td><td>11/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>11/22/2021
12:00:57 PM</td><td> </td><td>5/5/2022 3:26:06 PM</td><td>&nbsp;</td><td>Museum
Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>16828</td><td>ELEC. ROOM-Band B</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Touch up for floor and cleaning
</td><td>Low</td><td>3/31/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>3/10/2021
12:59:24 PM</td><td> </td><td>5/5/2022 3:23:11
PM</td><td>&nbsp;</td><td>MS.12.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>12086</td><td>ESCAPE ROUTE-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Flooring need to touch up
</td><td>Low</td><td>10/22/2020 12:00:00 PM</td><td>Adel Nassrat</td><td>10/1/2020
2:16:05 PM</td><td> </td><td>5/5/2022 3:22:33
PM</td><td>&nbsp;</td><td>MQ.18.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>24892</td><td>CLOAKROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Metal plate
(S/S cladding)</td><td>Damage/dent/stains</td><td>&#39;Twisted Aluminum angels
should be adjusted </td><td>Low</td><td>11/29/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>11/8/2021 12:15:30 PM</td><td> </td><td>5/5/2022 3:20:09
PM</td><td>&nbsp;</td><td>MG.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22294</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Joints are not aligned and should be adjusted
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:50:17 AM</td><td> </td><td>5/5/2022 3:19:41
PM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>25888</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Rockwool to be checked
</td><td>Low</td><td>2/13/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/23/2022
11:59:32 AM</td><td> </td><td>5/5/2022 3:10:55 PM</td><td>Based on PMI on DWG-10-
100066 Rev. E, as no need for Sika PU foam at this
part</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>12507</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;The cladding is not fixed properly
</td><td>High</td><td>10/29/2020 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/22/2020 12:13:42 PM</td><td> </td><td>5/5/2022 2:42:47
PM</td><td>&nbsp;</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>24476</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>EL Nasr</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gravel granules size is not as per approved
material</td><td>High</td><td>11/4/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/28/2021 12:01:13 PM</td><td> </td><td>5/5/2022 2:34:02
PM</td><td>&nbsp;</td><td>Part 3</td><td>&nbsp;</td>
</tr><tr>
<td>24475</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>EL Nasr</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Gravel Depth shall be adjusted to be as
design drawings</td><td>High</td><td>11/4/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/28/2021 11:59:26 AM</td><td> </td><td>5/5/2022 2:33:34
PM</td><td>&nbsp;</td><td>Part 5</td><td>&nbsp;</td>
</tr><tr>
<td>12278</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing surface preparation and dust sealer
for Security Fence concrete base </td><td>Low</td><td>11/2/2020 12:00:00
PM</td><td>Mohamed Samir</td><td>10/12/2020 3:08:54 PM</td><td> </td><td>5/5/2022
2:32:56 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22411</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Stained</td><td>&#39;Stains should be removed
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Mohamed
El-Sergany</td><td>8/29/2021 3:11:07 PM</td><td> </td><td>5/5/2022 2:28:59
PM</td><td>&nbsp;</td><td>Part 4</td><td>&nbsp;</td>
</tr><tr>
<td>22410</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Metal trim should be flush with
stone</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Mohamed
El-Sergany</td><td>8/29/2021 3:11:02 PM</td><td> </td><td>5/5/2022 2:28:31
PM</td><td>&nbsp;</td><td>Part 4</td><td>&nbsp;</td>
</tr><tr>
<td>22428</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Poor application of grout around linear drain</td><td>&#39;Poor
grouting should be repaired </td><td>Low</td><td>9/19/2021 12:00:00
PM</td><td>Mohamed El-Sergany</td><td>8/29/2021 3:12:40 PM</td><td>
</td><td>5/5/2022 2:28:01 PM</td><td>&nbsp;</td><td>Part 2</td><td>&nbsp;</td>
</tr><tr>
<td>24103</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Bending radius of cables, repair drainage
for all manhole </td><td>High</td><td>11/2/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>10/26/2021 10:57:42 AM</td><td> </td><td>5/5/2022
1:57:54 PM</td><td>&nbsp;</td><td>Part 9</td><td>&nbsp;</td>
</tr><tr>
<td>14584</td><td>Ticketing Piazza </td><td>Ticketing
Piazza</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Facade -
Stone Cladding</td><td>Stains</td><td>&#39;Crystal Stain and rusted
tiles</td><td>Low</td><td>1/19/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>12/29/2020 11:07:15 AM</td><td> </td><td>5/5/2022 11:21:13
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25111</td><td>Parking Level-P4</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interlock level should be flushed with kerbstone
level</td><td>Low</td><td>12/5/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/14/2021 10:30:35 AM</td><td> </td><td>5/5/2022 11:21:12
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26503</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Surface preparation is needed for concrete
part(along the fence)</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/24/2022 11:52:21 AM</td><td> </td><td>5/5/2022 11:21:11
AM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>

<td>26531</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Scratched tiles should be repaired
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
2:22:46 PM</td><td> </td><td>5/5/2022 11:21:10
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26786</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Area not
cleaned/finished.</td><td>&#39;Cleaning for overflow
basin</td><td>High</td><td>3/8/2022 12:00:00 PM</td><td>ahmedsalem</td><td>3/1/2022
4:12:41 PM</td><td> </td><td>5/5/2022 11:21:09
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26789</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Area not
cleaned/finished.</td><td>&#39;Cleaning for overflow
basin</td><td>High</td><td>3/8/2022 12:00:00 PM</td><td>ahmedsalem</td><td>3/1/2022
4:12:51 PM</td><td> </td><td>5/5/2022 11:21:08
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26794</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Area not
cleaned/finished.</td><td>&#39;Rusted cover and wrong subject
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>ahmedsalem</td><td>3/1/2022
4:13:00 PM</td><td> </td><td>5/5/2022 11:21:04
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26901</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Damaged curb stone need repair.</td><td>Low</td><td>3/23/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/2/2022 11:15:10 AM</td><td>
</td><td>5/5/2022 11:21:02 AM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>
<td>27199</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;All broken edges should be repaired
</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022
4:39:06 PM</td><td> </td><td>5/5/2022 11:21:01
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>18603</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom -
Fixed accessories</td><td>General</td><td>&#39;Missing soap dispenser
</td><td>Low</td><td>6/29/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/8/2021
4:48:17 PM</td><td> </td><td>5/5/2022 11:17:32
AM</td><td>&nbsp;</td><td>MW.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19592</td><td>W.C - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Bathroom
Accessories -Soap dispenser</td><td>missing/ wrong location</td><td>&#39;Missing
soap dispenser </td><td>Low</td><td>7/7/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/30/2021 1:26:09 PM</td><td> </td><td>5/5/2022
11:17:25 AM</td><td>&nbsp;</td><td>MW.13.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>26098</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing rock wool should e
checked.</td><td>Low</td><td>2/24/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/3/2022 2:25:27 PM</td><td> </td><td>5/5/2022
11:11:45 AM</td><td>Based on PMI on DWG-10-100066 Rev. E, as Sika PU foam is not
needed for some parts</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26049</td><td>Grand Stair-Band E</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing rock wool and sika foam to be
checked </td><td>Low</td><td>2/21/2022 12:00:00
AM</td><td>mohamed.sami</td><td>1/31/2022 11:37:27 AM</td><td> </td><td>5/5/2022
11:11:24 AM</td><td>Based on PMI on DWG-10-100066 Rev. E, as Sika PU foam is not
needed for some parts</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25931</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Rock wool to be checked
</td><td>Low</td><td>2/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022
10:42:35 AM</td><td> </td><td>5/5/2022 11:11:14 AM</td><td>Based on PMI on DWG-10-
100066 Rev. E, as Sika PU foam is not needed for some
parts</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25970</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sika foam and rock-wool </td><td>Low</td><td>2/14/2022
12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022 12:10:18 PM</td><td>
</td><td>5/5/2022 11:11:03 AM</td><td>Based on PMI on DWG-10-100066 Rev. E, as Sika
PU foam is not needed for some parts</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>26005</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Rock wool to be checked
</td><td>Low</td><td>2/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/25/2022
11:39:27 AM</td><td> </td><td>5/5/2022 11:10:45 AM</td><td>Based on PMI on DWG-10-
100066 Rev. E, as Sika PU foam is not needed for some
parts</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>13643</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;No accessible for entrance to do the
snagging</td><td>High</td><td>12/7/2020 12:00:00 AM</td><td>Sameh Ibrahim El-
Sawah</td><td>11/30/2020 10:58:38 AM</td><td> </td><td>5/5/2022 11:00:13
AM</td><td>&nbsp;</td><td>MS.18.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>13667</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>Alignment and Level not followed</td><td>&#39;Cable trunk not
covered and many Cables not rested inside the trunk</td><td>High</td><td>12/7/2020
12:00:00 AM</td><td>Sameh Ibrahim El-Sawah</td><td>11/30/2020 10:59:32 AM</td><td>
</td><td>5/5/2022 11:00:10
AM</td><td>&nbsp;</td><td>MS.23.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>13723</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>XERVON Egypt S.A.E</td><td>MEP-Electrical</td><td>LIGHT
FITTINGS(INTERNAL/ EXTERNAL/ EMERGENCY)</td><td>Alignment and Level not
followed</td><td>&#39;Missing work</td><td>High</td><td>12/8/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/1/2020 10:36:10 AM</td><td> </td><td>5/5/2022
11:00:09 AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>19888</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>CABLE
TRUNKING</td><td>General Snag</td><td>&#39;End cap should be installed- cables
should be rested inside the tray and should be tied</td><td>High</td><td>8/4/2021
12:00:00 AM</td><td>Sameh Ibrahim El-Sawah</td><td>7/28/2021 11:41:03 AM</td><td>
</td><td>5/5/2022 11:00:06
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>27532</td><td>CORE D2</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Not allowed to install EMT Conduits in
exposed area</td><td>High</td><td>3/16/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/9/2022 10:57:50 AM</td><td> </td><td>5/5/2022 11:00:05
AM</td><td>&nbsp;</td><td>MC.18.2A.D21</td><td>&nbsp;</td>
</tr><tr>
<td>27754</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39; Tray and trunk should be
covered</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:26 PM</td><td> </td><td>5/5/2022 11:00:03
AM</td><td>&nbsp;</td><td>MS.19.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>27764</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing labels and panels scheduled
</td><td>High</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/10/2022 12:22:45 PM</td><td> </td><td>5/5/2022 11:00:02
AM</td><td>&nbsp;</td><td>MS.13.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>28298</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>LIGHT
FITTINGS(INTERNAL/ EXTERNAL/ EMERGENCY)</td><td>Lamp not
Installed</td><td>&#39;Lighting inside AHU not installed.
</td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:14 AM</td><td> </td><td>5/5/2022 11:00:01
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28301</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>LIGHT
FITTINGS(INTERNAL/ EXTERNAL/ EMERGENCY)</td><td>Alignment and Level not
followed</td><td>&#39;AHU lighting not connected. </td><td>Medium</td><td>4/29/2022
12:00:00 AM</td><td>Mohamed ElMahalawy</td><td>4/19/2022 11:48:19 AM</td><td>
</td><td>5/5/2022 11:00:00
AM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28317</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>LIGHT
FITTINGS(INTERNAL/ EXTERNAL/ EMERGENCY)</td><td>General Snag</td><td>&#39;AHUs
light not installed yet. </td><td>High</td><td>4/26/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>4/19/2022 11:49:19 AM</td><td>
</td><td>5/5/2022 10:59:59
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>28390</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>Internal
Lighting</td><td>General Snag</td><td>&#39;Inside machine lighting not working.
</td><td>High</td><td>5/4/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/27/2022 11:44:52 AM</td><td> </td><td>5/5/2022 10:59:58
AM</td><td>&nbsp;</td><td>MS.19.2A.017</td><td>&nbsp;</td>
</tr><tr>
<td>14666</td><td>LOBBY</td><td>AT CONNEC
L37</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Media converter installation not complete, missing power outlets
for media converter, labels and fluke test is
missing,</td><td>High</td><td>1/12/2021 12:00:00 PM</td><td>Mohamed
Samir</td><td>1/5/2021 11:20:59 AM</td><td> </td><td>5/5/2022 10:13:57
AM</td><td>&nbsp;</td><td>SN.00.0B.03</td><td>&nbsp;</td>
</tr><tr>
<td>27965</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>STS</td><td>MEP-ELV</td><td>General Snag</td><td>General
Snag</td><td>&#39;Patching </td><td>High</td><td>3/20/2022 12:00:00
AM</td><td>Muthukumar Paramakrishnan</td><td>3/13/2022 4:22:48 PM</td><td>
</td><td>5/5/2022 10:13:37
AM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>27966</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Incomplete work
</td><td>High</td><td>3/20/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>3/13/2022 4:22:49 PM</td><td> </td><td>5/5/2022 10:13:24
AM</td><td>&nbsp;</td><td>MS.13.2A.013
</td><td>&nbsp;</td>
</tr><tr>
<td>27901</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-ELV</td><td>General
Snag</td><td>General Snag</td><td>&#39;Field devices not terminated
</td><td>High</td><td>3/19/2022 12:00:00 AM</td><td>Mohamed Samir</td><td>3/12/2022
11:52:53 AM</td><td> </td><td>5/5/2022 10:12:56
AM</td><td>&nbsp;</td><td>MS.14.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>21864</td><td>Energy Center - L10</td><td>EN
L10</td><td>Closed</td><td>Cairo Communication
System</td><td>MEP-ELV</td><td>Security</td><td>General Snag</td><td>&#39;CCTV
labeling and testing and commissioning is pending </td><td>High</td><td>8/29/2021
12:00:00 AM</td><td>Muthukumar Paramakrishnan</td><td>8/22/2021 2:52:00 PM</td><td>
</td><td>5/5/2022 10:12:23 AM</td><td>&nbsp;</td><td>Energy Center -
L10</td><td>&nbsp;</td>
</tr><tr>

<td>26544</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>STS</
td><td>MEP-ELV</td><td>General Snag</td><td>General Snag</td><td>&#39;Photo kiosk
installation is incomplete and port activation and testing also not
done</td><td>High</td><td>3/3/2022 12:00:00 AM</td><td>Muthukumar
Paramakrishnan</td><td>2/24/2022 3:39:27 PM</td><td> </td><td>5/5/2022 10:12:13
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>20987</td><td>TICKETING SHED</td><td>New ticketing shed
GF</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Stability of glazing panel
</td><td>Low</td><td>9/1/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>8/11/2021
12:01:27 PM</td><td> </td><td>5/4/2022 3:57:30
PM</td><td>&nbsp;</td><td>ST.00.0G.46</td><td>&nbsp;</td>
</tr><tr>
<td>5394</td><td>DRIVERS ROOM</td><td>TB
GF</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Stainless steel not good finish </td><td>High</td><td>9/23/2019
12:00:00 PM</td><td>Marios Ioannou,</td><td>9/16/2019 3:31:47 PM</td><td>
</td><td>5/4/2022 3:23:29 PM</td><td>&nbsp;</td><td>ST.00.0G.01</td><td>&nbsp;</td>
</tr><tr>
<td>17308</td><td>Ticketing Shed</td><td>Old ticketing shed
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
waterproofing</td><td>damaged</td><td>&#39;Damaged waterproofing need to repair
</td><td>Low</td><td>5/3/2021 12:00:00 PM</td><td>aymanhaddadin</td><td>4/12/2021
11:58:10 AM</td><td> </td><td>5/4/2022 3:23:28
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23781</td><td>Atrium - Internal Side</td><td>Atrium
Internal Side</td><td>Closed</td><td>Track Intertech Joint
Venture</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Tile is missing </td><td>Low</td><td>11/8/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/18/2021 4:29:03 PM</td><td> </td><td>5/4/2022
3:23:27 PM</td><td>&nbsp;</td><td>Atrium - Internal Side</td><td>&nbsp;</td>
</tr><tr>
<td>23852</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Marked joint should be leveled </td><td>Low</td><td>11/14/2021
12:00:00 PM</td><td>Amr Nofal</td><td>10/24/2021 10:10:42 AM</td><td>
</td><td>5/4/2022 3:23:26 PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23964</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Filling interlock joints with sand
.</td><td>Low</td><td>11/15/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/25/2021
10:30:44 AM</td><td> </td><td>5/4/2022 3:23:20
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24347</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Bollards should be allocated as per design
drawing.</td><td>Low</td><td>11/17/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/27/2021 11:40:55 AM</td><td> </td><td>5/4/2022 3:23:19
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>12863</td><td>LANDSCAPED AREA</td><td>CCB
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>11/8/2020 12:00:00
AM</td><td>Ahmed.Galal</td><td>11/1/2020 11:46:51 AM</td><td> </td><td>5/4/2022
3:00:43 PM</td><td>&nbsp;</td><td>CX.02.03.005</td><td>&nbsp;</td>
</tr><tr>
<td>17503</td><td>SERVICE RISER</td><td>MU
BA</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Review insulation of cable tray and ladders
and check filling ratio</td><td>Low</td><td>5/18/2021 12:00:00
PM</td><td>Muthukumar Paramakrishnan</td><td>4/27/2021 12:37:05 PM</td><td>
</td><td>5/4/2022 3:00:43
PM</td><td>&nbsp;</td><td>CQ.07.0B.004</td><td>&nbsp;</td>
</tr><tr>
<td>17584</td><td>CR.08,0G.003</td><td>CCB
GF</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>5/11/2021 12:00:00
PM</td><td>Ahmed.Galal</td><td>5/4/2021 1:39:27 PM</td><td> </td><td>5/4/2022
3:00:39 PM</td><td>&nbsp;</td><td>CR.08,0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>22610</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>grouting quality</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/1/2021
10:49:55 AM</td><td> </td><td>5/4/2022 11:55:25 AM</td><td>&nbsp;</td><td>Part
2</td><td>&nbsp;</td>
</tr><tr>
<td>22845</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Bitted tiles should be replaced
</td><td>Low</td><td>10/3/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/12/2021
10:48:18 AM</td><td> </td><td>5/4/2022 11:55:23 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22864</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Missing tiles should be installed
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/13/2021
11:21:45 AM</td><td> </td><td>5/4/2022 11:55:22 AM</td><td>&nbsp;</td><td>Part
9</td><td>&nbsp;</td>
</tr><tr>
<td>23154</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edge should be repaired </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:50:55 AM</td><td> </td><td>5/4/2022 11:55:21
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23157</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
grouting should be repaired </td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:50:58 AM</td><td> </td><td>5/4/2022 11:55:19
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23163</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Stone
should be cleaned </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:51:05 AM</td><td> </td><td>5/4/2022 11:55:15
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23165</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Cutting
edge should be aligned and adjusted </td><td>Low</td><td>10/7/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/16/2021 11:51:08 AM</td><td> </td><td>5/4/2022
11:55:14 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23168</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
grouting should be repaired </td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:51:10 AM</td><td> </td><td>5/4/2022 11:55:13
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23171</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
repair should be adjusted </td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:51:14 AM</td><td> </td><td>5/4/2022 11:55:11
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23189</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
repair should be adjusted</td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:51:37 AM</td><td> </td><td>5/4/2022 11:55:10
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23190</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:51:37 AM</td><td> </td><td>5/4/2022 11:55:08
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23191</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tiles should be replaced</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:51:41 AM</td><td> </td><td>5/4/2022 11:55:07
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23194</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges should be adjusted</td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:51:45 AM</td><td> </td><td>5/4/2022 11:55:05
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23195</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
grouting should be repaired</td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:51:46 AM</td><td> </td><td>5/4/2022 11:55:04
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23201</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tile should be replaced</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:51:58 AM</td><td> </td><td>5/4/2022 11:55:02
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23219</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edge should be repaired </td><td>Low</td><td>10/7/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/16/2021 11:52:42 AM</td><td> </td><td>5/4/2022 11:55:01
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23223</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Gap between stone should be closed as per drawing
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:52:52 AM</td><td> </td><td>5/4/2022 11:54:59
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23257</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
cutting edges should be adjusted</td><td>Low</td><td>10/7/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/16/2021 12:05:59 PM</td><td> </td><td>5/4/2022
11:54:58 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23434</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>10/12/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/21/2021
11:05:00 AM</td><td> </td><td>5/4/2022 11:54:55
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23435</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>10/12/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/21/2021
11:05:01 AM</td><td> </td><td>5/4/2022 11:54:53
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23436</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Bad repair should be adjusted
</td><td>Low</td><td>10/12/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/21/2021
11:05:03 AM</td><td> </td><td>5/4/2022 11:54:52
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23437</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:05:04 AM</td><td> </td><td>5/4/2022 11:54:50
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23438</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Bad repair should adjusted
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:05:05 AM</td><td> </td><td>5/4/2022 11:54:49
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23439</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:05:07 AM</td><td> </td><td>5/4/2022 11:54:47
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23440</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Bad repair should be adjusted
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:05:08 AM</td><td> </td><td>5/4/2022 11:54:46
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23441</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Broken edges should be repaired/replaced
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:05:10 AM</td><td> </td><td>5/4/2022 11:54:45
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23538</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:07:38 AM</td><td> </td><td>5/4/2022 11:54:43
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23541</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:07:41 AM</td><td> </td><td>5/4/2022 11:54:42
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23544</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:07:44 AM</td><td> </td><td>5/4/2022 11:54:41
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23546</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:07:45 AM</td><td> </td><td>5/4/2022 11:54:39
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23552</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken tile should be replaced
</td><td>Low</td><td>10/12/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/21/2021
11:07:50 AM</td><td> </td><td>5/4/2022 11:54:38
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24473</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>EL Nasr</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged and missing geo grid in large
areas shall be reinstalled</td><td>High</td><td>11/4/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/28/2021 11:54:07 AM</td><td> </td><td>5/4/2022 11:54:37
AM</td><td>&nbsp;</td><td>Part 11</td><td>&nbsp;</td>
</tr><tr>
<td>25149</td><td>Parking Level-P1</td><td>Parking
Levels</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Cutting edges should be aligned and adjusted
</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/15/2021
10:16:50 AM</td><td> </td><td>5/4/2022 11:54:35
AM</td><td>&nbsp;</td><td>P1</td><td>&nbsp;</td>
</tr><tr>
<td>25152</td><td>Parking Level-P1</td><td>Parking
Levels</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Cutting edges should be aligned and adjusted for both sides
</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/15/2021
10:16:55 AM</td><td> </td><td>5/4/2022 11:54:34
AM</td><td>&nbsp;</td><td>P1</td><td>&nbsp;</td>
</tr><tr>
<td>25162</td><td>Parking Level-P2</td><td>Parking
Levels</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Cutting edge should be aligned and adjusted
</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/15/2021
10:17:06 AM</td><td> </td><td>5/4/2022 11:54:33
AM</td><td>&nbsp;</td><td>P2</td><td>&nbsp;</td>
</tr><tr>
<td>25193</td><td>Parking Level-P2</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>Area not cleaned/finished.</td><td>&#39;Kerb stone surface should be
cleaned</td><td>Low</td><td>11/22/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>11/15/2021 10:17:45 AM</td><td> </td><td>5/4/2022 11:54:31
AM</td><td>&nbsp;</td><td>P2</td><td>&nbsp;</td>
</tr><tr>
<td>25266</td><td>Service Road 2</td><td>Land of
Egypt</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Unaccepted kerb stone tiles
</td><td>Low</td><td>12/9/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/18/2021
9:32:35 AM</td><td> </td><td>5/4/2022 11:54:29 AM</td><td>&nbsp;</td><td>Service
Road 2</td><td>&nbsp;</td>
</tr><tr>

<td>26289</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/15/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022 11:24:16 AM</td><td>
</td><td>5/4/2022 11:54:24 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26315</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Surface preparation is needed
</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/22/2022 12:08:47 PM</td><td> </td><td>5/4/2022 11:54:22
AM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>26320</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Gap around bracket should be closed/ camera should be fixed
properly.</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/22/2022 1:23:38 PM</td><td> </td><td>5/4/2022 11:54:21
AM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>26326</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Recessed vertical groove edges to be repaired and
repaint.</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/22/2022 1:23:50 PM</td><td> </td><td>5/4/2022 11:54:20
AM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>

<td>26374</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced / repaired
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
11:21:26 AM</td><td> </td><td>5/4/2022 11:54:18
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26478</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Missing manhole
cover.</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/24/2022 11:51:53 AM</td><td> </td><td>5/4/2022 11:54:08
AM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>
<td>26486</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Marked parts need touch up painting
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/24/2022 11:52:03 AM</td><td> </td><td>5/4/2022 11:54:07
AM</td><td>&nbsp;</td><td>North Side</td><td>&nbsp;</td>
</tr><tr>

<td>26634</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Toothing between stone tiles should be leveled
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
3:15:30 PM</td><td> </td><td>5/4/2022 11:54:03
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26671</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Poor application of grouting need to adjustment
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
11:03:58 AM</td><td> </td><td>5/4/2022 11:53:59
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26682</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
11:04:15 AM</td><td> </td><td>5/4/2022 11:53:58
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26795</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Area not
cleaned/finished.</td><td>&#39;Wrong Cover of manhole it’s not light current
</td><td>High</td><td>3/8/2022 12:00:00 AM</td><td>ahmedsalem</td><td>3/1/2022
4:13:02 PM</td><td> </td><td>5/4/2022 11:53:57
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26801</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>Area not
cleaned/finished.</td><td>&#39;Subject must be written on the covers of the
manholes</td><td>High</td><td>3/8/2022 12:00:00
AM</td><td>ahmedsalem</td><td>3/1/2022 4:13:16 PM</td><td> </td><td>5/4/2022
11:53:55 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27010</td><td>Roof</td><td>Roof</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Rods should be removed.</td><td>Low</td><td>3/23/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/2/2022 4:14:40 PM</td><td> </td><td>5/4/2022
11:53:54 AM</td><td>&nbsp;</td><td>Solar Boat Building</td><td>&nbsp;</td>
</tr><tr>

<td>27014</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken stone tiles should be replaced / repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:15:12 PM</td><td> </td><td>5/4/2022 11:53:52
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27207</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Broken edges should be repaired </td><td>Low</td><td>3/27/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:39:23 PM</td><td>
</td><td>5/4/2022 11:53:51 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>27451</td><td>Entrance walls</td><td>Truck scanner
Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant for two movement joints
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/7/2022
3:56:36 PM</td><td> </td><td>5/4/2022 11:53:50
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>27452</td><td>Entrance walls</td><td>Truck scanner
Building</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Opening should be repaired and surface preparation
</td><td>Low</td><td>3/28/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/7/2022
3:56:38 PM</td><td> </td><td>5/4/2022 11:53:48
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28248</td><td>Parking Level-P4</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Gravel is missing </td><td>Low</td><td>4/12/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/22/2022 12:26:57 PM</td><td>
</td><td>5/4/2022 11:53:47 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23775</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked edge should be aligned
</td><td>Low</td><td>11/4/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/14/2021 3:46:58 PM</td><td> </td><td>5/4/2022 11:34:22
AM</td><td>&nbsp;</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>

<td>24083</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles </td><td>Low</td><td>11/15/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>10/25/2021 4:40:19 PM</td><td> </td><td>5/4/2022
11:34:21 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24693</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be replaced
</td><td>Low</td><td>11/22/2021 12:00:00 PM</td><td>mohamed.sami</td><td>11/1/2021
4:34:57 PM</td><td> </td><td>5/4/2022 11:34:20
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24696</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be replaced
</td><td>Low</td><td>11/22/2021 12:00:00 AM</td><td>mohamed.sami</td><td>11/1/2021
4:35:03 PM</td><td> </td><td>5/4/2022 11:34:18
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24698</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be replaced
</td><td>Low</td><td>11/22/2021 12:00:00 PM</td><td>mohamed.sami</td><td>11/1/2021
4:35:07 PM</td><td> </td><td>5/4/2022 11:34:17
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22281</td><td>FIRST AID 2</td><td>MU GF
</td><td>Closed</td><td>Trade Link</td><td>Architectural</td><td>Wall -
Skirting</td><td>Other Snag</td><td>&#39;Skirting should be fixed properly
</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>8/24/2021
11:49:59 AM</td><td> </td><td>5/4/2022 10:57:36
AM</td><td>&nbsp;</td><td>MG.12.0G.007</td><td>&nbsp;</td>
</tr><tr>
<td>28147</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Roof -
waterproofing</td><td>incomplete</td><td>&#39;Need to adjust cladding and foam
around duct </td><td>High</td><td>3/23/2022 12:00:00
AM</td><td>ahmedsalem</td><td>3/16/2022 2:40:23 PM</td><td> </td><td>5/4/2022
10:56:34 AM</td><td>&nbsp;</td><td>Museum Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>25364</td><td>MU RO Band D</td><td>MU
RO</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing painting from the
beams.</td><td>Low</td><td>12/13/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>11/22/2021 1:59:01 PM</td><td> </td><td>5/4/2022 10:55:39
AM</td><td>&nbsp;</td><td>Museum Roof Band D</td><td>&nbsp;</td>
</tr><tr>
<td>25343</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Repair for floor
sealant.</td><td>Low</td><td>12/13/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>11/22/2021 1:57:50 PM</td><td> </td><td>5/4/2022 10:54:46
AM</td><td>&nbsp;</td><td>Museum Roof Band A</td><td>&nbsp;</td>
</tr><tr>
<td>28152</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Roof -
waterproofing</td><td>incomplete</td><td>&#39;Need to complete foam between
cladding and wall (general snag in all band )</td><td>High</td><td>3/23/2022
12:00:00 AM</td><td>ahmedsalem</td><td>3/16/2022 2:40:35 PM</td><td>
</td><td>5/4/2022 10:52:35 AM</td><td>&nbsp;</td><td>Museum Roof Band
F</td><td>&nbsp;</td>
</tr><tr>
<td>28131</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
waterproofing</td><td>damaged</td><td>&#39;Damaged sika foam should be repaired
</td><td>Low</td><td>4/6/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/16/2022
12:09:27 PM</td><td> </td><td>5/4/2022 10:51:21 AM</td><td>&nbsp;</td><td>Museum
Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>22484</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>Hydrogreen</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing end plug and support need adjustment
</td><td>High</td><td>9/6/2021 12:00:00 AM</td><td>Mohamed
El-Sergany</td><td>8/30/2021 11:01:17 AM</td><td> </td><td>5/4/2022 10:51:09
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>28121</td><td>MU RO Band F</td><td>MU
RO</td><td>Closed</td><td>A-Build</td><td>Architectural</td><td>Roof -
waterproofing</td><td>damaged</td><td>&#39;Damaged sika foam should be repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>Adel Nassrat</td><td>3/16/2022
12:09:08 PM</td><td> </td><td>5/4/2022 10:50:06 AM</td><td>&nbsp;</td><td>Museum
Roof Band F</td><td>&nbsp;</td>
</tr><tr>
<td>25315</td><td>MU RO Band E</td><td>MU
RO</td><td>Closed</td><td> National Steel Fabrication
NSF</td><td>Architectural</td><td>Steel works at roof</td><td>Paint
finish</td><td>&#39;Missing painting for steel structure
</td><td>Low</td><td>11/29/2021 12:00:00 AM</td><td>Adel Nassrat</td><td>11/22/2021
12:00:06 PM</td><td> </td><td>5/4/2022 10:48:22 AM</td><td>&nbsp;</td><td>Museum
Roof Band A</td><td>&nbsp;</td>
</tr><tr>

<td>25409</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Gap between stone should be closed
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>sally.george</td><td>12/7/2021
10:15:15 AM</td><td> </td><td>5/4/2022 9:02:13
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>14396</td><td>B.O.H-ELEC. SUB-STATION - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Fire ductwork
damaged</td><td>&#39;Missing fire damper and fire sealant
</td><td>High</td><td>12/31/2020 12:00:00 AM</td><td>ahmedsalem</td><td>12/24/2020
3:22:55 PM</td><td> </td><td>4/28/2022 10:41:28
AM</td><td>&nbsp;</td><td>MS.18.02.008</td><td>&nbsp;</td>
</tr><tr>
<td>13759</td><td>EMERGENCY LIGHTING</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Repair for sealant around mep Fixtures
</td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:39:29 AM</td><td> </td><td>4/28/2022 10:31:55
AM</td><td>&nbsp;</td><td>MS.18.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>13760</td><td>EMERGENCY LIGHTING</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Missing sealant - touch up for repair
</td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:39:32 AM</td><td> </td><td>4/28/2022 10:31:52
AM</td><td>&nbsp;</td><td>MS.18.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>13761</td><td>EMERGENCY LIGHTING</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Touch up for repair </td><td>Low</td><td>12/22/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/1/2020 11:39:34 AM</td><td> </td><td>4/28/2022
10:31:51 AM</td><td>&nbsp;</td><td>MS.18.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>13762</td><td>EMERGENCY LIGHTING</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>Cracks</td><td>&#39;Repair for surface
</td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:39:36 AM</td><td> </td><td>4/28/2022 10:31:49
AM</td><td>&nbsp;</td><td>MS.18.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>13772</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Repair for scratches </td><td>Low</td><td>12/21/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/1/2020 11:40:04 AM</td><td> </td><td>4/28/2022
10:31:47 AM</td><td>&nbsp;</td><td>MS.18.2A.024</td><td>&nbsp;</td>
</tr><tr>
<td>13773</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up for concrete floor
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:40:06 AM</td><td> </td><td>4/28/2022 10:31:46
AM</td><td>&nbsp;</td><td>MS.18.2A.024</td><td>&nbsp;</td>
</tr><tr>
<td>13776</td><td>CORRIDOR</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Repair and touch up for duct sealer
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:40:14 AM</td><td> </td><td>4/28/2022 10:31:44
AM</td><td>&nbsp;</td><td>MS.18.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>13812</td><td>IT</td><td>MU L25</td><td>Closed</td><td>Al
Barakah</td><td>Architectural</td><td>Gypsum Ceiling</td><td>General
Snag</td><td>&#39;Gypsum ceiling not finished </td><td>Low</td><td>12/21/2020
12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020 11:41:45 AM</td><td>
</td><td>4/28/2022 10:31:43
AM</td><td>&nbsp;</td><td>MS.12.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13814</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall Painting</td><td>Patches/Touch
up</td><td>&#39;Wall painting need to touch up </td><td>Low</td><td>12/21/2020
12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020 11:41:49 AM</td><td>
</td><td>4/28/2022 10:31:42
AM</td><td>&nbsp;</td><td>MS.12.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>14576</td><td>Ticketing Piazza </td><td>Ticketing
Piazza</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Different width of joints
</td><td>Low</td><td>1/19/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>12/29/2020 11:06:49 AM</td><td> </td><td>4/28/2022 10:16:22
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17321</td><td>Ticketing Shed</td><td>Old ticketing shed
GF</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Broken, to be replaced</td><td>&#39;Cracked tile
</td><td>Low</td><td>5/3/2021 12:00:00 PM</td><td>aymanhaddadin</td><td>4/12/2021
11:58:49 AM</td><td> </td><td>4/28/2022 10:16:21
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>22883</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Bad grouting should be repaired
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:20 PM</td><td> </td><td>4/28/2022 10:16:20 AM</td><td>&nbsp;</td><td>Part
9</td><td>&nbsp;</td>
</tr><tr>
<td>22886</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Toothing between tiles
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:24 PM</td><td> </td><td>4/28/2022 10:16:19 AM</td><td>&nbsp;</td><td>Part
6</td><td>&nbsp;</td>
</tr><tr>
<td>22902</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Bad grouting should be repaired
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:36 PM</td><td> </td><td>4/28/2022 10:16:17 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22906</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>mohamed.sami</td><td>9/13/2021
4:02:39 PM</td><td> </td><td>4/28/2022 10:16:16 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22947</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be adjusted
</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:13:08 AM</td><td> </td><td>4/28/2022 10:16:15 AM</td><td>&nbsp;</td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>22949</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Metal trim should be flash with stone
level</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:13:11 AM</td><td> </td><td>4/28/2022 10:16:14 AM</td><td>&nbsp;</td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>22954</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Movement joint should be sealed
</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:13:18 AM</td><td> </td><td>4/28/2022 10:16:13 AM</td><td>&nbsp;</td><td>Part
9</td><td>&nbsp;</td>
</tr><tr>
<td>22960</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be adjusted
</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:13:29 AM</td><td> </td><td>4/28/2022 10:16:12 AM</td><td>&nbsp;</td><td>Part
9</td><td>&nbsp;</td>
</tr><tr>
<td>22970</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be adjusted
</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:13:44 AM</td><td> </td><td>4/28/2022 10:16:11 AM</td><td>&nbsp;</td><td>Part
11</td><td>&nbsp;</td>
</tr><tr>
<td>22984</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor repair for stone should be good
</td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/14/2021
11:14:06 AM</td><td> </td><td>4/28/2022 10:16:09 AM</td><td>&nbsp;</td><td>Part
11</td><td>&nbsp;</td>
</tr><tr>
<td>22992</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Level between stone and metal trim should be
flashed </td><td>Low</td><td>10/5/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/14/2021 11:14:19 AM</td><td> </td><td>4/28/2022 10:16:08
AM</td><td>&nbsp;</td><td>Part 11</td><td>&nbsp;</td>
</tr><tr>
<td>23105</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
grouting should be repaired </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:49:54 AM</td><td> </td><td>4/28/2022 10:16:07
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23684</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/17/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/26/2021
10:20:14 AM</td><td> </td><td>4/28/2022 10:16:06
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26187</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles should be adjusted
</td><td>Low</td><td>3/10/2022 12:00:00 AM</td><td>Amr Nofal</td><td>2/17/2022
12:11:53 PM</td><td> </td><td>4/28/2022 10:16:05
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26189</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken edges should be repaired </td><td>Low</td><td>3/10/2022
12:00:00 AM</td><td>Amr Nofal</td><td>2/17/2022 12:11:57 PM</td><td>
</td><td>4/28/2022 10:16:04 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26284</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/15/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022 11:24:08 AM</td><td>
</td><td>4/28/2022 10:16:03 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26285</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be repaired </td><td>Low</td><td>3/15/2022
12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022 11:24:10 AM</td><td>
</td><td>4/28/2022 10:16:02 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26351</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Cutting around manhole cover should be adjusted
</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022
3:29:15 PM</td><td> </td><td>4/28/2022 10:16:01
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26355</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022
3:29:19 PM</td><td> </td><td>4/28/2022 10:16:00
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26362</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Broken tiles should be
replaced/repaired.</td><td>Low</td><td>3/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/22/2022 3:29:28 PM</td><td> </td><td>4/28/2022
10:15:59 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26363</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Different textures should be
replaced.</td><td>Low</td><td>3/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/22/2022 3:29:30 PM</td><td> </td><td>4/28/2022
10:15:58 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26534</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Painting stains should be removed
</td><td>Low</td><td>3/17/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/24/2022
2:22:51 PM</td><td> </td><td>4/28/2022 10:15:56
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26670</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
11:03:56 AM</td><td> </td><td>4/28/2022 10:15:55
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27013</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
4:15:01 PM</td><td> </td><td>4/28/2022 10:15:54
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27203</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Wall</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>3/27/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:39:14 PM</td><td>
</td><td>4/28/2022 10:15:53 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>18215</td><td>KINDERGARTEN CLASSROOM 2 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Corner edges should be aligned
</td><td>Low</td><td>6/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021
4:04:38 PM</td><td> </td><td>4/28/2022 10:04:59
AM</td><td>&nbsp;</td><td>MK.12.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>18253</td><td>KINDERGARTEN CLASSROOM 3 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Marked joint should be sealed </td><td>Low</td><td>6/21/2021
12:00:00 AM</td><td>mohamed.sami</td><td>5/31/2021 4:10:55 PM</td><td>
</td><td>4/28/2022 10:04:57
AM</td><td>&nbsp;</td><td>MK.12.02.005</td><td>&nbsp;</td>
</tr><tr>
<td>18268</td><td>KINDERGARTEN CLASSROOM 4 - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Opening should be closed </td><td>Low</td><td>6/21/2021 12:00:00
PM</td><td>mohamed.sami</td><td>5/31/2021 4:11:18 PM</td><td> </td><td>4/28/2022
10:04:56 AM</td><td>&nbsp;</td><td>MK.17.02.002</td><td>&nbsp;</td>
</tr><tr>
<td>19559</td><td>CORRIDOR - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:23 PM</td><td> </td><td>4/28/2022 10:04:54
AM</td><td>&nbsp;</td><td>MS.18.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>18292</td><td>PLAY AREA - Band A</td><td>MU
L20</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>Wall</td><td>General Snag</td><td>&#39;Fire
cabinet frame should be leveled </td><td>Low</td><td>6/22/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/1/2021 4:10:49 PM</td><td> </td><td>4/28/2022
9:43:57 AM</td><td>&nbsp;</td><td>MK.12.02.006</td><td>&nbsp;</td>
</tr><tr>
<td>18461</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceiling -
Paint</td><td>General</td><td>&#39;Ceiling painting need to touch up
</td><td>Low</td><td>6/28/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/7/2021
4:09:15 PM</td><td> </td><td>4/28/2022 9:43:55
AM</td><td>&nbsp;</td><td>MW.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>18469</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Gypsum
Ceiling</td><td>General Snag</td><td>&#39;MEP fixtures should be leveled
</td><td>Low</td><td>6/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/7/2021
4:09:36 PM</td><td> </td><td>4/28/2022 9:43:53
AM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18473</td><td>LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Wall painting need to touch up
</td><td>Low</td><td>6/28/2021 12:00:00 PM</td><td>mohamed.sami</td><td>6/7/2021
4:09:47 PM</td><td> </td><td>4/28/2022 9:43:52
AM</td><td>&nbsp;</td><td>MA.18.02.009</td><td>&nbsp;</td>
</tr><tr>
<td>18601</td><td>W.C. LOBBY - Band B</td><td>MU
L20</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Broken edges </td><td>Low</td><td>6/29/2021
12:00:00 PM</td><td>mohamed.sami</td><td>6/8/2021 4:48:11 PM</td><td>
</td><td>4/28/2022 9:43:50
AM</td><td>&nbsp;</td><td>MW.13.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>19113</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;The marked part should be the same
width </td><td>Low</td><td>7/7/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/16/2021 10:54:06 AM</td><td> </td><td>4/28/2022
9:43:47 AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19114</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Screws are missing
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/16/2021
10:54:07 AM</td><td> </td><td>4/28/2022 9:43:46
AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19118</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall -
paint</td><td>General</td><td>&#39;Walls need touch up painting
</td><td>Low</td><td>7/7/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/16/2021
10:54:13 AM</td><td> </td><td>4/28/2022 9:43:44
AM</td><td>Covered</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19454</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Joints between panels not same width
</td><td>Low</td><td>7/15/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/24/2021
11:56:06 AM</td><td> </td><td>4/28/2022 9:43:42
AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19455</td><td>CHILDREN&#39;S MUSEUM - Band B</td><td>MU
L20</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Stainless steel profile need to
fixed horizontally </td><td>Low</td><td>7/15/2021 12:00:00
AM</td><td>mohamed.sami</td><td>6/24/2021 11:56:09 AM</td><td> </td><td>4/28/2022
9:43:41 AM</td><td>&nbsp;</td><td>MK.13.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>19536</td><td>CORRIDOR - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Sealant around metal doors need adjustment
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:24:53 PM</td><td> </td><td>4/28/2022 9:43:39
AM</td><td>&nbsp;</td><td>MS.18.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>19557</td><td>CORRIDOR - Band B</td><td>MU
L20</td><td>Closed</td><td>BOJV (MEP)</td><td>Architectural</td><td>Gypsum
Wall</td><td>General Snag</td><td>&#39;Missing MEP fixtures
</td><td>Low</td><td>7/21/2021 12:00:00 AM</td><td>mohamed.sami</td><td>6/30/2021
1:25:21 PM</td><td> </td><td>4/28/2022 9:43:38
AM</td><td>&nbsp;</td><td>MS.18.02.016</td><td>&nbsp;</td>
</tr><tr>
<td>20139</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire fighting
system</td><td>High</td><td>8/10/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/3/2021 11:44:47 AM</td><td> </td><td>4/28/2022
9:28:47 AM</td><td>&nbsp;</td><td>MS.23.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>20292</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>GENERAL
SUPPORTS</td><td>Arrangement is not vertical / horizontal</td><td>&#39;Missing fire
fighting system </td><td>High</td><td>8/11/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/4/2021 12:57:47 PM</td><td> </td><td>4/28/2022
9:26:02 AM</td><td>&nbsp;</td><td>MS.18.2A.012</td><td>&nbsp;</td>
</tr><tr>
<td>28286</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct penetration need to be checked and repair.
</td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:47:48 AM</td><td> </td><td>4/28/2022 9:18:59
AM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28285</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct penetration throw wall need to be checked.
</td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:47:46 AM</td><td> </td><td>4/28/2022 9:17:50
AM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>12147</td><td>AHU-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV QC
MEP</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Cover of control panel for fcu </td><td>High</td><td>10/11/2020
12:00:00 PM</td><td>ahmedsalem</td><td>10/4/2020 1:08:04 PM</td><td>
</td><td>4/28/2022 9:16:47
AM</td><td>&nbsp;</td><td>MS.17.01.001</td><td>&nbsp;</td>
</tr><tr>

<td>25430</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing sealant for movement joint between stone
and concrete base</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>12/7/2021 10:18:17 AM</td><td> </td><td>4/28/2022 8:36:13
AM</td><td>Done</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>20797</td><td>SERVICE TUNNEL (B)-Band A-B.O.H</td><td>MU
L10</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>MEP-Mechanical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Cleaning &amp; house keeping
</td><td>High</td><td>8/17/2021 12:00:00 AM</td><td>ahmedsalem</td><td>8/10/2021
12:09:26 PM</td><td> </td><td>4/28/2022 8:07:02
AM</td><td>&nbsp;</td><td>MQ.18.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>25998</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Toothing between tiles should be adjusted
</td><td>Low</td><td>2/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>1/25/2022
11:39:15 AM</td><td> </td><td>4/27/2022 12:44:06
PM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>21307</td><td>AHU</td><td>MU L10</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Damaged insulation </td><td>High</td><td>8/24/2021 12:00:00
PM</td><td>ahmedsalem</td><td>8/17/2021 4:06:52 PM</td><td> </td><td>4/27/2022
12:36:09 PM</td><td>&nbsp;</td><td>MS.19.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>9676</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;General snag missing fire
extinguishers </td><td>High</td><td>7/28/2020 12:00:00
PM</td><td>ahmedsalem</td><td>7/21/2020 11:57:06 AM</td><td> </td><td>4/27/2022
12:30:46 PM</td><td>&nbsp;</td><td>MS.13.0G.008</td><td>&nbsp;</td>
</tr><tr>
<td>16379</td><td>AHU / PLANT</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguishers
</td><td>High</td><td>2/21/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>2/14/2021 3:08:08 PM</td><td> </td><td>4/27/2022 12:18:44
PM</td><td>&nbsp;</td><td>MS.14.0G.002</td><td>&nbsp;</td>
</tr><tr>
<td>19965</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Missing handle of access doors of
AHU</td><td>High</td><td>8/5/2021 12:00:00 PM</td><td>ahmedsalem</td><td>7/29/2021
1:04:25 PM</td><td> </td><td>4/27/2022 12:16:23
PM</td><td>&nbsp;</td><td>MS.18.2A.005</td><td>&nbsp;</td>
</tr><tr>
<td>20269</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Air Handling
Units</td><td>General Snag</td><td>&#39;Touch up painting for valves wheel
</td><td>High</td><td>8/11/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/4/2021
12:57:08 PM</td><td> </td><td>4/27/2022 12:11:40
PM</td><td>&nbsp;</td><td>MS.23.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>21983</td><td>CORE B1</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>General Snag</td><td>&#39;Cleaning and touch up painting for
cabinet </td><td>High</td><td>8/30/2021 12:00:00
AM</td><td>ahmedsalem</td><td>8/23/2021 1:36:57 PM</td><td> </td><td>4/27/2022
12:09:37 PM</td><td>&nbsp;</td><td>MC.23.2A.B11</td><td>&nbsp;</td>
</tr><tr>
<td>28289</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Drainage
System</td><td>General Snag</td><td>&#39;FCU condensate water trap shall be
reviewed. </td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:47:55 AM</td><td> </td><td>4/27/2022 12:05:37
PM</td><td>&nbsp;</td><td>MW.18.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>16400</td><td>W.C. LOBBY</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>Fire
Extinguishers</td><td>Equipment</td><td>&#39;Missing fire extinguishers
</td><td>High</td><td>2/21/2021 12:00:00 PM</td><td>Kriton Katsamenis
</td><td>2/14/2021 3:09:31 PM</td><td> </td><td>4/27/2022 12:04:31
PM</td><td>&nbsp;</td><td>MG.14.0G.004</td><td>&nbsp;</td>
</tr><tr>
<td>22034</td><td>FIRE CONTROL ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Panel schedule should be updated
</td><td>High</td><td>8/30/2021 12:00:00 AM</td><td>Sameh Ibrahim
El-Sawah</td><td>8/23/2021 3:57:15 PM</td><td> </td><td>4/27/2022 11:51:00
AM</td><td>&nbsp;</td><td>MB.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22070</td><td>IT ROOM</td><td>MU GF
</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;Panel schedules not existing and should be
updated and missing labels in the panels</td><td>High</td><td>8/30/2021 12:00:00
AM</td><td>Sameh Ibrahim El-Sawah</td><td>8/23/2021 3:57:52 PM</td><td>
</td><td>4/27/2022 11:50:59
AM</td><td>&nbsp;</td><td>MS.14.0G.003</td><td>&nbsp;</td>
</tr><tr>
<td>10514</td><td>EMERGENCY LIGHTING</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Remove scaffolding &amp; storage material/
floor need repair </td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:14:25 PM</td><td> </td><td>4/27/2022 11:40:55
AM</td><td>Done.</td><td>MS.18.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>10516</td><td>EMERGENCY LIGHTING</td><td>MU
L25</td><td>Closed</td><td>Al-Kuhaimi Metal Industries Company,
Ltd.</td><td>Architectural</td><td>Doors</td><td>General Snag</td><td>&#39;Missing
sealant around metal door </td><td>Low</td><td>10/3/2020 12:00:00
AM</td><td>Michael Mahfouz</td><td>9/12/2020 1:14:29 PM</td><td> </td><td>4/27/2022
11:40:54 AM</td><td>Done.</td><td>MS.18.2A.013</td><td>&nbsp;</td>
</tr><tr>
<td>10536</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Wall need repair around MEP Fixtures
</td><td>Low</td><td>10/3/2020 12:00:00 AM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:15:14 PM</td><td> </td><td>4/27/2022 11:40:52
AM</td><td>Done.</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>13610</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Concrete wall need cleaning </td><td>Low</td><td>12/14/2020
12:00:00 AM</td><td>Kerolos Nagy Tawfik</td><td>11/23/2020 3:45:20 PM</td><td>
</td><td>4/27/2022 11:40:51
AM</td><td>Done.</td><td>MS.18.2A.024</td><td>&nbsp;</td>
</tr><tr>
<td>13611</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete flooring need surface preparation
</td><td>Low</td><td>12/14/2020 12:00:00 AM</td><td>Kerolos Nagy
Tawfik</td><td>11/23/2020 3:45:23 PM</td><td> </td><td>4/27/2022 11:40:49
AM</td><td>Done.</td><td>MS.18.2A.024</td><td>&nbsp;</td>
</tr><tr>
<td>16706</td><td>DELIVERY LOBBY</td><td>MU
BA</td><td>Closed</td><td>BOJV
(MEP)</td><td>Architectural</td><td>Signage</td><td>Not
Installed/Completed</td><td>&#39;Inclined Signage need fixed properly and should be
vertically</td><td>Low</td><td>3/28/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>3/7/2021 3:54:36 PM</td><td> </td><td>4/27/2022 11:29:38
AM</td><td>&nbsp;</td><td>CQ.07.0B.002</td><td>&nbsp;</td>
</tr><tr>
<td>13790</td><td>IT 2</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Missing sealant around mep Fixtures
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:40:46 AM</td><td> </td><td>4/27/2022 11:28:45
AM</td><td>&nbsp;</td><td>MS.18.2A.022</td><td>&nbsp;</td>
</tr><tr>
<td>16995</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Stone Tiles are missing </td><td>Low</td><td>4/1/2021 12:00:00
PM</td><td>Adel Nassrat</td><td>3/11/2021 12:32:38 PM</td><td> </td><td>4/27/2022
11:27:44 AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>16996</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Discoloration between tiles </td><td>Low</td><td>4/1/2021
12:00:00 PM</td><td>Adel Nassrat</td><td>3/11/2021 12:32:41 PM</td><td>
</td><td>4/27/2022 11:26:39
AM</td><td>&nbsp;</td><td>MN.13.01.001</td><td>&nbsp;</td>
</tr><tr>
<td>11702</td><td>FIRST AID 2</td><td>MU GF
</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Wall
Painting</td><td>General Snag</td><td>&#39;Crack at gypsum wall - corner not
aligned </td><td>Low</td><td>10/18/2020 12:00:00 PM</td><td>Adel
Nassrat</td><td>9/27/2020 4:40:18 PM</td><td> </td><td>4/27/2022 11:12:07
AM</td><td>&nbsp;</td><td>MG.12.0G.007</td><td>&nbsp;</td>
</tr><tr>
<td>14304</td><td>TB RO</td><td>TB
RO</td><td>Closed</td><td>BASCO Industrial</td><td>Architectural</td><td>Staircase
Handrail</td><td>Overall finishes</td><td>&#39;Glazed balustrade is missing and not
properly fixed.</td><td>Low</td><td>1/13/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>12/23/2020 2:18:56 PM</td><td> </td><td>4/27/2022 10:28:36
AM</td><td>&nbsp;</td><td>Ticketing Building Roof</td><td>&nbsp;</td>
</tr><tr>
<td>22444</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/29/2021
3:13:40 PM</td><td> </td><td>4/27/2022 10:28:35 AM</td><td>&nbsp;</td><td>Part
2</td><td>&nbsp;</td>
</tr><tr>
<td>22446</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Edges cutting should be aligned and
adjusted </td><td>Low</td><td>9/19/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>8/29/2021 3:13:44 PM</td><td> </td><td>4/27/2022 10:28:34
AM</td><td>&nbsp;</td><td>Part 2</td><td>&nbsp;</td>
</tr><tr>
<td>22558</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Poor application of grout around linear drain</td><td>&#39;Poor
grouting should be repaired </td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>8/30/2021 11:04:56 AM</td><td> </td><td>4/27/2022 10:28:33
AM</td><td>&nbsp;</td><td>Part 5</td><td>&nbsp;</td>
</tr><tr>
<td>22580</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>Stain/scratch on floor</td><td>&#39;Stains should be removed
</td><td>Low</td><td>9/22/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/1/2021
10:49:14 AM</td><td> </td><td>4/27/2022 10:28:33 AM</td><td>&nbsp;</td><td>Part
2</td><td>&nbsp;</td>
</tr><tr>
<td>22582</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>S/S trimmer flush</td><td>&#39;Metal trim should be flush with stone
level</td><td>Low</td><td>9/22/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/1/2021
10:49:16 AM</td><td> </td><td>4/27/2022 10:28:32 AM</td><td>&nbsp;</td><td>Part
2</td><td>&nbsp;</td>
</tr><tr>
<td>22588</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Stains should be removed and cleaning
</td><td>Low</td><td>9/8/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/1/2021
10:49:24 AM</td><td> </td><td>4/27/2022 10:28:31 AM</td><td>&nbsp;</td><td>Part
5</td><td>&nbsp;</td>
</tr><tr>
<td>22835</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>10/3/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/12/2021
10:48:03 AM</td><td> </td><td>4/27/2022 10:28:30 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22837</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Missing sealant should be applied
</td><td>Low</td><td>10/3/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/12/2021
10:48:06 AM</td><td> </td><td>4/27/2022 10:28:29 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>22874</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Missing tiles should be installed
</td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/13/2021
11:22:01 AM</td><td> </td><td>4/27/2022 10:28:28 AM</td><td>&nbsp;</td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>22877</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>grouting quality</td><td>&#39;Metal trim should be flashed with stone
flooring </td><td>Low</td><td>10/4/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/13/2021 11:22:07 AM</td><td> </td><td>4/27/2022 10:28:27
AM</td><td>&nbsp;</td><td>Part 8</td><td>&nbsp;</td>
</tr><tr>

<td>24908</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Area to be snagged after removing cranes and finalizing remaining
works </td><td>Low</td><td>11/30/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/9/2021 11:51:51 AM</td><td> </td><td>4/27/2022 10:28:26
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24924</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken /missing tiles should be replaced /installed
</td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/10/2021
11:26:21 AM</td><td> </td><td>4/27/2022 10:28:25
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24931</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced </td><td>Low</td><td>12/1/2021
12:00:00 AM</td><td>Amr Nofal</td><td>11/10/2021 11:26:33 AM</td><td>
</td><td>4/27/2022 10:28:24 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25003</td><td>Sculpture</td><td>Sculpture</td><td>Closed</td><td>Hydrogreen</
td><td>Architectural</td><td>General Snag</td><td>General Snag</td><td>&#39;Missing
plants should be installed </td><td>Low</td><td>12/1/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/10/2021 4:00:14 PM</td><td> </td><td>4/27/2022 10:28:23
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26152</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Edge
should be aligned </td><td>Low</td><td>3/8/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/15/2022 1:31:42 PM</td><td> </td><td>4/27/2022 10:28:15
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26154</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
grouting should be same color and width </td><td>Low</td><td>3/8/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>2/15/2022 1:31:47 PM</td><td> </td><td>4/27/2022
10:28:14 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26155</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Joints
between flooring and cladding should be same and closed
</td><td>Low</td><td>3/8/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>2/15/2022
1:31:50 PM</td><td> </td><td>4/27/2022 10:28:13
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>26230</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Missing sealant should be filled and adjustment
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
11:46:53 AM</td><td> </td><td>4/27/2022 10:28:12
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26287</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles </td><td>Low</td><td>3/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/22/2022 11:24:13 AM</td><td> </td><td>4/27/2022
10:28:12 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26291</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles </td><td>Low</td><td>3/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/22/2022 11:24:45 AM</td><td> </td><td>4/27/2022
10:28:10 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26340</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Poor grouting for joints should be repaired
</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022
3:29:03 PM</td><td> </td><td>4/27/2022 10:28:10
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26359</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022
3:29:24 PM</td><td> </td><td>4/27/2022 10:28:09
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26364</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Toothing between tiles should be
leveled.</td><td>Low</td><td>3/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/22/2022 3:29:32 PM</td><td> </td><td>4/27/2022
10:28:07 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26367</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Broken tiles should be replaced/repaired
</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/22/2022
3:29:37 PM</td><td> </td><td>4/27/2022 10:28:07
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26377</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Cracked grouting should be adjusted
</td><td>Low</td><td>3/2/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
11:21:33 AM</td><td> </td><td>4/27/2022 10:28:06
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26388</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Fold line should be extended on marked tile
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
11:21:56 AM</td><td> </td><td>4/27/2022 10:28:05
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26398</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing sealant at movement joint between stone
and concrete base </td><td>Low</td><td>3/16/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/23/2022 11:22:17 AM</td><td> </td><td>4/27/2022
10:28:04 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26536</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing grouting for joints
</td><td>Low</td><td>3/17/2022 12:00:00 PM</td><td>mohamed.sami</td><td>2/24/2022
2:22:53 PM</td><td> </td><td>4/27/2022 10:28:03
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26593</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/20/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/27/2022
3:12:12 PM</td><td> </td><td>4/27/2022 10:28:02
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26594</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing sealant between stone flooring and fence
base</td><td>Low</td><td>3/20/2022 12:00:00
PM</td><td>mohamed.sami</td><td>2/27/2022 3:12:14 PM</td><td> </td><td>4/27/2022
10:28:01 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26603</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Poor grouting should be adjusted
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
11:12:06 AM</td><td> </td><td>4/27/2022 10:28:00
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26606</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
11:12:14 AM</td><td> </td><td>4/27/2022 10:27:59
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26607</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Bitted tiles should be treated
</td><td>Low</td><td>3/21/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/28/2022
11:12:17 AM</td><td> </td><td>4/27/2022 10:27:58
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26656</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken edges should be repaired </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 10:31:40 AM</td><td>
</td><td>4/27/2022 10:27:56 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26659</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken edges should be repaired </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 10:31:45 AM</td><td>
</td><td>4/27/2022 10:27:54 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26736</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/22/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022
3:45:43 PM</td><td> </td><td>4/27/2022 10:27:53
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26874</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
10:31:13 AM</td><td> </td><td>4/27/2022 10:27:52
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26875</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing sealant for movement joint
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
10:31:15 AM</td><td> </td><td>4/27/2022 10:27:51
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26877</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Gap between metal trim and stone not consistent
</td><td>Low</td><td>3/23/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/2/2022
10:31:17 AM</td><td> </td><td>4/27/2022 10:27:51
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27097</td><td>Obelisk</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing grouting for marked joints
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
11:08:18 AM</td><td> </td><td>4/27/2022 10:27:50
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>27110</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Missing grouting around stainless steel columns
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
11:09:02 AM</td><td> </td><td>4/27/2022 10:27:49
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27114</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
11:09:09 AM</td><td> </td><td>4/27/2022 10:27:48
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27193</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Toothing between stone tiles
</td><td>Low</td><td>3/24/2022 12:00:00 AM</td><td>mohamed.sami</td><td>3/3/2022
3:01:46 PM</td><td> </td><td>4/27/2022 10:27:47
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27234</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Movement joint need cleaning and reseal
</td><td>Low</td><td>3/27/2022 12:00:00 AM</td><td>Marios Ioannou,</td><td>3/6/2022
4:50:55 PM</td><td> </td><td>4/27/2022 10:27:46
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>25954</td><td>Grand Stair-Band D</td><td>MU
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Discoloration between tiles</td><td>Low</td><td>2/14/2022
12:00:00 AM</td><td>mohamed.sami</td><td>1/24/2022 12:07:49 PM</td><td>
</td><td>4/27/2022 9:49:41 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>25432</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>Floor stone dry
area</td><td>&#39;Missing stone for water feature should be installed
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>12/7/2021 10:18:24 AM</td><td> </td><td>4/27/2022 9:05:49
AM</td><td>Done</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>13701</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV QC
MEP</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Duct supports must be separate from fire fighting supports
</td><td>High</td><td>12/7/2020 12:00:00 PM</td><td>ahmedsalem</td><td>11/30/2020
12:00:30 PM</td><td> </td><td>4/26/2022 11:45:54
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>19989</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>INSULATION</td><td>Items are
damaged</td><td>&#39;Missing foster and this branch needs to be reinsulated
</td><td>High</td><td>8/5/2021 12:00:00 PM</td><td>ahmedsalem</td><td>7/29/2021
1:05:20 PM</td><td> </td><td>4/26/2022 11:45:53
AM</td><td>&nbsp;</td><td>MS.18.2A.006</td><td>&nbsp;</td>
</tr><tr>
<td>28283</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Gauges stems shall be insulated.
</td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:47:41 AM</td><td> </td><td>4/26/2022 11:45:50
AM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28309</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (MEP)</td><td>MEP-Mechanical</td><td>GENERAL
SUPPORTS</td><td>Arrangement is not vertical / horizontal</td><td>&#39;All FF pipes
need touchup painting. </td><td>Medium</td><td>4/29/2022 12:00:00
AM</td><td>Mohamed ElMahalawy</td><td>4/19/2022 11:48:36 AM</td><td>
</td><td>4/26/2022 11:45:49
AM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28318</td><td>EQUIPMENT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Missing HILTI labels for all trades penetrations.
</td><td>High</td><td>4/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:49:24 AM</td><td> </td><td>4/26/2022 11:45:47
AM</td><td>&nbsp;</td><td>MS.24.2A.002</td><td>&nbsp;</td>
</tr><tr>
<td>8003</td><td>PLANT</td><td>CCB
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>CABLE
LADDER</td><td>Alignment and Level not followed</td><td>&#39;MSD motor is not
connected </td><td>High</td><td>1/15/2020 12:00:00
AM</td><td>ahmedsalem</td><td>1/8/2020 4:11:47 PM</td><td> </td><td>4/26/2022
11:13:59 AM</td><td>&nbsp;</td><td>CS.07.03.007</td><td>&nbsp;</td>
</tr><tr>
<td>12874</td><td>ROOF BRIDGE</td><td>CCB
L30</td><td>Closed</td><td>STS</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>11/8/2020 12:00:00
AM</td><td>Ahmed.Galal</td><td>11/1/2020 11:48:00 AM</td><td> </td><td>4/26/2022
11:13:56 AM</td><td>&nbsp;</td><td>CX.02.03.001</td><td>&nbsp;</td>
</tr><tr>
<td>16130</td><td>CORE B5
(STAIR)</td><td>CCB
L20</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>2/17/2021 12:00:00
PM</td><td>Ahmed.Galal</td><td>2/10/2021 3:36:41 PM</td><td> </td><td>4/26/2022
11:13:51 AM</td><td>&nbsp;</td><td>CC.02.02.B51</td><td>&nbsp;</td>
</tr><tr>
<td>17596</td><td>AHU ROOM</td><td>CCB
GF</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>5/11/2021 12:00:00
AM</td><td>Ahmed.Galal</td><td>5/4/2021 1:39:53 PM</td><td> </td><td>4/26/2022
11:13:44 AM</td><td>&nbsp;</td><td>CS.07.0G.005</td><td>&nbsp;</td>
</tr><tr>
<td>18519</td><td>CORE F7</td><td>CCB
L30</td><td>Closed</td><td>Petrokima</td><td>MEP-Electrical</td><td>General
Snag</td><td>General Snag</td><td>&#39;</td><td>High</td><td>6/15/2021 12:00:00
PM</td><td>Ahmed.Galal</td><td>6/8/2021 1:41:17 PM</td><td> </td><td>4/26/2022
11:13:38 AM</td><td>&nbsp;</td><td>CC.03.03.F71</td><td>&nbsp;</td>
</tr><tr>

<td>25431</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone flooring should be cutting aligned
</td><td>Low</td><td>12/28/2021 12:00:00 PM</td><td>Kerolos Nagy
Tawfik</td><td>12/7/2021 10:18:20 AM</td><td> </td><td>4/26/2022 11:09:35
AM</td><td>Done.</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>11228</td><td>W.C. LOBBY</td><td>CCB
GF</td><td>Closed</td><td>Form</td><td>Architectural</td><td>Cubicle
Partions</td><td>Visible repair</td><td>&#39;6th bathroom should touch up for
marked damaged HBL or replace it</td><td>Low</td><td>10/13/2020 12:00:00
PM</td><td>Marios Ioannou,</td><td>9/22/2020 12:14:08 PM</td><td>
</td><td>4/26/2022 10:54:38
AM</td><td>&nbsp;</td><td>CW.08.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>11392</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Suspended Ceiling Tile</td><td>General
Snag</td><td>&#39;Hole need cover or cutting well </td><td>Low</td><td>10/14/2020
12:00:00 AM</td><td>Marios Ioannou,</td><td>9/23/2020 12:13:47 PM</td><td>
</td><td>4/26/2022 10:54:37
AM</td><td>&nbsp;</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>14789</td><td>Land of Egypt - Level +42.00</td><td>Land of
Egypt</td><td>Closed</td><td>GEOTECH Tensar</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged keystone
</td><td>Low</td><td>2/2/2021 12:00:00 PM</td><td>aymanhaddadin</td><td>1/13/2021
7:52:50 AM</td><td> </td><td>4/26/2022 10:54:35 AM</td><td>&nbsp;</td><td>Land of
Egypt - Level +42.00</td><td>&nbsp;</td>
</tr><tr>
<td>15403</td><td>ENTRANCE VESTIBULE EAST</td><td>CCB
L20</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs cleaning and adjustment
</td><td>High</td><td>2/2/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>1/26/2021 4:22:53 PM</td><td> </td><td>4/26/2022 10:54:34
AM</td><td>&nbsp;</td><td>CA.08.02.001</td><td>&nbsp;</td>
</tr><tr>
<td>15406</td><td>AUDITORIUM ENTRANCE VESTIBULE</td><td>CCB
L20</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling tiles needs adjustment/leveling needs adjustment
</td><td>High</td><td>2/2/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>1/26/2021 4:23:02 PM</td><td> </td><td>4/26/2022 10:54:33
AM</td><td>&nbsp;</td><td>CA.07.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>15422</td><td>CONFERENCE BRIDGE</td><td>CCB
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Cleaning and adjustment for metal
ceiling </td><td>Low</td><td>2/16/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>1/26/2021 4:24:59 PM</td><td> </td><td>4/26/2022 10:54:32
AM</td><td>&nbsp;</td><td>CA.08.02.003</td><td>&nbsp;</td>
</tr><tr>
<td>15431</td><td>ENVIRO. LOBBY</td><td>CCB
L20</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Cleaning of tiles and alignment of gap
surrounding false ceiling </td><td>Low</td><td>2/16/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>1/26/2021 4:25:23 PM</td><td> </td><td>4/26/2022 10:54:31
AM</td><td>&nbsp;</td><td>CA.08.02.004</td><td>&nbsp;</td>
</tr><tr>
<td>15779</td><td>ENVIRO.LOBBY</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Leveling needs adjustment/color
discoloration </td><td>High</td><td>2/10/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>2/3/2021 4:03:47 PM</td><td> </td><td>4/26/2022 10:54:30
AM</td><td>&nbsp;</td><td>CA.08.01.006</td><td>&nbsp;</td>
</tr><tr>
<td>16097</td><td>Core B5</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Screws should be removed
</td><td>Low</td><td>3/2/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>2/9/2021
4:49:58 PM</td><td> </td><td>4/26/2022 10:54:29
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>16143</td><td>CORE B4</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Adjustment of ceiling tiles
joints </td><td>Low</td><td>3/3/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>2/10/2021 3:57:07 PM</td><td> </td><td>4/26/2022 10:54:28
AM</td><td>&nbsp;</td><td>CC.07.01.B41</td><td>&nbsp;</td>
</tr><tr>
<td>16163</td><td>CORE B4</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs cleaning and adjustment/edge is not aligned
</td><td>Low</td><td>3/3/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>2/10/2021
3:58:27 PM</td><td> </td><td>4/26/2022 10:54:28
AM</td><td>&nbsp;</td><td>CC.07.0G.B41</td><td>&nbsp;</td>
</tr><tr>
<td>16168</td><td>CORE B4</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs adjustment /red mark should be cleaned
</td><td>Low</td><td>3/3/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>2/10/2021
3:58:38 PM</td><td> </td><td>4/26/2022 10:54:27
AM</td><td>&nbsp;</td><td>CC.07.0G.B41</td><td>&nbsp;</td>
</tr><tr>
<td>16169</td><td>CORE B4</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Damaged tile should be replaced </td><td>Low</td><td>3/3/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>2/10/2021 3:58:39 PM</td><td>
</td><td>4/26/2022 10:54:26
AM</td><td>&nbsp;</td><td>CC.07.0G.B41</td><td>&nbsp;</td>
</tr><tr>
<td>16176</td><td>CORE B4</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs adjustment/red mark should be cleaned
</td><td>Low</td><td>3/3/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>2/10/2021
3:59:00 PM</td><td> </td><td>4/26/2022 10:54:25
AM</td><td>&nbsp;</td><td>CC.07.01.B41</td><td>&nbsp;</td>
</tr><tr>
<td>16248</td><td>Food Court</td><td>Food
Court</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Metal plate (S/S
cladding)</td><td>General Snag</td><td>&#39;General cleaning for the metal mesh/the
marked tile needs adjustment </td><td>Low</td><td>3/4/2021 12:00:00
PM</td><td>Marios Ioannou,</td><td>2/11/2021 11:15:44 AM</td><td>
</td><td>4/26/2022 10:54:24 AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>17332</td><td>ESCALATOR AREA</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Cleaning and complete missing
tiles</td><td>Low</td><td>5/3/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>4/12/2021 3:07:54 PM</td><td> </td><td>4/26/2022 10:54:23
AM</td><td>&nbsp;</td><td>CX.08.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>17345</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;General cleaning is needed for ceiling
</td><td>Low</td><td>5/3/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>4/12/2021
3:08:16 PM</td><td> </td><td>4/26/2022 10:54:22
AM</td><td>&nbsp;</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>18566</td><td>CORE D4</td><td>CCB
GF</td><td>Closed</td><td>Al Dhabi
Contracting</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling tiles should be adjusted </td><td>Low</td><td>6/29/2021
12:00:00 PM</td><td>Marios Ioannou,</td><td>6/8/2021 2:48:23 PM</td><td>
</td><td>4/26/2022 10:54:21
AM</td><td>&nbsp;</td><td>CC.08.0G.D41</td><td>&nbsp;</td>
</tr><tr>
<td>18885</td><td>CORE F6</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Saggaing</td><td>&#39;Cleaning for false ceiling tiles
</td><td>Low</td><td>7/4/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>6/13/2021
12:10:29 PM</td><td> </td><td>4/26/2022 10:54:20
AM</td><td>&nbsp;</td><td>CC.08.01.F61</td><td>&nbsp;</td>
</tr><tr>
<td>18931</td><td>AUDITORIUM LOBBY</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling Tiles</td><td>Alignment of tiles</td><td>&#39;Metal trim need to be aligned
</td><td>Low</td><td>7/5/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>6/14/2021
12:06:44 PM</td><td> </td><td>4/26/2022 10:54:20
AM</td><td>&nbsp;</td><td>CA.08.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>18932</td><td>EDUCATIONAL AUDITORIUM</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Ceiling works are not finished yet
</td><td>Low</td><td>7/5/2021 12:00:00 PM</td><td>Marios Ioannou,</td><td>6/14/2021
12:06:44 PM</td><td> </td><td>4/26/2022 10:54:19
AM</td><td>&nbsp;</td><td>CE.08.01.003</td><td>&nbsp;</td>
</tr><tr>
<td>18933</td><td>AUDITORIUM LOBBY</td><td>CCB
L10</td><td>Closed</td><td>Al Dhabi Contracting</td><td>Architectural</td><td>False
Ceiling</td><td>General snags</td><td>&#39;Ceiling should be cleaned and adjusted
</td><td>Low</td><td>7/5/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>6/14/2021
12:06:46 PM</td><td> </td><td>4/26/2022 10:54:18
AM</td><td>&nbsp;</td><td>CA.08.01.002</td><td>&nbsp;</td>
</tr><tr>
<td>19875</td><td>COMPUTER ROOM</td><td>CCB
L10</td><td>Closed</td><td>Petrokima</td><td>Architectural</td><td>Ceiling</
td><td>General Snag</td><td>&#39;MEP fixture need to fixed properly
</td><td>Low</td><td>8/15/2021 12:00:00 AM</td><td>ahmedsalem</td><td>7/25/2021
4:46:36 PM</td><td> </td><td>4/26/2022 10:54:17
AM</td><td>&nbsp;</td><td>CE.07.01.008</td><td>&nbsp;</td>
</tr><tr>
<td>21431</td><td>North Facade - CCB</td><td>CCB North
Facade</td><td>Closed</td><td>Alico</td><td>Architectural</td><td>Roof -
Cladding</td><td>Needs cleaning</td><td>&#39;General cleaning
</td><td>Low</td><td>9/8/2021 12:00:00 AM</td><td>Marios Ioannou,</td><td>8/18/2021
11:43:25 AM</td><td> </td><td>4/26/2022 10:54:16 AM</td><td>&nbsp;</td><td>North
Facade - CCB</td><td>&nbsp;</td>
</tr><tr>
<td>21994</td><td>RETAIL ARCADE</td><td>CCB
GF</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Marked gap should be closed </td><td>Low</td><td>9/13/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>8/23/2021 1:53:32 PM</td><td>
</td><td>4/26/2022 10:54:15
AM</td><td>&nbsp;</td><td>CX.07.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>22463</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Inspection for this part after removing the
storage material and equipment </td><td>Low</td><td>9/19/2021 12:00:00
PM</td><td>Amr Nofal</td><td>8/29/2021 3:14:13 PM</td><td> </td><td>4/26/2022
10:54:14 AM</td><td>&nbsp;</td><td>Part 1</td><td>&nbsp;</td>
</tr><tr>
<td>22511</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>Stained</td><td>&#39;Stains should be removed
</td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/30/2021
11:04:16 AM</td><td> </td><td>4/26/2022 10:54:13 AM</td><td>&nbsp;</td><td>Part
6</td><td>&nbsp;</td>
</tr><tr>
<td>22541</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Sealant is missing and should be adjusted
</td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/30/2021
11:04:42 AM</td><td> </td><td>4/26/2022 10:54:12 AM</td><td>&nbsp;</td><td>Part
5</td><td>&nbsp;</td>
</tr><tr>
<td>22543</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Edges cutting should be aligned and adjusted
</td><td>Low</td><td>9/20/2021 12:00:00 PM</td><td>Amr Nofal</td><td>8/30/2021
11:04:44 AM</td><td> </td><td>4/26/2022 10:54:11 AM</td><td>&nbsp;</td><td>Part
5</td><td>&nbsp;</td>
</tr><tr>
<td>22622</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>9/22/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/1/2021
10:50:12 AM</td><td> </td><td>4/26/2022 10:54:10 AM</td><td>&nbsp;</td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>22628</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Final snag after removing storage material
and crane </td><td>Low</td><td>9/22/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/1/2021 10:50:22 AM</td><td> </td><td>4/26/2022 10:54:09
AM</td><td>&nbsp;</td><td>Part 1</td><td>&nbsp;</td>
</tr><tr>
<td>22855</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Flooring
- stone</td><td>General</td><td>&#39;This part not accessible
</td><td>Low</td><td>10/3/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/12/2021
10:48:34 AM</td><td> </td><td>4/26/2022 10:54:08 AM</td><td>&nbsp;</td><td>Part
7</td><td>&nbsp;</td>
</tr><tr>
<td>23643</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Final snag after removing storage material
and crane </td><td>Low</td><td>10/13/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/22/2021 11:09:52 AM</td><td> </td><td>4/26/2022 10:54:07
AM</td><td>&nbsp;</td><td>Part 7</td><td>&nbsp;</td>
</tr><tr>
<td>24790</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>Hydrogreen</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Missing planting should be installed and
dead should be replaced </td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/7/2021 11:32:12 AM</td><td> </td><td>4/26/2022 10:54:07
AM</td><td>&nbsp;</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>25120</td><td>Parking Level-P5</td><td>Parking
Levels</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Wrong interlock
tiling</td><td>Low</td><td>12/5/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/14/2021 10:30:50 AM</td><td> </td><td>4/26/2022 10:54:06
AM</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>25151</td><td>Parking Level-P1</td><td>Parking
Levels</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Staircase Handrail</td><td>Overall
finishes</td><td>&#39;Handrail should be cleaned and stains should be removed
</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/15/2021
10:16:54 AM</td><td> </td><td>4/26/2022 10:54:04
AM</td><td>&nbsp;</td><td>P1</td><td>&nbsp;</td>
</tr><tr>
<td>25155</td><td>Parking Level-P2</td><td>Parking
Levels</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Missing stone should be installed </td><td>Low</td><td>12/6/2021
12:00:00 AM</td><td>Amr Nofal</td><td>11/15/2021 10:16:58 AM</td><td>
</td><td>4/26/2022 10:54:04 AM</td><td>&nbsp;</td><td>P2</td><td>&nbsp;</td>
</tr><tr>
<td>25179</td><td>Parking Level-P2</td><td>Parking
Levels</td><td>Closed</td><td>Hydrogreen</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Dead plants should be replaced
</td><td>Low</td><td>12/6/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/15/2021
10:17:26 AM</td><td> </td><td>4/26/2022 10:54:03
AM</td><td>&nbsp;</td><td>P2</td><td>&nbsp;</td>
</tr><tr>
<td>25270</td><td>Service Road 2</td><td>Land of
Egypt</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Kerb stone surface should be cleaned
</td><td>Low</td><td>12/9/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/18/2021
9:32:54 AM</td><td> </td><td>4/26/2022 10:54:02 AM</td><td>&nbsp;</td><td>Service
Road 2</td><td>&nbsp;</td>
</tr><tr>
<td>25271</td><td>Service Road 2</td><td>Land of
Egypt</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Mortar in joints between kerb stone should
be applied properly </td><td>Low</td><td>12/9/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/18/2021 9:32:58 AM</td><td> </td><td>4/26/2022 10:54:01
AM</td><td>&nbsp;</td><td>Service Road 2</td><td>&nbsp;</td>
</tr><tr>
<td>25272</td><td>Service Road 2</td><td>Land of
Egypt</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged kerb stone should be repaired /
replaced </td><td>Low</td><td>12/9/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/18/2021 9:33:03 AM</td><td> </td><td>4/26/2022 10:54:00
AM</td><td>&nbsp;</td><td>Service Road 2</td><td>&nbsp;</td>
</tr><tr>

<td>26215</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken tiles should be replaced/
repaired</td><td>Low</td><td>3/14/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/21/2022 11:38:23 AM</td><td> </td><td>4/26/2022
10:53:59 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26278</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Toothing between tiles </td><td>Low</td><td>3/15/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/22/2022 11:23:59 AM</td><td> </td><td>4/26/2022
10:53:58 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>26312</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Surface preparation is needed for marked parts
(along the fence)</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/22/2022 12:08:43 PM</td><td> </td><td>4/26/2022 10:53:57
AM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>26322</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Walk way interlock need to clean </td><td>Low</td><td>3/15/2022
12:00:00 AM</td><td>Marios Ioannou,</td><td>2/22/2022 1:23:42 PM</td><td>
</td><td>4/26/2022 10:53:56 AM</td><td>&nbsp;</td><td>South
Side</td><td>&nbsp;</td>
</tr><tr>
<td>26325</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Adjacent area(left and right) of all construction joints to be
repaired and repaint.</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/22/2022 1:23:48 PM</td><td> </td><td>4/26/2022 10:53:55
AM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>
<td>26327</td><td>Truck Scanner - Surrounding Area </td><td>Truck
Scanner Surrounding Area </td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Repair of the wall paint at the bottom all along the
wall</td><td>Low</td><td>3/15/2022 12:00:00 AM</td><td>Marios
Ioannou,</td><td>2/22/2022 1:23:53 PM</td><td> </td><td>4/26/2022 10:53:54
AM</td><td>&nbsp;</td><td>South Side</td><td>&nbsp;</td>
</tr><tr>

<td>26399</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>General</td><td>&#39;
Broken edges should be repaired </td><td>Low</td><td>3/16/2022 12:00:00
AM</td><td>mohamed.sami</td><td>2/23/2022 2:48:39 PM</td><td> </td><td>4/26/2022
10:53:53 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26403</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
2:49:10 PM</td><td> </td><td>4/26/2022 10:53:52
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26405</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Cleaning stone from paint stains and wheel print
</td><td>Low</td><td>3/16/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/23/2022
2:49:16 PM</td><td> </td><td>4/26/2022 10:53:50
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26470</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Broken edges should be repaired
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
11:16:50 AM</td><td> </td><td>4/26/2022 10:53:46
AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26662</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Broken edges should be repaired </td><td>Low</td><td>3/22/2022
12:00:00 AM</td><td>mohamed.sami</td><td>3/1/2022 10:31:50 AM</td><td>
</td><td>4/26/2022 10:53:45 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>27204</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Stone Floor</td><td>General
Snag</td><td>&#39;Grouting is missing </td><td>Low</td><td>3/27/2022 12:00:00
AM</td><td>Marios Ioannou,</td><td>3/6/2022 4:39:16 PM</td><td> </td><td>4/26/2022
10:53:43 AM</td><td>&nbsp;</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>22734</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Facade -
Stone Cladding</td><td>Chipped/dent</td><td>&#39;Marked edges should be cutting
aligned </td><td>Low</td><td>9/27/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>9/6/2021 3:42:10 PM</td><td> </td><td>4/26/2022 10:18:01
AM</td><td>Done.</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>22807</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall -
stone cladding</td><td>Damages to be rectified or replaced</td><td>&#39;Damaged
tile should be replaced </td><td>Low</td><td>9/29/2021 12:00:00 AM</td><td>Marios
Ioannou,</td><td>9/8/2021 12:16:57 PM</td><td> </td><td>4/26/2022 10:18:00
AM</td><td>Done.</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>
<td>23772</td><td>MU - North Facade</td><td>MU NORTH
FACADE</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Wall</td><td>General Snag</td><td>&#39;Marked gap should be closed marked edge
needs good repair </td><td>Low</td><td>11/4/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/14/2021 3:46:53 PM</td><td> </td><td>4/26/2022 10:17:58
AM</td><td>Done.</td><td>MU - North Facade</td><td>&nbsp;</td>
</tr><tr>

<td>23870</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>General Snag</td><td>General
Snag</td><td>&#39;Metal trim should be flushed with
grating</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:19:32 PM</td><td> </td><td>4/26/2022 10:17:57
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>23902</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>Unilex
Sign
Systems</td><td>Architectural</td><td>Signage</td><td>damaged</td><td>&#39;Damaged
parts should be repaired </td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Marios
Ioannou,</td><td>10/24/2021 12:20:22 PM</td><td> </td><td>4/26/2022 10:17:54
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24287</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>BASCO
Industrial</td><td>Architectural</td><td>Glass partion and door</td><td>General
Snag</td><td>&#39;Copping should be aligned </td><td>Low</td><td>11/16/2021
12:00:00 AM</td><td>Marios Ioannou,</td><td>10/26/2021 4:41:33 PM</td><td>
</td><td>4/26/2022 10:17:51 AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24695</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be replaced
</td><td>Low</td><td>11/8/2021 12:00:00 PM</td><td>mohamed.sami</td><td>11/1/2021
4:35:01 PM</td><td> </td><td>4/26/2022 10:17:48
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>

<td>24697</td><td>Entrance</td><td>Entrance</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring - stone</td><td>Broken, to be
replaced</td><td>&#39;Broken / cracked tiles should be replaced
</td><td>Low</td><td>11/8/2021 12:00:00 PM</td><td>mohamed.sami</td><td>11/1/2021
4:35:05 PM</td><td> </td><td>4/26/2022 10:17:46
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>11713</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Poor repair </td><td>Low</td><td>10/18/2020
12:00:00 PM</td><td>Adel Nassrat</td><td>9/27/2020 4:41:01 PM</td><td>
</td><td>4/26/2022 9:55:49
AM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>13752</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Touch up for repair </td><td>Low</td><td>12/22/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/1/2020 11:39:09 AM</td><td> </td><td>4/26/2022
9:55:47 AM</td><td>&nbsp;</td><td>MS.18.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>13753</td><td>ELEC.</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Surface and touch up
</td><td>Low</td><td>12/22/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:39:13 AM</td><td> </td><td>4/26/2022 9:55:46
AM</td><td>&nbsp;</td><td>MS.18.2A.015</td><td>&nbsp;</td>
</tr><tr>
<td>13781</td><td>W.C. /M</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Ceramic
Wall Tile</td><td>Grout</td><td>&#39;Repair grouting and cleaning - replace damaged
ceramic </td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel
Nassrat</td><td>12/1/2020 11:40:24 AM</td><td> </td><td>4/26/2022 9:55:45
AM</td><td>&nbsp;</td><td>MW.18.2A.001B</td><td>&nbsp;</td>
</tr><tr>
<td>13785</td><td>W.C. LOBBY</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Touch up and cleaning for concrete floor
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:40:33 AM</td><td> </td><td>4/26/2022 9:55:44
AM</td><td>&nbsp;</td><td>MW.18.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13786</td><td>STORAGE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Repair for sealant around pipe</td><td>Low</td><td>12/21/2020
12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020 11:40:35 AM</td><td>
</td><td>4/26/2022 9:55:43
AM</td><td>&nbsp;</td><td>MW.18.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>13787</td><td>STORAGE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Repair for holes </td><td>Low</td><td>12/21/2020 12:00:00
AM</td><td>Adel Nassrat</td><td>12/1/2020 11:40:37 AM</td><td> </td><td>4/26/2022
9:55:42 AM</td><td>&nbsp;</td><td>MW.18.2A.001A</td><td>&nbsp;</td>
</tr><tr>
<td>13810</td><td>IT</td><td>MU L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Blockwork</td><td>General
snag</td><td>&#39;Repair for sealant around electrical pipes
</td><td>Low</td><td>12/21/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/1/2020
11:41:39 AM</td><td> </td><td>4/26/2022 9:55:40
AM</td><td>&nbsp;</td><td>MS.12.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>13892</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Wall</td><td>General
Snag</td><td>&#39;Missing sealant around MEP Fixtures
</td><td>High</td><td>12/9/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/2/2020
11:09:41 AM</td><td> </td><td>4/26/2022 9:55:39
AM</td><td>&nbsp;</td><td>MS.23.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>13893</td><td>ELEC. ROOM</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>Cracks</td><td>&#39;Touch up for floor/general cleaning
</td><td>High</td><td>12/9/2020 12:00:00 AM</td><td>Adel Nassrat</td><td>12/2/2020
11:09:43 AM</td><td> </td><td>4/26/2022 9:55:38
AM</td><td>&nbsp;</td><td>MS.23.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>16264</td><td>VIP RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Scratches on tile should be repaired
</td><td>Low</td><td>2/21/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:00:49 PM</td><td> </td><td>4/26/2022 9:55:37
AM</td><td>&nbsp;</td><td>MV.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>16351</td><td>SCHOLAR RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Grouting joints need adjustment
</td><td>Low</td><td>3/7/2021 12:00:00 PM</td><td>Adel Nassrat</td><td>2/14/2021
2:04:30 PM</td><td> </td><td>4/26/2022 9:55:35
AM</td><td>&nbsp;</td><td>MR.14.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>21118</td><td>CORE B2</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Epoxy
Paint Floor</td><td>Joint finish</td><td>&#39;Repair and adjusted for epoxy
painting floor </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:49:44 AM</td><td> </td><td>4/26/2022 9:55:34
AM</td><td>&nbsp;</td><td>MC.18.2A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21122</td><td>CORE B2</td><td>MU
L25</td><td>Closed</td><td>Schindler</td><td>Architectural</td><td>Cabinet of
Elevator</td><td>General Snag</td><td>&#39;Inspection after removing protection
cover </td><td>Low</td><td>9/7/2021 12:00:00 AM</td><td>Adel
Nassrat</td><td>8/17/2021 10:49:52 AM</td><td> </td><td>4/26/2022 9:55:33
AM</td><td>&nbsp;</td><td>MC.18.2A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>21177</td><td>CORE B2</td><td>MU
L25</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Ceiling</td><td>General
Snag</td><td>&#39;Ceiling needs touch up painting </td><td>Low</td><td>9/7/2021
12:00:00 AM</td><td>Adel Nassrat</td><td>8/17/2021 10:56:43 AM</td><td>
</td><td>4/26/2022 9:55:32
AM</td><td>&nbsp;</td><td>MC.18.2A.B21</td><td>&nbsp;</td>
</tr><tr>
<td>22298</td><td>FIRST AID RECEPTION</td><td>MU GF
</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Sealer roller traces (for all
floor)</td><td>Low</td><td>9/14/2021 12:00:00 PM</td><td>Adel
Nassrat</td><td>8/24/2021 11:50:23 AM</td><td> </td><td>4/26/2022 9:55:28
AM</td><td>&nbsp;</td><td>MG.12.0G.001</td><td>&nbsp;</td>
</tr><tr>
<td>28313</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Repair the insulation around the access door.
</td><td>High</td><td>4/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:49:08 AM</td><td> </td><td>4/23/2022 3:49:47
PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28314</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>Access door
missing</td><td>&#39;Damage in ductwork and insulation.
</td><td>High</td><td>4/26/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:49:11 AM</td><td> </td><td>4/23/2022 3:48:14
PM</td><td>&nbsp;</td><td>MS.24.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>28308</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Ductwork insulation need repair.
</td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:34 AM</td><td> </td><td>4/23/2022 3:47:48
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28296</td><td>PLANT</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>AHU</td><td>Access doors and
lights</td><td>&#39;Duct and insulation need repair.
</td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:48:09 AM</td><td> </td><td>4/23/2022 3:47:31
PM</td><td>&nbsp;</td><td>MS.24.2A.001</td><td>&nbsp;</td>
</tr><tr>
<td>28278</td><td>EQUIPMENT ROOM</td><td>MU
L25</td><td>Closed</td><td>Goppion
Representative</td><td>MEP-Mechanical</td><td>Drainage System</td><td>General
Snag</td><td>&#39;Drainage trap need adjustment and support.
</td><td>Medium</td><td>4/29/2022 12:00:00 AM</td><td>Mohamed
ElMahalawy</td><td>4/19/2022 11:47:17 AM</td><td> </td><td>4/23/2022 3:46:36
PM</td><td>&nbsp;</td><td>MS.13.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>20429</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV
(MEP)</td><td>MEP-Mechanical</td><td>Ductwork</td><td>General
Snag</td><td>&#39;Missing acoustic lining for exhaust duct
</td><td>High</td><td>8/12/2021 12:00:00 PM</td><td>ahmedsalem</td><td>8/5/2021
1:45:21 PM</td><td> </td><td>4/21/2022 12:59:52
PM</td><td>&nbsp;</td><td>MS.23.2A.003</td><td>&nbsp;</td>
</tr><tr>
<td>22624</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor cutting stone edge should be alignment
</td><td>Low</td><td>9/22/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/1/2021
10:50:16 AM</td><td> </td><td>4/21/2022 11:43:25 AM</td><td>Done.</td><td>Part
1</td><td>&nbsp;</td>
</tr><tr>
<td>22678</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor finish should be finished
</td><td>Low</td><td>9/26/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/5/2021
10:19:46 AM</td><td> </td><td>4/21/2022 11:43:24 AM</td><td>Done.</td><td>Part
3</td><td>&nbsp;</td>
</tr><tr>
<td>22747</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
repair at joints</td><td>Low</td><td>9/28/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/7/2021 11:08:58 AM</td><td> </td><td>4/21/2022 11:43:19
AM</td><td>Done.</td><td>Part 6</td><td>&nbsp;</td>
</tr><tr>
<td>22756</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
edges should be repaired </td><td>Low</td><td>9/28/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/7/2021 11:09:21 AM</td><td> </td><td>4/21/2022 11:43:17
AM</td><td>Done.</td><td>Part 6</td><td>&nbsp;</td>
</tr><tr>
<td>22793</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Wall - stone
cladding</td><td>General</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>9/28/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/7/2021
11:11:24 AM</td><td> </td><td>4/21/2022 11:43:16 AM</td><td>Done.</td><td>Part
6</td><td>&nbsp;</td>
</tr><tr>
<td>23024</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Toothing
between tiles </td><td>Low</td><td>10/6/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>9/15/2021 11:31:13 AM</td><td> </td><td>4/21/2022 11:43:14
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23039</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tile should be replaced </td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/15/2021 11:31:37 AM</td><td> </td><td>4/21/2022 11:43:12
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23073</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Cutting
edge should be adjusted </td><td>Low</td><td>10/6/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/15/2021 11:32:35 AM</td><td> </td><td>4/21/2022 11:43:10
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23212</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General
Snag</td><td>&#39;Discoloration between tiles should treated or replaced
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
11:52:26 AM</td><td> </td><td>4/21/2022 11:43:09
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23218</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Broken
tile should be replaced </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:52:41 AM</td><td> </td><td>4/21/2022 11:43:06
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23220</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
repair should be adjusted </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:52:45 AM</td><td> </td><td>4/21/2022 11:43:02
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23231</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Cutting edges should be aligned and
adjusted </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 11:53:14 AM</td><td> </td><td>4/21/2022 11:43:00
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23262</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Toothing
between two tiles</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 12:06:06 PM</td><td> </td><td>4/21/2022 11:42:39
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23268</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El
Sarh</td><td>Architectural</td><td>Stone</td><td>General Snag</td><td>&#39;Poor
grouting should be repaired </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 12:06:17 PM</td><td> </td><td>4/21/2022 11:42:21
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23273</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>El Sarh</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be repaired
</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr Nofal</td><td>9/16/2021
12:06:26 PM</td><td> </td><td>4/21/2022 11:41:39
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23281</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Poor grouting should be
repaired</td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 12:06:40 PM</td><td> </td><td>4/21/2022 11:41:19
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23284</td><td>Recreational Area</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Interface between metal trim and stone
flooring should be closed </td><td>Low</td><td>10/7/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>9/16/2021 12:06:45 PM</td><td> </td><td>4/21/2022 11:40:38
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23608</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Broken tiles should be replaced
</td><td>Low</td><td>10/13/2021 12:00:00 AM</td><td>Amr Nofal</td><td>9/22/2021
11:06:51 AM</td><td> </td><td>4/21/2022 11:40:08 AM</td><td>Done.</td><td>Part
8</td><td>&nbsp;</td>
</tr><tr>
<td>23623</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>HAZ / Marble</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;</td><td>Low</td><td>10/13/2021 12:00:00
PM</td><td>Amr Nofal</td><td>9/22/2021 11:07:19 AM</td><td> </td><td>4/21/2022
11:40:05 AM</td><td>Done.</td><td>Part 7</td><td>&nbsp;</td>
</tr><tr>
<td>23723</td><td> RG</td><td>Recreational
Area</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Stone
Floor</td><td>General Snag</td><td>&#39;Gutter should be cleaned
</td><td>Low</td><td>11/1/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/11/2021
10:37:47 AM</td><td> </td><td>4/21/2022 11:39:52 AM</td><td>Done.</td><td>Part
11</td><td>&nbsp;</td>
</tr><tr>
<td>10548</td><td>SERVICE ZONE</td><td>MU
L25</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>Concrete
Floor</td><td>General Snag</td><td>&#39;Concrete flooring need repair
</td><td>Low</td><td>10/3/2020 12:00:00 PM</td><td>Michael
Mahfouz</td><td>9/12/2020 1:15:49 PM</td><td> </td><td>4/21/2022 11:25:11
AM</td><td>&nbsp;</td><td>MS.18.2A.004</td><td>&nbsp;</td>
</tr><tr>
<td>23820</td><td>Security Fence</td><td>East
Fences</td><td>Closed</td><td>Cochrane</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Inclined post need to be vertical
</td><td>Low</td><td>11/10/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/20/2021
11:52:18 AM</td><td> </td><td>4/21/2022 10:43:54 AM</td><td>Done.</td><td>Security
Fence</td><td>&nbsp;</td>
</tr><tr>
<td>23840</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Interface between kerb stone and interlock
should be flush </td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/24/2021 10:09:29 AM</td><td> </td><td>4/21/2022 10:43:53
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23862</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Marked cracks should be treated
</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/24/2021
10:11:01 AM</td><td> </td><td>4/21/2022 10:43:46
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>23864</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Joints between interlock should be filled
with sand</td><td>Low</td><td>11/14/2021 12:00:00 PM</td><td>Amr
Nofal</td><td>10/24/2021 10:11:04 AM</td><td> </td><td>4/21/2022 10:43:44
AM</td><td>Done.</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24163</td><td>Esplanade Road</td><td>East
Fences</td><td>Closed</td><td>BOJV
(CIV/ARCH)</td><td>Architectural</td><td>Concrete Floor</td><td>General
Snag</td><td>&#39;Cracks should be repaired and treated
</td><td>Low</td><td>11/16/2021 12:00:00 PM</td><td>Amr Nofal</td><td>10/26/2021
11:09:10 AM</td><td> </td><td>4/21/2022 10:43:41 AM</td><td>Done
</td><td>&nbsp;</td><td>&nbsp;</td>
</tr><tr>
<td>24757</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Damaged kerbstone should be repaired/replaced
</td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/7/2021
11:30:30 AM</td><td> </td><td>4/21/2022 10:43:39
AM</td><td>Done.</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>24758</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Interlock and kerbstone are missing
</td><td>Low</td><td>11/14/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/7/2021
11:30:33 AM</td><td> </td><td>4/21/2022 10:43:38
AM</td><td>Done.</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>24761</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General</td><td>&#39;Damaged kerbstone should be repaired/replaced
</td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Amr Nofal</td><td>11/7/2021
11:30:50 AM</td><td> </td><td>4/21/2022 10:43:35
AM</td><td>Done.</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>24777</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Damaged interlock should be repaired /
replaced </td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/7/2021 11:31:50 AM</td><td> </td><td>4/21/2022 10:43:34
AM</td><td>Done.</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>
<td>24783</td><td>North Fence</td><td>North
Fence</td><td>Closed</td><td>BOJV (CIV/ARCH)</td><td>Architectural</td><td>General
Snag</td><td>General Snag</td><td>&#39;Kerb stone should be curved and smoothed
properly </td><td>Low</td><td>11/28/2021 12:00:00 AM</td><td>Amr
Nofal</td><td>11/7/2021 11:32:01 AM</td><td> </td><td>4/21/2022 10:43:31
AM</td><td>Done.</td><td>Sidewalk</td><td>&nbsp;</td>
</tr><tr>

<td>26259</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Stone tiles need cleaning from painting dents
</td><td>Low</td><td>3/14/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/21/2022
3:25:20 PM</td><td> </td><td>4/21/2022 10:43:30
AM</td><td>Done.</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26467</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Poor grouting should be adjusted
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
11:16:42 AM</td><td> </td><td>4/21/2022 10:43:28
AM</td><td>Done.</td><td>PI</td><td>&nbsp;</td>
</tr><tr>

<td>26475</td><td>Piazza</td><td>Piazza</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural</td><td>Flooring -
stone</td><td>General</td><td>&#39;Salted tiles should be treated
</td><td>Low</td><td>3/17/2022 12:00:00 AM</td><td>mohamed.sami</td><td>2/24/2022
11:17:03 AM</td><td> </td><td>4/21/2022 10:43:26 AM</td><td>Comment still
exist.</td><td>PI</td><td>&nbsp;</td>
</tr><tr>
<td>16991</td><td>SPECIAL NEEDS GALLERY-Band
B-Hololens</td><td>MU L10</td><td>Closed</td><td>HAZ /
Marble</td><td>Architectural